Request for Approval of:
PRELIMINARY MASTER PLAN
PROPOSED ERADCO P.U.D.
Submitted to:
City of Renton
Department of Planning
Date:
Originally Submitted 26 February 1980
Revised and Resubmitted 25 April 1980
Revised and Resubmitted 28 January 1982
Submitted by:
Environmental Research and Development Inc.
18000 Pacific Highway South
Seattle, Washington 98188
At
RENTON BUILDING DEPARTMENT.'
MUNICIPAL BUIL CI •;
2CU Mi'L AVENUE JJ J I H
REN I UN, VVASH. 900->5
JAN 2 8 RECD
TABLE OF CONTENTS
Page
1. 0 Site Characteristics 1
1. 1 Ownership 1
1. 2 Site Location 1
1. 3 Size 1
1. 4 Existing Use 1
1.5 Zoning 1
1. 6 Comprehehensive Plan 1
1. 7 Access 1
1. 8 Soils , Topographical and Vegetation 1
1. 9 Consultants 2
2. 0 Introduction 3
3 . 0 Development Proposal 5
4. 0 Relationship to the Planned Unit Development Ordinance 6
5. 0 Density, Open Space, Set Back, Landscaping 7
5 . 1 Density 7
5 . 2 Open Spaces 7
5 . 3 Set Backs 8
5 . 4 Slope 8
5 . 5 Landscape 8
6.. 0 Development Program and Phasing 9
7. 0 Roads and Circulation 10
8. 0 Utilities 11
8 . 1 Water Supply 11
8 . 2 Sanitary Sewers 11
8 . 3 Storm Water Run-Off 11
8 . 4 Lighting 11
8. 5 Electric Power 12
8 . 6 Natural Gas 12
8 . 7 Circulation Roads 12
RENTON BUILDING DEPARTMENT,MUNICIPAL BUILDING
200 MI.1 AVENUE SOUTH
RL 4TON, WASH. 98055
JO 2 g REC'9. 0 Access - Traffic Impacts 13
9 . 1 Regional Access 13
9 . 2 Sub-Regional Access 13
9 . 3 Local Access 13
9 .4 Traffic Impact 13
9 . 5 Grading .Standards 13
10. 0 Covenants , Conditions and Restrictions 14
10. 1 Zoning Analysis Plan 14
10 . 2 Restrictions and Requirements in Density Area 1 14
10 . 3 Restrictions and Requirements in Density Area 2 15
10 . 4 Restrictions and Requirements in Density Area 3 16
10 . 5 Restrictions and Requirements in Density Area 4 17
11. 0 Ownership, Restrictions and Owners Associations 19
GRAPHICS
A-1 Vicinity Map
A-2 Slope Analysis Plan
A-3 Composite Analysis Plan
A-4 Density Analysis Plan
A-5 Illustrative Site Plan A
A-6 Illustrative Site Plan B
A-7 Site Section a-a
A-8 Site Section b-b
A-9 Site Section c-c
A-10 Off Site Utilities
A
RENTON BUILDING DEPARTMENT]IPAL BUILDING
2 :.1 .l AVENUE SOU I H
Rc14 i Jk, WASH. 9Fs0b5
JAN .2 8 REC'D
1.0 SITE CHARACTERISTICS
1. 1 OWNERSHIP
Monterey Terrace Associates/Environmental Research
and Development Co. , Seattle, Washington.
1. 2 SITE LOCATION
East of SR-169 (Maple Valley Highway) , South of
Monterey Terrace and Mt. Olivet Cemetery and West of
Bonneville Power Right of Way, located in the north-
east quarter of Section 17, Township 23N, Range 5E .
in King County, Washington.
1. 3 SIZE
41. 5 Acres total, with approximately 16. 5 acres desig-
nated greenbelt and 25 acres to be developed.
1. 4 EXISTING USE
Abandoned Gravel Pit and undeveloped green belt.
1.5 ZONING
R1 = 1 acre, R2 = 7 acres , R3 = 11.5 acres , R4 = 5 . 5
acres .
1. 6 COMPREHENSIVE PLAN
Single Family detached and row housing, mutiple
family condominium and apartment.
1. 7 ACCESS
Access via new paved road to be developed on easement
acquired, as required by Restrictive Covenant dated
February 22, 1977. Additional emergency vehicle access
via existing Blaine Avenue Northeast right of way.
1. 8 SOILS, TOPOGRAPHICAL AND VEGETATION
Sloped greenbelt with mature growth western red cedar,
douglas fir, hemlock, cottonwood, alder, salal and
oregon grape. Terraced building site primarily gravel,
with seasonal regrowth of scotch broom, small alder and
tall grasses .
1
RENTON BUILDING DEPARTMENT
MUNICIPAL BUILDI,::i
2:?0 MILL AVENUE SU JTH
kcii JN, WASH. ;:0:35
JAN 2 8 REC'0
1.9 CONSULTANTS
Planning Coordination: Urban Properties Company
Site Design: Omer Mithun and Associates
Environmental Assessment: R.W. Thorpe and Associates
Engineers : Wilsey and Ham, Inc.
Soils : James Eaton, P .E.
Traffic: Landmark Consulting, Inc.
2
s
RENTON BUILDING DEPARTMENT
MUNICIPAL BUILDING
230 Mi__L AVENUE SOUTH
RENTON, WASH. 98055
JAN 2 F. Kta
2.0 INTRODUCTION
Monterey Terrace Associates, is a limited partnership
whose managing partner is Environmental Research and
Development Company (ERADCO) . In keeping with the
City of Renton Planned Unit Development Ordinance and
a Restrictive Covenant dated February 22, 1977, ERADCO
presents this Preliminary Plan for the residential
development of the site previously known as Stoneway
Gravel Pits .
The development concept will provide a mixed environment
of single family attached and multi-family residences
within a parklike setting. Though the site, a former
gravel pit, no longer can be deemed in its natural
state, it is our intention to utilize and maintain those
natural and topographical aspects which can enhance the
livability of the site . Specifically the present
terraced contouring, wherever possible, will be main-
tained to enhance both residential privacy and view
potential.
Total density of the site will be kept substantially below
the level stipulated by the present residential zoning.
It is anticipated that by reducing the total number
of units to be built on the site, the impact of site
development on surrounding developments will be mini-
mized. Both the lowest density building types and
extra generous setbacks have been planned for areas
abutting existing residential development.
3
A
RENTON BUILDING DEPARINIcNT
f;1 J OIPAL BUILDI.,u
200 MILL PVENUE SOUTH
RENTON, WASH. 96055
AN 2 8 RECD
In keeping with the desire to provide a livable and scenic
environment, it is planned that all road and utility
construction will optimize the present contours of the
site, while providing necessary access, parking and
emergency vehicle turnarounds . On-site roads and parking
areas will be buffered from housing by utilizing the
existing terraced topography and incorporating strategic
green belt landscaping.
The large greenbelt on the south western border of the
site will be maintained in its natural state for passive
recreation and wildlife habitat, thus preserving some
sense of the wilderness setting of the site. It is
further planned that this greenbelt will be linked to
the residences on site with a jogging and hiking trail.
4
RENTON BUILDING DEPARTMENT]
MUNICIPAL BUILDI,'iu
200 PAI L AVENUE SOUTH
f,L14 f J14, WASH. 96055
JAN 2.a
3.0 DEVELOPMENT PROPOSAL
This project provides a comprehensive residential develop-
ment providing a maximum of 425 dwelling units , consisting
of single and multi-family residences . Ample parking,
adjacent landscaped buffer zones and garden terraces , with
a 16.5 acre dedicated greenbelt containing a jogging/hiking
trail is planned to compliment housing. Construction types
will be single family attached and row housing in clusters
of four to seven units , two story apartments , walkup
townhouses over flats , and three to five story apartments .
See Plate A5.
5
RENTON BUILDING DEPARTMENT;
4UNL 1PAL BUILD' _;
2?': ,i AVENUE . l H
RcNVTUIV, WASH. .,J)5
JAN
4.0 RELATIONSHIP TO PUD ORDINANCE
The ERADCO Preliminary Plan generally conforms to the purpose
of the PUD Ordinance by its approach to development which
enhances the natural features of the site, creates desirable
residential neighborhoods , and is environmentally compatible
with existing and man-made features surrounding the site.
4. 1 The Preliminary Plan calls for a variety of cluster
groups with graduated density configurations to provide
a transition between existing single family detached
residences proposed east of the site. See Plate A5
4. 2 The proposal maintains existing topography wherever
possible, taking advantage of existing green belts as
well as terraced contours to maximize privacy and views .
4. 3 Design of residential clusters will utilize landscaped
buffer zones built around existing topographic features ,
parking, roadways , and garden terraces to provide
further residential privacy and cut down on the overall
scale of the project.
4.4 The Preliminary Plan will enhance and expand upon the
original restrictive covenants by lowering the overall
site density below that contemplated originally. See
Plate A4
6
RENTON BUILDING DEPARTMtNGmINICIPALQUILDING
2RENTON?WASH. 98035
JAN 2 8 REC'D
5.0 DENSITY, OPEN SPACE, SETBACKS, LANDSCAPING
5 . 1 DENSITY
The proposed maximum density for the site falls 30
below that allowed under current zoning. See Plate A4.
5 . 2 OPEN SPACES
The PUD Ordinance requires a minimum of 35% of the net
developable area to be set aside for common open space .
This area may be utilized for either active or passive
recreation. The Preliminary Plan, with the intent of
maximizing the sense of green space on the site, esta-
blishes further restrictive covenants which limit building
coverage to a maximum of 35% of any portion of the site,
and only 157 coverage in Density Area 1. See Plate A4.
In keeping with this intent, the Preliminary Plan en-
compasses a range of "soft" recreation facilities built
around a jogging/hiking trail with a series of scenic
overlooks . The intent is to maintain an open, natural
sense of the site rather than the more typical "amenities"
such as swimming pools , tennis courts , clubhouses , etc.
Landscaped earth berms will be used in areas of more dense
development as an attempt to maintain the open space
quality of the site . Earth berms will be a minimum of
three feet above surrounding elevations and planted
with appropriate ground cover and/or shrubs to prevent
erosion.
The PUD Ordinance further requires that ground level
dwelling units shall have private open space contiguous
7
RENTON BUILDING DEPARTMENT'
1Uf' ICIPAL BUILDI.a:_4
2 `,1':.L AVENUE S3 .I H
WASH. 9 fl,5
JAN 2 8 ktc'q
to the dwelling unit and equal to a minimum of 2070 of the
site covered by the dwelling unit. Such open space shall
not be less than 500 square feet per unit. All other
dwelling units shall be provided open space of not less
than 5% of the gross square footage of the dwelling unit.
Such open space. shall not be less than 100 square feet.
5 . 3 SET BACKS
The Preliminary Plan provides for both development of new
landscaped buffer zones as well as maintenance of the
existing green belt zone to buffer the total site from
those areas immediately adjacent to the site. At
present only one area of residential development exists
adjacent to the site, at the northwest corner. A set-
back and landscaped buffer zone for this area will be
provided, amounting to 100 feet in width. The eastern
border of the site will be buffered by a landscaped road
and buffer zone. The southerly border of the site is
a dedicated green belt ranging in width from 150 feet to
400 feet . Minimum setback between all buildings is
20 feet.
5 . 4 SLOPE
Plate A2 depicts the slope of the site . No building
construction is to take place on 16 . 5 acres of the sloped
green belt. On the remaining 25 acres the proposed
maximum density for the site falls 30% below that allowed
by current zoning. This will cover any reduction in density
due to natural land slope in excess of 15%.
5 . 5 LANDSCAPING
The Preliminary Plan maintains the existing natural growth
to the extent possible. Since the building site proper
is no longer in its natural state, and has little natural
growth, most on-site landscaping in this area will be
developed and planted after construction.
8
RENTON BUILDING DEPAR T M_NT,
iJ Ilii.I?AL BUILDIN :,
L AVENUE SU,I H
fie.i1ON, WASH. 980 i5
6.0 DEVELOPMENT PROGRAM AND PHASING JAN 2 8 REC'D
Because of the current financing and marketing situations ,
the ERADCO PUD will be phased. Consistent with the current
PUD Ordinance the first phase of the approved PUD will be
completed within two years from the date of the approval
of final plans .
For aPUD the size of the ERADCO project, the PUD Ordinance
states tha the approval of a final plan covering at least
10% of either the site area or floor area of the total
project shall constitute a two year extension of the approved
preliminary plan.
It is anticipated that the first step of construction will
consist of preparation of the easterly access road for heavy
construction vehicles, on-site rough grading of circulation
roads and bringing local utilities to the site. The second
step would include site grading and extending of utilities .
Housing construction is anticipated to begin in the north-
westerly portion of the property and proceed up the hill
toward the east. During construction phases it is anticipated
that the easterly access road will be used for heavy construction
equipment, while the Blaine Avenue N.E. would be used for
small vehicle access .
9
RENTON BUILDING DEPARTMENT
MUNICIPAL BUILDING
200 114i'_L AVENUE S. JTH
R'IV i ON, WASH. 3 Uo5
JAN 2 8 REC'D
7.0 ROADS AND CIRCULATION .
An access road will be constructed, to enter the site at
the northeast corner. This road will be a 36' paved road-
way built upon a 60' right of way consistent with the City
of Renton Standards. A traffic light and appropriate
lane separations as well as compatible landscaping will
be provided. See site plate no. A6.
Secondary circulation roads on site will be a 24' paved
roadway with graded and planted shoulders . Minor access
roads and driveways will be a minimum of 20' paved road-
ways with soft shoulders . See section 5. 3 and standards
for each Density Zone for appropriate set backs from
roads . No parking will be allowed along roads on site.
Pedestrian paths will be hard surface with six foot widths
for paths serving more than one building and a minimum of
four foot widths for paths serving individual units and/or
buildings . The jogging/hiking path will be a graded and
drained cinder/gravel surface varying in width from a
minimum of four feet to areas up to 10 feet in width.
10
RENTON BUILDING DEPART
MUNICIPAL BUILDIN
200 MI•_L,',,dENUE SOUTH
RENTON, WASH. 98055
8.0 UTILITIES
JAN 2 8 R'o
8. 1 WATER SUPPLY
The water system, from a 16 inch main on Third Avenue
North, will conform to the City of Renton standards
for design, construction and materials . Fire flow
requirements will be met with 5000 gpm/ hr. Water
lines will be run along the site circulation roadways
as appropriate.
8. 2 SANITARY SEWERS
Three alternatives are outlined in the utilities
analysis . Each alternative involves the use of 8 inch
lines connecting with existing systems , two of which
approach the site from the north, the third being the
Metro line adjacent to the Maple Valley Highway.
Accessing the north side lines will involve acquiring
rights of way from property owners for sewer connection,
while the access to the Metro line would require
significant disruption of the green belt.
8. 3 STORM WATER RUN OFF
It is anticipated that surface water will be handled by
a combination of underground collection and surface
retention basins . The system would be linked with the
storm drainage ditches adjacent to the Maple Valley
Highway, with an energy dissipater at the juncture
with the ditch to accommodate the heavy flow down the
hill.
8. 4 LIGHTING
All exterior and security lighting will have underground
service and be designed and erected subject to residential
standards consistent with those of the City of Renton.
No internally lighted signs will be allowed on the site.
11
R
RENTON BUILDING DEPARTMENT)
MUNICIPAL BUILDIA.:;
200 MILL AVENUE SO.,I H
RENTON, WASH. 980J5
8 .5 ELECTRIC POWER
JAN 2 8 REGU
Three phase electric power is available along N.E.
Third Avenue at the entrance to the site. A looped
service (underground) would be provided for the site
along the new access road.
8. 6 NATURAL GAS
Natural Gas is available from a 8 inch high pressure
main on N.E. Third and a 4 inch high pressure main at
the bottom of the bluff near the west corner of the
site. Choice of access would depend upon Washington
Natural Gas ' s decision relative to costs , rights of way,
etc. See Plate No. 10 for proposed utility patterns .
8. 7 ROADS
Circulation roadways will be paved and landscaped.
No on street parking will be allowed on the circulation
routes . All parking will be provided in parking strips
or in covered parking adjacent to the dwelling units .
Adequate emergency vehicle turn around will be provided
as required.
12
RENTON BUILDING DEPAU:Mc116
MUNICIPAL BUI_. I
200 MILL AVENUE SOUTH
RENTON, WASH. 98055
JAN 2 8 "Lel/
9.0 ACCESS
9 . 1 REGIONAL ACCESS
Regional access to the site is via Interstate 405 and
SR-169 (Maple Valley Highway) .
9. 2 SUB-REGIONAL ACCESS
Primary sub-regional access will be via N.E. Third
Street and Sunset Boulevard North.
9. 3 LOCAL ACCESS
Local access will be provided by the construction of
a new paved road meeting the North East corner of the
property, originating on N.E. Third Street. This
road will be augmented on the site with a circulation
road system designed for maximum access to the site
for both residential and emergency vehicular traffic.
9 .4 TRAFFIC IMPACT
Primary traffic impact will be felt on N.E . Third Street
with the predominant flow westerly from the new access
road toward Sunset Boulevard North. Preliminary
studies of this impact point toward the construction
of a signal at the access road intersection with N.E .
Third Street. Complete analysis and trip figures have
been provided in the Environmental Impact Statement.
9 . 5 GRADING STANDARDS
Detailed site engineering plans have not been made as
yet and without such detailed engineering analysis it
is impossible to accurately determine the amount of
cut or fill. However, preliminary calculations indicate
a probable maximum of 65 , 000 cubic yards to be excavated
and removed from the site and 15, 000 cubic yards of
top soil to be imported to the site. These quantities
are consistent with the Preliminary Plan objective
of not disturbing the site more than is absolutely
necessary.
13
F4Et^JTON BUILDING DEPPr'T 414rM rMUNICIPALBUILD,
200 MILL AVENUE S, H
RENTON WASH.
JO
10.0 COVENANTS, CONDITIONS, AND RESTRICTIONS
Development of the site is currently controlled by
a restrictive covenant dated February 22, 1977. This
Preliminary Plan application includes proposals and/or
additional covenants to enhance the quality of life
and the livability of the proposed neighborhood, as
well as minimize the impact upon existing contiguous
residential areas , both present and future.
10. 1 ZONING ANALYSIS PLAN
The buildable portion of the site has been laid out
into four building zones, each zone roughly following
the existing residential zoning lines . One exception
to this pattern occurs in that the proposed Zone 1
incorporates both the R1 (one acre) portion and 3. 9
acres of R2 zoning. See Zoning Analysis Plan, Plate
No. A4.
The restrictions outlined below represent a general
indication of the types of housing density, setbacks ,
parking, etc. typical of each zone. A detailed
Statement of Declaration of Covenants , Constitutions
and Restrictions will be made available for final
approval.
10. 2 RESTRICTIONS AND REQUIREMENTS IN DENSITY AREA 1.
a. Scale and character: All buildings shall be
of a residential scale and character compatable
with other adjacent residential buildings within
the P .U.D. All buildings shall be attached
row house" type structures with not more than
five (5) dwelling units per building. Each
dwelling unit shall not exceed 800 square feet
of land coverage; nor shall each dwelling unit
1 /.
tIENTON BUILDING DEPV'i t;t_11
MUNICIPAL BUILDS
2RNTON WASH• 98U55
htL
JAN 2 8
garage exceed 540 square feet of land coverage.
Buildings shall be designed so that any elevation
exceeding forty (40) feet in length shall have
a minimum of one four (4) foot offset. Offsets
shall occur at a twenty (20) foot minimum dis-
tance up to a thirty foot maximum distance along
each building elevation.
b. Lot coverage: There shall be a maximum of
25% land coverage by building.
c. Height: No building shall exceed 25 feet .
d. Parking: Two parking spaces will be provided
per unit.
e . Special Conditions : No buildings are to be
constructed in the northerly 100 feet of this
density area.
1. A 25 foot landscaped buffer will be
established at northerly property boundary
of density area 1. Parking will not be
permitted in this area.
2 . Parking can be permitted in the remaining
75 feet of the northerly 100 feet of this
density area.
f. Density: A maximum of 9 dwelling units per acre
with overall density not to exceed 35 dwelling
units total .
10. 3 RESTRICTIONS AND REQUIREMENTS IN DENSITY AREA 2 .
a. Scale and character: All buildings shall be of
a residential scale and character compatible with
adjacent residential buildings within the P.U.D.
All buildings shall consist of a single story
dwelling unit with a two story townhouse dwelling
unit above or three single story dwelling units
A
RENTON BUILDING DEPART Mcili lg!INICIPAL BUILDI,d,3
2 '; f 11'—L VENUESUJIj
h, I ON. 9,0:"
JAN 2 8 ttt Q
in a two and one half story walkup configuration,
or any combination thereof. Maximum number of
units in any one building in Density Area 2 shall
be twelve.
b. Lot coverage: There shall be a maximum of 30%
land coverage by buildings .
c. Height : No building shall exceed 30 feet.
d. Parking: A minimum of 1. 75 covered parking stall
shall be required per dwelling unit.
e . Special Conditions : A minimum of 20 feet shall
separate buildings .
f. Density: A maximun of 11 dwelling units per
acre shall be permitted with overall density
of Density Area 2 not to exceed 45 dwelling
units total.
10. 4 RESTRICTIONS AND REQUIREMENTS IN DENSITY AREA 3.
a. Scale and character: All buildings shall be of
a residential scale and character compatible with
adjacent residential buildings within the P.U.D.
No building shall contain more than 35 dwelling
units , nor shall any dimension measured parallel
to a building face exceed 120 feet.
b . Height: No building shall exceed 40 feet.
c. Lot Coverage : Total site shall have a maximum
30% land coverage by buildings.
d. Parking: There shall be a minimum of 1 . 75 parking
spaces per dwelling unit.
e. Special Conditions : All buildings shall be
separated by a minimum distance of 20 feet plus
one additional foot for each foot of building
height above 30 feet. Special exceptions may be
permitted subject to design review.
f. Density: A maximum of 22 dwelling units per acre
1
RENTON BUILDING DEPA2TMEN111
MUNICIPAL BUI-21
200 MILL AVENUE S,/J fN
RENTON, WASH. 900D5
JAN 2 8 REC'D
will be permitted with overall density not to
exeeed 180 dwelling units total in Density Area 3.
10. 5 RESTRICTIONS AND REQUIREMENTS IN DENSITY AREA 4.
a. Scale and character: All buildings shall be of
a residential scale and character compatible
with adjacent residential buildings within the
P .U.D. Maximum number of dwelling units in any
one building shall be 70. No dimension of any
building four stories or above and measured
parallel to a building face shall exceed 200 feet.
Buildings below four stories in height shall
conform to size standards in Density Area 3.
b. Height: No building shall exceed 65 feet .
c. Lot Coverage : 'Total site shall have a maximum
of 35% of land coverage by buildings of three
stories or less in height and a maximum of 20%
land coverage by buildings over three stories
high.
d. Parking: There shall be a minimum of 1. 75 parking
spaces per dwelling unit.
e. Special Conditions : Buildings over 40 feet in
height shall require additional setbacks at front,
side and rear equal to an additional one foot of
setback for each additional one foot of building
height.
1. All buildings shall be separated by a minimum
of 20 feet plus one additional foot for each
foot above 30' in building height.
2 . Special consideration shall be taken in siting
buildings four stories and above to ensure
adequate protection from overlooking between
dwelling units.
17
RENTON BUILDING DEPARTMEN1
MUNICIPAL B
200 MILL AVEN yRENTON, WAS-,.
FI 2
f. Density: A maximum of 22 dwelling units per acre
will be permitted with overall density of Density
Area four not to exceed 165 dwelling units .
10. 6 Buffers Required in all Density Areas.
All buildings shall set back from site boundary and
Property lines a minimum of 30 feet. In addition, no
building shall be less than 20 feet from the edge of
paved roadways , except in Density Areas with more
restrictive requirements . All parking areas shall
contain a minimum 12 foot landscaped buffer between
paved parking areas and the edge of paved roadways
or site boundaries.
18
11.0 OWNERS ASSOCIATION
It is anticipated that an Owners Association will be
formed to which all property owners will belong. The
Association will have as its primary responsibility the
provision for care and maintenance of the common areas,
greenbelt, jogging and nature trails.
RENTON BUILDING DEPARTMENT,MUNICIPAL e UILDING
20I \
NASH.RENTON,
LL AVENUE SOUT rt98055
JAN 2 8 REC1
19
4.L
1 •'L-L/ - •14, _ u µ.
r.
1.1
M4....
I .
4i.:.1 •
I 1" r.r•..
f_- i .
l •
sr
u. '
f+A..^.. r. ..• •M• ...t. •
4. .r•..•
r- .
i • '. F'
1 ~
v. +•.' '_ i V ri i.,-.'J fw.- .. U IJ U r ,
71 ` I _1> J i.r..• U- - _ ..--- w-is_
r+ • `j? o` er ... Q .Q o
fn;1p, In •i. s;
Li- A.: rLry.'. .. ! ..t:.1..
r. _ 7r _1.
r! r'
r '' '
7{L . Fr
4q 4su•v
1{j"y^
r • , j iv
r 1'
ItiJ• , 1t
r
r
rS D
r
r••_ •
f"r,n•1J ,[ rm .J 0'
T'"q! , 5
N '
O a •.'I' Y'L]Ll ..•aJr.' 4
1.1],aL,.. •yi l•/-----'•-r! -tj`•• " r •--, l Jtkift- - t.• .'
r . 0 4FUy , i•
7a
r; iio..^
1r, 1
s. t ! s-. - •-.. '.
4'
r'
P•
r,
Gv , r,Q .
4 t!' . '.•''jf • y s '•
4 °ti:Jr-fa...1.t,; ;.;•+gyp-•
j
t`1. 1'p'rnr;iI
4. 0. cr Jyt-In
j • / . '
e> 4
4 -
fG: -
v i,
s .f1 7 RAJ.: l,+ ,I n/ ,C s"'.
u 'b•WY w RAFl,: w.: .-
y'`=`
I
y .0
Lam' .. -,4_,..., ,,.,,,
v,
f`
A rY j J• rye ( r7 trrfi... - _-- • . 'C. • r it 'r 1 , 4 ,,..4'l'
0I bt.n
um
i,J• / /., 3•,•__`•` Ur/' • U.1h.
4.4 • ...._
r,--.-,
t•t.•4. - ir Y• 3.:1 -• - r+ ' .„
fi•--T^TT• -•...••Y: L.{`-! .
i..)44 4.• '•.•.. f >s - '*r-1r,'I {
s -I, \'
A, 4 /'/ Q* !!'Qt D. r i?..94 1p[] pna .I , "`
l,'•. .• V r'
r
l`.
y,. +% .• t win, J9 1 _.p q * CR o
Mi _ •• ,r 7 '
wr r
i r' • 7
l`. / = S" Dc
7 ""rp -c17
Ar{
1, (
R
1 . " • _.•-..;--,..,,,,,.._-- 1`.., _--_
y -^ r ,
f• •'-• \',
Y ow •,,r1 -
1•.• `•. `'
J
t../oG" !`,`•• OU.. i U dVG'V•:LJ._
r _
c ,
r:
t ' Lr1 f7 r ti 4. - "lt.'---+-y •,-. -_-J. - n(-.e.. * { Ell
11I
ri, r,(" - 7 f yt7/ .vL': Q '" iLjO :fl -
1
r - -- R.
I I- }-H, -tjQ, 0Q•w r 4./-mac• 4 D o P „ 0 , 1-r y 'n r.1.1...7.X7.t
7." _ -r :4 w f .
L .`` ,
J
N• •!/,u i;, T D oDOaD''v •
yam,
s 'j•
v '
T '^ .".
L'..
1 ,-.- , • . • ' •
Q' k •..
l •el • •"ks•"'1 j/ / .1{ : "`CD L' '.1 ±"'` IjnG - •. ,.
t -•-• S • - r.. -r._,.
7 n r •_-
J i 1A,6 pa*
4'
T
4t ' nr
Y.L' Q LJ
1 _
1,1 ryF ;
Tz v D .
t. li c •• D 1_ .p[]D.7yyq •:: r i'l f7D J 3r `'
r'_Zrw w ems: '
rl : i irA•r' • :..
Al`'• •oi „.l
r
i ij ',t 3 O ,/r-1' ,
r
r r•, -.-. 1 ' •Rj,. 1a '
J 4j tom.
Ay
T -. o'
s'p i ' i
f',,
L . r n t-•:%? %•1,• 4..• -
s.{, {., `a
i w
r-
K A j
y $
f t y71 Q' i0. iF..u trfr (FL.''
1 --.- -
r
r :..
7 •
1'4: . r . ;!. '" y4. \' ,. ' c +' I. r -` -:' _ . _/
Y b oU40
Q'
tJ' 'A(]i] 44 ti-. c l t
I I1 •
s{ .+ _' ''
r', r • ,. --Inc oyi __7,. .
s. U.p.1_-- ,iTll ljc!'I:...ly
r- ciN\" 1d 1 '* 1 (
1/ 1/
f!
12:j•
y: i Irl1
I
u L] Y' n
r,1 ~ 1 jam. ' 4.. '
j _ ,, ! •'` . •'
kr _-
o -'' •
J'' • - -- -a'V.•I Gi.ppG :
1_ -,
yam_
rj , 1 ]Un - ;,flU I LOJncil
c-
1l a•- 1_n. . ..r
j'
j,f.
1•
r
P.A_ _Js. 4p Clt?_q"r 1
I.ac+ „zr.j- i . ry
T_
yi./ . : --•ap..- _ `' w i '`i .1i{ 0 -' _ ` • •. !
e`-• .•./..'•
r -• a 9 my
LiU
i. . . 3' ss e* +,> >
ri .- / a.
1 Pk} 4y`A !w'.
R nn'D Y
451'... r+,..„ R.,:,,X..r r •
y" ; ,. i/3•1,', ,.., ...„, , M r..
l rL..S7
q....44.,41,...... i p., ,r- i •^ R, i:..... •t ' • `!s
4---...;._
4.`,......
L(''%
i
c D
o-
e ..• yis>
Y''''1'1• .... ' . r r••
1.,.^ki• - -_. 4.r •
1 mil" M'
r •. • -% ,1 r
ski+ t I. /. "C•`
O.t'. •^-;/
t /,: ;SOj`Y.I'ir .`'• 'i`''' ' . .7."--'`
LO L7-!!, •
T ' .
i ,•
t cod. r k
I» r s J 4`
7R',,,/ . , ,
41)-•' :\.3 . t''1'-- *. ' "-
7..
r.
2.
y{1I •`t_'•
11.`` r .,
r,(
1 ..>+ •.•
r 1'I. _ ' O '- r
C `
w 0 ,,^
f 1
R•. r ' `„ I r •,,
a Z•. Jl;:. i. ..t•
y 'c.
s r' { '< ' `_1's.' ` Z nt n• r -
c
x /i
S \ r ` iL„'•_
i'.' • /G'rG+/ j J x.r' _
1 `,,. •, •
t \\
t-• • .?"
j--v.- x
N \t`\,
1' IF S ,'/•y/
r'
r'X Y .! t• _1• 1 - "'"' 4
Z•,1.T ,,,/.r/' .,'1• d• ,,t1'
If) mca., -•`•y
J ,
J• ... -e. r.
1 - .!(4.'
4'
r i „ ,,,, -
r`T U 1• ,(o. :SA` ` ,'/:
1
I{ r /1 I 1
NtN F:. ./ ai • 1 : -` ` 'lam 1 `
nL
Y-,'.' r•cif N. ti ,
r 'j.. } \;'," /-,
y
l o' :r•
it '•' '4 ,; '/ r1
i
ter.•
4
cc
ti...1kc---' 'r t ', .•i. rl ' ,, •_, fi y u I \
r:' ... /''e S • I•r '1 ,,:.." 1 +}
k.
l -ter 1`
t C !
J 1 1 i `+ \\ (f 1. I y .
Rr i i Mr r.
1 1• .st •.,
r- +...- '-_-,r=;r-s 1,. ` .,,,../...I,'-a ' -/
9 C.n
4.4 Ilri c(&S) 0 3
T
1-
0 i i O
N
Z-
1
0
11J)
rrnosz
c=.1D zZCO
c., Zr-0r
g mrD-z
co =cCo
pc,r r--rri
m_ LC)0")013
o
Co c 2 1
rn
z
Q Q p Q D rU- 'Ir
OMER L WNW( PAWL
i lJ UL` YVUU U U U l1V 0`JOQ J L L_. U J DONALD BOWMAN
U g 2000 112TH AVENUE N. E. BELLEVUE, WASHI NGTON 98004 454 • 3344 ROBERT L RAMALEV
M1
Jr0.10,7c***.'.. ',/,' T /
1.7j
nr
l\ \\\ • /i/,
r/
o/ !_..a/ta,^, W
LckiEe" !L-1.. x- s-, , • /_ ..»'`n. avmct . t..,... P"=!"
r• ,,,, 7) kji
I(1, c,c (, , , , \,
1I, , \_ N1/4s''''-- -- ----- -
1..-- --,---•,-.-. ---' ---31.---J.- -' ,...-_..-----::
1 , ,. ,...._ T.,...-7-- .
tiSI
r,•/,
1%
i:: zsU' /may '
7'.-...._•-•--•-.--.-t---•---..-----'•''*-.
d.................................,........1"- --.-
r'(''' ii‘.._.
1 .
vde -.....,..-2• ,•;;-- •-•• - . ----
7—:-..-- -. „... --------------- ..Z -- -.., „. _. -- s .....
ir
i, ,
i , 0„,, incesse /C.,e/itsj / n.ai
t ,1t1171:0;,- z
i/
N..........„1 )\:\
1:1:1/. /
Irig.P1I1("..'-
J. i,14jo,*/re''.''' At.... '.'ftki/7,- /--" M "-'
N.,-.-? \ \ :: \ s.--- \\ I
i1.1i
CPI
j:11)' . '
0 , I( NISOirz---
1:- r-- \\\\.\)
Th— - --\ \
r\\))\
C
I
N-''
N.---:--------
I.• i 'I(I
IIi 'P / 01,' i ' i -- ---_\--,--- =—.s \\\
171'
1'
I 'll e...
a611in4:,/ ; 1iI11i11i 01
U , foe111
1
46A0,
11--
t -
il
i
1:11//, - ii: 4Erifdi11 •
1 ,.,
dii /I,
11. 40
II1 ( A,
uY
irgiisi11, , i , ,
1 .ji
s,\\ '. •-•"11- If _fi, - 1 ,,.,., , .
ma ••••‘•
dL..:---.. _-••• / ' ' . i
Vme1;:rmi (rjt-,
1/1°1/,,___: - - . , '\, _ _ 1i, .30_.. )
1• few••i•• •• ofvP rO•-.-•-00'. l..
Oid • O.O re! 4,•,:..••••rPassr rP ,•.'y \ ter
141::,*
41'‘;#
4":‘
6-.:) '_____, . , ,
4044 -.. i ., >. "
li-
7r@•co< :\ \e% •wAt4op iyTh4:0_
44,
e,
c,
40,
Ate.. - V16,0•>— 4, vb. .,
1••ptea•f•aeacrr : i‘Ajt • • Aaa•• .%•••••*v "...e
lit.
r__ r•%•:••••••••y•.•••a••yes•o+4NO
7•tff t:3 ' Cli \144o•• •••••j• 1in
A•• *•.• *IP1..• ..0
1
ae••d••D••ewm-
a•4ii• •-•N •O.7••ti;,•••, ,Aineira,
i '• 1e`••a••.
k4.•y.,',4••••••••
e• •wA••••wed••4w* '•"•:••.
dq. 4.•••4••,i.•••" •••••••.at `. %A.
e,.e4.44••! .
Q•••••o.!.m•\• e*.tp,.o...ee•., ett•.•.N4oOewQ ` a••
j.C1\•••••-••• •wf*••••••Os•,14.e••••a .
w.a•,•• .'999irr' `
i••i. `+,)V '•iitiAi•••p`••ice•.• •• e,.
a••.+pwj •i•1•.Qi'CsA,.w•i. .•..••a•
pid0•i`••,`ti•1•0vi e+o.ew• d4••0,4 O •woe
ti41,iw* •i;.•.f`,,,,tei,
jam.••••y • t144.•i,• y/
A
moo•••••
l40•iF••w••' .•44•••4
0.*
1. ••i•.••••••.••f`1A
0
n0 ••.w•••• •.A •14 •** •'
N1'
0:- , G. Li04•4••. • d• ••4 .4w.••o•r••
14.•,%...,•
yit`•V 4ot•••*io,.e•yo44o.•.
0CL) 0ii211 . a7/A0
r0 ' . Ug- -
1.\\ ' t1) "/ft --Ns ' \ : '.\ %
4111\ ' 1. -
j,
4P0,44VOse.,•....
v.r...%0 „..- 0 -..-Z -
7:-__-- ---------\-;\ -
11' \\:\ \\
P - ,
C
CAA
i
01
1.4p
Ixi
nn47 -
Na.*s\
N
4
cnTi[MOTL)
L%UV
ASSOVOATEVWJU`JULO
U
IECSJp WfF
G.f
00NALDBOWMAN
N
g2000112THAVENUEN. E. BELLEVUE, WASHINGTON98004454 • 3344ROOMI. NAMALty
4 411111°11111111t it 0.:,.....„%/
4 ..........,,................00 , ,
l'- ''..1 -iiiiiie ' .W NAJEO 1 0 ",.1./(1-r,
1/4 vs., , - 4.4.....,...---- 1,,,B4O1._ „doe.. 453 .4..... - 0, .,,--. if •:
4.-,.....
2..../.......„.. . • . .141 ;
4
vfiNo.\ _ :z.-:' ,.\.\\
N. ...s \,_
c....„.,..............._.......;1*-—-------------. ..----- -- -•-&I. ' ...,-..-......-7:-.--e."."°
N'"'"'•
1,1/;I' -
r -.'". \
F7-•----------..,:-::: ::.7
le- --- ..:0j
7-----
1 ( (
7 7---:::7-- ..•-.".--.....:
77.----'""...'•-...
4-
17 ill. 17---;---
X. : '-,,-7 /7 ::„,. ::,,,,,k.,,,.......)-.- ...•"••••....-...,,,,........2.,___..2-------"
7 j
i!
i . la,
WI IA'
I / ol I
i‘ • 1 aii/ 1 0 SI #
aiblifir—i6404.7 -74,------- 7/ --1":----/:_nj------
7///7 $4 t .
r‘pi I,I 101141. # -Of-4.,,,,,A.,. /gt/Atit, Cf----Thi\N\ -__-.)\,,
siipil / 1 II i ...-- 1
11;11 I II tafiljtok / , --.-\. • ' . -7`-
ii' ' r \,) A. ')„,
i ;'... '....'...
ho II of iljtirl 1 *1 I r I-\ . .
7.-- .
4,0 iit
1. a 11: I I.i.•
111
L WWII '_.1
1 .
e. •Ilk D it I ,13i• 1 J.4 7g -t.:
11
4'
1 k I,IIli,
1
i/ I /ill I 1
e—— — 7 ) 4 ,Illif 0
I 11
1:
r-?., ;\q4". i, •
rilis__. 11 .11
s _
ir,„ „. iifo,i
t__ _„. e
N, . \.%,
N
4101,fir I .'" 1.''
r'\. :.
04,
A'
titi
I . ; )
ii. \` J
k_7,
f- ,--- -
111P,
I es;:,71
i j41) _A 'im 7,,\----
77:
441
v iib..4 _ , 4. - ----\ j
z\
o,
0,
im ii ..-.,.01
cl-/gri r, a •14,\.:444,0 '-"io
4-
1: D e Ni:
1:0' % ‘4\
4\Q 14
w_
6.4 ,, ,,n -41 4 . 1 , ft,
J
ii
broom- 1
1
t YA
14. i
7... _ ___ NS4 `''s. ".-7p\. , . (---
o,Ac:3 i42. P.N Ale^
I
i ,
2. , 1
411411
1
1
3A
V'
C i---- ZSON-\. ..1% - * :
A4a t \
8/r, \\1 .‘ Iki
CMIS_____ C) ---- I. ''.: '..
c.` \,}z ,,,/,, :,,ip5 ,A.:;)0-
1 ..,:)\\ ,\,\\\ , )4.1,i ,, ,. \ ,‘„) , /
L, ,
s. 3. ,.4a. 0 1,6.g- 0 ).-/, / \ ' \
N ,
s'. . \ <-‘,
4, .NV ....,/ • \ \
Ne„, z,
15... ,,, ,...„. ... ._,) ,\
81==ma wat
gp N 0
Df eI Y
ss
0
P° GC!-'1- '_ .
N.X."---,,,. --,, -....
0 2
2;5----____---:>„......___ i ,_ .\ /-.) .,, 14.
1.-_-_-_._________
1.,',,,...... ‘. --, \,..\‘, ;E,;
s1 Fin nr~ ,
i M N THELE MO U V ASSOCIATES U
LJ'l:J U/L1 I TE CTS own l411111M/ fAIA
4` J UONAID BOWMAN
a B 2000 112TH AVENUE N. E. BEI LEVUE, WASHINGTON 98004 454 • 3344 HOkANI l RAMA1rV
v eradco pcluad0
w r
A k -( 7 \ omisakiditik 7 ,.:) ii) II ,
k j ,0 0006 ._
L.411.7
t
N\
I\ ";7
g
7(/. • 7 - •
e.
s, '.•••'''',...... . .............: hter ./
lip •. , 5',"::
N'''...‘..'-'-.'..‘ \
s`-
s:-.:-H:"---7. --7,:ZZ----.. 041, ,
f;:----:-- ------.
ins L-". 1
s. .. /•)/
ip. ... alritar - L--:-.. __ __,_ _ ____ ---
o•••----- • i
V04I: f
i( •-"li'''" -----"
T ---- --------.. --""---
r--------\);,
fI.,D..-----'"'.'
I
4\,.'.',6/
k,Ti f',
1:,t"_.._.'_",.'"..
g7.
e.*"....
0. . .
i))? ..it 0 '
7/
11,:i
7 0 NU, i14'
I.
e, ././:„„ /
4"/ . .........' ............r.".1111/
4) „- , ,
I \
211 40 dbaA
1/ 1 N
4.
4at.
1 Il• 1fIrfl!! / ` s , t i ) . . _ 1,
1-' )
r•
it/ .._ / LO.,•Foriu -ifiit ^ i r
y
j Jf'T7TT
1,
li •r;t. 1 I I 1, ti,I ,T]e i
1 111
g
441 I I k
fi 11 - .
111
i.,
ill /1 1 ill .. ileitita (1---11
1 v..A.. . ,,, .
f g .11/ 1
ditrajA I 10.
11 ck II
624 , . ,, II il,
N' '
i ,\ ::'II 0Al...,",171.117 _
4 U 11 01
1---• :
I:
i..._ .._ ____--11 ' 4.'' iji i''' 1 \ T - gr, 44...w .... mw
N • -1\ilifill. i
Y III PI 1111 .
i.TTh\s 2,
ii,ti,\ ,
P.
NI1ii)L\ .. ,0 0, A
B
4 .... " --,•
ds,R co .44. A. . •hL7.7,
ecia , A e-
21.c4 rIE-I3
s
s.
T ige I 'c--1;:
14
4.....>
f-- 3 5D i
rt- vs-3 . ‘
i
i___ cc:,2,.p, .....1. .
30 - .--,A. ,,IJC., - ,--triii c-- 7.-2- ::::- -e
N\
C------c-\ ',.. 7.• ------\\ \-. 4t 0.: -.
4 ,.'
r . , --:-- . ...4,
R / iJ , ', \ L.,.. 7---IT, %A\.,7--- , , ,. _ _ ii , _R„, )i
i ; r-k ,,, /,
1 e ee.. .
J.,\ e
e.eet• k....,...__,., ., A, t, ..
4,; \ 01. ---- -- --- \.... '-,,qle *bp \ •
N- '.... .
1.%
C7v.:,7":''....."."--
r--—-----—-—--"'. .--'--...... • % (*.''..1 \I
iii "'VI"--- -------N,-
7-%. .1 L._
iiiieB"' •-• -. -s‘... T)) MCD 7 '.' '
L :...\\ . ''.\
ss\‘..: ',, ' - ... \ •
i,./ t.y•
il
i/ (._ ? )ck1""
0 '\____,../ \ '`., 1V'':.:\ - \
1 s _. ,,\
s.
s::::......_.
s....\....\:. \ .....,,
k\
s..:
Ns
C''Ci., ' - ...!.;',\...:-:::,:
7:::,,:17,,Cts.)
1==I____'--__?/://'--
1?), . ,\
L--;•;:
10:\
V-L
v.‘
1\%,
3.------1.---------------.
4..°
N-''''''''
N'
s -----,..„,,,
Nr„,..,_... ,•,. .,--,_________-_______\) -,f \\\ \\,,
t, " ,, It .47
k •v.,.,,,,,,,, ....."\--....,
ill 1,, Ik
Y \
i l!i I .1 n j
61
LJ le IK TD IU V ASS©COAT' A CHATECT ONNR L MUM" MLA
BOWMAN
13 $
2000Bract()
1112THAVVENUE N. E. BELLEVUE, WASHINGTON 98004 454 • 3344 ROItRT I. RAMA,EY
rj1: 1 Jy ppudia:
77.:..'"K, 7(741111..il-r-r7. ,. • --,- —
7 )1514---N 0
1 -7 p
cir ' 'rise.h„......
r .
1 . ..,..,..._....
x...... .:;„....... .......:.,...!/4"... . ... .,,,,,,,,,p,,* .4473 , 7A Ili al ii,,, "\
JON447 •
j.,•//
4/>:
4e..'"--7. . • Lill ........"-
tAh \\ \. S A -A(
4) ; ., - ._ - . k„.__ -,soh , :- :N ,, \ I / , ( ''•,
1 ' ..--..‘ :
N.----:-•• •-•- ••---
7-- -___,-.'--;-:-'"
r .
IL
t'••' :
I 4* \ \ '", 000 .
1!._......____ ,
0 • IP NN sitrai- -lir0•050-f ,
Al 0% 0,e / r----
1.41r411114 - lie.-• - -
4„....y. ,:"..,:_;_:- 4044 ..tA IA.. , •ili0tarC— --- _, ,..... L...i
r ---
r-
2. 9 111 ;1111). .11114:
11 ram( 3=--=-- i c
r--;I6*%... . ;: \ ......
7 __/-- ,
All
dif•Att,
ia
C
Ni ,1iiiigirlt; "Aypr ,i
i
i 11 .
oi.,..., . .. , 0 . floviitsdill 1 lair ,
1 ,...
la
Tr_.-:-.:..-: • 1; LIlf"ji•F
1::... , ik".... , .
I I • .,,
NI. 461/4 ' • /
kr
ill( I g ji or-**._er* 1/,--- • -.:., i
b 't f1 i— —
1111111111111111"."111111/
v
II
If.1 i
I v '11 •
i - 1/1 imp,i*r.
i
4 r I _I I,
A'44 41 41 ' 18)1
r, $r
I-
1.. ii- i •
f.......
J:17/7k „1r11/ lig 1Plifij,,, a.- i I i 1 - 41.____ . \ 1 1 1dill1I \\
ss .
rril—_ _)
j' \ (.
1 I ii! 0 (,I,- I.1 toriAji014 PP0 • / i
it 1 ii ._____ II • ., , ,
i.)t__ ___ __,/, ..114. \ 1:,lir r_..,___ ____ _ .... r--7...„ ' i ir Rs, • N 44 ifirialfr"
qv p ma m on ei # - / ' IL ' -\,.;,.,',, L-ti ; if, I, 1 ,,, , _
arm.- .• _ , , c,(6- 1 , ',•2, . lj a 1
N 043,--,
r; . .•.
v -..-.•••.:•:•i: ,os_.. .•-...• ---.......:. .. . .._ _ _:._._ . 4, -,
i.e.
is,....
00,_ , lea) i ,
it, l
j o•
gall 0 II '8111 r4ilie:IiYa
4.5 ` -Z as ,•a
r f•:„I. •
l.:
11
j;kik
Nip
N.
AliT.6.\
O \QUO
o o°Mail.. IA a., >v '• p, : .
f
r O y .;@
iiri >
w, la' i,a. fJy
0 III
op,
rya_
4. 1, r„
imp
f`
q w
c 7-,) ----'-----.'Z. , - - --.. . .- :•;..--•-"-"'_ . A-111 %..VA t." . - -
7
64.:
C J o d
J 1E J
O yr e F - a1,
i 1•`
t
0, '. !---• ------__ lillie -...,..7/0" -'L ''' N kilted a "
44 la '- .'
4t •
s' U-:..'''10...-IF 1114 4 -.•0 -188, i • A - ...." i -.
v•-14‘,643r, 4111ir.
r f, z\ d'
f----- 1•5. zma 0
eta'11161.
1=3 -rl'`....\----------- . N\
7
8.
A\Jib-.,‘;
A
Od' t yo
f\ ,Q G._ fir\\A 1 , \
i,
h..
I \.\
r\•,
c/))
i,,:,
CI;(
L''' -\ • ........
T)
is/5---,% -
OA -, • VE1
N‹. --
v..,.._-„,_------ \ 1 \1 40
It.
r I `1 \ ' - c., \:,•no I 1I ! 111
V
l'l'^.^+
OMER L AM NON. f#lATHE U\IU D U IJ J U V 0 L J U%n 0`C `V ` • J. DONALD DOWMAN
Qpt2000 112TH AVENUE N. E. BELLEVUE, WASHINGTON 98004 454 •• 3344 ROBERT L.RAMALEY
era1oo o LeoCATp
i. -
J -
t ,. ' `
t
CC
1.
w.-•
l'
C, -
t
tI-.
4.-.
i.
flltr =*< •{
v,, •
tyg','.
Ir..
tnf..
7•..
1.•
3;
1r
mow . -.
tie _
lS +
Ij
4 •' '• .
A
S
i• '
1•
i•
ka
4F ``
4
1Z . ;
i
141e
i..,
tt-
f.
1 '*
1
j
3 ~ ; •
t)••.-;
2
i . }•
i
I '
4
4ff , ' • ' ••
t.
t ;
Y ••''
It" •
i16
Y.: '
Yt: . . $ • , , .:
4 '$' ••
1...., :
l
1 -.
i ,.
I .
J .
w
j
t
C!
t
r
t ,
Sc1
r••""`'; _-
1 .
rODF
S
p
i
f
13
il.
4,
r+..
4Kro...•
r
W.
w
r
Y
l /,
1 .
ir
qt/! " `
i' -
a
Y_ -
c.. •
O
a5.'
s..
o.... ,
wa...
u
aumW
znuar
i
rw.
w..
ar.: -
r
r !
i
1
Ity
r •
1 , = -/
i`
y;
r
n-
l
y, , . _
fir•.. •
4
tiX'
a'
1 .
1
b,.
t .
Y
2,` •, ,-
0, `..."
T-• _
v -_'•-
1"'
i-
r'. ----
a.,„„,../..•.
crtr
I- ,
l'
i '
1 .
a,
wwv1a+
op
ii
1....:,,
P -..~
v •
o_
i - :
1
0J
P*
4:
4:•-
4
1 .
it•
7,...
1 -
I.
j ..,
N,i,..
j_ ..
4.,...
api‘
kot„..„. :,.. , .
317 . ",),
e.
0,
7):
1•*,..,
T.,,,,-...; ;--•
1-:....-..-•'-:..•,;;;•••',._. . -:.-.'._.-::-------:::----
7-: ''
N' ,
1.. ,
11......,
4,
i.....
Ntmv
r,...
41,
1‘.. ,,'
7
I
es ;
000471•° ,, \'.. ' - • *.'
7
7-
i . . ,
t." %
i
A. /
JAr'' -
L,".
r ,// '/'/.
I• , \
1•{'+
IM1 ' -
v.
Ot
N
7 !
O
J
4
r,
I`
ji
Al,
40`'
A.. .
3>
a
0• ;
N''
O `
v4
1 ;
N •
1
VI
1
kill
moo:
a,;
1' ,'
a
o
qQe:
d..
r
h
b
tI. +,' •• • '
1,
1• ,
1
N'
t `- ^'
j
d
Gl ,
0 - -'—
off
O "_
1`
I '
ir'
ll ! *• ..
1•
1 • `•
t '.
1'
v'
f
r_
C
i
a .
i•
v,
y'
1
b , '.
1,
f `)
a1 '•,• '
s•,
4
I
I' • ,
1 •
1
11
1
1
a ". , !. /,#
IT
A •
t .\
l- •
V/
t.
Yt.
1. • • :.{
r • . ,
t
0
w.
4
QI
t'
1 ,
L,
a
7
f1.
i '` : \
y , ,,
t,`
t'
A1`' ';,
t .,
t •.
t + ' . ,
II ,:. "'
r
vilti
rJ
y
l /
1`
r !
i(
t
t.‘
I
ti -
t , `• , .•. .`,
t.'
G!'
it .
T
iwi ). --(
c '.
f•
c
V
i,
T ,
0
1. , •'
Y ,
7- ...
1.
t..._
f'') ,
k•t
y
t
1,,
1 }
t
v• "
v,
Q
y
f
I '!*
fir
s
i
1
a-
O/
t1 .
p
Q
GJ.,
L
b ' }
f
1
l
t •.
a •
j
f-'
R ;
y ''
7'
t'+
t
S
1 ,•
e•
j.
i. (
1 !'
i
C
t
y
yit ` `
y
r , ; ' ,
ee .- ._..
f
1 .
i
r"•
V. -il
s.
6 -
zo
L-.,
0...
to
tr-.• __
4
41 .
j
k
f
I
lL •
1,. '.
4' ./ ;'
k
y •' ,: ,
1,
I ' ,•,
o..•
a_
t • _++
OW
O
GI
i /
Jl%
t • / /,•
I
S
jr
til
t\`
T •;: \\...‘ , ,,,
4
ti
r' „
t
n=-
Ia
0
OOi
laaaV
Np0°'_• /`' ! ' .'
e//
e ; :
i,
t, +
f ~•
T.------:•HN.., .
l
4
0
a. •
q
p`'`
r°
e4 :
fir'; , `
t>
4' ;
I"
Albi
a z''--
1:
0 •
s•
e
1
J
Da
i.H.7...
iit%*:.f , *
df. .
7,•.
V
mod! /
m,„,
ii•.--
7
1
4'
f
1 }
I
tl,
I;
j::
1
11•
Ch
9,`.., ; :,
N,';••. ::
0 /
t
J
2i5.•.•...`"
i'
1
1 `
i
e,
ri
I •
ry- , .
i
Q
dli ,
I. . •,
t`
J
9, . /...
4.
64..
4%...........,......,/( %\
N:
sik..\ ...,
r?
Fto ‘, -
4.
r.
L._..-- --`• .,
t`. ‘\'`\
ILIIiik
1;:
l.,.
i
ire, ' • --
lic; :.-- --.
1‘. .
1r,
0.
4-,
e- ..."
ejtZLI:
23
MB
4;
1
t
ar '
i
la . .
9,
O'
14
T*•
1 •
i.•.
A!
D
ON4,.,;
t'
f''.. -
y
13
tV'
1;
4--.,.. ,;, ,•. )
1,
1
N
1-
z, ,
14Aommme1rd
O
3
p
N
rya,
V
CGR
Tv
jf
5.
1
DO ..
441i
p
tv
i
4
1.
n,
rc
j
G
wf-------'?---
ii(-
r--
7N->
7.- (
cw--s
e.:,....",-
N.---"'------.—----?,
C
a (
Ili ;
7.
1', /
I '
i
i
1
1 ,',
s,
4 ,
c:
3
r
f•
JIi1
a....,
kiofs4,
111,
117 /
r
ij
f-.
l //
i• ,'
O
m
t(
O/
l_
jr..,..
Thk\‘
1
2".."":".../
11
i:
11
i '
is .- '\
11.
111...
iiiiiimimialmin .... \
tn. -
ks`-,-...
v-
9--
0.
0'.
wsfu:
13
1
r
0
f/
had
f'
ce, \
um
1
j
1. /..'
if,
g1 .
0;, . ,
p „
3 •
I
ir.;•'
r,
r,',
i-,
I„4,".
r1
1,..
1
4/';(. ,
1./' -•, .•
u.
1 '•
t
fl /
L........
1x_
igliip7ip
r .
ill
r /
t.
y
r
2',+''
t':,,..''
t '/'
1.
d/:'
1f•' /
i
11.
t(
1
j /,-
aa
4:
N• .
N. „.
4_
r
ri
rO•-.
P.---
a
1,„.,
p
efo
lit; '"
i
r
I( '
f '
1.
Al
1
Lz. ;
a
mi
t) '
f
r /
r ••
1
141 .
I , //
sll =<
t
ti -`
1 \_'- =-'
rn
i1110P,' , ,':
p(
j{
j.-
1 ,' ;
z
l
j •
CM
a
mit
r
t
li/' _;
S
O•
Z_
a
4
i
W
ili
i
J
c '
i
i"
t
is ;
j ^
v'•.•
1
0 "' '
p7
1,
r.
Il
h;•',,,:.
L\
f,
FA ` ,/./ •
S
i•'
i
i,
Y
t
i
1
I
c/
5
Il' (
ii;
L
a
r4, • (
o&
L
w'• .' ,`.•' '} -''
ti ,
t •.
1• .'''
Y
j,
I' -.
fi•
arI}.-
A3
t4," •
f'
aA.,. -
7'}
0, -
l.'•:, .
I'- .
4 "• !'• -
1
t, ; .
f •.',{.,
c`
af4+
l;., •
r!+'+
3:: _ .., "
f'.
1 . .. •
1 . '•
r '
t•..
i," . `+"•'... !
r :.,
v
4 .
ns. . ,
wwry,.p.N.` u..r ..u....+.N.+....1a...._ra....1:..w....4..:.a..l.p++....-..a+ w.>..-.. .....,..- > a ..„j iM.'.Y A......_ -- ..- ......u.--...... .r -i._ _-
r.. ....
1
5. i
etitwi . 4,... _
J
N,...\
ate,,,,,,,,
A • • 1
1.
I
fi
v
c
i
s.
k• !'
w
id
fa, IUY,/
1
J
I.y '
itkl:
i--A '.
Iv
oa0. 11
0 • till..-...1.. _
11 .,. m i i ‘5...
t,:..
t ,o
ii.c.
v..!.
o
gi pp
r,
vv1 0 0 f
SOCZ
tZr .
v
1 zcoo2
1 .. 000Y II
2
o VI.
may
M
Ir I(1/l_
L.
1
L tHIE UVII TU ULJ 11V ASS0C0AT S D
I
AJ UCU ll LI L JTS J
OMER
UBOWMAN RCG*STEAED
TL HI
G 8 2000 112TH AVENUE N. E. BELLEVUE, WASHINGTON 98004 454 . 3344 ROBERT L.RAMALET N `ARONiTEa
eradc@0
STATE or WWopfROM
ru.. wr.........:.i.u.-wr'.\r1a,... .Y..I.LMV.F rYW.r ... .. . w_ __
r • J Mb ..._rr • .. u AA- ....
l'\
l match line
y
ittc,ti`
61-111,
N. r , ,
lis
AN
ill/
kite-
t
k
LI.I‘ ilEjajk6-
1 gnill
fil ,r
1 •f-i '11
1 .: pro%
t4 t,lir
P-
1
a 4 , P.
7.,...s.., it,.‘ . vto-it ;Wig.
s -
41,,._AA i
j I 14011‘.. 1 —1
1,,,,,d 1_,,iii
k b..)
II. plo 4.
401171 /
4 7 mil Elltr,,_-.-_-4/
i, .,
I:.'rill-4110 elifillff 1
1 :77PM\ 1. 1_
1-01$
r \;,`1%;;-)
I C 8;
i I n0 ii
A E, I
E4 I
iiilI 1
1 1 i ,
51--- . - -.....
8
itli i
el3 cc
A I:fr:
i tf•a
0 tta 111
i
1J'
u
a. , ..,.. , ,,...,.:„.„.„,,,,, ,. -„,---.—.. ..,-..,,,,,:-., -
Ir
1, . -.mattdl line _ '_ . .
M'
y///''
1
n (
t(^` //^v I//' may l`^ OMER L.MITNUH F.ALA
T THE D [7:1 L N ASSOCIATESES D AJ LL/J .0 7ECI J. DONALD BOWMAN
TL 117
IM
p $ 2000 112TH AVENUE N. E. BELLEVUE, WASHINGTON 98004 454 • 3344 ROBERT L.RAMALEY I I
eradco pa u0dJ0T All a Ynwl rT10N
of made valley high4lay
f
r'
d /
his 3
F_..
1
mc+tth 11ne
I
a
1
le
1 t . .4 t,\
i
1I. 111I_.
a.
I1 N I, l
b
tY1'
Ire
i
A' . ` I
tr
7 I
i .I/' Q f!' '- ICI
1.. E Ili 11-'1.
Y s I_a-
0S,
t ;AI-
w's ilp-17441.:7/
Q P.
sue.
8 _ 1 N re
Altisity,
s g
IAN _
aT$
N N U^l m / V O C U UTC((( D
U ^ CI^ U TS OMER L MIiN!KFAIR.
J. DONALD BOWMAN "
T'
ARG/1T
I
ECf
a 2000 112TH AVENUE N. E. BELLEVUE, WASHINGTON 98004 454 • 3344 ROBERT I. RAMALEY 1 \777
j . rdc pa LIQd; STATEOf LLWIANWITONMOWN
1
r
h
r .• c ,/ v 1 i 1
r
s r „ yami.s..,. •. ..-_
S.,,.„.....-•••'.' ,••• .••....••.•.•..:..•:....:;::..:.1.
