HomeMy WebLinkAboutEX_25_RS_Drainage_Report_240607_v1
STRIDE Bus Rapid Transit
South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site
Plan Review, and Lot Line Adjustment Application
Attachment 32
Drainage Report
June 2024
Prepared by the
I-405 corridor
South Renton Transit Center
60% Storm Drainage Report
February 2024
Stride program: I-405 corridor
Page i | AE 0054-17 | 60% Storm Drainage Report February 2024
Consultant Quality Control Form
Version Title Date
Originator/
Drafted by Reviewed by
Approved
by
Notes, as
required
0 South Renton
Transit Center -
60% Storm
Drainage Report
01-31-23 J. Yuen R. Parish (QC) Sound
Transit
(June 2023)
Sound Transit
has no
comments.
1 South Renton
Transit Center -
60% Storm
Drainage Report
02-06-24 J. Yuen
2
3
Stride program: I-405 corridor
Page ii | AE 0054-17 | 60% Storm Drainage Report February 2024
Table of Contents
1 PROJECT OVERVIEW ............................................................................................................. 1
1.1 Introduction ......................................................................................................... 1
1.2 Purpose of Report ............................................................................................... 4
1.3 Site Description ................................................................................................... 4
1.3.1 Predeveloped Conditions ........................................................................ 6
1.3.2 Developed Site Conditions ...................................................................... 7
1.3.3 Soils and Groundwater ............................................................................ 8
2 CONDITIONS AND REQUIREMENTS SUMMARY ................................................................ 9
2.1 Core Requirements for Springbrook Creek: South Renton Transit Center
(TDA SRTC 1) ...................................................................................................10
2.2 Core Requirements for Rolling Hills Creek: S Grady Way (TDA SRTC 2) ..........11
2.3 Core Requirements for Black River: Lake Avenue S (TDA SRTC 3) ..................12
2.4 Core Requirements for Black River: Hardie Avenue SW (TDA SRTC 4) ............14
3 OFFSITE ANALYSIS .............................................................................................................. 16
3.1 Springbrook Creek: South Renton Transit Center (TDA SRTC 1) ......................17
3.1.2 Resource Review ...................................................................................18
3.1.3 Field Inspection ......................................................................................18
3.1.4 Problem Descriptions .............................................................................18
3.2 Rolling Hills Creek: S Grady Way (TDA SRTC 2) ...............................................19
3.2.2 Resource Review ...................................................................................19
3.2.3 Problem Descriptions .............................................................................20
3.3 Black River: Lake Ave (TDA SRTC 3) and Black River: Hardie Ave SW
(TDA SRTC 4) ...................................................................................................20
3.3.2 Resource Review ...................................................................................20
3.3.3 Problem Descriptions .............................................................................21
4 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY
FACILITY ANALYSIS AND DESIGN ..................................................................................... 22
4.1 Springbrook Creek: South Renton Transit Center (TDA SRTC 1) ......................22
4.1.1 Flow Control (Core Requirement #3) ......................................................22
4.1.2 Water Quality (Core Requirement #8) ....................................................23
4.1.3 On-Site BMPs (Core Requirement #9) ...................................................25
4.2 Rolling Hills Creek: S Grady Way (TDA SRTC 2) ...............................................28
4.2.1 Flow Control (Core Requirement #3) ......................................................28
4.2.2 Water Quality (Core Requirement #8) ....................................................29
Stride program: I-405 corridor
Page iii | AE 0054-17 | 60% Storm Drainage Report February 2024
4.2.3 On-Site BMPs (Core Requirement #9) ...................................................29
4.3 Black River: Lake Avenue (SRTC 3) ..................................................................31
4.3.1 Flow Control (Core Requirement #3) ......................................................31
4.3.2 Water Quality (Core Requirement #8) ....................................................31
4.3.3 On-Site BMPs (Core Requirement #9) ...................................................31
4.4 Black River: Hardie Avenue SW (SRTC 4) .........................................................33
4.4.1 Flow Control (Core Requirement #3) ......................................................33
4.4.2 Water Quality (Core Requirement #8) ....................................................33
4.4.3 On-Site BMPs (Core Requirement #9) ...................................................33
5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN ........................................................... 35
6 SPECIAL REPORTS AND STUDIES .................................................................................... 36
7 OTHER PERMITS ................................................................................................................... 36
8 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (CSWPP)
ANALYSIS AND DESIGN ...................................................................................................... 37
9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT ............................................................................................................................ 37
10 OPERATIONS AND MAINTENANCE MANUAL .................................................................. 37
11 REFERENCES ........................................................................................................................ 38
Stride program: I-405 corridor
Page iv | AE 0054-17 | 60% Storm Drainage Report February 2024
Figures
Figure 1 TIR Worksheet .................................................................................................... vi
Figure 1-2 Drainage Basins, Subbasins, and Site Characteristics ........................................ 5
Figure 3-1 South Renton Transit Center Downstream Analysis ...........................................17
Tables
Table 1-1 South Renton Transit Center TDA Summary ...................................................... 6
Table 2-1 City of Renton Core and Special Requirements Assessment .............................10
Table 2-2 City of Renton Core and Special Requirements Assessment .............................11
Table 2-3 City of Renton Core and Special Requirements Assessment .............................12
Table 2-4 City of Renton Core and Special Requirements Assessment .............................14
Table 4-1 BMP Treatment Areas .......................................................................................24
Table 4-2 TDA SRTC 1.1 Target Surfaces .........................................................................25
Table 4-3 TDA SRTC 1.1 BMP Evaluation .........................................................................26
Table 4-4 TDA SRTC 1.2 Target Surfaces .........................................................................27
Table 4-5 TDA SRTC 1.2 BMP Evaluation .........................................................................27
Table 4-6 TDA SRTC 2 Target Surfaces ............................................................................29
Table 4-7 TDA SRTC 1.2 BMP Evaluation .........................................................................30
Table 4-8 TDA SRTC 3 Target Surfaces ............................................................................32
Table 4-9 TDA SRTC 3 BMP Evaluation ............................................................................32
Table 4-10 TDA SRTC 4 Target Surfaces ............................................................................34
Table 4-11 TDA SRTC 4 BMP Evaluation ............................................................................34
Appendices
Appendix A Surface Area Changes
Appendix B Design Calculations
Appendix C 60% Design Drawings and Relevant Mapping
Appendix D Site and Downstream Analysis Photos
Appendix E Pilot Infiltration Test Results Report
Appendix F South Renton Transit Center Remediation Project, Storm Drainage Report
Stride program: I-405 corridor
Page v | AE 0054-17 | 60% Storm Drainage Report February 2024
Acronyms and Abbreviations
AHJ
BMP
BRT
CABS
cfs
COR
CUD
FIRM
ft2
GIS
GRR
I
MWS
PGIS
PGPS
PIT
project
ROW
SR
SRTC
ST
SWDM
TDA
TOD
USFWS
WRIA
WSDOT
WSP
Authority Having Jurisdiction
Best Management Practice
Bus Rapid Transit
Compost-Amended Bioswale
cubic feet per second
City of Renton
Contract Unit Description
Flood Insurance Rate Map
square feet
Geographic Information System
Geotechnical Recommendation Report
Interstate
Modular Wetlands® System Linear
Pollution-Generating Impervious Surface
Pollution-Generating Pervious Surface
Pilot Infiltration Test
Sound Transit STRIDE Project
Right-of-Way
State Route
South Renton Transit Center
Sound Transit
Stormwater Design Manual
Threshold Discharge Area
Transit Oriented Development
U.S. Fish and Wildlife Service
Water Resource Inventory Area
Washington State Department of Transportation
Williams Sale Partnership
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2022 City of Renton Surface Water Design Manual 6/22/2022
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual
8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 9 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual
8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
On-site BMPs Describe:
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Description Water Quality Description On-site BMPs Description
Detention
Infiltration
Regional
Facility
Shared
Facility
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Vegetated
Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Full Dispersion
Full Infiltration
Limited Infiltration
Rain Gardens
Bioretention
Permeable
Pavement
Basic Dispersion
Soil Amendment
Perforated Pipe
Connection
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual
8-A-6
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
____________________________________________________________________________________
Signed/Date
Stride program: I-405 corridor
Page 1 | AE 0054-17 | 60% Storm Drainage Report February 2024
1 PROJECT OVERVIEW
Since the 60% Drainage Plans had been submitted in 2023, the Transit Center entrance/exit
and the temporary surface parking lot has been re-graded. The stormwater design has been
modified to address the changes. The revised Drainage Plans and Storm Drainage Report are
needed for the City of Renton’s Conditional Use Permit (CUP) submittal requirements.
The purpose of this 60% Storm Drainage Report is to document drainage requirements and
considerations for the South Renton Transit Center (SRTC) project meets the City of Renton
(COR) stormwater requirements. The SRTC project site is in the northeast quadrant of the
Rainier Ave S and Grady Way S intersection. Improvements are also proposed along Rainier
Ave S and Lake Ave S, the latter being a private road within the South Renton Park & Ride lot
which is managed by the King County Metro (KCM) but owned by the Washington State
Department of Transportation (WSDOT). Sound Transit is also implementing minor roadway
modification along the north side of S Grady Way.
The Storm Drainage Report has been prepared in accordance with the 2022 City of Renton
Surface Water Design Manual (SWDM) which is based on the 2021 King County Surface Water
Design Manual with some modifications. Revisions have been made to the 2021 King County
Surface Water Design Manual to reflect City of Renton-specific requirements.
The storm drainage requirements discussed in this report are based on the 60% level design
and will be updated and expanded on for future design submittal as the SRTC design
progresses and is modified through the final design process. This report is intended to facilitate
coordination between ST and the authority having jurisdiction (AHJ), identify the project
requirements and constraints, and obtain concurrence on the 60% design assumptions. This
report is not intended to obtain final design approval.
1.1 Project Description
The Sound Transit’s Stride Bus Rapid Transit (BRT) is a new fast, frequent, and reliable bus
service connecting to light rail and to communities north, east, and south of Lake Washington. I-
405 Bus Rapid Transit (BRT) - connects communities along I-405 and SR 518 from Lynnwood
to Burien. CUD 5 will provide service within the State Route (SR) 518, Interstates I-405, and I-5
corridors between the cities of Burien and Lynnwood. Three service lines will be constructed as
part of the project: the S1 Line between Bellevue and Burien, the S2 Line between Lynnwood
and Bellevue, and the S3 Line between Shoreline and Bothell. The lines will connect to the Link
light rail at Lynnwood, Bellevue, and Tukwila, as well as to other transit services. A new transit
center in South Renton and several STRIDE stations will be constructed as part of the project.
The STRIDE Bus Rapid Transit (BRT) Project Map is shown on the following page.
This 60% Storm Drainage Report documents drainage requirements and considerations for only
the South Renton Transit Center (SRTC) and associated roadway improvements. The project
includes elements that are designed and constructed by Sound Transit (ST).
The schedule for design and construction of each project station is determined by the Contract
Unit Description (CUD). The SRTC is part of CUD 5. Sound Transit is also implementing minor
roadway modifications along SR 167 and S Grady Way, just south of the proposed SRTC,
which are part of CUD 5 and will be constructed prior to the SRTC.
Stride program: I-405 corridor
Page 2 | AE 0054-17 | 60% Storm Drainage Report February 2024
This 60% Storm Drainage Report is also organized to follow the SWDM Technical Information
Report format.
Stride program: I-405 corridor
Page 3 | AE 0054-17 | 60% Storm Drainage Report February 2024
STRIDE Bus Rapid Transit (BRT) Project Map
Stride program: I-405 corridor
Page 4 | AE 0054-17 | 60% Storm Drainage Report February 2024
1.2 Design Standards and Requirements
Stormwater design criteria are based on the following City, and Washington State design
standards and requirement, as well as design guidance for water quality facility:
Renton Municipal Code, Section 4-6-030 Drainage and Water Quality (Surface Water)
Standards
2022 City of Renton Surface Water Design Manual (SWDM)
City of Renton Public Works Standard Plans (current version)
2021 King County Surface Water Design Manual
1.3 Site Description
Sound Transit is constructing a transit center at the northeast corner of Rainier Ave S (SR 167)
and S Grady Way intersection. Multiple parcels will be redeveloped for the transit center, which
will be called the South Renton Transit Center (SRTC) and will include a future multi-story
parking garage (not built until 2034). Instead, a temporary surface level parking lot will be built
within the garage footprint and the TOD area. Improvements will also be made to Rainier Ave S,
along the north side of S Grady Way between Rainier Ave S and Lake Ave S, Lake Ave S
(between access to north Park & Ride lot and S Grady Way) and Hardie Ave SW to enhance
transit speed and reliability and access to the transit center for motorized and non-motorized
users. The limits of disturbance for this work are within 10,000 feet of Renton Municipal Airport
and therefore must consider Federal Aviation Administration (FAA) guidelines.
The project is divided into four threshold discharge areas (TDAs): South Renton Transit Center
including Rainier Ave S (TDA SRTC 1), S Grady Way (TDA SRTC 2), Lake Ave S (TDA SRTC
3), and Hardie Ave SW (TDA SRTC 4), as shown on Figure on next page. For this report, TDA
SRTC 1 is further divided into two sub-TDAs based on the AHJ. TDA SRTC 1.1 includes the
work within COR right-of-way (ROW) along Rainier Ave S adjacent to the transit center. TDA
SRTC 1.2 includes the work within the ST-owned parcels for the transit center site itself. The
core requirements were evaluated on all TDAs. See Table 1-1 for the naming of these TDAs
and the area of work that falls within each of them.
Stride program: I-405 corridor
Page 5 | AE 0054-17 | 60% Storm Drainage Report February 2024
Figure A Drainage Basins, Subbasins, and Site Characteristics
Stride program: I-405 corridor
Page 6 | AE 0054-17 | 60% Storm Drainage Report February 2024
Table 1-1 South Renton Transit Center TDA Summary
Drainage Basin TDA Owner/Agency Area of Work
Springbrook Creek SRTC 1.1 City of Renton SR 167 (Rainier Ave)
SRTC 1.2 Sound Transit Transit Center (Parcels)
Rolling Hills Creek SRTC 2 City of Renton S Grady Ave
Black River SRTC 3 WSDOT/King County Metro Lake Ave
SRTC 4 City of Renton Hardie Ave SW
SRTC = South Renton Transit Center; TDA = Threshold Discharge Area
1.3.1 Predeveloped Conditions
1.3.1.1 South Renton Transit Center and Rainier Ave S (TDA SRTC 1)
Stormwater runoff from TDA SRTC 1, which includes the existing parcels (TDA SRTC 1.2) and
Rainier Ave S (TDA SRTC 1.1), is collected in a system of catch basins and conveyed via storm
drainpipes to a Type 2 MH located on the east side of Rainier Ave S just north of the
intersection of Rainier Ave S and S Grady Way. From this Type 2 MH, the system flows in the
west direction for approximately 4,410 feet, crosses Rainier Ave S and connects with the SW
Grady Way conveyance system, which continues west to the eventual discharge location to
Springbrook Creek. Within TDA SRTC 1.2, the existing system includes 27-inch diameter
concrete pipe that is flat and in some areas at reverse pipe slope. The survey of this pipe
system measured standing water a few inches above the pipe inverts, which indicates that the
outlet elevation is placed above inlet elevation at some structures. The existing system through
TDA SRTC 1.2 conveys upstream runoff from public areas, which include a portion of Shattuck
Ave S, just north of S Grady Way.
1.3.1.2 S Grady Way (TDA SRTC 2)
Stormwater runoff from the existing roadway along the north side of S Grady Way is collected in
a system of catch basins along the edge of the roadway. Stormwater is collected at the low
point of the system, approximately halfway between Rainier Ave S and Lake Ave S. From this
low point, the system crosses S Grady Way and connects with the conveyance system on the
south side of S Grady Way, which continues flows in the south direction for approximately 2,380
feet to the eventual discharge location to Rolling Hills Creek.
1.3.1.3 Lake Avenue S (TDA SRTC 3)
Stormwater runoff from Lake Ave S is collected in a system of catch basins and conveyance
pipe in the roadway. The runoff conveyed via storm drains north to the S 7th Street conveyance
system that extends to the west for approximately 6,890 feet and eventually discharges to the
Black River.
1.3.1.4 Hardie Avenue SW (TDA SRTC 4)
Stormwater runoff from Hardie Ave SW is collected in a system of catch basins along both sides
of the roadway and is conveyed through a system of storm drain to the SW 7th Street
Stride program: I-405 corridor
Page 7 | AE 0054-17 | 60% Storm Drainage Report February 2024
conveyance system located along the westbound lane of SW 7 th Street, which continue flows
west for approximately 5,140 feet, eventually discharges to the Black River.
1.3.2 Developed Site Conditions
1.3.2.1 South Renton Transit Center (TDA SRTC 1)
Multiple parcels at northeast quadrant of the Rainier Ave S (SR 167) and S Grady Way
intersection are going to be redeveloped into the SRTC. The development of the SRTC includes
multiple bus bays, an electric bus charging area, and a future multi-story parking garage (not
built until 2034). There will also be improvements along Rainier Ave S to enhance transit speed,
reliability, and access to the transit center for non-motorized users.
A portion of the site, referred to as future Transit Oriented Development (TOD) will be a future
site development leased by ST to a private development. Because the nature of the future TOD
is uncertain, a temporary surface level parking lot will be built within the garage footprint and the
TOD area.
To make it easier for a future development, ST will re-route the existing 27-inch-diameter pipe
around the TOD area. The 27-inch diameter re-routed pipe will reconnect to the existing system
just east of Rainier Ave S adjacent to the SRTC property, and no other modifications to the
system within Rainier Ave S are needed.
The target surfaces being added or replaced as part of the redevelopment require stormwater
treatment for water quality per Core Requirement #8, which will be provided by two (2) Filterra
systems, five (5) Modular Wetlands® Systems Linear (MWS), three (3) biofiltration swales with
grass-legume mix on lightly compacted topsoil, and impermeability liner beneath the topsoil
layer. The proposed improvements within this area are shown in Appendix A – Surface Area
Changes. Flow control is not required.
1.3.2.2 S Grady Way (TDA SRTC 2)
The northern portion of S Grady Way between Rainier Ave S (SR 167) and Lake Ave S will be
partially redeveloped for improvements to enhance transit speed and reliability and access to
transit for motorized and non-motorized users, improvements include replacing the existing two
westbound outside lanes with full depth concrete/HMA pavements, as well as adding and
replacing sidewalks and replacing curbs and gutters.
The improvements will not modify the existing drainage pattern. The target surfaces being
added or replaced as part of the redevelopment do not reach the threshold required for flow
control or water quality, as discussed further in Section 4.2.
1.3.2.3 Lake Avenue S (TDA SRTC 3)
Portions of Lake Ave S will be redeveloped to add entrance/exit and sidewalks into the new
SRTC to enhance transit speed and reliability and access to transit for motorized and non-
motorized users.
As part of the improvements, a new storm drain system will be added to Lake Ave S that will
collect runoff from the added and replaced surfaces at the northern portion of the roadway,
Stride program: I-405 corridor
Page 8 | AE 0054-17 | 60% Storm Drainage Report February 2024
through stormwater treatment and reconnect it to the existing 27-inch-diameter pipe system. An
existing system for the King County park & ride lot along Lake Ave S that extends north to the
conveyance system along S 7th Street.
1.3.2.4 Hardie Avenue SW (TDA SRTC 4)
The intersection of Hardie Ave SW and Rainier Ave S has been reconfigured to line up with the
new entrance to the SRTC across Rainier Ave S.
The improvements will modify the existing drainage pattern. The target surfaces being added or
replaced as part of the redevelopment do not reach the threshold required for flow control, but
water quality is required, as discussed further in Section 4.4.
1.3.3 Soils and Groundwater
Geotechnical investigations were completed by WSP in March 2022 and by HWA GeoSciences
in 2019 (HWA GeoSciences 2019). The recent investigations within the site measured shallow
groundwater, approximately 5 feet below grade surface during winter months.
A pilot infiltration test (PIT) was performed at the site from March 2 to March 4, 2022, under the
supervision of WSP’s field geologist. The Pilot Infiltration Test Results Report, which is included
in Appendix E, summarizes the findings from the site visit. In general, the site soils were found
to not be conducive to the use of infiltration BMPs. At the test pit locations, subsurface
conditions were characterized by several feet of fill overlaying native soils, which were primarily
fine grained and alluvial deposits. Little to no infiltration was observed into the native soils during
the PIT test.
Another groundwater consideration is that the site is located within the City’s Cedar River
wellhead protection area. A copy of the City’s Groundwater Protection Area Map is included in
Appendix C. It shows that the site is within the 10-year zone. Based on the City’s standards,
infiltration, if feasible, would be allowed if the underlying soil meets certain standards.
Stride program: I-405 corridor
Page 9 | AE 0054-17 | 60% Storm Drainage Report February 2024
Not to Scale
Figure B Geologic Map of the Renton Quadrangle, King County, Washington
2 CONDITIONS AND REQUIREMENTS SUMMARY
The methodology described in the COR SWDM was used to determine the level of drainage
review required for the SRTC. The project is subject to Full Drainage Review according to
Figure 1.1.2.A of the COR SWDM.
The type of development determines the Target Impervious Surfaces that are required to be
mitigated by Core Requirement #3 (Flow Control Facilities), Core Requirement #8 (Water
Quality Facilities), and Core Requirement #9 (On-Site BMPs).
The SRTC is classified as a redevelopment with greater than 5,000 square feet (ft 2) impervious
and improvements greater than 50% of the assessed value of the existing site improvements.
Therefore, the Target Impervious Surfaces include new impervious surface (Core Requirement
#3), new plus replaced impervious surface (Core Requirement #9), and new plus replaced PGIS
(Core Requirement #8).
Stride program: I-405 corridor
Page 10 | AE 0054-17 | 60% Storm Drainage Report February 2024
Each TDA was reviewed to check the core and special requirements applicable to the proposed
improvements.
2.1 Core Requirements for Springbrook Creek: South Renton Transit
Center (TDA SRTC 1)
Table 2-1 summarizes each core requirement and special requirement in the COR SWDM and
its applicability to the TDA.
Table 2-1 City of Renton Core and Special Requirements Assessment
Requirement
Number Requirement Name How Will the Requirement Be Satisfied?
CR 1 Discharge at the
Natural Location
The existing locations of drainage discharge from the site will be
maintained.
CR 2 Offsite Analysis An offsite analysis was conducted for TDA SRTC 1
CR 3 Flow Control No flow control required for the improvements. See discussion in
Section 4.1.1 of this report.
CR 4 Conveyance
System
All new conveyance system elements will be analyzed, designed,
and constructed in accordance with Section 1.2.4.1 of the SWDM
and will be part of a future phase of the project.
CR 5 Construction
Stormwater
Pollution Prevention
Erosion and sediment control measures and stormwater pollution
prevention and spill control measures will be applied through a
construction stormwater pollution prevention plan and will be part
of a future phase of the project.
CR 6 Maintenance and
Operations
All drainage facilities are publicly owned and maintained by the
COR (TDA SRTC 1.1) and ST (TDA SRTC 1.2).
CR 7 Financial
Guarantees and
Liabilities
Not required for the project site because the project is
implemented by public agency.
CR 8 Water Quality Water quality treatment is required. See Section 4.1.2 of this
report.
CR 9 On-Site BMPs While the site improvements do exceed the thresholds for the On-
Site BMP requirements, the site area is not conducive for use in
infiltration BMP design based on the Pilot Infiltration Test Results
Report dated May 2022. The investigations found high
groundwater and very low infiltration rates. See discussion in
Section 4.1.3 of this report.
SR 1 Other Adopted
Area-Specific
Requirements
No additional stormwater requirements have been identified based
on area-specific plans related to stormwater
SR 2 Flood Hazard Area
Delineation
This requirement does not apply because TDA SRTC 1 is not
within a flood hazard area. Refer to the FEMA Floodplain Map at
the end of Appendix C.
SR 3 Flood Protection
Facilities
This requirement does not apply because there are no flood
protection facilities within the site.
Stride program: I-405 corridor
Page 11 | AE 0054-17 | 60% Storm Drainage Report February 2024
Requirement
Number Requirement Name How Will the Requirement Be Satisfied?
SR 4 Source Control The project site improvement does not include any activities that
require source controls.
SR 5 Oil Control TDA SRTC 1.1 - Filterra System units are proposed to be used for
the new plus replaced impervious surface.
TDA SRTC 1.2 is assumed not a high use site – ST predicts the
line will have up to 3,000 daily boardings at the planned transit
center by 2040. For the parking areas (temporary), the traffic
threshold for the High-Use menu shall be estimated by a
professional engineer or transportation specialist with experience
in traffic estimation at 90% design.
The 2024 ADT projections for Rainier Ave at the intersection is
23,000 to 25,000, but the 2024 ADT for Hardie Ave is less than the
15,000 ADT trigger for intersections.
SR 6 Aquifer Protection
Area
Per the COR Sensitive Areas – Aquifer Protection map, the
proposed project is in Zone 2 of the APA. Treatment liner is
required for the proposed CABS in accordance with Section 6.2.4.
(Table 6.2.4A) of the SWDM. An imported soil compacted till liner
is required for new swale(s) in accordance with Section 1.2.4.3 (H)
of the SWDM.
ADT = Average Daily Traffic; APA = Aquifer Protection Area; CR = Core Requirement;
FEMA = Federal Emergency Management Agency; SR = Special Requirement
2.2 Core Requirements for Rolling Hills Creek: S Grady Way (TDA
SRTC 2)
Table 2-2 summarizes each core requirement and special requirement in the COR SWDM and
its applicability to the TDA.
Table 2-2 City of Renton Core and Special Requirements Assessment
Requirement
Number
Requirement
Name How Will the Requirement Be Satisfied?
CR 1 Discharge at the
Natural Location
The existing drainage patterns and locations of discharges from
the site will be maintained.
CR 2 Offsite Analysis A limited offsite analysis has been conducted for TDA SRTC 2.(1)
CR 3 Flow Control No flow control required for the improvements. See discussion in
Section 4.2.1 of this report.
CR 4 Conveyance
System
All new conveyance system elements will be analyzed, designed,
and constructed in accordance with Section 1.2.4.1 of the SWDM
and will be part of a future phase of the project.
CR 5 Construction
Stormwater
Pollution
Prevention
Erosion and sediment control measures and stormwater pollution
prevention and spill control measures will be applied through a
construction stormwater pollution prevention plan and will be part
of a future phase of the project.
CR 6 Maintenance and
Operations
All drainage facilities are publicly owned and maintained by the
City of Renton.
Stride program: I-405 corridor
Page 12 | AE 0054-17 | 60% Storm Drainage Report February 2024
Requirement
Number
Requirement
Name How Will the Requirement Be Satisfied?
CR 7 Financial
Guarantees and
Liabilities
Not required for the project site because the project is
implemented by a public agency.
CR 8 Water Quality No water quality treatment is required. See discussion in Section
4.2.2 of this report.
CR 9 On-Site BMPs While the site improvements for this TDA do exceed the thresholds
for the On-Site BMP requirements, the site area is not conducive
for use in infiltration BMP design based on the Pilot Infiltration Test
Results Report dated May 2022. The investigations found high
groundwater and very low infiltration rates within TDA 1.2, located
very close to this TDA (roughly 90 feet). See discussion in Section
4.2.3 of this report.
SR 1 Other Adopted
Area-Specific
Requirements
No additional stormwater requirements have been identified based
on area-specific plans related to stormwater.
SR 2 Flood Hazard Area
Delineation
This requirement does not apply because TDA SRTC 2 is not
within a flood hazard area. Refer to the FEMA Floodplain Map at
the end of Appendix C.
SR 3 Flood Protection
Facilities
This requirement does not apply because there are no flood
protection facilities within the site.
SR 4 Source Control The project site improvement does not include any activities that
require source controls.
SR 5 Oil Control TDA SRTC 2 does not qualify as a high use site. The 2024 ADT
projections for S Grady Ave is 28,000 to 30,000, but the 2024 ADT
for Lake Ave S is less than the 15,000 ADT trigger for intersections
and there is no planned work at the intersection of Rainier Ave S
and S Grady Way.
SR 6 Aquifer Protection
Area
Prohibited drainage facilities are not applicable within TDA SRTC
2.
ADT = Average Daily Traffic; CR = Core Requirement; FEMA = Federal Emergency Management Agency;
SR = Special Requirement NOTE:
(1) The downstream analysis for this TDA was limited to a review of maps and available information. The main downstream
analysis was focused on the SRTC site (TDA 1).
2.3 Core Requirements for Black River: Lake Avenue S (TDA SRTC 3)
Table 2-3 summarizes each core requirement and special requirement in the COR SWDM and
its applicability to the TDA.
Table 2-3 City of Renton Core and Special Requirements Assessment
Requirement
Number Requirement Name How Will the Requirement Be Satisfied?
CR 1 Discharge at the
Natural Location
The existing drainage discharge location from the site will be
maintained.
Stride program: I-405 corridor
Page 13 | AE 0054-17 | 60% Storm Drainage Report February 2024
Requirement
Number Requirement Name How Will the Requirement Be Satisfied?
CR 2 Offsite Analysis A limited offsite analysis has been conducted for TDA SRTC
3(1)
CR 3 Flow Control No flow control required for the improvements. See discussion
in Section 4.3.1 of this report.
CR 4 Conveyance System All new conveyance system elements will be analyzed,
designed, and constructed in accordance with Section 1.2.4.1
of the SWDM and will be part of a future phase of the project.
CR 5 Construction
Stormwater Pollution
Prevention
Erosion and sediment control measures and stormwater
pollution prevention and spill control measures will be applied
through a construction stormwater pollution prevention plan and
will be part of a future phase of the project.
CR 6 Maintenance and
Operations
All drainage facilities are publicly owned and maintained by
King County Metro.
CR 7 Financial Guarantees
and Liabilities
Not required for the project site because the project is
implemented by a public agency.
CR 8 Water Quality Water quality treatment is provided. See discussion in Section
4.3.2 of this report.
CR 9 On-Site BMPs While the site improvements for this TDA do exceed the
thresholds for the On-Site BMP requirements, the site area is
not conducive for use in infiltration BMP design based on the
Pilot Infiltration Test Results Report dated May 2022. The
investigations found high groundwater and very low infiltration
rates within TDA 1.2, located very close to this TDA (roughly
100 feet). See discussion in Section 4.3.3 of this report.
SR 1 Other Adopted Area-
Specific
Requirements
No additional stormwater requirements have been identified
based on area-specific plans related to stormwater.
SR 2 Flood Hazard Area
Delineation
This requirement does not apply because TDA SRTC 3 is not
within a flood hazard area. Refer to the FEMA Floodplain Map
at the end of Appendix C.
SR 3 Flood Protection
Facilities
This requirement does not apply because there are no flood
protection facilities within the site.
SR 4 Source Control The project site improvement does not include any activities
that require source controls.
SR 5 Oil Control TDA SRTC 3 does not qualify as a high use site. ST predicts
the line will have up to 3,000 daily boardings at the planned
transit center by 2040.
SR 6 Aquifer Protection
Area
Prohibited drainage facilities are not applicable within TDA
SRTC 3.
CR = Core Requirement; FEMA = Federal Emergency Management Agency; SR = Special Requirement
NOTE:
(1) The downstream analysis for this TDA was limited to a review of maps and available information. The main downstream
analysis was focused on the SRTC site (TDA 1).
Stride program: I-405 corridor
Page 14 | AE 0054-17 | 60% Storm Drainage Report February 2024
2.4 Core Requirements for Black River: Hardie Avenue SW (TDA
SRTC 4)
Table 2-4 summarizes each core requirement and special requirement in the COR SWDM and
its applicability to the TDA.
Table 2-4 City of Renton Core and Special Requirements Assessment
Requirement
Number Requirement Name How Will the Requirement Be Satisfied?
CR 1 Discharge at the
Natural Location
The existing drainage patterns and locations of discharges from
the site will be maintained.
CR 2 Offsite Analysis A limited offsite analysis has been conducted for TDA SRTC 4(1)
CR 3 Flow Control No flow control required for the improvements. See discussion in
Section 4.4.1 of this report.
CR 4 Conveyance System All new conveyance system elements will be analyzed,
designed, and constructed in accordance with Section 1.2.4.1 of
the SWDM and will be part of a future phase of the project.
CR 5 Construction
Stormwater Pollution
Prevention
Erosion and sediment control measures and stormwater
pollution prevention and spill control measures will be applied
through a construction stormwater pollution prevention) plan and
will be part of a future phase of the project.
CR 6 Maintenance and
Operations
All drainage facilities are publicly owned and maintained by the
COR.
CR 7 Financial
Guarantees and
Liabilities
Not required for the project site because the project is
implemented by a public agency.
CR 8 Water Quality No Water Quality treatment is required. See discussion in
Section 4.4.2 of this report.
CR 9 On-Site BMPs While the site improvements for this TDA do exceed the
thresholds for the On-Site BMP requirements, the site area is not
conducive for use in infiltration BMP design based on the Pilot
Infiltration Test Results Report dated May 2022. The
investigations found high groundwater and very low infiltration
rates within TDA 1.2, located close to this TDA. See discussion
in Section 4.4.3 of this report.
SR 1 Other Adopted Area-
Specific
Requirements
No additional stormwater requirements have been identified
based on area-specific plans related to stormwater.
SR 2 Flood Hazard Area
Delineation
This requirement does not apply because TDA SRTC 5 is not
within a flood hazard area. Refer to the FEMA Floodplain Map at
the end of Appendix C.
SR 3 Flood Protection
Facilities
This requirement does not apply because there are no flood
protection facilities within the site.
SR 4 Source Control The project site improvement does not include any activities that
require source controls.
Stride program: I-405 corridor
Page 15 | AE 0054-17 | 60% Storm Drainage Report February 2024
SR 5 Oil Control TDA SRTC 4 does not qualify as a high use site. ST predicts the
line will have up to 3,000 daily boardings at the planned transit
center by 2040. The 2024 ADT projections for Rainier Ave at the
intersection is 23,000 to 25,000, but the 2024 ADT for Hardie
Ave is less than the 15,000 ADT trigger for intersections.
SR 6 Aquifer Protection
Area
Prohibited drainage facilities are not applicable within TDA
SRTC 4.
CR = Core Requirement; FEMA = Federal Emergency Management Agency; SR = Special Requirement
NOTE:
(1) The downstream analysis for this TDA was limited to a review of maps and available information. The main downstream
analysis was focused on the SRTC site (TDA 1).
Stride program: I-405 corridor
Page 16 | AE 0054-17 | 60% Storm Drainage Report February 2024
3 OFFSITE ANALYSIS
Per Section 1.2.2 of the COR SWDM, an offsite analysis is required for improvements at the
SRTC. The primary component of the analysis is a Level 1 downstream analysis for all
downstream flow paths from the project site boundary. The secondary component of the
analysis is an evaluation of the upstream drainage system to verify that significant flooding and
erosion impacts will not occur because of the project. The downstream analysis has focused on
the main SRTC site (TDA SRTC 1) rather than the other three TDAs. This is primarily because
the work in the other TDAs (consisting of roadways) is minor and includes no or very limited
new impervious surfaces. A more detailed downstream analysis of these smaller systems may
be required in the future as the design advances.
The downstream analysis for the SRTC is organized in four tasks:
Task 1: Study Area Definition and Maps
Define and map the study area.
Task 2: Resource Review
Review all available information on the study area.
Task 3: Field Inspection
Field Inspect the study area.
Task 4: Drainage System Description and Problem Descriptions
Describe the drainage system, and its existing and predicted drainage and water
quality problems.
Figure 3-1 shows the 1-Mile Flow Paths for each TDA associated with the SRTC.
Stride program: I-405 corridor
Page 17 | AE 0054-17 | 60% Storm Drainage Report February 2024
Figure 3-1 South Renton Transit Center Downstream Analysis
3.1 Springbrook Creek: South Renton Transit Center (TDA SRTC 1)
Downstream Analysis Description
For TDA SRTC 1, runoff from the existing developed site is collected in a system of catch
basins and storm drains and leaves the site through a catch basin near the intersection of S
Grady Way and Rainier Ave S. The flow from TDA SRTC 1 connects with the SW Grady Way
conveyance system and follows SW Grady Way until it discharges into Springbrook Creek, as
shown on Figure 3-1.
Upstream Analysis Description
As noted previously, there is a 27-inch-diameter pipe system running from east to west through
the existing site. This system is very flat, and at some locations it is at a slight reverse grade.
The system conveys flows from offsite areas, including portion (approximately 19,000 square
feet paved area) of Lake Ave S and a small portion (approximately 14,800 square feet paved
area) of Shattuck Ave S, both are located north of S Grady Way. One potential upstream
drainage issue is a potential connecting system from the north. COR geographic information
system (GIS) and the site survey identified two storm drain pipes that extends from the Hyundai
Auto Dealer property located at 201 S 7th Street. These storm drains are shown to come from
the north, crossing through the transit center site in the northeast corner and then into Lake Ave
S. During the field visit, no upstream catch basin within the Hyundai property could be found,
and it is likely that both systems are abandoned. COR GIS drainage maps show nearly all the
Stride program: I-405 corridor
Page 18 | AE 0054-17 | 60% Storm Drainage Report February 2024
Hyundai property draining to the north. The two storm drain pipes have been televised and no
confirmation that they are abandoned. The exact location of both pipes are shown on the 60%
site drainage plans included in Appendix C (see Key Notes 9 and 14 on the site drainage plans
for location).
3.1.2 Resource Review
The following documents were reviewed for TDA SRTC 1:
Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) –
Attached in Appendix C
COR SWDM – including groundwater protection areas – Attached in Appendix C
City of Renton Online GIS
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=CORMaps
U.S. Department of Agriculture, Natural Resources Conservation Service (USDA NRCS)
Web Soil Survey https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm\
U.S. Fish and Wildlife Service (UFWS) Wetlands Mapper
https://www.fws.gov/wetlands/data/Mapper.html
King County Online GIS King County GIS Data Hub - King County
Washington Department of Ecology (Ecology) Water Quality Atlas
https://fortress.wa.gov/ecy/waterqualityatlas/StartPage.aspx
Salmon Habitat Plan Green/Duwamish and Central Puget Sound Watershed (Water
Resource Inventory Area [WRIA] 9) (WRIA 9 Steering Committee 2005)
https://www.govlink.org/watersheds/9/plan-
implementation/WRIA9Salmon%20HabitatPlanFull.pdf
Green River Temperature Total Maximum Daily Load (TMDL) Green River Temperature
TMDL Water Quality Improvement Report: Combined Report Template (Ecology 2011)
3.1.3 Field Inspection
A field visit was performed by WSP as part of the offsite analysis for TDA SRTC 1 on April 2,
2021. Photos from the field inspection are contained in Appendix D. No evidence of existing or
potential drainage problems were identified during the field inspection.
3.1.4 Problem Descriptions
Based on the findings from the Level 1 Analysis, the project is not expected to cause any new or
aggravate any existing downstream flooding, erosion, or water quality problems within a quarter
mile from the TDA.
Stride program: I-405 corridor
Page 19 | AE 0054-17 | 60% Storm Drainage Report February 2024
The Ecology Water Quality Atlas states that Springbrook Creek has a 303(d)-listing category 4a
for temperature and is subject to the Green River Temperature TMDL. The implementation
strategy outlined in the TMDL does not require any further treatment, and Springbrook Creek is
more than a quarter mile from the TDA.
Because the site improvements will reduce the extent of impervious surfaces and reduce runoff
volumes, and because the improvements will include water quality treatment for PGIS, the
project is expected to both reduce runoff volumes and improve water quality.
TDA SRTC 1 is just north of a flood hazard area. The drainage system does not direct runoff to
the flood hazard area. Additional flood management requirements are not assumed to be
needed for this scope of work.
3.2 Rolling Hills Creek: S Grady Way (TDA SRTC 2)
Downstream Analysis Description
For TDA SRTC 2, runoff from the existing developed roadway is collected in a system of catch
basins and leaves the site through a catch basin on S Grady Way. The piped drainage system
extends south across S Grady Way to join with Rolling Hills Creek in the southeast quadrant of
I-405/SR167 interchange. From the confluence, Rolling Hills Creek continues south within the
Panther Creek Wetland system before entering a pipe system that crosses under SR 167 and
extends west along SW 19th Street, as shown on Figure 3-1.
Upstream Analysis Description
There is no upstream tributary area for TDA SRTC 2.
3.2.2 Resource Review
The following documents were reviewed for TDA SRTC 2:
FEMA FIRM – Attached in Appendix C
City of Renton Online GIS
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=CORMaps
USDA NRCS Web Soil Survey https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm\
UFWS Wetlands Mapper https://www.fws.gov/wetlands/data/Mapper.html
King County Online GIS King County GIS Data Hub - King County
Ecology Water Quality Atlas https://fortress.wa.gov/ecy/waterqualityatlas/StartPage.aspx
Salmon Habitat Plan Green/Duwamish and Central Puget Sound Watershed (WRIA 9)
(WRIA Steering Committee 2005) https://www.govlink.org/watersheds/9/plan-
implementation/WRIA9Salmon%20HabitatPlanFull.pdf
Stride program: I-405 corridor
Page 20 | AE 0054-17 | 60% Storm Drainage Report February 2024
3.2.3 Problem Descriptions
Based on the findings from the Level 1 Analysis, the project is not expected to cause any new or
aggravate any existing downstream flooding, erosion, or water quality problems within a quarter
mile from the TDA.
The S Grady Way drainage system downstream of the project area is within the FEMA 100-year
flood elevation based on the COR GIS. The entire Rolling Hills Creek and Panther Creek
Wetland (including Panther Creek) have been extensively studied as part of the Washington
State Department of Transportation (WSDOT) I-405 widening between Tukwila and Renton
program. Prior to 60% Design, per a personal communication with the COR (Farah, 2020), it is
understood that as a part of the overall WSDOT project, Rolling Hills Creek will be improved,
and the creek will be relocated to extend south to cross under SR 167 at SW 23rd Street in a
future fish passable channel improvement. The existing crossing and SW 19th Street will be
abandoned. As a part of the overall planning, analysis, and design of the improvements
completed by WSDOT, we anticipate that any existing flooding problem (besides being in the
100-year FEMA floodplain) will be addressed.
Prior to 60% Design, during a meeting among WSP, ST and King County, the possible
existence of an existing flooding problem at the intersection of Lake Ave S and S Grady Way
was raised. Per a subsequent personal communication with the City of Renton (Chavez, 2021),
it seems that the flooding problem has not been documented as a drainage complaint and no
one from the City maintenance staff has been notified of any issues at the intersection. At this
time, this will not be considered an existing downstream flooding problem.
3.3 Black River: Lake Ave S (TDA SRTC 3) and Black River: Hardie
Ave SW (TDA SRTC 4)
Downstream Analysis Description
TDA SRTC 3 and TDA SRTC 4 were combined for their analysis because runoff from both
TDAs follows SW 7th Street to the Black River. Runoff from the existing developed sites is
collected in a system of catch basins and leaves the sites through catch basins along SW 7th
Street. The flow from TDA SRTC 3 and 4 connects with the rest of the conveyance system and
follows SW 7th Street west until it discharges into the Black River, as shown on Figure 3-1.
Upstream Analysis Description
There is no upstream tributary area for TDA SRTC 3 and 4.
3.3.2 Resource Review
The following documents were reviewed for TDA SRTC 3 and 4:
FEMA FIRM – Attached in Appendix C
City of Renton Online GIS
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=CORMaps
Stride program: I-405 corridor
Page 21 | AE 0054-17 | 60% Storm Drainage Report February 2024
USDA NRCS Web Soil Survey https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm\
USFWS Wetlands Mapper https://www.fws.gov/wetlands/data/Mapper.html
King County Online GIS King County GIS Data Hub - King County
Ecology Water Quality Atlas https://fortress.wa.gov/ecy/waterqualityatlas/StartPage.aspx
Salmon Habitat Plan Green/Duwamish and Central Puget Sound Watershed (WRIA 9)
(WRIA Steering Committee 2005) https://www.govlink.org/watersheds/9/plan-
implementation/WRIA9Salmon%20HabitatPlanFull.pdf
Green River Temperature TMDL Green River Temperature TMDL Water Quality
Improvement Report: Combined Report Template (Ecology 2011)
City of Renton Preliminary Receiving Waters Assessment and Stormwater Management
Influence (Otak, 2020)
3.3.3 Problem Descriptions
Based on the findings from the Level 1 Analysis performed by WSP, the project is not expected
to cause any new or aggravate any existing downstream flooding, erosion, or water quality
problems within a quarter mile from the TDA.
The Ecology Water Quality Atlas states that the Black River has a 303(d)-listing category 4a for
temperature and is subject to the Green River Temperature TMDL. The implementation strategy
outlined in the TMDL does not require any further treatment, and the Black River is more than a
quarter mile from the TDA.
The downstream system along SW 7th Street to the Black River has historically had some
flooding problems and was extensively studied by the City as part of the Hardie Ave SW – SW
7th Street Storm System Improvement Project (SAIC, 2012). Between 2014 and 2018, the City
constructed over 2,000 feet of 72-inch-diameter conveyance improvements that are believed to
reduce flooding downstream of the project site along this system.
The COR had a Preliminary Receiving Waters Assessment and Stormwater Management
Influence Assessment conducted for the City’s receiving waters as part of the planning process
for their Stormwater Management Action Plan (Otak, 2020). The Black River Basin was included
in the assessment, and the impairments chosen as indicators of stream health were bacteria
and dissolved oxygen. The assessment found that the main sources of these impairments
include increased bacterial and nutrient loads from pet waste, yard waste, and on-site sewage
systems. The recommendations to solve issues related to these sources do not require
additional water quality treatment for SRTCs 3 and 4.
Stride program: I-405 corridor
Page 22 | AE 0054-17 | 60% Storm Drainage Report February 2024
4 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID)
AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
The following sections summarize the existing and developed site hydrology, performance
standards, and stormwater management BMPs proposed to meet the required flow control,
water quality, and on-site stormwater management requirements discussed in Section 2. See
Appendix A for a summary of the surface area changes associated with this work.
4.1 Springbrook Creek: South Renton Transit Center (TDA SRTC 1)
All the surface area changes within TDA SRTC 1 were reviewed against the minimum requirement
thresholds. If a facility is needed, the sections below split the discussion of what is needed between the
site and the roadway.
4.1.1 Flow Control (Core Requirement #3)
The basic exemption given in the COR SWDM does not apply to the proposed improvements
because there is more than 5,000 square feet (ft2) of new plus replaced impervious surface;
therefore, flow control must be further evaluated for TDA SRTC 1.
Based on the COR – Flow Control Application Map as shown on the following page, SRTC 1 is
in the Peak Rate (Existing) Flow Control Standard. The target surfaces within the Peak Rate
Flow Control Standard area are new impervious surfaces only. Exception 2 in Section 1.2.3.1 of
the COR SWDM stipulates that flow control is not required if flow from the target surfaces
causes less than a 0.15 cubic feet per second (cfs) increase in the 100-year peak flow
compared to existing conditions. MGSFlood modeling determined that an increase in new
impervious area of less than 9,321 ft2 would not increase the 100-year peak flow by more than
0.15 cfs. Therefore, Exemption 2 applies, and no flow control is required in TDA SRTC 1.1
because the new impervious area is 6,623 ft2, which is less than the 9,321 ft2 threshold.
Stride program: I-405 corridor
Page 23 | AE 0054-17 | 60% Storm Drainage Report February 2024
Stride program: I-405 corridor
Page 24 | AE 0054-17 | 60% Storm Drainage Report February 2024
4.1.2 Water Quality (Core Requirement #8)
There is more than 5,000 ft2 of new plus replaced PGIS within TDA SRTC 1; therefore, water
quality treatment is required. Total new PGIS plus replaced PGIS in TDA SRTC 1 is 205,654 ft 2.
Refer to Table 4-1 for PGIS treated by each proposed BMP. TDA SRTC 1 was divided into two
sub-TDAs to determine water quality BMPs to be used to satisfy the core requirement.
Table 4-1 BMP Treatment Areas
BMP Type PGIS Treated (ft2)
MWS 66 3,458
MWS 67 43,466
MWS 68 64,022
MWS 69 31,286
MWS 70 51,693
Wet Biofiltration Swale - Central 6,589
Filterra 1 4,842
Filterra 2 15,932
Total 221,288
BMP = best management practice; CABS = compost-amended bioswale; ft2 = square feet;
MWS = Modular Wetlands® Systems Linear; PGIS = pollution-generating impervious surface
4.1.2.1 Rainier Ave S (TDA SRTC 1.1)
The proposed facilities must be from the Enhanced Basic Water Quality menu because more
than 50 percent of the runoff from the site is coming from Rainier Ave S, which is anticipated to
have an average daily traffic volume of more than 7,500 vehicles, as detailed in Section 1.2.8.1
of the COR SWDM.
In 2014, the COR completed a project that installed an upgraded drainage system within Rainier
Ave S. As part of the 2014 project, the COR installed Filterras for water quality treatment. The
same product is proposed for the project’s improvements along Rainier Ave S. Filterras also
have an Ecology general use level designation for basic, enhanced, phosphorus and oil
treatment. Currently, three Filterras are proposed. Two Filterra units proposed along the Rainier
Ave S median will tie into existing catch basin individually, and the other Filterra unit with new
catch basin will be installed at the southeast corner of the Rainier Ave S/Hardie Ave SW
Intersection. The intent of the design is to not change the flow spread of the roadway and
minimize cutting into the newly replaced roadway. Filterras are compliant with the FAA Advisory
Circular titled “Hazardous Wildlife Attractants on or Near Airports.” See Appendix B for sizing of
the proposed Filterras.
4.1.2.2 Transit Center (TDA SRTC 1.2)
In accordance with Section 1.2.8.1 of the COR SWDM, when 50% or more of the site runoff
comes from commercial, industrial, or multifamily uses, enhanced treatment is required. The site
Stride program: I-405 corridor
Page 25 | AE 0054-17 | 60% Storm Drainage Report February 2024
is considered commercial, and therefore treatment following the Enhanced Basic Water Quality
menu is required.
Four MWS units and a CABS are proposed to provide water quality treatment, all water quality
facilities will be designed to meet FAA guidelines. Due to current grade difference between
finished grade at the west entrance to the Transit Center and the invert elevation of the existing
system along east side of Rainier Ave S, the MWS unit at the southeast corner of the entrance
will not provide adequate water quality treatment for the west portion of the Transit Center.
Finished grade surface will need to be raised at the west entrance at 90% Design. See
Appendix B for sizing of the water quality facilities.
4.1.3 On-Site BMPs (Core Requirement #9)
The COR SWDM includes an on-site BMP requirement for all projects that have new plus
replaced impervious surfaces larger than 2,000 ft2.
4.1.3.1 Rainier Ave S (TDA SRTC 1.1)
The redevelopment in TDA SRTC 1.1 must follow the Small Road Improvement and Urban
Road Improvement Projects BMP Requirements (COR SWDM Chapter 1.2.9.3.2). The target
surfaces subject to this low impact development performance standard are included in Table
4-2.
Table 4-2 TDA SRTC 1.1 Target Surfaces
Surface Type
Quantity
(ft2)
New Impervious Surface not fully dispersed 6,623
New Pervious Surface not fully dispersed 0
Existing Impervious Surface added since 01/08/2001 not already
mitigated with flow control or flow control BMP 0(1)
Replaced Impervious Surface 13,971
Total 20,594
ft2 = square feet; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) Assume the site has not been redeveloped after 2001.
The target surfaces must be evaluated to determine the feasibility and applicability of different
BMPs as described in COR SWDM Appendix C. Refer to Table 4-3 for an evaluation of BMPs.
Stride program: I-405 corridor
Page 26 | AE 0054-17 | 60% Storm Drainage Report February 2024
Table 4-3 TDA SRTC 1.1 BMP Evaluation
Step BMP Site Considerations
1 Full Dispersion for all
target surfaces
There is no vegetated surface adjacent to the roadway. The area is
highly urban, with parking and buildings along both sides of Rainier
Ave S.
2 Full Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 1.1 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Limited Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 1.1 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Bioretention Not feasibility. Native soils encountered are generally fine-grained and
exhibit very low permeability. The PIT results indicated no measurable
infiltration within the test duration.
Permeable Pavement Not feasible. The area soils have high groundwater and low infiltration
rates. A minimum of 3 feet clearance between the bottom of the
lowest gravel base course or sand layer, and the seasonal high
groundwater elevation cannot be achieved. Also, a number of
underground utilities are within the roadway prism that could be
affected by permeable pavement. (1)(2)
3 Basic Dispersion Not feasible. There are not enough vegetated surfaces within this
urban corridor to disperse runoff.
4 Soil moisture holding
capacity of new pervious
surfaces
Any landscaping included in the Project can include this BMP.
NOTES:
(1) The site is within a wellhead protection area zone.
(2) There are no regulated slopes, landslide, or erosion hazard areas within the site per Renton’s online mapping.
A soils investigation was done for the project including PIT tests within the Transit Center site
(TDA SRTC 1.2) and found very low infiltration. See discussion in Section 4.13.2. Based on
these results, it is unlikely that an infiltration BMP is feasible.
4.1.3.2 Transit Center (TDA SRTC 1.2)
The parcel redevelopment must follow the Large Lot BMP Requirements because the lot is
larger than 22,000 ft2. The target surfaces subject to this low impact development performance
standard are included in Table 4-4. The redevelopment of the Transit Center will result in an
impervious surface coverage greater than 65% on the buildable portion of the site/lot; therefore,
BMPs must be applied to 20% of the target impervious surfaces or to an impervious area equal
to at least 10% of the site/lot, whichever is less.
Stride program: I-405 corridor
Page 27 | AE 0054-17 | 60% Storm Drainage Report February 2024
Table 4-4 TDA SRTC 1.2 Target Surfaces
Surface Type
Quantity
(ft2)
New Impervious Surface not fully dispersed 2,919
New Pervious Surface not fully dispersed 0
Existing Impervious Surface added since 01/08/2001 not already
mitigated with flow control or flow control BMP 0(1)
Replaced Impervious Surface 259,789
Total 262,708
20% of Target Area 52,542
10% of Total Parcel Area 36,049
NOTES:
(1) The site has not been redeveloped after 2001.
The target surfaces must be evaluated to determine the feasibility and applicability of different
BMPs as described in the COR SWDM Appendix C.
To evaluate the potential for infiltration BMPs, a PIT test was performed at the site from March 2
to March 4, 2022, under the supervision of WSP’s field geologist. The Pilot Infiltration Test
Results Report, which is included in Appendix E, summarizes the findings from the site visit. In
general, the site soils were found to not be conducive to the use of infiltration BMPs. At the test
pit locations, subsurface conditions were characterized by several feet of fill overlaying native
soils, which were primarily fine grained and alluvial deposits. Little to no infiltration was
observed into the native soils during the PIT test.
Refer to Table 4-5 for an evaluation of BMPs.
Table 4-5 TDA SRTC 1.2 BMP Evaluation
Step BMP Site Considerations
1 Full Dispersion for all
target surfaces
The only location that could potentially be brought up to meet the
requirements of native vegetated surface is below the distribution power
lines. Additional research will be needed to determine if this type of
surfacing can be below the transmission power lines.
2 Full Infiltration of roof
runoff
Not feasible. A pilot infiltration test (PIT) performed at the site from March
2 to March 4, 2022, under the supervision of WSP’s field geologist
showed little to no infiltration into native soils. See Appendix E.(1)(2)
Stride program: I-405 corridor
Page 28 | AE 0054-17 | 60% Storm Drainage Report February 2024
Step BMP Site Considerations
3 Full Infiltration Not feasible. A pilot infiltration test (PIT) performed at the site from March
2 to March 4, 2022, under the supervision of WSP’s field geologist
showed little to no infiltration into native soils. See Appendix E.(1)(2)
Limited Infiltration Not feasible. A pilot infiltration test (PIT) performed at the site from March
2 to March 4, 2022, under the supervision of WSP’s field geologist
showed little to no infiltration into native soils. See Appendix E.(1)(2)
Bioretention Not feasible. A pilot infiltration test (PIT) performed at the site from March
2 to March 4, 2022, under the supervision of WSP’s field geologist
showed little to no infiltration into native soils. See Appendix E.(1)(2)
Permeable
Pavement
Not feasible. A pilot infiltration test (PIT) performed at the site from March
2 to March 4, 2022, under the supervision of WSP’s field geologist
showed little to no infiltration into native soils. See Appendix E.(1)(2)
4 Basic Dispersion Potentially feasible. The area under the overhead high-power
transmission lines will be landscaped. These areas could be used to
disperse a portion of the site runoff. Site grading and use of the site will be
further reviewed during future design phases.
5 Reduced Impervious
Surface Credit
Not applicable. The types of techniques included in this credit are not
applicable for the intended use of the site.
Native Growth
Retention Credit
Not feasible. The only significant vegetated area within the
parcel is located beneath the high voltage power transmission
lines. This area is not suitable for native growth because tall
vegetation is not permitted under the transmission lines.
Tree Retention Credit Not feasible. There are no existing trees to preserve.
6 Soil moisture holidng
capacity of new
pervious surfaces
Any landscaping included in the Project can include this BMP.
7 Downspout
perforated pipe
connection
The connection is intended to provide opportunity for infiltration of any
runoff that is being conveyed from roof areas. Since the site area is not
conducive for use in infiltration BMP design, this BMP is considered not
feasible.
BMP = best management practice; CABS = compost-amended bioswale; SRTC = South Renton Transit Center; TDA = threshold
discharge area
NOTES:
(1) The site is within a wellhead protection area zone.
(2) There are no regulated slopes, landslide, or erosion hazard areas within the site per Renton’s online mapping.
4.2 Rolling Hills Creek: S Grady Way (TDA SRTC 2)
All the surface area changes within TDA SRTC 2 were reviewed against the requirement
thresholds in the COR SWDM. If a facility is needed, it is discussed in the sections below.
4.2.1 Flow Control (Core Requirement #3)
The basic exemption given in the COR SWDM does not apply to the proposed improvements
because there is more than 5,000 ft2 of new plus replaced impervious surface; therefore, flow
control must be further evaluated for TDA SRTC 2.
Stride program: I-405 corridor
Page 29 | AE 0054-17 | 60% Storm Drainage Report February 2024
Based on the COR – Flow Control Application Map, SRTC 2 is in the Peak Rate (Existing) Flow
Control Standard. The target surfaces within the Peak Rate Flow Control Standard area are new
impervious surfaces only. Exception 2 in Section 1.2.3.1 of the COR SWDM stipulates that flow
control is not required if flow from the target surfaces causes less than a 0.15 cfs increase in the
100-year peak flow compared to existing conditions. MGSFlood modeling determined that an
increase in new impervious area of less than 9,321 ft2 would not increase the 100-year peak
flow by more than 0.15 cfs. Therefore, Exemption 2 applies, and no flow control is required in
TDA SRTC 2 because the new impervious area is 3,909 ft 2, which is less than the 9,321 ft2
threshold.
4.2.2 Water Quality (Core Requirement #8)
The Surface Area Exemption for Transportation Redevelopment Projects in Section 1.2.8 of the
COR SWDM applies to TDA SRTC 2. The total new impervious surface within the project limits
is less than 50% of the existing impervious surfaces, less than 5,000 ft2 of new PGIS, and less
than ¾ acre of new pollution generating pervious surfaces (PGPS) will be added within TDA
SRTC 2; therefore, water quality treatment is not required.
4.2.3 On-Site BMPs (Core Requirement #9)
The COR SWDM includes an on-site BMP requirement for all projects that have new plus
replaced impervious surfaces larger than 2,000 ft2. The redevelopment in this TDA must follow
the Small Road Improvement and Urban Road Improvement Projects BMP Requirements (COR
SWDM Chapter 1.2.9.3.2). The target surfaces subject to this low impact development
performance standard are included in Table 4-6.
Table 4-6 TDA SRTC 2 Target Surfaces
Surface Type
Quantity
(ft2)
New Impervious Surface not fully dispersed 3,909
New Pervious Surface not fully dispersed 0
Existing Impervious Surface added since 01/08/2001 not already
mitigated with flow control or flow control BMP
0 (1)
Replaced Impervious Surface 27,474
Total 31,383
BMP = best management practice; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) Assume the site has not been redeveloped after 2001.
Stride program: I-405 corridor
Page 30 | AE 0054-17 | 60% Storm Drainage Report February 2024
The target surfaces must be evaluated to determine the feasibility and applicability of different
BMPs as described in COR SWDM Appendix C. Refer to Table 4-7 for an evaluation of BMPs.
As noted above, a soils report, including PIT tests, has been conducted focusing on TDA 1 that
found high groundwater and very low infiltration rates (see Section 4.1.3.2 for a detailed
discussion). While the PIT test was in a different project TDA, its proximity is very close to TDA
2, which can provide information about its feasibility for infiltration.
Table 4-7 TDA SRTC 1.2 BMP Evaluation
Step BMP Site Considerations
1 Full Dispersion for all
target surfaces
Not feasible. The area north of the sidewalk is landscaped, but there
is only about 10 feet between the back of the sidewalk and the ROW
line. Even if the slope of the sidewalk could be non-standard and flow
away from the curb along Grady, there is insufficient flow path length.
2 Full Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 2 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Limited Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 2 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Bioretention Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 2 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Permeable Pavement Not feasible. The area soils have high groundwater and low infiltration
rates. A minimum of 3 feet clearance between the bottom of the
lowest gravel base course or sand layer, if required, and the seasonal
high groundwater elevation cannot be achieved. Also, there are a
number of underground utilities within the roadway prism that could
be affected by permeable pavement.
3 Basic Dispersion Not feasible. The site is almost entirely impervious.
4 Soil moisture holding
capacity of new pervious
surfaces
Any new or restored landscaping areas can be amended.
BMP = best management practice; ROW = right-of-way line; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) The site is within a wellhead protection area zone.
(2) There are no regulated slopes, landslide, or erosion hazard areas within the site per Renton’s online mapping.
Stride program: I-405 corridor
Page 31 | AE 0054-17 | 60% Storm Drainage Report February 2024
4.3 Black River: Lake Avenue (SRTC 3)
All the surface area changes within TDA SRTC 3 were reviewed against the triggers. If a facility
is needed it is discussed in the sections below.
4.3.1 Flow Control (Core Requirement #3)
The basic exemption given in the COR SWDM does not apply to the proposed improvements
because there is more than 5,000 ft2 of new plus replaced impervious surface; therefore, flow
control must be further evaluated for TDA SRTC 3.
Based on the COR – Flow Control Application Map, SRTC 3 is in the Peak Rate (Existing) Flow
Control Standard. The target surfaces within the Peak Rate Flow Control Standard area are new
impervious surfaces only. Exception 2 in Section 1.2.3.1 of the COR SWDM stipulates that flow
control is not required if flow from the target surfaces causes less than a 0.15 cfs increase in the
100-year peak flow compared to existing conditions. MGSFlood modeling determined that an
increase in new impervious area of less than 9,321 ft2 would not increase the 100-year peak
flow by more than 0.15 cfs. Therefore, Exemption 2 applies, and no flow control is required in
TDA SRTC 3 because the new impervious area is 4,401 ft 2, which is less than the 9,321 ft2
threshold.
4.3.2 Water Quality (Core Requirement #8)
The Surface Area Exemption for Transportation Redevelopment Projects in Section 1.2.8 of the
COR SWDM applies to TDA SRTC 3. The total new impervious surface within the project limits
is less than 50% of the existing impervious surfaces, less than 5,000 ft2 of new PGIS, and less
than ¾ acre of new PGPS will be added within TDA SRTC 3; therefore, water quality treatment
shall not be required. But consider that a potential connecting system from the north, crossing
through the transit center site in the northeast corner and then into Lake Ave S, a Modular
Wetlands® Systems Linear (MWS) is proposed to provide stormwater treatment for the northern
portion of Lake Ave S.
4.3.3 On-Site BMPs (Core Requirement #9)
The COR SWDM includes an on-site BMP requirement for all projects that have new plus
replaced impervious surfaces larger than 2,000 ft2. The redevelopment in this TDA must follow
the Small Road Improvement and Urban Road Improvement Projects BMP Requirements (COR
SWDM Chapter 1.2.9.3.2). The target surfaces subject to this low impact development
performance standard are included in Table 4-8.
Stride program: I-405 corridor
Page 32 | AE 0054-17 | 60% Storm Drainage Report February 2024
Table 4-8 TDA SRTC 3 Target Surfaces
Surface type
Quantity
(ft2)
New Impervious Surface not fully dispersed 4,401
New Pervious Surface not fully dispersed 0
Existing Impervious Surface added since 01/08/2001 not already
mitigated with flow control or flow control BMP 0 (1)
Replaced Impervious Surface 17,473
Total 21,874
BMP = best management practice; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) Assume the site has not been redeveloped after 2001.
The target surfaces must be evaluated to determine the feasibility and applicability of different
BMPs as described in COR SWDM Appendix C. Refer to Table 4-9 for an evaluation of BMPs.
As noted above, a soils report, including PIT tests, has been conducted focusing on TDA 1 that
found high groundwater and very low infiltration rates (see Section 4.1.3.2 for a detailed
discussion). While the PIT test was in a different project TDA, its proximity is very close to TDA
3, which can provide information about its feasibility for infiltration.
Table 4-9 TDA SRTC 3 BMP Evaluation
Step BMP Site Considerations
1 Full Dispersion for all
target surfaces
Not feasible. There are landscaped areas along Lake Ave, but there is
not enough room for a sufficient flow path length.
2 Full Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 3 would be similar
(because the PIT Test was approximately 100 feet from TDA 3, see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Limited Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 3 would be similar.
(because the PIT Test was approximately 100 feet from TDA 3, see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Bioretention Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 3 would be similar.
(because the PIT Test was approximately 100 feet from TDA 3, see
Stride program: I-405 corridor
Page 33 | AE 0054-17 | 60% Storm Drainage Report February 2024
Step BMP Site Considerations
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Permeable Pavement Not feasible. The area soils have high groundwater and low infiltration
rates. A minimum of 3 feet clearance between the bottom of the
lowest gravel base course or sand layer, if required, and the seasonal
high groundwater elevation cannot be achieved. Also, there are a
number of underground utilities within the roadway prism that could
be affected by permeable pavement. (1)(2)
3 Basic Dispersion Not feasible. The site is almost entirely impervious.
4 Soil moisture holding
capacity of new pervious
surfaces
Any new or restored landscaping areas can be amended.
BMP = best management practice; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) The site is within a wellhead protection area zone.
(2) There are no regulated slopes, landslide, or erosion hazard areas within the site per Renton’s online mapping.
4.4 Black River: Hardie Avenue SW (SRTC 4)
All the surface area changes within TDA SRTC 4 were reviewed against the triggers. If a facility
is needed, it is discussed in the sections below.
4.4.1 Flow Control (Core Requirement #3)
TDA SRTC 4 qualifies for the basic exemption from Core Requirement #3 because less than
5,000 ft2 of new plus replaced impervious surface will be created, and less than ¾ acre of new
pervious surface will be added; therefore, flow control is not required for this TDA.
4.4.2 Water Quality (Core Requirement #8)
The Surface Area Exemption for Transportation Redevelopment Projects in Section 1.2.8 of the
COR SWDM applies to TDA SRTC 4. The total new impervious surface within the project limits
is less than 50% of the existing impervious surfaces, less than 5,000 ft2 of new PGIS, and less
than ¾ acre of new PGPS will be added within TDA SRTC 4; therefore, water quality treatment
is not required.
4.4.3 On-Site BMPs (Core Requirement #9)
The COR SWDM includes an on-site BMP requirement for all projects that have new plus
replaced impervious surfaces larger than 2,000 ft2. The redevelopment in this TDA must follow
the Small Road Improvement and Urban Road Improvement Projects BMP Requirements (COR
SWDM Chapter 1.2.9.3.2). The target surfaces subject to this low impact development
performance standard are included in Table 4-10.
Stride program: I-405 corridor
Page 34 | AE 0054-17 | 60% Storm Drainage Report February 2024
Table 4-10 TDA SRTC 4 Target Surfaces
Surface type
Quantity
(ft2)
New Impervious Surface not fully dispersed 546
New Pervious Surface not fully dispersed 0
Existing Impervious Surface added since 01/08/2001 not already
mitigated with flow control or flow control BMP 0 (1)
Replaced Impervious Surface 2,162
Total 2,708
BMP = best management practice; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) Assume the site has not been redeveloped after 2001.
The target surfaces must be evaluated to determine the feasibility and applicability of different
BMPs as described in COR SWDM Appendix C. Refer to Table 4-11 for an evaluation of BMPs.
As noted above, a soils report, including PIT tests, has been conducted focusing on TDA 1 that
found high groundwater and very low infiltration rates (see Section 4.1.3.2 for a detailed
discussion). While the PIT test was in a different project TDA, its proximity is close to TDA 4,
which can provide information about its feasibility for infiltration.
Table 4-11 TDA SRTC 4 BMP Evaluation
Step BMP Site Considerations
1 Full Dispersion for all
target surfaces
Not feasible. There are landscaped areas along Lake Avenue, but
there is not enough room for a sufficient flow path length.
2 Full Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 4 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Limited Infiltration Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 4 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Bioretention Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 4 would be similar (see
Figure B at the end of Section 1.3.3). In addition, the area is almost
entirely impervious. (1)(2)
Stride program: I-405 corridor
Page 35 | AE 0054-17 | 60% Storm Drainage Report February 2024
Step BMP Site Considerations
Permeable Pavement Not feasible. A geotechnical report completed as a part of this study
found high groundwater and low permeability. Although the detailed
investigations focused on the transit center site (TDA 1.2), it is
assumed native soil conditions within TDA 4 would be similar (see
Figure B at the end of Section 1.3.3). Also there are a number of
underground utilities within the roadway prism that could be affected
by permeable pavement. (1)(2)
3 Basic Dispersion Not feasible. The site is almost entirely impervious.
4 Soil moisture holding
capacity of new pervious
surfaces
Any new or restored landscaping areas can be amended.
BMP = best management practice; SRTC = South Renton Transit Center; TDA = threshold discharge area
NOTES:
(1) The site is within a wellhead protection area zone.
(2) There are no regulated slopes, landslide, or erosion hazard areas within the site per Renton’s online mapping.
5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The proposed site development will install storm drain conveyance system within the Site TDAs
to collect and convey the regraded site runoff to the different water quality facilities. The
conveyance system consists of various segments of new storm drainpipes, catch basins (both
Type 1 and Type 2), and manholes. Grated inlets at catch basins will be located along flow lines
and at low points of the finished grade surface.
The project proposes to relocate a portion of the 27-inch-diameter storm drain around the TOD.
For this stage of design, it was assumed that the pipe would be replaced with the same
diameter size and at a flat slope (because the existing pipe is at reverse grade). This will require
further analysis in future design phases of the project. It is also noted that the upstream areas
tributary to this 27-inch diameter system are relatively small (and possibly limited to only a
portion of Shattuck Ave S). It is suspected that the system was originally designed to convey a
larger tributary area, but as the surrounding areas developed (such as the KC Metro Park and
Ride), the associated drainage was routed north to the SW 7th Street drainage system. As the
design is advanced, some consideration could be given to reducing the size of the relocated 30-
inch-diameter system.
The conveyance system has been sized for the 25-year storm event using the WSDOT Rational
Method spreadsheet. The spreadsheet has been modified to use King County’s coefficients to
calculate the flows. In addition, a backwater analysis using the King County Backwater
computer program has been completed to check the hydraulic grade line and backwater
conditions of the proposed storm conveyance system for the 100-year storm event. The
hydraulic grade line elevations are below the storm drain structures (catch basin, manholes) rim
elevation and there is no overtopping during the 100-year storm event. The Rational
Conveyance and Backwater Calculations are included in Appendix B.
The new biofiltration swales along the southern edge of the South Renton Transit Center site
(TDA SRTC 1.2) has been sized to convey the 25-year storm and ensure the 100-year storm
does not overtop the channel. Manning’s Equation and Federal Highway Administration
Hydraulic Toolbox were used to size the conveyance channel. MGSFlood was used to
Stride program: I-405 corridor
Page 36 | AE 0054-17 | 60% Storm Drainage Report February 2024
determine the 25-year and the 100-year storm flows generated from upstream areas
contributing to the swales. The Water Quality Treatment Catchment Figure in Appendix B
shows contributing areas. The MGSFlood reports, biofiltration swales sizing calculations are
included in Appendix B.
6 SPECIAL REPORTS AND STUDIES
A Geotechnical Recommendation Report (GRR) dated November 2021 have been
completed by WSP in association with HWA and have been submitted separately.
A Geotechnical Data Report dated 2020 (HWA, 2020).
I-405 Bus Rapid Transit Project – Parking Garages Geotechnical Data Report (HWA,
2020).
South Renton Transit Center Phase I Environmental Site Assessment (Shannon &
Wilson 2017)
South Renton Transit Center Phase II Environmental Site Assessment (Shannon &
Wilson 2018)
Above Reports and Studies have been submitted separately.
Pilot Infiltration Test Results Report by WSP dated March 2022. (See Appendix E)
7 OTHER PERMITS
The GEC will assist Sound Transit with acquiring permits and regulatory approvals necessary for
conducting data collection, fieldwork to support design development and for project construction. Sound
Transit will retain responsibility for acquiring the permits. A list of potential Environmental permits and
regulatory approvals was provided in September 2020 as part of the I-405 Corridor BRT SEPA Checklist.
The permit list identifies multiple permits and approvals needed from Agencies Having Jurisdiction (AHJ’s)
including, but not limited to, the following:
Environmental permits and approvals
o National Environmental Policy Act (NEPA) Review
o Critical area permits
o Stormwater and drainage approval
o NPDES permit
o Construction dewatering approval
o Well Log Reviews and Well Decommissioning
GEC = General Engineering Consulting; NDPES = National Pollutant Discharge Elimination System;
SEPA = State Environmental Policy Act
Stride program: I-405 corridor
Page 37 | AE 0054-17 | 60% Storm Drainage Report February 2024
8 CONSTRUCTION STORMWATER POLLUTION
PREVENTION PLAN (CSWPPP) ANALYSIS AND DESIGN
A Temporary Erosion and Sediment Control (TESC) Plan has been prepared and is included in
the 60% Drawing Set. A Construction Stormwater Pollution Prevention Plan (CSWPPP) will be
prepared and included in the next phase of the project.
9 BOND QUANTITIES, FACILITY SUMMARIES, AND
DECLARATION OF COVENANT
A bond quantities worksheet is not required for this project because ST is a public entity. Water
Quality Facility Summary and Sketch for each facility proposed for construction, Declaration of
Covenant and grant of easement required for proposed water quality facilities and/or on-site
BMPs shall be prepared by others and be included in 100% submittal.
10 OPERATIONS AND MAINTENANCE MANUAL
An Operation and Maintenance (O&M) Manual for the storm systems, runoff treatment to be
maintained and operated by the Sound Transit to be included in 90% submittal.
Stride program: I-405 corridor
Page 38 | AE 0054-17 | 60% Storm Drainage Report February 2024
11 REFERENCES
City of Renton Public Works Department Surface Water Utility (City of Renton). 2022 City of
Renton Surface Water Design Manual. Adopted on June 22, 2022
Chavez, Jonathan. 2021. Personal Communication. Email contact between Mike Giseburt WSP
and Jonathan Chavez, Civil Engineer III. City of Renton. July 18, 2021.
HWA GeoSciences, 2019. Personal Communication, November 2019, I-405 Bus Rapid Transit
(BRT) Project – Parking Garages Data
Farah, Joe. 2020. Personal Communication. Telephone/email contact between Mike Giseburt
WSP and Joe Farah, Surface Water Engineering Manager. City of Renton. Nov. 17, 2020.
Green/Duwamish and Central Puget Sound Watershed Water Resource Inventory Area 9
Steering Committee (WRIA 9 Steering Committee). 2005. Salmon Habitat Plan – Making
Our Watershed Fit for a King. Prepared for the WRIA 9 Forum. August 2005
Washington State Department of Ecology (Ecology). 2011. Green River Temperature Total
Maximum Daily Load Water Quality Improvement Report. June 2011.
Otak. 2020. Preliminary Receiving Waters Assessment and Stormwater Management Influence.
October 9, 2020.
SAIC. October 2012. Hardie Avenue SW – SW 7th Street Storm System Improvement Project.
Prepared for the City of Renton Public Works Department – Surface Water Utility.
Federal Emergency Management Agency Flood Insurance Rate Map Attached at end of
Appendix C
Websites
City of Renton Online GIS
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=CORMaps
U.S. Department of Agriculture, Natural Resources Conservation Service Web Soil Survey
https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm\
U.S. Fish and Wildlife Service Wetlands Mapper
https://www.fws.gov/wetlands/data/Mapper.html
Department of Ecology Water Quality Atlas
https://fortress.wa.gov/ecy/waterqualityatlas/StartPage.aspx
King County Online GIS https://kingcounty.gov/services/gis/GISData.aspx
AE 0054-17 | 60% Storm Drainage Report
I-405 corridor
Surface Area Changes
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
Project: RTA/OA 0206-19
Description: South Renton Transit Center and Roadway Improvements
TDA Core Requirement Matrix
Downstream
Drainage Basin
TDA Owner/Agency Regulatory Agency New Impervious
(SF)
Replaced
Impervious
(SF)
New + Replaced
Impervious
(SF)
Flow Control
Required?
Flow Control
BMP Type
New PGIS
(SF)
Replaced PGIS
(SF)
New + Replaced
PGIS
(SF)
Water Quality
Treatment
Required?
Water Quality BMP Type On-Site
Stormwater
Management
Required?
Target Surfaces
SRTC 1 Varies 9,542 273,760 283,302 54,641 151,013 205,654 Varies
1.1 City of Renton 6,623 13,971 20,594 5,916 2,060 7,976 New + Replaced Impervious Surface
1.2 Bus Rapid Transit
Center
2,919 259,789 262,708 48,725 148,953 197,678 Proposed site results in > 65% impervious
buildable surface.
Target 10% of total lot area (~36,049 SF)
Rolling Hills Creek SRTC 2 City of Renton Renton SWDM 3,909 27,474 31,383 No - Exemption 2
Applies
NA 0 21,774 21,774 No - Exemption 2
Applies
NA Yes New + Replaced Impervious Surface
Black River SRTC 3 King County Metro Renton SWDM 4,401 17,473 21,874 No - Exemption 2
Applies
NA 1,594 15,731 17,325 No - Exemption 2
Applies
MWS-36 Yes New + Replaced Impervious Surface
Black River SRTC 4 City of Renton Renton SWDM 546 2,162 2,708 No - Exemption 2
Applies
NA 313 343 656 No - Exemption 2
Applies
NA Yes New + Replaced Impervious Surface
MWS - Modular Wetland Treatment Unit
Yes
Core Requirement #3 Core Requirement #8
Renton Surface
Water Design
Manual (SWDM)
Site Description Core Requirement #9
Springbrook Creek No - Peak Rate
Flow Control
Standard Area
Exemption 2
Applies
NA Yes - New +
Replaced PGIS
MWS-66
MWS-67, MWS-68
MWS-69, MWS-70
Filterra-1
Filterra-2
Wet Biofiltration Swales
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
BUS BAY 7 BUS BAY 6 BUS BAY 5
BU
S
B
A
Y
2
BU
S
B
A
Y
8
BUS BAY 3 BUS BAY 4
BU
S
B
A
Y
1
^
^
^
^
^
^
^
^
^
^^^^^^^^^^^^^^
RA
I
N
I
E
R
A
V
E
S
S
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
S
B
HA
R
D
I
E
A
V
E
S
W
SR
-
1
6
7
N
B
SR
-
1
6
7
S
B
GRADY WA
Y
E
B
GRADY WA
Y
E
B
GRADY WA
Y
E
B
LA
K
E
A
V
E
S
LA
K
E
A
V
E
S
CO
//
/
/
/
/
//
/
/
/
/
//
/
/
/
/
/
/
/
/
////
/
/
/
/
/
/////
////////
/
/
/
/
/
//////
//////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///////
/
/
/
/
/
/
/
/
/
/
///
/
/
/
///
///
/
///////
/
/
/
/
/
/
/
/
/
/
/
/
////
//
/
/////
/
/
/
/
/
/
/
/
/
/////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////
/
/
/
//
/////////
/
/
/
////////
/
/
/
MISC
VALV
G
FO
FO
FO
G
FOFO
FO
FO
FO
FO
FO
FO
FO
SS
SS
SS
SS
SD
SD
SD
SD
SS
SS
SS
SS
S
S
SS SS
SS
SS
SS
SSSSSSSSSSSS
F
O
FO
FO
W
S
D
O
T
F
O
C
6'11"
3'
6
"
4'
8
"
8
'
1
1
"
ED
(TYP.)
ED
(TYP.)
ED
(TY
P
.
)
6" TREE
30' DLN
LAKE AVE S
1.5' RET WALL
PLANTER
1.5' RET WALL
PLANTER
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
///////////////
RA
I
N
I
E
R
A
V
E
S
N
B
/
/
/
/
/
/
/
/
2 MISC
MH
SD
SS
SS
SS
ED
(TY
P
.
