HomeMy WebLinkAboutR-431901A B C D E I F G H I J K
B-402 @-401
BLOWER STRIPPER BLOWER
TYPE-- TYPE:
RATE CFM FLOW RATE _ CFM
1 0 RPM HP 1 0 _ RPM
AC. VAC.
urc. MFG.:
12"PD-10B
S-401
P-4 1
STRIPPER TOWER STRIPPER
FEED PUMP
$—¢D2 FLOW
TYPE CENTRIFUGAL
T GPM TDH
STRIPPER TOWER
P.—O075 RPM
VACA 5/230
MFG.: BALDOR
T-402
TANK
TYPE —
SIZE _' DIA. x
_' L
CAPACITY:
DESIGN: —
MATL: —
5 CAL BUCKET
—4 1
47
3 I I 11 CONCRETE HOLDING TANK I
OUTFALL TO I 12" I2' WATER LEVEL, EL. 15.35 ICGT o
WETLANDS j
HV42z
BAFFLE AND WEIR ` ` I LI I BAFFLE
P-404
50 MICRON
FILTERS
100 MICRON
DV-1 W -1
01L/WATER
DETENTION VAULT SEPARATOR
(1Y-3"x7•_2"x11'-0^) (5Pw .
❑CB
I VAPOR RECOVERY UNIT I
I CONTAINMENT AREA I
xn I mvs1W
D AS -BUILT
1 ADDm ANTI FOMENT PUMP
2 AS -BUILT
(3) UNITS TANK FARM
4'-0" DIA. X
B'-0" NIGH) I
CARBON
TREATMENT
YSKID - - - T=; ----
(APPROK 1
HV412
GRIT I WO
'CHAMBER 4"x2"
Ctl-I��
I
I
12"-PD-110�
BLIND —
INSTALLED NC I
---T—fi --_
I
u
fro
I LC. 3"x2"
I
3 STORM WATER SYSTEM UPGRADE
1� 44 AS-BUILT��
I � 5 SPCC 2012 UPOATES
R-1
T-403
P-403
UNDERGROUND SPILL TANK
STORAGE TANK SUMP PUMP
I I
9
TYPE HORIZONTAL
SIZE: _' INA. x _' L
TYPE
FLOW RATE _ GPM 0 _TDH
2^ I
CAPACITY: IS" GAL
DESIGN: ATMOS./ OP. TEMP. AMBIENT
HP _ O _ RPM
VAC.
ATMOS.
MA 'L: POLY.
MFG, HYDROPURGE MODEL SP2-7
�1
TRUCK LOADING
RACK
iv
ON/OFF
KS 403
I CB CB I 6"
I I I
I
4Ms -{ 4^-PD-101
CB CD I
-
? I AIR
g I B-402
'LA
; VAULT
I
DRAIN
I CB I
I
HS ON/OFF I
4D1 S-402 MOBIL RECOVERY SYSTEM
°b0
T-403
J.HI CB MH
_ MS
401 CS 3"-PD-102
P-
P-4 1 VACUUM
�- CONRUEST' N - -
VERIFY 1.,
LOCATION
T 3" '0 PIPELINE MANIFOLD
-
LOADING RACK
LANE j%4
3
Dd —tIT AR�
PUMP OFF STATION
_
III—
Stormwater Flow
I
I
T-4
I
ER
WD
2'
LSH
502
2 FS I KwM I i 4
5 I I
LSL
502
T 402
PROCESS WATER TANK I
WD_______--
I I T-I
I I I
Nv,DO 5
m nwoz ,.LC.
B
INLET \ i "ERAIN \\
INLET I \
I
MVa00
I \
I I ww \
HV�04 I 12" WD
WATER DRAW NOTES.
WATER COMPILED FROM PREVIOUS
�P)H BASIN DRAWINGS AND FIELD NOTES,
2
amed9
B
RENTON
P&I DIAGRAM
DRAINAGE COLLECTION SYSTEM
0 6 1 SWPPP 2013 UPDATES