HomeMy WebLinkAboutOMA Construction, Inc. CONSTRUCTION, INC.
Office Box 429
Ile Valley,Washington 98038
BID ENCLOSED:
South 7th Street Corridor Improvements
Oakesdale Avenue to Burnett Avenue
Federal Aid#CRPUL-CM 1292(003)
Project No. CAG-24-109
7th Floor �,�s-Pm
Renton City Hall CITY OF RENTON
1055 South Grady Way
Renton , WA, 98057 OCT 02 2024 COT
RECEIVED
DUE: CITY CLERKS OFFICE
10/02/2024
2:00 PM
( SniSpurril Corridor
CONSTRUCTION, INC. C7 �e Av&n 4-13 B`,crr�� /e,nt.c,-e,
ffice Box 429 ���,"-fr_ ' A G (_ 2,F`'"1 — C ' ` 1 2 Z(0 D.3)
Valley,Washington 98038
I\(o A , 2-4 - 1a �
OMA Construction Inc
Supplementary Bid Docs
South 7th Street
CITY OF RENTON
OCT 03 2024
RECEIVED
CITY CLERKS OFFICE
r- A '
tpr3/ Z3Z9
City of Renton
Contract Provisions for
South 7th Street Corridor Improvements
III.PROJECT PROPOSAL
Contract Documents Page 10
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PROJECT PROPOSAL
Project:South 7th Street Corridor Improvements
FederalAid No:CRPUL-CM 1292(003)
City Contract Number:CAG-24-109
Company:OMA Construction,Inc.
Address:P0 Box 429
Maple Valley,WA 98038
Phone Number:206-262-1721
Fax Number:206-262-9107
TotatBidAmount:$%,-Y/
(TotaL of Bid ScheduLes A +B +C)
Contract Documents (Addendum No.3)Page 11
South 7th Street Corridor Improvements October 2024
Provided to Builders Bxchange of WA,Inc.For usage Conditions Agreement see www.bxwe.com -Always Verify Scale
PROPOSAL
South 7th Street Corridor Improvements
TO THE CITY OF RENTON
RENTON,WASHINGTON
Ladies and/or Gentlemen:
The undersigned (Bidder)hereby certify that the Bidder has examined the location and construction
details of the proposed work and has read and thoroughly understands the Contract Documents
governing the work,and the nature of the work,and the method by which payment will be made for
said work.Bidder hereby proposes to undertake and compLete the work detailed in and in
accordance with these Contract Documents,for the Total Bid Amount shown on the attached
Schedule of prices.
The Bidder understands that the quantities mentioned herein are approximate only and are subject
to increase or decrease,and hereby proposes to perform alt quantities of work as either increased
or decreased in accordance with the Contract Documents.
As evidence of good faith,pursuant to RCW 35.23.352(1),an original Bid ProposaL Deposit in the
form of (check one)1 bidbond,or
D cashier’s check (made payable to the City of Renton),or
D postal money order (made payabte to the City of Renton),in an amount eq ual to five percent
(5%)of the Total Bid Price,is attached hereto.
If a bid bond is signed by an attorney-in-fact,Bidder agrees that the power of attorney authorizing
such execution must be current and enforceable,be property executed by the Surety in accordance
with the Surety’s by-laws or other appLicable rules and resolutions,and include all necessary
corporate seals,signatures,and notaries.
Bidder understands that Contract Award or Bid rejection wilt occur within 60 catendar days after
the opening of bids,as specified in Section 1-03.2 of the Standard Specifications.
Bidder further understands that should Bidder failto enter into this contract in accordance with his
or her Bid and furnish a contract bond within a period of ten (10)days from the date at which he or
she is notified that he or she is the successful bidder,the Bid Proposal Deposit shall be forfeited to
the City of Renton,as set forth in RCW 35A.40.200 and RCW 35.23.352.
Bidder hereby agrees to complete the Physicat Work in all respects within 60 working days.
Contract time shalt begin on the first working day following the Notice to Proceed date.
Contract Documents Page 12
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scsi
PROPOSAL (BID SCHEDULE A-South 7th Street,Shattuck to Burnett)
South 7th Street CorrIdor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit prices for all items,all extensions,and total amount ot Bid shall be shown Enter unit prices in
numerical figures only in dollars and cents.e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible figures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified for
any item,the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
Al.1-05 Roadway Surveying 1 LS $20,000.00 $20,000.00
A2.1-05 ADA Features Surveying 1 LS $10,000.00 $10,000.00
A3.1-05 Record Drawings 1 LS $5,000.00 $5,000.00
A4.1-07.15 SPCC Plan 1 LS $500.00 $500.00
A5.1-09 Mobilization 1 LS $125,000.00 $125,000.00
A6.1-10 WorkZoneSafetyContingency 1 FA $25,000.00 $25,000.00
A7.1-10 PedestrianTrafficControl 1 LS $100,000.00 $100,000.00
A8.1-10 Flaggers 720 HR $75.00 $54,000.00
A9.1-10 OtherTraffic Control Labor 240 HR $200.00 $48,000.00
AiD.1-10 Construction Signs Class A 681 SF $8.00 $5,448.00
All.1-10 Other Temporary Traffic Control Devices 1 LS $50,000.00 $50,000.00
A12.2-01 Clearing and Grubbing 1 LS $25,000.00 $25,000.00
A13.2-02 Removal of Structures and Obstructions I LS $5,000.00 $5,000.00
A14.2-O2SP Sawcutting 10260 IN-FT $0.90 $9,234.00
A15.2-O3SP Pothole existing utilities 2 EA $1,250.00 $2,500.00
A16.2-03 Roadway Excavation md.Haul 50 CY $85.00 $4,250.00
A17.2-03 Common Borrow mci.Haul 133 CY $25.00 $3,325.00
A18.4-04 Crushed Surfacing Top Course 470 TON $50.00 $23,500.00
A19.5-045P HMA CL 1/2”,PG 64-22”310 TON $225.00 $69,750.00
A20.7-O4SP Ductile iron Pipe,12 In.Diam.90 LF $250.00 $22,500.00
A21.7-04 Solid Wall PVC Storm Sewer Pipe 12 In.Diam.10 LF $500.00 $5,000.00