)
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
5
/
2
4
|
1:
3
4
P
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
8
4
7
3
9
\
F
I
G
U
R
E
A
-
1
.
D
W
G
FIGURE A-1 FACILITY ID:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BTP120-VSF100
xS1-BT120-CDP001
xS1-BT120-VRX001
xS1-BT120-CPP001
OSBORN
CONSULTING
INCORPORATED
SCALE IN FEET
0 6030 12060
(1" = 60')
N
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
JANUARY 2024
LAND COVER
NEW AND REPLACED IMPERVIOUS
FIGURE A-1
LEGEND:
NEW IMPERVIOUS
REPLACED IMPERVIOUS
TDA BOUNDARY
TDA SRTC 2
TDA SRTC 1.2
TDA SRTC 3
TDA
SRTC 1.1
TDA
SRTC 4
TDA
SRTC
1.1
MATCHLINE SEE LEFT
MATCHLINE SEE RIGHT
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
RA
I
N
I
E
R
A
V
E
S
S
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
S
B
HA
R
D
I
E
A
V
E
S
W
SR
-
1
6
7
N
B
SR
-
1
6
7
S
B
GRADY WA
Y
E
B
GRADY WA
Y
E
B
GRADY WA
Y
E
B
LA
K
E
A
V
E
S
LA
K
E
A
V
E
S
SD
SD
SD
CO
SD
SD
SD
S
D
S
D
SD
S
D
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
//
/
/
/
/
//
/
/
/
/
//
/
/
/
/
/
/
/
/
////
/
/
/
/
/
/////
////////
/
/
/
/
/
//////
//////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///////
/
/
/
/
/
/
/
/
/
/
///
/
/
/
///
///
/
///////
/
/
/
/
/
/
/
/
/
/
/
/
////
//
/
/////
/
/
/
/
/
/
/
/
/
/////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////
/
/
/
//
/////////
/
/
/
////////
/
/
/
MISC
VALV
G
G
FOFO
FO
FO
FO
FO
FO
FO
FO
SS
SS
SS
SS
SD
SD
SD
SD
SS
SS
SS
SS
S
S
SS SS
SS
SS
SS
SSSSSSSSSSSS
W
S
D
O
T
F
O
C
SD
SD
SD
SD
S
D
6'11"
8
'
1
1
"
6" TREE
30' DLN
LAKE AVE S
1.5' RET WALL
PLANTER
1.5' RET WALL
PLANTER
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
///////////////
RA
I
N
I
E
R
A
V
E
S
N
B
/
/
/
/
/
/
/
/
2 MISC
MH
SDSD
SDSD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SS
SS
SS
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
5:
1
0
P
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
8
4
7
3
9
\
F
I
G
U
R
E
A
-
2
.
D
W
G
FIGURE A-2 FACILITY ID:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BTP120-VSF100
xS1-BT120-CDP001
xS1-BT120-VRX001
SCALE IN FEET
0 6030 12060
(1" = 60')
N
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
JANUARY 2024
NEW AND REPLACED PGIS
AREA CONVERSION
FIGURE A-2
LEGEND:
NEW PGIS
REPLACED PGIS
TDA BOUNDARY
TDA SRTC 2
TDA SRTC 1.2
TDA SRTC 3
TDA
SRTC 1.1
TDA
SRTC 4
TDA
SRTC
1.1
MATCHLINE SEE LEFT
MATCHLINE SEE RIGHT
AE 0054-17 | 60% Storm Drainage Report
I-405 corridor
Design Calculations
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 7:44 AM
Report Generation Date: 02/07/2024 7:47 AM
—————————————————————————————————
Input File Name: Flow Control Exemption.fld
Project Name: CUD 5 - Sound Transit BRT
Analysis Title: Flow Control Exemption Analysis
Comments: TDA Exemption Analysis of Added Impervious Surface
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.214 0.214
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.214 0.214
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.214
----------------------------------------------
Subbasin Total 0.214
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
ROADS/FLAT 0.214
----------------------------------------------
Subbasin Total 0.214
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 26.169
Link: New Copy Lnk1 0.000
_____________________________________
Total: 26.169
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 0.000
Link: New Copy Lnk1 0.000
_____________________________________
Total: 0.000
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.166 ac-ft/year, Post Developed: 0.000 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.017 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 43.02
Inflow Volume Including PPT-Evap (ac-ft): 43.02
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 43.02
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.084 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 95.75
Inflow Volume Including PPT-Evap (ac-ft): 95.75
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 95.75
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 1.667E-02 2-Year 8.425E-02
5-Year 2.898E-02 5-Year 0.108
10-Year 4.395E-02 10-Year 0.125
25-Year 6.703E-02 25-Year 0.160
50-Year 8.958E-02 50-Year 0.201
100-Year 8.989E-02 100-Year 0.240
200-Year 9.548E-02 200-Year 0.254
500-Year 0.103 500-Year 0.272
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
H
/
/
BUS SHELTER
T
T
MW
TMH
ICV
ICV
TMH
IC
V
W
SDSDSD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
DETECTOR
LOOP (TYP)
FO
FO
FO FO
FO
W
SD
SSSS
SS
CENTURYLI
N
K
CENT
U
R
Y
L
I
N
K
F
O
2'
8
"
D
P
2'
3
"
D
P
ED
(TY
P
.
)
25
25
25
52,393 SF
MWS-69
BUS BAY 7 BUS BAY 6 BUS BAY 5
BU
S
B
A
Y
2
BU
S
B
A
Y
8
BUS BAY 3 BUS BAY 4
BU
S
B
A
Y
1
^
^
^
^
^
^
^
^
^
^
^
^
^^^^^^^^^^^^^^^^
X
X
X
X
X
X
CONC
CONC
CONC
SIGN
SIGN
SI
G
N
SIGN
CONC
H
H
H
H
H
H
SD
SD
SD
SD
6" CONC
8" VC
8"
C
O
N
C
1
8
"
C
O
N
C
CONC SEAM
S
(
T
Y
P
)
CO
W
3TRAFFIC CONTROL
CABINETS
CO
MW
MW
MW
2VLTS
HH
T
TMH
DETECTOR
LOOP (TYP
)
DETECTOR
LOOP (TYP
)
G
G
G
G
W W
W
W
SD
SD
SD
SD
SD
SD
S
D
S
D
SD
SD
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X X X X X X X X
X
X
X
X
X
GAZEBO
CONC
X
X
X
X
//
/
/
/
/
///
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
//////
//
/
/
/
/
/////////////
//
/
/
/
/
/
/
///////
////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////
/
/
/
/
/
/
/
/
/
/
/
/
///
/
/
/
/////
/
///
/
/////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
/
/
//
/
//////
/
/
/
/
/
/
/
/
/
/
/
////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//////////
/
/
/
/
//
////
//
/////
/
/
/
//////////
/
/
/
/
MISC
VALV
SHELTER
CANOPY
BLDG
BLDG
BLDG
BLDG
FO
FO
FO
S
L
S
L
F
O
F
O
FO
FO
FO
FO
FO
FO
FO
W
W
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTURY
L
I
N
K
F
O
CENTURY
L
I
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
WS
D
O
T
F
O
W
S
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-
Z
A
Y
O
F
O
FO
VLT
MW
EL=25.08
MW
GWMW-3
EL=26.16
MW
GWMW-4
EL=26.41
MW
GWMW-2
EL=26.06
MW
GWMW-1
EL=26.60
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1
"
D
P
3'
6
"
D
P
4'
8
"
D
P
12'6" DP
13'6" DP
11'6"
DP10' DP
3'11"
DP
6'4" D
P
6'3" D
P
6'7" D
P
400
404
418
CONC SEA
M
S
(
T
Y
P
)
C
SD
SD
SD
SD
SD
SD
S
D
CO
2'2" DP
BROADBAND
VAULT
3'11" DP
4'2" DP
2'4" DP
12' DP
3'
6
"
4'
8
"
ED
(TYP.)
ED
(TYP.)
ED
(TY
P
.
)
3'1"
2'11"3'3"
WESTERN
SWALE
CENTRAL
SWALE
EASTERN
SWALE
SD
SD
2
8
2
7
2
9
29
2
7
2
8
27
2
6
26
2
6
26
27
27 2
7
2
7
2828
2828
27
27
27
2
8
27
302829
27
28
2
6
2
7
27
26
2
7
28
29
2
9
28
26
24 27
28
26
27
25
2
6
2
6
2
7
2
6
27
28
2
726
26
30
29
30
29
29 28
2
7
2
7
28
27 26
26
27
28
2829
29
29
2828
27
27
26
28
2
9
28
27
27
28
29
29
28
26
2
6
26
27
28
29
3
0
29
28
27
26
26
2
6
26
26
2
8
2726
26
26
27
26
27
2626
27
26
2
7
2
7
27
S
D
SD
SD
SD SDSDSD
SD2
9 29
28
27
29
28 27
26
27
28
26
26
27
27
26
26
26
26 26
27 26
26 27
2
7
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
5
/
2
4
|
9:
3
3
P
M
|
JO
H
N
Y
P:
\
1
0
-
2
0
0
0
1
0
S
O
U
N
D
T
R
A
N
S
I
T
B
U
S
R
A
P
I
D
T
R
A
N
S
I
T
(
B
R
T
)
G
E
C
\
B
T
1
0
5
(
C
U
D
5
)
_
T
A
S
K
O
R
D
E
R
0
1
9
\
2
D
O
C
S
\
R
E
P
O
R
T
S
\
D
R
A
I
N
A
G
E
R
E
P
O
R
T
\
B
T
1
0
5
\
6
0
%
C
U
P
D
R
A
I
N
A
G
E
R
E
P
O
R
T
\
F
I
G
U
R
E
S
(
N
E
E
D
U
P
D
A
T
E
D
V
E
R
S
I
O
N
S
)
\
F
I
G
U
R
E
B
-
1
.
D
W
G
FIGURE B-1 FACILITY ID:
NOT FOR CONSTRUCTION
90% SUBMITTAL
Xrefs:
xBRT-CUD05-TB22x34
CUP - Storm Drain Layout
BMP_Catchments
xS1-BT120-CPP002
dS1-BT120-CAV001
xS1-BT120-CPP001
xS1-BT120-VSF100
xS1-BT120-CDP001
SCALE IN FEET
025 5050 100
(1" = 50')
N
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
JANUARY 2024
WATER QUALITY TREATMENT
CATCHMENT DELINEATION
FIGURE B-1
LEGEND:
MWS-36 CATCHMENT AREA
MWS-66 CATCHMENT AREA
MWS-67 CATCHMENT AREA
MWS-68 CATCHMENT AREA
MWS-69 CATCHMENT AREA
MWS-70 CATCHMENT AREA
FIL-1 CATCHMENT AREA
FIL-2 CATCHMENT AREA
WET BIOFILTRATION SWALES CATCHMENT AREA
MATCHLINE SEE LEFT
MATCHLINE SEE RIGHT
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 8:46 AM
Report Generation Date: 02/07/2024 8:47 AM
—————————————————————————————————
Input File Name: MWS-36 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-36 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 36
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.469 0.469
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.469 0.469
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 0.469
----------------------------------------------
Subbasin Total 0.469
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.102
ROADS/FLAT 0.297
SIDEWALKS/FLAT 0.070
----------------------------------------------
Subbasin Total 0.469
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 80.898
Link: New Copy Lnk1 0.000
_____________________________________
Total: 80.898
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 12.473
Link: New Copy Lnk1 0.000
_____________________________________
Total: 12.473
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.512 ac-ft/year, Post Developed: 0.079 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.010 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 42.71
Inflow Volume Including PPT-Evap (ac-ft): 42.71
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 42.71
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.152 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.05 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 184.71
Inflow Volume Including PPT-Evap (ac-ft): 184.71
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 184.71
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 9.957E-03 2-Year 0.152
5-Year 1.580E-02 5-Year 0.192
10-Year 2.041E-02 10-Year 0.223
25-Year 2.654E-02 25-Year 0.302
50-Year 2.927E-02 50-Year 0.364
100-Year 3.339E-02 100-Year 0.458
200-Year 4.606E-02 200-Year 0.477
500-Year 6.309E-02 500-Year 0.501
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 9:02 AM
Report Generation Date: 02/07/2024 9:03 AM
—————————————————————————————————
Input File Name: MWS-66 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-66 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 66
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.079 0.079
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.079 0.079
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 0.079
----------------------------------------------
Subbasin Total 0.079
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
ROADS/FLAT 0.079
----------------------------------------------
Subbasin Total 0.079
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 13.627
Link: New Copy Lnk1 0.000
_____________________________________
Total: 13.627
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 0.000
Link: New Copy Lnk1 0.000
_____________________________________
Total: 0.000
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.086 ac-ft/year, Post Developed: 0.000 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.002 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 7.19
Inflow Volume Including PPT-Evap (ac-ft): 7.19
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 7.19
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.031 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 35.35
Inflow Volume Including PPT-Evap (ac-ft): 35.35
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 35.35
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 1.677E-03 2-Year 3.110E-02
5-Year 2.661E-03 5-Year 3.982E-02
10-Year 3.439E-03 10-Year 4.601E-02
25-Year 4.470E-03 25-Year 5.923E-02
50-Year 4.931E-03 50-Year 7.417E-02
100-Year 5.625E-03 100-Year 8.866E-02
200-Year 7.759E-03 200-Year 9.376E-02
500-Year 1.063E-02 500-Year 0.100
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 9:14 AM
Report Generation Date: 02/07/2024 9:15 AM
—————————————————————————————————
Input File Name: MWS-67 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-67 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 67
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.816 1.816
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.816 1.816
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.816
----------------------------------------------
Subbasin Total 1.816
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.087
ROADS/FLAT 0.998
SIDEWALKS/FLAT 0.731
----------------------------------------------
Subbasin Total 1.816
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 313.242
Link: New Copy Lnk1 0.000
_____________________________________
Total: 313.242
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 10.639
Link: New Copy Lnk1 0.000
_____________________________________
Total: 10.639
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.983 ac-ft/year, Post Developed: 0.067 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.039 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 165.36
Inflow Volume Including PPT-Evap (ac-ft): 165.36
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 165.36
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.684 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.26 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.14 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 791.08
Inflow Volume Including PPT-Evap (ac-ft): 791.08
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 791.08
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 3.856E-02 2-Year 0.684
5-Year 6.116E-02 5-Year 0.874
10-Year 7.904E-02 10-Year 1.022
25-Year 0.103 25-Year 1.315
50-Year 0.113 50-Year 1.640
100-Year 0.129 100-Year 1.980
200-Year 0.178 200-Year 2.087
500-Year 0.244 500-Year 2.226
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 9:24 AM
Report Generation Date: 02/07/2024 9:25 AM
—————————————————————————————————
Input File Name: MWS-68 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-68 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 68
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.685 1.685
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.685 1.685
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.685
----------------------------------------------
Subbasin Total 1.685
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.110
ROADS/FLAT 1.470
SIDEWALKS/FLAT 0.105
----------------------------------------------
Subbasin Total 1.685
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 290.646
Link: New Copy Lnk1 0.000
_____________________________________
Total: 290.646
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 13.452
Link: New Copy Lnk1 0.000
_____________________________________
Total: 13.452
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.840 ac-ft/year, Post Developed: 0.085 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.036 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 153.43
Inflow Volume Including PPT-Evap (ac-ft): 153.43
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 153.43
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.626 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.24 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.13 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 726.80
Inflow Volume Including PPT-Evap (ac-ft): 726.80
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 726.80
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 3.577E-02 2-Year 0.626
5-Year 5.675E-02 5-Year 0.798
10-Year 7.334E-02 10-Year 0.934
25-Year 9.534E-02 25-Year 1.209
50-Year 0.105 50-Year 1.499
100-Year 0.120 100-Year 1.818
200-Year 0.165 200-Year 1.914
500-Year 0.227 500-Year 2.039
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 9:33 AM
Report Generation Date: 02/07/2024 9:34 AM
—————————————————————————————————
Input File Name: MWS-69 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-69 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 69
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.179 1.179
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.179 1.179
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.179
----------------------------------------------
Subbasin Total 1.179
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.460
ROADS/FLAT 0.719
----------------------------------------------
Subbasin Total 1.179
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 203.366
Link: New Copy Lnk1 0.000
_____________________________________
Total: 203.366
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 56.252
Link: New Copy Lnk1 0.000
_____________________________________
Total: 56.252
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.287 ac-ft/year, Post Developed: 0.356 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.025 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 107.35
Inflow Volume Including PPT-Evap (ac-ft): 107.35
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 107.35
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.316 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.11 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.06 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 414.17
Inflow Volume Including PPT-Evap (ac-ft): 414.17
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 414.17
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.503E-02 2-Year 0.316
5-Year 3.971E-02 5-Year 0.405
10-Year 5.132E-02 10-Year 0.492
25-Year 6.671E-02 25-Year 0.687
50-Year 7.359E-02 50-Year 0.805
100-Year 8.395E-02 100-Year 1.016
200-Year 0.116 200-Year 1.041
500-Year 0.159 500-Year 1.068
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 9:59 AM
Report Generation Date: 02/07/2024 9:59 AM
—————————————————————————————————
Input File Name: MWS-70 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: MWS-70 Water Quality Flow Model
Comments: Water quality flows sizing for MWS 70
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.625 1.625
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.625 1.625
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.625
----------------------------------------------
Subbasin Total 1.625
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.067
ROADS/FLAT 1.187
SIDEWALKS/FLAT 0.371
----------------------------------------------
Subbasin Total 1.625
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 280.296
Link: New Copy Lnk1 0.000
_____________________________________
Total: 280.296
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 8.193
Link: New Copy Lnk1 0.000
_____________________________________
Total: 8.193
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.774 ac-ft/year, Post Developed: 0.052 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.035 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 147.97
Inflow Volume Including PPT-Evap (ac-ft): 147.97
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 147.97
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.615 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.23 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.13 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 710.55
Inflow Volume Including PPT-Evap (ac-ft): 710.55
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 710.55
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 3.450E-02 2-Year 0.615
5-Year 5.473E-02 5-Year 0.787
10-Year 7.073E-02 10-Year 0.918
25-Year 9.194E-02 25-Year 1.181
50-Year 0.101 50-Year 1.475
100-Year 0.116 100-Year 1.779
200-Year 0.160 200-Year 1.876
500-Year 0.219 500-Year 2.002
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 11:56 AM
Report Generation Date: 02/07/2024 11:57 AM
—————————————————————————————————
Input File Name: FIL-1 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: FIL-1 Water Quality Flow Model
Comments: Water quality flows sizing for Filterra 1
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.304 0.304
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.304 0.304
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 0.304
----------------------------------------------
Subbasin Total 0.304
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.063
ROADS/FLAT 0.111
SIDEWALKS/FLAT 0.130
----------------------------------------------
Subbasin Total 0.304
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 52.437
Link: New Copy Lnk1 0.000
_____________________________________
Total: 52.437
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 7.704
Link: New Copy Lnk1 0.000
_____________________________________
Total: 7.704
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.332 ac-ft/year, Post Developed: 0.049 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.006 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 27.68
Inflow Volume Including PPT-Evap (ac-ft): 27.68
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 27.68
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.100 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.04 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 120.49
Inflow Volume Including PPT-Evap (ac-ft): 120.49
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 120.49
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 6.454E-03 2-Year 9.951E-02
5-Year 1.024E-02 5-Year 0.126
10-Year 1.323E-02 10-Year 0.146
25-Year 1.720E-02 25-Year 0.197
50-Year 1.897E-02 50-Year 0.238
100-Year 2.165E-02 100-Year 0.299
200-Year 2.986E-02 200-Year 0.312
500-Year 4.089E-02 500-Year 0.327
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/07/2024 12:03 PM
Report Generation Date: 02/07/2024 12:04 PM
—————————————————————————————————
Input File Name: FIL-2 Water Quality Flow Model.fld
Project Name: Sound Transit BRT GEC
Analysis Title: FIL-2 Water Quality Flow Model
Comments: Water quality flows sizing for Filterra 2
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.388 0.388
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.388 0.388
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 0.388
----------------------------------------------
Subbasin Total 0.388
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Flat 0.022
ROADS/FLAT 0.366
----------------------------------------------
Subbasin Total 0.388
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 66.926
Link: New Copy Lnk1 0.000
_____________________________________
Total: 66.926
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 2.690
Link: New Copy Lnk1 0.000
_____________________________________
Total: 2.690
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.424 ac-ft/year, Post Developed: 0.017 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.008 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 35.33
Inflow Volume Including PPT-Evap (ac-ft): 35.33
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 35.33
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.145 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.05 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 168.18
Inflow Volume Including PPT-Evap (ac-ft): 168.18
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 168.18
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 8.238E-03 2-Year 0.145
5-Year 1.307E-02 5-Year 0.185
10-Year 1.689E-02 10-Year 0.217
25-Year 2.195E-02 25-Year 0.280
50-Year 2.422E-02 50-Year 0.348
100-Year 2.763E-02 100-Year 0.421
200-Year 3.811E-02 200-Year 0.443
500-Year 5.219E-02 500-Year 0.473
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 02/04/2024 10:11 AM
Report Generation Date: 02/04/2024 10:14 AM
—————————————————————————————————
Input File Name: West End of Eastern Swale.fld
Project Name: Sound Transit BRT GEC - BT105
Analysis Title: Water Quality Flow Model - West end of Eastern Swale
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.238 0.238
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.238 0.238
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 0.238
----------------------------------------------
Subbasin Total 0.238
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Steep 0.238
----------------------------------------------
Subbasin Total 0.238
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 41.053
Link: New Copy Lnk1 0.000
_____________________________________
Total: 41.053
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 28.120
Link: New Copy Lnk1 0.000
_____________________________________
Total: 28.120
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.260 ac-ft/year, Post Developed: 0.178 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.005 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 21.67
Inflow Volume Including PPT-Evap (ac-ft): 21.67
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 21.67
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
Basic Wet Pond Volume (91% Exceedance): 564. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 847. cu-ft
2-Year Discharge Rate : 0.030 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 50.88
Inflow Volume Including PPT-Evap (ac-ft): 50.88
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 50.88
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 5.053E-03 2-Year 3.038E-02
5-Year 8.016E-03 5-Year 4.760E-02
10-Year 1.036E-02 10-Year 6.733E-02
25-Year 1.347E-02 25-Year 9.442E-02
50-Year 1.485E-02 50-Year 0.145
100-Year 1.695E-02 100-Year 0.168
200-Year 2.338E-02 200-Year 0.194
500-Year 3.201E-02 500-Year 0.227
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
RT.05 - Wet Biofiltration Swale
Project:RTA/OA 0206-19 Designed By:John Yuen
Description:West End of Eastern Swale Checked By:
WET BIOSWALE SPREADSHEET VERSION 2.1
Design Steps
D-1 Determine runoff treatment design flow rate Qwq
Qwq 0.008 Runoff treatment design flow rate from MGS Flood OR SBUH; MGSFlood reports
an online and offline flow rate, please enter the applicable design flow rate
D-2 Determine the wet biofiltration design flow rate (Qbiofil)
Is the wet bioswale in eastern WA?No
2.00
P72%, 2-yr 1.44 72% of the 2-year 24 hr precip depth (in)
Wet biofiltration swales are offline ------->offline
Qbiofil 0.029 runoff treatment design flow rate
D-3 Determine the longitudinal slope of the proposed wet biofiltration swale (ft/ft)
s 0.005 ft/ft
D-4 Select a soil and vegetation cover suitable for the wet biofiltration swale
soil/veg <--Use pull down box
Manning's n=0.22
D-5 Select the design depth of flow y (see HRM Table 5-4)
y 0.33 (ft) design depth of flow; wet biofiltration swales depth of flow = 4" (0.33 ft) for WQ event
D-6 Select a trapezoidal swale cross-sectional shape.
D-7
<--manning's changed
HRM Chapter 5 Equation E-11
Use Excel Solver
D-7a Qbiofil 0.029 cfs - runoff treatment design flow rate
A 2.056 ft2 - wetted area
R 0.269 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 4.91 ft; wet bioswale bottom width
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.330 ft - design depth flow = maximum depth of flow
Qbiofil 0.411
D-7b If the swale calculations above give a swale width less than 2 feet wide, re-run calculations with 2 foot wide swale, solve for depth y
Or if redesigning swale with different dimensions, use below calculator and use Excel Goal Seek to determine new depth of flow.
Qbiofil 0.029 cfs - runoff treatment design flow rate
A 0.368 ft2 - wetted area
R 0.067 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 4.91 ft - enter new wet bioswale bottom width if applicable (2 foot is minimum)
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.071 ft - design depth flow
Qbiofil 0.029
2-year 24 hr precip depth (in)
Grass-legume mix on lightly compacted topsoil
From HRM Table 5-3
Use Manning's Eq and first approximations relating hydraulic radius and dimensions to
get width for trapezoidal cross section
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "b" value
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "y" value
n
sARQbiofil
2
1
3
2
49.1
5.0
67.
49.1 s
nQARbiofil
Wet Biofiltration Swale - West End of East Swale 2/7/2024 1:26 PM Version 2.1
D-8 Enter Final Bioswale Dimensions from the calculations in Step D-7a or D-7b
Enter Final Swale Area 0.368 ft2 - Wetted Area
Enter Final Swale R 0.067 ft - hydraulic radius
Enter Final Swale slope s 0.005 ft/ft longitudinal slope of swale
Enter Final Swale n 0.22 Manning's coefficient
Enter Final Swale bottom width b 4.91 ft - swale bottom width
Enter Final Swale zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale flow depth y 0.071 ft - design depth flow
D-9 Computer the flow velocity at Qbiofil
HRM Chapter 5 Equation E-12
Vbiofil 0.08 ft/sec - flow velocity; 1 ft/sec maximum
Flow veloicty is OK since it is less than 1 ft/sec
D-10 Compute Swale Length L (ft)
t 540 seconds - 9 minutes (540 seconds) for CABS, Basic, and Wet bioswale
L 42.17 ft - required length of bioswale; If swale is less than 100 feet, make swale have narrower
bottom width (2 foot minimum) and repeat Steps D-7 - D-10 and recalculate to get length over
100 feet or keep swale bottom width make swale length 100 feet minimum
D-11 Extended Wet Season Adjustment for Western Washington designs only
Is the wet bioswale downstream of a detention pond?
D-12 Revise Wet Bioswale Dimensions to meet minimums and for construction
Is the wet bioswale length at least 100 feet? If not, increase swale length to 100 feet.
Is the wet bioswale bottom width a constructible width?
Do no recalculate the wet bioswale depth of flow or velocity if the wet bioswale has the extended wet season adjustment.
Enter Final Adjusted Wet Bioswale Dimensions
Enter Final Swale bottom width b 4.91 ft - swale bottom width
Enter Final Swale length 196.58 ft - swale bottom length
196.58 ft
4.9 ft
0.005 ft/ft
4.0
4.0
0.07 ft
0.07 ft
Wet Bioswale Bottom Width
Swale Longitudinal Slope
zforeslope
zbackslope
WQ Depth
Swale Depth = WQ Depth for offline swales
No
Final Wet Bioswale Dimensions
Wet Bioswale Length
A
QV biofil
biofil
tVLbiofil
Wet Biofiltration Swale - West End of East Swale 2/7/2024 1:26 PM Version 2.1
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 01/31/2024 11:53 AM
Report Generation Date: 01/31/2024 11:53 AM
—————————————————————————————————
Input File Name: Central Swale.fld
Project Name: Sound Transit BRT GEC - BT105
Analysis Title: Water Quality Flow Model - Central Swale
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.092 1.092
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.092 1.092
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.092
----------------------------------------------
Subbasin Total 1.092
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Mod 0.914
ROADS/MOD 0.151
SIDEWALKS/FLAT 0.027
----------------------------------------------
Subbasin Total 1.092
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 188.359
Link: New Copy Lnk1 0.000
_____________________________________
Total: 188.359
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 111.699
Link: New Copy Lnk1 0.000
_____________________________________
Total: 111.699
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.192 ac-ft/year, Post Developed: 0.707 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.023 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.01 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 99.43
Inflow Volume Including PPT-Evap (ac-ft): 99.43
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 99.43
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
Basic Wet Pond Volume (91% Exceedance): 2114. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 3171. cu-ft
2-Year Discharge Rate : 0.165 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 264.06
Inflow Volume Including PPT-Evap (ac-ft): 264.06
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 264.06
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.318E-02 2-Year 0.165
5-Year 3.678E-02 5-Year 0.238
10-Year 4.753E-02 10-Year 0.322
25-Year 6.178E-02 25-Year 0.442
50-Year 6.816E-02 50-Year 0.594
100-Year 7.775E-02 100-Year 0.741
200-Year 0.107 200-Year 0.773
500-Year 0.147 500-Year 0.812
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
-------------------------------------------------------------------------------------------------
RT.05 - Wet Biofiltration Swale
Project:RTA/OA 0206-19 Designed By:John Yuen
Description:Central Swale Checked By:
WET BIOSWALE SPREADSHEET VERSION 2.1
Design Steps
D-1 Determine runoff treatment design flow rate Qwq
Qwq 0.020 Runoff treatment design flow rate from MGS Flood OR SBUH; MGSFlood reports
an online and offline flow rate, please enter the applicable design flow rate
D-2 Determine the wet biofiltration design flow rate (Qbiofil)
Is the wet bioswale in eastern WA?No
2.00
P72%, 2-yr 1.44 72% of the 2-year 24 hr precip depth (in)
Wet biofiltration swales are offline ------->offline
Qbiofil 0.071 runoff treatment design flow rate
D-3 Determine the longitudinal slope of the proposed wet biofiltration swale (ft/ft)
s 0.005 ft/ft
D-4 Select a soil and vegetation cover suitable for the wet biofiltration swale
soil/veg <--Use pull down box
Manning's n=0.22
D-5 Select the design depth of flow y (see HRM Table 5-4)
y 0.33 (ft) design depth of flow; wet biofiltration swales depth of flow = 4" (0.33 ft) for WQ event
D-6 Select a trapezoidal swale cross-sectional shape.
D-7
<--manning's changed
HRM Chapter 5 Equation E-11
Use Excel Solver
D-7a Qbiofil 0.071 cfs - runoff treatment design flow rate
A 1.096 ft2 - wetted area
R 0.232 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 2.00 ft; wet bioswale bottom width
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.330 ft - design depth flow = maximum depth of flow
Qbiofil 0.198
D-7b If the swale calculations above give a swale width less than 2 feet wide, re-run calculations with 2 foot wide swale, solve for depth y
Or if redesigning swale with different dimensions, use below calculator and use Excel Goal Seek to determine new depth of flow.
Qbiofil 0.071 cfs - runoff treatment design flow rate
A 0.671 ft2 - wetted area
R 0.108 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 5.27 ft - enter new wet bioswale bottom width if applicable (2 foot is minimum)
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.117 ft - design depth flow
Qbiofil 0.073
2-year 24 hr precip depth (in)
Grass-legume mix on lightly compacted topsoil
From HRM Table 5-3
Use Manning's Eq and first approximations relating hydraulic radius and dimensions to
get width for trapezoidal cross section
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "b" value
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "y" value
n
sARQbiofil
2
1
3
2
49.1
5.0
67.
49.1 s
nQARbiofil
Wet Biofiltration Swale - Central Swale 2/7/2024 1:30 PM Version 2.1
D-8 Enter Final Bioswale Dimensions from the calculations in Step D-7a or D-7b
Enter Final Swale Area 0.671 ft2 - Wetted Area
Enter Final Swale R 0.108 ft - hydraulic radius
Enter Final Swale slope s 0.005 ft/ft longitudinal slope of swale
Enter Final Swale n 0.22 Manning's coefficient
Enter Final Swale bottom width b 5.27 ft - swale bottom width
Enter Final Swale zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale flow depth y 0.117 ft - design depth flow
D-9 Computer the flow velocity at Qbiofil
HRM Chapter 5 Equation E-12
Vbiofil 0.11 ft/sec - flow velocity; 1 ft/sec maximum
Flow veloicty is OK since it is less than 1 ft/sec
D-10 Compute Swale Length L (ft)
t 540 seconds - 9 minutes (540 seconds) for CABS, Basic, and Wet bioswale
L 57.11 ft - required length of bioswale; If swale is less than 100 feet, make swale have narrower
bottom width (2 foot minimum) and repeat Steps D-7 - D-10 and recalculate to get length over
100 feet or keep swale bottom width make swale length 100 feet minimum
D-11 Extended Wet Season Adjustment for Western Washington designs only
Is the wet bioswale downstream of a detention pond?
D-12 Revise Wet Bioswale Dimensions to meet minimums and for construction
Is the wet bioswale length at least 100 feet? If not, increase swale length to 100 feet.
Is the wet bioswale bottom width a constructible width?
Do no recalculate the wet bioswale depth of flow or velocity if the wet bioswale has the extended wet season adjustment.
Enter Final Adjusted Wet Bioswale Dimensions
Enter Final Swale bottom width b 5.27 ft - swale bottom width
Enter Final Swale length 265.83 ft - swale bottom length
265.83 ft
5.3 ft
0.005 ft/ft
4.0
4.0
0.12 ft
0.12 ft
No
Final Wet Bioswale Dimensions
Wet Bioswale Length
Wet Bioswale Bottom Width
Swale Longitudinal Slope
zforeslope
zbackslope
WQ Depth
Swale Depth = WQ Depth for offline swales
A
QV biofil
biofil
tVLbiofil
Wet Biofiltration Swale - Central Swale 2/7/2024 1:30 PM Version 2.1
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.59
Program License Number: 201010003
Project Simulation Performed on: 01/31/2024 11:50 AM
Report Generation Date: 01/31/2024 11:51 AM
—————————————————————————————————
Input File Name: Western Swale.fld
Project Name: Sound Transit BRT GEC - BT105
Analysis Title: Water Quality Flow Model - Western Swale
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 15
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : Ecology Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.551 1.551
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 1.551 1.551
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Forest, Flat 1.551
----------------------------------------------
Subbasin Total 1.551
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
C, Lawn, Mod 1.347
ROADS/MOD 0.151
SIDEWALKS/FLAT 0.053
----------------------------------------------
Subbasin Total 1.551
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 267.532
Link: New Copy Lnk1 0.000
_____________________________________
Total: 267.532
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 164.616
Link: New Copy Lnk1 0.000
_____________________________________
Total: 164.616
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.693 ac-ft/year, Post Developed: 1.042 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.033 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 141.23
Inflow Volume Including PPT-Evap (ac-ft): 141.23
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 141.23
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
Basic Wet Pond Volume (91% Exceedance): 2954. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 4432. cu-ft
2-Year Discharge Rate : 0.216 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.04 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 362.77
Inflow Volume Including PPT-Evap (ac-ft): 362.77
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 362.77
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 3.293E-02 2-Year 0.216
5-Year 5.224E-02 5-Year 0.319
10-Year 6.751E-02 10-Year 0.431
25-Year 8.775E-02 25-Year 0.616
50-Year 9.681E-02 50-Year 0.808
100-Year 0.110 100-Year 0.986
200-Year 0.152 200-Year 1.043
500-Year 0.209 500-Year 1.116
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
--------------------------------------------------------------------------------------------
RT.05 - Wet Biofiltration Swale
Project:RTA/OA 0206-19 Designed By:John Yuen
Description:Western Swale Checked By:
WET BIOSWALE SPREADSHEET VERSION 2.1
Design Steps
D-1 Determine runoff treatment design flow rate Qwq
Qwq 0.025 Runoff treatment design flow rate from MGS Flood OR SBUH; MGSFlood reports
an online and offline flow rate, please enter the applicable design flow rate
D-2 Determine the wet biofiltration design flow rate (Qbiofil)
Is the wet bioswale in eastern WA?No
2.00
P72%, 2-yr 1.44 72% of the 2-year 24 hr precip depth (in)
Wet biofiltration swales are offline ------->offline
Qbiofil 0.089 runoff treatment design flow rate
D-3 Determine the longitudinal slope of the proposed wet biofiltration swale (ft/ft)
s 0.005 ft/ft
D-4 Select a soil and vegetation cover suitable for the wet biofiltration swale
soil/veg <--Use pull down box
Manning's n=0.22
D-5 Select the design depth of flow y (see HRM Table 5-4)
y 0.33 (ft) design depth of flow; wet biofiltration swales depth of flow = 4" (0.33 ft) for WQ event
D-6 Select a trapezoidal swale cross-sectional shape.
D-7
<--manning's changed
HRM Chapter 5 Equation E-11
Use Excel Solver
D-7a Qbiofil 0.089 cfs - runoff treatment design flow rate
A 1.096 ft2 - wetted area
R 0.232 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 2.00 ft; wet bioswale bottom width
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.330 ft - design depth flow = maximum depth of flow
Qbiofil 0.198
D-7b If the swale calculations above give a swale width less than 2 feet wide, re-run calculations with 2 foot wide swale, solve for depth y
Or if redesigning swale with different dimensions, use below calculator and use Excel Goal Seek to determine new depth of flow.
Qbiofil 0.089 cfs - runoff treatment design flow rate
A 0.889 ft2 - wetted area
R 0.095 ft - hydraulic radius
s 0.005 ft/ft longitudinal slope of swale
n 0.22 Manning's coefficient
b 8.49 ft - enter new wet bioswale bottom width if applicable (2 foot is minimum)
zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
y 0.100 ft - design depth flow
Qbiofil 0.089
2-year 24 hr precip depth (in)
Grass-legume mix on lightly compacted topsoil
From HRM Table 5-3
Use Manning's Eq and first approximations relating hydraulic radius and dimensions to
get width for trapezoidal cross section
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "b" value
cfs - use goal seek under "What-If Analysis" in the
"DATA" menu to set this cell equal to Qbiofil above
changing the "y" value
n
sARQbiofil
2
1
3
2
49.1
5.0
67.
49.1 s
nQARbiofil
Wet Biofiltration Swale - West Swale 2/7/2024 1:34 PM Version 2.1
D-8 Enter Final Bioswale Dimensions from the calculations in Step D-7a or D-7b
Enter Final Swale Area 0.889 ft2 - Wetted Area
Enter Final Swale R 0.095 ft - hydraulic radius
Enter Final Swale slope s 0.005 ft/ft longitudinal slope of swale
Enter Final Swale n 0.22 Manning's coefficient
Enter Final Swale bottom width b 8.49 ft - swale bottom width
Enter Final Swale zforeslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale zbackslope 4.00 horizontal number of bioswale slope i.e. 1V:3H, z=3 in this instance
Enter Final Swale flow depth y 0.100 ft - design depth flow
D-9 Computer the flow velocity at Qbiofil
HRM Chapter 5 Equation E-12
Vbiofil 0.10 ft/sec - flow velocity; 1 ft/sec maximum
Flow veloicty is OK since it is less than 1 ft/sec
D-10 Compute Swale Length L (ft)
t 540 seconds - 9 minutes (540 seconds) for CABS, Basic, and Wet bioswale
L 53.88 ft - required length of bioswale; If swale is less than 100 feet, make swale have narrower
bottom width (2 foot minimum) and repeat Steps D-7 - D-10 and recalculate to get length over
100 feet or keep swale bottom width make swale length 100 feet minimum
D-11 Extended Wet Season Adjustment for Western Washington designs only
Is the wet bioswale downstream of a detention pond?
D-12 Revise Wet Bioswale Dimensions to meet minimums and for construction
Is the wet bioswale length at least 100 feet? If not, increase swale length to 100 feet.
Is the wet bioswale bottom width a constructible width?
Do no recalculate the wet bioswale depth of flow or velocity if the wet bioswale has the extended wet season adjustment.
Enter Final Adjusted Wet Bioswale Dimensions
Enter Final Swale bottom width b 8.49 ft - swale bottom width
Enter Final Swale length 106.03 ft - swale bottom length
106.03 ft
8.5 ft
0.005 ft/ft
4.0
4.0
0.10 ft
0.10 ft
Wet Bioswale Bottom Width
Swale Longitudinal Slope
zforeslope
zbackslope
WQ Depth
Swale Depth = WQ Depth for offline swales
No
Final Wet Bioswale Dimensions
Wet Bioswale Length
A
QV biofil
biofil
tVLbiofil
Wet Biofiltration Swale - West Swale 2/7/2024 1:34 PM Version 2.1
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
1.25
0.35
1.75
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-71 CB TYPE 1 ROADWAY 7,615 7,615 0.175 0.25 0.90 0.90 0.16 6.3 6.3 0.80 2.73 0.43 0.43 12 0.014 0.0051 2.99 2.35
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 99.0 0.50 23.53 23.03 26.95 27.40 3.42 2.39 3.34
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-65 CB TYPE 1 ROADWAY 139 139 0.003 0.25 0.90 0.90 0.00 6.3 6.9 0.80 2.73 0.01 0.44 12 0.014 0.0051 3.01 2.36 VELOCITY OK ADEQUATE PIPE CAPACITY 43.0 0.22 23.03 22.81 27.40 27.07 4.37 3.34 3.23
More than 2 ft of
cover
More than 2 ft of
cover DI pipe
CB 201-79 CB TYPE 1 ROADWAY 2,982 2,982 0.068 0.25 0.90 0.90 0.06 6.3 7.1 0.80 2.73 0.17 0.61 12 0.014 0.0051 3.00 2.35 VELOCITY OK ADEQUATE PIPE CAPACITY 65.0 0.33 22.81 22.48 27.07 26.23 4.26 3.23 2.72
More than 2 ft of
cover
More than 2 ft of
cover DI pipe
CB 201-10 CB TYPE 1 ROADWAY 1,271 1,271 0.029 0.25 0.90 0.90 0.03 6.3 7.5 0.80 2.73 0.07 0.03 0.71 12 0.014 0.0058 3.21 2.52 VELOCITY OK ADEQUATE PIPE CAPACITY 100.0 0.58 22.48 21.90 26.23 24.91 3.75 2.72 1.99
More than 2 ft of
cover
Low Cover - Use
DI Pipe DI pipe
CB 201-09 CB TYPE 1 ROADWAY 1,993 1,993 0.046 0.25 0.90 0.90 0.04 6.3 8.0 0.80 2.73 0.11 0.24 1.07 12 0.014 0.0113 4.48 3.52 VELOCITY OK ADEQUATE PIPE CAPACITY 45.0 0.51 21.90 21.39 24.91 24.85 3.01 1.99 2.43
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 201-48 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.1 0.80 2.73 0.00 2.27 3.34 18 0.014 0.0133 6.37 11.25 VELOCITY OK ADEQUATE PIPE CAPACITY 15.0 0.20 21.39 21.19 24.85 24.50 3.46 1.93 1.78 Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
MWS-68 MWS ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.2 0.80 2.73 0.00 3.34 18 0.014 0.0143 6.60 11.65 VELOCITY OK ADEQUATE PIPE CAPACITY 7.0 0.10 20.77 20.67 24.50 24.48 3.73 2.12 2.21
More than 2 ft of
cover
More than 2 ft of
cover
CB 201-31 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.2 0.80 2.73 0.00 4.18 7.52 18 0.014 0.0071 4.66 8.23 VELOCITY OK ADEQUATE PIPE CAPACITY 28.0 0.20 20.67 20.47 24.48 24.03 3.81 2.16 1.92 More than 2 ft of
cover
Low Cover - Use
DI Pipe DI pipe
CB 201-18 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.3 0.80 2.73 0.00 7.52 18 0.014 0.0070 4.62 8.15 VELOCITY OK ADEQUATE PIPE CAPACITY 10.0 0.07 20.47 20.40 24.03 23.39 3.56 1.92 1.34
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
EX 201-05 CB TYPE 1L
12" Lined CPE
18" Ductile Iron
Discharge Drainage Design Drain Profile
18" Lined CPE
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) = 12" Ductile Iron
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.75
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-57 CB TYPE 1 ROADWAY 609 609 0.014 0.25 0.90 0.90 0.01 6.3 6.3 0.80 2.73 0.03 0.03 12 0.014 0.0051 3.00 2.36 VELOCITY OK ADEQUATE PIPE CAPACITY 55.0 0.28 23.10 22.82 28.00 26.58 4.90 3.75 2.61
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-11 CB TYPE 1 ROADWAY 6,715 6,715 0.154 0.25 0.90 0.90 0.14 6.3 6.6 0.80 2.73 0.38 0.41 12 0.014 0.0365 8.05 6.32 VELOCITY OK ADEQUATE PIPE CAPACITY 23.0 0.84 23.32 22.48 26.58 26.23 3.26 2.11 2.60
More than 2 ft of
cover
More than 2 ft of
cover
CB 201-10 CB TYPE 1
18" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.75
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-73 CB TYPE 1 ROADWAY 4,336 4,336 0.100 0.25 0.90 0.90 0.09 6.3 6.3 0.80 2.73 0.24 0.24 12 0.014 0.0052 3.03 2.38 VELOCITY OK ADEQUATE PIPE CAPACITY 27.0 0.14 22.04 21.90 25.24 24.91 3.20 2.06 1.86
More than 2 ft of
cover
Low Cover - Use
DI Pipe DI pipe
CB 201-09 CB TYPE 1
18" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
0.31
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 205-49 CB TYPE 1 ROADWAY 305 305 0.007 0.25 0.90 0.90 0.01 6.3 6.3 0.80 2.73 0.02 0.02 12 0.014 0.0053 3.06 2.40 VELOCITY OK ADEQUATE PIPE CAPACITY 19.0 0.10 24.67 24.57 27.69 27.97 3.02 1.91 2.30
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 205-50 CB TYPE 1 ROADWAY 87 87 0.002 0.25 0.90 0.90 0.00 6.3 6.4 0.80 2.73 0.00 0.02 12 0.014 0.0109 4.40 3.45 VELOCITY OK ADEQUATE PIPE CAPACITY 54.0 0.59 24.57 23.98 27.97 27.00 3.40 2.30 1.91
More than 2 ft of
cover
Low Cover - Use
DI Pipe DI pipe
CB 205-78 CB TYPE 1 ROADWAY 5,556 5,556 0.128 0.25 0.90 0.90 0.11 6.3 6.6 0.80 2.73 0.31 0.34 12 0.014 0.0187 5.76 4.52 VELOCITY OK ADEQUATE PIPE CAPACITY 63.0 1.18 23.98 22.80 27.00 25.82 3.02 1.91 1.91
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 203-63 CB TYPE 1 ROADWAY 8,995 8,995 0.206 0.25 0.90 0.90 0.19 6.3 6.8 0.80 2.73 0.51 0.84 12 0.014 0.0063 3.34 2.62 VELOCITY OK ADEQUATE PIPE CAPACITY 46.0 0.29 22.80 22.51 25.82 25.53 3.02 1.91 1.91
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 203-62 CB TYPE 1 ROADWAY 23 23 0.001 0.25 0.90 0.90 0.00 6.3 7.0 0.80 2.73 0.00 0.44 1.28 12 0.014 0.0095 4.10 3.21 VELOCITY OK ADEQUATE PIPE CAPACITY 37.0 0.35 22.51 22.16 25.53 25.17 3.02 1.91 1.90
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 203-14 CB TYPE 1 ROADWAY 4,146 4,146 0.095 0.25 0.90 0.90 0.09 6.3 7.2 0.80 2.73 0.23 1.52 12 0.014 0.0067 3.44 2.70 VELOCITY OK ADEQUATE PIPE CAPACITY 78.0 0.52 22.16 21.64 25.17 24.64 3.01 1.90 1.90
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 203-13 CB TYPE 1 ROADWAY 13,296 13,296 0.305 0.25 0.90 0.90 0.27 6.3 7.5 0.80 2.73 0.75 2.27 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 50.0 0.25 21.64 21.39 24.64 24.85 3.00 1.90 2.36
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 201-48 CB TYPE 2
(48" DIA)
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
12" Ductile Iron
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.27
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-64 CB TYPE 1 ROADWAY 7,721 7,721 0.177 0.25 0.90 0.90 0.16 6.3 6.3 0.80 2.73 0.44 0.44 8 0.014 0.0052 2.31 0.80
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 33.0 0.17 22.68 22.51 25.18 25.53 2.50 1.81 2.33
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 203-62 CB TYPE 1
8" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.27
0.31
1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 201-08 CB TYPE 1 ROADWAY 1,924 1,924 0.044 0.25 0.90 0.90 0.04 6.3 6.3 0.80 2.73 0.11 0.11 8 0.014 0.0051 2.30 0.80
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 35.0 0.18 23.18 23.00 25.53 26.00 2.35 1.66 2.31
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 201-54 CB TYPE 1 ROADWAY 7,700 7,700 0.177 0.25 0.90 0.90 0.16 6.3 6.6 0.80 2.73 0.43 0.70 1.24 12 0.014 0.0051 2.99 2.35
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 95.0 0.48 23.00 22.52 26.00 26.02 3.00 1.97 2.47
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 201-04 CB TYPE 1 ROADWAY 5,330 5,330 0.122 0.25 0.90 0.90 0.11 6.3 7.1 0.80 2.73 0.30 0.25 1.79 12 0.014 0.0051 3.02 2.37 VELOCITY OK ADEQUATE PIPE CAPACITY 37.0 0.19 22.52 22.33 26.02 25.54 3.50 2.40 2.11
More than 2 ft of
cover
More than 2 ft of
cover DI pipe
CB 201-53 CB TYPE 1 ROADWAY 2,625 2,625 0.060 0.25 0.90 0.90 0.05 6.3 7.3 0.80 2.73 0.15 1.94 12 0.014 0.0052 3.03 2.38 VELOCITY OK ADEQUATE PIPE CAPACITY 145.0 0.75 22.33 21.58 25.54 23.67 3.21 2.19 1.06
More than 2 ft of
cover
Low Cover - Use
DI Pipe DI pipe
CB 201-16 CB TYPE 2
(48" DIA)ROADWAY 9,093 9,093 0.209 0.25 0.90 0.90 0.19 6.3 8.1 0.80 2.73 0.51 1.73 4.18 12 0.014 0.0057 3.18 2.50 VELOCITY OK NEED MORE CAPACITY 7.0 0.04 21.58 21.54 23.67 24.30 2.09 1.06 1.74
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
MWS-67 MODULAR
WETLAND UNIT ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.1 0.80 2.73 0.00 4.18 18 0.014 0.0053 4.03 7.12 VELOCITY OK ADEQUATE PIPE CAPACITY 15.0 0.08 20.75 20.67 24.30 24.46 3.55 2.03 2.27 More than 2 ft of
cover
More than 2 ft of
cover
CB 201-31 CB TYPE 2
(48" DIA)
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
8" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
12" Ductile Iron
12" Lined CPE
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.27
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 201-27 CB TYPE 1 ROADWAY 8,373 8,373 0.192 0.25 0.90 0.90 0.17 6.3 6.3 0.80 2.73 0.47 0.47 8 0.014 0.0053 2.33 0.81
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 36.0 0.19 22.10 21.91 23.81 24.00 1.71 1.02 1.40
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 201-15 CB TYPE 1 ROADWAY 3,413 3,413 0.078 0.25 0.90 0.90 0.07 6.3 6.6 0.80 2.73 0.19 0.67 12 0.014 0.0054 3.09 2.43 VELOCITY OK ADEQUATE PIPE CAPACITY 26.0 0.14 21.91 21.77 24.00 24.14 2.09 1.07 1.35
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 201-35 CB TYPE 1 ROADWAY 2,253 2,253 0.052 0.25 0.90 0.90 0.05 6.3 6.7 0.80 2.73 0.13 0.79 12 0.014 0.0058 3.20 2.51 VELOCITY OK ADEQUATE PIPE CAPACITY 33.0 0.19 21.77 21.58 24.14 23.80 2.37 1.35 1.20
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 201-16 CB TYPE 1
MWS-67 MODULAR
WETLAND UNIT U.S. PIPE
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
8" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 201-60 CB TYPE 1 ROADWAY 16,590 16,590 0.381 0.25 0.90 0.90 0.34 6.3 6.3 0.80 2.73 0.94 0.94 8 0.012 0.0057 2.83 0.99
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 7.0 0.04 21.75 21.71 23.46 23.48 1.71 1.02 1.08
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 201-59 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.3 0.80 2.73 0.00 0.94 12 0.014 0.0052 3.04 2.38 VELOCITY OK ADEQUATE PIPE CAPACITY 25.0 0.13 21.71 21.58 23.48 23.67 1.77 0.74 1.06 Not Enough
Cover - Need to
Low Cover - Use
DI Pipe DI pipe
CB 201-16 CB TYPE 2
(48" DIA)
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
12" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.27
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 201-06 CB TYPE 1 ROADWAY 12,326 12,326 0.283 0.25 0.90 0.90 0.25 6.3 6.3 0.80 2.73 0.70 0.70 8 0.014 0.0050 2.28 0.80
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 101.0 0.51 23.51 23.00 27.26 26.00 3.75 3.06 2.31
More than 2 ft of
cover
More than 2 ft of
cover DI pipe
CB 201-54 CB TYPE 1
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
8" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 201-07 CB TYPE 1 ROADWAY 4,439 4,439 0.102 0.25 0.90 0.90 0.09 6.3 6.3 0.80 2.73 0.25 0.25 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 54.0 0.27 22.79 22.52 26.71 26.01 3.92 2.82 2.39
More than 2 ft of
cover
More than 2 ft of
cover
CB 201-04 CB TYPE 1
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 102-17 CB TYPE 1 ROADWAY 3,458 3,458 0.079 0.25 0.90 0.90 0.07 6.3 6.3 0.80 2.73 0.20 0.20 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 6.0 0.03 21.45 21.42 24.97 25.55 3.52 2.49 3.10
More than 2 ft of
cover
More than 2 ft of
cover
MWS-66 MODULAR
WETLAND ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.3 0.80 2.73 0.00 0.20 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 44.0 0.22 21.42 21.20 25.55 24.04 4.13 3.03 1.74
More than 2 ft of
cover
Low Cover - Use
DI Pipe
EX 201-01 CB TYPE 1L
Discharge Drainage Design Drain Profile
Pipe Thickness (inches) = 12" Lined CPE
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =12" DI
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.625
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
FIL-1 FILTERRA ROADWAY 13,251 13,251 0.304 0.25 0.90 0.90 0.27 6.3 6.3 0.80 2.73 0.75 0.75 12 0.014 0.0567 10.02 7.87 VELOCITY OK ADEQUATE PIPE CAPACITY 9.0 0.51 20.47 19.96 23.96 23.55 3.49 2.44 2.54 More than 2 ft of
cover
More than 2 ft of
cover
CB 201-58 CB TYPE 1
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
6" PVC
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-82 CB TYPE 1 ROADWAY 645 645 0.015 0.25 0.90 0.90 0.01 6.3 6.3 0.80 2.73 0.04 0.04 24 0.014 0.0051 4.79 15.05 VELOCITY OK ADEQUATE PIPE CAPACITY 35.0 0.18 25.17 24.99 27.52 28.00 2.35 0.25 0.91
Not Enough
Cover - Need to
Not Enough
Cover - Need to DI PIPE
CB 203-83 SDMH - 48" ROADWAY 10,490 10,490 0.241 0.25 0.90 0.90 0.22 6.3 6.4 0.80 2.73 0.59 0.63 24 0.014 0.0051 4.77 14.98 VELOCITY OK ADEQUATE PIPE CAPACITY 53.0 0.27 24.99 24.72 28.00 27.37 3.01 0.91 0.55
Not Enough
Cover - Need to
Not Enough
Cover - Need to DI PIPE
CB 204-27 CB TYPE 1 ROADWAY 10,943 10,943 0.251 0.25 0.90 0.90 0.23 6.3 6.6 0.80 2.73 0.62 1.25 12 0.014 0.0051 3.02 2.37 VELOCITY OK ADEQUATE PIPE CAPACITY 35.0 0.18 24.72 24.54 27.37 27.61 2.65 1.55 1.97
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI PIPE
CB 202-61 CB TYPE 1 ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.4 0.80 2.73 0.00 1.25 12 0.014 0.0046 2.86 2.25
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 13.0 0.06 24.54 24.48 27.61 27.60 3.07 1.97 2.02
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI PIPE
CB 202-26 CB TYPE 1 ROADWAY 14,369 14,369 0.330 0.25 0.90 0.90 0.30 6.3 6.5 0.80 2.73 0.81 2.06 12 0.014 0.0050 2.97 2.33
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 161.0 0.80 24.48 23.68 27.60 29.54 3.12 2.02 4.76
More than 2 ft of
cover
More than 2 ft of
cover
CB 202-25 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 7.4 0.80 2.73 0.00 2.06 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 156.0 0.78 23.68 22.90 29.54 28.01 5.86 4.76 4.00
More than 2 ft of
cover
More than 2 ft of
cover
CB 202-24 CB TYPE 2
(48" DIA)ROADWAY 6,824 6,824 0.157 0.25 0.90 0.90 0.14 6.3 8.3 0.80 2.73 0.39 1.41 3.85 12 0.014 0.0114 4.49 3.52 VELOCITY OK NEED MORE CAPACITY 59.0 0.67 22.01 21.34 28.01 27.56 6.00 4.89 5.12
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-23 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.5 0.80 2.73 0.00 0.14 4.00 12 0.014 0.0130 4.80 3.77 VELOCITY OK NEED MORE CAPACITY 10.0 0.13 21.34 21.21 27.56 27.08 6.22 5.12 4.76 More than 2 ft of
cover
More than 2 ft of
cover
MWS - 70 MWS ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.5 0.80 2.73 0.00 4.00 12 0.014 0.0125 4.71 3.69 VELOCITY OK NEED MORE CAPACITY 12.0 0.15 20.14 19.99 27.08 27.07 6.94 5.83 5.98
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-22 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.6 0.80 2.73 0.00 4.00 12 0.014 0.0053 3.07 2.41 VELOCITY OK NEED MORE CAPACITY 15.0 0.08 19.99 19.91 27.07 27.20 7.08 5.98 6.19
More than 2 ft of
cover
More than 2 ft of
cover
EX 204-02 CB TYPE 2
(60" DIA)
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
24" Lined CPE
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 106-12 CB TYPE 1 ROADWAY 1,319 1,319 0.030 0.25 0.90 0.90 0.03 6.3 6.3 0.80 2.73 0.07 0.07 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 36.0 0.18 22.95 22.77 25.31 25.45 2.36 1.33 1.65
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 106-55 CB TYPE 1 ROADWAY 154 154 0.004 0.25 0.90 0.90 0.00 6.3 6.5 0.80 2.73 0.01 0.08 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 16.0 0.08 22.77 22.69 25.45 25.55 2.68 1.65 1.83
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 204-35 CB TYPE 1 ROADWAY 1,073 1,073 0.025 0.25 0.90 0.90 0.02 6.3 6.6 0.80 2.73 0.06 0.06 0.21 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 88.0 0.44 22.69 22.25 25.55 26.75 2.86 1.83 3.47
Low Cover - Use
DI Pipe
More than 2 ft of
cover DI pipe
CB 204-34 CB TYPE 1 ROADWAY 1,787 1,787 0.041 0.25 0.90 0.90 0.04 6.3 7.1 0.80 2.73 0.10 0.36 0.67 12 0.014 0.0054 3.10 2.43 VELOCITY OK ADEQUATE PIPE CAPACITY 24.0 0.13 22.25 22.12 26.75 26.85 4.50 3.40 3.62
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-33 CB TYPE 1 ROADWAY 2,690 2,690 0.062 0.25 0.90 0.90 0.06 6.3 7.2 0.80 2.73 0.15 0.82 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 12.0 0.06 22.12 22.06 26.85 26.71 4.73 3.62 3.54
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-32 CB TYPE 1 ROADWAY 18,818 18,818 0.432 0.25 0.90 0.90 0.39 6.3 7.3 0.80 2.73 1.06 1.24 3.12 12 0.014 0.0079 3.75 2.94 VELOCITY OK NEED MORE CAPACITY 24.0 0.19 22.06 21.87 26.71 27.43 4.65 3.54 4.46
More than 2 ft of
cover
More than 2 ft of
cover Backwater passing, capacity OK
MWS - 69 MWS ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 7.4 0.80 2.73 0.00 3.12 12 0.014 0.0078 3.71 2.91 VELOCITY OK NEED MORE CAPACITY 18.0 0.14 20.01 19.87 27.43 27.23 7.42 6.32 6.25
More than 2 ft of
cover
More than 2 ft of
cover Backwater passing, capacity OK
CB 204-21 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 7.5 0.80 2.73 0.00 3.12 12 0.014 0.0056 3.14 2.46 VELOCITY OK NEED MORE CAPACITY 9.0 0.05 19.87 19.82 27.23 27.20 7.36 6.25 6.28
More than 2 ft of
cover
More than 2 ft of
cover Backwater passing, capacity OK
EX 204-02 CB TYPE 2
(60" DIA)
12" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
12" Lined CPE
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 204-75 CB TYPE 1 ROADWAY 1,149 1,149 0.026 0.25 0.90 0.90 0.02 6.3 6.3 0.80 2.73 0.06 0.06 12 0.014 0.0055 3.11 2.44 VELOCITY OK ADEQUATE PIPE CAPACITY 22.0 0.12 22.81 22.69 25.55 25.55 2.74 1.71 1.83
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI pipe
CB 204-35 CB TYPE 1
12" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 204-39 CB TYPE 1 ROADWAY 21,882 21,882 0.502 0.25 0.90 0.90 0.45 6.3 6.3 0.80 2.73 1.24 1.24 12 0.014 0.0054 3.08 2.42 VELOCITY OK ADEQUATE PIPE CAPACITY 84.0 0.45 22.51 22.06 25.63 26.71 3.12 2.01 3.55
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-32 CB TYPE 1
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 204-41 CB TYPE 1 ROADWAY 1,584 1,584 0.036 0.25 0.90 0.90 0.03 6.3 6.3 0.80 2.73 0.09 0.09 12 0.014 0.0052 3.03 2.38 VELOCITY OK ADEQUATE PIPE CAPACITY 58.0 0.30 25.96 25.66 28.98 29.02 3.02 1.92 2.26
Low Cover - Use
DI Pipe
More than 2 ft of
cover
CB 202-40 CB TYPE 1 ROADWAY 982 982 0.023 0.25 0.90 0.90 0.02 6.3 6.6 0.80 2.73 0.06 0.14 12 0.014 0.0637 10.63 8.34 VELOCITY OK ADEQUATE PIPE CAPACITY 62.0 3.95 25.66 21.71 29.02 27.56 3.36 2.26 4.75
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-23 CB TYPE 2
(48" DIA)
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 106-54 CB TYPE 1 ROADWAY 3,517 3,517 0.081 0.25 0.90 0.90 0.07 6.3 6.3 0.80 2.73 0.20 0.20 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 30.0 0.15 23.10 22.95 26.36 26.60 3.26 2.16 2.55
More than 2 ft of
cover
More than 2 ft of
cover DI pipe
CB 106-29 CB TYPE 1 ROADWAY 18,916 18,916 0.434 0.25 0.90 0.90 0.39 6.3 6.5 0.80 2.73 1.07 1.27 12 0.014 0.0051 3.01 2.36 VELOCITY OK ADEQUATE PIPE CAPACITY 98.0 0.50 22.95 22.45 26.60 26.79 3.65 2.55 3.24
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-28 CB TYPE 1 ROADWAY 383 383 0.009 0.25 0.90 0.90 0.01 6.3 7.0 0.80 2.73 0.02 0.12 1.41 12 0.014 0.0050 2.98 2.34
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 88.0 0.44 22.45 22.01 26.79 28.01 4.34 3.24 4.89
More than 2 ft of
cover
More than 2 ft of
cover
CB 202-24 CB TYPE 2
(48" DIA)
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.27
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 105-47 CB TYPE 1 ROADWAY 1,214 1,214 0.028 0.25 0.90 0.90 0.03 6.3 6.3 0.80 2.73 0.07 0.07 8 0.014 0.0050 2.27 0.79
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 18.0 0.09 26.38 26.29 27.91 28.10 1.53 0.84 1.12
Not Enough
Cover - Need to
Low Cover - Use
DI Pipe DI pipe
CB 105-48 CB TYPE 1 ROADWAY 1,603 1,603 0.037 0.25 0.90 0.90 0.03 6.3 6.4 0.80 2.73 0.09 0.16 8 0.014 0.0066 2.61 0.91
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 16.7 0.11 26.29 26.18 28.10 26.18 1.81 1.12 -0.69
Low Cover - Use
DI Pipe
Not Enough
Cover - Need to DI pipe
SWALE SWALE PERVIOUS 12,927 12,927 0.297 0.25 0.90 0.25 0.07 6.3 6.5 0.80 2.73 0.20 0.36 12 0.014 0.0952 12.99 10.20 VELOCITY OK ADEQUATE PIPE CAPACITY 22.1 2.10 26.18 24.08 26.18 24.08 0.00 -1.02 -1.02
Not Enough
Cover - Need to
Not Enough
Cover - Need to Conveyance design N/A
SD PIPE PIPE ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.6 0.80 2.73 0.00 0.36 12 0.014 0.0555 9.92 7.78 VELOCITY OK ADEQUATE PIPE CAPACITY 22.0 1.22 24.08 22.86 24.08 26.75 0.00 -1.02 2.87
Not Enough
Cover - Need to
More than 2 ft of
cover Daylighting pipe upstream end
CB 204-34 CB TYPE 1
8" Ductile Iron
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 106-56 CB TYPE 1 ROADWAY 2,127 2,127 0.049 0.25 0.90 0.90 0.04 6.3 6.3 0.80 2.73 0.12 0.12 12 0.014 0.0160 5.33 4.18 VELOCITY OK ADEQUATE PIPE CAPACITY 30.0 0.48 22.93 22.45 26.20 26.79 3.27 2.17 3.24
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-28 CB TYPE 1
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 202-80 CB TYPE 2 - 48" ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.3 0.80 2.73 0.00 0.00 12 0.014 0.0052 3.05 2.39 VELOCITY OK ADEQUATE PIPE CAPACITY 42 0.22 22.55 22.33 27.68 27.13 5.13 4.03 3.70
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-30 CB TYPE 2 - 48" ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.5 0.80 2.73 0.00 0.00 12 0.014 0.0053 3.06 2.40 VELOCITY OK ADEQUATE PIPE CAPACITY 38 0.20 22.33 22.13 27.13 26.16 4.80 3.70 2.93
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-21 CB TYPE1 ROADWAY 564 564 0.013 0.25 0.90 0.90 0.01 6.3 6.7 0.80 2.73 0.03 0.03 12 0.014 0.0052 3.03 2.38 VELOCITY OK ADEQUATE PIPE CAPACITY 60 0.31 22.13 21.82 26.16 26.41 4.03 2.93 3.49
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-20 CB TYPE 1 ROADWAY 39 39 0.001 0.25 0.90 0.90 0.00 6.3 7.1 0.80 2.73 0.00 0.23 0.26 12 0.014 0.0046 2.87 2.25
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 112 0.52 21.82 21.30 26.41 25.08 4.59 3.49 2.68
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-37 CB TYPE 1 ROADWAY 10,878 10,878 0.250 0.25 0.90 0.90 0.22 6.3 7.7 0.80 2.73 0.61 0.88 12 0.014 0.0057 3.18 2.50 VELOCITY OK ADEQUATE PIPE CAPACITY 7 0.04 21.30 21.26 25.08 25.62 3.78 2.68 3.26
More than 2 ft of
cover
More than 2 ft of
cover
MWS-36 MODULAR
WETLAND ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 7.8 0.80 2.73 0.00 0.88 12 0.014 0.0184 5.72 4.49 VELOCITY OK ADEQUATE PIPE CAPACITY 19 0.35 20.65 20.30 25.62 25.46 4.97 3.87 4.06
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-38 CB TYPE 2 - 60"
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 106-19 CB TYPE 1 ROADWAY 4,164 4,164 0.096 0.25 0.90 0.90 0.09 6.3 6.3 0.80 2.73 0.24 0.24 12 0.014 0.0051 3.02 2.37 VELOCITY OK ADEQUATE PIPE CAPACITY 39.0 0.20 22.02 21.82 25.53 26.41 3.51 2.41 3.49
More than 2 ft of
cover
More than 2 ft of
cover
CB 106-20 CB TYPE 1
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 2
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 204-42 CB TYPE 2
(60" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 6.3 0.80 2.73 0.00 0.00 27 0.014 0.0006 1.72 6.83
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 124.0 0.07 19.77 19.70 28.26 29.04 8.49 6.07 6.92
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-43 CB TYPE 2
(60" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 7.5 0.80 2.73 0.00 0.00 27 0.014 0.0006 1.74 6.92
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 138.0 0.08 19.70 19.62 29.04 28.83 9.34 6.92 6.79
More than 2 ft of
cover
More than 2 ft of
cover
CB 204-44 CB TYPE 2
(60" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.8 0.80 2.73 0.00 0.00 27 0.014 0.0006 1.81 7.18
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 112.0 0.07 19.62 19.55 28.83 27.50 9.21 6.79 5.53
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-45 CB TYPE 2
(60" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 9.9 0.80 2.73 0.00 1.55 1.55 27 0.014 0.0005 1.66 6.58
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 38.1 0.02 19.55 19.53 27.50 27.21 7.95 5.53 5.26
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-46 CB TYPE 2
(60" DIA)
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
27" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
SWALE_W SWALE PERVIOUS 27,578 27,578 0.633 0.25 0.90 0.25 0.16 6.3 6.3 0.80 2.73 0.43 0.43 24 0.030 0.0030 1.71 5.37
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 266.0 0.80 26.91 26.11 26.91 26.11 0.00 -2.10 -2.10
Not Enough
Cover - Need to
Not Enough
Cover - Need to
Cover not required, pipe design not
required.
STORM DRAIN
PIPE CULVERT PERVIOUS 0 0 0.000 0.25 0.90 0.90 0.00 6.3 8.9 0.80 2.73 0.00 0.43 12 0.014 0.0103 4.26 3.35 VELOCITY OK ADEQUATE PIPE CAPACITY 39.0 0.40 26.11 25.71 26.11 25.71 0.00 -1.10 -1.10
Not Enough
Cover - Need to
Not Enough
Cover - Need to Cover not required.
CABS CABS PERVIOUS 7,654 7,654 0.176 0.25 0.90 0.25 0.04 6.3 9.0 0.80 2.73 0.12 0.55 24 0.030 0.0150 3.82 11.99 VELOCITY OK ADEQUATE PIPE CAPACITY 106.0 1.59 25.71 24.12 25.71 24.12 0.00 -2.10 -2.10 Not Enough
Cover - Need to
Not Enough
Cover - Need to
Cover not required, pipe design not
required.
CB 104-81 CB TYPE 1 ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 9.5 0.80 2.73 0.00 0.55 12 0.014 0.0085 3.88 3.04 VELOCITY OK ADEQUATE PIPE CAPACITY 59.0 0.50 20.48 19.98 24.12 29.14 3.64 2.54 8.06
More than 2 ft of
cover
More than 2 ft of
cover
Cover not required, pipe design not
required.
CB 205-51 CB TYPE 2
(48" DIA)ROADWAY 0 0 0.000 0.25 0.90 0.90 0.00 6.3 9.8 0.80 2.73 0.00 0.55 12 0.014 0.0084 3.86 3.03 VELOCITY OK ADEQUATE PIPE CAPACITY 57.0 0.48 19.98 19.50 29.14 28.89 9.16 8.06 8.29
More than 2 ft of
cover
More than 2 ft of
cover
CB 205-77 CB TYPE 2
(60" DIA)
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 203-74 CB TYPE 1 ROADWAY 4,334 4,334 0.099 0.25 0.90 0.90 0.09 6.3 9.0 0.80 2.73 0.24 0.24 12 0.014 0.0051 3.01 2.36 VELOCITY OK ADEQUATE PIPE CAPACITY 45.0 0.23 23.85 23.62 26.98 26.92 3.13 2.03 2.20
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-72 CB TYPE 1 ROADWAY 5,734 5,734 0.132 0.25 0.90 0.90 0.12 6.3 9.3 0.80 2.73 0.32 0.57 12 0.014 0.0052 3.02 2.37 VELOCITY OK ADEQUATE PIPE CAPACITY 64.0 0.33 23.62 23.29 26.92 26.61 3.30 2.20 2.22
More than 2 ft of
cover
More than 2 ft of
cover
CB 205-76 CB TYPE 1 ROADWAY 9,903 9,903 0.227 0.25 0.90 0.90 0.20 6.3 9.6 0.80 2.73 0.56 0.42 1.55 12 0.014 0.0059 3.24 2.54 VELOCITY OK ADEQUATE PIPE CAPACITY 49.0 0.29 23.29 23.00 26.61 27.50 3.32 2.22 3.40
More than 2 ft of
cover
More than 2 ft of
cover
CB 203-45 CB TYPE 2
(60" DIA)
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 1.25
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
CB 105-52 CB TYPE 1 ROADWAY 1,587 1,587 0.036 0.25 0.90 0.90 0.03 6.3 6.3 0.80 2.73 0.09 0.09 12 0.014 0.0049 2.96 2.32
TRY TO
INCREASE ADEQUATE PIPE CAPACITY 85.0 0.42 21.52 21.10 25.09 24.68 3.57 2.46 2.48
More than 2 ft of
cover
More than 2 ft of
cover
EX 105-03 CB TYPE 1
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
12" Lined CPE
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
STORM SEWER DESIGN (English Units)
Osborn Consulting, Inc.
PR =3.4 iR = IR =
aR =2.66 bR =0.65 0.31
St
r
u
c
t
u
r
e
I
D
St
r
u
c
t
u
r
e
T
y
p
e
So
u
r
c
e
o
f
D
r
a
i
n
a
g
e
Pe
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
P
A
(
s
q
.
f
t
)
Im
p
e
r
v
i
o
u
s
D
r
a
i
n
a
g
e
Ar
e
a
I
A
(
s
q
.
f
t
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(
s
q
.
ft
)
Dr
a
i
n
a
g
e
A
r
e
a
A
(a
c
r
e
)
Pe
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Im
p
e
r
v
i
o
u
s
R
u
n
o
f
f
Co
e
f
f
.
C
Co
m
p
o
s
i
t
e
R
u
n
o
f
f
Co
e
f
f
.
C
CA
(
a
c
r
e
)
Tc A
c
r
o
s
s
A
r
e
a
(
m
i
n
u
t
e
s
)
To
t
a
l
T
c
=
C
o
l
.
8
a
+
T
c
ac
r
o
s
s
p
i
p
e
l
e
n
g
t
h
(m
i
n
u
t
e
s
)
iR
Ra
i
n
f
a
l
l
I
n
t
e
n
s
i
t
y
,
I
R
(i
n
/
h
r
)
Ru
n
o
f
f
(
c
f
s
)
Co
n
t
r
i
b
.
I
n
f
l
o
w
(
c
f
s
)
To
t
a
l
F
l
o
w
(
c
f
s
)
Pi
p
e
D
i
a
.
(
i
n
)
Ma
n
n
i
n
g
r
o
u
g
h
n
e
s
s
co
e
f
f
i
c
i
e
n
t
"
n
"
Pi
p
e
S
l
o
p
e
(
f
t
/
f
t
)
V
e
l
o
c
i
t
y
O
f
F
l
o
w
(f
t
/
s
)
Pi
p
e
C
a
p
a
c
i
t
y
(
c
f
s
)
Pi
p
e
V
e
l
o
c
i
t
y
C
h
e
c
k
(D
e
s
i
r
a
b
l
e
M
i
n
i
m
u
m
3
ft
/
s
e
c
;
D
e
s
i
r
a
b
l
e
Ma
x
i
m
u
m
1
0
f
t
/
s
e
c
f
o
r
Co
l
u
m
n
1
6
)
Pi
p
e
C
a
p
a
c
i
t
y
C
h
e
c
k
(C
o
l
u
m
n
1
3
v
s
.
Co
l
u
m
n
1
7
)
Pi
p
e
L
e
n
g
t
h
*
*
*
(
f
t
)
El
e
v
a
t
i
o
n
C
h
a
n
g
e
(
f
t
)
Up
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(
f
t
)
Do
w
n
s
t
r
.
I
n
v
e
r
t
E
l
e
v
.
(f
t
)
Up
s
t
r
.
G
r
o
u
n
d
E
l
e
v
.
(f
t
)
Do
w
n
s
t
r
.
G
r
o
u
n
d
El
e
v
.
(
f
t
)
Ri
m
t
o
I
n
v
e
r
t
D
i
s
t
a
n
c
e
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
(f
t
)
Up
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Do
w
n
s
t
r
.
