HomeMy WebLinkAbout5719.05 S 2024 0913Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 3 Report ID 5719.05 S 2024 0913 Date Fri 9/13/2024 Weather Sunny 65°F Arrival/Departure Time(s) 11:00AM-12:00PM Travel Time (hr)0.5 Project Name Solera Location 2902 NE Sunset Blvd, Renton ESNW Rep., CESCL No., Phone No. & Report Statement Spencer Natario | ECO-3-8262401 | 206.795.1817 “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact Heartland Construction, LLC | Mike Vaughan, Benham Hansen Permit No(s). WAR310291 Reviewed By JB Initials/Date N/A Field Supervisor Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 0.48 inches Precipitation in last 24 hours (approximate): 0.44 inches Phase of active construction (check all that apply): Pre-construction Clearing, demolition, or grading Infrastructure or roads Concrete pours Vertical construction Utilities Off-site improvements Site temporarily stabilized Final stabilization Was water quality sampling part of this inspection? Yes No If “Yes”: •Record results in the table below. •Hanna Turbidity Meter No. 017 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes Report ID 5719.05 S 2024 0913 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N -Construction fence around site perimeter -Silt fences around non-landscaped areas 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck G N -Blocks A and B paved -Quarry spalls at construction entrances for blocks C and D 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams - - N/A 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck G N -Silt fences around blocks with exposed soils 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles G N -Blocks A and B final landscaped and/or mulched -Block C hydroseeded -Water truck on site 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors - - N/A 7. Protect Drain Inlets • Catch Basin Inserts - - N/A 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets G N -Vegetated swales along roads 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N -Concrete washouts onsite -Secondary storage for materials onsite 10. Control Dewatering - - N/A 11. Maintain BMPs G N -See any recommendations below 12. Maintain SWPPP & Site Logbook G N -Available upon request 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Report ID 5719.05 S 2024 0913 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND HYDROSEEDED LOTS FINAL LANDSCAPED LOTS JOB SHACK CHEMICAL/MATERIAL STORAGE GRAVEL SILT FENCE CHAIN-LINK FENCE SWALE CONCRETE WASHOUT