Contract Documents (Addendum No 2)Page 13
South 7th Street Corridor Improvements September 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PROPOSAL (BID SCHEDULE A -So uth 7th Street,Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit prices for all items,all extensions,and total amount of Bid shall be shown Enter unit prices in
numerical figures only in dollars and cents.i e to two t2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible figures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified for
any tern the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
A22.7-05 Catch Basin Type 1 7 EA $3,500.00 $24,500.00
A23.7-05SP Open Grate Locking Lid 1 EA $500.00 $500.00
A24.7-05SP Solid Locking Lid I EA $500.00 $500.00
A25.7-O5SP 24 In.Locking Lid Non-Slip Manhole Cover I EA $500.00 $500.00
A26.7-O5SP Adjust Manhole (Slip-Resistant Lid)13 EA $750.00 $9,750.00
A27.7-O5SP Adjust Manhole (Slip-Resistant Lid Only)5 EA $750.00 $3,750.00
A28.7-05 AdjustManhole 4 EA $1,000.00 $4,000.00
A29.7-O5SP Adjust Water Valve 4 EA $500.00 $2,000.00
A30.7-O5SP Adjust utility Lid 6 EA $500.00 $3,000.00
A31.8-01 Erosion Control and Water Pollution Prevention 1 LS $10,000.00 $10,000.00
A32.8-01 Inlet Protection 22 EA $75.00 $1,650.00
A33.8-02 Seeded Lawn Installation 425 SY $5.00 $2,125.00
A34.8-O2SP Wood Chip Mulch (3”Depth)140 CY $65.00 $9,100.00
A35.8-O2SP Topsoil,Type A (8”Depth)393 CY $50.00 $19,650.00
A36.8-O2SP Coarse Compost (2.5”Depth)215 CY $65.00 $13,975.00
A37.8-02 Plant Selection,Deciduous Tree (2”Cal.)17 EA $250.00 $4,250.00
A38.8-02 Plant Selection,Shrub (#2 Cont)532 EA $20.00 $10,640.00
A39.8-02 Plant Selection,Shrub (#5 Cont.)24 EA $30.00 $720.00
A40.8-02 Plant Selection,Groundcover (#1 Cont.)3912 EA $8.00 $31,296.00
A41.8-O2SP Root Barrier (24”Depth)226 LF $8.00 $1,808.00
A42.8-O3SP Automatic Irrigation System,Complete 1 LS $65,000.00 $65,000.00
Contract Documents (Addendum No 2)Page 14
South 7th Street Corridor Improvements September 2024
Provided to Builders Ecchangs of WA,Inc.For usage Conditions Agreement see www.bxws.com -Always Verify Scal
PROPOSAL (BID SCHEDULE A -South 7th Street,Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit prices for all items,all extensions,and total amount of Bid shall be shown.Enter unit prices in
numerical figures only in dollars and cents.i e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible tigures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified tot
any item,the unit price shall prevail,and totals shall be corrected to conform thereto.
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
A43.8-04 Cement Cone.Traffic Curb and Gutter 931 LF $45.00 $41895.00
A44.8-04 Cement Cone.Traffic Curb 57 LF $55.00 $3135.00
A45.8-04 Cement Cone.Pedestrian Curb 81 LF $45.00 $3,645.00
A46.8-O6SP Cement Cone.Driveway Entrance 160 SY $100.00 $16,000.00
A47.8-06 Cement Cone.Driveway Entrance Type 3 50 SY $100.00 $5,000.00
A48.8-09 Raised Pavement Marker Type 1 10 HUND $750.00 $7,500.00
A49.8-09 Raised Pavement Marker Type 2 5 HUND $950.00 $4,750.00
A50.8-IOSP Traffic Separator,White 17 EA $350.00 $5950.00
A51.8-1OSP Traffic Separator,White 11 EA $350.00 $3,850.00
A52.8-12SP Black Polyvinyl Coated 4FT Chainlink Fence 413 LF $55.00 $22,715.00
A53.8-12SP Privacy Fence 6FT Wooden 97 LF $85.00 $8,245.00
A54.8-13 MonumentCaseandCover 2 EA $500.00 $1,00000
A55.8-14 Cement Cone.Sidewalk 1195 SY $80.00 $95,600.00
A56.8-14 Cement Cone.Curb Ramp Type Perpendicular A 2 EA $2,000.00 $4,000.00
A57.8-14 Cement Cone.Curb Ramp Type Perpendicular B 4 EA $1,500.00 $6,000.00
A58.8-14 Cement Cone.Curb Ramp Type Bike 2 EA $500.00 $1,000.00
A59.8-14 Detectable Warning Surface 107 SF $12.00 $1,284.00
A60.8-I4SP Tactile Directional Indicator 24 SF $50.00 $1,200.00
A61.820Sp Traffic Signal System Modification -S 7th st &Shattuck Ave
1 LS $150,000.00 $150,000.00
A62.8-20 Illumination System,Complete 1 LS $215,000.00 $215,000.00
A63.8-20 Conduit Pipe3ln.Diam.2266 LF $23.00 $52,118.00
Contract Documents (Addendum No.2)Page 15
South 7th Street Corridor Improvements September 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scsi
PROPOSAL (BID SCHEDULE A -South 7th Street,Shattuck to Burnett)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit pnces for at items,all extensions and total amount of Bid shall be shown Enter unit prices in
numerical figures only i dollars and cents.e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible figures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified for
any item,the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price”AmountNo.Section
A64.8-21 Permanent Signing 1 LS $35,000.00 $35000.00
A65.8-21SP Remove Private Sign 1 LS $500.00 $500.00
A66.8-22SP Remove Pavement Markings 1 LS $5,000.00 $5,000.00
A67,8-22SP Plastic Bike Dot 9 EA $650.00 $5,850.00
A68.8-22 PlasticTraffic Arrow 4 EA $350.00 $1,400.00
A69.8-22 Plastic Speed Bump Symbol 2 EA $450.00 $900.00
A70.8-22 Plastic Stop Line 66 LF $17.00 $1,122.00
A71.8-22 Plastic Crosswalk Line 932 SF $12.00 $11,184.00
A72.8-22SP MMA Profiled Line 3554 LF $6.00 $21,324.00
A73.8-22SP MMAProfiledWideLine 97 LF $15.00 $1,455.00
A74.8-22SP MMA Crosshatch Marking 54 LF $15.00 $810.00
A75.8-22SP MMACrosswalkLine(Green)875 SF $21.00 $18,375.00
Total Schedule A (South 7th Street,Shattuck to Burnett)*$1,584,528.00
“All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1)and
WAC 458-20-7 71.