P
i
p
e
C
o
v
e
r
Ch
e
c
k
(
f
t
)
Re
m
a
r
k
s
5 6 7 8a 9 10 11 12 13 14 14a 15 16 17 17a 17b 18 19 20 21 22 23 24 25 26 27 24
FIL-2 FILTERRA 4x4 ROADWAY 7,483 7,483 0.172 0.25 0.90 0.90 0.15 6.3 6.3 0.80 2.73 0.42 0.42 6 0.014 0.0000 0.00 0.00
TRY TO
INCREASE NEED MORE CAPACITY 11.0 0.00 24.80 24.80 26.55 26.61 1.75 1.22 1.28
Low Cover - Use
DI Pipe
Low Cover - Use
DI Pipe DI PIPE
CB 205-76 CB TYPE 1
6" PVC
Discharge Drainage Design Drain Profile
(aR)(Tc)^-bR)PRiR Pipe cover = Top of Finished Grade to Top of Pipe
Design Storm Event = 25 Pavement thickness (ft) = 0.00 Pipe Thickness (inches) =
BRT GEC Designed By: L. Jacobs
(Flows calculated using King County Rational Method)Project Office:
Stride program: I-405 corridor
AE 0054-17 | 60% Storm Drainage Report February 2024
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 203-71 to EX 201-05.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:21.9 feet
Discharge Range:0.25 to 11. Step of 0.25 [cfs]
Overflow Elevation:26.95 feet
Weir:NONE
Upstream Velocity:2.99 feet/sec
PIPE NO. 1: 10 LF - 18"CP @ 0.70% OUTLET: 20.40 INLET: 20.47 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 24.03 BEND: 30 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 1.44 21.91 * 0.012 0.19 0.17 1.50 1.50 1.44 1.44 0.24
0.50 1.44 21.91 * 0.012 0.27 0.24 1.50 1.50 1.44 1.44 0.35
0.75 1.44 21.91 * 0.012 0.33 0.29 1.50 1.50 1.44 1.44 0.43
1.00 1.44 21.91 * 0.012 0.38 0.33 1.50 1.50 1.44 1.44 0.50
1.25 1.45 21.92 * 0.012 0.42 0.37 1.50 1.50 1.44 1.45 0.56
1.50 1.45 21.92 * 0.012 0.46 0.41 1.50 1.50 1.44 1.45 0.62
1.75 1.45 21.92 * 0.012 0.50 0.44 1.50 1.50 1.44 1.45 0.67
2.00 1.45 21.92 * 0.012 0.54 0.47 1.50 1.50 1.44 1.45 0.72
2.25 1.46 21.93 * 0.012 0.57 0.50 1.50 1.50 1.44 1.46 0.77
2.50 1.46 21.93 * 0.012 0.60 0.53 1.50 1.50 1.44 1.46 0.81
2.75 1.47 21.94 * 0.012 0.63 0.56 1.50 1.50 1.44 1.47 0.86
3.00 1.47 21.94 * 0.012 0.66 0.58 1.50 1.50 1.44 1.47 0.90
3.25 1.48 21.95 * 0.012 0.69 0.61 1.50 1.50 1.44 1.48 0.94
3.50 1.49 21.96 * 0.012 0.72 0.63 1.50 1.50 1.44 1.49 0.98
3.75 1.49 21.96 * 0.012 0.75 0.66 1.50 1.50 1.44 1.49 1.01
4.00 1.50 21.97 * 0.012 0.77 0.68 1.50 1.50 1.44 1.50 1.05
4.25 1.52 21.99 * 0.012 0.80 0.71 1.50 1.50 1.45 1.52 1.09
4.50 1.52 21.99 * 0.012 0.82 0.73 1.50 1.50 1.45 1.52 1.12
4.75 1.53 22.00 * 0.012 0.84 0.75 1.50 1.50 1.45 1.53 1.16
5.00 1.54 22.01 * 0.012 0.87 0.78 1.50 1.50 1.45 1.54 1.19
5.25 1.55 22.02 * 0.012 0.89 0.80 1.50 1.50 1.45 1.55 1.22
5.50 1.56 22.03 * 0.012 0.91 0.82 1.50 1.50 1.45 1.56 1.25
5.75 1.58 22.05 * 0.012 0.93 0.85 1.50 1.50 1.46 1.58 1.29
6.00 1.59 22.06 * 0.012 0.95 0.87 1.50 1.50 1.46 1.59 1.32
6.25 1.60 22.07 * 0.012 0.97 0.89 1.50 1.50 1.46 1.60 1.35
6.50 1.61 22.08 * 0.012 0.99 0.91 1.50 1.50 1.46 1.61 1.38
6.75 1.63 22.10 * 0.012 1.01 0.94 1.50 1.50 1.46 1.63 1.41
7.00 1.65 22.12 * 0.012 1.03 0.96 1.50 1.50 1.47 1.65 1.44
7.25 1.66 22.13 * 0.012 1.05 0.98 1.50 1.50 1.47 1.66 1.47
7.50 1.67 22.14 * 0.012 1.07 1.01 1.50 1.50 1.47 1.67 1.50
7.75 1.69 22.16 * 0.012 1.08 1.03 1.50 1.50 1.48 1.69 1.53
8.00 1.71 22.18 * 0.012 1.10 1.06 1.50 1.50 1.48 1.71 1.56
8.25 1.72 22.19 * 0.012 1.12 1.08 1.50 1.50 1.48 1.72 1.59
8.50 1.75 22.22 * 0.012 1.13 1.11 1.50 1.50 1.49 1.75 1.63
8.75 1.76 22.23 * 0.012 1.15 1.14 1.50 1.50 1.49 1.76 1.67
9.00 1.78 22.25 * 0.012 1.17 1.17 1.50 1.50 1.49 1.78 1.71
9.25 1.80 22.27 * 0.012 1.18 1.20 1.50 1.50 1.50 1.80 1.75
9.50 1.82 22.29 * 0.012 1.20 1.23 1.50 1.50 1.50 1.82 1.80
9.75 1.84 22.31 * 0.012 1.21 1.27 1.50 1.50 1.50 1.84 1.84
10.00 1.88 22.35 * 0.012 1.22 1.32 1.50 1.50 1.51 1.86 1.88
10.25 1.93 22.40 * 0.012 1.24 1.50 1.50 1.50 1.51 1.88 1.93
10.50 1.97 22.44 * 0.012 1.25 1.50 1.50 1.50 1.52 1.90 1.97
10.75 2.02 22.49 * 0.012 1.26 1.50 1.50 1.50 1.52 1.93 2.02
11.00 2.07 22.54 * 0.012 1.28 1.50 1.50 1.50 1.52 1.95 2.07
PIPE NO. 2: 28 LF - 18"CP @ 0.71% OUTLET: 20.47 INLET: 20.67 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 24.48 BEND: 60 DEG DIA/WIDTH: 4.0 Q-RATIO: 1.25
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 1.25 21.92 * 0.012 0.19 0.17 1.44 1.44 1.25 1.25 0.24
0.50 1.25 21.92 * 0.012 0.27 0.24 1.44 1.44 1.25 1.25 0.35
0.75 1.26 21.93 * 0.012 0.33 0.29 1.44 1.44 1.25 1.26 0.43
1.00 1.26 21.93 * 0.012 0.38 0.33 1.44 1.44 1.25 1.26 0.50
1.25 1.27 21.94 * 0.012 0.42 0.37 1.45 1.45 1.25 1.27 0.57
1.50 1.28 21.95 * 0.012 0.46 0.41 1.45 1.45 1.26 1.28 0.63
1.75 1.29 21.96 * 0.012 0.50 0.44 1.45 1.45 1.26 1.29 0.68
2.00 1.30 21.97 * 0.012 0.54 0.47 1.45 1.45 1.26 1.30 0.74
2.25 1.32 21.99 * 0.012 0.57 0.50 1.46 1.46 1.27 1.32 0.79
2.50 1.33 22.00 * 0.012 0.60 0.53 1.46 1.46 1.27 1.33 0.84
2.75 1.35 22.02 * 0.012 0.63 0.55 1.47 1.47 1.28 1.35 0.89
3.00 1.37 22.04 * 0.012 0.66 0.58 1.47 1.47 1.29 1.37 0.93
3.25 1.40 22.07 * 0.012 0.69 0.61 1.48 1.48 1.30 1.40 0.98
3.50 1.41 22.08 * 0.012 0.72 0.63 1.49 1.49 1.30 1.41 1.03
3.75 1.44 22.11 * 0.012 0.75 0.66 1.49 1.49 1.31 1.44 1.07
4.00 1.47 22.14 * 0.012 0.77 0.68 1.50 1.50 1.33 1.47 1.12
4.25 1.50 22.17 * 0.012 0.80 0.70 1.52 1.52 1.35 1.50 1.16
4.50 1.53 22.20 * 0.012 0.82 0.73 1.52 1.52 1.36 1.53 1.21
4.75 1.56 22.23 * 0.012 0.84 0.75 1.53 1.53 1.37 1.56 1.25
5.00 1.60 22.27 * 0.012 0.87 0.77 1.54 1.54 1.39 1.60 1.29
5.25 1.63 22.30 * 0.012 0.89 0.80 1.55 1.55 1.40 1.63 1.34
5.50 1.66 22.33 * 0.012 0.91 0.82 1.56 1.56 1.42 1.66 1.38
5.75 1.71 22.38 * 0.012 0.93 0.84 1.58 1.58 1.45 1.71 1.43
6.00 1.75 22.42 * 0.012 0.95 0.86 1.59 1.59 1.47 1.75 1.47
6.25 1.79 22.46 * 0.012 0.97 0.89 1.60 1.60 1.49 1.79 1.51
6.50 1.84 22.51 * 0.012 0.99 0.91 1.61 1.61 1.51 1.84 1.56
6.75 1.88 22.55 * 0.012 1.01 0.93 1.63 1.63 1.52 1.88 1.60
7.00 1.93 22.60 * 0.012 1.03 0.95 1.65 1.65 1.55 1.93 1.65
7.25 1.98 22.65 * 0.012 1.05 0.98 1.66 1.66 1.57 1.98 1.69
7.50 2.03 22.70 * 0.012 1.07 1.00 1.67 1.67 1.59 2.03 1.74
7.75 2.09 22.76 * 0.012 1.08 1.03 1.69 1.69 1.62 2.09 1.78
8.00 2.14 22.81 * 0.012 1.10 1.05 1.71 1.71 1.65 2.14 1.83
8.25 2.20 22.87 * 0.012 1.12 1.07 1.72 1.72 1.67 2.20 1.88
8.50 2.26 22.93 * 0.012 1.13 1.10 1.75 1.75 1.70 2.26 1.93
8.75 2.32 22.99 * 0.012 1.15 1.13 1.76 1.76 1.73 2.32 2.00
9.00 2.38 23.05 * 0.012 1.17 1.16 1.78 1.78 1.75 2.38 2.05
9.25 2.45 23.12 * 0.012 1.18 1.19 1.80 1.80 1.79 2.45 2.11
9.50 2.51 23.18 * 0.012 1.20 1.22 1.82 1.82 1.81 2.51 2.17
9.75 2.58 23.25 * 0.012 1.21 1.25 1.84 1.84 1.85 2.58 2.24
10.00 2.67 23.34 * 0.012 1.22 1.30 1.88 1.88 1.90 2.67 2.30
10.25 2.76 23.43 * 0.012 1.24 1.35 1.93 1.93 1.95 2.76 2.37
10.50 2.86 23.53 * 0.012 1.25 1.50 1.97 1.97 2.01 2.86 2.43
10.75 2.96 23.63 * 0.012 1.26 1.50 2.02 2.02 2.07 2.96 2.50
11.00 3.06 23.73 * 0.012 1.28 1.50 2.07 2.07 2.13 3.06 2.57
PIPE NO. 3: 7 LF - 18"CP @ 1.43% OUTLET: 20.67 INLET: 20.77 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 24.50 BEND: 90 DEG DIA/WIDTH: 8.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.11 1.16 21.93 * 0.012 0.13 0.10 1.25 1.25 1.16 1.16 0.15
0.22 1.16 21.93 * 0.012 0.18 0.14 1.25 1.25 1.16 1.16 0.22
0.33 1.16 21.93 * 0.012 0.22 0.17 1.26 1.26 1.16 1.16 0.28
0.44 1.16 21.93 * 0.012 0.25 0.19 1.26 1.26 1.16 1.16 0.32
0.56 1.17 21.94 * 0.012 0.28 0.21 1.27 1.27 1.17 1.17 0.36
0.67 1.20 21.97 * 0.012 0.31 0.23 1.28 1.28 1.19 1.20 0.40
0.78 1.20 21.97 * 0.012 0.33 0.25 1.29 1.29 1.19 1.20 0.44
0.89 1.21 21.98 * 0.012 0.36 0.26 1.30 1.30 1.20 1.21 0.47
1.00 1.23 22.00 * 0.012 0.38 0.28 1.32 1.32 1.22 1.23 0.50
1.11 1.24 22.01 * 0.012 0.40 0.29 1.33 1.33 1.23 1.24 0.53
1.22 1.27 22.04 * 0.012 0.42 0.31 1.35 1.35 1.25 1.27 0.56
1.33 1.30 22.07 * 0.012 0.44 0.32 1.37 1.37 1.28 1.30 0.59
1.44 1.32 22.09 * 0.012 0.46 0.34 1.40 1.40 1.30 1.32 0.61
1.56 1.34 22.11 * 0.012 0.47 0.35 1.41 1.41 1.32 1.34 0.64
1.67 1.37 22.14 * 0.012 0.49 0.36 1.44 1.44 1.34 1.37 0.66
1.78 1.41 22.18 * 0.012 0.51 0.37 1.47 1.47 1.38 1.41 0.69
1.89 1.44 22.21 * 0.012 0.52 0.38 1.50 1.50 1.41 1.44 0.71
2.00 1.48 22.25 * 0.012 0.54 0.39 1.53 1.53 1.44 1.48 0.74
2.11 1.51 22.28 * 0.012 0.55 0.40 1.56 1.56 1.47 1.51 0.76
2.22 1.54 22.31 * 0.012 0.57 0.42 1.60 1.60 1.50 1.54 0.78
2.33 1.58 22.35 * 0.012 0.58 0.43 1.63 1.63 1.53 1.58 0.81
2.44 1.62 22.39 * 0.012 0.60 0.44 1.66 1.66 1.57 1.62 0.83
2.56 1.67 22.44 * 0.012 0.61 0.45 1.71 1.71 1.61 1.67 0.85
2.67 1.72 22.49 * 0.012 0.62 0.46 1.75 1.75 1.65 1.72 0.88
2.78 1.77 22.54 * 0.012 0.64 0.46 1.79 1.79 1.70 1.77 0.90
2.89 1.82 22.59 * 0.012 0.65 0.47 1.84 1.84 1.74 1.82 0.92
3.00 1.86 22.63 * 0.012 0.66 0.48 1.88 1.88 1.78 1.86 0.94
3.11 1.92 22.69 * 0.012 0.68 0.49 1.93 1.93 1.84 1.92 0.96
3.22 1.98 22.75 * 0.012 0.69 0.50 1.98 1.98 1.89 1.98 0.98
3.33 2.04 22.81 * 0.012 0.70 0.51 2.03 2.03 1.94 2.04 1.01
3.44 2.10 22.87 * 0.012 0.71 0.52 2.09 2.09 2.00 2.10 1.03
3.56 2.16 22.93 * 0.012 0.72 0.53 2.14 2.14 2.05 2.16 1.05
3.67 2.23 23.00 * 0.012 0.74 0.54 2.20 2.20 2.10 2.23 1.07
3.78 2.30 23.07 * 0.012 0.75 0.55 2.26 2.26 2.17 2.30 1.09
3.89 2.36 23.13 * 0.012 0.76 0.55 2.32 2.32 2.23 2.36 1.11
4.00 2.43 23.20 * 0.012 0.77 0.56 2.38 2.38 2.29 2.43 1.13
4.11 2.51 23.28 * 0.012 0.78 0.57 2.45 2.45 2.36 2.51 1.15
4.22 2.58 23.35 * 0.012 0.79 0.58 2.51 2.51 2.42 2.58 1.17
4.33 2.66 23.43 * 0.012 0.80 0.59 2.58 2.58 2.49 2.66 1.20
4.44 2.76 23.53 * 0.012 0.81 0.60 2.67 2.67 2.58 2.76 1.22
4.56 2.86 23.63 * 0.012 0.82 0.60 2.76 2.76 2.68 2.86 1.24
4.67 2.97 23.74 * 0.012 0.83 0.61 2.86 2.86 2.77 2.97 1.26
4.78 3.08 23.85 * 0.012 0.85 0.62 2.96 2.96 2.87 3.08 1.28
4.89 3.19 23.96 * 0.012 0.86 0.63 3.06 3.06 2.98 3.19 1.30
PIPE NO. 4: 15 LF - 18"CP @ 1.33% OUTLET: 21.19 INLET: 21.39 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 24.85 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 2.12
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.11 0.54 21.93 * 0.012 0.13 0.10 0.74 0.74 0.54 0.54 0.15
0.22 0.54 21.93 * 0.012 0.18 0.14 0.74 0.74 0.54 0.54 0.22
0.33 0.55 21.94 * 0.012 0.22 0.17 0.74 0.74 0.54 0.55 0.28
0.44 0.55 21.94 * 0.012 0.25 0.19 0.74 0.74 0.54 0.55 0.32
0.56 0.57 21.96 * 0.012 0.28 0.22 0.75 0.75 0.55 0.57 0.36
0.67 0.60 21.99 * 0.012 0.31 0.23 0.78 0.78 0.57 0.60 0.40
0.78 0.61 22.00 * 0.012 0.33 0.25 0.78 0.78 0.57 0.61 0.43
0.89 0.63 22.02 * 0.012 0.36 0.27 0.79 0.79 0.58 0.63 0.47
1.00 0.65 22.04 * 0.012 0.38 0.28 0.81 0.81 0.60 0.65 0.50
1.11 0.67 22.06 * 0.012 0.40 0.30 0.82 0.82 0.61 0.67 0.53
1.22 0.71 22.10 * 0.012 0.42 0.31 0.85 0.85 0.64 0.71 0.56
1.33 0.74 22.13 * 0.012 0.44 0.33 0.88 0.88 0.67 0.74 0.58
1.44 0.77 22.16 * 0.012 0.46 0.34 0.90 0.90 0.69 0.77 0.61
1.56 0.79 22.18 * 0.012 0.47 0.35 0.92 0.92 0.71 0.79 0.63
1.67 0.82 22.21 * 0.012 0.49 0.37 0.95 0.95 0.73 0.82 0.66
1.78 0.86 22.25 * 0.012 0.51 0.38 0.99 0.99 0.78 0.86 0.68
1.89 0.90 22.29 * 0.012 0.52 0.39 1.02 1.02 0.81 0.90 0.71
2.00 0.94 22.33 * 0.012 0.54 0.40 1.06 1.06 0.85 0.94 0.73
2.11 0.97 22.36 * 0.012 0.55 0.41 1.09 1.09 0.88 0.97 0.75
2.22 1.01 22.40 * 0.012 0.57 0.42 1.12 1.12 0.92 1.01 0.78
2.33 1.04 22.43 * 0.012 0.58 0.43 1.16 1.16 0.95 1.04 0.80
2.44 1.08 22.47 * 0.012 0.60 0.44 1.20 1.20 0.99 1.08 0.82
2.56 1.13 22.52 * 0.012 0.61 0.45 1.25 1.25 1.05 1.13 0.84
2.67 1.18 22.57 * 0.012 0.62 0.46 1.30 1.30 1.10 1.18 0.86
2.78 1.23 22.62 * 0.012 0.64 0.47 1.35 1.35 1.15 1.23 0.88
2.89 1.28 22.67 * 0.012 0.65 0.48 1.40 1.40 1.20 1.28 0.90
3.00 1.33 22.72 * 0.012 0.66 0.49 1.44 1.44 1.25 1.33 0.92
3.11 1.39 22.78 * 0.012 0.68 0.50 1.50 1.50 1.31 1.39 0.95
3.22 1.45 22.84 * 0.012 0.69 0.51 1.56 1.56 1.37 1.45 0.97
3.33 1.51 22.90 * 0.012 0.70 0.52 1.62 1.62 1.43 1.51 0.99
3.44 1.58 22.97 * 0.012 0.71 0.53 1.68 1.68 1.50 1.58 1.00
3.56 1.65 23.04 * 0.012 0.72 0.54 1.74 1.74 1.56 1.65 1.02
3.67 1.72 23.11 * 0.012 0.74 0.55 1.81 1.81 1.62 1.72 1.04
3.78 1.80 23.19 * 0.012 0.75 0.56 1.88 1.88 1.69 1.80 1.06
3.89 1.87 23.26 * 0.012 0.76 0.56 1.94 1.94 1.76 1.87 1.08
4.00 1.94 23.33 * 0.012 0.77 0.57 2.01 2.01 1.83 1.94 1.10
4.11 2.03 23.42 * 0.012 0.78 0.58 2.09 2.09 1.91 2.03 1.12
4.22 2.11 23.50 * 0.012 0.79 0.59 2.16 2.16 1.98 2.11 1.14
4.33 2.20 23.59 * 0.012 0.80 0.60 2.24 2.24 2.06 2.20 1.16
4.44 2.30 23.69 * 0.012 0.81 0.61 2.34 2.34 2.16 2.30 1.18
4.56 2.42 23.81 * 0.012 0.82 0.61 2.44 2.44 2.27 2.42 1.20
4.67 2.53 23.92 * 0.012 0.83 0.62 2.55 2.55 2.38 2.53 1.22
4.78 2.65 24.04 * 0.012 0.85 0.63 2.66 2.66 2.49 2.65 1.24
4.89 2.77 24.16 * 0.012 0.86 0.64 2.77 2.77 2.60 2.77 1.25
PIPE NO. 5: 45 LF - 12"CP @ 1.13% OUTLET: 21.39 INLET: 21.90 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 24.91 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.35
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.04 0.11 22.01 * 0.012 0.08 0.07 0.54 0.54 0.09 0.11 0.10
0.07 0.16 22.06 * 0.012 0.11 0.10 0.54 0.54 0.12 0.16 0.14
0.11 0.17 22.07 * 0.012 0.14 0.12 0.55 0.55 0.14 ***** 0.17
0.14 0.20 22.10 * 0.012 0.16 0.13 0.55 0.55 0.16 ***** 0.20
0.18 0.23 22.13 * 0.012 0.18 0.15 0.57 0.57 0.18 ***** 0.23
0.21 0.25 22.15 * 0.012 0.19 0.16 0.60 0.60 0.19 ***** 0.25
0.25 0.27 22.17 * 0.012 0.21 0.17 0.61 0.61 0.21 ***** 0.27
0.28 0.29 22.19 * 0.012 0.22 0.18 0.63 0.63 0.22 ***** 0.29
0.32 0.31 22.21 * 0.012 0.24 0.19 0.65 0.65 0.24 ***** 0.31
0.36 0.33 22.23 * 0.012 0.25 0.20 0.67 0.67 0.25 ***** 0.33
0.39 0.35 22.25 * 0.012 0.26 0.21 0.71 0.71 0.26 ***** 0.35
0.43 0.36 22.26 * 0.012 0.28 0.22 0.74 0.74 0.28 ***** 0.36
0.46 0.38 22.28 * 0.012 0.29 0.23 0.77 0.77 0.29 ***** 0.38
0.50 0.39 22.29 * 0.012 0.30 0.24 0.79 0.79 0.30 ***** 0.39
0.53 0.46 22.36 * 0.012 0.31 0.25 0.82 0.82 0.32 0.46 0.41
0.57 0.47 22.37 * 0.012 0.32 0.26 0.86 0.86 0.36 0.47 0.42
0.61 0.49 22.39 * 0.012 0.33 0.26 0.90 0.90 0.39 0.49 0.44
0.64 0.52 22.42 * 0.012 0.34 0.27 0.94 0.94 0.43 0.52 0.45
0.68 0.54 22.44 * 0.012 0.35 0.28 0.97 0.97 0.46 0.54 0.47
0.71 0.57 22.47 * 0.012 0.36 0.29 1.01 1.01 0.50 0.57 0.48
0.75 0.60 22.50 * 0.012 0.37 0.29 1.04 1.04 0.54 0.60 0.49
0.78 0.64 22.54 * 0.012 0.37 0.30 1.08 1.08 0.58 0.64 0.50
0.82 0.69 22.59 * 0.012 0.38 0.31 1.13 1.13 0.64 0.69 0.52
0.85 0.73 22.63 * 0.012 0.39 0.31 1.18 1.18 0.69 0.73 0.53
0.89 0.78 22.68 * 0.012 0.40 0.32 1.23 1.23 0.74 0.78 0.54
0.93 0.84 22.74 * 0.012 0.41 0.33 1.28 1.28 0.80 0.84 0.55
0.96 0.88 22.78 * 0.012 0.42 0.33 1.33 1.33 0.85 0.88 0.57
1.00 0.94 22.84 * 0.012 0.42 0.34 1.39 1.39 0.91 0.94 0.58
1.03 1.01 22.91 * 0.012 0.43 0.35 1.45 1.45 0.98 1.01 0.59
1.07 1.07 22.97 * 0.012 0.44 0.35 1.51 1.51 1.04 1.07 0.60
1.10 1.14 23.04 * 0.012 0.45 0.36 1.58 1.58 1.11 1.14 0.61
1.14 1.22 23.12 * 0.012 0.45 0.37 1.65 1.65 1.18 1.22 0.62
1.18 1.29 23.19 * 0.012 0.46 0.37 1.72 1.72 1.25 1.29 0.63
1.21 1.37 23.27 * 0.012 0.47 0.38 1.80 1.80 1.33 1.37 0.65
1.25 1.45 23.35 * 0.012 0.48 0.38 1.87 1.87 1.41 1.45 0.66
1.28 1.53 23.43 * 0.012 0.48 0.39 1.94 1.94 1.48 1.53 0.67
1.32 1.62 23.52 * 0.012 0.49 0.39 2.03 2.03 1.57 1.62 0.68
1.35 1.71 23.61 * 0.012 0.50 0.40 2.11 2.11 1.66 1.71 0.69
1.39 1.80 23.70 * 0.012 0.50 0.41 2.20 2.20 1.74 1.80 0.70
1.42 1.91 23.81 * 0.012 0.51 0.41 2.30 2.30 1.85 1.91 0.71
1.46 2.03 23.93 * 0.012 0.52 0.42 2.42 2.42 1.97 2.03 0.72
1.50 2.15 24.05 * 0.012 0.52 0.42 2.53 2.53 2.09 2.15 0.73
1.53 2.27 24.17 * 0.012 0.53 0.43 2.65 2.65 2.21 2.27 0.74
1.57 2.40 24.30 * 0.012 0.54 0.43 2.77 2.77 2.33 2.40 0.75
PIPE NO. 6: 100 LF - 12"CP @ 0.58% OUTLET: 21.90 INLET: 22.48 INTYP: 5
JUNC NO. 6: OVERFLOW-EL: 26.23 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.06
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.03 0.10 22.58 * 0.012 0.07 0.07 0.11 0.11 0.07 0.10 0.09
0.05 0.14 22.62 * 0.012 0.10 0.10 0.16 0.16 0.10 0.14 0.12
0.08 0.17 22.65 * 0.012 0.12 0.12 0.17 0.17 0.12 0.17 0.15
0.11 0.18 22.66 * 0.012 0.14 0.13 0.20 0.20 0.14 ***** 0.18
0.13 0.22 22.70 * 0.012 0.15 0.15 0.23 0.23 0.15 0.22 0.20
0.16 0.22 22.70 * 0.012 0.17 0.16 0.25 0.25 0.17 ***** 0.22
0.18 0.23 22.71 * 0.012 0.18 0.17 0.27 0.27 0.18 ***** 0.23
0.21 0.29 22.77 * 0.012 0.19 0.19 0.29 0.29 0.19 0.29 0.25
0.24 0.27 22.75 * 0.012 0.21 0.20 0.31 0.31 0.21 ***** 0.27
0.26 0.28 22.76 * 0.012 0.22 0.21 0.33 0.33 0.22 ***** 0.28
0.29 0.30 22.78 * 0.012 0.23 0.22 0.35 0.35 0.23 ***** 0.30
0.32 0.31 22.79 * 0.012 0.24 0.23 0.36 0.36 0.24 ***** 0.31
0.34 0.32 22.80 * 0.012 0.25 0.24 0.38 0.38 0.25 ***** 0.32
0.37 0.34 22.82 * 0.012 0.26 0.24 0.39 0.39 0.26 ***** 0.34
0.40 0.35 22.83 * 0.012 0.26 0.25 0.46 0.46 0.26 ***** 0.35
0.42 0.36 22.84 * 0.012 0.27 0.26 0.47 0.47 0.27 ***** 0.36
0.45 0.37 22.85 * 0.012 0.28 0.27 0.49 0.49 0.28 ***** 0.37
0.47 0.38 22.86 * 0.012 0.29 0.28 0.52 0.52 0.29 ***** 0.38
0.50 0.40 22.88 * 0.012 0.30 0.28 0.54 0.54 0.30 ***** 0.40
0.53 0.41 22.89 * 0.012 0.31 0.29 0.57 0.57 0.31 ***** 0.41
0.55 0.42 22.90 * 0.012 0.31 0.30 0.60 0.60 0.31 ***** 0.42
0.58 0.43 22.91 * 0.012 0.32 0.31 0.64 0.64 0.32 ***** 0.43
0.61 0.44 22.92 * 0.012 0.33 0.31 0.69 0.69 0.33 ***** 0.44
0.63 0.45 22.93 * 0.012 0.34 0.32 0.73 0.73 0.34 ***** 0.45
0.66 0.51 22.99 * 0.012 0.34 0.33 0.78 0.78 0.35 0.51 0.46
0.69 0.52 23.00 * 0.012 0.35 0.33 0.84 0.84 0.37 0.52 0.47
0.71 0.53 23.01 * 0.012 0.36 0.34 0.88 0.88 0.40 0.53 0.48
0.74 0.54 23.02 * 0.012 0.36 0.35 0.94 0.94 0.44 0.54 0.49
0.77 0.57 23.05 * 0.012 0.37 0.35 1.01 1.01 0.49 0.57 0.49
0.79 0.61 23.09 * 0.012 0.38 0.36 1.07 1.07 0.55 0.61 0.50
0.82 0.67 23.15 * 0.012 0.38 0.37 1.14 1.14 0.62 0.67 0.51
0.84 0.72 23.20 * 0.012 0.39 0.37 1.22 1.22 0.68 0.72 0.52
0.87 0.79 23.27 * 0.012 0.40 0.38 1.29 1.29 0.76 0.79 0.53
0.90 0.86 23.34 * 0.012 0.40 0.38 1.37 1.37 0.84 0.86 0.54
0.92 0.95 23.43 * 0.012 0.41 0.39 1.45 1.45 0.93 0.95 0.55
0.95 1.04 23.52 * 0.012 0.41 0.40 1.53 1.53 1.02 1.04 0.56
0.98 1.12 23.60 * 0.012 0.42 0.40 1.62 1.62 1.11 1.12 0.56
1.00 1.21 23.69 * 0.012 0.43 0.41 1.71 1.71 1.19 1.21 0.57
1.03 1.31 23.79 * 0.012 0.43 0.41 1.80 1.80 1.29 1.31 0.58
1.06 1.42 23.90 * 0.012 0.44 0.42 1.91 1.91 1.41 1.42 0.59
1.08 1.55 24.03 * 0.012 0.44 0.42 2.03 2.03 1.53 1.55 0.60
1.11 1.67 24.15 * 0.012 0.45 0.43 2.15 2.15 1.65 1.67 0.60
1.13 1.80 24.28 * 0.012 0.45 0.44 2.27 2.27 1.78 1.80 0.61
1.16 1.94 24.42 * 0.012 0.46 0.44 2.40 2.40 1.91 1.94 0.62
PIPE NO. 7: 65 LF - 12"CP @ 0.51% OUTLET: 22.48 INLET: 22.81 INTYP: 5
JUNC NO. 7: OVERFLOW-EL: 27.07 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.02 0.09 22.90 * 0.012 0.07 0.07 0.10 0.10 0.07 0.09 0.08
0.05 0.13 22.94 * 0.012 0.10 0.10 0.14 0.14 0.10 0.13 0.12
0.07 0.17 22.98 * 0.012 0.12 0.12 0.17 0.17 0.12 0.17 0.15
0.10 0.19 23.00 * 0.012 0.13 0.14 0.18 0.18 0.14 0.19 0.17
0.12 0.22 23.03 * 0.012 0.15 0.15 0.22 0.22 0.15 0.22 0.19
0.15 0.24 23.05 * 0.012 0.16 0.16 0.22 0.22 0.16 0.24 0.21
0.17 0.26 23.07 * 0.012 0.18 0.18 0.23 0.23 0.18 0.26 0.23
0.20 0.27 23.08 * 0.012 0.19 0.19 0.29 0.29 0.19 0.27 0.24
0.22 0.29 23.10 * 0.012 0.20 0.20 0.27 0.27 0.20 0.29 0.26
0.25 0.31 23.12 * 0.012 0.21 0.21 0.28 0.28 0.21 0.31 0.27
0.27 0.32 23.13 * 0.012 0.22 0.22 0.30 0.30 0.22 0.32 0.29
0.30 0.34 23.15 * 0.012 0.23 0.23 0.31 0.31 0.23 0.34 0.30
0.32 0.35 23.16 * 0.012 0.24 0.24 0.32 0.32 0.24 0.35 0.31
0.35 0.37 23.18 * 0.012 0.25 0.25 0.34 0.34 0.25 0.37 0.33
0.37 0.34 23.15 * 0.012 0.26 0.25 0.35 0.35 0.26 ***** 0.34
0.40 0.35 23.16 * 0.012 0.27 0.26 0.36 0.36 0.27 ***** 0.35
0.42 0.41 23.22 * 0.012 0.27 0.27 0.37 0.37 0.27 0.41 0.36
0.45 0.42 23.23 * 0.012 0.28 0.28 0.38 0.38 0.28 0.42 0.37
0.47 0.43 23.24 * 0.012 0.29 0.29 0.40 0.40 0.29 0.43 0.38
0.50 0.39 23.20 * 0.012 0.30 0.29 0.41 0.41 0.30 ***** 0.39
0.52 0.41 23.22 * 0.012 0.31 0.30 0.42 0.42 0.31 ***** 0.41
0.55 0.47 23.28 * 0.012 0.31 0.31 0.43 0.43 0.31 0.47 0.41
0.57 0.42 23.23 * 0.012 0.32 0.31 0.44 0.44 0.32 ***** 0.42
0.60 0.43 23.24 * 0.012 0.33 0.32 0.45 0.45 0.33 ***** 0.43
0.62 0.50 23.31 * 0.012 0.33 0.33 0.51 0.51 0.33 0.50 0.44
0.65 0.51 23.32 * 0.012 0.34 0.34 0.52 0.52 0.34 0.51 0.45
0.67 0.46 23.27 * 0.012 0.35 0.34 0.53 0.53 0.35 ***** 0.46
0.70 0.53 23.34 * 0.012 0.35 0.35 0.54 0.54 0.35 0.53 0.47
0.72 0.48 23.29 * 0.012 0.36 0.35 0.57 0.57 0.36 ***** 0.48
0.75 0.49 23.30 * 0.012 0.37 0.36 0.61 0.61 0.37 ***** 0.49
0.77 0.55 23.36 * 0.012 0.37 0.37 0.67 0.67 0.40 0.55 0.50
0.80 0.56 23.37 * 0.012 0.38 0.37 0.72 0.72 0.44 0.56 0.51
0.82 0.58 23.39 * 0.012 0.38 0.38 0.79 0.79 0.49 0.58 0.51
0.85 0.63 23.44 * 0.012 0.39 0.39 0.86 0.86 0.56 0.63 0.52
0.87 0.69 23.50 * 0.012 0.40 0.39 0.95 0.95 0.64 0.69 0.53
0.90 0.77 23.58 * 0.012 0.40 0.40 1.04 1.04 0.74 0.77 0.54
0.92 0.85 23.66 * 0.012 0.41 0.40 1.12 1.12 0.83 0.85 0.55
0.95 0.94 23.75 * 0.012 0.41 0.41 1.21 1.21 0.92 0.94 0.56
0.97 1.04 23.85 * 0.012 0.42 0.42 1.31 1.31 1.02 1.04 0.56
1.00 1.16 23.97 * 0.012 0.42 0.42 1.42 1.42 1.14 1.16 0.57
1.02 1.28 24.09 * 0.012 0.43 0.43 1.55 1.55 1.26 1.28 0.58
1.05 1.41 24.22 * 0.012 0.43 0.43 1.67 1.67 1.39 1.41 0.59
1.07 1.54 24.35 * 0.012 0.44 0.44 1.80 1.80 1.52 1.54 0.59
1.10 1.68 24.49 * 0.012 0.45 0.44 1.94 1.94 1.66 1.68 0.60
PIPE NO. 8: 43 LF - 12"CP @ 0.51% OUTLET: 22.81 INLET: 23.03 INTYP: 5
JUNC NO. 8: OVERFLOW-EL: 27.40 BEND: 60 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.02 0.09 23.12 * 0.012 0.07 0.07 0.09 0.09 0.07 0.09 0.08
0.05 0.13 23.16 * 0.012 0.10 0.10 0.13 0.13 0.10 0.13 0.12
0.07 0.17 23.20 * 0.012 0.12 0.12 0.17 0.17 0.12 0.17 0.15
0.10 0.19 23.22 * 0.012 0.13 0.13 0.19 0.19 0.13 0.19 0.17
0.12 0.22 23.25 * 0.012 0.15 0.15 0.22 0.22 0.15 0.22 0.19
0.15 0.24 23.27 * 0.012 0.16 0.16 0.24 0.24 0.16 0.24 0.21
0.17 0.26 23.29 * 0.012 0.18 0.18 0.26 0.26 0.18 0.26 0.23
0.20 0.28 23.31 * 0.012 0.19 0.19 0.27 0.27 0.19 0.28 0.24
0.22 0.29 23.32 * 0.012 0.20 0.20 0.29 0.29 0.20 0.29 0.26
0.25 0.31 23.34 * 0.012 0.21 0.21 0.31 0.31 0.21 0.31 0.27
0.27 0.33 23.36 * 0.012 0.22 0.22 0.32 0.32 0.22 0.33 0.29
0.30 0.34 23.37 * 0.012 0.23 0.23 0.34 0.34 0.23 0.34 0.30
0.32 0.36 23.39 * 0.012 0.24 0.24 0.35 0.35 0.24 0.36 0.32
0.35 0.33 23.36 * 0.012 0.25 0.24 0.37 0.37 0.25 ***** 0.33
0.37 0.34 23.37 * 0.012 0.26 0.25 0.34 0.34 0.26 ***** 0.34
0.40 0.35 23.38 * 0.012 0.27 0.26 0.35 0.35 0.27 ***** 0.35
0.42 0.41 23.44 * 0.012 0.27 0.27 0.41 0.41 0.27 0.41 0.36
0.45 0.42 23.45 * 0.012 0.28 0.28 0.42 0.42 0.28 0.42 0.38
0.47 0.43 23.46 * 0.012 0.29 0.29 0.43 0.43 0.29 0.43 0.39
0.50 0.40 23.43 * 0.012 0.30 0.29 0.39 0.39 0.30 ***** 0.40
0.52 0.41 23.44 * 0.012 0.31 0.30 0.41 0.41 0.31 ***** 0.41
0.55 0.47 23.50 * 0.012 0.31 0.31 0.47 0.47 0.31 0.47 0.42
0.57 0.43 23.46 * 0.012 0.32 0.31 0.42 0.42 0.32 ***** 0.43
0.60 0.44 23.47 * 0.012 0.33 0.32 0.43 0.43 0.33 ***** 0.44
0.62 0.50 23.53 * 0.012 0.33 0.33 0.50 0.50 0.33 0.50 0.45
0.65 0.46 23.49 * 0.012 0.34 0.33 0.51 0.51 0.34 ***** 0.46
0.67 0.47 23.50 * 0.012 0.35 0.34 0.46 0.46 0.35 ***** 0.47
0.70 0.53 23.56 * 0.012 0.35 0.35 0.53 0.53 0.36 0.53 0.48
0.72 0.49 23.52 * 0.012 0.36 0.35 0.48 0.48 0.36 ***** 0.49
0.75 0.50 23.53 * 0.012 0.37 0.36 0.49 0.49 0.37 ***** 0.50
0.77 0.56 23.59 * 0.012 0.37 0.37 0.55 0.55 0.38 0.56 0.50
0.80 0.51 23.54 * 0.012 0.38 0.37 0.56 0.56 0.38 ***** 0.51
0.82 0.58 23.61 * 0.012 0.38 0.38 0.58 0.58 0.40 0.58 0.52
0.85 0.58 23.61 * 0.012 0.39 0.38 0.63 0.63 0.44 0.58 0.53
0.87 0.60 23.63 * 0.012 0.40 0.39 0.69 0.69 0.49 0.60 0.54
0.90 0.65 23.68 * 0.012 0.40 0.40 0.77 0.77 0.57 0.65 0.55
0.92 0.71 23.74 * 0.012 0.41 0.40 0.85 0.85 0.65 0.71 0.56
0.95 0.79 23.82 * 0.012 0.41 0.41 0.94 0.94 0.74 0.79 0.56
0.97 0.88 23.91 * 0.012 0.42 0.41 1.04 1.04 0.84 0.88 0.57
1.00 1.00 24.03 * 0.012 0.42 0.42 1.16 1.16 0.97 1.00 0.58
1.02 1.13 24.16 * 0.012 0.43 0.43 1.28 1.28 1.10 1.13 0.59
1.05 1.25 24.28 * 0.012 0.43 0.43 1.41 1.41 1.22 1.25 0.60
1.07 1.39 24.42 * 0.012 0.44 0.44 1.54 1.54 1.36 1.39 0.61
1.10 1.53 24.56 * 0.012 0.45 0.44 1.68 1.68 1.49 1.53 0.61
PIPE NO. 9: 99 LF - 12"CP @ 0.51% OUTLET: 23.03 INLET: 23.53 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.02 0.07 23.60 * 0.012 0.07 0.07 0.09 0.09 0.07 -0.04 -0.06
0.05 0.10 23.63 * 0.012 0.10 0.10 0.13 0.13 0.10 0.00 -0.02
0.07 0.12 23.65 * 0.012 0.12 0.12 0.17 0.17 0.12 0.03 0.01
0.10 0.14 23.67 * 0.012 0.13 0.14 0.19 0.19 0.14 0.05 0.03
0.12 0.15 23.68 * 0.012 0.15 0.15 0.22 0.22 0.15 0.08 0.05
0.15 0.16 23.69 * 0.012 0.16 0.16 0.24 0.24 0.16 0.10 0.07
0.17 0.18 23.71 * 0.012 0.18 0.18 0.26 0.26 0.18 0.12 0.09
0.20 0.19 23.72 * 0.012 0.19 0.19 0.28 0.28 0.19 0.14 0.11
0.22 0.20 23.73 * 0.012 0.20 0.20 0.29 0.29 0.20 0.15 0.12
0.25 0.21 23.74 * 0.012 0.21 0.21 0.31 0.31 0.21 0.17 0.14
0.27 0.22 23.75 * 0.012 0.22 0.22 0.33 0.33 0.22 0.19 0.15
0.30 0.23 23.76 * 0.012 0.23 0.23 0.34 0.34 0.23 0.20 0.16
0.32 0.24 23.77 * 0.012 0.24 0.24 0.36 0.36 0.24 0.22 0.18
0.35 0.25 23.78 * 0.012 0.25 0.25 0.33 0.33 0.25 0.23 0.19
0.37 0.26 23.79 * 0.012 0.26 0.25 0.34 0.34 0.26 ***** 0.25
0.40 0.27 23.80 * 0.012 0.27 0.26 0.35 0.35 0.27 ***** 0.26
0.42 0.27 23.80 * 0.012 0.27 0.27 0.41 0.41 0.27 0.27 0.23
0.45 0.29 23.82 * 0.012 0.28 0.28 0.42 0.42 0.28 0.29 0.24
0.47 0.30 23.83 * 0.012 0.29 0.29 0.43 0.43 0.29 0.30 0.25
0.50 0.30 23.83 * 0.012 0.30 0.29 0.40 0.40 0.30 ***** 0.29
0.52 0.31 23.84 * 0.012 0.31 0.30 0.41 0.41 0.31 ***** 0.30
0.55 0.33 23.86 * 0.012 0.31 0.31 0.47 0.47 0.31 0.33 0.28
0.57 0.34 23.87 * 0.012 0.32 0.32 0.43 0.43 0.32 0.34 0.29
0.60 0.33 23.86 * 0.012 0.33 0.32 0.44 0.44 0.33 ***** 0.32
0.62 0.37 23.90 * 0.012 0.33 0.33 0.50 0.50 0.33 0.37 0.31
0.65 0.38 23.91 * 0.012 0.34 0.34 0.46 0.46 0.34 0.38 0.32
0.67 0.35 23.88 * 0.012 0.35 0.34 0.47 0.47 0.35 ***** 0.34
0.70 0.40 23.93 * 0.012 0.35 0.35 0.53 0.53 0.35 0.40 0.34
0.72 0.41 23.94 * 0.012 0.36 0.36 0.49 0.49 0.36 0.41 0.35
0.75 0.37 23.90 * 0.012 0.37 0.36 0.50 0.50 0.37 ***** 0.36
0.77 0.43 23.96 * 0.012 0.37 0.37 0.56 0.56 0.37 0.43 0.37
0.80 0.38 23.91 * 0.012 0.38 0.37 0.51 0.51 0.38 ***** 0.38
0.82 0.45 23.98 * 0.012 0.38 0.38 0.58 0.58 0.38 0.45 0.39
0.85 0.46 23.99 * 0.012 0.39 0.39 0.58 0.58 0.39 0.46 0.40
0.87 0.41 23.94 * 0.012 0.40 0.39 0.60 0.60 0.40 ***** 0.41
0.90 0.48 24.01 * 0.012 0.40 0.40 0.65 0.65 0.40 0.48 0.42
0.92 0.43 23.96 * 0.012 0.41 0.40 0.71 0.71 0.41 ***** 0.43
0.95 0.49 24.02 * 0.012 0.41 0.41 0.79 0.79 0.43 0.49 0.43
0.97 0.50 24.03 * 0.012 0.42 0.42 0.88 0.88 0.48 0.50 0.44
1.00 0.57 24.10 * 0.012 0.42 0.42 1.00 1.00 0.57 0.54 0.45
1.02 0.70 24.23 * 0.012 0.43 0.43 1.13 1.13 0.70 0.63 0.46
1.05 0.82 24.35 * 0.012 0.43 0.43 1.25 1.25 0.82 0.73 0.47
1.07 0.96 24.49 * 0.012 0.44 0.44 1.39 1.39 0.96 0.87 0.48
1.10 1.11 24.64 * 0.012 0.45 0.44 1.53 1.53 1.11 1.02 0.49
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 203-57 to CB 201-10.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.2 feet
Discharge Range:0.2 to 1.5 Step of 0.2 [cfs]
Overflow Elevation:28. feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 23 LF - 12"CP @ 3.65% OUTLET: 22.48 INLET: 23.32 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 26.58 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 0.23 23.55 * 0.012 0.19 0.12 0.72 0.72 0.19 ***** 0.23
0.40 0.34 23.66 * 0.012 0.27 0.16 0.72 0.72 0.27 ***** 0.34
0.60 0.43 23.75 * 0.012 0.33 0.20 0.72 0.72 0.33 ***** 0.43
0.80 0.50 23.82 * 0.012 0.38 0.23 0.72 0.72 0.38 ***** 0.50
1.00 0.57 23.89 * 0.012 0.43 0.25 0.72 0.72 0.43 ***** 0.57
1.20 0.64 23.96 * 0.012 0.47 0.28 0.72 0.72 0.47 ***** 0.64
1.40 0.71 24.03 * 0.012 0.51 0.30 0.72 0.72 0.51 ***** 0.71
1.60 0.77 24.09 * 0.012 0.54 0.32 0.72 0.72 0.54 ***** 0.77
PIPE NO. 2: 55 LF - 12"CP @ 0.51% OUTLET: 22.82 INLET: 23.10 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 0.46 23.56 * 0.012 0.19 0.19 0.73 0.73 0.46 0.33 0.11
0.40 0.57 23.67 * 0.012 0.27 0.26 0.84 0.84 0.57 0.45 0.26
0.60 0.66 23.76 * 0.012 0.33 0.32 0.93 0.93 0.66 0.55 0.32
0.80 0.75 23.85 * 0.012 0.38 0.37 1.00 1.00 0.75 0.65 0.38
1.00 0.83 23.93 * 0.012 0.43 0.42 1.07 1.07 0.83 0.74 0.45
1.20 0.91 24.01 * 0.012 0.47 0.47 1.14 1.14 0.91 0.83 0.52
1.40 1.01 24.11 * 0.012 0.51 0.51 1.21 1.21 1.01 0.94 0.59
1.60 1.09 24.19 * 0.012 0.54 0.55 1.27 1.27 1.09 1.04 0.65
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 203-73 to CB 201-09.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.43 feet
Discharge Range:0.1 to 0.5 Step of 0.1 [cfs]
Overflow Elevation:25.24 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 27 LF - 12"CP @ 0.52% OUTLET: 21.90 INLET: 22.04 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.40 23.44 * 0.012 0.13 0.13 1.53 1.53 1.40 1.26 0.03
0.20 1.39 23.43 * 0.012 0.19 0.19 1.53 1.53 1.39 1.25 0.11
0.30 1.39 23.43 * 0.012 0.23 0.23 1.53 1.53 1.39 1.26 0.16
0.40 1.39 23.43 * 0.012 0.27 0.26 1.53 1.53 1.39 1.26 0.26
0.50 1.39 23.43 * 0.012 0.30 0.29 1.53 1.53 1.39 1.26 0.29
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 205-49 to CB 201-48.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.33 feet
Discharge Range:0.2 to 3. Step of 0.2 [cfs]
Overflow Elevation:27.69 feet
Weir:NONE
Upstream Velocity:2.98 feet/sec
PIPE NO. 1: 50 LF - 12"CP @ 0.50% OUTLET: 21.39 INLET: 21.64 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 24.64 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 1.70 23.34 * 0.012 0.19 0.19 1.94 1.94 1.70 1.70 0.24
0.40 1.70 23.34 * 0.012 0.27 0.26 1.94 1.94 1.70 1.70 0.35
0.60 1.71 23.35 * 0.012 0.33 0.32 1.94 1.94 1.70 1.71 0.43
0.80 1.72 23.36 * 0.012 0.38 0.38 1.94 1.94 1.71 1.72 0.50
1.00 1.74 23.38 * 0.012 0.43 0.42 1.94 1.94 1.72 1.74 0.57
1.20 1.76 23.40 * 0.012 0.47 0.47 1.94 1.94 1.74 1.76 0.62
1.40 1.78 23.42 * 0.012 0.51 0.51 1.94 1.94 1.76 1.78 0.68
1.60 1.81 23.45 * 0.012 0.54 0.56 1.94 1.94 1.78 1.81 0.73
1.80 1.84 23.48 * 0.012 0.58 0.60 1.94 1.94 1.80 1.84 0.77
2.00 1.88 23.52 * 0.012 0.61 0.64 1.94 1.94 1.82 1.88 0.82
2.20 1.92 23.56 * 0.012 0.64 0.69 1.94 1.94 1.85 1.92 0.86
2.40 1.96 23.60 * 0.012 0.67 0.73 1.94 1.94 1.88 1.96 0.90
2.60 2.01 23.65 * 0.012 0.70 0.79 1.94 1.94 1.92 2.01 0.94
2.80 2.06 23.70 * 0.012 0.72 0.85 1.94 1.94 1.95 2.06 0.98
3.00 2.11 23.75 * 0.012 0.75 1.00 1.94 1.94 1.99 2.11 1.02
PIPE NO. 2: 78 LF - 12"CP @ 0.67% OUTLET: 21.64 INLET: 22.16 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 25.17 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 1.19 23.35 * 0.012 0.19 0.18 1.70 1.70 1.19 1.19 0.24
0.40 1.19 23.35 * 0.012 0.27 0.25 1.70 1.70 1.19 1.19 0.35
0.60 1.21 23.37 * 0.012 0.33 0.30 1.71 1.71 1.21 1.21 0.43
0.80 1.24 23.40 * 0.012 0.38 0.35 1.72 1.72 1.23 1.24 0.50
1.00 1.28 23.44 * 0.012 0.43 0.39 1.74 1.74 1.27 1.28 0.57
1.20 1.33 23.49 * 0.012 0.47 0.43 1.76 1.76 1.31 1.33 0.63
1.40 1.39 23.55 * 0.012 0.51 0.47 1.78 1.78 1.36 1.39 0.68
1.60 1.46 23.62 * 0.012 0.54 0.51 1.81 1.81 1.42 1.46 0.73
1.80 1.54 23.70 * 0.012 0.58 0.55 1.84 1.84 1.49 1.54 0.78
2.00 1.62 23.78 * 0.012 0.61 0.58 1.88 1.88 1.57 1.62 0.82
2.20 1.72 23.88 * 0.012 0.64 0.62 1.92 1.92 1.65 1.72 0.87
2.40 1.82 23.98 * 0.012 0.67 0.66 1.96 1.96 1.74 1.82 0.91
2.60 1.94 24.10 * 0.012 0.70 0.70 2.01 2.01 1.84 1.94 0.95
2.80 2.06 24.22 * 0.012 0.72 0.74 2.06 2.06 1.95 2.06 0.99
3.00 2.19 24.35 * 0.012 0.75 0.78 2.11 2.11 2.06 2.19 1.04
PIPE NO. 3: 37 LF - 12"CP @ 0.95% OUTLET: 22.16 INLET: 22.51 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 25.53 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.52
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 0.85 23.36 * 0.012 0.19 0.16 1.19 1.19 0.85 0.85 0.24
0.40 0.86 23.37 * 0.012 0.27 0.23 1.19 1.19 0.85 0.86 0.35
0.60 0.88 23.39 * 0.012 0.33 0.28 1.21 1.21 0.87 0.88 0.44
0.80 0.93 23.44 * 0.012 0.38 0.32 1.24 1.24 0.91 0.93 0.51
1.00 0.99 23.50 * 0.012 0.43 0.36 1.28 1.28 0.96 0.99 0.58
1.20 1.07 23.58 * 0.012 0.47 0.39 1.33 1.33 1.02 1.07 0.65
1.40 1.15 23.66 * 0.012 0.51 0.43 1.39 1.39 1.09 1.15 0.71
1.60 1.26 23.77 * 0.012 0.54 0.46 1.46 1.46 1.17 1.26 0.77
1.80 1.37 23.88 * 0.012 0.58 0.49 1.54 1.54 1.27 1.37 0.83
2.00 1.50 24.01 * 0.012 0.61 0.52 1.62 1.62 1.37 1.50 0.89
2.20 1.64 24.15 * 0.012 0.64 0.56 1.72 1.72 1.49 1.64 0.95
2.40 1.80 24.31 * 0.012 0.67 0.59 1.82 1.82 1.62 1.80 1.01
2.60 1.97 24.48 * 0.012 0.70 0.62 1.94 1.94 1.76 1.97 1.07
2.80 2.15 24.66 * 0.012 0.72 0.65 2.06 2.06 1.91 2.15 1.12
3.00 2.35 24.86 * 0.012 0.75 0.68 2.19 2.19 2.07 2.35 1.19
PIPE NO. 4: 46 LF - 12"CP @ 0.63% OUTLET: 22.51 INLET: 22.80 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 25.82 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.13 0.57 23.37 * 0.012 0.15 0.15 0.85 0.85 0.57 0.57 0.20
0.26 0.58 23.38 * 0.012 0.22 0.20 0.86 0.86 0.57 0.58 0.28
0.39 0.61 23.41 * 0.012 0.26 0.25 0.88 0.88 0.60 0.61 0.35
0.53 0.67 23.47 * 0.012 0.31 0.29 0.93 0.93 0.65 0.67 0.40
0.66 0.73 23.53 * 0.012 0.34 0.32 0.99 0.99 0.71 0.73 0.46
0.79 0.81 23.61 * 0.012 0.38 0.35 1.07 1.07 0.79 0.81 0.50
0.92 0.91 23.71 * 0.012 0.41 0.38 1.15 1.15 0.89 0.91 0.54
1.05 1.02 23.82 * 0.012 0.44 0.41 1.26 1.26 1.00 1.02 0.58
1.18 1.15 23.95 * 0.012 0.46 0.44 1.37 1.37 1.13 1.15 0.62
1.32 1.29 24.09 * 0.012 0.49 0.46 1.50 1.50 1.26 1.29 0.66
1.45 1.45 24.25 * 0.012 0.51 0.49 1.64 1.64 1.42 1.45 0.69
1.58 1.62 24.42 * 0.012 0.54 0.51 1.80 1.80 1.59 1.62 0.73
1.71 1.81 24.61 * 0.012 0.56 0.54 1.97 1.97 1.77 1.81 0.76
1.84 2.02 24.82 * 0.012 0.58 0.56 2.15 2.15 1.97 2.02 0.79
1.97 2.24 25.04 * 0.012 0.60 0.59 2.35 2.35 2.18 2.24 0.82
PIPE NO. 5: 63 LF - 12"CP @ 1.87% OUTLET: 22.80 INLET: 23.98 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 27.00 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.13 0.19 24.17 * 0.012 0.15 0.11 0.57 0.57 0.15 ***** 0.19
0.26 0.28 24.26 * 0.012 0.22 0.16 0.58 0.58 0.22 ***** 0.28
0.39 0.34 24.32 * 0.012 0.26 0.19 0.61 0.61 0.26 ***** 0.34
0.53 0.40 24.38 * 0.012 0.31 0.22 0.67 0.67 0.31 ***** 0.40
0.66 0.45 24.43 * 0.012 0.34 0.24 0.73 0.73 0.34 ***** 0.45
0.79 0.50 24.48 * 0.012 0.38 0.27 0.81 0.81 0.38 ***** 0.50
0.92 0.54 24.52 * 0.012 0.41 0.29 0.91 0.91 0.41 ***** 0.54
1.05 0.58 24.56 * 0.012 0.44 0.31 1.02 1.02 0.44 ***** 0.58
1.18 0.62 24.60 * 0.012 0.46 0.33 1.15 1.15 0.46 ***** 0.62
1.32 0.65 24.63 * 0.012 0.49 0.35 1.29 1.29 0.49 ***** 0.65
1.45 0.69 24.67 * 0.012 0.51 0.36 1.45 1.45 0.51 ***** 0.69
1.58 0.72 24.70 * 0.012 0.54 0.38 1.62 1.62 0.54 ***** 0.72
1.71 0.84 24.82 * 0.012 0.56 0.40 1.81 1.81 0.73 0.84 0.75
1.84 1.03 25.01 * 0.012 0.58 0.41 2.02 2.02 0.98 1.03 0.78
1.97 1.29 25.27 * 0.012 0.60 0.43 2.24 2.24 1.23 1.29 0.81
PIPE NO. 6: 54 LF - 12"CP @ 1.09% OUTLET: 23.98 INLET: 24.57 INTYP: 5
JUNC NO. 6: OVERFLOW-EL: 27.97 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.13 0.19 24.76 * 0.012 0.15 0.13 0.19 0.19 0.15 ***** 0.19
0.26 0.28 24.85 * 0.012 0.22 0.18 0.28 0.28 0.22 ***** 0.28
0.39 0.35 24.92 * 0.012 0.26 0.22 0.34 0.34 0.26 ***** 0.35
0.53 0.41 24.98 * 0.012 0.31 0.25 0.40 0.40 0.31 ***** 0.41
0.66 0.47 25.04 * 0.012 0.34 0.28 0.45 0.45 0.34 ***** 0.47
0.79 0.52 25.09 * 0.012 0.38 0.30 0.50 0.50 0.38 ***** 0.52
0.92 0.57 25.14 * 0.012 0.41 0.33 0.54 0.54 0.41 ***** 0.57
1.05 0.62 25.19 * 0.012 0.44 0.35 0.58 0.58 0.44 ***** 0.62
1.18 0.66 25.23 * 0.012 0.46 0.38 0.62 0.62 0.46 ***** 0.66
1.32 0.71 25.28 * 0.012 0.49 0.40 0.65 0.65 0.49 ***** 0.71
1.45 0.76 25.33 * 0.012 0.51 0.42 0.69 0.69 0.51 ***** 0.76
1.58 0.80 25.37 * 0.012 0.54 0.44 0.72 0.72 0.54 ***** 0.80
1.71 0.85 25.42 * 0.012 0.56 0.46 0.84 0.84 0.56 ***** 0.85
1.84 0.89 25.46 * 0.012 0.58 0.48 1.03 1.03 0.58 ***** 0.89
1.97 1.04 25.61 * 0.012 0.60 0.50 1.29 1.29 0.81 1.04 0.94
PIPE NO. 7: 19 LF - 12"CP @ 0.53% OUTLET: 24.57 INLET: 24.67 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.13 0.15 24.82 * 0.012 0.15 0.15 0.19 0.19 0.15 0.09 0.06
0.26 0.22 24.89 * 0.012 0.22 0.21 0.28 0.28 0.22 ***** 0.21
0.39 0.26 24.93 * 0.012 0.26 0.26 0.35 0.35 0.26 0.26 0.21
0.53 0.32 24.99 * 0.012 0.31 0.30 0.41 0.41 0.32 0.32 0.30
0.66 0.38 25.05 * 0.012 0.34 0.33 0.47 0.47 0.37 0.38 0.33
0.79 0.43 25.10 * 0.012 0.38 0.37 0.52 0.52 0.43 0.43 0.38
0.92 0.48 25.15 * 0.012 0.41 0.40 0.57 0.57 0.48 0.48 0.43
1.05 0.54 25.21 * 0.012 0.44 0.43 0.62 0.62 0.53 0.54 0.47
1.18 0.59 25.26 * 0.012 0.46 0.46 0.66 0.66 0.58 0.59 0.52
1.32 0.64 25.31 * 0.012 0.49 0.49 0.71 0.71 0.63 0.64 0.56
1.45 0.69 25.36 * 0.012 0.51 0.51 0.76 0.76 0.67 0.69 0.60
1.58 0.74 25.41 * 0.012 0.54 0.54 0.80 0.80 0.72 0.74 0.65
1.71 0.79 25.46 * 0.012 0.56 0.57 0.85 0.85 0.77 0.79 0.69
1.84 0.85 25.52 * 0.012 0.58 0.60 0.89 0.89 0.82 0.85 0.73
1.97 1.00 25.67 * 0.012 0.60 0.62 1.04 1.04 0.99 1.00 0.77
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:Cb 203-64 to CB 203-62.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.77 feet
Discharge Range:0.1 to 0.75 Step of 0.1 [cfs]
Overflow Elevation:25.18 feet
Weir:NONE
Upstream Velocity:2.31 feet/sec
PIPE NO. 1: 33 LF - 8"CP @ 0.52% OUTLET: 22.51 INLET: 22.68 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.10 23.78 * 0.012 0.15 0.15 1.26 1.26 1.10 1.02 0.11
0.20 1.10 23.78 * 0.012 0.21 0.21 1.26 1.26 1.10 1.02 0.20
0.30 1.11 23.79 * 0.012 0.26 0.26 1.26 1.26 1.11 1.04 0.27
0.40 1.12 23.80 * 0.012 0.30 0.31 1.26 1.26 1.12 1.07 0.34
0.50 1.14 23.82 * 0.012 0.34 0.35 1.26 1.26 1.14 1.10 0.40
0.60 1.16 23.84 * 0.012 0.37 0.39 1.26 1.26 1.16 1.15 0.46
0.70 1.20 23.88 * 0.012 0.40 0.43 1.26 1.26 1.18 1.20 0.51
0.80 1.25 23.93 * 0.012 0.43 0.48 1.26 1.26 1.21 1.25 0.57
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-08 to CB 201-02.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.05 feet
Discharge Range:0.1 to 6. Step of 0.1 [cfs]
Overflow Elevation:25.53 feet
Weir:NONE
Upstream Velocity:2.3 feet/sec
PIPE NO. 1: 15 LF - 18"CP @ 0.53% OUTLET: 20.67 INLET: 20.75 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 24.30 BEND: 0 DEG DIA/WIDTH: 8.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 2.31 23.06 * 0.012 0.12 0.12 2.38 2.38 2.31 2.31 0.15
0.20 2.30 23.05 * 0.012 0.17 0.17 2.38 2.38 2.30 2.30 0.22
0.30 2.30 23.05 * 0.012 0.21 0.20 2.38 2.38 2.30 2.30 0.27
0.40 2.30 23.05 * 0.012 0.24 0.23 2.38 2.38 2.30 2.30 0.31
0.50 2.30 23.05 * 0.012 0.27 0.25 2.38 2.38 2.30 2.30 0.35
0.60 2.30 23.05 * 0.012 0.29 0.28 2.38 2.38 2.30 2.30 0.38
0.70 2.30 23.05 * 0.012 0.32 0.30 2.38 2.38 2.30 2.30 0.42
0.80 2.30 23.05 * 0.012 0.34 0.32 2.38 2.38 2.30 2.30 0.44
0.90 2.30 23.05 * 0.012 0.36 0.34 2.38 2.38 2.30 2.30 0.47
1.00 2.30 23.05 * 0.012 0.38 0.36 2.38 2.38 2.30 2.30 0.50
1.10 2.30 23.05 * 0.012 0.40 0.37 2.38 2.38 2.30 2.30 0.53
1.20 2.31 23.06 * 0.012 0.41 0.39 2.38 2.38 2.30 2.31 0.55
1.30 2.31 23.06 * 0.012 0.43 0.41 2.38 2.38 2.30 2.31 0.57
1.40 2.31 23.06 * 0.012 0.45 0.42 2.38 2.38 2.30 2.31 0.60
1.50 2.31 23.06 * 0.012 0.46 0.44 2.38 2.38 2.30 2.31 0.62
1.60 2.31 23.06 * 0.012 0.48 0.45 2.38 2.38 2.30 2.31 0.64
1.70 2.31 23.06 * 0.012 0.50 0.47 2.38 2.38 2.30 2.31 0.66
1.80 2.31 23.06 * 0.012 0.51 0.48 2.38 2.38 2.30 2.31 0.68
1.90 2.31 23.06 * 0.012 0.52 0.49 2.38 2.38 2.30 2.31 0.70
2.00 2.31 23.06 * 0.012 0.54 0.51 2.38 2.38 2.30 2.31 0.72
2.10 2.32 23.07 * 0.012 0.55 0.52 2.38 2.38 2.31 2.32 0.74
2.20 2.32 23.07 * 0.012 0.57 0.53 2.38 2.38 2.31 2.32 0.76
2.30 2.32 23.07 * 0.012 0.58 0.54 2.38 2.38 2.31 2.32 0.77
2.40 2.32 23.07 * 0.012 0.59 0.56 2.38 2.38 2.31 2.32 0.79
2.50 2.32 23.07 * 0.012 0.60 0.57 2.38 2.38 2.31 2.32 0.81
2.60 2.33 23.08 * 0.012 0.62 0.58 2.38 2.38 2.31 2.33 0.83
2.70 2.33 23.08 * 0.012 0.63 0.59 2.38 2.38 2.31 2.33 0.84
2.80 2.33 23.08 * 0.012 0.64 0.60 2.38 2.38 2.31 2.33 0.86
2.90 2.33 23.08 * 0.012 0.65 0.62 2.38 2.38 2.31 2.33 0.87
3.00 2.33 23.08 * 0.012 0.66 0.63 2.38 2.38 2.31 2.33 0.89
3.10 2.34 23.09 * 0.012 0.68 0.64 2.38 2.38 2.31 2.34 0.91
3.20 2.34 23.09 * 0.012 0.69 0.65 2.38 2.38 2.31 2.34 0.92
3.30 2.34 23.09 * 0.012 0.70 0.66 2.38 2.38 2.31 2.34 0.94
3.40 2.34 23.09 * 0.012 0.71 0.67 2.38 2.38 2.31 2.34 0.95
3.50 2.35 23.10 * 0.012 0.72 0.68 2.38 2.38 2.31 2.35 0.97
3.60 2.35 23.10 * 0.012 0.73 0.70 2.38 2.38 2.32 2.35 0.98
3.70 2.35 23.10 * 0.012 0.74 0.71 2.38 2.38 2.32 2.35 0.99
3.80 2.35 23.10 * 0.012 0.75 0.72 2.38 2.38 2.32 2.35 1.01
3.90 2.36 23.11 * 0.012 0.76 0.73 2.38 2.38 2.32 2.36 1.02
4.00 2.36 23.11 * 0.012 0.77 0.74 2.38 2.38 2.32 2.36 1.04
4.10 2.36 23.11 * 0.012 0.78 0.75 2.38 2.38 2.32 2.36 1.05
4.20 2.37 23.12 * 0.012 0.79 0.76 2.38 2.38 2.32 2.37 1.06
4.30 2.37 23.12 * 0.012 0.80 0.77 2.38 2.38 2.32 2.37 1.08
4.40 2.37 23.12 * 0.012 0.81 0.78 2.38 2.38 2.32 2.37 1.09
4.50 2.38 23.13 * 0.012 0.82 0.79 2.38 2.38 2.32 2.38 1.10
4.60 2.38 23.13 * 0.012 0.83 0.80 2.38 2.38 2.32 2.38 1.12
4.70 2.38 23.13 * 0.012 0.84 0.81 2.38 2.38 2.33 2.38 1.13
4.80 2.39 23.14 * 0.012 0.85 0.82 2.38 2.38 2.33 2.39 1.14
4.90 2.39 23.14 * 0.012 0.86 0.83 2.38 2.38 2.33 2.39 1.15
5.00 2.39 23.14 * 0.012 0.87 0.84 2.38 2.38 2.33 2.39 1.17
5.10 2.40 23.15 * 0.012 0.87 0.85 2.38 2.38 2.33 2.40 1.18
5.20 2.40 23.15 * 0.012 0.88 0.86 2.38 2.38 2.33 2.40 1.19
5.30 2.41 23.16 * 0.012 0.89 0.88 2.38 2.38 2.33 2.41 1.20
5.40 2.41 23.16 * 0.012 0.90 0.89 2.38 2.38 2.33 2.41 1.22
5.50 2.41 23.16 * 0.012 0.91 0.90 2.38 2.38 2.34 2.41 1.23
5.60 2.42 23.17 * 0.012 0.92 0.91 2.38 2.38 2.34 2.42 1.24
5.70 2.42 23.17 * 0.012 0.93 0.92 2.38 2.38 2.34 2.42 1.25
5.80 2.43 23.18 * 0.012 0.93 0.93 2.38 2.38 2.34 2.43 1.26
5.90 2.43 23.18 * 0.012 0.94 0.94 2.38 2.38 2.34 2.43 1.27
6.00 2.43 23.18 * 0.012 0.95 0.95 2.38 2.38 2.34 2.43 1.29
6.00 2.43 23.18 * 0.012 0.95 0.95 2.38 2.38 2.34 2.43 1.29
PIPE NO. 2: 7 LF - 18"CP @ 0.57% OUTLET: 21.54 INLET: 21.58 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 23.67 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.89
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.49 23.07 * 0.012 0.12 0.12 1.52 1.52 1.49 1.49 0.15
0.20 1.48 23.06 * 0.012 0.17 0.16 1.51 1.51 1.48 1.48 0.22
0.30 1.48 23.06 * 0.012 0.21 0.20 1.51 1.51 1.48 1.48 0.27
0.40 1.48 23.06 * 0.012 0.24 0.23 1.51 1.51 1.48 1.48 0.31
0.50 1.48 23.06 * 0.012 0.27 0.25 1.51 1.51 1.48 1.48 0.35
0.60 1.48 23.06 * 0.012 0.29 0.27 1.51 1.51 1.48 1.48 0.39
0.70 1.49 23.07 * 0.012 0.32 0.29 1.51 1.51 1.48 1.49 0.42
0.80 1.49 23.07 * 0.012 0.34 0.31 1.51 1.51 1.48 1.49 0.45
0.90 1.49 23.07 * 0.012 0.36 0.33 1.51 1.51 1.48 1.49 0.48
1.00 1.49 23.07 * 0.012 0.38 0.35 1.51 1.51 1.48 1.49 0.51
1.10 1.50 23.08 * 0.012 0.40 0.37 1.51 1.51 1.48 1.50 0.54
1.20 1.50 23.08 * 0.012 0.41 0.38 1.52 1.52 1.48 1.50 0.56
1.30 1.50 23.08 * 0.012 0.43 0.40 1.52 1.52 1.48 1.50 0.59
1.40 1.51 23.09 * 0.012 0.45 0.41 1.52 1.52 1.48 1.51 0.62
1.50 1.51 23.09 * 0.012 0.46 0.43 1.52 1.52 1.48 1.51 0.64
1.60 1.52 23.10 * 0.012 0.48 0.44 1.52 1.52 1.49 1.52 0.67
1.70 1.53 23.11 * 0.012 0.50 0.46 1.52 1.52 1.49 1.53 0.69
1.80 1.53 23.11 * 0.012 0.51 0.47 1.52 1.52 1.49 1.53 0.71
1.90 1.54 23.12 * 0.012 0.52 0.48 1.52 1.52 1.49 1.54 0.74
2.00 1.54 23.12 * 0.012 0.54 0.50 1.52 1.52 1.49 1.54 0.76
2.10 1.55 23.13 * 0.012 0.55 0.51 1.53 1.53 1.49 1.55 0.78
2.20 1.56 23.14 * 0.012 0.57 0.52 1.53 1.53 1.50 1.56 0.81
2.30 1.57 23.15 * 0.012 0.58 0.53 1.53 1.53 1.50 1.57 0.83
2.40 1.58 23.16 * 0.012 0.59 0.55 1.53 1.53 1.50 1.58 0.85
2.50 1.58 23.16 * 0.012 0.60 0.56 1.53 1.53 1.50 1.58 0.88
2.60 1.59 23.17 * 0.012 0.62 0.57 1.54 1.54 1.50 1.59 0.90
2.70 1.61 23.19 * 0.012 0.63 0.58 1.54 1.54 1.51 1.61 0.92
2.80 1.61 23.19 * 0.012 0.64 0.59 1.54 1.54 1.50 1.61 0.94
2.90 1.62 23.20 * 0.012 0.65 0.61 1.54 1.54 1.51 1.62 0.96
3.00 1.63 23.21 * 0.012 0.66 0.62 1.54 1.54 1.51 1.63 0.99
3.10 1.64 23.22 * 0.012 0.68 0.63 1.55 1.55 1.51 1.64 1.01
3.20 1.65 23.23 * 0.012 0.69 0.64 1.55 1.55 1.51 1.65 1.03
3.30 1.66 23.24 * 0.012 0.70 0.65 1.55 1.55 1.52 1.66 1.05
3.40 1.67 23.25 * 0.012 0.71 0.66 1.55 1.55 1.52 1.67 1.07
3.50 1.69 23.27 * 0.012 0.72 0.67 1.56 1.56 1.52 1.69 1.10
3.60 1.70 23.28 * 0.012 0.73 0.68 1.56 1.56 1.53 1.70 1.12
3.70 1.71 23.29 * 0.012 0.74 0.69 1.56 1.56 1.53 1.71 1.14
3.80 1.72 23.30 * 0.012 0.75 0.70 1.56 1.56 1.53 1.72 1.16
3.90 1.74 23.32 * 0.012 0.76 0.71 1.57 1.57 1.54 1.74 1.19
4.00 1.75 23.33 * 0.012 0.77 0.72 1.57 1.57 1.54 1.75 1.21
4.10 1.77 23.35 * 0.012 0.78 0.73 1.57 1.57 1.54 1.77 1.23
4.20 1.78 23.36 * 0.012 0.79 0.74 1.58 1.58 1.55 1.78 1.25
4.30 1.80 23.38 * 0.012 0.80 0.75 1.58 1.58 1.55 1.80 1.28
4.40 1.81 23.39 * 0.012 0.81 0.77 1.58 1.58 1.55 1.81 1.30
4.50 1.83 23.41 * 0.012 0.82 0.78 1.59 1.59 1.56 1.83 1.32
4.60 1.84 23.42 * 0.012 0.83 0.79 1.59 1.59 1.56 1.84 1.34
4.70 1.86 23.44 * 0.012 0.84 0.80 1.59 1.59 1.56 1.86 1.37
4.80 1.88 23.46 * 0.012 0.85 0.81 1.60 1.60 1.57 1.88 1.39
4.90 1.89 23.47 * 0.012 0.86 0.82 1.60 1.60 1.57 1.89 1.41
5.00 1.91 23.49 * 0.012 0.87 0.83 1.60 1.60 1.58 1.91 1.43
5.10 1.93 23.51 * 0.012 0.87 0.84 1.61 1.61 1.58 1.93 1.46
5.20 1.95 23.53 * 0.012 0.88 0.85 1.61 1.61 1.59 1.95 1.48
5.30 1.96 23.54 * 0.012 0.89 0.86 1.62 1.62 1.59 1.96 1.50
5.40 1.98 23.56 * 0.012 0.90 0.87 1.62 1.62 1.60 1.98 1.53
5.50 2.00 23.58 * 0.012 0.91 0.88 1.62 1.62 1.60 2.00 1.55
5.60 2.02 23.60 * 0.012 0.92 0.89 1.63 1.63 1.60 2.02 1.58
5.70 2.04 23.62 * 0.012 0.93 0.90 1.63 1.63 1.61 2.04 1.60
5.80 2.06 23.64 * 0.012 0.93 0.91 1.64 1.64 1.61 2.06 1.62
5.90 2.08 23.66 * 0.012 0.94 0.92 1.64 1.64 1.62 2.08 1.65
**************** OVERFLOW ENCOUNTERED AT 6.00 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
6.00 2.10 23.68 * 0.012 0.95 0.93 1.64 1.64 1.62 2.10 1.67
6.00 2.10 23.68 * 0.012 0.95 0.93 1.64 1.64 1.62 2.10 1.67
PIPE NO. 3: 145 LF - 12"CP @ 0.52% OUTLET: 21.58 INLET: 22.33 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 25.54 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.75 23.08 * 0.012 0.10 0.10 1.49 1.49 0.75 0.75 0.12
0.11 0.74 23.07 * 0.012 0.14 0.14 1.48 1.48 0.74 0.74 0.18
0.16 0.74 23.07 * 0.012 0.17 0.17 1.48 1.48 0.74 0.74 0.22
0.21 0.74 23.07 * 0.012 0.19 0.19 1.48 1.48 0.74 0.74 0.25
0.26 0.74 23.07 * 0.012 0.22 0.21 1.48 1.48 0.74 0.74 0.28
0.32 0.75 23.08 * 0.012 0.24 0.23 1.48 1.48 0.75 0.75 0.31
0.37 0.75 23.08 * 0.012 0.26 0.25 1.49 1.49 0.75 0.75 0.34
0.42 0.77 23.10 * 0.012 0.27 0.27 1.49 1.49 0.76 0.77 0.36
0.48 0.78 23.11 * 0.012 0.29 0.29 1.49 1.49 0.77 0.78 0.38
0.53 0.78 23.11 * 0.012 0.31 0.30 1.49 1.49 0.77 0.78 0.41
0.58 0.79 23.12 * 0.012 0.32 0.32 1.50 1.50 0.78 0.79 0.43
0.63 0.80 23.13 * 0.012 0.34 0.33 1.50 1.50 0.79 0.80 0.45
0.69 0.81 23.14 * 0.012 0.35 0.34 1.50 1.50 0.80 0.81 0.47
0.74 0.82 23.15 * 0.012 0.36 0.36 1.51 1.51 0.81 0.82 0.48
0.79 0.84 23.17 * 0.012 0.38 0.37 1.51 1.51 0.82 0.84 0.50
0.85 0.86 23.19 * 0.012 0.39 0.38 1.52 1.52 0.84 0.86 0.52
0.90 0.88 23.21 * 0.012 0.40 0.40 1.53 1.53 0.86 0.88 0.54
0.95 0.89 23.22 * 0.012 0.41 0.41 1.53 1.53 0.87 0.89 0.55
1.01 0.90 23.23 * 0.012 0.43 0.42 1.54 1.54 0.88 0.90 0.57
1.06 0.92 23.25 * 0.012 0.44 0.43 1.54 1.54 0.90 0.92 0.58
1.11 0.93 23.26 * 0.012 0.45 0.45 1.55 1.55 0.91 0.93 0.60
1.16 0.96 23.29 * 0.012 0.46 0.46 1.56 1.56 0.94 0.96 0.61
1.22 0.98 23.31 * 0.012 0.47 0.47 1.57 1.57 0.96 0.98 0.63
1.27 1.00 23.33 * 0.012 0.48 0.48 1.58 1.58 0.98 1.00 0.64
1.32 1.03 23.36 * 0.012 0.49 0.49 1.58 1.58 1.01 1.03 0.66
1.38 1.05 23.38 * 0.012 0.50 0.50 1.59 1.59 1.02 1.05 0.67
1.43 1.08 23.41 * 0.012 0.51 0.51 1.61 1.61 1.06 1.08 0.69
1.48 1.10 23.43 * 0.012 0.52 0.52 1.61 1.61 1.07 1.10 0.70
1.53 1.13 23.46 * 0.012 0.53 0.54 1.62 1.62 1.10 1.13 0.71
1.59 1.16 23.49 * 0.012 0.54 0.55 1.63 1.63 1.12 1.16 0.72
1.64 1.19 23.52 * 0.012 0.55 0.56 1.64 1.64 1.15 1.19 0.74
1.69 1.22 23.55 * 0.012 0.56 0.57 1.65 1.65 1.18 1.22 0.75
1.75 1.25 23.58 * 0.012 0.57 0.58 1.66 1.66 1.21 1.25 0.76
1.80 1.28 23.61 * 0.012 0.58 0.59 1.67 1.67 1.24 1.28 0.77
1.85 1.31 23.64 * 0.012 0.58 0.60 1.69 1.69 1.27 1.31 0.79
1.90 1.35 23.68 * 0.012 0.59 0.61 1.70 1.70 1.30 1.35 0.80
1.96 1.38 23.71 * 0.012 0.60 0.62 1.71 1.71 1.33 1.38 0.81
2.01 1.42 23.75 * 0.012 0.61 0.64 1.72 1.72 1.37 1.42 0.82
2.06 1.46 23.79 * 0.012 0.62 0.65 1.74 1.74 1.40 1.46 0.83
2.12 1.50 23.83 * 0.012 0.63 0.66 1.75 1.75 1.44 1.50 0.84
2.17 1.54 23.87 * 0.012 0.63 0.67 1.77 1.77 1.47 1.54 0.86
2.22 1.58 23.91 * 0.012 0.64 0.68 1.78 1.78 1.51 1.58 0.87
2.28 1.62 23.95 * 0.012 0.65 0.69 1.80 1.80 1.55 1.62 0.88
2.33 1.66 23.99 * 0.012 0.66 0.71 1.81 1.81 1.59 1.66 0.89
2.38 1.70 24.03 * 0.012 0.67 0.72 1.83 1.83 1.63 1.70 0.90
2.43 1.75 24.08 * 0.012 0.67 0.73 1.84 1.84 1.67 1.75 0.91
2.49 1.79 24.12 * 0.012 0.68 0.74 1.86 1.86 1.71 1.79 0.92
2.54 1.84 24.17 * 0.012 0.69 0.76 1.88 1.88 1.75 1.84 0.93
2.59 1.89 24.22 * 0.012 0.70 0.77 1.89 1.89 1.80 1.89 0.94
2.65 1.93 24.26 * 0.012 0.70 0.79 1.91 1.91 1.84 1.93 0.95
2.70 1.98 24.31 * 0.012 0.71 0.80 1.93 1.93 1.89 1.98 0.96
2.75 2.03 24.36 * 0.012 0.72 0.82 1.95 1.95 1.93 2.03 0.97
2.80 2.08 24.41 * 0.012 0.72 0.83 1.96 1.96 1.98 2.08 0.98
2.86 2.14 24.47 * 0.012 0.73 0.85 1.98 1.98 2.03 2.14 0.99
2.91 2.19 24.52 * 0.012 0.74 0.88 2.00 2.00 2.08 2.19 1.00
2.96 2.24 24.57 * 0.012 0.74 0.91 2.02 2.02 2.13 2.24 1.01
3.02 2.30 24.63 * 0.012 0.75 1.00 2.04 2.04 2.18 2.30 1.03
3.07 2.35 24.68 * 0.012 0.76 1.00 2.06 2.06 2.23 2.35 1.04
3.12 2.41 24.74 * 0.012 0.76 1.00 2.08 2.08 2.28 2.41 1.05
3.17 2.47 24.80 * 0.012 0.77 1.00 2.10 2.10 2.34 2.47 1.07
3.17 2.47 24.80 * 0.012 0.77 1.00 2.10 2.10 2.34 2.47 1.07
PIPE NO. 4: 37 LF - 12"CP @ 0.51% OUTLET: 22.33 INLET: 22.52 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 26.02 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.20
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.57 23.09 * 0.012 0.10 0.10 0.75 0.75 0.57 0.57 0.12
0.11 0.56 23.08 * 0.012 0.14 0.14 0.74 0.74 0.56 0.56 0.18
0.16 0.56 23.08 * 0.012 0.17 0.17 0.74 0.74 0.56 0.56 0.22
0.21 0.57 23.09 * 0.012 0.19 0.19 0.74 0.74 0.56 0.57 0.25
0.26 0.57 23.09 * 0.012 0.22 0.21 0.74 0.74 0.56 0.57 0.29
0.32 0.58 23.10 * 0.012 0.24 0.23 0.75 0.75 0.57 0.58 0.31
0.37 0.59 23.11 * 0.012 0.26 0.25 0.75 0.75 0.57 0.59 0.34
0.42 0.60 23.12 * 0.012 0.27 0.27 0.77 0.77 0.58 0.60 0.37
0.48 0.61 23.13 * 0.012 0.29 0.29 0.78 0.78 0.59 0.61 0.39
0.53 0.63 23.15 * 0.012 0.31 0.30 0.78 0.78 0.60 0.63 0.42
0.58 0.64 23.16 * 0.012 0.32 0.32 0.79 0.79 0.61 0.64 0.44
0.63 0.66 23.18 * 0.012 0.34 0.33 0.80 0.80 0.62 0.66 0.46
0.69 0.67 23.19 * 0.012 0.35 0.34 0.81 0.81 0.63 0.67 0.48
0.74 0.70 23.22 * 0.012 0.36 0.36 0.82 0.82 0.65 0.70 0.50
0.79 0.71 23.23 * 0.012 0.38 0.37 0.84 0.84 0.66 0.71 0.52
0.85 0.74 23.26 * 0.012 0.39 0.38 0.86 0.86 0.68 0.74 0.54
0.90 0.76 23.28 * 0.012 0.40 0.40 0.88 0.88 0.70 0.76 0.56
0.95 0.78 23.30 * 0.012 0.41 0.41 0.89 0.89 0.71 0.78 0.58
1.01 0.80 23.32 * 0.012 0.43 0.42 0.90 0.90 0.73 0.80 0.60
1.06 0.82 23.34 * 0.012 0.44 0.43 0.92 0.92 0.75 0.82 0.62
1.11 0.84 23.36 * 0.012 0.45 0.45 0.93 0.93 0.76 0.84 0.64
1.16 0.88 23.40 * 0.012 0.46 0.46 0.96 0.96 0.80 0.88 0.66