N...\\t /I /\ ! i', /" r ib 1 1 /•'/ / r / /{/, 1 1 \ fir / / ,, 1 J I l ar •fly. \
7 ) 2 ,/,/ ' i •'..t
r 1 i' e1N- -'_.."I' • `-. ,\• •`7 _ ...1: '
r •. ` n Imo• ,,•• I; J
1 i a-•-•••-•••-... •ip.»:).0 --...,---cam,, - •
10•--i---.--. , ...,1•
1:.
8.
1
ii*:.,.....\1. ''\
e l r
1:1-:..,...1:°"i
P-'
4)....:.:.: :•--
7......II::: ..:1:11.
Si;'
L: -...' '. : .-.
7•.
I ' I1 , I.
I .'% '•
i
n .i. ,....., .. ii r---, 1-•••••p-‘• •••'‘)•e-- 1-7,I 1Ij1
1 i n ;• : i / I. vim '
r
I t U i I ' • r _ 11 ..! j. X` ,.,j E 1 l f-1 1 1
t j j , .gl i I t 18 r I •• f 1
s... . ..[
1
j .• -
I 1 • r•= . !i
J
i ,J 7 lei
r•••• . j I . , , L.r I. i i . ;l l_.J I
I L, • .1.j II CC•
i Y _ `' • '
1
1. .
1 . ,
fN
r' , i, ,—•, 11
I,-•-
I •--•+ i ;; i! i •I i I r _ 1 . . 12 i '
1,
i j. rf I 1{
I
44,1-..-jr-,- III' El f• I: •.--,'.....-•
U7__,i rI ; " t j8 r, s 1 "^``i , ! - 11 i /r .' _, r VVV ,iiei,l•.fl,c!
it• I/ I y 1..
I./ 1: .d/ ;. i• ;1
r- - -- - i
I
iiii i
a 1 j
r
J r i
e,
i \ v \ \ GREEN BELT -
s rr E .074 . •... ... \ .• tt,,, .
s• ..
1 q,f \. , \ • ,..,•__ -N... 0 . , , ,• .. \ ,
e
1 V.ei \\\ \ \, , '
O'
er , ` \•, `` ' 1
1 v\'\ • 4
s......2. 1 . 'r 1.
GREEN BELT ~- __
yam I / i .. .. `\
k). '
s.••\\ • '
X.- —. A.::\ \ ‘.
s ' .‘,....:
1 \ , .,
LEGEND i'` ram''. \ \ 1
VI,
OFF SITE UTILITIES—
1\ • ` ''. i .i 1'
i,j,•//) I I \\\ . .
Exist. Proposed I\ N
r Power 1 j
Gas• Y
44._ -.-....rr,..-.- San Sewer 1. \ \ \ 1\ •:\
6 ---8'. Water 4: :i. \\ \ \ '1\ \ I '\ N.
N Drainage " `-1.--
S\ \: _ 1
fi' \\ ..\\‘:
N.`t c\\N . ,,,,;.......,„...-r•-...). ..._
I N1 Y\
ik•-....,.. .......e'N..,
N.
11).
7;..-.1.. ''.:.;.::''
iYAIE
1.l`—, (1V -r U U V ASV V \ OAT. V
O Q C O TJ
OMER l MIT f
J DONALD BOWMAN
4 2000 112TH AVENUE N E BELLEVUE, WASHINGTON 98004 • 454 • 3344 ROPER? I AAMAI EY
QI ERADCO P. U. D. I
DRAFT
ENVIRONMENTAL
IMPACT STATEMENT
ERADCO
PLANNED UNIT DEVELOPMENT
January 1981
MICROFIL!P " '
City of Renton
Nt
DRAFT
ENVIRONMENTAL IMPACT STATEMENT
FOR
ERADCO
PLANNED UNIT DEVELOPMENT
Prepared For The
CITY OF RENTON
RENTON PLANNING DEPARTMENT
RENTON, WASHINGTON
By
R. W. THORPE AND ASSOCIATES
Prepared in Compliance With
The State Environmental Policy Act of 1971
Chapter 43.21C, Revised Code of Washington, as amended
SEPA Guidelines, Effective January 16, 1976
Chapter 197-10, Washington Administration Code, as revised
City of Renton Ordinance #3060
Date of Issue of Draft EIS: January 30, 1981
Date Comments Due: March 6, 1981
Cost Per Copy: $4.00
1
INTRODUCTION
Action Sponsor:
Environmental Research and Development Corporation
1115 Sea-Tac Office Building
18000 Pacific Highway South
Seattle, Washington 98188
206) 244-0080
Proposed Action:
The Action Sponsor has requested City of Renton approval to subdivide and
develop approximately 41.5 acres zoned for R-1, R-2, R-3 and R-4 into up to
425 units for multi-family residential use in the form of a Planned Unit
Development.
Project Location:
North of SR-169 (Maple Valley Highway) south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power Right-of-Way. Access to the site
is from the north via N.E. 3rd St. (Cemetery Rd.) (See Appendix A for legal
description.)
Lead Agency:
City of Renton
Responsible Official:
David Clemens, Acting Planning Director
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
206) 235-2550
Planning Department Contact Person:
David Clemens, Acting Planning Director
206) 235-2550
Authors and Principal Contributors/Location of Background Data:
Environmental Analysis and Document Preparation:
R. W. Thorpe & Associates
815 Seattle Tower Building
Third at University
Seattle, Washington 98101
206) 624-6239 Contact Person: Deborah Krouse
ii
Licenses and Permits Required:
Draft and Final EIS approvals, preliminary and final Planned Unit Development
approvals, engineering planning/construction inspection approvals, water and
sewer hookup permits, grading permit, building permit.
Cost of Document: $4.00
Date of Issue of Draft EIS: January 30, 1981
Return Comments to Responsible Official By: March 6, 1981
iii
TABLE OF CONTENTS
Introduction i
Distribution List v
I. Summary 1
A. Description of the Proposal 1
B. Impacts and Mitigating Measures 1
C. Alternatives Considered 13
D. Unavoidable Adverse Environmental Impacts 14
II. Description of the Proposal 16
A. Name and Sponsor of the Project 16
111 B. Project Location 16
C. Agencies Involved 16
D. Detailed Project Description 16
E. Major Physical and Engineering Aspects of the Proposal 19
F. Consistency or Inconsistency with Comprehensive Land
Use Plans and Zoning Regulations, and Regional, City,
and Neighborhood Goals, Objectives and Policies 23
III. Existing Environmental Conditions; Environmental
Impacts of the Proposed Action; Mitigating Measures;
Unavoidable Adverse Impacts
A. Index of Elements of the Environment 26
B. Physical Environment 28
C. Human Environment 55
IV. Relationship Between Local Short-Term Use of the Environment
and Maintenance and Enhancement of Long-Term Productivity 95
V. Irreversible and Irretrievable Commitments of Resources 96
VI. Alternatives to the Proposal and Their Relative
Environmental Impacts 97
VII. Mitigating Measures 101
VIII. Impacts Determined Not to be Adverse 107
Appendices:
A. Legal Description
B. Soils Report
C. Traffic Analysis
D. Preliminary Site Engineering
E. Letter from the Office of Archaeology and Historic
Preservation
F. Declaration of Restrictive Covenants
G. Stormwater Detention Details
References; Organizations Consulted
iv
FIGURES
1. Location Map vii
2. Vicinity/Circulation Map viii
3. Aerial Photo of the Site ix
4. Site Plan 17
5. Section A-A 18
6. Section B-B 20
7. Section C-C 21
8. Area Zoning 22
9. Density Analysis 24
10. Comprehensive Plan 25
11. Slope Analysis 291112. Existing Land Use 51
13. Composite Analysis 52
14. Community Facilities 76
15. Alternative Site Access 100
TABLES
1. Summary of Pollutant Concentrations in the Renton Area 34
2. Carbon Monoxide Levels 36
3. Existing Noise Levels in Decibels in the Site Vicinity 44
4. Anticipated Maximum Noise Levels from Construction
Equipment 46
5. Immediate Abatement Potential of Construction Equipment
Noise Level in dBA at 50 Feet 47
6. Demographic Trends in AAM Districts 3840 and 3860,
Combined 56
7. Projected School Enrollment and Capacity 75
V
RECIPIETTS OF THIS DRAFT ENVIRONMENTAL IMPACT STATEMENT
Federal
Environmental Protection Agency
Department of Housing and Urban Development
Department of Energy
Arny Corps of Engineers, Seattle District Engineer
Soils Conservation Service, Department of Agriculture
U. 3. Department of Interior, Fish and Wildlife
State
Governor's Office
Office of Program Planning and Fiscal Management
Department of Ecology
Department of Fisheries
Department of Game
Department of Transportation
Department of Social and Health Services
Ecplogical Commission
Office of Archaeology and Historic Preservation
Office of Public Archaeology, University of Washington
Regional
Metro - Water Quality Division
Metro - Transit
Puget Sound Air Pollution Control Agency
Puget Sound Council of Governments
Seattle - King County Department Public Health
Local G w ernment
King County Department of Public Works, Hydraulics Division
Kizg County Building and Land Development Division
King County Planning and Community Development Department
Kiig County Soil and Water Conservation District
City of Kent
City of Tukwila
City of Seattle
City of Renton
Mayor
City Council
Hearing Examiner's Office
Planning Commission
Public Works Department
Parks and Recreation Department
Police Department
Fire Department
City Attorney
SEPA Information Center
vi
Utilities/Services
Renton School District #403
Puget Sound Power and Light
Washington Natural Gas Company
Pacific Northwest Bell
Libraries
Renton Public Library - Main Branch - (3)
University of Washington Library, College of Architecture and Urban
Planning
King County Public Library System
Newspapers
Seattle Times
Seattle Post-Intelligencer
Daily Journal of Commerce
Renton Record Chronicle
Private Organizations and Others
Seattle Audubon Society
Greater Renton Chamber of Commerce
Rainier Audubon Society
Monterey Terrace Community Club
Mt. Olivet Cemetery
Stoneway Sand and Gravel Company
vii
1-5
r---:----\ r/ .,
1 :,
3 a..
n
BELLEVUE (
v I t AT LAKE
a r" " SAMMAMISH
j 1 1 )40
RENTON
SITE
f
x UKWILA• 4OS
@.
LAKE
YOUNG
z/
APLE
VALLEY
KENT 0
SIe
i
n
I J
BLACK •
0 AUBURN DIAMOND
FIFE
TACOMA
1. LOCATION MAP
ERADCO P.U.D.
NORTH R. W. THORPE & ASSOCIATES
viii
a____ 1
a 1. 111Villi°
WRENT• rK
AIRPO' T
2
Q N.E. 4th ST
a
N_____ III /
N•E•3r d
a `r MT OLIVET
CEMETERY
IkIENTON
iI - I
I
O -
C
4A R Ri_ '-'2 I SIT E
SR 9 I B
q,
1
SA?
70
P
iiillA
I. A
0
N
co
r
a
In
APPROX. 'i MILE TO
VALLEY GENERAL
HOSPITAL
1 NOISE MONITORING LOCATIONS
2.VICINITY MAP
CIRCULATION
USGS BASE iu = 2000' ER .DCD PU D
NORTH R. W. THORPE & ASSOCIATES
Ilrove V:! .
ZR a s v i to ,. .••••• -,X-. ,,-'''''''''': . 7,
li
yk• a
x le
411 a.,,,,I. , . •••„. „..„:„:„....,.,
44... :.
rm:.,rA• Nrikri . ':.
a
@
k
c
ex
1.,
ab "
pF
jc
Viii , .‘'.. •...''' 77.7:...-..74, 2:-.el:- .7: .,. :-.:,
Ai " »w Pre
a
i1f„ N
W a
t
IL
I9
a.
XI m K*<xi«a
e
fix`
M
9
in D 4 • 4
co
CO
0 f Eti'B' F
M ti: i, ;
k;,
r.
Li
t=rwD5
CO 0 omenta! Research &
4 _..::prne,ni Corphratren AEROttST Inc.
IROL•J ua.if:C of,•lfin T SC:;TM•SCAT'![.[ WA 0*,S•SEATTLE,VIA 8816! I1Wi nMf MM
6 - 6 - - 77li 184
1
PREFACE
Those mitigating measures which are presently scheduled to be implemented by
the developer are noted with an asterisk.
I. SUMMARY
A. De;cription of the Proposal
Thl proponent is requesting permits for the development of a Planned Unit
Development consisting of single family attached and multi-family
housing, associated parking areas and open space. Consistent with the
graduated densities of the four zoning designations on the project site,
the residential buildings will increase in height and density from west
to east. A maximum of 425 units is planned ranging in price from $60,000
to $90,000. The townhouse units will feature 2 parking spaces per unit,
while the remaining unit types will feature 1.75 spaces each. A jogging
trill will be constructed around 25 acres of the site, and landscaping
will be planted in parking areas and between adjacent buildings . The
PU) will comply with the zoning designations approved by Ordinance #3113,
adppted on March 4, 1977 .
B. Impacts and Mitigating Measures
Physical Environment
1 . Earth
a. Geology and Soils
1/Impacts
It is estimated that 50,000 to 55,000 cubic yards of earth will be
displaced during construction of the road system on the site. About
15,000 cubic yards of topsoils would be imported for use in final
landscaping.
Mitigating Measures
a) The City' s requirements on grading and excavation will be
followed.
b) All the recommendations of the soils engineer will be followed.
2
b. Topography
Impacts
Topography will be modified in order to create building and road
sites .
Mitigating Measures
None.
c. Unique Physical Features
Impacts
A jogging trail and a potential utility trench may be constructed
through the greenbelt.
Mitigating Measures
a) The denuded areas should be reseeded immediately upon completion
and a jute net should be applied over the cleared area until
vegetation is reestablished.
b) A 25-foot setback from the top of the bluff should be maintained.
d. Erosion
Impacts
During excavation and grading , the potential for erosion would
increase. Erosion may occur during the construction of the jogging
path and the possible utility trench in the greenbelt.1/
Mitigating Measures
a) A permanent surface water management system consisting of a
combination of underground collection and surface retention
basins will be installed to connect with the storm drainage
ditches adjacent to Maple Valley Highway. An energy dissipator
at the juncture of the ditch will moderate the velocity of the
water flow down the hill.
b) The denuded areas resulting from jogging trail construction
should be reseeded immediately and a jute net should be applied
over the cleared areas until the vegetation is reestablished.
3
2. Air Quality
Impacts
There will be a short-term increase in dust and fumes during construction
phases. Over the long-term, under "worst case" conditions, the increase
of 204 vehicles during the peak hour can be expected to increase existing
carbon monoxide levels by about 1.6 parts per million during the evening
peak hour.
Mitigating Measures
a) Utilize low-emission construction equipment whenever feasible.
b) Measures to control construction dust, such as watering and reseeding
of cleared areas , cleaning , and sweeping of streets will be
implemented.
3. Water
Runoff/Absorption
Impacts
Increased surface runoff from the site; however, the peak rate of runoff
world remain at existing levels. Increased levels of polluted surface
runoff. All alteration of runoff characteristics will occur with the
diversion of storm flow into ditches and storm pipes.
Mitigating Measures
a) Utilize temporary detention ponds during construction phases to
collect silt.
I) Careful construction practices would prevent litter, debris, or other
pollutants from entering drainage.
c) Collect stormwater runoff in a storm sewer system.
d) Utilize catch basins and screens to collect litter and debris .
e) Utilize oil/water separators to retain gas, oil, and grease for
removal from stormwater.
f) Settling basins would remove solids from runoff.
g) Provide adequate street and parking area cleaning and maintenance of
the stormwater system.
4
Groundwater Movement, Quantity and Quality
Impacts
Alteration of groundwater movement during excavation and construction.
Mitigating Measures
None.
4. Flora
Impacts
Removal of most of the sparse vegetation currently on the buildable
portion of the site, with the exception of any sizable stands of large
trees.
Mitigating Measures
a) Present plans call for retention of as many of the existing trees as
possible through sensitive site planning.
b) Retain vegetation outside of road improvements until buidings are
constructed, as feasible.
c) Minor modifications of building siting will occur based on tree
inventories provided by field suryeys.
d) No trees will be removed from the greenbelt area.
5. Fauna
Impacts
Reduction of potential habitat areas which will result in the reduction
or elimination of the number and/or diversity of species utilizing the
site.
Mitigating Measures
a) Retain as much natural vegetation as possible.
b) Utilize landscaping materials that provide food sources for birds and
small animals.
5
6. Nose
Impacts (Short-Term)
Dining construction activities, noise levels will increase considerably,
wi:h frequent noise peaks depending on the type of equipment used.
Trsffic noise will increase on adjacent streets.
Mi:igating Measures
a) Construction equipment that will not exceed the State of Washington
maximum environmental noise standards will be employed and operated
accordingly.
b) Noisy operations should be scheduled so that they are not concurrent.
c) The hours of operation of construction equipment will be limited.
d) Truck arrivals should be controlled to reduce vehicle congestion.
e) Construction equipment should be placed as far from property
boundaries as possible.
f) Roadway improvements should be timed to alleviate congestion and
reduce volumes on existing streets .
Impacts (Long-Term)
Increase in traffic movements will result in a proportionate increase in
noise levels. Increases in noise levels due to human activity at the
site will occur.
Mitigating Measures
See "Vehicular Transportation Generated - Mitigating Measures" on p. 7 .
7 . Light and Glare
Impacts
Addition of low-level lighting on the site. The traffic generated by the
site will increase the incidence of headlight glare. Some glare will be
produced by reflections from windows and the buildings themselves.
Mitigating Measures
e) Perimeter landscaping, fencing, and berming, especially around
parking areas and road entrances, will reduce light spillage.
6
b) Parking area lighting could be limited so that no direct light spills
off-site.
8. Land Use
Impacts
Change in the land use of the site, from vacant land to a planned unit
development.
Mitigating Measures
Sixteen acres of the site will be Reserved as a greenbelt and a
landscaped buffer will separate the R-1 portion of the site from the
existing residential subdivision to the north.
9. Natural Resources
Impacts
Consumption of some natural resources for construction and maintenance of
the project such as energy and raw materials used in concrete, steel,
aluminum, glass, copper and other materials of varying scarcity.
Mitigating Measures
None.
HUMAN ENVIRONMENT
1. Population
Impacts
Population on the site will increase from zero to 1164 to 1173 persons
over a period of three to five years.
Mitigating Measures
Development of the site to a lower density would result in a decrease in
residential population.
2. Housing
Impacts
Housing density will increase from zero up to 425 units.
7
Mitigating Measures
Node required.
3. Transportation/Circulation
a. Vehicular Transportation Generated
Impacts
The project could generate approximately 2,546 vehicle trips per day
and about 204 one-way trips during the evening peak hour. These
added traffic volumes will primarily impact the intersection of the
primary access road with Northeast Third Street during the morning
and evening peak hours.
Mitigating Measures
Inquire at Metro as to the feasibility of and collaborate with them
in the planning of erecting a bus shelter in the site vicinity to
encourage transit ridership.
b. Parking Facilities
Impacts
Project development will result in the construction of 1.75 parking
spaces for each apartment unit and 2 parking spaces for each
townhouse unit in the R-1 zone. No overflow of parking supply is expected.
Mitigating Measures
None.
c. Transportation Systems
Impacts
A potential increase in transit demand may result.
Mitigating Measures
a) A traffic signal with "volume-density" timing features could be
installed at the intersection of the primary access road with
N.E. Third Street.
8
b) N.E. Third Street could be widened at its intersection with the
primary access road to accommodate westbound left-turning
vehicles.
d. Movement/Circulation of People or Goods
Impacts
An increase in pedestrian activity may be expected as a result of
construction of the project and jogging trail around the site.
Mitigating Measures
None.
e. Traffic Hazards
Impacts
The project-generated traffic exiting and entering the site at the
intersection of the primary access road with Northeast Third Street
will interrupt the continuous traffic flow on the arterial.
Mitigating Measures
a) A traffic signal with volume-density timing features should be
installed at that intersection to ensure safe and smooth traffic
flows on both roads.
b) Localized widening may be required at the subject intersection to
accommodate left-turning vehicles.
4. Public Services
a. Fire
Impacts
Increase in the demand for fire protection services at the site.
Over the short-term, construction activity may increase the hazards
of fire fighting. During occupancy, the fire protection and
emergency aid responsibilities of the Renton Fire Department would be
increased by the influx of 1 ,164 to 1 , 173 residents and the
construction of 425 dwelling units .
9
Mitigating Measures
a) The Fire Department will be notified in advance of any extended
street blockage.
b) Sprinkler (life support) systems installed in buildings would
reduce the amount of fire flow required.
c) Select building materials that would reduce combustibility.
b. Police
Impacts
Demand for police protection services could potentially increase
during the construction phase. During occupany, service requirements
for the site will increase, but existing manpower and equipment are
adequate to serve this added demand.
Mitigating Measures
Internal security systems and security lighting installed at
appropriate strategic locations would augment police protection.
c. Schools
Impacts
Approximately 258 school-aged children would be added to the school
system. Existing facilities can accommodate this increase. Property
tax revenues from the proposed development and increased local sales
tax will help offset the cost of additional services.
Mitigating Measures
None.
d. Parks and Other Recreational Facilities
Impacts
The number of people using regional and area parks and recreational
facilities may increase.
10
Mitigating Measures
a) A jogging trail will be constructed along the perimeter of the
buildable portion of the site.
b) A variety of on-site recreational facilities, such as swimming
pool, tennis and basketball courts, tot lots, and open playground
areas could be provided, lcoated by the individual builders.
c) A walking trail could be constructed through the greenbelt to
provide pedestrian access to Cedar River Park via the sidewalks
along Maple Valley Highway.
d) A fee could be donated to the City Capital Improvements Program
for purchase and development of property to accommodate the re-
quired recreational space.
e. Maintenance
Impacts
Street maintenance demands on City Engineering Department will
increase due to construction vehicles carrying materials to and from
the site and depositing mud and dust onto adjacent streets.
During occupancy, the City of Renton Public Works Department will
maintain water and sewer lines as well as public roadways and
drainage facilities located within them.
Mitigating Measures
a) Wash the wheels of exiting vehicles during construction to
minimize mud deposition on adjacent streets.
b) Cover the trucks carrying excavation loads with canvas or tarp.
c) Developer could provide regular street cleaning.
f. Other Governmental Services
Hospital Facilities
Impacts
The proposed development is not expected to significantly affect
usage of the Valley General Hospital, lcoated 2-3/4 miles from the
site, nor the Group Health Cooperative Clinic, located north of N.E.
Third Street.
11
Mitigating Measures
None.
Libraries Facilities
Impacts
Development may result in increased patronage of two local libraries
but will not necessitate the expansion of services or personnel.
Mitigating Measures
None.
Energy
Impacts
Increase in demand of electricity and natural gas.
Mitigating Measures
a) Utilize insulation in walls, floors, roof and install insulated
I/
glass.
b) Major living areas of the units (living rooms, bedrooms) could be
oriented toward the southern exposure of the building when
feasible.
c) An energy analysis of building design elements could be
undertaken to assess feasibility of reducing long-term demand,
e.g. , passive solar energy systems.
5. Utilities
Impacts
Existing water supply and system would experience some additional demand.
Accditional demand for communication facilities would be generated .
Deterioration of the quality of water entering combined sewer and storm
drainage system is possible during construction activity and increased
qtantity as a result of the increased impervious surface on the site.
Erergy demand on the site will increase substantially.
I/
12
Mitigating Measures
a) A permanent surface water management system consisting of a
combination of underground collection and surface retention basins
will be installed to connect with the storm drainage ditches adjacent
to Maple Valley Highway. An energy dissipator at the juncture of the
ditch will moderate the velocity of water flow down the hill.
6. Human Health
Impacts
Although noise generated during construction activities could be a source
of annoyance and irritation to area residents, it is not expected to
cause significant mental or physical damage.
Mitigating Measures
Refer to the mitigating measures listed under "Noise," page 5 .
7 . Aesthetics
Impacts
The visual appearance of the site will be altered from a former gravel
pit site to multi-family residential structures, parking areas, and
landscaping.
Mitigating Measures
a) A minimum 25-foot wide setback and landscaped buffer area will
separate the proposed site and the adjacent residential neighborhood
to the northwest.
b) Building units in that area could be below the foundation levels of
houses and be limited to 2 stories in height (i.e. , townhouses) .
c) The eastern border of the site will be lined with a landscaped road
to act as a buffer for the quarry activity to the east of the subject
property.
d) The greenbelt, ranging in width from 150 feet to 400 feet, located
along the southerly border of the site will remain intact.
8. Recreation (See Parks and Other Recreational Facilities, page 9.)
13
9 . Archaeological/Historical
Im'ac is
No known historical sites or archaeological resources exist on the site.
Due to the previous extraction use on the site, it is unlikely that such
resources exist there.
Mitigating Measures
If any significant artifacts are unearthed during construction
activities , immediate action should be taken to evaluate their
significance with the appropriate authorities.
C. Alternatives Considered
No development would produce neither the adverse impacts of the proposed
action nor its positive aspects. The site would remain a depleted quarry,
Olen space, and wildlife habitat. Demand for housing would not be
appeased. No action on this site could transfer the impacts of this type
of development to another site which may or may not be as well suited for
development.
Development to Single Family Density would result in a development of a
less intense use (125 dwelling units) than the proposed action. This
would utilize the site below its potential as identified in the City of
Renton Comprehensive Plan and Zoning Ordinance. Impacts on the physical
and human elements of the environment resulting from this alternative
would be similar to those of the proposed action, but less intensive.
Development to Maximum Density would result in the utilization of the
site to its fullest potential (625 dwelling units) as identified in the
City of Renton Comprehensive Plan and Zoning Ordinance. Generally,
is pacts on the physical and human elements of the environments would be
greater than those incurred by the implementation of the proposed action.
Alternative Site Access would involve construction of the residential
btildings as proposed. However, rather than accessing the site via
Ncrtheast Third Street, site access would occur via a roadway constructed
14
through the greenbelt from Maple Valley Highway. Although the traffic
impacts on N.E. Third Street and other arterials to the northeast and
northwest would be eliminated, considerable degradation to the greenbelt
would result.
D. Unavoidable Adverse Environmental Impacts
The Physical Environment
Geology and Soils
Exposure and disturbance of about 50,000 to 55,000 cubic yards of surface
soils over 25 acres of the site.
Erosion
Possible soil erosion from the site during construction activities.
Air Qualitl
Construction activities will generate increased levels of particulates
in the form of dust. Additional motor vehicle traffic will increase
particulate levels and carbon monoxide levels (a 1.6 ppm increase in the
latter) .
Water
Potential for increased surface runoff from the site.
Flora
Reduction of potential habitat areas which will result in the elimination
of the number and/or diversity of species utilizing the site.
Fauna
Construction will result in a loss and/or deterioration of habitat on the I
site.
Noise
Noise levels will increase over the short-term due to construction
activities, and over the long-term due to increased traffic volumes and
residential activities associated with up to 425 units and 1,164 to 1,173
1
inhabitants.
15
Laid Use
Alternative land uses for the site will be foreclosed for the life of the
building if the project is developed as proposed.
Na:ural Resources
Consumption ®f some natural resources.
The Human Environment
Population and Housing
The option of building low-cost housing on the site will be eliminated
fo7 the life of the proposed buildings; population on the site will
increase by up to 425 households and 1,164 to 1,173 individuals.
Transportation/Circulation
Increased truck traffic during construction. Traffic volumes will
increase by approximately 2,546 vehicle trips per day. Potential for
increase in traffic hazards.
Utilities
Demand for all public utilities will increase in proportion to the
increase in population on the site.
Aesthetics
The visual appearance of the site will be altered.
Economics
Substantial increase in property tax revenues is expected. Short-term
erployment for construction workers and long-term opportunities for
neighborhood businesses serving the general vicinity would result from
implementation of the proposed action.
16
II. DESCRIPTION OF THE PROPOSAL
A. Name and Sponsor of the Project
The proponent, Environmental Research and Development Corporation of
Seittle, Washington, is requesting permits for the development of ERADCO,
a Planned Unit Development of medium density single family attached and
mu.ti-family housing and open space uses.
B. Project Location
Th 2 site is located in the southeastern portion of Renton, Washington and
contains approximately 41 .5 acres bounded by SR-169 (Maple Valley
Highway) , Monterey Terrace subdivision and Mt. Olivet Cemetery and the
Bonneville Power Right-of-Way. The site is located in the northeast
quarter of Section 17, Township 23N. , Range 5 E. in King County,
Washington. Appendix A discloses the legal description. (See Vicinity
Ma), p. viii.)
C. AL2ncies Involved
Ci :y of Renton, Washington
D. De :ailed Project Description
Coisistent with the graduated densities of the four zoning designations
on the project site, the residential buildings proposed to be constructed
would vary in height and density.
1
The structures proposed to be
constructed within the R-1 and R-2 zoning designations would together
average 11 units per acre with maximum heights of 25 feet and 30 feet
respectively. In the R-3 and R-4 sections, proposed density would range
fr,m 22-25 dwelling units per acre with maximum heights of 35 feet and 65
feet respectively. With a total of up to 425 units planned, the project
si:e will be developed to 70% of the maximum density allowed under the
zo iing code.
1Ii accordance with Ordinance #3113, adopted March 4, 1977.
At, THE INIITHUN ASSOCIATES ° ARCHOTECTS
an
2000 112TN AVENUE NE ELLEBVUE, WASHINGTON 9-8004 - 154•39.*
1 erad00 tPudrt`z
a
A / i ----______
a 2,._-_,__-__.--•----;...._pa_._,_ C',AN_
4,4wA nv !
witT,-„a4.--- ,,;- --•?,---),--,----- ,,---, .; -- --:- 1 i-----i-4-Tiiit..9°44.--NTx-iii-ii.Azitrir.x. 1
k• liSinliie...lit,,..,.141"7.-Ici"it.-!'gga,;4". ---- __,./ W
1 • 4terilf,... ./% l'„ '•- •• ,
s.
A,.._, ,.„ .silh, . ,
of.i404,144•1: •.-... ....2.0060.1.4V ij,,64,4//,-------a Oa:-o. •-• '-
i
411 • . 07-1,101":.,--4,-,o0" ' ' ' A-J-7-,-7,-=7.----.1.L.:41. agi-k.
m-t....airtio -77.-77-77------ i ''A' .-e:,..a..,,,-re-A,. , a ‘
risp,_19 - ''...i.Vi'- '14,' 7 R4:...././.:, / • ,./. ..--- -.' iii• ,'.I-- v.•%,,e,,,.., • /
S'
L
IV _.........,..........._. ....:..- 41• "IP '' n 1. 'y--
7:z.\\N •
J ''/, -• •11••i . •.. • 1
VIP*it f 1111414W ' _L.--::,---, ° -
6--
if.....0 .4 / 17 i' ' //z---.'
N\-! e''c \\ - s.
4,\ \\,f\CIINI
1 C-
d--
7' 1:.
llrilia"'N-".'----:1111Sterall .4i-Hittir;-\°1 ‹). ''' ' i-44 ",1 , , ,_,-------\ //.)
t, _ ,Iv•--., si , ., - lil
4.1' ----• 3 Pli' liiifir iiiii11411141 \ : ; )01911114'8 11 1''
I 11 117(1//.4:./rfl1W;4;1.:.. I 1. 1r "-•••, L7 \ ' .:-- i -
s '
r-.-- 4 WO : 4!IMO 4,* ..17.• • ..'r -e°;."•-•'' 1 '
1.,',i\\'.,\ '..., ' , / /
I
1----- vi,.\—, \,,,,.,.,,,,t IF --....i-- .. - .i ;-. 71-17701 \:•„1:2`',•:;:.::'?.... ''''''`‘s ,I'
A V, 1-‘511 . a ...,, all! i ;•.v,V;,,!1 eseJ \C11, , :‘ ), ,.. - '
il (. • .
1 • 4 t Ain 41640,k li ;* , (••44,,',/, --,---• -- r
aevai, -.,,,,, s', 41.1&,-i.;_.......,..-- 5.,
1 j, ,'„,,q1.:1,p. - I - ".7/.. /'
i'r,--4 ,4 n
S n 1 V"
1 / /
I/1 r -A0 ‘\:' , -
11\ ,\N '. •-.. -., -.--. ."-- ;L-''''-. .. V .'. " '• 0---01) 6 ' 111. qgn' -!. -'I. e....•,tp . f• / / / ' Joe7.„,
2. ,.,.7,7-.. t't , / i
IP' Wan;"."'"17, i!'141, 47--4- 4.90 y • // 11 \ •„,k_\ \\il •,• \„.... ... c:j V T._ to / ., 1.-,i• „, v,',‘Nk \ ..ii,. - ---r---, ,, 1IVi1 ' 14,..,—.. ,s.__7,-- li •i•', .ie7 TiAtI,Rifikxv4,-4,- //,`'.4 ' ..
i
i _,%-
K. ••.,,,,,_. _/,
i., : .
I,. ,‘',...4 ,4,.."iiii..4-tik,,..1 i'".:1'91-4:4.`:,.,:,;.,." ..', / ' -. . N' • , .4%., . . • w - tilc.„.4t. , 7/.,, • • . ..'- t,, „•.... \•,,,,, , ,,
4••••,,a....., ....,.... --. .8 ,.....__:,:.,.,. ,,...0:,,,,,_ o L9:0,.u.Pzo ---. ' ....--Ni••\•'.•s'‘\
t ..\.,\\ ,,, ,,, Nki:,14001=3.°
6-
e.'•• n -- ---- e6tii,ir r,.r:r4liro , f.)..0•,.. - -1,Z,-, •
cQ/. ''Al 47PI.0,4 Zit"...-A„ ‘'‘../; r.,------.7
33
1•. '-,:_)) )) \ ) ); 1=2:11:. ---
V, • co:- 101,a
i'
j,J1:V" --nej f/--- t>, _ --..-'-----9 .,-___;:_•.'"":.E.74.--7-12-
s.---
s---...., 4444•Namosmimmem
T°11 r =),Q -'..?' , ' °"F1'sr,4:r Aq•,-,'*WP/•° /4"
I I' i I i. In(,S% 4t.'--..\ ---- ,?-k---k-7-...\"t',_r1 '. !OF .f.0 . , ,%,p• z/
Cc ,,('Ais!--------- \ / ...-....:-.. -
A
im•ottl\c=ir ilmiit.4 fel
c,k'ff-A"'%.'1.. ie.' /'' /•gm., ,t,,t .
s. ,,,';., . •_-..',' - , -
t,,, / ,'• 7;'.. 0- rri- /
1 1 I I
0 (1) i /, 1 A IMIMUIMIMIMIIIMIIMMINI ., \,...--=--ri?,, it:4;4r"."/ •;•-1;
ri..N __-_-__..-/ I , os m.., •I--I( .' ,I
xi > ma 0.' \-:.- 1 1: III IP .1111.111-1 IM MI ill OW U., ,0 ''.°w:,-..174-49 ,fr-'
5' •* i.
Tj 0 w4n1
it lifil s 4k'j'
lb lk • lig,a ,JD ,,,
1 4is"4111/ Itsi.al ••-...61 IIMIONIC Ell In i, - ' • 7
i.0 n Ti
Re
410%•1la . ,..},- /7" • !„.._L- 111•IIVIAMILIBMIMBIEIMMONO..
k .! ;,) 1140110.•40/0 IINZ74.__
IK
miliqmpik\
k...7........././IV I 1. '.i St r, (Ai!'\/fr,-,•/
y/
1,7 n I
A ,'i.,,AIIL 7, . .0.. 0 ma mar—11.1 PI ill Mali lir .. .1 S CA),,,- 1/ •- 'i.' ''' mi) 0 r 41. di •11‘r . Iliam ..7-..... I i . i j , / //'.,• '
1
i
liv-9._,,--___----- —
t'
s \
n ,: :
I Coo Op....•
41:1111. #'
1i1N' •-
4 -,-,j, \
It • Ig
1 0'• '
dCi!
I -V"
n p
0100 200
f'\tAV•IP;
rur, v' Rn
0)/ /
OD
SRO Seaton a-a
m
THE MITHUN ASSOCIATES:
ARCHITECTS
oD
0
m
C
0
CO
C
m 0cn
19
The site will be subdivided with portions of the parcel sold to private
individual builders.
Construction types will be single family attached and row housing in
clusters of 4-7 units, two-story apartments, walkup townhouses over flats
and 3-5 story apartments. R-ltownhouses will feature 2 parking spaces
per unit, while the remaining unit types will feature 1 .75 each. Prices
for the residential units will range from $60,000 to $90,000. Building
exteriors will be a combination of natural wood and stucco and about 50%
of the units will contain fireplaces. On the level acreage, a jogging trail
will be constructed on the project site and landscaping will be
introduced upon completion of the project to be located in parking areas
and between adjacent buildings.
The objective of the proposal is to provide a mixed residential
environment of single family attached and multi-family uses within a
park-like setting. The natural and topographical aspects of the site
will be maintained and utilized to enhance the livability of the
development. Specifically, the present contouring, whenever possible,
will be retained to ensure both residential privacy and view potential.
E. Major Physical and Engineering Aspects of the Proposal
It is anticipated that the first phase of construction will consist of
preparation of the easterly access road for heavy construction vehicles,
on-site rough grading of circulation roads and bringing local utilities
to the site. This phase will begin within one year of Master Plan
approval and should be substantially completed within 18 months.
The second phase includes site grading, extending of utilities, and
building construction should begin within a year and a half of plan
approval. Housing construction is anticipated to begin in the
northwesterly portion of the property, and proceed up the hill toward the
east. During construction phases it is anticipated that the easterly
access road will be used for heavy construction equipment, while the
Blaine Avenue N.E. would be used for small vehicle access.
111111,
etemmU-ii - ,k--'1'' '1' .... ''', ''
S'' .:f_
ii ..E ., Ldoutle loaded parWng "bu*n
y
jardxcaparoadway landsaarypnmory
1
l eilroadway
nillil - 1; . 1
E
lj
01_
li I/
v:/ ;
IT -_
C ti .
rey,
INw
j'
h
iv44/ O
4
m C,
o
a
m _
n n s e S= c/on bob
3ID1 THE MITHUN ASSOCIATES : ARCHITECTS
n 13
1 0 0
s.' :
14.: 1111 .4 ' -- -, 1,-: ' --.,, _ a. „,,.., : ,,k(,, ., -,i--, dV'P
r
I r I cr double loaded parkarg la pe pnwer line eayemen}
2 i d'Y walku- gartjer a[nv merr
µ
e[r
4-'
4°*
yc
IJ
s,rs9
i ,,,,,
2,,,,,,Aii46,1--A,,,
i
y...
1)
a .
R1 Site 8CtIOo C C
a 31.1
CO THE MITHUN ASSOCIATES
A 1:I0
iC0
w00A
4
C
c •r CC tit H • '
L
Cr y 11311
I
r•la C. s I 1i
I11.
161.14. V,,,,,ao."4004 .1 1 l 1 i.' . ,,,I 4.. .4... Ilir / S\
e ,'
i V
v p i Z s6 19
n_
no= ICI" iii 1 l°' "
I OF tl MN f
7.(4Lat- 7
f . f
9 i I". PACIFIC CAR
f• \p, •'. 's
ire aMinn>La1 c IL.—
FOUNDRY co ii ids „r A
II 6 1 r
rn(cam rn 7 t7 7
i7 r'rl!i7 W'f ET! 1
Ior Er- e , I , R-4
r ' rr
ice> ' r
pk,---7 ' till'L° e I
r74I!l tl F?1
rtf rr
J F-earmmu
ma 11-
iiii r- 7ammrm fz •Iii=wN.. /
Icr, --4f a .....WI p71 7 01-- /
um ri. 4 lit; //\ s - 3 --;i:40;0010.il. Tri fl 7 t7 i• OW t
MirN ., v,l L/BERTY
A/p ii „, \ till!,zIlll
d Tj V
I
PARK
al In
i
ate-
12 RV
pi MO mrouver
pg
1
P QK j r cenierear 1 1
1
I
lair p. \ P- I V O 1
rmiewro a Ns
i /, SrT E 1/
i'ice
CI
or,
a j 7 __ 111 3
i''
cp,. !tl 4 11` ill r _\I
I,
t
e'''
J._ _ me
i
CAI
Ti rflial J
r B_I
at" il mmt , ,imr, ,•
8. ZONING MAP
SC URGE:CITY OF RENTON ZONING ERADCO PUD
NCRTH 1'
r.
8OO'1978 R. W. THORPE & ASSOCIATES
23
F. Consistency or Inconsistency with Comprehensive Land Use Plans and Zoning
Regulations , and Region, City and Neighborhood Goals , Objectives and
Policies
The City of Renton Zoning Code
The site was rezoned from Residence District (R-1) and Suburban Residence
District (S-1) to Residence Districts (R-1, R-2, R-3 and R-4) and
Greenbelt by Ordinance #3113, adopted on March 4, 1977. The R-1
designation signifies residential single family with minimum lot area of
7,200 square feet. The R-2 designation signifies residential duplex with
minimum lot area of 7,200 square feet. Residential zones R-3 and R-4
signify residential multi-family with minimum lot area of 5,000 square
feet. The proposal is consistent with this zoning. The total develop-
ment will comply with the rezone conditions and requirements of the
Planned Unit Development Ordinance.
The City Comprehensive Plan
The proposed Planned Unit Development lies within an area on the
Comprehensive Map which designates greenbelt and multi-family uses in
ascending density from west to east. The western-most portion of the
site in addition to the greenbelt bluff is designated greenbelt. About
1/4 of the site immediately to the east is designated low-density multi-
family; the center half of the buildable portion of the property is
designated medium density multi-family and the final eastern-most half is
slated for high-density multi-family. (See Figures 9 and 10.) Also
refer to p. for a discussion of the relationship of the proposal to
existing land uses in the area.)
Other Plans and Policies
Because the property is not located within a flood hazard nor a shoreline
management zone, regulations governing those situations do not apply.
The proposed Planned Unit Development is consistent with the Puget Sound
Council of Government's King Sub-regional Plan, adopted in December 1978.
Policy 1 related to Phased Growth encourages that new growth be concen-
trated in established urban areas.
AI THE NOOTHU l ASSOCDQTIES ° QRCODTL CT
0 $ 2000 112THdAVENUE N E BELLEVUE WASHINGTON 98001 464•3344 616641.....wr
0 i \,
r
ICJ.
7
7 .
k,!/ \''' -$.- i,;:' -,,:
1_ .1. ..1., ./
1 ' • Eil C- 1 - 7-17% ..
c 4 •4-7:7-_-,0---
r. --------„, V ' .4.;;/ --A j
i' /, ,
t I fil • 7.7., ,, ,,,,..:.
ir .
c--\., , i1. i. II , , 1, 1,
c, ; sirt , 3_-_ , .itiv,„..,,,g,,,,,,,„, ,,,,„, ,, .i,t: •8. per-A. 0,....,
igYa hi-. arrtL I
i t..._, ),
i 14. .
41:.--;". . , ,, ,, ' .///'
r.•
i..,....,.
I. .,.
7):',...-•,..)•".;--,'
14: ,.'.•K s
I ( 04-4"44 ' :.
1 :'-\.,\' '''ttk,‘
i..,I,,,
4;. _ ..•
i;
4 • . .. •L •,' L
I I P' f IC.,v-
7.3 -.'
N)
y. 7 ,_.....----1...,
II ,- / :
ii,Inp
ieI,. arm
LO
45 ___.-- , i \ ;
1 .‘\CIO 1-..i E-J r-Zi'..--It-q 113 ,'. ( SU •k..
m i
l I C trEi nAtTT'
1MI
i
2> j _ g ---1, --,--- 0, -.ii " \%Q. n i n
4 ..: / ,, ; .- („E? 0
I L11-)A 1 - • " ',
0 n > 4: „I.__ ...
4. •
r , / ,
ti;0 ,,,2
7 1 0 Ell_ r-.7._ rg - -- \1 i t
U 12
f y c
r it l
C iyam
z. _
mad
9 / Pl' i
25
gm ---MN N—no NE---- No In M
Ell
1
1
l O 1
a 1 1
W V y Ifj / S
1E1 8/..
4"...":"...
1:_::.::.:':.:...1:.
i' / I.: .... • •••. •• ••. • ••••• •••. ••..•••. ••• •...••• • ••••
Nilo ,"
xX xxx
x X x x5 ' X x x x x x .
c. •• x x x x x x x x x
x x z x x x x x x x 1irxxxxxxxxxxx % 7
j..
x x x x x x x x x x x x x
x x , x , x x x x x ,, x x x x
x x x x x x x x
x x x x x x x x x
l
i 1—\v.,. x x x x x .x x x
i `, 1 x x x x x x.x x
z x x x x x x x x
x x x x x x x x x •
4:4.'
mil\., -!,I x x x x x x x x
1_ ,•- \ /.
i x x x x x x x x x
INUMINOUS\
Inn.l/lS./_\- /, x x x x x x x x
fe\i L0 1—/ x x x x x x x x
V
xxxxxxx
11 Xxxxxxxzx•yl..,yEIrye x x x ,t x x xL C* T x x x x x x x x
i ; x x xxz x x x x
i/ ,,i , 1 ,il1`.xxxxxx xxxxxxxxxx4 / /'} - x x x x x x x x x
t 7 ,/1% ,,,•x xx xx xx xx xx xx xx xxl+ + + +++ ++ + +++ ++ + + 'e`' y l\'-< x x x x x x x x
X x x x x x x ;
1C .:?• ••
x%xxxxxxxx• • • •
x x x x, • • • •
Ss+ ++4-....;;;„+.
1.....++ + + 4. +++ •‘. ,, ,
SINGLE FAMILY r``• ('t'
r''
x x x If1 «. .-4G•t`,,. gc4,,r?;.•::.i x X x x x
LOW DEN.MULTI FAM. I ''+':: 1t xxxxxxx .
c,
MED. tAte:4, fret'A
x ,
t4 t, !
Nage HIGH r . . E•
t.
j
COMMERCIAL
IIIIIIIIIIIIII LIGHT INDUSTRY OR M-P I
1771l111I1 HEAVY INDUSTRY INFLUENCE
x
x
x
x
X i RECREATION
AREA BOUNDARY
ated . GREENBELT
r -:=\i PUBLIC & QuASl-
10 COMPREHENSIVE PLAN
4 PUBLIC
ERAC)CO PUS
NORTH 1 *800' R. W. THORPE & ASSOCIATES
26
III. EXISTING ENVIRONMENTAL CONDITIONS; IMPACTS FROM
PROPOSED PROJECT AND MITIGATING MEASURES
A. INDEX OF ELEMENTS OF THE ENVIRONMENT
1. The Physical Environment
Earth
Geology 28
Soils 28
Topography 30
Unique physical features 31
Erosion 32
Accretion/avulsion NA
Air
Air Quality 34
Odor 34
Climate 34
Water
Surface water movement 38
Runoff/absorption 38
Floods NA
Surface water quantity NA
Surface water quality NA
Groundwater movement 38
Groundwater quantity 38
Groundwater quality 38
Public water supplies 86
Flora
Numbers of diversity of species 40
Unique species NA
Barriers and/or corridors 40
Agricultural crops NA
Fauna
Numbers of diversity of species 42
Unique species NA
Barriers and/or corridors 42
Fish or wildlife habitat 42
Noise 43
Light and glare 48
Natural Resources
Rate of use 54
Nonrenewable resources 54
Risk of Explosion or Hazardous Emissions NA
27
2. The Human Environment
Population 55
Housing 58
Transporation/circulation
Vehicular transportation generated 59
Parking facilities 62
Transportation systems 63
Movement/circulation of people or goods 65
Waterborne, rail and air traffic NA
Traffic hazards 66
Public Services
Fire 70
Police 71
Hospital 73
Schools 75
Libraries 78
Parks or other recreational facilities 79
Maintenance 81
Other governmental services NA
Energy
Amount required 81
Source/availability 81
Utilities
Energy 83
Communications 85
Water 86
Sewer 87
Stormwater 38
Solid waste 88
Human Health (including mental health) 89
Aesthetics 91
Recreation 79
Archaeological/historical 93
Additional Population Characteristics NA
Economic Factors 94
28
B. PHYSICAL ENVIROrftNT
EARTH
Earth Sciences provided the foundation and soils investigation for the
proposed ERADCO PUD. Dated March 13, 1980, this report summarizes the
findings, conclusions, and recommendations based on analysis of existing
technical data, 12 exploratory back-hoe excavated test pits and
laboratory soils testing. The following information is taken from that
report, the full text of which is provided in Appendix B.
1. GM LOGY AND SOILS
Existing Conditions
The soil on the site consists of an upper layer of fine to medium grained
sand with local coarser fractions including some gravel. This unit is of
recessional glacial origin. Stratigraphically below the sand and exposed
at various points along the lower slope of the greenbelt, is a formation
of very dense pre-glacial strata including glacial till and variable
silt-sand-gravel mixtures. The soils engineer indicates that the soil
pr)vides adequate support for the proposed development.
Impacts
It is estimated that approximately 50,000 to 55,000 cubic yards of earth
will be redistributed during construction of the road system on the site.
No Development
Conditions would remain as described in Existing Conditions.
Development to Single Family Density
Impacts resulting from excavation for building foundations and parking
spices associated with 125 dwelling units would be less extensive than
these created by the proposal; however, it can be expected that a greater
amount of topsoil would be required for landscaping than would be
necessary for the proposal.
tn,
45 .. THE MOTHUH ASSOCOATES - ARCHOTECTSi . 2 0 0 0 112TH AVENUE At E. LIESEVUE, WASHINGTON 98004 454-•3544
atInottaih:.........aa..4 '.• ,._
1k) Oradco Aud11, ,,, 4 37.--_--•!_•,,,€7,7-__.-....ft,17.---ii
e-1. .
1.,,,,,,,..,...4,•. . -
0:"-N\-tN• --',1*.4.;
Ii 4
c";' •.'.--..„... 7
N XV :\.4.
Iiiiiv•';' g4t\i;i'f-i;;:i::
n4::;1:•:;$4i:;%;::;0$:;:;.:;•:i:::
l•:•.*4%*:;i•:•;•F::!•:f:••:`:.,,•:-:;,•::,•'••,•;:',..:.*.";•:.;,*.•*;:.•:•;:.•
X•.:•".::/•.:•;;•74
W.'4SZ%-::::%:;:•;:;;;::%:.!!'.*::•,*::.4kie4-4,:•-4
al.. 3'-'• :••-•-•-er,;:::•;•:. 4•44•44t, •••.,•445:.;.....,;•,,•••••:::".,4•••••/••• / .
v ;VA, v-i• 4.•••••:..•—..• •........„-,...4",i,• ,,
4•4,.•••01,A. *,••••••;.-4.4%,....3.,--.;:.•••,,,e; ,••
r 1" .
1 . .; /I l‘k\ .•'."44,":••:•:•:%14..44.•.•..,,....V.:.*;•:•;••,•....•V,r.4,•i•-I•Ar • •• ••e9F.I••••••••••••••.0•A•..•••....U.•.•A,•••••••••••••••••.. 40...A,•'..••••••••••••$••r.,.• •
464.••••••••••••WV. •••,•.../W•to••N OVAIV,• •
NI V. I • 4‘v \4::;Pro•• •/**/•:••••:*•••:•. ,•••••••t•V•43 r••••*•!•:•'•4'
4.0:4.:.‘•,...:;,:•444,....100......4,4e,,,h‘i.•,•0•••a••.i••••'IV,'4'.••••...I"...•••••'•.'••••••:' -',• t••6 V;;*,•••:'•.•••.:•.:'/:•:••••.•••40 v..••••••0 . Z
w S,.,- _ ,
3, \\ .
s, .1 tr°4:4••••:•:•/,0 •••••!-.•.,,•;••••A' Iii•ii:eigit; :st,Z1.;Aii0'.. ' 1 /
4 /
I1 'ek
v. T • ;
I \\".'‘.‘;4:
1's''' I ..;1'il'•,••••••••.:,••••••••••••,..:...:,,...,,,;...„0,%,",.:34::::`,..V.,),v."
41'
4..I
N '444::%;;;:f.;:kr::A-V.,;;;•;••••;• • . • /. / f, (
sso J
A
I\
1')Iii. .'"•-' ' r x0,<.,.....:,!•.....1.,4* , ,
A , ,,, r
1 ---
V::::•;A:;.:.*;.,x.x.:.:0, ., c
Fc.4), x.....4.:*;;,,..;:s"$;%;***"A"
k'C
i • \c -,.. — N' .• ‘ . 4.tfeI1,., 4,1" AA gii3:::::VA44:.!..:"/// / ' ,i,"1J-.1,/,.•
tm:::::::*::::::•4-,...ii
A OA•...4, •/ .._ ,V. V 4
1 •
V;-- -- ..•••%•
VV•4•••••••••••• •'/ ,4 •••••• ,•
N.,.._ ,/
V.; A.
6?;':.:
4.•••:•"4:474. ' "", _-1"...,:-_
1 I i i k N elkk 1..:...:.-A---
r
X...4/46.•,•,4,..4.0.y , /, ,4, .•/ r • / • ••••.... •
N)
QD
7 1''' I(' ..11 ,
7••-•-•
2\ ,$•;4.i.:',g;;i1:*;:;,V•V°. . f,•/ •'1'i r.-••-.>'-' ''' ............
i•V..... -k•s r Ai.•$••••••••••••••• .•„.
j„.•NO '' /;•*..;:•••:i*:.:•;••••:"•••••. .' • / ,ki. I
6.... k Illki;.24:•••:••••••V.V.••••/ /A
C-.......:-.3...;,-;••••' „..
r • .•-
1
1(
N, '/4.;:....;•,...411.111::**4ge,'.. -". '. '('i/
e.• .....1;'•- • -------..." •-
s
Illitteg:; :.§1:: .•• ///X
fl •.:- -- .- , '1 "
t ..
n \
4 1, •;."
1 , . .
2 ,.• : (... ; .•.:1 1 I 1.- • \ : - ::: \ N‘,,,)
MWr14 1 ‘,I.,f1.
I:'.,.•
I
4•..,.,.
i t. .,..>... .•-;.t .-"•• ...,•', •;• ,'....•?., >,
i,.-;:,i;:,.
i.
i.:,,:.:1:,'.- .'.
s-.4z,.
4.•
4..i4..
4:,.....*•..0o..
1„......:.,
k:...:-.•
4::.::.•‘„.::.:/,:.:•:04:.:,•:N!..•-:;•,,.•:..:;
0•..•.
iN,•.."-„t-••:
4.:
ir••:.gP•..
0:::.':•
I::•::i;,,:;,!
l,:
1t,!:i;•:r":•:n"•;7.*:.• -',.„•.•,, /.• ..-',. '.,.. ,•‘....•,.. •.
1....
C,
N.....""-0 I
j .
0.-,..8'.-.,•
c..'1-\..--:-;
7-..
b _,• I ..-i r....,. 1'....:.-- , ' 4t.:•:*.•:,:%, .,..-
i;•:•%•„s1,:.,,,-, \...•-
k N -7-14L ,
A 0 m V_ , . - - : i : _
x.......v.:.;...0.,............0,?...• v....4::
1
g:g1:;%:..1 . ,,,..-.•:•
v.ows. 25 50%
tia) 0 2 N)0•'
itillOryWs.
U) > 4
0
rwo r.< 3 .= -
r.)
i1 '
P' •//
1-)•1 Imo cn
m ri ....
30
Development to Maximum Density
Excavation impacts would be greater than those created by the proposal
due to increase in the number of building foundations and parking area
associated with 625 dwelling units.
Alternative Side Access
Geologic impacts resulting from this alternative are difficult to access
at this stage without detailed soil and geologic studies of the wooded
hillside. However, this alternative would result in the excavation of
452,000 cubic feet of earth material in order to construct a roadway
length of about 2,200 linear feet consisting of two ten foot lanes with
fcur foot wide paved shoulders on each side.
Mitigating Measures
a) All the recommendations of the soils engineer will be followed.
b) The City's requirements on grading and excavation will be followed.
Unavoidable Adverse Environmental Impacts
Exposure and disturbance of 50,000 to 55,000 cubic yards of surface soils
on the site.
2• TO'OGRAPHY
Existing Conditions
Approximately 25 acres of the 41.5 acre site is cleared and relatively
flat, resulting from previous use as a gravel extraction operation. The
renaining area consists of a steep, wooded hillside which drops some 250
vertical feet from the aforementioned flat area down to Maple Valley
Hi;hway.
Im 3acts
Ex:avation procedures for the construction of roads and building
foundations will occur on the flat portion of the site. However, the
original topography could be restored at the end of the project' s useful
life.
31
No Development
Conditions would remain as described under Existing Conditions.
Development to a Single Family Density
Changes in site topography could be expected to approximate those
resulting from project implementation.
Development to Maximum Density
Changes in the topography would not substantially differ from those
created by the subject proposal.
Alternative Site Access
This alternative would significantly impact the greenbelt, specifically,
with the construction of finished slopes of 1-1/2 to 1 grade. A maximum
profile slope of 10%, with slopes around the sharp curves reduced to
7.5% in the 2,200 linear foot long roadway would result.
Mitigating Measures
None.
Unavoidable Adverse Environmental Impacts
None.
3- .UNIQUE PHYSICAL FEATURES
Axisting Conditions
About 16 acres of the 41.5 acre site consists of a steep, wooded hillside
which drops 250 vertical feet down to Maple Valley Highway.
Impacts
Although the greenbelt will remain largely intact, project design plans
for the construction of a jogging trail along its upland rim. Also, it
may be necessary to connect a storm sewer into the Metro sewer trunk line
at the base of the bluff along Maple Valley Highway.
32
No Development
Conditions would remain as described under Existing Conditions.
DEvelopment to Single Family Density
In pacts would be similar to those of the proposal.
DEvelopment to Maximum Density
In pacts would be similar to those of the proposal.
Alternative Site Access
Tre 28 foot wide roadway would bisect the greenbelt resulting in a
significant impact on the wooded hillside .
Mitigating Measures
a) The denuded area should be seeded immediately upon completion and a
jute net should be applied over the cleared area until vegetation is
reestablished.
b) A 25-foot hillside setback from the top of the bluff should be
maintained.
Unavoidable Adverse Environmental Impacts
No ie.
4. EF;OSION
Existing Conditions
The highly permeable and unsaturated surface soils across the site
currently absorb most of the precipitation with no adverse downslope
effects. Therefore, there is little evidence of significant erosion on
thy! site.
Im)acts
During excavation and grading, where existing vegetation would be
reiioved, the potential for erosion would increase. On the steep slopes
of the greenbelt, the soil would be highly erosive. However, the slopes
are currently covered by dense vegetation and would remain so, except
33
for the aforementioned jogging path and the potential utility trench to
be introduced.
No Development
Presently there is little evidence of significant erosion on the site.
Natural erosion would continue.
Development to Single Family Density
This low-density alternative would require less extensive clearing of
surface soil materials and would thus, produce less potential for erosion
than the proposal.
Development to Maximum Density
The increased density would not have a significantly larger impact on
erosion than the proposal; however, use of the jogging trail would be
heavier than the use created by the proposal. Potential for significant
erosion could increase with the increase in usage of the trail.
Alternative Site Access
Construction of the Maple Valley Highway Access Road would increase the
potential significant erosion on a steep hillside.
Mitigating Measures
a) A permanent surface water management system consisting of a
combination of underground collection and surface retention basins
will be installed to connect with the storm drainage ditches adjacent
to Maple Valley Highway. An energy dissipator at the juncture of the
ditch will moderate the velocity of the water flow down the hill.
b) The denuded area resulting from the jogging trail and potential
utility trench construction should be reseeded immediately and a jute
net should be applied over the cleared areas until vegetation is
reestablished.
Unavoidable Adverse Environmental Impacts
Possible soil erosion from the site during construction activities.
34
5. Accretion/Avulsion
S: nce the site does not exhibit the natural processes of accretion and
alulsion, an analysis of environmental impacts is not necessary.
AIR
1•PARTICULATE LEVELS
Existing Conditions
Tte Puget Sound Air Pollution Control Agency (PSAPCA) monitors air
gtality at selected sites. The sites nearest to the proposed project
wtich monitor particulate levels are the S.E. District Health Center
12015 S.E. 128th) and the Renton Municipal Building (South Second Street
ar.d Mill Avenue South) . As indicated in the following table, particulate
levels are generally increasing annually, yet are well within the
standards.
Table 1
Summary of Pollutant Concentrations in the
Renton Area
Particulate Matter
parts per million (ppm)
Locatioi 1979 1978 1977 Standard
S.E. District Health Center 43 36 38 60
Renton 4unicipal Building 59 55 51 60
Thi! measurements at these stations will differ from what can be expected
at the project site, because of their proximity to major air pollution
sources. Information from these stations, however, represents the best
data available, short of monitoring air quality at the actual site .
The adjacent gravel extraction operation to the east of the site is a
probable source of suspended particulate matter at the project site.
Nearby homes (fireplaces) and traffic on adjacent streets may also impact
the. air quality of the site.
1A: r Quality Data Summary, Puget Sound Air Pollution Control Agency, 1979.
35
Impacts
Over the short-term, suspended particulate levels (soot and dust) will be
increased by construction activity, especially during the period of
excavation. About 50% of the housing units will contain fireplaces. One
fireplace generates about .17 pounds of particulates per hour while it is
burning wood (half seasoned). Under worst case conditions, 36 pounds of
particulates per hour would be generated if all the fireplaces were
simultaneously in use. However, the fireplaces in the project are not
the principal heating source for the units, so their use will probably
not be continual, even in the winter months.
Particulate matter will also be generated by additional traffic around
the site.
