Loading...
HomeMy WebLinkAboutEX_07_P_Drainage_Control_Plan_240607_v1 STRIDE Bus Rapid Transit South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site Plan Review, and Lot Line Adjustment Application Attachment 31 Drainage Control Plan June 2024 Prepared by the 2 8 2 7 2 9 2 7 2 8 27 26 26 26 26 27 27 2828 27 27 27 2 8 27 302829 27 28 2 6 2 727 26 2 7 28 29 2 9 28 26 24 27 28 26 27 25 2 6 2 6 2 7 26 27 28 2 7 26 26 30 29 30 29 2 9 2 8 2 7 2 7 28 27 26 26 27 2 8 28 29 29 29 2828 27 27 26 28 2 9 28 27 27 28 29 29 28 26 2 6 26 27 28 29 3 0 29 28 27 26 26 2 6 26 26 2 8 2726 26 27 26 27 2626 27 26 272 727 29 29 28 27 29 28 27 28 26 27 28 26 26 27 27 26 26 26 26 26 2 7 26 26 27 27 PC BUS B A Y 7 BUS B A Y 6 BUS B A Y 5 B U S B A Y 2 B U S B A Y 8 BUS B A Y 3 BUS B A Y 4 B U S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 8" SD 8" S D RA I N I E R A V E S S GRADY WAY LA K E A V E S HA R D I E AV E S W BUS C H A R G I N G A R E A CO R E FA C I L I T Y SE C U R I T Y BU I L D I N G REFUSE AND RECYCLING AREA EX. CB TYPE 2 CB (TYP.) PROPERTY LINE EX SD PIPE MWS CONNECT TO EX. CB MWS MWS MWS FIL CONC. VALLEY GUTTER CONC. VALLEY GUTTER CONC. VALLEY GUTTER FIL CONNECT TO EX. CB CONNECT TO EX. CB NEW 6" PVC CONNECT TO EX. SD PIPE CONNECT EX. SD PIPE TO NEW TYPE 2 CB WESTERN SWALE CENTRAL SWALE EASTERN SWALE PIPE FLOW ARROW (TYP.) STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R.PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL DRAINAGE CONTROL PLAN BT120-DP101 BT120 S. SRIDHARAN S. GOGIA R. PARISH L. THOMSEN ## ###### ###### ###### ###### ###### ###### ###### RTA/LR 0206-19 No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 05 / 2 9 / 2 4 | 3: 5 0 P M | SA K S H I G C: \ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 8 4 7 3 9 \ D R A I N A G E P L A N . D W G DRAINAGE PLAN FACILITY ID: NOT FOR CONSTRUCTION Xrefs: xS1-BT120-APP211 xS1-BT120-CAP001 xS1-BT120-CDP001 xS1-BT120-CMP001 xS1-BT120-CPP001 xS1-BT120-VRX001 xS1-BT120-LTP001 xS1-BT120-VCN001 xS1-BT120-RPP001 xS1-BT120-USP001 xBRT-CUD05-TB22x34 OSBORN CONSULTING INCORPORATED SCALE IN FEET 0 4020 8040 (1" = 40') N ABBREVIATIONS: CB CATCH BASIN FIL FILTERRA UNIT MH MANHOLE MWS MODULAR WETLAND TREATMENT UNIT CUP SUBMITTAL LEGEND: TYPE I CB TYPE 2 CB SD PIPE