1.22 0.90 23.42 * 0.012 0.47 0.47 0.98 0.98 0.82 0.90 0.68
1.27 0.94 23.46 * 0.012 0.48 0.48 1.00 1.00 0.85 0.94 0.70
1.32 0.97 23.49 * 0.012 0.49 0.49 1.03 1.03 0.88 0.97 0.72
1.38 1.00 23.52 * 0.012 0.50 0.50 1.05 1.05 0.90 1.00 0.73
1.43 1.04 23.56 * 0.012 0.51 0.51 1.08 1.08 0.94 1.04 0.75
1.48 1.07 23.59 * 0.012 0.52 0.53 1.10 1.10 0.97 1.07 0.77
1.53 1.11 23.63 * 0.012 0.53 0.54 1.13 1.13 1.00 1.11 0.79
1.59 1.15 23.67 * 0.012 0.54 0.55 1.16 1.16 1.03 1.15 0.81
1.64 1.19 23.71 * 0.012 0.55 0.56 1.19 1.19 1.06 1.19 0.83
1.69 1.23 23.75 * 0.012 0.56 0.57 1.22 1.22 1.10 1.23 0.84
1.75 1.27 23.79 * 0.012 0.57 0.58 1.25 1.25 1.13 1.27 0.86
1.80 1.32 23.84 * 0.012 0.58 0.59 1.28 1.28 1.17 1.32 0.88
1.85 1.37 23.89 * 0.012 0.58 0.60 1.31 1.31 1.21 1.37 0.90
1.90 1.42 23.94 * 0.012 0.59 0.61 1.35 1.35 1.25 1.42 0.92
1.96 1.47 23.99 * 0.012 0.60 0.63 1.38 1.38 1.29 1.47 0.94
2.01 1.52 24.04 * 0.012 0.61 0.64 1.42 1.42 1.33 1.52 0.95
2.06 1.57 24.09 * 0.012 0.62 0.65 1.46 1.46 1.37 1.57 0.97
2.12 1.62 24.14 * 0.012 0.63 0.66 1.50 1.50 1.42 1.62 0.99
2.17 1.68 24.20 * 0.012 0.63 0.67 1.54 1.54 1.46 1.68 1.01
2.22 1.74 24.26 * 0.012 0.64 0.68 1.58 1.58 1.51 1.74 1.03
2.28 1.79 24.31 * 0.012 0.65 0.70 1.62 1.62 1.56 1.79 1.05
2.33 1.85 24.37 * 0.012 0.66 0.71 1.66 1.66 1.60 1.85 1.07
2.38 1.92 24.44 * 0.012 0.67 0.72 1.70 1.70 1.65 1.92 1.09
2.43 1.98 24.50 * 0.012 0.67 0.73 1.75 1.75 1.70 1.98 1.10
2.49 2.04 24.56 * 0.012 0.68 0.75 1.79 1.79 1.76 2.04 1.12
2.54 2.11 24.63 * 0.012 0.69 0.76 1.84 1.84 1.81 2.11 1.14
2.59 2.17 24.69 * 0.012 0.70 0.77 1.89 1.89 1.86 2.17 1.16
2.65 2.24 24.76 * 0.012 0.70 0.79 1.93 1.93 1.92 2.24 1.18
2.70 2.31 24.83 * 0.012 0.71 0.80 1.98 1.98 1.97 2.31 1.20
2.75 2.38 24.90 * 0.012 0.72 0.82 2.03 2.03 2.03 2.38 1.22
2.80 2.45 24.97 * 0.012 0.72 0.84 2.08 2.08 2.09 2.45 1.24
2.86 2.52 25.04 * 0.012 0.73 0.86 2.14 2.14 2.15 2.52 1.26
2.91 2.60 25.12 * 0.012 0.74 0.88 2.19 2.19 2.21 2.60 1.28
2.96 2.67 25.19 * 0.012 0.74 0.92 2.24 2.24 2.27 2.67 1.30
3.02 2.75 25.27 * 0.012 0.75 1.00 2.30 2.30 2.33 2.75 1.33
3.07 2.83 25.35 * 0.012 0.76 1.00 2.35 2.35 2.40 2.83 1.35
3.12 2.91 25.43 * 0.012 0.76 1.00 2.41 2.41 2.46 2.91 1.37
3.17 2.99 25.51 * 0.012 0.77 1.00 2.47 2.47 2.53 2.99 1.40
3.17 2.99 25.51 * 0.012 0.77 1.00 2.47 2.47 2.53 2.99 1.40
PIPE NO. 5: 95 LF - 12"CP @ 0.51% OUTLET: 22.52 INLET: 23.00 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 26.00 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 6.23
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.04 0.14 23.14 * 0.012 0.09 0.09 0.57 0.57 0.13 0.14 0.11
0.09 0.19 23.19 * 0.012 0.13 0.13 0.56 0.56 0.16 0.19 0.16
0.13 0.22 23.22 * 0.012 0.15 0.15 0.56 0.56 0.18 0.22 0.20
0.18 0.26 23.26 * 0.012 0.18 0.18 0.57 0.57 0.20 0.26 0.23
0.22 0.29 23.29 * 0.012 0.20 0.20 0.57 0.57 0.21 0.29 0.26
0.26 0.32 23.32 * 0.012 0.22 0.21 0.58 0.58 0.23 0.32 0.29
0.31 0.35 23.35 * 0.012 0.23 0.23 0.59 0.59 0.24 0.35 0.31
0.35 0.37 23.37 * 0.012 0.25 0.25 0.60 0.60 0.26 0.37 0.33
0.40 0.35 23.35 * 0.012 0.27 0.26 0.61 0.61 0.27 ***** 0.35
0.44 0.42 23.42 * 0.012 0.28 0.28 0.63 0.63 0.29 0.42 0.37
0.49 0.44 23.44 * 0.012 0.29 0.29 0.64 0.64 0.30 0.44 0.39
0.53 0.46 23.46 * 0.012 0.31 0.30 0.66 0.66 0.32 0.46 0.41
0.57 0.48 23.48 * 0.012 0.32 0.32 0.67 0.67 0.33 0.48 0.43
0.62 0.50 23.50 * 0.012 0.33 0.33 0.70 0.70 0.35 0.50 0.45
0.66 0.52 23.52 * 0.012 0.34 0.34 0.71 0.71 0.36 0.52 0.47
0.71 0.54 23.54 * 0.012 0.36 0.35 0.74 0.74 0.38 0.54 0.49
0.75 0.56 23.56 * 0.012 0.37 0.36 0.76 0.76 0.39 0.56 0.50
0.79 0.57 23.57 * 0.012 0.38 0.37 0.78 0.78 0.41 0.57 0.52
0.84 0.59 23.59 * 0.012 0.39 0.38 0.80 0.80 0.43 0.59 0.54
0.88 0.61 23.61 * 0.012 0.40 0.39 0.82 0.82 0.45 0.61 0.55
0.93 0.62 23.62 * 0.012 0.41 0.41 0.84 0.84 0.46 0.62 0.57
0.97 0.64 23.64 * 0.012 0.42 0.42 0.88 0.88 0.49 0.64 0.59
1.01 0.66 23.66 * 0.012 0.43 0.43 0.90 0.90 0.51 0.66 0.60
1.06 0.68 23.68 * 0.012 0.44 0.44 0.94 0.94 0.54 0.68 0.62
1.10 0.71 23.71 * 0.012 0.45 0.45 0.97 0.97 0.57 0.71 0.63
1.15 0.73 23.73 * 0.012 0.46 0.46 1.00 1.00 0.60 0.73 0.65
1.19 0.77 23.77 * 0.012 0.47 0.47 1.04 1.04 0.65 0.77 0.66
1.23 0.80 23.80 * 0.012 0.47 0.48 1.07 1.07 0.69 0.80 0.68
1.28 0.84 23.84 * 0.012 0.48 0.48 1.11 1.11 0.73 0.84 0.69
1.32 0.87 23.87 * 0.012 0.49 0.49 1.15 1.15 0.77 0.87 0.71
1.37 0.92 23.92 * 0.012 0.50 0.50 1.19 1.19 0.82 0.92 0.72
1.41 0.97 23.97 * 0.012 0.51 0.51 1.23 1.23 0.87 0.97 0.74
1.46 1.01 24.01 * 0.012 0.52 0.52 1.27 1.27 0.92 1.01 0.75
1.50 1.07 24.07 * 0.012 0.52 0.53 1.32 1.32 0.98 1.07 0.77
1.54 1.14 24.14 * 0.012 0.53 0.54 1.37 1.37 1.04 1.14 0.78
1.59 1.20 24.20 * 0.012 0.54 0.55 1.42 1.42 1.10 1.20 0.80
1.63 1.27 24.27 * 0.012 0.55 0.56 1.47 1.47 1.16 1.27 0.81
1.68 1.33 24.33 * 0.012 0.56 0.57 1.52 1.52 1.22 1.33 0.83
1.72 1.40 24.40 * 0.012 0.56 0.58 1.57 1.57 1.28 1.40 0.84
1.76 1.47 24.47 * 0.012 0.57 0.59 1.62 1.62 1.34 1.47 0.85
1.81 1.54 24.54 * 0.012 0.58 0.60 1.68 1.68 1.41 1.54 0.87
1.85 1.62 24.62 * 0.012 0.58 0.61 1.74 1.74 1.48 1.62 0.88
1.90 1.69 24.69 * 0.012 0.59 0.62 1.79 1.79 1.54 1.69 0.90
1.94 1.77 24.77 * 0.012 0.60 0.63 1.85 1.85 1.61 1.77 0.91
1.98 1.85 24.85 * 0.012 0.61 0.64 1.92 1.92 1.69 1.85 0.93
2.03 1.93 24.93 * 0.012 0.61 0.64 1.98 1.98 1.76 1.93 0.94
2.07 2.01 25.01 * 0.012 0.62 0.65 2.04 2.04 1.83 2.01 0.96
2.12 2.10 25.10 * 0.012 0.63 0.66 2.11 2.11 1.91 2.10 0.97
2.16 2.18 25.18 * 0.012 0.63 0.67 2.17 2.17 1.99 2.18 0.99
2.20 2.27 25.27 * 0.012 0.64 0.68 2.24 2.24 2.07 2.27 1.00
2.25 2.36 25.36 * 0.012 0.65 0.69 2.31 2.31 2.15 2.36 1.02
2.29 2.45 25.45 * 0.012 0.65 0.70 2.38 2.38 2.23 2.45 1.03
2.34 2.55 25.55 * 0.012 0.66 0.71 2.45 2.45 2.32 2.55 1.05
2.38 2.64 25.64 * 0.012 0.67 0.72 2.52 2.52 2.41 2.64 1.06
2.43 2.74 25.74 * 0.012 0.67 0.74 2.60 2.60 2.49 2.74 1.08
2.47 2.84 25.84 * 0.012 0.68 0.75 2.67 2.67 2.58 2.84 1.09
2.51 2.94 25.94 * 0.012 0.68 0.76 2.75 2.75 2.68 2.94 1.11
**************** OVERFLOW ENCOUNTERED AT 2.56 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
2.56 3.04 26.04 * 0.012 0.69 0.77 2.83 2.83 2.77 3.04 1.12
2.60 3.14 26.14 * 0.012 0.70 0.78 2.91 2.91 2.86 3.14 1.14
2.65 3.25 26.25 * 0.012 0.70 0.79 2.99 2.99 2.96 3.25 1.15
2.65 3.25 26.25 * 0.012 0.70 0.79 2.99 2.99 2.96 3.25 1.15
PIPE NO. 6: 35 LF - 8"CP @ 0.51% OUTLET: 23.00 INLET: 23.18 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.01 0.04 23.22 * 0.012 0.04 0.04 0.14 0.14 0.04 -0.03 -0.04
0.01 0.06 23.24 * 0.012 0.05 0.06 0.19 0.19 0.06 -0.01 -0.02
0.02 0.08 23.26 * 0.012 0.07 0.07 0.22 0.22 0.08 0.01 0.00
0.02 0.10 23.28 * 0.012 0.08 0.08 0.26 0.26 0.10 0.03 0.01
0.03 0.13 23.31 * 0.012 0.08 0.09 0.29 0.29 0.13 0.06 0.02
0.04 0.15 23.33 * 0.012 0.09 0.09 0.32 0.32 0.15 0.08 0.03
0.04 0.18 23.36 * 0.012 0.10 0.10 0.35 0.35 0.18 0.11 0.04
0.05 0.20 23.38 * 0.012 0.10 0.11 0.37 0.37 0.20 0.12 0.05
0.05 0.19 23.37 * 0.012 0.11 0.11 0.35 0.35 0.19 0.12 0.06
0.06 0.24 23.42 * 0.012 0.12 0.12 0.42 0.42 0.24 0.16 0.07
0.07 0.27 23.45 * 0.012 0.12 0.13 0.44 0.44 0.27 0.19 0.07
0.07 0.29 23.47 * 0.012 0.13 0.13 0.46 0.46 0.29 0.21 0.08
0.08 0.31 23.49 * 0.012 0.13 0.14 0.48 0.48 0.31 0.23 0.09
0.09 0.33 23.51 * 0.012 0.14 0.14 0.50 0.50 0.33 0.25 0.10
0.09 0.35 23.53 * 0.012 0.14 0.15 0.52 0.52 0.35 0.27 0.10
0.10 0.36 23.54 * 0.012 0.15 0.15 0.54 0.54 0.36 0.28 0.11
0.10 0.38 23.56 * 0.012 0.15 0.15 0.56 0.56 0.38 0.30 0.12
0.11 0.40 23.58 * 0.012 0.16 0.16 0.57 0.57 0.40 0.32 0.12
0.12 0.42 23.60 * 0.012 0.16 0.16 0.59 0.59 0.42 0.34 0.13
0.12 0.43 23.61 * 0.012 0.16 0.17 0.61 0.61 0.43 0.35 0.13
0.13 0.45 23.63 * 0.012 0.17 0.17 0.62 0.62 0.45 0.37 0.14
0.13 0.47 23.65 * 0.012 0.17 0.18 0.64 0.64 0.47 0.39 0.14
0.14 0.49 23.67 * 0.012 0.18 0.18 0.66 0.66 0.49 0.41 0.15
0.15 0.51 23.69 * 0.012 0.18 0.18 0.68 0.68 0.51 0.43 0.16
0.15 0.54 23.72 * 0.012 0.18 0.19 0.71 0.71 0.54 0.46 0.16
0.16 0.56 23.74 * 0.012 0.19 0.19 0.73 0.73 0.56 0.48 0.17
0.16 0.60 23.78 * 0.012 0.19 0.19 0.77 0.77 0.60 0.52 0.17
0.17 0.63 23.81 * 0.012 0.19 0.20 0.80 0.80 0.63 0.55 0.18
0.18 0.67 23.85 * 0.012 0.20 0.20 0.84 0.84 0.67 0.59 0.18
0.18 0.70 23.88 * 0.012 0.20 0.20 0.87 0.87 0.70 0.62 0.19
0.19 0.75 23.93 * 0.012 0.20 0.21 0.92 0.92 0.75 0.67 0.19
0.20 0.79 23.97 * 0.012 0.21 0.21 0.97 0.97 0.79 0.72 0.20
0.20 0.84 24.02 * 0.012 0.21 0.21 1.01 1.01 0.84 0.77 0.20
0.21 0.90 24.08 * 0.012 0.21 0.22 1.07 1.07 0.90 0.83 0.20
0.21 0.97 24.15 * 0.012 0.22 0.22 1.14 1.14 0.97 0.89 0.21
0.22 1.03 24.21 * 0.012 0.22 0.22 1.20 1.20 1.03 0.96 0.21
0.23 1.10 24.28 * 0.012 0.22 0.23 1.27 1.27 1.10 1.02 0.22
0.23 1.16 24.34 * 0.012 0.23 0.23 1.33 1.33 1.16 1.09 0.22
0.24 1.23 24.41 * 0.012 0.23 0.23 1.40 1.40 1.23 1.16 0.23
0.24 1.30 24.48 * 0.012 0.23 0.24 1.47 1.47 1.30 1.23 0.23
0.25 1.38 24.56 * 0.012 0.24 0.24 1.54 1.54 1.38 1.31 0.24
0.26 1.45 24.63 * 0.012 0.24 0.24 1.62 1.62 1.45 1.38 0.24
0.26 1.53 24.71 * 0.012 0.24 0.25 1.69 1.69 1.53 1.46 0.25
0.27 1.61 24.79 * 0.012 0.24 0.25 1.77 1.77 1.61 1.54 0.25
0.27 1.69 24.87 * 0.012 0.25 0.25 1.85 1.85 1.69 1.62 0.25
0.28 1.77 24.95 * 0.012 0.25 0.25 1.93 1.93 1.77 1.70 0.26
0.29 1.85 25.03 * 0.012 0.25 0.26 2.01 2.01 1.85 1.78 0.26
0.29 1.94 25.12 * 0.012 0.26 0.26 2.10 2.10 1.94 1.87 0.27
0.30 2.02 25.20 * 0.012 0.26 0.26 2.18 2.18 2.02 1.96 0.27
0.30 2.11 25.29 * 0.012 0.26 0.27 2.27 2.27 2.11 2.05 0.27
0.31 2.20 25.38 * 0.012 0.26 0.27 2.36 2.36 2.20 2.14 0.28
0.32 2.29 25.47 * 0.012 0.27 0.27 2.45 2.45 2.29 2.23 0.28
**************** OVERFLOW ENCOUNTERED AT 0.32 CFS DISCHARGE *****************
0.32 2.39 25.57 * 0.012 0.27 0.27 2.55 2.55 2.39 2.33 0.29
0.33 2.48 25.66 * 0.012 0.27 0.28 2.64 2.64 2.48 2.42 0.29
0.34 2.58 25.76 * 0.012 0.27 0.28 2.74 2.74 2.58 2.52 0.29
0.34 2.68 25.86 * 0.012 0.28 0.28 2.84 2.84 2.68 2.62 0.30
0.35 2.78 25.96 * 0.012 0.28 0.29 2.94 2.94 2.78 2.72 0.30
0.35 2.89 26.07 * 0.012 0.28 0.29 3.04 3.04 2.89 2.83 0.31
0.36 2.99 26.17 * 0.012 0.28 0.29 3.14 3.14 2.99 2.93 0.31
0.37 3.10 26.28 * 0.012 0.29 0.29 3.25 3.25 3.10 3.04 0.31
0.37 3.10 26.28 * 0.012 0.29 0.29 3.25 3.25 3.10 3.04 0.31
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-08 to CB 201-02.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:22.76 feet
Discharge Range:0.1 to 6. Step of 0.1 [cfs]
Overflow Elevation:25.53 feet
Weir:NONE
Upstream Velocity:2.3 feet/sec
PIPE NO. 1: 15 LF - 18"CP @ 0.53% OUTLET: 20.67 INLET: 20.75 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 24.30 BEND: 0 DEG DIA/WIDTH: 8.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 2.02 22.77 * 0.012 0.12 0.12 2.09 2.09 2.02 2.02 0.15
0.20 2.01 22.76 * 0.012 0.17 0.17 2.09 2.09 2.01 2.01 0.22
0.30 2.01 22.76 * 0.012 0.21 0.20 2.09 2.09 2.01 2.01 0.27
0.40 2.01 22.76 * 0.012 0.24 0.23 2.09 2.09 2.01 2.01 0.31
0.50 2.01 22.76 * 0.012 0.27 0.25 2.09 2.09 2.01 2.01 0.35
0.60 2.01 22.76 * 0.012 0.29 0.28 2.09 2.09 2.01 2.01 0.38
0.70 2.01 22.76 * 0.012 0.32 0.30 2.09 2.09 2.01 2.01 0.42
0.80 2.01 22.76 * 0.012 0.34 0.32 2.09 2.09 2.01 2.01 0.44
0.90 2.01 22.76 * 0.012 0.36 0.34 2.09 2.09 2.01 2.01 0.47
1.00 2.01 22.76 * 0.012 0.38 0.36 2.09 2.09 2.01 2.01 0.50
1.10 2.01 22.76 * 0.012 0.40 0.37 2.09 2.09 2.01 2.01 0.53
1.20 2.02 22.77 * 0.012 0.41 0.39 2.09 2.09 2.01 2.02 0.55
1.30 2.02 22.77 * 0.012 0.43 0.41 2.09 2.09 2.01 2.02 0.57
1.40 2.02 22.77 * 0.012 0.45 0.42 2.09 2.09 2.01 2.02 0.60
1.50 2.02 22.77 * 0.012 0.46 0.44 2.09 2.09 2.01 2.02 0.62
1.60 2.02 22.77 * 0.012 0.48 0.45 2.09 2.09 2.01 2.02 0.64
1.70 2.02 22.77 * 0.012 0.50 0.47 2.09 2.09 2.01 2.02 0.66
1.80 2.02 22.77 * 0.012 0.51 0.48 2.09 2.09 2.01 2.02 0.68
1.90 2.02 22.77 * 0.012 0.52 0.49 2.09 2.09 2.01 2.02 0.70
2.00 2.02 22.77 * 0.012 0.54 0.51 2.09 2.09 2.01 2.02 0.72
2.10 2.03 22.78 * 0.012 0.55 0.52 2.09 2.09 2.02 2.03 0.74
2.20 2.03 22.78 * 0.012 0.57 0.53 2.09 2.09 2.02 2.03 0.76
2.30 2.03 22.78 * 0.012 0.58 0.54 2.09 2.09 2.02 2.03 0.77
2.40 2.03 22.78 * 0.012 0.59 0.56 2.09 2.09 2.02 2.03 0.79
2.50 2.03 22.78 * 0.012 0.60 0.57 2.09 2.09 2.02 2.03 0.81
2.60 2.04 22.79 * 0.012 0.62 0.58 2.09 2.09 2.02 2.04 0.83
2.70 2.04 22.79 * 0.012 0.63 0.59 2.09 2.09 2.02 2.04 0.84
2.80 2.04 22.79 * 0.012 0.64 0.60 2.09 2.09 2.02 2.04 0.86
2.90 2.04 22.79 * 0.012 0.65 0.62 2.09 2.09 2.02 2.04 0.87
3.00 2.04 22.79 * 0.012 0.66 0.63 2.09 2.09 2.02 2.04 0.89
3.10 2.05 22.80 * 0.012 0.68 0.64 2.09 2.09 2.02 2.05 0.91
3.20 2.05 22.80 * 0.012 0.69 0.65 2.09 2.09 2.02 2.05 0.92
3.30 2.05 22.80 * 0.012 0.70 0.66 2.09 2.09 2.02 2.05 0.94
3.40 2.05 22.80 * 0.012 0.71 0.67 2.09 2.09 2.02 2.05 0.95
3.50 2.06 22.81 * 0.012 0.72 0.68 2.09 2.09 2.02 2.06 0.97
3.60 2.06 22.81 * 0.012 0.73 0.70 2.09 2.09 2.03 2.06 0.98
3.70 2.06 22.81 * 0.012 0.74 0.71 2.09 2.09 2.03 2.06 0.99
3.80 2.06 22.81 * 0.012 0.75 0.72 2.09 2.09 2.03 2.06 1.01
3.90 2.07 22.82 * 0.012 0.76 0.73 2.09 2.09 2.03 2.07 1.02
4.00 2.07 22.82 * 0.012 0.77 0.74 2.09 2.09 2.03 2.07 1.04
4.10 2.07 22.82 * 0.012 0.78 0.75 2.09 2.09 2.03 2.07 1.05
4.20 2.08 22.83 * 0.012 0.79 0.76 2.09 2.09 2.03 2.08 1.06
4.30 2.08 22.83 * 0.012 0.80 0.77 2.09 2.09 2.03 2.08 1.08
4.40 2.08 22.83 * 0.012 0.81 0.78 2.09 2.09 2.03 2.08 1.09
4.50 2.09 22.84 * 0.012 0.82 0.79 2.09 2.09 2.03 2.09 1.10
4.60 2.09 22.84 * 0.012 0.83 0.80 2.09 2.09 2.03 2.09 1.12
4.70 2.09 22.84 * 0.012 0.84 0.81 2.09 2.09 2.04 2.09 1.13
4.80 2.10 22.85 * 0.012 0.85 0.82 2.09 2.09 2.04 2.10 1.14
4.90 2.10 22.85 * 0.012 0.86 0.83 2.09 2.09 2.04 2.10 1.15
5.00 2.10 22.85 * 0.012 0.87 0.84 2.09 2.09 2.04 2.10 1.17
5.10 2.11 22.86 * 0.012 0.87 0.85 2.09 2.09 2.04 2.11 1.18
5.20 2.11 22.86 * 0.012 0.88 0.86 2.09 2.09 2.04 2.11 1.19
5.30 2.12 22.87 * 0.012 0.89 0.88 2.09 2.09 2.04 2.12 1.20
5.40 2.12 22.87 * 0.012 0.90 0.89 2.09 2.09 2.04 2.12 1.22
5.50 2.12 22.87 * 0.012 0.91 0.90 2.09 2.09 2.05 2.12 1.23
5.60 2.13 22.88 * 0.012 0.92 0.91 2.09 2.09 2.05 2.13 1.24
5.70 2.13 22.88 * 0.012 0.93 0.92 2.09 2.09 2.05 2.13 1.25
5.80 2.14 22.89 * 0.012 0.93 0.93 2.09 2.09 2.05 2.14 1.26
5.90 2.14 22.89 * 0.012 0.94 0.94 2.09 2.09 2.05 2.14 1.27
6.00 2.14 22.89 * 0.012 0.95 0.95 2.09 2.09 2.05 2.14 1.29
6.00 2.14 22.89 * 0.012 0.95 0.95 2.09 2.09 2.05 2.14 1.29
PIPE NO. 2: 7 LF - 18"CP @ 0.57% OUTLET: 21.54 INLET: 21.58 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 23.67 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.89
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.20 22.78 * 0.012 0.12 0.12 1.23 1.23 1.20 1.20 0.15
0.20 1.19 22.77 * 0.012 0.17 0.16 1.22 1.22 1.19 1.19 0.22
0.30 1.19 22.77 * 0.012 0.21 0.20 1.22 1.22 1.19 1.19 0.27
0.40 1.19 22.77 * 0.012 0.24 0.23 1.22 1.22 1.19 1.19 0.31
0.50 1.19 22.77 * 0.012 0.27 0.25 1.22 1.22 1.19 1.19 0.35
0.60 1.20 22.78 * 0.012 0.29 0.27 1.22 1.22 1.19 1.20 0.39
0.70 1.20 22.78 * 0.012 0.32 0.29 1.22 1.22 1.19 1.20 0.42
0.80 1.20 22.78 * 0.012 0.34 0.31 1.22 1.22 1.19 1.20 0.45
0.90 1.20 22.78 * 0.012 0.36 0.33 1.22 1.22 1.19 1.20 0.48
1.00 1.21 22.79 * 0.012 0.38 0.35 1.22 1.22 1.19 1.21 0.51
1.10 1.21 22.79 * 0.012 0.40 0.37 1.22 1.22 1.19 1.21 0.54
1.20 1.21 22.79 * 0.012 0.41 0.38 1.23 1.23 1.19 1.21 0.56
1.30 1.22 22.80 * 0.012 0.43 0.40 1.23 1.23 1.19 1.22 0.59
1.40 1.22 22.80 * 0.012 0.45 0.41 1.23 1.23 1.19 1.22 0.62
1.50 1.23 22.81 * 0.012 0.46 0.43 1.23 1.23 1.19 1.23 0.64
1.60 1.23 22.81 * 0.012 0.48 0.44 1.23 1.23 1.19 1.23 0.67
1.70 1.25 22.83 * 0.012 0.50 0.46 1.23 1.23 1.20 1.25 0.69
1.80 1.25 22.83 * 0.012 0.51 0.47 1.23 1.23 1.20 1.25 0.71
1.90 1.26 22.84 * 0.012 0.52 0.48 1.23 1.23 1.20 1.26 0.74
2.00 1.26 22.84 * 0.012 0.54 0.50 1.23 1.23 1.20 1.26 0.76
2.10 1.27 22.85 * 0.012 0.55 0.51 1.24 1.24 1.20 1.27 0.78
2.20 1.28 22.86 * 0.012 0.57 0.52 1.24 1.24 1.20 1.28 0.81
2.30 1.29 22.87 * 0.012 0.58 0.53 1.24 1.24 1.21 1.29 0.83
2.40 1.30 22.88 * 0.012 0.59 0.55 1.24 1.24 1.21 1.30 0.85
2.50 1.31 22.89 * 0.012 0.60 0.56 1.24 1.24 1.21 1.31 0.88
2.60 1.32 22.90 * 0.012 0.62 0.57 1.25 1.25 1.21 1.32 0.90
2.70 1.33 22.91 * 0.012 0.63 0.58 1.25 1.25 1.21 1.33 0.92
2.80 1.34 22.92 * 0.012 0.64 0.59 1.25 1.25 1.22 1.34 0.94
2.90 1.35 22.93 * 0.012 0.65 0.61 1.25 1.25 1.22 1.35 0.96
3.00 1.36 22.94 * 0.012 0.66 0.62 1.25 1.25 1.22 1.36 0.99
3.10 1.37 22.95 * 0.012 0.68 0.63 1.26 1.26 1.22 1.37 1.01
3.20 1.39 22.97 * 0.012 0.69 0.64 1.26 1.26 1.23 1.39 1.03
3.30 1.40 22.98 * 0.012 0.70 0.65 1.26 1.26 1.23 1.40 1.05
3.40 1.41 22.99 * 0.012 0.71 0.66 1.26 1.26 1.23 1.41 1.07
3.50 1.42 23.00 * 0.012 0.72 0.67 1.27 1.27 1.23 1.42 1.10
3.60 1.44 23.02 * 0.012 0.73 0.68 1.27 1.27 1.24 1.44 1.12
3.70 1.45 23.03 * 0.012 0.74 0.69 1.27 1.27 1.24 1.45 1.14
3.80 1.46 23.04 * 0.012 0.75 0.70 1.27 1.27 1.24 1.46 1.16
3.90 1.48 23.06 * 0.012 0.76 0.71 1.28 1.28 1.25 1.48 1.19
4.00 1.49 23.07 * 0.012 0.77 0.72 1.28 1.28 1.25 1.49 1.21
4.10 1.51 23.09 * 0.012 0.78 0.73 1.28 1.28 1.25 1.51 1.23
4.20 1.52 23.10 * 0.012 0.79 0.74 1.29 1.29 1.25 1.52 1.25
4.30 1.54 23.12 * 0.012 0.80 0.75 1.29 1.29 1.26 1.54 1.28
4.40 1.55 23.13 * 0.012 0.81 0.77 1.29 1.29 1.26 1.55 1.30
4.50 1.57 23.15 * 0.012 0.82 0.78 1.30 1.30 1.27 1.57 1.32
4.60 1.59 23.17 * 0.012 0.83 0.79 1.30 1.30 1.27 1.59 1.34
4.70 1.60 23.18 * 0.012 0.84 0.80 1.30 1.30 1.27 1.60 1.37
4.80 1.62 23.20 * 0.012 0.85 0.81 1.31 1.31 1.28 1.62 1.39
4.90 1.64 23.22 * 0.012 0.86 0.82 1.31 1.31 1.28 1.64 1.41
5.00 1.65 23.23 * 0.012 0.87 0.83 1.31 1.31 1.28 1.65 1.43
5.10 1.67 23.25 * 0.012 0.87 0.84 1.32 1.32 1.29 1.67 1.46
5.20 1.69 23.27 * 0.012 0.88 0.85 1.32 1.32 1.29 1.69 1.48
5.30 1.71 23.29 * 0.012 0.89 0.86 1.33 1.33 1.30 1.71 1.50
5.40 1.73 23.31 * 0.012 0.90 0.87 1.33 1.33 1.30 1.73 1.53
5.50 1.75 23.33 * 0.012 0.91 0.88 1.33 1.33 1.31 1.75 1.55
5.60 1.77 23.35 * 0.012 0.92 0.89 1.34 1.34 1.31 1.77 1.58
5.70 1.79 23.37 * 0.012 0.93 0.90 1.34 1.34 1.32 1.79 1.60
5.80 1.81 23.39 * 0.012 0.93 0.91 1.35 1.35 1.32 1.81 1.62
5.90 1.83 23.41 * 0.012 0.94 0.92 1.35 1.35 1.33 1.83 1.65
6.00 1.85 23.43 * 0.012 0.95 0.93 1.35 1.35 1.33 1.85 1.67
6.00 1.85 23.43 * 0.012 0.95 0.93 1.35 1.35 1.33 1.85 1.67
PIPE NO. 3: 145 LF - 12"CP @ 0.52% OUTLET: 21.58 INLET: 22.33 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 25.54 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.46 22.79 * 0.012 0.10 0.10 1.20 1.20 0.46 0.46 0.12
0.11 0.45 22.78 * 0.012 0.14 0.14 1.19 1.19 0.45 0.45 0.18
0.16 0.45 22.78 * 0.012 0.17 0.17 1.19 1.19 0.45 0.45 0.22
0.21 0.47 22.80 * 0.012 0.19 0.19 1.19 1.19 0.46 0.47 0.25
0.26 0.47 22.80 * 0.012 0.22 0.21 1.19 1.19 0.46 0.47 0.28
0.32 0.49 22.82 * 0.012 0.24 0.23 1.20 1.20 0.47 0.49 0.31
0.37 0.50 22.83 * 0.012 0.26 0.25 1.20 1.20 0.48 0.50 0.34
0.42 0.51 22.84 * 0.012 0.27 0.27 1.20 1.20 0.49 0.51 0.36
0.48 0.53 22.86 * 0.012 0.29 0.29 1.20 1.20 0.50 0.53 0.38
0.53 0.54 22.87 * 0.012 0.31 0.30 1.21 1.21 0.51 0.54 0.41
0.58 0.56 22.89 * 0.012 0.32 0.32 1.21 1.21 0.52 0.56 0.43
0.63 0.57 22.90 * 0.012 0.34 0.33 1.21 1.21 0.53 0.57 0.45
0.69 0.59 22.92 * 0.012 0.35 0.34 1.22 1.22 0.54 0.59 0.47
0.74 0.60 22.93 * 0.012 0.36 0.36 1.22 1.22 0.55 0.60 0.48
0.79 0.62 22.95 * 0.012 0.38 0.37 1.23 1.23 0.56 0.62 0.50
0.85 0.64 22.97 * 0.012 0.39 0.38 1.23 1.23 0.58 0.64 0.52
0.90 0.66 22.99 * 0.012 0.40 0.40 1.25 1.25 0.60 0.66 0.54
0.95 0.67 23.00 * 0.012 0.41 0.41 1.25 1.25 0.61 0.67 0.55
1.01 0.69 23.02 * 0.012 0.43 0.42 1.26 1.26 0.63 0.69 0.57
1.06 0.71 23.04 * 0.012 0.44 0.43 1.26 1.26 0.64 0.71 0.58
1.11 0.72 23.05 * 0.012 0.45 0.45 1.27 1.27 0.66 0.72 0.60
1.16 0.74 23.07 * 0.012 0.46 0.46 1.28 1.28 0.67 0.74 0.61
1.22 0.76 23.09 * 0.012 0.47 0.47 1.29 1.29 0.70 0.76 0.63
1.27 0.78 23.11 * 0.012 0.48 0.48 1.30 1.30 0.71 0.78 0.64
1.32 0.79 23.12 * 0.012 0.49 0.49 1.31 1.31 0.73 0.79 0.66
1.38 0.81 23.14 * 0.012 0.50 0.50 1.32 1.32 0.75 0.81 0.67
1.43 0.83 23.16 * 0.012 0.51 0.51 1.33 1.33 0.77 0.83 0.69
1.48 0.86 23.19 * 0.012 0.52 0.52 1.34 1.34 0.80 0.86 0.70
1.53 0.88 23.21 * 0.012 0.53 0.54 1.35 1.35 0.82 0.88 0.71
1.59 0.90 23.23 * 0.012 0.54 0.55 1.36 1.36 0.84 0.90 0.72
1.64 0.92 23.25 * 0.012 0.55 0.56 1.37 1.37 0.86 0.92 0.74
1.69 0.95 23.28 * 0.012 0.56 0.57 1.39 1.39 0.90 0.95 0.75
1.75 0.98 23.31 * 0.012 0.57 0.58 1.40 1.40 0.93 0.98 0.76
1.80 1.01 23.34 * 0.012 0.58 0.59 1.41 1.41 0.96 1.01 0.77
1.85 1.05 23.38 * 0.012 0.58 0.60 1.42 1.42 1.01 1.05 0.79
1.90 1.09 23.42 * 0.012 0.59 0.61 1.44 1.44 1.04 1.09 0.80
1.96 1.12 23.45 * 0.012 0.60 0.62 1.45 1.45 1.07 1.12 0.81
2.01 1.16 23.49 * 0.012 0.61 0.64 1.46 1.46 1.11 1.16 0.82
2.06 1.20 23.53 * 0.012 0.62 0.65 1.48 1.48 1.15 1.20 0.83
2.12 1.24 23.57 * 0.012 0.63 0.66 1.49 1.49 1.18 1.24 0.84
2.17 1.28 23.61 * 0.012 0.63 0.67 1.51 1.51 1.22 1.28 0.86
2.22 1.32 23.65 * 0.012 0.64 0.68 1.52 1.52 1.25 1.32 0.87
2.28 1.36 23.69 * 0.012 0.65 0.69 1.54 1.54 1.29 1.36 0.88
2.33 1.40 23.73 * 0.012 0.66 0.71 1.55 1.55 1.33 1.40 0.89
2.38 1.45 23.78 * 0.012 0.67 0.72 1.57 1.57 1.38 1.45 0.90
2.43 1.49 23.82 * 0.012 0.67 0.73 1.59 1.59 1.41 1.49 0.91
2.49 1.53 23.86 * 0.012 0.68 0.74 1.60 1.60 1.45 1.53 0.92
2.54 1.59 23.92 * 0.012 0.69 0.76 1.62 1.62 1.50 1.59 0.93
2.59 1.63 23.96 * 0.012 0.70 0.77 1.64 1.64 1.54 1.63 0.94
2.65 1.68 24.01 * 0.012 0.70 0.79 1.65 1.65 1.58 1.68 0.95
2.70 1.73 24.06 * 0.012 0.71 0.80 1.67 1.67 1.63 1.73 0.96
2.75 1.78 24.11 * 0.012 0.72 0.82 1.69 1.69 1.68 1.78 0.97
2.80 1.83 24.16 * 0.012 0.72 0.83 1.71 1.71 1.73 1.83 0.98
2.86 1.88 24.21 * 0.012 0.73 0.85 1.73 1.73 1.77 1.88 0.99
2.91 1.94 24.27 * 0.012 0.74 0.88 1.75 1.75 1.82 1.94 1.00
2.96 1.99 24.32 * 0.012 0.74 0.91 1.77 1.77 1.87 1.99 1.01
3.02 2.04 24.37 * 0.012 0.75 1.00 1.79 1.79 1.93 2.04 1.03
3.07 2.10 24.43 * 0.012 0.76 1.00 1.81 1.81 1.97 2.10 1.04
3.12 2.16 24.49 * 0.012 0.76 1.00 1.83 1.83 2.03 2.16 1.05
3.17 2.21 24.54 * 0.012 0.77 1.00 1.85 1.85 2.08 2.21 1.07
3.17 2.21 24.54 * 0.012 0.77 1.00 1.85 1.85 2.08 2.21 1.07
PIPE NO. 4: 37 LF - 12"CP @ 0.51% OUTLET: 22.33 INLET: 22.52 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 26.02 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.20
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.28 22.80 * 0.012 0.10 0.10 0.46 0.46 0.28 0.28 0.12
0.11 0.28 22.80 * 0.012 0.14 0.14 0.45 0.45 0.27 0.28 0.18
0.16 0.29 22.81 * 0.012 0.17 0.17 0.45 0.45 0.27 0.29 0.22
0.21 0.32 22.84 * 0.012 0.19 0.19 0.47 0.47 0.29 0.32 0.25
0.26 0.34 22.86 * 0.012 0.22 0.21 0.47 0.47 0.29 0.34 0.29
0.32 0.37 22.89 * 0.012 0.24 0.23 0.49 0.49 0.31 0.37 0.31
0.37 0.39 22.91 * 0.012 0.26 0.25 0.50 0.50 0.32 0.39 0.34
0.42 0.42 22.94 * 0.012 0.27 0.27 0.51 0.51 0.34 0.42 0.37
0.48 0.44 22.96 * 0.012 0.29 0.29 0.53 0.53 0.35 0.44 0.39
0.53 0.47 22.99 * 0.012 0.31 0.30 0.54 0.54 0.37 0.47 0.42
0.58 0.49 23.01 * 0.012 0.32 0.32 0.56 0.56 0.39 0.49 0.44
0.63 0.51 23.03 * 0.012 0.34 0.33 0.57 0.57 0.40 0.51 0.46
0.69 0.54 23.06 * 0.012 0.35 0.34 0.59 0.59 0.42 0.54 0.48
0.74 0.56 23.08 * 0.012 0.36 0.36 0.60 0.60 0.43 0.56 0.50
0.79 0.58 23.10 * 0.012 0.38 0.37 0.62 0.62 0.45 0.58 0.52
0.85 0.60 23.12 * 0.012 0.39 0.38 0.64 0.64 0.47 0.60 0.54
0.90 0.63 23.15 * 0.012 0.40 0.40 0.66 0.66 0.49 0.63 0.56
0.95 0.64 23.16 * 0.012 0.41 0.41 0.67 0.67 0.50 0.64 0.58
1.01 0.67 23.19 * 0.012 0.43 0.42 0.69 0.69 0.52 0.67 0.60
1.06 0.69 23.21 * 0.012 0.44 0.43 0.71 0.71 0.54 0.69 0.62
1.11 0.71 23.23 * 0.012 0.45 0.45 0.72 0.72 0.56 0.71 0.64
1.16 0.73 23.25 * 0.012 0.46 0.46 0.74 0.74 0.57 0.73 0.66
1.22 0.75 23.27 * 0.012 0.47 0.47 0.76 0.76 0.60 0.75 0.68
1.27 0.77 23.29 * 0.012 0.48 0.48 0.78 0.78 0.61 0.77 0.70
1.32 0.80 23.32 * 0.012 0.49 0.49 0.79 0.79 0.64 0.80 0.72
1.38 0.82 23.34 * 0.012 0.50 0.50 0.81 0.81 0.66 0.82 0.73
1.43 0.84 23.36 * 0.012 0.51 0.51 0.83 0.83 0.68 0.84 0.75
1.48 0.87 23.39 * 0.012 0.52 0.53 0.86 0.86 0.71 0.87 0.77
1.53 0.89 23.41 * 0.012 0.53 0.54 0.88 0.88 0.73 0.89 0.79
1.59 0.92 23.44 * 0.012 0.54 0.55 0.90 0.90 0.75 0.92 0.81
1.64 0.94 23.46 * 0.012 0.55 0.56 0.92 0.92 0.77 0.94 0.83
1.69 0.98 23.50 * 0.012 0.56 0.57 0.95 0.95 0.81 0.98 0.84
1.75 1.01 23.53 * 0.012 0.57 0.58 0.98 0.98 0.84 1.01 0.86
1.80 1.05 23.57 * 0.012 0.58 0.59 1.01 1.01 0.88 1.05 0.88
1.85 1.10 23.62 * 0.012 0.58 0.60 1.05 1.05 0.94 1.10 0.90
1.90 1.16 23.68 * 0.012 0.59 0.61 1.09 1.09 0.99 1.16 0.92
1.96 1.21 23.73 * 0.012 0.60 0.63 1.12 1.12 1.03 1.21 0.94
2.01 1.26 23.78 * 0.012 0.61 0.64 1.16 1.16 1.07 1.26 0.95
2.06 1.31 23.83 * 0.012 0.62 0.65 1.20 1.20 1.12 1.31 0.97
2.12 1.37 23.89 * 0.012 0.63 0.66 1.24 1.24 1.16 1.37 0.99
2.17 1.42 23.94 * 0.012 0.63 0.67 1.28 1.28 1.20 1.42 1.01
2.22 1.48 24.00 * 0.012 0.64 0.68 1.32 1.32 1.25 1.48 1.03
2.28 1.54 24.06 * 0.012 0.65 0.70 1.36 1.36 1.30 1.54 1.05
2.33 1.60 24.12 * 0.012 0.66 0.71 1.40 1.40 1.35 1.60 1.07
2.38 1.66 24.18 * 0.012 0.67 0.72 1.45 1.45 1.40 1.66 1.09
2.43 1.72 24.24 * 0.012 0.67 0.73 1.49 1.49 1.45 1.72 1.10
2.49 1.78 24.30 * 0.012 0.68 0.75 1.53 1.53 1.50 1.78 1.12
2.54 1.85 24.37 * 0.012 0.69 0.76 1.59 1.59 1.56 1.85 1.14
2.59 1.92 24.44 * 0.012 0.70 0.77 1.63 1.63 1.61 1.92 1.16
2.65 1.98 24.50 * 0.012 0.70 0.79 1.68 1.68 1.66 1.98 1.18
2.70 2.06 24.58 * 0.012 0.71 0.80 1.73 1.73 1.72 2.06 1.20
2.75 2.12 24.64 * 0.012 0.72 0.82 1.78 1.78 1.77 2.12 1.22
2.80 2.20 24.72 * 0.012 0.72 0.84 1.83 1.83 1.84 2.20 1.24
2.86 2.27 24.79 * 0.012 0.73 0.86 1.88 1.88 1.89 2.27 1.26
2.91 2.35 24.87 * 0.012 0.74 0.88 1.94 1.94 1.96 2.35 1.28
2.96 2.42 24.94 * 0.012 0.74 0.92 1.99 1.99 2.01 2.42 1.30
3.02 2.50 25.02 * 0.012 0.75 1.00 2.04 2.04 2.08 2.50 1.33
3.07 2.57 25.09 * 0.012 0.76 1.00 2.10 2.10 2.14 2.57 1.35
3.12 2.66 25.18 * 0.012 0.76 1.00 2.16 2.16 2.21 2.66 1.37
3.17 2.73 25.25 * 0.012 0.77 1.00 2.21 2.21 2.27 2.73 1.40
3.17 2.73 25.25 * 0.012 0.77 1.00 2.21 2.21 2.27 2.73 1.40
PIPE NO. 5: 95 LF - 12"CP @ 0.51% OUTLET: 22.52 INLET: 23.00 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 26.00 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 6.23
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.04 0.13 23.13 * 0.012 0.09 0.09 0.28 0.28 0.09 0.13 0.11
0.09 0.18 23.18 * 0.012 0.13 0.13 0.28 0.28 0.13 0.18 0.16
0.13 0.22 23.22 * 0.012 0.15 0.15 0.29 0.29 0.15 0.22 0.20
0.18 0.26 23.26 * 0.012 0.18 0.18 0.32 0.32 0.18 0.26 0.23
0.22 0.29 23.29 * 0.012 0.20 0.20 0.34 0.34 0.20 0.29 0.26
0.26 0.29 23.29 * 0.012 0.22 0.21 0.37 0.37 0.22 ***** 0.29
0.31 0.35 23.35 * 0.012 0.23 0.23 0.39 0.39 0.23 0.35 0.31
0.35 0.37 23.37 * 0.012 0.25 0.25 0.42 0.42 0.25 0.37 0.33
0.40 0.35 23.35 * 0.012 0.27 0.26 0.44 0.44 0.27 ***** 0.35
0.44 0.42 23.42 * 0.012 0.28 0.28 0.47 0.47 0.28 0.42 0.37
0.49 0.44 23.44 * 0.012 0.29 0.29 0.49 0.49 0.29 0.44 0.39
0.53 0.41 23.41 * 0.012 0.31 0.30 0.51 0.51 0.31 ***** 0.41
0.57 0.48 23.48 * 0.012 0.32 0.32 0.54 0.54 0.32 0.48 0.43
0.62 0.51 23.51 * 0.012 0.33 0.33 0.56 0.56 0.33 0.51 0.45
0.66 0.53 23.53 * 0.012 0.34 0.34 0.58 0.58 0.34 0.53 0.47
0.71 0.49 23.49 * 0.012 0.36 0.35 0.60 0.60 0.36 ***** 0.49
0.75 0.50 23.50 * 0.012 0.37 0.36 0.63 0.63 0.37 ***** 0.50
0.79 0.52 23.52 * 0.012 0.38 0.37 0.64 0.64 0.38 ***** 0.52
0.84 0.54 23.54 * 0.012 0.39 0.38 0.67 0.67 0.39 ***** 0.54
0.88 0.55 23.55 * 0.012 0.40 0.39 0.69 0.69 0.40 ***** 0.55
0.93 0.63 23.63 * 0.012 0.41 0.41 0.71 0.71 0.41 0.63 0.57
0.97 0.65 23.65 * 0.012 0.42 0.42 0.73 0.73 0.42 0.65 0.59
1.01 0.66 23.66 * 0.012 0.43 0.43 0.75 0.75 0.43 0.66 0.60
1.06 0.68 23.68 * 0.012 0.44 0.44 0.77 0.77 0.44 0.68 0.62
1.10 0.69 23.69 * 0.012 0.45 0.45 0.80 0.80 0.46 0.69 0.63
1.15 0.71 23.71 * 0.012 0.46 0.46 0.82 0.82 0.48 0.71 0.65
1.19 0.72 23.72 * 0.012 0.47 0.47 0.84 0.84 0.50 0.72 0.66
1.23 0.73 23.73 * 0.012 0.47 0.48 0.87 0.87 0.52 0.73 0.68
1.28 0.75 23.75 * 0.012 0.48 0.48 0.89 0.89 0.54 0.75 0.69
1.32 0.77 23.77 * 0.012 0.49 0.49 0.92 0.92 0.56 0.77 0.71
1.37 0.78 23.78 * 0.012 0.50 0.50 0.94 0.94 0.58 0.78 0.72
1.41 0.80 23.80 * 0.012 0.51 0.51 0.98 0.98 0.62 0.80 0.74
1.46 0.83 23.83 * 0.012 0.52 0.52 1.01 1.01 0.66 0.83 0.75
1.50 0.86 23.86 * 0.012 0.52 0.53 1.05 1.05 0.70 0.86 0.77
1.54 0.90 23.90 * 0.012 0.53 0.54 1.10 1.10 0.76 0.90 0.78
1.59 0.95 23.95 * 0.012 0.54 0.55 1.16 1.16 0.82 0.95 0.80
1.63 1.01 24.01 * 0.012 0.55 0.56 1.21 1.21 0.88 1.01 0.81
1.68 1.06 24.06 * 0.012 0.56 0.57 1.26 1.26 0.94 1.06 0.83
1.72 1.15 24.15 * 0.012 0.56 0.58 1.31 1.31 1.03 1.15 0.84
1.76 1.21 24.21 * 0.012 0.57 0.59 1.37 1.37 1.09 1.21 0.85
1.81 1.28 24.28 * 0.012 0.58 0.60 1.42 1.42 1.15 1.28 0.87
1.85 1.36 24.36 * 0.012 0.58 0.61 1.48 1.48 1.21 1.36 0.88
1.90 1.44 24.44 * 0.012 0.59 0.62 1.54 1.54 1.29 1.44 0.90
1.94 1.51 24.51 * 0.012 0.60 0.63 1.60 1.60 1.36 1.51 0.91
1.98 1.60 24.60 * 0.012 0.61 0.64 1.66 1.66 1.43 1.60 0.93
2.03 1.68 24.68 * 0.012 0.61 0.64 1.72 1.72 1.50 1.68 0.94
2.07 1.76 24.76 * 0.012 0.62 0.65 1.78 1.78 1.58 1.76 0.96
2.12 1.85 24.85 * 0.012 0.63 0.66 1.85 1.85 1.66 1.85 0.97
2.16 1.93 24.93 * 0.012 0.63 0.67 1.92 1.92 1.73 1.93 0.99
2.20 2.01 25.01 * 0.012 0.64 0.68 1.98 1.98 1.81 2.01 1.00
2.25 2.11 25.11 * 0.012 0.65 0.69 2.06 2.06 1.90 2.11 1.02
2.29 2.20 25.20 * 0.012 0.65 0.70 2.12 2.12 1.98 2.20 1.03
2.34 2.29 25.29 * 0.012 0.66 0.71 2.20 2.20 2.07 2.29 1.05
2.38 2.39 25.39 * 0.012 0.67 0.72 2.27 2.27 2.15 2.39 1.06
2.43 2.49 25.49 * 0.012 0.67 0.74 2.35 2.35 2.24 2.49 1.08
2.47 2.58 25.58 * 0.012 0.68 0.75 2.42 2.42 2.33 2.58 1.09
2.51 2.68 25.68 * 0.012 0.68 0.76 2.50 2.50 2.42 2.68 1.11
2.56 2.78 25.78 * 0.012 0.69 0.77 2.57 2.57 2.51 2.78 1.12
2.60 2.89 25.89 * 0.012 0.70 0.78 2.66 2.66 2.61 2.89 1.14
2.65 2.99 25.99 * 0.012 0.70 0.79 2.73 2.73 2.70 2.99 1.15
2.65 2.99 25.99 * 0.012 0.70 0.79 2.73 2.73 2.70 2.99 1.15
PIPE NO. 6: 35 LF - 8"CP @ 0.51% OUTLET: 23.00 INLET: 23.18 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.01 0.04 23.22 * 0.012 0.04 0.04 0.13 0.13 0.04 -0.03 -0.04
0.01 0.06 23.24 * 0.012 0.05 0.06 0.18 0.18 0.06 -0.01 -0.02
0.02 0.08 23.26 * 0.012 0.07 0.07 0.22 0.22 0.08 0.01 0.00
0.02 0.10 23.28 * 0.012 0.08 0.08 0.26 0.26 0.10 0.03 0.01
0.03 0.13 23.31 * 0.012 0.08 0.09 0.29 0.29 0.13 0.06 0.02
0.04 0.13 23.31 * 0.012 0.09 0.09 0.29 0.29 0.13 0.06 0.03
0.04 0.18 23.36 * 0.012 0.10 0.10 0.35 0.35 0.18 0.11 0.04
0.05 0.20 23.38 * 0.012 0.10 0.11 0.37 0.37 0.20 0.12 0.05
0.05 0.19 23.37 * 0.012 0.11 0.11 0.35 0.35 0.19 0.12 0.06
0.06 0.25 23.43 * 0.012 0.12 0.12 0.42 0.42 0.25 0.17 0.07
0.07 0.27 23.45 * 0.012 0.12 0.13 0.44 0.44 0.27 0.19 0.07
0.07 0.24 23.42 * 0.012 0.13 0.13 0.41 0.41 0.24 0.17 0.08
0.08 0.31 23.49 * 0.012 0.13 0.14 0.48 0.48 0.31 0.23 0.09
0.09 0.33 23.51 * 0.012 0.14 0.14 0.51 0.51 0.33 0.25 0.10
0.09 0.35 23.53 * 0.012 0.14 0.15 0.53 0.53 0.35 0.27 0.10
0.10 0.31 23.49 * 0.012 0.15 0.15 0.49 0.49 0.31 0.24 0.11
0.10 0.33 23.51 * 0.012 0.15 0.15 0.50 0.50 0.33 0.26 0.12
0.11 0.35 23.53 * 0.012 0.16 0.16 0.52 0.52 0.35 0.28 0.12
0.12 0.36 23.54 * 0.012 0.16 0.16 0.54 0.54 0.36 0.29 0.13
0.12 0.38 23.56 * 0.012 0.16 0.17 0.55 0.55 0.38 0.31 0.13
0.13 0.46 23.64 * 0.012 0.17 0.17 0.63 0.63 0.46 0.38 0.14
0.13 0.47 23.65 * 0.012 0.17 0.18 0.65 0.65 0.47 0.39 0.14
0.14 0.49 23.67 * 0.012 0.18 0.18 0.66 0.66 0.49 0.41 0.15
0.15 0.51 23.69 * 0.012 0.18 0.18 0.68 0.68 0.51 0.43 0.16
0.15 0.52 23.70 * 0.012 0.18 0.19 0.69 0.69 0.52 0.44 0.16
0.16 0.53 23.71 * 0.012 0.19 0.19 0.71 0.71 0.53 0.45 0.17
0.16 0.55 23.73 * 0.012 0.19 0.19 0.72 0.72 0.55 0.47 0.17
0.17 0.56 23.74 * 0.012 0.19 0.20 0.73 0.73 0.56 0.48 0.18
0.18 0.58 23.76 * 0.012 0.20 0.20 0.75 0.75 0.58 0.50 0.18
0.18 0.60 23.78 * 0.012 0.20 0.20 0.77 0.77 0.60 0.52 0.19
0.19 0.61 23.79 * 0.012 0.20 0.21 0.78 0.78 0.61 0.54 0.19
0.20 0.64 23.82 * 0.012 0.21 0.21 0.80 0.80 0.64 0.57 0.20
0.20 0.66 23.84 * 0.012 0.21 0.21 0.83 0.83 0.66 0.59 0.20
0.21 0.69 23.87 * 0.012 0.21 0.22 0.86 0.86 0.69 0.62 0.20
0.21 0.73 23.91 * 0.012 0.22 0.22 0.90 0.90 0.73 0.66 0.21
0.22 0.78 23.96 * 0.012 0.22 0.22 0.95 0.95 0.78 0.71 0.21
0.23 0.84 24.02 * 0.012 0.22 0.23 1.01 1.01 0.84 0.76 0.22
0.23 0.89 24.07 * 0.012 0.23 0.23 1.06 1.06 0.89 0.82 0.22
0.24 0.98 24.16 * 0.012 0.23 0.23 1.15 1.15 0.98 0.91 0.23
0.24 1.05 24.23 * 0.012 0.23 0.24 1.21 1.21 1.05 0.98 0.23
0.25 1.12 24.30 * 0.012 0.24 0.24 1.28 1.28 1.12 1.05 0.24
0.26 1.19 24.37 * 0.012 0.24 0.24 1.36 1.36 1.19 1.12 0.24
0.26 1.27 24.45 * 0.012 0.24 0.25 1.44 1.44 1.27 1.20 0.25
0.27 1.35 24.53 * 0.012 0.24 0.25 1.51 1.51 1.35 1.28 0.25
0.27 1.43 24.61 * 0.012 0.25 0.25 1.60 1.60 1.43 1.36 0.25
0.28 1.51 24.69 * 0.012 0.25 0.25 1.68 1.68 1.51 1.44 0.26
0.29 1.59 24.77 * 0.012 0.25 0.26 1.76 1.76 1.59 1.53 0.26
0.29 1.68 24.86 * 0.012 0.26 0.26 1.85 1.85 1.68 1.62 0.27
0.30 1.77 24.95 * 0.012 0.26 0.26 1.93 1.93 1.77 1.70 0.27
0.30 1.85 25.03 * 0.012 0.26 0.27 2.01 2.01 1.85 1.79 0.27
0.31 1.95 25.13 * 0.012 0.26 0.27 2.11 2.11 1.95 1.88 0.28
0.32 2.04 25.22 * 0.012 0.27 0.27 2.20 2.20 2.04 1.97 0.28
0.32 2.14 25.32 * 0.012 0.27 0.27 2.29 2.29 2.14 2.07 0.29
0.33 2.23 25.41 * 0.012 0.27 0.28 2.39 2.39 2.23 2.17 0.29
0.34 2.33 25.51 * 0.012 0.27 0.28 2.49 2.49 2.33 2.27 0.29
**************** OVERFLOW ENCOUNTERED AT 0.34 CFS DISCHARGE *****************
0.34 2.43 25.61 * 0.012 0.28 0.28 2.58 2.58 2.43 2.37 0.30
0.35 2.53 25.71 * 0.012 0.28 0.29 2.68 2.68 2.53 2.47 0.30
0.35 2.63 25.81 * 0.012 0.28 0.29 2.78 2.78 2.63 2.57 0.31
0.36 2.74 25.92 * 0.012 0.28 0.29 2.89 2.89 2.74 2.68 0.31
0.37 2.84 26.02 * 0.012 0.29 0.29 2.99 2.99 2.84 2.78 0.31
0.37 2.84 26.02 * 0.012 0.29 0.29 2.99 2.99 2.84 2.78 0.31
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-27 to CB 201-16.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.47 feet
Discharge Range:0.1 to 1.5 Step of 0.1 [cfs]
Overflow Elevation:23.81 feet
Weir:NONE
Upstream Velocity:2.33 feet/sec
PIPE NO. 1: 33 LF - 12"CP @ 0.58% OUTLET: 21.58 INLET: 21.77 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 24.14 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.71 23.48 * 0.012 0.13 0.13 1.89 1.89 1.71 1.71 0.17
0.20 1.70 23.47 * 0.012 0.19 0.18 1.89 1.89 1.70 1.70 0.24
0.30 1.70 23.47 * 0.012 0.23 0.22 1.89 1.89 1.70 1.70 0.30
0.40 1.71 23.48 * 0.012 0.27 0.25 1.89 1.89 1.70 1.71 0.35
0.50 1.71 23.48 * 0.012 0.30 0.28 1.89 1.89 1.71 1.71 0.39
0.60 1.71 23.48 * 0.012 0.33 0.31 1.89 1.89 1.71 1.71 0.43
0.70 1.72 23.49 * 0.012 0.35 0.34 1.89 1.89 1.71 1.72 0.47
0.80 1.72 23.49 * 0.012 0.38 0.36 1.89 1.89 1.71 1.72 0.51
0.90 1.73 23.50 * 0.012 0.40 0.39 1.89 1.89 1.72 1.73 0.54
1.00 1.74 23.51 * 0.012 0.43 0.41 1.89 1.89 1.72 1.74 0.57
1.10 1.74 23.51 * 0.012 0.45 0.43 1.89 1.89 1.73 1.74 0.60
1.20 1.75 23.52 * 0.012 0.47 0.45 1.89 1.89 1.73 1.75 0.63
1.30 1.76 23.53 * 0.012 0.49 0.47 1.89 1.89 1.74 1.76 0.65
1.40 1.77 23.54 * 0.012 0.51 0.49 1.89 1.89 1.74 1.77 0.68
1.50 1.78 23.55 * 0.012 0.52 0.51 1.89 1.89 1.75 1.78 0.71
PIPE NO. 2: 26 LF - 12"CP @ 0.54% OUTLET: 21.77 INLET: 21.91 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 24.00 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.58 23.49 * 0.012 0.13 0.13 1.71 1.71 1.58 1.58 0.17
0.20 1.56 23.47 * 0.012 0.19 0.18 1.70 1.70 1.56 1.56 0.24
0.30 1.56 23.47 * 0.012 0.23 0.22 1.70 1.70 1.56 1.56 0.29
0.40 1.57 23.48 * 0.012 0.27 0.26 1.71 1.71 1.57 1.55 0.33
0.50 1.57 23.48 * 0.012 0.30 0.29 1.71 1.71 1.57 1.55 0.37
0.60 1.58 23.49 * 0.012 0.33 0.32 1.71 1.71 1.58 1.55 0.40
0.70 1.59 23.50 * 0.012 0.35 0.34 1.72 1.72 1.59 1.54 0.42
0.80 1.59 23.50 * 0.012 0.38 0.37 1.72 1.72 1.59 1.54 0.44
0.90 1.60 23.51 * 0.012 0.40 0.39 1.73 1.73 1.60 1.53 0.46
1.00 1.61 23.52 * 0.012 0.43 0.42 1.74 1.74 1.61 1.53 0.47
1.10 1.63 23.54 * 0.012 0.45 0.44 1.74 1.74 1.63 1.52 0.48
1.20 1.64 23.55 * 0.012 0.47 0.46 1.75 1.75 1.64 1.51 0.48
1.30 1.65 23.56 * 0.012 0.49 0.48 1.76 1.76 1.65 1.50 0.48
1.40 1.67 23.58 * 0.012 0.51 0.50 1.77 1.77 1.67 1.50 0.50
1.50 1.68 23.59 * 0.012 0.52 0.52 1.78 1.78 1.68 1.49 0.48
PIPE NO. 3: 36 LF - 8"CP @ 0.53% OUTLET: 21.91 INLET: 22.10 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.40 23.50 * 0.012 0.15 0.15 1.58 1.58 1.40 1.32 0.11
0.20 1.38 23.48 * 0.012 0.21 0.21 1.56 1.56 1.38 1.30 0.20
0.30 1.39 23.49 * 0.012 0.26 0.26 1.56 1.56 1.39 1.33 0.27
0.40 1.41 23.51 * 0.012 0.30 0.31 1.57 1.57 1.41 1.36 0.33
0.50 1.44 23.54 * 0.012 0.34 0.35 1.57 1.57 1.44 1.40 0.40
0.60 1.47 23.57 * 0.012 0.37 0.39 1.58 1.58 1.47 1.45 0.45
0.70 1.51 23.61 * 0.012 0.40 0.43 1.59 1.59 1.50 1.51 0.51
0.80 1.58 23.68 * 0.012 0.43 0.47 1.59 1.59 1.54 1.58 0.57
0.90 1.65 23.75 * 0.012 0.45 0.52 1.60 1.60 1.58 1.65 0.63
**************** OVERFLOW ENCOUNTERED AT 1.00 CFS DISCHARGE *****************
1.00 1.74 23.84 * 0.012 0.48 0.59 1.61 1.61 1.63 1.74 0.69
1.10 1.84 23.94 * 0.012 0.50 0.67 1.63 1.63 1.69 1.84 0.75
1.20 1.94 24.04 * 0.012 0.52 0.67 1.64 1.64 1.75 1.94 0.83
1.30 2.06 24.16 * 0.012 0.54 0.67 1.65 1.65 1.82 2.06 0.91
1.40 2.18 24.28 * 0.012 0.56 0.67 1.67 1.67 1.89 2.18 1.00
1.50 2.31 24.41 * 0.012 0.58 0.67 1.68 1.68 1.96 2.31 1.10
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-60 to CB 201-16.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.1 feet
Discharge Range:0.85 to 1.35 Step of 0.05 [cfs]
Overflow Elevation:23.46 feet
Weir:NONE
Upstream Velocity:2.83 feet/sec
PIPE NO. 1: 25 LF - 12"CP @ 0.52% OUTLET: 21.58 INLET: 21.71 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 23.48 BEND: 30 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.85 1.41 23.12 * 0.012 0.39 0.38 1.52 1.52 1.41 1.36 0.47
0.90 1.40 23.11 * 0.012 0.40 0.40 1.52 1.52 1.40 1.35 0.47
0.95 1.41 23.12 * 0.012 0.41 0.41 1.52 1.52 1.41 1.35 0.48
1.00 1.41 23.12 * 0.012 0.43 0.42 1.52 1.52 1.41 1.34 0.49
1.05 1.41 23.12 * 0.012 0.44 0.43 1.52 1.52 1.41 1.34 0.50
1.10 1.41 23.12 * 0.012 0.45 0.44 1.52 1.52 1.41 1.33 0.50
1.15 1.41 23.12 * 0.012 0.46 0.45 1.52 1.52 1.41 1.33 0.51
1.20 1.41 23.12 * 0.012 0.47 0.46 1.52 1.52 1.41 1.32 0.52
1.25 1.42 23.13 * 0.012 0.48 0.47 1.52 1.52 1.42 1.32 0.52
1.30 1.42 23.13 * 0.012 0.49 0.49 1.52 1.52 1.42 1.31 0.52
1.35 1.42 23.13 * 0.012 0.50 0.50 1.52 1.52 1.42 1.31 0.53
1.35 1.42 23.13 * 0.012 0.50 0.50 1.52 1.52 1.42 1.31 0.53
PIPE NO. 2: 7 LF - 8"CP @ 0.57% OUTLET: 21.71 INLET: 21.75 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.85 1.41 23.16 * 0.012 0.44 0.48 1.41 1.41 1.40 1.41 0.56
0.90 1.43 23.18 * 0.012 0.45 0.50 1.40 1.40 1.40 1.43 0.59
0.95 1.45 23.20 * 0.012 0.47 0.53 1.41 1.41 1.40 1.45 0.62
1.00 1.47 23.22 * 0.012 0.48 0.56 1.41 1.41 1.41 1.47 0.65
1.05 1.50 23.25 * 0.012 0.49 0.60 1.41 1.41 1.41 1.50 0.68
1.10 1.53 23.28 * 0.012 0.50 0.67 1.41 1.41 1.42 1.53 0.71
1.15 1.55 23.30 * 0.012 0.51 0.67 1.41 1.41 1.43 1.55 0.75
1.20 1.58 23.33 * 0.012 0.52 0.67 1.41 1.41 1.43 1.58 0.79
1.25 1.61 23.36 * 0.012 0.53 0.67 1.42 1.42 1.44 1.61 0.83
1.30 1.65 23.40 * 0.012 0.54 0.67 1.42 1.42 1.45 1.65 0.87
1.35 1.68 23.43 * 0.012 0.55 0.67 1.42 1.42 1.46 1.68 0.92
1.35 1.68 23.43 * 0.012 0.55 0.67 1.42 1.42 1.46 1.68 0.92
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-06 to CB 201-54.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:24.01 feet
Discharge Range:0.5 to 1. Step of 0.1 [cfs]
Overflow Elevation:27.26 feet
Weir:NONE
Upstream Velocity:2.28 feet/sec
PIPE NO. 1: 101 LF - 8"CP @ 0.50% OUTLET: 23.00 INLET: 23.51 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.50 0.64 24.15 * 0.012 0.34 0.35 1.01 1.01 0.64 0.61 0.40
0.60 0.72 24.23 * 0.012 0.37 0.39 1.01 1.01 0.72 0.71 0.46
0.70 0.80 24.31 * 0.012 0.40 0.44 1.01 1.01 0.79 0.80 0.52
0.80 0.92 24.43 * 0.012 0.43 0.48 1.01 1.01 0.88 0.92 0.57
0.90 1.05 24.56 * 0.012 0.45 0.53 1.01 1.01 0.98 1.05 0.63
1.00 1.20 24.71 * 0.012 0.48 0.62 1.01 1.01 1.09 1.20 0.69
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 201-07 to CB 201-04.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:24.14 feet
Discharge Range:0.1 to 0.5 Step of 0.1 [cfs]
Overflow Elevation:26.71 feet
Weir:NONE
Upstream Velocity:2.98 feet/sec
PIPE NO. 1: 54 LF - 12"CP @ 0.50% OUTLET: 22.52 INLET: 22.79 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.36 24.15 * 0.012 0.13 0.14 1.62 1.62 1.36 1.22 0.03
0.20 1.35 24.14 * 0.012 0.19 0.19 1.62 1.62 1.35 1.21 0.11
0.30 1.35 24.14 * 0.012 0.23 0.23 1.62 1.62 1.35 1.22 0.17
0.40 1.36 24.15 * 0.012 0.27 0.26 1.62 1.62 1.36 1.22 0.26
0.50 1.36 24.15 * 0.012 0.30 0.29 1.62 1.62 1.36 1.23 0.29
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 102-17 to EX 201-01.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:22.2 feet
Discharge Range:0.05 to 0.3 Step of 0.05 [cfs]
Overflow Elevation:24.97 feet
Weir:NONE
Upstream Velocity:2.98 feet/sec
PIPE NO. 1: 44 LF - 12"CP @ 0.50% OUTLET: 21.20 INLET: 21.42 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 25.55 BEND: 15 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.79 22.21 * 0.012 0.10 0.10 1.00 1.00 0.79 0.79 0.12
0.10 0.79 22.21 * 0.012 0.13 0.14 1.00 1.00 0.79 0.79 0.17
0.15 0.79 22.21 * 0.012 0.16 0.16 1.00 1.00 0.79 0.79 0.21
0.20 0.79 22.21 * 0.012 0.19 0.19 1.00 1.00 0.79 0.79 0.24
0.25 0.79 22.21 * 0.012 0.21 0.21 1.00 1.00 0.79 0.79 0.27
0.30 0.79 22.21 * 0.012 0.23 0.23 1.00 1.00 0.79 0.79 0.30
PIPE NO. 2: 6 LF - 12"CP @ 0.50% OUTLET: 21.42 INLET: 21.45 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.77 22.22 * 0.012 0.10 0.10 0.79 0.79 0.77 0.63 -0.02
0.10 0.77 22.22 * 0.012 0.13 0.14 0.79 0.79 0.77 0.63 0.03
0.15 0.77 22.22 * 0.012 0.16 0.16 0.79 0.79 0.77 0.63 0.07
0.20 0.77 22.22 * 0.012 0.19 0.19 0.79 0.79 0.77 0.63 0.11
0.25 0.77 22.22 * 0.012 0.21 0.21 0.79 0.79 0.77 0.64 0.14
0.30 0.77 22.22 * 0.012 0.23 0.23 0.79 0.79 0.77 0.64 0.17
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:FIL-1 to CB 201-58.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:20.46 feet
Discharge Range:0.05 to 0.3 Step of 0.05 [cfs]
Overflow Elevation:23.96 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 9 LF - 12"CP @ 5.67% OUTLET: 19.96 INLET: 20.47 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.10 20.57 * 0.012 0.10 0.06 0.50 0.50 0.10 ***** 0.06
0.10 0.13 20.60 * 0.012 0.13 0.08 0.50 0.50 0.13 ***** 0.08
0.15 0.16 20.63 * 0.012 0.16 0.09 0.50 0.50 0.16 ***** 0.09
0.20 0.19 20.66 * 0.012 0.19 0.11 0.50 0.50 0.19 ***** 0.11
0.25 0.21 20.68 * 0.012 0.21 0.12 0.50 0.50 0.21 ***** 0.12
0.30 0.23 20.70 * 0.012 0.23 0.13 0.50 0.50 0.23 ***** 0.14
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 203-82 to EX 204-02.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:20.91 feet
Discharge Range:0.25 to 9.5 Step of 0.25 [cfs]
Overflow Elevation:27.52 feet
Weir:NONE
Upstream Velocity:2.86 feet/sec
PIPE NO. 1: 15 LF - 12"CP @ 0.53% OUTLET: 19.91 INLET: 19.99 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 27.07 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 0.93 20.92 * 0.012 0.21 0.21 1.00 1.00 0.93 0.93 0.27
0.50 0.93 20.92 * 0.012 0.30 0.29 1.00 1.00 0.93 0.93 0.39
0.75 0.94 20.93 * 0.012 0.37 0.36 1.00 1.00 0.93 0.94 0.49
1.00 0.95 20.94 * 0.012 0.43 0.42 1.00 1.00 0.93 0.95 0.57
1.25 0.96 20.95 * 0.012 0.48 0.47 1.00 1.00 0.94 0.96 0.64
1.50 0.97 20.96 * 0.012 0.52 0.52 1.00 1.00 0.94 0.97 0.70
1.75 0.99 20.98 * 0.012 0.57 0.58 1.00 1.00 0.95 0.99 0.76
2.00 1.02 21.01 * 0.012 0.61 0.63 1.00 1.00 0.96 1.02 0.82
2.25 1.04 21.03 * 0.012 0.65 0.68 1.00 1.00 0.97 1.04 0.87
2.50 1.06 21.05 * 0.012 0.68 0.74 1.00 1.00 0.98 1.06 0.92
2.75 1.10 21.09 * 0.012 0.72 0.80 1.00 1.00 1.00 1.10 0.97
3.00 1.13 21.12 * 0.012 0.75 0.90 1.00 1.00 1.01 1.13 1.02
3.25 1.16 21.15 * 0.012 0.78 1.00 1.00 1.00 1.03 1.16 1.09
3.50 1.20 21.19 * 0.012 0.80 1.00 1.00 1.00 1.04 1.20 1.16
3.75 1.25 21.24 * 0.012 0.83 1.00 1.00 1.00 1.06 1.25 1.23
4.00 1.30 21.29 * 0.012 0.85 1.00 1.00 1.00 1.08 1.29 1.30
4.25 1.39 21.38 * 0.012 0.87 1.00 1.00 1.00 1.10 1.34 1.39
4.50 1.47 21.46 * 0.012 0.89 1.00 1.00 1.00 1.12 1.39 1.47
4.75 1.57 21.56 * 0.012 0.91 1.00 1.00 1.00 1.15 1.44 1.57
5.00 1.66 21.65 * 0.012 0.92 1.00 1.00 1.00 1.17 1.50 1.66
5.25 1.76 21.75 * 0.012 0.93 1.00 1.00 1.00 1.20 1.56 1.76
5.50 1.87 21.86 * 0.012 0.94 1.00 1.00 1.00 1.22 1.62 1.87
5.75 1.98 21.97 * 0.012 0.95 1.00 1.00 1.00 1.25 1.69 1.98
6.00 2.10 22.09 * 0.012 0.96 1.00 1.00 1.00 1.28 1.75 2.10
6.25 2.22 22.21 * 0.012 0.97 1.00 1.00 1.00 1.31 1.83 2.22
6.50 2.35 22.34 * 0.012 0.97 1.00 1.00 1.00 1.35 1.90 2.35
6.75 2.48 22.47 * 0.012 0.98 1.00 1.00 1.00 1.38 1.98 2.48
7.00 2.62 22.61 * 0.012 0.98 1.00 1.00 1.00 1.41 2.06 2.62
7.25 2.76 22.75 * 0.012 0.98 1.00 1.00 1.00 1.45 2.14 2.76
7.50 2.91 22.90 * 0.012 0.99 1.00 1.00 1.00 1.49 2.22 2.91
7.75 3.06 23.05 * 0.012 0.99 1.00 1.00 1.00 1.52 2.31 3.06
8.00 3.22 23.21 * 0.012 0.99 1.00 1.00 1.00 1.56 2.40 3.22
8.25 3.38 23.37 * 0.012 0.99 1.00 1.00 1.00 1.61 2.50 3.38
8.50 3.54 23.53 * 0.012 0.99 1.00 1.00 1.00 1.65 2.59 3.54
8.75 3.72 23.71 * 0.012 0.99 1.00 1.00 1.00 1.69 2.69 3.72
9.00 3.89 23.88 * 0.012 1.00 1.00 1.00 1.00 1.74 2.80 3.89
9.25 4.07 24.06 * 0.012 1.00 1.00 1.00 1.00 1.78 2.90 4.07
9.50 4.26 24.25 * 0.012 1.00 1.00 1.00 1.00 1.83 3.01 4.26
PIPE NO. 2: 12 LF - 12"CP @ 1.25% OUTLET: 19.99 INLET: 20.14 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 27.08 BEND: 0 DEG DIA/WIDTH: 6.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 0.79 20.93 * 0.012 0.21 0.17 0.93 0.93 0.79 0.79 0.27
0.50 0.80 20.94 * 0.012 0.30 0.23 0.93 0.93 0.79 0.80 0.39
0.75 0.81 20.95 * 0.012 0.37 0.29 0.94 0.94 0.79 0.81 0.48
1.00 0.83 20.97 * 0.012 0.43 0.33 0.95 0.95 0.80 0.83 0.56
1.25 0.86 21.00 * 0.012 0.48 0.37 0.96 0.96 0.82 0.86 0.63
1.50 0.88 21.02 * 0.012 0.52 0.41 0.97 0.97 0.83 0.88 0.70
1.75 0.92 21.06 * 0.012 0.57 0.45 0.99 0.99 0.86 0.92 0.76
2.00 0.96 21.10 * 0.012 0.61 0.48 1.02 1.02 0.89 0.96 0.82
2.25 1.00 21.14 * 0.012 0.65 0.52 1.04 1.04 0.92 1.00 0.87
2.50 1.05 21.19 * 0.012 0.68 0.55 1.06 1.06 0.96 1.05 0.92
2.75 1.12 21.26 * 0.012 0.72 0.58 1.10 1.10 1.02 1.12 0.97
3.00 1.17 21.31 * 0.012 0.75 0.62 1.13 1.13 1.05 1.17 1.02
3.25 1.24 21.38 * 0.012 0.78 0.65 1.16 1.16 1.10 1.24 1.08
3.50 1.31 21.45 * 0.012 0.80 0.69 1.20 1.20 1.15 1.31 1.15
3.75 1.39 21.53 * 0.012 0.83 0.73 1.25 1.25 1.21 1.39 1.22
4.00 1.49 21.63 * 0.012 0.85 0.77 1.30 1.30 1.28 1.49 1.30
4.25 1.62 21.76 * 0.012 0.87 0.81 1.39 1.39 1.38 1.62 1.38
4.50 1.75 21.89 * 0.012 0.89 0.87 1.47 1.47 1.49 1.75 1.47
4.75 1.89 22.03 * 0.012 0.91 1.00 1.57 1.57 1.60 1.89 1.56
5.00 2.04 22.18 * 0.012 0.92 1.00 1.66 1.66 1.71 2.04 1.66
5.25 2.20 22.34 * 0.012 0.93 1.00 1.76 1.76 1.84 2.20 1.76
5.50 2.36 22.50 * 0.012 0.94 1.00 1.87 1.87 1.97 2.36 1.87
5.75 2.53 22.67 * 0.012 0.95 1.00 1.98 1.98 2.10 2.53 1.98
6.00 2.71 22.85 * 0.012 0.96 1.00 2.10 2.10 2.24 2.71 2.10
6.25 2.90 23.04 * 0.012 0.97 1.00 2.22 2.22 2.39 2.90 2.22
6.50 3.09 23.23 * 0.012 0.97 1.00 2.35 2.35 2.54 3.09 2.35
6.75 3.30 23.44 * 0.012 0.98 1.00 2.48 2.48 2.70 3.30 2.48
7.00 3.51 23.65 * 0.012 0.98 1.00 2.62 2.62 2.86 3.51 2.61
7.25 3.72 23.86 * 0.012 0.98 1.00 2.76 2.76 3.03 3.72 2.76
7.50 3.95 24.09 * 0.012 0.99 1.00 2.91 2.91 3.21 3.95 2.90
7.75 4.18 24.32 * 0.012 0.99 1.00 3.06 3.06 3.39 4.18 3.06
8.00 4.42 24.56 * 0.012 0.99 1.00 3.22 3.22 3.58 4.42 3.21
8.25 4.67 24.81 * 0.012 0.99 1.00 3.38 3.38 3.78 4.67 3.37
8.50 4.92 25.06 * 0.012 0.99 1.00 3.54 3.54 3.98 4.92 3.54
8.75 5.19 25.33 * 0.012 0.99 1.00 3.72 3.72 4.18 5.19 3.71
9.00 5.46 25.60 * 0.012 1.00 1.00 3.89 3.89 4.40 5.46 3.89
9.25 5.74 25.88 * 0.012 1.00 1.00 4.07 4.07 4.61 5.74 4.07
9.50 6.02 26.16 * 0.012 1.00 1.00 4.26 4.26 4.84 6.02 4.26
PIPE NO. 3: 10 LF - 12"CP @ 1.30% OUTLET: 21.21 INLET: 21.34 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 27.56 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.04
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 0.27 21.61 * 0.012 0.21 0.17 0.00 0.17 0.21 ***** 0.27
0.50 0.39 21.73 * 0.012 0.30 0.23 0.00 0.23 0.30 ***** 0.39
0.75 0.49 21.83 * 0.012 0.37 0.28 0.00 0.28 0.37 ***** 0.49
1.00 0.57 21.91 * 0.012 0.43 0.33 0.00 0.33 0.43 ***** 0.57
1.25 0.64 21.98 * 0.012 0.48 0.37 0.00 0.37 0.48 ***** 0.64
1.50 0.70 22.04 * 0.012 0.52 0.41 0.00 0.41 0.52 ***** 0.70
1.75 0.77 22.11 * 0.012 0.57 0.44 0.00 0.44 0.57 ***** 0.77
2.00 0.83 22.17 * 0.012 0.61 0.48 0.00 0.48 0.61 ***** 0.83
2.25 0.88 22.22 * 0.012 0.65 0.51 0.00 0.51 0.65 ***** 0.88
2.50 0.94 22.28 * 0.012 0.68 0.54 0.00 0.54 0.68 ***** 0.94
2.75 0.99 22.33 * 0.012 0.72 0.58 0.05 0.58 0.72 ***** 0.99
3.00 1.04 22.38 * 0.012 0.75 0.61 0.10 0.61 0.75 ***** 1.04
3.25 1.11 22.45 * 0.012 0.78 0.64 0.17 0.64 0.78 ***** 1.11
3.50 1.18 22.52 * 0.012 0.80 0.68 0.24 0.68 0.80 ***** 1.18
3.75 1.26 22.60 * 0.012 0.83 0.71 0.32 0.71 0.83 ***** 1.26
4.00 1.34 22.68 * 0.012 0.85 0.75 0.42 0.75 0.85 ***** 1.34
4.25 1.43 22.77 * 0.012 0.87 0.80 0.55 0.80 0.87 ***** 1.43
4.50 1.52 22.86 * 0.012 0.89 0.85 0.68 0.85 0.89 ***** 1.52
4.75 1.62 22.96 * 0.012 0.91 1.00 0.82 0.91 0.92 1.34 1.62
5.00 1.72 23.06 * 0.012 0.92 1.00 0.97 0.97 1.02 1.41 1.72
5.25 1.83 23.17 * 0.012 0.93 1.00 1.13 1.13 1.18 1.62 1.83
5.50 1.95 23.29 * 0.012 0.94 1.00 1.29 1.29 1.37 1.84 1.95
5.75 2.08 23.42 * 0.012 0.95 1.00 1.46 1.46 1.56 2.08 2.07
6.00 2.32 23.66 * 0.012 0.96 1.00 1.64 1.64 1.75 2.32 2.19
6.25 2.58 23.92 * 0.012 0.97 1.00 1.83 1.83 1.96 2.58 2.32
6.50 2.84 24.18 * 0.012 0.97 1.00 2.02 2.02 2.18 2.84 2.46
6.75 3.12 24.46 * 0.012 0.98 1.00 2.23 2.23 2.40 3.12 2.60
7.00 3.41 24.75 * 0.012 0.98 1.00 2.44 2.44 2.63 3.41 2.74
7.25 3.70 25.04 * 0.012 0.98 1.00 2.65 2.65 2.88 3.70 2.90
7.50 4.01 25.35 * 0.012 0.99 1.00 2.88 2.88 3.13 4.01 3.05
7.75 4.33 25.67 * 0.012 0.99 1.00 3.11 3.11 3.38 4.33 3.21
8.00 4.66 26.00 * 0.012 0.99 1.00 3.35 3.35 3.65 4.66 3.38
8.25 5.00 26.34 * 0.012 0.99 1.00 3.60 3.60 3.92 5.00 3.55
8.50 5.35 26.69 * 0.012 0.99 1.00 3.85 3.85 4.21 5.35 3.73
8.75 5.71 27.05 * 0.012 0.99 1.00 4.12 4.12 4.50 5.71 3.91
9.00 6.08 27.42 * 0.012 1.00 1.00 4.39 4.39 4.80 6.08 4.10
**************** OVERFLOW ENCOUNTERED AT 9.25 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
9.25 6.46 27.80 * 0.012 1.00 1.00 4.67 4.67 5.11 6.46 4.30
9.50 6.85 28.19 * 0.012 1.00 1.00 4.95 4.95 5.43 6.85 4.50
PIPE NO. 4: 59 LF - 12"CP @ 1.14% OUTLET: 21.34 INLET: 22.01 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 28.01 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.69
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.24 0.27 22.28 * 0.012 0.21 0.17 0.27 0.27 0.21 ***** 0.27
0.48 0.39 22.40 * 0.012 0.29 0.24 0.39 0.39 0.29 ***** 0.39
0.72 0.49 22.50 * 0.012 0.36 0.29 0.49 0.49 0.36 ***** 0.49
0.96 0.58 22.59 * 0.012 0.42 0.33 0.57 0.57 0.42 ***** 0.58
