Minor Franchise Permit: MFP24005044
IVR Number: 24005044
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/02/2024Application Date:7236500015Parcel Number: 450 INDEX PL NE
Permit Type:10/16/2024Issue Date:Franchise
Permit Work Class:10/16/2025Expiration Date:Minor Utility
Job Number: 101175656Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REPLACE BO POLE AT P01 (318147 166732), INSTALL OH
TRANSFORMER AND SWING OH SERVICE. NO HS CUTS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101175656
450 INDEX PL NE
AMY HILL 253-243-5089
MFP24005044
Monday Friday 8:00am 3:00pm
Scott Warlick CED 10/16/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
450 Index Pl NE
Renton
WA 98056
USA
161612 12
PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKW20-7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
SEE PROJECT NOTES AND
CHARTS FOR APPROPRIATE SIGN
SPACING AND TAPER LENGTHS
P01
P02
STOP
STOP
W20-7AW20-1
ROADWORKAHEADBEPREPAREDTOSTOPW3-4
BEPREPAREDTOSTOPW3-4W20-1ROADWORKAHEADNE 4TH ST INDEX PL NEN
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGET
SOUNDENERGY
Designer:
Job #
REV
Matlock Highbarger
808-375-4152
Matlock.Highbarger@pse.com
1 OF 1450 Index Pl NE, Renton, WA
0
514972617
09/02/2024
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated,
if indicated use ADA compliant channelization.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours as
per jurisdictional requirements. (Generally between 9
a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3
p.m. on arterials. If night time work is approved,
signaling and flaggers shall conform to WAC
296-155-305. Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRON
ARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
POLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299
Card Exp. 09/30/2027
gregory.harwood@pse.com
(425)424-6425
MFP24005044
463
459
450
414
2821
451
415
411
2817
2829
408
2908
2805
2809
407
2813
402
403 INDEX PL NENE 4TH ST
318147-166732
25kVA 120/240V (C)
UNK (25T)
SLAP1856
#2ACSRC
318131-166732
15 kVA 120/240V (C)
318145-166725
50kVA 120/240V (C)
318116-166733
UNK (UNK)
SLAG7799
318120-166741
W
DWY
KIRK
L
A
N
D
A
V
E
N
E
N
E
5T
H
P
LHARRINGTON AVE NEINDEX
AVE
NERENTON AVE NENE 5TH CT
FERNDALE AVE NEFERNDALE AVE NENE 4TH ST JEFFERSON AVE NEIN
D
E
X
A
V
E
N
E
JEFFERSON AVE NENE 3
R
D S
T
NE 3
R
D STNE 4TH CTINDEX PL NEDWY
318147-166732
25kVA 120/240V (C)
UNK (25T)
SLAP1856
25'
12'
5'
4'SIDEWALKSIDEWALK4'
4'
10'
ROW
60'
PRE
12
SITE SPECIFIC NOTES
AT P01: 318147-166732 (3-10) (3-11)
Owner / Developer Contact Info
officeATTN:
BABBIT CONSTRUCTION COMPANY
3612 S 54TH ST
TACOMA, WA 98409
ZACH HOHBEIN 253-223-5612 101175656GAS
PHONE
CABLE TV
108156966
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Sec Wire/Pole Remv
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:AMY HILL
253-243-5089
AMY.HILL@PSE.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
A. HILL 253-243-5089 07-08-24
A. BETTENCOURT 206-584-4182 07-08-24
T. MYER 714-893-2405 07-08-24
N/A RENTON
GRIFFIN RESIDENCE
REPL BO POLE, INSTALL OH XFMR, UPGRADE SVC (200A)
450 INDEX PL NE, RENTON, WA 98056
N/A N/A
N/A 101175656
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
SW 09-23N-05E N/A N/A
2305E035 2305E040 2305E035 PRE-12
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101175656514972617
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-12
11/2023
326.00 307.00 282.00