2• CARBON MONOXIDE
Existing Conditions
Although neither the Department of Ecology nor the Puget Sound Air
Pollution Control Agency maintain monitoring stations for carbon monoxide
in the Renton area, figures could be obtained from the Washington State
Highway Department as illustrated in Table 2 below.
36
Table 2
Carbon Monoxide Levels
Carbon Monoxide ppm
Location Period 1 Hr Max 8 Hr Max
Airport Way & Logan Avenue January-March 1977 9.0 8.0
Southcenter Blvd & 57th S. January-March 1977 11.5 8.9
Puget Power Yard June-July 1977 3.2 2.0
March-April 1977 4.2 3.3
October-November 1976 8.1 6.6
June-July 1976 2.2 1.3
S tanda-d s:
Carbon Monoxide 1 Hour Standard - 35 ppm
Carbon Monoxide 8 Hour Standard - 9 ppm
Source: Earlington Woods P.U.D. Draft EIS, January 1979)
Carbon monoxide levels are approaching the eight hour standard during the
worst case" winter months. However, the carbon monoxide levels at these
stations are probably higher than those at the project site, due to their
proximity to major arterials.
It/pacts
Tte traffic analysis projects an increase of approximately 2,546 vehicle
trips per day. An increase of this magnitude is expected to increase
carbon monoxide levels by 1.6 parts per million, but will probably not
result in violations of federal and regional standards.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Over the short-term during the construction phase, suspended particulate
le'Tels caused by dust would be less due to a shorter construction
sc'iedule. However, air pollution generated from the fireplaces would be
37
at least as concentrated as estimated for the proposal. Particulate
levels generated by traffic volumes associated with 125 dwelling units
would be less than those generated from the proposed project.
With the decreased density, carbon monoxide levels would be less than
those levels generated by the proposed project due to decreased traffic
volume generation.
Development to Maximum Density Particulate Levels
Over the short-term suspended particulate levels, in the form of dust
would be higher than those emitted from the proposed project due to
construction of 200 additional dwelling units. The number of fireplaces
could be expected to increase in direct proportion to the increase in
welling units. It could also be expected that an additional 7 lbs. of
articulates per hour would be generated by maximumd evelopment if all
fireplaces were simultaneously in use. Particulate matter would also
increase due to an increase in traffic volumes around the site.
Carbon monoxide levels would increase proportionately with the increase of
traffic volumes associated with 625 dwelling units.
Alternative Site Access
Particulate levels would not significantly differ from the proposal over
the short-term during road construction.
Carbon monoxide levels would not appreciably differ over the long-term as
a result of the alternative road access .
Mitigating Measures
a) Utilize low-emission construction equipment whenever feasible.
b) Measures to control construction dust, such as watering and reseeding
of cleared areas, cleaning and sweeping of streets will be
implemented.
38
Uaavoidable Adverse Impacts
Slort-term increase in pollutant levels as a result of construction
activities. Long-term increase in pollutant levels due to increased
vehicular activities.
4'ATER
E:,sting Conditions
Tiere is no surface water on the site, except for seasonal ponding at the
southeast portion of the site. Permeable soils over the entire site
result in a high proportion of absorption of rainfall, which then travels
laterally once impermeable layers are reached. This overflow travels
dcwn the greenbelt sloping to the west and enters the ditch abutting
SF-169 and ultimately enters the Cedar River. Small, scattered, possibly
irtermittent springs were noted between the two soil formations and
irternal to the lower formation along the embankment.
Impacts
Temporary detention facilities will be required during the construction
phases of development in order to control potential siltation resulting
from erosion. These facilities will be removed upon completion of the
development.
Ap)roximately 70 percent of the site will be converted to impermeable
su-faces. This will increase the potential stormwater runoff from the
site. Stormwater runoff levels generated after construction commences
will comply with the Renton Storm and Surface Water Drainage Ordinance
3174. This regulation mandates that peak runoff rates not exceed the
peak rate of runoff of a ten-year storm prior to development. In the
case of the subject site, the present rates of runoff for 10- and 25-year
storms are 4.5 cubic feet per second (cfs) and 5.3 cfs, respectively.
Without detention, it is estimated that construction would generate a
peek runoff rate of 22.2 cfs during a 10-year storm and 27.6 cfs during a
25-year storm. Stormwater runoff, however, will be collected by storm
sever, routed through silt traps and oil/water separators and detained on
the site in conventional underground storage facilities before entering
39
the City storm sewer system located adjacent to SR-169. The silt traps
will remove most solid materials and the oil-water separators will remove
petroleum products and other floating debris . These will require
periodic maintenance to remain effective.
Thus, the total volume of runoff will increase, but the maximum rate of
runoff will remain approximately the same. For additional details on the
detention system, see Appendix G.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Stormwater run-off volumes would be less than the amount generated by the
proposed project due to a decrease in impervious surface on the site.
Development to Maximum Density
Stormwater run-off levels would be greater than those levels estimated
for the proposed project due to an increase in impervious surface on the
site.
Alternative Site Access
Stormwater run-off created by construction of the roadway would be
collected and channeled into an underground drainage system and catch
basins at 300 foot intervals along the outside edge of the top of the
slope. The inside edge of the roadway along the toe of the slope would
be equipped with a rock-lined drainage swale relieved by crossroad drains
to each catch basin. The total volume of run-off from the site would
increase as a result of this alternative.
Mitigating Measures
a) Utilize temporary detention ponds during construction phases to
collect silt.
b) Careful construction practices will prevent litter, debris, or other
pollutants from entering drainage.
40
c) Collect stormwater runoff in a storm sewer system.
d) Utilize catch basins and screens to collect litter and debris.
e) Utilize oil/water separators to retain gas, oil, and grease for
removal from stormwater.
f) Settling basins would remove solids from runoff.
g) Provide adequate street and parking area cleaning and maintenance of
the stormwater system.
Unavoidable Adverse Impacts
Inzrease in total runoff volume.
FLORA
Existing Conditions
Ths vegetation analysis for the site of the proposed development is based
on several on-site investigations. The site consists of two distinct
setions: the westerly border of the site contains a steep greenbelt area
which will remain intact and the majority of the site is a comparatively
flit plateau area where the construction will occur.
Thi. greenbelt features species typical of natural stand of mature growth
vegetation. These include western red cedar, Douglas fir, hemlock,
co :tonwood, maple, alder, in addition to salal, Oregon grape, sword fern,
nei:tles, etc.
Tim buildable portion of the project site was previously used in gravel
extraction activities, and thus the original vegetation has been
destroyed. There is, however, regrowth of successional plant materials,
namely alder, scotch broom and seasonal tall grasses. A few stands of
large coniferous trees are located along the perimeter of the upland
area. Essentially, the site is barren of undergrowth.
Ism acts
The greenbelt slope will remain intact, with the primary intrusions
resulting from increased human activity and the addition of a jogging
trail along the top of it.
41
Most of the sparse vegetation currently existing on the buildable portion
of the site will be removed, with the exception of any sizable stands of
large trees. Landscaping consisting of native plant materials will help
mitigate this loss .
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Since construction to 125 dwelling units would require less building area.
It is likely that a greater portion of the existing vegetation would
remain intact with this alternative. In addition, upon completion of the
home construction, a greater amount of open space would remain available
for landscaping.
Development to Maximum Density
It could be expected that a greater amount of the existing site
vegetation would be removed with implementation of this alternative than
would be removed with the implementation of the proposed development.
Alternative Site Access
A 28 foot wide and 2,200 foot long strip of major vegetation in the
greenbelt would be removed as a result of the implementation of this
alternative.
Mitigating Measures
a) Retention of as many of the existing trees as possible through
sensitive site planning.
b) Retain vegetation outside of road and railroad improvements until
buildings are constructed, as feasible.
c) Minor modifications of building siting will occur based on tree
inventories provided by field surveys.
d) No trees will be removed from the greenbelt area.
42
Unavoidable Adverse Impacts
Removal of most of the vegetation from the buildable portion of the site.
FAUNA
Existing Conditions
W: ldlife on the site consists of birds and small animals tolerant of an
urban environment. Potential habitat area is present on the site,
particularly in the greenbelt.
In pacts
In pacts to wildlife will be the result of loss and deterioration of
habitat. Most of the productive habitat along the greenbelt will be left
largely undisturbed. The addition of new landscaping and the retention
of some of the natural vegetation on the buildable portion of the site
may partially offset this impact. Species displaced from the site will
have to compete for the remaining habitat and some may perish as a result.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Construction of 300 fewer dwelling units than proposed would result in
till preservation of additional existing habitat thus impacting the site
faina less than the project.
Development to Maximum Family Density
Haiitat would most likely be impacted more severely by this alternative.
In order to construct 625 dwelling units and corresponding parking areas,
open space would be reduced.
Alternative Site Access
Sotne of the habitat existing in the greenbelt would be eliminated by
construction of the roadway. The remaining greenbelt habitat could be
disturbed by the introduction of traffic activity on the hillside. The
impacts on the land portion of the site would be identical to impacts
created by the proposal.
43
Mitigating Measures
a) Retain as much natural vegetation as possible.
b) Utilize landscaping materials that provide food sources for birds and
small animals.
Unavoidable Adverse Impacts
Removal of vegetation will result in the loss of animal habitat. Most
species on the site will be eliminated. Urban tolerant species will
replace those species which are not.
NOISE
Nose levels in this statement are expressed in A-weighted decibels, or
dBA, which best describes the human perception of noise levels. Each
increase of 10 dBA in the noise level is subjectively judged as an
approximate doubling of loudness .
A fluctuating noise can be described statistically by the noise levels
exceeded for given percentages of time during a prescribed time period.
The commonly used statistical levels are L99' L90' L50' L10' and L1, for
which the number in the subscript indicates the percentage of time that
the given level was exceeded. The L99 and L90 are indicative of back-
ground noise in the absence of local noise events. The L50 is the median
level, exceeded 50% of the time. The Li0 is usually indicative of noise
from typical traffic events. L1 is the level exceeded one percent of the
time, and is usually indicative of the highest noise levels from buses,
trucks and aircraft.
Existing Conditions
Calibrated noise measurements were taken at two locations on the site on
April 2, 1980 between 3:00 p.m. and 3:30 p.m. and on April 3, 1980
between 10:05 a.m. and 10:25 a.m. Refer to the Vicinity Map on viii for
location of sampling stations .
44
High noise levels in the area of proposed action are due primarily to
lcw-flying aircraft, jet-engine testing, airplane take-offs and motor
vehicles operating on public highways, principally traffic on SR-169.
These sources are approximated by the existing noise level readings shown
in Table 3, below.
Table 3
Existing Noise Levels in Decibels (dBA) in the Vicinity
of the Proposed ERADCO PUD
Station Number L1 L10 L50 L90 Date and Time
1 74 56 52 50 April 2, 1980, 3:00 pm
2 73 60 50.5 45.5 April 3, 1980, 10:05 am
Reading3 were taken by R.W. Thorpe & Associates using Quest ANSI 21.4 (Type 2)
sound level meter with an attached wind screen. The sound level meter was
calibrated with Quest 2G-2718 calibrator before and after each set of
measurements. Weather was sunny and about 50-60 degrees with high clouds and
winds between 0-5 miles per hour.
The L1 levels shown on Table 3 represent maximum noise levels recorded on
thfi site during daytime sampling in April 1980. These L1 levels range
from 73 dBA to 74 dBA (engine testing and low jets) . Average noise
le els (LS0) within the site range from 50 dBA to 52 dBA. Under the
provisions of the Renton Zoning Code, Section 4-734(K) , continuous noise
le,'els must not exceed a maximum of 70 dBA with adjustments for types and
duration of noise.
I pacts
There will be a short-term increase in daytime noise levels due to
construction activity, with periodic peaks of noise depending on the type
of equipment in use. Table 4 shows the types of equipment and their
noise potential. All such equipment produces noise at 50 feet which is
45
more than 10 dBA above the EPA' s recommended noise levels for a
residential district. Table 5 illustrates noise abatement potential for
construction equipment.
In the long-term, human activity on the site will lead to a slight
increase in noise levels. The 11.5% increase in traffic volumes on
Northeast Third Street will result in a proportional increase in traffic
noise. Mechanical equipment noise during building operation should not
be noticeable.
No Development
Conditions would remain as described under Existing Conditions. There
would be no noise generated by construction, additional traffic volumes
or human activity.
Development to Single Family Density
Noise levels resulting from both short-term construction activities and
long-term occupancy of this alternative would be less than those
generated by the proposal due to a less extensive construction phase,
less population and, in turn, less traffic volume.
Development to Maximum Density
Short-term noise as a result of construction would last for a longer
period of time than for the construction phase of the proposed develop-
ment. Noise levels generated by implementation of this alternative would
be higher during occupancy due to increased traffic and human activity.
1
46
Table 4
Anticipated Maximum Noise Levels from Construction Equipment
Noise Level
Construction Phase and Equipment dBA, Leg, at 50 ft)
DEMOLITION AND SITE PREPARATION 79-91
50-to 60-ton crane with headache ball 88
D-8 bulldozer 79
D-8 front loader 91
Jackhammer 88
II EXCAVATION 79-91
D-7 bulldozer 80
Front loader 79
15-to 20-cubic-yard dump truck 91
Jackhammer 88
III FOJNDATION 79-98
Earth augering machine (drill) 98
30-to 60-ton crane 83
Welding generator 78
Concrete mixer 85
Concrete pump 82
Concrete vibrator 76
Cement and dump trucks 91
IV EXTERIOR 78-88
welding generator 78
Large Crane 88
Air compressor 81
Pneumatic tool 85
V INTERIOR, FINISHING AND CLEAN-UP 78-91
fir compressor 81
enerator 78
ulldozer 80
Front Loader 79
Dump truck 91
Paver 89
Source: Bolt, Beranek and Newman, Noise from Construction Equipment and
Operations, Building Equipment, and Home Appliances, U.S. , Environmen-
tal Protection Agency, NIID 300.1, 1971.
47
Table 5
Immediate Abatement Potential of Construction Equipment
Noise Level in dB(A) at 50 ft.
Important
With Feasible1 Noise2 3EquipmentPresentNoiseControlSourcesUsage
Earthmoving
front loader 79 75 E CFI H 40
backhoes 85 75 ECFIH 16
dozers 80 75 E CFI H 16
tractors 80 75 E CFI W 40
scrapers 88 80 E CFI W 40
graders 85 75 ECFIW 8
truck 91 75 ECFIT 40
paver 89 80 EDFI 10
Materials Handling
concrete mixer 85 75 ECFWT 40
concrete pump 82 75 E C H 40
crane 83 75 E CFI T 16
derrick 88 75 E CFI T 16
Stationary
pumps 76 75 E C 100
generators 78 75 E C 100
compressors 81 75 ECHI 100
Impact
pile drivers 101 95 W P E 4
jack hammers 88 75 PWEC 10
rock drills 98 80 W E P 4
pneumatic tools 86 80 PWEC 16
Other
saws 78 75 W 4
vibrator 76 75 W E C 40
1Estimated levels obtainable by selecting quieter procedures or machine and
implementing noise control features requiring no major redesign or extreme
cost.
2In order of importance:
T Power Transmission System, Gearing F Cooling Fan
C Engine Casing W Tool-Work Interaction
E Engine Exhaust H Hydraulics
P Pneumatic Exhaust I Engine Intake
3Percentage of time equipment is operating at noisiest mode in most used phase
on site.
U. S. Environmental Protection Agency, December 31, 1971.
48
Alternative Site Access
Nc=ise levels associated with construction of housing units would remain
the same for both the proposal and this alternative as would long-term
occupancy noise levels associated with human activity. Also,noise levels
generated by construction of both the proposed roadway and the Maple
Valley Access alternative would be approximately the same. However,
because of the close proximity of the greenbelt roadway to the housing
units, and due to the steep slopes of the greenbelt future residents of
tte planned unit development would be subject to increased traffic noise.
Mitigating Measures
a) Construction equipment that will not exceed the State of Washington
maximum environmental noise standards will be employed and operated
accordingly.
I) Noisy operations should be scheduled so that they are not concurrent.
c) The hours of operation of construction equipment will be limited.
d) Truck arrivals should be controlled to reduce vehicle congestion.
e) Construction should be placed as far from property boundaries as
possible.
f) Roadway improvements should be timed to alleviate congestion and
reduce volumes on existing streets.
Unavoidable Adverse Impacts
SLort-term noise levels will increase as a result of construction
activities. The added traffic volumes will increase the noise levels
over the long-term.
LIGHT AND GLARE
Existing Conditions
There are no sources of light or glare currently on the site. Interior
ani street lighting from the houses to the northwest of the site may be
visible from the site.
49
Impacts
The proposed development will result in the addition of lighting,
directed downward on the circulation system within the Planned Unit
Development. The precise type of lighting to be installed has yet to be
determined. The entrance driveway will feature street lights and the
eadlights of entering and exiting vehicles will emit light at night.
wever, this light should not impact the existing residences located to
he north and northwest of the site due to vegetation and topography.
hese sources of light generated from the project site will not generally
e visible from SR-169 Maple Valley Highway.)
o Development
one.
Development to a Single Family Density
mpacts due to street lighting would be the same as those in the
roposal. However, the frequency of headlights of entering and exiting
ehicles would decrease.
Development to Maximum Density
Impacts due to street lighting would be the same as those for the
Proposal. However, at night, the frequency of headlights of automobiles
entering and existing the site increase.
Alternative Site Access
Impacts in addition to those of the proposal would include street lights
through the greenbelt and headlights entering and existing the site,
which would be visible from Maple Valley Highway.
Mitigating Measures
a) Perimeter landscaping, fencing and berming, especially around parking
areas and road entrances, will reduce light spillage.
b) Parking area lighting could be limited so that no direct light spills
off site.
50
Unavoidable Adverse Impacts
None.
LAND USE
E::fisting Conditions
The entire site was rezoned by Ordinance #3113, adopted on March 4, 1977.
A number of conditions are placed on the rezone regarding building
height, greenbelt preservation and access. (For a full discussion of
this restrictive covenant, please refer to Appendix F.)
The project site is divided into five distinct parcels. (See Figure 12,
p 51):
Parcel A (1 acre) was rezoned to R-1, with a maximum density of 5
dcrelling units per acre.
Parcel B (7 acres) was rezoned to R-2 with a maximum density of 10-12
wits per acre.
Parcel C (11.5 acres) was rezoned to R-3 with a maximum density of 20
units per acre.
Parcel D (5.5 acres) was rezoned R-4 with a maximum density of 50 units
per acre.
Parcel E (16 .5 acres) was rezoned Greenbelt and is protected from
development in perpetuity.
E3 isting Land Use
Tie surrounding area is mixed uses with single family residential (to the
ncrthwest of the site as well as further north across Northeast Third
Street) . Mt. Olivet Cemetery abuts the property to the north and
Stoneway Sand and Gravel Company operates a gravel extraction facility to
tie south, east, and west of the project site. To the west of the
stbject site travels SR-169. The site itself is comprised of vacant,
oyen space.
Tie area north of N.E. Third Street is composed of both single and multi-
family residential uses. The 35-acre Windsor Hills neighborhood consists
of about 500 single family homes. The Sunset View apartment complex is
r
0
a 413..;i'-.1 :I
g M 1 - 4Z40tIrr14!.'
D 4:
r w r, ni? s....,
v
t
II 33
aCO
CO
v ' • . ,111.1)40m
73y7.
X
X Nippih%11p ti
VSXN %
FqIIw'yxzxx 4441,I I. xzxzIN
y K % Y x % % x % % 'Y %
OSXx ``>/
X x % % X Y %
x x 1 : ifs, x x x x x x x x x x x "••-
1`.
Y x -x x x x x % X x % X •`\ _
X
xXx •%.
1- .
yp.• 74: !.:-.-• •.7.%•:
X xxx...--/`
i..%*,:-•.. ,.
Ltspx
KxK /",• • • XXNk/\/,3••
U1
x x -1-1. E w • • •• x x_./I., 1\•..•.-••• •-.14:.:::. 1—'
z x 11 \ 7r. •• •••••••••••• • ••••• x x X •\/1/t• .... ..• •
x x ,-.- ..N t;k i• 0.01.00.0 •'••...... x x x x z .L".i••....••.•..•••.•...•.•••••....
tyw) N K K K x % 'x :::•i:.:::•.:•:::.::::::::::::::::•7•:•:•/i:::.
i^ i'
0.0
x x x x x x % •.•.•.•..•.•..•.•••.•••••••.•
1••••••••••.•
f 1•........•.••..1••..••
O.•D i .....
x x x K X X x X •••••.•.•.•••.•.••..•••••••••••••••••••••
y' IIII XXXXXXXX x•, ,•.•••••••••••••/•••••••••••••••••••
com a+3 mai
x x x x x x x x x x x .•..•..••.•.•.../..........•••..•••
r 3 :y I_., x x x x x x x e % x ....•..••....•.••.....•....•...•..••
0 C
CO
P
S{, { m 1\/mil i\/
x x x x x z N x z x %••.....•••••••..•.••.1.1•.•••.••11•
I x x x x x x x x x N
t! t 1\, x x x x x x x % x •.••.•.......•..••.
1••.1••11••1..••.
1••••1••.•••••••..•••••.I
r
1 5.7 t 1/j' x X x x X x x••••-••„•••1.••••.••.••.•....•.•..1••••••...•
TT x x x x K x •,•...••••••••••••••.•.•••••••••••••.••4
23)XI Z Iii lir.-
t 7
K
x . N x x x x . ,' •.......••...•••..•...•.••••.••......•..iXKX
XxKxKx N k
X X• % x % x x'.• •••'••.••••••..••.•.•••••.•.•..•..••••••.••Dpor v'/ )
X X X w .. K % % % X X X X ••. )• •..••.•••.•••••.•1.•••.•••11•••••1...:
K % K X X
x % x % X X xXxXK%K%X%
X %
X x % % •••....••••••••••••••••••••••••••••••••IDMil
MO MB IIMI NM IIN MINI!
x X x X x X % M % k k
x x
1.•.•..•...•.••••••f.}3_'xKNNx N % % %
kx%x%K S K %
X K % K K %
x%%%
XXXX%%x%
NX%
XKX
KXXXKXxXx\ :•1••/.•••••••.1•••• :•:•••••••••••
D0 x%KXKxK xKxKxKxK%XxKxx%x%
KX%X%X%X%XK X%
Xx xN%k%%%XxxXKxx% K%x%%%%xXXK% •••••••..••••.•..••..1••1••..•.• :1•
x x x % x x X X X % % % % % K N % X x ••••••...............................
O
Y x Y K x x x x
1,
x x x x % X % % % % K % X %Xx X%
XK'XXX % X % X x X % % % % X x x X X N'...•.•.•.•..••••••.•••..•••.•..•••••:
r,_
X % % % % %
N%K%xxx KK%K%N% %
X X X
XxxKxx%X%X xxxx xKxKxKxKxK%X••.•
1••.1..•1•/.•....•.•1••.•••••....
0
X K % % k x % x X x X X
x 1/1.•.....•..•..•1.1.4
1x_;{Ix % X % K % X X K
X X X X % X x x K X
1••..••..•11•.•
i x % X % % N % X
XXX%X%
X K k
X k X %
If % X X x ••••••••••••••.••••••••••..••••1.•••i
1i
X % k X X
x % M x % X X x.x.x %
x X % X X % ..••••••••1.1..••.••••••••.•.1.•1•.•.
x % % % % % k % % % x % % % % %
KXN%
X X % % x x X x x x K •••.••••••••••••••••••••••••••••••••••
X % % 1..••••••••••••••••••••••.••••••••••
KX X NXNXx
X NXKXXX XXXX%%SXx XIt%%%XXXX%XXXX xXK%XXXX.%% %xKX%X% KXKX%X%XKX••
1.••••.1•.•••..1..•.•.•.1••..••.•.•.
X X X X % % %
x x % % % K % x x x x
x x
x X N x ••••.••••••••.••.••••.••.
1•.••.•.•.••
x % % % % %
X x % X%XKX%
X % x % % K % % % % %
x%KX%xKNK% X % % X x.••••.•••••••••••••.••.•••0•••.••••••
X X x % x X X X X x X%
X N X X
XXxX K x K X K X K x
xXNK;
X X % X 'I..••.•..••.•.•..••••.••.•••••.•...••
O m XXxX % % Y % % % % X X x X%KX%%KMK XIt % % % lI X X % % x X X x X ••••••..•.•....•.•..•.•••.•••.•••..•
X X X % k X X % % % X K % % % x X % % % X x % x x ..••.•.
11••••...11••••..•.•..••1•••••x x % % % X x- % % X X X % X XXX%%Xk%%XXx%
XX 5 KxKNXXXX%%%%XX%: xxxx KXK
XI•::::::••••...••./.•
1••••••.•••..S••••
v%v%v%yx4%vM % % X % X % % X % x X Y Y X Y .. .. u .. v v
ga 1r TD=O MINIMM QSSOcOA7 3 ° LSO CCO;IOTCC 4SIo.y..g 2000 112 TH AVENUE N.E.BELLE VUE, WASHINGTON O8001 154-3311 pin I.11,,4441.0,
0 G% In n n Ai
1-1i %.r v.1 o
f. \'/ n`
poeverIIf$ easement i
icisr.11,11
fi ( / \i 'x .+ -j, ice
c\V
6
1
mlLorej t 111L_ ;51.://lirtit,i.1.eill. '''.- ...-1'..\:--
omenbatareair•-•-, •‘ . . :, •••\ '.,,,. . '.- Z-':'-- '''
L ij 411 A. - ,, / f
iiieJI rwup.r
da rwa_
i C
I ;`
i ''i, Q
T _",'
9 / • A i'
if,41a
n. sL -, it ;7. . •
f— .
e,, ekoui 0t i y ;. %% vj
7,1 \. . rA.. l , . i 1) - 0 • 7 1 itoir---
1 Ns \;\ '-•J(/'1,1/1 pi(J' 11 1 I
iit' aar. rtin 3 ,, .ii ip,di P_
4 Ti u9 I/ i•II 4._ iminam.74-4,4
0 )1).
k 2'/ I. 7 Q[ i n. i' .' /. , ...
f'
1'` '
tea L.'n e'
er A'`j ,, l
mOm r y s=I a j/i IL , . / rn f 414).3
I; ph Q jjfie_; ...__...._..a., y r ,
rn n> ivi, rWIlk i' ,1t /*
3„,..,
II ran :i'!f'
it.t,-••
n
so aoo narta
53
located to the south of this neighborhood adjacent to the Group Health
Cooperative of Puget Sound Clinic, situated on Bronson Way N.E. A
condominium development, the Vantage Point, has recently been constructed
at the corner of N.E. 4th Street and Edmonds Avenue N.E.
Impacts
The proposed development will directly impact the land use within the
site boundaries and may seecondarily impact surrounding land uses in the
general vicinity of the site.
Approval of the Planned Unit Development proposal will allow conversion
of approximately 25.5 acres of vacant open space to multi-family
residential uses. The project will be consistent with existing zoning in
terms of the type and density of the proposed land use, and is also
consistent with the Renton City comprehensive land use designation. This
use will be compatible with existing land uses to the north. The
Greenbelt bluff which will remain on the southwest border of the site
will buffer the proposed uses from the industrial uses to the west of
SR-169 (Maple Valley Highway) . The affected single family properties to
the north of the site will be buffered by the proposed landscaping.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
This proposal would impact surrounding land uses less than a higher
density development. This alternative would not be as compatible to
surrounding land uses as the proposal, most notably the gravel extraction
operation.
Development to Maximum Density
This proposal would develop the site to its full potential in regard to
conformance to the City of Renton Zoning Code . However, this proposal
would impact the surrounding land uses to a greater extent than the
proposal due to a higher level of human activity and an increase in
traffic.
54
Alternative Site Development
This alternative would permanently alter a strip of the greenbelt,
converting a portion of wildlife habitat to impervious surface.
Mitigating Measures
Sixteen acres of the site will be preserved as greenbelt and a landscaped
buffer will separate the R-1 portion of the development from the existing
residential subdivision to the north.
Unavoidable Adverse Impacts
Reduction for the total acreage of open space in the City of Renton.
NATURAL RESOURCES
Existing Conditions
Given that the site is vacant, there is currently no use of natural
resources nor any depletion of nonrenewable natural resources at the
site. According to a representative of the Stoneway Sand and Gravel
Ccmpany, all gravel resources on the site have been depleted.
In.pacts
Construction of the buildings will consume natural resources, including
energy and raw materials used in concrete, steel, aluminum, glass,
copper and other materials of varying scarcity.
Nr Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Icipacts on natural resources associated with construction would be less
than those of the proposal due to less intense development.
Development to Maximum Density
Impacts related to natural resources associated with construction wuld be
greater than those in the proposal due to more intense development.
55
Alternative Site Access
Impacts would include those described under the proposal. In addition, a
strip of the greenbelt would be permanently converted to impervious
surface. Natural resources, including energy and materials used in
asphalt and streetlighting, would be consumed but to roughly the same
extent as the proposal.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Consumption of building materials and energy loss of open space due to
residential development.
Risk of Explosion or Hazardous Emissions
No assessment of environmental impacts is necessary since the project
will not involve any quantity of explosive or hazardous substances.
c. HUMAN ENVIRONMENT
POPULATION
Existing Conditions
Population data were derived from Puget Sound Council of Governments
PSCOG) sources, including their Trends and Policies Comparison Report,
September 19 , 1979) and Population and Housing Estimates (1977 and
1978) . The Puget Sound Council of Governments maintains updated
population projections according to activity allocation model (AAM)
districts comprising one or more census tracts. The proposed project is
located in Census Tract 256 which, together with Census Tract 257
comprises AAM District 3840. Population data for Census Tracts 252, 254,
and 255 (AAM District 3860) are also discussed, as this population study
area appears to have similar population characteristics to the proposed
ERADCO Planned Unit Development . Both population study areas are
entirely within the city limits of Renton.
56
Table 6 provides information on population and housing characteristics
for AAM Districts 3840 and 3860.
Table 6
Demographic Trends in AAM District 3840 and 3860, Combined
PSCOG, 1979)
Yeir/ Total Total Household
Di ;t. Population Households Size (Avg.)
19 '6
0 7,359 2,681 2.74
3850 11,918 4,217 2.83
1930
38+0 8,398 3,039 2.76
3850 12,112 4,471 2.71
19)0
3840 11 ,337 4,004 2.83
3850 12,651 4,889 2.58
The 1976 population in AAM District 3840, which includes the project
site, was 7,359, compared to 11,918 persons residing within AAM District
3850. Population projections for 1980 forecast a 14% increase in the
resident population within AAM District 3840 during the current four-year
interim (from 7359 persons to 8398) . The total population within AAM
District 3860 in 1976 was 11,918 persons and a 1% increase (to 12,112
persons) is forecast for 1980.
Analysis of the data provided in Table 6 indicates that a declining
household size is associated with population and housing projections for
1980 and 1990 in AAM District 3860, whereas an increase in household size
is projected for AAM District 3840, wherein the project site is located.
In pacts
Using the 1980 estimated household size for AAM District 3840 (2 .76
persons per dwelling unit), a resident population of approximately 1 ,173
persons may be projected to reside within the 425 dwelling units in the
EFADCO PUD. This population would constitute approximately 14% of the
57
1980 estimate of total population within AAM District 3840, or approxi-
mately 5.7% of the 1980 estimate of the combined population in AAM
Districts 3840 and 3860. These residents would be introduced onto a site
which is presently unoccupied and could be expected to originate pre-
dominantly from outside the boundaries of AAM Districts 3840 and 3860.
No Development
Conditions would remain as described in Existing Conditions.
Development to Single Family Density
A residential population of approximately 345 persons could be projected
to reside in the 125 single family homes constructed with that
alternative. This population would constitute approximately 1 .7% of the
1980 estimate of the combined population in AAM Districts 3840 and 3860,
and 4.1% of the 1980 estimated population for AAM District 3840.
Development to Maximum Density
A residential population of approximately 1 ,725 persons could be
projected to reside within the 625 dwelling units constructed under this
alternative development. This represents approximately 25% of the 1980
estimated population for AAM District 3840 and approximately 8.4% of the
1980 estimate of the combined population in AAM Districts 3840 and 3860.
Alternative Site Access
This alternative would not have an impact on the population.
Mitigating Measures
Development of the site to a lower density would result in a decrease in
residential population.
Unavoidable Adverse Impacts
None.
58
HOUSING
Existing Conditions
Th? Spring 1980 edition of the Seattle Real Estate Research Committee
reports that the Seattle-Everett SMSA is experiencing a 17% decrease in
building permit issuances in 1979 in relation to the previous year.
Single family permits declined by 22% and permit issuances in the multi-
fanily category were off by 2,486 units, or 12%. Increased development
pressure on available lots is expected to continue to escalate the cost
of new homes. In addition, the cost of construction for new framed
residences is 8% higher in 1980 than in 1979. The single family vacancy
rate, currently is estimated to be 1 .78% which is down from the autumn
1979 rate of 1.8%, but up from the rate of 1.6% from Spring 1979.
Generally, vacancies have decreased in low- and moderate-priced housing
ani increased in higher-priced housing. Vacancy rates for multi-family
rental units are presently estimated to be 2.08% which is equal to that
of a year ago . The Puget Sound Council of Governments policies
comparison report of September 1979 estimates that in 1980 District 3840
in which the site is located) will have a total number of households of
3,339 and Districts 3840 and 3860 will have a combined number of
households of 7,510.
Impacts
The proposal would provide a total of 425 housing units which would
develop approximately 70% of the maximum density permitted under the
zoning code. Construction types would be single family attached and
townhouses in clusters of 4 to 7 units. The addition of 425 housing
units would represent approximately 14% of the total households in AAM
District 3840. It would represent approximately 5% of the combined
household in AAM Districts 3840 and 3860.
No Development
Conditions would remain as described in Existing Condition.
59
Development to Single Family Density
This alternative would develop 125 single family dwelling units which
would amount to approximately 4% of the total households in AAM District
3840. The development would amount to approximately 1% of the total
number of households in AAM Districts 3840 and 3860.
Development to Maximum Density
This proposal would provide 625 housing units which would comprise
approximately 1% of the total number of households in AAM District 3840
and approximately 8% in the combined Districts of 3840 and 3860.
Alternative Site Access
Housing impacts under this alternative would not differ from those of the
proposed project.
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
TRANSPORTATION/CIRCULATION
l.VEHICULAR TRANSPORTATION GENERATED
Existing Conditions
The primary arterials serving the project site are N.E. Third Street
which intersects N.E. Sunset Boulevard to the west. Existing traffic
volumes near the site on N.E. Third Street have steadily increased from
18,801 vehicles per day in 1973 to 28,523 vehicles per day in 1980 for an
overall increase of approximately 3.4 percent annually. Peak hour
volumes (for both directions) on N.E. Third Street near the proposed
intersection of the primary access road to the development average 2,082
at 7:00 a.m. and 2,089 at 6:00 p.m.
60
Impacts
Primary access to the site will be via a paved roadway extending
northerly from the northeast corner of the development to N.E. Third
Street. Emergency access to the site will be provided via Blaine Avenue
N.1% which connects to the site at a point approximately 1,000 feet west
of the primary access point. This emergency route will be closed to the
general public by suitable barricade devices meeting Renton Fire
Department regulations.
The on-site circulation system will consist of a roadway system providing
access to the major subdivisions within the site and parking areas
proximate to each building unit. Parking will not be permitted on access
roadways. A ratio of 1.75 parking spaces per unit will be installed for
all building types except the townhouse units in the R-1 zone which will
feature 2 parking spaces per unit. Cul-de-sacs will be designed to
accommodate emergency vehicles and will conform to the City of Renton
building standards.
Tc estimate the daily trip generation rates that may result from
ccnstruction of up to 425 residential units, the traffic consultant used
tre rates suggested for various residential land uses by the Institute of
Transportation Engineers. The Planned Unit Development will be divided
into 332 apartments and 93 condominiums. The applicable average weekday
trip generation rates would be 6.1 trips per dwelling unit per day for
tre apartments and 5.6 trips per dwelling unit per day for the condo-
61
miniums.
1
Therefore, it is estimated that the entire composite of
apartment and condominium uses would produce an approximate 2,546 vehicle
trips per day.
Because the proposed development and the Monterey Terrace subdivision
located directly to the north are both solely residential and their
respective occupants are likely to exhibit similar trip destination/
origin and trip purpose characteristics, Monterey Terrace has been used
as a model for the development of a traffic distribution analysis for the
proposed Planned Unit Development . This comparison, however, was not used
in calculating the estimated trip generation rates of the proposed project.
The entrance to Monterey Terrace was observed for 30 minutes during a
typical weekday morning to determine trip distribution charcteristics for
that neighborhood. Traffic was predominantly exiting during that period
and it was observed that approximately 82 percent of the vehicles turned
left (to the west) upon exiting, whereas about 18 percent of the vehicles
turned to the east when exiting. It is expected that these trip distri-
bution characteristics will be reflective of those of the proposed
development.
In order to determine the potential impact of the project-generated
traffic volumes on the intersection of West 3rd Street and Sunset
Blvd. N. , a capacity analysis was undertaken by the traffic consultant.
The full text of the study has been included as a supplement to the
Traffic Analysis in Appendix C of this document.
1The term "PUD" applies to a wide range of possible land-uses including
single family, multi-family, commercial, owner-occupied, renter-occupied,
etc. According to the traffic analyst, the 7 .9 trips per unit specified
in the "ITE Trip Generation Manual" is applicable to a single-family
planned unit development. The proposal consists of a defined mix of
apartments and condominiums which, notwhithstanding the fact they would
be developed on a PUD concept, should still have the trip generation
rates for those specified uses. Generally, renters and condominium
owners generate fewer daily trips than do the traditional homeowners with
their larger families.
61A
The intersection was analyzed with and without the effects of the
proposed project for level of service (LOS) 'D' and with the effects
of the project for LOS 'E' .2 The morning peak hour analysis indicates
that the intersection is presently 18% over-capacity at LOS 'D' and
the additional project trips would increase the capacity deficiency
by 6%. During the afternoon peak hour, the intersection presently
operates at 7% under-capacity at LOS 'D' but would be 1% over-capacity
LOS 'D' with the additional trips.
Similarly, a capacity analysis at LOS 'E' for the same intersection
reveals that during the morning peak hour, LOS 'E' capacity would be
exceeded by 6% with the proposed action, which indicates that the
intersection is just at LOS 'E' under existing conditions.
In summary, the volume generated by the proposal would have a rela-
tively minor impact on the intersection, and this impact would decrease
in the future, on arelative basis, due to the natural increase in
volumes that can be expected on N.E. 3rd Street.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Access and on-site circulation would be approximately the same as
described in the proposal.
2
Level of service 'D' is defined in the Highway Capacity Manual as
approaching unstable flow" and level of service 'E' is defined as
unstable flow." Level of service 'E' is considered the actual
capacity of an intersection and is characterized by a condition
where all critical movements in the intersection are fully loaded
and most motorists will wait an average of a full cycle to move
through the intersection. Level of service 'E' is the typical
operating mode for intersections near major employment centers
during peak traffic periods.
62
Trip generation generated by 125 single family dwelling units would
approximate 1,250 trips per day. A parking ratio of 2 spaces per unit
would be provided; however, resulting impervious surfaces would be less
than the proposal.
Development to Maximum Density
Access and on-site circulation would be the same as described in the
proposal . Trip generation created by 625 dwelling units would
approximate 5,000 daily vehicle trips.
Parking ratios would also approximate the same as those in the proposal.
Alternative Site Access
Primary access would be via an access road from the Maple Valley Highway
SR-169) entering the south portion of the site. The site circulation
system would essentially remain the same; however, circulation would be
slightly altered with cars exiting from the south. Parking ratios would
be the same as described in the proposal. Trip generation rates would
not be affected by this access road.
Mitigating Measures
Inquire at Metro as to the feasibility of and collaborate with them in
the planning of erecting a bus shelter in the site vicinity to encourage
transit ridership.
Unavoidable Adverse Impacts
Increase in peak hour traffic volumes on local streets.
2- Pi4RKfNG FACILITIES
Existing Conditions
No parking presently occurs on the site which is vacant.
Impacts
The plans for the ERADCO PUD feature two parking spaces for each
townhouse unit in the R-1 zone and 1.75 parking spaces for the remaining
63
unit types. 88 additionalspaces would be required to bring the parking
ratio to two parking spaces per unit. No parking will be permitted on
the internal circulation route of the PUD. It is anticipated that all
parking demand will be accommodated on-site.
No Development
No ie.
Development to Single Family Density
Assuming two parking spaces per dwelling unit, approximately 250 spaces
wo.ild be required. It is assumed that all parking would be off-street.
Development to Maximum Density
Parking ratio requirements would be the same as for the proposal.
Between 350 and 400 additional off-street parking spaces would be
required.
Alternative Site Access
None.
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
3• TRANSPORTATION SYSTEMS
EXisting Conditions
Refer to the Circulation Map on viii for a graphic depiction of the area
rcads most directly impacted by the proposed development.
In pacts
AE previously indicated, traffic volumes on N.E. Third Street have
increased overall by approximately 3 .4 percent annually. Future
ircreases may diminish somewhat due to energy shortages and increased
64
driving costs; however, if growth remains consistent and if the project
is constructed as propsed, 1985 traffic volume on N.E. Third Street west
of the primary access road will be in the range of 29,000 to 35,800
vehicles per day. This increase may require some improvements to the
intersection of Northeast Third Street and Sunset Boulevard North. The
proposed project in itself will contribute 6% to 7% toward creating a need
for such improvements.
The primary traffic impact of the proposed development will be at the
intersection of the primary access road with N.E. Third Street .
Secondary impacts will occur on streets and intersections west of the
proposed action. Impacts on streets and intersections east of the
proposed development should be minimal due to the anticipated heavy bias
toward traffic movements to and from the west.
The additional traffic loads which the proposed project will impose on
N.E. Third Street west of the primary access road will have some impact
on the intersection of NE Third Street and Sunset Boulevard N. The
intersection will be moderately impacted during the morning peak hour
7:00 to 8:00 a.m.) and during off-peak periods since the intersection
operates far below design capacities during those times.
The approach volumes at the intersection of NE Third Street and Sunset
Boulevard N. for the westbound approach during the morning peak hour will
increase about 4.7 percent following completion of the project. Impacts
on other approaches during that period should be very minimal. The
afternoon peak hour period will see an overall increase of about 160
vehicles in the intersection; however, there is insufficient information
available to determine the percentage of increase for particular
approaches during this period. It is reasonable to assume, however, that
no approach will experience an increase greater than approximately three
to five percent over existing volumes since the additional volumes will
be distributed over all four approaches to the intersection. Other
intersections and roadways west of the proposed project should not be
significantly impacted due to the rapid dispersal of the traffic as it
radiates away from the project .
65
No Development
Conditions would remain as described in Existing Conditions.
Development to Single Family Density
Streets and intersections impacted by the proposal would also be impacted
by the alternative to a much lesser degree. There would be approximately
1/3 the traffic generated from this alternative compared to the proposal.
Development to Maximum Density
Streets and intersections impacted by this proposal would also be
impacted by this alternative to a greater degree. Traffic generated by
this alternative would be approximately 2/3 greater than the traffic
generated by the proposal.
Alternative Site Access
The Maple Valley Highway has traffic characteristics that are very sim-
ilar to those on NE 3rd Street. Current traffic volume on the Maple
Valley Highway are 21,597 vehicles per day as compared to 28,523 vehicles
per day on NE 3rd Street. The peak hour characteristics are also simi-
lar for the two roadways, however, the morning peak hour volume on the
Maple Valley Highway is currently about 5% greater than that on NE 3rd
Street.
T1-e provision of the primary plus the alternate access would obviously
alter trip distribution characteristics to the extent that a traffic sig-
nel would not be required at the intersections of either route with the
City's arterial system (See Traffic Warrant Analysis in Traffic Study for
Primary Access Roadway) . The fact that each intersection would operate
without a traffic signal would encourage a clockwise traffic pattern since
the "right-out" "right-in" movements would be substantially easier than
1Eft-turns into or out of the site at either location.
65A
The net effect of the provision of the two routes, as compared to the
single primary access, would be to concentrate a greater number of morn-
ing peak hour trips at the "Maple Valley Wye" while lessening the impacts
at the intersection of NE 3rd Street and Sunset Blvd. N.
The "Maple Valley Wye" is a complex series of intersections involving
freeway ramps, the junction of two major roadways (Maple Valley Highway
and Sunset Blvd. N) , a railroad crossing, and two important city streets
Bronson Way N. and Houser Way N) . It is one of the most complex inter-
sections in the Renton area and it uses a highly sophisticated form of
Coordinated-Actuated" traffic control system which provides the best
form of traffic control that can be attained at that location. Traffic
congestion is prevalent at that intersection during peak hours and it
will become increasingly so as volumes increase on the Maple Valley High-
way. The provision of the alternate access would exacerbate the conges-
tion although widening of the Maple Valley Highway and freeway access im-
provements could mitigate a portion of these impacts.
The intersection of NE 3rd Street and Sunset Blvd. N. , as well as miti-
gation measures at that location, is discussed in the traffic study for
the primary access road.
The alternate access would, at best, provide marginal benefit to future
residents of the proposed development. Trip lengths would be longer,
however, this may be off-set by reduced ways to gain access to the arter-
ial system. It is probable that commute times for the future residents
would be essentially the same with or without the alternate access, giv-
en the assumption that a traffic signal would be installed at the inter-
section of the primary access road and NE 3rd Street in the case where
the alternate access is not to be provided.
The cost to provide the alternate access roadway, in addition to the pri-
mary access roadway, has been previously estimated to be in the range of
1 million, subject to the suitability of soils in the area. The cost
to provide a traffic signal at the intersection of the primary access
roadway and NE 3rd Street would be in the range of $50,000 to $100,000,
subject to the extent of roadway improvements that may be required.
Mitigating Measures
a) A traffic signal, with "volume-density" timing features could be
installed at the intersection of the primary access road with N.E.
Third Street.
b) N.E. Third Street could be widened at its intersection with the
primary access road to accommodate westbound left-turning vehicles.
Unavoidable Adverse Impacts
None.
4- MOV 3'1ENT/CIRCULATION OF PEOPLE AND/OR GOODS
Existing Conditions
There is little evidence of pedestrian activity on the site, aside from
the recreational use of dirt bikes. Due to the absence of sidewalks on
N.E . Third Street (Cemetery Road) , pedestrian activity is discouraged
alcng it.
66
Impacts
It is anticipated that construction of the jogging/hiking trail will
result in a substantial increase of pedestrian activity on the site.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Impacts would be similar to those of the proposal, but to a lesser extent
due to smaller population.
Development to Maximum Density
Impacts would be similar to those in the proposal, but to a greater
extent due to a larger population.
Alternative Site Access
Pedestrian/vehicle conflicts could occur on this alternative access road.
Mitigating Measures
Improved marking of the crosswalk traversing Maple Valley Highway near
the project site could reduce the potential for pedestrian/vehicle
conflict.
Unavoidable Adverse Impacts
None.
5• TRAFFIC HAZARDS
The nationally recognized "Manual on Uniform Traffic Control Devices for
Streets and Highways" provides eight warrants for determining if a need
exists for providing traffic signalization at a traffic intersection.
Satisfaction of one or more of these warrants is usually considered valid
evidence that a signal should be installed. The warrants are:
67
1. Minimum vehicular volume
2. Interruption of continuous traffic
3. Minimum pedestrian volume
4. School crossing
5. Progressive movement
6. Accident experience
7. Systems
8. Combination of warrants
The conditions that merit the most consideration when analyzing the
intersection of the primary access roadway with N.E. Third Street fall
within Warrant No. 2. Pedestrian activity is low in the vicinity,
accident experience cannot be analyzed since the intersection is
presently non-existent, and the remaining warrants do not apply in this
case.
Warrant No. 2 applies to operating conditions where the traffic volume on
a major street is so heavy that traffic on a minor intersecting street
suffers excessive delay or hazard in entering or crossing the major
street. The warrant is satisfied when for each of any 8 hours of an
average day, the traffic volumes on the major street exceed 900 vehicles
per hour and the traffic volumes on the minor street approach exceeds 75
vehicles per hour.
Tte following tabulation is derived by using the traffic volumes
estimated above for the exiting traffic using the primary access roadway
and the total volumes estimated to be on N.E. 3rd Street following
ccmpletion of the project (see Figure 9 in Appendix C) . The tabulation
slows the highest 8 hours where the conditions for Warrant No. 2 are met.
68
Predicted Volume Predicted Volume on
Time on NE 3rd Street Primary Access Road
1. 8:00 - 9:00 a.m. 1,320 109
2. 7:00 - 8:00 a.m. 2,150 88
3. 9:00 - 10:00 a.m. 980 88
4. 3:00 - 4:00 p.m. 1,810 87
5. 10:00 - 11:00 p.m. 970 86
6. 4:00 - 5:00 p.m. 2,130 79
7. 11:00 a.m. - 12:00 p.m. 1,170 77
8. 2:00 - 3:00 p.m. 1,490 76
Impacts
The above tabulation indicates that a signal will be warranted for the
intersection of the primary access road with N.E. Third Street, even if
it serves no other uses than the proposed development. If a roadway
should be extended to the intersection from the north to serve areas
north of N.E. Third Street, traffic using that roadway would benefit from
a signal and would provide additional justification for it.
A traffic signal at the intersection of the primary access road with N.E.
Third Street will not be unduly disruptive if it is properly designed and
operated. The specific location of the intersection is far enough from
other signalized locations so that interference between signals will be
minimal.
N.E. Third Street may need localized widening at the intersection with
the primary access road to accommodate left-turning vehicles. The
incidence of westbound left-turns will be minor due to the predominance
of traffic movements to and from the west. The need to accommodate
eastbound left-turns will only exist if a connection to the north is
provided. The final determination on the need for widening should be
reached following a detailed design study for the intersection.
69
No Development
Conditions would remain as they are now existing. N.E. Third Street's
traffic volume would continue to increase by approximately 3.4% annually.
Development to Single Family Density
Impacts would be the same as those created by the proposal to a lesser
de;;ree.
Development to Maximum Density
Impacts created by maximum development would be greater than those
described as a result of the proposal. However, this alternative in
itself would not be a significant factor in creating a need for
im?rovement of the intersection of N.E. Third Street and Sunset Blvd.
North.
Alternative Site Access
Impacts on the intersection of N.E. Third Street and Sunset Boulevard No.
would be less than those described as a result of the proposal. However,
cumulative effects of traffic entering Maple Valley Highway would
increase the likelihood of congestion and the need for traffic control
devices.
Mitigating Measures
a) A traffic signal with "volume-density" timing features would be
installed at the intersection of the primary access road with N.E.
Third Street.
t) N.E. Third Street could be widened at its intersection with the
primary access road to accommodate left-turning vehicles.
Utavoidable Adverse Impacts
Nc ne.
70
PUBLIC SERVICES
1. FIRE PROTECTION
Existing Conditions
Fire protection services to the proposed development will be provided by
the Rentonn Fire Department. All calls to the Department will initially
be handled from Station 12 located at N.E. 9th and Harrington in the
Highlands. Services will be augmented by the main station located at
Mill Avenue South and South Second Street. The stations have a full
component of pumpers, ladder trucks, and aid vehicles, with' full-time
personnel on duty 24 hours each day. The average response time under
normal circumstances to a call from the proposed site would be 4 to 5
minutes. Renton has a Class 4 fire insurance rating from the Washington
Survey and Rating Bureau.
Impacts
The construction of up to 425 units in a multi-family Planned Unit
Development will require fire protection and emergency aid to be provided
by the City of Renton Fire Department. The Department is presently
sufficiently staffed to provide adequate protection to the site; however,
if fire flow demands incurred from the site exceed 3,000 gallons per
minute, additional equipment would be needed. It is expected, though,
that the additional tax revenues generated from the proposed action will
help to offset any increased fire protection costs. However, it should
be noted that the incremental capital costs of installation of the water
tower cannot be expected to be regained through revenue produced from
development of the proposed action.
The Fire Department will require a loop system via two access routes to
adequately serve the project site. Blaine Road coupled with the proposed
east entrance driveway abutting the eastern property line to Third Avenue
will satisfy this requirement . Road improvements and water system will be
required to be installed prior to issuance of any building permits. Roads
shall be hard surface and capable of supporting fire apparatus loads.
No Development
None.
71
De'relopment to Single Family Density
This City of Renton has a capability to serve the 125 dwelling units
proposed by this alternative. No adverse impact would be anticipated.
De'relopment to Maximum Density
Thy! construction of 625 dwelling units would create an increase in fire
quota demands; possibly necessitating additional equipment. Increased
ta:c revenue generated from this alternative would help offset increased
fire protection costs .
Al:ernative Site Access
Response time via the alternative access would be less the response via
till proposal access road. Adequacy of fire quota protection for this
al:ernative would be the same as for the proposal.
Mitigating Measures
a) The Fire Department should be notified in advance of any extended
street blockage.
b) Sprinkler (life support) systems installed in halls and entries would
reduce the amount of fire flow required.
c) Select building materials that would reduce combustibility.
Unavoidable Adverse Impacts
Increased demand for fire service.
2•POLICE PROTECTION
Existing Conditions
Pc lice protection services for the proposed development would be provided
by the City of Renton Police Department with its station located at 200
Mill Avenue South. The present ratio of uniformed officers to population
is about two officers for each 1,000 persons. This ratio is slightly
below the national average of 2.3 officers per 1 ,000 persons, but is
within the normal range for a city of this size.
72
The primary kind of crime found in the vicinity of the subject site is
residential burglaries, occurring particularly in apartment/condominium
type development.
Impacts
The proposed development will add up to 425 housing units to the project
site which would increase the population requiring police services by
1,150 to 1,225 people. During construction, vandalism and theft of
construction materials, applainces, carpets, etc. can be expected, but
these incidents will decrease as the units become inhabited by residents.
The Police Department maintains two patrol cars in the Highlands area and
response time to the site under normal circulstances would be 2 to 2.5
minutes. According to a Department spokesman, the project in itself
would not necessitate additional personnel or equipment; however, the
cumulative impact of other residential and commercial development in the
City would require additional personnel and equipment. (Captain Bourasa,
Renton Police Department, 2-21-80). However, property tax revenues from
the proposed development and local sales tax will help offset the cost of
additional services.
No Development
Conditions would be the same as those described under Existing Conditions.
Development to Single Family Density
This alternative development would add up to 125 housing units and
approximately 345 people to the project site. Impacts in regard to
police protection would be the same as described under Impacts for the
Proposal.
Development to Maximum Density
This alternative development would add up to 625 housing units and
approximately 1,725 people to the project site. Impacts in regard to
police protection would be increasesd over those impacts stated by the
proposal.
73
Al:ernative Site Access
Re3ponse time via the alternative access road from the police department
world be less than via the proposed access road.
Mitigating Measures
Internal security systems and security lighting installed at appropriate
strategic locations would augment police protection.
Unavoidable Adverse Impacts
Increased demand for police service.
3• H)SPITAL FACILITIES
Existing Conditions
The closest hospital serving the proposed development would be the Valley
General Hospital which is located approximately 2-3/4 miles southeast of
tte site. The hospital at present has 254 beds. Although the hospital
presently operates at 76 percent annual capacity, it often operates at 90
tc 100 percent capacity on weekdays. Optimum use of the hospital
facilities has been determined to be operation at 80 percent of capacity.
Earlington Woods PUD Draft EIS, 1979).
Tte hospital has a current facility expansion plan which is scheduled for
ccnstruction beginning in 1980 and operation in 1982. The new facilities
wculd add a day surgery unit and pediatric beds. These new facilities
would increase the beds available for acute care from the present 254
beds to over 300 beds in addition to providing a variety of new services.
The hospital staff, which is adequate now, will be increased as needed.
Final plans for this expansion are presently in review and may change
depending on approvals by funding agencies. (Mike Cvitkovich, Projects
Coordinator, Valley General Hospital, February 20, 1980) .
In pactsis
The Puget Sound Comprehensive Health Planning Council has determined a
hospital use rate of 692 patient days per year for every 1,000 people in
the southeast planning area. The proposed action is expected to house
74
from 1,150 to 1,225 people and therefore will increase hospital use by an
estimated 795-847 patient days on all hospitals in the Seattle area. The
planning council has estimated that about 46 percent of this demand on
hospital services would be assumed by the Valley General Hospital with
the balance of the impact being diffused to other hospitals in the area.
The impact on the Valley General Hospital would therefore be 365-390
patient days (46 percent of 795 and 847) at full capacity of hospital
facilities.
No Development
None.
Development to Single Family Density
This alternative would increase hospital usage by an estimated 238
patient days on all hospitals in the Seattle-Renton area. An estimated
46% of this demand on hospital services would be assumed by the Valley
General Hospital with the remainder of the impact being assumed by other
hospitals in the area. The impact on the Valley General Hospital would
be approximately 109 patient days, less than 1/3 of that created by the
proposal.
Development to Maximum Density
This alternative would increase hospital usage by an estimated 1 ,193 days
on all hospitals in the Seattle-Renton area. An estimated 46% of this
demand on hospital services would be assumed by the Valley General
Hospital, with the remainder of the impact being diffused to other
hospitals in the area. The impact on Valley General Hospital would be
approximately 548 patient days, approximately 30% greater than the
proposal.
Alternative Site Access
Impacts would be the same as described in the proposal.
Mitigating Measures
None.
75
Unavoidable Adverse Impacts
Slight increase in demand for hospital services.
4• Si:H00L FACILITIES
Existing Conditions
Reaton School District #403 serves the area of the proposed development.
Edicational facilities currently serving the site are Hazen High School
1101 Hoquiam Northeast) , McKnight Middle School (2600 N.E. 12th) and the
Highlands Elementary School (2727 N.E. 9th) . Enrollment characteristics
for these schools is illustrated in Table 7 below:
Table 7
Projected School Enrollment and Capacity
Capacity Projection for
School Enrollment October 1980
4 Highland Elementary 675 445
McKnight Middle 1,107 743
Hazen High 1,404 1,385
Herb Elliott, Data Services, Renton School District,
8/22/80) .
According to Mr. Elliott, the school system has been
experiencing a slight decline in school enrollment.
In pacts
Ile methodology used to calculate the probable number of school-aged
children likely to reside on the site was derived from population
information in the Puget Sound Council of Governments Trends and Policies
Comparison Report, published September 19, 1979. The percentage of the
population in AAM Districts 3840 and 3860 between the ages of 5 and 17
years is' approximately 22%. When this figure is multiplied by the total
projected population for the site (1,173) , the result is 258 school aged
children that may seek services of the Renton School District. It should
be noted that this estimate is based upon population statistics which do
76
7 am FIRE. TA ION
Ir
W g! I~ i
7 HIGH . • - =LEMe
d c‘---'-
a
W
RENTONZ
VOC TECH4.INSTITUTE11N,E. 4TH ST.
RENTON OU- EALTH
AIRPORT
O
Si.'
a
E•3N•
R Y r - / , EDAR MT OLIVET CEMETERY4111r'.. j ^" RIVERrl !ij''4 PARK %•
i.
ce 4FIRESTAter' ' • -ti g.'
CI — i• L , *1" I'Ll<ik4 6171"B
sa 90011 4 9
I
1
lieBNRae R R S piilTONHILL7,
O
44P CO
G12P L
ADy 1.
1 '
1r.
cA
r
ID
r
11
14.COMMUNITY FACILITIES
USGS BASE 11= 2000' ERADCD PhD
NORTH R. W. THORPE & ASSOCIATES
77
no : differentiate between type of dwelling unit. It is, therefore,
likely that given the condominium and apartment nature of the proposal,
this actual number of school aged children to be generated on the site
wi:.l be much lower than if the development consisted of 425 single family
hones.
Th,i school system can accommodate this increased demand generated by the
proposal.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Generally, the percentage of school age children to total population is
220. Therefore, it is estimated that approximately 76 school age
children would reside in this alternative PUD. School facilities could
accommodate this number of children.
Development to Maximum Density
The expected maximum number of school age children that would reside in
this alternative PUD would be approximately 380. However, much of the
development is condominium development which would generate fewer school
age children per dwelling unit than single family homes; thus, this
figure of 380 is a very high estimate.
Alternative Site Access
Iapacts would be the same as described as a result of the proposal.
78
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
5. LIBRARY FACILITIES
Existing Conditions
The City of Renton has two libraries that may be potentially impacted by
the increase in residents on the project site. The main branch, located
at 100 Mill Avenue South and the Highlands branch, located at 2902 N.E.
12th, contain a combined total 120,797 volumes. The libraries are
extensively used by the community, particularly after school hours and
on weekends.
Impacts
It is anticipated that future residents of the proposed Planned Unit
Development would use both of these libraries; however, these facilities
will be able to adequately service this increased demand. The increase
in patronage will be relatively small and will not necessitate expansion
of service or personnel at the libraries.
No Development
None.
Development to Single Family Density
Library service and personnel would not be adversely impacted by this
alternative.
Development to Maximum Density
The increase in patronage would not necessitate expansion of service or
personnel at the library.
Alternative Site Access
None.
79
Mitigating Measures
None.
Unavoidable Adverse Impacts
Nona.
6. ARK AND RECREATIONAL FACILITIES
Existing Conditions
There is no public recreational activity on the site at present, except
for evidence of dirt bikes. The facilities closest to the project site
are Cedar River Park, Liberty Park and Windsor Hill:. Park. Cedar River
park, about one mile from the site at Maple Valley Highway and Houser
Way, provides areas for picnicking and fishing, in addition to the Carco
Theatre and a multi-use field. Liberty Park, located at Bronson Way N.E.
and House Way N.E. , which is approximately lea miles from the site,
features lighted tennis courts, ball fields , multi-use fields , and
asphalt game areas. Also available are picnicking facilities, play
equipment, a bathhouse and swimming and fishing.