1.20 0.67 22.68 * 0.012 0.47 0.38 0.64 0.64 0.47 ***** 0.67
1.44 0.75 22.76 * 0.012 0.51 0.41 0.70 0.70 0.51 ***** 0.75
1.68 0.83 22.84 * 0.012 0.56 0.45 0.77 0.77 0.56 ***** 0.83
1.92 0.91 22.92 * 0.012 0.60 0.49 0.83 0.83 0.60 ***** 0.91
2.16 1.00 23.01 * 0.012 0.63 0.52 0.88 0.88 0.63 ***** 1.00
2.40 1.08 23.09 * 0.012 0.67 0.55 0.94 0.94 0.67 ***** 1.08
2.64 1.17 23.18 * 0.012 0.70 0.59 0.99 0.99 0.70 ***** 1.17
2.88 1.26 23.27 * 0.012 0.73 0.62 1.04 1.04 0.73 ***** 1.26
3.13 1.35 23.36 * 0.012 0.76 0.66 1.11 1.11 0.76 ***** 1.35
3.37 1.47 23.48 * 0.012 0.79 0.69 1.18 1.18 0.91 1.45 1.47
3.61 1.69 23.70 * 0.012 0.82 0.73 1.26 1.26 1.11 1.69 1.59
3.85 1.92 23.93 * 0.012 0.84 0.77 1.34 1.34 1.26 1.92 1.72
4.09 2.16 24.17 * 0.012 0.86 0.82 1.43 1.43 1.42 2.16 1.85
4.33 2.43 24.44 * 0.012 0.88 0.88 1.52 1.52 1.59 2.43 2.00
4.57 2.70 24.71 * 0.012 0.90 1.00 1.62 1.62 1.78 2.70 2.15
4.81 3.00 25.01 * 0.012 0.91 1.00 1.72 1.72 1.97 3.00 2.31
5.05 3.30 25.31 * 0.012 0.92 1.00 1.83 1.83 2.17 3.30 2.48
5.29 3.63 25.64 * 0.012 0.94 1.00 1.95 1.95 2.39 3.63 2.65
5.53 3.97 25.98 * 0.012 0.95 1.00 2.08 2.08 2.62 3.97 2.84
5.77 4.45 26.46 * 0.012 0.95 1.00 2.32 2.32 2.97 4.45 3.03
6.01 4.94 26.95 * 0.012 0.96 1.00 2.58 2.58 3.34 4.94 3.23
6.25 5.45 27.46 * 0.012 0.97 1.00 2.84 2.84 3.72 5.45 3.44
6.49 5.99 28.00 * 0.012 0.97 1.00 3.12 3.12 4.12 5.99 3.66
**************** OVERFLOW ENCOUNTERED AT 6.73 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
6.73 6.54 28.55 * 0.012 0.98 1.00 3.41 3.41 4.53 6.54 3.89
6.97 7.12 29.13 * 0.012 0.98 1.00 3.70 3.70 4.96 7.12 4.12
7.21 7.71 29.72 * 0.012 0.98 1.00 4.01 4.01 5.40 7.71 4.36
7.45 8.32 30.33 * 0.012 0.99 1.00 4.33 4.33 5.86 8.32 4.61
7.69 8.96 30.97 * 0.012 0.99 1.00 4.66 4.66 6.33 8.96 4.87
7.93 9.61 31.62 * 0.012 0.99 1.00 5.00 5.00 6.82 9.61 5.14
8.17 10.29 32.30 * 0.012 0.99 1.00 5.35 5.35 7.32 10.29 5.41
8.41 10.98 32.99 * 0.012 0.99 1.00 5.71 5.71 7.84 10.98 5.70
8.65 11.70 33.71 * 0.012 0.99 1.00 6.08 6.08 8.37 11.70 5.99
8.89 12.43 34.44 * 0.012 1.00 1.00 6.46 6.46 8.92 12.43 6.29
9.13 13.19 35.20 * 0.012 1.00 1.00 6.85 6.85 9.48 13.19 6.60
PIPE NO. 5: 156 LF - 12"CP @ 0.50% OUTLET: 22.90 INLET: 23.68 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 29.54 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.23 23.91 * 0.012 0.16 0.16 0.00 0.16 0.16 0.23 0.21
0.28 0.33 24.01 * 0.012 0.22 0.22 0.00 0.22 0.22 0.33 0.29
0.43 0.36 24.04 * 0.012 0.28 0.27 0.00 0.27 0.28 ***** 0.36
0.57 0.42 24.10 * 0.012 0.32 0.31 0.00 0.31 0.32 ***** 0.42
0.71 0.47 24.15 * 0.012 0.36 0.35 0.00 0.35 0.36 ***** 0.47
0.85 0.58 24.26 * 0.012 0.39 0.39 0.00 0.39 0.39 0.58 0.52
1.00 0.63 24.31 * 0.012 0.42 0.42 0.00 0.42 0.42 0.63 0.57
1.14 0.67 24.35 * 0.012 0.45 0.46 0.02 0.45 0.46 0.67 0.61
1.28 0.71 24.39 * 0.012 0.48 0.49 0.11 0.48 0.49 0.71 0.65
1.42 0.75 24.43 * 0.012 0.51 0.52 0.19 0.51 0.52 0.75 0.68
1.56 0.78 24.46 * 0.012 0.54 0.55 0.28 0.54 0.55 0.78 0.72
1.71 0.81 24.49 * 0.012 0.56 0.58 0.37 0.56 0.58 0.81 0.75
1.85 0.84 24.52 * 0.012 0.58 0.61 0.46 0.58 0.61 0.84 0.79
1.99 0.87 24.55 * 0.012 0.61 0.64 0.58 0.61 0.64 0.87 0.82
2.13 0.90 24.58 * 0.012 0.63 0.67 0.80 0.80 0.67 0.90 0.85
2.28 0.93 24.61 * 0.012 0.65 0.70 1.03 1.03 0.77 0.93 0.88
2.42 1.19 24.87 * 0.012 0.67 0.74 1.27 1.27 1.11 1.19 0.91
2.56 1.53 25.21 * 0.012 0.69 0.77 1.54 1.54 1.44 1.53 0.93
2.70 1.89 25.57 * 0.012 0.71 0.82 1.81 1.81 1.80 1.89 0.96
2.84 2.28 25.96 * 0.012 0.73 0.87 2.11 2.11 2.17 2.28 0.99
2.99 2.69 26.37 * 0.012 0.75 1.00 2.41 2.41 2.57 2.69 1.02
3.13 3.11 26.79 * 0.012 0.76 1.00 2.74 2.74 2.98 3.11 1.05
3.27 3.57 27.25 * 0.012 0.78 1.00 3.08 3.08 3.42 3.57 1.09
3.41 4.15 27.83 * 0.012 0.80 1.00 3.56 3.56 4.00 4.15 1.13
3.56 4.76 28.44 * 0.012 0.81 1.00 4.05 4.05 4.59 4.76 1.17
3.70 5.40 29.08 * 0.012 0.82 1.00 4.56 4.56 5.22 5.40 1.21
**************** OVERFLOW ENCOUNTERED AT 3.84 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
3.84 6.06 29.74 * 0.012 0.84 1.00 5.10 5.10 5.86 6.06 1.25
3.98 6.74 30.42 * 0.012 0.85 1.00 5.65 5.65 6.53 6.74 1.30
4.12 7.45 31.13 * 0.012 0.86 1.00 6.23 6.23 7.23 7.45 1.35
4.27 8.19 31.87 * 0.012 0.87 1.00 6.82 6.82 7.95 8.19 1.39
4.41 8.95 32.63 * 0.012 0.89 1.00 7.43 7.43 8.69 8.95 1.44
4.55 9.73 33.41 * 0.012 0.90 1.00 8.07 8.07 9.46 9.73 1.49
4.69 10.54 34.22 * 0.012 0.90 1.00 8.72 8.72 10.25 10.54 1.54
4.84 11.37 35.05 * 0.012 0.91 1.00 9.40 9.40 11.07 11.37 1.60
4.98 12.23 35.91 * 0.012 0.92 1.00 10.09 10.09 11.91 12.23 1.65
5.12 13.12 36.80 * 0.012 0.93 1.00 10.81 10.81 12.77 13.12 1.71
5.26 14.03 37.71 * 0.012 0.93 1.00 11.54 11.54 13.66 14.03 1.77
5.41 14.96 38.64 * 0.012 0.94 1.00 12.30 12.30 14.58 14.96 1.83
PIPE NO. 6: 161 LF - 12"CP @ 0.50% OUTLET: 23.68 INLET: 24.48 INTYP: 5
JUNC NO. 6: OVERFLOW-EL: 27.60 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.23 24.71 * 0.012 0.16 0.16 0.23 0.23 0.16 0.23 0.21
0.28 0.34 24.82 * 0.012 0.22 0.22 0.33 0.33 0.22 0.34 0.30
0.43 0.37 24.85 * 0.012 0.28 0.27 0.36 0.36 0.28 ***** 0.37
0.57 0.48 24.96 * 0.012 0.32 0.32 0.42 0.42 0.32 0.48 0.43
0.71 0.49 24.97 * 0.012 0.36 0.35 0.47 0.47 0.36 ***** 0.49
0.85 0.61 25.09 * 0.012 0.39 0.39 0.58 0.58 0.39 0.61 0.55
1.00 0.66 25.14 * 0.012 0.42 0.42 0.63 0.63 0.42 0.66 0.60
1.14 0.71 25.19 * 0.012 0.45 0.46 0.67 0.67 0.46 0.71 0.65
1.28 0.76 25.24 * 0.012 0.48 0.49 0.71 0.71 0.49 0.76 0.70
1.42 0.81 25.29 * 0.012 0.51 0.52 0.75 0.75 0.52 0.81 0.75
1.56 0.86 25.34 * 0.012 0.54 0.55 0.78 0.78 0.55 0.86 0.80
1.71 0.91 25.39 * 0.012 0.56 0.58 0.81 0.81 0.58 0.91 0.85
1.85 0.95 25.43 * 0.012 0.58 0.61 0.84 0.84 0.61 0.95 0.90
1.99 1.00 25.48 * 0.012 0.61 0.64 0.87 0.87 0.64 1.00 0.95
2.13 1.05 25.53 * 0.012 0.63 0.67 0.90 0.90 0.67 1.05 1.00
2.28 1.09 25.57 * 0.012 0.65 0.70 0.93 0.93 0.70 1.09 1.05
2.42 1.29 25.77 * 0.012 0.67 0.74 1.19 1.19 1.02 1.29 1.10
2.56 1.74 26.22 * 0.012 0.69 0.78 1.53 1.53 1.44 1.74 1.15
2.70 2.22 26.70 * 0.012 0.71 0.82 1.89 1.89 1.88 2.22 1.20
2.84 2.73 27.21 * 0.012 0.73 0.87 2.28 2.28 2.36 2.73 1.25
**************** OVERFLOW ENCOUNTERED AT 2.99 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
2.99 3.26 27.74 * 0.012 0.75 1.00 2.69 2.69 2.85 3.26 1.31
3.13 3.82 28.30 * 0.012 0.76 1.00 3.11 3.11 3.37 3.82 1.37
3.27 4.41 28.89 * 0.012 0.78 1.00 3.57 3.57 3.92 4.41 1.44
3.41 5.14 29.62 * 0.012 0.80 1.00 4.15 4.15 4.61 5.14 1.51
3.56 5.91 30.39 * 0.012 0.81 1.00 4.76 4.76 5.33 5.91 1.59
3.70 6.70 31.18 * 0.012 0.82 1.00 5.40 5.40 6.07 6.70 1.66
3.84 7.53 32.01 * 0.012 0.84 1.00 6.06 6.06 6.85 7.53 1.74
3.98 8.38 32.86 * 0.012 0.85 1.00 6.74 6.74 7.66 8.38 1.82
4.12 9.27 33.75 * 0.012 0.86 1.00 7.45 7.45 8.49 9.27 1.90
4.27 10.19 34.67 * 0.012 0.87 1.00 8.19 8.19 9.35 10.19 1.99
4.41 11.14 35.62 * 0.012 0.89 1.00 8.95 8.95 10.25 11.14 2.08
4.55 12.12 36.60 * 0.012 0.90 1.00 9.73 9.73 11.17 12.12 2.17
4.69 13.13 37.61 * 0.012 0.90 1.00 10.54 10.54 12.12 13.13 2.27
4.84 14.17 38.65 * 0.012 0.91 1.00 11.37 11.37 13.10 14.17 2.37
4.98 15.25 39.73 * 0.012 0.92 1.00 12.23 12.23 14.11 15.25 2.47
5.12 16.35 40.83 * 0.012 0.93 1.00 13.12 13.12 15.15 16.35 2.57
5.26 17.49 41.97 * 0.012 0.93 1.00 14.03 14.03 16.22 17.49 2.68
5.41 18.66 43.14 * 0.012 0.94 1.00 14.96 14.96 17.32 18.66 2.79
PIPE NO. 7: 13 LF - 12"CP @ 0.46% OUTLET: 24.48 INLET: 24.54 INTYP: 5
JUNC NO. 7: OVERFLOW-EL: 27.61 BEND: 15 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.23 24.77 * 0.012 0.16 0.16 0.23 0.23 0.18 0.23 0.21
0.28 0.34 24.88 * 0.012 0.22 0.23 0.34 0.34 0.28 0.34 0.29
0.43 0.41 24.95 * 0.012 0.28 0.28 0.37 0.37 0.32 0.41 0.36
0.57 0.49 25.03 * 0.012 0.32 0.32 0.48 0.48 0.43 0.49 0.42
0.71 0.53 25.07 * 0.012 0.36 0.36 0.49 0.49 0.44 0.53 0.48
0.85 0.63 25.17 * 0.012 0.39 0.40 0.61 0.61 0.56 0.63 0.52
1.00 0.68 25.22 * 0.012 0.42 0.43 0.66 0.66 0.61 0.68 0.57
1.14 0.73 25.27 * 0.012 0.45 0.47 0.71 0.71 0.66 0.73 0.61
1.28 0.79 25.33 * 0.012 0.48 0.50 0.76 0.76 0.72 0.79 0.65
1.42 0.84 25.38 * 0.012 0.51 0.53 0.81 0.81 0.77 0.84 0.69
1.56 0.88 25.42 * 0.012 0.54 0.56 0.86 0.86 0.82 0.88 0.72
1.71 0.93 25.47 * 0.012 0.56 0.59 0.91 0.91 0.87 0.93 0.76
1.85 0.98 25.52 * 0.012 0.58 0.62 0.95 0.95 0.92 0.98 0.79
1.99 1.04 25.58 * 0.012 0.61 0.66 1.00 1.00 0.98 1.04 0.82
2.13 1.10 25.64 * 0.012 0.63 0.69 1.05 1.05 1.03 1.10 0.85
2.28 1.15 25.69 * 0.012 0.65 0.72 1.09 1.09 1.08 1.15 0.89
2.42 1.36 25.90 * 0.012 0.67 0.76 1.29 1.29 1.28 1.36 0.92
2.56 1.83 26.37 * 0.012 0.69 0.80 1.74 1.74 1.73 1.83 0.94
2.70 2.33 26.87 * 0.012 0.71 0.86 2.22 2.22 2.22 2.33 0.97
2.84 2.86 27.40 * 0.012 0.73 1.00 2.73 2.73 2.74 2.86 1.00
**************** OVERFLOW ENCOUNTERED AT 2.99 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
2.99 3.41 27.95 * 0.012 0.75 1.00 3.26 3.26 3.28 3.41 1.03
3.13 3.99 28.53 * 0.012 0.76 1.00 3.82 3.82 3.84 3.99 1.06
3.27 4.60 29.14 * 0.012 0.78 1.00 4.41 4.41 4.45 4.60 1.11
3.41 5.36 29.90 * 0.012 0.80 1.00 5.14 5.14 5.19 5.36 1.15
3.56 6.14 30.68 * 0.012 0.81 1.00 5.91 5.91 5.96 6.14 1.19
3.70 6.96 31.50 * 0.012 0.82 1.00 6.70 6.70 6.76 6.96 1.23
3.84 7.81 32.35 * 0.012 0.84 1.00 7.53 7.53 7.60 7.81 1.28
3.98 8.69 33.23 * 0.012 0.85 1.00 8.38 8.38 8.46 8.69 1.32
4.12 9.61 34.15 * 0.012 0.86 1.00 9.27 9.27 9.36 9.61 1.37
4.27 10.55 35.09 * 0.012 0.87 1.00 10.19 10.19 10.29 10.55 1.42
4.41 11.53 36.07 * 0.012 0.89 1.00 11.14 11.14 11.25 11.53 1.47
4.55 12.54 37.08 * 0.012 0.90 1.00 12.12 12.12 12.24 12.54 1.52
4.69 13.59 38.13 * 0.012 0.90 1.00 13.13 13.13 13.26 13.59 1.58
4.84 14.66 39.20 * 0.012 0.91 1.00 14.17 14.17 14.32 14.66 1.63
4.98 15.77 40.31 * 0.012 0.92 1.00 15.25 15.25 15.40 15.77 1.69
5.12 16.91 41.45 * 0.012 0.93 1.00 16.35 16.35 16.52 16.91 1.75
5.26 18.08 42.62 * 0.012 0.93 1.00 17.49 17.49 17.67 18.08 1.81
5.41 19.28 43.82 * 0.012 0.94 1.00 18.66 18.66 18.85 19.28 1.88
PIPE NO. 8: 35 LF - 12"CP @ 0.51% OUTLET: 24.54 INLET: 24.72 INTYP: 5
JUNC NO. 8: OVERFLOW-EL: 27.37 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.23 24.95 * 0.012 0.16 0.16 0.23 0.23 0.16 0.23 0.21
0.28 0.33 25.05 * 0.012 0.22 0.22 0.34 0.34 0.22 0.33 0.30
0.43 0.37 25.09 * 0.012 0.28 0.27 0.41 0.41 0.28 ***** 0.37
0.57 0.48 25.20 * 0.012 0.32 0.31 0.49 0.49 0.34 0.48 0.43
0.71 0.54 25.26 * 0.012 0.36 0.35 0.53 0.53 0.38 0.54 0.49
0.85 0.60 25.32 * 0.012 0.39 0.39 0.63 0.63 0.46 0.60 0.54
1.00 0.65 25.37 * 0.012 0.42 0.42 0.68 0.68 0.52 0.65 0.59
1.14 0.71 25.43 * 0.012 0.45 0.45 0.73 0.73 0.57 0.71 0.64
1.28 0.77 25.49 * 0.012 0.48 0.48 0.79 0.79 0.63 0.77 0.68
1.42 0.83 25.55 * 0.012 0.51 0.51 0.84 0.84 0.69 0.83 0.73
1.56 0.88 25.60 * 0.012 0.54 0.54 0.88 0.88 0.74 0.88 0.78
1.71 0.95 25.67 * 0.012 0.56 0.57 0.93 0.93 0.80 0.95 0.82
1.85 1.01 25.73 * 0.012 0.58 0.60 0.98 0.98 0.86 1.01 0.87
1.99 1.10 25.82 * 0.012 0.61 0.63 1.04 1.04 0.95 1.10 0.91
2.13 1.20 25.92 * 0.012 0.63 0.66 1.10 1.10 1.03 1.20 0.95
2.28 1.28 26.00 * 0.012 0.65 0.70 1.15 1.15 1.09 1.28 1.00
2.42 1.54 26.26 * 0.012 0.67 0.73 1.36 1.36 1.32 1.54 1.04
2.56 2.04 26.76 * 0.012 0.69 0.76 1.83 1.83 1.80 2.04 1.09
2.70 2.59 27.31 * 0.012 0.71 0.80 2.33 2.33 2.32 2.59 1.13
**************** OVERFLOW ENCOUNTERED AT 2.84 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
2.84 3.16 27.88 * 0.012 0.73 0.85 2.86 2.86 2.87 3.16 1.18
2.99 3.76 28.48 * 0.012 0.75 1.00 3.41 3.41 3.44 3.76 1.23
3.13 4.40 29.12 * 0.012 0.76 1.00 3.99 3.99 4.04 4.40 1.28
3.27 5.07 29.79 * 0.012 0.78 1.00 4.60 4.60 4.67 5.07 1.34
3.41 5.88 30.60 * 0.012 0.80 1.00 5.36 5.36 5.45 5.88 1.40
3.56 6.72 31.44 * 0.012 0.81 1.00 6.14 6.14 6.26 6.72 1.47
3.70 7.60 32.32 * 0.012 0.82 1.00 6.96 6.96 7.10 7.60 1.53
3.84 8.52 33.24 * 0.012 0.84 1.00 7.81 7.81 7.98 8.52 1.60
3.98 9.47 34.19 * 0.012 0.85 1.00 8.69 8.69 8.89 9.47 1.67
4.12 10.45 35.17 * 0.012 0.86 1.00 9.61 9.61 9.83 10.45 1.74
4.27 11.47 36.19 * 0.012 0.87 1.00 10.55 10.55 10.80 11.47 1.82
4.41 12.52 37.24 * 0.012 0.89 1.00 11.53 11.53 11.81 12.52 1.90
4.55 13.61 38.33 * 0.012 0.90 1.00 12.54 12.54 12.85 13.61 1.98
4.69 14.73 39.45 * 0.012 0.90 1.00 13.59 13.59 13.92 14.73 2.06
4.84 15.88 40.60 * 0.012 0.91 1.00 14.66 14.66 15.03 15.88 2.15
4.98 17.08 41.80 * 0.012 0.92 1.00 15.77 15.77 16.17 17.08 2.24
5.12 18.30 43.02 * 0.012 0.93 1.00 16.91 16.91 17.34 18.30 2.33
5.26 19.56 44.28 * 0.012 0.93 1.00 18.08 18.08 18.55 19.56 2.42
5.41 20.85 45.57 * 0.012 0.94 1.00 19.28 19.28 19.79 20.85 2.52
PIPE NO. 9: 53 LF - 24"CP @ 0.51% OUTLET: 24.72 INLET: 24.99 INTYP: 5
JUNC NO. 9: OVERFLOW-EL: 28.00 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.19 25.18 * 0.012 0.13 0.13 0.23 0.23 0.13 0.19 0.17
0.28 0.24 25.23 * 0.012 0.19 0.18 0.33 0.33 0.19 ***** 0.24
0.43 0.30 25.29 * 0.012 0.23 0.22 0.37 0.37 0.23 ***** 0.30
0.57 0.34 25.33 * 0.012 0.26 0.25 0.48 0.48 0.26 ***** 0.34
0.71 0.43 25.42 * 0.012 0.29 0.28 0.54 0.54 0.30 0.43 0.38
0.85 0.47 25.46 * 0.012 0.32 0.31 0.60 0.60 0.35 0.47 0.42
1.00 0.51 25.50 * 0.012 0.35 0.33 0.65 0.65 0.40 0.51 0.46
1.14 0.56 25.55 * 0.012 0.37 0.35 0.71 0.71 0.45 0.56 0.49
1.28 0.60 25.59 * 0.012 0.40 0.37 0.77 0.77 0.50 0.60 0.52
1.42 0.65 25.64 * 0.012 0.42 0.39 0.83 0.83 0.56 0.65 0.55
1.56 0.70 25.69 * 0.012 0.44 0.41 0.88 0.88 0.62 0.70 0.58
1.71 0.75 25.74 * 0.012 0.46 0.43 0.95 0.95 0.68 0.75 0.61
1.85 0.81 25.80 * 0.012 0.48 0.44 1.01 1.01 0.74 0.81 0.63
1.99 0.89 25.88 * 0.012 0.49 0.46 1.10 1.10 0.83 0.89 0.66
2.13 0.98 25.97 * 0.012 0.51 0.48 1.20 1.20 0.93 0.98 0.68
2.28 1.06 26.05 * 0.012 0.53 0.49 1.28 1.28 1.02 1.06 0.70
2.42 1.29 26.28 * 0.012 0.55 0.51 1.54 1.54 1.27 1.29 0.73
2.56 1.79 26.78 * 0.012 0.56 0.52 2.04 2.04 1.78 1.79 0.75
2.70 2.34 27.33 * 0.012 0.58 0.54 2.59 2.59 2.33 2.34 0.77
2.84 2.91 27.90 * 0.012 0.59 0.55 3.16 3.16 2.90 2.91 0.79
**************** OVERFLOW ENCOUNTERED AT 2.99 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
2.99 3.51 28.50 * 0.012 0.61 0.56 3.76 3.76 3.50 3.51 0.81
3.13 4.15 29.14 * 0.012 0.62 0.58 4.40 4.40 4.13 4.15 0.83
3.27 4.82 29.81 * 0.012 0.64 0.59 5.07 5.07 4.81 4.82 0.85
3.41 5.63 30.62 * 0.012 0.65 0.60 5.88 5.88 5.62 5.63 0.87
3.56 6.48 31.47 * 0.012 0.67 0.62 6.72 6.72 6.46 6.48 0.89
3.70 7.36 32.35 * 0.012 0.68 0.63 7.60 7.60 7.34 7.36 0.91
3.84 8.28 33.27 * 0.012 0.69 0.64 8.52 8.52 8.26 8.28 0.93
3.98 9.23 34.22 * 0.012 0.71 0.65 9.47 9.47 9.21 9.23 0.95
4.12 10.21 35.20 * 0.012 0.72 0.67 10.45 10.45 10.19 10.21 0.97
4.27 11.23 36.22 * 0.012 0.73 0.68 11.47 11.47 11.21 11.23 0.98
4.41 12.29 37.28 * 0.012 0.74 0.69 12.52 12.52 12.27 12.29 1.00
4.55 13.38 38.37 * 0.012 0.76 0.70 13.61 13.61 13.36 13.38 1.02
4.69 14.50 39.49 * 0.012 0.77 0.71 14.73 14.73 14.48 14.50 1.03
4.84 15.66 40.65 * 0.012 0.78 0.72 15.88 15.88 15.64 15.66 1.05
4.98 16.86 41.85 * 0.012 0.79 0.74 17.08 17.08 16.83 16.86 1.07
5.12 18.08 43.07 * 0.012 0.80 0.75 18.30 18.30 18.05 18.08 1.08
5.26 19.35 44.34 * 0.012 0.81 0.76 19.56 19.56 19.31 19.35 1.10
5.41 20.64 45.63 * 0.012 0.83 0.77 20.85 20.85 20.61 20.64 1.12
PIPE NO.10: 35 LF - 24"CP @ 0.51% OUTLET: 24.99 INLET: 25.17 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.13 25.30 * 0.012 0.13 0.13 0.19 0.19 0.13 0.07 0.04
0.28 0.19 25.36 * 0.012 0.19 0.18 0.24 0.24 0.19 ***** 0.18
0.43 0.23 25.40 * 0.012 0.23 0.22 0.30 0.30 0.23 ***** 0.22
0.57 0.26 25.43 * 0.012 0.26 0.25 0.34 0.34 0.26 ***** 0.25
0.71 0.29 25.46 * 0.012 0.29 0.28 0.43 0.43 0.29 ***** 0.28
0.85 0.32 25.49 * 0.012 0.32 0.30 0.47 0.47 0.32 ***** 0.30
1.00 0.35 25.52 * 0.012 0.35 0.33 0.51 0.51 0.35 ***** 0.33
1.14 0.43 25.60 * 0.012 0.37 0.35 0.56 0.56 0.38 0.43 0.36
1.28 0.46 25.63 * 0.012 0.40 0.37 0.60 0.60 0.42 0.46 0.40
1.42 0.49 25.66 * 0.012 0.42 0.39 0.65 0.65 0.46 0.49 0.43
1.56 0.53 25.70 * 0.012 0.44 0.41 0.70 0.70 0.51 0.53 0.46
1.71 0.57 25.74 * 0.012 0.46 0.43 0.75 0.75 0.57 0.57 0.48
1.85 0.62 25.79 * 0.012 0.48 0.44 0.81 0.81 0.62 0.61 0.51
1.99 0.70 25.87 * 0.012 0.49 0.46 0.89 0.89 0.70 0.67 0.53
2.13 0.80 25.97 * 0.012 0.51 0.48 0.98 0.98 0.80 0.75 0.56
2.28 0.88 26.05 * 0.012 0.53 0.49 1.06 1.06 0.88 0.82 0.58
2.42 1.12 26.29 * 0.012 0.55 0.51 1.29 1.29 1.12 1.03 0.61
2.56 1.62 26.79 * 0.012 0.56 0.52 1.79 1.79 1.62 1.51 0.63
2.70 2.17 27.34 * 0.012 0.58 0.54 2.34 2.34 2.17 2.06 0.65
**************** OVERFLOW ENCOUNTERED AT 2.84 CFS DISCHARGE *****************
2.84 2.73 27.90 * 0.012 0.59 0.55 2.91 2.91 2.73 2.62 0.68
2.99 3.34 28.51 * 0.012 0.61 0.56 3.51 3.51 3.34 3.23 0.70
3.13 3.97 29.14 * 0.012 0.62 0.58 4.15 4.15 3.97 3.87 0.72
3.27 4.64 29.81 * 0.012 0.64 0.59 4.82 4.82 4.64 4.54 0.74
3.41 5.46 30.63 * 0.012 0.65 0.60 5.63 5.63 5.46 5.36 0.76
3.56 6.30 31.47 * 0.012 0.67 0.62 6.48 6.48 6.30 6.21 0.78
3.70 7.19 32.36 * 0.012 0.68 0.63 7.36 7.36 7.19 7.09 0.80
3.84 8.10 33.27 * 0.012 0.69 0.64 8.28 8.28 8.10 8.01 0.82
3.98 9.06 34.23 * 0.012 0.71 0.65 9.23 9.23 9.06 8.97 0.84
4.12 10.04 35.21 * 0.012 0.72 0.66 10.21 10.21 10.04 9.96 0.86
4.27 11.06 36.23 * 0.012 0.73 0.68 11.23 11.23 11.06 10.98 0.88
4.41 12.12 37.29 * 0.012 0.74 0.69 12.29 12.29 12.12 12.04 0.90
4.55 13.21 38.38 * 0.012 0.76 0.70 13.38 13.38 13.21 13.13 0.92
4.69 14.34 39.51 * 0.012 0.77 0.71 14.50 14.50 14.34 14.26 0.94
4.84 15.50 40.67 * 0.012 0.78 0.72 15.66 15.66 15.50 15.42 0.95
4.98 16.69 41.86 * 0.012 0.79 0.73 16.86 16.86 16.69 16.62 0.97
5.12 17.92 43.09 * 0.012 0.80 0.74 18.08 18.08 17.92 17.85 0.99
5.26 19.18 44.35 * 0.012 0.81 0.76 19.35 19.35 19.18 19.12 1.01
5.41 20.48 45.65 * 0.012 0.83 0.77 20.64 20.64 20.48 20.42 1.03
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 106-12 to EX 204-02.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.21 feet
Discharge Range:0.25 to 4. Step of 0.25 [cfs]
Overflow Elevation:25.31 feet
Weir:NONE
Upstream Velocity:2.34 feet/sec
PIPE NO. 1: 9 LF - 12"CP @ 0.56% OUTLET: 19.82 INLET: 19.87 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 27.23 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 3.35 23.22 * 0.012 0.21 0.20 3.39 3.39 3.35 3.35 0.28
0.50 3.35 23.22 * 0.012 0.30 0.29 3.39 3.39 3.34 3.35 0.40
0.75 3.37 23.24 * 0.012 0.37 0.35 3.39 3.39 3.34 3.37 0.51
1.00 3.39 23.26 * 0.012 0.43 0.41 3.39 3.39 3.35 3.39 0.60
1.25 3.42 23.29 * 0.012 0.48 0.47 3.39 3.39 3.35 3.42 0.69
1.50 3.46 23.33 * 0.012 0.52 0.52 3.39 3.39 3.35 3.46 0.78
1.75 3.50 23.37 * 0.012 0.57 0.57 3.39 3.39 3.36 3.50 0.86
2.00 3.55 23.42 * 0.012 0.61 0.62 3.39 3.39 3.36 3.55 0.95
2.25 3.60 23.47 * 0.012 0.65 0.67 3.39 3.39 3.37 3.60 1.04
2.50 3.66 23.53 * 0.012 0.68 0.73 3.39 3.39 3.38 3.66 1.13
2.75 3.73 23.60 * 0.012 0.72 0.79 3.39 3.39 3.39 3.73 1.22
3.00 3.81 23.68 * 0.012 0.75 0.87 3.39 3.39 3.39 3.81 1.32
3.25 3.89 23.76 * 0.012 0.78 1.00 3.39 3.39 3.40 3.89 1.43
3.50 3.98 23.85 * 0.012 0.80 1.00 3.39 3.39 3.41 3.98 1.56
3.75 4.07 23.94 * 0.012 0.83 1.00 3.39 3.39 3.42 4.07 1.69
4.00 4.17 24.04 * 0.012 0.85 1.00 3.39 3.39 3.44 4.17 1.83
PIPE NO. 2: 18 LF - 12"CP @ 0.78% OUTLET: 19.87 INLET: 20.01 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 27.43 BEND: 90 DEG DIA/WIDTH: 3.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 3.22 23.23 * 0.012 0.21 0.19 3.35 3.35 3.22 3.22 0.28
0.50 3.23 23.24 * 0.012 0.30 0.26 3.35 3.35 3.22 3.23 0.40
0.75 3.26 23.27 * 0.012 0.37 0.32 3.37 3.37 3.24 3.26 0.50
1.00 3.31 23.32 * 0.012 0.43 0.38 3.39 3.39 3.26 3.31 0.60
1.25 3.37 23.38 * 0.012 0.48 0.42 3.42 3.42 3.30 3.37 0.69
1.50 3.45 23.46 * 0.012 0.52 0.47 3.46 3.46 3.34 3.45 0.78
1.75 3.54 23.55 * 0.012 0.57 0.51 3.50 3.50 3.40 3.54 0.86
2.00 3.64 23.65 * 0.012 0.61 0.56 3.55 3.55 3.46 3.64 0.95
2.25 3.76 23.77 * 0.012 0.65 0.60 3.60 3.60 3.52 3.76 1.04
2.50 3.89 23.90 * 0.012 0.68 0.64 3.66 3.66 3.60 3.89 1.13
2.75 4.03 24.04 * 0.012 0.72 0.69 3.73 3.73 3.68 4.03 1.22
3.00 4.19 24.20 * 0.012 0.75 0.73 3.81 3.81 3.78 4.19 1.32
3.25 4.36 24.37 * 0.012 0.78 0.79 3.89 3.89 3.88 4.36 1.43
3.50 4.55 24.56 * 0.012 0.80 0.85 3.98 3.98 3.98 4.55 1.56
3.75 4.75 24.76 * 0.012 0.83 1.00 4.07 4.07 4.10 4.75 1.69
4.00 4.96 24.97 * 0.012 0.85 1.00 4.17 4.17 4.22 4.96 1.83
PIPE NO. 3: 24 LF - 12"CP @ 0.79% OUTLET: 21.87 INLET: 22.06 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 26.71 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 1.50
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 1.18 23.24 * 0.012 0.21 0.19 1.36 1.36 1.18 1.18 0.27
0.50 1.19 23.25 * 0.012 0.30 0.26 1.37 1.37 1.18 1.19 0.40
0.75 1.24 23.30 * 0.012 0.37 0.32 1.40 1.40 1.22 1.24 0.50
1.00 1.31 23.37 * 0.012 0.43 0.37 1.45 1.45 1.28 1.31 0.59
1.25 1.41 23.47 * 0.012 0.48 0.42 1.51 1.51 1.35 1.41 0.68
1.50 1.52 23.58 * 0.012 0.52 0.47 1.59 1.59 1.43 1.52 0.76
1.75 1.65 23.71 * 0.012 0.57 0.51 1.68 1.68 1.54 1.65 0.84
2.00 1.80 23.86 * 0.012 0.61 0.55 1.78 1.78 1.65 1.80 0.92
2.25 1.98 24.04 * 0.012 0.65 0.60 1.90 1.90 1.79 1.98 0.99
2.50 2.17 24.23 * 0.012 0.68 0.64 2.03 2.03 1.94 2.17 1.07
2.75 2.39 24.45 * 0.012 0.72 0.68 2.17 2.17 2.10 2.39 1.15
3.00 2.62 24.68 * 0.012 0.75 0.73 2.33 2.33 2.28 2.62 1.24
3.25 2.88 24.94 * 0.012 0.78 0.78 2.50 2.50 2.48 2.88 1.34
3.50 3.15 25.21 * 0.012 0.80 0.84 2.69 2.69 2.69 3.15 1.45
3.75 3.45 25.51 * 0.012 0.83 1.00 2.89 2.89 2.92 3.45 1.57
4.00 3.77 25.83 * 0.012 0.85 1.00 3.10 3.10 3.17 3.77 1.69
PIPE NO. 4: 12 LF - 12"CP @ 0.50% OUTLET: 22.06 INLET: 22.12 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 26.85 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.13 23.25 * 0.012 0.13 0.14 1.18 1.18 1.13 1.13 0.17
0.20 1.13 23.25 * 0.012 0.19 0.19 1.19 1.19 1.13 1.13 0.24
0.30 1.18 23.30 * 0.012 0.23 0.23 1.24 1.24 1.18 1.18 0.30
0.40 1.26 23.38 * 0.012 0.27 0.26 1.31 1.31 1.25 1.26 0.35
0.50 1.35 23.47 * 0.012 0.30 0.29 1.41 1.41 1.35 1.35 0.39
0.60 1.47 23.59 * 0.012 0.33 0.32 1.52 1.52 1.46 1.47 0.43
0.70 1.60 23.72 * 0.012 0.35 0.35 1.65 1.65 1.59 1.60 0.47
0.80 1.76 23.88 * 0.012 0.38 0.38 1.80 1.80 1.75 1.76 0.50
0.90 1.93 24.05 * 0.012 0.40 0.40 1.98 1.98 1.92 1.93 0.54
1.00 2.13 24.25 * 0.012 0.43 0.42 2.17 2.17 2.12 2.13 0.57
1.10 2.35 24.47 * 0.012 0.45 0.45 2.39 2.39 2.34 2.35 0.60
1.20 2.59 24.71 * 0.012 0.47 0.47 2.62 2.62 2.57 2.59 0.62
1.30 2.85 24.97 * 0.012 0.49 0.49 2.88 2.88 2.83 2.85 0.65
1.40 3.13 25.25 * 0.012 0.51 0.51 3.15 3.15 3.11 3.13 0.68
1.50 3.44 25.56 * 0.012 0.52 0.53 3.45 3.45 3.41 3.44 0.70
1.60 3.76 25.88 * 0.012 0.54 0.56 3.77 3.77 3.73 3.76 0.73
PIPE NO. 5: 24 LF - 12"CP @ 0.54% OUTLET: 22.12 INLET: 22.25 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 26.75 BEND: 75 DEG DIA/WIDTH: 2.5 Q-RATIO: 1.75
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 1.01 23.26 * 0.012 0.13 0.13 1.13 1.13 1.01 1.01 0.17
0.20 1.00 23.25 * 0.012 0.19 0.18 1.13 1.13 1.00 1.00 0.25
0.30 1.06 23.31 * 0.012 0.23 0.22 1.18 1.18 1.06 1.06 0.30
0.40 1.14 23.39 * 0.012 0.27 0.26 1.26 1.26 1.13 1.14 0.36
0.50 1.23 23.48 * 0.012 0.30 0.29 1.35 1.35 1.22 1.23 0.40
0.60 1.36 23.61 * 0.012 0.33 0.32 1.47 1.47 1.34 1.36 0.44
0.70 1.50 23.75 * 0.012 0.35 0.34 1.60 1.60 1.48 1.50 0.48
0.80 1.66 23.91 * 0.012 0.38 0.37 1.76 1.76 1.64 1.66 0.52
0.90 1.85 24.10 * 0.012 0.40 0.39 1.93 1.93 1.82 1.85 0.56
1.00 2.06 24.31 * 0.012 0.43 0.41 2.13 2.13 2.02 2.06 0.59
1.10 2.29 24.54 * 0.012 0.45 0.44 2.35 2.35 2.24 2.29 0.63
1.20 2.54 24.79 * 0.012 0.47 0.46 2.59 2.59 2.48 2.54 0.66
1.30 2.82 25.07 * 0.012 0.49 0.48 2.85 2.85 2.75 2.82 0.70
1.40 3.11 25.36 * 0.012 0.51 0.50 3.13 3.13 3.04 3.11 0.73
1.50 3.43 25.68 * 0.012 0.52 0.52 3.44 3.44 3.34 3.43 0.76
1.60 3.77 26.02 * 0.012 0.54 0.54 3.76 3.76 3.67 3.77 0.80
PIPE NO. 6: 88 LF - 12"CP @ 0.50% OUTLET: 22.25 INLET: 22.69 INTYP: 5
JUNC NO. 6: OVERFLOW-EL: 25.55 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.80
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.04 0.58 23.27 * 0.012 0.08 0.09 1.01 1.01 0.58 0.58 0.10
0.07 0.57 23.26 * 0.012 0.11 0.12 1.00 1.00 0.57 0.57 0.14
0.11 0.62 23.31 * 0.012 0.14 0.14 1.06 1.06 0.62 0.62 0.18
0.15 0.70 23.39 * 0.012 0.16 0.16 1.14 1.14 0.70 0.70 0.21
0.18 0.80 23.49 * 0.012 0.18 0.18 1.23 1.23 0.80 0.80 0.23
0.22 0.92 23.61 * 0.012 0.20 0.20 1.36 1.36 0.92 0.92 0.26
0.25 1.07 23.76 * 0.012 0.21 0.21 1.50 1.50 1.07 1.07 0.28
0.29 1.23 23.92 * 0.012 0.23 0.23 1.66 1.66 1.23 1.23 0.30
0.33 1.42 24.11 * 0.012 0.24 0.24 1.85 1.85 1.42 1.42 0.32
0.36 1.63 24.32 * 0.012 0.25 0.25 2.06 2.06 1.63 1.63 0.34
0.40 1.86 24.55 * 0.012 0.27 0.26 2.29 2.29 1.86 1.86 0.35
0.44 2.12 24.81 * 0.012 0.28 0.28 2.54 2.54 2.11 2.12 0.37
0.47 2.40 25.09 * 0.012 0.29 0.29 2.82 2.82 2.39 2.40 0.39
0.51 2.70 25.39 * 0.012 0.30 0.30 3.11 3.11 2.69 2.70 0.40
**************** OVERFLOW ENCOUNTERED AT 0.55 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
0.55 3.02 25.71 * 0.012 0.31 0.31 3.43 3.43 3.01 3.02 0.42
0.58 3.37 26.06 * 0.012 0.32 0.32 3.77 3.77 3.35 3.37 0.43
PIPE NO. 7: 16 LF - 12"CP @ 0.50% OUTLET: 22.69 INLET: 22.77 INTYP: 5
JUNC NO. 7: OVERFLOW-EL: 25.45 BEND: 60 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.02 0.51 23.28 * 0.012 0.06 0.07 0.58 0.58 0.51 0.51 0.07
0.04 0.50 23.27 * 0.012 0.09 0.09 0.57 0.57 0.50 0.50 0.11
0.06 0.55 23.32 * 0.012 0.11 0.11 0.62 0.62 0.55 0.55 0.13
0.08 0.63 23.40 * 0.012 0.12 0.12 0.70 0.70 0.63 0.63 0.15
0.10 0.73 23.50 * 0.012 0.13 0.14 0.80 0.80 0.73 0.73 0.17
0.12 0.85 23.62 * 0.012 0.15 0.15 0.92 0.92 0.85 0.85 0.19
0.14 1.00 23.77 * 0.012 0.16 0.16 1.07 1.07 1.00 1.00 0.20
0.16 1.16 23.93 * 0.012 0.17 0.17 1.23 1.23 1.16 1.16 0.22
0.18 1.34 24.11 * 0.012 0.18 0.18 1.42 1.42 1.34 1.34 0.23
0.20 1.55 24.32 * 0.012 0.19 0.19 1.63 1.63 1.55 1.55 0.25
0.22 1.79 24.56 * 0.012 0.20 0.20 1.86 1.86 1.79 1.79 0.26
0.24 2.04 24.81 * 0.012 0.21 0.21 2.12 2.12 2.04 2.04 0.27
0.26 2.32 25.09 * 0.012 0.22 0.21 2.40 2.40 2.32 2.32 0.28
0.28 2.62 25.39 * 0.012 0.22 0.22 2.70 2.70 2.62 2.62 0.29
**************** OVERFLOW ENCOUNTERED AT 0.30 CFS DISCHARGE *****************
******** OVERFLOW CONDITIONS CALCULATED ASSUMING SURCHARGE CONDITIONS *********
0.30 2.94 25.71 * 0.012 0.23 0.23 3.02 3.02 2.94 2.94 0.30
0.32 3.29 26.06 * 0.012 0.24 0.24 3.37 3.37 3.29 3.29 0.32
PIPE NO. 8: 36 LF - 12"CP @ 0.50% OUTLET: 22.77 INLET: 22.95 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.02 0.34 23.29 * 0.012 0.06 0.07 0.51 0.51 0.34 0.26 -0.01
0.04 0.33 23.28 * 0.012 0.09 0.09 0.50 0.50 0.33 0.25 0.02
0.06 0.38 23.33 * 0.012 0.11 0.11 0.55 0.55 0.38 0.30 0.05
0.08 0.46 23.41 * 0.012 0.12 0.12 0.63 0.63 0.46 0.38 0.07
0.10 0.56 23.51 * 0.012 0.13 0.14 0.73 0.73 0.56 0.48 0.09
0.12 0.68 23.63 * 0.012 0.15 0.15 0.85 0.85 0.68 0.60 0.10
0.14 0.83 23.78 * 0.012 0.16 0.16 1.00 1.00 0.83 0.75 0.12
0.16 0.99 23.94 * 0.012 0.17 0.17 1.16 1.16 0.99 0.91 0.13
0.18 1.17 24.12 * 0.012 0.18 0.18 1.34 1.34 1.17 1.09 0.15
0.20 1.37 24.32 * 0.012 0.19 0.19 1.55 1.55 1.37 1.29 0.16
0.22 1.61 24.56 * 0.012 0.20 0.20 1.79 1.79 1.61 1.52 0.17
0.24 1.86 24.81 * 0.012 0.21 0.21 2.04 2.04 1.86 1.78 0.19
0.26 2.14 25.09 * 0.012 0.22 0.21 2.32 2.32 2.14 2.06 0.21
**************** OVERFLOW ENCOUNTERED AT 0.28 CFS DISCHARGE *****************
0.28 2.44 25.39 * 0.012 0.22 0.22 2.62 2.62 2.44 2.36 0.21
0.30 2.77 25.72 * 0.012 0.23 0.23 2.94 2.94 2.77 2.69 0.22
0.32 3.11 26.06 * 0.012 0.24 0.24 3.29 3.29 3.11 3.03 0.23
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 204-75 to CB 204-35.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:23.76 feet
Discharge Range:0.05 to 0.25 Step of 0.05 [cfs]
Overflow Elevation:25.55 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 22 LF - 12"CP @ 0.55% OUTLET: 22.69 INLET: 22.81 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.96 23.77 * 0.012 0.10 0.10 1.07 1.07 0.96 0.82 -0.02
0.10 0.96 23.77 * 0.012 0.13 0.13 1.07 1.07 0.96 0.82 0.03
0.15 0.96 23.77 * 0.012 0.16 0.16 1.07 1.07 0.96 0.82 0.07
0.20 0.96 23.77 * 0.012 0.19 0.18 1.07 1.07 0.96 0.82 0.18
0.25 0.96 23.77 * 0.012 0.21 0.21 1.07 1.07 0.96 0.82 0.14
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 204-39 to CB 204-32.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:25.51 feet
Discharge Range:1. to 2. Step of 0.1 [cfs]
Overflow Elevation:25.63 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 84 LF - 12"CP @ 0.54% OUTLET: 22.06 INLET: 22.51 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
1.00 3.06 25.57 * 0.012 0.43 0.42 3.45 3.45 3.06 2.96 0.45
1.10 3.07 25.58 * 0.012 0.45 0.44 3.45 3.45 3.07 2.97 0.49
1.20 3.08 25.59 * 0.012 0.47 0.46 3.45 3.45 3.08 3.00 0.52
1.30 3.10 25.61 * 0.012 0.49 0.48 3.45 3.45 3.10 3.02 0.55
1.40 3.11 25.62 * 0.012 0.51 0.50 3.45 3.45 3.11 3.04 0.59
**************** OVERFLOW ENCOUNTERED AT 1.50 CFS DISCHARGE *****************
1.50 3.13 25.64 * 0.012 0.52 0.52 3.45 3.45 3.13 3.07 0.62
1.60 3.14 25.65 * 0.012 0.54 0.54 3.45 3.45 3.14 3.10 0.65
1.70 3.16 25.67 * 0.012 0.56 0.56 3.45 3.45 3.16 3.13 0.68
1.80 3.18 25.69 * 0.012 0.58 0.58 3.45 3.45 3.18 3.17 0.71
1.90 3.20 25.71 * 0.012 0.59 0.61 3.45 3.45 3.20 3.20 0.75
2.00 3.24 25.75 * 0.012 0.61 0.63 3.45 3.45 3.23 3.24 0.78
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 204-41 to CB 202-23.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:22.86 feet
Discharge Range:0.1 to 0.5 Step of 0.1 [cfs]
Overflow Elevation:28.98 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 62 LF - 12"CP @ 6.37% OUTLET: 21.71 INLET: 25.66 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 29.02 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.14 25.80 * 0.012 0.13 0.08 1.15 1.15 0.13 ***** 0.14
0.20 0.22 25.88 * 0.012 0.19 0.10 1.15 1.15 0.19 ***** 0.22
0.30 0.28 25.94 * 0.012 0.23 0.13 1.15 1.15 0.23 ***** 0.28
0.40 0.33 25.99 * 0.012 0.27 0.14 1.15 1.15 0.27 ***** 0.33
0.50 0.37 26.03 * 0.012 0.30 0.16 1.15 1.15 0.30 ***** 0.37
PIPE NO. 2: 58 LF - 12"CP @ 0.52% OUTLET: 25.66 INLET: 25.96 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.13 26.09 * 0.012 0.13 0.13 0.14 0.14 0.13 0.05 0.03
0.20 0.19 26.15 * 0.012 0.19 0.19 0.22 0.22 0.19 0.14 0.11
0.30 0.23 26.19 * 0.012 0.23 0.23 0.28 0.28 0.23 0.20 0.16
0.40 0.27 26.23 * 0.012 0.27 0.26 0.33 0.33 0.27 ***** 0.26
0.50 0.30 26.26 * 0.012 0.30 0.29 0.37 0.37 0.30 ***** 0.29
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 106-54 to CB 202-24.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:24.44 feet
Discharge Range:0.15 to 2. Step of 0.1 [cfs]
Overflow Elevation:26.36 feet
Weir:NONE
Upstream Velocity:2.34 feet/sec
PIPE NO. 1: 88 LF - 12"CP @ 0.50% OUTLET: 22.01 INLET: 22.45 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 26.79 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.10
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.15 2.00 24.45 * 0.012 0.16 0.16 2.43 2.43 2.00 2.00 0.21
0.25 2.00 24.45 * 0.012 0.21 0.21 2.43 2.43 1.99 2.00 0.28
0.35 2.00 24.45 * 0.012 0.25 0.25 2.43 2.43 2.00 2.00 0.33
0.45 2.01 24.46 * 0.012 0.28 0.28 2.43 2.43 2.00 2.01 0.38
0.55 2.02 24.47 * 0.012 0.31 0.31 2.43 2.43 2.01 2.02 0.42
0.65 2.03 24.48 * 0.012 0.34 0.34 2.43 2.43 2.01 2.03 0.47
0.75 2.05 24.50 * 0.012 0.37 0.36 2.43 2.43 2.02 2.05 0.51
0.85 2.07 24.52 * 0.012 0.39 0.39 2.43 2.43 2.03 2.07 0.54
0.95 2.08 24.53 * 0.012 0.41 0.41 2.43 2.43 2.04 2.08 0.58
1.05 2.11 24.56 * 0.012 0.44 0.44 2.43 2.43 2.06 2.11 0.62
1.15 2.13 24.58 * 0.012 0.46 0.46 2.43 2.43 2.07 2.13 0.65
1.25 2.15 24.60 * 0.012 0.48 0.48 2.43 2.43 2.08 2.15 0.69
1.35 2.18 24.63 * 0.012 0.50 0.50 2.43 2.43 2.10 2.18 0.73
1.45 2.21 24.66 * 0.012 0.52 0.52 2.43 2.43 2.11 2.21 0.76
1.55 2.24 24.69 * 0.012 0.53 0.54 2.43 2.43 2.13 2.24 0.79
1.65 2.28 24.73 * 0.012 0.55 0.57 2.43 2.43 2.15 2.28 0.83
1.75 2.31 24.76 * 0.012 0.57 0.59 2.43 2.43 2.17 2.31 0.86
1.85 2.35 24.80 * 0.012 0.58 0.61 2.43 2.43 2.19 2.35 0.90
1.95 2.39 24.84 * 0.012 0.60 0.63 2.43 2.43 2.21 2.39 0.93
2.05 2.43 24.88 * 0.012 0.62 0.65 2.43 2.43 2.24 2.43 0.97
PIPE NO. 2: 98 LF - 12"CP @ 0.51% OUTLET: 22.45 INLET: 22.95 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 26.60 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 1.51 24.46 * 0.012 0.16 0.16 2.00 2.00 1.51 1.51 0.20
0.23 1.50 24.45 * 0.012 0.20 0.20 2.00 2.00 1.50 1.50 0.26
0.32 1.51 24.46 * 0.012 0.24 0.23 2.00 2.00 1.51 1.51 0.31
0.41 1.53 24.48 * 0.012 0.27 0.27 2.01 2.01 1.52 1.53 0.36
0.50 1.55 24.50 * 0.012 0.30 0.29 2.02 2.02 1.54 1.55 0.40
0.59 1.57 24.52 * 0.012 0.32 0.32 2.03 2.03 1.56 1.57 0.44
0.68 1.60 24.55 * 0.012 0.35 0.34 2.05 2.05 1.58 1.60 0.48
0.77 1.63 24.58 * 0.012 0.37 0.37 2.07 2.07 1.61 1.63 0.51
0.86 1.67 24.62 * 0.012 0.39 0.39 2.08 2.08 1.63 1.67 0.55
0.95 1.71 24.66 * 0.012 0.41 0.41 2.11 2.11 1.67 1.71 0.58
1.05 1.75 24.70 * 0.012 0.43 0.43 2.13 2.13 1.70 1.75 0.62
1.14 1.80 24.75 * 0.012 0.45 0.45 2.15 2.15 1.74 1.80 0.65
1.23 1.85 24.80 * 0.012 0.47 0.47 2.18 2.18 1.78 1.85 0.68
1.32 1.91 24.86 * 0.012 0.49 0.49 2.21 2.21 1.83 1.91 0.71
1.41 1.96 24.91 * 0.012 0.51 0.51 2.24 2.24 1.87 1.96 0.75
1.50 2.03 24.98 * 0.012 0.52 0.53 2.28 2.28 1.92 2.03 0.78
1.59 2.09 25.04 * 0.012 0.54 0.55 2.31 2.31 1.98 2.09 0.81
1.68 2.17 25.12 * 0.012 0.56 0.57 2.35 2.35 2.04 2.17 0.84
1.77 2.24 25.19 * 0.012 0.57 0.59 2.39 2.39 2.10 2.24 0.87
1.86 2.32 25.27 * 0.012 0.59 0.61 2.43 2.43 2.16 2.32 0.90
PIPE NO. 3: 30 LF - 12"CP @ 0.50% OUTLET: 22.95 INLET: 23.10 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 1.37 24.47 * 0.012 0.16 0.16 1.51 1.51 1.37 1.29 0.12
0.23 1.35 24.45 * 0.012 0.20 0.20 1.50 1.50 1.35 1.27 0.18
0.32 1.37 24.47 * 0.012 0.24 0.24 1.51 1.51 1.37 1.28 0.23
0.41 1.38 24.48 * 0.012 0.27 0.27 1.53 1.53 1.38 1.30 0.27
0.50 1.40 24.50 * 0.012 0.30 0.29 1.55 1.55 1.40 1.33 0.32
0.59 1.43 24.53 * 0.012 0.32 0.32 1.57 1.57 1.43 1.36 0.35
0.68 1.46 24.56 * 0.012 0.35 0.35 1.60 1.60 1.46 1.39 0.39
0.77 1.49 24.59 * 0.012 0.37 0.37 1.63 1.63 1.49 1.43 0.42
0.86 1.53 24.63 * 0.012 0.39 0.39 1.67 1.67 1.53 1.48 0.46
0.95 1.58 24.68 * 0.012 0.41 0.41 1.71 1.71 1.58 1.53 0.49
1.05 1.62 24.72 * 0.012 0.43 0.43 1.75 1.75 1.62 1.58 0.52
1.14 1.67 24.77 * 0.012 0.45 0.45 1.80 1.80 1.67 1.64 0.55
1.23 1.73 24.83 * 0.012 0.47 0.48 1.85 1.85 1.73 1.70 0.58
1.32 1.79 24.89 * 0.012 0.49 0.49 1.91 1.91 1.79 1.77 0.61
1.41 1.85 24.95 * 0.012 0.51 0.51 1.96 1.96 1.85 1.84 0.64
1.50 1.92 25.02 * 0.012 0.52 0.53 2.03 2.03 1.92 1.92 0.67
1.59 2.01 25.11 * 0.012 0.54 0.55 2.09 2.09 2.00 2.01 0.70
1.68 2.09 25.19 * 0.012 0.56 0.57 2.17 2.17 2.07 2.09 0.73
1.77 2.19 25.29 * 0.012 0.57 0.59 2.24 2.24 2.15 2.19 0.76
1.86 2.29 25.39 * 0.012 0.59 0.61 2.32 2.32 2.24 2.29 0.79
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 105-47 to CB 204-34.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:26.85 feet
Discharge Range:0.05 to 0.25 Step of 0.05 [cfs]
Overflow Elevation:27.91 feet
Weir:NONE
Upstream Velocity:2.21 feet/sec
PIPE NO. 1: 17 LF - 8"CP @ 0.65% OUTLET: 26.18 INLET: 26.29 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 28.10 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.57 26.86 * 0.012 0.11 0.10 0.67 0.67 0.57 0.57 0.14
0.10 0.57 26.86 * 0.012 0.15 0.14 0.67 0.67 0.57 0.57 0.19
0.15 0.58 26.87 * 0.012 0.18 0.17 0.67 0.67 0.57 0.58 0.24
0.20 0.58 26.87 * 0.012 0.21 0.20 0.67 0.67 0.57 0.58 0.28
0.25 0.59 26.88 * 0.012 0.24 0.23 0.67 0.67 0.57 0.59 0.32
PIPE NO. 2: 18 LF - 8"CP @ 0.50% OUTLET: 26.29 INLET: 26.38 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.49 26.87 * 0.012 0.11 0.11 0.57 0.57 0.49 0.41 0.06
0.10 0.49 26.87 * 0.012 0.15 0.15 0.57 0.57 0.49 0.42 0.12
0.15 0.49 26.87 * 0.012 0.18 0.19 0.58 0.58 0.49 0.42 0.16
0.20 0.50 26.88 * 0.012 0.21 0.22 0.58 0.58 0.50 0.44 0.21
0.25 0.51 26.89 * 0.012 0.24 0.24 0.59 0.59 0.51 0.45 0.24
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 204-75 to CB 204-35.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:24.76 feet
Discharge Range:0.05 to 0.2 Step of 0.05 [cfs]
Overflow Elevation:26.2 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 22 LF - 12"CP @ 0.55% OUTLET: 22.69 INLET: 22.81 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 1.96 24.77 * 0.012 0.10 0.10 2.07 2.07 1.96 1.82 -0.02
0.10 1.95 24.76 * 0.012 0.13 0.13 2.07 2.07 1.95 1.81 0.03
0.15 1.95 24.76 * 0.012 0.16 0.16 2.07 2.07 1.95 1.81 0.07
0.20 1.95 24.76 * 0.012 0.19 0.18 2.07 2.07 1.95 1.81 0.18
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 202-80 to CB 106-38.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:21.3 feet
Discharge Range:0.1 to 1. Step of 0.1 [cfs]
Overflow Elevation:27.68 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 19 LF - 12"CP @ 1.84% OUTLET: 20.30 INLET: 20.65 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 25.62 BEND: 75 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.65 21.30 * 0.012 0.13 0.10 1.00 1.00 0.65 0.65 0.16
0.20 0.65 21.30 * 0.012 0.19 0.14 1.00 1.00 0.65 0.65 0.24
0.30 0.66 21.31 * 0.012 0.23 0.17 1.00 1.00 0.65 0.66 0.30
0.40 0.66 21.31 * 0.012 0.27 0.19 1.00 1.00 0.65 0.66 0.35
0.50 0.67 21.32 * 0.012 0.30 0.21 1.00 1.00 0.65 0.67 0.39
0.60 0.68 21.33 * 0.012 0.33 0.23 1.00 1.00 0.65 0.68 0.44
0.70 0.69 21.34 * 0.012 0.35 0.25 1.00 1.00 0.65 0.69 0.47
0.80 0.70 21.35 * 0.012 0.38 0.27 1.00 1.00 0.65 0.70 0.51
0.90 0.71 21.36 * 0.012 0.40 0.29 1.00 1.00 0.65 0.71 0.55
1.00 0.72 21.37 * 0.012 0.43 0.30 1.00 1.00 0.64 0.72 0.58
PIPE NO. 2: 7 LF - 12"CP @ 0.57% OUTLET: 21.26 INLET: 21.30 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 25.08 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.19 21.49 * 0.012 0.13 0.13 0.04 0.13 0.13 0.19 0.17
0.20 0.25 21.55 * 0.012 0.19 0.18 0.04 0.18 0.19 ***** 0.25
0.30 0.30 21.60 * 0.012 0.23 0.22 0.05 0.22 0.23 ***** 0.30
0.40 0.36 21.66 * 0.012 0.27 0.26 0.05 0.26 0.27 ***** 0.36
0.50 0.40 21.70 * 0.012 0.30 0.29 0.06 0.29 0.30 ***** 0.40
0.60 0.45 21.75 * 0.012 0.33 0.31 0.07 0.31 0.33 ***** 0.45
0.70 0.49 21.79 * 0.012 0.35 0.34 0.08 0.34 0.35 ***** 0.49
0.80 0.53 21.83 * 0.012 0.38 0.36 0.09 0.36 0.38 ***** 0.53
0.90 0.56 21.86 * 0.012 0.40 0.39 0.10 0.39 0.40 ***** 0.56
1.00 0.60 21.90 * 0.012 0.43 0.41 0.11 0.41 0.43 ***** 0.60
PIPE NO. 3: 112 LF - 12"CP @ 0.46% OUTLET: 21.30 INLET: 21.82 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 26.41 BEND: 0 DEG DIA/WIDTH: 2.5 Q-RATIO: 5.75
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.19 22.01 * 0.012 0.13 0.14 0.19 0.19 0.14 0.19 0.17
0.20 0.28 22.10 * 0.012 0.19 0.19 0.25 0.25 0.19 0.28 0.25
0.30 0.34 22.16 * 0.012 0.23 0.23 0.30 0.30 0.23 0.34 0.30
0.40 0.40 22.22 * 0.012 0.27 0.27 0.36 0.36 0.27 0.40 0.36
0.50 0.45 22.27 * 0.012 0.30 0.30 0.40 0.40 0.30 0.45 0.40
0.60 0.49 22.31 * 0.012 0.33 0.33 0.45 0.45 0.33 0.49 0.44
0.70 0.54 22.36 * 0.012 0.35 0.36 0.49 0.49 0.36 0.54 0.48
0.80 0.58 22.40 * 0.012 0.38 0.38 0.53 0.53 0.38 0.58 0.52
0.90 0.62 22.44 * 0.012 0.40 0.41 0.56 0.56 0.41 0.62 0.56
1.00 0.65 22.47 * 0.012 0.43 0.43 0.60 0.60 0.43 0.65 0.59
PIPE NO. 4: 60 LF - 12"CP @ 0.52% OUTLET: 21.82 INLET: 22.13 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 26.16 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.01 0.07 22.20 * 0.012 0.05 0.06 0.19 0.19 0.06 0.07 0.06
0.03 0.10 22.23 * 0.012 0.07 0.08 0.28 0.28 0.08 0.10 0.09
0.04 0.13 22.26 * 0.012 0.09 0.09 0.34 0.34 0.11 0.13 0.11
0.06 0.15 22.28 * 0.012 0.10 0.11 0.40 0.40 0.13 0.15 0.13
0.07 0.19 22.32 * 0.012 0.12 0.12 0.45 0.45 0.17 0.19 0.15
0.09 0.21 22.34 * 0.012 0.13 0.13 0.49 0.49 0.20 0.21 0.16
0.10 0.25 22.38 * 0.012 0.14 0.14 0.54 0.54 0.24 0.25 0.18
0.12 0.29 22.42 * 0.012 0.15 0.15 0.58 0.58 0.28 0.29 0.19
0.13 0.32 22.45 * 0.012 0.15 0.15 0.62 0.62 0.31 0.32 0.20
0.15 0.36 22.49 * 0.012 0.16 0.16 0.65 0.65 0.35 0.36 0.21
PIPE NO. 5: 38 LF - 12"CP @ 0.53% OUTLET: 22.13 INLET: 22.33 INTYP: 5
JUNC NO. 5: OVERFLOW-EL: 27.13 BEND: 15 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.01 0.07 22.40 * 0.012 0.05 0.06 0.07 0.07 0.06 0.07 0.06
0.03 0.10 22.43 * 0.012 0.07 0.08 0.10 0.10 0.08 0.10 0.09
0.04 0.13 22.46 * 0.012 0.09 0.09 0.13 0.13 0.09 0.13 0.11
0.06 0.15 22.48 * 0.012 0.10 0.11 0.15 0.15 0.11 0.15 0.13
0.07 0.16 22.49 * 0.012 0.12 0.12 0.19 0.19 0.12 0.16 0.15
0.09 0.18 22.51 * 0.012 0.13 0.13 0.21 0.21 0.13 0.18 0.16
0.10 0.20 22.53 * 0.012 0.14 0.14 0.25 0.25 0.14 0.20 0.17
0.12 0.21 22.54 * 0.012 0.15 0.15 0.29 0.29 0.15 0.21 0.19
0.13 0.22 22.55 * 0.012 0.15 0.15 0.32 0.32 0.17 0.22 0.20
0.15 0.24 22.57 * 0.012 0.16 0.16 0.36 0.36 0.19 0.24 0.21
PIPE NO. 6: 42 LF - 12"CP @ 0.52% OUTLET: 22.33 INLET: 22.55 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.01 0.06 22.61 * 0.012 0.05 0.06 0.07 0.07 0.06 -0.07 -0.08
0.03 0.08 22.63 * 0.012 0.07 0.08 0.10 0.10 0.08 -0.04 -0.05
0.04 0.09 22.64 * 0.012 0.09 0.09 0.13 0.13 0.09 -0.01 -0.03
0.06 0.11 22.66 * 0.012 0.10 0.11 0.15 0.15 0.11 0.01 -0.01
0.07 0.12 22.67 * 0.012 0.12 0.12 0.16 0.16 0.12 0.02 0.01
0.09 0.13 22.68 * 0.012 0.13 0.13 0.18 0.18 0.13 0.04 0.02
0.10 0.14 22.69 * 0.012 0.14 0.14 0.20 0.20 0.14 0.06 0.04
0.12 0.15 22.70 * 0.012 0.15 0.15 0.21 0.21 0.15 0.07 0.05
0.13 0.15 22.70 * 0.012 0.15 0.15 0.22 0.22 0.15 0.09 0.06
0.15 0.16 22.71 * 0.012 0.16 0.16 0.24 0.24 0.16 0.10 0.07
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 106-19 to CB106-20.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:22.22 feet
Discharge Range:0.1 to 0.5 Step of 0.1 [cfs]
Overflow Elevation:25.53 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 39 LF - 12"CP @ 0.51% OUTLET: 21.82 INLET: 22.02 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.21 22.23 * 0.012 0.13 0.14 0.40 0.40 0.21 0.09 0.03
0.20 0.23 22.25 * 0.012 0.19 0.19 0.40 0.40 0.23 0.14 0.11
0.30 0.24 22.26 * 0.012 0.23 0.23 0.40 0.40 0.24 0.20 0.16
0.40 0.27 22.29 * 0.012 0.27 0.26 0.40 0.40 0.27 ***** 0.26
0.50 0.30 22.32 * 0.012 0.30 0.29 0.40 0.40 0.30 ***** 0.29
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 204-42 to CB 203-46.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:21.78 feet
Discharge Range:0.25 to 2.5 Step of 0.25 [cfs]
Overflow Elevation:28.26 feet
Weir:NONE
Upstream Velocity:1.72 feet/sec
PIPE NO. 1: 38 LF - 27"CP @ 0.05% OUTLET: 19.53 INLET: 19.55 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 27.50 BEND: 45 DEG DIA/WIDTH: 5.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 2.24 21.79 * 0.012 0.17 0.28 2.25 2.25 2.24 2.24 0.22
0.50 2.24 21.79 * 0.012 0.24 0.39 2.25 2.25 2.24 2.24 0.31
0.75 2.24 21.79 * 0.012 0.29 0.48 2.25 2.25 2.24 2.24 0.39
1.00 2.24 21.79 * 0.012 0.34 0.55 2.25 2.25 2.24 2.24 0.45
1.25 2.24 21.79 * 0.012 0.38 0.62 2.25 2.25 2.24 2.24 0.50
1.50 2.24 21.79 * 0.012 0.41 0.68 2.25 2.25 2.24 2.24 0.55
1.75 2.24 21.79 * 0.012 0.45 0.73 2.25 2.25 2.24 2.24 0.60
2.00 2.24 21.79 * 0.012 0.48 0.79 2.25 2.25 2.24 2.24 0.64
2.25 2.24 21.79 * 0.012 0.51 0.84 2.25 2.25 2.24 2.24 0.68
2.50 2.25 21.80 * 0.012 0.54 0.89 2.25 2.25 2.24 2.25 0.72
PIPE NO. 2: 112 LF - 27"CP @ 0.06% OUTLET: 19.55 INLET: 19.62 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 28.83 BEND: 15 DEG DIA/WIDTH: 5.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 2.18 21.80 * 0.012 0.17 0.27 2.24 2.24 2.18 2.18 0.22
0.50 2.18 21.80 * 0.012 0.24 0.38 2.24 2.24 2.18 2.18 0.31
0.75 2.18 21.80 * 0.012 0.29 0.46 2.24 2.24 2.18 2.18 0.39
1.00 2.18 21.80 * 0.012 0.34 0.53 2.24 2.24 2.18 2.18 0.45
1.25 2.18 21.80 * 0.012 0.38 0.59 2.24 2.24 2.18 2.18 0.50
1.50 2.18 21.80 * 0.012 0.41 0.65 2.24 2.24 2.18 2.18 0.55
1.75 2.18 21.80 * 0.012 0.45 0.70 2.24 2.24 2.18 2.18 0.60
2.00 2.18 21.80 * 0.012 0.48 0.75 2.24 2.24 2.18 2.18 0.64
2.25 2.18 21.80 * 0.012 0.51 0.80 2.24 2.24 2.18 2.18 0.68
2.50 2.19 21.81 * 0.012 0.54 0.85 2.25 2.25 2.19 2.19 0.72
PIPE NO. 3: 138 LF - 27"CP @ 0.06% OUTLET: 19.62 INLET: 19.70 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 29.04 BEND: 45 DEG DIA/WIDTH: 5.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 2.11 21.81 * 0.012 0.17 0.28 2.18 2.18 2.11 2.11 0.22
0.50 2.11 21.81 * 0.012 0.24 0.38 2.18 2.18 2.11 2.11 0.31
0.75 2.11 21.81 * 0.012 0.29 0.47 2.18 2.18 2.11 2.11 0.39
1.00 2.11 21.81 * 0.012 0.34 0.54 2.18 2.18 2.11 2.11 0.45
1.25 2.11 21.81 * 0.012 0.38 0.60 2.18 2.18 2.11 2.11 0.50
1.50 2.11 21.81 * 0.012 0.41 0.66 2.18 2.18 2.11 2.11 0.55
1.75 2.11 21.81 * 0.012 0.45 0.72 2.18 2.18 2.11 2.11 0.60
2.00 2.11 21.81 * 0.012 0.48 0.77 2.18 2.18 2.11 2.11 0.64
2.25 2.11 21.81 * 0.012 0.51 0.82 2.18 2.18 2.11 2.11 0.68
2.50 2.14 21.84 * 0.012 0.54 0.86 2.19 2.19 2.13 2.14 0.72
PIPE NO. 4: 124 LF - 27"CP @ 0.06% OUTLET: 19.70 INLET: 19.77 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 2.05 21.82 * 0.012 0.17 0.28 2.11 2.11 2.05 2.00 0.18
0.50 2.05 21.82 * 0.012 0.24 0.39 2.11 2.11 2.05 2.00 0.27
0.75 2.05 21.82 * 0.012 0.29 0.47 2.11 2.11 2.05 2.00 0.34
1.00 2.05 21.82 * 0.012 0.34 0.54 2.11 2.11 2.05 2.01 0.40
1.25 2.05 21.82 * 0.012 0.38 0.61 2.11 2.11 2.05 2.01 0.46
1.50 2.05 21.82 * 0.012 0.41 0.67 2.11 2.11 2.05 2.01 0.51
1.75 2.05 21.82 * 0.012 0.45 0.72 2.11 2.11 2.05 2.01 0.55
2.00 2.05 21.82 * 0.012 0.48 0.77 2.11 2.11 2.05 2.01 0.60
2.25 2.05 21.82 * 0.012 0.51 0.82 2.11 2.11 2.05 2.01 0.64
2.50 2.08 21.85 * 0.012 0.54 0.87 2.14 2.14 2.08 2.04 0.68
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:SWALE_W to CB 205-77.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:20.5 feet
Discharge Range:0.1 to 0.6 Step of 0.1 [cfs]
Overflow Elevation:24.12 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 57 LF - 12"CP @ 0.84% OUTLET: 19.50 INLET: 19.98 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 29.14 BEND: 45 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.53 20.51 * 0.012 0.13 0.12 1.00 1.00 0.53 0.53 0.17
0.20 0.53 20.51 * 0.012 0.19 0.17 1.00 1.00 0.53 0.53 0.24
0.30 0.54 20.52 * 0.012 0.23 0.20 1.00 1.00 0.53 0.54 0.30
0.40 0.55 20.53 * 0.012 0.27 0.23 1.00 1.00 0.53 0.55 0.35
0.50 0.56 20.54 * 0.012 0.30 0.26 1.00 1.00 0.53 0.56 0.39
0.60 0.57 20.55 * 0.012 0.33 0.28 1.00 1.00 0.53 0.57 0.44
PIPE NO. 2: 59 LF - 12"CP @ 0.85% OUTLET: 19.98 INLET: 20.48 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.10 0.14 20.62 * 0.012 0.13 0.12 0.53 0.53 0.14 0.05 0.12
0.20 0.19 20.67 * 0.012 0.19 0.17 0.53 0.53 0.19 ***** 0.17
0.30 0.23 20.71 * 0.012 0.23 0.20 0.54 0.54 0.23 ***** 0.20
0.40 0.27 20.75 * 0.012 0.27 0.23 0.55 0.55 0.27 ***** 0.23
0.50 0.30 20.78 * 0.012 0.30 0.26 0.56 0.56 0.30 ***** 0.26
0.60 0.33 20.81 * 0.012 0.33 0.28 0.57 0.57 0.33 ***** 0.30
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 203-74 to CB 203-45.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:21.79 feet
Discharge Range:0.25 to 2.25 Step of 0.25 [cfs]
Overflow Elevation:26.98 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 49 LF - 12"CP @ 0.59% OUTLET: 23.00 INLET: 23.29 INTYP: 5
JUNC NO. 1: OVERFLOW-EL: 26.61 BEND: 90 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.74
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.25 0.28 23.57 * 0.012 0.21 0.20 0.00 0.20 0.21 ***** 0.28
0.50 0.40 23.69 * 0.012 0.30 0.28 0.00 0.28 0.30 ***** 0.40
0.75 0.50 23.79 * 0.012 0.37 0.35 0.00 0.35 0.37 ***** 0.50
1.00 0.60 23.89 * 0.012 0.43 0.40 0.00 0.40 0.43 ***** 0.60
1.25 0.69 23.98 * 0.012 0.48 0.46 0.00 0.46 0.48 ***** 0.69
1.50 0.77 24.06 * 0.012 0.52 0.51 0.00 0.51 0.52 ***** 0.77
1.75 0.86 24.15 * 0.012 0.57 0.56 0.00 0.56 0.57 ***** 0.86
2.00 1.01 24.30 * 0.012 0.61 0.61 0.00 0.61 0.61 1.01 0.94
2.25 1.08 24.37 * 0.012 0.65 0.66 0.00 0.65 0.66 1.08 1.03
PIPE NO. 2: 64 LF - 12"CP @ 0.52% OUTLET: 23.29 INLET: 23.62 INTYP: 5
JUNC NO. 2: OVERFLOW-EL: 26.92 BEND: 30 DEG DIA/WIDTH: 2.5 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.23 23.85 * 0.012 0.16 0.16 0.28 0.28 0.16 0.23 0.21
0.29 0.30 23.92 * 0.012 0.23 0.22 0.40 0.40 0.23 ***** 0.30
0.43 0.37 23.99 * 0.012 0.28 0.27 0.50 0.50 0.28 ***** 0.37
0.57 0.47 24.09 * 0.012 0.32 0.31 0.60 0.60 0.34 0.47 0.43
0.72 0.53 24.15 * 0.012 0.36 0.35 0.69 0.69 0.41 0.53 0.48
0.86 0.59 24.21 * 0.012 0.39 0.39 0.77 0.77 0.48 0.59 0.53
1.01 0.66 24.28 * 0.012 0.43 0.42 0.86 0.86 0.57 0.66 0.57
1.15 0.78 24.40 * 0.012 0.46 0.45 1.01 1.01 0.72 0.78 0.62
1.29 0.87 24.49 * 0.012 0.49 0.49 1.08 1.08 0.82 0.87 0.66
PIPE NO. 3: 45 LF - 12"CP @ 0.51% OUTLET: 23.62 INLET: 23.85 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.14 0.16 24.01 * 0.012 0.16 0.16 0.23 0.23 0.16 0.09 0.07
0.29 0.23 24.08 * 0.012 0.23 0.22 0.30 0.30 0.23 ***** 0.22
0.43 0.28 24.13 * 0.012 0.28 0.27 0.37 0.37 0.28 ***** 0.27
0.57 0.32 24.17 * 0.012 0.32 0.31 0.47 0.47 0.32 ***** 0.31
0.72 0.36 24.21 * 0.012 0.36 0.35 0.53 0.53 0.36 ***** 0.35
0.86 0.46 24.31 * 0.012 0.39 0.39 0.59 0.59 0.41 0.46 0.40
1.01 0.51 24.36 * 0.012 0.43 0.42 0.66 0.66 0.47 0.51 0.45
1.15 0.58 24.43 * 0.012 0.46 0.46 0.78 0.78 0.58 0.58 0.50
1.29 0.67 24.52 * 0.012 0.49 0.49 0.87 0.87 0.67 0.65 0.55
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB 105-52 to EX 105-03.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:22.1 feet
Discharge Range:0.05 to 0.3 Step of 0.05 [cfs]
Overflow Elevation:25.09 feet
Weir:NONE
Upstream Velocity:2.96 feet/sec
PIPE NO. 1: 85 LF - 12"CP @ 0.49% OUTLET: 21.10 INLET: 21.52 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.05 0.59 22.11 * 0.012 0.10 0.10 1.00 1.00 0.59 0.45 -0.02
0.10 0.59 22.11 * 0.012 0.13 0.14 1.00 1.00 0.59 0.45 0.03
0.15 0.59 22.11 * 0.012 0.16 0.16 1.00 1.00 0.59 0.46 0.07
0.20 0.59 22.11 * 0.012 0.19 0.19 1.00 1.00 0.59 0.46 0.11
0.25 0.59 22.11 * 0.012 0.21 0.21 1.00 1.00 0.59 0.46 0.14
0.30 0.59 22.11 * 0.012 0.23 0.23 1.00 1.00 0.59 0.46 0.17
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:FIL-2 to CB 205-76.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:24.37 feet
Discharge Range:0.2 to 0.6 Step of 0.05 [cfs]
Overflow Elevation:26.55 feet
Weir:NONE
Upstream Velocity:0.01 feet/sec
PIPE NO. 1: 11 LF - 6"CP @ 0.00% OUTLET: 24.80 INLET: 24.80 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.20 0.37 25.17 * 0.012 0.23 0.00 0.00 0.23 0.32 0.37 0.32
0.25 0.42 25.22 * 0.012 0.26 0.00 0.00 0.26 0.36 0.42 0.37
0.30 0.47 25.27 * 0.012 0.28 0.00 0.00 0.28 0.39 0.47 0.41
0.35 0.51 25.31 * 0.012 0.31 0.00 0.00 0.31 0.42 0.51 0.46
0.40 0.56 25.36 * 0.012 0.33 0.00 0.00 0.33 0.46 0.56 0.50
0.45 0.61 25.41 * 0.012 0.35 0.00 0.00 0.35 0.49 0.61 0.55
0.50 0.67 25.47 * 0.012 0.37 0.00 0.00 0.37 0.52 0.67 0.59
0.55 0.72 25.52 * 0.012 0.38 0.00 0.00 0.38 0.54 0.72 0.64
0.60 0.79 25.59 * 0.012 0.40 0.00 0.00 0.40 0.57 0.79 0.71
AE 0054-17 | 60% Storm Drainage Report
I-405 corridor
60% Design Drawings and Relevant Mapping
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceH
S
S
M
H
3
6
"
Ø
C
O
N
C
R
I
M
=
2
7
.