0.00 0.00 1.30
326.00 307.00 283.30
SITE PLAN
SCALE: 1" = 50'
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
JOB SITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND
ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS
PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH
THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
47.489, -122.180
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC E. SCHOTT
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
PARTIAL PLAN DETAIL
SCALE: 1" = 20'ROW60'ROW
60'
NOT TO SCALE
CROSS SECTION - INDEX PL NE
LOOKING WEST
E
60' ROW
CL
00 1"2"
00 50'100'
593258902OH Misc & Expense
Perm Svc - Modified 593258903515118500
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 2850 SQ FT
PANEL SIZE: 200A
HEAT TYPE: GAS
EST. DEMAND: 8.9kW
LRC: 115A
% V. DROP: 1.7%
% FLICKER: 3.4%
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318147-166732
25kVA
6211250
CØ
W
WIRE REMOVAL TABLE
Work
Location Wire Size & Type Quantity
Length
(per
conductor)
Remarks
From To
P01 P02 SEC #2 OH TPX 1 138'
SERVICE LINE
(UTILITY OWNED)
11' MIN
3-1/2' MIN
11' MIN
3'
MIN
DECK
ROOFS WITH
PERMANENT ACCESS
ROOFS WITHOUT
PERMANENT ACCESS
ELECTRIC
METER
GAS
METER
OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL
SCALE: NONE
SERVICE BRACKET SERVICE DROP
NO. 6 COPPERWELD,
AIRCRAFT CABLE
OR EQUIVALENT
3/4" RIGID GALVANIZED
45˚
MIN
18" MIN
SEE
DETAIL 1
FLASHING
STRUCTURAL FRAMING
AND FINISH MATERIALS
5/16" U-BOLT
2" X 4" BACKING
BLOCKING BETWEEN
MAST AND BUILDING
RIGID STEEL
CONDUIT
STRUCTURAL
FRAMING
AND FINISH
MATERIALS
GROUND GROUND
5/16" U-BOLT
2" X 4" BACKING
RIGID STEEL
CONDUIT
CONDUIT OR EQUIVALENT ENDS
FLATTENED AND DRILLED
SHARP BEND; NO RADIUS
(SEE DETAIL 2)45˚
MIN
COLLARS,
CYCLONE
FENCE
CLAMP OR
EQUIVALENT
WITH 3/8" MIN
BOLT SIZE
WEATHERHEAD
DETAIL 1 DETAIL 2
GALVANIZED
THIMBLE AND CABLE
CLAMP
FLASHING OR MASTIC
METHOD OF GUYING
ATTACHMENT
SEE DETAIL 1
GALVANIZED BOLT;
EYE-BOLT OPTIONAL
PULL
60˚ - 90˚
GUY WIRES
60˚ - 90˚
APART
PULL
COLLARS, CYCLONE FENCE
CLAMP OR EQUAL WITH
3/8" MIN BOLT SIZE
GUYED SERVICE MAST DETAIL
SCALE: NONE
POLE TABLE (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318147-166732 45'CL-1
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
Wk
Loc
Pole Data Pole
TEL TV FIBER TRAN RMVD ID NUMBER
Grid #Length Class Year TOPPED RMVD
P01 220837-168375 40'1 1959
00 1"2"
00 20'40'
Stephan Shaw 04/07/2025
AT P02: 318131-166732
-EXISTING 40' CL 5 1969 POLE TO REMAIN
-EXISTING 15 kVA 120/240v OH XFMR TO REMAIN
M01 AT "450":
-INSTALL 200A OH METER
M02 AT "450":
-REMOVE EXISTING OH METER
SPAN SPECIFIC NOTES (2-20A) (3-03)
**SEE SITE PLAN AND TABLES FOR INSTALL(S) & REMOVAL(S)**
-SWING EXISTING SPAN OH TPX, ± 45’ ___' ACTUAL (FROM M02)
-EXISTING B/O 1959 40' CL1 POLE TO BE REMOVED
-INSTALL NEW 45' CL-3 DIST POLE W/ GROUNDS PER STD 6010.1000 (PD453)
-INSTALL 12 kV 1Ø DEADEND FRAMING 6031.1040
-INSTALL (1) STIRRUP & HOT CLAMP #4-4/0 & TAP CØ (MID: 2254000 & 2153100)
-INSTALL (1) RIGID CLEVIS, NEUTRAL IN COMMON POSITION 6015.1000 (INDNRC)
-INSTALL (1) 25kVA 120/240v OH XFMR W/LB C/O (FUSE @ 10T) PER STD 6025.1000 (TRFNXF)
-INSTALL (1) 3/8" DOWN GUY 30' EAST OF POLE 6013.0100 (GYD3SA)
-INSTALL (1) SINGLE HELIX ANCHOR 30' EAST OF POLE 6012.1000 (ANDH1)
-TRANSFER EXISTING STREET LIGHT
-TRANSFER EXISTING RISERS TO NEW POLE
-RECONNECT EXISTING SERVICES TO NEW OH TRF
(DE2115)
Raymond Reynolds 04/23/2025