Windsor Hills Park, about 2.5 miles from the site, is located at the 400
blo.k on Windsor Way N.E. It offers a small multi-use field with back-
stop, play equipment, and a picnic area with tables and benches. In
addition, other recreational opportunities include playgrounds associated
with all public schools, the nearest of which is Highlands Elementary, at
2727 N.E. 9th Street. It is anticipated that these parks will be access-
ibla primarily via automobile.
Acquisition
Heather Downs Neighborhood Park (10 to 12 acres) is the highest priority
acquisition on the City's Six-Year CIP for parks. It is located just east
of the site.
Impacts
There will be increased usage of existing park and recreational
facilities due to the influx of about 1,163-1,173 residents. The
increased demand can be expected to be distributed among several park
facilities, rather than concentrated at any one facility. However, some
of the parks are currently heavily impacted by existing population.
80
In 1978 the Renton City Council adopted the Comprehensive Park and Recrea-
tion Plan which set forth standards related to recreational space and park
requirements. That document established a neighborhood park standard of
ten acres per one thousand population. This requirement could be met in
numerous ways combining on-site and off-site recreational land and facil-
ities. However, it is recommended that approximately half of the require-
ment be met on-site with the remaining five plus acres per thousand popu-
lation provided off-site in conjunction with the City's park system.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Impacts by this alternative would be similar to those of the proposal;
However, as a result of fewer residents, there would be less usage of
nearby parks.
Development to Maximum Density
Impacts on nearby parks would be slightly greater than described in the
proposal. It would be unlikely additional recreational areas would be
provided due to utilization of buildable areas by buildings.
Alternative Site Access
Impacts would be the same described under the proposed development.
Mitigating Measures
a) A jogging trail will be constructed along the perimeter of the
buildable portion of the site.
b) A variety of on-site recreational facilities, such as swimming pool,
tennis and basketball courts, tot lots, and open playground areas
could be provided, to be located by the individual builders.
c) A walking trail could be constructed through the greenbelt to provide
pedestrian access to Cedara River Park via the sidewalks along Maple
Valley Highway.
d) A fee could be donated to the Capital Improvement Program for purchase and
development of property to accommodate the required recreational space.
81
Unavoidable Adverse Impacts
None.
7 nIINTENANCE
Existing Conditions
The City of Renton presently maintains all public roads in the vicinity
of the site.
Impacts
The City of Renton Public Works Department will maintain water and sewer
lines as well as roadway and drainage facilities. During construction,
street sweeping and ditch cleaning will be undertaken by the developer.
Little maintenance will be required during the first few years following
completion of the PUD. However, normal maintenance operations would be
required after this period. The City would undertake normal maintenance
operations such as street sweeping pavement upkeep, catch basin and ditch
cleaning, vegetation spraying and cutting, following construction.
Mitigating Measures
a) Wash the wheels of exiting vehicles during construction to minimize
mud deposition on adjacent streets.
t) Cover the trucks carrying excavation loads with canvas or tarp.
c) Developer could provide regular street cleaning.
E JERGY
Existing Conditions
Presently there is no energy consumption on the site.
In pacts
Daring construction, energy will be committed in the form of equipment
operation, motor fuels and manufactured materials. Energy consumed
ring this period will be typical of standard residential construction.
Hcwever, because of the multiple family density on portions of the site,
erergy expenditure for construction per dwelling unit would be less than
wculd be expended for a single family development.
82
The precise type of energy source to be utilized in the ERADCO P.U.D. has yet
to be selected. However, according to 1979 residential consumption data for all-
electric apartments provided by Seattle City Light, an average of 950 kilowatt
hours (kwh) per month or 11,400 kwh annually were consumed. At this rate, the
425 units of the proposal would consume about 403,750 kwh monthly or 4,845,000
kwh annually.
It is possible that the dwelling units of the proposed development
will be heated by natural gas. According to figures provided by Bill Fry
of the Technical Services Division of Washington Natural Gas, energy
consumption for heating and hot water purposes in multi-family
residential uses ranges from .283 to .5 therms per square foot per year.
One therm = 100,000 Btu's.) Since the precise square footages of the
proposed dwelling units will be determined by individual builders, an
approximate average of 2,000 square feet per dwelling unit was used in
calculating energy consumption of natural gas at the site. Based on
these figures, it is estimated that annual natural gas consumption on the
site during occupancy will range from 240,000 to 425,000 therms. It
should be noted that improved building methods, more stringent energy
codes, and increased awareness in energy conservation will result in less
energy consumption than the above estimate.
Energy expenditure in terms of transportation related to work, shopping
and social purposes will create a long-term energy commitment.
Mitigating Measures
a) Insulated walls, floors, roof, and glass could be used through the
structures.
b) Major living areas of the units (living rooms, bedrooms) could be
oriented toward the southern exposure of the building.
c) An energy analysis of building design elements could be undertaken to
assess the feasibility of reducing long-term demand, e.g. passive
solar energy systems.
Unavoidable Adverse Environmental Impacts
Increased energy demand on the site in both the short- and long-terms.
83
UTILITIES
1• NATURAL GAS
Existing Conditions
Natural gas could be supplied to the project site by the Washington
Natural Gas Company. Presently, an 8-inch high pressure supply line is
located in the N.E. Third Street right-of-way and a 4-inch high pressure
main exists at the bottom of the bluff near the west corner of the site.
Iapacts
It is yet to be determined whether the residential units planned for
construction on the project site will utilize natural gas supplies as a
source of energy. However, to serve the site, the Washington Natural Gas
Conpany would review the plat or site plan provided by the project
engineer to calculate the appropriate location and economics of gas pipe
installation. It is anticipated that the gas main would access the site
via the entrance driveway to be constructed along the eastern site
boundary. (Bob Vaughan, Washington Natural Gas Company, 2/21/80) .
No Development
None.
Development to Single Family Density
Conditions would be the same as described for the proposal.
Development to Maximum Density
Conditions would be the same as described for the proposal.
Alternative Site Access
Conditions would be the same as described for the proposal.
Mitigating Measures
a) Insulated walls, floors, roof and glass could be used throughout the
structures .
b) Major living areas of the units (living rooms, bedrooms) could be
oriented toward the southern exposure of the building.
84
c) An energy analysis of building design elements could be undertaken to
assess the feasibility of reducing long-term demand, e.g. , passive
solar energy systems.
Unavoidable Adverse Impacts
Increased demand for natural gas.
2. ELECTR I C I TY
Existing Conditions
The site would be served from the existing three phase electric power
available along N.E. Third Street from Puget Sound Power and Light
Company (PP & L) .
Impacts
A representative of the above company indicated that any additional load
on the existing system would substantially impact the ability of the
company to supply power. It was determined, however, that a looped
underground service would be provided for the site along Blaine Avenue
N.E. Water and space heating is no longer available. (Frank McDermand,
Marketing Division, Puget Sound Power and Light Company, 2/21/80) .
No Development
None.
Development to Single Family Density
Impacts would be less than those created by the proposed project;
however, any additional load on the existing system would adversely
impact the ability of PP&L to supply power.
Development to Maximum Density
The addition of 200 dwelling units above what is proposed would put
additional strains on the PP&L Company.
Alternative Site Access
Impacts would be the same as those described as a result of the proposal.
85
Mitigating Measures
Noae.
Unavoidable Adverse Impacts
In:reased demand for electrical energy.
3• TELEPHONE
Existing Conditions
Telephone service to the project site would be provided by Pacific
Northwest Bell Telephone Company. Main feeder routes are located in
Maple Valley Highway and Bronson Way.
Impacts
The proposed development would consist of up to 425 housing units.
Ac:ording to a spokesman from the PNB Telephone Company, two lines would
be provided for each unit resulting in the need for the installation of
either 900 or 1,000 pair cable unit. (Frank Forrest, Pacific Northwest
Bell Telephone Company, Engineering Division, 2/21/80) .
No Development
No ie.
Deielopment to Single Family Density
Tha alternative development would require approximately 250 telephone
li ies.
Deielopment to Maximum Density
In order to serve 625 housing units, approximately 1 ,250 telephone lines
world be required.
Alternative Site Access
Impacts would be the same as those described as a result of the proposal.
Mitigating Measures
a) Installation of telephone lines should be coordinated with
installation of electrical lines.
86
b) All utility services should be installed underground.
Unavoidable Adverse Impacts
None.
4. WATER
Existing Conditions
The proposed Planned Unit Development lies within the jurisdiction of the
City of Renton Public Works Department. An existing 16" water main
serving the area of the site is located in the N.E. Third Avenue
right-of-way which has adequate pressure to service the site.
Impacts
The subject property would require a loop system installed in the Blaine
Road and the entrance driveway rights-of-way. To determine the adequate
pipe size, a fire flow analysis will be conducted. No new water supply
sources will be required. (Ron Olson, Water Utility Engineer, Renton
Water Department, 1/21/80) .
No Development
None.
Development to Single Family Density
Impacts would be the same as those described under the proposal.
Develoment to Maximum Density
A loop water system located in the ,Blaine Road and entrance driveway
rights-of-way would be installed. A fireflow analysis would be required
in order to determine the desired pipe size. It is not expected that
additional water supply sources would be required.
Alternative Site Access
Impacts would be the same as those described for the proposal.
87
Mitigating Measures
None.
Unavoidable Adverse Impacts
In:reased demand on water supply.
5. EWER
Existing Conditions
Sewer service for the project site is under the jurisdiction of the City
of Renton Public Works Department. The nearest residential development
to the site, the Monterey Terrace subdivision, is served by an 8-inch
pi )e. There is also a 42-inch Metro sewer trunk located in the SR-169
M,iple Valley Highway) .
Im.)acis
A representative of the Renton Sewer Utility has indicated that the
8-:_nch pipe serving the Monterey Terrace neighborhood is inadequate for
the proposed Planned Unit Development. Therefore, it will be necessary
to tie directly into the Metro sewer trunk installing an 8-inch line down
the bluff along the southwest side of the site and across Maple Valley
HiF;hway (SR-169) . (Dick Houghton, Renton Sewer Utility, 1/21/80) .
Approval of the sewer tie-in must initially be secured from the Renton
Boisrd of Public Works by submitting a technical package consisting of a
vicinity map, narrative description of the proposed action, construction
drawings and a certification form. This package is then forwarded to the
appropriate land-use agency coordinator for verification of consistency
wi :h local land-use plans . (Bob Hirsch, Metro Municipality of
Metropolitan Seattle, Local Land-Use Agency Coordinator, 1/23/80) .
No Development
Nolte.
De`elopment to Single Family Density
Impacts created by this alternative would be approximately 1/3 of those
impacts created by the proposal.
88
Development to Maximum Density
The system would have to be tied directly to the Metro system sewer
terminal along Maple Valley Highway SR-169. A line would have to be
placed under the bluff along the southwest side of the site and along the
Maple Valley Highway.
Alternative Site Access
Impacts would be similar to those described in the proposal.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Increased sewage flow.
Storm Drainage
Refer to the discussion under Water, p. 38
6• SOLID WASTE DISPOSAL
Existing Conditions
Solid waste collection for residents of the proposed development would be
conducted by the General Disposal Company, which will rent dumpsters
ranging in size from one- to forty-yards. (A one-yard container would
hold the equivalent of seven typical garbage cans . ) Rental and
collection rates vary according to the size of container; for example, a
two-yard conntainer would rent for $6.75/month and each pick-up would
cost $9.94. The solid waste is then transported to the Renton Transfer
Station on N.E. 4th Street and weighed. Ultimate disposal occurs at the
Newcastle Landfill.
Impacts
The proposed action would result in increased demand for solid waste
collection, which can be adequately absorbed by General Disposal company.
89
Nc Development
Ncne.
Development to Single Family Density
Tlis alternative would increase demands for solid waste collection to a
lesser degree than what would be demanded as a result of the proposal.
General Disposal Company would adequately provide the service and the New-
castle landfill has the capacity to absorb the increased demand.
Development to Maximum Density
This alternative would increase demands for collection over the proposal
by approximately 1/3. However, service and the disposal site could
easily accommodate the increase in demand.
Alternative Site Access
Impacts would be the same as those described for the proposal.
Mitigating Measures
No ie.
Unavoidable Adverse Impacts
No ie.
HUhAN HEALTH
Existing Conditions
nu! human response to noise has been documented by the Environmental
Protection Agency. Continuous noise at high decibels is not only
irritating, but can cause damage to the hearing mechanism and otherwise
im )air both physical and mental health. Prolonged noise exceeding 80
decibels (dBA) can result in hearing loss. Noise in excess of 55 dBA can
interfere with speech communication, and that above 35 dBA can disrupt
sleep. Other physical effects from continuous, excessively loud noise
le""els are increases in blood pressure, and alterations in heart rate,
wh:.ch are usually temporary, but may become chronic. It is improbable
that environmental noise itself causes mental illness; however, the
90
continual exposure to noise of a person already suffering in a depressed
state may promote stress in that person, which does aggravate the
condition of mental illness.
Impacts
The residents of the Monterey Terrace subdivision to the northwest of the
subject site would be the most sensitive receptors of the construction
noise generated from project development. Depending on the position of
the noise source in relation to those homes , noise levels would
approximate those shown on Table 4 , p. 46 of this document. The
construction of the initial phase in the R-1 portion of the site would
impact that neighborhood to a greater degree than the remaining phases of
construction. It is anticipated, however, that noise levels generated
from construction would be attenuates to some degree by distance, even
during the initial phase of construction. Therefore, although
construction noise could be a source of annoyance and irritation to area
residents, it is not expected to cause significant mental or physical
damage to them.
No Development
None.
Development to Single Family Density
Construction of the northwesterly portion of the site would impact that
neighborhood to a greater degree than any other phase of the
construction. The degree of annoyance and irritation due to noise would
decrease with distance. Impact would be less than those created by the
proposal.
Development to Maximum Density
The degree of annoyance and irritation due to noise would be greater than
those created by the proposal during construction; however, it is not
expected to cause significant mental or physical damage to area residents.
91
A] ternative Site Access
Inpacts would be similar to those of the proposal. Long-term noise
inpacts would be increased due to increased engine of automobiles
ascending the hill.
Mitigating Measures
Refer to the Mitigating Measures under "Noise," pp. 103-104.
Unavoidable Adverse Impacts
Short-term annoyance and irritation to area residents during construction.
AESTHETICS
Existing Conditions
The site is currently open space. The site is visible from the gravel
extraction operation to the east, and the single family residences in the
Monterey Terrace subdivision. There is natural vegetation covering most
of the site. The surrounding area is a combination of single family
hones and a cemetery to the north, and industrial uses to the east, south
ani west.
Impacts
The appearance of the site will be transformed from open space to
multi-family residential structures, parking areas, and open space. The
le,el of activity on the site will increase and the development will be
visible from the single family residences abutting the site to the
northwest, from the cemetery to the north, and from the gravel extraction
facility to the east. The development will not result in the blockage of
any views.
Building exteriors will be mostly natural wood and stucco. Landscaping
will be introduced in the parking areas and adjacent to the buildings to
serve as buffers and to soften the visual impact of the developed areas.
Existing vegetation in the greenbelt will remain intact.
92
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
The appearance of the site would be transformed from open space to single
family residential structure.
Develo.ment to Maximum Densit
The site would be changed from open space to multiple family residential
structures, parking areas and open space. A level of activity would be
greater than that of the proposal. Much of the open space retained in the
proposed plan would be replaced by parking and residential structures in
this alternative.
Alternative Site Access
This alternative would partially deface a greenbelt. Other impacts would
be similar to those of the proposed development.
Mitigating Measures
a) A 25-foot wide setback and landscaped buffer area will separate the
proposal site and the adjacent residential subdivision to the
northwest.
b) Building units in that area could be built below the foundation
levels of houses and be limited to 2-stories in height.
c) The eastern border of the site will be lined with a landscaped road
to act as a buffer for the industrial activity to the east of the
subject property.
93
d) The greenbelt, ranging in width from 150 feet to 400 feet, located
along the southerly border of the site, will remain intact.
Ui;avoidable Adverse Impacts
VJsual appearance of the site will be altered.
Re creation
REfer to discussion on Parks and Recreation, p.92 .
AR:HAEOLOGY/HISTORY (See Appendix D)
Ttere are no known historical sites or archaeological resources that
would require physical preservation in the immediate area of the project
site, according to the Washington State Office of Archaeology and
Historic Preservation. Due to the previous extraction use on the site,
it is unlikely that such resources exist there.
No Development
Conditions would remain as described under Existing Conditions.
Development to Single Family Density
Op?n space in the form of yard set-backs would provide the greatest
am)unt of passive open space than any of the alternatives.
Development to Maximum Density
Th.1 trail system will circumvent the development as described under the
pr)posal. There would be fewer passive recreational areas as a result
ofnore intense development in the form of residential structures and
pa-king areas.
Al:ernative Site Access
Impacts would remain the same as described under the proposed development.
Mi :igating Measures
If any significant artifacts are unearthed during construction
activities, immediate action should be taken to evaluate their
significance with the appropriate authorities.
94
Unavoidable Adverse Impacts
None.
ECONOMICS
Existing Conditions
Impacts
The project would create construction employment for an undefined Period.
Additional income will be generated for businesses in the Renton area.
Property taxes would increase as a result of the development. However,
the cost to service the development will partially negate these increases
in revenues.
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
95
IV. RELATIONSHIP BETWEEN LOCAL SHORT-TERM USES OF THE ENVIRONMENT
AND MAINTENANCE AND ENHANCEMENT OF LONG-TERM PRODUCTIVITY
Implemmtation of the proposed ERADCO Planned Unit Development would provide a
residential neighborhood of approximately 425 families on 25 acres, while
preserving 16.5 acres of greenbelt open space. Project approval would commit
the site to residential use for at least 50 years, although the structures
and foundations would endure for a considerably longer period of time.
Development of the project would represent a tradeoff between medium density
residential use and continuation of open space and wildlife habitat uses.
Project development would result in economic benefits to private investors,
would :ncrease the housing inventory and increase the tax base of the City. A
local housing shortage would partially be alleviated. The Planned Unit
Development would be developed adjacent to an existing residential area.
These benefits must be weighed against the loss of an open space and wildlife
habitat area.
Benefits of deterring development of the site would include maintenance of
prevailing trends of local traffic volumes, noise, light, and glare levels,
air p )llution levels , retention of existing vegetation and soils
characteristics and preservation of habitat areas.
Delaying implementation of the proposal until some future time would be more
costly as a result of inflation and the potential scarcity and increasing
costs cf building materials. Demand for housing stock would not immediately
be met on the site. Development in other areas less suitable for residential
use might result . Delaying project development would not necessarily
eliminate or ameliorate the level of environmental impacts associated with the
project.
Development of the site would preclude the exercise of future options for the
site. These include preservation for open space and wildlife refuge and a
modified proposal that would present fewer environmental impacts.
There are no known recharge areas or unique ecosystems on the site. The only
known mineral resource, gravel, has been completely mined from the site.
96
V. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES
Implementation of the proposed action would result in the irreversible and
irre rievable loss of an open space and wildlife habitat area on the 25 acre
buil able portion of the site. The majority of the natural vegetation on this
leve acreage of the site would be removed, except for substantial stands of
trees. There are no known mineral resources, unique ecosystems or aquifer
recharge areas which would be lost as a result of development of the site for
the proposed use.
Cons ruction and maintenance of the proposed residential PUD would require the
irre rievable commitment of natural resources, energy, capital and manpower.
Foss 1 fuels and electrical energy would be consumed for transportation,
lighting and heating during construction, occupation and maintenance of the
deve opment. Material commitments would generally include water, wood and
metal products, sand and gravel, asphalt and cement. Long-term commitment of
public water supply, sanitary sewer capacity, solid waste disposal services,
electrical energy, communication services and police and fire protection
services would be required to maintain the development. All of these
commitments would be required for residential growth wherever it may occur in
the Renton area.
97
VI. ALTERNATIVES TO THE PROPOSAL AND THEIR RELATIVE
ENVIRONMENTAL IMPACTS
A. No Development
Description
W:.th the no action alternative, the existing ecosystems on the site would
not be disturbed, nor would an increase in demand for services ,
utilities, or energy resources occur on the site.
In light of the residential development trends with pressure for
development within the city, no action on this site would most likely
transfer the impacts of this development type to another site. The
environmental impacts, costs, and benefits and resources required to
develop another site may be more or less than those of the proposal site,
depending on available services, existing ecosystems and location of the
new site. The ERADCO PUD site may generate fewer impacts than other
sites in that it does not require utility extensions , or service
expansions, does not have valuable water resources or vegetation, and is
ir, an area already marked by multiple family units.
Feasibility
The objectives of the proponent would not be met by this alternative.
B. Development to Single Family Density
Description
Development of the project site to single family density would yield a
total of 125 housing units and approximately 345 residents occupying the
total development. It is assumed that the greenbelt portion of the site
world remain intact and that additional open space would remain on the
buildable portion of the site due to decreased acreage devoted to parking
ar?as and building foundations .
Im)acts
Ov!rall, implementation of the single family density alternative would
im)act all elements of both the physical and human environments to a
le ;ser degree than the proposed action.
98
Feasibility
Construction of a lower density, single family alternative would not meet
the stated objectives of the proponent of providing a mix of single-family
and multi-family residential uses. In addition, the sale price of the
units would increase substantially if a lower density alternative were im-
plemented, thus diminishing the opportunity to provide ownership housing
for middle income households.
C. Development to Maximum Density
Description
Development of the project site to the maximum density permitted by the
zoning code would yield a total of 625 housing units and approximately
1,725 residents occupying structures of up to 6 stories in height.
Impacts
Overall, implementation of this alternative would impact both the phys-
ical and human environments to a greater degree than that of the proposed
action.
Feasibility
The objective of the proponent to provide a low density, residential
development with open space and privacy would not be met by this proposal.
D. Alternative Site Access (Please refer to Figure 15)
Description
In addition to the primary access road to NE 3rd Street, this option
would entail constructing a second roadway from Maple Valley Highway
through the greenbelt up to the level portion of the site. This road bed
would consist of two 10 foot wide lanes with 4 foot wide shoulders on
each side. The maximum profile slope of the 2,200 linear foot long
roadway would be 10 percent with a maximum of 7.5 percent on the sharp
curves. The cost was estimated to be about one million dollars. The feas-
ibility of this alternative is predicated upon the assumption that the
existing soils on the greenbelt bluff would be suitable for roadway
support.
99
Inpacts
With this proposal, impacts on the geologic, topographic, hydrologic and
vegetative characteristics of the buildable portion of the site would
remain the same. However, these same elements in relation to the
greenbelt would be significantly altered with a concomitant degradation
to the greenbelt. Elements of the human environment would remain largely
the same as with the proposed action, however, traffic patterns would
markedly differ. (Refer to pp. C-15 through 17 of Appendix C. )
Feasibility
Tie prohibitive cost of this alternative, coupled with the destruction of
the greenbelt render this option economically and environmentally
urviable according to the proponent.
100
if/„,-
0,,
i,i0 11 ,40,, ,
u ,
Aii I 1,it
Loy 1 L ia
oplii-
ra II I kl
s, .. . . mop on
ill,‘idnyri),),
w i , 7_7,-_..-.,ii1 .......
4041, i3,,
NM
y
EN ------... / a \+\Y1
II
r 1I 1
JO
Ns . X 27i
O •I, 1
c 1
L71 1
APPRox.TOP OPSLOPE(TY#•
i \
DLL Cur SLOPES/4:/
A
i i 0 0 I
0,\ ,.. 4,,,‘,I11
Ja —I
1
4„,.,--__. ,
z n
EDAR`, \ \ k \ .: o 1
ss:.\`\. .
7REE
1t7-A‘
4.,. i ------- 3 \ I
t-
4\'71;
111* /. .
4°
N
I
4 N . \•-• A ...4 - :_:-.i,
s ,
A k iiram,,..
t. ip . , ( ,, ci;) - VE tb\ \
PAVED
N44h!•QO a a
x 57 I\ • k
1.0
5cHME2flfl V
1 ROADWAY "4 CCESS
1 1' PL?EL/M/NAQY STUDY
Fxa.
FsAilorsmi:,
k. . ri"
I ii . ,1 ecr iu.
Ireol ilin\.e.•rN[. TeFplsr
RENTON WASH/NGTON i:k...•.4. ,.woo• mms.r_ 4
Q01f `` LJ Owg 3-373-0/0/--80-01 SA,/al2
15.ALT. SITE ACCESS
I( ERADCO PUD
NORTH R. W. THORPE & ASSOCIATES
101
VII. MITIGATING MEASURES
Those mitigating measures presently scheduled to be implemented by the
developer are indicated with an asterisk.
The Physical Environment
Geology and Soils
The City's requirements on grading and excavation will be followed.
All the recommendations of the soils engineer will be followed.
Tc pography
Nc ne.
Unique Physical Features
The denuded areas should be reseeded immediately upon completion and a
jute net should be applied over the cleared area until vegetation is
re-established.
A 25-foot setback from the top of the bluff should be maintained.
Erosion
A permanent surface water management system consisting of a combination
of underground collection and surface retention basins will be installed
tc connect with the storm drainage ditches adjacent to Maple Valley
Highway. An energy dissipator at the juncture of the ditch will moderate
the velocity of the water flow down the hill.
The denuded areas resulting from walking and jogging trails construction
should be reseeded immediately and a jute net should be applied over the
cleared areas until the vegetation is re-established.
Air
Utilize low-emission construction equipment whenever feasible.
Measures to control construction dust, such as watering and reseeding of
cleared areas, cleaning, and sweeping of streets will be implemented.
102
Water
Utilize temporary detention ponds during construction phases to collect
silt.
Careful construction practices will prevent litter, debris, or other
pollutants from entering drainage.
Collect stormwater runoff in a storm sewer system.
Utilize catch basins and screens to collect litter and debris.
Utilize oil/water separators to retain gas, oil, and grease for removal
from stormwater.
Settling basins would remove solids from runoff.
Provide adequate street and parking area cleaning and maintenance of the
stormwater system.
Groundwater Movement, Quality and Quantity
None.
Flora
Present plans call for retention of as many of the existing trees as
possible through sensitive site planning.
Retain vegetation outside of road improvements until buildings are
constructed, as feasible.
Minor modifications of building siting will occur based on tree
inventories provided by field surveys.
No trees will be removed from the greenbelt area.
Fauna
Retain as much natural vegetation as possible.
Utilize landscaping materials that provide food sources for birds and
small animals.
Noise
Construction equipment that will not exceed the State of Washington
maximum environmental noise standards will be employed and operated
accordingly.
Noisy operations should be scheduled so that they are not concurrent.
103
The hours of operation of construction equipment will be limited.
Truck arrivals should be controlled to reduce vehicle congestion.
Construction equipment should be placed as far from property boundaries
al; possible.
Roadway improvements should be timed to alleviate congestion and reduce
volumes on existing streets.
S4te "Vehicular Transportation Generated - Mitigating Measures" on pp. 103-4.
L: ght and Glare
Perimeter landscaping, fencing, and berming, especially around parking
areas and road entrances will reduce light spillage.
Parking area lighting could be limited so that no direct light spills
off-site.
Land Use
Sixteen acres of the site will be preserved as a greenbelt and a
landscaped buffer will separate the R-1 portion of the site from the
existing residential subdivision to the north.
Natural Resources
None.
Tha Human Environment
Population
Development of the site to a lower density would result in a decrease in
residential population on the site.
Ho ising
None..
Transportation/circulation
Inquire at Metro as to the feasibility of and collaborate with them in
the planning of erecting a bus shelter in the site vicinity to encourage
trn.nsit ridership.
104
A traffic signal with "volume-density" timing features could be installed
at the intersection of the primary access road with N.E. Third Street.
N.E. Third Street could be widened at its intersection with the primary
access road to accommodate westbound left-turning vehicles.
Improved marking of the crosswalk traversing Maple Valley Highway near
the project site could reduce the potential for pedestrian/vehicle
conflicts.
Public Services
The Fire Department will be notified in advance of any extended street
blockage.
Sprinkler (life support) systems installed in buildings would reduce the
amount of fire flow required.
Select building materials that would reduce combustability.
Police
Internal security systems and security lighting installed at appropriate
strategic locations would augment police protection.
Schools
None.
Parks and Other Recreational Facilities
A jogging trail will be constructed along the perimeter of the buildable
portion of the site.
A variety of on-site recreational facilities, such as swimming pool,
tennis and baseketball courts, tot lots, and open playground areas could
be provided, to be located by the individual builders.
105
A walking trail could be constructed through the greenbelt to provide
pedestrian access to Cedar River Park via the sidewalks along Maple
Villey Highway.
A fee could be donated to the Capital Improvements Program for purchase
of property to accommodate the required recreational space.
Mi.intenance
Wish the wheels of exiting vehicles during construction to minimize mud
dEposition on adjacent streets .
Ccver the trucks carrying excavation loads with canvas or tarp.
Developer could provide regular street cleaning.
Hcspital Facilities
Ncne.
Library Facilities
Ncne.
Energy
Utilize insulation in walls, floors, roof and install insulated glass.
Major living areas of units (living rooms, bedrooms) could be oriented
toward the southern exposure of the building, when feasible.
An energy analysis of building design elements could be undertaken to
assess feasibility of reducing long-term demand, e.g. passive solar
energy systems.
Utilities
A permanent surface water management system consisting of a combination
of underground collection and surface retention basins will be installed
to connect with the storm drainage ditches adjacent to Maple Valley
106
Highway. An energy dissipator at the juncture of the ditch will moderate
the velocity of water flow down the hill.
Human Health
Please refer to mitigations for construction "Noise," pp. 102-103.
Aesthetics
A minimum 25-foot wide setback and landscaped buffer area will separate
the proposed site and the adjacent residential neighborhood to the
northwest.
Building units in that area will be below the foundation levels of houses
and can be limited to 2 stories in height (i.e. , townhouses) .
The eastern border of the site will be lined with a landscaped road to
act as a buffer for the quarry activity to the east of the subject
property.
The greenbelt, ranging in width from 150 feet to 400 feet, located along
the southerly border of the site, will remain intact.
Archaeological/Historical
If any significant artifacts are unearthed during construction
activities, immediate action should be taken to evaluate their
significance with the appropriate authorities.
107
VIII. IMPACTS DETERMINED NOT TO BE ADVERSE
Tie City of Renton's tax base will be increased.
Tte demand for housing in the area will be eased.
A residential land use in accordance with the City's goals and policies
it the Comprehensive Plan will be established.
Increased employment opportunities during the construction period will
result.
REFERENCES
GEOLOGY, SOILS AND TOPOGRAPHY
Preliminary Soils Investigation on 25-acre Monterey Terrace Site, Renton,
Washington, Earth Sciences, March 1980.
AIR
Air Quality Data Summary, Puget Sound Air Pollution Control Agency, 1977,
1978 and 1979.
Earlington Woods PUD Draft EIS, January 1979.
WATER
Preliminary Site Engineering Report for the ERADCO PUD, Renton, Washington,
Wilsey & Ham, Inc. , February, 1980.
FLORA
On-site investigation by Kathryn Figon, Landscape Architect, March, 1980.
NOISE
Maximum Environmental Noise Levels, Washington State Department of Ecology
WAC 173-60) , Olympia, WA 1975.
Renton Zoning Code, Section 4-734(K) .
Noise from Construction Equipment and Operations, Building Equipment, and
Home Appliances, Bolt, Beranek and Newman, U.S. Environmental Protection
Agency, NIID 300.1, 1971.
Sound Measurement Procedures Manual, Department of Environmental Quality,
NPCS-1.
LAND USE
Renton Zoning Code.
Renton Urban Area Comprehensive Plan, July 1965.
King Sub-regional Plan, Puget Sound Council of Governments (PSCOG) ,
December 1978.
POPULATION AND HOUSING
Trends and Policies Comparison Report, PSCOG, September, 1979.
Population and Housing Estimates, PSCOG, 1977 and 1978.
Seattle Real Estate Research Committee Report, Spring 1980.
TRANSPORTATION/CIRCULATION
Traffic Analysis for the ERADCO PUD, Renton, Washington, David Hamlin,
February, 1980.
PUBLIC SERVICES AND UTILITIES
Community Facilities Plan, Renton, Washington, July 1965.
Utilities Report for Renton Urban Area, Renton, Washington, April 1965.
ORGANIZATIONS CONSULTED
Renton Fire Department
Renton Police Department
Valley General Hospital
Renton School District
Renton Public Library
Washington Natural Gas Company
Puget Sound Power and Light Company
Pacific Northwest Bell Company
Renton Water Department
Renton Sewer Utility
Metro Municipality of Metropolitan Seattle
General Disposal Company
Seattle City Light
Washington State Office of Archaeology and Historic Preservation
APPENDICES
A. Legal Description
B. Soils Analysis
C. Traffic Analysis
D. Preliminary Site Engineering Report
E. Letter from the Washington State Office of
Archaeology and Historic Preservation
F. Restrictive Covenant
G. Stormwater Detention Details
APPENDIX A
PLANNED UNIT DEVELOPMENT APPLICATION
Monterey Terrace Associates / Environmental Research
and Development Corporation
ITEM #3 - Legal Description
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17, Township 23 North,
Range 5 East, W. M. described as follows :
Beginning at the southwest corner of the southeast one-
quarter of the northeast one-quarter of said Section 17;
thence north along the west line of said subdivision a
distance of 252.23 feet to the true point of beginning;
said point also designated as Point "A" ; thence south
89045' 17" east a distance of 526. 41 feet; thence south
8852 ' 04" east a distance of 799 feet to the east line
of Section 17; thence south along said east line to the
east one-quarter corner of Section 17; thence continuing
south along the east line of said section to an intersection
with the northerly right-of-way line of State Road No. 5
St. S. R. #169) (_Maple Valley Highway) ; thence in a
general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north. 89°45 ' 17" west a distance of 653. 91 feet from
Point "A"; thence south 89°45 ' 17" east a distance of
653. 91 feet to Point "A" and the true point of beginning.
W
1
1
rr..
r
wur.. .
n+.••.
OD'
v:.
t41Y
JaJtZ•
y /
a
sr•:.
o. +•.
tc: .
z
j
J+
i:
J
Na
l+
1}
I
ra++
r •
rca;
S
rMwr:
CJ'. _ '•
t .:•
t..•....
i...,•.
t_
a.
a.r.!
re.
r
tin
Z\
k. '
i
11,
1.4•11
s
f_-
j .
s1t•,
4'
y
I
I.
7.:
i '
j.
l.:
IP
16?
r
1,
1 . •
f
y
r/
Oa..
11L*
r.
M.
Y..
eIS!.
t
til•
I
8
j,:'/ - '
i.
i .,•
r'•
ilk.•
N
3AV
3N1V
9
4•
4• !
c`
na•
c `/:':
Q'/
cv
I
lj
tI
v':`" .
C/
a
1,•
I...,
6
y-:-.----.--
r-
125.•-_-•-_,--.,---,•,••••
c_
r••;•• , .
fni.'
co,Cb •
Ye:
5----
N -
1
1'
04
ITC. .... ',
N.
W. •. *•..
r . '
r-
1,: ,,,
C,c.5/'/ '
1 /
i'
tl• .. .
a.••
1 ( '^^•
Lam.
TSI .
L —
e
JL...
r''
1
I1
M
pc.), ,
I
Er
l 1 t
a7 ,
J' "
37 S
aXkt;S1'
i_ fi': *_.-
r.=0 ," b' ,
I !` ',§
er,N.
ft •H 1b"' T4-4 ! i,
t ` •
q , *
f
y w,, i t- evi Ps
eS A1 ; YT", 11:YI 4,,,, `Il .tt r, t7f °,..t* .
a 4
I.
y +sa 4 s 7 r saVe ^
4rr •
r 'lf r°
i AL
ax tL E
A
n
t sn. g37. !F't i5>1< ILA*? Ie ra 4."‘4 n
r 1¢},4„,
ii .f I.! I 8, D
Bd
r+nrA.a+,c
A . 3,ry•/O'
e ,. ....s-4-4.- -0. t•4- r.-.. - . :w.....s_ .a..
r
TitR1<'r,Y ,,
r h't 51
1
4 i 4' . .' tom,-" • '. ni F' tos
V 4.....- t ..4t, yf r:S/7tT ,'i4 .,2L y..+ij,T, j.;....s v y.-• ;
y -
e
y, ,
t t --••st.44'2i.
17,141•
6 nwn1l.es,.s6www6',a+eerr ar
G
ti, *
i '
a t
a i
r.. i1RiL."Bi 1. 'Y Itia%1irM1RA C'orE 3.
k 1
r
t rf, 9ry 1
t'
S
z.^.1 A-.- -- Y •. yt.. M...fF`i ,".c.rt....-.,.+,,tlYlr 111 4 a...f. .. key... ..e
y. *"'‘7 1l u f1 {tZ' /
r ,
r,p i
g
Wtr
I L 1 bY3 T „' ,,,yy, •
T+
e
r'7yy' eky yt,.E} , ..'J.
d!
tR 4} —=',
r a.,
4, ,
A
p
L$ . t fi,
w .,r
rhe1 `}1 a y"
H , 4 1-.
i h' `gs r L+
z'
A`,MFJ Ire "
M 4,,,' 4r'f,{.:, rry
J 9
r+
f - ,
ta•ri ,,
l- #„.
L`
tV 47a9.
r .4. t
f'Q! h 4 Jy v.ri
11 .rt.« 444 Kk ,l . k
ft Al ,t yW #Za, - • .. 6n T1( M /H I4 M
0`' '' h4tt°:'Rk1 : J! y9i t,'''''
r
y w'
nx F ' { if" iV ' 4 i
Y d kJ' lif. ;Tp.a9 #
i '' 4a$. 4,
Y'
1,
n
iii.•'.
e` tQ•'.ta ..,+•>•G Z. t'{ as'k rM'' „ >«,: • t i:"*'' R :t'r?AneFrk
r
ix W.
yy
c* s tt
Ct t>.,...
4^
t,. «ca.:.i" rr
ca]]->_.
S•
rN r.v M\•
Kok - r4 i -'
t d,•`a lj„ k ` iR *0'I .t. y1' fi y
cr-q,A *
x.4' l'L A
s.„ r._,
E
r r._ i v. - Y14- ;"i 44 9f''$ ,!.y • y
r - Y AIY. s'r,+'k ler, i,,414,7 9.'
44r,t„.., ,x M1s `,'„5a`... ,. .. A,' ., l .4 r_
r i,,,
k ,!,
t °
yd$
c . +r,pk,
t
A
u > +
at.,,..
L
xr iC^•.+rar,9Aa. "1f`7lNaY• ..rtrr rye,. Im-,,7i,a'tl ,s $
u,-, .r,,t,
NwV,•.<'r a,il.
740+ll``r , z •' 1 ,¢' ''•t:d 3":. a r ver.• x' bFAr v .,tii, yA-
V
V T: e'Ai,.:;c 1
1„" , ..
fir
a xo+ ''
1... : ,
Ae 1"
fi tir* Iwal..4.A 1` .lI ' w 1.1•!
V'
4 ar..). ..s•. •., «1..,a ,sr..ew. .,,,Cv .yNpyt..Fiy, ?ai-. .. 4 ,{.'- i 4* ,r .''K- f• ,-=
vee.... '-; .
a r ...: .
vs r j,.:h .; a•-: .•ti#M..At....
I..
n•;
xda1i:,
1" .
m.:," '
q, 7r. .ol. '
r
yy ,
s- 'e"'6'•p' Y Rn'!!7f+f4i" 2' .,;"G: y' ` i. - v. . , 3 — - x--r-a
r.q ....rws11 w....i..-,- •--... -"'ira`k« `p--— ,y'y` L.srNaii+wv,,'•.sr.::vr,s..,i aif 7ii}IPA•x 4-as st4,,:Jyg.+glti4AI
7
r 'PK>E„ t. 4 4-:"r e4I 9; iM X a o'4'elti.„q q "f- 'y 7p' tl '"d•
I f '
IM 1'i1 4 ,
d. .:
r 1 M' '..
i t-'t
TOB9 Av. -'ram yK,ra .kvJe, t: V +. +. j, /iw IyA,'f!1( q'.,s'9;,.A t'Er:. «.+ „} jpq,IL
la ill 1
n
Y T yy,
a,
a t+Sk ,
Via$.
titi4 '.:
v j,
J F t2. 0...._ II.A , -w-lT. Jt.S•'-3 s` i} t t
19!Mtis v'p'•,,,,,0:: t$ ! `
tf,:
1.si,, 1 }
b 3 r ss, ,4
n7
S::.„
1.,_.-,
r 73,1e f1'''
V '`
x:7L i ?..i+4.1a 1! 'x
L }'
S ry +j r
J
ioh13-",-*..2 „,., 401&,..4 ' -2:.x.kl.'Ni...:; ',..,:'' 4F/I _ , DJ a , it I LTN.:4,1Wr lik
G"F
Ali •3i. . 4w eeh•,#rd !„TrLv,} I b,;rw .t++Ll++S1 R:,.
C. r. . •.f.''. ..
4 ,
y r
yry. r•a
@ F3 K' r t y.•.:• nos
4 *1; a im.: ,-
r..,;
i- 1 _
r , r.
t @ s. t. J ....._, - - }t5 ~
E 14,,_a'.. .A„k..14Nr S.ci:,c' ,.rG V'.
t
r i .t' - '.fp '1f%A',.,.t, ..!: ':dlYiA:'W : ,A. i::.a -3 4 e SiM
APPENDIX B
pl
A4064L:
ERFITH SCIENCES ERT01:1
BOX 126 HOBART,WASHINGTON 98025 ID
TEL: AREA:06• 682-6942
March 13, 1980
Mr. PatrickT. Easter, President
Environmental Research & Development Corporation
Sea-Tac Office Building
18000 Pacific Highway South
Seattle, WA 98188
Re: Monterey Terrace Property
Dear Mr. Easter:
Contained herein are my preliminary findings and recommendations related
to the soil and subsurface conditions on your 25 acre Monterey Terrace site.
The roughly triangular parcel lies immediately south of the Mt. Olivet
Cemetery in Renton. Roughly half of the total area is cleared and relative-
ly flat; it was formerly a borrow pit. The remaining area consists of steep,
vooded hillside which drops some 250 vertical feet from the aforementioned
flat area down to PSH 169 (the Maple Valley Highway) and the Green River
Valley floor. A topographic map taken from two separate maps prepared by
others is shown on page 6 ; it shows approximate property lines. Since there
are essentially no features on either original map, internal to the 25 acres,
which could be precisely located on the ground, the accuracy of the composite
map is limited accordingly.
Development plans are somewhat vague at this point; however, you envision
constructing multiple family residential across the flat upland area and
leaving the steep slopes unaltered. You are now at the stage of planning
znd design, where soil and related subsurface information is needed for design
Furposes and for inclusion in an environmental impact statement. You, others
en your staff, and Mr. Thorpe of R.W. Thorpe & Associates have summarized
your current informational needs. They are:
1 ) An analysis of existing technical data of the areas and of existing
site conditions including soil and groundwater.
2) An inspection of the soil exposures and surface features of the
property and immediate adjacent areas. This is to include exami-
nation of conditions in widely scattered, backhoe-dug test pits.
3) An analysis of site constraints and limitations, especially as
related to slope stability and building setback distances along
the top of the steep embankment.
Mr. Patrick T. Easter
Page 2
March 13, 1980
4) General remarks on the possible construciton of utilities down the
steep embankment.
5) Preparation of a written report which would be suitable for inclusion
in or submission as a supporting document with the E.I.S.
6) Comments and recommendations on siting of buildings, grading require-
ments , utility and roadway construction , and preliminary stormwater
treatment including the limited use of drywells.
With your letter of 21 February 1980, you authorized me to apply my technical
efforts to satisfy the above needs. My findings , contained herein,are not
intended to be wholely adequate for design and construction purposes. Many
of the buildings and other improvements will , necessarily, be poorly repre-
sented by randomly scattered test holes. What, if any, additional exploratory
work may be in order will depend partially on the amount of construction
inspection which is scheduled during earth-work; inspections of opened exca-
vations and of fills in progress can, to some degree, verify continuity of
condition between test pits and thereby be substituted for additional test
holes.
Subsurface Conditions
t
Two basic geologic units are of relevance to any developmental plans. First,
soils to a probable depth of several tens of feet across most of the upland
area consists of fine to medium grained sand with local coarser fractions
including some gravel . This unit is of recessional glacial origin. Second,
stratigraphically below the sand and exposed at various points along the
lower slope of the embankment,is a formation of very dense pre-glacial strata
including glacial till , and variable silt-sand-gravel mixtures. Although
the formation represents widely different soil types , the USGS in mapping the
area found it impossible or impractical to map out the lesser units. This is
because of the limited mumber of exposures and the absence of credible, deep
boring information. As was determined in the course of this investigation, the
lower unit is highly competent, stable and of little relevence to your project.
Across most of the southwest, facing the embankment, contact between the two
units is roughly between elevation 150 and 200; the contact is probably a
warped surface which would make extrapolation of its location inaccurate over
great distances.
0 Shallow conditions were explored by digging 12 exploratory back-hoe excavated
test pits at locations which are shown on the site map. The pits were dug
to depths as great as 13 feet and each was back filled after close examination
of conditions there. A summary of soil conditions observed in the test pits
is presented on pages 7 to 8 . Except for the lower reaches of pits 8 and
11 which terminated in very dense glacial till or hard-pan, only the sand
formation and a few thin and relatively insignificant fills were excavated in
the test holes.
The only groundwater noted in any of the test pits was internal to the glacial
till of number 11 ; that water is believed to represent a very localized
B-2
Mr. Patrick T. Easter
Page 3
March 13, 1980
and possibly intermittent condition which would in no way affect your project.
Scattered small, and possibly intermittent,springs were noted either along the
contact between the two soil formations or internal to the lower formation
along the embankment. It does not appear that these represent major aquifers
in the areas where they were observed. Since the contact at the base of the
sand formation represents an impervious surface and, as mentioned earlier,
that surface is not level , it is possible that at some random locations , such
as the test pit 8 and 11 , there is no water table above the contact whereas at
other locations, one may exist.
Conclusion and Recommendations
Overall subsurface conditions are almost ideally suited for development as it
is now proposed. The steep embankment is considered stable in its present
configuration; no major fills were encountered; the on-site materials are very
well suited for utility back fill , utility hedding, and as borrow for compaction;
and the native soils have excellent drainage characteristics and good bearing
strength.
Site Grading - Essentially the only grading that will be required will be that
which is designed for architectural reasons. In the event that old fills are
encountered, these should be removed or replaced from all areas which are to
support major improvements. Except for a few scattered mounds of obvious
fill , it does not appear that past site utilization will impose serious re-
strictive or grading requirements on the current project. Where structural
fills are placed beneath building or roadway area, the placement and compaction
should be done under engineer inspection in order to ensure that the degree
of compaction is sufficient for the intended purpose. As is usual good design
practice, fills beneath buildings and immediate peripheral areas should be
compacted in six-inch maximum lifts to at least 95% of maximum density as
measured by the Modified or five layer Proctor method. With the available
sandy soil and under proper moisture conditions , this should be relatively
easy to achieve with a vibrating flat roller. Ninety per cent compaction
by the same standard would be adequate for paved areas and areas of incidental
improvements.
Associated with site grading are several subjects of particular relevance to the
E.I.S. These include dusting and erosion and to a lesser extent, noise and
nudding. So long as no large area is bared on the steep slopes, the grading
related effects of development should be no more than slight. For many years,
the site was the center of a mining operation; the effects of excavating equip-
ment operating in the area are well known to all those who have familiarity with
the property or with adjacent properties where mining continues. Since there
is no more than a trace of dust sized particles, i .e. silt and clay, in the
shallow soil , dust levels should be as low here as on any project in the glaci-
ated areas of the Puget Sound. On steep slopes , the soil would be highly erosive.
However, no such slopes are now bared nor will they be except, possibly, for
one utility trench which is discussed later. No significant drainage presently
discharges onto erosive parts of the slope and none should be allowed after
development. The erosive nature of the soil is partly offset by its permeabili-
ty. Most precipitation which falls on the site now soaks in even though most
B-3
Mr. Patrick T. Easter
Page 4
March 13, 1980
of the area to be developed is presently bared of vegetation. To those
broad, presently bare areas, grading will amount to no change so far as
erosion and dust are concerned and will be followed by an improvement once
the project is completed and vegetation is established.
Slope Stability and Setbacks - The embankment which separates the area to
be developed from the Maple Valley Highway is stable at its present inclina-
tion. On any slope this steep, localized sloughing and small-scale earth
movements, such as might occur when a tree uproots, are to be expected from
time to time. It is prudent design practice to allow sufficient setback
distances to allow for some such natural processes and for erosion and simi-
lar losses which might result from plumbing mishaps or future acts of human
carelessness. In my opinion, a 25-foot building setback from the top of the
embankment would be reasonable. Siting units closer to the slope would be
acceptable if individually designed deep foundations were included so that
the stability of the buildings would not be affected by shallow downhill
losses.
Stormwater Disposal - All runoff from roadways and surfaced public areas
should be directed into public stormwater sewers. The highly permeable and
unsaturated surface soils across the site are capable of absorbing consider-
able water through drywells. However, to insure that groundwater levels are
not significantly raised along the face of the steep slope above the Maple
Valley Highway, thereby reducing slope stability, the use of seepage pits
or drywells should be limited. Since almost all precipitation is currently
absorbed by the soil without adverse downslope effects, the advised limi-
tations relate mainly to concentration of introduced water in proximity to
slope-sensitive areas. I recommend that no drywell or seepage pit be con-
structed nearer than 200 feet to the top of the embankment and that no such
structure be made in fill at any location. I also recommend that the de-
signer confer with me about the locations of all drywells and about the rate
and duration of expected recharge at each location prior to adopting the
recharge scheme.
Subgrade Utility Construction - Where utilities are to be laid through the
clean, sandy soils of the type encountered in all test pits except in the
lower reaches of pits 8 and 11 , imported bedding aggregate may not be neces-
sary, depending on the discretion of the utility designer. The native soil
is well suited as backfill and can be compacted with relative ease.
There is no reason why a storm sewer cannot be laid diagonally down the em-
bankment to the Maple Valley Highway. Likewise, there is no reason a narrow
road could not be made on the slope to facilitate machine excavation. You
will find considerable differences in attitude and willingness to undertake
the job among contractors. If the trench is machine excavated, inspection
C
B-L
Mr. Patrick T. Easter
Page 5
March 13, 1980
in progress by someone such as myself is advised. Also, maximum effort
should be applied to limit erosion which might be associated with that
construction. Runoff from the upland area should be channeled away from
the slope, and the bared area should be expeditiously seeded upon comple-
tion. Jute net should be applied over the bared area until vegetation is
reestablished. As an alternative to machine excavation, the line could
be laid entirely above grade. In this case, the presumably metal pipe
should be firmly bracketed to metal stakes.
3uilding Foundations - Providing that my recommendations on grading and
setbacks are followed, all buildings could be founded on conventional
spread footings which bear either on native soil or on compacted fill .
Although at some, or even most, building locations higher pressures could
be justified, unless building-by-building exploration is performed, bearing
pressures should be limited to 2000 psf. Minimum footing dimensions and
depth of burial will be dictated by local codes.
Once a grading plan is completed, building locations are known, and founda-
tions have been designed, please provide me with that information. Also,
please keep me informed about construction scheduling and any other develop-
ments which seem relevant to my efforts.
Yours very truly,
EARTH SCIENCES
5— i-e-,„ , c,14
games N. Eaton
JNE:ib
01-4270
2 Copies Submitted
2 Copies to R. W. Thorpe Assoc.
N `/
2,
I --)7,..,` ./,..-.\ ,,,,y,\
e
B-5
J ` r
I NI I,37----Th /,' ' ' -- ---/- N> IT- ,rt) it
O
3 I f
N __..) / CO
4 L ,:_: '/V A °L--
c
OS
i lc
1 81 eo7
s S
o
i
NORTH I sA
C\
N.
SCALE IOU 1
Lq-
V,0( \\ \\\ -- —". I
1
c5
613
4%.ir Q\
CEDAR F1-
y
41 klaPi
Aso 00
y
J DENSE TREES
kh.,,
ERADC 0 RENTON PROPERTY
3.4o
1,\
No•NIF/
Page 6 TEST PIT LOGS
0 -
Brown fine to medium sand (dense, clean).
9.0'- Completed. No groundwater encountered.
0 -
Sod and non-organic topsoil (loose).
0.7'-
Brown fine to medium sand (dense, clean).
13.0'- Completed, no groundwater encountered.
r3 0 -
Brown fine to medium sand with trace of gravel
dense, clean) .
12.5'- Completed, no groundwater encountered.
4 0 - Sod and non-organic topsoil (loose) .
0.8'-
Brown well graded sandy gravel (dense, clean).
8.5'- Completed, no groundwater encountered.
5 0 -
Brown well graded sandy gravel (dense, clean) .
1 .9'-
Brown fine to medium sand with trace of gravel
dense, clean) .
9.5 - Completed, no groundwater encountered.
6 0 -
Brown silty, sandy gravel (dense, fill ).
0.5'-
Brown fine to medium sand (dense, clean).
2.7'-
Brown silty sand with gravel (very dense,
glacial till ) .
9.0'- Completed, no groundwater encountered.
7 0 -
Brown fine to medium sand (dense, clean).
4.7'-
Brown well graded sand with fine gravel (dense,
clean) .
6.4'-
Brown fine to medium sand (dense, clean) .
10.0'- Completed, no groundwater encountered.
8 0 -
Brown well graded sand with gravel (dense, clean) .
5.5'-
Brown silty sand with gravel (very dense, glacial
till ) .
9.0'- Completed, no groundwater encountered.
l
B-7
Page 7
TEST PIT LOGS (CONTINUED)
9 0 -
Brown, slightly silty, fine to medium sand with some
coarse sand and gravel (dense).
11 .0'- Completed, no groundwater encountered.
10 0 -
Brown fine to medium sand with stringers of coarser
sand and gravel (dense, clean) .
9.5'- Completed, no groundwater encountered.
11 0 -
Brown well graded sandy gravel (dense, clean) .
1 .5'-
Brown silty sand with gravel (very dense, glacial till ).
5.4'- Slight groundwater seepage.
9.0'- Completed.
12 0 -
t Brown silty sand with gravel (loose, probable fill ) .
3.5'-
Brown fine to medium sand (dense, clean) .
7.5'- Completed, no groundwater encountered.
B-8
APPENDIX C
DRAFT
TRAFFIC STUDY - ERADCO PROJECT - NE 3RD ST
RENTON, WASH
Dave Hamlin 2/25/80
LANDMARK ENGINEERING
TRAFFIC ANALYSIS
General
This proposal will provide an estimated 425 dwelling units in a combination
of apartments and condominiums. Primary access to the site will be via a
paved foot roadway extending northerly from the northeast corner of the
development to NE 3rd Street. Emergency access to the site will be provided
via Blaine Avenue NE which connects to the site at a point approximately1000feetwestoftheprimaryaccesspoint. The emergency access route
will not be open to the general public and will be provided with suitable
barricade devices meeting Renton Fire Department regulations.
The on-site transportation system will consist of a roadway system providing
access to the major subdivisions within the site and parking areas proximatetoeachbuildingunit. Parking will not be allowed on access roadways.
Cul-de-sacs will be designed to accommodate emergency vehicles and will
conform to City of Renton standards. Parking areas will provide sufficient
parking supply to meet current City of Renton standards.
Trip Generation
The proposed development will include approximately 332 apartments and 93
condominiums. The Institute of Transportation Engineers has provided trip
generation rates for various residential land-uses which are presented inthe "ITE Trip Generation Manual" published in 1976. Figure 1 shows the
summary of residential trip generation rates.
The appropriate average weekday trip generation rates for the proposed
development would be 6.1 trips per dwelling unit per day for the apartments
and 5.6 trips per dwelling unit per day for the condominiums. These trip
generation rates will produce an estimated 2546 trips per day for the entire
composite of apartments an'd condominiums.
The adjacent residential development of Monterey Terrace has been used in
this analysis as a model for developing traffic characteristics for the
proposed development. This is considered appropriate in that MontereyTerraceisexclusivelyresidential, as the proposed development will be,
and since residents of Monterey Terrace should have similar trip destination/
origin and trip purpose characteristics as will the residents of the proposeddevelopment.
Figure 2 shows the hourly trip characteristics for traffic entering and
exiting the Monterey Terrace neighborhood on an average weekday. Figure 3
shows the hourly trips as a percentage of the total trips per day for
entering and exiting traffic. Figure 3 was derived from Figure 2; however
C-1
the hourly traffic rates were averaged with each succeeding and precedinghourlyrateinordertosmooththecurvesandtoprovideareasonable
approximation of trip characteristics for larger residential neighborhoods.
Figure 4 provides a composite of entering and exiting traffic expressed as
a percentage of total daily trips. Figures 3 and 4 should reflect reasonable
approximations of the trip characteristics for the proposed development.
Figures 5 and 6 show the estimates of directional and total hourly volumes,
respectively, that are anticipated to be on the primary access roadway onanaverageweekday. Figures 5 and 6 were developed by combining the trip
generation rates and hourly characteristics derived above.
Trip Distribution
Traffic entering/exiting the site of the proposed development will be comingfrom/to the east and west on NE 3rd Street.
The entrance to Monterey Terrace was observed for 30 minutes during a typical
weekday morning to determine trip distribution characteristics for that
neighborhood. Traffic was predominantly exiting during that period and it
was observed that approximately 82% of the vehicles turned left (to the west)
upon exiting and approximately 18% of the vehicles turned right (_to the east)
upon exiting. These characteristics should be representative of the tripdistributioncharacteristicsfortrafficrelatedtotheproposeddevelopment,i.e. , it is estimated that approximately 82% of the total trips destined
to/from the site will use NE 3rd Street west of the site and 18% will use
NE 3rd Street east of the site.
Figures 7 and 8 show the existing directional and total traffic volumes on
NE 3rd Street for the section of that roadway near the point where the
primary access roadway will connect to it. Figure. 9 shows the
additional volumes anticipated to be generated by the proposed development
superimposed on the existing volumes for NE 3rd Street west of the inter-
section with the primary access road. The impacts on NE 3rd Street east
of the intersection with the primary access road will be considerably less
since 82% of the added traffic is estimated to be on the west leg of theintersection.
C - 2 -
Impacts on Existing Transportation System
The primary traffic impact of the proposed development will be at the
intersection of the primary access road with NE 3rd Street. Secondary
impacts will occur on streets and intersections west of the proposed
development. Impacts on streets and intersections east of the proposed
development should be nominal due to the anticipated heavy has towards
traffic movements to and from the west.
The nationally recognized "Manual on Uniform Traffic Control Devices for
Streets and Highways" provides eight warrants for determining if a need
exists for providing traffic signalization at a traffic intersection.
Satisfaction of one or more of these warrants is usually considered valid
evidence that a signal should be installed. The warrants are:
Warrant 1 - Minimum vehicular volume
Warrant 2 - Interruption of continuous traffic
Warrant 3 - Minimum pedestrian volume
Warrant 4 - School crossing
Warrant 5 - Progressive movement
Warrant 6 - Accident experience
Warrant 7 - Systems
Warrant 8 - Combination of warrants
The conditions that merit the most consideration when analyzing the inter-
section of the primary access roadway with NE 3rd Street fall within Warrant
No. 2. Pedestrian activity is low in the vicinity, accident experience
cannot be analyzed since the intersection is presently non-existent, and
the remaining warrants do not apply in this case.
Warrant No. 2 applies to operating conditions where the traffic volume on
a major street is so heavy that traffic on a minor intersecting street
suffers excessive delay or hazard in entering or crossing the major street.
The warrant is satisfied when for each of any 8 hours of an average day,
the traffic volumes on the major street exceed 900 vehicles per hour and
the traffic volumes on the minor street approach exceeds 75 vehicles per
hour.
C - 3 -
The following tabulation is derived by using the traffic volumes estimated
above for the exiting traffic using the primary access roadway and the total
volumes estimated to be on NE 3rd Street following completion of the project
see Figure 9). The tabulation shows the highest eight hours where the
conditions for Warrant No. 2 are met.
Predicted Volume Predicted Volume on
Time on NE 3rd Street Primary Access Road
1. 8:00 - 9:00 AM 1320 109
2. 7:00 - 8: 00 AM 2150 88
3. 9:00 - 10:00 AM 980 88
4. 3:00 - 4:00 PM 1810 87
5. 10:00 - 11:00 PM 970 86
6. 4:00 - 5:00 PM 2130 79
7. 11:00 - 12:00 AM 1170 77
8. 2:00 - 3:00 PM 1490 76
The above tabulation indicates that a signal will be warranted for the
intersection of the primary access road with NE 3rd Street, even if it
serves no other uses than the proposed development. If a roadway should
be extended to the intersection from the north to serve areas north of
NE 3rd Street, traffic using that roadway would benefit from a signal
and would provide additional justification for it.
A traffic signal at the intersection of the primary access road with
NE 3rd Street should be a two-phase full-actuated unit with volume-density
features for the phase serving NE 3rd Street. The design for the signal
should provide advance detectors for NE 3rd Street and stop-bar detectors
for the side street. The signal may need provisions for accommodating
separate left-turn phases for traffic on NE 3rd Street, if there is likeli-
hood for a roadway connection to the north.
