TEMPORARY EROSION/SEDIMENTATION
CONTROL NOTES:
1. THIS TEMPORARY EROSION/SEDIMENTATION CONTROL (TESC) PLAN DOES NOT
CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G.
SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION
FACILITIES, UTILITIES, ETC.)
2. CONTRACTOR REQUIRED TO SUBMIT TESC AND DEWATERING PLAN TO OWNER
AND ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION.
3. CONTRACTOR AND AN ON -SITE REPRESENTATIVE OF OWNER WILL REVIEW THE
INSTALLATION, MAINTENANCE AND PERFORMANCE OF THE TESC MEASURES
SHOWN ON THE APPROVED PLANS. THE TESC OBSERVER OR PERMITTING
AGENCY MAY RECOMMEND ADDITIONAL MEASURES OR CHANGES TO THE
TESC PLAN THAT ARE WARRANTED DURING CONSTRUCTION. THE
CONTRACTOR AND OBSERVER WILL EXAMINE ALL TESC MEASURES
PERIODICALLY DURING THE CONSTRUCTION PERIOD, AND AFTER STORMS
HAVING 0.5 INCHES OR MORE OF RAINFALL IN A 24-HOUR PERIOD. THE
OBSERVER AND THE PERMITTING AGENCY HAVE THE AUTHORITY TO REQUIRE
CORRECTIVE ACTION IN ORDER TO ACHIEVE EROSION CONTROL OBJECTIVES.
4. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS
THE RESPONSIBILITY OF THE CONTRACTOR. TESC MEASURES SHALL REMAIN
FUNCTIONING AND IN PLACE UNTIL THE SITE HAS BEEN STABILIZED AND THE
PERMITTING AGENCY, OWNER OR ENGINEER HAS APPROVED THE REMOVAL OF
THE TESC MEASURES.
5. AS CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS
DICTATE, ADDITIONAL TESC MEASURES MAY BECOME NECESSARY TO
PROTECT ADJACENT PROPERTIES AND TO ENSURE WATER QUALITY FOR SITE
RUNOFF. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ADDRESS
DEFICIENT TESC CONDITIONS, AND TO PROVIDE ADDITIONAL FACILITIES, OVER
AND ABOVE THE MINIMUM REQUIREMENTS OUTLINED ON THE APPROVED
PLANS AS NEEDED.
6. THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A
MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE
DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
7. THE TESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED (E.G.
ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS
NEEDED.
8. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED AS NECESSARY TO ENSURE THEY CONTINUE TO FUNCTION.
9. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT
WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN
DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH
APPROVED ESC METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING,
ETC.)
10. ANY AREA NEEDING TESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION,
SHALL BE STABILIZED WITHIN SEVEN (7) DAYS.
11. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE
LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL
NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.
12. WHERE MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL
BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES.
13. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED
AREAS SHALL BE REVIEWED TO IDENTIFY WHICH AREAS CAN BE STABILIZED IN
PREPARATION FOR THE WINTER RAINS. IDENTIFIED AREAS SHOULD BE
STABILIZED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
14. TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE
IMPLEMENTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES
CONSTRUCTION STORMWATER GENERAL PERMIT, THE CONSTRUCTION
STORMWATER POLLUTION PREVENTION PLAN, ALL OTHER APPLICABLE PERMIT
CONDITIONS, AND ALL OTHER APPLICABLE FEDERAL AND STATE LAWS.
15. NOT ALL CONSTRUCTION STORMWATER BMPS ARE SHOWN ON THE TESC
DRAWINGS. SEE SWPPP FOR DESCRIPTIONS OF THE BMPS IDENTIFIED IN THE
PLAN SHEETS AS WELL AS FOR OTHER APPLICABLE CONSTRUCTION
STORMWATER BMPS.
16. TESC MEASURES AND SELECTED BMPS IDENTIFIED ON THE TESC PLAN AND IN
THE SWPPP ARE BASED ON INFORMATION AVAILABLE AT THE TIME OF THE
DRAWING AND SWPPP DEVELOPMENT. CONTRACTOR'S CERTIFIED EROSION
AND SEDIMENT CONTROL LEAD (CESCL) SHALL MODIFY TESC PLAN AND SWPPP
AS REQUIRED TO ENSURE THE REQUIREMENTS DESCRIBED IN ITEM 15 ARE
MET AT ALL TIMES.
