Contract Provisions for
South 7th Street Corridor Improvements
III. PROJECT PROPOSAL
Contract Documents Page 10
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal /
I
PROPOSAL
South 7th Street Corridor Improvements
TO THE CITY OF RENTON
RENTON,WASHINGTON
Ladies and/or Gentlemen:
The undersigned(Bidder) hereby certify that the Bidder has examined the location and construction
details of the proposed work and has read and thoroughly understands the Contract Documents
governing the work, and the nature of the work, and the method by which payment will be made for
said work. Bidder hereby proposes to undertake and complete the work detailed in and in
accordance with these Contract Documents,for the Total Bid Amount shown on the attached
Schedule of prices.
The Bidder understands that the quantities mentioned herein are approximate only and are subject
to increase or decrease, and hereby proposes to perform all quantities of work as either increased
or decreased in accordance with the Contract Documents.
As evidence of good faith, pursuant to RCW 35.23.352(1), an original Bid Proposal Deposit in the
form of(check one)
X bid bond,or
❑ cashier's check(made payable to the City of Renton), or
0 postal money order(made payable to the City of Renton), in an amount equal to five percent
(5%)of the Total Bid Price,is attached hereto.
If a bid bond is signed by an attorney-in-fact, Bidder agrees that the power of attorney authorizing
such execution must be current and enforceable,be properly executed by the Surety in accordance
with the Surety's by-laws or other applicable rules and resolutions,and include all necessary
corporate seals, signatures, and notaries.
Bidder understands that Contract Award or Bid rejection will occur within 60catendar days after
the opening of bids, as specified in Section 1-03.2 of the Standard Specifications.
Bidder further understands that should Bidder fail to enter into this contract in accordance with his
or her Bid and furnish a contract bond within a period of ten(10)days from the date at which he or
she is notified that he or she is the successful bidder,the Bid Proposal Deposit shall be forfeited to
the City of Renton, as set forth in RCW 35A.40.200 and RCW 35.23.352.
Bidder hereby agrees to complete the Physical Work in all respects within 60 working days.
Contract time shall begin on the first working day following the Notice to Proceed date.
Contract Documents Page 12
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PROJECT PROPOSAL
Project: South 7th Street Corridor Improvements
Federal Aid No: CRPUL-CM 1292(003)
City Contract Number: GAG-24-109
Company: Reed Trucking & Excavating, Inc.
Address: 11616 24th Ave E., Tacoma, WA 98445
Phone Number: 360-701-0997
Fax Number: 253-841-4816
Total Bid Amount: $ 1 . 01.74 )O• U
(Total of Bid Schedules A+ B +C)
Contract Documents(Addendum No. 3) Page 11
South 7th Street Corridor Improvements October 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
PROPOSAL (BID SCHEDULE A -South 7th Street, Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price* Amount
No. Section
Al. 1-05 Roadway Surveying 1 LS $2O wl) 00 $j Qa'v0.W
A2. 1-05 ADA Features Surveying 1 LS $ rj,Coo.co $5,coo.00
A3. 1-05 Record Drawings 1 LS $ 500 ,00 , $ -DO . 00
A4. 1-07.15 SPCC Plan 1 LS $ 5-00.Ou $ 0-00.00
A5. 1-09 Mobilization 1 LS $ JOc� 00j S.Qh6 J0o oo
A6. 1-10 Work Zone Safety Contingency 1 FA $25,000 $25,000
A7. 1-10 Pedestrian Traffic Control 1 LS $ w; Li?) $2,0.r00
A8. 1-10 Flaggers 720 HR $ 10.O0 $5-0,'00.00
A9. 1-10 Other Traffic Control Labor 240 HR $ °O Ov $ I C)ZOO,co
A10. 1-10 Construction Signs Class A 681 SF $ 30.00 $2 IDLI 3o.00
Al 1. 1-10 Other Temporary Traffic Control Devices 1 LS $ Va) O $ 20,0( .(°
Al2. 2-01 Clearing and Grubbing 1 LS $j 9 a O.00' $i 6 000 iz
A13. 2-02 Removal of Structures and Obstructions 1 LS $ 25000 00,, $2Bc. O CZ
j
A14. 2-02SP Sawcutting 10260 IN-FT $ 0,50 $5130.00
A15. 2-03SP Pothole existing utilities 2 EA $ 6.00.00 $ (0 00.00
A16. 2-03 Roadway Excavation incl. Haul 50 CY $ j Q Op $ 50W 0o
A17. 2-03 Common Borrow Incl. Haul 133 CY $ (00.00 $lgs0.00
A18. 4-04 Crushed Surfacing Top Course 470 TON $ p0 $Z$,20o 00
A19. 5-04SP HMA CL 1/2", PG 64-22" 310 TON $ 2_25.C717 $100)760 00
A20. 7-04SP Ductile Iron Pipe, 12 In. Diam. 90 LF $ 0-5.00 $ I i z- o oc
A21. 7-04 Solid Wall PVC Storm Sewer Pipe 12 In. Diam. 10 LF $ 2O0 00 $ 2.000.00
Contract Documents (Addendum No. 2) Page 13
South 7th Street Corridor Improvements September 2024
PROPOSAL (BID SCHEDULE A -South 7th Street, Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price* Amount
No. Section
A22. 7-05 Catch Basin Type 1 7 EA $ 3.000.00 S li)Do0.t)0
A23. 7-05SP Open Grate Locking Lid 1 EA $ Lp5-0.00 $ (D5-0 .00
A24. 7-05SP Solid Locking Lid 1 EA $ 500 00 $SO.00
A25. 7-05SP 24 In. Locking Lid Non-Slip Manhole Cover 1 EA $ 500.00 $ 500.00
A26. 7-05SP Adjust Manhole(Slip-Resistant Lid) 13 EA $ 5-0 00 $ C-750.co
A27. 7-05SP Adjust Manhole(Slip-Resistant Lid Only) 5 EA $550.00 $ 2:1b0.00�
A28. 7-05 Adjust Manhole 4 EA $750.00 $30o0.co
A29. 7-05SP Adjust Water Valve 4 EA $ goo.00 $2.000.00
A30. 7-05SP Adjust Utility Lid 6 EA $ 5 00.00 $ 3000.00
A31. 8-01 Erosion Control and Water Pollution Prevention 1 LS $ 00 .09 $15 00 00
A32. 8-01 Inlet Protection 22 EA $ 100 00 $22()0 •w'
A33. 8-02 Seeded Lawn Installation 425 SY $ p0 $2 550.0U
A34. 8-02SP Wood Chip Mulch(3"Depth) 140 CY $ �0 00 $ By00.Oo
A35. 8-02SP Topsoil. Type A(8"Depth) 393 CY $ lD0 00 $223B0.0c
A36. 8-02SP Coarse Compost(2.5"Depth) 215 CY $ C0 $ 12900.00
A37. 8-02 Plant Selection, Deciduous Tree(2"Cal.) 17 EA $ 50 00 $ Bs00.00
A38. 8-02 Plant Selection, Shrub(#2 Cont.) 532 EA $ 2_2.00 $ -loy 00
A39. 8-02 Plant Selection. Shrub(#5 Cont.) 24 EA $ b0.00 $ 1200.00
A40. 8-02 Plant Selection,Groundcover(#1 Cont.) 3912 EA $ 13 -) $ 3- 0)D,DD
A41 8-02SP Root Barrier(24"Depth) 226 LF S 22 00 $ 1.4°,-j2 00
A42. 8-03SP Automatic Irrigation System, Complete 1 LS $ G16 opt,op $ 35000,0O
Contract Documents (Addendum No. 2) Page 14
South 7th Street Corridor Improvements September 2024
PROPOSAL (BID SCHEDULE A -South 7th Street, Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price* Amount
No. Section
A43. 8-04 Cement Conc.Traffic Curb and Gutter 931 LF $ y 00 $Lio0110k)Apu
A44. 8-04 Cement Conc. Traffic Curb 57 LF $ 24l2 tJU
A45. 8-04 Cement Conc. Pedestrian Curb 81 LF $ L12,00 $3 )02.00
A46. 8-06SP Cement Conc. Driveway Entrance 160 SY $ (y 5.00 $232A0.00
A47. 8-06 Cement Conc. Driveway Entrance Type 3 50 SY $ )i� uU $7250.O0
A48. 8-09 Raised Pavement Marker Type 1 10 HUND $ 25 00 $C Z2 0,00
A49. 8-09 Raised Pavement Marker Type 2 5 HUND $Ir 5O,cg $5250.00
A50. 8-10SP Traffic Separator,White 17 EA $ 1.4 00.W $0600.00
A51. 8-10SP Traffic Separator;White 11 EA $ u o o.00 $Lig DO Bo
A52. 8-12SP Black Polyvinyl Coated 4FT Chainlink Fence 413 LF $ 50 .00 $20(.50.120
A53. 8-12SP Privacy Fence 6FT Wooden 97 LF $ 22_00 $ (((-3-Z 1.00
A54. 8-13 Monument Case and Cover 2 EA $2o00.CO $H 000.00
A55. 8-14 Cement Conc.Sidewalk 1195 SY $ IOD .00 $ 1101500.00
A56. 8-14 Cement Conc. Curb Ramp Type Perpendicular A 2 EA $ 31v00 o0 $ 7200,00
A57. 8-14 Cement Conc. Curb Ramp Type Perpendicular B 4 EA $ 34300 00 $IL1t-100.00
A58. 8-14 Cement Conc. Curb Ramp Type Bike 2 EA $300U.00 $
pO0o.O0
A59. 8-14 Detectable Warning Surface 107 SF $ 6O.00 $02_o Lo.00
A60. 8-14SP Tactile Directional Indicator 24 SF $ too 00 $ 214 0O.t3
A61. 8-20SP Traffic Signal System Modification-S 7th St& 1 LS Sti0,000..00 NO,000 .00
Shattuck Ave S
A62. 8-20 Illumination System,Complete 1 LS $71 000.Ot) $'220,000.00
A63. 8-20 Conduit Pipe 3 In. Diam. 2266 LF $ 1;•00 $ y 6.0)
Contract Documents (Addendum No. 2) Page 15
South 7th Street Corridor Improvements September 2024
PROPOSAL (BID SCHEDULE A -South 7th Street, Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price* Amount
No. Section
A64. 8-21 Permanent Signing 1 LS $115000 00 $
1-5UD0 -nU
A65. 8-21 SP Remove Private Sign 1 LS $ OOo.0 0 $ 100t0.00
A66. 8-22SP Remove Pavement Markings 1 LS $L1000.00 $14000.00
A67. 8-22SP Plastic Bike Dot 9 EA $ 125.00 $052. .00
A68. 8-22 Plastic Traffic Arrow 4 EA $ 1400.00 $i(O 00.00
A69. 8-22 Plastic Speed Bump Symbol 2 EA $ U5 3.00 $ C)00.00
A70. 8-22 Plastic Stop Line 66 LF $ ZO.oo $ i32o.00
A71. 8-22 Plastic Crosswalk Line 932 SF $ 0 $ i 01)?).00
A72. 8-22SP MMA Profiled Line 3554 LF $ 1 00 $ZL
A73. 8-22SP M MA Profiled Wide Line 97 LF $ i U.00 $ '-)N ID.00
A74. 8-22SP MMA Crosshatch Marking 54 LF $ 20.00 $ 0'o.a)
A75. 8-22SP MMA Crosswalk Line(Green) 875 SF $ it.4 .00 $21 ,000.oC
Total Schedule A (South 7th Street, Shattuck to Burnett)* $ ti5q44.951 •6°
*All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and
WAC 458-20-171.