NE 3rd Street may need localized widening at the intersection with the
primary access road to accommodate left-turning vehicles. The incidence
of westbound left-turns will be minor due to the predominance of traffic
movements to and from the west. The need to accommodate eastbound left-
turns will only exist if a connection to the north is provided. The final
determination on the need for widening should be reached following a detailed
design study for the intersection.
C - 4 -
A traffic signal at the intersection of the primary access road with NE
3rd Street will not be unduly disruptive if it is properly designed and
operated. The specific location of the intersection is far enough from
other signalized locations so that interference between signals will be
minimal.
The additional traffic loads which the proposed project will impose on
NE 3rd Street west of the primary access road will have some impact at
the intersection of North 3rd Street and Sunset Boulevard North. The
intersection will be moderatelyimpacted during the morning peak hour
7: 00 AM to 8:00 AM) and during the afternoon peak hour (4:00 PM to
5:00 PM). The additional traffic volumes will have no impact during
off-peak periods since the intersection operates far below design
capacities during those times.
The approach volumes at the intersection of North 3rd Street and Sunset
Boulevard North for the westbound approach during the morning peak hour
will increase about 4.7 % following completion of the project. Impacts on
other approaches during that period should be very minimal. The afternoon
peak hour period will see an overall increase of about 160 vehicles in
the intersection; however, there is insufficient information available to
determine the percentage of increase for particular approaches during this
period. It is reasonable to assume, however, that no approach will
experience an increase greater than approximately 3-5% over existing volumes
since the additional volumes will be distributed over all four appraches to
the intersection.
The intersection of North 3rd Street and Sunset Boulevard North has operated
without improvement for many years and should be subjected to a traffic
analysis. It should be possible to greatly enhance the efficiency of
the intersection by adjusting detector operations and signal timings.
Such adjustments would, presumably, more than compensate for the relatively
minor traffic increases that will be generated by the proposed project.
Other intersections and roadways west of the proposed project should not
be significantly impacted due to the rapid dispersal of the traffic as it
radiates away from the project.
The traffic on NE 3rd Street will continue to increase in the foreseeable
future. The traffic volume has increased from 18,801 vehicles per day in
1973 to 22,170 vehicles per day in 1978 for an overall increase of approxi-
mately 3.4% per year. Future increases may diminish somewhat due to energy
shortages and increased driving costs. The traffic volume on NE 3rd Street
west of the primary access road in 1985, if we assume an annual increase
of 3.4% and if the project is constructed as proposed, will be in the range
of 29,000 to 31,000 vehicles per day. This increase may require some
improvements at the intersection of North 3rd Street and Sunset Boulevard
North; however, the proposed project itself will not be a significant factor
in' creating the need for such improvements.
C - 5 -
1 1--`<P RI\ 5 F02 RS51 Dan-1 AL 1 AkI D -V 5E5
Table 2. Summarization of Rate Tables of Different Types of Dwelling Units.
Average Vehicle Ends per
Weekday Trip Unit
Type of Dwelling Unit Average Maximum Minimum
210—Single Family Detached Unit 10.0 21.9 4.3
220—General Apartment 6.1 12.3 0.5
22l—Low-Rise Apartment 5.4 5.5 4.7
222—High-Rise Apartment 4.3 6.4 3.1
230—Condominium 5.6 5.6 5.6
240—Mobile Home 5.4 6.8 2.8
250—Retirement Community 3.3 4.9 2.8
270—Planned Unit Development 7.9 10.0 6.2
SOURCE EM2INIEERINC21 , vaL 4J0, N0. ID, O STOT J2. Ic1/6
C-6
LOcATIOIJ MONTeREY 1)1a, NE SOUTH OF'_ NE '3`-kk 5T____ __ 1 IRi=CTIUt 1 Eu ( P// I)
TX\E NDV ic1,W Ia-7S
1 1 -
i t 1 1 ri -r- , 111 , 1---T-- ;
It I 4_- I I i i
i j I +
i I
fi it-- - j — OCR
i. {
I I i I
j 1 I i I
I
Gi
I
S uT N f5O0 t•0 O --II1
I
I i I I ONCiZ' N'o N I ctt
I
1 -
I ;
f ; ---/-
i
A j 1 i- v , .. i 11
al
z. -.I
I
I . I i I
1 - - ! — I
i----,1 ---
f---
1 i i ..
t:
1 1 !i...... ; I
a',lo ____., _ __ ;.____I____. ____f__ ,, i c ;, , I, 1 , 1,
0
I ii, Li , 1 i \ / 1
i___________ __ ,____,_ ___,.. _ : „ •
tom _ i______i____ i 1
1 Z. 3 4 5 6 1 r., 9 10 1I 12 1 2. 3 4 4, 7 8 9 10 II 12.
TIME
LocATiON N\okrISI3EY DR NE SavtN OF N .3''j 5T.__ DI REcTiDN 1)T1-1 (_EAG)-1)_
1 NOV 1%,11, 1915
I T -
1
A. -., 4- --4---
I I
l
1 0. 0 - -- + I__ _ 1
r
Tsai. ! i + t d
1
f
IN;
A
iv
1
T1 t1
I I
1
I n 0,1
D 5°it) — -- --- t_____ _
f ._, __
1-/ji: U‘",' C
1 1 1I
I I I 1T. ---7: I—----;- !
I'
I
t
1 Z •3 4 5 (0 7 $ 9 10 it 12 2_ 3 4 '5' fe 1 8 9 10 1 1 12
TIME
avvLL
ZI 11 O I b 8 L , 4 -b C Z 1 ZI I I O 1 6 4 L 1 b £ Z 1
T 1 I !-
7. 3 7---- 1-- i /
1 ak ,
i Il
0
as I 04,4. rn
3 iD 0
i
O
B ID 1
ec 0/
O
ak.-ea 'g I
1v o \.I I I p;IFp.)
IiiN t---
T-- - T- -,—i —t
I 1 1 Li i
SLb i o 't 1 1'ON alcc
rviaL) rucci. NOI 9 Kc1 LC f. _ N -J4 I-1L.nos gN Ic1 .`- J4vovd Nol-mo-1
LOCATION PSI MAr2: _IACC.655_ U DI REC.TiO 4 bDTi'i (E )
cal ti= _
Jif_
I _ _ ] I
2___iT
i I 3
I tiic nl1IiI251II
I 11 j (a ti N
1 A__ ___[._ _ ;___ _.-_ -. / -_1 t( ±
I V. I ?,
1 2 it
90 4____ ' __.. __ , ____ _ / __ri 2—_\_L_i 1--
lia)q-ilN1C.1 I I
1, '
r,T K, Crl
D tiA I- --{i 1
GO --4---___
r_
i
1 I 4 '
i 90r
i
4
T-,
30 ZLiII L N
I
1 1 I 1
j•
I
i 1 i
4 5 b 1 $ 9 10 I f 12 I 2- 3 4 g- 6 1 8 9 t o 1'2 1 12
TIME
LOCATIOJ FRIfX aRY _ ACCESS R(,)a>- DIRGGTiOt4 FO'{-I (TOTAI.
usTe
1 I O rti11II
1 r 1 --, 1 _ _..._ i
I j O
I 2D4
z 0
200 1 1
r
t I i
1 Cc
1--- --i--
ii ii, I i 0 xi
C: 6N
100 I 1 i C o
1 r
i
b
r3
1 1 u)
1 v
0 _______I
1 I
I l d
i 1
1
1 . 1 1 I 1 i 1 1
1 2. 3 4 5 6 '1 a 9 w i l !2 1 2. 4- 4. Z 8 9 I o 1 I 12.
TIME
N 1...t_
11 11 01 b 8 L 9 -s. - c Z 1-1 H 0l 6 (3 L 9 5 -b C. Z. 1
o i--- 1st .__4____L___4__ ! i •
kr
i
v Li_ Pr cI.t_ rcrt--L. (\\
co.) <
r
1
r-
I__ T.
f f
cn
o_
1
I IaN`Q l`}G j f L
7 , T 1
I
00Z I, Y
TS I I i j
wo I i-- L -- - ! -- --f--- .4. - - -
gt_U oZ'1,01 :-ins a 1
H'v. ) H c NO'J-)?- 1(i i 3fw -'dO .LS3I\\ 1S p--.2 3N tv011rn4-1
alN11
ZI 11 oI 6 9 L g A -17 c 2 1 -it 11 Ot 6 ' L 9 S -b C. 2 t
a •r-- - 1--
1
7 t- - i-- -j--+•--1-----•--- 1- -- OOS
i 1 r iCI
I
f
i--:- i - 1 --._ I i
h 1 L501
j I
1.1- 1— L 1 _
1 __ _ __ -._..Or
co 1 •• I i I 3
Ti- Iif .
i Prl _- -__
i r OOG I
cI' j
rn
H . i —1 1- i .
Li_ u-- In 1-- rt— - - OQoz )'
i-- f 1
2
T i j
al I I
1 ' -
tli r I 1 i , .
I I _. __ _... . .. ____ _ __ ,_ _ I
SLbA 4Z'bl A-1n1 w
iG.101) I aNO117a IC 30 1 5. 30 _LLn\ .Ls F.,2 3N NO1-0 i0-1
L.0 c AT 1 ow NE 3rg ST \VE57 OF PRI Mil.(2,`(' A4,C.ESS PO/VD DIRECTION _ Ti-4 (TOT/ )
MTE
I- - --
T-
i i BY I-. 1 lrAft tD"-AiiD VOL.uk\E. t7 •
i I
HI i
j I Cc1
H
r
I
s I----+---_ - --t--- 1•• f i j' 71
11)
t
z i' ci-
1 I i____ti v'
W j j
f
i 1 m i
I \ Q
7) 5t5T1N; \,/a Idi
1
1 u, <
i j
f
i T ' -t- t"- --- ic
8 >
2 3 4 5 6 1 t 9 10 11 12 I 2- 3 4 5- 4, -i 8 9 10 11 12
TIME
SUPPLEMENTAL TRAFFIC ANALYSIS FOR THE ALTERNATIVE ACCESS OPTION.
By Dave Hamlin.
GENERAL
The alternate access to the site would provide a two-lane roadway that
would traverse the bluff on the southerly side of the site to reach the
Maple Valley Highway. The maximum grade on the roadway would be 10 percent
and tight-radius curves would be required at the bottom and near the top of
the roadway due to the topographic features of the area.
TRIP GENERATION
The trip generation characteristics associated with the proposal would re-
main the same as discussed in the traffic analysis of the primary access
road.
TRIP DISTRIBUTION
The provision of an alternate access from the site to the Maple Valley High-
way would alter trip distribution characteristics when compared to the op-
tion of the primary access only. The most significant change in trip dis-
tribution patterns would be in the morning peak hour when traffic exiting
the site via the alternate access could turn right onto the Maple Valley
Highway to reach points of major attraction.
The directional trip distribution characteristics of those motorists who
would use the alternate access would be similar to those using the primary
access. However, it is estimated that a greater percentage (90 - 95%)
would be destined to, or originate from the northwest. This estimate is
based on the fact that few shopping and employment opportunities or schools
are located southeast of the intersection of the alternate access road with
the Maple Valley Highway.
The actual volume of traffic that would use the alternate access would de-
pend on several variables, but primarily on the efficiencies of traffic op-
erations at the "Maple Valley Wye" and the intersection of NE 3rd Street and
Sunset Blvd. North. The primary access and the alternate access are very
similar in terms of providing access to major attractions and it is not
possible to accurately predict volumes on either route, if both exist, due
to the sensitivity of motorists to perceived traffic conditions at locations
cited above. Under "ideal" conditions, however, it is reasonable to assume
that 50 to 75% of the morning peak hour trips would use the alternate ac-
cess and that 50 to 75% of the afternoon peak hour trips would use the pri-
mary access.
IMPACTS ON EXISTING TRANSPORTATION SYSTEM
The Maple Valley Highway has traffic characteristics that are very similar
to those on NE 3rd Street. Current traffic volume on the Maple Valley High-
C-15
way are 21,597 vehicles per day as compared to 22,170 vehicles per day on
NE 3rd Street. The peak hour characteristics are also similar for the two
roadways, however, the morning peak hour volume on the Maple Valley High-
way is currently about 5% greater than that on NE 3rd Street.
The provision of the primary plus the alternate access would obviously alter
trip distribution characteristics to the extent that a traffic signal would
not be required at the intersections of either route with the City's arter-
ial system (See Traffic Section Warrant Analysis in Traffic Study for Pri-
mary Access Roadway) . The fact that each intersection would operate with-
out a traffic signal would encourage a clockwise traffic pattern since the
right-out' "right-in" movements would be substantially easier than left-
turns into or out of the site at either location.
The net effect of the provision of the two routes, as compared to the sin-
gle primary access, would be to concentrate a greater number of morning
peak hour trips at the "Maple Valley Wye" while lessening the impacts at
the intersection of NE 3rd Street and Sunset Blvd. N.
The "Maple Valley Wye" is a complex series of intersections involving free-
way ramps, the junction of two major roadways (Maple Valley Highway and
Sunset Blvd. N.) , a railroad crossing, and two important city streets
Bronson Way N. and Houser Way. N) . It is one of the most complex inter-
sections in the Renton area and it uses a highly sophisticated form of
Coordinated-Actuated" traffic control system which provides the best form
of traffic control that can be attained at that location. Traffic conges-
tion is prevalent at that intersection during peak hours and it will be-
come increasingly so as volumes increase on the Maple Valley Highway. The
provision of the alternate access would exacerbate the congestion with no
reasonable means of mitigation.
The intersection of NE 3rd Street and Sunset Blvd. N. , as well as mitiga-
tion measures at that location, is discussed in the traffic study for the
primary access road.
The alternate access would, at best, provide marginal benefit to future
residents of the proposed development. Trip lengths would be longer, how-
ever, this may be off-set by reduced ways to gain access to the arterial
system. It is probable that commute times for the future residents would
be essentially the same with or without the alternate access, given the as-
sumption that a traffic signal would be installed at the intersection of
the primary access road and NE 3rd Street in the case where the alternate
access is not to be provided.
The cost to provide the alternate access roadway, in addition to the pri-
mary access roadway, has been previously estimated to be in the range of
1 million, subject to the suitability of soils in the area. The cost to
provide a traffic signal at the intersection of the primary access road-
way and NE 3rd Street would be in the range of $50,000 to $100,000, sub-
ject to the extent of roadway improvements that may be required.
The provision of an alternate access roadway, as analyzed in this report,
is not found to be significantly beneficial nor cost-effective. Addition-
ally, the roadway itself would have negative features including, steep grades
and sharp curves dictated by terrain, and would likely be used as a short-
cut, particularly during peak hours, by motorists seeking to avoid the
Maple Valley Wye".
C-16
LOCATION Mil\PLE., VALLE`tt- oi-i\\/A:r \ + o SF -fl'( UN\ITS DIRECTION 60T•-1 (EACN)
DATE 507T e q, 10)$0
I ' ll ! , l : { I 111'i ! I 1 I I I j ' I I I I I i I I I I + I
1
1 '
r 1 , ' ' I
I , ! I II 111 1 ,
4. ( '
1 1 1 , ; 1 . ' 11 4 1 ; ` 1 1 .
iI H I I 1 1 44-
STRaQUW I Ij •• j ,
Lji I 1 idIII II
tftrT 1i- --;-----
1
i I i ! I ;
I r-1
f L : ! ! i
1
t, I 1----i-t-i--1-4 . , 4. I. 1-• --',t-,-f- t_...._ —,..... . ___:.......• 1—•
i rI • i i 11 j , I j j ,
1 j i i
1 I
I, I r r
l• "'_-fir-7- 1 .}-. r ' ' i JL fl6001_ , i1 i I
1I
1 I
I
I 1 1Ii , : , , 1 'I
1 1:1 •• i 1
Sop
I
i/ I i 1
1 I I 1i 1 i1 • I1 1 ,
i
I I i IiI ' I ' 1
I lit 11 i I 1; 1_. y I . I.
1 2 3 4 5 6 7 8 9 10 11/1 2 3 4 5 6 7 8 9 10 1J. I !
A.M
NOON`
P.M.
SUPPLEMENT TO APPENDIX C
SUPPLEMENTAL TRAFFIC ANALYSIS FOR ERADCO P.U.D. - MONTEREY TERRACE ASSOCIATES
The major volume of trips generated by the proposed ERADCO PUD will
be destined to/from the west on N. E. 3rd Street, provided that the access
road connecting the development to N. E. 3rd Street is the sole access.
The initial traffic analysis for the project concluded that approximately
32% of all trips generated by the project will use N. E. 3rd Street west
of the access road connection.
Virtually all of the traffic going to/from the project on N. E. 3rd
Street will proceed through the intersection of West 3rd Street and Sunset
Blvd. N. That intersection has been observed during morning and after-
noon peak-hours and a capacity analysis has been conducted to determine
the peak-hour performance of the intersection with and without the proposed
project. The capacity analysis has been done using the methods and
data as provided in the nationally recognized "Highway Capacity Manual",
1965 Edition.
The capacity analysis has been confined to the intersection of North
3rd Street and Sunset Blvd. because the.trips forecast indicate that few
trips will proceed east from the proposed development and the traffic
impacts beyond North 3rd Street and Sunset Blvd. North will become
negligible. The turning movements discussed below indicate that the
traffic from the development will be fairly uniformly still between
using the south leg and the west leg of the intersection.
Figures 1A and 2A show the results of morning and afternoon peak-hour
turning movement counts. The data shown thereon was derived by separately
counting each approach and combining the turning/through percentages with
the current count data, as supplied by the City of Renton, to derive the
turning/through volumes.
The intersection was analyzed with and without the effects of the
proposed project for "level of service 'D'" and with the effects of the
project for "level of service 'E'". Level of service 'D' is defined in
the HIGHWAY CAPACITY MANUAL as "approaching unstable flow" and level of
service ' E' is defined as "unstable flow. " Level of service ' E' is
considered the actual capacity of an intersection and is characterized
by a condition where all critical movements in the intersection are fully
loaded and most motorists will wait an average of a full cycle to move
through the intersection. Level of service ' E' is the typical operating
mode for intersections near major employment centers during peak traffic
periods. C-18
VEHICLE VOLUME F1C.tUPIE sA
GRAPHIC SUMARY SHEET
Location N 3 ST / SU i S T N_-(RE 4TGN)
Date 2 / 5 / S a
Weather Road Surface Conditions
6'
6-
eJ
TIME
CO From:30 OM
r
TO: 301
1 1
Inc.i oa,te North
9Mco
J
35$0
I 7(01 1524- F-44-4
Zc a
2 —
33 142 — 4-4
330 —
1 v
VEHICLE:3 COUNTED
CLASS DIRECTION in
i A11 1 I
Pass.
IComm.d- 0
Q'
Other
Remarks:
Compiled B;- D- -IAVJ
C-19
VEHICLE VOLUME FlcnuRE, 24
GRAPHIC SUMMARY SHEET
Locati - 3 SZ f SUNSET BLVD N {Re.t p•1 )Date 12 f 4/Bo
Weathe Road Surface Conditions
r
r
L TD
a' 0 from: 3:4. PN1
r TO: 4'.45 PM
Indicate North
LP M
J A
134
354 -- 1 E20 63G
60
224r1 - 4 2.29 5
3-
I gc 5 ab-' 9 53 -- 1659 I-630)
i I
VEHICLES COUNTED
N0 '(CLASS DIRECTION m vg
All U
Pans,
cI
Comm.r 0
Other I I
6—
c.l
Remarks:
Compiled By D, 1-46ML111
C-20
Figure 3A shows the estimate of new trips in the intersection that
will be generated by the proposed project during the morning and afternoon
peak hours. These volumes were developed by applying the existing
turning characteristics to the estimate of trips generated by the proposed
project.
Figure 4A shows a tabulation of capacity factors for the intersection
of North 3rd Street and Sunset Blvd. North under a variety of conditions.
Rows 8, 10, 14, and 16 show the results of capacity analysis at level of
service 'D' with and without the effects of the proposed project. The
morning peak-hour analysis (rows 8 and 10) show that the intersection
is presently 18% over-capacity at level of service 'D' and the new trips
would increase the capacity deficiency by 6%. The afternoon peak-hour
analysis (rows 14 and 16) shows that the intersection is presently 7%
under-capacity at level of service 'D' but would be 1% over-capacity with
the new trips.
Rows 12 and 18 show the results of capacity analysis at level of
service 'E' with the effects of the proposed project. The morning peak-
hour analysis (row 12) indicates that the intersection will be 6% over-
capacity with the proposed project which indicates that the intersection
is just at level of service ' E' capacity under existing conditions. The
afternoon peak-hour analysis (row 18) shows that the intersection will
be 10% under-capacity with the proposed project.
The intersection of North 3rd Street and Sunset Blvd. North appears
to operate at a somewhat higher level of efficiency than is implied by
the capacity analysis. This is probably due to the fact that the inter-
section is controlled by a fully-activated controller which is not
adequately accounted for in the capacity analysis technique. The
efficiency of the intersection could be further enhanced if the controller
were replaced with a more modern unit with "volume-density" features for
through movements on Sunset Blvd. North and if the detection locations
were re-engineered. This revision would provide an even more efficient
use of time in the intersection and would most likely allow the intersection
to continue to function at much higher volumes than is implied by the
traditional capacity analysis.
C-21
FIGURE 3A
PEAK -HOUR TURNINCa \O\EMEI4T5
C EW-ERL\TE) PAY PPPOPOSED ERAD CO
PUD PR03'ECT - RENr'OtJ
N 3'1) ST I SUN SC-,T gLV D IN
MOR 1 NCI PEAK HOUR
Z
Q
N 3'd ST 39
30
2.0 ee.
N,
A*- tRN 0ON PEAK-440UP,
Z
n
N 34 ST 61-
O2
39 r
c-2 2
The above analysis indicates that the proposed ERADCO P.U.D. will ,
in itself, have a relatively minor impact on the intersection. The
impact in the future will become even less, on a relative basis, due
to the natural increase in volumes that can be expected on N. E. 3rd
Street. It was estimated in the earlier traffic analysis for this
project that the traffic on N. E. 3rd Street will probably grow at the
rate of about 3.4% per year until saturation development is reached.
This growth rate would put the morning peak-hour volumes in 5 years
1985) at about 118% of the theoretical level of service ' E' capacity
without the project and about 123% of the theoretical level of service
E' capacity with the proposed project.
There are no practical physical changes that can be recommended,
other than those specified above, that will appreciably increase the
intersection capacity. The provision of a second northbound left-lane,
at the expense of one of the two existing northbound through lanes,
was examined but was found to seriously disrupt afternoon capacities.
The intersection of West 3rd Street and Sunset Blvd. North, as well
as all roadways and intersections in Renton, will benefit by the en-
couragement of carpools, increased public transportation services, and
most important, staggered work hours. All of the roadway facilities
in the Renton area have substantial excess capacity during off-peak
hours that can be utilized if the shift-break times in the Renton area
can be spread over longer periods.
C-23
FIGURE 4A
CAPACITY ANALYSIS
N. 3RD ST./SUNSET BLVD. N. - WITH AND WITHOUT ERADCO PUD
OVEMEN
Total Req'd Capacity Capacity41yyrlP. 44 4 Cycle Time at LOS "D" at LOS "D"
Capacity LOS "D" 1000 2880 1000 1000 2880 1000 4401 4401
Capacity LOS "E" 1200 3116 1200 1200 3116 1200 5036 5036
Exist. AM Vol . 385 574 13 444 130 328 *1687 *365
Exist. + Added AM Vol . 385 574 14 444 130 348 *1785 *874
Exist. PM Vol . 133 606 37 60 379 638 *724 *2013
Exist. + Added PM Vol . 133 606 39 60 379 677 *797 *2073
AM G/C LOS "D" (Exist. ) 0.38 0.20 0.02 0.44 0.05 0.33 0.38 0.08
AM Required Seconds Including
Clear. LOS "D" (Exist. ) 72 6/40 8 83 8 63 we 72 18 213 sec. 118%
CAM G/C LOS "D" (Exist. + Added) 0.38 0.20 0.02 0.44 0.05 0.35 0.41 0.08
AM Required Seconds Including
Clear. LOS "D" (Exist. + Added) 72 y/40 8 V 83 8 67 78 18 219 sec. 122%
AM CT/C LOS "E" (Exist. + Added) 0.32 0.18 0.01 0.37 0.04 0.29 035 0.07
CAM Required Seconds Including
Clear. LOS "E" (Exist. + Added) 62 36 6 71 11 56 i 67 17 191 sec. I 106%
PM G/C LOS "D" (Exist. ) i 0. 13 0.21 0.04 0.06 0.13 0.64 0.16 0.45i---
PM Required Seconds Including
Clear. LOS "D" '(Exist. + Added) 27 1 /4? 11 15 27 119 33 87 177 sec. ! - 98%
PM G/CLOS "E" aExist. + Added) 0.13 0.21 0.0 0.06 0. 13 -0.68 0.18 0.47
PM Required Seconds Including I
l Clear. LOS "E" (Exist. + Added) 27 42 11 15 27 1 122 /36 89 182 sec.101%i
PM G/T LOS "E" (Exist. + Added) I 0. 11 0.17 , 0.03 0.05 0. 12 0.56 0. 16 0.41
1PM Required Seconds Including
i Clear. LOS "E" (Exist. + Added) 24 38 j 9 13 26 105 33 / 78 162 sec. 90%
G/C = Green time/ to PM Cycle Length
Assumed Cycle Length = 180 Seconds
Left-Turn Volumes factored up 20% to account for inefficiency
Critical Phases
APPENDIX D
WILSEY& AM INC•Earl P.Wispy(1E192-1957)
Central Park Building Toll Free Numbers
1980 112th Ave. N.E. Everett 353-86.97
Bellevue,WA 98004
Tacoma 572-9982
Telephone (206)454-3250
February 25, 1980
File No. 3-373-0201-20
Mr. Stephen Klos
Environmental Research & Development Company
18000 Pacific Highway South
Seattle, Washington 98188
RE: PRELIMINARY SITE ENGINEERING, ERADCO P.U.D.
RENTON, WASHINGTON
Dear r•lr. Ki os:
In response to your authorization of February 4, 1980, we are pleased to
present herein the results of our preliminary study regarding utility and
drainage facilities for your proposed P.U.D. in Renton, Washington.
The following data has been developed through contacts with the appropriate
City of Renton departments, Puget Sound Power and Light Company, and
Washington Natural Gas Company.
1 . Water Supply
Water supply is available from an existing 16 inch main on Third Avenue
North, the static pressure in this main has adequate psi.
Service requirements for the proposed 425 units will be approximately
380 gpm for maximum instantaneous domestic flow (DSHS design standards)
and a probable 5000 gpm 2-hour fire, flow.
City of Renton requirements call for a completed loop from Third Avenue
North, one line along the east entry road and the other along Mt. Olivet
Way (Blaine Avenue N.E. ).
The flow requirements indicate that the primary loop will consist of
approximately 3000 feet of 12 inch along fait. Olivet Way and along the
east entry road. Both connections to the existing main will require
street crossings of Third Avenue North.
engineering/planning/surveying/environmental analysis/landscape design
Offices located in: Bellevue Washington •Tacoma Washington • Portland,Oregon •Foster City,California
Mr. Stephen Klos Page Two
Febriary 25, 1980
There is an existing 12 inch main on the Maple Valley Highway to the
south, about 250 feet below the site and in a different pressure zone.
This low pressure and the anticipated expense of laying pipe up the
slope indicate this line to be inadequate for supply to the site.
Additionally, the existing water system in the Monterey Terrace area
is all 4 inch pipe and inadequate, if access were possible.
2. Sanitary Sewers
Sanitary sewer service is available from an existing METRO 42 inch trunk
sewer on the Maple Valley Highway. Connection to this sewer will require
the construction of an 8 inch line down the bluff along the southwest
side of the site, and across the Maple Valley Highway (SR-169) . This
solution will provide an assured connection, however, the outfall down
the bluff will be expensive construction and, at least temporarily,
iisruptive to existing growth and ground cover.
Along the west side of the existing Monterey Terrace subdivision, north-
Nest of the project site there is an existing sanitary sewer which is
terminated near the west corner of the site with a 243 foot run of 6
inch sewer. Hydraulically this sewer is adequate to carry the flow from
the project, however, City requirements call for a minimum 8 inch sewer
size for all but minor services. If suitable right-of-way could be
acquired from the owner of the property at the terminus of this sewer,
this connection, although expensive would be preferable to a sewer line
sown the bluff to the Maple Valley Highway. If demanded by the City
and access is available through the rear yards of adjoining property
the final 243 feet of 6 inch sewer could be reconstructed as 8 inch
sewer.
A third alternative and also the most economical would be a connection
to the existing 8 inch street sewer on Monterey Drive near the north-
nest corner of the site. Access to this sewer would require a right-
3f-way along the side lot lines between houses on Monterey Drive for
a distance of about 100 feet. With care during construction and re-
storation of existing landscaping this route would appear to be the
most desirable alternative to provide sanitary service to the site.
A question has been raised by the City of Renton as to the adequacy of
downstream sewers (near I-405) in this system to carry the additional
load of this project. No data exists to indicate a lack of capacity,
however, the City will probably require some verification of adequacy
prior to allowing connection through the Monterey Terrace system.
3. Storm Water Runoff
Storm water runoff from the site must be collected and discharged in
accordance with the "Renton Storm and Surface Water Drainage Ordinance"
Ordinance No. 3174) . This ordinance basically restricts the peak
discharge of storm water runoff to no increase due to development of
the land. It is estimated that the existing peak runoff rate, from
the undeveloped site, under the influence of a 1 :10 year frequency
D—2
Mr. Stephen Kl os Page Three
February 25, 1980
will be approximately 4.5 cfs and under a 1 :25 year frequency storm
approximately 5. 3 cfs. After development these peak runoff rates will
increase to 22.2 cfs and 27.6 cfs respectively. Detention facilities
will be required in the 25 acre developed area to reduce the 1 :10 year
frequency flow rate to predevelopment levels, however, collection at
the final discharge point leaving the site should have emergency
capabilities of passing flow from a 1 :25 year frequency flow.
For purposes of preliminary analysis and cost estimating a conceptual
collection and detention system was laid out on a preliminary site
development plan. This system is shown on the attached drawing. The
system as shown provides for conventional underground collection from
paved and street areas feeding into over-sized pipes and depressed
landscape areas which serve as detention facilities. The outlet to
each of these four detention systems contains a throttled outlet to
reduce peak outflows to required predevelopment levels and also
provides oil separation prior to discharge.
The required storage capability for the system, in conformance with
Renton Ordinance is approximately 24,100 cubic feet. The plan as shown
places approximately 11 ,300 C. F. in underground storage with the remain-
ing 12,800 C.F. accommodated in surface storage. Final design and close
coordination between drainage design and final grading could vary this
ratio. Open ponding in landscaped areas should be provided on gentle
slopes and planted with material resistent to periodic short term
inundation. More intense use of parking areas could also be achieved
in the grading design. Because of the lack of overflow capacities
for storms in excess of the design storm (1 :10 year) some infrequent
surcharging of the open pond areas should be anticipated in pond
design and extra discharge capacity provided in the outfall line from
the site. To accommodate this possibility the outfall has been sized
to carry the allowable outflow from a 1 :100 year predevelopment con-
dition of 6. 9 cfs. It is suggested that a surface flume, properly
supported and screened, along the slope might provide the most
advantageous outfall with the least amount of disruption to the exist-
ing ground and ground cover. Special care will be required to
dissipate the water energy at the bottom of the slope prior to dis-
charge into the existing ditch system along the Maple Valley Highway.
Attached is a preliminary cost estimate of the conceptual collection
and detention system as shown on the attached drawing
4. Electric Power
Three-phase electric power is available along N. E. Third Avenue at
the entrance to the site, from Puget Sound Power and Light Company.
A looped service (underground) would be provided for the site along
the east entry road and along Mt. Olivet Way (Blaine Avenue N. E. ) .
Developer cost of this service would be based on estimated revenues
from power users over the first five years of installation. If
estimated 5 year revenues equalled or exceeded the construction cost
there would be no developer cost for the service. If estimated 5
year revenues were less than construction cost, the developer cost
would equal the difference.
D-3
Mr. Stephen Klos Page Four
February 25, 1980
5. Natural Gas
Natural gas supply from Washington Natural Gas Company is adequate and is
available from an existing 8 inch high-pressure main in Northeast Third
Street or from an existing 4 inch high-pressure main at the bottom of the
bluff near the west corner of the site. The choice of the route, by
4ashington Natural Gas Company, will depend upon the availability of
easement rights up the bluff and the alternative costs of providing
service along Mt. Olivet Way (Blaine Avenue N.E. ).
There is attached hereto a composite site area map showing the above described
utility facilities affecting the site development. Additional details of
specific locations, valving, grades, etc. are available at such time as your
site planning becomes precise. At such time as you are ready to begin final
desiln for the site we would appreciate the opportunity to be of further
service to you.
Very truly yours,
WILSEY & HAM NC.
Dick Reeve P.E.
Senior Associate
DR/l j r
Enclosures: Preliminary Drainage Study Map
Drainage Cost Estimate
Site Area Utilities Map
cc: The Mithun Associates
D-4
STORM DRAINAGE
PRELIMINARY COST ESTIMATE
MONTEREY TERRACE
ITEM APPROXIMATE ESTIMATED TOTAL
QUANTITY UNIT COST COST
12" SD pipe 2,960 L.F. 12.00 35,520
15" SD pipe 650 L.F. 16.00 10,400
18" SD pipe 260 L.F. 20.00 5,200
24" SD pipe 700 L.F. 28.00 19,600
36" SD pipe 1 ,290 L.F. 40.00 51 ,600
Type I C.B. 21 EA.700.00 14,700
Type II C.B. 7 EA.1 ,000.00 7,000
48" M.H. 1 EA.1 ,000.00 1 ,000
54" M.H. inlet 4 EA.1 ,500.00 6,000
54" Outlet M.H. 4 EA.2,500.00 10,000
72" Outlet M.H. 1 EA.3,500. 00 3,500
Type V Lake inlet M.H. 5 EA.1 ,000.00 5,000
Drain swale 2,250 L.F. 5.00 11 ,250
Pond grading L.S. 9,000.00 9,000
18" outfall flume 360 L.F. 70.00 25,200
with anchors
Energy dissipator L.S. 7,500.00 7,500
Rehab. slope L.S. 5,000.00 5,000
Total 227,470
15% Contingency 34,120
261 ,590
D_5
APPENDIX E
STATE OF OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION
WASHINGTON7I 111 West Twenty-First Avenue,Olympia.Washington 98504 206/7534011
Dixy Lee Ray
Governor
Date: February 20, 1980
DeborEh Krouse In reply refer to: 114-C-KI-14R.W. Thorpe & Associates
815 Seattle Tower 3rd & University Re:
Seattle, WA 98101
Dear applicant:
We have reviewed the project materials forwarded to us for the above project andwouldliketomakethefollowingcomments:
Invufficient information: We will need: a detailed narrative of the project
elements; a vicinity map; a map of the project site and surrounding areashowingtopography, drainage, specific project boundaries, and indicatingCounty, Section, Township, and Range; line drawings of the project; photo-graphs of structures to be renovated or demolished.
X No resources known: No properties are listed in the National or State Registers
of Historic Places or the State Inventory of Historic Places which may beimpactedbytheproject. Properties include archaeological and historic
resources.
Project area has/ has not been surveyed for cultural resources.
Potential effects on unidentified resources: There is reasonable probability thatculturalresourcesexistintheprojectareas. A cultural resources survey/
monitoring of the project area is recommended as part of project construction.
Res,urces present: no effect/ effect uncertain; see below for comment.
No adverse effect/ Adverse effect on National Register property. See below for
comment.
XX In :he event that cultural materials are disclosed during construction, work in
the immediate vicinity should be discontinued and this office notified.
Sincerely,
JEANNE M. WELCH, Deputy State
Historic Preservation Officer
Sheila A. Stump, Archeologist
and
Comments: Please provide project name.
arm AHP R-5 (Rev 1/79) 3
I
DECLARATION OF RESTRICTIVE COVENANTS
l
APPENDIX F
WHEREAS, Kent Highlands , Inc . , successor by merger to Stone-
way Concrete , Inc. , a firm incorporated in the State of Washington ,
is the owner of real property in the City of Renton , County of King ,
State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
CVRange 5 East, W. M. described as follows :
400
Beginning at the southwest corner of the southeast one-
CD quarter of the northeast one-quarter of said Section 17 ;
CDthence north along the west line of said subdivision a
c7 distance of 252. 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the east line
of Section 17 ; thence south along said east line to the
east one-quarter corner of Section 17 ; thence continuing
south along the east line of said section to an intersec-
tion with the northerly right-of-way line of State Road
No. 5 (St. S. R. #169 ) (Maple Valley Highway) ; thence in
a general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence south 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning.
WHEREAS, the owner of said described property desires to
irinose the following restrictive covenants running with the land as
to use, ?resent and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant, and impose restrictions and covenants running with the land
a<_ to the use of the land hereinabove described with respect to the
u! e by the undersigned , their successors , heirs and assigns , as
fc l l ows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , (Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton. " A master development plan for the entire
property as described above shall be submitted to and
approved by the City of Renton pursuant to the abovemen-
tioned ordinance prior to preparation of specific develop-
ment plans .
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-
r-_
five ( 35) feet when located within the westerly 1100 feet
of above described property as measured from the northwest
corner along the north property line ( including Parcels. A
and B, as noted on attached Exhibit A ) .
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway (SR- 169) , indicated as
greenbelt on the City of Renton Comprehensive land Use
Plan as revised May 17 , 1972 , shall be retained in its
natural state. No buildings , structures , roads , drive-
ways , or parking shall be constructed in said greenbelt
N area (Parcel E, Exhibit A) .
C
CDACCESS
A primary access street shall be provided to the site
from N. E. Third Street, subject to City of Renton approval
of its design and location as part of the total develop—
ment plan. Access to existing Blaine Avenue N. E. shall be
for emergency purposes only. A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N. E. subject to Renton Traffic Division and
Fire Department approval . Installation of appropriate
traffic control devices ( including channelization, light-
ing, signing and traffic signals ) at N. E. Third Street
will be provided by the property owner and/or developer
when required by the City of Renton .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted
by the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two (2 ) years and substantial construction begun
within three (3) years of the filing of these covenants ,
and said construction and development diligently prosecu-
ted toward completion thereafter, the zoning of said
property shall without further City action revert back to
the zoning which existed prior to the filing of this docu-
ment, and these restrictive covenants shall become null
and void. The term "substantial construction" shall mean
the physical alteration of the land for construction pursu-
ant to City approved development plans as per the above-
mentioned Planned Unit Development O-dinance and a valid
building permit, or construction of required utilities for
such development. The abovementioned time periods may be
extended for reasonable cause upon written request to and
of approval by the Renton Planning Department . Such reason-
able cause shall include , but may not be limited to, the
requirement of an environmental impact statement pursuant
to the State Environmental Policy Act of 1971 .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
111 ing subject property who are adversely affected by said breach .
r IN WITNESS WHEREOF the parties hereby affix their hands this
Y
day of - I-,. e i a:ii 19•J f .
Cr)
C3 KENT HIGHLANDS , INC .
w,
r
B
President
i
By i f •-17 _ L_
Secret'- ry
1-
STATE OF WASHINGTON)
COUNTY OF KING
On this_.2 2 447 day of /- ,Ca ,g - r 1977 .
before me personally appeared f2?/J rcui , j and
cl C1 A',tzAzi,v to me known
to be the t,?,__ec' - '-'(--s.1 sac ,..•, and ._._Tc c•a•, ',zee
respectively, of KENT HIGHLANDS , INC . , the corporation that executed
the within and foregoing instrument , and acknowledged said instrument
to be the free and voluntary act of said corporation for the uses and
purposes therein mentioned , and on oath stated that they were author-
ized to execute said instrument and that the seal affixed is the
corporate seal of said corporation .
IN E'!ITNESS WHEREOF, I have hereunto set my hand and affixed my
official seal the day and year first above written .
Q1_" _ ,
F-2 Notlry Pu i cc in nd for the State o£
4J a s h i n g t dui , r e s t ing at --_)-.=f 4_4.J t 4 7—c t
APPENDIX G
VILSEY& HAM INC.Earl P Wilsey(1892-1957)
Central Park Building Toll Free Numbers
1980 112th Ave. N.E. Everett 353-8837
Bellevue,WA 98004 Tacoma 572-9982
Telephone (206)454-3250
August 22, 1980
File No. 3-373-0201-20
Ms. Deborah Krouse
R. W. Thorpe & Associates
815 Seattle Tower
3rd and University
Seattle, Washington 98101 RE: ERADCO P.U.D.
Dear Ms. Krouse:
With reference to your letter of August 6, 1980 regarding comments on the
preliminary draft EIS for ERADCO, I believe the following information will
satisfy the questions.
1 . A statement that on-site detention in conformance with the Renton Surface
Water Run-Off Ordinance should suffice for the EIS, however, it may be
appropriate to mention the following:
a. Estimated detention storage requirement for a 1 :10 year storm is
24,100 cubic feet which is proposed to be accommodated by 11 ,300
C.F. in underground pipe storage and 12,800 C.F. in open surface
ponding in landscape depressions and parking areas.
b. Although the normal discharge from the detention system should be
restricted to a predevelopment peak rate of 4.5 cfs (1 :10 yr. ) ,
self-operating emergency facilities should be capable of passing
5.3 cfs (1 :25 yr. ). The outfall to the Maple Valley Highway should
be capable of passing a 1 :100 flow if necessary although this
occurrence could probably be handled through increased surface pond-
ing in the system. I believe this configuration would assure pre-
vention of uncontrolled overflows down the bank.
c. I believe interim protection during construction should be achieved
through partial construction of the storm detention system, (i .e. the
outfall and lower portion of the detention system utilizing the open
pond areas as silting basins). Also, drainage swales along the top
of the bank should be part of this initial system. The logistics
of this interim construction will depend on the construction phasing.
Erosion prevention for construction in the greenbelt must also be
accommodated in some manner by the Contractor through timing, jute
matting, hay bales, ponds, etc.
engineering/planning/surveying/environmental analysis/landscape design
Offices located in: Bellevue Washington •Tacoma Washington• Portland,Oregon •Foster City,California
Ms. Deborah Krouse Page Two
August 22, 1980
2. The object of the detention system is to reduce peak rates of outflow
not total volume. As long as the peak rate of outflow is contained
within pre-development values the existing system on the Cedar Valley
Road should be satisfactory, as long as adequate energy dissipation is
achieved.
3. It is suggested that although the completed project surface will be more
impermeable to the entry of groundwater this will be mitigated to some
unknown extent by use of open storage ponds in the drainage system and
within landscaped areas.
I hope the above will provide the necessary responses for this document.
If you have any further questions please call me.
Very truly yours ,
WILSEY & HAM, INC.
Dick Reeves, `'D. E.
Senior Associate
DR/ljr
G_2
OF I
N THE CITY OF RENTON
U ty © Z
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
o .BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
9 v 235- 2550
o,
9g7E0 SEP E0
January 30, 1981
Dear Recipient:
RE: DRAFT ENVIRONMENTAL IMPACT STATEMENT
ERADCO - PLANNED UNIT DEVELOPMENT
The attached draft document is submitted to you for your
review pursuant to the City of Renton Environmental Ordinance
and the State of Washington Environmental Policy Act of 1971 ,
as amended, RCW 43. 21C.
Approval has been requested by the Environmental Research
and Development Corporation to subdivide and develop approxi-
mately 41 . 5 acres for multi-family residential use in the
form of a Planned Unit Development situated north of SR-169
Maple Valley Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery, and west of the Bonneville Power Right-of-Way.
Please direct your written response to the Planning Department
within thirty-five days, or by March 6 , 1981 , in accordance
with local and state SEPA guidelines.
If you have any further questions, please contact the Renton
Planning Department at 235-2550.
Ver truly yo s
1 eL6-ram
avid R. Clemens
Acting Planning Director
DRC :wr
Attachment
FINAL
ENVIRONMENTAL
IMPACT STATEMENT
ERADCO
PLANNED UNIT DEVELOPMENT
JUNE 1981
Y O
0 „
ti
Nr-cO City of Renton
FINAL
ENVIRONMENTAL IMPACT STATEMENT
FOR
ERADCO
PLANNED UNIT DEVELOPMENT
Prepared For The
CITY OF RENTON
RENTON PLANNING DEPARTMENT
RENTON, WASHINGTON
By
R. W. THORPE AND ASSOCIATES
Prepared in Compliance With
The State Environmental Policy Act of 1971
Chapter 43.21C, Revised Code of Washington, as amended
SEPA Guidelines, Effective January 16, 1976
Chapter 197-10, Washington Administration Code, as revised
City of Renton Ordinance #3060
TABLE OF CONTENTS
INTRODUCTION ii
DISTRIBUTION LIST iv
LOCATION MAP vi
VICINITY MAP vii
AERIAL PHOTOGRAPH viii
SITE PLAN ix
COMMENT LETTERS
Written Comments from Governmental Agencies and Public Utilities and
Responses to Comments
1. Washington State Department of Ecology 2
2. Puget Sound Air Pollution Control Agency 4
3. King County Department of Budget and Program
Development 8
4. King County Conservation District 12
5. City of Renton Building Department 16
6. City of Renton Public Works Department 18
7. City of Renton Police Department 22
8. City of Renton Engineering Department 28
9. City of Renton Fire Marshall 33
10. Municipality of Metropolitan Seattle 35
11. Puget Power 38
Written Comments from Neighborhood Residents, Community Groups and
other Interested Private Parties and Responses to Comments
1. Mr. Ray Barilleaux and E.B. Brady 41
2. Mr. William L. Cokely 43
3. Malka Fricks 45
4. Mr. Richard M. .Houser 49
5. Mr. D.A. Hogan. . . 51
6. Mr. William Pitt 53
7. Mr. Theodore H. Gathe 55
Letters Not Requiring Response
1. United States Department of Interior 59
2. Washington State Department of Archaeology and Historic
Preservation 60
3. Washington State Department of Fisheries 61
4. City of Kent Planning Department 62
i
INTRODUCTION
Action Sponsor:
Environmental Research and Development Corporation
1115 Sea-Tac Office Building
18000 Pacific Highway South
Seattle, WA 98188
206) 244-0080
Proposed Action:
The Action Sponsor has requested City of Renton approval to subdivide and devel-
op approximately 41.5 acres zoned for R-1, R-2, R-3 and R-4 into up to 425 units
for multi-family residential use in the form of a Planned Unit Development.
Project Location:
North of SR-169 (Maple Valley Highway) south of Monterey Terrace and Mt. Olivet
Cemetery and west of Bonneville Power Right-of-Way. Access to the site is from
the north via N.E. 3rd St. (Cemetery Rd.)
Lead Agency:
City of Renton
Responsible Official:
Renton Environmental Review Committee
Municipal Building
200 Mill Avenue South
Renton, WA 98055
206) 235-2550
Environmental Review Committee Contact Person:
David Clemens, Acting Planning Director
206) 235-2550
Authors and Principal Contributors:
This EIS was prepared under the direction of the City of Renton Planning Depart-
ment; research and analyses were provided by the following firms:
Environmental Analysis and Document Preparation:
R.W. Thorpe & Associates
815 Seattle Tower Building
Third at University
Seattle, WA 98101
206) 624-6239 Contact Person: Deborah Krouse
ii
The Mithun Associates (Architecture and Site Planning)
2000-112th Avenue N.E.
Bellevue, WA 98004
Contact: Jim Bodoia)
Earth Sciences (Soils Engineering)
Box 126
Hobart, WA 98025
Contact: Jim Eaton)
Mr. David Hamlin, P.E. (Traffic and Circulation)
1900 South Puget Drive
Suite 210
Renton, WA 98055
Contact: David Hamlin)
Wilsey & Ham, Inc. (Drainage Engineering)
Central Park Building
1980-112th Avenue N.E.
Bellevue, WA 98004
Contact: Dick Reeves)
Location of Background Data
R.W. Thorpe and Associates
815 Seattle Tower
3rd & University
Seattle, WA 98101
Renton Planning Department
City of Renton
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Licenses and Permits Required:
Draft and Final EIS approvals, preliminary and final Planned Unit Development
approvals, engineering planning/construction inspection approvals, water and
sewer hookup permits, grading permit, building permit.
Cost of Document: 3
Date of Issue of Draft EIS: January 30, 1981
Date of Issue of Final EIS: May 28, 1981
iii
RECIPIENTS OF THIS DRAFT ENVIRONMENTAL IMPACT STATEMENT
Federal
Environmental Protection Agency
Department of Housing and Urban Development
Department of Energy
Army Corps of Engineers, Seattle District Engineer
Soils Conservation Service, Department of Agriculture
U.S. Department of Interior, Fish and Wildlife
State
Governor's Office
Office of Program Planning and Fiscal Management
Department of Ecology
Department of Fisheries
Department of Game
Department of Transportation
Department of Social and Health Services
Ecological Commission
Office of Archaeology and Historic Preservation
Office of Public Archaeology, University of Washington
Regional
Metro - Water Quality Division
Metro - Transit
Puget Sound Air Pollution Control Agency
Puget Sound Council of Governments
Seattle - King County Department Public Health
Local Government
King County Department of Public Works, Hydraulics Division
King County Building and Land Development Division
King County Planning and Community Development Department
King County Soil and Water Conservation District
City of Kent
City of Tukwila
City of Seattle
City of Renton
Mayor
City Council
Hearing Examiner's Office
Planning Commission
Public Works Department
Parks and Recreation Department
Police Department
Fire Department
City Attorney
SEPA Information Center
iv
Utilities/Services
Renton School District #403
Puget Sound Power and Light
Washington Natural Gas Company
Pacific Northwest Bell
Libraries
Renton Public Library - Main Branch - (3)
University of Washington Library, College of Architecture and Urban
Planning
King County Public Library System
Newspapers
Seattle Times
Seattle Post-Intelligencer
Daily Journal of Commerce
Renton Record Chronicle
Private Organizations and Others
Seattle Audubon Society
Greater Renton Chamber of Commerce
Ranier Audubon Society
Monterey Terrace Community Club
Mt. Olivet Cemetery
Stoneway Sand and Gravel Company
v
f I
r i P / i I-5
14
1/4'),., \
k\
1
0° --°••••-if ...id
t l:.' : AT . L- LAKE
i'
v
AMMAMIS Hii1l 1 71)1
I,gD
J '` iTLk, v
5
11
1`
f '
w RENTON
J l it• SITE
i UKWILA• 405
76
t
1,,,,0
LAKE
1YOUN
G
i APLE
i ti VALLEY
r
0KENT O
F
s .,. ,
S 7e
li s f
al
BLACK •
11 N 49 AUBURN DIAMOND
A _ N.
t _ rt
t
f
FIFE
1 TACOMA
4. ,s... ,
Mill
I. LOCATION MAP
ERADCO P.U.D.
NORTH R. W. THORPE & ASSOCIATES
vi
is
t.
C.'11._ 1
t,
4. Illy47,`
s' II RENT
W AIRPO••T t..
z 1
ci
IXN.E. Ziti
N.
EN.1
TY`-
a /. .
MT OLIVET
AL • ra CEMETERY
y 9 ENTON r-
iramC.
AR 2 I SITEOR/LO
SA9 a
4
sq
70
immiiik!if
fi
7
k 4 )
1 GRP
til
e
co
APPROX. 'I MILE TO
VALLEY GENERAL
HOSPITAL
1
z 1 NOISE MONITORING LOCATIONS
2.VICINITY MAI
CIRCULATIC I
USGS BASE 'I" = 2000' ERADCD PLI E
NORTH R. W. THORPE & ASSOCIATE
vii
a
s 11 M ?' " Ig" .N " a
sue s :. T;1" .ry
A
wti`o
F ': 9b„ 1.}y: . i, t t;$
3,. P gy w4 j li
p
t tQ.
G• 5, Y+ '•
Y •
4
a`
g'Ik}:,
IT j t di.
j t F?
AYE:, Al d
gg •y `,d Yt' eft h 4 7. Yi F•a, s,
Oa' t•
E
w+.+r ,1 aw nrY t.x: gY b i z d `4g_ e 59 r r
r t kscataw.» 104.4,,,,,
g 3a> =i`'.' n s ' 2r" :, a v,2d 't .". :b :fir''"
11:4') 4*
a 14
4ayYtifi c br • f .
2 a g r - '4 ..
71 8r Fci z xYhAt s q? CCten'.
k'' 4. "
1-"
X f.'GII
a „
r
ar sr
y;: 'i qc a
tiiii- 1^e as 4;..Ft' t. _ .•a. "'.
a .; ; ;gtF'"x'- A"r'• F.3•p", ,. "
44'
x
4411 .
t a..r
L e
a _f
k ' fi
a' va'.Ss €
a•
kilt :'•:'‘ '.-ii.iiiii•' *--g,?,.;g4t,as',# '' ' •'•••:4: '..'' ''''' '''''''' '' ....,... . ..., .,•-• ,,
144-_7. 3:1/4.T,, ,..,,, ,i,.,,,.: 1,k-Z. A.' *4:t. 4.4
T, ,,,,.,t:,,,'„',. .,,
i,;‘,,'''
rs.
4,
4,' • -a, -
A •:" -s-rt,44rftwf,,r"'' .. -.- -.• ' ':1;.4:.•:4-:
TZn y 2: 11';:::::.:1".
v..,:
1,:::•;;:.1.1tti 71:V• .4V't:71:''''-'7.117"-::'r,yr...y
a[ a? Z J,,• F
y 'gy., t
gby. i :.•
yl/n,
t e 'r LS..<
F : £
F ( ':
9: y 'e
T' ST .kA'
k.
ro.,3,,, „,,,, ..
Y {.'.
s.f•>; r ;, tf $,s .'+3 =
L .. ‘ f i,wa hs.. x ,
3 ` s
kl r:Z
Zy m 2 k '`^.` y ..:
t „
SSE
L
z F'' C: i yppc. ; x ,
c ','
g.
a
x +3At
a. w.r a,.„,.. fir
F .,
H. 4
j 6y.
If
e.. ..fit. cs 1 4 .a
Alwii- )
1.H.
i.i s
7
i..' .# a `
a`,
R n r m a
u'L
r
iil:.r 14
ti ' :. w
t '
S? •k a art C: S.., i
n. .....,..„-.
1,-z!;.*:-..,4,,„!...;„
4.,.. ..i.,
m ,f., . Zkey , b O`fu 4-" 'h
t• N''' '' 11'
es!>
T>i°n ..
S, . ;' ,, '
t
yY
1 f `"' -.- xe, .yP"'II ,,,,
tea' Rd
L r '. #t
n
SC ".v iM 0. "3
h
x
V 3 1 .
h'
id 4a
s, ',,,..
m
A s'
Ty i,
i.. s a .ei .FL ..*. '{,
i : ;; .sr
y
tom ,. j ;jxs zee .L` tyS4
4 f '''
s ry^i+',,p; ^'
a " `F . '. ,,-.
r.1a.
A'"=
4 . '
ttik '' s';,.
xt'L" r` '';SRlJ:. :i tie t.t n r i,. 3+ ;., " w.•.ss:"
D t + t ii "
r+ z sr
Fitt rg aiI` & oiltit
f^
eRr?AtisA
i
11
S Sr" *n •
S :
3 A :.Fc ^. ,
COW
f
j
Y'` 3 jr t
l R d.
i
F6`• 3'*A
Itgi
hi'',1 11:1D
J xY 1 ram- i "
E
a a.• a5.
N. 3':
I —I
vi.ax?.3 ' sae rylCt# .3i :. R .fit'. #- w : i
AAiI:NO tglt:iI7 0lI41%MtOfrverann
taf
pevalppment Corporation
55484t*
raur=c nwaw•r wv+.•KA1ru WA
6 _ C
IMMO AMIN laiiia Atiail Akita/ illiiii• Aiiii.i gal/WA MAi.àmufti; aia...... 11.11 - ariiric imAiLai i...iiii• Am..
I
THE EllOTHUN ASSOCOATES ° ARCHOTECTS2000112THAVENUENE.BELLEVUE. WASHINGTON 96004 454 3344
eradoo Aucl a
i
AI
4.\\/ 7-Tdri ms__,/C 11N. VintalikEiC, ,li t-..' n•-•"--- --:•••-•.r. - ., - 7.---4-,-.-4:41•
30 '
1 f', 1
itin4.....-:' ,--,f."' ,,,"-... --,„-• - • • NILM.4,1/40;11` till 544tnt4,47:0,11k6 -;Z,-- -/iiilk 2/.' • ' I
e,-Ammo . _,,,e,...' r" . :,: - .'' . .•
0. -, •
11.1'7:3 41,11 P r" ..•'tryp:lin'c';1:7..."---••
e /1//,,-; •I - . 1;;Ips.nifii: 7 ,,,,,'"-4. ./.,', ,• • , .rl'M Ile •-": `,.._,_
a .Lit,/ ..A.0,
1%
y. - //•____----..4....----
rottee..-ip,..7,0---7,0
i I '., ,_,,, 0 vv. idat,w.;* _014.4%,, --//-:.---..-... ......,,.//i,IV4--- J./40,T., - l'i - se(6q2ar____,,.: . 'a - .....-3,,%.*' *Wit'• , 72.•.‘ '..../ / •
I (.........lkc'.- °
I \! f\;.* •`•
1 1 r ii."..-11111111/11iW'.- ....0 i) r"---3,"------•illitale" ,.9/ • .----.\-1 'A'1 0 -..' ,- .3, \ I, P , °
i4V-.47,4,---4,:i--,---;° .., '
t!., ,
i'l-.
1 ...• ..,";.. - ,
1 t '7,1 'llatilr4111 le"'•
a.•- • -- /I01-1111:1A.. ..g i
e ! :43.,?1111:!1. .„., .. ge.,. -. 1 /i,, r----s.\ 1.. -\ . . ......1(, ,,.
rj,
i.'0 -,113, - '''.... #o Tim,: .•" ., • .. ,::..-,, .., • I
i /.
C.,,,-. . tiill ‘ allimm I, a.7 It I •••:„. ' stseJ. '„
i. ,‘\._,.;c1 gt, . • ,11. ., 1:
1 % • z. .:
11..----- A'
1.:
s' :\'‘‘Ii 41•- - 5A/ / )'lic-: . , ' .‘ N.\,\ -N.., •. . . ...----- -IA ---7.-- ''' ''''''''''''''''.'.1,' 72B14. -e;‘..1 ! / */ ' je1Silaailse;....-..., i ofigo: IV.). 0„ ,, ' ' -
i'
1 ' '
s: k. • ., • .4. -.
I 1 ' \ Q• 1\. ‘•\.1.;k •• ...' 17:i t.:1 ze...• ,,,2 r . • /. ___ _____,.,
1 . .1 \ \\',1\,\ .: :S' l'
1 11 01 i• I\ \,,•;,‘• S\C?1, ti., ::: A•\.. ' _.,.(r •.) 4 ,„ .4y•-!t A.A.'4:11414 itti$4.0,,;/,,.,,y , /,/ / _.,,,,,,-; -,_ III. \I.--;\.. 1. • A ... t ,,• or? t• ..,. .4%.-:•., . t'D ..... .•
7:7-.......1L-- mi.. ,. \.:N .. ,.::\ ,
ci•A'f4.7 '`'I I • ''. tf-4 i A'4., .- -- ,--•a ;..---- ..,.., ,,,,,„.. 0. . , do..tf. 1:fr„,,,t, . _,.-.', 1:--;
t,.... , ,....,,„ . ....., •
s‘,... n_r_,.._•_-_ _____ , -----____,i, 11,._;,.., „• • 1••••,/„. ... 0 , . , •••, . , .;. , vc-_-1,1„J 1.___H...,JL_., ou,..., Q .4: 1. • !-Iiti, ...k. 9 v e.r.',-- .../, • • 1.„....--..- -
33 11\.•\.t \ ( ii)). 44'..."„„,....., jr-,14,1 .. -10+4,
4°
f/ ./----- ..-- t_ \:::::----. - '5- •• . __ -- -
1,, ip-' 44410 ;44/ _... '
i/./..`".so; f D
M
s•\.,1 \- ( ,',//' . (I . diPs t-it:iJE:ic •I-13• 0 -,f -
1 - S . L- -- - t- _.t. '-• • •••.) A4 ,O ,4q4 7/• ia?-
If . ,•1 (i 1. , )) n-_, • -
0.4t_ _ ...,7.4,
0s,,,,__
2---::• "'''...- ., .' .r-,--;-=, .
I 1:1 'Nil ,• .. #40__.,., - II • N- • r) I. ,. /.0 , .. 4,. / /./
v .
1::::)[:::3C:00,1::-301-.J p.„„x`faiet„J9 / 5
I a'e F•&V,./L\ •?.• ' - • ./' • V....r.'i .. .7.•• / gt. Ii'i - l' i ' Immullsimmeninum .• '• f Or; ‘
1/4.