Contract Documents (Addendum No.2)Page 16
South 7th Street Corridor Improvements September 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify scsi
PROPOSAL (BID SCHEDULE B -South 7th Street,Oakesdale to west of Shattuck)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit prices for all items,all extensions,and total amount of Bid shall be shown Enter unit prices in
numerical figures only in dollars and cents.i e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible.Bids with illegible figures in the Unit Price column will be
rejected as unresponsive.Where conflict occurs between the unit price and the total amount specified tot
any item,the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
Bi.1-05 Roadway Surveying 1 LS $15,000.00 $15,000.00
B2.1-05 ADA Features Surveying I LS $5,000.00 $5,000.00
B3.1-09 Mobilization 1 LS $50,000.00 $50,000.00
84.1-10 WorkZoneSafetyContingency 1 FA $10,000.00 $10,000.00
85.1-10 PedestrianTrafficControl 1 LS $12,500.00 $12,500.00
B6.1-10 Flaggers 360 HR $75.00 $27,000.00
87.1-10 OtherTrafficControlLabor 180 HR $200.00 $36,000.00
B8.1-10 Other Temporary Traffic Control Devices 1 LS $5,000.00 $5,000.00
B9.1-10 Uniformed Police Officer 72 HR $250.00 $18,000.00
BlO.2-02 Removal of Structures and Obstructions 1 LS $5,000.00 $5,000.00
811.2-O2SP Sawcuffing 636 IN-FT $1.00 $636.00
B12.4-04 Crushed Surfacing Top Course 13 TON $65.00 $845.00
813.5-O4SP HMACL1/2”,PG64-22”8 TON $250.00 $2,000.00
814.5-04 Planing Bituminous Pavement 34 SY $80.00 $2,720.00
B15.7-055P Adjust Manhole (Slip-Resistant Lid)12 EA $250.00 $3,000.00
B16.7-O5SP Utility Lid Only 5 EA $250.00 $1,250.00
BI 7.8-01 Erosion Control and Water Pollution Prevention 1 LS $1,500.00 $1,500.00
818.8-01 Inlet Protection 2 EA $75.00 $150.00
B19.8-02 Seeding &Mulching 34 SY $20.00 $680.00
B20.8-02 Topsoil,Type A 34 5y $20.00 $680.00
821.8-04 Cement Cone.Traffic Curb and Gutter 46 LF $70.00 $3,220.00
Contract Documents Page 17
South 7th Street Corridor Improvements —Addendum No 2 September 2024
provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PROPOSAL (BID SCHEDULE B -South 7th Street,Oakesdaleto west of Shattuck)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note Unit prices for all items,all extensions,and total amount of Bid shall be shown,Enter unit prices in
numerical figures only in dollars and cents,i e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible figures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified for
any item,the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
B22.8-04 Cement Cone.Pedestrian Curb 36 LF $45.00 $1,620.00
B23.8-04 Extruded Curb 101 LF $50.00 $5,050.00
B24.8-14 Detectable Warning Surface 36 SF $45.00 $1,620.00
B25.8-14 Cement Cone.Sidewalk 19 SY $100.00 $1,900.00
B26.8-14 Cement Cone.Curb Ramp Type Combination I EA $2,500.00 $2,500.00
B27.8-14 Cement Cone.Curb Ramp Type Perpendicular Tvoe B I EA $2,500.00 $2,500.00
B28.8-20 Traffic Signal System Modification:SW 7th St &Lind Ave
1 LS $40,000.00 $40,000.00
B29.8-20 Traffic Signal System Modification.SW 7th St &Hardie Ave
LS $40,000.00 $40,000.00
B30.8-20 Traffic Signal System Modification:S 7th St &Rainier Ave 5 1 LS $40,000.00 $40,000.00
B31.8-2OSP RRFB System,Complete -SW 7th St I EA $100,000.00 $100,000.00
B32.8-21 Permanent Signing 1 LS $15,000.00 $15,000.00
B33.8-22SP Remove Pavement Markings I LS $1,000.00 $1,000.00
B34.8-22 Plastic Stop Line 44 LF $18.00 $792.00
B35.8-22 PlasticCrosswalkLine 160 SF $10.00 $1,600.00
B36.8-22SP Plastic Shared Lane Marking 40 EA $450.00 $18,000.00
B37.8-22SP Plastic Bicycle Detection Marking 2 EA $350.00 $700.00
Total Schedule B (South 7th Street,Oakesdale to west of Shaftuck)*$472,463.00
*All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(7)and WAC 458-20-777.
Contract Documents Page 18
South 7th Street Corridor Improvements —Addendum No.2 September 2024
Provided to Builders Exchange of WA.Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PROPOSAL (BID SCHEDULE C -South 7th Street 21”Clay Pipe Abandonment)
South 7th Street Corridor Improvements
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note:Unit prices for all items,all extensions,and total amount of Bid shall be shown Enter unit prices in
numerical figures only in dollars and cents,i e to two (2)decimal places (including for whole dollar
amounts)All figures must be clearly legible Bids with illegible figures in the Unit Price column will be
rejected as unresponsive Where conflict occurs between the unit price and the total amount specified for
any item,the unit price shall prevail,and totals shall be corrected to conform thereto
Item Spec.Description Quantity Unit Unit Price*AmountNo.Section
Cl.7-04SP Abandonment of Existing 21 Clay Pipe in place 467 LF $25.00 $11,675.00
C2.7-O4SP Compaction of pipe Abandonment 467 LF $25.00 $11,675.00
C3.7-04SP Ductile Iron Pipe,6 In.Diam.6 LF $300.00 $1,800.00
C4.7-04 Solid Wall PVC Storm Sewer Pipe 6 In.Diam.7 LF $300.00 $2,100.00
C5.7-05 Abandon Existing Manhole 2 EA $5,000.00 $10000.00
C6.7-O5SP lnserta Tee OneFit 2 EA $1,250.00 $2,500.00
Total Schedule C (South 7th Street 21”Clay Pipe Abandonment)*$39,750.00
*All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1)and WAC 458-20-7 71.
Summary:$1,584,528.00TotalScheduleAbroughtforward=S
________________________________
Total Schedule B brought forward =$$472,463.00
Total Schedule C brought forward $$39,750,00
Total Bid Amount,Schedules A,B,C =$
______
$2,096,741.00
[Note:Determination of low bidder will be based solely on the “Total Bid”
Contract Documents Page ISA
South 7th Street Corridor Improvements —Addendum No.2 September 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Local Agency Certification for Federal-Aid Contracts
The prospective participant certifies by signing and submitting
this bid or proposal,to the best of his or her knowledge and
belief,that:
(1)No Federal appropriated funds have been paid or will be paid,by or on
behalf of the undersigned,to any person for influencing or attempting to
influence an officer or employee of any Federal agency,a Member of Congress,
an officer or employee of Congress,or an employee of a Member of Congress
in connection with the awarding of any Federal contract,the making of any
Federal grant,the making of any Federal loan,the entering into of any
cooperative agreement,and the extension,continuation,renewal,amendment,
or modification of any Federal contract,grant,loan or cooperative agreement.
(2)If any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or
employee of any Federal agency,a Member of Congress,an officer or
employee of Congress,or an employee of a Member of Congress in connection
with this Federal contract,grant,loan,or cooperative agreement,the
undersigned shall complete and submit Standard Form-LLL,‘Disclosure Form
to Report Lobbying,”in accordance with its instructions.
This certification is material representation of the fact upon which reliance was
placed when this transaction was made or entered into.Submission of this
certification is a prerequisite for making or entering into this transaction imposed
by Section 1352,Title 31,U.S.Code.Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not
more than $100,000 for each failure.