9
7
I
E
8
"
V
C
N
E
=
1
4
.
5
I
E
8
"
C
O
N
C
S
=
1
3
.
9
C
B
2
.
3
'
X
2
.
0
'
C
O
N
C
R
I
M
=
2
5
.
6
6
I
E
1
2
"
D
I
W
=
2
2
.
2
W
A
T
=
2
2
.
2
B
O
T
=
2
0
.
8
I
N
L
E
T
R
I
M
=
2
5
.
3
7
C
B
2
.
1
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
6
.
6
1
I
E
1
2
"
D
I
S
E
=
2
2
.
7
I
E
1
2
"
D
I
W
=
2
2
.
7
W
A
T
=
2
2
.
6
B
O
T
=
1
9
.
8
I
N
L
E
T
R
I
M
=
2
6
.
8
8
S
D
M
H
4
8
"
Ø
C
O
N
C
R
I
M
=
2
9
.
4
3
I
E
1
2
"
D
I
N
=
2
0
.
6
I
E
3
6
"
D
I
E
=
2
0
.
0
I
E
3
6
"
C
M
P
S
=
2
0
.
2
I
E
1
2
"
C
O
N
C
W
=
2
0
.
0
W
A
T
=
2
0
.
4
B
O
T
=
1
9
.
7
I
N
L
E
T
R
I
M
=
2
8
.
7
5
S
D
M
H
4
8
"
Ø
B
R
I
C
K
R
I
M
=
2
8
.
8
9
I
E
3
0
"
C
O
N
C
E
=
1
9
.
9
I
E
2
4
"
C
O
N
C
W
=
1
9
.
8
W
A
T
=
2
0
.
4
B
O
T
=
1
9
.
5
I
N
L
E
T
R
I
M
=
2
8
.
6
4
I
N
L
E
T
R
I
M
=
2
8
.
7
2
I
N
L
E
T
R
I
M
=
2
8
.
3
8
I
N
L
E
T
R
I
M
=
2
8
.
2
2
I
N
L
E
T
R
I
M
=
2
8
.
2
2
I
N
L
E
T
R
I
M
=
2
7
.
7
0
U
N
A
B
L
E
T
O
S
E
E
P
I
P
E
S
W
A
T
=
2
0
.
3
B
O
T
=
1
8
.
8
C
B
R
I
M
=
2
6
.
6
7
I
N
L
E
T
R
I
M
=
2
5
.
9
3
I
N
L
E
T
R
I
M
=
2
5
.
8
5
S
S
M
H
R
I
M
=
2
8
.
4
0
I
E
8
"
C
O
N
C
N
=
1
3
.
2
I
E
1
8
"
C
O
N
C
S
E
=
1
0
.
4
I
E
1
8
"
C
O
N
C
N
W
=
1
0
.
2
SD
SD
SSSSSSSSSSSS
SS
SS
SS
SS
SS
S
D
Y
I
E
L
D
F
H
CONC
BENCH
Y
I
E
L
D
4' WOOD FNC
U
S
E
C
R
O
S
S
W
A
L
K
CW CONC BENCH CO
N
C
B
E
N
C
H
Y
I
E
L
D
ARTWORK
CONC
DRW
SW
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
DRW
E
E
E
W
E
E
I
N
L
E
T
R
I
M
=
2
8
.
6
6
W
V
W
V
3
W
V
W
V
W
V
W
V
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
3
H
H
H
H
H
H
H
H
H
H
H
H
HHHHH
H
H
H
ELEC VLT
4
E
L
E
C
V
L
T
E
L
E
C
V
L
T
E
L
E
C
V
L
T
3
I
R
R
G
2
I
R
R
G
W
M
EEEE
E
WWWWWW
W
W
E
W
W
FO
E E
E E
E
E
E
E
E
WWW
W
G
G
G
E E E E E E E
E
E
E
E
EE
E
E
E
E
EEEEEEEEEE
E
E
E
E
EE
E
E
E
E E EEE
E
E
E
E
E
E
E
E
E
E
G G G G G G G G
G
G
G
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
W
W
W
W
FO
FO FO FO FO FO FO FO FO
FO
FO
FO
FO
F
O
F
O
FO FO
F
O
F
O
FO
SD
SD
SD
S
D
S
D
SD
SD
SD SD
SD SD
SD
SD
SD
SD
SDSD
S
D
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
EE
E
E
E
E
E
E
E
E
E
E
E E E E E E
E
E
E
EEEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
F
O
FO
F
O
FO
FO
FO FO
FO
FO
FO
F
O
FO
FO
FO
FO
FO
FO
X
X
X
X
X
X
X
X
X
X
6
'
T
E
M
P
C
L
E
F
X
C
B
R
I
M
=
2
5
.
5
3
M
I
S
C
V
A
L
V
S
S
M
H
R
I
M
=
2
8
.
6
6
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
S
S
M
H
R
I
M
=
2
8
.
7
5
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
I
N
L
E
T
R
I
M
E
L
=
2
7
.
0
1
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
I
N
L
E
T
6
0
"
C
O
N
C
R
I
M
E
L
=
2
5
.
3
4
I
E
2
4
"
C
P
P
N
=
2
0
.
1
I
E
1
2
"
C
P
P
E
=
2
0
.
7
I
E
6
"
P
V
C
S
=
2
2
.
2
I
E
2
4
"
C
P
P
S
=
2
3
.
0
W
A
T
=
2
0
.
4
B
O
T
=
1
8
.
0
I
N
L
E
T
R
I
M
E
L
=
2
6
.
7
8
U
N
A
B
L
E
T
O
O
P
E
N
C
B
6
0
"
C
O
N
C
R
I
M
E
L
=
2
8
.
3
5
I
E
2
4
"
C
P
P
N
=
1
9
.
4
I
E
3
0
"
C
P
P
N
E
=
1
9
.
8
I
E
1
2
"
C
P
P
S
=
2
1
.
7
I
E
3
6
"
C
P
P
S
W
=
1
9
.
6
B
O
T
=
1
7
.
8
S
D
M
H
4
8
"
C
O
N
C
R
I
M
E
L
=
2
8
.
7
1
I
E
1
2
"
D
I
N
=
2
2
.
6
I
E
1
2
"
D
I
S
=
2
2
.
8
W
A
T
=
2
2
.
6
B
O
T
=
2
0
.
6
C
B
1
.
9
'
X
2
.
2
'
C
O
N
C
R
I
M
E
L
=
2
8
.
0
2
T
O
P
O
F
1
2
"
D
I
S
E
=
2
4
.
3
I
E
1
2
"
D
I
N
=
2
3
.
2
W
A
T
=
2
3
.
3
B
O
T
=
2
2
.
1
C
B
1
.
9
'
x
2
.
2
'
C
O
N
C
R
I
M
E
L
=
2
6
.
8
2
I
E
1
2
"
D
I
N
E
=
2
3
.
7
W
A
T
=
2
3
.
8
B
O
T
=
2
2
.
2
C
B
R
I
M
E
L
=
2
7
.
3
6
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
SSSSSSSSSSSSSSSSSSSS
FO
FO
FO
FO
FO
FO
F
O
FO
F
O
FO
FO
FO
FO
F
O
FO
E E E
FO
FO
FO
FO FO FO
RE
N
T
O
N
RENTON
RENTON
R
E
N
T
O
N
R
E
N
T
O
N
R
E
N
T
O
N
RENTON
R
E
N
T
O
N
RENTON
RENTO
N
RENTON
WSDOT FOWSDOT
F
O
2
-
Z
A
Y
O
F
O
P
S
E
G
A
S
PSE GAS P
S
E
G
A
S
E
E
U
T
I
L
V
L
T
H
H
E
E
E
P
O
T
H
O
L
E
1
3
G
N
D
E
L
=
2
9
.
0
5
2
"
P
O
W
E
R
C
N
D
T
O
P
O
F
C
N
D
E
L
=
2
6
.
8
4
P
O
T
H
O
L
E
1
4
G
N
D
E
L
=
2
5
.
9
6
2
"
P
O
W
E
R
C
N
D
T
O
P
O
F
C
N
D
E
L
=
2
3
.
9
6
P
O
T
H
O
L
E
0
1
G
N
D
E
L
=
2
9
.
0
5
4
"
F
I
B
E
R
O
P
T
I
C
T
O
P
O
F
C
N
D
E
L
=
2
7
.
0
1
2'5" D
P
1'8" DP
2'1" DP
1'11" DP
2'5" DP2' DP2'4"
DP2'10" DP2'5" DP2' DP
2'
4
"
D
P
2'
5
"
D
P
5
'
4
"
D
P
5
'
D
P
5
'
5
"
D
P
4
'
8
"
D
P
4'D
P
3'
7
"
D
P
2' DP
E
E
1
'
1
1
"
D
P
1
'
7
"
D
P
4
'
5
"
D
P
5
'
6
"
D
P
1
'
8
"
D
P
2
'
5
"
D
P
1
'
1
1
"
D
P
4'
9
"
4'
1
1
"
RE
C
N
O
.
2
0
1
1
0
8
1
2
0
0
1
7
1
8
4'
S
L
O
P
E
&
U
T
I
L
I
T
Y
EA
S
E
M
E
N
T
/////////////
//////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
RAINIER AVE S
S
W
G
R
A
D
Y
W
A
Y
S
G
R
A
D
Y
W
A
Y
G
R
A
D
Y
1
4
9
+
0
0
GRADY 150+00
G
R
A
D
Y
1
5
1
+
0
0
RAINIER 200+00
RAINIER 201+00 RAINIER 202+00 RAINIER 203+00
RAINIER
2
0
4
+
0
0
RAINIER STA 200+00.07
= GRADY STA 150+00.02
SD
SD
SD
SD
SD
28
27
29
29
2
7
2
8
27
2
7
29
2
7
CONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/RA
I
N
I
E
R
A
V
E
S
S
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
N
B
RA
I
N
I
E
R
A
V
E
S
S
B
HA
R
D
I
E
A
V
E
S
W
SR
-
1
6
7
N
B
SR
-
1
6
7
S
B
GRADY WAY
E
B
GRADY WAY
E
B
GRADY WAY
E
B
GRADY WAY
E
B
SR
-
1
6
7
S
B
SR
-
1
6
7
N
B
SR
-
1
6
7
S
B
LAK
E
A
V
E
S
LA
K
E
A
V
E
S
CONC
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
AS
P
H
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
BUS SHELTER
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
18" TREE±46' DLN
10" TREE±8' DLN10" TREE±10' DLN
RAIS
E
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
RAISE
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
DOU
B
L
E
R
A
I
S
E
D
M
A
R
K
E
R
S
RAISED MARKERS
DOUBLE RAISED MARKERS
6" TREE±12' DLN
4" TREE±22' DLN
6" TREE±10' DLN
BUS SHELTER
TRASHBIN
TRAFFICCONTROLCABINET
6" TREE±16' DLN
6" TREE±18' DLN
6" TREE±12' DLN
8" TREE±14' DLN
RAISED MARKERS
DOUBLE RAISED MARKERS
DOUBLE RAISED MARKERS
DOUBLE RAISED MARKERS
8" TREE±20' DLN
6" TREE±14' DLN
6" TREE±14' DLN
6" TREE±14' DLN
6" TREE±14' DLN
DOU
B
L
E
R
A
I
S
E
D
M
A
R
K
E
R
S
RAISE
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
RAIS
E
D
M
A
R
K
E
R
S
DOUB
L
E
R
A
I
S
E
D
M
A
R
K
E
R
S
DOU
B
L
E
R
A
I
S
E
D
M
A
R
K
E
R
S
DOUBLE RAISED MARKERS
DOUBLE RAISED MARKERS
C&G
C&G
C&G
C&G
C&
G
C&G
C&G
C&G
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
EXT
R
C
O
N
C
C
U
R
B
EXT
R
C
O
N
C
C
U
R
B
EXTR
C
O
N
C
CUR
B
CONC
W
A
L
L
S 7TH ST
36"
C
M
P
36" DI
30" CONC
30" CO
N
C
27" CONC
27" CONC
27" CONC
24" CMP
12
"
C
O
N
C
4"
C
O
N
C
6" DI
12"
C
P
P
12"
C
P
P
12
"
C
O
N
C
6" CONC
6" CONC
6" CONC
6"
P
V
C
12" DI
12" CO
N
C
12" CONC
6"
C
O
N
C
15
"
C
M
P
1
5
"
C
M
P
6" CONC
8" VC
8"
C
O
N
C
18
"
C
O
N
C
TT
T
TRAFFICVLT
TMH
GV
GV
GV
GV
GV
2 MISCMH
GV
GV
MW
TMH
TMH
GV
GV
GATE
CW
SW
SW
CON
C
BEN
C
H
RAISED MARKER
S
DOUBLE RAISED
M
A
R
K
E
R
S
RAISED MARKE
R
S
RAISED MARKERS
RAISED MARKERS
9" TREE10' DLN
6" TREE8' DLN
8" TREE9' DLN
11" TREE10' DLN
11" TREE27' DLN
14" TREE24' DLN
10" TREE20' DLN
14" TREE23' DLN
14" TREE25' DLN
14" TREE25' DLN
GRASS
GRASS
ASPH
4' W
O
O
D
F
N
C
C
W
SW
GRASS
GRASS
37" TREE40' DLN
43" TREE45' DLN
32" TREE34' DLN
11" TREE31' DLN
5" TREE12' DLN
12" TREE28' DLN
11" TREE28' DLN
5" TREE11' DLN
5" TREE11' DLN
10" STUMP
11" STUMP
11" STUMP
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
LANDSCAPING
CO
N
C
DR
W
5" TREE8' DLN
5" TREE11' DLN
5" TREE11' DLN
6" TREE12' DLN
5" TREE11' DLN
5" TREE13' DLN 6" TREE12' DLN
6" TREE13' DLN
DRW
5" TREE15' DLN
6" TREE14' DLN
8" TREE16' DLN
5" TREE12' DLN
LAN
D
S
C
A
P
I
N
G
6" TREE14' DLN
RAISED MARK
E
R
S
RAISED MARKE
R
S
RAISED MAR
K
E
R
S
RA
I
S
E
D
M
A
R
K
E
R
S
RA
I
S
E
D
M
A
R
K
E
R
S
SW
MULTIPLE6" TREES35' DLN
5" TREE8' DLN
5" TREE11' DLN
AS
P
H
AS
P
H
ASPHCONC SEAMS
(
T
Y
P
)
LA
N
D
S
C
A
P
I
N
G
C&
G
C&G
C&G
C&G
C&G
ASPH
SW
SW
SW
LA
N
D
S
C
A
P
I
N
G
DR
W
DR
W
GRASS
CO
GV
GV
GV
3TRAFFIC CONTROLCABINETS
MW
GV
GV
GM
MW
MW
2VLTS
HH
TTMH
GM
DETECTOR
LOOP (TYP)
DETECTOR
LOOP (TYP)
6" CONC
16"
C
M
P
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
ASPH
ASPH
ASPH
X 5.5' CLEF
4" TREE10' DLN
SW
2' FNC
C&G
C&
G
C&
G
GATE
6' C
L
E
F
ASPH
5.5' CLEF
6' CLEF
BLDGEQUIP
GAZEBO
CONC
LA
N
D
S
C
A
P
I
N
G
LA
N
D
S
C
A
P
I
N
G
LANDSCAPING
LAN
D
S
C
A
P
I
N
G
LA
N
D
S
C
A
P
I
N
G
2 11" TREES32' DLN
MULTIPLE5-7" TREES20' DLN
SW
SW
SW
SW SW
LANDSCAPING
DA
S
H
E
D
Y
E
L
L
O
W
SO
L
I
D
W
H
I
T
E
GRASS
C&G
SW
SW
SWC&G
5" TREE8' DLN
4" TREE7' DLN
CONC BASEREMOVED LT
6'
T
E
M
P
C
L
E
F
6' CLEF
WHEEL STOPS (
T
Y
P
)
WH
E
E
L
S
T
O
P
S
(
T
Y
P
)
CHAN
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
WHEELSTOPS (TYP)
6' CLEF
DETECTORLOOP (TYP)
DETECTORLOOP (TYP)
RAI
S
E
D
M
A
R
K
E
R
S
RA
I
S
E
D
M
A
R
K
E
R
S
RAI
S
E
D
M
A
R
K
E
R
S
GAT
E
STORAGESHED
MISCVALV
SHELTERCANOPY
EO
P
EO
P
EO
P
EO
P
BLDG
BLDG
BLDG
BLDG
INLETRIM EL=24.52NEEDS TRAFFIC CONTROL
CBRIM=25.13NEEDS TRAFFIC CONTROL
12" RCP
8" CONC
8" CONC
4" CONC
30
"
C
P
P
24"
C
P
P
18"
D
I
18" DI
12" CPP
12"
C
P
P
12" C
P
P
/
/
/
/
SL
SL
SS
CO
M
C
A
S
T
COM
C
A
S
T
COM
C
A
S
T
CO
M
C
A
S
T
COM
C
A
S
T
CO
M
C
A
S
T
CO
M
C
A
S
T
CO
M
C
A
S
T
CO
M
C
A
S
T
C
O
M
C
A
S
T
CO
M
C
A
S
T
COMCAST
COMCAST
COMCAST
C
O
M
C
A
S
T
CO
M
C
A
S
T
CO
M
C
A
S
T
COMCAST
CO
M
C
A
S
T
COMCAST
CO
M
C
A
S
T
CO
M
C
A
S
T
COMCAST
COMCA
S
T
F
O
CO
M
C
A
S
T
CENTURYLINK
CENTUR
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLINK
F
O
CENTURYLIN
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
PS
E
2-P
S
E
2-P
S
E
3-P
S
E
PSE
2-PS
E
2-PSE
2-PSE 2-PSE
2-PSE
2-PSE
2-PSE
2-PSE
2-PSE
2-PSE
PSE
PSE
PSE
PSE
PSE
PS
E
PS
E
P
S
E
PS
E
PSE
PSE
PS
E
PS
E
PSE
PSE
RENTONRENTON
RENTON
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
MWEL=25.08
MWGWMW-3EL=26.16
MWGWMW-4EL=26.41
MWGWMW-2EL=26.06
MWGWMW-1EL=26.60
5'4" D
P
6'8"
D
P
5' D
P
4' D
P
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP
1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"
DP10' DP
8'
5
"
D
P
8'1
1
"
D
P
8'
1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
2'2
"
D
P
2'8" DP
2'7" DP
2'8"
D
P
3'6"DP
3'6" DP
3'9" DP
3'10" DP
4'3" DP
2'3"
D
P
1'7"
D
P
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'11
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP3'7"DP2'
D
P
4'11" DP
5'2
"
D
P
4'6"
DP 3'5"
DP
1'9"
D
P
2' DP
4' DP
1'9" D
P
5'7
"
D
P
2'7"
DP
2'4"
DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
5'8
"
D
P
3'
D
P
3'9
"
D
P
3'6
"DP
4'11
"
D
P
6'7"
D
P
3'9"
D
P
2'2"
D
P
2'4"
D
P
5'8"
D
P
8'6"
D
P
9'11
"
D
P
10'
D
P
2'DP
5'10
"
D
P
10'
D
P
3'8" DP
3'11"DP
5'1" D
P
5'3" D
P
5'2" DP
6'4" D
P
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
1'4" DP
2'1" D
P
7' DP
7' DP
2'
8
"
D
P
4'11
"
D
P
6'3"
D
P
8' DP
2'2" DP
1'3"DP
2'5
"
D
P
1'1
0
"
D
P
2'3
"
D
P
4'1
1
"
D
P
3'11
"
D
P
2'8
"
D
P
3'6"DP
3'10
"
D
P
2'7" DP 2'4" DP 3'4" DP
3'10" DP 3'5"
D
P
3'2"
D
P
3'11
"
D
P
3'9"
D
P
2'4
"
D
P
3'3"
D
P
5'5
"
DP
4'10
"
D
P
4'4"
D
P
5'3"
D
P
4'
D
P
1'9
"
D
P
2'8
"
D
P
2' D
P
1'1
1
"
D
P
4'4
"
D
P
6' D
P
5'
D
P
2'8
"
D
P
3'8
"
D
P
3'1
0
"
D
P
2'8
"
D
P
2'
D
P
3'7
"
D
P
2'2
"
D
P
2'4
"
D
P
3'8
"
D
P
3' D
P
3'
D
P
3'1
1
"
D
P
3'9
"
D
P
3'7
"
D
P
1'8
"
D
P
4' D
P
5'1
1
"
D
P
3'
D
P
1'1
0
"
D
P
1'2
"
D
P
1'6" DP
1'8
"
D
P
2'3
"
D
P
5'6
"
D
P
2'4
"
D
P
5'4" DP
4'8" DP
5'8" DP
3'11" DP
6'1" DP
6'4" DP
6'1" DP
5'4" DP
2'4" DP 1'6" DP 1'4"DP
1'8" DP
1'5" DP
1'1" DP
1'4" DP 1'3" DP 1'6" DP1'8" DP
1'5" DP
1'5" DP
1'4" DP
1'5" DP
1'8" DP
1'7" DP
2'3" DP
1'7" DP
4'
D
P
2'6" DP
3' D
P
1'5" DP
1'6"
D
P
1'7" D
P
2'2"
D
P
2'5
"
D
P
4' DP 2'5" DP2'2" DP
1'1
1
"
D
P
2'
D
P
2'1
"
D
P
2'2
"
D
P
1'1
1
"
D
P
1'6
"
D
P
2'4
"
D
P
2'4
"
D
P
2'4
"
D
P
1'8"
D
P
4' D
P
5'4" DP
4'11"DP1'10"
D
P
2' D
P
2'8"
D
P
2'4" DP
3' D
P
3'8"
D
P
1'9
"
D
P
4' DP
4' D
P
3'6"
D
P
5' DP
5'11" D
P
6'9" DP
5'4" DP7'11" DP
6'7" DP
4'5" DP
2'8"
D
P
2'2"
D
P
2' D
P
2' D
P
2'6"
D
P
2'2"
D
P
1'9"
D
P
1' DP
3' DP
3' D
P
3' D
P
2'5
"
D
P
2'6
"
D
P
2'2"
D
P
2'6
"
D
P
2'5"
D
P
2'7
"
D
P
2'8
"
D
P
2'5
"
D
P
2'7
"
D
P
2'6
"
D
P
2'4
"
D
P
2'6
"
D
P
'
3'4
"
D
P
2'9
"
D
P
5'
D
P
2'
8
"
D
P
3'
D
P
2' D
P
2'1
0
"
D
P
4'8
"
D
P
5' D
P
5'9"
D
P
5'1
0
"
D
P
5'8"
D
P
5'10
"
D
P
2'8
"
D
P
3' DP
6'9" DP
6' DP
7'6" DP
2'1
"
D
P
5'6" D
P
4' DP
2'4" D
P
2'5
"
D
P
2'5" DP
2'8" DP
2'3
"
D
P
1' D
P
2'5" DP2'5" DP
1'6" DP
1'5" DP
2'6" DP2'D
P
4'DP
4'D
P
1'
9
"
D
P
2'5"
D
P
2'DP
PSE
12
"
W
12
"
W
12"
W
12
"
W
12"
W
12"
W
12"W
12"W
12"W
12"W
ABAN
-
W
ABAN
-
W
ABAN
-
W
ABAN
-
W
ABA
N
-
W
AB
A
N
-
W
ABAN-
W
ABAN-
W
ABA
N
-
W
AB
A
N
-
W
12"W
1
2
"
W
12"
W
12
"
W
12
"
W
12
"
W
400
404
418
CONC SEAMS (TY
P
)
DASHED WHITE
C&G
EXTRUDED CU
R
B
DASHED WHITE
SOLID WHITE
DASHED WHITE
CO
2'4'
EXTR CONC CURB
EXTR CONCCURB
3'11" DP4'11" DP
3'5" DP
5'5" DP
2'6" DP
1'3" DP
1'11" DP3'9" DP
1' DP
3' DP
2' DP
4' DP3'10" DP
2'5" DP
2'3" DP2'2" DP 2'2" DP
2' DP
1'11" DP
1'5" DP
BROADBANDVAULT
2'11" DP
5'11" DP3'8" DP
1' DP
2'8" DP
2' DP
2' DP
3' DP
2'3" DP
1'11" DP
3' DP
1' 11" DP
2'3" DP3'11" DP
1'8" DP1'10" DP
4'11" DP
5'2" DP
4'4" DP
1'7" DP 1'8" DP
4'5" DP5'6" DP
3'1"DP 3'3" DP
1' 8" DP
3'2" DP
2'5" DP
1'9" DP
1' DP
1'11" DP
1'5" DP 1'5" DP3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'7" DP
1'9" DP
3' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP
2' DP
1'9" DP1'5" DP
1'5" DP
2'6" DP
1'4" DP
1'5" DP
1'9" DP
2'4" DP2'4" DP2'6" DP
3'10" DP
2' DP
2' DP 5'5"DP6'7" DP3'5" DP
1'8" DP
4'2" DP
2'4" DP
12' DP
2'4" DP
1' DP
1' DP
6'11"
3'6"
4'8"
8'1
1
"
1'7"
2'
3'9
"
4'10
"
1'1"
1'5"
1'4"
1'7"
1'10"
1'7"
1'11
"
2'2"
1'
0'11"
6'9"
4'5"
1'
2'10
"
1'9
"
1'
3'
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
1'2"1'10"
2'9
"
2'3
"
2'
2'
3'3'4"1'3"4'3'2"3'4'
2'6
"
2'
3'
3'
1'8"1'2"1'2"
2'7
"
2'5"2'7"3'8"
2'2"
1'7
"
2'9"
4'2'
3'
3'
3'
3'
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
2'1"
1'11
"
1'9"
2'1"
1'8"
4'3"
3'9"
4'7"3'11"3'7"
3'11"
10"
1'9"
1'7"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
3'11"
3'
5'2
"
4'1"
4'7
"
2'11"2'9"1'4"
1'7"
2'9
"
2'1
"
2'7"2'11"
3'4"
3'9"
2'10
"
2'2"
2'11"
1'9"
1'5"
1'7"
1'7"
1'10
"
1'8"
1'7"2'11"
2'1"2'
2'3"1'9"
1'6
"
1'8"
1'7"
1'11"
2'1"
1'7"
1'6"
1'6"1'2"
1'4"
1'5"
2'3"
2'1"
2'7"3'1"3'1"
2'
3'4"
3'3"
1'11"3'5"
2'1"2'3"
2'9"
2'1"
2'4"
1'4"
1'5"
1'4"1'3"
1'6"
1'6"
1'11"
1'5"2'
3'10"
1'3"1'6"
1'4"
3'9"
1'5"
1'11"
3'11"
3'9"
1'7"
3'10"
4'10"
4'9"
4'10"
1'3"
1'8
"
4'1"
4'9"4'9"
2'7
"
2'10"
4'1"
6'6"
5'7"
2'9"
1'1"
2'7
"
3'4
"
2'10
"
2'3"
1'
10"8"10"
2'9
"
2'6
"
2'1
"
1'8"
1'11"
2'5
"
2'3
"
2'7"
2'11"
1'7"
1'9"
2'2"
2'2"
1'7"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6'3
"
5'4
"
5'3
"
4'9"
5'7"3'10"
4'11
"
5'1
1
"
6'8"
6'11"
3'10"
1'6"
4'1"
4'2"
4'7"
5'9"
5'8"4'8"
5'1
1
"
3'1
1
"
4'1"
3'9"
4'5"
2'11"
3'1
"
5'2"
4'11
"
4'7"
4'1"4'6"
4'8"
4'6"
5'3"
4'6"
4'9"
4'11
"
3'7"
4'
1'
8" TREE20' DLN
8" TREE15' DLN 10" TREE20' DLN
6" TREE10' DLN
8" TREE20' DLN
8" TREE20' DLN
12" TREE20' DLN
8" TREE20' DLN
6" TREE20' DLN
8" TREE20' DLN
10" TREE20' DLN
12" TREE25' DLN
8" TREE20' DLN
BIKESTORAGE
6" TREE30' DLN
SOLID YELLOW
SOLID WHITE
SOLID WHITE
SO
L
I
D
YE
L
L
O
W
BUS STOPCANOPY
BUS STOPCANOPY
LAKE AVE S
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
RAINIER STA 200+00 TO RAINIER STA 204+00
BT120-CDP101
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
3
3
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
NO DRAINAGE WORK ON THIS SHEET
MA
T
C
H
L
I
N
E
:
R
A
I
N
I
E
R
S
T
A
2
0
4
+
0
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
2
MATCHL
I
N
E
:
G
R
A
D
Y
S
T
A
1
5
1
+
0
0
SEE DW
G
BT120-C
D
P
1
0
4
MATC
H
L
I
N
E
:
SEE D
W
G
BT120
-
C
D
P
2
0
5
MATCHLINE:
SEE DWG BT120-CDP205
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
EX ROW
107
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceDRAINAGE STRUCTURE TABLE
STRUCTURE NAME
102-17
MWS-66
STRUCTURE DETAILS
CB TYPE 1
STA. 207+86.09 (1.36', RT)
RIM 24.97
MWS 4x4
STA. 207+85.05 (6.92', RT)
RIM 25.55
PIPES IN
IE 21.42 (NW)
PIPES OUT
IE 21.45 (SE)
IE 21.42 (E)
20
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH OPEN CURB FACE FRAME AND GRATE
PER COR STD PLAN 203.00.
REPLACE EXISTING OPEN CURB FACE FRAME AND
GRATE WITH RECTANGULAR FRAME AND SOLID
METAL COVER PER COR STD PLANS 204.00 AND
204.10, RESPECTIVELY. ADJUST FRAME AND COVER
TO GRADE.
ADJUST RIM TO GRADE.
INSTALL 4'x4' MODULAR WETLAND TREATMENT
UNIT. SEE DWG. BT120-CDD503 FOR DETAILS.24
5
21Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CON
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLEF
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTONRENTON
RENTON
REN
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8"
D
P
5' DP
4' DP
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
3'6"DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" D
P
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
S
I
G
N
SIGN
S
I
G
N
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
U
T
H
H
H
H
V
L
T
V
L
T
V
L
T
V
L
T
S
SW
I
N
L
E
T
R
I
M
=
2
5
.
2
5
C
B
1
.
7
'
X
2
.
2
'
C
O
N
C
R
I
M
=
2
4
.
7
4
I
E
6
"
C
O
N
C
W
=
2
3
.
9
W
A
T
=
2
3
.
8
B
O
T
=
2
2
.
0
C
B
2
.
1
'
X
1
.
7
'
C
O
N
C
R
I
M
=
2
4
.
6
4
I
E
8
"
C
O
N
C
N
=
2
3
.
2
I
E
4
"
C
O
N
C
E
=
2
3
.
3
I
E
6
"
C
O
N
C
E
=
2
3
.
3
I
E
6
"
X
6
"
S
Q
U
A
R
E
C
O
N
C
W
=
2
3
.
1
W
A
T
=
2
3
.
2
B
O
T
=
2
2
.
4
I
N
L
E
T
R
I
M
=
2
5
.
1
2
I
N
L
E
T
R
I
M
=
2
3
.
6
2
S
D
M
H
3
6
"
Ø
C
O
N
C
R
I
M
=
2
5
.
7
8
I
E
1
2
"
C
O
N
C
N
=
2
0
.
5
W
A
T
=
2
0
.
6
B
O
T
=
1
9
.
3
S
D
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
9
4
I
E
1
2
"
D
I
S
E
=
2
3
.
1
I
E
6
"
C
O
N
C
W
=
2
3
.
2
W
A
T
=
2
3
.
0
B
O
T
=
2
1
.
2
C
B
1
.
6
'
X
2
.
1
'
C
O
N
C
R
I
M
=
2
4
.
4
9
I
E
6
"
C
O
N
C
E
=
2
3
.
5
W
A
T
=
2
3
.
7
B
O
T
=
2
1
.
8
S
D
SS
S
S
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
3
5
M
P
H
DRW
E
C
O
EE
E
E
WV
3WV WV
W
V
3
W
V
W
V
WV
HH
HH
HH
HH
HH HH
HH
HH
H
H
HH
H
H
ELEC VLT
E
L
E
C
V
L
T
2IRRG
GV
G
V
WM
G
G
FO
FO
FO
FO
FO
E
E
E
E
E
E
E
G
G
G
G
G
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
FO
FO
FO
FO
FO
FO
FO
FO
FO
SDSD
FO
F
O
FO
FO
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
SD
SD
SD
SDSDSD
SD SD SD SD SD SD SD SD SDSD
SD
SD
SD
SD
S
D
SD
SD
SD
SD
E
E
E
E
E
E
E
E
F
O
FO
F
O
FO
F
O
FO
C
B
2
.
2
'
X
1
.
8
'
C
O
N
C
R
I
M
E
L
=
2
3
.
6
0
I
E
1
8
"
D
I
N
E
=
2
0
.
5
I
E
1
2
"
C
P
P
S
E
=
2
0
.
8
I
E
1
8
"
D
I
S
W
=
2
0
.
6
W
A
T
=
2
0
.
5
B
O
T
=
1
9
.
4
I
N
L
E
T
R
I
M
E
L
=
2
5
.
0
9
I
N
L
E
T
R
I
M
E
L
=
2
5
.
0
4
I
N
L
E
T
R
I
M
E
L
=
2
4
.
3
7
I
N
L
E
T
R
I
M
E
L
=
2
5
.
7
0
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
I
N
L
E
T
R
I
M
E
L
=
2
7
.
0
1
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
F
O
FO
F
O
F
O
FO
F
O
W
W
W
SS
SS
SS
SD
SD
SD
SD
RE
N
T
O
N
RENTON
RENTON
RENTON
PSE GAS
PSE GAS
P
S
E
G
A
S
P
S
E
G
A
S
T T T T T T T T T
G
V
I
R
R
G
6
'
9
"
D
P
1
'
D
P
1'11" D
P
2'3"DP
2' DP
2'
D
P
3
'
1
1
"
D
P
1'7" DP
2'9" DP2'1" DP1'9" DP1'6" DP2'1" DP2'3" DP
2'1" DP
2'3" DP
3
'
1
1
"
D
P
6
'
4
"
D
P
6
'
3
"
D
P
6
'
7
"
D
P
4'11" DP 3'11" DP
2'8" DP
3'10" DP
3'3" DP
5'6" DP
G
G
4
0
4
2
'
2
"
D
P
2
'
3
"
D
P
3
'
1
1
"
D
P
4
'
1
1
"
D
P
ED
(TYP.)
ED
(TYP.)
RAINIER AVE S
HARD
I
E
A
V
E
S
W
N
T
C
5
0
9
+
5
3
N TC 510+00
S TC 609+53
S TC 610+00
HA
R
D
I
E
3
1
0
+
0
0
HA
R
D
I
E
3
0
9
+
0
0
HA
R
D
I
E
3
1
0
+
0
0
RAINIER
2
0
4
+
0
0
RAINIER 205
+
0
0
RAINIER 206+00
RAINIER 207+00
RAINIER
2
0
8
+
0
0
RAINI
E
R
2
0
9
+
0
0
N TC STA 510+04.91
= RAINIER STA 207+16.93
S TC STA 610+02.99
= RAINIER STA 206+67.81
S
D
27
28
27
26
2
6
26
2
6
24
2
6
ET MATCHLINE:
SEE DWG BT120-CDP201
MATCHLINE:
SEE DWG BT120-CDP203
M
A
T
C
H
L
I
N
E
:
R
A
I
N
I
E
R
S
T
A
2
0
4
+
0
0
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
1
0
1
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
RAINIER STA 204+00 TO RAINIER STA 208+50
BT120-CDP102
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
3
4
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
102
103
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
MA
T
C
H
L
I
N
E
:
R
A
I
N
I
E
R
S
T
A
2
0
8
+
5
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
3
21
EX ROW
EX ROW
106
107
S
I
G
N
S
W
SW
SW
D
R
W
Y
I
E
L
D
B
U
S
S
I
G
N
/
//
/
//
T
R
A
S
H
B
I
N
Y
I
E
L
D
SW
SW DRW
DRWSW
SW
DRW
SW
S
W
S
W
CONC WALL
C
B
1
.
7
'
X
2
.
1
'
C
O
N
C
R
I
M
=
2
4
.
6
8
IE
6
"
C
O
N
C
N
=
2
3
.
4
IE
6
"
C
P
P
E
=
2
3
.
5
IE
6
"
C
O
N
C
S
=
2
3
.
3
Y
A
R
D
D
R
A
I
N
0
.
9
'
X
0
.
9
'
C
O
N
C
R
I
M
=
2
4
.
9
6
IE
6
"
P
V
C
S
W
=
2
4
.
0
Y
A
R
D
D
R
A
I
N
0
.
9
'
X
0
.
9
'
C
O
N
C
R
I
M
=
2
5
.
1
7
IE
6
"
P
V
C
N
E
=
2
4
.
0
IE
6
"
P
V
C
S
W
=
2
4
.
0
B
O
T
=
2
3
.
7
IN
L
E
T
R
I
M
=
2
4
.
2
0
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
0
7
IE
1
2
"
D
I
S
E
=
2
1
.
5
W
A
T
=
2
1
.
5
B
O
T
=
1
9
.
6
C
B
2
.
3
'
X
2
.
1
'
C
O
N
C
R
I
M
=
2
4
.
5
8
IE
6
"
C
O
N
C
N
E
=
2
3
.
4
W
A
T
=
2
3
.
4
B
O
T
=
2
0
.
7
IN
L
E
T
R
I
M
=
2
3
.
9
7
C
B
R
I
M
=
2
3
.
7
9
C
B
R
I
M
=
2
4
.
5
1
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
2
5
IE
6
"
D
I
N
=
2
2
.
3
IE
1
2
"
D
I
S
E
=
2
1
.
7
IE
1
2
"
D
I
N
W
=
2
1
.
6
W
A
T
=
2
1
.
7
B
O
T
=
2
0
.
1
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
4
7
IE
1
2
"
D
I
N
W
=
2
1
.
4
W
A
T
=
2
1
.
3
B
O
T
=
1
9
.
8
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
6
.
3
7
IE
1
2
"
C
O
N
C
N
E
=
2
2
.
9
IE
6
"
C
O
N
C
S
=
2
2
.
8
IE
1
2
"
C
O
N
C
S
W
=
2
2
.
9
W
A
T
=
2
2
.
9
B
O
T
=
2
1
.
7
S
D
S
D
SD
SD
SD
SD
SD
SD
C
B
R
I
M
=
2
5
.
8
5
U
N
A
B
L
E
T
O
O
P
E
N
D
U
E
T
O
B
R
O
K
E
N
H
A
N
D
L
E
SD
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
5
.
4
4
C
B
2
.
3
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
8
1
IE
6
"
D
I
S
W
=
2
2
.
7
W
A
T
=
2
1
.
0
B
O
T
=
2
0
.
7
S
D
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
9
4
IE
1
2
"
D
I
S
E
=
2
3
.
1
IE
6
"
C
O
N
C
W
=
2
3
.
2
W
A
T
=
2
3
.
0
B
O
T
=
2
1
.
2
SD
SD
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
7
7
IE
6
"
P
V
C
S
=
2
1
.
4
IE
6
"
C
O
N
C
S
W
=
2
1
.
7
W
A
T
=
2
1
.
4
B
O
T
=
2
0
.
1
C
B
1
.
6
'
X
2
.
1
'
C
O
N
C
R
I
M
=
2
4
.
4
9
IE
6
"
C
O
N
C
E
=
2
3
.
5
W
A
T
=
2
3
.
7
B
O
T
=
2
1
.
8
SD
IN
L
E
T
R
I
M
=
2
4
.
4
6
C
B
R
I
M
=
2
4
.
4
6
T
T
E
C
O
IT
S
V
L
T
2
T
S
L
T
V
L
T
W
V
4
W
V
L
TV
L
T
LT
HH
WV
WV
GV
TS LT
HH
TS
L
T
VLT
ELEC
VLT
2
M
I
S
C
M
H
T
S
-
L
T
V
L
T
G
V
G
V
L
TH
H
T
M
H
T
M
H
G
V
W
V
W
V
W
V
B
R
O
A
D
B
A
N
D
V
L
T
L
TH
H
I
C
V
ICV
I
C
V
ICVI
C
V
HH
WVWV
ELEC
VLT
HH
C
O
C
O
ICVICV
2HH
WMELEC
VLT
LT HH
WV
ELEC VLT2WM
WV
LT HH
ELEC
VLT
LT
HH
WM ICV
G
V
DRW
WV
WV
HH
HH GV
FO
G
G
FO FO FO FO FO
E E E E E
G G G G G G G G G G G G G G G GEEEEEEE E
E E
E
E E E E E E E E
E
T T T T T T
FO
FO
F
O
F
O
F
O
E E E E
E
FO FO
FO
FO FO FO
E E E
E
E E E
FO
T
T
T
T T T T T T T
T T T T
T
T T T T T T
T
T
E
E
E
E
E
E
E
E E E E
E
E E E E
E E E E
E E E E E E
E E E E
W
W
W
W
W
W W W W W
W
W
W
W
W W W W W W W W W
W
G
G
G G G G G
G G
G G G G
G
G
G
G
G
G
E
E
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
FOFOFOFOFOFOFOFO
F
O
F
O
F
O
F
O
F
O
FO FO FO
F
O
F
O
F
O
F
O
F
O
FOFOFOFOFOFOFOFO
FO
FO
FOFOFOFOFOFOFOFOFOFOFO
W
S
D
S
D
SD SD SD
FO
FO
FO
FO
FO FO FO FO FO
FO
FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO
SD
SD
SD
SD
SD
SD
S
D
SD SD SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
SD SD SD SDSDSDSDSDSDSDSD
SD SD SD
SDSDSDSDSDSD
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
SD
SD
SD
S
D
S
D
S
D
S
D
S
D
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
F
O
FO
FO
FO
S
D
M
H
R
I
M
=
2
5
.
4
7
S
D
M
H
R
I
M
=
2
4
.
7
8
IN
L
E
T
R
I
M
E
L
=
2
6
.
2
5
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B2.
2
'
X
1
.
8
'
C
O
N
C
RI
M
E
L
=
2
5
.
6
2
IE
1
2
"
C
P
P
S
E
=
2
2
.
5
IE
1
2
"
C
P
P
N
W
=
2
2
.
6
W
A
T
=
2
2
.
5
B
O
T
=
2
0
.
7
S
D
M
H
R
I
M
=
2
5
.
6
9
1
2
"
C
P
P
E
=
N
A
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B2.
2
'
X
1
.
8
'
C
O
N
C
RI
M
E
L
=
2
5
.
2
0
IE
6
"
D
I
E
=
2
1
.
6
IE
1
2
"
C
P
P
W
=
2
1
.
6
W
A
T
=
2
1
.
6
B
O
T
=
1
9
.
7
S
D
M
H
R
I
M
=
2
5
.
6
7
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
IN
L
E
T
R
I
M
E
L
=
2
4
.
9
4
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
IN
L
E
T
R
I
M
E
L
=
2
5
.
1
6
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
S
D
M
H
R
I
M
=
2
6
.
0
4
1
2
"
C
P
P
S
W
=
N
A
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B2.
2
'
X
1
.
8
'
C
O
N
C
RI
M
E
L
=
2
5
.
3
6
IE
1
2
"
C
P
P
N
E
=
2
1
.
5
IE
1
2
"
C
P
P
S
E
=
2
1
.
5
IE
1
2
"
C
P
P
S
W
=
2
1
.
6
W
A
T
=
2
1
.
7
B
O
T
=
1
9
.
9
S
D
M
H
R
I
M
=
2
4
.
9
9
1
2
"
C
P
P
N
W
=
N
A
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B2.
2
'
X
1
.
8
'
C
O
N
C
RI
M
E
L
=
2
4
.
6
0
IE
1
2
"
C
P
P
S
E
=
2
0
.
8
W
A
T
=
2
0
.
8
B
O
T
=
1
9
.
1
S
D
M
H
R
I
M
=
2
5
.
5
9
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
S
D
M
H
R
I
M
=
2
4
.
6
6
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
S
D
M
H
R
I
M
=
2
5
.
1
3
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
R
I
M
=
2
4
.
9
9
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B2.
2
'
X
1
.
8
'
C
O
N
C
RI
M
E
L
=
2
4
.
7
1
IE
1
2
"
C
P
P
N
E
=
2
1
.
4
IE
1
2
"
C
P
P
S
E
=
2
1
.
5
IE
1
8
"
D
I
S
W
=
2
1
.
5
W
A
T
=
2
1
.
5
B
O
T
=
2
0
.
3
IN
L
E
T
R
I
M
E
L
=
2
4
.
2
1
N
O
P
I
P
E
,
F
U
L
L
O
F
P
A
C
K
E
D
D
I
R
T
/
S
I
L
T
/
D
E
B
R
I
S
C
B3
6
"
C
O
N
C
RI
M
E
L
=
2
4
.
2
9
IE
1
8
"
D
I
N
=
2
0
.
8
IE
8
"
C
P
P
N
E
=
2
1
.
1
IE
1
2
"
C
P
P
E
=
2
1
.
2
IE
1
8
"
D
I
S
W
=
2
0
.
8
W
A
T
=
2
0
.
9
B
O
T
=
1
7
.
8
S
S
M
H
R
I
M
=
2
6
.
3
1
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
C
B
2
.
3
'
X
1
.
9
'
C
O
N
C
R
I
M
E
L
=
2
5
.
7
4
IE
1
2
"
P
V
C
S
E
=
2
2
.
2
W
A
T
=
2
2
.
1
B
O
T
=
2
0
.
6
S
D
S
D
M
H
RI
M
=
2
5
.
7
7
1
2
"
C
P
P
N
W
=
N
A
N
E
E
D
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
S
D
S
D
SS
SS
SS
SS
E E E E
E
E
FO
FO
FO
FO
E
E
SS
S
S
FO
SSSS
S
S
S
S
S
S
S
S
C
E
N
T
U
R
Y
L
I
N
K
CENTURYLINK FO
RENTON
RENTON
RENTON
P
S
E
G
A
S
PSE GAS PSE GAS
T 5'4" DP 6'8" DP 5' DP 4' DP 4' DP 3' DP
3'9" DP
3'4" DP
1'10" DP
1'11" DP
2' DP 3'1" DP3'1" DP 3'6"
DP
1'9" DP
2' DP 1'9" DP
2'4"
D
P
1'10" DP 2'1" DP
2' DP 3'
2
"
D
P
2
'
6
"
D
P
7'11
"
D
P
6'7"
D
P
4'5"
D
P
6
'
9
"
D
P
6
'
D
P
7
'
6
"
D
P
5'6" DP
2'5" DP
R
I
M
=
2
3
.
7
5
C
B1.
7
'
X
2
.
2
'
C
O
N
C
RI
M
E
L
=
2
3
.
7
5
IE
6
"
C
O
N
C
N
W
=
2
2
.
4
3'
1
1
"
D
P
4'
1
1
"
D
P
3'
5
"
D
P
3'
9
"
D
P
3'
1
0
"
D
P
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
1'
7
"
2'
6'9"
4'5"
ED
(TYP.)
S
7
T
H
S
T
RAINIER AVE S
S
W
7
T
H
S
T
S
W
7
T
H
S
T
2
4
9
+
0
0
SW 7TH ST 250+00
S
W
7
T
H
S
T
2
5
1
+
0
0
RAINIER 208+00
RAINIER 209+00 RAINIER 210+00 RAINIER 211+00 RAINIER 212+00 RAINIER 213+00 RAINIER 214+00
SW 7TH ST STA 249+99.98
= RAINIER STA 212+42.13
26
26
26
25
25
25
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CO
N
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLEF
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTONRENTON
RENTON
REN
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8" D
P
5' DP
4' DP
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
3'6"DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
RAINIER STA 208+50 TO RAINIER STA 212+42.13
BT120-CDP103
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
MA
T
C
H
L
I
N
E
:
R
A
I
N
I
E
R
S
T
A
2
0
8
+
5
0
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
1
0
2
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
3
5
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
NO DRAINAGE WORK ON THIS SHEET
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
M
A
T
C
H
L
I
N
E
:
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
2
0
1
EX ROW
EX ROW
EX ROW
106
107
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH BEEHIVE GRATE. SEE DWG. NO.
BT120-CDD503 FOR DETAILS.
INSTALL COMPOST AMENDED BIOSWALE (CABS). SEE
DWG. NO. BT120-CDD502 FOR DETAILS.
INSTALL INLET/OUTFALL PROTECTION WITH RIPRAP
PAD (MINIMUM THICKNESS IS 2 FEET).
INSTALL WET BIOFILTRATION SWALE (VAR. BOTTOM
WIDTH). SEE DWG. BT120-CDD502 FOR DETAILS.
ADJUST RIM TO GRADE.
CUT AND CAP EXISTING PIPE.
REPLACE EXISTING INLET WITH CATCH BASIN TYPE 1
PER COR STD PLAN 200.00, WITH OPEN CURB FACE
FRAME AND GRATE PER COR STD PLAN 203.00.
RE-CONNECT EXISTING PIPES TO THE NEW CB.
REPLACE EXISTING CB WITH CATCH BASIN TYPE 2
PER COR STD PLAN 201.00. WITH FRAME AND VANED
GRATE PER COR STD PLAN 204.00. RE-CONNECT
EXISTING PIPES TO THE NEW CB.
13
21
23
18
19
15
26
29Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceGENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CO
N
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLEF
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTON
RENTO
N
RENTON
REN
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8" D
P
5' DP
4' DP
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1" D
P
3'1" D
P
3'6"DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
X
X
X
XXXXXXXXXX
X
X
X
X X
CONC
H
H
VLT
SSMH
36"Ø
C
O
N
C
RIM=2
6
.
4
9
IE 18"
C
O
N
C
N
W
=
1
2
.
3
IE 18"
C
O
N
C
E
=
1
2
.
3
IE 8"
C
O
N
C
S
=
1
3
.
0
RIM=2
5
.
8
5
CB
RIM=2
6
.
7
8
IE 8" D
I
S
=
2
5
.
5
WAT=
2
5
.
3
B
O
T
=
2
2
.
9
CB
RIM=2
6
.
2
0
CB
RIM=2
5
.
9
0
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SW
C
O
N
C
B
E
N
C
H
C
O
N
C
B
E
N
C
H
YIELD
A
R
T
W
O
R
K
CONC SEAMS (TYP)
OE OE OE OE
OE OE OE OE
SW SWE
E
HH
HH
2 HH HH
2ELEC VLT
HH
E E E E E E E E E E E E E E E
E
E
E
E EEEEE
E
E E E E E E E E E
E
FO
FO
FO
F
O
F
O
F
O
F
O
F
O
F
O
F
O
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
W
W
W
W
SD SD SD SD SD
SD SD SD SD SD SD SD
F
O
F
O
F
O
FO
FO
FO
FO
FO
FO
FO
SD
SD
SD
S
D
SD SD SD SD SD SD SD SD SD
FO
F
O
FO
OEOE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
INLET
RIM E
L
=
2
6
.
9
3
NEED
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
CB
1.7' X 2.
2
'
C
O
N
C
RIM EL
=
2
6
.
5
5
IE 4" C
O
N
C
W
=
2
5
.
2
WAT=2
5
.
2
B
O
T
=
2
4
.
9
CB
1.9' X 2.
4
C
O
N
C
RIM EL
=
2
6
.
1
0
IE 8" C
O
N
C
S
=
2
4
.
4
WAT=2
4
.
7
B
O
T
=
2
1
.
8
SD
SD
INLET
RIM EL
=
2
6
.
8
8
NEEDS
T
R
A
F
F
I
C
C
O
N
T
R
O
L
SL
FO
F
O
FO
FO
FO
FO
F
O
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
C
E
N
T
U
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
2-ZAYO FO 2-ZAYO FO
2-ZAYO FO
FO
VLT3'6" DP 5'9" DP 7'2" DP 6'11" DP 7' DP 6'6" DP 4'4" DP 4'3" DP 3'7" DP 2' DP
4'10" DP 5'9" DP 4'7" DP 1'11" DP 1'11" DP 2'6" DP 5' DP 1'4" DP 2'6" DP
2'2" DP 3'1" DP
2'6" DP
1'7" DP
1'9" DP
8
'
5
"
D
P
8
'
1
1
"
D
P
8
'
1
0
"
D
P
9
'
D
P
3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP
1'7" DP1'4" DP
1'5" DP1'10" DP
3'1" DP
1' DP
2'4"
DP
2'
5
"
D
P
4'DP
3'7"
DP
2' DP
400
W W
E E E E E E E E E TTTTTT
CONC SEAMS (TYP)
WV
WV
C
C
C
C
CB
48"Ø CONC
RIM EL=26.77
IE 12" RCP W=22.4
IE 8" CONC N=22.3
IE 12" RCP E=22.2
BOT=20.3
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
S
D
S
D
S
D
SDMH
2.0' X 1.
5
'
C
O
N
C
RIM EL
=
2
5
.
7
3
IE 8" C
O
N
C
S
W
=
2
3
.
5
IE 8" C
O
N
C
E
=
2
2
.
2
IE 12" R
C
P
W
=
2
2
.
0
IE 12" R
C
P
N
=
2
2
.
0
IE 12" R
C
P
S
=
2
1
.
9
WAT=2
1
.
7
B
O
T
=
2
1
.
4
SD
SD
SD
1' 8" D
P
1'11"
D
P
3'8" D
P
4'9" D
P
1'4" D
P
3' DP
5'8" D
P
5'10"
D
P
6'2" D
P
5'5" D
P
6' DP
4' DP
6'11"
8
'
1
1
"
ED
(TYP.)
S GRADY WAY
GRADY 151+00 GRADY 152+00 GRADY 153+00 GRADY 154+00 GRADY 155+00 GRADY 156+00
BOTTOM OF SWALE
BOTTOM OF SWALETOP OF SWALE
S
D
27
27
2727
2828
2828
27
27
2828
27
28
272
7
27
26
27
28
26
26
27
SD
26
26
26
2
7
26
26
27
27
SD
IE (IN) 24.79
IE (IN) 25.59
39 LF 24" SD
@
0
.
0
0
%
37 LF 24" SD @ 0.53%
TOP OF SWALE
IE (OUT) 24.79
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME STRUCTURE DETAILS PIPES IN PIPES OUT
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
GRADY STA 151+00 TO GRADY STA 156+50
BT120-CDP104
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
3
5
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
SW GRA
D
Y
WAY
101 104
105
MA
T
C
H
L
I
N
E
:
G
R
A
D
Y
S
T
A
1
5
1
+
0
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
1
MA
T
C
H
L
I
N
E
:
G
R
A
D
Y
S
T
A
1
5
6
+
5
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
5
MATCHLINE:
SEE DWG BT120-CDP205
BT120-C-GRADY
MATCHLINE:
SEE DWG BT120-CDP204
21 21 21
21
19
23
EX ROW
EX ROW
19
26 26
KEY MAP
106
107
29
CENTRAL SWALE 1818
18
18
WESTERN SWALE
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
105-47
105-48
105-52
105-55
EX. 105-03
STRUCTURE DETAILS
CB TYPE 1
STA. 718+76.29 (66.02', RT)
RIM 27.91
CB TYPE 1
STA. 718+76.28 (48.02', RT)
RIM 28.10
CB TYPE 1
STA. 400+54.30 (17.16', LT)
RIM 25.09
CB TYPE 1
STA. ??? (???', ???)
RIM 25.81
CB TYPE 1
STA. 401+04.18 (59.32', RT)
RIM 24.68
PIPES IN
IE 26.29 (S)
IE 22.23 (NW)
IE 21.10 (W)
PIPES OUT
IE 26.38 (N)
IE 25.29 (W)
IE 26.29 (E)
IE 21.52 (E)
IE 20.60 (NE)
21
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
CONNECT TO EXISTING CB.
IINSTALL WET BIOFILTRATION SWALE (2' BOTTOM
WIDTH). SEE DWG. BT120-CDD502 FOR DETAILS.
INSTALL INLET/OUTFALL PROTECTION WITH RIPRAP
PAD (MINIMUM THICKNESS IS 2 FEET).
INSTALL WET BIOFILTRATION SWALE (VAR. BOTTOM
WIDTH). SEE DWG. BT120-CDD502 FOR DETAILS.
ADJUST RIM TO GRADE.
REPLACE EXISTING INLET WITH CATCH BASIN TYPE
1 PER COR STD PLAN 200.00, WITH OPEN CURB
FACE FRAME AND GRATE PER COR STD PLAN
203.00. RE-CONNECT EXISTING PIPES TO THE NEW
CB.
1
2
18
19
17
26Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceGENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CO
N
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLEF
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTONRENTON
RENTON
REN
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8" D
P
5' DP
4' DP
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
3'6"DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
X X
UT
VLT
IE 6"
D
I
W
=
2
6
.
0
WAT=
2
6
.
4
B
O
T
=
2
4
.
5
WAT=
2
0
.
6
B
O
T
=
1
9
.
1
2.2' X
1
.
9
'
C
O
N
C
RIM=2
4
.
9
5
IE 16"
C
O
N
C
S
E
=
2
0
.
9
WAT=
2
1
.
5
B
O
T
=
1
9
.
3
SW
T T T T T
T
T T T
T T
E
EEEEEE
T
TS
HH
HH
HH
HHHH
HH
TMH
VLT
TS VL
T
HH VLT
HH
E
EEEEEEEEEEE
E
E
E E E
E E E E
FO FO FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
FO
FO
FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
FO
S
D
S
D
SD
SD
SD
SD
SD
SDSDSDSD
SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
FO
FO
FO
HH
HH
/////////////////
/
/
/
/
/
/
/
//
/
X
X
X
X
X
X
X
X
LOAD
LIMIT
USE
CROS
S
W
A
L
K
SW
PARK
&
RIDE
USE
CROS
S
W
A
L
K
X X X
X
2' FNC GATE
/
/
///////
6' CL
E
F
SW
MAZD
A
SIGN
SW
SW
SW
///////////
/
/
/
//////////////
/
//
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
CB
2.2' X 1.
9
'
C
O
N
C
RIM EL
=
2
5
.
0
2
IE 12" R
C
P
E
=
2
1
.
8
WAT=2
1
.
9
B
O
T
=
2
0
.
4
CB
1.9' X 2.
2
'
C
O
N
C
RIM EL
=
2
4
.
2
3
IE 8" C
O
N
C
E
=
2
2
.
5
IE 8" CP
P
S
=
2
2
.
6
CB
1.9' X 2.
2
'
C
O
N
C
RIM EL
=
2
4
.
6
8
IE 12" R
C
P
N
E
=
2
1
.
1
IE 12" R
C
P
W
=
2
1
.
0
WAT=2
1
.
7
B
O
T
=
1
9
.
8
CB
1.9' X
2
.
2
'
C
O
N
C
RIM E
L
=
2
5
.
3
3
IE 8"
C
O
N
C
E
=
2
3
.
8
WAT=
2
3
.
4
B
O
T
=
2
2
.
8
SD
SDMH
RIM=15
.
0
2
NEEDS
T
R
A
F
F
I
C
C
O
N
T
R
O
L
CB
RIM=25
.
1
3
NEEDS
T
R
A
F
F
I
C
C
O
N
T
R
O
L
SL
FO
FO
FO
FO FO
FO FO
FO FO
FO FO
SDSD
SS
CENTURYLINK FO
CENTURYLINK FO
2-ZAYO FO 2-ZAYO FO
2-ZAY
O
F
O
2-ZAYO FO
EEEEE
1'8" DP 1'6" DP 1'6" DP 1'7" DP 1'6" DP 1'9" DP
7'11" DP11' DP
4'9" DP
4'9" DP
13'6" DP
6'3" DP
5'8" DP
12'6" DP13'6" DP11'6"
DP
10' DP
TTTTTTTTTTE
SD SD CB
1.7' X 2.2' CONC
RIM EL=25.85
IE 8" CONC W=22.8
IE 8" CONC N=22.8
WAT=22.4 BOT=22.1
SDHH
1'5" D
P 1'7" D
P
2'8" D
P
2'4" D
P
2'6" D
P
4'2" D
P
2'4" D
P
12' DP
ED
(TYP.)
S GRADY WAY
LAK
E
A
V
E
S
LAKE 399+48
LAKE 400+00
LAK
E
4
0
1
+
0
0
GRADY 160+46GRADY 157+00 GRADY 158+00 GRADY 159+00 GRADY 160+00
LAKE STA 400+00.05
= GRADY STA 158+70.91
RAILAKDW 722+12
RAILA
K
D
W
7
1
9
+
0
0
RAILAKD
W
7
2
0
+
0
0
RAILA
K
D
W
7
2
1
+
0
0
RAILAKDW STA 722+12.21
= LAKE STA 401+91.32
IE (IN) 25.97
BOTTOM OF SWALETOP OF SWALE
26
27
2
8
29
27
26
27
2626
27
26
SD
SD
SD
SD
27
26
26
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
GRADY STA 156+50 TO GRADY STA 160+46.15
BT120-CDP105
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
3
7
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
SW GRA
D
Y
WAY
101 104
105
MA
T
C
H
L
I
N
E
:
G
R
A
D
Y
S
T
A
1
5
6
+
5
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
4
MATC
H
L
I
N
E
:
SEE D
W
G
BT120
-
C
D
P
2
0
4
MATCHLINE: LAKE STA 401+50
SEE DWG BT120-CDP106
21
EX ROW
EX ROW
EXIST. PL
EXIST. PL
19
19
17
KEY MAP
106
107
1 105-81
HIGH POINT @ SWALE
18
EASTERN SWALE
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
106-12
106-19
106-20
106-21
106-28
106-29
106-30
106-37
106-38
106-55
106-56
MWS-36
STRUCTURE DETAILS
CB TYPE 1
STA. 721+72.80 (17.33', LT)
RIM 25.31
CB TYPE 1
STA. 403+67.78 (13.78', RT)
RIM 25.53
CB TYPE 1
STA. 403+66.40 (25.17', LT)
RIM 26.41
CB TYPE 1
STA. 404+25.20 (19.96', LT)
RIM 26.16
CB TYPE 1
STA. 618+06.16 (18.15', RT)
RIM 26.79
CB TYPE 1
STA. 517+76.74 (14.17', LT)
RIM 26.60
CB TYPE 2-48"
STA. 517+92.65 (29.50', LT)
RIM 27.13
CB TYPE 1
STA. 402+53.47 (14.26', LT)
RIM 25.08
CB TYPE 2 60"
STA. 402+31.01 (24.01', LT)
RIM 25.53
CB TYPE 1
STA. 721+60.12 (16.17', RT)
RIM 25.45
CB TYPE 1
STA. 618+36.25 (18.17', RT)
RIM 26.20
MWS 4x4
STA. 402+53.07 (21.56', LT)
RIM 25.62
PIPES IN
IE 21.82 (N)
IE 21.82 (E)
IE 22.13 (W)
IE 22.45 (N)
IE 22.45 (E)
IE 22.95 (E)
IE 22.33 (W)
IE 21.26 (N)
IE 20.30 (N)
IE 19.30 (E)
IE 22.77 (NE)
IE 21.26 (E)
PIPES OUT
IE 22.95 (SW)
IE 22.02 (W)
IE 21.82 (S)
IE 22.13 (S)
IE 22.45 (W)
IE 22.95 (S)
IE 22.33 (E)
IE 21.26 (W)
IE 19.20 (W)
IE 22.77 (W)
IE 22.93 (W)
IE 20.65 (S)
EX EX
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
(PRIVATE) PER COR STD PLAN 204.40.
INSTALL 3' WIDE CONCRETE VALLEY GUTTER. SEE
DWG. BT120-CRD121 FOR DETAILS.
REPLACE EXIST. SDMH WITH NEW CATCH BASIN
TYPE 2 PER COR STD PLAN 201.00, WITH STORM
ROUND FRAME AND COVER (PRIVATE) PER COR
STD PLAN 204.40. RECONNECT EXISTING PIPES (2)
TO THE NEW CATCH BASIN.
1
3
6
28Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceGENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
UT
UT
UT
VLT
VLT
VLT
VLT
VLT
HH
VLTS
VLT
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CO
N
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLEF
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTONRENTON
RENTON
REN
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8" D
P
5' DP
4' DP
4' DP
3' D
P
3'9" DP
3'4" DP
2'11" DP
6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
3'6"DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TYP
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
S
D
M
H
3
6
"
Ø
C
O
N
C
R
I
M
=
2
5
.
2
4
N
P
I
P
E
N
O
T
V
I
S
I
B
L
E
I
E
2
4
"
C
M
P
E
=
1
9
.
3
I
E
2
7
"
C
O
N
C
S
W
=
1
9
.
2
W
A
T
=
2
0
.
6
B
O
T
=
1
9
.
1
C
B
2
.
2
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
4
.
9
5
I
E
1
6
"
C
O
N
C
S
E
=
2
0
.
9
W
A
T
=
2
1
.
5
B
O
T
=
1
9
.
3
C
B
2
.
3
'
X
1
.
9
'
C
O
N
C
R
I
M
=
2
5
.
9
4
I
E
1
2
"
C
O
N
C
S
=
2
0
.
5
I
E
1
2
"
C
O
N
C
N
W
=
2
0
.
3
W
A
T
=
2
0
.
7
B
O
T
=
1
9
.
2
SD
SD
SD
SD
SD
SD
SD
E
H
H
2
W
V
H
H
E
L
E
C
V
L
T
H
H
H
H
E
E
E
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
X
X
X
XX
X
X
X
X
X
X
X
X
XXXXXXXXXX
5
.
5
'
C
L
E
F
P
P
S
I
G
N
6' C
L
E
F
SW
SW
S
W
SW
S
W
2
B
L
R
D
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
1
5
M
P
H
S
I
G
N
C
B
R
I
M
=
2
7
.
3
0
U
N
A
B
L
E
T
O
A
C
C
E
S
S
S
D
S
D
S
D
S
D
4
1
8
H
H
2
W
M
E
L
E
C
V
L
T
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
H
A
N
D
I
C
A
P
F
I
R
E
L
A
N
E
W
V
E
L
E
C
P
E
D
G
R
O
U
N
D
R
O
D
S
T
O
P
S
I
G
N
B
U
S
I
N
F
O
S
O
U
T
H
R
E
N
T
O
N
P
L
A
N
T
E
R
^
^
^
^
^
^
^
LAKE AVE S
L
A
K
E
A
V
E
S
LAKE 402+00
LAKE 403+00 LAKE 404+00
LA
K
E
4
0
5
+
0
0
N
T
C
5
1
8
+
7
5
N
T
C
5
1
8
+
0
0
S TC 619+04
S
T
C
6
1
8
+
0
0
S
T
C
6
1
9
+
0
0
LAKE STA 403+23.01
= S TC STA 618+80.42
RAILAKDW 722+12
R
A
I
L
A
K
D
W
7
2
1
+
0
0
RAILAKDW 722+00
RAILAKDW STA 722+12.21
= LAKE STA 401+91.32
2727
26
27
26
26
26
26
28
27 26
2
6
26
27
2
6
SD
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSD
SD
SD
2
6
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
LAKE STA 401+50 TO LAKE STA 405+55.16
BT120-CDP106
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
4
4
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
SW GRA
D
Y
WAY
101 104
105
MA
T
C
H
L
I
N
E
:
L
A
K
E
S
T
A
4
0
1
+
5
0
SEE
D
W
G
BT1
2
0
-
C
D
P
1
0
5
MATCHLINE:
SEE DWG BT120-CDP204
MATCHLINE:
SEE DWG BT120-CDP202
6 6
EXIST. PL
EXIST. PL
KEY MAP
107
106
EXIST. SD PIPE
TO BE REMOVED
EXIST. CB TO
BE REMOVED
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.Label contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceLabel contains broken referenceCONC
CONC
CONC
SIGN
DEBRIS
SIGN
SIG
N
SIGN
/
/
/
/
CONC
TRASHBIN TRASHBIN
SW SW
SW
SW
DRW DRW
TRASHBIN
SW
SW
SW
DRW
DRW
SW
SW
DRW
SW
SW
SW
SW
DRW
CONC
W
A
L
L
SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7
SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9
SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0
SSMHRIM=27.27UNABLE TO OPEN
SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2
SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2
TT
T
TMH
GV
CO
GV
GV
GV
CO
GV
2 MISCMH
GV
GV
TMH
TMH
GV
CO
CO
GV
GATE
CW
SW
SW
CO
N
C
BEN
C
H
4'
W
O
O
D
F
N
C
C
W
SW
C
O
N
C
B
E
N
C
H
CO
N
C
B
E
N
C
H
AR
T
W
O
R
K
CO
N
C
DR
W
DRW
SW
CONC SEAMS
(
T
Y
P
)
SW
SW
SW
DR
W
DR
W
CO
GV
GV
GV
GV
GV
GM
2VLTS
HH
TTMH
GM
X
6' CLEF
6' TEMP CLEF
X
6' TEMP CLEF
6' TEMP CLEF
6' TEM
P
CLEF
8' CLEF
X 5.5' CLEF
SW
2' FNC
GATE
6' C
L
E
F
5.5' CLEF
6' CLE
F
BLDGEQUIP
CONC
SW
SW
SW
SW SW
SW
SW
SW
CONC BASEREMOVED LT
4 BLRD
3 BLRD
3 BLRD
2 BLRD
6'
T
E
M
P
C
L
E
F
6' CLEF
2 BLRD
3 BLRD
6'
T
E
M
P
C
L
E
F
SIGN POST ONCONC BASE
6' CLEF
GAT
E
STORAGESHED
MISCVALV
SSMHRIM=25.21NEEDS TRAFFICCONTROL
SSMHRIM=26.31NEEDS TRAFFIC CONTROL
SSMHRIM=24.31NEEDS TRAFFIC CONTROL
SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL
/
/
/
/
SL
SL
SS
CENTURYLINK
CENTU
R
Y
L
I
N
K
F
O
CENTU
R
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTUR
Y
L
I
N
K
F
O
CENTURYLIN
K
F
O
CENTURYLI
N
K
F
O
CE
N
T
U
R
Y
L
I
N
K
F
O
RENTONRENTON
RENTON
RE
N
T
O
N
RE
N
T
O
N
REN
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RENTON
RENTON
RENTO
N
RE
N
T
O
N
RENTON
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
RE
N
T
O
N
WS
D
O
T
F
O
WS
D
O
T
F
O
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-ZAYO FO
2-Z
A
Y
O
F
O
2-ZAYO FO
PSE GAS
PS
E
G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GAS
PSE G
A
S
PSE
G
A
S
PSE
G
A
S
PSE GA
S
PSE GAS
PSE GAS
P
S
E
G
A
S
PS
E
G
A
S
PSE GAS
PSE GAS
FOVLT
HH
GV
5'4" D
P
6'8" D
P
5' DP
4' DP
4' DP
3' DP
3'9" DP
3'4" DP
2'11" DP 6'9" DP 1'DP
1'1
1
"
D
P
2'3
"
DP
2' D
P
2' DP
3'11" DP
3'6" DP
5'9" DP
7'2" DP
6'11" DP
7' DP 6'6" DP
4'4" DP
4'3" DP
3'7" DP
2' DP
4'10" DP
5'9" DP
4'7" DP 1'11" DP 1'11" DP 2'6" DP
5' DP 1'4" DP
2'6" DP
2'2" DP
3'1" DP2'6" DP 1'7" DP
1'9" DP
1'8" DP
1'6" DP
1'6" DP
1'7" DP
1'6" DP
1'9" DP
7'11" DP
11' DP4'9" DP
4'9" DP13'6" DP
6'3" DP
5'8" DP
4'1"
D
P
3'6
"
D
P
4'8
"
D
P
12'6" DP
13'6" DP
11'6"DP10' DP
8'
5
"
D
P
8'
1
1
"
D
P
8'1
0
"
D
P
9'
D
P
3'3" DP
3'1" DP
3'2" DP
2'10" DP
1'6" DP
1'3" DP
1'9" DP
1'7" DP
2'5" DP
1'7" DP1'7" DP
1'4" DP
1'5" DP
1'10" DP
3'1" DP
1' DP
1'10"
D
P
1'1
1
"
D
P
2' DP
3'1"
D
P
3'1" D
P
3'6"
DP
1'7"
D
P
2'9"
D
P
2'1
"
D
P
1'9
"
D
P
1'6
"
D
P
2'1
"
D
P
2'3
"
D
P
2'1"
D
P
2'3
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
1'8
"
D
P
2'1
"
D
P
1'1
1
"
D
P
2'5
"
D
P
2'
D
P
2'4
"
DP
2'1
0
"
D
P
2'5
"
D
P
2'
D
P
2'4"DP
2'5" DP
5'4" DP5' DP5'5" DP4'8" DP
4'DP
3'7"DP2'
D
P
1'9"
D
P
2' DP
1'9" DP
2'4" DP
2' DP
1'10
"
D
P
2'1" D
P
3'11"DP
6'4" DP
6'3" DP
6'7" D
P
2' DP
3'2"DP2'6" DP
4'1
1
"
D
P
3'11
"
D
P
2'8"
D
P
3'10
"
D
P
3'3"
D
P
5'6
"
D
P
7'11" DP
6'7" DP
4'5" DP
6'9" DP
6' DP
7'6" DP 5'6" D
P
2'5"
D
P
2'DP
400
404
418
CONC SEAMS (T
Y
P
)
CO
SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.