Contract Documents (Addendum No. 2) Page 16
South 7th Street Corridor Improvements September 2024
PROPOSAL (BID SCHEDULE B -South 7th Street, Oakesdale to west of Shattuck)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price` Amount
No. Section
B1. 1-05 Roadway Surveying 1 LS $U,00J 00 $0000.00
B2. 1-05 ADA Features Surveying 1 LS $ U5D0.00 $j5-p0 .00
B3. 1-09 Mobilization 1 LS 00.OD $ I i5.000.00
B4. 1-10 Work Zone Safety Contingency 1 FA $10,000 $10,000
B5. 1-10 Pedestrian Traffic Control 1 LS $f 5-GGO .00 $i. 0 co .
B6. 1-10 Flaggers 360 HR $ 1 p 00 $2S2 o0.00
B7. 1-10 Other Traffic Control Labor 180 HR $ coo.00 $i y 00 00
B8. 1-10 Other Temporary Traffic Control Devices 1 LS $3500.00 $3500.00
B9. 1-10 Uniformed Police Officer 72 HR $ 150 00 $f O8o0.0O
B10. 2-02 Removal of Structures and Obstructions 1 LS $ 1500 $ 7500.OO
B11. 2-02SP Sawcutting 636 IN-FT $p 5 $ 3 f cb,UQ
B12. 4-04 Crushed Surfacing Top Course 13 TON $ lD� 00 $ 1$0.00
B13. 5-04SP HMA CL 1/2", PG 64-22" 8 TON $C 00 $11p0O.CO
B14. 5-04 Planing Bituminous Pavement 34 SY $ `2- CU $ 7(D50 co
B15. 7-05SP Adjust Manhole(Slip-Resistant Lid) 12 EA $15 Do $°I DOD.00
B16. 7-05SP Utility Lid Only 5 EA $5D0 00 $25Do.00
817. 8-01 Erosion Control and Water Pollution Prevention 1 LS $5000.00 $5Do0.D0
B18. 8-01 Inlet Protection 2 EA $ 100 DO $ 200.00
B19. 8-02 Seeding&Mulching 34 SY $ $
B20. 8-02 Topsoil, Type A 34 SY $ 22 dp $"' $.0O
B21. 8-04 Cement Conc.Traffic Curb and Gutter 46 LF $ L.00 $2020 op
Contract Documents Page 17
South 7th Street Corridor Improvements-Addendum No. 2 September 2024
PROPOSAL (BID SCHEDULE B -South 7th Street, Oakesdale to west of Shattuck)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price* Amount
No. Section
B22. 8-04 Cement Conc. Pedestrian Curb 36 LF $ l2.o0 S i5 12.00
B23. 8-04 Extruded Curb 101 LF $ 5D 00 $ 5U0.00
B24. 8-14 Detectable Warning Surface 36 SF $ .5 UU $ 2oez.00
B25. 8-14 Cement Conc. Sidewalk 19 SY $ i 0 5.c O $ i°►q 5.c o
B26. 8-14 Cement Conc. Curb Ramp Type Combination 1 EA $4200.00 $L1200.00
B27. 8-14 Cement Conc. Curb Ramp Type Perpendicular 1 EA $3100.00 $3100.00
Type B
B28. 8-20 Traffic Signal System Modification: 1 LS M 00o Co $ 20 o00.UO
SW 7th St&Lind Ave SW
B29. 8-20 Traffic Signal System Modification: 1 LS $ UOU 00 $ 2(6 000
SW 7th St&Hardie Ave SW
B30. 8-20 Traffic Signal System Modification: 1 LS $32. 0 00 W $32,00(),00
S7thSt&RainierAveS
B31. 8-20SP RRFB System, Complete-SW 7th St 1 EA $15000,00 $ 100o.00
B32. 8-21 Permanent Signing 1 LS $e0000 De $'O,000.UO
B33. 8-22SP Remove Pavement Markings 1 LS $ 1000 .00 $ 00 O_CU
B34. 8-22 Plastic Stop Line 44 LF $ 20.0G $ �,^lJ.00
B35. 8-22 Plastic Crosswalk Line 160 SF $ 13.00 $ 2o50.cj
B36. 8-22SP Plastic Shared Lane Marking 40 EA $ $ 20000 00
B37. 8-22SP Plastic Bicycle Detection Marking 2 EA $ I-100 00 $ B .00
Total Schedule B (South 7th Street, Oakesdale to west of Shattuck)*$ 2),(471 , '2.221 • 00
*All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and
WAC 458-20-171.
Contract Documents Page 18
South 7th Street Corridor Improvements-Addendum No. 2 September 2024
PROPOSAL (BID SCHEDULE C - South 7th Street 21" Clay Pipe Abandonment)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in
numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar
amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be
rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for
any item, the unit price shall prevail, and totals shall be corrected to conform thereto.
Item Spec. Description Quantity Unit Unit Price' Amount
No. Section
C1. 7-04SP Abandonment of Existing 21' Clay Pipe in place 467 LF $ 2E•00 S j)o-15.0D
C2. 7-04SP Compaction of pipe Abandonment 467 LF $ -16 oo $ 107 00
C3. 7-04SP Ductile Iron Pipe. 6 In. Diam. 6 LF $ 300.00 $ K-50D oo
C4. 7-04 Solid Wall PVC Storm Sewer Pipe 6 In. Diam. 7 LF $ 2h0_(X $ f 5D.Co
C5. 7-05 Abandon Existing Manhole 2 EA $50J•00 $ 000.00
C6. 7-05SP Inserta Tee OneFit 2 EA $ ►J.-DD.00 $ ) Duo.co
Total Schedule C (South 7th Street 21" Clay Pipe Abandonment)* $ 'L), 0)00` 00
*All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and
WAC 458-20-171.
Summary:
Total Schedule A brought forward = $_ � rJ/.614, 11,51 .
Total Schedule B brought forward= $ - 00
Total Schedule C brought forward= $ 2.5 0)U0 00
Total Bid Amount, Schedules A, B, C = $ 014,14, 5 5O .s
Note: Determination of low bidder will be based solellr on the "Total Bid"
Contract Documents Page 18A
South 7th Street Corridor Improvements—Addendum No. 2 September 2024
3. No changes at this time.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
Bob Ha son, . .
Transportation Design Manager
City of Renton
Receipt acknowledged, and conditions agreed to this 11 day of September, 2024
Bidder > c
Signature
S 7th Street Corridor Improvements Addendum No. 1
Page 2 of 2
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
PLANS
13. DELETE Sheet COV and REPLACE with attached revised Sheet COV. Revisions include:
• Revision of the index to reflect the added sheets SDO8 and SD09.
14. DELETE Sheets SVO1 to SVO5 and REPLACE with attached revised Sheets SVO1 to SV05.
Revisions include:
• Signature of professional land surveyor on all survey sheets.
15. DELETE Sheets SD-01 to SD-07 and REPLACE with attached revised Sheets SD-01 to SD-09.
Revisions include:
• Removal of an existing 21" clay stormwater pipe and reconnection of pipes to an existing
parallel trunk line.
16. DELETE Sheet EL-03 and REPLACE with attached revised Sheet EL-03. Revisions include:
• Revised anchor bolt required minimum length on City standard.
17. DELETE Sheets SGO1 to SGO3 and REPLACE with attached revised Sheets SGO1 to SG03.
Revisions include:
• Luminaire at Shattuck intersection to be replaced with new luminaire and salvage existing
back to City of Renton.