4gtew\J4`
f/ •
t-
ma ir:t i. it A \ \ z,•_:-_ ,,.) i. -, ... .. 4.,,,,,,z,..,:,,• ‘n -/-ekr,,,e4.„./ -' . i ..... ' ,.. /.
c,,,,
1. „.,. cp
1.,.,... ,//‘ .
i&L . 4010ilthirVaktt "
t-- IIIII.‘!:Zk-- , \. Di 110"." • / ii• , s,
e• 601; 2--(' . , •
Iv
0 n Ti ic....,)- . ,...W.,.....ti ..i...umatoriamonewmaN'unami, - ....>.././7/Iffire gaz wimp L. i
I
p • iSralVi,P1tj1 , . , --,,, lyilu)) a r
wo..1;,. ••,.imi Wins / ,i0e, •-• ---‘'•ki s. z•u I; „ r
1,
I r .. '1 i/t•
A. ,.„1 ,„ 1.plE.on 4 'U)IA -- "- • .125 4*.-...: ,t- •
po ---..._
3
1
77"-7-----_____ __77-4/ ' A I
in0132 . _ . 4.t1' '
II , i
i
5 _
t
1
r-A.'.' ',,,
f ., ."14-11rj , „,. p,
ill
rIti
WRITTEN COMMENTS FROM GOVERNMENTAL AGENCIES
AND PUBLIC UTILITIES
AND RESPONSES TO COMMENTS
1
STATE
JOHN SPELLMAN DONALD W.MOOS
Governor 1/889'°' Director
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Mail Stop PV-11 • Olympia, Washington 98504 • (206)753-2800
February 27, 1981
Mr. David Clemens
City of Renton Planning
Director
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
Thank you for the opportunity to comment on the draft environmental
impact statement for the ERADCO planned unit development. Headquarters
and regional personnel have reviewed the EIS and have the following
concerns.
The proposed development will add large amounts of sewage to the Renton
sewage treatment plant (STP) which is already operating at or above
capacity. It may be several years before the STP is upgraded. The STP
does not, at times, meet the current NPDES permit limits and the new 1
permit may be even more stringent. The EIS should discuss the impacts 1
of this development on the STP and on the water quality of the Green +
River.
The developer and contractor should use all appropriate measures to
prevent any water quality violations, especially during the construction /0
phase.
If you have any questions, please call Mr. Mike Dawda of our Northwest
Regional Office at 885-1900.
Sincerely,
Barbara J. itchie
Environmental Review Section
BJR:bjw
cc: Mike Dawda, DOE, Northwest Region
2
Response to Comments from the Washington State Department of Ecology
Comment Number: 1
Comment rated. Communication with John Lesniak of the Municipality of Metro-
politan Seattle has confirmed the information contributed in the response letter
from the Department of Ecology. A Draft Wastewater Management Plan has been for-
mulated which contains recommendations for upgrading the Renton system in order
to provide adequate protection to water quality and health. Suggested improve-
ments included in this Draft Plan involve major construction activities which
are scheduled for completion in 1985.
Until these improvements are instituted, interim measures will be enacted as de-
tailed in the excerpt of the Draft Wastewater Management Plan, which has been
included as Appendix A in this document.
However, it is inevitable that NPDES permit levels will be periodically exceeded ,
particularly during excessive wastewater flows in the winter months. The pro-
posed action, in conjunction with other development in the area, will exacerbate
the degree of these violations as well as contribute to an increase in their fre-
quency, with a commensurate detrimental impact on the water quality of the Green
River.
Comment Number: 2
Those water quality impact mitigations marked by an asterisk on pages 3, 33,
39-40, and 102 of the Draft EIS will be implemented by the developer. Addition-
al mitigations could be imposed as a condition of project approval by the res-
ponsible decisionmaker.
3
ti
ir:
410 West Harrison Street,P.O.Box 9863 (206)344-7330
1,
0 Seattle,Washington 98109
tits 1ai 4',:.
February 24, 1981
Mr. David Clemens ,
Acting Planning Director
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Dear Mr. Clemens :
ERADCO Planned Unit Development
The following comments are submitted in response to our
review of the ERADCO Planned Unit Development Draft
Environmental Impact Statement.
A correction should be made in Table I on page 34.
Particulate matter is expressed as micrograms per cubic
meter (- g/m3) rather than parts per million (ppm) . The j1979particulateconcentrationof59ug/m3 is just below
the 60 ug/m3 standard which dictates strict observance
of all mitigating measures to reduce air pollution during g
the construction phase. Enclosed is a copy of the current
air quality standards for your information.
Thank you for the opportunity to comment .
Sincerely,
411‘dtkA-?UAMMLZA.
Arthur R. Dammkoehler
Air Pollution Control Officer
SERVING: S j
KING COUNTY
410 West Harrison St EnclosureP.O.Box 9863
Seattle.98109
206)344-7330
KITSAP COUNTY
Dial Operator for Toll
Free Number Zenith 838!
Bainbridge Island,98110
Dial 344-7330
PIERCE COUNTY
213 Hess Building
Tacoma,98402
206)383-5851
SNOHOMISH COUNTY
206)259-0288
BOARD OF DIRECTORS
CHAIRMAN Gene Lobe.Commissioner Kitsap County; VICE CHAIRMAN:James B.Haines,Councilman Snohomish CountyRonDunlap,King County Executive; Glenn K.Jarstad.Mayor Bremerton; William E.Moore.Mayor Everett. Mike Parker,Mayor Tacoma
Harvey S.Poll.Member at Large. Charles Royer.Mayor Seattle;Joe Storting,Commissioner Pierce County: A R Dammkoehler,Air Pollution Control Officer
4
AMBIENT AIR QUALITY STANDARDS
OZONE
SULFUR OXIDES NATIONAL WASHINGTON PUGET SOUND Oxidants are produced in the atmosphere
STATE REGION when nitrogen oxides and some hydro-
The presence of sulfur oxides in the carbons are exposed to sunlight. Ozone
ambient air has been associated with a PRIMARY SECONDARY o o o is the oxidant found in largest amounts.
variety of respiratory diseases and in- t t t It is a pulmonary irritant that affectscreasedmortalityrates. They repre-SULFUR OXIDES ppm ppm 3 ppm
e
ppm e lung tissues and respiratory functions.
sent a significant economic burden and Ozone impairs the normal function of
have a nuisance impact. When sulfur Annual Average 0.03 a 0,02 a 0.02 a lung and, at concentrations between
oxides are inhaled withsmall particles, 30 day Average 04 a 0.15 and 0.25 ppm, causes lung tight-the effect on health is increased. In- ness, coughing, and wheezing. Other
halation of sulfur dioxide can cause 24-hour Average 0,14 b 0,10 b 0.10 a oxidants, produced in smaller amountsincreasedairwayresistancebycon- Per-3-hour Average 0.50 b than ozone, cause eye irritation. Per-
stricting lung passages. sons with chronic respiratory problems
1-hour Average 0.25 c 0,25 c such as asthma seem most sensitive to
PARTICULATES 1-hour Average 0.40 b 0,40 a
changes in ozone concentration.
5 min. Average 1,00 d NITROGEN DIOXIDE
Small discrete masses of solid or liq-
uid matter dispersed in the atmosphere, SUSPENDED
u9/m3 ug/m3 ug/m3 u9/m3 Nitric oxide results from the fixation
especially those of one micron or less PARTICULATES of nitrogen and oxygen at high temper-
in diameter, are associated with a Annual Geo. Mean atures as in fuel combustion. There
variety of adverse effects on public 75 60 a 60 a 60 a
are several atmospheric reactions
health and welfare. Particulate mat- 24-hour Average 260 150 b 150 b 150 b which lead to the oxidation of nitric
ter in the respiratory tract may pro-oxide to nitrogen dioxide, and the
duce injury by itself, or it may act CARBON MONOXIDE ppm presence of nitrogen dioxide in ambient
in conjunction with gases to increase air is essential to the production ofLn
the effect on the body. Small parti- 8-hour Average photochemical oxidants. The presence
Iles suspended in the air are chiefly9 9 same b same same
P of nitrogen dioxide in ambient air has
responsible for reduced visibility in 1-hour Average 35 b been associated with a variety of res-
the Puget Sound area. Soiling of build-piratory diseases.
ings and other property is a common OZONE m
effect of high particulate levels.pp HYDROCARBONS
1-hour Average 0.12 same e same same Defined as organic compounds composed
CARBON MONOXIDE exclusively of carbon and hydrogen,
NITROGEN DIOXIDE ppm
hydrocarbons are primarily associated
Carbon monoxide reacts with the hemo-with the use of petroleum products.
globin in red blood cells to decrease Annual Average 0.05 same a same same
They are the main components of photo-
the oxygen-carrying capacity of the chemical smog. Hydrocarbons alone have
blood. The national primary standard HYDROCARBONS ppm
no known effect on human health; there-
fore the sole purpose of prescribingforcarbonmonoxidewasbasedonevi-Less Methane) b the sole purpose of prescribing
a hydrocarbon standard is to controldencethatlevelsofcarboxyhemoglobin
in human blood as low as 2. 5% may be 3-hour Average 0,24 same photochemical oxidants.
associated with impairment of ability LEAD ug/m3 LEAD
to discriminate time intervals. The
national ambient air quality standards Calendar Quarter same as Lead affects humans in numerous ways,
for carbon monoxide are intended to Average 1,5 same a National but the greatest effects appear to be
protect against the occurrence of car-on the blood-forming system, the nerv-
boxyhemoglobin levels above 2%. Note:ous system, and the kidneys. It af-
Smoking up to 2 packs of cigarettes a a Never to be exceeded fects some persons more than others.
day raises carboxyhemoglobin levels to b Not to be exceeded more than once per year Young children (ages 1-5) are particu-
about 5%. This is equivalent to expos-c Not to be exceeded more than twice in seven days larly sensitive to lead exposure. The
ure for 8 or more hours to 30 ppm of d Not to be exceeded more than once in eight hours standard for lead in air is intended
carbon monoxide. e Standard attained when expected number of days to prevent most children from exceeding
per year with maximum hourly average above 0.12 ppm = parts per million blood lead levels of 30 micrograms per
ppm is equal to or less than one deciliter of blood.
f Applies 6 a.m. to 9 a.m. daily ug/m3 = micrograms per
cubic meter
PSAPCA 8/80
O PUGET SOUND
AIR POLLUTION
CONTROL AGENCY
410 West Harrison Street
SOURCES OF INFORMATION P.O.Box 9863
ABOUT OTHER AIR POLLUTION CONTROL STANDARDS Seattle,Washington 98109
In addition to ambient air quality standards, the
federal Clean Air Act specified that standards NATIONAL AMBIENT AIR QUALITY STANDARDS
were to be set to limit emissions from specific
categories of air pollution sources. These stand-
ards are: A new approach to air pollution control came into
National Emission Standards for Hazardous Air Pol- being with the Federal Clean Air Act of 1970.
lutants - These standards are intended to protect The law requires the U. S. Environmental Protec-
the public from emissions of pollutants which tion Agency to promulgate national primary and
could cause serious illness or death. secondary ambient air quality standards. The pri-
mary standards for each pollutant are based upon
New Source Performance Standards - These stand- known health effects for that particular substance
ards are applicable to certain categories of as detailed in "air quality criteria" documents
industries which significantly contribute to air published by the federal government.
pollution. They apply to new or modified instal-
lations of industries for which performance stand- Primary standards protect the public health and
ards have been set.must allow an adequate margin of safety. Second-
Another limit on air pollution exists in the fed- ary standards must protect the public welfare `°
eral Clean Air Act to protect areas which have against other adverse effects. These include
cleaner air than that required by National Ambient effects on soils, water, crops , vegetation, man-
Air Quality Standards. While not strictly a stand- made materials, animals, wild life, weather, vis-
ard, the Act does contain numerical limits on the ibility, climate, property, transportation, econ-
amount of increase allowed for particulate matter omic values and personal comfort and well being.
and sulfur dioxide in clean air areas.
control standards
Pursuant to the schedule established by the Con-
Information about air pollutiongress, the Environmental Protection Agency pub-
is available from: lished on April 30, 1971, the first national
U. S. Environmental Protection Agency ambient air quality standards. In January, 1979,
1200 6th Ave. , Seattle 98101 the standard for photochemical oxidant was re-
named "Ozone," and was changed from 0.08 ppm to
Washington State Department of Ecology 0.12 ppm. A new national standard for lead in air
Olympia 98504 was adopted in October, 1978.
Puget Sound Air Pollution Control Agency
P. 0. Box 9863, Seattle 98109
Serving
KING, KITSAP, PIERCE fe'SNOHOMISH COUNTIES
Response to Comments from the Puget Sound Air Pollution Control Agency
Comment Number: 1
In response to the correction suggested in the PSAPCA letter, the following table
found on page 34 of the Draft EIS is hereby revised as follows:
Table 1
Summary of Pollutant Concentrations in the
Renton Area
Particulate Matter
micrograms per cubic meter (ug/m3)
Location 1979 1978 1977 Standard
S.E. District Health Center 43 36 38 60
Renton Municipal Building 59 55 51 60
Comment Number: 2
The air quality impact mitigation marked with an asterisk on pages 3, 37, and
101 of the Draft EIS will be implemented by the developer. Additional mitiga-
tions could be imposed as a condition of project approval by the responsible
decisionmaker.
7
King County,State of Washington
erh°
Ron Dunlap,County Executive
Department of Budget and Program Development
Room 400 King County Courthouse
516 Third Avenue
Seattle,Washington 98104
John M.Rose,Director
206)344-3434
March 2 , 1981
Mr. Lavid Clemens
Rentcn Department of Planning 4,_
Municipal Building
200 Nill Avenue
Rentcn, WA 98055
Dear Mr. Clemens :
The draft EIS for the Eradeo P .U.D. has been reviewed by
several King County departments. Comments received from
the Planning Division indicate that the discussion on land
use and park impacts are adequate, but they have the
following transportation comments :
1. The traffic analysis should include comparative maps 1
of future traffic with and without the proposal.
2 . Page 28 - The intent of the "Alternative Site Access" 2
is unclear. This should be clarified and stated early
in the text.
3. Page 65B. Mitigating Measures - If the proposal is approved,
tae applicant should be required to provide a traffic signal
at the intersection of the primary road and N.E. 3rd St.
This should also include the widening of N.E. 3rd to
accomodate left turns. Without these improvements , access
to the proposed site would be hazardous .
4. Page 68 - Page 7 states that there would be 204 PM peak 4
one way trips. This conflicts with the volumes presented
in the table and also does not conform with the appropriate
peak hour designation (AM vs. PM) .
5. N.E. 3rd St. between Sunset and Jefferson is the most heavily 5
traveled section of the road. Traffic is further impacted,
e3pecially eastbound, by the gradient of the hill. We are
cpncerned about the impacts of conciestion at the intersection
of growth to the east and the impacts of a signal on N.E.
3rd which would disrupt traffic flow and compound existing
crngestion problems .
8
Mr. David Clemens
March 2 , 1981
Page 2
6. Page C-7, 8, 9 - These figures were derived from information 5 '
collected in November 1975. Since these figures are signi-
ficant in forecasting the project's traffic impact, have
any changes occurred over the years?
Thank you for the opportunity to review and comment on this
proposal.
Sin ely,
0/ (Z '(-----
0$$'
ohn M. Rose, Chairman
Environmental Impact Committee
9
Response to Comments from King County Department of Budget and Program Development
Comment Number: 1
The key issue involving the traffic impacts of the proposal is the peak-hour im-
pact at the signalized intersection of N. 3rd Street and Sunset Blvd. N. The
EIS provided comparisons of operating conditions at that location with and with-
out the proposal. See response to comment 6, letter from Renton Traffic
Engineer for further elaboration on this subject, on page 21 of this document.
Comment Number: 2
The purpose of the "Alternative Site Access" would be to provide access from the
site to Maple Valley Highway. The alternate access would be constructed in ad-
dition to the existing access roadway and would offer residents of the proposed
development the opportunity to use either N.E. 3rd Street or Maple Valley Highway
to gain access/egress to the site.
Comment Number: 3
On pages 8, 69 and 104, the Draft EIS suggests these measures as mitigations to
the impacts of the proposal. The City of Renton, as lead agency, will make fi-
nal the determination as to which measures to employ.
Comment Number: 4
The EIS shows an estimate of 204 total trips on the access road during the PM
peak hour (Figure 6, Appendix C, P. 11 of the Draft EIS) . This estimate repre-
sents travel volumes in both directions. The table on page 68 shows the esti-
mate for approach volumes (single direction) for the access road which is the
proper method for presenting the data when discussing traffic signal warrants.
Comment Number: 5
Comment noted. The widening of N.E. Third Street will have the effect of insur-
ing the continuous flow of through traffic past the new access intersection
while providing for safe turning movements. This will be particularly critical
due to the proximate of the proposed access points to the crest of the hill im-
mediately to the east. Without proper channelization, the potential for future
hazardous traffic situations will be increased.
The traffic signalization of N.E. Third Street is an apparent need expressed
in the Draft EIS. The extension of Edmonds Avenue N.E. by the Homecraft devel-
opment proposed between N.E. Third Street and N.E. Fourth Street will likewise
initiate the need for a signalized intersection. If the two access locations
could be accommodated through the single intersection of Edmonds and N.E. Third
Street, certain cost efficiencies and traffic safety improvements such as turn
lanes can be realized.
10
Response to Comments from King County Department of Budget and Program
Development (Continued)
However, as presently proposed, the primary access to the ERADCO PUD development
will intersect N.E. Third Street about 350 feet west of the intersection of the
Edmonds extention and N.E. Third Street. This access has been constructed in
accordance with City requirements, in a location acceptable to the City at the
time of permit approval. However, the covenants accompanying the rezone of the
proposal require City approval of access as a part of the development permit pro-
cess. The currently constructed access represents a private driveway to vacant
property. This access may or may not be deemed satisfactory for a 425-unit mul-
tiple family residential development.
Comment Number: 6
The referenced figures present trip data characteristics for the Monterey
Terrace neighborhood in 1975. This data was conditioned in order to determine
hourly trip characteristics expressed as a percentage of total daily trips.
There have been no significant changes in the neighborhood or the street sys-
tem since 1975.
11
Jai King County Conservation District
35 SOUTH GRADY WAY RENTON, WASHINGTON 98055
March 5 , 1981
Mr. David Clemens
Acting Planning Director
Municipal Bldg.
200 Mill Ave. South
Renton, Wash. 98055
Re: DEIS of the ERADCO PUD
Dear Mr. Clemens :
Having reviewed the information presented in the Draft En-
vironmental Impact Statement for ERADCO PUD, we have
several concerns which we feel need enumeration in order
to provide a more comprehensive assessment of the potential
impa.;ts of the aforementioned proposal.
This DEIS does not include adequate information regarding
the soils on this site, mentioning only the findings of
the test pit logs, and none of their properties relevant to
construction activities. According to the United States
Depa:-tment of Agriculture, Soil Conservation Service' s 1973
Soil Survey of the King County Area, this site is composed of
soil; of the Alderwood-Kitsap (AkF) and Everett (EvC) series .
Alderwood-Kitsap (AkF) found in the designated greenbelt areaofthesite, is about .50 percent Alderwood gravelly sandy loam
and ::5 percent Kitsap silt loam, with steep slopes of 25 to
75 percent. Drainage and permeability vary. Runoff is rapid
to very rapid, and erosion hazard is severe to very severe.
The ;slippage potential is severe. Soil limitations are severe
for ;;hallow excavations due to steep slopes and severe slippage 1.
potential. There is low to moderate corrosivity for uncoated
stee] and concrete. This soil is fair to poor for roadfill
material, and is poor for highway location due to moderate
shrink-swell potential, slippage potential on steeper slopes ,
and high frost-action potential. This soil is best used for
timber production.
Everett (EvC) found in the flatter upland areas of the is made
up of somewhat excessively drained gravelly sandy loam that is Zunderlainbyaverygravellysandatadepthof18-36 inches.
Some areas may have up to 5 percent Alderwood, or 5 percent
Indianola, or up to 25 percent Neilton. Slopes are 5-15 percent.
Permeability is rapid, runoff is slow and the erosion hazard is
12
2-
slight. Soil limitation is moderate for building foundations
if slope is more than 8 percent, severe for shallow excavations
due to being very gravelly. This soil is poor for topsoil, good
for roadfill and has low compressibility for embankments; per-
vious when compacted and has piping hazard. This soil is best
used for timber, pasture and urban development.
Further investigation of the soil/geologic stability of this
site reveals that the proposed greenbelt area is classified
as a Class III and the flatter upland portion as a Class II
Seizmic Hazard Area according to the Sensitive Areas Map Folio
for King County. The Class III units are "areas potentially
susceptible to liquefaction, wherein the structural strength of
unconsolidated soils and alluvial materials are drastically and .3
abruptly reduced. Seizmic shock can induce liquefaction by
disrupting the cohesive strength of saturated ganular earth
materials" . The Class II units exhibit the same potential prob-
lems to a lesser degree. In conjunction with these Classes,
the folio also depicts the greenbelt area as one of potentially
High Erosion Hazard, and classifies that same area as Class III
for Slide and Slippage having serious slippage potential.
Due ,to the aformentioned limitations of the soil found in green-
belt area, we strongly recommend that the use of heavy equip-
ment for construction of the proposed jogging path be minimized, 4
and that those denuded areas resulting from that construction
be reseeded and stabilized (mulched and jute netted) immediately 5
upon completion. The Alternative Site Access proposed in the
statement should be avoided, as its stability during and after
construction would be extremely questionable.
The statement mentions that "approximately 70 percent of the
site will be converted to impermeable surfaces" . This is an
extremely high value (especially in an area of permeable soil)
covering almost 17 . 5 acres of the 25 acres proposed for de-
velopment with rooftops, parking areas , sidewalks , and roads .
Of main concern is the fact that this impervious area will pre-
vent infiltration and percolation of precipitation, forcing
more water to drainageways faster than under pre-development
conditions. It is mentioned in the statement that the pre-
development 10-year and 25-year stormwater volumes have been
calculated for the site. It is imperative that the temporary
and permanent drainage systems be sized for the 10-year 24-year
storm, and that these systems be properly designed, implemented,
and maintained.
We recommend that seasonal constraints be placed upon construction C5
activities and urge that earth works and any stabilizing measures
instituted be certified by a qualified soils engineer aware of 9
seizmic and liquefaction potentials. In order to enhance the
stability of the site, disturbance and/or removal of natural
vegetation should be minimized.
Thank you for affording us the opportunity to comment on this
document. If we can be of further assistance, please contact us .
S; cerely1
J ' Ballweber
Water Quality Planner
13
Response to Comments from the King County Conservation District
Comment Number: 1
The discussions of the erosional and slippage characteristics, as well as their
implications with respect to construction activities of the soils located on the
greenbelt portion of the site, may be found on pages B-3 and B-4 of the Draft
EIS.
Comment Number: 3
Comments noted. The discussion of "Geology and Soils - Existing Conditions" on
page 28 of the Draft EIS is hereby revised to incorporate the following informa-
tion:
The greenbelt portion of the site is classified as a Class III and the
flatter upland portion as a Class II Seismic Hazard Area according to
the Sensitive Areas Map Folio for King County. Class III units fea-
ture soils with potential susceptibility to liquefaction, which may
be induced by seismic shock. This process disrupts the structural
strength of unconsolidated soils and alluvial materials. Class II
units exhibit this capability to a lesser degree. In addition, the
Folio also classifies the greenbelt area as having High Erosion Haz-
ard, as well as Class III for Slide and Slippage having serious slip-
page potential."
Comment Number: 4
To reflect the concern stated in the District's letter, the following mitigating
measure is hereby added to the list of "Unique Physical Features - Mitigating
Measures" on pages 2, 32, and 101 of the Draft EIS:
c) The use of heavy equipment for construction of the proposed jog-
ging path should be minimized to protect the hillside from dam-
age caused by high erosion and slippage potential."
Comment Number: 5
This proposed mitigating measure, as included in the Draft EIS on pages 2, 32,
and 101 has been revised to include the concerns indicated in the comment let-
ter, as follows:
a) The denuded area should be reseeded and stabilized with mulch and
jute net immediately upon completion until vegetation is reestab-
lished."
As a condition of project approval, implementation of this mitigation may be im-
posed by the responsible decisionmaker.
14
Response to Comments from the King County Conservation District (Continued)
Comment Number: 6
The purpose of including the alternative site access discussion within the Draft
EIS was to fully investigate any alterations it may have on the traffic/circu-
lation impacts of the proposal.
However, as indicated on page 99 of the Draft EIS, the extremely high cost of
this alternative, as well as the destruction of the greenbelt, render this op-
tion economically and environmentally questionable.
Comment Number: 7
Comment noted.
Comment Number: 8
To incorporate the concern registered in the comment letter, the following mi-
tigation has been added to the list of "Erosion-Mitigating Measures" on pages
2, 33 and 101, as follows:
c) Excavation and grading activities could be limited to periods of
normally dry weather to reduce the potential for erosion."
Comment Number: 9
As indicated in the discussion of "Geology and Soils - Mitigating Measures," on
pages 1, 30, and 101 of the Draft EIS all the recommendations of the soils en-
gineer will be implemented. Among these, the soils engineer has suggested that
he supervise the placement and compaction of structural fills in order to ensure
that the degree of compaction is sufficient for the intended purpose.
Comment Number: 10
Comment noted.
15
OF R4,
11 .©. ° BUILDING DEPARTMENT
RONALD G. NELSON - DIRECTOR
salL
o09 co
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0947.E0 Pt
e
P
0 98SEMarch1 , 1 1
BARBARA Y. SHINPOCH
MAYOR
TO: Planning Department
FROM: Jim Hanson, Building Department
SUBJECT: Review of Draft EIS for Eradco P.U.D.
Mitigating the effect of increased traffic on N.E. 3rd
Street, and especially the intersection of N.E. 3rd
Street and Sunset Boulevard North, should be considered
in more depth.
1
A more modern signal system seems to be the only suggested
mitigation in the traffic studies.
Adding this complex with others now proposed and still
others within and outside the City will, as pointed out,
continue to decrease the level of service of the inter-
Z
section of North 3rd and Sunset.
Perhaps construction in this part of the City should be
stopped until a more comprehensive traffic study is done
in order to establish the street needs of the future.
JCH/mp
16
Response to Comments from the City of Renton Building Department
Comment Number: 1
A more detailed analysis of the possible mitigation for traffic impacts on N.E.
Third Street and its intersection with Sunset Blvd. is contained in the response
to comment 6 , letter from Gary Norris, the City Traffic Engineer, on page 21 .
Comment Number: 2
The comments related to the impacts of development both within the city limits
and beyond is well taken. The question of whether to limit future development
is both an environmental and policy issue. This and other EISs can assess their
levels of environmental impacts. However, a decision as to whether these im-
pacts are of sufficient magnitude to warrant denial of permits for further de-
velopment must be made at the policy level by the appropriate legislative body.
It is apparent from the information available in the ERADCO PUD Draft EIS that
the future consequences of growth and development in this general vicinity and
easterly on the East Renton Plateau will continue to adversely affect traffic
circulation. As a result, those secondary environmental consequences of in-
creased noise, air pollution, energy utilization and the cost of congestion upon
the local economy will continue to increase.
As stated in this Draft EIS, the current traffic volumes at N.E. Third Street
and Sunset Blvd. are at a level of service D. The implementation of this pro-
posal will add 6-7% additional traffic, while other developments within the City
in the vicinity of this subject site will add an additional 6000+ daily trips
to this corridor over the next several years. At the same time, the level of
traffic increase as a result of permits issued in King County have been adding
an average of 3 to 5% increase in daily trips each year.
The result is a continuing and complex series of traffic and related secondary
environmental impacts which apparently have few immediate solutions beyond minor
short-term relief. The Environmental Review Committee, Hearing Examiner and the
City Council must consider these consequences in the plan review process for
this and any future development in this immediate area.
17
I
OF RSA
o THE CITY OF RENTON
U ` 0 Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
n . rn BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
09 co. 235- 2550
Ao9
TD SEP E '
May 29 , 1981
RE : FINAL ENVIRONMENTAL IMPACT STATEMENT
ERADCO PLANNED UNIT DEVELOPMENT
Dear Recipient :
This document is the final environmental impact
statement (EIS) for the proposed planned unit devel-
opment . The final EIS is written in the form of an
appendix to the draft impact statement , which was
circulated in January, 1981 . It is necessary to
have both volumes for a complete document. The
determination was made to accept the draft document
with a final addendum as the final EIS pursuant to
WAS 197-10-580 (2) .
Review of the draft EIS by interested agencies and
persons has been appreciated by this department.
Thank you for the information provided through your
responses .
Very truly you j
i
n61(R21
D v ' d R. 1 ens
Acting Planning Director
OF R&
I
4•' PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
L
oinimr MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
90 co-
04.47.so SEPTcA0
BARBARA Y. SHINPOCH
MAYOR February 10, 1981
TO: Dave Clemens, Acting Planning Director
0
FROM: Gary Norris, Traffic Engineer
SUBJECT: ERADCO - PUD EIS
Pursuant to your request, we have reviewed the subject EIS. As a result, we
have the following comments:
1. Development should be limited to 425 units unless an analysis is
conducted to evaluate the impacts of a maximum density of 625
dwelling units.
2. Transit service will not necessarily serve to reduce auto vehicle
trip rates as the ITE Trip Generation Rates are for auto vehicle
trips only which means there exist background transit trips.
3. The actual traffic volume increase experienced on NE Third has
been approximately 6.1 percent annually as opposed to 3.4 percent
indicated on page 59.
4. As discussed previously, ERADCO should be strongly encouraged to
align their access road to the extension of Edmonds Ave. NE and
participate jointly with Homecraft in making necessary improvements
such as signalization and left turn channelization and widening.
Otherwise, ERADCO should be conditioned to construct signalization,
all channelization and widening improvements to accommodate a
smooth access from their property to NE Third. Also, these
improvements should align with the improvements at NE Third and
Edmonds Ave. NE.
5. Although it is logical to assume that trip distribution patterns
would be similar to other residential developments in the area,
the analysis did not evaluate the change in trip distribution as
a result of capacity constraints (i.e. N 3rd & Sunset) and the
provision of new arterial access (i.e. Edmonds Ave. ) .
18
Dave Clemens
Page 2
February 10, 1981
6. The development should be required to maintain the intersection of
North 3rd and Sunset at the existing level of service. In other
words, their project increases the capacity deficiency by 6% in
the a.m. peak period and reduces available capacity by 8% in the p.m.
peak period. Therefore, they should participate financially or
otherwise in respective percentages to maintain the available
capacity. Such improvements could include widening of North 3rd on
the east leg, rechannelization and widening of Sunset on the north
leg, as well as signal modifications and improvements at North 3rd
and Sunset.
7. The EIS did not evaluate the increase in background traffic to be
experienced by the time ERADCO' s project is complete.
t should be pointed out that commonly accepted intersection design standards
or urban areas allow for LOS C operation with LOS D permitted for short periods
f time during the morning and afternoon peak hours. The intersection of North
rd and Sunset operates LOS E during peak hour operation, which is ultimate
apacity. Beyond this level of service the intersection will become jammed.
e major constraint in improving the level of service at this intersection is
the 1-405 bridge supports on North 3rd. The cost to widen this facility would
be substantial. Also, traffic on I-405 would be seriously impacted during the
removal of the old facility and construction of the new. However, if recent
growth trends continue into the future at some point in time, it will be
necessary to either widen the North 3rd approach to the intersection or develop
major alternative access from the Highlands area to the commercial and industrial
centers of the city.
The proponents EIS states the proposed project will have a "relatively minor
impact" on the operation of the intersection at North 3rd and Sunset. However,
virtually all new developments have only a "relatively minor impact" although
when they are all added together the impact becomes significant. Consequently,
the city must receive from each development a portion of the overall cost of
new improvements.
The volume added to the intersection by the new development, though not
significant in comparison to existing volumes, will essentially drop the inter-
section into level of service F, which is forced flow. In other words, the
tersection will become jammed.
P for to project approval, the proponent should be required to mitigate in some
f rm the impacts at North 3rd and Sunset, and access problems on NE 3rd at
it point of access in conjunction with the Homecraft Development.
r r
GAN:ad
19
0 THE CITY OF RENTONc) 020,4 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
salL
BARBARA Y. SHINPOCH, MAYOR POLICE DEPARTMENT
09,
0 February 17, 1981 HUGH R. DARBY, CHIEF
09gT C SEPT ,
j
MEMORANDUM
10: Dave Clemens, Planning Dept.
FROM: Lt. D. R. Persson
RE: Eradco/Draft E. I.S.
After reviewing the draft E. I.S. I have 5 major areasof concern that are
mentioned in the impact statement. It would appear that the developer is
not prepared to respond adequately to the mitigating measures suggested in
the E. I .S. The mitigating measures that I am concerned with are:
1) Public Services:
1
A) Police Services - this development "will " have
an impact on our ability to provide price
services. However, the development could build
in inexpensive devices that would mitigate the
impact the development would have on our services.
Devices are such things as:
1) Security locks
2) Security windows
3) Peep holes in doors
4) Properly placed lighting in the parking lot.
5) Large house numbers.
6) Prewired units for burglar alarm systems.
B) The statement lists the current ratio of police officers
2_
inthe City of Renton at 2 per thousand when, in fact,
the ratio is 1.7 officers per thousand.
C) Street maintenance: The E. I.S. lists several mitigating
measures that may be taken, however, the developer is not
willing to comply with but one. I would suggest that the
developer be required to do the following:
1) Build a grated area where the truck wheels could
be washed prior to leaving the area (suggested
mitigating measure on page 10) .
2) Be required to clean the streets at lease once
a day and more often if deemed necessary by the
street department or the police department.
22
OF RED
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE, SO. RENTON, WASH. 98055
n BARBARA Y. SHINPOCH, MAYOR POLICE DEPARTMENT
09 February 17, 1981 HUGH R. DARBY, CHIEF
7-
SEPS
O
MEMORANDUM
continued--
3) Post a $5,000.00 cash bond with the City 3
to cover the cost of street cleaning if the
developer does not comply with the street
department or the police department
request.
4) Only operate Monday thru Friday as we do 3
not have manpower to watch them on the
weekends unless they want to pay an officers
wages on any Saturday or Sunday they want to
work so we can monitor the site and if trucks
are being overloaded. (Trucks historically
overload on weekends as most scale and truck
weighing operations do not work weekends. )
2) Noise Impacts: Again the developer does not appear to want to do 4
anything to mitigate the noise that would be created by the
construction. I would recommend the following restrictions be
placed on the construction.
A) Work hours: Monday thru Friday 7 a.m. to 7 p.m.
Saturday & Sunday 10 a.m. to 6 p.m.
only if they provide for police and
building inspection on these days)
B) Noisy operations should be scheduled so that they are not
concurrent.
C) Truck arrivals should be controlled to reduce vehicle con-
gestion.
D) Roadway improvements should be timed to alleviate congestion
and reduce volumes on existing streets.
3) Transportation Circulation: This particular development will have 6
a tremendous impact on traffic and is the most important concern
that I have. The development should not be allowed to proceed
until the following areas are addressed.
23
OF R
0 THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o ' BARBARA Y. SHINPOCH, MAYOR POLICE DEPARTMENT
9A co- February 17, 1981 HUGH R. DARBY, CHIEF
09q
C SEP1°.
1'O
P
MEMORANDUM
continued--
A) Alignment of the access road from this development
with Edmonds NE and the Homecraft Development under
consideration directly across NE 3rd.
B) Widening and installation of a left turn lane on NE 3rd 7
and the access roads.
C) Installation of a traffic signal on NE 3rd.
D) Participation in updating (or fine tuning) the inter- 9
section of NE 3rd and Sunset.
E) Improving and paving the east shouldhof Sunset Blvd North ic;
between the Maple Valley Hiway and North 3rd. This would
allow for more storage capability on Sunset Blvd. North
for those vehicles preparing to travel up North 3rd, and
should help the congestion caused by afternoon rush hour.
4) The impact on the residents who live on Blaine NE presently. The II
E.I.S. does not address the impact that this developement will
have on Blaine NE and the difficulties that the residents living
there will have gaining access/egress from their homes when the
new development is completed. It would be my suggestion that
Blaine NE be continued to the new access road so that these
residents will have access to a signalized intersection to gain
access to NE 3rd.
5) Emergency Access: The impact statement addresses the need to use I z
Blaine NE as an emergency access to the development which is a
necessity. However, for Blaine to be used as an emergency access
it needs to be widened so that emergency vehicles can travel it
safely. In its present condition, Blaine Ave NE is not adequate
as an outbound vehicle could block an inbound emergency vehicle
from gaining access to the proposed development. Thus, Blaine
Ave. NE needs to be upgraded before it can be considered for
emergency access to this development.
if I can be of further help or if you wish further comments,; please feel free
to contact me.
77/f4-,Liz—z_
P5incerely,
Lt. D. R. Persson
24
Response to Comments from the City of Renton Police Department
Comment Number: 1
In response to the stated concerns regarding impacted police services, the miti-
gations addressing police protection listed on pages 9, 73, and 104 of the Draft
EIS are hereby augmented to read as follows:
The developer should install the following devices in order to en-
hance police protection for the proposed action:
a. security locks
b. security windows
c. peepholes in doors
d. appropriately placed lighting in parking lot
e. large house numbers
f. prewire units for burglar alarm system."
Comment Number: 2
The final two sentences on page 71 of the Draft EIS are herby revised to read
as follows:
The present ratio of uniformed officers to population is about 1.7
officers for each 1,000 persons. This ratio is below the national
average of 2.3 officers per 1,000 persons."
Comment Number: 3
To reflect the statements concerning street maintenance, the following suggested
mitigations are hereby added to the list of mitigations on pages 10, 81, and 105
of the Draft EIS as follows:
The developer should clean the street at least once daily, or
more often if deemed necessary by the City of Renton police or
street maintenance department."
The developer should post a $5,000.00 cash bond with the City
to ensure compliance with the City's request for street clean-
ing."
Comment Number: 4
In response to the comment letter, item "c" under 'Noise-Mitigating Measures"
on pages 5, 48 and 103 of the Draft EIS is hereby amended to read as follows:
c) The hours of operation of construction equipment should be
restricted to 7 a.m. to 7 p.m. Monday through Friday."
Comment Number: 5
Comment noted. These suggested mitigating measures may be found on pages 5, 48
and 102-103 of the Draft EIS.
25
Response to Comments from Renton Police. Department, Continued.
Comment Number: 5, Continued
The City, at its discretion and in conformance with SEPA policies, will consider
imposing these mitigating measures as possible conditions in association with
the issuance of a building permit.
Comment Number: 6
Please refer to the response to comment 4, letter from the Renton Public Works
Department - Traffic Engineering, on page 20 of this document. Also, please
refer to response to comment 1, letter from the Renton Engineering Department on
page 31 of this EIS.
Comment Number: 7
As indicated in the discussion of potential mitigations on pages 8, 69 and 104
of the Draft EIS, "N.E. Third Street could be widened at its intersection with
the primary access road to accommodate left-turning vehicles."
Comment Number: 8
As indicated in the discussion of potential mitigations on pages 8, 69 and 104
of the Draft EIS, "a traffic signal with 'volume-density' timing features would
be installed at the intersection of the primary access road with N.E. Third
Street."
Comment Number: 9
On page C-21 of the Draft EIS it is confirmed that the efficiency of the intersec-
tion of N.E. Third Street and Sunset Blvd. North would be increased" if the con-
troller were replaced with a more modern unit with "volume-density' features for
through movements on Sunset Blvd. North and if the detection locations were re-
engineered.
Comment Number: 10
Comment noted. The paving of the east shoulder of Sunset Blvd. North between
N.E. Third Street and Maple Valley Highway would provide for more orderly traf-
fic flow and convenience in the general area. The decision to require that such
an improvement be made will occur in the plan approval process .
Comment Number: 11
Traffic entering Blaine Avenue should experience negligible impacts since the
bulk of traffic will come from the west and thus enter Blaine Avenue by making
26
Response to Comments from the Renton Police Department, Continued
Comment Number: 11, Continued
a right turn. Traffic exiting Blaine Avenue should find it somewhat easier to
access N.E. Third Street (westbound) following the installation of a traffic
signal at the primary access road and N.E. Third Street since the signal will
provide occasional gaps in the traffic stream.
Comment Number: 12
As indicated on page 86 of the Draft EIS, it will be necessary to install a loop
water service system to be located in both Blaine Road and the entrance drive-
way rights-of-way. When placement of this line is complete, Blaine Road would
be improved to meet standards that would permit heavy fire equipment to safely
utilize the roadway. In addition, curves would be designed to comply with the
Fire Department's minimum radius requirements.
27
Traffic Engineering Department of the Renton Public Works Department.
Comment Number: 1
Comment acknowledged. The project as proposed would consist of a maximum of 425
residential units.
Comment Number: 2
The Institute of Transportation Engineers trip generation rates assume "average"
quality of bus service on the basis of nationwide surveys. The Puget Sound Region
has an excellent transit service when compared to most areas of the country. The
auto-dependency of the residents of the proposed project could reduce, thereby
reducing daily trip rates if in the future, Metro should decide to provide high-
quality service and frequency to the vicinity of the project site.
Comment Number: 3
The traffic growth rate (3.4%) as indicated in the report was determined on the
basis of traffic characteristics from 1973 to 1978 (the latest traffic data avail-
able at the time of report preparation) . Traffic growth rates are normally de-
termined on the basis of long-term trends. Year to year growth characteristics
are not particularly significant since they can be dramatically affected by un-
usually coincident development, new roadway construction, fuel crisis, etc. The
traffic growth rate on N.E. Third Street should remain in the vicinity of 3.4%
on a long-term basis.
Comment Number: 4
The ERADCO PUD has an established access road that has been constructed in ac-
cordance with City locational requirements. The proponent proposes to improve
the established roadway to meet City PUD Ordinance standards and provide access
to the site. It would not be economical to abandon it in favor of a new road-
way to coincide with Edmonds Avenue. However, a final determination as to the
adequacy of this approach is required through the development approval process
as specified in the rezone conditions. Alignment and precise configuration will
be determined at that time.
Comment Number: 5
There is very little liklihood of significant alteration in trip distribution
patterns due to capacity constraints at N.E. Third Street and Sunset Blvd. since
N.E. Third Street is the only viable roadway linking the site to major origins
and destinations. The extension of Edmonds Avenue N.E. from N.E. Third Street
to N.E. Fourth Street would alter trip patterns to some extent, however, that
project would likely affect traffic patterns throughout the general vicinity and
it is not possible to assess the resulting trip distributions without a more de-
tailed traffic study. As a part of the PUD application, the proponent may be
required to provide such a study.
20
Response to Comments from Traffic Engineering Department of the Renton Public
Works Department (Continued)
Comment Number: 6
The report provided extensive analysis and data on the present operating condi-
tions at N.E. Third Street and Sunset Blvd. North. The City of Renton should de-
termine the best method of improving the intersection that is consistent with
their overall goals and objectives for the transportation system. The data pro-
vided in the ERADCO EIS will provide the basis for conducting that investigation.
The EIS recommends the installation of a "full-actuated volume-density" traffic
signal controller to mitigate impacts at the subject intersection (Appendix C,
P. 21 of the Draft EIS) .
Comment Number: 7
There has been no specific schedule established for project implementation. The
EIS provides daily trip rates for the proposed project as well as growth rates
and estimates for future traffic volumes on N.E. Third Street. The impact of the
proposal, as a percentage of background traffic, will gradually diminish as the
background traffic increases; the future growth of traffic on the street system
will be the result of increasing housing development, commercial development,
and employment in the region. The proposed action will be a natural portion of
this growth and as such will be a component part of the traffic growth as estima-
ted in the EIS.
21
INTEROFFICE CORRESPONDENCE
Date February 9 , 1981
To: Dave Clemens , Planning Department
FROM: Don Monaghan , Engineering Department
SUBJECT: Eradco Draft EIS
After reviewing the Draft EIS for the Eradco Development ,
it should be pointed out that the long range plans for
access to the site, which were addressed in your memorandum
of February 5, 1981, were not incorporated into the draft
document .
These items should be incorporated . Also , further detail 2-will be needed in the future on how exactly the storm
drainage will get across the Maple Valley Highway and into
the Cedar River .
Don Monaghan
ckd
28
OF I
4, v
c,
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
n BARBARA Y. SHINPOCH. MAYOR • PLANNING DEPARTMENT
9q 235- 2550
0,
9gTEO SEFTv_tO
MEMORANDUM
February 5, 1981
TO: File
FROM: Dave Clemens, Acting Planning Director
Dick Houghton, Acting Public Works Director
RE: HOMECRAFT SHORT PLAT
ERADCO PLANNED UNIT DEVELOPMENT
RAINIER SAND & GRAVEL MINING AND EXCAVATION PERMIT
RE : EDMONDS AVENUE N.E. AND N.E. 3RD INTERSECTION
Following a discussion on Friday, January 30th, the Planning
and Public Works Departments have concluded the following
as it relates to the intersection of Edmonds Avenue N.E.
and I .E. 3rd Street. As of this date we have proposals from
Homecraft for approximately 280 multiple family dwelling
units and from ERADCO for approximately 425 multiple family
units . The net effect of these two developments is to increase
traffic flows on N.E. 3rd by in excess of 400 vehicles during
peak hours , and 4500 vehicles per day. As a result, it is
the conclusion of these departments that access from these
two developments to N.E. 3rd Street must be in the form of
a public street right-of-way developed to normal City street
standards. These improvements should minimize or eliminate
the impact of additional traffic on Bronson Way N.E. from
the Homecraft development, and provide for access of the
ERADCO project into the traffic stream on N.E. 3rd.
GENERAL STANDARDS OF DESIGN
Edmonds Avenue N.E. north of N.E. 3rd shall be constructed
as part of the Homecraft Short Plat and multiple family develop-
ment to include intersection improvements on N.E. 3rd providing
for 5-lane street section with left turn channelization and
a traffic signal providing for left turn movements at this
intersection. The ERADCO PUD shall provide for the connection
of Edmonds Avenue N.E. to N.E. 3rd Street, provide for 5-lane
N.E. 3rd Street channelization including left turn lanes,
and signalize the intersection. Likewise, the Rainier Sand '
Gravel mining , excavation and grading permit shall provide
29
9
Memorandum to File
February 5, 1981
Page -2-
for the dedication of the extension of Edmonds Avenue N.E.
from N.E. 3rd to the ERADCO property. Since no development
is proposed at this time in this grading permit application,
only the right-of-way dedication will be required at this
time. Future development of Edmonds Avenue N.E. extending
southerly to Maple Valley Highway will be considered at a
later time.
PREFERRED ALTERNATIVES
Since both the Homecraft and ERADCO multiple family developments
will be required to install the public street linkage of
Edmonds Avenue N.E. to N.E. 3rd, it is suggested that this
intersection be a 4-way intersection located at the southerly
terminus of the existing Edmonds Avenue right-of-way at N.E.
3rd. This will ensure the minimum widening, channelization
and left turn lanes in N.E. 3rd. This proposal will also
only require one traffic signal to be constructed. Both
Homecraft and ERADCO should discuss distribution of the costs
related to the intersection improvements and traffic signal
installation. The ERADCO portion of the Edmonds Avenue extension
would be constructed over the right-of-way provided by Rainier
Sand & Gravel in its permit. Should the two applicants be
unable to mutually agree to the necessary improvements at
Edmonds and N.E. 3rd, two traffic signals located at approxi-
mately 350 foot centers appears to be an acceptable alternative,
although considerably more costly.
MAPLE VALLEY EXTENSION OF EDMONDS AVENUE N.E.
As a part of any development proposal for the Rainier Sand
Gravel Co. site, extension of Edmonds Avenue N.E. southerly
to provide connection to the Maple Valley Highway in the
vicinity of the existing Gull gasoline service station should
be provided. The alignment of this street right-of-way should
be such that properties in the immediate vicinity can access
to this street in order to provide access to Maple Valley
Highway rather than the requirement to connect to the N.E.
3rd and N.E. 4th street corridors .
cc : Dick Houghton
Don Monaghan
Gary Norris
Ron Olsen
Mayor
Mike Parness
Planning Department Staff
DRC:yb
30
Response to Comments from the City of Renton Engineering Department
Comment Number: 1
The memorandum of February 5, 1981, to which the comment letter alludes, has
been inserted on page 29 of this Final EIS. This memo outlines the design
standards that appear to be necessary as a result of the Homecraft development
located between N.E. Third and N.E. Fourth Streets and the subject development
located south of N.E. Third Street.
In the review of the Homecraft development, it became apparent that the poten-
tial existed for a conflict in the location and future utility of the Edmonds
Avenue N.E. corridor in the immediate vicinity of these two sites. As a result
of the proposed short plat and future development of the Homecraft site, Edmonds
Avenue N.E. will be constructed to a new intersection approximately 350 feet
easterly of the recently constructed access to property.
As currently constructed and designed, the private access roadway now in place
between N.E. Third Street and the property owned by Mount Olivet Cemetery would
not meet the necessary standards of the subdivison ordinance of the City of Renton
for proper access to the site. Under the applicable sections of the Planned Unit
Development ordinance, the standards of the subdivision ordinance do not apply
specifically; however, the necessity for adequate access, pedestrian walkways and
other typical appurtenances of a public street would have to be met. The current
design does not provide for these requirements, but the improvements will be
made prior to commencement of construction activities. As noted in the restric-
tive covenants (Appendix F of the Draft EIS) , "A primary access street shall be
provided to the site from N.E. Third Street, subject to City of Renton approval
of its design and location as a part of the total development plan." This re-
view will be completed after the completion of this EIS process.
If this current roadway is utilized to provide access to the subject development,
two intersections of N.E. Third will be created in a span of less than 400 feet.
As noted in the February 5th memo, this conflict could be eliminated with the
implementation of an extension of Edmonds Avenue N.E. southerly from N.E. Third
Street to a point where it can serve as the main access to the subject proposal.
This action will require the current roadway located 350 feet to the west to be
abandoned or relinquished to Mount Olivet Cemetery for permanent access. If
abandoned, a single signalized intersection could be created which would elimin-
ate the need for two such intersections within 400 feet of each other.
The environmental consequences of using the extension of Edmonds Avenue N.E. for
access to the subject development would include the necessity of constructing
a new crossing over the drainage feature which is currently crossed by the pri-
vate access driveway at the location of the proposed future access point. This
construction would impact soils, vegetation, and groundwater quality in the same
manner as the access proposed in the Draft EIS, on page 19.
In the future, this extension of Edmonds Avenue could continue southeasterly
to serve the properties lying in the general vicinity between N.E. Third Street
and Maple Valley Highway and further, provide a secondary collector function
which could potentially alleviate some of the congestion currently occurring at
Sunset Blvd. and both N.E. Third Street and Maple Valley Highway. By providing
31
Response to Comments from the City of Renton Engineering Department, Continued
Comment Number: 1, Continued
a bypass for traffic which would otherwise be required to travel through these
intersections to get from Maple Valley Highway to the Renton Highlands Plateau
area, both congestion and trip mile could be reduced. The specific consequences
of this extension of Edmonds Avenue N.E. will be considered either as part of
the development of intervening property, or if proposed to be implemented prior
to property development, a separate environmental impact assessment would be
required.
Comment Number: 2
The discharge from the on-site detention system is proposed to be transported
down the steep greenbelt slope in a flume to the Maple Valley Highway where an
energy dissipator structure will absorb the excess energy and release the water
to an existing roadside ditch. This ditch will carry the water northwesterly
to the entrance to an existing 24-inch pipe crossing the highway and thence
southeasterly in the existing system to the river outfall.
Detailed design and construction drawings will be prepared for City approval
prior to any work being performed.
32
I
I MEMORANDUM
I FROM THE DESK OF , , ,
2-13-81
I
JIM MATTHEW
FIRE MARSHAL
ITO: DAVE CLEMENS, ACTING PLANNING DIRECTOR
RE: E.I.S. - ERADCO P.U.D.
I
I
On page 70 of the statement, the report refers to our access requirement for this
development. In previous reviews we have pointed out our concerns over the accepta-
bility of Blaine Ave N.E. as it exists, as secondary access route. I feel the state-
ment does not adequately mitigate this concern, for unless Blaine Ave N.E. is improved
I from N.E. 3rd Ave Extension into the complex, it will not be suitable for a secondary
access consideration.
I The alternative site access would be acceptable if constructed to standards that would
allow heavy fire apparatus to use the roadway and curves as designed to meet our
miniaum radius requirements.
I
7
mes F. Ma thew, F. e Marshala
v
t-? t_.ti_ <_e—
Richard Geissler, Chief
I 7 j•.
r,•
S.
t
33
Response to Comments from the City of Renton Fire Marshall
Comment Number: 1
As indicated on page 86 of the Draft EIS, it will be necessary to install a loop
water service system to be located in both Blaine Road and the entrance driveway
rights-of-way. When placement of this line is complete, Blaine Road would be
improved to meet standards that would permit heavy fire equipment to safely util-
ize the roadway. In addition, curves would be designed to comply with the fire
department's minimum radius requirements.
34
ETRDl1
Municipality of Metropolitan Seattle
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104
February 24 , 1981
Mr. David Clemens
Acting Planning Director
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
Draft Environmental Impact Statement
ERADCO Planned Unit Development
Metro staff has reviewed this proposal and has the
following comments.
Wastewater Facilities/Water Quality
We note the proposed development is within the service
area of the Renton Treatment Plant. The Renton
Treatment Plant is currently operating at "design"
capacity with interim measures being taken to protect
water quality. Metro is preparing a facilities plan
for the Renton system with a grant from DOE and EPA.
The Draft Plan was recently released for review and
comment and contains a recommended program for
upgrading the Renton system so that water quality and
health will continue to be protected.
As noted on page 87 of the DEIS, any direct connection
to a Metro interceptor requires a certification (Metro
Council Resolution No. 2933) that service is consistent
with the local land use plans and policies of the
affected jurisdictions. Mr. Bob Hirsch of Metro' s
Water Quality Division coordinates the administration
of Metro Council Resolution No. 2933 and should be
contacted at 447-6577 should you have any questions
regarding certification.
The proposed drainage measures appear adequate and
consistent with the objectives of the Areawide Water
Quality Plan.
35
Mr. David Clemens
DEIS/ERADCO Planned Unit Development
February 24 , 1981
Page two
Transportation
We note the mention on p. 62 of placement of a bus
shelter to encourage transit ridership. Staff of
Metro ' s Transit Development Division are available
to assist the proponent in this and other methods to IL
encourage use of transit. Mr. Jerry Dow can assist
in investigating service opportunities and facilities
for transit patrons; he may be reached at 447-6627 .
It should be noted, however, that there are only four
trips per day in this area and further service is not
planned in the next two years. Ms. B.J. Carol of
Metro' s Marketing Division can assist in regard to
subsidized passes, transit informational displays,
and other transit incentives; she may be reached at
447-6629.
Thank you for the opportunity to review and comment.
Very truly yours,
1(41,41:;;ZP)
Rodney . Proctor, Manager
Environmental Planning Division
RGP: shm
cc: B.J. Carol
Jerry Dow
I
36
Response to Comments from the Municipality of Metropolitan Seattle
Comment Number: 1
For a discussion of the interim measures to be implemented until the Renton
Treatment Facility is upgraded, please refer to the response to comment 1,
letter from the Department of Ecology on page 3 of this document.
Comment Number: 2
To incorporate the additional information provided by the METRO spokesperson,
the following paragraph is hereby added to the discussion of "Vehicular Trans-
portation Generated - Existing Conditions" on page 39 of the Draft EIS as fol-
lows:
Presently there are four Metro transit trips daily in the site vic-
inity and further service is not planned in the next two years."
I
37
fi s
March 6, 1981
Mr. David Clemens
Acting Planning Director
City of Renton
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Dear Mr. Clemens:
ERADCO Planned Unit Development
Draft Environmental Impact Statement
We have reviewed the subject document and offer the following
comments for your consideration:
Page 22, Figure 8 - Puget Power presently has two 55 kV
transmission lines on the corridor to the east of the
ERADCO P.U.D. and intends to fully develop the corridor
in the future. A new 115 kV line will be constructed
on the corridor in 1982 and another at a later date.
Page 84, ELECTRICITY, Impacts - Delete the second sentence.
The exact manner of serving the development cannot be
determined until more detailed plans are available. Delete
the third sentence. Restrictions on electrical space and
water heating are no longer applicable. The order issued
by the Washington Utilities and Transportation Commission
regarding these restrictions was reversed by the King
County Superior Court on September 26, 1980.
Thank you for the opportunity to comment on the DEIS.
Ver my yours,
6 - -(-,":„..-- ,____,....„ ,,,____Y':Finnegan, irector
Licensing & Eriv' ronmental
Compliance
Puget Sound Power&Light Company Puget Power Building3 Bellevue,Washington 98009 (206)454-6363
Response to Comments from Puget Power
Comment Number: 1
Comments noted.
Comment Number: 2
The discussion of "Electricity - Impacts" on page 84 of the Draft EIS is hereby
revised to read as follows:
A representative of Puget Sound Power and Light indicated that any
additional load on the existing system would substantially impact the
ability of the company to supply power. In addition, the precise man-
ner of serving the subject development will be determined when more
detailed plans are available. (Written correspondence from W.J.
Finnegan, Director of Licensing and Environmental Compliance, Puget
Sound Power and Light, March 10, 1981.) "
39
WRITTEN COMMENTS FROM NEIGHBORHOOD RESIDENTS, COMMUNITY GROUPS,
AND OTHER INTERESTED PRIVATE PARTIES AND RESPONSES TO COMMENTS
40
FEBRUARY 18, 1981 OI
I t
DAVID R CLEMENS
ACTING PLANNING DIRECTOR
CITY OF RENTON
DEAR SIR,
IN REVIEWING THE ENVIRONMENTAL IMPACT STATEMENT FOR THE ERADCO
PLANNED UNIT DEVELOPMENT NORTH OF SR-169,SOUTH OF MONTERY TERRACE, AND
MT. OLIVET CEMETARY, I FIND NO MENTION OF THE IMPACT OF SUCH A
DEVELOPMENT ON THE AREA DIRECTLY TO THE NORTH. BLAINE AVE. IS MENTIONED
ONLY AS A SECONDARY ACCESS FOR EMERGENCY VEHICLES.
PRESENTLY BLAINE AVE N.E. EXITS ONTO N.E. 3RD ST. WEST OF THE PROPPOSED
ACCESS TO THE DEVELOPMENT SITE. A SITUATION NOW EXISTS BECAUSE OF THE
TRAFFIC VOLUME ON N.E. 3RD ST. WHERE ENTERING THE MAIN STREAM OF TRAFFIC 1.
IS AT TIMES VERY DIFFICULT. WITH THE ADDITION OF MORE TRAFFIC, AND ALSO
A TRAFFIC LIGHT A SHORT DISTANCE AWAY IT WOULD BE EVEN MORE DIFFICULT, AND
DANGEROUS.
BLAINE AVE. N.E. IS NOW A VERY NARROW ROAD IN NEED OF REPAIR, WITH
NO FIRE HYDRANTS, AND A MINIMAL SOURCE OF WATER THROUGH A SMALL PIPE
FROM MONTERY TERRACE.
I FEEL THAT IF THIS DEVELOPMENT IS ALLOWED, THEN BLAINE AVE. N.E.
SHOULD BE TIED INTO THE MAIN ACCESS ROAD AT THE TRAFFIC LIGHT, AND THE
ROAD UPGRADED TO ACCOMODATE EMERGENCY TRAFFIC. ALSO AT THIS TIME THE
CITY MIGHT CONSIDER CONSTRUCTION OF A SEWER TO SERVE THE AREA.
1ERI/S TRULY YOURS,,
RAY BA,RkLEAUX
RESIDENT,
154 BLAINE AVE. N.E.
E. B. Brady
14.2 Blaine Avenue N. E.
Renton, WA 98055
41
Response to Comments from Ray Barilleaux and E.B. Brady
Comment Number: 1
It is acknowledged that present. traffic volumes on N.E. Third Street render
access from Blaine Road hazardous and difficult. However, the installation of
a traffic control signal at the intersection of N.E. Third Street and the site's
entrance driveway would not exacerbate this condition. Rather, it is likely that
such a signal would produce gaps in the downstream traffic flow, thereby increas-
ing the efficiency of the Blaine Road exit.
Comment Number: 2
As indicated on page 86 of the Draft EIS, it will be necessary to install a loop
water service system to be located in the rights-of-way of both Blaine Road and
the entrance driveway. When placement of this line is complete, Blaine Road
would be improved to meet standards that would permit heavy fire and emergency
equipment to safely utilize the roadway. In addition, curves would be designed
to comply with the fire department's minimum radius requirements.
Comment Number: 3
As stated on page 87 of the Draft EIS, sewer facilities will be provided to the
site with the installation of an 8-inch line down the bluff along the southwest
side of the site. This pipe will tie directly into the Metro sewer trunk loca-
ted along Maple Valley Highway.
42
TO: Planning Director Marc, 6, 1981
municipal Building
200 Mill Avenue Soutw
Renton, Waswington 9805,
FROM: William L. Cokeley
Subject: !IB 'radco Development
Twe Draft `nviornmental Impact Statement iosued January 1981,
does not c,natitute a full disclosure of enviormmental effects.
Twe most glaring deficiency is twat it almost totally ignores
twe adverse effect on a nearly residential community wwicw
is one of twe best in Renton. Monterey Terrace will be im-
pacted severly in several ways. Twe s.atement swould be re-
vised to include twoae effects and twe plan altered to mitigate
twe damage as mucw as possuble.
1 few years age public wearings were weld by twe Renton Flanning
Commission and as a result of local concerns twe residents of
gonterey were promised a 1002t. Greenbelt and an area of a 1 2.
zoning near tweir "omea. Twe buffer zone is now some land-
seeping, but 'de are not told wwat twat means. It is evident twat
twe developer is receiving more consideration twan twe voters
already iiv:ng in twe area.
illiam L. Cokeley
64 Monterey P1. N
Renton, Waswington 9805:
43
Response to Comments from William L. Cokely
Comment Number: 1
The Draft EIS does enumerate several impacts resulting from project implementation
which would adversely affect the residents of Monterey Terrace. The most signif-
icant adverse impact on the nearby community would be the construction noise, the
effects of which are discussed in full on pages 89 and 90 of the Draft EIS. Miti-
gations for these impacts are listed on pages 5, 48, and 103-104 of the Draft
EIS.