2 BLRD
3'11" DP4'11" DP
3'5" DP
3'9" DP
3'10" DP
2'2" DP
1'5" DP
BROADBANDVAULT
1' 11" DP
2'3" DP3'11" DP
4'11" DP
1'7" DP
4'5" DP5'6" DP
1' 8" DP
2'5" DP
1'11" DP
3'8" DP4'9" DP
1'4" DP
3' DP 5'8" DP
5'10" DP
6'2" DP
5'5" DP
6' DP4' DP
1'5" DP 1'7" DP
2'8" DP
2'4" DP 2'6" DP
4'2" DP
2'4" DP
12' DP
6'11"
3'6
"
4'8"
8'1
1
"
1'7"
2'
6'9"
4'5"
ED(TYP.)
ED(TYP.)
ED(TYP
.
)
ED
(TY
P
.
)
3'10"
4'1"
4'9"
7"
4'1"
3'11"
5'9"
5"
2'1
"
1'11
"
9"2'4"
3'1"2'11"3'3"
4'9"
4'11"2'8"2'1"
2'8"
2'7"
2'5"
7"
1'1"
1'4"
2'
2'1"
2'9"
6" TREE30' DLN
1.5' RET WALLPLANTER
1.5' RET WALLPLANTER
2
8
2
7
2
9
29
2
7
2
8
2726
26
2
6
26
262626
25
2525
2727 2
7
2
728282828
2727
27
2
8
27
3028292728
2
6
2
727 26
2
7
2829
2
9
2826
24 27 28262725
2
6
2
6
2
7
2
6
27
282
726263029
30292928
2
7
2
7
282726
26
272828292929
282827 27 26
28
2
9
2827
2728
29 29 28
262
6
26
2728 29 3
0
29 2827
26
26
2
6
2626
2
8
2726
26
2627
26
272626
2726
2
7
2
727
2
9292827
292827262728
26 2627
272626
2626262726 2627 2
7
W
W
W
W
W
W
W
W
W
W
WWWWWWW
W
S
D
S
D
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
3'2"3'4'
2
'
3
'
1'8"1'2"1'2"
2
'
7
"
HH
HHHHHH
ELEC VLT
10" TREE
20' DLN
6" TREE
10' DLN
8" TREE
20' DLN
8" TREE
20' DLN
12" TREE
20' DLN
ELEC VLT HHHH8" TREE
20' DLN
6" TREE
20' DLN
8" TREE
20' DLN
12" TREE
25' DLN
8" TREE
20' DLN
SL
HH
SOUTH
RENTON
RULES &
REGULATIONS
LOAD
LIMIT
LP W / SPEED
LIMIT SIGN
SL
HH
////
/
/////
/
/
/
/////
/
////
/
/
//
/
/
////
/
////
HANDICAP
GUIDELINES
PERMIT
PRKG
BIKE
STORAGE
ELEC
PED
GROUND
ROD
BUS
INFO
STOP
SIGN
STOP
SIGN
SOLID YELLOW
SOLID WHITE
SOLID WHITE
HANDICAP
BUS STOP
CANOPY
BUS STOP
SOUTH
RENTON
SOUTH
RENTON
SDMH
48"Ø CONC
RIM EL=25.45
IE 8" PVC W=22.8
BOT=17.5
CB
1.5' X 2.0' CONC
RIM EL=25.84
IE 8" CPP SW=23.1
WAT=23.1 BOT=21.5
CB
2.0' X 1.5' CONC
RIM EL=25.85
IE 8" CPP NE=23.1
IE 8" CPP S=23.0
WAT=23.1 BOT=21.4
CB
1.3' X 2.6' CONC
RIM EL=25.30
IE 6" CONC S=23.8
BOT=23.7
CB
1.5' X 2.0' CONC
RIM EL=25.42
IE 8" PVC E=23.7
WAT=23.9 BOT=23.4 CB
2.0' X 1.5' CONC
RIM EL=25.49
IE 8" PVC S=24.1
WAT=24.1 BOT=23.4
SDSDSD
SD
SD
SD
SD
SD
CB
1.5' X 2.0' CONC
RIM EL=25.13
IE 6" CONC N=23.1
IE 10" CONC SE=23.1
WAT=23.1 BOT=23.1
PERMIT
PRKG
PERMIT
PRKG
LAKE AVE S
1.5' RET WALL
PLANTER
1.5' RET WALL
APPROX CENTERLINE OF REC
NO 2554795, TO PSP&L FOR A
SINGLE LINE OF POLES. NO
ESMT WIDTH RECITED IN DOC.
BUT THIS ESMT IS NOT
SHOWN ON THE WSDOT
SUNDRY SITE PLAN.
10' SEWER EASEMENT TO
CITY, AFN 5292274
10' UTIL ESMT TO SEATTLE
CITY LIGHT, REC NO.
8205280520
LAKE 408+29
LAKE 406+00 LAKE 407+00 LAKE 408+00
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
LAKE STA 405+50 TO LAKE STA 408+28.91
BT120-CDP107
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
----
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
10
:
3
9
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
1
0
1
-
1
0
7
.
D
W
G
S1-BT120-CDP101-107 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT1P20-VSF100
xS1-BT120-CDN001
xS1-BT120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BT120-CAP001
xS1-BT120-CMP001
xS1-BT120-CGP001
GB-SEAL-JY35420
xS1-BT120-CDP001
OSBORN
CONSULTING
INCORPORATED
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
SW GRA
D
Y
WAY
101 104
105
20 40
SCALE IN FEET
01020
(1" = 20')
102
103
LAKE AVE S
CL BT120-C-LAKE
MA
T
C
H
L
I
N
E
:
L
A
K
E
S
T
A
4
0
5
+
5
0
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
6
KEY MAP
107
106
NO DRAINAGE WORK ON THIS SHEET
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
201-04
201-06
201-07
201-08
201-09
201-10
201-15
201-16
201-18
201-27
201-31
201-35
201-48
201-53
201-54
201-58
201-59
201-60
201-79
EX. 201-01
EX. 201-05
STRUCTURE DETAILS
CB TYPE 1
STA. 612+68.36 (14.17', RT)
RIM 26.02
CB TYPE 1
STA. 513+69.38 (17.91', LT)
RIM 27.26
CB TYPE 1
STA. 613+22.21 (14.17', RT)
RIM 26.71
CB TYPE 1
STA. 512+32.15 (14.17', LT)
RIM 25.53
CB TYPE 1
STA. 611+56.79 (40.33', RT)
RIM 24.91
CB TYPE 1
STA. 612+57.15 (40.33', RT)
RIM 26.23
CB TYPE 1
STA. 510+81.29 (15.86', RT)
RIM 23.99
CB TYPE 2-48"
STA. 610+85.64 (14.17', RT)
RIM 23.67
CB TYPE 2-48"
STA. 610+61.13 (23.05', RT)
RIM 24.03
CB TYPE 1
STA. 510+92.12 (18.60', LT)
RIM 23.82
CB TYPE 2-48"
STA. 610+85.64 (36.74', RT)
RIM 24.46
CB TYPE 1
STA. 610+82.71 (18.27', LT)
RIM 24.14
CB TYPE 2-48"
STA. 611+11.71 (45.00', RT)
RIM 24.85
CB TYPE 1
STA. 612+31.13 (14.17', RT)
RIM 25.54
CB TYPE 1
STA. 512+67.24 (14.51', LT)
RIM 26.00
CB TYPE 1
STA. 206+22.56 (48.66', RT)
RIM 23.51
CB TYPE 2-48"
STA. 610+60.72 (15.13', RT)
RIM 23.48
CB TYPE 1
STA. 610+55.17 (18.60', RT)
RIM 23.46
CB TYPE 1
STA. 613+22.21 (40.33', RT)
RIM 27.07
EX. CB
STA. 610+68.36 (120.05', LT)
RIM 24.00
EX. CB
STA. 610+50.56 (23.30', RT)
RIM 23.39
PIPES IN
IE 22.52 (SE)
IE 22.52 (NE)
IE 21.90 (S)
IE 21.90 (SE)
IE 22.48 (SW)
IE 21.98 (SE)
IE 21.91 (NE)
IE 21.58 (SE)
IE 21.58 (N)
IE 21.58 (W)
IE 20.47 (SE)
IE 20.42 (NE)
IE 20.75 (SW)
IE 21.77 (NE)
IE 21.39 (SW)
IE 21.39 (E)
IE 22.33 (SE)
IE 23.00 (E)
IE 23.00 (NW)
IE 20.42 (SE)
IE 20.30 (NE)
IE 21.71 (W)
IE 22.31 (SE)
IE 21.20 (W)
IE 20.70 (NE)
PIPES OUT
IE 22.52 (NW)
IE 23.51 (W)
IE 22.79 (NW)
IE 23.18 (SE)
IE 21.90 (W)
IE 22.48 (NW)
IE 21.91 (SW)
IE 21.58 (SW)
IE 20.47 (NW)
IE 22.10 (SW)
IE 20.67 (NW)
IE 21.77 (S)
IE 21.39 (NW)
IE 22.33 (NW)
IE 23.00 (SW)
IE 20.30 (SW)
IE 21.71 (E)
IE 21.75 (E)
IE 22.31 (NW)
IE 20.70 (SW)
EX EXKEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
CONNECT TO EXISTING CB.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
(PRIVATE) PER COR STD PLAN 204.40.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH FRAME AND VANED GRATE PER COR
STD PLAN 204.00.
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH OPEN CURB FACE FRAME AND GRATE
PER COR STD PLAN 203.00.
INSTALL 3' WIDE CONCRETE VALLEY GUTTER. SEE
DWG. BT120-CRD121 FOR DETAILS.
INSTALL 8'x8' MODULAR WETLAND TREATMENT
1
2
3
6
5
4
INSTALL 8'x8' MODULAR WETLAND TREATMENT
UNIT. SEE DWG. BT120-CDD503 FOR DETAILS.
INSTALL 8'x12' MODULAR WETLAND TREATMENT
UNIT. SEE DWG. BT120-CDD503 FOR DETAILS.
REPLACE EXISTING OPEN CURB FACE FRAME AND
GRATE WITH RECTANGULAR FRAME AND SOLID
METAL COVER PER COR STD PLANS 204.00 AND
204.10 RESPECTIVELY. ADJUST FRAME AND COVER
TO GRADE.
ADJUST RIM TO GRADE.
EXISTING SD PIPE TO REMAIN.
REPLACE EXISTING GRATE WITH SOLID METAL
COVER PER COR STD PLANS 204.10.
7
8
21
22
25
20
KEY NOTES:
SDSD
S
D
S
D
SD
28
26
27
25
26
2
6
26
26
2
6
27
28
29
28
27
26
25
24
SIGN
ASPH
H
VLT
CB
2.2' X
1
.
9
'
C
O
N
C
RIM=2
3
.
8
1
IE 6"
P
V
C
N
E
=
2
1
.
2
IE 12
"
D
I
N
W
=
2
0
.
8
WAT=2
0
.
9
B
O
T
=
1
9
.
2
CB
2.2' X
1
.
9
'
C
O
N
C
RIM=2
4
.
2
7
IE 12
"
D
I
N
W
=
2
1
.
1
WAT=2
1
.
1
B
O
T
=
1
9
.
4
W
V
HH
H
H
H
H
CO
W
W
W
W
W
FO
FO
FO
FO
F
O
F
O
F
O
F
O
FOFOFOFOFOFOFOFO
FO
F
O
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WM
WV
WV
3WV
W
V
L
T
HH
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C C
2" DR
O
P
SD
SD
SD
SD
SD
SD
SD
X
X
XX
X
X
X
6' TEMP
C
L
E
F
X X X X X X X X X X X X X X X X
6' CLEF
ELEC
EQUIP
/
/
//
/
/
/
//
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
3 BLR
DPIV
GATE
CB2.2' X
1
.
8
'
C
O
N
C
RIM EL
=
2
4
.
0
4
IE 18"
D
I
N
E
=
2
0
.
7
IE 18"
D
I
S
W
=
2
0
.
7
WAT=2
0
.
8
B
O
T
=
1
9
.
3
WAT=2
0
.
5
B
O
T
=
1
9
.
4
CB1.9' X
2
.
4
'
C
O
N
C
RIM EL
=
2
5
.
6
3
IE 6"
D
I
W
/
P
L
U
G
W
=
2
4
.
4
WAT=2
3
.
9
B
O
T
=
2
0
.
9
CB1.7' X
2
.
2
'
C
O
N
C
RIM EL
=
2
5
.
7
0
IE 6"
D
I
S
W
/
P
L
U
G
W
=
2
5
.
0
WAT=2
4
.
4
B
O
T
=
2
1
.
1
SD
S
D
SD
E
E
E
E
E E
E
E
E
E
E
E
S
S
S
S
S
S
RE
N
T
O
N
EEEEEEEE
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
HH
E
E
E
E
E
UNKN
O
W
N
U
T
I
L
I
T
Y
C
C
C
C
C
C
C
C
C
W
E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
FO
FO
FO
FO
FO
FO
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
IT IS B
E
L
I
E
V
E
D
T
H
I
S
S
T
R
U
C
T
U
R
E
AND T
H
E
A
S
S
O
C
I
A
T
E
D
P
I
P
E
S
M
A
Y
BE STO
R
M
D
R
A
I
N
,
N
O
T
S
E
W
E
R
.
2 BLR
D
FH
CBRIM=23.
7
5
SD
SD
SD
SD
SD
SD
SD
SD
CB1.7' X
2
.
2
'
C
O
N
C
RIM EL
=
2
3
.
7
5
IE 6"
C
O
N
C
N
W
=
2
2
.
4
WAT=2
2
.
0
B
O
T
=
2
0
.
5
SD
SD
65 LF 24" SD @ 0.51%
100 LF 12" SD @ 0.58%
37 LF 12" DI @ 0.51%145 LF 12" SD @ 0.52%
101 LF 8" DI @ 0.50%
35 LF 8" DI
@ 0.51%
95
L
F
1
2
"
D
I
@
0
.
5
1
%
26 LF 8" DI @ 0.53%
2726
25
26 27
27
2826
25
28
201-79 1
1 201-06
201-07 1
201-10 1
201-04 1
201-54 1
1 201-53
1 201-08
201-18 3
201-15 1
MWS-67 7
N TC 511+00
N TC 512+00 N TC 513+00
N TC 514+00
S TC 611+00 S TC 612+00 S TC 613+00
S TC 614+00
201-27 1
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
^
^
201-35 1
201-59 4
33 LF 8" SD @ 0.58%
201-60 1
201-16 4
45 LF 12" SD @ 1.13%
201-48 3
36 LF 8" DI @ 0.53%
MWS-68 8
201-58 5
201-09 1
28
L
F
1
2
"
S
D
@
0
.
7
1
%
15 LF 18" SD @ 0.53%
7 LF 18" SD @ 0.54%
8 LF 18" SD @ 1.21%
26 LF 18" SD @ 0.77%
201-31 3
/
/
/
/
SS
WSD
O
T
F
O
MWS-67
MWS-68
MWS 8x8
STA. 610+85.67 (21.57', RT)
RIM 24.30
MWS 8x12
STA. 610+85.64 (45.00', RT)
RIM 24.50
IE 21.54 (NE)
IE 21.19 (SE)
IE 20.50 (SW)
IE 20.85 (NE)
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME STRUCTURE DETAILS PIPES IN PIPES OUT
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
BT120-CDP201
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
4
8
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDP201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT120-CDN001
xS1-BTP120-CDP001
xS1-BTP120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BTP120-CAP001
xS1-BTP120-VSF100
xS1-BT120-CGP001
xS1-BT120-CMP001
xS1-BT120-APP211
GB-SEAL-JY35420
xS1-BT120-CABS_BIOSWALE
CUP - Storm Drain Layout
OSBORN
CONSULTING
INCORPORATED
MATCHLINE:
SEE DWG BT120-CDP103
M
A
T
C
H
L
I
N
E
:
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
2
0
2
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
2
MATCHLINE:
SEE DWG BT120-CDP203
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
21
2
6
21
22
25
22
20
21
22
2
EX. 201-05
21 EX. 201-01
11LF 12" SD @ 0.66%
22LF 18" SD @ 39.82%
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
202-24
202-25
202-26
202-40
202-61
202-80
STRUCTURE DETAILS
CB TYPE 2-48"
STA. 617+17.91 (19.00', RT)
RIM 28.01
CB TYPE 2-48"
STA. 615+61.71 (18.96', RT)
RIM 29.54
CB TYPE 1
STA. 614+05.23 (22.11', RT)
RIM 27.60
CB TYPE 1
STA. 616+48.33 (44.08', RT)
RIM 29.02
CB TYPE 1
STA. 614+07.19 (34.39', RT)
RIM 27.64
CB TYPE 2-48"
STA. 517+50.29 (29.50', LT)
RIM 27.68
PIPES IN
IE 22.90 (W)
IE 22.01 (E)
IE 23.68 (W)
IE 24.48 (S)
IE 25.66 (S)
IE 24.54 (S)
IE 22.05 (NW)
PIPES OUT
IE 22.01 (S)
IE 23.68 (E)
IE 24.48 (E)
IE 25.66 (SE)
IE 24.54 (N)
IE 22.55 (E)
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH FRAME AND VANED GRATE PER COR
STD PLAN 204.00.
SAWCUT AND REMOVE SECTION OF EXISTING
12-INCH STORM DRAIN PIPE. INSTALL CATCH BASIN
TYPE 2 PER COR STD PLAN 201.00, WITH STORM
ROUND FRAME AND COVER PER COR STD PLAN
204.50. CONNECT EXISTING 12-INCH STORM DRAIN
PIPE (NW) TO THE NEW CATCH BASIN. PIPE INVERTS
TO BE DETERMINED IN FIELD.
EXISTING SD PIPE TO REMAIN.
1
4
14
22
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.
2
6
2
7
2
6
SD
SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSD
SD
S
D
WW
FO
FO
FO
W
W
W
W
WM
WM
WV
WV
E
E
E E E E E E E E E E
2" DROP
W W W W W W W W
S
D
S
D
S
D
S
D
S
D
X
X
X
X X X X X X X X X X X X X X X X X X5.5' CLEF
2 BLRD
PM
X
X
X
X
X
X
X
6
'
T
E
M
P
C
L
E
F
X
X
/
///////////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////
/
/
/
/
/
/
/
/
/
/
//////
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE
CB
1.7' X 2.2' CONC
RIM EL=25.70
IE 6" DI SW/ PLUG W=25.0
WAT=24.4 BOT=21.1
CB
1.7' X 2.2' CONC
RIM EL=25.92
IE 12" RCP N=21.8
IE 8" CONC E=21.2
IE 12" RCP S=21.6
IE 8" CONC W=22.7
WAT=21.7 BOT=20.8
CB
RIM=27.30
UNABLE TO ACCESS
SD SD
S
D
SD
W
W
W
W
W
E
1 201-06
202-26 1
4 202-25
1 202-40
4 202-24
N TC 514+00
N TC 515+00 N TC 516+00 N TC 517+00
S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00
^
^
^
^
^
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
202-80 14
202-61 1
/
/
/
/
SS
WSD
O
T
F
O
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
BT120-CDP202
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
4
9
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDP201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT120-CDN001
xS1-BTP120-CDP001
xS1-BTP120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BTP120-CAP001
xS1-BTP120-VSF100
xS1-BT120-CGP001
xS1-BT120-CMP001
xS1-BT120-APP211
GB-SEAL-JY35420
xS1-BT120-CABS_BIOSWALE
CUP - Storm Drain Layout
OSBORN
CONSULTING
INCORPORATED
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
2
0
1
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
6
MATCHLINE:
SEE DWG BT120-CDP204
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
22
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
203-11
203-13
203-14
203-45
203-46
203-57
203-62
203-63
203-64
203-65
203-71
203-72
203-73
203-74
203-82
STRUCTURE DETAILS
CB TYPE 1
STA. 612+50.48 (61.83', RT)
RIM 26.58
CB TYPE 1
STA. 611+10.40 (94.60', RT)
RIM 24.64
CB TYPE 1
STA. 204+79.77 (98.15', RT)
RIM 25.17
CB TYPE 2-60"
STA. 716+48.91 (63.04', RT)
RIM 27.50
CB TYPE 2-60"
STA. 716+11.09 (58.49', RT)
RIM 27.18
CB TYPE 1
STA. 612+49.06 (116.59', RT)
RIM 27.62
CB TYPE 1
STA. 204+38.56 (97.20', RT)
RIM 25.53
CB TYPE 1
STA. 203+87.58 (101.24', RT)
RIM 25.82
CB TYPE 1
STA. 204+38.47 (64.42', RT)
RIM 25.03
CB TYPE 1
STA. 613+56.56 (66.56', RT)
RIM 27.40
CB TYPE 1
STA. 613+53.93 (165.92', RT)
RIM 26.95
CB TYPE 1
STA. 153+96.92 (214.14', LT)
RIM 26.92
CB TYPE 1
STA. 611+73.45 (61.83', RT)
RIM 25.24
CB TYPE 1
STA. 613+70.81 (183.62', RT)
RIM 26.98
CB TYPE 1
STA. 613+92.30 (151.92', RT)
RIM 27.69
PIPES IN
IE 22.82 (SW)
IE 21.64 (SW)
IE 22.16 (S)
IE 19.55 (E)
IE 23.00 (W)
IE 19.53 (SE)
IE 22.51 (S)
IE 22.51 (W)
IE 22.80 (S)
IE 23.03 (SW)
IE 23.62 (NE)
PIPES OUT
IE 23.32 (NE)
IE 21.64 (NE)
IE 22.16 (NE)
IE 19.55 (NW)
IE 19.53 (W)
IE 23.10 (NE)
IE 22.51 (N)
IE 22.80 (N)
IE 22.68 (E)
IE 22.53 (NW)
IE 23.53 (NE)
IE 23.62 (S)
IE 22.04 (N)
IE 23.85 (SW)
IE 25.17 (N)KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
(PRIVATE) PER COR STD PLAN 204.40.
INSTALL 3' WIDE CONCRETE VALLEY GUTTER. SEE
DWG. BT120-CRD121 FOR DETAILS.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
PER COR STD PLAN 204.50. CONNECT EXISTING
27-INCH STORM DRAIN PIPE (W) AND THE NEW
27-INCH PIPE (SE) TO THE NEW CATCH BASIN.
INSTALL FILTERRA OFFLINE UNIT FT0404. SEE DWG.
BT120-CDD501 FOR DETAILS.
ADJUST RIM TO GRADE.
EXISTING SD PIPE TO REMAIN.
1
3
9
21
22
16
6
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.
S
D
S
D
SD
S
D
S
D
SD
SD
SD
S
D
S
D
SD
28
27
26
2
7
2
8
2
9
29
2826
2
4
2
7
27
2
8 2
9
29
28
SD
SD
ET
28
27
26
25
25
2
8
28
3
0
30
INLE
T
RIM=2
3
.
6
2
SSMH
48"Ø
C
O
N
C
RIM=2
5
.
7
9
CB
2.2' X
1
.
9
'
C
O
N
C
RIM=2
5
.
6
1
IE 12
"
D
I
S
W
=
2
2
.
7
WAT=2
2
.
7
B
O
T
=
2
1
.
0
INLE
T
RIM=2
5
.
3
7
CB
RIM=2
7
.
6
4
UNAB
L
E
T
O
A
C
C
E
S
S
SD
SS
SS
SS
SS
SS
SS
SS
SS
SS
BROA
D
B
A
N
D
VAUL
T
E
3
W
V
W
V
H
H
H
H
HH
HH
2
I
R
R
G
W
M
MW
GV
2VLT
S
E
E
E
E
W
W
W
C
C
C
C
E
E
E
E
E
C
C
C C C
C
C
C
C
C
C
E
E
E
EE
E
E
E
E
E
E
E
SD
SD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
6' TE
M
P
C
L
E
F
X
X
X
X
X
8' CL
E
F
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
CB
RIM=2
5
.
7
1
6
'
T
E
M
P
C
L
E
F
CB
RIM=2
5
.
5
3
CB60" CO
N
C
RIM EL
=
2
4
.
3
7
IE 24"
C
P
P
N
=
2
0
.
7
IE 12"
C
P
P
N
E
=
2
0
.
5
IE 6"
P
V
C
S
=
2
1
.
2
IE 24"
C
P
P
S
=
2
0
.
1
WAT=2
0
.
4
B
O
T
=
1
8
.
2
INLE
T
RIM E
L
=
2
4
.
3
7
INLET
60" CO
N
C
RIM EL
=
2
5
.
3
4
IE 24"
C
P
P
N
=
2
0
.
1
IE 12"
C
P
P
E
=
2
0
.
7
IE 6"
P
V
C
S
=
2
2
.
2
IE 24"
C
P
P
S
=
2
3
.
0
WAT=2
0
.
4
B
O
T
=
1
8
.
0
1.9' X
2
.
4
'
C
O
N
C
RIM EL
=
2
5
.
6
3
IE 6"
D
I
W
/
P
L
U
G
W
=
2
4
.
4
WAT=2
3
.
9
B
O
T
=
2
0
.
9
SD
FO FO FO FO FO FO FO FO FO
EE
E
E
E
E
E
E
E
E
F
O
F
O
F
O
F
O
F
O
F
O
F
O
FO
S
S
S
S
S
S
S
S
S
S
S
S
CENTURYLINK FO
R
E
N
T
O
N
RE
N
T
O
N
PSE G
A
S
P
S
E
G
A
S
PSE G
A
S
EE
E
E
E
E
E
E
E
C
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
W
W
W
W
W
W
E
HH
E
E
E
E
E
C
C
C
E
E
E
E
E
E
E
E
E
E
F
O
F
O
F
O
F
O
F
O
F
O
FO
FO
FO
F
O
FO
FO FO
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G G
G
2'2
"
D
P
E E
E
78 LF 12" SD
@ 0.66%
50 LF 12" SD @ 0.50%
38 LF 27"
S
D
@ 0.05%
26 27
25
1 203-14
203-13 1
204-27
203-46 9
FIL -1 16
RAILAKDW 716+00
203-73 1 203-11 1
1 203-14
1 203-64
203-62 1
203-63 1
203-72 1
203-71 1
203-65 1
37 LF 12" SD @ 0.95%
33 LF 8" SD @ 0.52%
46 LF 12" SD @ 0.64%
45 LF 12" SD @ 0.51%
99 LF 12" SD @ 0.50%
63 LF 12" SD @ 0.52%
203-74 1
3 203-45
27 LF 12" SD @ 0.51%
1 203-82
1 203-83
203-57 1
26 LF 18" SD @ 0.77%
53 LF 12" SD @ 0.51%
35 LF 12" SD @ 0.51%
55
L
F
1
2
"
S
D
@
0
.
5
1
%
/
/
/
/
SS
WSD
O
T
F
O
203-83
FIL -1
CB TYPE 1
STA. 613+89.70 (116.93', RT)
RIM 27.58
FILTERRA FT0404
STA. 206+13.12 (51.98', RT)
RIM 23.96
IE 24.99 (S)IE 24.99 (NE)
IE 20.47 (NE)
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME STRUCTURE DETAILS PIPES IN PIPES OUT
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
BT120-CDP203
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
4
9
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDP201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT120-CDN001
xS1-BTP120-CDP001
xS1-BTP120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BTP120-CAP001
xS1-BTP120-VSF100
xS1-BT120-CGP001
xS1-BT120-CMP001
xS1-BT120-APP211
GB-SEAL-JY35420
xS1-BT120-CABS_BIOSWALE
CUP - Storm Drain Layout
OSBORN
CONSULTING
INCORPORATED
M
A
T
C
H
L
I
N
E
:
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
2
0
4
MATCHLINE:
SEE DWG BT120-CDP205
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
2
M
A
T
C
H
L
I
N
E
:
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
1
0
1
MATCHLINE:
SEE DWG BT120-CDP201
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
22
21
21
6
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
204-21
204-22
204-23
204-27
204-32
204-33
204-34
204-35
204-39
STRUCTURE DETAILS
CB TYPE 2-48"
STA. 720+56.43 (47.28', LT)
RIM 27.23
CB TYPE 2-48"
STA. 720+67.15 (66.72', LT)
RIM 27.07
CB TYPE 2-48"
STA. 617+02.81 (76.22', RT)
RIM 27.56
CB TYPE 1
STA. 614+03.21 (69.15', RT)
RIM 27.37
CB TYPE 1
STA. 720+36.97 (22.83', LT)
RIM 26.71
CB TYPE 1
STA. 720+40.85 (11.17', LT)
RIM 26.85
CB TYPE 1
STA. 720+49.15 (11.16', RT)
RIM 26.75
CB TYPE 1
STA. 721+37.65 (11.27', RT)
RIM 25.55
CB TYPE 1
STA. 721+20.51 (22.83', LT)
RIM 25.63
PIPES IN
IE 19.87 (SW)
IE 19.99 (N)
IE 21.34 (N)
IE 21.71 (NW)
IE 24.72 (SW)
IE 22.06 (SE)
IE 22.06 (NE)
IE 22.12 (SE)
IE 22.25 (NE)
IE 22.69 (E)
IE 22.69 (NW)
PIPES OUT
IE 19.87 (NW)
IE 19.99 (S)
IE 21.34 (S)
IE 24.72 (N)
IE 22.06 (NW)
IE 22.12 (NW)
IE 22.25 (NW)
IE 22.69 (SW)
IE 22.19 (SE)
IE 22.51 (SW)
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
(PRIVATE) PER COR STD PLAN 204.40.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
PER COR STD PLAN 204.50. CONNECT EXISTING
27-INCH STORM DRAIN PIPE (E) AND THE NEW
27-INCH PIPE (SW) TO THE NEW CATCH BASIN.
INSTALL 6'X8' MODULAR WETLAND TREATMENT
UNIT. SEE DWG. BT120-CDD503 FOR DETAILS.
INSTALL 8'X8' MODULAR WETLAND TREATMENT
UNIT. SEE DWG. BT120-CDD503 FOR DETAILS.
ADJUST RIM TO GRADE.
EXISTING SD PIPE TO REMAIN.
1
10
11
12
21
22
3
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.
SD
SD
SD
SD
SD
27
27
28
2
7
26
26
30
28
27 26
26
27
28
2829
29
29
2828
27
26
27
2626
26
S
D
S
D
SD
SD
SD
SD
SD
26
27
27
26
26
2
7
SD
X
X
CONC
UT
UT
VLT
SSMH
RIM=27.27
UNABLE TO OPEN
SSMH
48"Ø CONC
RIM=25.79
IE 8" CONC NE=17.1
IE 6" CONC E=18.5
IE 8" DI SE=21.8
IE 8" VC SW=18.2
SDMH
60"Ø CONC
RIM=26.62
12" CPP NE=UNABLE TO SEE
IE 30" CONC NE=19.1
IE 30" CONC W=19.4
WAT=20.4 BOT=18.7
CB
1.7' X 2.2' CONC
RIM=25.21
IE 12" CPP SW=23.0
WAT=23.0 BOT=22.6
SDMH
60"Ø CONC
RIM=26.13
IE 12" CPP NE=21.5
IE 27" CONC E=19.7
IE 30" CONC SW=19.2
WAT=20.4 BOT=17.6
CB
2.1' X 1.6' CONC
RIM=25.47
IE 8" CONC N=24.1
IE 12" CPP SW=24.0
WAT=24.0 BOT=23.6 CB
2.1' X 1.8' CONC
RIM=26.15
IE 12" CONC N=20.3
IE 12" UNK S=19.9
WAT=20.6 BOT=18.8
SDMH
RIM=26.16
UNABLE TO OPEN
CB
1.6' X 2.1' CONC
RIM=25.82
IE 4" CONC S=24.1
IE 12" CPP NW=24.1
WAT=23.9 BOT=23.2
CB
1.4' X 1.4' CONC
RIM=26.93
N PIPE NOT VISIBLE
IE 6" DI W=26.0
WAT=26.4 BOT=24.5
SDMH
60"Ø CONC
RIM=27.40
IE 27" CONC W=19.8
IE 27" CONC NE=19.4
WAT=19.6 BOT=18.9
SD
SS
SS
SS
SS
SS
SD
SD
SD
SS
SS
SD
S
D
SW
WM
ELEC
VLT
E
W
W
W
W
W
W
W
GV
GM
WM
WV
WM
2VLTS
C
C
C
C
C
C
C
C
C
C C
E
E
E
E
E
E
TS VLT
HH
GM
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
F
O
FO
FO
FO
FO
FO
FO
F
O
F
O
S
D
S
D
SD
SD
FO
FO
HH
HH
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
6' CLEF
X
PP
PP
X
X
X
X
2' FNC
GATE
/
/
6'
C
L
E
F
SW
4 BLRD
3 BLRD
3 BLRD
X
X
X
X
6' CLEF
/
/
/
/
/
/
/
/
/
/
/
//////
/
/
/
/
/
/
/
/
/
/
/
//////
/
/
/
//////////////
/
/
///
/
/
/
/
/
/
/
/
/
/
/
//
///
///
///
/
///
///////
///
////
///////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////////
/
/
/
/
/
/
/
/
//////////////////
/
/
/
/
/
/
/
/
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
///////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
BLD
EQUIP
6' CLEF
OE
OE
OE
CB
2.2' X 1.9' CONC
RIM EL=25.02
IE 12" RCP E=21.8
WAT=21.9 BOT=20.4
SD
G
G
G
G
G
E
E
E
E
E
E
E
E
E
SS
SS
SS
SS
SS
PSE GAS
PSE
G
A
S
P
S
E
G
A
S
EEEEE
E
E
E
E
E
E
E
E
E
E
EEEEE
C
C
C
C
C
C
C
C
C
C
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E
E
E
E
W
W
W
E
E
E
E
E
UTIL
VLT
FO
FO
FO
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO
FO
E
E E
E
E
W
W
E
E
E
E
E
E
E
E
E
E
FO
FO
EE
112 LF
2
7
"
S
D
@
0
.
0
6
%
138 LF 27" SD @ 0.06%
12 LF 12" SD @ 0.50%
84 L
F
1
2
"
S
D
@
0
.
5
4
%
88 L
F
1
2
"
S
D
@
0
.
5
0
%
9 LF 12" SD @ 0.56%
17 LF 12" SD
@ 0.81%
17 LF 8" DI @ 0.54%
204-27 1
3 204-23
3 204-22
204-21 3
204-44 3
3 204-43
11 MWS-69
1 204-32
1 204-33
1 204-34
MWS-70 12
1 105-48
105-47 1
IE (OUT) 25.91
1 204-41
18 LF 8" DI @ 0.50%
LAKE 400+00
LA
K
E
4
0
1
+
0
0
GRADY 1
5
9
+
0
0
LAKE STA 400+00.05
= GRADY STA 158+70.91
RAILAKDW 717+00
RAILAKDW 718+00 RAILAKDW 719+00 RAILA
K
D
W
7
2
0
+
0
0
RAIL
A
K
D
W
7
2
1
+
0
0
1
203-65 1
45 LF 12" SD @ 0.51%
99 LF 12" SD @ 0.50%
203-74 1
10 204-42
1 204-39
1 204-75
1 204-35
21 EX. 204-02 22 LF 12" SD
@ 0.53%
25 LF 12" SD @ 0.79%
124
L
F
2
7
"
S
D
@
0
.
0
6
%
1 203-82
1 203-83
53 LF 12" SD @ 0.51%
35 LF 12" SD @ 0.51%
/
/
/
/
SS
WSD
O
T
F
O
204-41
204-42
204-43
204-44
204-75
EX. 204-02
MWS-69
MWS-70
CB TYPE 1
STA. 616+30.05 (99.27', RT)
RIM 28.98
CB TYPE 2-60"
STA. 719+57.74 (87.81', LT)
RIM 28.26
CB TYPE 2-60"
STA. 718+69.93 (0.01', RT)
RIM 29.04
CB TYPE 2-60"
STA. 717+32.25 (0.03', RT)
RIM 28.83
CB TYPE 1
STA. 721+36.97 (11.17', LT)
RIM 25.55
EX. CB 60" DIA
STA. 720+56.43 (56.19', LT)
RIM 27.40
MWS 4x8
STA. 720+39.06 (47.28', LT)
RIM 27.43
MWS 6x8
STA. 720+78.55 (77.94', LT)
RIM 27.08
IE 19.70 (NE)
IE 19.62 (E)
IE 19.91 (N)
IE 19.82 (SE)
IE 19.40 (E)
IE 21.87 (SE)
IE 21.21 (N)
IE 25.96 (N)
IE 19.77 (SW)
IE 19.70 (W)
IE 19.62 (W)
IE 22.81 (SE)
IE 19.80 (W)
IE 20.01 (NE)
IE 20.14 (S)
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME STRUCTURE DETAILS PIPES IN PIPES OUT
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
BT120-CDP204
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
0
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDP201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT120-CDN001
xS1-BTP120-CDP001
xS1-BTP120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BTP120-CAP001
xS1-BTP120-VSF100
xS1-BT120-CGP001
xS1-BT120-CMP001
xS1-BT120-APP211
GB-SEAL-JY35420
xS1-BT120-CABS_BIOSWALE
CUP - Storm Drain Layout
OSBORN
CONSULTING
INCORPORATED
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
2
0
3
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
2
0
5
MATCHLINE:
SEE DWG BT120-CDP202
MATCHL
I
N
E
:
SEE DWG
BT120-C
D
P
1
0
4
MATCHL
I
N
E
:
SEE DWG
BT120-C
D
P
1
0
5
MA
T
C
H
L
I
N
E
:
SE
E
D
W
G
BT
1
2
0
-
C
D
P
1
0
6
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
LIGHTING CHARGING YARD (SEE
ELECTRICAL PLANS FOR DETAILS)
22
DRAINAGE STRUCTURE TABLE
STRUCTURE NAME
205-49
205-50
205-51
205-76
205-77
205-78
FIL -2
STRUCTURE DETAILS
CB TYPE 1
STA. 202+59.88 (64.27', RT)
RIM 27.69
CB TYPE 1
STA. 202+59.48 (83.08', RT)
RIM 27.97
CB TYPE 2-48"
STA. 151+86.32 (126.40', LT)
RIM 29.14
CB TYPE 1
STA. 716+11.15 (93.44', RT)
RIM 26.61
CB TYPE 2-60"
STA. 151+86.65 (183.35', LT)
RIM 28.89
CB TYPE 1
STA. 203+19.47 (86.75', RT)
RIM 27.00
FILTERRA FT0404
STA. 202+30.86 (330.22', RT)
RIM 26.55
PIPES IN
IE 24.57 (W)
IE 19.98 (SE)
IE 23.29 (N)
IE 24.80 (E)
IE 21.00 (S)
IE 19.50 (E)
IE 23.98 (S)
PIPES OUT
IE 24.67 (E)
IE 24.57 (N)
IE 19.98 (N)
IE 23.29 (E)
IE 19.50 (W)
IE 23.98 (N)
IE 24.80 (N)
EX EX
KEY NOTES:
INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN
200.00, WITH RECTANGULAR FRAME AND VANED
GRATE PER COR STD PLANS 204.00 AND 204.20,
RESPECTIVELY.
INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN
201.00, WITH STORM ROUND FRAME AND COVER
(PRIVATE) PER COR STD PLAN 204.40.
INSTALL FILTERRA OFFLINE UNIT FT0404. SEE DWG.
BT120-CDD501 FOR DETAILS.
ADJUST RIM TO GRADE.
EXISTING SD PIPE TO REMAIN.
CUT AND CAP EXISTING PIPE.
SAWCUT AND REMOVE SECTION OF EXISTING
30-INCH STORM DRAIN PIPE. INSTALL CATCH BASIN
TYPE 2 PER COR STD PLAN 201.00 WITH STORM
ROUND FRAME AND COVER PER COR STD PLAN
204.50. CONNECT EXISTING 30-INCH STORM DRAIN
PIPES (E&W) AND THE NEW 12-INCH PIPE (SE) TO
THE NEW CATCH BASIN.
1
21
22
23
3
27
16
GENERAL NOTES:
1.SEE CDD SHEETS FOR DRAINAGE DETAILS.
2.SEE CRY SHEETS FOR TYPICAL ROADWAY SECTIONS.
3.SEE CSP SHEETS FOR SITE PREPARATION PLANS.
4.SEE CPP SHEETS FOR PAVING PLANS.
5.SEE UCP SHEETS FOR EXISTING STORM
STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS.
6.EXISTING FACILITIES TO BE PROTECTED-IN-PLACE
UNLESS OTHERWISE NOTED.
7.FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE
PAVING, TRAFFIC, AND UTILITY SHEETS.
S
D
S
D
S
D
SD
SD
2
7
29
27
27
27302829
27
28
262
7
27
28
29
28
27
2
9
29 28
2
7
29
28
27
26
27
28
26
SD
26
26
26
27
26
27
26
29
29
2
7
28
26
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ASPH
ASPH
ASPH
VLT
SSMH
36"Ø
C
O
N
C
RIM=2
7
.
9
7
IE 8"
V
C
N
E
=
1
4
.
5
IE 8"
C
O
N
C
S
=
1
3
.
9
2.3' X
2
.
0
'
C
O
N
C
RIM=2
5
.
3
7
CB
2.1' X
1
.
9
'
C
O
N
C
RIM=2
6
.
6
1
IE 12
"
D
I
S
E
=
2
2
.
7
IE 12
"
D
I
W
=
2
2
.
7
WAT=2
2
.
6
B
O
T
=
1
9
.
8
INLE
T
RIM=2
6
.
8
8
CB
2.1' X
1
.
8
'
C
O
N
C
RIM=2
6
.
4
2
IE 12
"
C
P
P
N
W
=
2
3
.
6
WAT=2
3
.
2
B
O
T
=
2
1
.
8
INLE
T
RIM=2
8
.
7
5
SDMH
48"Ø
B
R
I
C
K
RIM=2
8
.
8
9
IE 30
"
C
O
N
C
E
=
1
9
.
9
IE 24
"
C
O
N
C
W
=
1
9
.
8
WAT=2
0
.
4
B
O
T
=
1
9
.
5
CB
RIM=2
6
.
7
8
IE 8"
D
I
S
=
2
5
.
5
WAT=2
5
.
3
B
O
T
=
2
2
.
9
CB
RIM=2
5
.
9
0
CB
2.3' X
2
.
2
'
C
O
N
C
RIM=2
5
.
6
5
IE 6"
D
I
S
=
2
4
.
5
WAT=2
4
.
4
B
O
T
=
2
1
.
3
S
D
S
D
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
D
HH
S
W
OE
OE
OE
SW
D
R
W
E E E E
RIM=
2
8
.
6
6
WV
WV
HH
HH
HH
3HH
HH HH
HH
4ELE
C
VLT
HH
WM
E
E
E
E
E
E
E
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SD
SD
SD
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SS
SS
SS
SS
SS
E
FOF
O
FO
X
X
X
X
X
X
X
X
X
X
6' TE
M
P
C
L
E
F
X
X
X
X
X
X
X
X
X
6' TE
M
P
C
L
E
F
X
X
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
INLE
T
RIM E
L
=
2
6
.
7
8
UNAB
L
E
T
O
O
P
E
N
CB60" CO
N
C
RIM EL
=
2
8
.
3
5
IE 24"
C
P
P
N
=
1
9
.
4
IE 30"
C
P
P
N
E
=
1
9
.
8
IE 12"
C
P
P
S
=
2
1
.
7
IE 36"
C
P
P
S
W
=
1
9
.
6
BOT=1
7
.
8
SDMH
48" CO
N
C
RIM EL
=
2
8
.
7
1
IE 12"
D
I
N
=
2
2
.
6
IE 12"
D
I
S
=
2
2
.
8
WAT=2
2
.
6
B
O
T
=
2
0
.
6
INLE
T
RIM E
L
=
2
6
.
9
3
NEED
S
T
R
A
F
F
I
C
C
O
N
T
R
O
L
CB1.7' X
2
.
2
'
C
O
N
C
RIM EL
=
2
6
.
5
5
IE 4"
C
O
N
C
W
=
2
5
.
2
WAT=2
5
.
2
B
O
T
=
2
4
.
9
SD
F
O
FO
F
O
R
E
N
T
O
N
2-ZA
Y
O
F
O
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
UTIL
VLT
E
HH
E
E
FO
FO
FO
FO
FO
FO
FO
FO
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
F
O
F
O
F
O
F
O
E
E
E
E
E
E
E
E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
W
W
W
W
W
W
W
W
W
W
W
5'9"
D
P
7'2"
D
P
6'5"
D
P
7' D
P
6'6"
D
P
3'8"
D
P
4'9"
D
P
4'10
"
D
P
3' D
P
5'8"
D
P
5'9"
D
P
5'10
"
D
P
6'2"
D
P
5'5"
D
P
4'7"
D
P
E
EE
E
E
E
E
F
O
F
O
F
O
E
SD
SD
SD
SD
S G
R
A
D
Y
W
A
Y
R
A
I
N
I
E
R
A
V
E
S
GRA
D
Y
1
5
3
+
0
0
GRA
D
Y
1
5
4
+
0
0
R
A
I
N
I
E
R
2
0
2
+
0
0
63 LF 12" SD @ 1.88%
205-78 1
5
4
L
F
1
2
"
S
D
@
1
.
0
9
%
205-50 1
205-49 1
205-76 1
19 LF 12" SD @ 0.53%
205-77 27
5
7
L
F
1
2
"
S
D
@
1
.
7
9
%
205-51 3
60 LF 12" SD @ 7.18%
FIL -2 16
EX. 205-04 21
2
9
2
9
/
/
/
/
SS
WSD
O
T
F
O
20 40
SCALE IN FEET
01020
(1" = 20')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PLAN
BT120-CDP205
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
1
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
P
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDP201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xS1-BT120-VRX001
xS1-BT120-CDN001
xS1-BTP120-CDP001
xS1-BTP120-CPP001
xBRT-CUD05-TB22x34
xS1-BTP120-GZK020
xS1-BTP120-CAP001
xS1-BTP120-VSF100
xS1-BT120-CGP001
xS1-BT120-CMP001
xS1-BT120-APP211
GB-SEAL-JY35420
xS1-BT120-CABS_BIOSWALE
CUP - Storm Drain Layout
OSBORN
CONSULTING
INCORPORATED
MAT
C
H
L
I
N
E
SEE
D
W
G
BT1
2
0
-
C
D
P
1
0
4
22
MATCHLINE:
SEE DWG BT120-CDP203
M
A
T
C
H
L
I
N
E
:
S
E
E
D
W
G
B
T
1
2
0
-
C
D
P
1
0
1
102
103
106
201
202
203
204
205
SW 7TH ST
RA
I
N
I
E
R
AV
E
S
HA
R
D
I
E
AV
E
S
W
SR
-
1
6
7
KEY MAP
SW GRA
D
Y
WAY
101 104
105
23
21
10
15
20
25
30
35
40
10
15
20
25
30
35
40
26
.
4
'
28
.
2
6
'
27
.
0
'
29
.
1
7
'
25
.
8
'
29
.
1
7
'
27
.
8
'
28
.
6
7
'
27
.
5
'
27
.
3
2
'
27
.
5
'
26
.
7
9
'
26
.
6
28
.
5
9
27
.
3
28
.
6
4
27
.
9
28
.
6
0
26
.
5
29
.
0
4
25
.
8
29
.
1
5
25
.
4
29
.
1
9
27
.
4
29
.
0
8
27
.
5
28
.
9
3
27
.
7
28
.
6
4
27
.
8
28
.
1
9
27
.
8
27
.
8
3
27
.
8
27
.
4
9
124 LF 27" CONC SD @ 0.06%138 LF 27" CONC SD @ 0.06%112 LF 27" CONC SD @ 0.06%
38 LF 27" CONC SD
@ 0.05%112 LF 27" CONC SD @ 0.06%138 LF 27" CONC SD @ 0.06%124 LF 27" CONC SD @ 0.06%
20
4
-
4
2
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
9
+
5
7
.
7
4
,
8
7
.
8
1
'
L
T
RI
M
2
8
.
2
6
27
"
I
E
(
O
U
T
)
1
9
.
7
7
(
S
W
)
20
4
-
4
3
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
8
+
6
9
.
9
3
,
0
.
0
1
'
R
T
RI
M
2
9
.
0
4
27
"
I
E
(
I
N
)
1
9
.
7
0
(
N
E
)
27
"
I
E
(
O
U
T
)
1
9
.
7
0
(
W
)
20
4
-
4
4
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
7
+
3
2
.
2
5
,
0
.
0
3
'
R
T
RI
M
2
8
.
8
3
27
"
I
E
(
I
N
)
1
9
.
6
2
(
E
)
27
"
I
E
(
O
U
T
)
1
9
.
6
2
(
W
)
20
3
-
4
5
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
6
+
4
8
.
9
1
,
6
3
.
0
4
'
R
T
RI
M
2
7
.
5
0
27
"
I
E
(
I
N
)
1
9
.
5
5
(
E
)
12
"
I
E
(
I
N
)
2
3
.
0
0
(
W
)
27
"
I
E
(
O
U
T
)
1
9
.
5
5
(
N
W
)
20
3
-
4
6
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
6
+
1
1
.
0
9
,
5
8
.
4
9
'
R
T
RI
M
2
7
.
1
8
27
"
I
E
(
I
N
)
1
9
.
5
3
(
S
E
)
30
"
I
E
(
O
U
T
)
1
9
.
5
3
(
W
)
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
2
'
27
.
5
2
'
27
.
1
27
.
5
7
26
.
8
27
.
6
5
26
.
1
27
.
4
9
25
.
9
'
27
.
9
3
'
26
.
0
27
.
6
4
26
.
3
27
.
8
6
26
.
5
28
.
1
5
26
.
5
'
28
.
4
7
'
26
.
6
28
.
8
0
26
.
6
29
.
1
2
26
.
7
29
.
4
1
26
.
8
'
29
.
5
5
'
26
.
8
29
.
5
2
26
.
9
29
.
3
3
26
.
9
29
.
0
2
27
.
0
'
28
.
6
9
'
27
.
4
28
.
3
7
27
.
9
28
.
0
5
27
.
9
27
.
7
3
27
.
5
'
27
.
4
1
'
27
.
4
27
.
0
9
27
.
6
26
.
6
2
''
20
2
-
2
6
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
4
+
0
5
.
2
3
,
2
2
.
1
1
'
R
T
RI
M
2
7
.
6
0
12
"
I
E
(
I
N
)
2
4
.
4
8
(
S
)
12
"
I
E
(
O
U
T
)
2
4
.
4
8
(
E
)
20
2
-
2
5
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
5
+
6
1
.
7
1
,
1
8
.
9
6
'
R
T
RI
M
2
9
.
5
4
12
"
I
E
(
I
N
)
2
3
.
6
8
(
W
)
12
"
I
E
(
O
U
T
)
2
3
.
6
8
(
E
)
20
2
-
2
4
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
6
+
8
8
.
4
9
,
8
5
.
0
0
'
R
T
RI
M
2
8
.
0
1
12
"
I
E
(
I
N
)
2
2
.
9
0
(
W
)
12
"
I
E
(
I
N
)
2
2
.
0
1
(
E
)
12
"
I
E
(
O
U
T
)
2
2
.
0
1
(
S
)
20
4
-
2
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
4
+
0
3
.
2
1
,
6
9
.
1
5
'
R
T
RI
M
2
7
.
3
7
12
"
I
E
(
I
N
)
2
4
.
7
2
(
S
W
)
12
"
I
E
(
O
U
T
)
2
4
.
7
2
(
N
)
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL20
2
-
6
1
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
4
+
0
7
.
1
9
,
3
4
.
3
9
'
R
T
RI
M
2
7
.
6
4
12
"
I
E
(
I
N
)
2
4
.
5
4
(
S
)
12
"
I
E
(
O
U
T
)
2
4
.
5
4
(
N
)
10
6
-
2
8
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
8
+
0
6
.
1
6
,
1
8
.
1
5
'
R
T
RI
M
2
6
.
7
9
12
"
I
E
(
I
N
)
2
2
.
4
5
(
N
)
12
"
I
E
(
I
N
)
2
2
.
4
5
(
E
)
12
"
I
E
(
O
U
T
)
2
2
.
4
5
(
W
)
35 LF 12" DI SD @ 0.50%
13 LF 12" CONC SD @ 0.50%
161 LF 12" CONC SD @ 0.50%
156 LF 12" CONC SD @ 0.50%
88 LF 12" CONC SD @ 0.50%
10
6
-
5
6
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
8
+
3
6
.
2
5
,
1
8
.
1
7
'
R
T
RI
M
2
6
.
2
0
12
"
I
E
(
O
U
T
)
2
2
.
9
3
(
W
)
30 LF 12" CONC SD @ 1.60%
20
3
-
8
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
8
9
.
7
0
,
1
1
6
.
9
3
'
R
T
RI
M
2
7
.
5
8
12
"
I
E
(
I
N
)
2
4
.
9
9
(
S
)
12
"
I
E
(
O
U
T
)
2
4
.
9
9
(
N
E
)
20
3
-
8
2
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
9
2
.
3
0
,
1
5
1
.
9
2
'
R
T
RI
M
2
7
.
6
9
12
"
I
E
(
O
U
T
)
2
5
.
1
7
(
N
)
35 LF 12" DI SD @ 0.51%
53 LF 12" DI SD @ 0.51%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
1
'
26
.
7
1
'
27
.
4
26
.
3
9
27
.
4
26
.
0
6
27
.
6
25
.
7
4
''
20
4
-
3
2
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
3
6
.
9
7
,
2
2
.
8
3
'
L
T
RI
M
2
6
.
7
1
12
"
I
E
(
I
N
)
2
2
.
0
6
(
S
E
)
12
"
I
E
(
I
N
)
2
2
.
0
6
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
0
6
(
N
W
)
84 LF 12" CONC SD @ 0.54%
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL 20
4
-
3
9
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
2
0
.
5
1
,
2
2
.
8
3
'
L
T
RI
M
2
5
.
6
3
12
"
I
E
(
O
U
T
)
2
2
.
5
1
(
S
W
)
SCALE IN FEET
02.5 55 10
(1" = 5')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PROFILE
BT120-CDV201
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
AS NOTED
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
4
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
V
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDV201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BT120-CDV001
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
20 40
SCALE IN FEET
01020
(1" = 20')
(HOR.)(VERT.)
204-42 TO 203-46
SCALE 1" = 20' H, 1" = 5' V
203-82 TO 106-56
SCALE 1" = 20' H, 1" = 5' V
204-32 TO 204-39
SCALE 1" = 20' H, 1" = 5' V
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''26
.
6
'
24
.
8
5
'
27
.
2
25
.
2
1
28
.
2
24
.
9
7
27
.
8
25
.
3
0
28
.
1
'
25
.
6
3
'
28
.
0
25
.
9
6
27
.
7
26
.
2
8
27
.
7
26
.
6
0
27
.
5
'
26
.
9
3
'
27
.
3
27
.
2
8
27
.
2
27
.
3
8
27
.
3
27
.
3
7
27
.
4
'
27
.
2
4
'
27
.
5
27
.
0
9
27
.
5
26
.
9
7
27
.
5
'
27
.
4
2
'
100 LF 12" DI SD @ 0.58%
20
1
-
1
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
5
7
.
1
5
,
4
0
.
3
3
'
R
T
RI
M
2
6
.
2
3
12
"
I
E
(
I
N
)
2
2
.
4
8
(
S
W
)
12
"
I
E
(
I
N
)
2
2
.
4
8
(
S
E
)
12
"
I
E
(
O
U
T
)
2
2
.
4
8
(
N
W
)
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
65 LF 12" CONC SD @ 0.51%
43 LF 12" CONC SD
@ 0.51%99 LF 12" CONC SD @ 0.50%
20
1
-
7
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
2
2
.
2
1
,
4
0
.
3
3
'
R
T
RI
M
2
7
.
0
7
12
"
I
E
(
I
N
)
2
2
.
8
1
(
S
E
)
12
"
I
E
(
O
U
T
)
2
2
.
8
1
(
N
W
)
20
3
-
6
5
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
5
6
.
5
6
,
6
6
.
5
6
'
R
T
RI
M
2
7
.
4
0
12
"
I
E
(
I
N
)
2
3
.
0
3
(
S
W
)
12
"
I
E
(
O
U
T
)
2
3
.
0
3
(
N
W
)
20
3
-
7
1
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
5
3
.
9
3
,
1
6
5
.
9
2
'
R
T
RI
M
2
6
.
9
5
12
"
I
E
(
O
U
T
)
2
3
.
5
3
(
N
E
)
20
1
-
4
8
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
1
1
.
7
1
,
4
5
.
0
0
'
R
T
RI
M
2
4
.
8
5
12
"
I
E
(
I
N
)
2
1
.
3
9
(
S
W
)
12
"
I
E
(
I
N
)
2
1
.
3
9
(
E
)
18
"
I
E
(
O
U
T
)
2
1
.
3
9
(
N
W
)
45 LF 12" DI SD @ 1.13%
20
1
-
0
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
5
6
.
7
9
,
4
0
.
3
3
'
R
T
RI
M
2
4
.
9
1
12
"
I
E
(
I
N
)
2
1
.
9
0
(
S
)
12
"
I
E
(
I
N
)
2
1
.
9
0
(
S
E
)
12
"
I
E
(
O
U
T
)
2
1
.
9
0
(
W
)
5
10
15
20
25
30
35
5
10
15
20
25
30
35
''24
.
7
'
23
.
6
7
'
24
.
5
24
.
0
5
24
.
4
24
.
6
8
24
.
3
23
.
9
2
''''
26 LF 8"
DI SD @ 0.53%
36 LF 8" DI SD
@ 0.53%
20
1
-
1
5
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
0
+
8
1
.
2
9
,
1
5
.
8
6
'
R
T
RI
M
2
3
.
9
9
8"
I
E
(
I
N
)
2
1
.
9
1
(
N
E
)
8"
I
E
(
O
U
T
)
2
1
.
9
1
(
S
W
)
L
FINISHED GRADE
@ PIPE C
L
EXISTING GROUND
@ PIPE C
20
1
-
2
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
0
+
9
2
.
1
2
,
1
8
.
6
0
'
L
T
RI
M
2
3
.
8
2
8"
I
E
(
O
U
T
)
2
2
.
1
0
(
S
W
)
20
1
-
3
5
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
2
.
7
1
,
1
8
.
2
7
'
L
T
RI
M
2
4
.
1
4
8"
I
E
(
I
N
)
2
1
.
7
7
(
N
E
)
8"
I
E
(
O
U
T
)
2
1
.
7
7
(
S
)
20
1
-
1
6
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
1
4
.
1
7
'
R
T
RI
M
2
3
.
6
7
12
"
I
E
(
I
N
)
2
1
.
5
8
(
S
E
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
N
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
W
)
18
"
I
E
(
O
U
T
)
2
1
.
5
8
(
S
W
)
33 LF 8" DI SD
@ 0.58%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''25
.
4
'
24
.
4
6
'
24
.
8
23
.
6
8
25
.
7
24
.
0
0
26
.
4
24
.
3
3
27
.
0
'
24
.
6
5
'
27
.
4
24
.
9
8
28
.
0
25
.
2
9
28
.
0
25
.
6
3
27
.
7
'
25
.
9
5
'
27
.
7
26
.
2
8
27
.
3
26
.
5
9
''
20
1
-
5
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
3
1
.
1
3
,
1
4
.
1
7
'
R
T
RI
M
2
5
.
5
4
12
"
I
E
(
I
N
)
2
2
.
3
3
(
S
E
)
12
"
I
E
(
O
U
T
)
2
2
.
3
3
(
N
W
)
20
1
-
0
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
6
8
.
3
6
,
1
4
.
1
7
'
R
T
RI
M
2
6
.
0
2
12
"
I
E
(
I
N
)
2
2
.
5
2
(
S
E
)
12
"
I
E
(
I
N
)
2
2
.
5
2
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
5
2
(
N
W
)
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
MW
S
-
6
7
,
M
W
S
8
x
8
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
7
,
2
1
.
5
7
'
R
T
RI
M
2
4
.
3
0
18
"
I
E
(
I
N
)
2
1
.
5
4
(
N
E
)
18
"
I
E
(
O
U
T
)
2
0
.
5
0
(
S
W
)
20
1
-
0
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
2
2
.
2
1
,
1
4
.
1
7
'
R
T
RI
M
2
6
.
7
1
12
"
I
E
(
O
U
T
)
2
2
.
7
9
(
N
W
)
37 LF 12" DI SD @ 0.51%
145 LF 12" DI SD @ 0.52%
20
1
-
1
6
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
1
4
.
1
7
'
R
T
RI
M
2
3
.
6
7
12
"
I
E
(
I
N
)
2
1
.
5
8
(
S
E
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
N
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
W
)
18
"
I
E
(
O
U
T
)
2
1
.
5
8
(
S
W
)
20
1
-
3
1
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
3
6
.
7
4
'
R
T
RI
M
2
4
.
4
6
18
"
I
E
(
I
N
)
2
0
.
4
2
(
N
E
)
18
"
I
E
(
I
N
)
2
0
.
7
5
(
S
W
)
12
"
I
E
(
O
U
T
)
2
0
.
6
7
(
N
W
)
15 LF 18" DI SD @ 0.53%
7 LF 18" DI SD @ 0.54%
54 LF 12" DI SD @ 0.50%
5
10
15
20
25
30
35
5
10
15
20
25
30
35
''23
.
4
'
23
.
4
5
'
23
.
8
23
.
7
7
''
25 LF 8" DI SD @ 0.52%
7 LF 8" DI SD @ 0.61%
20
1
-
6
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
5
5
.
1
7
,
1
8
.
6
0
'
R
T
RI
M
2
3
.
4
6
8"
I
E
(
O
U
T
)
2
1
.
7
5
(
E
)
20
1
-
5
9
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
6
0
.
7
2
,
1
5
.
1
3
'
R
T
RI
M
2
3
.
4
8
8"
I
E
(
I
N
)
2
1
.
7
1
(
W
)
8"
I
E
(
O
U
T
)
2
1
.
7
1
(
E
)
20
1
-
1
6
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
1
4
.
1
7
'
R
T
RI
M
2
3
.
6
7
12
"
I
E
(
I
N
)
2
1
.
5
8
(
S
E
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
N
)
8"
I
E
(
I
N
)
2
1
.
5
8
(
W
)
18
"
I
E
(
O
U
T
)
2
1
.
5
8
(
S
W
)
L
FINISHED GRADE
@ PIPE C
L
EXISTING GROUND
@ PIPE C
10
15
20
25
30
35
40
10
15
20
25
30
35
40
27
.
5
'
27
.
4
2
'
27
.
4
27
.
4
6
27
.
2
'
27
.
4
2
'
26
.
8
26
.
9
1
27
.
2
26
.
7
8
28
.
5
26
.
6
6
28
.
9
'
27
.
0
5
'
27
.
8
27
.
3
6
''
20
3
-
7
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
3
+
7
0
.
8
1
,
1
8
3
.
6
2
'
R
T
RI
M
2
6
.
9
8
12
"
I
E
(
O
U
T
)
2
3
.
8
5
(
S
W
)
45 LF 12" CONC SD @ 0.51%
20
3
-
7
2
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
G
R
A
D
Y
ST
A
.
1
5
3
+
9
6
.
9
2
,
2
1
4
.
1
4
'
L
T
RI
M
2
6
.
9
2
12
"
I
E
(
I
N
)
2
3
.
6
2
(
N
E
)
12
"
I
E
(
O
U
T
)
2
3
.
6
2
(
S
)
63 LF 12" CONC SD @ 0.52%
20
5
-
7
6
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
6
+
1
1
.
1
5
,
9
3
.
4
4
'
R
T
RI
M
2
6
.
6
1
12
"
I
E
(
I
N
)
2
3
.
2
9
(
N
)
6"
I
E
(
I
N
)
2
4
.
8
0
(
E
)
12
"
I
E
(
O
U
T
)
2
3
.
2
9
(
E
)
20
3
-
4
5
,
C
B
T
Y
P
E
2
-
6
0
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
6
+
4
8
.
9
1
,
6
3
.
0
4
'
R
T
RI
M
2
7
.
5
0
27
"
I
E
(
I
N
)
1
9
.
5
5
(
E
)
12
"
I
E
(
I
N
)
2
3
.
0
0
(
W
)
27
"
I
E
(
O
U
T
)
1
9
.
5
5
(
N
W
)
48 LF 12" DI SD @ 0.60%
EXISTING GROUND
@ PIPE C
L
FINISHED GRADE
@ PIPE C
L
L
EXISTING 30" CONC SD
SCALE IN FEET
02.5 55 10
(1" = 5')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PROFILE
BT120-CDV202
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
6
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
V
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDV201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BT120-CDV001
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
20 40
SCALE IN FEET
01020
(1" = 20')
(HOR.)(VERT.)
201-16 TO 201-27
SCALE 1" = 20' H, 1" = 5' V
201-48 TO 203-71
SCALE 1" = 20' H, 1" = 5' V
201-31 TO 201-07
SCALE 1" = 20' H, 1" = 5' V
201-60 TO 201-16
SCALE 1" = 20' H, 1" = 5' V
203-74 TO 203-45
SCALE 1" = 20' H, 1" = 5' V
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''26
.
6
'
26
.
7
5
'
26
.
8
26
.
4
2
27
.
3
26
.
1
0
27
.
5
25
.
7
7
27
.
5
'
25
.
9
4
'
27
.
4
25
.
4
3
''
20
4
-
3
4
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
4
9
.
1
5
,
1
1
.
1
6
'
R
T
RI
M
2
6
.
7
5
12
"
I
E
(
I
N
)
2
2
.
2
5
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
2
5
(
N
W
)
88 LF 12" DI SD @ 0.50%
20
4
-
3
5
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
3
7
.
6
5
,
1
1
.
2
7
'
R
T
RI
M
2
5
.
5
5
12
"
I
E
(
I
N
)
2
2
.
6
9
(
E
)
12
"
I
E
(
I
N
)
2
2
.
6
9
(
N
W
)
12
"
I
E
(
O
U
T
)
2
2
.
6
9
(
S
W
)
12
"
I
E
(
O
U
T
)
2
2
.
6
9
(
S
E
)
16 LF 12" DI SD @ 0.50%
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL
36 LF 12" DI SD @ 0.50%
10
6
-
5
5
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
6
0
.
1
2
,
1
6
.
1
7
'
R
T
RI
M
2
5
.
4
5
12
"
I
E
(
I
N
)
2
2
.
7
7
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
7
7
(
W
)
10
6
-
1
2
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
7
2
.
8
0
,
1
7
.
3
3
'
L
T
RI
M
2
5
.
3
1
12
"
I
E
(
O
U
T
)
2
2
.
9
5
(
S
W
)
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''25
.
2
'
25
.
2
4
'
24
.
9
24
.
9
4
''
20
3
-
7
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
7
3
.
4
5
,
6
1
.
8
3
'
R
T
RI
M
2
5
.
2
4
12
"
I
E
(
O
U
T
)
2
2
.
0
4
(
N
)
27 LF 12" CONC SD
@ 0.51%
20
1
-
0
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
5
6
.
7
9
,
4
0
.
3
3
'
R
T
RI
M
2
4
.
9
1
12
"
I
E
(
I
N
)
2
1
.
9
0
(
S
)
12
"
I
E
(
I
N
)
2
1
.
9
0
(
S
E
)
12
"
I
E
(
O
U
T
)
2
1
.
9
0
(
W
)
5
10
15
20
25
30
35
''26
.
6
'
24
.
0
9
'
26
.
6
26
.
8
2
26
.
9
27
.
3
0
27
.
3
27
.
0
6
27
.
4
'
27
.
2
3
'
27
.
3
27
.
0
6
27
.
4
27
.
4
9
27
.
6
27
.
9
6
27
.
9
'
28
.
4
3
'
'
9 LF 12" CONC SD @ 0.56%
20
4
-
2
1
,
C
B
T
Y
P
E
2
-
4
8
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
5
6
.
4
3
,
4
7
.
2
8
'
L
T
RI
M
2
7
.
2
3
12
"
I
E
(
I
N
)
1
9
.
8
7
(
S
W
)
12
"
I
E
(
O
U
T
)
1
9
.
8
7
(
N
W
)
17 LF 12" CONC SD @ 0.81%
25 LF 12" CONC SD @ 0.79%
20
4
-
3
2
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
3
6
.
9
7
,
2
2
.
8
3
'
L
T
RI
M
2
6
.
7
1
12
"
I
E
(
I
N
)
2
2
.
0
6
(
S
E
)
12
"
I
E
(
I
N
)
2
2
.
0
6
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
0
6
(
N
W
)
12 LF 12" CONC SD @ 0.50%
20
4
-
3
3
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
4
0
.
8
5
,
1
1
.
1
7
'
L
T
RI
M
2
6
.
8
5
12
"
I
E
(
I
N
)
2
2
.
1
2
(
S
E
)
12
"
I
E
(
O
U
T
)
2
2
.
1
2
(
N
W
)
20
4
-
3
4
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
4
9
.
1
5
,
1
1
.
1
6
'
R
T
RI
M
2
6
.
7
5
12
"
I
E
(
I
N
)
2
2
.
2
5
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
2
5
(
N
W
)
OUTLET
FROM
SWALE
IE 24.08
20
2
-
2
4
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
7
+
1
7
.
9
1
,
1
9
.
0
0
'
R
T
RI
M
2
8
.
0
1
12
"
I
E
(
I
N
)
2
2
.
9
0
(
W
)
12
"
I
E
(
I
N
)
2
2
.
0
1
(
E
)
12
"
I
E
(
O
U
T
)
2
2
.
0
1
(
S
)
MW
S
-
7
0
,
M
W
S
6
x
8
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
7
8
.
5
5
,
7
7
.
9
4
'
L
T
RI
M
2
7
.
0
8
12
"
I
E
(
I
N
)
2
1
.
2
1
(
N
)
12
"
I
E
(
O
U
T
)
2
0
.
1
4
(
S
)
EX
.
2
0
4
-
0
2
,
E
X
.
C
B
6
0
"
D
I
A
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
5
6
.
4
3
,
5
6
.
1
9
'
L
T
RI
M
2
7
.
4
0
12
"
I
E
(
I
N
)
1
9
.
9
1
(
N
)
12
"
I
E
(
I
N
)
1
9
.
8
2
(
S
E
)
27
"
I
E
(
I
N
)
1
9
.
4
0
(
E
)
27
"
I
E
(
O
U
T
)
1
9
.
8
0
(
W
)
E
X
.
C
O
N
C
20
4
-
2
2
,
C
B
T
Y
P
E
2
-
4
8
"
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
6
7
.
1
5
,
6
6
.
7
2
'
L
T
RI
M
2
7
.
0
7
12
"
I
E
(
I
N
)
1
9
.
9
9
(
N
)
12
"
I
E
(
O
U
T
)
1
9
.
9
9
(
S
)
20
4
-
2
3
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
7
+
0
2
.
8
1
,
7
6
.
2
2
'
R
T
RI
M
2
7
.
5
6
12
"
I
E
(
I
N
)
2
1
.
3
4
(
N
)
12
"
I
E
(
I
N
)
2
1
.
7
1
(
N
W
)
12
"
I
E
(
O
U
T
)
2
1
.
3
4
(
S
)
24 LF 12" CONC SD @ 0.53%
15 LF 12" CONC SD @ 0.53%
16 LF 12" CONC SD @ 0.94%
14 LF 12" CONC SD @ 0.93%
59 LF 12" CONC SD @ 1.13%
MW
S
-
6
9
,
M
W
S
4
x
8
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
0
+
3
9
.
0
6
,
4
7
.
2
8
'
L
T
RI
M
2
7
.
4
3
12
"
I
E
(
I
N
)
2
1
.
8
7
(
S
E
)
12
"
I
E
(
O
U
T
)
2
0
.
0
1
(
N
E
)
EX
.
C
O
N
C
5
10
15
20
25
30
35
5
10
15
20
25
30
35
''27
.
3
'
26
.
6
3
'
26
.
0
26
.
0
7
26
.
0
26
.
0
2
''
10
6
-
1
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
3
+
6
7
.
7
8
,
1
3
.
7
8
'
R
T
RI
M
2
5
.
5
3
12
"
I
E
(
O
U
T
)
2
2
.
0
2
(
W
)
10
6
-
2
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
3
+
6
6
.
4
0
,
2
5
.
1
7
'
L
T
RI
M
2
6
.
4
1
12
"
I
E
(
I
N
)
2
1
.
8
2
(
N
)
12
"
I
E
(
I
N
)
2
1
.
8
2
(
E
)
12
"
I
E
(
O
U
T
)
2
1
.
8
2
(
S
)
39 LF 12" CONC SD
@ 0.51%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
6
'
27
.
2
8
'
27
.
4
27
.
2
6
27
.
5
27
.
5
7
27
.
8
27
.
1
7
27
.
9
'
26
.
6
0
'
27
.
9
26
.
3
8
''
10
6
-
2
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
7
+
7
6
.
7
4
,
1
4
.
1
7
'
L
T
RI
M
2
6
.
6
0
12
"
I
E
(
I
N
)
2
2
.
9
5
(
E
)
12
"
I
E
(
O
U
T
)
2
2
.
9
5
(
S
)
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL
10
6
-
2
8
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
8
+
0
6
.
1
6
,
1
8
.
1
5
'
R
T
RI
M
2
6
.
7
9
12
"
I
E
(
I
N
)
2
2
.
4
5
(
N
)
12
"
I
E
(
I
N
)
2
2
.
4
5
(
E
)
12
"
I
E
(
O
U
T
)
2
2
.
4
5
(
W
)
98 LF 12" CONC SD @ 0.51%
30 LF 12" CONC SD @ 0.50%
10
6
-
5
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
8
+
0
6
.
4
5
,
1
4
.
2
5
'
L
T
RI
M
2
6
.
3
6
12
"
I
E
(
O
U
T
)
2
3
.
1
0
(
W
)
5
10
15
20
25
30
35
5
10
15
20
25
30
35
''25
.
5
'
25
.
6
2
'
''
MW
S
-
3
6
,
M
W
S
4
x
4
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
2
+
5
3
.
0
7
,
2
1
.
5
6
'
L
T
RI
M
2
5
.
6
2
12
"
I
E
(
I
N
)
2
1
.
2
6
(
E
)
12
"
I
E
(
O
U
T
)
2
0
.
6
5
(
S
)
7 LF 12" CONC SD
@ 0.00%
10
6
-
3
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
2
+
5
3
.
4
7
,
1
4
.
2
6
'
L
T
RI
M
2
5
.
0
8
12
"
I
E
(
I
N
)
2
1
.
2
6
(
N
)
12
"
I
E
(
O
U
T
)
2
1
.
2
6
(
W
)
SCALE IN FEET
02.5 55 10
(1" = 5')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PROFILE
BT120-CDV203
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
7
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
V
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDV201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BT120-CDV001
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
20 40
SCALE IN FEET
01020
(1" = 20')
(HOR.)(VERT.)
204-34 TO 106-12
SCALE 1" = 20' H, 1" = 5' V
203-73 TO 201-09
SCALE 1" = 20' H, 1" = 5' V
106-28 TO 106-54
SCALE 1" = 20' H, 1" = 5' V
204-34 TO 202-24
SCALE 1" = 20' H, 1" = 5' V
106-20 TO 106-19
SCALE 1" = 20' H, 1" = 5' V
MWS-36 TO 106-37
SCALE 1" = 20' H, 1" = 5' V
15
20
25
30
35
40
45
15
20
25
30
35
40
45
''29
.
0
'
28
.
9
8
'
29
.
0
29
.
0
1
29
.
0
29
.
0
3
28
.
2
28
.
2
3
27
.
6
'
27
.
5
6
'
''
20
4
-
4
1
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
6
+
3
0
.
0
5
,
9
9
.
2
7
'
R
T
RI
M
2
8
.
9
8
12
"
I
E
(
O
U
T
)
2
5
.
9
6
(
N
)
20
2
-
4
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
6
+
4
8
.
3
3
,
4
4
.
0
8
'
R
T
RI
M
2
9
.
0
2
12
"
I
E
(
I
N
)
2
5
.
6
6
(
S
)
12
"
I
E
(
O
U
T
)
2
5
.
6
6
(
S
E
)
20
4
-
2
3
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
7
+
0
2
.
8
1
,
7
6
.
2
2
'
R
T
RI
M
2
7
.
5
6
12
"
I
E
(
I
N
)
2
1
.
3
4
(
N
)
12
"
I
E
(
I
N
)
2
1
.
7
1
(
N
W
)
12
"
I
E
(
O
U
T
)
2
1
.
3
4
(
S
)
58 LF 12" CONC SD @ 0.52%
63 LF
1
2
"
C
O
N
C
S
D
@
6
.
2
4
%
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''25
.
8
'
25
.
5
3
'
25
.
9
25
.
8
7
25
.
7
26
.
1
8
25
.
7
26
.
4
8
25
.
7
'
26
.
7
9
'
25
.
9
27
.
1
0
''
20
1
-
5
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
2
+
6
7
.
2
4
,
1
4
.
5
1
'
L
T
RI
M
2
6
.
0
0
8"
I
E
(
I
N
)
2
3
.
0
0
(
E
)
8"
I
E
(
I
N
)
2
3
.
0
0
(
N
W
)
12
"
I
E
(
O
U
T
)
2
3
.
0
0
(
S
W
)
20
1
-
0
8
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
2
+
3
2
.
1
5
,
1
4
.
1
7
'
L
T
RI
M
2
5
.
5
3
8"
I
E
(
O
U
T
)
2
3
.
1
8
(
S
E
)
35 LF 8" DI SD @ 0.51%
101 LF 8" DI SD @ 0.50%
20
1
-
0
6
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
3
+
6
9
.
3
8
,
1
7
.
9
1
'
L
T
RI
M
2
7
.
2
6
8"
I
E
(
O
U
T
)
2
3
.
5
1
(
W
)
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
8
'
27
.
6
9
'
27
.
2
28
.
3
7
26
.
7
27
.
4
1
26
.
5
26
.
9
7
26
.
3
'
26
.
6
7
'
26
.
2
26
.
1
0
26
.
2
25
.
7
5
26
.
4
25
.
6
6
26
.
7
'
25
.
3
1
'
26
.
9
25
.
1
4
27
.
0
24
.
9
7
27
.
0
24
.
8
1
27
.
2
'
25
.
1
3
'
27
.
6
24
.
9
8
26
.
4
24
.
8
1
25
.
5
24
.
4
8
24
.
5
'
24
.
1
7
'
''
20
3
-
1
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
4
+
7
9
.
7
7
,
9
8
.
1
5
'
R
T
RI
M
2
5
.
1
7
12
"
I
E
(
I
N
)
2
2
.
1
6
(
S
)
12
"
I
E
(
O
U
T
)
2
2
.
1
6
(
N
E
)
78 LF 12" DI SD @ 0.66%
20
3
-
1
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
1
0
.
4
0
,
9
4
.
6
0
'
R
T
RI
M
2
4
.
6
4
12
"
I
E
(
I
N
)
2
1
.
6
4
(
S
W
)
12
"
I
E
(
O
U
T
)
2
1
.
6
4
(
N
E
)
50 LF 12" DI SD @ 0.50%
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
20
5
-
4
9
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
2
+
5
9
.
8
8
,
6
4
.
2
7
'
R
T
RI
M
2
7
.
6
9
12
"
I
E
(
O
U
T
)
2
4
.
6
7
(
E
)
20
5
-
5
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
2
+
5
9
.
4
8
,
8
3
.
0
8
'
R
T
RI
M
2
7
.
9
7
12
"
I
E
(
I
N
)
2
4
.
5
7
(
W
)
12
"
I
E
(
O
U
T
)
2
4
.
5
7
(
N
)
20
5
-
7
8
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
3
+
1
9
.
4
7
,
8
6
.
7
5
'
R
T
RI
M
2
7
.
0
0
12
"
I
E
(
I
N
)
2
3
.
9
8
(
S
)
12
"
I
E
(
O
U
T
)
2
3
.
9
8
(
N
)
20
3
-
6
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
3
+
8
7
.
5
8
,
1
0
1
.
2
4
'
R
T
RI
M
2
5
.
8
2
12
"
I
E
(
I
N
)
2
2
.
8
0
(
S
)
12
"
I
E
(
O
U
T
)
2
2
.
8
0
(
N
)
20
3
-
6
2
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
4
+
3
8
.
5
6
,
9
7
.