Stantec
1687 114TH Avenue SE, Suite 100 Bellevue WA
98004 phone: (425) 869-9448 www.stantec.com
2x2 WOOD POST
FENCING
MATERIAL
STAPLE TOP TIE
SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE),
r 50# MIN. TENSILE STRENGTH, UV STABILIZED
FENCING
MATERIAL
HIGH DENSITY POLYETHYLENE OR
POLYPROPYLENE MESH, AND SHALL BE
UV RESISTANT. ORANGE COLOR
1'- 0" MIN.
(DEEPER FOR
UNSTABLE SOIL)
PLACE SAND BAGS AS REQUIRED
AROUND CULVERT TO PROVIDE
SUPPORT FOR SILT FENCE
PREP
STEEL T-BAR POST
_ SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE),
50# MIN. TENSILE STRENGTH, UV STABILIZED
/ ENVIRONMENTALLY
2'- 0" SENSITIVE AREA
(DESIRABLE) ,� BOUNDARY
2x2 WOOD OR
STEEL T-BAR POST
TYPICAL SECTION
SILT FENCE - SEE
STD. PLAN 1-30.10
6'- 0" MAX.
-------------------
--------
---nr
---------------
----
ttor---
-------------------
- -----
---
---------
-----------------
---
-------
-----------
- -
--------
----------------------------
---------------------------
------------------------
rr---
----------------------------
---I--------------------------
C
C
C
C
C
C
C
C
art ,(
ELEVATION
HIGH VISIBILITY FENCE
49 NTS
CULVERT, BOX CULVERT, OR PIPE ARCH
END TREATMENT VARIES
SILT FENCE DESIGN
COMPOST BERM - SEE
STD. PLAN 1-80.10
CULVERT. BOX CULVERT, OR PIPE ARCH
END TREATMENT VARIES
QR�
COMPOST BERM DESIGN
GEOTEXTILE FOR TEMPORARY SILT FENCE
SEE STD. SPEC. 9-33.2(1), TABLE 6'\
b
fV
FLOW
EDGE OF GEOTEXTILE
SECTION OA
NOTE
1. Post shall have sufficient strength and durability
to support the fence through the life of the project.
ELEVATION
FENCE ON SLOPE
STATE OF
WAS INGTON
d(Jj jl (1M� REGISTERED
REGISTERED
LANDSCAPE ARCHITECT
MARK W.MAURER
CERTIFICATE NO. 000598
REouEs..
HIGH VISIBILITY FENCE
STANDARD PLAN 1-10.10-01
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich 111 08-11-09
STATE DESIGN ENGINEER DATE
VWashington State Department of Transportation
NOTE
Perform maintenance in accordance with Standard
Specification 8-01.3(9)A and 8-01.3(15).
POST - SEE STD. SPEC. 8-01.3(9)A)
EROSION CONTROL AT CULVERT ENDS
NTS
EMBED POSTS INTO SAND
BAGS AS REQUIRED
Z
0
STATE OF
MM tMV� WASH INGTON
REGISTERED
LANDSCAPE ARCHITECT
MARK W.MAURER
CERTIFICATE NO. 000598
NOM raoNwouwcnre.aRx:nN+t srcNeosriREEvcueRem
v
canoN isxrnroasxe nnr-
r°oF,Ra�NsroaranoN. Aaavr,wrnEoer M ou�,�E�r�°E°
EROSION CONTROL
AT CULVERT ENDS
STANDARD PLAN 1-30.20-00
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich 11l 09-20-07
STATE DESIGN ENGINEER DATE
Washington State Department of Transportation
GEOTEXTILE
POST- SEE STD.
SPEC. 8-01.3(9)A
..peO.Ope
,Opei��Pp�i;
e0�'eieeei
_ FASTEN GEOTEXTILE TO
POST EVERY 6" (IN.) O.C.
a
SELF-LOCKING TIE -NYLON 616 (MIN. GRADE),
120# MIN. TENSILE STRENGTH, UV STABILIZED
O
NOTES
1. Install the ends of the high visibility silt fence to point slightly upslope
to prevent sediment from flowing around the ends of the fence
2. Perform maintenance in accordance with Standard Specifications
8-01.3(9)A and 8-01.3(15).