2 .
The impact on views from the single family residences abutting the site is noted
on page 91 of the Draft EIS. Although no view blockage would occur, the open
space presently existing on the site would be replaced with residential develop-
ment. The landscaping buffer proposed to be planted between Monterey Terrace and
the northeast portion of the site is anticipated to mitigate this alteration in
view. Similarly, impacts of light and glare generated from the proposed residen-
tial development are expected to be largely mitigated by this landscaping buffer,
as well as by distance. (Page 49 of the Draft EIS.)
The impacts of an additional 2,546 vehicle trips per day to be generated from
project implementation are discussed on pages 60-69 of the Draft EIS. It is
stated that all the parking demand associated with the development is anticipated
to be accomodated on-site, thereby not impacting the residents of Monterey
Terrace.
However, the intersection of N.E. Third Street and Sunset Blvd. would be moder-
ately impacted during the morning peak hour and project related traffic would
add 160 vehicles to the intersection during the evening peak hour. Residents of
Monterey Terrace who utilize the intersection at these times of day may perceive
the resulting increased congestion.
44
2611 N.E. 4 St. #234
Renton, Wash. 98055
March 6, 1981
David Clemens, Director
Planning Department
City of Renton
300 Mill Avenue South
Renton, Wash. 98055
Re: Eradco Project
Dear Mr. Clemens,
On behalf of the Vantage Point Condominium Owners
Association, I should like to call to your attention some con-
cerns about the Eradco Project proposal and its effect on the
Renton Highlands community.
Although this project is not immediately adjacent to
Vantage Point, the proposed ingress/egress for Eradco residents
would be the N.E. 3rd Street corridor. It is a known fact that
traffic at the junction of N:E. 3rd St. and Sunset has alreadyreachedLevel "F" capacity - or 18% over the maximum for which
it was designed. The Developer of Eradco claims that the 425
units in his project would "only" add another 6% impact to the
traffic flow. Presumably, these aforementioned percentages are
based on current, actual traffic densities - plus the estimated
Eradco impact.
However, I should like to call attention to the many
vehicles about to increase the traffic flow from projects under
construction dr are at various stages of development :
Homecraft: N.E. 3rd/N.E.4th and Edmonds N.E.
280 units proposed
Highbury Park: Edmonds N.E. & N.E. 4th
97 lots
21 homes presently under
construction
Hilltop Apts . : 158 units
Mastro Development : 244 units
In addition to the actual and proposed number of vehicles
using (or about to use) the N.E.3rd St. corridor, I understand
that Homecraft, in its proposal, wishes to extend Edmonds Ave .N.E.
between N.E. 3rd and N.E. 4th to permit its project owners ingress/
egress directly on to N.E. 3rd. In order to do this , they are rec-
ommending a turn lane (left turn going East) at what will become
the corner of Edmonds N.E. (extended) and N.E. 3rd.
In addition also, Eradco proposes a similar turn lane
left turn going West) at what will become the corner entrance
to the Mount Olivet Cemetery Road and N.E. 3rd St. to give its
project residents access (ingress when traveling West) .
45
2-
Both Homecraft and Eradco are proposing traffic lightsinadditiontotheseturnlanes . Although I can understand the
logic of these two developers on behalf of their future purchasers,I fail to see how two additional traffic lights coupled with two
additional turn lanes (within several hundreds of feet of each Z
other) will help to increase the smoothness of the traffic flow
and mitigate this traffic problem. Apparently an even greaterhindrancetobothEast-West flow of through traffic would be
created by even one of these Developers being permitted to pursuethisplan, let alone two Developers doing so.
According to an estimate of traffic to be generated bytheEradcoProject (Renton Record-Chronicle 2/4/81) , 2,546 vehicletripsper. day was listed. Presumably, this accounts only for reg-ular commuter traffic. However, with a project this large (425units) , there needs to be a consideration of daily school bustrafficandservicevehicles, as well as occasional public vehicles 3
police, fire, ambulance, etc. ) , thereby bringing the total ofregularvehiculartripstoaconsiderablyhigherfigure. Also,
when considering school bus traffic in peak morning drive time,consideration must be given to the stop and go effect on all 44trafficinbothdirectionsduringstudentpickup.
Aside from traffic problems, the other major concern I
wish to present relates to the increased burden on city services :i.e. fire, police, schools, hospitals, etc. , which according toEradco 's impact statem6nt, would be negligible. Eradco sees "noadditionalneedfortheexpansionoftheseservices . " 5`
This latter conclusion is irresponsible and preposterous.As a professional public school employee, I can attest to the factthateachadditionalchildinaschoolcreatesanimpactonservices .The necessity of creating new school bus routes where none existedbeforeisasignificantcaseinpoint. )
In conclusion, I suggest that the various major impactsthatthedevelopmentoftheEradcoProject (as proposed) wouldcreateseriousproblemsandhardshipsforthecommunityandCity
6
services, thless some of the possible solutions (particularlytraffic) are addressed PRIOR to development.
Sincerely,
Malka Pricks, President
Vantage Point Condominium
Owners Association
46
Response to Comments from Malka Fricks, President of the Vantage Point
Condominium Owners Association
Comment Number: 1
The comments related to the impacts of development both within the city limits,
and beyond is well taken. The question of whether to limit future development
is both an environmental and policy issue. This and other EISs can assess their
levels of environmental impacts. However, a decision as to whether these impacts
are of sufficient magnitude to warrant denial of permits for further development
must be made at the policy level by the appropriate legislative body.
It is apparent from the information available in the ERADCO PUD Draft EIS that
the future consequences of growth and development in this general vicinity and
easterly of the East Renton Plateau will continue to adversely affect traffic cir-
culation. As a result, those secondary environmental consequences of increased
noise, air pollution, energy utilization and the cost of congestion upon the lo-
cal economy will continue to increase.
As stated in this Draft EIS, the current traffic volumes at N.E. Third Street
and Sunset Blvd. are at a level of service D. The implementation of this pro-
posal will add 6-7% additional traffic, while other developments within the City
in the vicinity of this subject site will add an additional 4000+ daily trips to
this corridor over the next several years. At the same time, the level of traf-
fic increase as a result of permits issued in King County have been adding an
average of 3 to 5% increase in daily trips each year.
The result is a continuing and complex series of traffic and related secondary
environmental impacts which apparently have few immediate solutions beyond minor
short-term relief. The Environmental Review Committee, Hearing Examiner and City
Council must consider these consequences in the plan review process for this and
any future development in this immediate area.
Comment Number: 2
For a detailed discussion of proposed traffic improvements for the intersection
of the primary access road and N.E. Third Street, please refer to the response to
comment 1, letter from Renton Engineering Department on page 31 of this docu-
ment.
Comment Number: 3
The traffic consultant utilized the trip generation rates for various residential
uses provided in the "Institute of Transportation Engineers Trip Generation Manual"
published in 1976. The recommended average weekday trip generation rates of 6.1
trips per day per apartment unit and 5.6 trips per day per condominium unit do not
apply solely to commuter traffic. These figures account for all associated ve-
hicle traffic, including emergency, service and public vehicles.
47
Response to Comments from Malka Pricks, President of the Vantage Point
Condominium Owners Association, Continued
Comment Number: 4
Comment noted. The discussion of traffic impacts during the morning peak hour on
page 64 of the Draft EIS is hereby amended to include the following:
The ERADCO PUD could potentially contain about 258 school-aged children
who would be relying upon bus transportation to and from school. On
N.E. Third Street, morning bus pickup, which coincides with the morning
peak hour, would momentarily disrupt traffic flow in both directions
when children are boarding the bus . Afternoon school bus service oc-
curs prior to the evening peak hour, and thus would affect a traffic
flow of considerably reduced volume."
Comment Number: 5
In the preparation of this Draft EIS, representatives of the fire and police
departments, the school district and Valley General Hospital were apprised of
the nature and scope of the proposed ERADCO PUD. Those individuals assessed
the potential impacts of the development on their respective public services
and indicated to the consultant the degree of impact, as well as the extent of
expansion of personnel and/or equipment that would be necessary.
It is important to note that additional population can have an impact on a spe-
cific service without creating the need for expansion of those services in terms
of personnel and equipment.
Commment Number: 6
The intent of the EIS process is to identify potential adverse impacts resulting
from a specific development and recommend pertinent mitigations to minimize
those impacts. The Draft and Final EISs for the ERADCO PUD fulfill this pur-
pose. It will be the responsibility of the decisionmaker to decide which miti-
gations will be imposed as a condition of project approval.
48
February 26, 1981
The Monterey Club
118 Monterey Club
Renton, Washington 98055
David R. Clemens, Acting Planning Director
The City of Renton
Municipal Building
200 Mill Ave. South
Renton, Washington 98055
Dear Mr. Clemens,
In response to your letter of January 30, 1981, concerning a
planned unit development by ERADCO, our Monterey Club met and
disi:ussed the Environmental Impact statement. As a result of that meeting,
we :'eel that the following concerns be given the highest consideration.
That a covenant be included to exclude Blaine Avenue
from being used by construction vehicles-that it be
used for emergency access only.
That the sewer and water systems be separate and not
tied in with the present Monterey Terrace system. Z.
That the newly constructed signal light at the primary
access road and Third Avenue.North be syncronized 3
with the existing signal light at Monterey Dr. N.E.
and Third Avenue to allow an even flow of traffic.
That the caliber of the newly constructed buildings
and houses be compatible with those existing in 4
Monterey Terrace-that they compliment each other in
general appearance.
That the set-back or buffer zone between the two areas
5beofsufficientwidthandproperlymaintainedbythe
development company.
That a foot trail be constructed from the new
development to Maple Valley Highway for easy access
to the park grounds area-to ease the possibility of 6
new tennants cutting through Monterey Terrace
properties.
Sincerely,
11%/1.-ed
Richard M. Houser, r sident
Monterey Club
49
Response to Comments from Richard M. Houser, President of The Monterey Club
Comment Number: 1
As stated on page 119 of the Draft EIS, the primary access road will be used
for heavy construction equipment and that only small vehicles would use the
Blaine Avenue N.E. access.
Comment Number: 2
As discussed on pages 86 and 87 of the Draft EIS, independent water and sewer
services would be installed to serve the proposed action.
Comment Number: 3
It is recommended that the proposed traffic signal be a full-actuated volume-
density signal as is the existing signal at Monterey Drive and N.E. Third Street.
This type of operation provides the most efficient and safe operation in the
case where the volumes on intersecting streets are significantly dissimilar.
The proposed traffic signal would provide preferential service to N.E. Third
Street and would be less likely to arbitrarily terminate service to traffic on
N.E. Third Street than would a synchronized traffic signal.
Comment Number: 4
The configuration of zoning densities throughout the site, as illustrated on
page 52 of the Draft EIS, ensures that low density development (a maximum of 9
dwelling units per acre) would be constructed on the portion of the site ad-
jacent to Monterey Terrace.
All buildings within this R-1 zone would be attached "row house" type structures,
with a maximum of five dwelling units in each building. No building would ex-
ceed 25 feet in height.
The exterior building materials will consist of natural wood and stucco.
Comment Number: 5
Comment noted. A 25-foot wide landscaping buffer to be maintained by the pro-
ponent will be planted between Monterey Terrace and the R-1 portion of the site.
Comment Number: 6
A mitigating measure suggesting that a walking trail be constructed through the
greenbelt to provide pedestrian access to Cedar River Park has been included
on pages 10, 80 and 105 of the Draft EIS. Implementation of such a measure
could be imposed by the decisionmaker as a condition of project approval.
50
ftfl. H00flD E fiSSUCIfITES • PROFESSIONAL ENGINEERS
1703 DEXTER AVENUE NORTH
SEATTLE,WASHINGTON 98109
TELEPHONE(2061 285-0400
March 6 , 1981
Mr . Dave Clemens , Planning Director
City of Renton
Planning Department
200 Mill Avenue South
Renton , Washington 98055
Dear Mr . Clemens :
Cemetery Spring Water Supply
Concerning the roadway , Edmonds Avenue Northeast extension ,
we have discussed the drainage patterns with our client . The
improvement made for collective and channeling drainage appears
satisfactory except for the lower discharge that is still
causing erosion. However , it is my considered opinion that
this can only satisfactorily handle runoff generated on the
roadway section only and not contributory runoff.
Relative to the Eradco E . I . S . : it seems that the hydrology
studies and drainage plan do not adequately protect the ground j -
water conditions for the contributory area of the cemetery
water supply .
Yours very truly ,
gig(`,
D. A . , Hogan
DAH/dd
cc : Mr . James Colt
51
Response to Comments from Mr. D.A. Hogan
Comment Number: 1
In response to this concern about the potential impacts of the proposed ERADCO
PUD on the contributory ground water for the cemetery water supply, Mr. Thomas
Bekey of Rittenhouse-Zeman & Associates, Inc. was retained to conduct an inves-
tigation of ground water conditions in the site vicinity. A letter summarizing
the existing conditions and potential impacts of the ERADCO PUD on the ground
water has been included as Appendix B of this document.
It was found that surface water drains from the cemetery toward the subject site
or toward Monterey Terrace, and surface runoff from the site flows south, to-
ward the Cedar River. Based on these observations, it is not anticipated that
development of the ERADCO PUD should appreciably impact the water supply for
Mount Olivet Cemetery.
52
Feb . 18 , 1981
City of Renton
Municipal Building
Renton , Wash . 98055
Attn : David Clemens
Subject : "Eradco" E . I . S .
The proposed development by Environmental Research and
Development Corp . sounds very good for the City of Renton .
The additional revenue from taxes and consumer spending is —'
definitly a bonus . The reason I am writing this letter is
to complain , or remark , about the access to the development
from N . E . 3rd . The addition of 425 units will increase the
already burgeoning traffic that now exists on Cemetary road .
I have seen cemetary road go from a two lane road to four
lanes in ten years . The volumn of traffic has steadily grown
during that time until it is now unbearable in the morining
and evening .
The snow we had Wednesday proved that the corridor as it
now exists is inadequate . There must be considered in this
proposal additional avenues of access and degress . I am
afraid that with the new apartments going in across from
Renton Voc . Tech , and the new 425 units proposed it will
bring the traffic everyday to a complete standstill .
Thank You
William Pitt
14454 196th S . E .
Renton , Wash . 98055
53
Response to Comments from William Pitt
Comment Number: 1
The issue of additional avenues of access for development in the vicinity of
the proposed ERADCO PUD is discussed in detail on page 31 of this document in
the response to comment 1 , letter from the Renton Engineering Department.
54
LAW OFFICES OF
SETCHELL &GATHE
Larry Setchell,P.S.
Theodore H.Gathe,P.S.
Seth M.("Kelly")Fulcher,Jr.
March 4, 1981
Planning Department
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Attention: David R. Clemens
Re: Draft Environmental Impact Statement
Eradco - Planned Unit Development
Dear Mr. Clemens:
We represent American Memorial Services, Inc. whose
wholly owned subsidiary is Mount Olivet Cemetery. Sometime
ago, American Memorial Services granted an easement to Kent
Highlands which easement extended from Northeast Third
Avenue easterly to property then owned by Kent Highlands.
That property was subsequently conveyed to Eradco and
comprises the PUD which is the subject of the above-
mentioned draft EIS.
Eradco has repeatedly promised American Memorial
Services that it would construct a roadway extending from
Northeast Third accross Mount Olivet property to the Eradco
site. Construction of this site constituted the con-
sideration for granting the easement and Eradco' s failure to
construct said road has hampered Mount Olivet's reclamation
plans and caused loss of substantial revenues from its fill
and grade operation.
American Memorial Services and Mount Olivet have no
choice but to institute suit against Eradco to vacate the
easement and to seek damages.
The draft EIS describes access from Northeast Third
Street as the "primary" access to the Eradco property. (See
page 60 - draft EIS ) . The alternative access extending from
the Maple Valley Highway to the south portion of the subject
site is described in the EIS as being "econmically and '
environmentally unviable" (see page 99 - EIS) . Destruction
of a long strip of major vegetation in the greenbelt area
between the subject site and the Maple Valley Highway is
unacceptable according to the draft EIS. (See page 41) . In
addition to the items mentioned above, the excessively steep
grade (see page 31) and the question of stability of the
soil and erosion problems (see page 33) seem to rule out the
possibility of using the alternate access route.
4111 East Madison Street SeattleWashington 98112 206/328-2204
Planning Department
March 4 , 1981
Page Two
Eradco's propectus for the sale of limited partnership
shares (known as Monterey Terrace Associates) lists
Northeast Third and the easement route as the only access to
the property. Likewise, on page 19 of the draft EIS, it is
stated that the easterly access route will be prepared for
heavy construction vehicles however no mention is made as to
whether or not the alternate access route would be suitable
for use by such heavy construction vehicles and machinery.
If the easement in question is vacated by the court, 1.
Eradco' s primary access route will not be available.
The draft EIS neither raises the possibility that the
primary access would be unavailable nor fully addresses all
impacts associated with using the Maple Valley route as the
major access.
With regard to water conditions, American Memorial
Services challenges the adequacy of the EIS ' s analysis con-
tained on pages 38-39. There is surface water on the site
in addition to seasonal ponding at the southeast corner.
The northeast portion of the property in the R3 and R4 zones
contains springs which together with rainfall absorption
flow in a northerly-northeasterly direction. This flow is ,
in part, a source of recharging the ground water in the
Segale pit area. The flow from that pit, both surface and
ground water, forms the water supply for Mount Olivet. Loss
of water absorption through construction of impermeable sur-
faces and destruction and/or redirection of underground
springs could affect Mount Olivet ' s water. None of these
considerations appear in the EIS.
In addition, while discussion of buffer areas may be
3confinedtotheplannedunitdevelopment, there is no indi-
cation in the draft EIS as to how Mount Olivet Cemetery will
be properly buffered from the Eradco development.
Please advise me of the public hearing date with regard
to this draft EIS .
Very truly yours,
THEODORE H. GATHE, P.S .
I
By 4(2ir -- r`
Theodore H. Gathe
THG/dag
cc: American Memorial Services
56
Response to Comments from Theodore H. Gathe
Comment Number: 1
According to Ms. Roberta Hayhurst, representative for the proponent, Contract
performance for construction of the roadway and payment for same is presently
being negotiated by the three involved parties: Stoneway Sand and Gravel Com-
pany, American Memorial Services, Inc. and the Environmental Research and Devel-
opment Corporation (ERADCO) .
Comment Number: 2
In response to this concern about the potential impacts of the proposed ERADCO
PUD on the contributory ground water for the cemetery water supply, Mr. Thomas
Bekey of Rittenhouse-Zeman & Associates, Inc. was retained to conduct an inves-
tigation of ground water conditions in the site vicinity. A letter summarizing
the existing conditions and potential impacts of the ERADCO PUD on the ground
water has been included as Appendix B of this document.
It was found that surface water drains from the cemetery toward the subject
site or toward Monterey Terrace, and surface runoff from the site flows south,
toward the Cedar River. Based on these observations, it is not anticipated that
development of the ERADCO PUD should appreciably impact the water supply for
Mount Olivet Cemetery.
Comment Number: 3
To reflect the concern about screening of the proposal from Mount Olivet Cemetery,
the following information is hereby added to the discussion of "Aesthetics -
Impacts" on page 91 of the Draft EIS as follows:
The cemetery adjacent to the north is screened from the subject site
both by its increased elevation and by several existing trees which
will remain upon development. In addition, some landscaping will be
planted along that perimeter of the site, which will act to somewhat
buffer the cemetery from the proposed action."
57
LETTERS NOT REQUIRING RESPONSES
58
HT Of
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Ecological Services
2625 Parkmont Lane, S.W. , Bldg. B-3
Olympia, Washington 98502
Fe)ruary 4, 1981
Mr. David R. Clemens
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton , Washington 98055
RE : DRAFT ENVIRONMENTAL IMPACT STATEMENT, Eradco Planned Unit Development,
dated 1/30/81
Die to recent changes in program emphasis, we will be unable to comment on
the referenced draft environmental impact statement.
It should be noted that the proposed project may be subject to permits for
which we have review responsibilities. Accordingly, our comments do not
preclude an additional and separate evaluation by the U.S. Fish and Wildlife
Service, pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661,
et seq. ) , if eventual project development requires a permit from the
U.S. Coast Guard and/or the Corps of Engineers, U.S. Army (Sections 9 and
10 of the River and Harbor Act of 1899 and Section 404 of P.L. 92-500) .
In review of permit applications, the Fish and Wildlife Service may concur,
with or without stipulations, or object to the proposed work, depending on
specific construction practices which may impact fish and wildlife resources.
In the event that such permits do become necessary, we would encourage the
project -sponsor to contact our office (phone 206-753-9440) prior to permit
application. We may be able to give guidance on design criteria which will
facilitate the permit-review process.
We appreciate notification of this proposed project and the opportunity to
conment on its potential impact on fish and wildlife resources.
Siicerely,
Charles A. Dunn
Fi ?ld Supervisor
cc: WDE
WDF
WDG
EPA
BIA
NMFS
Project Sponsor
59
TAT6
f'
y STATE OF OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION
4
4f' '"y = WASHINGTON 111 West Twenty-First Avenue,M.S.KL-11,Olympia,Washington 98504 206/753-4011
dH ..
February 5, 1981
David Clemens, Acting Planning Director
Municipal Building
200 Mill Avenue South
Renton, WA 98055
In reply refer to: 114-C-KI-14
Re: Eradco Planned Unit Development
Dear Mr. Clemens:
We have reviewed your draft environmental impact statement and find
there are no historic or archaeological properties on the State or
National Register of Historic Places, or the Washington State Inven-
tory of Historic Places, that will be impacted by the project.
In the event that unknown archaeological resources are inadvertently
unearthed during construction activities, please notify the Office of
Archaeology and Historic Preservation in Olympia, and the Washington
Archaeological Research Center, Pullman, Washington.
Sincerely,
Sheila A. Stump
Archaeologist
db
Form AHP R-6 (1/81)3
li
STAT£
t STATE OFDEPARTMENT OF FISHERIES
WASHINGTON 115 General Administration Building,Olympia,Washington 98504 206/753-6000
John Spellman
Governor
February 6, 1981
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Attention Mr. David Clemens
Gentlemen:
Draft EIS-ERADCO Planned Unit Development
We have reviewed the above referenced document and offer the following
general comments. Our main concern is the possibility of sediment, oil
and other pollutants reaching nearby salmon-producing streams. Adherence
to city ordinances regarding stormwater control should help minimize
detrimental impacts to local aquatic habitat. If you have any questions,
please contact our Natural Production Division at (206) 753-6650.
Sincerely,
c--1.4C1‘:51'.\ "31e-C1(21512- 1°-2-
Rolland A. Schmitten,
Di rector
cc: Department of Game
Department of Ecology
3
61
CITY OF Tartly
1;40 March 2, 1981
I•\crA
David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
RE: ERADCO - Planned Unit Development (Draft EIS)
Thank you for the opportunity to comment on the ERADCO
P.U.D. Draft EIS. This department has reviewed the document
and has no comment to offer.
incerely,
1"1"-e--17444
J es P. Harris
Planning Director
j
4141/0140
62
P.O.BOX 310/220 SO.4th AVE./KENT,WASHINGTON 98031 /TELEPHONE (206)872-3300
APPENDICES
A. Excerpt of Draft Wastewater Management Plan for the Lake
Washington/Green River Basins.
B. Ground Water Evaluation by Rittenhouse-Zeman & Associates,
Inc.
63
Appendix A
DRAFT WASTEWATER MANAGEMENT PLAN
FOR THE
LAKE WASHINGTON/GREEN RIVER BASINS
DECEMBER, 1980
MUNICIPALITY OF METROPOLITAN SEATTLE
64
Interim Measures to Protect Water Quality. The four final alterna-
tives identified in the Draft Plan all entail major construction
activities which are scheduled for completion in 1985. During
this construction period Renton treatment plant average wet
weather flows are projected to increase from 41 mgd to '50 mgd,
excluding the Redmond Connection. Bringing the Redmond Connec-
tion on line prior to the completion of the Phase 1 expansion
levels are brought down to an acceptable standard. Ammonia,
on the other hand, is a more complex problem requiring the use •of measures which are less readily implemented. Many of the
ammonia reduction measures identified below and summarized inFigure4-5a require long lead times, are capital intensive and
provide only marginal reductions in ammonia discharges to the
river.
While few readily implementable solutions are available, Metro
recognizes the need to reduce ammonia discharges in order to
protect the river' s fisheries resource. As a result, the ammonia
reduction measures are grouped into two categories. The first,
Measures to be Implemented, " contains those actions which are
currently being undertaken to reduce the ammonia problem.The second group, "Additional Measures Available, " represents
measures which could be implemented should additional protectionbenecessaryinthefuture.
Measures to be Implemented
1) Fast Track Implementation of Plant Expansion - Construction
of the aeration system combined with chemical 'addition in
the primary system could allow nitrification of all the
effluent, significantly reducing ammonia discharges . This
measure is being implemented as an interim measure.
2) Diversion of Flow via Sludge Force Mains - Approximately2mgdofsludgemixedwithpartiallytreatedwastewater are
sent through force mains to the West Point treatment plantforsolidsprocessing. Modifications are currently beingmadetothesludgeforcemainstodivertanadditional3 mgd
of partially treated wastewater to the West Point system.
This measure will reduce wastewater and ammonia discharges
to the river during the 1981 summer low flow period.
3) Reduce Summer Flushing - Metro, as well as a number of
local sewer agencies, flushes collection lines during summer
months to prevent sedimentation. This action results in
the dilution of ammonia found in the wastewater. While
summer flushing itself does not affect the plant' s ammoniadischarge, it does reduce the effectiveness of any diversion
measures intended to reduce ammonia levels in the river.
Plans call for reducing the use of flushing in order to
maximize the effectiveness of the sludge force main diver-
sion in the summer of 1981.
Additional Measures Available
1) Interim vitrification with Existing Facilities - Modifications
could be made to the treatment plant to nitrify a portion of
the wastewater to reduce ammonia discharge.
2) Construct Special Nitrification Facilities - Ammonia stripping,
roughing filters, and breakpoint chlorination could be used
65
would further increase flow by an additional 4 mgd. Recognizing
that the existing treatment plant is operating in excess of its
design capacity and water quality problems currently exist in
the Duwamish River, the question arises as to what measures can
be implemented to cope with these projected flows and maintain
an acceptable level of water quality while design and construc-
tion of the expanded facility is under way.
As previously mentioned in this chapter, several measures are
available to the treatment plant staff to reduce BOD and sus-
pended solid levels during periods of excessive flow. These
measures, consisting of wastewater storage, alum addition,
effluent blending and biological "stressing, " have proven effec-
tive in meeting the plant ' s NPDES permit requirements in the
past and are anticipated to continue to do so during the interim
period prior to completion of the Phase 1 expansion.
Metro recognizes that the effectiveness of these measures is
dependent upon sufficient funding to assure that adequate staffing,
equipment and chemicals are provided to optimize treatment plant
performance. Throughout the upcoming construction period Metro
is committed to the use of these measures in a manner which max-
imizes the existing plant ' s performance with respect to BOD
and suspended solids removals.
While the above measures should prove adequate to maintain BOD
and suspended solids within the requirements of the NPDES permit
during the critical low flow periods , they cannot assure that
permit limits will be met throughout the year. Process upset
triggered by excessive wastewater flows will continue to result
in occasional violations of the permit ' s requirements , especially
during the winter months . As wastewater flows increase through
1985, the frequency of these violations can be expected to
increase. The impact on water quality in the Duwamish River due
to these violations should be negligible, as their occurrence
will coincide with high river flows which should provide suffi-
cient assimilative capacity to accept these increased wastewater
loads.
Other water quality problems in the river which have been attri-
buted in part to the plant ' s wastewater discharge include ammonia ,
dissolved oxygen, temperature, residual chlorine, nitrate, toxi-
cants and effluent dilution ratios. These parameters are not
significantly affected by the measures currently used to maintain
acceptable BOD and suspended solids discharge levels and will
remain a water quality concern until effluent is removed from
the river by completion of the Phase 1 program. Two of these
parameters, chlorine and ammonia, pose a potential threat to
the river ' s fisheries resource requiring that measures be taken
to reduce their levels through the interim construction period.
The other parameters , while of long term concern, pose no immediate
threat during the interim period .
The chlorine problem is quite easily remedied, and steps have
been taken to modify the plant ' s chemical feed system to ensure
12 ?-
66
MM
FIGURE: 4-5e. INTERIM MEASURES TO REDUCE AMMONIA LOADING TO Till: UUWA?i1Sii RIVER
Potential Reduction Capital
of Current Costs Incremental O/M
Measures to be Implemented Ammonia Load to Metro _Costs to Metro Comments
1) Fast Track Implementa- high high moderate Implementation of this alternative would require 3 to S years.Lion of Plant Expansion
2) Diversion of Flow via slight slight slight Modifications currently being made to implement this diversion.S1uj a Force Mains
3) Reduced Summer Flushing slight none slight Requires implementation of some form of effluent diversion to achieve a slightamountofammoniaremoval.Additional Measures Available
1) Interim Nitrification with . moderate moderate high This alternative could seriously impact treatment plant operations thusExistingFacilities
jeopardizing overall effluent quality.
2) Construct Special Nitrifi-
cation Facilities
a) Ammonia stripping high high high High capital cost alternatives which could completely remove ammonia in theb) Roughing Filters high high high effluent. The facilities would have little or no use tipon completion ofve) breakpoint Chlorination high high high the Phase 1 program.
3) Use of Kent/Auburn Lagoons moderate moderate moderate Use of this alternative is dependent upon the availability of the
existing Kent and Auburn Lagoons.
4) Diversion of Flow via moderate high moderate High capital cost project which could allow up to 10 mccd to be diverted toRiverton/Renton Pump West Point. Would take 2 years to implement and would be of limited useful-Scatiuu
ncss once Phase 1 expansion is completed.
5) Diversion of Effluent high • high high Large amount of land area required near the treatment facility may not befurLandDisposal
available.
i) Local Agency Infiltration slight none none Requires implementation of some form of effluent diversion to achieve aControl
slight amount of ammonia removal.
7) Water Conservation slight none none Requires implementation of some form of effluent diversion to achieve a
slight amount of ammonia removal.
ll) Interim River Flow high none unknown The success of this alternative is dependent upon the cooperation of the U.S. Army CorpAugmentation
or Engineers in operating the Howard Hanson Dam, and the availability of stored water.
9) Fisheries Resource none moderate moderate Requires the cooperation of the Department of Fisheries.Protection
lu) Sewer Moratorium none none none The effectiveness of this alternative is questionable. Should it prove effective,its impact would be in the reduction of future anuuonialevels.
to significantly reduce ammonia discharges . These capital
intensive measures would have little utility upon completion
of, the Phase 1 program.
3) Use of Kent/Auburn Lagoons - The existing lagoons could be
used for nitrification of flows from the Auburn Interceptor.
Upon completion of lagoon treatment, wastewater would be
discharged to the Auburn Interceptor thus reducing the
treatment plant' s ammonia load.
4) Diversion of Flow via Riverton/Renton Pump Station - This
capital intensive measure could divert 10 mgd to the West'
Point system via a new force main system. The facility by
itself would be of little utility after completion of the
Phase 1 program.
5) Diversion of Effluent for Land Disposal - This measure calls
for diverting approximately half the plant' s flow to a
land disposal site of approximately 2 , 750 acres .
6) Local Agency Infiltration Control - Excessive infiltration
results in the dilution of ammonia found in wastewater.
The rehabilitation of collection systems having excessive
infiltration, by itself, would not reduce the ammonia problem.
However, in combination with a diversion measure it does act
to maximize the effectiveness of that measure by diverting
additional ammonia from the river. `
7) Water Conservation - Water conservation programs by local
water purveyors would concentrate ammonia found in wastewater.
Water conservation, by itself, would not reduce ammonia
levels in the river. However, in combination with a diver-
sion measure, water conservation would maximize a diversion ' s
effectiveness.
3) Interim River Flow Augmentation - Additional water could be
released from Howard Hanson Dam during critical low flow
periods to flush the estuary of ammonia and prevent the
occurrence of toxic ammonia levels .
9) Fisheries Resource Protection - A number of measures might
be implemented to protect the fisheries resource from the
ammonia problem. These might include physical diversion
of fish or implementation of replacement measures in the
event of a fish kill.
10) Sewer Moratorium - A moratorium on building and/or sewer
construction within the Renton service area would not reduce
existing ammonia levels; however, if effective, it would slow
the pace of further increases.
While few of the above measures in and of themselves solve the
ammonia problem, combinations of these measures can adecuately_
protect the river' s fisheries resource through the interim
126-
68
construction period. It is important to note that these interim
measures do not represent an alternative to the four final pro-
grams presented in this Draft Plan. They simply represent
options which are available to alleviate the most critical water
quality problem in the river at the present time while construc-
tion of the ultimate solution is completed. With increasing
wastewater flow the interim measures to reduce ammonia presented
here will become ever more expensive and less effective. The
key is to minimize the length of time the river is vulnerable
to the ammonia problem by completing the Phase 1 expansion as
soon as is practical.
1
1
1
1
127-
69
Appendix B
RITTENHOUSE-ZEMAN & ASSOCIATES, INC.
GEOLOGY & SOILS ENGINEERING
13837 N.E.8th Street,Bellevue,Washington 98005 (208) 748-8020
8050 S.W. Cirrus Drive, Beaverton, Oregon 97005 (509) 644-9141
17 April 1981 W-3601
ER DCO
Se Tac Office Building
18 00 Pacific Highway South
Se ttle, Washington 98188
Attention: Miss Roberta Hayhurst
Subject: Ground Water Evaluation
ERADCO - Monterey Terrace P.U.D.
At the request of Ms. Susan Prentke, of Urban Properties, we have visited the
su•ject parcel and the adjacent Mount Olivet Cemetery. We have also reviewed
water well data collected by the State of Washington' s Department of Ecology.
This letter summarizes our findings and conclusions, concerning ground water
co ditions in the vicinity of the development.
Generally, the Mount Olivet Cemetery property is at a higher elevation than the
immediately adjacent protion of the P.U.D. As a result, surface water drains
from the cemetery toward your development or the property to the west. Because
there is a deep ravine north of the cemetery, followed by N.E. Third Street,
surface waters do not reach the cemetery from the north. Gravel borrow oper-
ations east of your parcel and the cemetery intercept surface runoff from the
east.
Well log data, indicates that the ground water table generally slopes downward
from the northeast to the south and southwest. In addition, the only water
which we observed in the northeast portion of the site, appeared to be perched
on areas which have been "mudded up" by truck traffic. What evidence of sur-
ficial drainage we could observe, indicated that surface runoff flows to the
south, toward the Cedar River.
70
B-2
ERADCO W-3601
17 April 1981 Page Two
Based on these observations, we do not anticipate that development of this site
should appreciably impact, the Mount Olivet Cemetery's water supply. We appre-
ciate having this opportunity to assist you. If you have any questions, please
call .
Respectfully submitted,
RITTENHOUSE-ZEMAN & ASSOCIATES, INC.
Tom Bekey, Chief Geologist
cc: Susan Prentke/Urban Properties
4 Deborah Krouse/R.W. Thorpe & Associates
71
Ill
BEGINNINCi
OF FILE
FILE TITLE '
11...
1,
filICVF " ° "
itAadri° lilt ' • I
0 i A
j
4
OD&
p r— r
r I I.
Ill,A•
1
III I ' ?1'I 1 b HT. WH1,1
MON re- ; Q ^ . 1.68 Ac.1I.:El, L,It
up1,•;Y i 5 „`, 41 CM At All OLIVI I TAM'I
CJ I SO T ni Nuc01171Wi15:;
1 It)35 Ar.1
yy CJ 6 ...ta•
r. ....
G -_ . • Z —4,1, \ '
Sri'7, \•.'--_ 5pO
IS(,
k 14 ;121•.'
z'V; 35 j,
rl
12 '..` • 1105; 4,
iii. l•
1I 3•-- a ., m. I _= 1
1CI ,2 12' b 09
1via,•
Q
i
4.
o T
G
ER A
1 ;3, 13• a !:3. 12 II r l
t tI l I — w' 519• - W
I
MT,OLIVT-CEMETERY_Boo
f
51-8, W 1,
tf6).
r
co ,: Z 1Af --
II at.;21
1 it
F-
I Lr.i 1f i 01 z.
56,I ,: -
1W
tFL (
0 m
IAI Di IVI T u- - -. _:\ __
7k, 1:" /y':Lt L4IEBY It, .we.,,7 j
1`/'
f 1 Ii
itRC 1.
i 330' fx' '
til
pi i ,TO'i
R•I 1 As
I , , R,....5
sy pv'Pto
cti PaIStitegir ` 1 '}PARCEL C. ._ ) acre
P. 7, 1
R...A.
i PARc,E1.L -
o
1
e'
N 1 1
C
Ql r
I1
I
1
1
N Ifka1 ' , !
A\
J'\' -. _
4
N.RPACC CORP Ns, •,\ j
i t AL‘ : .,•,...‘,31 : :: - a.14/,,,.'\ p..C1
1 r Ages. `:, ,•Mi C coAHC i'(/
4 - :,...:. ....-_: ... •. .. Hi -.:,,,, -/
l : cam.I 'VW..: %r• / Y ,
1 ,'.•'.r _
qf
1 t A,i 1 ; silt r I
I
II 1 111 'III
0 -....
r
1 - ,/.
1.7!`/a 11G W11111 1
ADD ER :'S 68 ac. i/.r,, 1jI• - ••I 1.
I
NT
fy •
IiS , rl,.••:
11,
yl in.,
Z—
p w;y '• ,• - fI,:7•I All (It WI I Ch MI HY
I.
rli7J14174.
06.
141.
5.
5" f..f ll.....
f js
m' I of
ut 11 A ll W111 .,' a I• 4!lJ
1 :L!I:L
l ) Q 1i R' b 0, I I I
Q 1 1. .
T .R E- AlI i V
or:I
1
Si -(
i2 /
uT,t<IV T CEM TERYQ9R, k! Ev • 11 lob r W t_ I EM4 , ;
trla4jZI Jla:Z
t;
I
a --I•
LP;. e 1 ii it .1" .•,
1
O
e'
J i 'J a.Q r
Lc, 9! ' • // , Q
all 1..
sb I 11 o11vt 1 CCellkJ ,` "' .•I: Ctt,tllERY II<INs"1
I . II
L21
ic '
8`o' '
P
j N
1
c
I
CEL $j TO 3T o'•
i 1 l.5 t j
i 1 p
1 t ,.
J
1 Y i t1
r
I 1 5 5 etc
4!_ n!A
l '* '
06
1%,iRI'A!E 10 I-
CPS,LO
n\
t
1.‹........,...
l.\,A el. 2,
1
4 IN.0 9 ... ;\; V_ ;;::
4, .
Akrrs K_ c ti,11M1E
J 1:1 y. is
J y;
t
iI I
IC Fr )J J
i
I
RENJ`q'ON BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 088 - 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH 6 DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT : TERRACE ASSOCIATES.
PROJECT TI -LE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERTY
TO R-1, R• 2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PLANNED UNIT DEVELOPMENT.
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLIVE" CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO :
n PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
ENGINEERING DIVISION
11IRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
n FIRE PREVENTION BUREAU
1 PARKS & RECREATION DEPARTMENT
l (
BUILDING & ZONING DEPARTMENT
l ! POLICE DEPARTMENT
n POLIC ( DEVELOPMENT DEPARTMENT
l l OTHER 3 :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P , 1 , ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION :
n APPRO ED OAPPROVED WITHH CONDITIONS
l (
NOT APPROVED
3 es N E T 6" . V .r^1 S e S
41 I,3c. c-.,tie C.-h 94 CO..,, b +- / ,lecc- d-S k
c6 5 4 rYler° y(iy ftVytay ,17) De.drip-4
DATE : I L
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
REN'w vn4 BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 08f - 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH 6 DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT : TERRACE ASSOCIATES .
PROJECT TITLE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1, R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PLANNED UNIT DEVELOPMENT.
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLP'ET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO :
Eil PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
0 ENGINEERING DIVISION
TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
1:=1 BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
0 POLICY DEVELOPMENT DEPARTMENT
OTHE RS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITI1G , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 F' ,M, ON JANUARY 4, 1982
REVIEWING, DEPARTMENT/DIVISION : 4 -/JSVL-EC-i/ ('
APPROVED MI APPROVED WITH CONDITIONS NOT APPROVED
1
a cces - `a ad ex i - j 0-4-, 7-o S 4,`, A)E
tp tie fir`/ fit;
o rD d-P Y s.5 ' , 2 %o fi` /9>e2Z- 74'4-)-- C et 2 Sr; `\
6,.1i c g spcTioy vim f7Z / Ed Ate A) -
7L-4 r SELF j/(}CL.
t /a Y_ , -„ e_ ,A)c_. ,
sd k U r- s/-
a was7227 s;74(7'
DATE: //a/52-3
SIGNATURE: OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
RENTON BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - o8f - 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT : TERRACE ASSOCIATES.
PROJECT TITLE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1, R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PLANNED UNIT DEVELOPMENT.
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLIVET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO:
n PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
El ENGINEERING DIVISION
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
UTILITIES ENG . DIVISION
n FIRE PREVENTION BUREAU
1]PARKS & RECREATION DEPARTMENT
0 BUILDING & ZONING DEPARTMENT
n POLI :E DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M. ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION : //`7/kite*Atfi/
APPROVED En APPROVED WI H CONDITIONS 0 NOT APPROVED
freaove/Aolot
L/ 0 '. au 4' ) c . ewe", se eit,
ewe 6/0107di e. P rr C/I o d Sect he SI J
C/' /1u #(Y&$
SAlete/mteit
YI
1 elloefl V-% /7J G, // A hayl
d dG fileea7 U• / _i/ ado'
it %fieea spa// consike4d ?4,, /woe / tie/lice' / '
wes d1'ds /ae/ri ' 4/70/ s/wo•/,e/ g few/
1J )/9tema s/aW deP S. il".0 DATE : /Z ld it
R ORUTH0SIGNATUREOFDIRECTA r ED
1
REPRESENTATIVE
RENT uN BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 08F - 82
APPLICATION NO(S) ; REZONE (R-077-82)
ENVIRONMENTAL RESEARCH 6 DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT ; TERRACE ASSOCIATES.
PROJECT TITLE ; ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1, R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PLANNED UNIT DEVELOPMENT.
LOCATION ; LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLD,ET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO :
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
ENGINEERING DIVISION
TRAFFIC ENG, DIVISION SCHEDULED HEARING DATE :
C UTILITIES ENG . DIVISION
n FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT
0 POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
Li OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITIt\G , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 F .M. ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION :
APPFOVED APPROVED WITH CONDITIONS ONOT APPROVED
4,LL T/i'61 /7-) / 09 T//0 G- /mil8 .(v26: s (pfies tQ-81 T dk
r 0It /04 /9/r-S 7?6" c GPI L L. c L i T7hL 6-
6/ e L`er-y 7 tr7tJ T 6,-/J T 4/67 / m P/JR Cr ' o P/9 iP/r S
FA c/ L ,Tie w it - i3c " /» inio2 .
c-014 )e A
DATE: I4 % 3
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
RENTON BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF — osf — 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH 6 DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT : TERRACE ASSOCIATES .
PROJECT T ITLE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1 , R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PUNNED UNIT DEVELOPMENT,
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLI`'ET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO :
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
El ENGINEERING DIVISION
El TRAFFIC ENG . DIVISION SCHEDULED HEARING DATE :
E] UTILITIES ENG . DIVISION
IFIFIRE PREVENTION BUREAU
n PARKS & RECREATION DEPARTMENT J
CiTY OF RENTON
174
BUILDING & ZONING DEPARTMENT
A5 U U I[ D
JAN 5 1983
n POL] CE DEPARTMENT
Lk.r
POLICY DEVELOPMENT DEPARTMENT
I I OTHE RS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITIrG . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 F' .M. ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION :
APPROVED OAPPROVED WITH CONDITIONS ONOT APPROVED
i v5
DATE: / . 4C2—)
SIGNA F DIR OR OR AUTHORIZED REPRESENTATIVE
REN'i vol BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - ost - 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH 6 DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONEN1 : TERRACE ASSOCIATES.
PROJECT 'TITLE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1, R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PUNNED UNIT DEVELOPMENT.
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLIYET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO :
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
CJENGINEERING DIVISION
TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
UTILITIES ENG . DIVISION
FIRE PREVENTION BUREAU
PARk S & RECREATION DEPARTMENT arY©t RENTON
1-1RZONINGDEPARTMENTOBUILDING o
JAN 5 1°83F-1 POLICE DEPARTMENT
POL] CY DEVELOPMENT DEPARTMENT BUI`D1NC
OTHE RS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITIPG . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 FM,M, ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION :UrAry Deer
OAPPROVED APPROVED WITH CONDITIONS NOT APPROVED
UTILITY APPROVAL SUBJECT Tel
LATE COMERS AGREEMENT • WATER V,Es v6,.•rr k.J- ('"ii..o
LATE COMERS AGREEMENT • SEWER ygs
memo
SYSTEM DEVELOPMENT CHARGE • WATER yes .O - 1 -rrc.yerce°806;
r"N
P,C^'
SYSTEM DEVELOPMENT CHARGE • SEWER y s
SPECIAL ASSESSMENT AREA CHARGE • WATER No
SPECIAL ASSESSMENT AREA CHARGE • SEWER m
A7PROVED WATER PLAN c
APPROVED SEWER PLAN 4s-
APPROVED FIRE WORM LOCUMS
l
BY FIRE DEPT.
FIRE FLOW ANALYS' y€S
DATE:Y - 83
SIGNATURE DIRECTOR OR AUTHORIZED REPRESENTATIVE
RENTON BUILDING & ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 08E — 82
APPLICATION NO(S) : REZONE (R-077-82)
ENVIRONMENTAL RESEARCH b DEVELOPMENT COPORATION-GEN. PARTNER/MONTEREY
PROPONENT : TERRACE ASSOCIATES.
PROJECT TITLE : ERADCO PLANNED UNIT DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT: APPLICATION TO REZONE APPROXIMATELY 41.5 ACRES OF PROPERT
TO R-1, R-2, R-3 AND R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL USE IN THE FORM
OF A PLANNED UNIT DEVELOPMENT.
LOCATION : LOCATED NORTH OF SR-169 MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE AND
MT. OLI\ET CEMETERY AND WEST OF BONNEVILLE POWER RIGHT-OF-WAY.
TO:
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 1-5-82
LI ENGINEERING DIVISION
TRAFFIC ENG . DIVISION SCHEDULED HEARING DATE :
El UTILITIES ENG . DIVISION
n FIRE PREVENTION BUREAU
Ei PARKS & RECREATION DEPARTMENT
n BUILDING & ZONING DEPARTMENT
11 POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 F ,M, ON JANUARY 4, 1982
REVIEWING DEPARTMENT/DIVISION : L [7 L.
APPFOVED El APPROVED WITH CONDITIONS NOT APPROVED
DATE : /2 - Z
SIGN A OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
r
Real Estate•
Investments•Securities•Development
PITY OF R eNTQ J
I1 Tf
MAY 14 1985May13, 1985
KUILPING/ZONING DEPT,
Rojer J. Blaylock
Zoning Administrator
City of Renton
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Re: ERADCO/MONTEREY TERRACE ASSOCIATES rezone (R-077-82)
Dear Mr. Blaylock:
From a review of your letter of January 28th, 1985 , we noted
that while our rezone file would be kept open until July 1,
1985 as requested, an update of the general information in
the EIS would be necessary and a March meeting might be
necessary in order to review the rezone application process.
Unfortunately the pending sale of the KENT HIGHLANDS PROPERTIES
to Marsh Investment Co. , with whom we had resolved the
problem of the road straightening change to Edmonds and
development of the MONTEREY TERRACE PROPERTY, fell apart.
Renegotiations with KENT HIGHLANDS to resolve the several
matters relating to the legal actions dragged on without
final solution. The KENT HIGHLANDS PROPERTIES are once
again involved in a sales negotiation which could well
resolve the matters which have delayed our pursuit of the
rezone without resort to the courts and reopening of the
old Colt lawsuits and the question of temporary and per-
manent road easement representations.
18000 Pacific Highway South, Suite 1115, Seattle, Washington 98188 (206) 2)4-0080
o
May 13, 1985
Rojer J. Blaylock
Page 2
This letter is by way of explanation as to why a March
meeting re the rezone application was not requested and
the possible need for another request for an extension
of time to perfect the application originally applied
for.
Yours truly,
ENVIRONMENTAL RESEARCH &
DEVELOPMENT CORPORATION
11-4,
M.W. Smith
Land Management
MWS/ln
OF RFC4
t$
o THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o BARBARA Y. SHINPOCH, MAYOR MAXINE E.MOTOR.
o P CITY CLERK • (206) 235-2500
917'F0 SEPTET'
CERTIFICATE
STATE OF WASHINGTON)
ss.
COUNTY OF KING
On this 6th day of January 1983 at 9:30 a.m. I hereby certify the
following items are true and correct and constitue the complete file of
Eradco/Monterey Rezone 077-82 (except for maps) .
Maxine E. Motor, City Clerk
SUBSCRIBED AND SWORN TO BEFORE me this 6th day of January, 1983.
0, o ,
ary Public in and far-the State
of Washington, residing in Renton
IP
ML OLIVET 10J,
V -.
cri
co, Otteke
January 6 , 1983
RECEIVED C o
CITY OF RENTON 9.2t7Z£2,2 '
HEARING EXAMINER
Hearing Examiner JAN3 1983
city of Renton AM PM
iunicipal Building 7,8,9,10,11,12,1,2,3o415,6
Mill Avenue , South
er.ton , Washington 98055
Re : Letter of Appeal of the
ERADCO/Monterey Terrace
Rezone 41077-82
Dear Mr . Kaufman,
In December 1982 , I was informed by the Building &
Zoning Department that a new application for rezone was
received on December 3, 1982 . They suggested on December
6 . 1982 , that I would be interested in the file. Upon ex-
amination of the file at City Hall , I was informed by Mr .
Nelson that even though application was submitted by ERADCO
and was in the City ' s possession , it had not been "formally
accepted" by the City and was not complete . At this time,
the administrative processing section of the application
was totally blank, as were references to existing zoning .
I requested that the City notify Mt . Olivet upon
formal acceptance" and was assured that we would be . Fur-
ther, I disussed the application and existing litigation
regarding the City and zonirg policy in Superior Court and
17as informed by Mr . Nelson t . ,r>>til Mr . Lorry Warren re-
vi ,-coed the • jttet , the apptic_: tion "would not he accepted . "
mhseauei.t l scussic.ns vit ! Mr . lb December 1982
cnd January 1983 , we were again . nformed it had not been
accepted and he related it had been discussed with Mr . War-
ren, with no action being taken.
On January 6th , while examing files regarding ERADCO at
City Hall , I was informed verbally that the application was
formally accepted" and that an ERC meeting had been held
the day before with a "determination" that a Memorandum of
t; ncurrance was being issued today , January 6, 1983 . I was
rovided the attached draft a=. the representation of the
decision" but without signa.ture , as it had yet to be typed .
This draft is the "Memorandum of Concurrance" as represented
by the following department personnel who were . present : Mr .
Ron Nelson , Mr . Jerry Lind and Mr . Roger Blaylock . Also all
Cemetery, Mausoieur: Crematory & Gardens
547 • 100 Blaine Ave. N.E n+,gin NA 98057 • 206-255-0323
4110
Page 2 .
January 6 , 1983
Mr . Kaufman
documents in the file were copied and certified as to auth-
enticity by the City Clerk, at 9 : 30 am on January 6 , 1983 .
We are appealing the following actions by unknown department
beads or unknown persons employed by the City of Renton :
1 . Formal notice of acceptance of application has been
neither dated , signed or initialed by the unknown City
official .
2 . Mr . Dave Clemens , when asked , stated that he did not
knew who accepted the application. The failure to formally
c.cept and notify is an error in law .
3 . The certified copy with no acceptance indicated by
si Tnature , date or initial is attached .
4 . No notification of "formal acceptance" of application
was sent to applicant .
5 . No notification of acceptance was sent to Mt . Olivet ,
James Colt , Bulchis & Garrison or any parties of record in
this rezone application or the attorneys of record regarding
the lawsuit over the rezone property and ordinances govern-
ing the property (#3113 . )
6 . Mt . Olivet and any interested adjacent property own-
ers have been denied rights to challenge the sufficiency of
the application itself and further the right to be allowed
to be heard and to comment on the application and any file
documents due to failure to provide notice .
As of the 6th of January , 1963 at 9 : 30 am, the Master
i i cation has not been prc'per' L 7ceat L; by the City of
r : and until it is formally accepted , no action should
Lice . This may be an oversight by the City but 11 is
error in law and should be corrected and application for-
i I .• _: 'cepted prior to any further action, with notice of
iornal acceptance sent to any interested parties and parties
c2: rE-cord and applicant .
By way of further appeal , Mt . Olivet further contends
that the determination by the Utility Engineering Department ' s
Mr . Olson is totally incorrect and an error in fact based on
the file and records in the ERADCO files . Mt . Olivet will
introduce testimony , exhibits , maps , expert witnesses and
other supporting information" at the appeal hearing .
As Mr . Olson ' s "Interpretation/Determination" was made
on January 4 , 1983 (see attached exhibit) our appeal of his
Page 3 .
January 6 , 1983
Mr . Kaufman
interpretation of the environmental impacts is made in a
timely manner .
By way of further appeal , Mt . Olivet will introduce
testimony , exhibits , maps , expert witnesses and other sup-
porting information" in appealing each of the environmental
findings or interpretations by the appropriately noted
staff member" based on the records and files in the City
rf Renton as being improper, incorrect , an error in fact
nd having a potential detrimental "effect" on adjacent
property owners and other interested parties .
Document : Staff Member & Error :
ERC REVIEW Mr . Jim Matthews , Fire Marshall
Refers to an EIS which is not included
in application or presented for exam-
ination in the file .
ERC REVIEW Mr . Robert Hufnagle , Recreation Supr .
Refers to a Thorpe Report which is not
part of the application or included for
examination in the file available to
the public . His interpretation and
determinations are in error within the
scope of the projected 425 units .
ERC REVIEW Mr. James Hansen , Building Department
Indicates no impacts on review sheet
and refers to a final EIS which is not
part of this application .
EVELOPNENT
rLICATION
CIEW SHEET r . Jc-es Hansen , i irector and Author-
ized representative of City of Renton,
Building Department ; signed on December
28 , 1982 , the "Development Application
Review Sheet" approving the application
without conditions or comments .
By way of further appeal , neither the application or
any file documents indicate the Restrictive Covenants which
are supposedly in effect at this time and since 1977 , which
effect both the zoning and development of the properties .
The Restrictive Covenants must be considered with the appli-
cation for rezone as they run with the property . Further ,
the Rezone Certificate issued by Transamerica indicates
41/11 410
Page 4 .
January 6 , 1983
Mr . Kaufman
easement roadways running with the property, one of which
is in current litigation , which must be addressed during the
review process .
Mr . Dave Clemens of the Policy Department , recommends
approval with conditions .
Mt . Olivet appeals his decisions and interpretations
tl.c adequacy ant will provide expert testimony and
exhibits addressing the determinations .
Mr . Clemens further disregarded the Restrictive Cove-
nants which directly address access routes and other related
matters to this application in his determination or inter-
pretation .
Mt . Olivet further appeals the determination of Mr .
Ronald Olsen of the Utility Department , made on January 4,
1983 , in approving with conditions, as attached (see exhibit
1.") - his required Late Comers Agreements for sewer, water
ud other ut .'_ ic . :,ar es , may violate the easement agree-
ent referred t in the rezone file, Transamerica Rezone
Certificate , , 1 ccudd violate the rights of third parties
under these and ether agreements . Further testimony , doc-
uments and exhibits will be provided at the Hearing .
By way of further appeal , the City is in error as a
matter of law, in failing to consider the Restrictive Cov-
enants running with the land by way of Ordinance #3113 in
CAP. rezone application . Testimony and exhibits will add-
his issue at the appeal hearing .
as a mat t€r of law and errors in fact
interpretations made without suffi-
i nR inf orm,, ti.or: i. lot part of
n and the potential detrimental effects
t: visions entitle Mt . Oli,: et to be heard
i A hearing at the earliest date is re-
i :._. -our formal appeal from the errors
dc'terninatier: cited , based on the file of the City of
l.,2ntc- this date .
CellletEY Co . , Inc .
James L. Colt , President
iLC : dkc
attachments from file 077-82
OF R Eti
cr.,
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
c,
iilL
amm BARBARA Y. SHINPOCH, MAYOR • FINANCE DIRECTOR
09q co' MICHAEL J.MULCAHY
O9gTED SEP
P
235-2558
January 28, 1984
Patrick T. Easter
President
ERADCO Real Estate
1800C Pacific Highway S., Suite 1115
Seatt:e, WA 98188
Re: ERADCO/Monterey Terrace Associate Rezone (R-077-82)/Status
Dear 'vtr. Easter:
In response to your letter of January 9th and subsequent telephone conversation, we do
acknowledge that because of the lengthy legal actions that Monterey Terrace Associates
and ERADCO have been involved in that the City will keep the rezone file open for
appro<imately 6 months or until July 1, 1985. The Environmental Review Committee does
have some necessary action to update the general information in the EIS based upon a
Hearing Examiner decision back in 1984. We should probably sit down in March some time
to sort out all of the details and reestablish the order of review in the rezone application
procer;s.
Sincerely,
ROI
Roger J. Blaylock
Zonin j Administrator
RJB:1287Z:c1
y;
t, '
F:
4 yy gam,
it
Real Estate•
a
Investments•Serunties•Development
January 9, 1985
CITY C? ^E'?1ON
VP
City of Renton s$ W M 11 1985 FT)
BUILDING & ZONING DEPARTMENT
200 Mill Avenue So. (Municipal Building) iit.. :i',t`ti" % .T
Renton, WA 98055
Attn: Roger Blaylock,
Zoning Administrator
Re: ERADCO/MONTEREY TERRACE ASSOCIATES
Rezone R-077-82/Status
Dear Mr. Blaylock:
In answer to your letter dated December 14, 1984 to Mr. McIntosh, formerly
with our company, regarding the above numbered rezone application please be
advised as follows:
Monterey Terrace Associates and ERADCO have been involved in legal actions
with Kent Highland and American Memorial Services, Inc. for many months
which most have hopefully been resolved and the construction of the requir-
ed road is presently being negotiated with Kent Highlands. We ask that an
extension of 180 days be granted by your office to permit us to complete
the application originally applied for.
Please advise regarding this request.
Sincerely,
MONTEREY TERRACE ASSOCIATES
by It's General Partner:
FNV'iINMENTAL R'SE4RCH & DEVELOPMENT CORPORATION
atrick T. Easter,
It's President
PIE:kkd
18000 Pacific Highway South, Suite 1115, Seattle, Washington 98188 (206) 244-0080
rPei x • •
v 'r r e ,g4 ,-''+• Rt .....r=v .r>•z _
Y
v
k' •r'
r.
t yt}:t K'.t t t .z'^4 yt t!'?i'f t'{:
c
tilk e
c,
K x? ^ -
r
dae-1'S.
Y„ -'
f •
7not44-
1.
3•
ice
r
1 t'T''.Y r' 'tit 7 if `s y+,w 'f 's{ "?R k:
t
i` r71! r .—
5
I
OF R E14
I6 BUILDING & ZONING DEPARTMENT
mcg `` :` RONALD G. NELSON - DIRECTOR
Z rnp MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
097tf' SEPjEk
BARBARI, Y. SHINPOCH
MAYOR
December 14, 1984
Glen A McIntosh
Environmental Research & Development Corporation
1800J Pacific Highway S., Suite 1115
Seattle, WA 98188
Re: ERADCO/Monterey Terrace Associates Rezone R-077-82/Status
Dear Mr. McIntosh:
Plea .e find enclosed a check in the amount $98.84 remaining from the original
envixonmental review fees that were utilized to prepare the Draft Environmental Impact
Statement for the above project. This closes out the environmental review account for
the project.
The rezone application, R-077-82, is still pending. However, there has been no activity
on ypur part since January of 1983. We would appreciate some action on your part to
clarify the situation. If written directions are not received from your company by
Janu3ry 15, 1985, we will consider the file inactive and request that the Land Use Hearing
Examiner dismiss the application.
Sincerely,
Roger J. Blaylock
Zoniig Administrator
RJB:1215Z:c1
Encl)sure (Check)
R
s j.v}• }.
1..sT }Ae '. a k
R-017-82..
OF R4,
ti II
OFFICE OF THE CITY ATTORNEY • RENTON,WASHINGTON
Ci z111-7•• POST OFFICE BOX 626 100 S 2nd STREET • RENTON. WASHINGTON 98057 255-8678
0 .mum.
475
LAWRENCE J.WARREN, CITY ATTORNEY DANIEL KELLOGG, ASSISTANT CITY ATTORNEY
o
CO' DAVID M. DEAN, ASSISTANT CITY ATTORNEY
09q).
SEP
MARK E. BARBER, ASSISTANT CITY ATTORNEY
ED March 3, 1983 ZANETTA L.FONTES, ASSISTANT CITY ATTORNEY
CITY C*.RENTON
TO : Barbara Y. Shinpoch, Mayor and t. 1.0)5
Members of City Council j
MAR 4 19FROM: Lawrence J. Warren, City Attorney 83
BUILDING/ZONING DEPf.