18. DELETE Sheets IL-01, IL-03 and IL-04 and REPLACE with attached revised Sheets IL-01, IL-03 and
IL-04. Revisions include:
• Clarification of the City of Renton (COR) standard to be used for luminaire poles. 117.1
should be used. Standards 117.1A and 117.1B removed from the Plans.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerel
ob Hanson, PI.
Transportation Design Manager
City of Renton
Receipt acknowledged, and conditions agreed to this 25 day of September , 2024
Bidder ��-
Signature
S 7th Street Corridor Improvements Addendum No. 2
Page 12 of 12
PLANS
3. No changes at this time
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
(Bob Hanson, P. .
Transportation Design Manager
City of Renton
Receipt acknowledged, and conditions agreed to this 1 day of October, 2024
Bidder cp
Signature
S 7th Street Corridor Improvements Addendum No. 3
Page 2 of 2
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
Local Agency Certification for Federal-Aid Contracts
The prospective participant certifies by signing and submitting
this bid or proposal, to the best of his or her knowledge and
belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on
behalf of the undersigned, to any person for influencing or attempting to
influence an officer or employee of any Federal agency, a Member of Congress,
an officer or employee of Congress, or an employee of a Member of Congress
in connection with the awarding of any Federal contract, the making of any
Federal grant, the making of any Federal loan, the entering into of any
cooperative agreement, and the extension, continuation, renewal, amendment,
or modification of any Federal contract, grant, loan or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or
employee of any Federal agency, a Member of Congress, an officer or
employee of Congress, or an employee of a Member of Congress in connection
with this Federal contract, grant, loan, or cooperative agreement, the
undersigned shall complete and submit Standard Form-LLL, "Disclosure Form
to Report Lobbying," in accordance with its instructions.
This certification is material representation of the fact upon which reliance was
placed when this transaction was made or entered into. Submission of this
certification is a prerequisite for making or entering into this transaction imposed
by Section 1352, Title 31, U.S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not
more than $100,000 for each failure.
The prospective participant also agrees by submitting his or her bid or proposal
that he or she shall require that the language of this certification be included in
all lower tier subcontracts,which exceed $100,000 and that all such
subrecipients shall certify and disclose accordingly.
SR
DOT Form 272-040A EF
07/2011
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Failure to return this Declaration as part of the bid proposal package
will make the bid nonresponsive and ineligible for award.
NON-COLLUSION DECLARATION
I, by signing the proposal, hereby declare, under penalty of
perjury under the laws of the United States that the following
statements are true and correct:
1. That the undersigned person(s), firm, association or corporation has
(have) not, either directly or indirectly, entered into any agreement,
participated in any collusion, or otherwise taken any action in restraint of
free competitive bidding in connection with the project for which this
proposal is submitted.
2. That by signing the signature page of this proposal, I am
deemed to have signed and to have agreed to the provisions
of this declaration.
NOTICE TO ALL BIDDERS
To report rigging activities call:
1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll-free
"hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone
with knowledge of possible bid rigging, bidder collusion, or other fraudulent
activities should use the "hotline" to report such activities.
The "hotline" is part of USDOT's continuing effort to identify and investigate
highway construction contract fraud and abuse and is operated under the
direction of the USDOT Inspector General. All information will be treated
confidentially and caller anonymity will be respected.
SR
DOT Form
0712011 272-0361 EF
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Local Agency Name
Local Agency Address
Local Agency Subcontractor List
Prepared in compliance with RCW 39.30.060 as amended
To Be Submitted with the Bid Proposal
Project Name South Seventh Street Corridor Improvements
Failure to list subcontractors with whom the bidder, if awarded the contract,will directly subcontract for performance of the
work of structural steel installation, rebar installation, heating,ventilation and air conditioning, plumbing,as described in
Chapter 18.106 RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform
the same work will result in your bid being non-responsive and therefore void.
Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation,
rebar installation. heating, ventilation and air conditioning, plumbing, as described in Chapter 18 106 RCW, and electrical as
described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.
To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is
listed below to perform such work,the bidder certifies that the work will either(i)be performed by the bidder itself,or(ii) be
performed by a lower tier subcontractor who will not contract directly with the bidder.
Subcontractor Name Reed Trucking & Excavating, Inc.
Work to be performed Structural Steel Installation
Subcontractor Name Reed Trucking & Excavating. Inc.
Work to be performed Rebar Installation
Subcontractor Name Vector Electrical Group LLC
Work to be performed Electrical
Subcontractor Name
Work to be performed
Subcontractor Name
Work to be performed
*Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit;junction boxes, etc, are considered
electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical
current is connected during the project
DOT Form 271-015A
Revised 06/2020
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
s APWA-WA Division 1 Committee rev. 5/13/2022
Proposal for Incorporating Recycled Materials into the Project
In compliance with RCW 70A.205.700, the Bidder shall propose below, the total percent of
construction aggregate and concrete materials to be incorporated into the Project that are
recycled materials. Calculated percentages must be within the amounts allowed in Section
9-03.21(1)E, Table on Maximum Allowable Percent(By Weight) of Recycled Material, of the
Standard Specifications.
Proposed total percentage: 0 percent.
Note: Use of recycled materials is highly encouraged within the limits shown above, but does
not constitute a Bidder Preference, and will not affect the determination of award, unless two or
more lowest responsive Bid totals are exactly equal. in which case proposed recycling
percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03. 1 of the Special
Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the
Contractor should do its best to accomplish. Bidders will be required to report on recycled
materials actually incorporated into the Project, in accordance with the APWA GSP in Section
1-06.6 of the Special Provisions.
Bidder: Reed Trucking & Excavating, Inc.
Signature of Authorized Official: O
Date: 9/18/2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Washington State
�; Department of Transportation
Contractor Certification
Wage Law Compliance - Responsibility Criteria
Washington State Public Works Contracts
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL
MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD
I hereby certify, under penalty of perjury under the laws of the State of Washington, on behalf of the firm
identified below that, to the best of my knowledge and belief, this firm has NOT been determined by a final
and binding citation and notice of assessment issued by the Washington State Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully
violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three
(3) years prior to the date of the Call for Bids.
Bidder Name: Reed Trucking & Excavating, Inc.
Name of Contractor/Bidder-Print full legal entity name of firm
By: 'cam` �-. Dustin Wright
Signature of authorized person Print Name of person making certifications for firm
Title: Vice President Place: Tacoma, WA
Title of person signing certificate Print city and state where signed
Date: 9/18/2024
Form 272-009
082017
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Allk
WI
sadvantaWashington StateDi ed Business
Department of Transportation 9
Enterprise Utilization Certification
To be eligible for Award of this Contract the Bidder shall fill out and submit, as a supplement to its sealed Bid Proposal,
a Disadvantaged Business Enterprise (DBE) Utilization Certification. The Contracting Agency shall consider as non-
responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly
demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided for in the
proposed Contract. Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An
example form has been provided on Page 3. The successful Bidder's DBE Utilization Certification shall be deemed a
part of the resulting Contract.
Box 1: Reed Trucking & Excavating Inc certifies that the DBE firms listed below have been contacted
regarding participation on this project. If this Bidder is successful on this project and is awarded the Contract, it shall
assure that subcontracts or supply agreements are executed with named DBEs. (If necessary, use additional sheets.)
Box 2: South 7th St. Cooridor Improvement
Column 1 Column 2 Column 3 Column 4 Column 5
Name of DBE Project Role Description of Work Dollar Amount Dollar Amount
(See instructions) (See instructions) (See instructions) Subcontracted to be Applied
to DBE Towards Goal
(See instructions) (See instructions)
O'Bunco Subcontractor Surveying
$25,965.00 $25,965.00
Green City Subcontractor Landscaping
5198,808.00 S198,808.00
Highmark Concrete Subconstractor Concrete
Contractors $177,257.70 $177,257.70
Disadvantaged Business Enterprise 5424.1l1_ Total DBE Commitment Dollar Amount 402030. 10
Condition of Award Contract Goal Box 3 Box 4
5❑By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DBE participation to meet
the COA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with
Section 1-02.9 of the Contract
DOT Form 272-056 C
Revised 03/2018
Disadvantaged Business Enterprise (DBE)
WI4111
Washington Statep
Department of Transportation Written Confirmation Document
See Contract Provisions: DBE Document Submittal Requirements
Disadvantaged Business Enterprise Participation
THIS FORM SHALL ONLY BE SUBMITTED TO A DBE THAT IS LISTED ON THE CONTRACTOR'S
DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE DBE.
PART A: To be completed by the bidder
The entries below shall be consistent with what is shown on the Bidder's Disadvantaged Business Enterprise
Utilization Certification. Failure to do so will result in Bid rejection.
Contract Title: South 7th Street Corridor Improvements
Bidder's Business Name: Reed Trucking and Excavating Inc a
DBE's Business Name: Highmark Concrete Contractors
Description of DBE's Work: Cement Conc Curb & Gutter, Sidewalk,Driveway, ADA Ramps
Dollar Amount to be Applied Towards DBE Goal: 4 117, 2-57 .70
Dollar Amount to be Subcontracted to DBE*: $177,257.70
*Optional Field
PART B: To be completed by the Disadvantaged Business Enterprise
As an authorized representative of the Disadvantaged Business Enterprise, I confirm that we have been
contacted by the Bidder with regard to the referenced project for the purpose of performing the Work described
above. If the Bidder is awarded the Contract, we will enter into an agreement with the Bidder to participate in
the project consistent with the information provided in Part A of this form.
