Loading...
HomeMy WebLinkAboutEX40_HEX_SRTC_PPTSouth Renton Transit Center and Roadway Improvement Project PUBLIC HEARING, OCTOBER 15, 2024 JILL DING, SENIOR PLANNER Brief Description The applicant, Sound Transit, is requesting master plan review, site plan review, a Hearing Examiner conditional use permit, lot line adjustment, bicycle parking modification, and driveway modification to construct the South Renton Transit Center (SRTC). The project site is zoned CA. High Seismic Hazard Areas and Downtown Wellhead Protection Area Zone 2 are mapped onsite. The site is mostly flat with impervious surfaces. Brief Description Sound Transit has partnered with Washington State Department of Transportation (WSDOT) to implement new bus rapid transit (BRT) service along I-405. The Transit Center would include: Stops for Sound Transit and King County Metro (KCM) routes; Bus operator facilities; Transit shelter canopy; Eight (8) bus bays; 13-bus layover spaces with a gantry for bus charging; 158-stall surface parking lot for transit center users; and Bicycle racks/lockers Analysis Master Site Plan, Site Plan, Conditional Use Permit (CUP), Bicycle Parking Modification, Driveway Modification, Lot Line Adjustment Analysis: The proposal is consistent with relevant Comprehensive Plan Land Use and Transportation Element policies; The proposal is compliant with all relevant zoning and urban design regulations if all conditions of approval are complied with; The proposal is compliant with the critical areas regulations if all conditions of approval are complied with; The proposal is compliant with the CUP criteria if all conditions of approval are complied with; The proposal is compliant with the Master Plan and Site Plan review criteria if all conditions of approval are complied with; The proposal is compliant with the bicycle parking and driveway modifications if all conditions of approval are complied with; and The proposal is compliant with the Lot Line Adjustment Principles of Acceptability if all conditions of approval are complied with. Availability of Public Services Police and Fire Prevention staff indicate that sufficient resources exist to furnish services to the proposed development. Water and sewer service is provided by the City of Renton. Water and sewer improvements will be required within and around the project site. The applicant submitted a Drainage Report, prepared by Osbourne Consulting, Inc. The proposed project would provide modular wetlands, biofiltration swales and Filterra units to meet water quality requirements. The project would be required to comply with the City of Renton Surface Water Design Manual (SWDM). Recommendation Staff recommends approval of the South Renton Transit Center and Roadway Improvement Project, File No. LUA24-000233, SA-M, SA-H, CU- H, LLA, MOD, MOD as depicted in Exhibit 2, subject to 7 conditions of approval. Recommendation Amendments Condition #3: The design of the gantry wrap shall be approved by the Current Planning Project Manager prior to the issuance of a building permit. The design of the charging gantry wrap will screen from public view the equipment within it, and will be cohesive with the overall site design. Condition #4:Details for the proposed benches shall be submitted to the Current Planning Project Manager for review and approval, prior to the issuance of a Construction Permit. The design of the benches shall be made of durable and vandal- and weather- resistant materials that do not block pedestrian access, and will be cohesive with the overall site design. Condition #5: A materials board shall be submitted to the Current Planning Project Manager for review and approval at the time of Building Permit application. The materials chosen for the core buildings and bus island canopies will be cohesive with the overall site design. Condition #7: The applicant’s geotechnical engineer shall review the project’s building and civil permit plans to verify compliance with the submitted geotechnical report. The geotechnical engineer shall provide his/her seal on the following plans that are based on geotechnical engineering recommendations: structural engineering drawings and typical section drawings which include the pavement sections and excavation requirements.