HomeMy WebLinkAboutS-392149N roll W Q Z W J L, TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES: 1. THIS TEMPORARY EROSION/SEDIMENTATION CONTROL (TESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.) 2. CONTRACTOR REQUIRED TO SUBMIT TESC AND DEWATERING PLAN TO OWNER AND ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. 3. CONTRACTOR AND AN ON -SITE REPRESENTATIVE OF OWNER WILL REVIEW THE INSTALLATION, MAINTENANCE AND PERFORMANCE OF THE TESC MEASURES SHOWN ON THE APPROVED PLANS. THE TESC OBSERVER OR PERMITTING AGENCY MAY RECOMMEND ADDITIONAL MEASURES OR CHANGES TO THE TESC PLAN THAT ARE WARRANTED DURING CONSTRUCTION. THE CONTRACTOR AND OBSERVER WILL EXAMINE ALL TESC MEASURES PERIODICALLY DURING THE CONSTRUCTION PERIOD, AND AFTER STORMS HAVING 0.5 INCHES OR MORE OF RAINFALL IN A 24-HOUR PERIOD. THE OBSERVER AND THE PERMITTING AGENCY HAVE THE AUTHORITY TO REQUIRE CORRECTIVE ACTION IN ORDER TO ACHIEVE EROSION CONTROL OBJECTIVES. 4. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR. TESC MEASURES SHALL REMAIN FUNCTIONING AND IN PLACE UNTIL THE SITE HAS BEEN STABILIZED AND THE PERMITTING AGENCY, OWNER OR ENGINEER HAS APPROVED THE REMOVAL OF THE TESC MEASURES. 5. AS CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS DICTATE, ADDITIONAL TESC MEASURES MAY BECOME NECESSARY TO PROTECT ADJACENT PROPERTIES AND TO ENSURE WATER QUALITY FOR SITE RUNOFF. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ADDRESS DEFICIENT TESC CONDITIONS, AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS OUTLINED ON THE APPROVED PLANS AS NEEDED. 6. THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. 7. THE TESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS NEEDED. 8. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEY CONTINUE TO FUNCTION. 9. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH APPROVED ESC METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING, ETC.) 10. ANY AREA NEEDING TESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE STABILIZED WITHIN SEVEN (7) DAYS. 11. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 12. WHERE MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES. 13. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH AREAS CAN BE STABILIZED IN PREPARATION FOR THE WINTER RAINS. IDENTIFIED AREAS SHOULD BE STABILIZED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 14. TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE IMPLEMENTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES CONSTRUCTION STORMWATER GENERAL PERMIT, THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN, ALL OTHER APPLICABLE PERMIT CONDITIONS, AND ALL OTHER APPLICABLE FEDERAL AND STATE LAWS. 15. NOT ALL CONSTRUCTION STORMWATER BMPS ARE SHOWN ON THE TESC DRAWINGS. SEE SWPPP FOR DESCRIPTIONS OF THE BMPS IDENTIFIED IN THE PLAN SHEETS AS WELL AS FOR OTHER APPLICABLE CONSTRUCTION STORMWATER BMPS. 16. TESC MEASURES AND SELECTED BMPS IDENTIFIED ON THE TESC PLAN AND IN THE SWPPP ARE BASED ON INFORMATION AVAILABLE AT THE TIME OF THE DRAWING AND SWPPP DEVELOPMENT. CONTRACTOR'S CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) SHALL MODIFY TESC PLAN AND SWPPP AS REQUIRED TO ENSURE THE REQUIREMENTS DESCRIBED IN ITEM 15 ARE MET AT ALL TIMES. Stantec 1687 114TH Avenue SE, Suite 100 Bellevue WA 98004 phone: (425) 869-9448 www.stantec.com 2x2 WOOD POST FENCING MATERIAL STAPLE TOP TIE SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE), r 50# MIN. TENSILE STRENGTH, UV STABILIZED FENCING MATERIAL HIGH DENSITY POLYETHYLENE OR POLYPROPYLENE MESH, AND SHALL BE UV RESISTANT. ORANGE COLOR 1'- 0" MIN. (DEEPER FOR UNSTABLE SOIL) PLACE SAND BAGS AS REQUIRED AROUND CULVERT TO PROVIDE SUPPORT FOR SILT FENCE PREP STEEL T-BAR POST _ SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE), 50# MIN. TENSILE STRENGTH, UV STABILIZED / ENVIRONMENTALLY 2'- 0" SENSITIVE AREA (DESIRABLE) ,� BOUNDARY 2x2 WOOD OR STEEL T-BAR POST TYPICAL SECTION SILT FENCE - SEE STD. PLAN 1-30.10 6'- 0" MAX. ------------------- -------- ---nr --------------- ---- ttor--- ------------------- - ----- --- --------- ----------------- --- ------- ----------- - - -------- ---------------------------- --------------------------- ------------------------ rr--- ---------------------------- ---I-------------------------- C C C C C C C C art ,( ELEVATION HIGH VISIBILITY FENCE 49 NTS CULVERT, BOX CULVERT, OR PIPE ARCH END TREATMENT VARIES SILT FENCE DESIGN COMPOST BERM - SEE STD. PLAN 1-80.10 CULVERT. BOX CULVERT, OR PIPE