Name (printed): Justin O'Keefe
Signature:
Title: Operations Manager/Estimator
Address: 2003 136th Ave E Date: 10.2.2024
Sumner,WA 98390
DOT Form 422-031
Revised 07/2016
� , e Disadvantaged Business Enterprise (DBE)
1Il Department of Transportation Written Confirmation Document
See Contract Provisions: DBE Document Submittal Requirements
Disadvantaged Business Enterprise Participation
THIS FORM SHALL ONLY BE SUBMITTED TO A DBE THAT IS LISTED ON THE CONTRACTOR'S
DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE DBE.
PART A: To be completed by the bidder
The entries below shall be consistent with what is shown on the Bidder's Disadvantaged Business Enterprise
Utilization Certification. Failure to do so will result in Bid rejection.
Contract Title: - 1e" C,co*r"'rt°r
Bidder's Business Name: RE-E 7 C Vh1 1 NJ C-t I N-1 C.
DBE's Business Name: Greeq Ct
Description of DBE's Work: 1 5 ikfreiertYrn
Dollar Amount to be Applied Towards DBE Goal: 4 I £r ?,C .00
Dollar Amount to be Subcontracted to DBE*:
'Optional Field
PART B:To be completed by the Disadvantaged Business Enterprise
As an authorized representative of the Disadvantaged Business Enterprise, I confirm that we have been
contacted by the Bidder with regard to the referenced project for the purpose of performing the Work described
above. If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to participate in
the project consistent with the information provided in Part A of this form.
Name(printed): ;lti.o
Signature:
Title: t•6.?'eck
q/3o%z&
Address: ,4*1 l7__ Date:
12errion LA- 61/30.55-
DOT Form 422-031
Revised 07/2016
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
AUK
Washington State Disadvantaged Business Enterprise (DBE)
WA; Department of Transportation Written Confirmation Document
See Contract Provisions: DBE Document Submittal Requirements
Disadvantaged Business Enterprise Participation
THIS FORM SHALL ONLY BE SUBMITTED TO A DBE THAT IS LISTED ON THE CONTRACTOR'S
DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PART A PRIOR TO SENDING TO THE DBE.
PART A: To be completed by the bidder
The entries below shall be consistent with what is shown on the Bidder's Disadvantaged Business Enterprise
Utilization Certification. Failure to do so will result in Bid rejection.
Contract Title: South 7th Street Corridor Improvements
Bidder's Business Name: R.E - T 1z- LC l N G -V' EA CP`V/TIN I t`-1 C.
DBE's Business Name: Obunco Engineering
Description of DBE's Work: Surveying
Dollar Amount to be Applied Towards DBE Goal: It 2.5' cob.0 0
Dollar Amount to be Subcontracted to DBE*:
'Optional Field
PART B:To be completed by the Disadvantaged Business Enterprise
As an authorized representative of the Disadvantaged Business Enterprise, I confirm that we have been
contacted by the Bidder with regard to the referenced project for the purpose of performing the Work described
above. If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to participate in
the project consistent with the information provided in Part A of this form.
Name(printed): Todd Williams
Signature: --�
Title: Principal
33650 6th Avenue S STE 102 Date: 9/29/24
Address: Federal Way WA 98003
DOT Form 422-031
Revised 07/2016
Ilk
OaWashington State Disadvantaged Business Enterprise
Department of Transportation (DBE) Bid Item Breakdown Form
1. Contract Number 2. Contract Name
South 7th Street Corridor Improvements
3. Prime Contractor 4. Prime Contractor Representative Name
Reed Trucking and Excavating Inc Dustin Wright
5. Prime Contractor Representative Phone Number 6. Prime Contractor Representative Email
360-701-0995 dwright@reedtrucking.com
Column 7 Column 8
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
(See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) Towards Goal
(See Instructions)
(See Instructions)
Highmark Concrete A43 Partial 931 LF $33.55 $31,235.05 $31,235.05
Highmark Concrete A44 Partial 51 LF Cement Conc Traffic Curb $32.50 $ 1,852.50 $ 1,852.50
Highmark Concrete A45 Partial 81 LF Cement Conc Pedestrian Curb $31.55 $2,555.55 $2,555.55
Highmark Concrete A46 Partial 160 SY Cement Conc Driveway Entrance $ 116.25 $ 18,600.00 $ 18,600.00
Subtotal: $54,243.10 $54,243.10
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Highmark Concrete A47 Partial 50 SY $ 116.25 $5,812.50 $5,812.50
Highmark Concrete A55 Partial 1195 SY Cement Conc Sidewalk $68.40 $81,738.00 $81,738.00
Highmark Concrete A56 Partial 2 EA Cemeni Cone Curb Ramo Type PerpentlirulerA $2,350.00 $4,700.00 $4,700.00
Highmark Concrete A57 Partial 4 EA Cement Conc Curb Ramp Type PeryenpiwWr13 $2,350.00 $9,400.00 $9,400.00
Subtotal: $ 101,650.50 $ 101,650.50
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Highmark Concrete A58 Partial 2 EA Cement Conc Curb Ramp Type Bike $ 1,800.00 $3,600.00 $3,600.00
Highmark Concrete A59 Partial 107 SF Detectable Warning Surface $47.25 $5,055.75 $5,055.75
Highmark Concrete A60 Partial 24 SF Tactile Direction Indicator $72.75 $ 1,746.00 $ 1,746.00
Highmark Concrete B21 Partial 46 LF c.memco r,erc croemacne. $33.55 $ 1,543.30 $ 1,543.30
Subtotal: $ 11,945.05 $ 11,945.05
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Highmark Concrete B22 Partial 36 LF Cement Conc Pedestrian Curb $31.55 $ 1,135.80 $ 1,135.80
Highmark Concrete B24 Partial 36 LF Detectable Warning Surface $47.25 $ 1,701.00 $ 1,701.00
Highmark Concrete B25 Partial 19 SY Cement Conc Sidewalk $72.75 $ 1,382.25 $ 1,382.25
Highmark Concrete B26 Partial 1 EA cemen,con,Curb Ramp Type Coeenelion $2,850.00 $2,850.00 $2,850.00
Subtotal: $7,069.05 $7,069.05
TOTAL UDBE Dollar Amount: $ 174,907.70 $174,907.70
DOT Form 272-054
Revised 09/2020
WIWashington State Disadvantaged Business Enterprise
Department of Transportation (DBE) Bid Item Breakdown Form
1. Contract Number 2.Contract Name
South 7th Street Corridor Improvements
3. Prime Contractor 4. Prime Contractor Representative Name
Reed Trucking and Excavating Inc Dustin Wright
5. Prime Contractor Representative Phone Number 6. Prime Contractor Representative Email
360-901-0995 dwright@reedtrucking.com
Column 7 Column 8
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
(See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) Towards Goal
(See Instructions) (See Instructions)
Highmark Concrete B27 Partial 1 EA Corn.Canc Curb Rrnp Type P.andlakre $2,350.00 $2,350.00 $2,350.00
Subtotal: $2,350.00 $2,350.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.0o
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.00
TOTAL UDBE Dollar Amount: $2,350.00 $2,350.00
DOT Form 272-054
Revised 09/2020
Ilk
Washington State Disadvantaged Business Enterprise
Department of Transportation (DBE) Bid Item Breakdown Form
1. Contract Number 2.Contract Name
South 7th Corridor Improvement
3. Prime Contractor 4. Prime Contractor Representative Name
Reed Trucking and Excavating Inc Dustin Wright
5. Prime Contractor Representative Phone Number 6. Prime Contractor Representative Email
360-701-0997 dwright@reedtrucking.com
Column 7 Column 8
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Total Unit to be Applied
(SeeInstructions) (SeeInstructions) (SeeInstructions) (SeeInstructions) (SeeInstructions) Instructions) Cost
(See Towards Goal
(See Instructions)
(See Instructions)
Green City Inc A34 Partial 140 CY Wood Chip Mulch(3"depth) $55.00 $7,700.00 $7,700.00
Green City Inc A35 Partial 393 CY Topsoil Type A(8"Depth) $55.00 $21,615.00 $21,615.00
Green City Inc A36 Partial 215 CY Coarse Compost(2.5"Depth) $55.00 $ 11,825.00 $ 11,825.00
Green City Inc A37 Partial 17 EA $450.00 $7,650.00 $7,650.00
Subtotal: $48,790.00 $48,790.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Green City Inc A38 Partial 532 EA Plant Selection Shrub-2 gal cont $20.00 $ 10,640.00 $ 10,640.00
Green City Inc A39 Partial 24 EA Plant Selection Shrub-5 gal cunt $45.00 $ 1,080.00 $ 1,080.00
Green City Inc A40 Partial 3912 EA $ 12.75 $49,878.00 $49,878.00
Green City Inc A41 Partial 226 EA Root Barrier(24"depth) $20.00 $4,520.00 $4,520.00
Subtotal: $66,118.00 $66,118.00
Total Unit Dollar Amount
Name of UDBE Bid Item# FulUPartial Quantity Description Unit Price Cost to be Applied
Towards Goal
Green City Inc A42 Partial 1 EA Automatic Irrigation System $83,050.00 $83,050.00 $83,050.00
Green City Inc B19 Partial 34 Seeding and Mulching $5.00 $ 170.00 $ 170.00
Green City Inc B20 Partial 34 Topsoil Type A $20.00 $680.00 $680.00
Subtotal: $83,900.00 $83,900.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.00
TOTAL UDBE Dollar Amount: $ 198,808.00 $198,808.00
DOT Form 272-054
Revised 09/2020
Alik
� Washington State Disadvantaged Business Enterprise
VI/ Department of Transportation (DBE) Bid Item Breakdown Form
1.Contract Number 2. Contract Name
South 7th St.Corridor Improvements
3. Prime Contractor 4. Prime Contractor Representative Name
Reed Trucking and Excavating Inc Dustin Wright
5. Prime Contractor Representative Phone Number 6. Prime Contractor Representative Email
360-701-0997 dwright@reedtrucking.com
Column 7 Column 8
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
(See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) (See Instructions) Towards Goal
(See Instructions)
(See Instructions)
O'Bunco Engineering Al Full 1 Roadway Surveying $ 17,650.00 $ 17,650.00 $ 17,650.00
O'Bunco Engineering A2 Full 1 ADA Features Surveying $3,190.00 $3,190.00 $3,190.00
O'Bunco Engineering B1 Full 1 Roadway Surveying $4,125.00 $4,125.00 $4,125.00
O'Bunco Engineering B2 Full 1 ADA Features Surveying $ 1,000.00 $ 1,000.00 $ 1,000.00
Subtotal: $25,965.00 $25,965.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.00
Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Total Unit to be Applied
Cost Towards Goal
.
