Loading...
HomeMy WebLinkAboutEX_44_I-405 BRT - BT105 SRTC Project History 10.15.24I-405 BRT BT105 SRTC Project History Pre-2016 • ST/City coordination on what is included in Sound Transit 3 Plan (ST3). 2016 • ST3 approved by voters, which included the South Renton Transit Center as part of the new Stride Bus Rapid Transit (BRT) program. 2018/2019 • Level 1/Level 2 alternatives evaluation via conceptual design Interagency group workshops with the City, WSDOT, ST, and KCM. Workshops evaluated 10+ conceptual designs/site schemes. 2020 • ST/City coordination on 10% conceptual engineering plans. • SEPA Determination of Non-Significance (DNS) issued in September 2020. 2021 • ST participation in City-convened Stakeholder Workgroup Meetings for Rainier/Grady Junction TOD Subarea Plan. 2022/2023 • ST/City coordination on 30% preliminary engineering plans. • Started monthly ST/City coordination meetings to collaborate on a variety of design topics related to the revised potential future parking garage location and design refinements for 60% and 90% engineering plans in May 2022. 2024 • SEPA Addendum issued to cover surface parking and minor design updates to the transit center and roadway improvements in June 2024. • CUP and associated land use applications submitted to City in June 2024.