The prospective participant also agrees by submitting his or her bid or proposal
that he or she shall requite that the language of this certification be included in
all lower tier subcontracts.which exceed $100,000 and that all such
subrecipients shall certify and disclose accordingly.
SR
DOT Form 272-040A EF
0712011
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Failure to return this Declaration as part of the bid proposal package
will make the bid nonresponsive and ineligible for award.
NON-COLLUSION DECLARATION
I,by signing the proposal,hereby declare,under penalty of
perjury under the laws of the United States that the following
statements are true and correct:
1.That the undersigned person(s),firm,association or corporation has
(have)not,either directly or indirectly,entered into any agreement,
participated in any collusion,or otherwise taken any action in restraint of
free competitive bidding in connection with the project for which this
proposal is submitted.
2.That by signing the signature page of this proposal,I am
deemed to have signed and to have agreed to the provisions
of this declaration.
NOTICE TO ALL BIDDERS
To report rigging activities call:
1 -800-424-9071
The U.S.Department of Transportation (USDOT)operates the above toll-free
“hotline”Monday through Friday,8:00 a.m.to 5:00 p.m.,eastern time.Anyone
with knowledge of possible bid rigging,bidder collusion,or other fraudulent
activities should use the “hotline”to report such activities.
The “hotline”is part of USDOT’s continuing effort to identify and investigate
highway construction contract fraud and abuse and is operated under the
direction of the USDOT Inspector General.All information will be treated
confidentially and caller anonymity will be respected.
SR
DOT Form 272-0361 EF
07/2011
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.lixwa.com -Always Verify Scal
Local Agency Name
.—>.,%.
Local Agency Address /
Local Agency Subcontractor List
Prepared in compliance with RCW39.30.060 as amended
To Be Submitted with the Bid Proposal
Project Name South 7th Street Corridor Improvements
Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the
work of structural steel installation,rebar installation,heating,ventilation and air conditioning,plumbing,as described in
Chapter 18.1 06 RGW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform
the same work will result In your bId being non-responsive and therefore void.
Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation,
rebar installation,heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as
described in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subcontractor(s)name.
To the extent the Project includes one or more categories of work referenced In RCW 39.30.060,and no subcontractor Is
listed below to perform such work,the bidder certifies that the work will either (i)be performed by the bidder itself,or (ii)be
performed by a lowar tier subcontractor who will not contract directly with the bidder.
Subcontractor Name Self Perform
Work to be performed Rebar Installation
Subcontractor Name Self Perform
Work to be performed Structural Steel
Subcontractor Name N/A
Work to be performed HVAC
Subcontractor Name N/A
Work to be performed Plumbing
Subcontractor Name ,442rL c tcjt C
Work to be performed Electrical
*Bidders are notified that it is the opinion of the enforcement agency that PVC or metal conduit,junction boxes,etc,are considered
electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical
current is connected during the project.
DOT Form 271 -015A
Revised 06/2020
Provided to Suilders Sxchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Seal
APWA-WA Division 1 Committee rev.5/13/2022
Proposal for Incorporating Recycled Materials into the Project
In compliance with RCW 70A.205.700,the Bidder shall propose below,the total percent of
construction aggregate and concrete materials to be incorporated into the Project that are
recycled materials.Calculated percentages must be within the amounts allowed in Section
9-03.21(1)E,Table on Maximum Allowable Percent (By Weight)of Recycled Material,of the
Standard Specifications.
Proposed total percentage:0%percent.
Note:Use of recycled materials is highly encouraged within the limits shown above,but does
not constitute a Bidder Preference,and will not affect the determination of award,unless t’wo or
more lowest responsive Bid totals are exactly equal,in which case proposed recycling
percentages will be used as a tie-breaker,per the APWA GSP in Section 1-03.1 of the Special
Provisions.Regardless,the Bidder’s stated proposed percentages will become a goal the
Contractor should do its best to accomplish.Bidders will be required to report on recycled
materials actually incorporated into the Project,in accordance with the APWA GSP in Section
1-06.6 of the Special Provisions.
Bidder:OMA Construction,Inc.
Signature of Authorized
____________________
Date:10/02/2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Washington State
Department of Tiansportation
Contractor Certification
Wage Law Compliance -Responsibility Criteria
Washington State Public Works Contracts
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL
MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD
I hereby certify,under penalty of perjury under the laws of the State of Washington,on behalf of the firm
identified below that,to the best of my knowledge and belief,this firm has NOT been determined by a final
and binding citation and notice of assessment issued by the Washington State Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully
violated,as defined in RCW 49.48.082,any provision of RCW chapters 49.46,49.48,or 49.52 within three
(3)years prior to the date of the Call for Bids.
Bidder Name:OMA Construction,Inc.
Name of Contractor/Bidder -Print full legal entity name of firm
B ‘____—_-Brandon Akers;Vice President
ignature of authorized person Print Name of person making certifications for firm
Title:Vice President Place:Maple Valley,WA
Title of person signing certificate Print city and state where signed
Date:10/02/2024
Form 272-009
0812017
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Washington StateVJDepartmentofTransportation
To be eligible for Award of this Contract the Bidder shall fill out and submit,as a supplement to its sealed Bid Proposal,
a Disadvantaged Business Enterprise (DBE)Utilization Certification.The Contracting Agency shall consider as non-
responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly
demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided for in the
proposed Contract.Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An
example form has been provided on Page 3.The successful Bidders DBE Utilization Certification shall be deemed a
part of the resulting Contract.
Box 1:OMA Construction,Inc.certifies that the DBE firms listed below have been contacted
regarding participation on this project.If this Bidder is successful on this project and is awarded the Contract,it shall
assure that subcontracts or supply agreements are executed with named DBEs.(If necessary,use additional sheets.)
Box 2:South 7th Street Corridor Improvements
Columni Cdumn2 Cdumn3 Cdumn4 Cdumn5
Name of DBE Project Role Description of Work Dollar Amount Dollar Amount
(See instructions)(See instructions)(See nstructions)Subcontracted to be Applied
to DEE Towards Goal
(See nstructions)(See instructions)AkiS q1-g
Disadvantaged Business Enterprise S9 ,‘,‘?3 Total DBE Commitment Dollar Amount 38
Condition of Award Contract Goal Box 3 Box 4
5 By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DBE participation to meet
the COA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with
Section 1-02.9 of the Contract
DOT Form 272-056 C
Revised 03/2018ProvidedtoBuildersExchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Disadvantaged Business
Enterprise Utilization Certification
Instructions for Disadvantaged Business
Enterprise Utilization Certification Form
Box 1:Name of Bidder (Proposal holder)submitting Bid.
Box 2:Name of the Project.
Column 1:Name of the Disadvantaged Business Enterprise (DBE).DBE firms can be found using the Diversity
Management and Compliance System web page:https./Avsdot.diversit’compliance.com Repeat the name of
the DBE for each Project Role that will be performed.