Subtotal: $0.0o $0.00
Total Unit Dollar Amount
Name of UDBE Bid Item# Full/Partial Quantity Description Unit Price Cost to be Applied
Towards Goal
Subtotal: $0.00 $0.00
TOTAL UDBE Dollar Amount: $25,965.00 $25,965.00
DOT Form 272-054
Revised 09/2020
Ammo. Washington State Disadvantaged Business Enterprise
WI Department of Transportation (DBE)Trucking Credit Form
PART A: TO BE COMPLETED BY THE BIDDER
This form is in support of the trucking commitment identified on the DBE Utilization Certification Form submitted with the proposal.
Please note that DBE's must be certified prior to time of submittal.
Federal Aid# Contract# Project Name
If listing items by hours or by lump sum amounts. please provide calculations to substantiate the quantities listed
Bid Item Item Description
Use additional sheets as necessary.
Bidder Name/Title (please print)
Phone Fax Signature
Address
I certify that the above information is complete and accurate
Email Date
PART B: TO BE COMPLETED BY THE DBE TRUCKING FIRM
Note: DBE trucking firm participation may only be credited as DBE participation for the value of the hauling services, not for the
materials being hauled unless the trucking firm is also recognized as a supplier of the materials used on the project and approved
for this project as a regular dealer
1 Type of Material expected to be
hauled'?
2 Number of fully operational trucks Tractor/trailers. Dump trucks'
expected to be used on this project?
3 Number of trucks and trailers owned by Tractor/trailers Dump trucks
the DBE that will be used on this
project'?
4 Number of trucks and trailers leased by Tractor/trailers Dump trucks.
the DBE that will be used on this
prnjpnt?
DBE Firm Name Name/Title(please print)
Certification Number
Phone Fax Signature
Address
I certify that the above information is complete and accurate.
Email Date
DOT Form 272-058
Revised 09/2020
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PROPOSAL SIGNATURE PAGE
By signing below, Bidder acknowledges receipt and understanding of the following Addenda to the
Bid Documents:
Addendum No. Date of Receipt Addendum No. Date of Receipt
1 09/11/2024 4
2 09/25/2024 5
3 10/01/2024 6
Note:a Proposal may be considered irregular and maybe rejected if the receipt of Addenda is not
acknowledged.
The Bidder is hereby advised that by signature of this proposal, he/she is deemed to have
acknowledged all requirements and signed all certificates contained herein.
L_,_ Reed Trucking & Excavating, Inc.
[Signature of Authorized Official]* [Business Name]
Dustin Wright 11616 24th Ave E.
[Printed Name] [Address Line 1]
Vice President Tacoma, WA 98445
[Title] [Address Line 2]
9/18/2024 360-701-0997
[Date] [Telephone Number]
*Note:Evidence of the signato 's authority to sign the Proposal on behalf of the business entity
shall be submitted with the Bid. Otherwise. the submitted Bid will be considered irregular and non-
responsiv_e.ancLthe Bid xrilllze rejected.
Note: The address and phone number listed will be used for all communications regarding this Proposal.
Type of business entity(e.g. corporation, partnership,etc.)
Corporation
State of Incorporation, or State where business entity was formed:
Washington
Contract Documents Page 32
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
WA State Contractor's Registration# REEDTE1016JW exp.: 4/16/2025
UBl# 601-915-034 exp.: 4/16/2025
Industrial Insurance Account# 983,104-00
Employment Security Department# 093121-0-04 exp.: 4/16/2025
State Excise Tax Registration# 601-915-034 exp.: 4/16/2025
DUNS# NI
The Surety Company which will furnish the required Contract Bond is:
Endurance Assurance Company 155 NE 100th Dt., Suite 201
[Surety] [Address Line 1]
(800) 441-0712 Seattle, WA 98125
[Telephone Number] [Address Line 2]
Contract Documents Page 33
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Y 0� PROPOSAL BID BOND TO THE CITY OF RENTON
•
QFNTOr
KNOW ALL MEN BY THESE PRESENTS,That we, [Bidder] Reed Trucking & Excavating, Inc.
of[address] 11616 24thAve E, Tacoma, WA 98445
as Principal, and[Surety] Fndurance Assurance Corporation
a corporation organized and existing under the laws of the State of Delaware
as a surety corporation, and qualified under the laws of the State of Washington to become surety
upon bonds of contractors with municipal corporations, as Surety, are jointly and severally held and
firmly bound unto the City of Renton in the full sum of five (5) percent of the total amount of the
proposal of said Principal for the work hereinafter described,for the payment of which,well and truly
to be made,we bind ourselves and our heirs,executors,administrators and assigns,and successors
and assigns,jointly and severally,firmly by these presents.
The condition of this bond is such. that whereas the Principal herein is herewith submitting his/her
or its sealed proposal for the following public works construction project,to wit:
South 7th Street Corridor Implo ements
said bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, if the said proposal bid by said Principal be accepted, and the contract be
awarded to said Principal, and if said Principal shall duly make and enter into and execute said
contract and shall furnish contract bond as required by the City of Renton within a period of ten
(10)days from and after said award, exclusive of the day of such award,then this obligation shall be
null and void, otherwise it shall remain and be in full force and effect.
IN THE EVENT, the Principal, following award, fails to execute an Agreement with the City of Renton
in accordance with the terms of the Proposal and furnish a contract bond with Surety or Sureties
approved by the City of Renton within ten (10) days from and after said award, then Principal shall
forfeit the Bid Bond/Bid Proposal Deposit or Surety shall immediately pay and forfeit to the City of
Renton the amount of the Proposal Bid Bond,as set forth in RCW 35A.40.200 and RCW 35.23.352.
This Proposal Bid Bond shall be governed and construed by the State of Washington,and venue shall
be in King County,Washington.
IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be signed and
sealed this 18th day of, September 20 24
Contract Documents Page 34
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
PRINCIPAL SURETY
Reed Trucking & Excavating, Inc. Endurance Assurance Corporation
[PRINCIPAL] [SURETY]
CC a Afa.26[Signature of Authorized Official] [Signatur of Authorized Official]610/2h/� L - Ga'{d 1I Alyssa J. Lopez
[Printed Name] [Printed Name]
d-Orp _ �I Attorney-in-Fact
[Title] [Title]
09/18/2024 09/18/2024
[Date] [Date]
Name and address of local office of Propel Insurance
Agent and/or SURETY Company: 601 Union Street, Suite 3400
Seattle, WA 98101
Telephone: (206)676-4200
Surety WAOIC# 500129
Surety NAIC# 11551
Contract Documents Page 35
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always verify Scal
SOMPO INTERNATIONAL POWER OF ATTORNEY
KNOW ALL BY THESE PRESENTS,that Endurance Assurance Corporation,a Delaware corporation('EAC").Endurance American Insurance Company,a Delaware
corporation("EAIC"),Lexon Insurance Company,a Texas corporation("LIC"),and/or Bond Safeguard Insurance Company,a South Dakota corporation("BSIC"),each,
a"Company"and collectively.`Sompo International."do hereby constitute and appoint:Aliceon A.Keltner,Cynthia L.Jay,Eric A.Zimmerman,James B.Binder,
Brandon K.Bush,Jacob T.Haddock,Diane M.Harding, Jamie L.Marques,Carley Espiritu,Christopher Kinyon,Brent E.Heilesen, Annelies M.Richie,Holli
Albers.Michael S.Mansfield,Sara Sophie Sellin,Donald Percell Shanklin Jr.,Misti M.Webb,Kari Michelle Motley,Bryan Richard Ludwick,Tamara A.
Ringeisen,Dana Marie Brinkley,Amelia G.Burrill,Katharine J.Snider,Amber Lynn Reese,Justin Dean Price,Julie R.Truitt,Sherri W.Hill, Lindsey Elaine
Jorgensen,Alyssa J.Lopez,Alexa Manley,Lois F.Weathers,Terrie L.Conard,Sarah Whitaker,Lori J.Kelly,Marian C.Newman,Wesley V.Dasher,Jr.as true
and lawful Attorney(s)-In-Fact to make,execute,seal,and deliver for,and on its behalf as surety or co-surety;bonds and undertakings given for any and all purposes,also
to execute and deliver on its behalf as aforesaid renewals,extensions,agreements,waivers,consents or stipulations relating to such bonds or undertakings provided,
however,that no single bond or undertaking so made,executed and delivered shall obligate the Company for any portion of the penal sum thereof in excess of the sum of
One Hundred Million Dollars($100,000,000.00).