2
0
'
R
T
RI
M
2
5
.
5
3
12
"
I
E
(
I
N
)
2
2
.
5
1
(
S
)
8"
I
E
(
I
N
)
2
2
.
5
1
(
W
)
12
"
I
E
(
O
U
T
)
2
2
.
5
1
(
N
)
20
1
-
4
8
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
1
+
1
1
.
7
1
,
4
5
.
0
0
'
R
T
RI
M
2
4
.
8
5
12
"
I
E
(
I
N
)
2
1
.
3
9
(
S
W
)
12
"
I
E
(
I
N
)
2
1
.
3
9
(
E
)
18
"
I
E
(
O
U
T
)
2
1
.
3
9
(
N
W
)
MW
S
-
6
8
,
M
W
S
8
x
1
2
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
4
5
.
0
0
'
R
T
RI
M
2
4
.
5
0
18
"
I
E
(
I
N
)
2
1
.
1
9
(
S
E
)
18
"
I
E
(
O
U
T
)
2
0
.
8
5
(
N
E
)
20
1
-
1
8
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
6
1
.
1
3
,
2
3
.
0
5
'
R
T
RI
M
2
4
.
0
3
12
"
I
E
(
I
N
)
2
0
.
4
7
(
S
E
)
12
"
I
E
(
O
U
T
)
2
0
.
4
7
(
N
W
)
46 LF 12" CONC SD @ 0.64%37 LF 12" CONC SD @ 0.95%
63 LF 12" CONC SD
@
1
.
8
8
%
54 LF 12" CONC SD @ 1.09%
19 LF 12" CONC SD @ 0.53%
20
1
-
3
1
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
8
5
.
6
4
,
3
6
.
7
4
'
R
T
RI
M
2
4
.
4
6
18
"
I
E
(
I
N
)
2
0
.
4
2
(
N
E
)
18
"
I
E
(
I
N
)
2
0
.
7
5
(
S
W
)
12
"
I
E
(
O
U
T
)
2
0
.
6
7
(
N
W
)
26 LF 18" DI SD @ 0.77%
8 LF 18" DI SD @ 1.21%28 LF 12" CONC SD
@ 0.71%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
7
'
26
.
0
2
'
27
.
2
26
.
5
1
26
.
9
26
.
6
2
26
.
4
26
.
3
8
''''
20
1
-
0
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
6
8
.
3
6
,
1
4
.
1
7
'
R
T
RI
M
2
6
.
0
2
12
"
I
E
(
I
N
)
2
2
.
5
2
(
S
E
)
12
"
I
E
(
I
N
)
2
2
.
5
2
(
N
E
)
12
"
I
E
(
O
U
T
)
2
2
.
5
2
(
N
W
)
95 LF 12" DI SD @ 0.51%
20
1
-
5
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
2
+
6
7
.
2
4
,
1
4
.
5
1
'
L
T
RI
M
2
6
.
0
0
8"
I
E
(
I
N
)
2
3
.
0
0
(
E
)
8"
I
E
(
I
N
)
2
3
.
0
0
(
N
W
)
12
"
I
E
(
O
U
T
)
2
3
.
0
0
(
S
W
)
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''26
.
1
'
26
.
0
8
'
''
20
4
-
3
5
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
3
7
.
6
5
,
1
1
.
2
7
'
R
T
RI
M
2
5
.
5
5
12
"
I
E
(
I
N
)
2
2
.
6
9
(
E
)
12
"
I
E
(
I
N
)
2
2
.
6
9
(
N
W
)
12
"
I
E
(
O
U
T
)
2
2
.
6
9
(
S
W
)
12
"
I
E
(
O
U
T
)
2
2
.
6
9
(
S
E
)
20
4
-
7
5
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
2
1
+
3
6
.
9
7
,
1
1
.
1
7
'
L
T
RI
M
2
5
.
5
5
12
"
I
E
(
O
U
T
)
2
2
.
8
1
(
S
E
)
22 LF 12" DI SD @ 0.53%
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL
SCALE IN FEET
02.5 55 10
(1" = 5')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PROFILE
BT120-CDV204
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
8
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
V
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDV201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BT120-CDV001
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
20 40
SCALE IN FEET
01020
(1" = 20')
(HOR.)(VERT.)
204-41 TO 204-23
SCALE 1" = 20' H, 1" = 5' V
201-08 TO 201-06
SCALE 1" = 20' H, 1" = 5' V
205-49 TO 201-18
SCALE 1" = 20' H, 1" = 5' V
201-04 TO 201-54
SCALE 1" = 20' H, 1" = 5' V
204-35 TO 204-75
SCALE 1" = 20' H, 1" = 5' V
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''25
.
2
'
25
.
0
9
'
25
.
6
25
.
6
25
.
5
7
24
.
9
''
EX
.
1
0
5
-
0
3
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
1
+
0
4
.
1
8
,
5
9
.
3
2
'
R
T
RI
M
2
4
.
6
8
12
"
I
E
(
I
N
)
2
1
.
1
0
(
W
)
12
"
I
E
(
O
U
T
)
2
1
.
1
0
(
N
E
)
EXISTING GROUND
@ PIPE CL
FINISHED GRADE
@ PIPE CL
10
5
-
5
2
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
0
+
5
4
.
3
0
,
1
7
.
1
6
'
L
T
RI
M
2
5
.
0
9
12
"
I
E
(
O
U
T
)
2
1
.
5
2
(
E
)
85 LF 12" CONC SD @ 0.50%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''25
.
6
'
25
.
6
3
'
24
.
7
24
.
6
7
''
MW
S
-
6
6
,
M
W
S
4
x
4
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
7
+
8
5
.
0
5
,
1
.
6
0
'
R
T
RI
M
2
5
.
5
5
12
"
I
E
(
I
N
)
2
1
.
4
2
(
N
W
)
12
"
I
E
(
O
U
T
)
2
1
.
4
2
(
E
)
6 LF 12" CONC SD
@ 0.53%
10
2
-
1
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
7
+
8
6
.
0
9
,
1
.
3
6
'
R
T
RI
M
2
4
.
9
7
12
"
I
E
(
O
U
T
)
2
1
.
4
5
(
S
E
)
44 LF 12" CONC SD @ 0.50%
EX
.
2
0
1
-
0
1
,
E
X
.
C
B
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
0
+
6
8
.
3
6
,
1
2
0
.
0
5
'
L
T
RI
M
2
4
.
0
0
12
"
I
E
(
I
N
)
2
1
.
2
0
(
W
)
18
"
I
E
(
I
N
)
2
0
.
7
0
(
N
E
)
18
"
I
E
(
O
U
T
)
2
0
.
7
0
(
S
W
)
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''27
.
8
'
27
.
7
1
'
27
.
9
27
.
3
8
27
.
9
26
.
9
9
25
.
9
26
.
2
7
26
.
1
'
26
.
1
8
'
26
.
0
26
.
2
8
25
.
9
26
.
3
9
25
.
9
26
.
2
1
25
.
9
'
25
.
8
4
'
25
.
8
25
.
8
7
25
.
7
25
.
6
2
25
.
3
25
.
5
9
''
20
2
-
8
0
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
7
+
5
0
.
2
9
,
2
9
.
5
0
'
L
T
RI
M
2
7
.
6
8
12
"
I
E
(
I
N
)
2
2
.
5
5
(
N
W
)
12
"
I
E
(
O
U
T
)
2
2
.
5
5
(
E
)
FINISHED GRADE
@ PIPE CL
EXISTING GROUND
@ PIPE CL
10
6
-
3
0
,
C
B
T
Y
P
E
2
-
4
8
"
BT
1
2
0
-
C
-
N
T
C
ST
A
.
5
1
7
+
9
2
.
6
5
,
2
9
.
5
0
'
L
T
RI
M
2
7
.
1
3
12
"
I
E
(
I
N
)
2
2
.
3
3
(
W
)
12
"
I
E
(
O
U
T
)
2
2
.
3
3
(
E
)
MW
S
-
3
6
,
M
W
S
4
x
4
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
2
+
5
3
.
0
7
,
2
1
.
5
6
'
L
T
RI
M
2
5
.
6
2
12
"
I
E
(
I
N
)
2
1
.
2
6
(
E
)
12
"
I
E
(
O
U
T
)
2
0
.
6
5
(
S
)
10
6
-
3
8
,
C
B
T
Y
P
E
2
6
0
"
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
2
+
3
1
.
0
1
,
2
4
.
0
1
'
L
T
RI
M
2
5
.
5
3
12
"
I
E
(
I
N
)
2
0
.
3
0
(
N
)
24
"
I
E
(
I
N
)
1
9
.
3
0
(
E
)
27
"
I
E
(
O
U
T
)
1
9
.
2
0
(
W
)
7 LF 12" CONC SD @ 0.00%
10
6
-
3
7
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
2
+
5
3
.
4
7
,
1
4
.
2
6
'
L
T
RI
M
2
5
.
0
8
12
"
I
E
(
I
N
)
2
1
.
2
6
(
N
)
12
"
I
E
(
O
U
T
)
2
1
.
2
6
(
W
)
19 LF 12" CONC SD @ 1.88%
42 LF 12" CONC SD @ 0.52%
38 LF 12" CONC SD @ 0.52%
60 LF 12" CONC SD @ 0.51%112 LF 12" CONC SD @ 0.50%
10
6
-
2
1
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
4
+
2
5
.
2
0
,
1
9
.
9
6
'
L
T
RI
M
2
6
.
1
6
12
"
I
E
(
I
N
)
2
2
.
1
3
(
W
)
12
"
I
E
(
O
U
T
)
2
2
.
1
3
(
S
)
10
6
-
2
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
L
A
K
E
ST
A
.
4
0
3
+
6
6
.
4
0
,
2
5
.
1
7
'
L
T
RI
M
2
6
.
4
1
12
"
I
E
(
I
N
)
2
1
.
8
2
(
N
)
12
"
I
E
(
I
N
)
2
1
.
8
2
(
E
)
12
"
I
E
(
O
U
T
)
2
1
.
8
2
(
S
)
EX
.
C
M
P
EX
.
C
O
N
C
EX
.
P
I
P
E
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''26
.
4
'
28
.
4
0
'
26
.
3
28
.
4
9
''
10
5
-
4
7
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
8
+
7
6
.
2
9
,
6
6
.
0
2
'
R
T
RI
M
2
7
.
9
1
8"
I
E
(
O
U
T
)
2
6
.
3
8
(
N
)
12
"
I
E
(
O
U
T
)
2
5
.
7
9
(
W
)
10
5
-
4
8
,
C
B
T
Y
P
E
1
BT
P
1
2
0
-
C
-
R
A
I
L
A
K
D
W
ST
A
.
7
1
8
+
7
6
.
2
8
,
4
8
.
0
2
'
R
T
RI
M
2
8
.
1
0
8"
I
E
(
I
N
)
2
6
.
2
9
(
S
)
8"
I
E
(
O
U
T
)
2
6
.
2
9
(
E
)
OUTLET TO SWALE
IE 26.20
18 LF 8" DI SD
@ 0.50%
17 LF 8" DI SD @ 0.54%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''23
.
5
'
23
.
5
1
'
''
20
1
-
5
8
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
6
+
2
2
.
5
6
,
4
8
.
6
6
'
R
T
RI
M
2
3
.
5
1
6"
I
E
(
I
N
)
2
0
.
4
2
(
S
E
)
12
"
I
E
(
I
N
)
2
0
.
3
0
(
N
E
)
12
"
I
E
(
O
U
T
)
2
0
.
3
0
(
S
W
)
FI
L
-
1
,
F
I
L
T
E
R
R
A
F
T
0
4
0
4
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
6
+
1
3
.
1
,
4
9
.
5
0
'
R
T
TH
R
O
A
T
O
P
E
N
I
N
G
2
2
.
9
8
6"
I
E
(
O
U
T
)
2
0
.
4
7
(
N
E
)
12 LF 6" PVC SD
@ 0.45%
EX
.
D
I
EX
.
D
I
10
15
20
25
30
35
40
10
15
20
25
30
35
40
''26
.
7
'
26
.
7
2
'
26
.
6
26
.
6
0
''
20
1
-
1
0
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
5
7
.
1
5
,
4
0
.
3
3
'
R
T
RI
M
2
6
.
2
3
12
"
I
E
(
I
N
)
2
2
.
4
8
(
S
W
)
12
"
I
E
(
I
N
)
2
2
.
4
8
(
S
E
)
12
"
I
E
(
O
U
T
)
2
2
.
4
8
(
N
W
)
20
3
-
1
1
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
S
T
C
ST
A
.
6
1
2
+
5
0
.
4
8
,
6
1
.
8
3
'
R
T
RI
M
2
6
.
5
8
12
"
I
E
(
I
N
)
2
2
.
8
2
(
S
W
)
12
"
I
E
(
O
U
T
)
2
3
.
3
2
(
N
E
)
23 LF 12" CONC SD
@ 3.73%
10
15
20
25
30
35
40
10
15
20
25
30
35
40
20
3
-
6
2
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
4
+
3
8
.
5
6
,
9
7
.
2
0
'
R
T
RI
M
2
5
.
5
3
12
"
I
E
(
I
N
)
2
2
.
5
1
(
S
)
8"
I
E
(
I
N
)
2
2
.
5
1
(
W
)
12
"
I
E
(
O
U
T
)
2
2
.
5
1
(
N
)
20
3
-
6
4
,
C
B
T
Y
P
E
1
BT
1
2
0
-
C
-
R
A
I
N
I
E
R
ST
A
.
2
0
4
+
3
8
.
4
7
,
6
4
.
4
2
'
R
T
RI
M
2
5
.
0
3
8"
I
E
(
O
U
T
)
2
2
.
6
8
(
E
)
33 LF 8" DI SD @ 0.52%
''25
.
5
'
25
.
5
5
'
25
.
2
25
.
1
7
''
SCALE IN FEET
02.5 55 10
(1" = 5')
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE PROFILE
BT120-CDV205
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
1"=20'
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
8:
5
8
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
V
2
0
1
-
2
0
5
.
D
W
G
S1-BT120-CDV201-205 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
xS1-BT120-CDV001
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
20 40
SCALE IN FEET
01020
(1" = 20')
(HOR.)(VERT.)
105-52 TO EX. 105-03
SCALE 1" = 20' H, 1" = 5' V
102-17 TO EX. 201-01
SCALE 1" = 20' H, 1" = 5' V
202-80 TO 106-38
SCALE 1" = 20' H, 1" = 5' V
105-47 TO SWALE
SCALE 1" = 20' H, 1" = 5' V
201-58 TO FIL-1
SCALE 1" = 20' H, 1" = 5' V
203-62 TO 203-64
SCALE 1" = 20' H, 1" = 5' V
201-10 TO 203-11
SCALE 1" = 20' H, 1" = 5' V
FLOW FLOW
EX CURB
EX GUTTER
4.00'
INLET OPENING
13.00' CONCRETE DEPRESSED GUTTER
FL
O
W
EX GUTTER
EX CURB
7
11
2
B
-
CONNECT PIPE TO
BYPASS STRUCTURE
6"Ø OUTLET PIPE
A,C
-
4.
0
0
'
4
3.
5
4
'
IN
V
.
T
O
T
O
P
CLEANOUT COVER
TREE GRATE
AND FRAME
MULCH LAYER
6"Ø OUTLET PIPE
(LOCATION VARIES)
FILTERRA
ENGINEERED
MEDIA
PERFORATED
UNDERDRAIN
UNDERDRAIN STONE
PROVIDED BY FILTERRAINTERNAL JOINT, TYP
DEPRESSED GUTTER
AND THROAT OPENING
C
-
4.00'
TRANSITIONAL
DEPRESSED GUTTER
5.00'
FULLY DEPRESSED GUTTER
SEE DETAIL 2 THIS SHEET
4.00'
TRANSITIONAL
DEPRESSED GUTTER
EX CURB
THROAT
OPENING
TRANSITIONAL
CURB
FILTERRA UNIT (BEHIND)
TRANSITIONAL
CURB
EX GUTTER
EX CURB
EX GUTTER
2
22 11
0.
5
0
'
2
EX PAVEMENT
8" PRECAST
TOP SLAB
(FILTERRA UNIT)
INLET TRAY (FILTERRA UNIT)
TO BE INSTALLED BY FILTERRA
CREW AT ACTIVATION
PRECAST BOX WALL
(FILTERRA UNIT)
DEPRESSED GUTTER
AND THROAT OPENING
STANDARD 90° NOSING
(FILTERRA UNIT)
#4 DOWEL BARS @ 12" O.C.
(FILTERRA UNIT)
EX CURB AND GUTTER (BEHIND)
5
2
8
THROAT
OPENING
ELEVATION
9
2
-
0.75'0.75'
0.
5
0
'
0.
9
2
'
0.50'
1.50'
1.
0
6
'
0.
5
0
'
STANDARD FILTERRA UNIT WITH OFF-LINE BYPASS
SCALE: 1"=2'
1
-
FILTERRA UNIT WITH PERFORATED UNDERDRAIN
SCALE: 1"=2'
A
-
CONCRETE DEPRESSED GUTTER
SCALE: 1"=2'
B
-
DEPRESSED GUTTER AND THROAT OPENING
SCALE: 1"=1'
C
-
DEPRESSED GUTTER AND
THROAT OPENING DETAIL
SCALE: 1"=1'
2
-
GENERAL FILTERRA CONSTRUCTION NOTES
1.FILTERRA UNIT TOP ELEVATION AND THROAT OPENING ELEVATIONS
ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY FILTERRA UNIT
ELEVATIONS AND SET FILTERRA UNIT ELEVATIONS TO ACHIEVE
REQUIRED GRADES FROM EXISTING GUTTER.
2.IF THE FILTERRA IS STORED BEFORE INSTALLATION, THE TOP SLAB
MUST BE PLACED ON THE BOX USING THE 2X4 WOOD PROVIDED, TO
PREVENT ANY CONTAMINATION FROM THE SITE. ALL INTERNAL
FITTINGS SUPPLIED (IF ANY), MUST BE LEFT IN PLACE AS PER THE
DELIVERY.
3.THE UNIT SHALL BE PLACED ON A COMPACTED SUB-GRADE WITH A
MINIMUM 6-INCH CSTC. THE UNIT IS TO BE PLACED SUCH THAT THE
UNIT AND TOP SLAB MATCH THE GRADE OF THE CURB IN THE AREA
OF THE UNIT. COMPACT UNDISTURBED SUB-GRADE MATERIALS TO
95% OF MAXIMUM DENSITY AT +1 TO 2% OF OPTIMUM MOISTURE.
UNSUITABLE MATERIAL BELOW SUB-GRADE SHALL BE REPLACED TO
THE ENGINEER'S APPROVAL.
4.OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET
THE APPROVED DRAWINGS WITH MODIFICATIONS NECESSARY TO
MEET SITE CONDITIONS AND CITY STANDARDS.
5.ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND
PROTECTIVE MESH COVER MUST BE LEFT INTACT. REMOVE ONLY
THE TEMPORARY WOODEN SHIPPING BLOCKS BETWEEN THE BOX
AND THE TOP SLAB. THE TOP LID SHOULD BE SEALED ONTO THE
BOX SECTION BEFORE BACKFILLING, USING A NON-SHRINK GROUT,
BUTYL RUBBER OR SIMILAR WATERPROOF SEAL. THE BOARDS ON
TOP OF THE LID AND BOARDS SEALED IN THE UNIT'S THROAT MUST
NOT BE REMOVED. THE SUPPLIER (AMERICAST OR ITS AUTHORIZED
DEALER) WILL REMOVE THESE SECTIONS AT THE TIME OF
ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A CAREFUL
MANNER, BRINGING THE APPROPRIATE FILL MATERIAL UP IN 6"
LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL BE SET IN A
MANNER THAT WILL RESULT IN A WATERTIGHT JOINT. IN ALL
INSTANCES, INSTALLATION OF FILTERRA UNIT SHALL CONFORM TO
ASTM SPECIFICATION C891 "STANDARD PRACTICE FOR
INSTALLATION OF UNDERGROUND PRECAST UTILITY STRUCTURES",
UNLESS DIRECTED OTHERWISE IN CONTRACT DOCUMENTS.
6.THE CONTRACTOR IS RESPONSIBLE FOR INLET
PROTECTION/SEDIMENT CONTROL AND CLEANING AROUND EACH
FILTERRA UNIT.
7.ACTIVATION OF THE FILTERRA UNIT IS PERFORMED ONLY BY THE
SUPPLIER. CONTRACTOR IS RESPONSIBLE FOR FILTERRA INLET
PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS PROCESS
CANNOT COMMENCE UNTIL THE AREA TRIBUTARY TO THE UNIT IS
FULLY STABILIZED AND CLEANED (FULL LANDSCAPING, GRASS
COVER, FINAL PAVING AND STREET SWEEPING COMPLETED),
NEGATING THE CHANCE OF CONSTRUCTION MATERIALS
CONTAMINATING THE FILTERRA SYSTEM. CARE SHALL BE TAKEN
DURING CONSTRUCTION NOT TO DAMAGE THE PROTECTIVE
THROAT AND TOP PLATES.
CONSTRUCTION NOTES
CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING CURB AND
GUTTER AS NECESSARY TO INSTALL FILTERRA UNIT AND
TRANSITIONAL CURB.
CONTRACTOR SHALL CAST IN PLACE NEW CEMENT CONCRETE
DEPRESSED GUTTER AND TRANSITIONAL CURB AS NEEDED.
DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE FIELD
VERIFIED. NEW CURB AND GUTTER SHALL TRANSITION SMOOTHLY
TO MATCH EXISTING GRADES AND FEATURES INCLUDING CURB,
GUTTER, AND PAVEMENT.
ORIENTATION OF FILTERRA UNIT SHOWN IS FOR LEFT SIDE OUTLET.
RIGHT SIDE OUTLET VERSION IS AN EXACT MIRROR IMAGE. LEFT
AND RIGHT SIDE ORIENTATION IS BASED ON LOOKING TOWARDS THE
UNIT FROM THE STREET CENTERLINE.
OUTLET PIPE LOCATION VARIES, SEE DRAINAGE PLAN SHEETS.
CONTRACTOR TO BEND FILTERRA UNIT DOWEL BAR AS NEEDED TO
INSTALL CAST IN PLACE DEPRESSED GUTTER AND THROAT
OPENING.
INTERIOR FEATURES OF FILTERRA UNIT ARE TYPICALLY PROVIDED
BY MANUFACTURER AND ARE SHOWN FOR REFERENCE ONLY.
STATION/OFFSET LOCATIONS AND NORTHING/EASTING
COORDINATES FOR FILTERRA UNITS ARE FOR MIDPOINT OF THROAT
OPENING AT OUTER FACE OF PRECAST WALL. UNIT ALIGNMENT IS
ORIENTED PARALLEL TO CURB LINE. LOCATIONS ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
THROAT CLEARANCE SHALL BE 4" MIN AND 6" MAX.
SEE FILTERRA UNITS SCHEDULE FOR THROAT OPENING ELEVATION.
TABLE ELEVATION IS APPROXIMATE, CONTRACTOR TO FIELD VERIFY.
1
2
3
4
5
6
7
8
9
3 6
3 6
3
FILTERRA UNITS SCHEDULE
ID #STATION/
OFFSET
OUTLET
SIDE
THROAT OPENING
ELEVATION
PLANT
SELECTION
FIL-1 RAINIER
206+13.12, 51.98' RT L 22.98'
CHOKEBERRY,
BLACK (ARONIA
MELANOCARPA)
FIL-2 RAINIER
202+30.86, 330.22' RT L 26.01'
CHOKEBERRY,
BLACK (ARONIA
MELANOCARPA)
37
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE DETAILS
BT120-CDD501
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
AS NOTED
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
9:
0
2
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
D
5
0
1
-
5
0
3
.
D
W
G
S1-BT120-CDD501-503 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
9
2.
5
'
M
A
X
.
(B
O
T
H
S
I
D
E
S
)
4:1
S
L
O
P
E
VARIES
4:1 SL
O
P
E
VARIES
BOTTOM OF SWALE
WIDTH VARIES
(2' MINIMUM)
3" DEPTH OF
COMPOST
LIGHTLY COMPACTED TOPSOILIMPERMEABLE
LINER
18
"
M
I
N
.
FINISHED
GRADE
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE DETAILS
BT120-CDD502
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
AS NOTED
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
9:
4
5
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
D
5
0
1
-
5
0
3
.
D
W
G
S1-BT120-CDD501-503 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
SWALE SECTION
SCALE: NTS
3
-
1.ALL SWALES ARE DESIGNED AS WET BIOFILTRATION SWALE.
2.LONGITUDINAL SLOPE:
WESTERN SWALE - 0.5%
CENTRAL SWALE - 0.5%
EASTERN SWALE
WEST END - 0.5%
EAST END - 1.0% (MIN.)
3.BED WIDTH:
WESTERN SWALE - VARIABLE (2 FEET MIN.)
CENTRAL SWALE - VARIABLE (2 FEET MIN.)
EASTERN SWALE
WEST END - VARIABLE (2 FEET MIN.)
EAST END - 2 FEET
4.LENGTH:
WESTERN SWALE - 106 FEET
CENTRAL SWALE - 266 FEET
EASTERN SWALE
WEST END - 196 FEET
EAST END - 100 FEET
5.SEE LPP SHEETS FOR LANDSCAPING PLANTING PLANS.
SWALE INFORMATION:
FLOW CONTROL
RISER
LENGTH,
SEE SCHEDULE
C/L
IE IN
IE OUT
RIM/FG
PRE-FILTER
CARTRIDGE
C/L
C/L
INLET PIPE SEE
NOTES
OUTLET PIPE
SEE NOTES
B/C
-
A
-
WETLAND MEDIA
BED
DRAIN DOWN
FILTER
PERIMETER
VOID AREA
PRE-FILTER
CARTRIDGE
WIDTH,
SEE SCHEDULE
C/L
RIM/FG
HATCH
0.
7
1
'
HATCH
HE
I
G
H
T
,
S
E
E
S
C
H
E
D
U
L
E
OUTLET PIPE
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
R. PARGAS 01/31/2023 J. ALTCHECH 01/31/2023 01/31/2023
CIVIL
DRAINAGE DETAILS
BT120-CDD503
BT120
###----
L. JACOBS
H. ONG
R. PARISH
L. THOMSEN
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
------------------------
RTA/LR 0206-19
AS NOTED
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
02
/
0
6
/
2
4
|
9:
1
3
A
M
|
JO
H
N
Y
C:
\
P
W
W
O
R
K
I
N
G
\
J
A
C
O
B
S
_
B
&
I
\
J
E
G
_
E
X
-
Y
U
E
N
J
\
D
0
4
3
6
1
2
0
\
S
1
-
B
T
1
2
0
-
C
D
D
5
0
1
-
5
0
3
.
D
W
G
S1-BT120-CDD501-503 FACILITY ID:
PACKAGE #AHJ:
NOT FOR CONSTRUCTION
Xrefs:
xBRT-CUD05-TB22x34
GB-SEAL-JY35420
OSBORN
CONSULTING
INCORPORATED
MODULAR WETLAND SECTION
SCALE: 1"=2'
A
-
1.MODULAR WETLAND SHALL BE MANUFACTURED BY CONTECH ENGINEERED SOLUTIONS, LLC.
2.MODULAR WETLAND WITHOUT PLANTS SHALL HAVE SOLID CONCRETE TOP SLAB AND ACCESS HATCHES MEETING HS20-44 LOADING.
3.INTERNAL VAULT DIMENSIONS.
MODULAR WETLAND GENERAL NOTES:
MODULAR WETLAND PLAN
SCALE: 1"=2'
4
-
MODULAR WETLAND SECTION
SOLID LID
SCALE: 1"=2'
B
-
MODULAR WETLAND UNITS SCHEDULE
ID #ALIGNMENT
STATION/ OFFSET
LENGTH (FT)
(SEE NOTE 3)
WIDTH (FT)
(SEE NOTE 3)
HEIGHT (FT)INLET PIPE
SIZE (IN)
INLET PIPE
IE
OUTLET
SIDE
OUTLET PIPE
SIZE (IN)
OUTLET
PIPE IE
PLANT
SELECTION
MWS-66 BT120-C-CENISLS
610+94.1, 21.6' RT 4.0 4.0 4.17 12 21.42 SE 12 21.42
NO PLANTS. USE
SOLID COVER.
SEE NOTE 2.
MWS-67 BT120-C-CENISLS
610+94.1, 21.6' RT 8.0 8.0 3.54 12 21.55 SW 12 20.96
NO PLANTS. USE
SOLID COVER.
SEE NOTE 2.
MWS-68 BT120-C-CENISLS
610+90.6, 48.0' RT 12.0 8.0 3.57 12 21.31 NE 12 20.93
NO PLANTS. USE
SOLID COVER.
SEE NOTE 2.
MWS-69 BT120-C-CENISLS
616+72.7, 136.5' RT 8.0 4.0 7.39 12 21.87 NE 12 20.01
NO PLANTS. USE
SOLID COVER.
SEE NOTE 2.
MWS-70 BT120-C-CENISLS
616+94.7, 107.3' RT 8.0 6.0 7.16 12 21.66 SW 12 19.94
NO PLANTS. USE
SOLID COVER.
SEE NOTE 2.
AE 0054-17 | 60% Storm Drainage Report
I-405 corridor
Site and Downstream Analysis Photos
(Performed by WSP)
AE 0054-17 | 60% Storm Drainage Report
AE 0054-17 | 60% Storm Drainage Report
AE 0054-17 | 60% Storm Drainage Report
AE 0054-17 | 60% Storm Drainage Report
I-405 corridor
Pilot Infiltration Test Results Report
I-405 corridor
South Renton Transit Center
Pilot Infiltration Test Results
Report
May 2022
Stride program: I-405 corridor
Page i | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Consultant Quality Control Form
Version Title Date
Originator/
Drafted by Reviewed by
Approved
by
Notes, as
required
0 South Renton
Transit Center Pilot
Infiltration Test
Results – Draft
March 16,
2022
Margaret
Pryor (WSP
USA)
Elizabeth
Lundquist
(WSP)
Rob Gorman For ST review
1 South Renton
Transit Center Pilot
Infiltration Test
Results
May 2,
2022
Margaret
Pryor (WSP
USA)
Elizabeth
Lundquist
(WSP)
Rob Gorman Addressed ST
comments.
Issued as final
Stride program: I-405 corridor
Page ii | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Summary
Purpose
This report documents procedures and presents the findings of the pilot infiltration test (PIT)
performed in the City of Renton at the South Renton Transit Center (SRTC) for the Sound
Transit I-405 Bus Rapid Transit (BRT) project.
The PIT was performed in general accordance with the Western Washington Storm Water
Manual (Department of Ecology 2019) for development of surface water drainage design
recommendations at the site.
The subsurface conditions generally consisted of fill overlying fine-grained alluvial deposits.
Groundwater seeps were observed at various depths within the fill.
The PIT results indicated no measurable infiltration within the test duration. The PIT results and
the presence of seeps and pockets of groundwater within the voids in the upper fill material
indicate variability in permeability within the fill. Native soils encountered at the site typically
exhibit very low permeability as evidenced by the perched groundwater in the upper fill soils and
the PIT results. Based on the subsurface conditions and results of the infiltration tests, the site
area is not conducive for use in infiltration best management practices design.
This report has been prepared for the exclusive use of Sound Transit for the design of the
SRTC site as part of the Sound Transit I-405 BRT project. The findings, conclusions, and
recommendations presented in this report are applicable only to the specific project study
elements and locations described and are not intended to apply to any other design elements or
locations. All subsequent users shall accept any and all liability resulting from any use or reuse
of the data, opinions, and recommendations without the prior written consent of WSP.
Stride program: I-405 corridor
Page iii | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Table of Contents
1 INTRODUCTION ......................................................................................................................... 1
1.1 Background ........................................................................................................... 1
1.2 Purpose and Scope of Work ................................................................................. 1
2 PILOT INFILTRATION TEST ...................................................................................................... 3
2.1 Existing Geotechnical Data ................................................................................... 3
2.2 Field Investigation ................................................................................................. 3
2.3 Laboratory Testing ................................................................................................ 5
3 CONCLUSIONS .......................................................................................................................... 6
4 REFERENCES ............................................................................................................................ 7
Figures
Figure 1-1 I-405 Bus Rapid Transit Project ............................................................................ 2
Figure 2-1 Approximate Test Pit Locations ............................................................................. 4
Tables
Table 2-1 Laboratory Testing ................................................................................................ 5
Appendices
Appendix A Test Pit Log
Appendix B Laboratory Test Results
Stride program: I-405 corridor
Page iv | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Acronyms and Abbreviations
bgs below ground surface
BMP best management practices
BRT bus rapid transit
DOE Washington State Department of Ecology
GPR ground penetrating radar
PE preliminary engineering
PIT Pilot Infiltration Test
SRTC South Renton Transit Center
Stride program: I-405 corridor
Page 1 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
1 INTRODUCTION
1.1 Background
WSP USA (WSP) was retained by Sound Transit to provide preliminary engineering design
services for the I-405 Bus Rapid Transit (BRT) project located in Washington state. The I-405
BRT project would provide BRT service along the I-405 corridor spanning 37 miles between the
cities of Lynwood and Burien. The proposed project alignment and stations are presented in
Figure 1-1.
This project stage involves preliminary engineering (PE) design of BRT elements, including BRT
stations and park-and-ride facilities. This report covers the assessment of the infiltration
capacity of the subsurface material at the South Renton Transit Center (SRTC) site.
1.2 Purpose and Scope of Work
The purpose of this report is to document procedures and present the findings of the pilot
infiltration test (PIT) performed in the City of Renton at the SRTC for the Sound Transit I-405
BRT project.
The WSP scope of work included the following:
Field investigation: Perform a PIT for potential best management practices (BMP) facilities
Laboratory testing: Perform geotechnical laboratory tests on selected soil samples (Section
2.3)
Preparation of this report
The information provided in this report is based on field testing and observations of the PIT test
and laboratory testing of soil samples from the PIT, existing geotechnical data, and published
literature.
Stride program: I-405 corridor
Page 2 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Figure 1-1 I-405 Bus Rapid Transit Project
Stride program: I-405 corridor
Page 3 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
2 PILOT INFILTRATION TEST
The PIT was conducted in general accordance with the City of Renton guidelines (City of
Renton 2017) and the Washington State Department of Ecology (DOE) (DOE 2019).
2.1 Existing Geotechnical Data
The geotechnical explorations at the SRTC completed by HWA Geosciences of Bothell,
Washington, during the project’s conceptual engineering phase and WSP during this phase are
summarized in the previously submitted South Renton Transit Center Geotechnical
Recommendations Report (WSP 2021). No other historic information was found nearby.
2.2 Field Investigation
This section describes field activities conducted for the PIT. This work was performed by, and
under the supervision of, WSP’s field geologist. Related construction activities were provided by
Reano Construction and Logging (Reano) based in Black Diamond, Washington. Prior to
conducting the field investigation, WSP staff marked the site for utility clearance by utility
owners as required by the state of Washington.
The following is a summary of the field work and infiltration testing performed at the site from
March 2 through March 4, 2022.
March 2, 2022
WSP arrived on site at approximately 1:00 p.m. to perform ground penetrating radar (GPR)
utility clearance of the proposed excavation site and prepare a PIT excavation. GPR results
indicated an unmarked conduit that runs through the northern half of the marked locate area.
The initial PIT excavation was sited in the southern half of the locate area. No utility owners had
marked the presence of services within the marked locate area.
A 7-foot by 15-foot sawcut area was completed in the overlying asphalt after performing the
GPR survey. Test pit excavation was started at approximately 3:30 p.m. using a Komatsu
PC138 track hoe with a toothed bucket. The test pit (TP-1) had an approximate footprint of 8
feet by 5 feet and was excavated to a depth of 10 feet below existing ground surface (bgs). The
test pit location is shown on Figure 2-1. Excavation spoils were placed in a dump truck and soil
samples were collected from the test pit walls and from the excavator bucket for each distinct
soil unit observed. A log of Test Pit -01 is included in Appendix A.
The upper portion of the test pit consisted of approximately 2.5 inches of asphalt overlying
approximately 3.5 inches of base course. Subsurface conditions observed in the test pit
consisted of 5 feet of fill below the base course overlying native soils to the termination depth of
10 feet. The fill material generally comprised silty sand with varying amounts of gravel and
debris that included concrete, bricks, metal, and plastic and was observed to be dense to very
dense with a faint creosote odor. Native soils consisted of very soft to soft, dark brown elastic
silt overlying a very soft to soft, medium plasticity blue-gray clay.
Stride program: I-405 corridor
Page 4 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
Figure 2-1 Approximate Test Pit Locations
Water was observed seeping into the test pit at approximately 5 feet bgs originating from a
localized area in the northwest corner of the test pit. The flow rate of the seep was
approximated 1 gallon per minute.
The excavation was backfilled with spoils, and the upper 1 foot of the test pit was backfilled with
imported gravel borrow and compacted with a walk-behind vibratory plate compactor.
March 3, 2022
WSP and Reano arrived on site at approximately 8:00 a.m. to perform a second excavation (TP-
02), which was performed approximately 15 feet west of the first location with an approximate
footprint of 7 feet by 5 feet. The soil types and the depths encountered were similar to those
observed in TP-01. A localized seep was observed at approximately 5.5 feet in the northeast
corner of the excavation. The flowrate was estimated at 10 gallons per minute and rapidly filled
the excavation and seemed to stabilize at about 5.5 feet bgs. Due to the volume of water, the
excavation was terminated at a depth of 7 feet bgs and backfilled with spoils. The upper 1-foot
of the excavated area was backfilled with imported gravel borrow and compacted with a walk-
behind vibratory plate compactor.
At approximately 12:00 p.m., the field geologist conferred with the project engineer to assess
the path forward for the PIT. It was determined that a small-scale PIT was to be performed in
the upper portion of the fill. As such, a third excavation (PIT-01) was sited approximately 2 feet
south and centered between test pits TP-01 and TP-02. The PIT footprint measured
NTS
Stride program: I-405 corridor
Page 5 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
approximately 6 feet by 6 feet and was excavated to a depth of 1.75 feet bgs using a smooth-
edged bucket. The soil is classified as low plasticity sandy silt, similar to the two initial test pits;
however, no significant pieces of concrete debris were observed. A marginal seep was noted
along the south edge of the excavation at 0.3 feet bgs. The seep originated from the crushed
rock base course underlying the asphalt and the flow rate was too low to estimate.
A City of Renton hydrant was used as a water source to conduct the PIT. Water was conveyed
using a garden hose flowing into a 4-inch acrylonitrile butadiene styrene plastic pipe inserted
into a plastic bucket to disperse flow and prevent excessive scour or entrainment of fines. A
stadia rod with 0.01-inch demarcations along with HOBO® pressure transducer data loggers
were used to observe and record the height of water. The flow rate of the water to the pit was
monitored with an Assured Automation DM-P series ½-inch flow meter.
At 1:00 p.m., the PIT was filled to a water level height of 1.1 feet. The water was then shut off to
observe an initial infiltration rate. After approximately 90 minutes, the water level had gained
approximately 0.01 feet. WSP departed the site and the PIT was allowed to remain uncovered
overnight.
March 4, 2022
WSP arrived on site at approximately 8:00 a.m. to observe any changes in water level within the
PIT. Upon arrival, the water level was measured at 1.15 feet, indicating an increase in water
level from the day before of about 0.05 feet over an approximate 17-hour duration. Records
from the data logger indicate the water level was stable over the last six hours of the test period.
It was also noted the seep at the southern edge of the PIT had ceased to flow. Based on these
observations, in addition to the observation that no significant rainfall occurred in the area
overnight, it was concluded there was no measurable water infiltrated within the PIT during the
testing period. The test was considered complete and Reano placed cold patch asphalt on the
surface of all three test pits.
2.3 Laboratory Testing
A laboratory test program is underway to confirm field classifications and obtain additional
information on selected physical and mechanical properties of the materials encountered in the
boreholes. Geotechnical laboratory testing was performed by HWA. Table 2-1 presents a
summary of the laboratory tests that are being performed. The laboratory test results will be
provided in the final version of this memo once the testing is complete.
Table 2-1 Laboratory Testing
Laboratory Test Standard Quantity
Moisture Content ASTM D2216 2
Particle Size Analysis ASTM D6913/D7928 2
Atterberg Limits ASTM D4318 2
Stride program: I-405 corridor
Page 6 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
3 CONCLUSIONS
The PIT results indicated no measurable infiltration within the test duration. The PIT results and
the presence of seeps and pockets of perched zones indicate variability in permeability within
the upper fill materials. Native soils encountered are generally fine-grained and exhibit very low
permeability as evidenced by no to very low infiltration rates of the PIT as well as perched zones
within the upper fill soil. Based on the subsurface conditions and results of the infiltration tests,
the site area is not conducive for use in infiltration BMP design. Laboratory testing on the fill and
native soils is currently underway, and the results will be used to update and complete these
conclusions and recommendations as needed.
Stride program: I-405 corridor
Page 7 | AE 0054-17 | South Renton Transit Center Pilot Infiltration Test Results Report May 2022
4 REFERENCES
Maps
Schuster, J.E. 2015. Geologic map of the Tacoma 1:100,000 – scale quadrangle.
Regulatory Guidance
City of Renton. 2017. City of Renton Surface Water Design Manual.
Washington State Department of Ecology (DOE). 2019. Stormwater Management Manual for
Western Washington. 19-10-021.
AE 0054-17 | South Renton Transit Center Pilot Infiltration Test
Results Report
I-405 corridor
Test Pit Log
DE
P
T
H
(
f
t
)
1
2
3
4
5
6
7
8
9
10
EQ
U
I
P
M
E
N
T
Ko
m
a
t
s
u
P
C
1
3
8
ME
T
H
O
D
Ex
c
a
v
a
t
i
o
n
MATERIAL PROFILE
DESCRIPTION
ASPHALT
CRUSHED ROCK
(SM) SILTY SAND, fine to coarse, some non-plastic fines,
little fine sub-rounded to sub-angular gravel, dark grayish
brown, dense to very dense, moist, pieces of concrete, brick,
metal and plastic debris, faint creosote odor. [FILL]
(SM) SILTY SAND WITH GRAVEL, fine to coarse, some sub-
rounded to sub-angular gravel, little non-plastic fines, up to
5% by volume cobbles, pale grayish brown, dense to very
dense, moist, pieces of concrete, brick, metal and plastic
debris. [FILL]
(MH) ORGANIC SILT, mostly high plasticity fines,
approximately 10% organic matter by volume, dark brown
to black, very soft to soft, moist, with lenses of FAT CLAY
(CH), dark brown to black, pieces of preserved wood and
bark. [ALLUVIUM]
(CL) LEAN CLAY, low to medium plasticity fines, pale blue
gray, very soft to soft, moist, trace organic debris observed.
[ALLUVIUM]
End of hole at 10.00 ft.
US
C
S
ST
R
A
T
A
PL
O
T
ELEV.
---------
DEPTH
(ft)
0.0
0.2
0.5
2.5
5.5
8.5
SAMPLES
NU
M
B
E
R
S-
1
S-
2
S-
3
S-
4
TY
P
E
GS
GS
GS
GS
WATER CONTENT SHEAR
STRENGTH
AD
D
I
T
I
O
N
A
L
LA
B
T
E
S
T
I
N
G
AD
D
I
T
I
O
N
A
L
OB
S
E
R
V
A
T
I
O
N
S
5.00 - 5.50 ft: Groundwater seep flowing from concrete
void, estimated at 1 gal/min
RECORD OF TEST PIT: TP-1
Sheet 1 of 1
CLIENT:
Sound Transit
DATE:March 02, 2022
PROJECT: WSP ST I405 Bus Rapid Transit WA
PROJECT NO: 21501163 CONTRACTOR: Reano Construction
LOCATION:Renton, WA
GROUND ELEV: Approx. 27 ft.
COORD SYS:
HORZ DATUM:
HOLE LOC: 200 S Grady, Renton, WA
North side wall View looking west
Golder - 3 Imperial US / ASTM D2487 Auto (most common ASTM) / 2022-03-11
REV:
DIMENSIONS: 7.0 ft length x 5.0 ft width
LOGGED: D. Bida
CHECKED: M. Pryor
DATE: Mar 02, 2022
DATE: Mar 08, 2022Draft
Plastic & Liquid Limits
(%)
Water Content (%)
NP Nonplastic
0 25 50 75 10
0
12
5
15
0
Nat Vane
Rem Vane
Pocket Pen
Q
U
Torvane0123 4 5
AE 0054-17 | South Renton Transit Center Pilot Infiltration Test
Results Report
I-405 corridor
Laboratory Test Results
21312 30th Dr. SE, STE. 110, Bothell, WA 98021 | 425.774.0106 | hwageo.com
March 23, 2022
HWA Project No. 2017-135-21 Task 300
WSP USA
999 Third Ave, Suite 3200
Seattle, WA 98104
Attn: Mr. Robert Gorman, P.E.
Subject: BATCH 5 SUBMISSION
I-405 BRT Project – Phase 3 Laboratory Testing
Client Project No.: 160363P3.003 Task 3.04.2
Dear Mr. Gorman;
In accordance with your request, HWA GeoSciences Inc. (HWA) performed laboratory testing
for the above referenced project. Herein we present the results of our laboratory analyses, which
are summarized on the attached Figures. The laboratory testing program was performed in
general accordance with your instructions and appropriate ASTM Standards as outlined below.
SAMPLE DESCRIPTION: The subject samples were delivered to our laboratory on March 11 by
Golder personnel. The samples were delivered in sealed Ziploc bags and designated with test pit
IDs and sample depths. The soil samples were classified using visual-manual methods. The
descriptions may be found on the attached Summary of Material Properties, Figure 1.
PARTICLE SIZE ANALYSIS OF SOILS: The particle size distribution of each specified sample was
determined in general accordance with ASTM D6913 and ASTM D7928. The results are plotted
on the attached Particle Size Analysis of Soils Report, Figure 2, which also indicate the moisture
content of the soil samples at the time of testing.
LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF SOILS (ATTERBERG LIMITS): The
plasticity index of the specified samples was tested using method ASTM D4318, multi-point
method. The results are reported on the attached Liquid Limit, Plastic Limit, and Plasticity Index
of Soils Report, Figure 3.
◆
PIT-1,S-1 1.5 1.8 23.8 36 25 11 6.7 41.5 51.8 ML Dark grayish-brown, sandy SILT
TP-1,S-3 6.5 7.5 78.6 81 45 36 8.3 91.7 MH Black, elastic SILT
(f
e
e
t
)
TO
P
D
E
P
T
H
SAMPLE DESCRIPTION
Notes:
AS
T
M
S
O
I
L
MO
I
S
T
U
R
E
CO
N
T
E
N
T
(
%
)
OR
G
A
N
I
C
%
F
I
N
E
S
SP
E
C
I
F
I
C
G
R
A
V
I
T
Y
EX
P
L
O
R
A
T
I
O
N
DE
S
I
G
N
A
T
I
O
N
1. This table summarizes information presented elsewhere in the report and should be used in conjunction with the report test, other graphs and tables, and the exploration logs.
2. The soil classifications in this table are based on ASTM D2487 and D2488 as applicable.
MATERIAL PROPERTIES
1
PAGE: 1 of 1
SUMMARY OF
LIMITS (%)
ATTERBERG
BO
T
T
O
M
D
E
P
T
H
CO
N
T
E
N
T
(
%
)
%
S
A
N
D
%
G
R
A
V
E
L
PIPLLL CL
A
S
S
I
F
I
C
A
T
I
O
N
(f
e
e
t
)
2017-135 T3PROJECT NO.:
INDEX MATSUM 2 2017-135 PH 3.GPJ 3/23/22
FIGURE:
Laboratory Testing for WSP
I-405 BRT Project - Phase 3
Client Project No.: 160363P3.003 Task 3.04.2
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110
GRAIN SIZE IN MILLIMETERS
50
SAMPLE
S-1
S-3
1.5 - 1.8
6.5 - 7.5
36
81
#10
41.5
8.3
30
CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name
U.S. STANDARD SIEVE SIZES
SAND
2
11
36
Coarse
#60#40
51.8
91.7
#20
Fine Coarse
SYMBOL
Gravel
%
3"1-1/2"
PE
R
C
E
N
T
F
I
N
E
R
B
Y
W
E
I
G
H
T
#4 #200
6.7
Sand
%
(ML) Dark grayish-brown, sandy SILT
(MH) Black, elastic SILT
Fines
%
0.00050.005
CLAY
PIT-1
TP-1
25
45
SILT
3/4"
GRAVEL
0.05
5/8"
70
#100
0.5
24
79
50
Medium Fine
3/8"
5
PI
90
10
% MC LL PLDEPTH ( ft.)
PARTICLE-SIZE ANALYSIS
OF SOILS ASTM METHODS
D6913/D7928
2017-135 T3PROJECT NO.:
HWAGRSZ HYDRO 2017-135 PH 3.GPJ 3/23/22
FIGURE:
Laboratory Testing for WSP
I-405 BRT Project - Phase 3
Client Project No.: 160363P3.003 Task 3.04.2
0
10
20
30
40
50
60
0 20 40 60 80 100
% MC LL
CL-ML MH
SAMPLE
PL
A
S
T
I
C
I
T
Y
I
N
D
E
X
(
P
I
)
SYMBOL PL PI
S-1
S-3
25
45
24
79
LIQUID LIMIT, PLASTIC LIMIT AND
PLASTICITY INDEX OF SOILS
METHOD ASTM D4318
51.8
91.7
CL
(ML) Dark grayish-brown, sandy SILT
(MH) Black, elastic SILT
CLASSIFICATION % Fines
LIQUID LIMIT (LL)
PIT-1
TP-1
ML
36
81
DEPTH (ft)
11
36
CH
3
1.5 - 1.8
6.5 - 7.5
2017-135 T3PROJECT NO.:
HWAATTB 2017-135 PH 3.GPJ 3/23/22
FIGURE:
Laboratory Testing for WSP
I-405 BRT Project - Phase 3
Client Project No.: 160363P3.003 Task 3.04.2
soundtransit.org
brt@soundtransit.org
206-398-5470
AE 0054-17 | 60% Storm Drainage Report
APPENDIX F
Remediation Project, Storm Drainage Report
I-405 corridor
South Renton Transit
Center Remediation Project,
Storm Drainage Report
July 2022
Stride program: I-405 corridor
Page i | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
Consultant Quality Control Form
Version Title Date
Originator/
Drafted by Reviewed by
Approved
by
Notes, as
required
0 South Renton
Transit Center
Remediation
Project, Storm
Drainage Report
– Draft
05/18/2022
M. Giseburt J. Erickson Rob
Gorman
Initial issue.
1 South Renton
Transit Center
Remediation
Project, Storm
Drainage Report
07/08/2022 M. Giseburt J. Erickson Rob
Gorman
Revised to
address ST
comments
Stride program: I-405 corridor
Page ii | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
Table of Contents
1 INTRODUCTION ......................................................................................................................... 1
2 CORE REQUIREMENT #5: CONSTRUCTION STORMWATER POLLUTION
PREVENTION .............................................................................................................................. 3
3 SPECIAL REQUIREMENT #6: AQUIFER PROTECTION AREA ............................................. 4
4 REFERENCES ............................................................................................................................ 6
Figures
Figure 1-1 Stride Project ......................................................................................................... 2
Figure 1-2 Drainage Basins, Subbasins, and Site Characteristics ......................................... 3
Appendices
Appendix A South Renton Transit Center Remediation Plan
Appendix B Erosion and Sediment Control Plan
Appendix C City of Renton Wellhead Protection Area Map
Stride program: I-405 corridor
Page iii | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
Acronyms and Abbreviations
BMP best management practice
COR City of Renton
CSWPP Construction Stormwater Pollution Prevention Plan
ESC Erosion and Sediment Control
project Sound Transit STRIDE Project
RMC Renton Municipal Code
ROW right-of-way
SRTC South Renton Transit Center
ST Sound Transit
SWDM Surface Water Design Manual
SWPPS Stormwater Pollution Prevention Spill Plan
TDA Threshold Discharge Area
Stride program: I-405 corridor
Page 1 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
1 INTRODUCTION
Sound Transit (ST) is proposing a new transit center in South Renton as part of the overall
Stride Program for the I-405 corridor. The overall Stride Program project area and the proposed
station locations, including the South Renton Transit Center, are shown on Figure 1-1.
The ultimate plan for the South Renton Transit Center (SRTC) includes redeveloping an existing
developed site located at the northeast quadrant of the intersection of S Grady Way and Rainier
Ave S with a new parking garage and transit center. The project would also include
improvements to adjacent roads. WSP previously prepared a separate Preliminary Storm
Drainage Report that documents (at 30% design level) drainage requirements and
considerations for the future SRTC and associated roadway improvements (WSP, May 2022).
To facilitate site preparation, ST completed some soils and groundwater testing and found
elevated levels of some contaminants that require remediation. ST contracted separately with
Shannon and Wilson, Inc. to develop a remediation design and construction documents.
The remediation work includes over 5,000 square feet of pavement removal to excavate and
dispose of and/or treat some of the contaminants. A copy of the remediation design plans is
included in Appendix A.
In discussions between ST and the City of Renton (City), it was determined that a limited
stormwater report would be required to support the remediation work. More specifically, the City
requested a brief memorandum that addresses how the remediation work will meet the City’s
storm drainage Core Requirement #5 and Special Requirement #6 detailed in the 2022 Surface
Water Design Manual (SWDM) (Renton 2022). Core Requirement #5 is associated with
Construction Stormwater Pollution Prevention. Special Requirement #6 is associated with work
in Aquifer Protection Areas.
The previous Preliminary Storm Drainage Report (WSP, May 2022) document, which is on file
with the City, includes a site description, a downstream analysis, and how the core and special
requirements are anticipated to be addressed for the ultimate site improvement for the various
project Threshold Discharge Areas. Figure 1-2, excerpted from the May 2022 WSP report,
shows the site. The remediation work is planned within TDA SRTC 1.2.
The remainder of this memorandum discusses these two requirements and how they are being
addressed.
Stride program: I-405 corridor
Page 2 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
Figure 1-1 Stride Project
Stride program: I-405 corridor
Page 3 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
Figure 1-2 Drainage Basins, Subbasins, and Site Characteristics
2 CORE REQUIREMENT #5: CONSTRUCTION STORMWATER POLLUTION PREVENTION
To prevent sediment transport and pollutant discharges as well as other impacts related to land-
disturbing and construction activities, Erosion and Sediment Control (ESC) measures and
Stormwater Pollution Prevention and Spill Control (SWPPS) measures that are appropriate to
the project site must be applied through a comprehensive Construction Stormwater Pollution
Prevention Plan (CSWPP) as described in the City’s Surface Water Design Manual.
Appendix B includes a preliminary ESC plan. It is noted that it is conceptual. As a part of the
construction contract, ST will require the successful bidder (i.e., Contractor) to prepare a final
ESC plan based on their strategy for completing the remediation work. This final ESC plan will
need to be approved by both ST and the City prior to authorizing the work to begin.
The ESC features proposed on-site include a stockpile and staging area designated by the
Contractor and catch basin inserts for all catch basins in proximity of the project work area.
These features are to reduce transport of sediment from the project area to downstream
Stride program: I-405 corridor
Page 4 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
drainage facilities and properties. Any pollutants potentially present from excavation will be
handled and controlled following SWPPS standards.
To comply with CSWPP performance and compliance, the Contractor will identify a CSWPP
Supervisor that needs to be approved by the City (per Section 1.2.5.2 of the City’s SWDM). The
Supervisor will review ESC and SWPPS measures and may monitor discharges for sediment
and pollutants. Additional ESC or SWPPS measures may be required based on monitoring
results. If applicable, any wet season construction (October 1 to April 30) will require additional
ESC measures and a separate plan will need to be submitted before commencing work at the
site. The site area will be stabilized and ESC and SWPPS measures removed prior to receiving
final construction approval.
3 SPECIAL REQUIREMENT #6: AQUIFER PROTECTION AREA
Special Requirement #6 states that a project proposed in an Aquifer Protection Area (APA)
requires certain considerations based on APA Zone designation (Zone 1 or Zone 2). The
requirement either prohibits certain drainage facilities (Zone 1) or requires lining open facilities
or conveyance systems (Zone 2). The SRTC project area is within Zone 2 of the Downtown
Wellfield. Therefore, the SWDM special requirements for Zone 2 apply to the project. A map
with the Wellhead Protection Area Zones layer of COR Maps displayed (extracted from
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=cormaps) is included in Appendix C.
The SWDM requirement for Zone 2 is as follows:
The following may require a liner in accordance with the design criteria in Section 6.2.4:
a. Facilities that allow runoff to have direct contact with the soil, such as flow control
and water quality treatment ponds, stormwater wetlands, filter strips, and infiltration
facilities.
b. Open channel conveyance systems that are not concrete lined, such as ditches or
swales.
The project is only providing soil remediation and does not propose any of the above-listed
features that would require a liner, and thus the requirement does not apply.
In addition to the Special Requirement #6, the Renton Municipal Code was reviewed for
applicable requirements. The project area is within a Wellhead Protection Area as defined by
RMC 4-3-050, Critical Areas Regulations. The Critical Areas Regulation defines any area within
a wellhead capture zone be subject to critical areas regulations and requires that considerations
be made to address hazardous materials, pesticides, and groundwater impacts within the
Wellhead Protection Area. It further references RMC 4-9-015 Aquifer Protection Area Permits,
that establishes permit procedures, operating permits, closure permits, and uniform standards
for release reporting, emergency response, closure, and abandonments.
The remediation plan for the project does not introduce any hazardous materials or pesticides
and would not degrade groundwater quantity or quality. Rather, the plan removes diesel
(hazardous) and lube oil (non-hazardous) from four separate areas of the site. In one of these
four areas, a remediation agent (Regenesis PersulfOxtm) will be mixed with backfill material to
stimulate the degradation of latent contaminants. In a fifth area, the plan calls for injecting a
Stride program: I-405 corridor
Page 5 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
biostimulation material (Regenesis Petrofixtm). Together, the excavation and soil treatment will
improve groundwater quality.
It is also noted that as part of the SRTC Preliminary Storm Drainage Report (WSP May 2022),
an infiltration investigation for the project site was completed, including two pilot infiltration tests,
which determined the site soils have very low infiltration rates that would reduce the risk for
groundwater contamination.
To satisfy Special Requirement #6, ST plans to make compliance with RMC 4-03-050 and 4-9-
015 a requirement for the construction Contractor. In addition, the Contractor will need to
determine, with input from the City, whether a Closure Permit (per RMC 4-9-15) is required.
Stride program: I-405 corridor
Page 6 | AE 0054-17 | South Renton Transit Center Remediation Project, Storm Drainage Report July 2022
4 REFERENCES
City of Renton Public Works Department Surface Water Utility (City of Renton). 2022. 2022 City
of Renton Surface Water Design Manual. Effective June 22, 2022.
WSP USA, Inc. 2022. Preliminary Storm Drainage Report – South Renton Transit Center.
Prepared for Sound Transit. May.
AE 0054-17 | South Renton Transit Center Remediation Project,
Storm Drainage Report
I-405 corridor
South Renton Transit Center Remediation Plan
ISSUED FOR BID
SOUTH RENTON TRANSIT CENTER REMEDIATION PROJECT
CONTRACT NO. RTA/CN 0188-21
VOLUME 3 OF 4
CONTRACT DRAWINGS
MARCH, 2022
AE 0054-17 | South Renton Transit Center Remediation Project,
Storm Drainage Report
I-405 corridor
Erosion and Sediment Control Plan
TESC NOTES AND CONSTRUCTION SEQUENCE
SOUTH RENTON TC
TESC-N
1 ----
AS NOTED----
----
----
----No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
07
/
0
6
/
2
2
|
3:
3
3
P
M
|
US
C
U
7
0
5
5
6
0
C:
\
B
M
S
\
W
S
P
-
U
S
-
P
W
-
0
2
\
D
0
3
1
3
6
8
9
\
T
E
S
C
_
R
E
M
E
D
_
N
O
T
E
S
.
D
W
G
TESC_REMED_NOTES FACILITY ID:
PHASE 3 - 30% SUBMITTAL I-405 BRT
AE 0054-17
04/04/2022PR
E
L
I
M
I
N
A
R
Y
405
R. GORMAN 04/04/2022
GENERAL EROSION AND SEDIMENT CONTROL NOTES
1.THESE GENERAL EROSION AND SEDIMENT CONTROL NOTES, TOGETHER WITH DETAIL 1,
THIS DWG, CONSTITUTE A CONCEPTUAL TEMPORARY EROSION AND SEDIMENT CONTROL
(TESC) PLAN. THE CONTRACTOR IS REQUIRED TO SUBMIT A DETAILED STORMWATER
POLLUTION AND PREVENTION PLAN (SWPPP) MEETING CITY REQUIREMENTS. THE TESC
MEASURES SHALL THEN BE IMPLEMENTED CONSISTENT WITH THE
CONTRACTOR-PREPARED SWPPP.
2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE,
REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED.
3.THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN
CONJUNCTION WITH ALL CLEARING AND GRADING TO ENSURE THAT THE TRANSPORT OF
SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS
MINIMIZED.
4.THE ESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR
ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC
FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND
MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G. ADDITIONAL SUMP
PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.).
5.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND
MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL
BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES DURING THE WET SEASON (OCT. 1
TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. 30).
6.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT
BE DISTURBED FOR TWO (2) DAYS DURING THE WET SEASON OR SEVEN (7) DAYS DURING
THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC
METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
7.ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION SHALL BE
ADDRESSED WITHIN FIFTEEN (15) DAYS.
8.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT (48) HOURS FOLLOWING A
STORM EVENT.
9.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES
SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
10.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE
APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES.
11.NO STOCKPILING/STAGING WILL BE CONDUCTED WITHIN THE RIGHT OF WAY OR CITY
OWNED SITE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ITS OWN
STOCKPILE/STAGING AREAS.
12.PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE CITY.
FLUSHING OF STREETS WITH WATER WILL NOT BE ALLOWED.
13.IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY REQUIREMENTS, WASTEWATER
FROM CEMENT CONCRETE MASONRY, OR ASPHALT CONCRETE CUTTING, OR POURING
OPERATIONS SHALL NOT BE DISCHARGED INTO STORM DRAINAGE SYSTEMS OR SURFACE
WATERS. IMPERVIOUS SURFACES CONTAMINATED WITH SEDIMENT FROM GRIT AND
CUTTING, PLANNING, OR PULVERIZING OPERATIONS SHALL BE VACUUM-CLEANED TO
PREVENT CONTAMINANTS FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE
WATERS.
14.CATCH BASIN INSERTS SHALL BE PLACED AT ALL CATCH BASINS SHOWN ON SHEET 2 PER
COR STANDARD DETAIL 216.30, THIS SHEET.
15.INSTALL SILT FENCING ALONG THE DOWNSLOPE EDGE OF EXCAVATION AREAS PER COR
STANDARD DETAIL 214.00, THIS SHEET.
16.INSTALL STRAW BALES ALONG THE DOWNSLOPE EDGE OF THE STAGING/STOCKPILE AREA.
17.INSTALL STABILIZED CONSTRUCTION ENTRANCE WHERE SHOWN ON SHEET 2 PER COR
STANDARD DETAIL 215.10, THIS SHEET, EXCEPT MINIMUM LENGTH SHALL BE REDUCED
TO 30' OR AS REQUIRED BY COR.
18.TEMPORARY SEDIMENTATION POND MAY BE REQUIRED IN CONTRACTOR STAGING AREA
IF THE SILT FENCING IS NOT ADEQUATE.
19.KEEP PUBLIC AND PRIVATE ROADWAYS/PARKING LOTS, SIDEWALKS, AND TRAILS FREE OF
DEBRIS AND SEDIMENT.
20.DO NOT ALLOW SURFACE WATER TO INFILTRATE OR ENTER KNOWN AREAS OF
CONTAMINATION. CONSTRUCT TEMPORARY STORMWATER BYPASSES OR SANDBAG
DIVERSIONS AS NEEDED DURING CONSTRUCTION TO DIVERT STORMWATER AROUND
EXCAVATION ACTIVITIES AND MAINTAIN DRAINAGE OF UPSTREAM STORMWATER.
CONTRACTOR IS RESPONSIBLE FOR DESIGN OF SURFACE FLOW AND STORM DRAIN
BYPASS PLAN. SUBMIT AS PART OF FINAL ESC PLAN. STORM DRAIN BYPASS PLAN SHALL
ALSO ADDRESS THE DOWNSTREAM SYSTEM AND PREVENTION OF STORMWATER
ENTERING THE WORK AREA BY BACKING UP FROM DOWNSTREAM.
21. ALL DEWATERING AND RUNOFF WITHIN CONSTRUCTION AREAS SHALL BE TREATED VIA
SEDIMENTATION, FILTRATION THROUGH VEGETATION IN APPROVED AREAS, OR
PORTABLE FILTRATION SYSTEMS (UTILIZING TANKS AND FILTERS), AS NEEDED, PRIOR TO
DISCHARGE TO DOWNSTREAM SYSTEMS TO MEET ALL APPLICABLE LOCAL, STATE, AND
FEDERAL WATER QUALITY REGULATIONS. CONTRACTOR MAY ALSO DISCHARGE TO THE
SANITARY SEWER SYSTEM AFTER OBTAINING APPLICABLE PERMITS AND MEETING
PRETREATMENT REQUIREMENTS.
PRELIMINARY CONSTRUCTION SEQUENCE
1.SUBMIT TRAFFIC CONTROL PLAN, TESC PLAN, STAGING PLAN, UTILITY PROTECTION PLAN
AND MATERIALS SUBMITTALS.
2.ATTEND PRECONSTRUCTION CONFERENCE.
3.INSTALL TESC CONTROL MEASURES AND SET UP CONTRACTOR-OBTAINED
STOCKPILE/STAGING AREA.
4.CALL FOR UTILITY LOCATES.
5.SET UP SHORING, DEWATERING SYSTEM, AND STORM DRAIN BYPASS SYSTEMS AS
APPLICABLE.
6.CONDUCT REMEDIATION EXCAVATIONS, INJECTIONS, AND APPLICATIONS.
7.UPON COMPLETION AND APPROVAL COMPLETE FINAL PAVEMENT AND SURFACE
RESTORATION.
8.REMOVE EROSION CONTROL MEASURES AFTER CITY APPROVAL OF WORK.
SOUTH RENTON TRANSIT CENTER
REMEDIATION PROJECT
X
X
X
X
X
X
X
X
X
X
X
H
H
H
H
H
RIM=24.47
IE 12" DI NW=21.4
WAT=21.3 BOT=19.8
INLET
RIM=25.25
2.1' X 1.7' CONC
IE 8" CONC N=23.2
IE 4" CONC E=23.3
IE 6" CONC E=23.3
IE 6" X 6" SQUARE CONC W =23.1
WAT=23.2 BOT=22.4
CB
2.2' X 1.9' CONC
RIM=23.81
IE 6" PVC NE=21.2
IE 12" DI NW=20.8
WAT=20.9 BOT=19.2
CB
2.2' X 1.9' CONC
RIM=24.27
IE 12" DI NW=21.1
WAT=21.1 BOT=19.4
INLET
RIM=25.12
INLET
RIM=23.62
CB
2.2' X 1.9' CONC
RIM=25.61
IE 12" DI SW =22.7
WAT=22.7 BOT=21.0
INLET
RIM=25.37
CB
2.1' X 1.9' CONC
RIM=26.61
IE 12" DI SE=22.7
IE 12" DI W=22.7
WAT=22.6 BOT=19.8
INLET
RIM=26.88
CB
2.1' X 1.8' CONC
RIM=26.42
IE 12" CPP NW=23.6
WAT=23.2 BOT=21.8
SDMH
48"Ø BRICK
RIM=28.89
IE 30" CONC E=19.9
IE 24" CONC W=19.8
WAT=20.4 BOT=19.5
CB
RIM=26.78
IE 8" DI S=25.5
WAT=25.3 BOT=22.9
CB
RIM=25.90
CB
2.3' X 2.2' CONC
RIM=25.65
IE 6" DI S=24.5
WAT=24.4 BOT=21.3
CB
RIM=27.64
UNABLE TO ACCESS
SDMH
60"Ø CONC
RIM=26.62
12" CPP NE=UNABLE TO SEE
IE 30" CONC NE=19.1
IE 30" CONC W=19.4
WAT=20.4 BOT=18.7
CB
1.7' X 2.2' CONC
RIM=25.21
IE 12" CPP SW=23.0
WAT=23.0 BOT=22.6
SDMH
60"Ø CONC
RIM=26.13
IE 12" CPP NE=21.5
IE 27" CONC E=19.7
IE 30" CONC SW=19.2
WAT=20.4 BOT=17.6
CB
2.1' X 1.6' CONC
RIM=25.47
IE 8" CONC N=24.1
IE 12" CPP SW=24.0
WAT=24.0 BOT=23.6
CB
2.1' X 1.8' CONC
RIM=26.15
IE 12" CONC N=20.3
IE 12" UNK S=19.9
WAT=20.6 BOT=18.8
SDMH
RIM=26.16
UNABLE TO OPEN
CB
1.6' X 2.1' CONC
RIM=25.82
IE 4" CONC S=24.1
IE 12" CPP NW=24.1
WAT=23.9 BOT=23.2
CB
1.4' X 1.4' CONC
RIM=26.93
N PIPE NOT VISIBLE
IE 6" DI W=26.0
WAT=26.4 BOT=24.5
SDMH
60"Ø CONC
RIM=27.40
IE 27" CONC W=19.8
IE 27" CONC NE=19.4
WAT=19.6 BOT=18.9
SDMH
36"Ø CONC
RIM=25.24
N PIPE NOT VISIBLE
IE 24" CMP E=19.3
IE 27" CONC SW=19.2
WAT=20.6 BOT=19.1
CB
2.2' X 1.9' CONC
RIM=24.95
IE 16" CONC SE=20.9
WAT=21.5 BOT=19.3
CB
2.3' X 1.9' CONC
RIM=25.94
IE 12" CONC S=20.5
IE 12" CONC NW=20.3
WAT=20.7 BOT=19.2
S
D
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
SD
SS
SD
SD
E
E
EE
E E E
E
E
E
E
W
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
G
E
E
E
E
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
CO
WW
W
W
W
W
W
W
W
W
T
E
E
W
W
T
T
E
E
T
T
T
T
T
EE
E
E
E
EE
EE
E
T T
T
T
T
T
T
T
T
E
E
EE
E
E
E
E E E E
G
E
EE
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
G
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
W
W
W
W
W
W W W W
W
W
W
W
W
W
W
SD
SD
SD
SD
SD
W
W
W
F
O
F
O
F
O
FO
FO
FO
FO
FO
FO
FO
FO
F
O
FO
F
O
FO
S
D
S
D
S
D
S
D
SD
SD
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
S
FO
FO
E
E
E
E
E
E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
F
O
FO
FO
GAZEBO
/
/
/
/
/
/
/
/
/
///
/
/
/
/
/
/
///
/
/
/
/
/
/
/
/
/
/
/
/
///////
/
//
/
/
/
/
/
/
//
/////
/////
//
///
/
/
/
/
/
/
/
/
////////
//////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////
/
/
/
/
/
////
/
/
////
/
/
//////////
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////
/
/
////
////////
/
/
/
/
/
/
/
/
/
/
/
/
/
///////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////
/
/
/
/
/
////
/////
/
///////
/
/
/
/
/////////
///
/
/
/
/
CB
RIM=25.71
CB
RIM=25.53
SHELTER
CANOPYBLDG
BLDG
BLDG
BLDG
CB
36" CONC
RIM EL=24.29
IE 18" DI N=20.8
IE 8" CPP NE=21.1
IE 12" CPP E=21.2
IE 18" DI SW=20.8
WAT=20.9 BOT=17.8CB
2.2' X 1.8' CONC
RIM EL=24.04
IE 18" DI NE=20.7
IE 18" DI SW=20.7
WAT=20.8 BOT=19.3
CB
2.2' X 1.8' CONC
RIM EL=23.60
IE 18" DI NE=20.5
IE 12" CPP SE=20.8
IE 18" DI SW=20.6
WAT=20.5 BOT=19.4
CB
2.2' X 1.8' CONC
RIM EL=23.39
IE 18" DI NE=20.3
IE 12" CPP E=20.7
IE 18" DI SW=20.4
WAT=20.4 BOT=19.3
INLET
RIM EL=25.09
INLET
RIM EL=25.04
CB
60" CONC
RIM EL=24.37
IE 24" CPP N=20.7
IE 12" CPP NE=20.5
IE 6" PVC S=21.2
IE 24" CPP S=20.1
WAT=20.4 BOT=18.2
INLET
RIM EL=24.37
NEEDS TRAFFIC CONTROL
INLET
60" CONC
RIM EL=25.34
IE 24" CPP N=20.1
IE 12" CPP E=20.7
IE 6" PVC S=22.2
IE 24" CPP S=23.0
WAT=20.4 BOT=18.0
INLET
RIM EL=26.78
UNABLE TO OPEN
60" CONC
RIM EL=28.35
IE 24" CPP N=19.4
IE 30" CPP NE=19.8
IE 12" CPP S=21.7
IE 36" CPP SW=19.6
BOT=17.8
SDMH
48" CONC
RIM EL=28.71
IE 12" DI N=22.6
IE 12" DI S=22.8
WAT=22.6 BOT=20.6
CB
1.9' X 2.2' CONC
RIM EL=28.02
TOP OF 12" DI SE=24.3
IE 12" DI N=23.2
WAT=23.3 BOT=22.1
CB
1.9' x 2.2' CONC
RIM EL=26.82
IE 12" DI NE=23.7
WAT=23.8 BOT=22.2
INLET
RIM EL=26.93
NEEDS TRAFFIC CONTROL
CB
1.7' X 2.2' CONC
RIM EL=26.55
IE 4" CONC W=25.2
WAT=25.2 BOT=24.9
CB
1.9' X 2.4 CONC
RIM EL=26.10
IE 8" CONC S=24.4
WAT=24.7 BOT=21.8
CB
1.9' X 2.4' CONC
RIM EL=25.63
IE 6" DI W/ PLUG W=24.4
WAT=23.9 BOT=20.9
CB
1.7' X 2.2' CONC
RIM EL=25.70
IE 6" DI SW/ PLUG W=25.0
WAT=24.4 BOT=21.1
CB
1.7' X 2.2' CONC
RIM EL=25.18
IE 6" PVC S=23.4
IE 6" PVC S=23.3
TOP OF 6" DI W=23.2
WAT=22.7 BOT=21.0
CB
2.2' X 1.9' CONC
RIM EL=25.02
IE 12" RCP E=21.8
WAT=21.9 BOT=20.4
CB
1.7' X 2.2' CONC
RIM EL=25.80
IE 8" CPP N=22.6
IE 8" CPP SE=22.6
IE 8" CPP SW=22.6
WAT=22.6 BOT=21.1
CB
1.9' X 2.2' CONC
RIM EL=24.23
IE 8" CONC E=22.5
IE 8" CPP S=22.6
IE 8" CONC W=22.6
WAT=22.6 BOT=22.6
CB
2.2' X 1.9' CONC
RIM EL=24.72
IE 12" RCP N=22.3
IE 12" RCP S=22.2
WAT=22.2 BOT=20.4
CB
1.9' X 2.2' CONC
RIM EL=24.68
IE 12" RCP NE=21.1
IE 12" RCP W=21.0
WAT=21.7 BOT=19.8
CB
1.7' X 2.2' CONC
RIM EL=25.92
IE 12" RCP N=21.8
IE 8" CONC E=21.2
IE 12" RCP S=21.6
IE 8" CONC W=22.7
WAT=21.7 BOT=20.8
CB
1.9' X 2.2' CONC
RIM EL=25.33
IE 8" CONC E=23.8
WAT=23.4 BOT=22.8
CB
RIM=27.30
UNABLE TO ACCESS
SD
CB
RIM EL=26.77
8" CONC N=NA
NEEDS TRAFFIC CONTROL
INLET
RIM EL=26.88
NEEDS TRAFFIC CONTROL
SDMH
RIM=24.94
NEEDS TRAFFIC CONTROL
SDMH
RIM=15.02
NEEDS TRAFFIC CONTROL
CB
RIM=25.13
NEEDS TRAFFIC CONTROL
G
G
FO
FO
FO
FO
E
E
E
E
E
E
E
E
E
E
E
E
E E E E
E
E
E
E
FO
FO
FO
FO
F
O
F
O
E
F
O
F
O
F
O
F
O
FO
FO
FO
FO
FO
FO
FO
FO
FO
W
W
W
W
SS
SS
FO
SD
SD
SS
SS
SS
SS
SS
SSSS
SS
SS
WW
F
O
SS
SS
SS
SS
E
E
E
E
W
W
E
E
E
E
T
T
T
T
T
T
T
T
T
T
T
GG
G
G
G
G
G
GGG
G
G
G
G
G
G
G
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W
W
G
G
G
E
E
W E
E
E E
E
E
E
E
E E
E
W
W
W
W
E
EE
E
E
E
E
C
C
C
C
C
T
T
T
T
T
T
E
E
T
T
T
E
G
G
C
E
E
E
E
E
E
E
E
E
E
HA
R
D
I
E
A
V
E
S
W
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
XX
1
1
1
1
1
1
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
X
X
2
4
2
2
2
4
4
4
4
4
5
5
5
5
2
6
7
INSTALL CATCH BASIN INSERT
PER COR STD DETAIL 216.30.
LEGEND:
LIMITS OF REMEDIATION WORK.
STOCKPILE/STAGING AREA.
1
2
3
APPROX. HOTSPOT EXCAVATION
AREA
APPROX. BIOSTIMULATION
COMPOUND INJECTION AREA
APPROX. EXCAVATION AND
BIOSTIMULATION APPLICATION AREA
LIMITS OF REMEDIATION WORK
SHALL BE FLAGGED WITH HIGH
VISIBILITY FENCING.
INSTALL SILT FENCE ALONG THE
DOWNSLOPE EDGE OF ALL
EXCAVATION AREAS TO CAPTURE
ANY OVERLAND FLOW. SILT FENCE
TO BE INSTALLED PER COR STD
DETAIL 214.00.
4
5
1.HIGH VISIBILITY FENCING SHOWN
OFFSET FROM LIMITS OF
REMEDIATION WORK FOR VISUAL
PURPOSES ONLY.
2.SEE SHEET 1 FOR COR STANDARD
DETAILS.
NOTES:
INSTALL STABILIZED CONSTRUCTION
ENTRANCE PER COR STD DETAIL
215.10. LENGTH SHALL BE REDUCED
TO 30' OR AS REQUIRED BY COR.
6
PLACE STRAW BALES ON PAVEMENT
ALONG DOWNSLOPE EDGE OF
STOCKPILE AREA TO CAPTURE ANY
SILT-LADEN RUNOFF FROM
STOCKPILE AREA.
7
SCALE IN FEET
0 4020 8040
(1" = 40')
TESC PLAN
SOUTH RENTON TC
TESC-P
2
1" = 40'
N
No.DATE DSN CHK APP REVISION
SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE:
CONTRACT No.:
FILENAME:
SCALE:DRAWING No.:
SHEET No.:REV:
LI
N
E
I
S
1
"
A
T
FU
L
L
S
C
A
L
E
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
07
/
0
6
/
2
2
|
2:
5
7
P
M
|
US
C
U
7
0
5
5
6
0
C:
\
B
M
S
\
W
S
P
-
U
S
-
P
W
-
0
2
\
D
0
3
1
3
6
8
9
\
T
E
S
C
_
R
E
M
E
D
_
P
L
A
N
.
D
W
G
TESC_REMED_PLAN FACILITY ID:
PHASE 3 - 30% SUBMITTAL I-405 BRT
AE 0054-17
04/04/2022PR
E
L
I
M
I
N
A
R
Y
405
R. GORMAN 04/04/2022
RA
I
N
I
E
R
A
V
E
S
SOUTH RENTON TRANSIT CENTER
REMEDIATION PROJECT
PROPERTY
LINES, TYP.
EXISTING ROW, TYP.
L
A
K
E
A
V
E
S
S GRAD
Y
W
A
Y
S GRAD
Y
W
A
Y
STAGING/STOCKPILE
AREA
AE 0054-17 | South Renton Transit Center Remediation Project,
Storm Drainage Report
I-405 corridor
City of Renton Wellhead Protection Area Map
72,224 6,019
Wellhead Protection Area Zones Map City of Renton
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
7/7/2022
Legend
4,09302,046
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
4,093
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Labels
City and County Boundary
<all other values>
Renton
Wellhead Protection Area Zones
Zone 1
Zone 1 Modified
Zone 2
Environment Designations
Natural
Shoreline High Intensity
Shoreline Isolated High Intensity
Shoreline Residential
Urban Conservancy
Jurisdictions
Streams (Classified)
<all other values>
Type S Shoreline
Type F Fish
Type Np Non-Fish
Type Ns Non-Fish Seasonal
Unclassified
Not Visited
Wetlands
Streets
Waterbodies
soundtransit.org
brt@soundtransit.org
206-398-5470
soundtransit.org
brt@soundtransit.org
206-398-5470