Column 2:The Project Role that the DBE will be performing as follows:
•Prime Contractor
•Subcontractor
•Subcontractor (Force Account)
•Work sublet as Force Account must be listed separately.
•Manufacturer
•Regular Dealer
•Work sublet to a Regular Dealer must be listed separately.
•Regular Dealer status must be approved prior to Bid submittal by the Office of Equal Opportunity,
Washington State Department of Transportation,on each Contract.
•Broker
•Work sublet to a Broker must be listed separately.
List each project role to be performed by a single DBE individually on a separate row.The role is used to
determine what portion of the amount to be subcontracted (Column 4)may be applied toward meeting the goal
(column 5).
Column 3:Provide a description of work to be performed by the DBE.The work to be performed must be consistent with
the Certified Business Description of the DBE provided at the Diversity Management and Compliance System
web page https:IJwsdot.diversitvcomolancecom
•A Bidder subletting a portion of a bid item shall state “Partial”and describe the Work that is included.
•For example:Electrical (Partial)—Trenching”.
•Mobilization”will not be accepted as a description of Work.
Column 4:List the total amount to be subcontracted to each DBE for each Project Role they are performing.
Column 5:This is the dollar amount for each line listed in the certification that the prime intends to apply towards meeting
the COA Contract goal.It may be that only a portion of the amount subcontracted to a DBE in Column 4 is
eligible to be credited toward meeting the goal See Note 1,Note 2,Note 3.The Contracting Agency will utilize
the sum of this column (Box 4)to determine whether or not the bidder has met the goal.In the event of an
arithmetic error in summing column 5 or an error in making appropriate reductions in the amounts in column
four,See Note 1,Note 2,Note 3,then the mathematics will be corrected and the total (Box 4)will be revised
accordingly.
Note 1:For Work sublet as Force Account the bidder may only claim 50%of the amount subcontracted (Column 4)
towards meeting the goal (Column 5).This information will be used to demonstrate that the DBE contract goal
is met at the time that the bidder submits their bid.For example:amount sublet as force account =$100,000
(Column 4)equates to ($1 00,000 X 50%)=$50,000 (Column 5)to be applied towards the goal.
Note 2:For Work sublet to a Regular Dealer the bidder may only claim 60%of the cost of the materials or supplies
(Column 4)towards meeting the goal (Column 5).For example;Material cost =$1 00,000 (Column 4)equates
to ($100,000 X 60%)=$60,000 (Column 5)to be applied towards the goal
Note 3:For Work sublet to a Broker the bidder may only claim the fees paid to a Broker towards meeting the
goal (Column 4).For example;amount sublet to a broker =$100,000 (Column 4)equates to ($100,000 X
reasonable fee %)=$(Column 5)to be applied towards the oaI.
Box 3:Box 3 is the COA Contract goal which is the minimum required DBE participation.The goal stated in the
Contract will be in terms of a dollar amount or a percentage in the Contract.When expressed as a percentage
you must multiply the percentage times the sum total of all bid items as submitted in the Bidder’s Proposal to
determine the dollar goal and write it in Box 3.In the event of an error in this box,the Contracting Agency will
revise the amount accordingly.
Box 4:Box 4 is the sum of the values in column 5.This value must equal or exceed the COA Contract goal
amount written in Box 3 or;
Box 5:Check Box 5 if insufficient DBE Participation has been achieved and a good faith effort is required.Refer to the
subsection titled,Selection of Successful Bidder/Good Faith Efforts (GEE)in the Contract.
See the Disadvantaged Business Enterprise Participation specification in the Contract for more
information.
DOT Form 272-056
Revised 03/2018ProvidedtoBuildersExchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
VshioState Disadvanta ed BusinessV1JD.Parhnerrt of aiortaffon Enterprise UtiIizatior Certification
To be eligible for Award of this Contract the Bidder shall fill out and submit,as a supplement to its sealed Bid Proposal,
a Disadvantaged Business Enterprise (DBE)Utilization Certification.The Contracting Agency shall consider as non-
responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly
demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided for in the
proposed Contract.Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An
example form has been provided on Page 3.The successful Bidders DBE Utilization Certification shall be deemed a
part of the resulting Contract.
Box 1 A Plus Construction Company certifies that the DBE firms listed below have been contacted
regarding participation on this project.If this Bidder is successful on this project and is awarded the Contract,it shall
assure that subcontracts or supply agreements are executed with named DBEs.(If necessary,use additional sheets.)
Box 2:US 395,Spokane City Limits to Stevens County Line -Paving and Safety
Cdumnl Column 2 Cdumn3 Cdumn4 Cdumn5
Name of DBE Project Role Description of Work DollarAmount Dollar Amount
See instructions)See instructions)See instructions)Subcontracted to be Applied
toDBE Towards Goal
See instructions)See instructions)
A Plus Construction Prime Asphalt and concrete paving,asphalt milling,preleveling N/A 900 000Companyandpavementrepaa
In the Line Services,Inc.Subcontractor (force Crack sealing 20 000 10 000Account)
In the Line Services,Inc Subcontractor Guideposts,joint seal,pavement markers,temporary 200 000 200 000signage.construction sign installation
The Regular Dealer Rental and sales of highway construction and related 100 000 60 000EverythingGuys.LLC equipment and materials
Optimus Prime Trucking.Subcontractor Dump Trtkthg 50,000Inc.
Metatheads,Inc.Manufacturer Dowel Bars 75,000 75,000
Erosion Under Control Broker Erosion control blankets,straw bales and wattles,sand bags 000 250Co-,-
Disadvantaged Business Enterprise 356,968.16 Total DBE Commitment Dollar Amount 1,295,250
Condition of Award Contract Goal Box 3 Box 4
5 By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DEE participation to meet
the OA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with
Section 1-02.9 of the Contract
DOT Form 272-056
Revised 03/2018
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.lixwa.com -Always Verify Scal
Washington State
Department of Tiansportation
Disadvantaged Business Enterprise
(DBE)Trucking Credit Form
PART A:TO BE COMPLETED BY THE BIDDER
This form is in support of the trucking commitment identified on the DBE Utilization Certification Form submitted with the proposal.
Please note that DBEs must be certified prior to time of submittal.
Federal Aid #Contract #Project Name
DRPUL-CM 1292(003)RPUL-CM 1292(003)South 7th Street Corridor Improvi
If listing items by hours,or by lump sum amounts,please provide calculations to substantiate the quantities listed.
Bid Item Item Description
NO DBE TRUCKING
Use additional sheets as necessary.
Bidder Name/Title (please print)
OMA Construction,Inc.Brandon Akers:Vice President
Phone Fax Signature
06-262-1 721 06-262-91 07
Address
P0 Box 429;Maple Valley,WA 98038 certify that the above information is complete and accurate.