ARCH END TREATMENT VARIES QR� COMPOST BERM DESIGN GEOTEXTILE FOR TEMPORARY SILT FENCE SEE STD. SPEC. 9-33.2(1), TABLE 6'\ b fV FLOW EDGE OF GEOTEXTILE SECTION OA NOTE 1. Post shall have sufficient strength and durability to support the fence through the life of the project. ELEVATION FENCE ON SLOPE STATE OF WAS INGTON d(Jj jl (1M� REGISTERED REGISTERED LANDSCAPE ARCHITECT MARK W.MAURER CERTIFICATE NO. 000598 REouEs.. HIGH VISIBILITY FENCE STANDARD PLAN 1-10.10-01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakotich 111 08-11-09 STATE DESIGN ENGINEER DATE VWashington State Department of Transportation NOTE Perform maintenance in accordance with Standard Specification 8-01.3(9)A and 8-01.3(15). POST - SEE STD. SPEC. 8-01.3(9)A) EROSION CONTROL AT CULVERT ENDS NTS EMBED POSTS INTO SAND BAGS AS REQUIRED Z 0 STATE OF MM tMV� WASH INGTON REGISTERED LANDSCAPE ARCHITECT MARK W.MAURER CERTIFICATE NO. 000598 NOM raoNwouwcnre.aRx:nN+t srcNeosriREEvcueRem v canoN isxrnroasxe nnr- r°oF,Ra�NsroaranoN. Aaavr,wrnEoer M ou�,�E�r�°E° EROSION CONTROL AT CULVERT ENDS STANDARD PLAN 1-30.20-00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakotich 11l 09-20-07 STATE DESIGN ENGINEER DATE Washington State Department of Transportation GEOTEXTILE POST- SEE STD. SPEC. 8-01.3(9)A ..peO.Ope ,Opei��Pp�i; e0�'eieeei _ FASTEN GEOTEXTILE TO POST EVERY 6" (IN.) O.C. a SELF-LOCKING TIE -NYLON 616 (MIN. GRADE), 120# MIN. TENSILE STRENGTH, UV STABILIZED O NOTES 1. Install the ends of the high visibility silt fence to point slightly upslope to prevent sediment from flowing around the ends of the fence 2. Perform maintenance in accordance with Standard Specifications 8-01.3(9)A and 8-01.3(15). 3 Splices shall never be placed in low spots or sump locations- If splices are located in low or sump areas, the fence may need to be reinstalled unless the Project Engineer approves the installation. 4. Install silt fencing parallel to mapped contour lines. QQo� / GEOTEXTILE FOR HIGH VISIBILITY SILT FENCE COLOR - ORANGE --SEE STANDARD SPECIFICATION SECTION ,• 9-33.2 (1), TABLE 6 NOTE DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT- RATING FLOWS. COMPACTION MUST BE ADEQUATE TO PREVENT UNDERCUTTING FLOWS. TYPICAL INSTALLATION DETAIL J (STEEL POSTS SHOWN) DocuSigrl Envelope ID. SEE CF5B6-6D2A-4E4A-B436-A317AA638878 POST - �� WOOD OR STEEL (TYPICAL) STATE OF WASHITON TYPICAL HIGH VISIBILITY SILT FENCE ��% �� LANDSCAPE ARCHITECT U REGISTERED SEE NOTE 1 ¢P� WITHOUT BACKUP SUPPORT LANDSCAPE ARCHITECT ISOMETRIC � S Q (STEEL POSTS SHOWN) ANDRA L. SALISBIJRY FASTEN GEOTEXTILE TO CERTIFICATE NO. 000860 POST EVERY 6" (IN.) O.C. ENreuravr�cnmwc Ducuc.rE�m�oniciuni s�cNEoer rr�cxaxEfa.aun FABRIC (GEOTEXTILE) (TYPICAL) HIGH VISIBILITY SILT FENCE STANDARD PLAN 1-30.17-00 SHEET 1 OF 1 SHEET SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE APPROVED FOR PUBLICATION FENCE AT THE OVERLAP. JOINING SECTIONS SHALL NOT BE PLACED Pasco Bakotich III 3122113 IN LOW SPOTS OR IN SUMP LOCATIONS- SPLICE DETAIL STATE DESIGN ENGINEER DATE W ashington state Department or Tm,spmfation (WOOD POSTS SHOWN) -„ HIGH VISIBILITY SILT FENCE NTS 4" MAX. ORAINAGE GRATE TRIM GRATE FRAME _ OVERFLOW BYPASS BELOW INLET CRATE DEVICE SEDIMENT AND DEBRIS . +ILTSXE FIAT�R ��JJJJ SECTION VIEW DWIINAGE CRATE SRECTANGLJLAR GRATE SHOWN) Rr:'MIEVAL SYSTEM (?YP.) I '�J �I t OVERFLOW BYPASS (TYP ) BELOW INLET GRATE DEvIGE ISOMETRIC VIEW NOTES: 1 PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. 2. INLET PROTECTION SWILL OF USED TO PROTECT TIIE DRAINAGE SYSTEM. 3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE. A. SIZE THIE BELOW INLET C ATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WLLL SERVICE, 5. THE BL&D SHALT_ HAVE A BUILT-IN HIGH -ROW RELIEF SYSTENi (OVERFLOW BYPASS), 6. THE RET'RIEVAl- SYSTEM MLIST At-LQW REMOVAL OF THE BIGD WrIHQUT SPILLIW THE COLLECTED MATERIAL, 7, PERFORM MAINTENANCE IN ACCORDANCE W]" STANDARD SPECIFICATION S-01.3(15). 8, ANY SECNMENT IN THE CATCH BASIN INSERT SHALL iBE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL. BE CLEANED OR REPLACED AT LEAST MONTHLY. UNLESS DTHOwsk NDTEP, DRAWING 15 NOT TP VALE (NTS} URI STD. MAN - 216.10 PUBLIC WORKS Apt"R Bg; DEPARTMENT CATCH BASIN INSERT AZ 9/28/2018 �It SMwnl4onln Ni us. DATE. CATCH BASIN FILTER Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as -built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed :45 AP drawings are on file at the offices of the City of Renton. S-392149 RECORD DRAWING