LEGEND
EXISTING
PROPOSED
HBF
HUB FOUND
SANITARY SEWER, FLOW DIRECTION
P
POWER BOX
LIGHT POLE
04 SANITARY SEWER MANHOLE
E
UNDERGROUND POWER (PAINTED LOCATION)
FIRE HYDRANT
ASPHALT RESTORATION
V✓v
X
WATER VALVE
W
WATER LINE (PAINTED LOCATION)
TREE TO BE REMOVED
TEL o
TELEPHONE RISER
C
UNDERGROUND COMMUNICATION (PAINTED LOCATION)
T.E.S.0
CB ❑ CATCH BASIN
-D -
STORM DRAIN LINE/ CULVERT
SDI STORM DRAIN INLET
cv
- - CITY OF RENTON SEWER
GAS VALVE
AND ACCESS EASEMENT
GM El
GAS METER
TEMPORARY CONSTRUCTION
G
UNDERGROUND GAS LINE (PAINTED LOCATION)
PERMIT LIMIT
SMH
SEWER MANHOLE
-x x x x- ORANGE CONSTRUCTION FENCING
SCO O
SEWER CLEANOUT
- - - - - - CLEARING LIMITS
-S
SEWER LINE
SILT FENCING
0'-011
SET HUB W/PIPE DEPTH PER LOCATOR
DOUBLE SILT FENCING
52.00
64-76'0
GROUND ELEVATION/POT HOLED UTILITY DEPTH
PROPOSED GRAVITY WALL OR ROCKERY
EDGE OF PAVEMENT
O CATCH BASIN FILTER
WETLAND FLAG LOCATION AT TIME OF SURVEY
••
WETLAND BOUNDARY
STABILIZED CONSTRUCTION ENTRANCE
BREAKLINE - TOP OR BOTTOM OF SLOPE
SURVEY CONTROL POINT
EXISTING ACCESS IMPROVEMENTS
EXISTING THUNDER HILLS
SEWER INTERCEPTOR
EXISTING THUNDER HILLS
SEWER INTERCEPTOR (CIPP)
EXISTING THUNDER HILLS
SEWER INTERCEPTOR
(ABANDON)
PROPOSED LOCATIONS OF
GRAVITY WALL OR ROCKERY
PROPOSED LOCATIONS OF
PARALLEL SEWER PIPE
PROPOSED LOCATION OF
IMPROVED GRAVEL ROAD
;;;;;;;;;;;;;;;;;;;;;;;;;;;
PROPOSED LOCATION OF
IMPROVED PAVED AREAS
WET BFR WETLAND BUFFER BOUNDARY
CONSTRUCTION SEQUENCE
1. ATTEND PRE -CONSTRUCTION MEETING AND PERMIT COMPLIANCE MEETING, AS REQUIRED BY PERMIT.
SURVEY NOTES:
THE SURVEY INFORMATION SHOWN IN THE ATTACHED PLAN HAS BEEN PROVIDED BY STANTEC.
SEE: HORIZONTAL CONTROL SHEETS
HORIZONTAL CONTROL DATUM:
NAD83/91 PER VALUES PUBLISHED FOR CITY OF RENTON CONTROL POINTS 1063 AND 476, CITY OF RENTON SURVEY CONTROL.
BENCHMARKS AND VERTICAL CONTROL DATUM:
1. CITY OF RENTON CONTROL POINT 2193: TOP OF BRASS DISK IN CONCRETE MONUMENT AT THE INTERSECTION OF S 18TH ST. AND GRANT AVE S.
ELEV = 317.58 (NAVD'88)
2. CITY OF RENTON CONTROL POINT 1063: TOP OF PUNCH IN BRASS PIN IN CONCRETE MONUMENT IN CASE AT THE INTERSECTION OF S 18TH ST. AND EAGLE RIDGE DRIVE.