Such bonds and undertakings for said purposes,when duly executed by said attorney(s)-in-fact,shall be binding upon the Company as fully and to the same extent as if
signed by the President of the Company under its corporate seal attested by its Corporate Secretary.
This appointment is made under and by authority of certain resolutions adopted by the board of directors of each Company by unanimous written consent effective the 30'h
day of March,2023 for BSIC and LIC and the 171h day of May,2023 for EAC and EAIC,a copy of which appears below under the heading entitled"Certificate".
This Power of Attorney is signed and sealed by facsimile under and by authority of the following resolution adopted by the board of directors of each Company by
unanimous written consent effective the 30'h day of March,2023 for BSIC and LIC and the 17'h day of May,2023 for EAC and EAIC and said resolution has not since
been revoked,amended or repealed:
RESOLVED,that the signature of an individual named above and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto
by facsimile,and any such power of attorney or certificate bearing such facsimile signature or seal shall be valid and binding upon the Company in the future with respect
to any bond or undertaking to which it is attached.
IN WITNESS WHEREOF,each Company has caused this instrument to be signed by the following officers,and its corporate seal to be affixed this 25th day of
May,2023.
Endurance Assurance Corporation Endurance American Lexon Insurance Company Bond Safeguard
j y (�, In/surance Company �` `.' / 1 + 1 Insurance Company
By. `1f .r.+J i "n lv' By: `1-.ram f l Ct ff/L i{ By ,Z /1 t -•f✓ By f1. ,. + if "(�, '
Richard Appel;, ,,VR&.genior Counsel Richard Appel,;,SVP•,B,Senior Counsel Richard Appel;S Senior Counsel Richard Appel;r,SVP 8„SenloYvourfsel
rc'suranc.e'4. Gan fr}SrJ'•.,� aAkcf`• D tNSU
c•VO,OPPUR.gj�0F% iF�•p�POR;ij.l97' p. .•�,y�0. CO'ri-0V '� A Cck.,
SEAL
; SOUTH `.C)
:T SEAL ;O'_ _` SE-AL ',()z S 1 S 'a: DAKOTA ,O
• 7 SEALii0 INSURANCE '
_ '. 2002 gym'• 1996 1Os I': , r, '
vj•,DELAWARE O •j',DELAWARE:D3 8 t v • a�' COMPANY y
• ` (> ACKNOWLEDGEMENT �`.,/r �+
On this 25th day of May,2023,before me,personally came the above signatories known to me,who being duly sworn,did depose and say that he/they is an officer of each
of the Companies;and that he executed said instrument on behalf of each Company by authority of his office under th by ws of each Company. "v TArto '
PN R
sun
By: Amy aylor,Not ublic My Commisstontx to/947
CERTIFICATE
I,the undersigned Officer of each Company,DO HEREBY CERTIFY that:
1. That the original power of attorney of which the foregoing is a copy was duly executed on behalf of each Company and has not since been revoked arfibndetl or modified;
that the undersigned has compared the foregoing copy thereof with the original power of attorney.and that the same is a true and correct copy of the original power of
attorney and of the whole thereof;
2.The following are resolutions which were adopted by the board of directors of each Company by unanimous written consent effective 30'"day of March,2023 for BSIC
and LIC and the 17m day of May,2023 for EAC and EAIC and said resolutions have not since been revoked,amended or modified:
"RESOLVED,that each of the individuals named below is authorized to make,execute,seal and deliver for and on behalf of the Company any and all bonds,
undertakings or obligations in surety or co-surety with others: RICHARD M.APPEL,MATTHEW E.CURRAN,MARGARET HYLAND,SHARON L.SIMS,
CHRISTOPHER L.SPARRO,
and be it further
RESOLVED,that each of the individuals named above is authorized to appoint attorneys-in-fact for the purpose of making,executing,sealing and delivering bonds,
undertakings or obligations in surety or co-surety for and on behalf of the Company."
3.The undersigned further certifies that the above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof.
IN WITNESS WHEREOF,I have hereunto set my hand and affixed the corporate seal this 18th day of Se•tember 1,20 24
Daniel S. •rieeretary
NOTICE: U.S.TREASURY DEPARTMENT'S OFFICE OF FOREIGN ASSETS CONTROL(OFAC)
No coverage is provided by this Notice nor can it be construed to replace any provisions of any surety bond or other surety coverage provided. This Notice provides information concerning
possible impact on your surety coverage due to directives issued by OFAC. Please read this Notice carefully.
The Office of Foreign Assets Control(OFAC)administers and enforces sanctions policy,based on Presidential declarations of"national emergency". OFAC has identified and listed
numerous foreign agents,front organizations,terrorists,terrorist organizations,and narcotics traffickers as"Specially Designated Nationals and Blocked Persons". This list can be located
on the United States Treasury's website—https://www.treasury.gov/resource-center/sanctions/SDN-List.
In accordance with OFAC regulations,if it is determined that you or any other person or entity claiming the benefits of any coverage has violated U.S.sanctions law or is a Specially
Designated National and Blocked Person,as identified by OFAC,any coverage will be considered a blocked or frozen contract and all provisions of any coverage provided are immediately
subject to OFAC. When a surety bond or other form of surety coverage is considered to be such a blocked or frozen contract,no payments nor premium refunds may be made without
authorization from OFAC. Other limitations on the premiums and payments may also apply.
Any reproductions are void.
Surety Claims Submission:LexonClaimAdministration(risompo-intl.com
Telephone:615-553-9500 Mailing Address:Sompo International;12890 Lebanon Road;Mount Juliet,TN 37122-2870
REEDC. Contractor's License: REEDTEI016JW
TRUCKING & EXCAVATING Contractor's License Bond: WA5470784
ATTACHMENT A Employment Security: 093121-004
11616 24th Ave E L&I: 983, 104-00
Tacoma, WA 98445 Tax ID: 91-1938552
Office 253-841-4837 UBI: 601 915 034
Fax 253-841-4816 King County SCS Certification No. 989
Shawn Reed, President ; Prime Contractor
sreed@reedtrucking.com I -
Qualifications Information
Project: Seattle& Cedar Water Main Replacement&Complete Streets
Owner: City of Pacific
Contact: Rick Gehrke
Scope: This project provides for the improvement of water mains, water services, water
meters, and pavement within Seattle Blvd S from 2nd Ave SW to 3'd Ave SW, Cedar
Ln from 1st Ave E to 2' Ave Se, and 15t PI SE east of Cedar Ln, and other work.
Bonded: YES
Contract Amount: $1,756,207.63
% Complete: 0%
Scheduled Completion: 190 calendar days
Federally Funded: No
Project: Projects for 2024 Overlay
Owner: City of Normandy Park
Contact: Tani Stafford
Scope: The Contract provides for sidewalk and storm drainage improvements in various
streets within the City. The project includes storm drainage improvements, curb
and gutter replacements and sidewalk improvements at various locations within the
public right of way and easements, around the City, and other work all in
accordance with the attached Contract Plans.
Bonded: YES
Contract Amount: $678,565.00
% Complete: 23%
Scheduled Completion: 40 Days
Federally Funded: No
Project: 10th Street SE Improvements
Owner: City of Puyallup
Contact: Jessica Wilson
Scope: Specific work consists repairing the roadway for 10th Street SE, replacement of
approximately 260 linear feet of sewer main, and replacement of approximately
500 linear feet of water main and 465 linear feet of stormwater lines. The work
will also include new curb and gutters, sidewalk, an ADA ramp, signing, striping,
and traffic control for the City of Puyallup.
Bonded: YES
Contract Amount: $804,329.99
Page 1
%Complete: 78%
Scheduled Completion: 70 Days
Federally Funded: No
Project: 124th Ave NE Roadway Improvements
Owner: City of Kirkland
Contact: Allen Prouty
Scope: Specific work consists of furnishing all labor, tools, materials, and equipment
necessary for construction of the 124th Ave NE Roadway Improvements.Specific
Work includes, but is not limited to the improvement of 124th Ave NE from NE
116th St to NE 124th St including clearing and grubbing,traffic control and
maintenance of traffic, temporary erosion and sedimentation control,
construction of curbs, asphalt concrete paving, reconstruction of driveways,
retaining walls, landscaping, installation of storm drainage pipe, catch basins,
traffic signal and APS upgrades, roadway illumination, channelization, signing, and
property restoration and other work.
Bonded: YES
Contract Amount: $10,310,710.24
%Complete: 13%
Scheduled Completion: 220 Days
Federally Funded: Yes
Project: Streets Initiative Package#23
Owner: City of Tacoma
Contact: Brandon Snow
Scope: This project includes generally consists of a grind and overlay of the roadway
surface along all existing segments and new grade and pave with wedge curb on
gravel road segments on Kellogg Street.New catch basins will be installed and
catch basin maintenance will occur at all intersections as needed. Additionally,
new street trees are to be installed.
Bonded: YES
Contract Amount: $3,896,647.00
%Complete: 99%
Scheduled Completion: 140 Days
Federally Funded: No
Project: A Street Loop
Owner: City of Auburn
Contact: Matt Larson
Scope: The major items of work include constructing approximately 250 linear feet of new
collector street, storm drainage, and retaining wall improvements—including
excavation for new roadway pavement and subgrade; new asphalt concrete
roadway pavement and subgrade; pavement grinding; cement concrete curb and
gutter; pervious concrete sidewalk; curb ramps; storm drainage collection,
conveyance, infiltration and water quality treatment; soldier pile retaining walls;
fencing; illumination system; and other appurtenances, and other work.