Email Date /
.a kers@ornaco nstru ctio n .corn O4I22&’%47’
PART B:TO BE COMPLETED BY THE DBE TRUCKING FIRM
Note:DBE trucking firm participation may only be credited as DBE participation for the value of the hauling services,not for the
materials being hauled unless the trucking firm is also recognized as a supplier of the materials used on the project and approved
for this project as a regular dealer.
1.Type of Material expected to be A--
hauled?
2.Number of fully operational trucks Tractor/trailers:
expected to be used on this project?
3.Number of trucks and trailers owned by
______________
Tractor/trailers
____________
the DBE that will be used on this
project?
4.Number of trucks and trailers leased by Tractor/trailers:
the DBE that will be used on this
nrnicnf
DBE Firm Name ,%t /r Name/Title (please print)
Certification Number
Phone Fax Signature
Address
I certify that the above information is complete and accurate.
Email Date
DOT Form 272-058
Revised 09/2020
ments
Dump trucks:
Dump trucks:
Dump trucks:
_____________
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
Submit this form to in accordance with section 1-02.9 of the Contract.
Instruction to Bidder:The Bidder shall complete and submit the Disadvantaged Business Enterprise (DDE)Trucking Credit
Form in accordance with Section 1-02.9 of the Contract.
INSTRUCTIONS
Please note —AU Fields are required
PART A:TO BE COMPLETED BY THE BIDDER
Federal Aid:Include the project federal-aid number.
County:Specify the County where the project will take place.
Contract #:Specify the Project Contract Number which can be found in the Engineer’s estimate bid check report.
Bid Item:Provide the Bid Item Number (as it appears in the engineer’s estimate bid check report)for which trucking
services will be utilized.
Item Description:Provide description of the bid item (as it appears in the engineer’s estimate bid check report)for which
trucking will be utilized.
Bidder:In this section,provide the bidder’s legal name,title,Business address,Phone and email.
The bidder’s representative signature is required in addition to the date the form was signed.
PART B:TO BE COMPLETED BY THE DBE TRUCKING FIRM
Question 1:Specify type of material that will be hauled (i.e.Sand,HMA,gravel)
Question 2:Specify the total number of operational trucks that will be used on the project.
Question 3:Specify the total number of operational trucks and trailers owned by the DBE that will be used on the project.
Question 4:Specify the total number of operational trucks and trailers leased by the DDE that will be used on the project.
DBE Firm:In this section,provide the DBE Firm’s legal name,DDE Firm’s representative legal name and title,certification
Number (Found in the firm’s OMWBE Profile page in the OMWBE directory),Business address,Phone,fax and email.
The DBE Firm’s representative signature is required in addition to the date the form was signed.
DOT Form 272-058
Revised 09/2020
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.lixwa.com -Always Verify Scal
PROPOSAL SIGNATURE PAGE
By signing below,Bidder acknowledges receipt and understanding of the following Addenda to the
Bid Documents:
Addendum No.Date of Receipt Addendum No.Date of Receipt
1 09/11/2024 4
_______________
2 0912R/2 024
_________________
10/01/2024 6
________________
Note:a Proposal may be considered irregular and maybe rejected if the receipt of Addenda is not
acknowledged.
The Bidder is hereby advised that by signature of this proposal,he/she is deemed to have
acknowledged all requirements and signed alt certificates contained herein.
_____________________________
OMA Construction,Inc.
ignature of Authorized Official]*[Business Name]
Brandon Akers P0 Box 429
[Printed Name][Address Line 1]
Vice President Maple Valley,WA 98038
[TitLe][Address Line 2]
10/02/2024 206-262-1721
[Date][Telephone Number]
*Note:Evidence of the signatory’s authority to sign the Proposal on behalf of the business entity
shalt be submitted with the Bid.Otherwise,the submitted Bid witt be considered irregular and non-
responsive and the Bid witt be rejected.
Note:The address and phone number tisted wilt be used for alt communications regarding this Proposat.
Type of business entity (e.g.corporation,partnership,etc.)
Corporation
State of Incorporation,or State where business entity was formed:
WA
Contract Documents Page 32
South 7th Street Corridor Improvements August 2024
Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify ScalProvidedto
OMACOI*023L6
WA State Contractor s Registration #
________________________
UBI#601-872-128
Industrial Insurance Account #97844601
Employment Security Department #086364001
State Excise Tax Registration #601-872-128
DUNS#82908752
The Surety Company which willfurnish the required Contract Bond is:
I Battery Park PlazaNationwide
[Surety][Address Line 7]
206-666-1058 Cell New York,NY 10004
[Telephone Number][Address Line 2]
Contract Documents Page 33
South 7th Street Corridor Improvements August 2024
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PROPOSAL BID BOND TO THE CITY OF RENTON
KNOWALL MEN BY THESE PRESENTS,That we,[Bidder]OMA Construction,Inc.
of [address]P0 Box 429,Maple Valley,WA 98038
as Principal,and [Surety]Nationwide Mutual Insurance Company
a corporation organized and existing under the taws of the State of Ohio
as a surety corporation,and qualified under the taws of the State of Washington to become surety
upon bonds of contractors with municipat corporations,as Surety,are jointly and severally hetd and
firmly bound unto the City of Renton in the futt sum of five (5)percent of the total amount of the
proposalof said Principatforthe work hereinafter described,forthe payment of which,wetland truty
to be made,we bind oursetves and our heirs,executors,administrators and assigns,and successors
and assigns,jointty and severatty,firmty by these presents.
The condition of this bond is such,that whereas the Principal herein is herewith submitting his/her
or its sealed proposat for the fotlowing public works construction project,to wit:
South 7th Street Corridor Improvements
said bid and proposat,by reference thereto,being made a part hereof.
NOW,THEREFORE,if the said proposal bid by said Principal be accepted,and the contract be
awarded to said Principal,and if said Principal shalt duly make and enter into and execute said
contract and shall furnish contract bond as required by the City of Renton within a period of ten
(10)days from and after said award,exclusive of the day of such award,then this obtigation shalt be
nult and void,otherwise it shalt remain and be in full force and effect.
IN THE EVENT,the Principal,following award,faits to execute an Agreement with the City of Renton
in accordance with the terms of the Proposat and furnish a contract bond with Surety or Sureties
approved by the City of Renton within ten (10)days from and after said award,then Principal shalt
forfeit the Bid Bond/Bid ProposaL Deposit or Surety shalt immediately pay and forfeit to the City of
Renton the amount of the Proposal Bid Bond,as setforth in RCW 35A.40.200 and RCW 35.23.352.
This ProposaL Bid Bond shalt be governed and construed bythe State of Washington,and venue shatt
be in King County,Washington.
IN TESTIMONY WHEREOF,the Principal and Surety have caused these presents to be signed and
seated this 18th day of,September 2024
Contract Documents Page 34
South 7th Street Corridor Improvements August 2024
PRINCIPAL SURETY
OMA Construction,Inc.