ELEV = 261.22 (NAVD'88)
SURVEY CONTROL
PT
NORTHING
EASTING
ELEV
DESCRIPTION
10000
172586.2255
1302738.9296
310.19
SURVEY SPIKE IN EAST WALK-10FT NW OF POWER VAULT-85'SOUTH OF DRIVE #1626
10001
172295.6550
1302573.3620
317.59
PUNCH IN 3�4' PLUG IN CONCRETE MONUMENT IN CASE @ INTERSECTION S18TH ST / GRANT AVE S
10002
172461.8279
1302632.1910
314.10
MAG / FLAG @ BACK OF WEST WALK-150'+/- NORTH OF INTERSECTION S 18TH ST / GRANT AVE S
10004
172728,8543
1302411.5284
265.82
60D NAIL @ WEST EDGE OF TRAIL -MID-POINT OF CURVE -40FT NW OF 36"COTTONWOOD
10005
172805.2029
1302347.1873
259.23
60D NAIL @ WEST EDGE OF TRAIL @ SOUTH END OF ROCKERY @ EAST EDGE OF STREAM
10006
172936.7576
1302277.7484
246.10
CENTER OF GRATE SCREW (PAINTED) -9FT WEST OF EAST END OF FOOT BRIDGE OVER STREAM
10007
173129.4056
1302183.0947
232.65
60D NAIL @ CENTER OF FOOT BRIDGE OVER STREAM -6FT WEST OF EAST END OF BRIDGE
10008
173248.7734
1302173.5206
225.50
60D NAIL @ EDGE OF TRAIL @ P.C. OF TRAIL -120FT N'LY OF POINT # 10007
10009
173341.6439
1302087.0197
213.75
60D NAIL @ WEST EDGE OF TRAIL -MID-POINT OF CURVE -127FT N'LY OF POINT #10008
10011
173544.9145
1302001.5606
200.98
60D NAIL @ WEST EDGE OF TRAIL -55FT SOUTH OF FOOTBRIDGE/TRAIL THAT IS AT THE SOUTH EDGE OF
UTILITY EASEMENT
10012
173669.8858
1302008.8299
201.99
60D NAIL @ EAST EDGE OF TRAIL - @ APPROX. MID -POINT OF UTILITY EASEMENT
10013
173847.4196
1301973.6768
185.02
60D NAIL @ EAST EDGE OF TRAIL -25FT SOUTH OF SEWER VALVE
10014
173957.7680
1301894.2182
179.49
60D NAIL @ EAST EDGE OF ACCESS ROAD -6FT NORTH OF ASPHALT PARKING FOR APARTMENTS
10015
174119.8923
1301786.3041
166.46
60D NAIL @ WEST EDGE OF ACCESS ROAD -35FT NORTH OF GATE
10016
174278,7737
1301711,0942
155.59
60D NAIL @ WEST EDGE OF ACCESS ROAD -176FT NORTH OF POINT #10015
10025
174413,8703
1301696.5503
150.81
60D NAIL/FEATHER - @ TOP OF BANK - NW CORNER OF GRAVEL ACCESS ROAD
10026
174525,8748
1301617,9919
132.19
60D NAIL/FEATHER @ SOUTH EDGE OF TRAIL -20FT WEST OF SLIDE AREA
10027
174644.7928
1301581.7239
109.65
60D NAIL FEATHER @ NORTH EDGE OF TRAIL -36FT WEST OF POINT #10026 -19FT NW OF REBAR/CAP @
SOUTH EDGE OF TRAIL @ ROCKERY BOTTOM
10028
174747,1798
1301551,7095
93.99
60D NAIL/FEATHER @ NORTH EDGE OF TRAIL -108FT WEST OF POINT #10027
10029
174842.7369
1301488.0672
81.78
60DNAIL/FEATHER @ NORTH EDGE OF TRAIL -115FT WEST OF POINT # 10028 -5FT SE OF 12"MAPLE TREE
2. OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) PRIOR TO COMMENCING
WORK.
3. COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING TO BE PROVIDED BY CONTRACTOR.
4. INSTALL PERIMETER PROTECTION, TEMPORARY EROSION AND SEDIMENT CONTROLS, AND BMPS.
5. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT THE PROJECT.
6. CLEAR, ROUGH GRADE, AND INSTALL PROPOSED WALLS ONSITE
7. PROVIDE SEQUENCING PLAN AND SEWAGE BYPASS PUMPING PLAN FOR REVIEW AND ACCEPTANCE BY CITY PRIOR TO PERFORMING INTERCEPTOR
IMPROVEMENTS.
8. PERFORM BYPASS PUMPING, INSTALL OPEN -CUT SEWER AND INSTALL CIPP.
9. INSTALL GRAVEL ROAD.
10. PERFORM LEAKAGE TESTING AND TELEVISION INSPECTION OF NEW SANITARY SEWER MAIN, AND CIPP MAIN.
11. OBTAIN CITY APPROVAL BEFORE TRANSFERRING SEWAGE TO NEW SANITARY SEWER MAIN, AND CIPP MAIN. CONNECT TO EXISTING SANITARY SEWER SYSTEM.
12. ABANDON EXISTING SANITARY SEWER FACILITIES AS SHOWN ON PLANS.
13. PERFORM FINAL GRADING/PAVING AND SURFACE RESTORATION.
14. AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY CITY. COORDINATE REMOVAL OR TRANSFER OF TEMPORARY BMPS WITH FOLLOW-UP
CONSTRUCTION PROJECTS.
15. CONTRACTOR TO PROVIDE FIELD MARK-UP OF PLANS AS CONSTRUCTED.
NOTE: THIS IS A POSSIBLE SEQUENCE OF CONSTRUCTION ACTIVITIES. FINAL SEQUENCE SHALL BE DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY
OWNER.
Stantec
1687 114TH Avenue SE, Suite 100 Bellevue WA
98004 phone: (425) 869-9448 www.stantec.com
SCALE
20 0 20 40
(FEET)
1 INCH = 20 FT
S-392102
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as -built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
RECORD DRAWING
APPFIOM BY
DAIS