Bonded: YES
Contract Amount: $1,602,715.00
%Complete: 26%
Scheduled Completion: 65 Days
Federally Funded: Yes
Project: Israel Road &Linderson Way Water Main
Owner: City of Tumwater
Page 2
Contact: Nhan Vo
Scope: This project includes new ductile iron water main spanning Israel Road from 1-5 to
Capitol Boulevard,and Linderson Wat from Israel Road to Department of Labor
and Industries building. The new water main will include connections to existing
laterals, replacement if meter services and hydrant assemblies, and connection to
existing dry line that crosses the bridge on the west end of the project limits. Other
work will include shifting of existing gas and sewer lines to resolve conflicts with
the proposed water main,joint utility trenching for private utilities,and overhead
to underground power conversion,removing and replacing cement concrete
sidewalks, striping, repairing paved surfaces,clean-up and other work.
Bonded: YES
Contract Amount: $3,365,536.16
%Complete: 100%
Scheduled Completion: 60 Days
Federally Funded: No
Project: Kingston Regional Stormwater Facilities
Owner: Kitsap County
Contact: Tim Beachy
Scope: This project includes procurement and installation of six BioPod vaults within the
Kitsap County right of way, construction of new sidewalks on Ohio Avenue,
roadway reconstruction and other work
Bonded: YES
Contract Amount: $1,653,867.71
%Complete: 99%
Scheduled Completion: 60 Days
Federally Funded: No
Project: Auburn Way S. South Side Sidewalk
Owner: City of Auburn
Contact: Seth Wickstrom
Scope: The work provides for the construction of Project CP2129, Auburn Way S South
Side Sidewalk. The major items of work include the construction of approximately
1,400 linear feet of curb/gutter and sidewalk, 1,300 linear feet of beam guardrail,
storm drainage improvements and a new Rectangular Rapid Flashing Beacon
(RRFB).
Bonded: YES
Contract Amount: $645,591.25
%Complete: 100%
Scheduled Completion: 50 Days
Federally Funded: No
Project: 1st Avenue South Sidewalk
Owner: City of Normandy Park
Contact: Tani Stafford
Scope: The Contract provides for sidewalk and storm drainage improvements in various
streets within the City. The project is divided into two schedules of work. Schedule
A: 1 s Avenue South Sidewalk Improvements includes 900 LF of clearing,
grubbing, pavement removals, storm improvements, cement concrete curb, gutter
and sidewalk, HMA pavement patch, raising guardrail, modular block walls and
advanced traffic loop replacement on the west side of 1st Avenue South between
SW 176th Street and South 174th Street. Schedule B: Projects for 2023 Overlay
includes storm drainage improvements on 1st Avenue South near the south city
limits, ditch regrading and improvements along South 218th Street and 6th Avenue
Page 3
South; and approximately 335 linear feet of sidewalk, driveway entrance and curb
ramp replacement at 16 isolated locations along the SW 171st Street, SW 174th
Street, Marine View Drive, Terrace Court SW, and SW Normandy Road corridors.
Bonded: YES
Contract Amount: $497,167.00
%Complete: 100%
Scheduled Completion: 40 Days
Federally Funded: No
Project: Riverwalk Drive SE Non-Motorized Improvements
Owner: City of Auburn
Contact: Aleksey Koshman
Scope: Site preparation and demolition,constructing new pavement surfacing, new
sidewalk, curb and gutter,curb walls, stormwater conveyance,franchise utility
coordination, permanent signing, illumination, RRFB,traffic control and staging.
Bonded: YES
Contract Amount: $1,689,653.33
%Complete: 100%
Scheduled Completion: 125 Days
Federally Funded: No
Project: Park Street Turn Lane
Owner: City of North Bend
Contact: Tom Mohr
Scope: Vertical concrete curb and gutter, concrete sidewalk, replacing sewer manhole
castings, miscellaneous surface restoration,pavement markings,traffic
control.
Bonded: YES
Contract Amount: $59,750.00
Final Contract Amount: $55,231.10
%Complete: 100%
Scheduled Completion: 30 Days
Federally Funded: No
Project: SR 162 E Water Main Replacement Phase 2&3
Owner: Valley Water District
Contact: Will Smythe
Scope: This project provides for water main improvements within the Valley Water
District.The project is located within WSDOT right-of-way.Work will consist
of furnishing and installing approximately 1,460 linear feet of 12" ductile iron
water main in Phase 2 and 3,530 linear feet of 12" ductile iron water main in
Phase 3 and all associated water system materials including water main,
fittings,valves,fire hydrants, and water service materials,as well as traffic
control and surface restoration.
Bonded: YES
Contract Amount: $1,602,163.00
%Complete: 100%
Scheduled Completion: 100 Days
Federally Funded: No
Project: CIP 30 North Fork McSorley Creek Diversion
Owner: City of Des Moines
Contact: Tyler Beekley
Page 4
Scope: The project consists of approximately 1,100 linear feet of storm sewer pipe and
catch basin of various types and diameters.The project will also include replacing
hot mix asphalt pavement, new cement concrete rolled curb and gutter, new
cement concrete sidewalk, and other work.
Bonded: YES
Contract Amount: $630,324.70
Final Contract Amount: $708,866.74
%Complete: 100%
Scheduled Completion: 40 Days
Federally Funded: No
Project: 4th Street SE Preservation
Owner: City of Auburn
Contact: Jeffrey Bender
Scope: Site preparation and demolition, constructing new pavement surfacing, sidewalks,
curb and gutter, curb walls, stormwater conveyance, water main, sanitary sewer
main, franchise utility coordination, private property restoration, landscaping
restoration, permanent signing, and traffic control and staging, and other work.
Bonded: YES
Contract Amount: $3,703,704.32
Final Contract Amount: $3,447,120.44
%Complete: 100%
Scheduled Completion: 160 Days
Federally Funded: No
Project: WSU LID Frontage Improvements Phase 4B
Owner: City of Puyallup
Contact: Ryan Rutkosky RRutkosky@PuyallupWA.gov
Scope: Precast concrete bridge under Pioneer Way, 600 ft of porous HMA and concrete
curbs, sidewalks, coil nail and gabion walls
Bonded: YES
Contract Amount: $995,054.89
Final Contract Amount: $818,514.08
%Complete: 100%
Completion Date: 6/8/2022
Federally Funded: No
Project: Duvall Ave NE
Owner: City of Renton
Contact: Flora Lee
Scope: Excavation,grading, removal of pavement, planing pavement, paving with
asphalt, curb and gutter, drainage, illumination, HAWK signal, sidewalk, walls,
adjustments to utility frames, grates, and covers, water system improvements,
undergrounding utilities, property restoration.
Bonded: YES
Contract Amount: $5,218,171.95
%Complete: 100%
Scheduled Completion: 260 Days
Federally Funded: No
Project: Alameda Drive
Owner: City of University Place
Contact: Jack Ecklund
Page 5
Scope: New road consisting of curbs, gutters, sidewalks, walls, bike lanes, storm drainage
improvements, paving, landscaping, irrigation and street lights.
Bonded: YES
Contract Amount: $981,798.00
Final Contract Amount: $935,490.73
%Complete: 100%
Completion Date: 5/27/2022
Federally Funded: No
Project: Streets Initiative Package#22
Owner: City of Tacoma
Contact: Larry Rybachuck
Scope: Pavement removal, roadway excavation, adjustment of utility structures, and
paving.
Bonded: YES
Contract Amount: $1,790,920.00
Final Contract Amount: $2,494,934.65
%Complete: 100%
Completion Date: 5/27/2022
Federally Funded: No
Project: 24th&Meridian Sidewalk Gaps
Owner: City of Edgewood
Contact: Jeremy Metzler
Scope: Construct sidewalks and appurtenant road and utility improvements, retaining
wall, storm drainage, water main, bike lane and illumination.
Bonded: YES
Contract Amount: $621,356.25
%Complete: 100%
Completion Date: 1/15/2022
Federally Funded: No
Project: WSU LID Frontage Improvements Phase 4A
Owner: City of Puyallup
Contact: Ryan Rutkosky RRutkosky@PuyallupWA.gov
Scope Precast concrete bridge under Pioneer Way, 600 ft of porous HMA and concrete
curbs, sidewalks, coil nail and gabion walls
Bonded: YES
Contract Amount: $2,436,462.50
Final Contract Amount: $2,001,932.72
%Complete: 100%
Completion Date: 4/8/2022
Federally Funded: No
Project: North Airport Area Storm Improvements
Owner: City of Auburn
Contact: Seth Wickstrom 2532-804-5034 swickstrom@auburnwa.gov
Scope: Remove existing and install 470'of new storm pipe with structures.
Bonded: YES
Contract Amount: 115,000
%Complete: 100%
Completion Date: 01/29/2021
Page 6 —
Federally Funded: No
Project: Fitz Hugh Watermain
Owner: City of Lacey
Contact: Justin Knox
Scope: Install 1,300 Lineal feet of water main.
Bonded: YES
Contract Amount: $427,754.00
% Complete: 100%
Completion Date: 1/8/2021
Federally Funded: No
Project: Mary Lyon Elementary SRTS
Owner: City of Tacoma
Contact: Neal Sartain 253-208-3739
Scope: Safe Routes to School includes remove asphalt& concrete, replace with new. Add
storm structures, crosswalk paint lines, and traffic signal modifications at three
intersections.
Bonded: YES
Contract Amount: $260,913.00
%Complete to Date: 100%
Completion Date: 12/7/2020
Federally Funded: No
Project: SR 410 Sewer Bottleneck Phase II
Owner: City of Bonney Lake
Contact: Doug Budzinsky 253-447-4342
Scope: Install new sewer main and rejoin existing sewer system boring under SR-410 at
192nd Upgrade pushbuttons, new concrete curb ramps, storm water swale
improvements.