[PRINCIPAL]
-ifof mfficiatj
[Printed Name]
—
U ;r ‘%fr
[TitLe]
ptember 18.2024
[Date]
Nationwide Mutual Insurance Company
[SURETY]
[Signature of Authorized Official]
Ghana M Boadle
[Printed Name]
Attorney-in-Fact
[Title]
September 18,2024
[Date]
Propel Insurance
601 Union St.Suite 3400
Seattle,WA 98101
TeLephone:(206)676-4200
913
23787
Contract Documents
South 7th Street Corridor Improvements
Page 35
August 2024
Name and address of local office of
Agent and/or SURETY Company:
Surety WACIC #
Surety NAIC #
Power of Attorney
KNOW ALL MEN BY THESE PRESENTS THAT:
Nationwide Mutual Insurance Company,an Ohio corporation
hereinafter referred to severally as the Company”and collectively as “the Companies”does hereby make,constitute and appoint:
ALEXA MANLEY:ALICEON A KELTHER,ALYSSA J LOPEZ:AMELIA G BURRILL.
ANNELIES M RICHIE:CAALEY ESPIRITU.CHARLA M BOADLE:CHRISTOPHER KINYON.CYWI}tIA L JAY.
DONALD PERCELL SHANKLIN.FRANK W HAFNER.lIt.HOLLI ALBERS.JAMES R COGDILL.JAMIF C MARQUES.
JULIANNE MORRIS.JUSTIN DEAN PRICE KARl MICHELLE MOTLEY:KATHARINE J SNIDER:LINDSEY ELAINE JORGENSEN.LOIS F WEATHERS.
LORI J KELLY:MAPIAN C NEWMAN.MICHAEL S MANSFIELD;SARAN WHITAKER.SHERRI W HILL.TAMARA A RINGEISEN,
TERRIE L CONARD.W D MORRIS JR.WESLEY V DASHER.JR
each in their individual capacity,its true and lawful attorney-in-fact,with full power and authority to sign,seal,and execute on its behalf any and all bonds and
undertakings,and other obligatory instruments of similar nature,in penalties not exceeding the sum of
UNLIMITED
and to bind the Company thereby,as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Company;and all acts
of said Attorney pursuant to the authority given are hereby ratified and confirmed.
This power of attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the board of directors of the Company:
‘RESOLVED,that the president,or any vice president be,and each hereby is,authorized and empowered to appoint attorneys-in-fact of the Company,
and to authorize them to execute and deliver on behalf of the Company any and all bonds,forms,applications,memorandums,undertakings,
recognizances,transfers,contracts of indemnity,policies,contracts guaranteeing the fidelity of persons holding positions of public or private trust,and other
writings obligatory in nature that the business of the Company may require;and to modify or revoke,with or without cause,any such appointment or
authority;provided,however,that the authority granted hereby shall in no way limit the authority of other duly authorized agents to sign and countersign any
of said documents on behalf of the Company.”
“RESOLVED FURTHER,that such attorneys-in-fact shall have full power and authority to execute and deliver any and all such documents and to bind the
Company subject to the terms and limitations of the power of attorney issued to them,and to affix the seal of the Company thereto;provided,however,that
said seal shall not be necessary for the validity of any such documents.”
This power of attorney is signed and sealed under and by the following bylaws duly adopted by the board of directors of the Company.
Execution of Instruments.Any vice president,any assistant secretary or any assistant treasurer shall have the power and authority to sign or attest all
approved documents,instruments,contracts,or other papers in connection with the operation of the business of the company in addition to the chairman of
the board,the chief executive officer,president,treasurer or secretary;provided,however,the signature of any of them may be printed,engraved,or
stamped on any approved document,contract,instrument,or other papers of the Company.
IN WITNESS WHEREOF,the Company has caused this instrument to be sealed and duly attested by the signature of its officer the 20th day of August,2027.
Antonio C.Albanese,Vice President of Nationwide Mutual Insurance Company
ACKNOWLEDGMENT
STATE OF NEW YORK COUNTY OF NEW YORK:ss
.On this 20th day of August,2027,before me came the above-named officer for the CompanyIf:aforesaid,to me personally known to be the officer described in and who executed the preceding
0 ‘instrument,and he acknowledged the execution of the same,and being by me duly
$‘..‘.,.‘sworn,deposes and says,that he is the officer of the Company aforesaid,that the seal affixed
4 hereto is the corporate seal of said Company,and the said corporate seal and his signature were
duly affixed and subscribed to said instrument by the authority and direction of said Company.
Notary Pubh’cate of New York
Qualified in New York County Notary PubIcConimissionEapiresOctober19,2024 My Commission Expires
October 19,2024
CERTIFICATE
I,Laura B.Guy,Assistant Secretary of the Company,do hereby certify that the foregoing is a full,true and correct copy of the original power of attorney issued
by the Company;that the resolution included therein is a true and correct transcript from the minutes of the meetings of the boards of directors and the same has
not been revoked or amended in any manner;that said Antonio C.Albanese was on the date of the execution of the foregoing power of attorney the duly elected
officer of the Company,and the corporate seal and his signature as officer were duly affixed and subscribed to the said instrument by the authority of said board
of directors;and the foregoing power of attorney is still in full force and effect.
IN WITNESS WHEREOF,I have hereunto subscribed my name as Assistant Secretary,and affixed the corporate seal of said Company this 18th day of
SeDtember ,2024
Assistant Secretary
BDJ 1(08-21)00
3.No changes at this time.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Bob
Transportation Design Manager
City of Renton
and conditions agreed to this2fld day of Oct.,2024
S 7th Street Corridor Improvements Addendum No.1
Page 2 of 2
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.lixwa.com -Always Verify Scale
PLANS
13.DELETE Sheet CDV and REPLACE with attached revised Sheet CCV.Revisions include:
•Revision of the index to reflect the added sheets SDO8 and SDO9.
14.DELETE Sheets SVOI to SVO5 and REPLACE with attached revised Sheets SVOI to SVO5.
Revisions include:
•Signature of professional land surveyor on all survey sheets.
15.DELETE Sheets SD-Cl to SD-07 and REPLACE with attached revised Sheets SD-Cl to SD-09.
Revisions include:
•Removal of an existing 21”clay stormwater pipe and reconnection of pipes to an existing
parallel trunk line.
16.DELETE Sheet EL-03 and REPLACE with attached revised Sheet EL-03.Revisions include:
•Revised anchor bolt required minimum length on City standard.
17.DELETE Sheets SGO1 to SGO3 and REPLACE with attached revised Sheets SGQI to SGO3.
Revisions include:
•Luminaire at Shattuck intersection to be replaced with new luminaire and salvage existing
back to City of Renton.
18.DELETE Sheets IL-Cl,IL-03 and 1L-04 and REPLACE with attached revised Sheets IL-Cl,IL-03 and
IL-04.Revisions include:
•Clarification of the City of Renton (COR)standard to be used for luminaire poles.117.1
should be used.Standards 117.IA and 117.IB removed from the Plans.