3 Splices shall never be placed in low spots or sump locations- If
splices are located in low or sump areas, the fence may need to be
reinstalled unless the Project Engineer approves the installation.
4. Install silt fencing parallel to mapped contour lines.
QQo�
/
GEOTEXTILE FOR HIGH VISIBILITY SILT FENCE
COLOR - ORANGE --SEE STANDARD
SPECIFICATION SECTION
,•
9-33.2 (1), TABLE 6
NOTE
DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND
AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH
SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT-
RATING FLOWS. COMPACTION MUST BE ADEQUATE TO
PREVENT UNDERCUTTING FLOWS.
TYPICAL INSTALLATION DETAIL J
(STEEL POSTS SHOWN)
DocuSigrl Envelope ID. SEE CF5B6-6D2A-4E4A-B436-A317AA638878
POST -
�� WOOD OR STEEL
(TYPICAL) STATE OF
WASHITON
TYPICAL HIGH VISIBILITY SILT FENCE ��% �� LANDSCAPE
ARCHITECT
U REGISTERED
SEE NOTE 1 ¢P� WITHOUT BACKUP SUPPORT LANDSCAPE ARCHITECT
ISOMETRIC � S Q
(STEEL POSTS SHOWN) ANDRA L. SALISBIJRY
FASTEN GEOTEXTILE TO CERTIFICATE NO. 000860
POST EVERY 6" (IN.) O.C.
ENreuravr�cnmwc Ducuc.rE�m�oniciuni s�cNEoer rr�cxaxEfa.aun
FABRIC (GEOTEXTILE)
(TYPICAL)
HIGH VISIBILITY
SILT FENCE
STANDARD PLAN 1-30.17-00
SHEET 1 OF 1 SHEET
SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER
TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE
APPROVED FOR PUBLICATION
FENCE AT THE OVERLAP. JOINING SECTIONS SHALL NOT BE PLACED
Pasco Bakotich III 3122113
IN LOW SPOTS OR IN SUMP LOCATIONS-
SPLICE DETAIL
STATE DESIGN ENGINEER DATE
W ashington state Department or Tm,spmfation
(WOOD POSTS SHOWN)
-„
HIGH VISIBILITY SILT FENCE
NTS
4" MAX.
ORAINAGE GRATE TRIM
GRATE FRAME _
OVERFLOW BYPASS
BELOW INLET CRATE DEVICE
SEDIMENT AND DEBRIS .
+ILTSXE
FIAT�R ��JJJJ
SECTION VIEW
DWIINAGE CRATE
SRECTANGLJLAR GRATE SHOWN) Rr:'MIEVAL SYSTEM (?YP.)
I '�J
�I t
OVERFLOW BYPASS (TYP )
BELOW INLET GRATE DEvIGE
ISOMETRIC VIEW
NOTES:
1 PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
2. INLET PROTECTION SWILL OF USED TO PROTECT TIIE DRAINAGE SYSTEM.
3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
A. SIZE THIE BELOW INLET C ATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WLLL SERVICE,
5. THE BL&D SHALT_ HAVE A BUILT-IN HIGH -ROW RELIEF SYSTENi (OVERFLOW BYPASS),
6. THE RET'RIEVAl- SYSTEM MLIST At-LQW REMOVAL OF THE BIGD WrIHQUT SPILLIW THE COLLECTED MATERIAL,
7, PERFORM MAINTENANCE IN ACCORDANCE W]" STANDARD SPECIFICATION S-01.3(15).
8, ANY SECNMENT IN THE CATCH BASIN INSERT SHALL iBE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL. BE CLEANED OR REPLACED AT LEAST MONTHLY.
UNLESS DTHOwsk NDTEP, DRAWING 15 NOT TP VALE (NTS}
URI
STD. MAN - 216.10
PUBLIC WORKS Apt"R Bg;
DEPARTMENT CATCH BASIN INSERT AZ 9/28/2018
�It SMwnl4onln Ni us. DATE.
CATCH BASIN FILTER
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as -built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
:45 AP drawings are on file at the offices of the City of Renton.
S-392149
RECORD DRAWING