Bonded YES
Contract Amount: $910,908.04
Final Contract Amount: $911,720.78
% Complete to Date 100%
Completion Date: 10/23/2020
Federally Funded: No
Project: Jackson Ave SE & SE Salmonberry Road Intersection
Owner: Kitsap County
Contact: Steve Nichols 253-405-9711
Scope: Construct single-lane roundabout, 10' sidewalks, Bioretention cell, 4 gravity block
walls and new illumination system at the intersection of Jackson Avenue SE & SE
Salmonberry Road.Traffic control, paving, curb &gutter and pavement markings.
Bonded: YES
Contract Amount: $1,121,773.00
Final Contract Amount: $1,141,692.83
% Complete to Date: 100%
Completion Date: 12/4/2020
Federally Funded: No
Project: Cedar Street Improvements
Owner: City Of Buckley
Page 7
Contact: Chris Banks
Scope: Install 1,200 LF of roadway on Cedar Street from Jefferson Ave to Main Street.
Grind & overlay above existing concrete panels, full reconstruction, replace curb
&gutter, curb ramp retrofits. 1,100 LF of new 8-in & 12-in storm pipe structures.
1,100 LF of 8-inch DI water main replacement. replace 220 LF of 8-inch PVC SCH
35 sanitary sewer main. Pave 275 LF of alley. concrete curb, gutter, sidewalk.
Bonded: YES
Contract Amount: $1,290,651.24
Final Contract Amount: $1,290,651.24
% of Work Completed to Date: 100%
Completion Date: July 30, 2020
Federally Funded: No
Project: Water Main Replacement Project MRP 2018-45
Owner: City of Tacoma Public Utilities
Contact: Geff Yotter 253-377-5966
Scope: Construct approximately 9,700 LF of water main with all necessary valves and
specials. Also install 10 foot precast concrete vault with bollards.
Bonded: YES
Contract Amount: 1,473,617.30
%of work completed to date: 100%
Completion Date: 1/15/2021
Project: Meridian Water Improvements
Owner: City of Lacey
Contact: Aubrey Collier 360-438-2639
Scope: Install 1,700 LF of 6 inch and 12 inch water main, valves and connections.
Bonded: YES
Contract Amount: $340,212.12
%of work completed to date: 100%
Completion Date: 05/01/2020
Federally Funded: No
Project: Liberty Bay Bioretention Project
Owner: City of Poulsbo
Contact: Charles Roberts 360-779-4078
Scope: Install water quality features: Site 1 Install large concrete storm water quality
treatment vault on the NK Middle School, install 300 LF storm pipe. Site 2-
Retrofit and install 300 LF bio-retention swale on Fjord Drive.
Bonded: Yes
Contract Amount: $270,224.35
% of work completed to date: 100%
Completion Date: 5/29/2020
Federally Funded: No
Project: Volunteer Sidewalks
Owner: City of Sumner
Contact: Andrew Leach 253-299-5711
Scope: Various sidewalk and ADA improvements, new water main, spot repairs, asphalt.
Bonded: YES
Contract Amount: $1,072,061.17
%of work completed to date: 100%
Completion Date: 1/17/2020
Page 8
Federally Funded: No
Project: 24th/25th Street Water Main Replacement
Owner: City of Bonney Lake
Contact: Doug Budzynski
Scope: Replace existing PVC Water Main with new DIP Water Main.
Bonded: YES
Contract Amount: $116,546.59
% of work completed to date: 100%
Completion Date: 6/10/2019
Federally Funded: No
Project: 2017 Sidewalk Links
Owner: City of Puyallup
Contact: Drew Young PE (253-435-3641)
Scope: Roadwork, utilities, HMA, concrete sidewalks, pervious concrete, spot repair
Bonded: YES
Contract Amount: $1,288,155.00
% of work completed to date: 100%
Completion Date: 7/10/2019
Federally Funded: No
Project: 2016 Sidewalk Program
Owner: City of Puyallup
Contact: Drew Young Project Engineer (253-435-3641)
Scope: Roadwork, utilities, HMA, concrete sidewalks, spot repair, tree removal.
Bonded: YES
Contract Amount: $656,941.00
%of work completed to date: 100%
Completion Date: 5/17/2019
Federally Funded: No
Construction experience and present commitments of the key individuals of Reed Trucking & Excavating, Inc.
Shawn J. Reed: President/Owner 30 years managing construction projects
Dustin Wright: Vice President/Superintendent 27 years construction
Tiffani Barquist: Contract Administrator 5 years contract administration
Chance Erdmann: Foreman 20 years construction
Travis Haney: Foreman 20 years construction
Chris Rustan: Foreman 25 years construction
Joey Frantom: Foreman 15 years construction
Equipment Operators, Pipe Layers, Top Man, Laborers, Dump Truck Drivers, Flaggers,Traffic Control Supervisor
List of Major Equipment Owned:
2023 KOMATSU PC 238 Excavator
2022 KOMATSU PC 238 Excavator
2002 KOMATSU PC 200 Excavator
2023 KOMATSU PC 138 Excavator
(2) 2019 KOMATSU PC 138 Excavator
2018 & 2020 KOMATSU PC 88 Excavator
Page 9
2019 Kubota KX057 Excavator
2005 KOMATSU WA250L-5 Loader
2018 KOMATSU WA270-8 Loader
2022 KOMATSU WA320-8 Loader
2002 JOHN DEERE 310 Backhoe
2020 JOHN DEERE 410 Backhoe
2002 JOHN DEERE MDL 550H Dozer
2002 Tilt Top Trailer
(3) FRIEGHTLINER 8 Axle DUMP Trucks &Trailers
2005 Ford F-450 Utility Truck
2019 Ford F-450 Utility Truck
2020 Ford F-450 Utility Truck
2022 Ford F-450 Utility Truck
2023 Ford F-450 Utility Truck
2014 Ford F-350 TCS Truck
2022 Ford F-350 TCS Truck
2001 International Water Truck
2014 RANDCO Tanks Water Truck
1998 Sakai 84" Drum Roller
2019 ASPHALT ZIPPER
(2)2019 PORTABLE MESSAGE BOARDS
(2)2021 PORTABLE MESSAGE BOARDS
(2)2021 ARROW BOARDS
2015 Caterpillar CB24B Asphalt Compactor
2015 SM300 Laymore Sweeper004
2022 NB25 BROOM Sweeper
(2)2022 Super Solo Dump Trucks
2024 Western Star
TRADE REFERENCES
Ferguson Waterworks 2042 S 112th ST. PH: 253-538-8275 Fax: 253-531-9909
Lance Hayes Tacoma, WA 98444 lance.hayes@ferguson.com
Shope Concrete 1618 E. Main PH: 253-848-1551 Fax: 253-845-0292
Derek Rogers Puyallup, WA 98372 drogers@shopeconcrete.com
Washington Rock 21711 103rd Ave PH: 253-262-1661 ext 102 Fax: 253-262-1664
Madison Cole Graham, WA 98338 AR@wa-rock.com
Page 10
Contracts on Hand
Job# Project Name Bonded Amount Billed to date Balance of contract
166 1st Avenue South Sidewalk $497,167 $641,041.09
Kingston Regional Stormwater
165 Facilities $1,653,867.71 $1,567,265.79 $86,601.92
169 A Street Loop $1,602,715.00 $596,794.59 $1,005,920.41
170 Streets Initiative Package#23 $3,896,647.00 $4,300,718.96
172 124th Ave NE Improvements $10,310,710.24 $1,069,759.76 $9,240,950.28
173 10th St SE improvements $804,329.99 $635,144.76 $169,185.23
174 Projects for 2024 Overlay $678,565.00 $158,926.92 $519,638.08
175 Seattle& Cedar Water Main $1,756,207.63 $0.00 $1,756,207.63
$21,200,209.57 $8,969,651.87 $12,778,503.55
Page 11
CONSENT OF DIRECTORS
OF
REED TRUCKING & EXCAVATING, INC.
IN LIEU OF ANNUAL MEETING
Pursuant to the provisions of RCW 23B.07.040, the undersigned, being the sole member of the Board of
Directors of REED TRUCKING & EXCAVATING, INC., a Washington corporation, acting by unanimous
written consent to the taking of the action set forth therein.
RESOLVED: That the following named elected to all the offices of the corporation for the coming year, or
until their successors are elected and qualified: /
President: Shawn J. Reed �L`
Vice President: Dustin Wright
Secretary: Connie L. Gordon / /
P
RESOLVED: That all actions by officers of the corporation since the last meeting of the Board of Directors
are hereby ratified and confirmed.
RESOLVED: That the Corporation shall continue to create a budget and forecast for the coming year and
review spending and equipment paid off in 2021.
The execution of the Consent, which may be accomplished in counterparts, shall constitute a written
waiver of any notice required by the Washington Business Corporation Act or Corporation's Articles of
Incorporation and Bylaws.
DATED the 29th of March, 2022.
hawn J. Reed Pr i ent
Dustin Wright, Vice President
2/9711U:‹.
Connie L. Gordon, Secretary
?EED
LICKING & EXCAVATING
LLENCE IN CIVIL CONSTRUCTION SINCE 1998
6 24th Ave E
ma, WA 98445
C -L1 O IZe1(1
l 0 55 5d( }-k. GC 0-0\.c ct. G._)cKly
q Fo 5 '7
CITY OF RENTON \''C77 (\
OCT 02 2024 cyrn
RECEIVED
CITY CLERK'S OFFICE; 1/
J (-'