Transportation Design Manager
City of Renton
Receipt owledged,and conditions agreed to this 2nd day of Oct.,2024
—Brarrdon Akers;Vice President
Signature
S 7th Street Corridor Improvements Addendum No.2
Page 12 of 12
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scal
PLANS
3.No changes at this time
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sin erely,
ob Hanson,P.
Transportation Design Manager
City of Renton
Receipt a owledged,and conditions agreed to this 2nd day of October ,2024
___________________________
Vice President
S 7th Street Corridor Improvements Addendum No.3
Page 2 of 2
Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com -Always Verify Scale
Washington Disadvantaged BUsiness Enterprise tDBE)
Department of Transportation Written ConfirmatiOn DocUment
See Contract Provisions:D3E Document S’ubmittal Requirements
Disadvantaged3usiness Enteiprise Participation
THIS FORM SHALL ONLY BE SUBMITrED TO A DBE THAT IS LISTED ON WE CONTRACTOR’S
DISADVANTAGED BUSINESS ENTERPRISE U’IILIZATR)N CERTIFICATION.
THE CONTRACTOR SHALL COMPLETE PARTAPRIOR TO SENDiNG TO THE DBE.
PART A:To be completed bythe bidder
The entries below shall be conistent with what is shown on the Bidder’s Disa4vantaged Business Enterprise
Utilization Certifications Failure to do so will result in Bid rejection.
South 7th Street Corridor Improvements
Contract Title:
Bidder’s Bijsiness Name:DMA Construction.Inc
Ashford Electric &Construction Co.DBE s Business Name:
Description of DBE’s Work:Electrical
Dollar Amount to be ApplIed Towards DBE Goal:$636;538.OO
Dollar Amount to be Subcontracted to DBE*:
Optional Field
PART B:To be completed by the Disadvantaged Business Eirterprise
As an atitiiórized representative of the Disadvantaged Business Enterprise,I confinn that we have been
contacted by the Bidder with regard to the referenced project for the purpose of performing the Work described
above.If the Bidder is awarded the Contract,we will enter into an agreement with the Bidder to participate lii
the project consistent with the infomia.tion provided in Part A of this form.
Name (printed):-‘A?S J -rd
Signature:--—--
Title:
Address:/Date:/O/-‘Y C’1 jj )3
DOT Form 422-031
Revised 07/2016
Washington State
Department of Transportation
Disadvantaged Business Enterprise
(DEE)Bid Item Breakdown Form
3.Prime Contractor 4.Prime Contractor Representative Name
DMA Construction,Inc.Brandon Akers
I Contract Number 2.Contract Name
RPUL-CM 1292(003)pouth 7th Street Corridor Improvements
5.Prime Contractor Representative Phone Number 6.Prime Contractor Representative Email
206-262-1721 frakers@omaconstruction.com
Column 1
Name of UDBE
(See nsructbns)
Column 2
Bid Item#
(See IrrtnS)
Column 3
Full/Partial
(See skuctns)
Ashford Electric
Column 4
Quantity
(See Instrticbons)
Column 5
Description
ISee Instructions)
ll Partial 1
‘1
Colirnn 6
Unit Price
ISee nsuctions)
31 #A5
81 #A61
81 #A61
81 #A1
31 #828
•BI#829•
31 #830
81 #831
1
9 9
Column BColumn7DollarAmountTotalUnittobeAppliedCostTowardsGoalISeeInslructtotts)
Instructions)
1
1
Mobilization
TSS 7”/Shattack
Illumination
1”PVC
TSS 7t1t /Lind
•TSS 7th /Hardie
TSS 7”/Rainier
RRFB 7th
5,450.00
47,780.OC
14,000.00
3.00
4,730.00
Name of UDBE
1
1
Bid ltem#
S 15,450.00 S 15,450.00
5 147,780.00 147,780.00 —
S 214,000.00 $214,000.00
5 52,118.00 52,118.00 —
5 34,730.00 S 34,730.00
c 34,730.00 34,730.00 —
S 39,860.00 5 39,860.00
99,860.00 —S 99,860.00 —
Full/Partial
q,(JU.UU
6,860.00
Quantity
Subtotal:
Description Unit Price
—$638,528.00 —S 638,528.00 uollarMmountTotalUnittobeAppliedCostTowardsGoal
Name of UDBE Bid Item#FuWPartiai
Subtotal:$0.00 $0.00
TOTAL UDBE Dollar Amount:--$.o..oo---.----.sc--.-.
Quantity
Subtotal:
Description
$0.00
Unit Price
$0.00
Total Unit
Cost
Dollar Amount
to be Applied
Towards Goal
Name of UDBE Bid ltem#Full/Partial Quantity
Subtotal:
Description
$0.00
Unit Price
$0.00
Total Unit
Cost
Dollar Amount
to be Applied
Towards Goal
$638,528.00 $638,528.00
DOT Form 272-054
Revised 09/2020
Instructions for Disadvantaged Business Enterprise (DBE)Bid Item Breakdown Form
Box 1:Provide the Contract Number as stated in the project information webpage.
Box 2:Provide the Name of the project as stated in the project information webpage.
Box 3:Provide the Name of the bidder (Proposal holder)submitting Bid.
Box 4:Provide the name of the prime contractor’s representative available to contact regarding this form.
Box 5:Provide the phone number of the prime contractors representative available to contact regarding this form.
Box 6:Provide the email of the prime contractor’s representative available to contact regarding this form.
Column 1:Provide the Name of the Disadvantaged Business Enterprise (DBE)Firm.DBE Firms can be found using the
search tools under the Firm Certification section of the Diversity Management and Compliance System
(DMCS)webpage https://wsdot.diversitycompliance.com.
Column 2:Provide the Bid Item Number (as it appears in the engineer’s estimate bid check report)available on the project
information webpage.
Column 3:If the DBE is performing only part of the bid item,mark ‘Partial”.If the DBE is performing the entire bid item,
mark “Complete”.
Column 4:Provide the estimated quantity for the specific bid item.For trucking firms,use hour or another unit of measure.
Column 5:Provide a description of the work to be performed by the DBE.
Column 6:Provide the price per unit and specify the type of unit used.For trucking firms,use hour or another unit of
measure.
Column 7:Provide the estimated total unit cost amount per bid item.
Column 8:Provide the amount of the bid item being used to fulfil the DEE goal.The work to be performed must
be consistent with the Certified Business Description of the DBE provided in the DMCS webpage https://wsdot.
diversitycompliance.com.Mobilization upto 10%is acceptable.If mobilization is more than 10%additional information
and/or justification may be requested.The total amount shown for each DEE shall match the amount shown on the DEE
Utilization Certification Form.
Use Additional Sheets if necessary.
DOT Form 272-054
Revised 09/2020