HomeMy WebLinkAboutAddendum No 3 - CAG-24-109S 7TH STREET CORRIDOR IMPROVEMENTS
ADDENDUM NO.3
Federal Aid Number:CRPUL-CM 1292(003)
TIB Number:P-P-102(P03)-1
City Project Number:CAG-24-1 09
DATE OF ADDENDUM ISSUE:October 1,2024
BID DUE DATE:October 2,2024
DATE OF BID OPENING:October 4,2024
NOTE TO ALL PLANHOLDERS:
This Addendum No.3,containing the following revisions,additions,deletions,and/or clarifications,is
hereby made a part of the Plans and Contract Provisions (Contract Documents)for the above-named
project.Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No.3 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package.Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
BID PROPOSAL
1.DELETE Project Proposal (Pages 11)and REPLACE with attached Project Proposal (Page 11).
Revisions include:
.Added Schedule C to the total bid amount note
2.No changes at this time
SPECIAL PROVISIONS
S 7th Street Corridor Improvements Addendum No.3
Page 1 of 2
PLANS
3.No changes at this time
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely
öb Hanson,P.E.
Transportation Design Manager
City of Renton
Receipt acknowledged,and conditions agreed to this
_____
day of
________,
2024
Bidder
__________________________________
Signature
S 7th Street Corridor Improvements Addendum No.3
Page 2 of 2
PROJECT PROPOSAL
Project:South 7th Street Corridor Improvements
Federat Aid No:CRPUL-CM 1292(003)
City Contract Number:CAG-24-1 09
Company:
Address:
________________________________
Phone Number:
______________________________
Fax Number:
_______________________________
TotaL Bid Amount:$
__________________________________________
(Tota’of Bid Schedul.es A +B +C)
Contract Documents (Addendum No.3)Page 11
South 7th Street Corridor Improvements October 2024