Dear Madam Mayor and Members of the Council :
Please be advised that the lawsuit brought against the City
by Mt. Olivet Cemeteries has been dismissed. Once the
Council passed an ordinance downzoning the property, at the
date required by the Restrictive Covenants , the action was
moot. For some reason the attorneys for the various parties
would not agree to sign the order dismissing the case and
so we had to bring on a formal motion before the Court. That
was done and the Order dismissing the City from the action
was signed on February 28 , 1983 . Interestingly enough, Mt.
Olivet Cemeteries , Eradco and Kent-Highlands Corporation are
still involved in a lawsuit over the way in which this initial
suit arose. However, the City has been able to extricate
itself from their in-fighting.
Should you need any further details on this matter, please
feel free to contact me.
Lawrence J. Warren -
LJW:nd
cc : Ron Nelson
Dave Clemens
Fred Kaufman
yW 4-.;,
r
µ.
h *
F= 6: C i.y;
c+.
A` a+FH 1•• f'
Ft. N/ :Yt F4 I. :
1 111w 4,
rl y •
p
r,`
2
r wy' ct;y
ti s zc.x,..,.^ri,'S.t• a •- ..i j,.e six-.. k%
i,.'' cii L; j Aryl;•..'4 l.., %-•
5
NOTICE OF PUBLIC HEARING
RENTON LAND USE HEARING EXAMINER
RENTON, WASHINGTON
A PUBLIC HEARING WILL BE HELD BY THE RENTON LAND USE HEARING EXAMINER
AT HIS REGULAR MEETING IN THE COUNCIL CHAMBERS, CITY HALL, RENTON,
WASHINGTON ON MARCH 8, 1983, AT 9:00 A.M. TO CONSIDER THE FOLLOWING
PETITIC N:
COLT APPEAL
Appeal by James Colt, President, Mt. Olivet Cemetery Co., Inc., file AA0-012-83,
o' a decision by the Environmental Review Committee regarding a Memorandum of
Concurrence, dated January 5, 1983, which accepted the adequacy of the draft EIS
January 1981) and the final EIS (June 1981) for the construction of 425 residential
units on 41.5 acres, file R-077-82; property located south of Monteray Terrace and
Mt. Olivet Cemetery, north of the Maple Valley Highway and west of the Edward's
Gravel Pit, access from N.E. 3rd Street.
Legal dE scriptions of the file noted above are on file in the Renton Building and Zoning
Depart a ent.
ALL INTERESTED PERSONS TO SAID PETITION ARE INVITED TO BE PRESENT AT THE
PUBLIC HEARING ON MARCH 8, 1983, AT 9:00 A.M. TO EXPRESS THEIR OPINIONS.
PUBLISHED : February 25, 1983 Ronald G. Nelson
Building and Zoning Director
j.for ti
i ate,...M, a r„S,r r r - T a
Y
l'!,
r ii'• ,r^-7'y."`.tl {4--a r„.e"'.F'c"K'RA."yF,, + F ..X
i.
k ' r;WY" c".
t. y *I71'_Z <!
r`
oc
r1-:
4.
V
F"
d v.sf,,. ..
Real Estate•
Investments•Securities•Development
January 9, 1985
CITY OF RENTON
0 ri_ R F. 11 VI I!.
City of Renton JAN 111985
BUILDING & ZONING DEPARTMENT
200 Mill Avenue So. (Municipal Building) Eu;i. i(sciiGl`JIC.?a DEPT.
Renton, WA 98055
Attn: Roger Blaylock,
Zoning Administrator
Re: ERADCO/MONTEREY TERRACE ASSOCIATES
Rezone R-077-82/Status
Dear Mr. Blaylock:
In answer to your letter dated December 14, 1984 to Mr. McIntosh, formerly
with our company, regarding the above numbered rezone application please be
advised as follows:
Monterey Terrace Associates and ERADCO have been involved in legal actions
with Kent Highland and American Memorial Services, Inc. for many months
which most have hopefully been resolved and the construction of the requir-
ed road is presently being negotiated with Kent Highlands. We ask that an
extension of 180 days be granted by your office to permit us to complete
the application originally applied for.
Please advise regarding this request.
Sincerely,
MONTEREY TERRACE ASSOCIATES
by It's General Partner:
ONMENTAL CH & DEVELOPMENT CORPORATION
t td- T. Easter,
It's President
PTE:kkd
18000 Pacific Highway South, Suite 1115, Seattle, Washington 98188 (206) 244-0080
i
OF RA'l_
411 THE CITY OF RENTON
Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
omomBARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
pA O FRED J. KAUFMAN, 235-2593
09g7-0 SEPTE
0
P
Ciiy 05:Rw‘,,
ytholv
February 23, 1983
FEB 2 31983
TO: Environmental Review Committee BUILDING/ZONING DEp7
FROM: Fred J. Kaufman
Land Use Hearing Examiner
SUBJECT: COLT ERADCO Appeal of the Adequacy of the EIS
ECF-088--82, Rezone R-077-82
The public hearing regarding the above entitled matter will be held at 9:00 a.m. on
Tuesday, March 8, 1983 in the Council Chambers. City staff may be required to testify to
the extent of their knowledge regarding the determination.
FJ K:se
0028E
cc: Mayor
City Attorney
Public Works Director
Traffic Engineering
Utilities Engineering
Building do Zoning Dept.
Policy Dev. Dept.
Police Department
Fire Department
st' a.aa', ' i j +1' '''' a " `'""„"'
4 '''°,•` , -,
4..t.d,. f ;' y'
M e+. '
rY a•
y, '°'axes' +!;•-.YYf'd
j^i f.± .tv.. F'"»• +,'
t ,
M
tt 4' L 4"T....s
ra ;• +';'SA° 'c+ k u !'x^ ,n sa s .
j-
k
OF 1
p .Z.
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
o BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
A o.FRED J. KAUFMAN. 235-2593
o9.
1F0 SEPS (
CITY OF kENTON
February 23, 1983
3FEB23 1983
TO: Environmental Review Committee RUiLDING/ZONING DEPT.
FROM: Fred J. Kaufman
Land Use Hearing Examiner
SUBJECT: COLT ERADCO Appeal of the Adequacy of the EIS
ECF-088--82, Rezone R-077-82
The public hearing regarding the above entitled matter will be held at 9:00 a.m. on
Tuesday, March 8, 1983 in the Council Chambers. City staff may be required to testify to
the extent of their knowledge regarding the determination.
FJK:se
0028E
cc: Mayor
City Attorney
Public Works Director
Traffic Engineering
Utilities Engineering
Building do Zoning Dept.
Policy Dev. Dept.
Police Department
Fire Department
c s x`n;
f '" '"'
ry'• #s.s's ` ', 4 . r ,y i.M
r
t'S•19-C Y
y if t"4d Y r ++ T
r
yK vowcn"°
r ;
irkJ.Y.F'4.
ttr..y
i
OF R4,A
A.
CITY OF RENTON
C
o
ti z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON. WASH. 98055
BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
FRED J. KAUFMAN. 235-2593
0911.
o EP1Ei '
February 18, 1983
Mr. Kenn'ath B. Shellan
P. O. Box 26
Renton, VJ A 98057
Dear Mr. Shellan:
RE: AE PEAL OF ERC DETERMINATION, ERADCO
REZONE APPLICATION R-077-82
A public hearing on the above referenced appeal has been scheduled for Tuesday, March 8,
1983 at 9'00 a.m. in the Council Chambers of the Renton Municipal Building. The subject
of the appeal will be the adequacy of the environmental impact statement issued for the
subject property. The Environmental Review Committee has previously determined that
the statement is adequate.
If there are any procedural questions, you may contact this office for further information.
Sincerely,
Fred J. Kaufman
Hearing Examiner
cc: Don Glovick
FJK se
0021E
I L
1^,
1+1 'p Wit(.
t•_ }. c`
rl.rs
OF
A.
THE CITY OF RENTON44$ © z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
o BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
A O FRED J. KAUFMAN. 235-2593
0,
9g1 E.°SEPSE110'
February 18, 1983
Mr. Don Glovick
ERADCO
18000 Pacific Highway So.
Suite 1115
Seattle, WA 98188
Dear Mr. Glovick:
Re: APPEAL OF ERC DETERMINATION, ERADCO
REZONE APPLICATION R-077-82
A public hearing on the above referenced appeal has been scheduled for Tuesday, March 8,
1983 at 9:00 a.m. in the Council Chambers of the Renton Municipal Building. The subject
of the appeal will be the adequacy of the environmental impact statement issued for the
subject property. The Environmental Review Committee has previously determined that
the statement is adequate.
If there are any procedural questions, you may contact this office for further information.
Sincerely,
41A../°Qoa
Fred J. Kaufman
Hearing Examiner
cc: Kenneth B. Shellan
FJK:se
0022E
ik 40,44-'" i r rye' .".. r :1 k 3ry •a Fiat*t' r rG ,,-lea n'K $ta a
f
OF R4,
4$ o THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
selL
BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
9q O FRED J. KAUFMAN. 235-2593
p P
9
TFD 3EP E0O
MEMORANDUM
CITY o RENTON
FebruE ry 10, 1983 tz7 t L
FEB 1p1283
TO: Environmental Review Committee BUILDING/ZONING DEPT,
FROM: Fred J. Kaufman
Land Use Heari ng Exami ner
SUBJECT: ERADCO, EIS Review, ECF-088-82
This office has received an appeal regarding your deferral nation in the above
entit ed matter. Please forward to this office all documents relating to thi s
matter by not later than 5:00 p.m. , Friday, February 18, 1983.
An appeal hearing will be scheduled as time permits in the matter.
If th- s office can be of assi stance, please feel free to contact me.
FJK:wr
0019E
cc: (;i ty Attorney
Roger Blaylock
r' - Kr
K^e t,"'.i. n "r t ;+. ,:,rw .rt l•.- ,:1: y {,V, ^ 1T+ 7
f
MT0 OLIVET
January 6 , 1983 RECEIVED
CITY OF RENTON
HEARING EXAMINER
The Hearing Examiner
JAN 1983AMPM
City of Renton
Municipal Building
71819118r11t12e112t3141516
200 Mill Avenue, South e'
Renton, Washington 98055
Re: Letter of Appeal of the
ERADCO/Monterey Terrace
Rezone #077-82
Dear Mr. Kaufman,
In December 1982 , I was informed by the Building &
Zoning Department that a new application for rezone was
received on December 3, 1982 . They suggested on December
6, 1982 , that I would be interested in the file. Upon ex-
amination of the file at City Hall , I was informed by Mr.
Nelson that even though application was submitted by ERADCO
and was in the City ' s possession , it had not been "formally
accepted" by the City and was not complete . At this time,
the administrative processing section of the application
was totally blank, as were references to existing zoning .
I requested that the City notify Mt . Olivet upon
formal acceptance" and was assured that we would be . Fur-
ther , I disussed the application and existing litigation
regarding the City and zoning policy in Superior Court and
was informed by Mr. Nelson that until Mr . Larry Warren re-
viewed the matter , the application "would not be accepted . "
In subsequent discussions with Mr . Nelson in December 1982
and January 1983 , we were again informed it had not been
accepted and he related it had been discussed with Mr . War-
ren , with no action being taken.
On January 6th , while examing files regarding ERADCO at
City Hall , I was informed verbally that the application was
formally accepted" and that an ERC meeting had been held
the day before with a "determination" that a Memorandum of
Concurrance was being issued today, January 6, 1983 . I was
provided the attached draft as the representation of the
decision" but without signatures , as it had yet to be typed .
This draft is the "Memorandum of Concurrance" as represented
by the following department personnel who were present : Mr .
Ron Nelson, Mr . Jerry Lind and Mr . Roger Blaylock. Also all
Cemetery, Mausoleum, Crematory & Gardens
Box 547 • 100 Blaine Ave. N.E., Renton, WA. 98057 • 206-255-0323
G.\f•. t f` P` it "' C i.G.
l"T ..
t +Lj f',K
1s fy
Q j i ;n•°`Z-.'Y,`*
fi, 'r fi ' t Y '
Page 2 .
January 6, 1983
Mr. Kaufman
documents in the file were copied and certified as to auth-
enticity by the City Clerk, at 9 : 30 am on January 6 , 1983 .
We are appealing the following actions by unknown department
heads or unknown persons employed by the City of Renton:
1 . Formal notice of acceptance of application has been
neither dated , signed or initialed by the unknown City
official.
2 . Mr . Dave Clemens , when asked , stated that he did not
know who accepted the application. The failure to formally
accept and notify is an error in law.
3 . The certified copy with no acceptance indicated by
signature, date or initial is attached .
4 . No notification of "formal acceptance" of application
was sent to applicant .
5 . No notification of acceptance was sent to Mt . Olivet ,
James Colt , Bulchis & Garrison or any parties of record in
this rezone application or the attorneys of record regarding
the lawsuit over the rezone property and ordinances govern-
ing the property (#3113 . )
6 . Mt . Olivet and any interested adjacent property own-
ers have been denied rights to challenge the sufficiency of
the application itself and further the right to be allowed
to be heard and to comment on the application and any file
documents due to failure to provide notice .
As of the 6th of January, 1983 at 9 : 30 am, the Master
Application has not been properly accepted by the City of
Renton and until it is formally accepted , no action should
take place . This may be an oversight by the City but is
an error in law and should be corrected and application for-
mally accepted prior to any further action, with notice of
formal acceptance sent to any interested parties and parties
of record and applicant .
By way of further appeal , Mt. Olivet further contends
that the determination by the Utility Engineering Department ' s
Mr . Olson is totally incorrect and an error in fact based on
the file and records in the ERADCO files . Mt . Olivet will
introduce testimony, exhibits , maps , expert witnesses and
other supporting information" at the appeal hearing .
As Mr. Olson ' s "Interpretation/Determination" was made
on January 4 , 1983 (see attached exhibit) our appeal of his
2..
t'
i 4 a R•x f
t h 23q,. a7y ! ! 4 is T.K
s.i wO
t•
s.
v}t
fr.
ti .'
br
yt`
tks '1,c•,
T 2 K : FY.ft:.. < .;
4
Ape
i '
yp
i ; +.,
1
D ' r„ tn.rfi' s>t
r+
t M-4"vr tLv '1r i'/r -
E"s
t tr,7w y.".`'
A' ^ `
yWWyylc1t
e- g•s,
r fa r,r, za r tn:` i
Page 3.
January 6 , 1983
Mr. Kaufman
interpretation of the environmental impacts is made in a
timely manner.
By way of further appeal, Mt . Olivet will introduce
testimony, exhibits , maps , expert witnesses and other sup-
porting information" in appealing each of the environmental
findings or interpretations by the appropriately noted
Abr. _ "staff member" based on the records and files in—the City
of Renton as being improper , incorrect , an error in fact
and having a potential detrimental "effect" on adjacent
property owners and other interested parties .
Document: Staff Member & Error :
ERC REVIEW Mr. Jim Matthews , Fire Marshall
Refers to an EIS which is not included
in application or presented for exam-
ination in the file.
ERC REVIEW Mr . Robert Hufnagle, Recreation Supr.
Refers to a Thorpe Report which is not
part of the application or included for
examination in the file available to
the public . His interpretation and
determinations are in error within the
scope of the projected 425 units .
ERC REVIEW Mr. James Hansen, Building Department
Indicates no impacts on review sheet
and refers to a final EIS which is not
part of this application.
DEVELOPMENT
APPLICATION
REVIEW SHEET Mr . James Hansen, Director and Author-
ized representative of City of Renton,
Building Department ; signed on December
28 , 1982 , the "Development Application
Review Sheet" approving the application
without conditions or comments .
By way of further appeal , neither the application or
any file documents indicate the Restrictive Covenants which
are supposedly in effect at this time and since 1977 , which
affect both the zoning and development of the properties .
The Restrictive Covenants must be considered with the appli-
cation for rezone as they run with the property . Further ,
the Rezone Certificate issued by Transamerica indicates
1 ,yj•
e .;`
4 .v -; ,s,r <,Ir -r,
C y f¢
ia 4 .
s
it "4 x; '
1:13-4vi
4110
Page 4.
January 6, 1983
Mr. Kaufman
easement roadways running with the property , one of which
is in current litigation , which must be addressed during the
review process .
Mr. Dave Clemens of the Policy Department , recommends
approval with conditions .
Mt . Olivet appeals his decisions and interpretations
as to the adequacy and will provide expert testimony and
exhibits addressing the determinations .
Mr . Clemens further disregarded the Restrictive Cove-
nants which directly address access routes and other related
matters to this application in his determination or inter-
pretation.
Mt . Olivet further appeals the determination of Mr .
Ronald Olsen of the Utility Department , made on January 4 ,
1983, in approving with conditions , as attached (see exhibit
A")- his required Late Comers Agreements for sewer , water
and other utility charges , may violate the easement agree-
ment referred to in the rezone file, Transamerica Rezone
Certificate , and could violate the rights of third parties
under these and other agreements . Further testimony , doc-
uments and exhibits will be provided at the Hearing .
By way of further appeal , the City is in error as a
matter of law, in failing to consider the Restrictive Cov-
enants running with the land by way of Ordinance #3113 in
this rezone application . Testimony and exhibits will add-
ress this issue at the appeal hearing .
The above errors , as a matter of law and errors in fact
and determination and interpretations made without suffi-
cient information or using information which is not part of
this rezone application and the potential detrimental effects
of these errors and decisions entitle Mt . Olivet to be heard
ate a public hearing . A hearing at the earliest date is re-
quested . This letter is our formal appeal from the errors
and determinations cited , based on the file of the City of
Renton, this date.
Sincere ,
t liv emet o . , Inc .
a es L . Colt , President
J/C : dkc
jtachrnents
from file 077-82
f` ' ,r r4'
ems
raG•:sT•.' 4 .t7 • 4;r s.
T
p x 4 y
wit - -
t
i
OF REDA
y 0 THE CITY OF RENTON
t$z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o era.
BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
9,0 O FRED J. KAUFMAN. 235-2593
0,
9gTFO SEP-1 '
MEMORANDUM
CITY OF P.ENTONFebruiry10, 1983 f; (
l V7
uu FEB 101983
TO: Environmental Review Committee
13UILDINGiTONING DEPT.FROM: Fred J. Kaufman
Land Use Hearing Examiner
SUBJECT: ERADCO, EIS Review, ECF-088-82
This cffice has received an appeal regarding your determination in the above
entitled matter. Please forward to this office all documents relating to thi s
matter by not later than 5:00 p.m. , Friday, February 18, 1983.
An appeal hearing will be scheduled as time permits in the matter.
If this office can be of assistance, please feel free to contact me.
FJK:wr
0019E
cc: City Attorney
Roger Blaylock
Y
r rti
MT0 OLIVET
January 6 , 1983 RECEIVED
CITY OF RENTON
HEARING EXAMINER
The Hearing Examiner
JaN v 1983
PM
City of Renton
Municipal Building
71819110,11r12111213s415,6
200 Mill Avenue, South
Renton, Washington 98055
Re : Letter of Appeal of the
ERADCO/Monterey Terrace
Rezone #077-82
Dear Mr . Kaufman,
In December 1982 , I was informed by the Building &
Zoning Department that a new application for rezone was
received on December 3 , 1982 . They suggested on December
6, 1982 , that I would be interested in the file. Upon ex-
amination of the file at City Hall , I was informed by Mr.
Nelson that even though application was submitted by ERADCO
and was in the City ' s possession, it had not been "formally
accepted" by the City and was not complete . At this time,
the administrative processing section of the application
was totally blank, as were references to existing zoning .
I requested that the City notify Mt . Olivet upon
formal acceptance" and was assured that we would be . Fur-
ther , I disussed the application and existing litigation
regarding the City and zoning policy in Superior Court and
was informed by Mr. Nelson that until Mr . Larry Warren re-
viewed the matter , the application "would not be accepted . "
In subsequent discussions with Mr . Nelson in December 1982
and January 1983 , we were again informed it had not been
accepted and he related it had been discussed with Mr . War-
ren, with no action being taken.
On January 6th , while examing files regarding ERADCO at
City Hall , I was informed verbally that the application was
formally accepted" and that an ERC meeting had been held
the day before with a "determination" that a Memorandum of
Concurrance was being issued today, January 6, 1983 . I was
provided the attached draft as the representation of the
decision" but without signatures , as it had yet to be typed .
This draft is the "Memorandum of Concurrance" as represented
by the following department personnel who were present : Mr .
Ron Nelson , Mr . Jerry Lind and Mr . Roger Blaylock. Also all
Cemetery, Mausoleum, Crematory & Gardens
Box 547 • 100 Blaine Ave. N.E., Renton, WA. 98057 • 206-255-0323
i• +i "e j
c
aT.'S•' .<'s*. ex:sa.r 'afi S• L-'"p'a-f' j,+
i .,s ,e'¢z;t `7yi 3+..RCT47:XR>hF!:t FRi`i K'SF3 I q.
eY..yif ?•"•yc-F,,,c iy`vxS.Y Z,.,T
4 •r .N { sJq TL'
54.
1/
4 Ar}.,Yl i Ly, .
fi
w
Page 2.
January 6, 1983
Mr. Kaufman
documents in the file were copied and certified as to auth-
enticity by the City Clerk, at 9: 30 am on January 6, 1983 .
We are appealing the following actions by unknown department
heads or unknown persons employed by the City of Renton:
1 . Formal notice of acceptance of application has been
neither dated , signed or initialed by the unknown City
official .
2 . Mr . Dave Clemens , when asked , stated that he did not
know who accepted the application. The failure to formally
accept and notify is an error in law.
3 . The certified copy with no acceptance indicated by
signature, date or initial is attached .
4 . No notification of "formal acceptance" of application
was sent to applicant .
5. No notification of acceptance was sent to Mt . Olivet,
James Colt , Bulchis & Garrison or any parties of record in
this rezone application or the attorneys of record regarding
the lawsuit over the rezone property and ordinances govern-
ing the property (#3113 . )
6 . Mt . Olivet and any interested adjacent property own-
ers have been denied rights to challenge the sufficiency of
the application itself and further the right to be allowed
to be heard and to comment on the application and any file
documents due to failure to provide notice .
As of the 6th of January, 1983 at 9 : 30 am, the Master
Application has not been properly accepted by the City of
Renton and until it is formally accepted , no action should
take place . This may be an oversight by the City but it is
an error in law and should be corrected and application for-
mally accepted prior to any further action, with notice of
formal acceptance sent to any interested parties and parties
of record and applicant .
By way of further appeal , Mt . Olivet further contends
that the determination by the Utility Engineering Department ' s
Mr . Olson is totally incorrect and an error in fact based on
the file and records in the ERADCO files . Mt . Olivet will
introduce testimony , exhibits , maps , expert witnesses and
other supporting information" at the appeal hearing .
As Mr . Olson 's "Interpretation/Determination" was made
on January 4 , 1983 (see attached exhibit) our appeal of his
SY'`
1 TR'?sT 'r* >e• ^
h9 T c cl 4t fey tiSw
4'L' y`raff. -vj 1. -,•41•Urk4 w1Y3i'r a"S
L.+,
Y
4
ari l:rtt- a;..f•,
rr sF. >3 r,
a °
S aSi r
Page 3.
January 6 , 1983
Mr . Kaufman
interpretation of the environmental impacts is made in a
timely manner.
By way of further appeal, Mt. Olivet will introduce
testimony, exhibits , maps , expert witnesses and other sup-
porting information" in appealing each of the environmental
findings or inte p Lations,,.by,y,the appropriately noted
staff tbirt`er" based sln the records and files in the City
of Renton as being improper, incorrect , an error in fact
and having a potential detrimental "effect" on adjacent
property owners and other interested parties .
Document : Staff Member & Error :
ERC REVIEW Mr. Jim Matthews , Fire Marshall
Refers to an EIS which is not included
in application or presented for exam-
ination in the file.
ERC REVIEW Mr . Robert Hufnagle , Recreation Supr.
Refers to a Thorpe Report which is not
part of the application or included for
examination in the file available to
the public. His interpretation and
determinations are in error within the
scope of the projected 425 units .
ERC REVIEW Mr. James Hansen, Building Department
Indicates no impacts on review sheet
and refers to a final EIS which is not
part of this application.
DEVELOPMENT
APPLICATION
REVIEW SHEET Mr . James Hansen, Director and Author-
ized representative of City of Renton,
Building Department ; signed on December
28 , 1982 , the "Development Application
Review Sheet" approving the application
without conditions or comments .
By way of further appeal, neither the application or
any file documents indicate the Restrictive Covenants which
are supposedly in effect at this time and since 1977 , which
affect both the zoning and development of the properties .
The Restrictive Covenants must be considered with the appli-
cation for rezone as they run with the property . Further ,
the Rezone Certificate issued by Transamerica indicates
Y?3Et '/" S'tJJjr? j yt+3 S p; 343GiP
L < aff{ok&
Y ' 'a3'«•, x'„"i k'.'t aw f e
ra
if 4t r• s,.' i".tnt d7.F.3» ?iVt- .$ 'tt. 44
5'' 44V
Page 4 .
January 6 , 1983
Mr . Kaufman
easement roadways running with the property, one of which
is in current litigation, which must be addressed during the
review process .
Mr. Dave Clemens of the Policy Department , recommends
approval with conditions .
Mt . Olivet appeals his decisions and interpretations
as to the adequacy and will provide expert testimony and
exhibits addressing the determinations .
Mr . Clemens further disregarded the Restrictive Cove-
nants which directly address access routes and other related
matters to this application in his determination or inter-
pretation.
Mt . Olivet further appeals the determination of Mr .
Ronald Olsen of the Utility Department , made on January 4 ,
1983, in approving with conditions , as attached (see exhibit
A")- his required Late Comers Agreements for sewer , water
and other utility charges , may violate the easement agree-
ment referred to in the rezone file, Transamerica Rezone
Certificate , and could violate the rights of third parties
under these and other agreements . Further testimony , doc-
uments and exhibits will be provided at the Hearing .
By way of further appeal , the City is in error as a
matter of law, in failing to consider the Restrictive Cov-
enants running with the land by way of Ordinance #3113 in
this rezone application . Testimony and exhibits will add-
ress this issue at the appeal hearing .
The above errors , as a matter of law and errors in fact
and determination and interpretations made without suffi-
cient information or using information which is not part of
this rezone application and the potential detrimental effects
of these errors and decisions entitle Mt . Olivet to be heard
at a public hearing . A hearing at the earliest date is re-
quested . This letter is our formal appeal from the errors
and determinations cited , based on the file of the City of
Renton, this date .
Sincere ,
t • liv emet o . , Inc .
I
es L . Colt , President
it C : dkc
tachments from file 077-82
wa ti 40rk "
c '
iTri:4 +C'ri i - o"YX*,-, Ts•'j;0: t i.h iA oti6' '7t''l 7{ • ^; r,' '
P 4--:,`.,"`" 5.1 irr ;,,, s t .k.T.-. . .y 4i 11.
y
Wef%ry
r' "
Y. F.'ts y f{- a Nh lf
i.e`c>ri'' xt '1' "VN,+
F 7:
r
f
i
Renton City Council
February 7, 1983
Page Three
with city funds totaling $18,700. Public hearing to be set for
March 7, 1983. Council concur.
Consent tgenda MOVED BY TRIMM, SECONDED BY CLYMER, COUNCIL ADOPT CONSENT AGENDA AS
Approved PRESENTED. CARRIED.
CORRESPOPDENCE Letter from James H. Robinow, General Manager, Group W Cable, Inc.
Group W (able advised rate increases for Renton residents effective February 1 ,
rate increase 1983 as follows: Basic Cable: $10.35; Additional Outlet: $3.00.
and billing The letter also indicated that a tax was inadvertently not removed
error resulting in a 20t error on February bills; and this amount will
be credited to each account on the March, 1983 billing statement .
All Renton customers will receive a letter reflecting this correction.
Anti-DWI Police Chief Alan L. Wallis addressed the Council regarding national
Program problem with drunk drivers, noting 25,000 people killed per year in
alcohol-related accidents. A recent study estimates that unless the
problem is checked, there is a 100% chance that 500,000 people will die
in alcohol-related accidents within the next 20 years. Although the
volume of deaths is not high in the City of Renton from this cause,
there is a high rate of injuries sustained. However, a heavy
enforcement effort has resulted in 1 ,655 arrests during the past two
years which is two and one-half times greater than accepted by National
Highway Safety Administration. Efforts are now underway to organize
community groups, elected officials , business leaders, school district
administrators, judges in a consolidated endeavor to convince Renton
citizenry that driving while drinking is unacceptable and enforcement
will be exercised. Sgt. Gerald Ritchie was introduced and his
contribution to the anti-driving campaign noted. Mayor Shinpoch and
Council members were invited to attend a meeting on Wednesday,
February 9, 1983 at 7:30 p.m. in the Senior Citizens Center to discuss
Renton' s Anti-DWI Program and offer their support .
OLD BUSINESS Utilities Committee Chairman Mathews presented a report recommending
Utilities denial of the request of Laurence Ashley regarding sewer connection
Committee in accordance with Resolution No. 2162, Section 1A3, which prohibits
Laurence Ashley connection for new construction. The report further recommended that
Request for Policy Development Department staff review possible annexation of the
Sewer Connection property with Mr. Lawrence. MOVED BY STREDICKE, SECONDED BY MATHEWS,
COUNCIL CONCUR IN THE RECOMMENDATION OF THE UTILITIES COMMITTEE. CARRIED.
Latecome- Utilities Committee Chairman Mathews presented a report recommending
Agreement concurrence by the City Council in the request by Public Works
LID 322 Department for latecomer agreement on the sanitary sewer installation
Sanitary in Puget Drive South financed by the Utility Department. MOVED BY
Sewer MATHEWS, SECONDED BY HUGHES, COUNCIL CONCUR IN THE RECOMMENDATION OF
THE UTILITIES COMMITTEE AND AUTHORIZE THE MAYOR AND CITY CLERK TO
SIGN THE DOCUMENT. CARRIED.
Community Community Services Committee Chairman Reed presented a report
Services for information only recommending that the city take no action on
Committee the Ann Grinolds petition to remove three trees from the state
Grinolds right-of-way adjacent to FAI-405 on Cedar Avenue South. Further
Petition to action can be considered when details of proposed expansion of FAI-405
Remove T311 transit lanes are available.
Trees
Transportation
Transportation Committee Chairman Stredicke presented a report
Committee recommending that Mr. Zaputil and Mr. Purcell submit a petition to
Lind Avenue S.W.
the City Clerk along with a filing fee to request vacation of Lind
Closure Protest
Avenue S.W. in response to letter of protest to closure of that street .
Once the application is initiated, determination will be made regarding
whether a charge will be assessed for the right-of-way. MOVED BY
STREDICKE SECONDED BY ROCKHILL, COUNCIL CONCUR IN THE RECOMMENDATION OF
THE TRANSPORTATION COMMITTEE. CARRIED.
Bid Award - Transportation Committee Chairman Stredicke presented a report
SW 7th E Hardie recommendation acceptance of the low bid submitted by Breaker
Signalization Construction, Inc. for the S.W. 7th Street and Hardie Avenue S.W.
and Lighting Signalization and Lighting Project, and award said contract
Project - accordingly. The report further recommended authorization for the
Breaker Mayor and City Clerk to sign the contract upon receipt of the
Construction necessary funds and approval of the latecomers agreement from Holvick
deRegt Knering . MOVED BY STREDICKE, SECONDED BY ROCKHILL, COUNCIL
CONCUP THE RECOMMENDATION OF THE TRANSPORTATION COMMITTEE. CARRIED.
Renton City Council
February 7, 1983
Page Four
OLD BUSINESS Continued
Planning and Planning and Development Committee Chairman Rockhill presented a
Development report recommending that the Council accept the Central Renton
Committee Comprehensive Plan Amendment as examined, studied and discussed by
Central Renton the committee and recommended by the Planning Commission; and refer
Comprehensive the matter to the Ways and Means Committee for suitable action.
Plan Amerdment MOVED BY ROCKHILL, SECONDED BY REED, COUNCIL CONCUR IN THE
Adopted RECOMMENDATION OF THE PLANNING AND DEVELOPMENT COMMITTEE. CARRIED.
Block Watch Councilman Hughes advised attending a Block Watch meeting on
February 1 , 1983 , sponsored by the Renton Police Department Crime
Prevention Bureau and attended by approximately 50 citizens .
Captain Don Persson, Chief Alan Wallis, and Ron Arnsberg, volunteer
in the program, were commended for convincing each participant of
his/her worth and value as a resource to the police department in
ensuring a successful program.
Councilman Following announcement by Councilman Clymer of Councilman Rockhill 's
Rockhill s birthday, it was MOVED BY STREDICKE, SECONDED BY TRIMM, COUNCIL RECESS
Birthday,'Recess FOR FIVE MINUTES TO HONOR THE OCCASION. CARRIED. Time: 9:42 p.m.
Council reconvened at 9:48 p.m. Roll call : All present.
ORDINANC :S AND RESOLUTIONS
Ways and Means Ways and Means Committee Chairman Clymer presented a report recommending
Committe the following ordinance for second and final readings :
Ordinance #3708 An ordinance was read adopting the Zoning Map as official designation
Zoning Map for zoning classifications in the City of Renton. MOVED BY CLYMER,
SECONDED BY HUGHES, COUNCIL ADOPT THE ORDINANCE AS PRESENTED.
Upon inquiry by Councilman Stredicke, City Attorney Warren indicated
that the zoning map prevails over individual zoning ordinances. MOTION
CARRIED.
First Reading Ways and Means Committee Chairman Clymer presented a report recommending
the following ordinances for first reading :
Stoneway An ordinance was read changing the zoning classification of property
Concrete located east of Maple Valley Highway, south of Monterey Terrace and
Reversicnary Mt. Olivet Cemetery and west of Bonneville Powerline right-of-way
Ordinance from Residence District (R-1 , R-2, R-3 and R-4) to General Classification
District (G-1 ) for Stoneway Concrete Co. , R-891 -76. MOVED BY CLYMER,
SECONDED BY HUGHES, THIS MATTER BE REFERRED BACK TO COMMITTEE FOR ONE
WEEK. For the record, Councilman Stredicke requested an explanation
of action initiated by ordinance adoption and whether property owners
have been notified. City Attorney Warren explained reversionary clause
in restrictive covenants executed upon approval of original rezone
requiring commencement of construction within certain time constraints.
Since time limits were not met , a new ordinance must be adopted reverting
property designation to its original zoning. Property owners have been
notified of the city's action, and as evidence, have initiated a new
rezone on the subject site. MOTION CARRIED.
Taxicab An ordinance was read amending a portion of Chapter 19 of Title V
Ordinan :e Business Regulations) of City Code relating to taxicabs. MOVED BY
CLYMER, SECONDED BY HUGHES, THIS MATTER BE REFERRED BACK TO COMMITTEE
FOR ONE WEEK. CARRIED.
Ways and Means Committee Chairman Clymer presented a report recommending
the following resolutions for reading and adoption:
Resolution #2488 A resolution was read authorizing interlocal cooperative agreement with
Animal Control the City of Tukwila for animal control services . MOVED BY CLYMER,
Services/Tukwila SECONDED BY HUGHES, COUNCIL ADOPT THE RESOLUTION AS PRESENTED. CARRIED.
Resolution ##2489 A resolution was read authorizing borrowing of funds from Tax
Tax Anticipation Anticipation Notes operating cash requirements fund. MOVED BY CLYMER,
Notes - Borrowing SECONDED BY HUGHES, COUNCIL ADOPT THE RESOLUTION AS PRESENTED. CARRIED.
Resolution #2490 A resolution was read providing for transfer of funds from Cumulative
Fund Transfer Reserve Fund #2104 (Park Equipment) unto Park Fund, Facilities Division,
for park Acct. No. 101/000/20.575. 10.64.00 in the amount of $26,268.79 for
equipment purchase of park equipment. MOVED BY CLYMER, SECONDED BY HUGHES,
purchase COUNCII ')PT THE RESOLUTION AS PRESENTED. CARRIED.
For Use By City Clerk's Office Only
A. I . N
AGENDA ITEM
RENTON CITY COUNCIL MEETING
SUBMITTING
Dept./Div./Bd./Comm. Zoning For Agenda Of anuaiy> 24,.
Meeting Date)
Staff Contact Roger Blaylock
Name) Agenda Status:
SUBJECT: sTONE:;AY CO`.dCRETE, INC.Consent
r•'RADCO)/REV R:;ION Or DRDINApCF; 3113
Public Hearing
Correspondence
Ordinance/Resolution
Old Business
Exhibits: (Legal Descr. , Maps, Etc. )Attach
New Business
Study Session
A. lttached memorandum.
Other
B.
C.
Approval :
Legal Dept. Yes No N/A
COUNCIL ACTION RECOMMENDED: Refi.rral to Finance Dept. Yes No. N/A
r'3 ,<, a,• i Means Committee for ordinance
Other Clearance
pre77,aration.
FISCAL IMPACT:
Amount Appropriation-Expenditure Required $
Budgeted $ Transfer Required $
SUMMARY (Background information, prior action and effect of implementation)
Attach additional pages if necessary. )
The subject property was rezoned from G-1 to a variety of multiple family zones in accord-
ance with Ordinance 3113 with restrictive covenants _that provided For commencement of cons-
truction within a certain time,period. A series of: extensions oZ this time period were
granted, finally to expire February_ 1, 1983, ,Thus, in accordance with provisions of the
covenants indicating that "the zoning of said property shall without further City action
revert back to the zoning which existed prior to the filing of this document, and these
restrictive covenants shall become ,null and voids" the Building and Zoning Department
on February 2, 1963, will interpret the zoning on the subject site as C-1, General Use
District. A new ordinance will be necessary, however, to correct the Official Zoning Map.
Since a public hearing is not necessary, and the Council will not be meeting on January 31,
1983, it is recommended that.the item be sent to Ways and leans Committee on February 7th
for ordinance .:reparation.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
THIS COPY FOR YOUR FILES.
p tom,4.a
ti Arit: t'-n-.i v
j•_
a„` :r f:• F =ra • tr >• n Jt'' j t..,..f't k)
y t z!"is4 ;
1},
a(r cj"h '•'!tt
OF R4
z BUILDING & ZONING DEPARTMENT
z RONALD G. NELSON — DIRECTOR
0 ammo
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
09
T FC SE PS
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
Ja nut,ry 19, 1983
TO: City Council
FROM: Roger Blaylock
Zoni ng Admi ni strator
SUBJECT: STONEWAY CONCRETE, INC. (ERADCO)/REVERSION OF ORDINANCE 3113
Kent Highlands, Inc. , formerly Stoneway Concrete, Inc. , on February 22, 1977,
recorded restrictive covenants in conformance with Ordinance 3113 (R-891 -76) .
These covenants included a time schedule for planning and construction to
begin, along with a provision for extension to complete the environmental
impact statement. The Planning Department granted a series of extensions,
thus changing the reversion date from February 22, 1980, to February 1 , 1983.
Based upon the covenants, "the zoning of said property shall without further
City action revert back to the zoning which existed prior to the filing of
this document, and these restrictive covenants shall become null and void."
The Euilding and Zoning Department on February 2, 1983, will interpret the
zonirg on the subject site as being G-1 , General Use District. However, to
correct the Official Zoning Map, the City Council would need to pass a new
ordirance. This is identical to the recent case of the reversion of Ordinance
3370 (Bernard Wiemann - R-364-79) . On November 22, 1982, the City Council
adopted Ordinance 3679, which down-zoned the property to comply with the
restrictive covenants.
Since a public hearing i s not necessary, and the Council will not be meeting
on January 31 , 1983, we would recommend that the item be sent to the Ways and
Means Committee on February 7, 1983, for ordinance preparation.
RJB:wr
0040B
cc: Mayor
City Attorney
t... k• 1+ '+. f• k.y
17 ., i'9 r4 £.e rk »r' nrrs3C;i•XtriPli
sr5[.c z L,lri t
OF R4,ti
c Q z
BUILDING & ZONING DEPARTMENTt$
RONALD G. NELSON - DIRECTORz ,01L
O
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
091t
0 SEPIEI\
CS
Q
BARBARA Y. SHINPOCH
N AYOR
MEMORANDUM
January 19, 1983
TO: City Council
FROM: Roger Blaylock
Zoni ng Admi ni strator
SUBJECT: STONEWAY CONCRETE, INC. (ERADCO)/REVERSION OF ORDINANCE 3113
Kent Highlands, Inc. , formerly Stoneway Concrete, Inc. , on February 22, 1977,
recorded restrictive covenants in conformance with Ordinance 3113 (R-891 -76) .
These covenants included a time schedule for planning and construction to
begin, along with a provision for extension to complete the environmental
impact statement. The Planning Department granted a series of extensions,
thus :hanging the reversion date from February 22, 1980, to February 1 , 1983.
Based upon the covenants, "the zoning of said property shall without further
City action revert back to the zoning which existed prior to the filing of
this document, and these restrictive covenants shall become null and void."
The Building and Zoni ng Department on February 2, 1983, wi 11 interpret the
zoning on the subject site as being G-1 , General Use Di strict. However, to
correct the Official Zoning Map, the City Council would need to pass a new
ordinance. This is identical to the recent case of the reversion of Ordinance
3370 (Bernard Wiemann - R-364-79) . On November 22, 1982, the City Council
adopt?d Ordinance 3679, which down-zoned the property to comply with the
restrictive covenants.
Since a public hearing is not necessary, and the Council will not be meeting
on January 31 , 1983, we would recommend that the item be sent to the Ways and
Means Committee on February 7, 1983, for ordinance preparation.
RJB:w^
0040E
cc: Mayor
City Attorney
Jr Use By City Clerk's Office Only
A. I . #
AGENDA ITEM
RENTON CITY COUNCIL MEETING
r=saa3s=aar a=a=====r=cr==axasmm aamssa=a===.===a3sssasa=sr.a
SUBMITTING
Dept./Div./Bd./Comm. Building & Zoning For Agenda Of January 24, 1983
Meeting Date)
Staff Contact Roger Blaylock
Name) Agenda Status:
SUBJECT: STONEWAY CONCRETE, INC. Consent
ERADCO)/REVERSION OF ORDINANCE 3113
Public Hearing
Correspondence
Ordinance/Resolution
Old Business
Exhibits: :Legal Descr. , Maps, Etc. )Attach
New Business
Study Session
A. :attached memorandum.
Other
B.
C.
Approval :
Legal Dept. Yes X No_ N/A
COUNCIL AC 'ION RECOMMENDED: Referral to Finance Dept. Yes No. N/A
Ways and Means Committee for ordinance
Other Clearance
preparation.
FISCAL IMPACT:0-
Expenditure Required $
Amount $ Appropriation- $
Budgeted Transfer Required
SUMMARY (Background information, prior action and effect of implementation)
Attach additional pages if necessary. )
The subject property was rezoned from G-1 to a variety of multiple family zones in accord-
ance with Ordinance 3113 with restrictive covenants that provided for commencement of cons-
truction within a certain time period. A series of extensions of this time period were
granted, finally to expire February 1, 1983. Thus, in accordance with provisions of the
covenants indicating that "the zoning of said property shall without further City action
revert back to the zoning which existed prior to the filing of this document, and these
restrictive covenants shall become null and void, " the Building and Zoning Department
on February 2, 1983, will interpret the zoning on the subject site as G-1, General Use
District. A new ordinance will be necessary, however, to correct the Official Zoning Map.
Since a public hearing is not necessary, and the Council will not be meeting on January 31,
1983, it is recommended that the item be sent to Ways and Means Committee on February 7th
for ordinance preparation.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
ti ° _SL
3' sr, a^c s
MT0 OLIVKT 8
January 6 , 1983
RECEIVED C 04-
CITY OF RENTONZ,22.,.
HEARING EXAMINER
711,-, Hearing Examiner JAN3 1983
City of Renton AM PM
1binicipal Building 718,9110111112111213141516
Mill Avenue , South
Pnton , Washington 9805ti
L'c : Letter of Appeal of the
ERADCO/Monterey Terrace
Rezone 11077-82
Dear Mr . Kaufman ,
In December 1982 , I was informed by the Building S
Zoning Department that a new application for rezone was
received on December 3 , 1982 . They suggested on December
1982 , that I would be interested in the file. Upon ex-
amination of the file at City Hall , I was informed by Mr .
Nelson that even though application was submitted by ERADCO
and was in the City ' s possession, it had not been "formally
accepted" by the City and was not complete . At this time ,
the administrative processing section of the application
was totally blank, as were references to existing zoning .
I requested that the City notify Mt . Olivet upon
formal acceptance" and was assured that we would be . Fur-
ther , I disussed the application and existing litigation
regarding the City and zonir: ralicy in Superior Court and
informed by Mr . Nelsn:-. until Mr . La. r - 1.:nrrc'1 . r-
y :t d the m„. t t e , , the a, F would not be accepted . "
J^SeC:ueis . T) v _ _. _ . :gel _ ^n 17. December 1982
c is January 1 ' F3 , we were aE. ;: ir, informed _ had not peen
accepted and he related it had been discussed with Mr . War-
ren , with no action being taken .
On January 6th , while examing files regarding ERADCO at
City Hall , I was informed verbally that the application was
formally accepted" and that an ERC meeting had been held
Cie day before with a "determination" that a Memorandum of
rcurrance was being issued today , January 6 , 1983 . I was
vided the attached draft as the representation of the
decision" but without signLtures , as it had yet to be typed .
This draft is the "Memorandum of Concurrance" as represented
by the following department personnel who were present : Mr .
Ron Nelson , Mr . Jerry Lind and Mr . Roger Blaylock . Also all
Cemetery, Mcusoieu' C' Fen'atc,ry & Gardens
1 i i • i 6 b
x f t l { ,t``+':4 Q `' ,iw• Y )vc ' •-r">
x e y
s •
v-r 5 i^ r
t y
d...iy,.- .+ rt 7 r..
f
3.
Z r '
1[
yi
Page 2 .
January 6, 1983
Mr . Kaufman
documents in the file were copied and certified as to auth-
enticity by the City Clerk, at 9 : 30 am on January 6 , 1983 .
11e are appealing the following actions by unknown department
heads or unknown persons employed by the City of Renton :
1 . Formal notice of acceptance of application has been
neither dated , signed or initialed by the unknown City
official .
2 . Mr . Dave Clemens , when asked , stated that he did not
know who accepted the application . The failure to formally
r _ cept and notify is an error in law.
3 . The certified copy with no acceptance indicated by
signature , date or initial is attached .
No notification of "formal acceptance" of application
was sent to applicant .
5 . No notification of acceptance was sent to Mt . Olivet ,
James Colt , Bulchis & Garrison or any parties of record in
this rezone application or the attorneys of record regarding
the lawsuit over the rezone property and ordinances govern-
ing the property (#t3113 . )
6 . Mt . Olivet and any interested adjacent property own-
ers have been denied rights to challenge the sufficiency of
the application itself and further the right to be allowed
to be heard and to comment on the application and any file
documents due to failure to provide notice .
s of the 6th of January , 19F,3 at 9 : 30 am, the Master
cation has not been proper ..scented by the City of
and until it is formally accepted , no action should
b. ce . This may be an o‘.vers i ;:Lr by the City but it is
ror in law and should be corrected and application for-
i ( cepted prior to any further action , with notice of
acceptance sent to any interested parties and parties
rc and applicant .
By way of further appeal , Mt . Olivet further contends
that the determination by the Utility Engineering Department ' s
Yr . Olson is totally incorrect and an error in fact based on
tic file and records in the ERADCO files . Mt . Olivet will
introduce testimony , exhibits , maps , expert witnesses and
other supporting information" at the appeal hearing .
As Mr . Olson ' s "Interpretation/Determination" was made
on January 4 , 1983 (see attached exhibit) Qur appeal of his
f ax$ 7:ine' ? YM,J y; 7k'.*+i'.g.c n,t7' 'r'"rr'' i+k*r ,cb .Si.Y + s"c+,+yy.. r.`4
s.. ( t t, •
v-q; R j'r x'a.a1'Fz ,
r
X '+a4 }r '$,' ..( - `
c`,>
sic <' 'h+:`"`s
7
Page 3.
January 6 , 1983
Mr . Kaufman
interpretation of the environmental impacts is made in a
timely manner .
By way of further appeal , Mt . Olivet will introduce
testimony , exhibits , maps , expert witnesses and other sup-
porting information" in appealing each of the environmental
findings or interpretations by the appropriately noted
staff member" based on the records and files in the City
Renton as being improper , incorrect , an error in fact
having a potential detrimental "effect" on adjacent
roperty owners and other interested parties .
Document : Staff Member & Error :
FRC REVIEW Mr . Jim Matthews , Fire Marshall
Refers to an EIS which is not included
in application or presented for exam-
ination in the file .
C REVIEW Mr . Robert Hufnagle , Recreation Supr .
Refers to a Thorpe Report which is not
part of the application or included for
examination in the file available to
the public . His interpretation and
determinations are in error within the
scope of the projected 425 units .
ERC REVIEW Mr. James Hansen , Building Department
Indicates no impacts on review sheet
and refers to a final EIS which is not
part of this application .
CA'i i ON
FrisE" sir . r. ,:es P ; cn , I irector and Author—
ized representative of City of Renton ,
Building Department ; signed on December
28 , 1982 , the "Development Application
Review Sheet" approving the application
without conditions or comments .
By way of further appeal , neither the application or
cc! ': file documents indicate the Restrictive Covenants which
supposedly in effect at this time and since 1977 , which
2ffcct both the zoning and development of the properties .
is Restrictive Covenants must be considered with the appli-
cation for rezone as they run with the property . Further ,
t}te Rezone Certificate issued by Transamerica indicates
a C` ii.tr,
s4rti ..e h Y
Y!
K Y
4.4P x.",r 3r
Y
r ' Y •4.-;
K,1, rr
R vl
styy {,. l.s f''o
w
j • i r
t r
Page 4 .
January 6, 1983
ir .. Kaufman
Easement roadways running with the property , one of which
Js in current litigation , which must be addressed during the
view process .
Ir . Dave Clemens of the Policy Department , recommends
aprro':al with conditions .
t . Olivet appeals his decisions and interpretations
uacv and will provide expert testimony and
ey.h—lh_ ts aidressing the determinations .
w
Clerr.ens further disregarded the Restrictive Cove-
nants ::ich directly address access routes and other related
utters to this application in his determination or inter-
pretation .
Mt . Olivet further appeals the determination of Mr .
onald Olsen of the Utility Department , made on January 4 ,
1OS . in approving with conditions , as attached (see exhibit
rc' -o:'. rEd Late Comers Agreements for sewer , water
t : ' i , -- . -:a:ges , may violate the eareront agree-
cferrec. i!e rezone file , Transamerica Rezone
Certi_ ic - c • _. ' ;, violate the rights of third parties
under these r 'er agreements . Further testimony , doc-
iIm.:ents and e::, bits will be provided at the Hearing .
BY wav of further appeal , the City is in error as a.
matter of law, in failing to consider the Restrictive Cov-
e:.ar. ts running with the land by way of Ordinance #3113 in
7 -ne application . Testimony and exhibits will add-
F. :le- at the appeal hearing .
of ors in fact
interpretations made . _ thaut suffi-
i ,. . . t p r _ o
7 and the pot :, : 1,._ ,: _ -ntal effects
isions entitle :it . i" . . . , to be heard
S. :,erinr at the e.. _ - . . date is re-
ur for.,..., ,_: ,... .. : : ..:. the. errors
i :cc. , based on the fiia of the City of
Cc : cc- , lnc .
r :s L . Colt , President
from file 077-82
sue -
Y:44,,,,,.4.— i:_.+'9a - sf;' a wa- r• _ gr a„,
i ,. t,:r ,
J1S^r,4it'.-ate y?' `fihII 'x,, JJ""--•'„
a +gyp!
id'"' ',`. ''
9". Ate( 4'H• y. e..` 4.
i1.#I rf4 P"4<4f. R'4 F 1,)!'n L :
y{
4'4 xxs 4-A ?..A i
C.,h"i_. `E 't`[:ks .c ,,, },. { .4+• Y. f / : . 'f r ,
Y
x »
i " acehiCa A xCi _-y rt
1 . .
a'{ d ::
7
X
4
iY-
r;. {.
c ' ;•111 1- wry . ' 1 : ..,1, f, •
4 1' , 4.5.- LLf ht j 146a
ENVIRONMENTAL REVIEW COMMITTEE
JANUARY 5, 1983
AGENDA:
Commencing at 10:00 A.M.
Third Floor Conference Room.
NEW 3USINESS:
ECF-)88-82 ENVIRONMENTAL RESEARCH & DEVELOPMENT CORPORATION
R-077-82 GEN. PARTNER/MONTFREY TERRACE ASSOCIATES
Application to rezone 41 .5 acres of property to R-1 ,
R-2, R-3 and R-4 for up to 425 units for multi-family
residential use in the form of a planned unit
development; property located north of SR-169 (Maple
Valley Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery and vest of Bonneville Power
right-of-way.
OLD BUSINESS:
ECF-089-82 CITY OF RENTON PUBLIC WORKS DEPARTMENT
West Hill Reservoir, pump station, water transmission
mains and well No. 9 water system improvements. The
project is to improve the water supply for the West
Hill community served by the City of Renton and the
Lakeridge community served by Water District No. 63 in
a joint water system improvement project; the project
elements are scattered around the central and western
neighborhoods of the City and Lakeridge community.
are,t
y
j -
v
72:
L -`••
q."3 ,,` '«•
S. r c• > 5. `^
P" •
s rG e Pe6.r s+
t
e '++' xr .q-'. a'"" :'• >^•. 1 1r t i M
J.•
r,:Ja ' F X- - may.
MEMORANDUM OF CONCURRENCE
APPLICATION NO( s) : R-077-82
DESCRIPTION OF PROPOSAL: Application to rezone 41 .5 acres of property
to R-1 , R-2, R-3 and R-4, for up to 425
units for multi-family residential use in
the form of a Planned Unit Development.
PROPONENT: Environmental Research & Development
Corporation - General Partner/Monterey
Terrace Associates.
LOC„TION OF PROPOSAL: Located north of SR-169 (Maple Valley
Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power
right-of-way.
LEAD AGENCY: Building & Zoning Department.
DATE OF ERC REVIEW: January 5, 1983.
Acting as the Responsible Official , the ERC has determined that the requested
modifications to the initial proposal reviewed under ECF-088-82 on January 5,
1983, are within the scope of that original proposal and the environmental
disclosure is still valid.
This decision was reached following a presentation by Jerry Lind of the
Building & Zoning Department. Oral comments were accepted from: Ronald
Nelson, Robert Bergstrom, Roger Blaylock, David Clemens, Donald Persson,
Richard Houghton, Gary Norris and Jerry Lind.
Incorporated by reference in the record of proceedings of the ERC on
application R-077-82 are the following:
1 ) Environmental Impact Statement: Environmental Research and Development
Corporation (ERADCO) , dated: December 3, 1982.
2) Application( s) : REZONE (R-077-82) .
The Environmental Review Committee issues this Memorandum of Concurrence
sub; ect to the following conditions:
1 ) A significant adverse impact on the environment will occur due to
traffic impact and associated secondary environmental impacts because of
traffic increases on N.E. 4th from this proposal , the Schneider Hilltop
Development (170 units, 1000 trips) , the Mastro 4th and Monroe and 4th
west of Union developments (544 units, 3200 trips) , the Homecraft
Terrace project (290 units, 1700 trips) , and the proposed Cascadia
Development (500+ units, 3000 trips). Therefore, the City Council must
determine in the—approval process that these impacts can be mitigated by
the proposal , or that overriding social , economic or environmental
considerations make approval of this PUD appropriate.
2) The access to the proposed PUD shall form a four (4) way intersection at
N.E. 3rd with the future northerly extension of Edmonds Avenue N.E. The
intersection shall be signalized and widened to provide for left turn
movements into and out of the project.
3) The proposed access roadway shall be constructed to collector street
standards consisting of a thirty-six (36) foot curb-to-curb section,
widened to fourty-four (44) feet at the intersection of N.E. 3rd. In
addition, sidewalks, street lights and other appurtenant improvements
shall be provided along the access roadway.
4) Participation in the amount of 4.4% of the operational improvements
necessary to accommodate traffic at the N.E. 3rd and Sunset Boulevard
intersection, including widening, paving or signal modification, shall
be provided by this development.
MEMORANDUM OF CONCURRENCE
January 5, 1983
Page 2
5) Any exposed cut or fill slopes on the subject property shall be
immediately reseeded and stabilized with jute matting.
6) Blaine Avenue N.E. shall be improved from N.E. 3rd Street to the subject
property to accommodate public safety vehicles only. Improvements shall
include twenty-two (22) feet of paving and any necessary grading,
alignment or storm water drainage revisions.
7) The mitigating measures suggested by the Police Department shall be
included in the final building plans.
1?
7-1
47(((t;l,t-
Rona d G. Nel son Davi R. lemens
Building Official Policy Development Director
c iaroug ton
Pub' is Works Director
EXP::RATION OF APPEAL PERIOD: JANUARY 19, 1983
Real Estate•
lin'csnnents•JCa1f711c's•Der elopment
December 9, 1982
CITY C r .' ;y C(4
Office of the Land Use Hearing Examiner 1..2 DEC 1 3 1982
City of Renton
Renton, Washington 98055 t .`
Attachments: A. Legal Description
B. Assessors Map
C. N.E. Renton Comprehensive Plan
Gentlemen:
Environmental Research and Development Corporation as General Partner of
that property legally described on attachment "A" and indicated on the
at-:ached assessors map (attachment "B") , herewith submit for your approval
the reclassification of the subject property to conform with the City of
Rentons northeast comprehensive plan dated December 1981 (attachment "C") .
As outlined in that comprehensive plan, we feel justification for the
reclassification is logical and timely and will address the scope of
plan and implementing policies that apply to that reclassification.
3.A. LAND DEVELOPMENT OBJECTIVE: Growth and development should occur in
a timely and logical progression of the existing urban area to maximize
the use of existing services.
POLICY COMMENTS:
1. The reclassification would not be a premature development in that it
is compatible with the present uses in the vacinity (re: proximity
to the downtown core and major work and recreational sites) .
2. The reclassification is within the urban fringe.
3. The reclassification is surrounded by either developed properties,
quasi-public land, recreational land or major arterials.
4. The reclassification has a 42-inch metro sewer trunk within 200'
feet of the property (Maple Valley Highway) .
5. The reclassification is in close proximity to the major commercial
and industrial sites of the city.
6. The reclassification would be an upgrade of the property.
7. Not applicable.
SUUO Pacific Highway South,Suite 1115,Seattle, ll" lgtott 98188 (206)244-0080
w•
i'wi.fir G t, i? N qF p
1
4 4*I
S.' 4Ji > .,L .rr`s
Office of the Land Use Hearing Examiner
Dezember 9, 1982
Page 2
8. Not applicable.
9. Not applicable.
10. Not applicable.
11. The reclassification is definite and reasonable in that the need for
housing near work centers is important in todays economy and the
buffering" of single family residences to high density multi-family
within the reclassification is in keeping with modern zoning concepts.
IMPLEMENTING POLICIES
LAND USE OBJECTIVES:
Policy 3. Land development should progress logically from west to east
on the east Renton plateau and from south to north in the
Kennydale and Hazelwood areas.
Comments: As the reclassification is on the westerly rim of the east
Renton plateau, it should have priority for reclassification.
COMMERCIAL DEVELOPMENT OBJECTIVE:
Not applicable.
COhMUNITY FACILITIES OBJECTIVE:
Policy 1. To project life and property, the Highlands Fire Station should
be moved easterly to the vacinity of Sunset Boulevard N.E. and
Union Avenue N.E. , while a new fire station should be developed
in the Kennydale area.
Comnents: The existing fire station south of S.E. 128th on 156th S.E. would
serve the reclassification by both the Maple Valley Highway and
N.E. 3rd.
TRANSPORTATION OBJECTIVE:
Policy 2. All east west arterial corridors including the Maple Valley Hwy. ,
N.E. 3rd/N.E. 4th/S.E. 128th Streets and Sunset Boulevard should
be primarily utilized for arterial street purposes. Land use
activities which disrupt arterial street movements should be
minimized.
Comnents: With the improvement requirements of the intersection at N.E.3rd
and Edmonds Avenue by Homecraft Land Development Co. , Inc. and
future latecomers, the reclassification would not disrupt the
anticipated arterial movements of N.E. 3rd.
f9 V
S' ' sari;'v
P^' f it....• F •.. Yr'l° }c ri a". a f C +.*" 1• 1
i
i
F -
n,'
r c
4i; .,`
3•' t j :.
t +S !fir{ x f", r
Y - Y A .w t 4 f `' S-`J ayy..d . i f M
u y S 44 9,,ry
n•
OFfice of the Land Use Hearing Examiner
D:cember 9, 1982
P ige 3
ARTERIAL STREET IMPROVEMENT OBJECTIVE:
Policy 2. Edmonds Avenue N.E. should be extended southerly from N.E. 4th
to the Maple Valley Hwy.
Comments: The extension of Edmonds Avenue N.E. to the Maple Valley Hwy.
would pass in close proximity to the northeast corner of the
reclassification, thereby enhancing the need for that policies
objective.
U-ILITIES OBJECTIVE:
Police 1. The availability of sanitary sewers should be a prerequisite
for new land development.
Ccmments: A representative of the Renton Sewer Utility has indicated that
a sewer. tie-in to a metro 42-inch sewer trunk could be accom-
plished by installing an 8-inch line down the bluff along the
southwest side of the site and across the Maple Valley Hwy. ,
SR-169) (Dick Houghton, Renton Sewer Utility, 1/21/80.
Si ncerely,
ENVIRONMENTAL RESEARCH &
DEVELOPMENT CORPORATION
Gl n A. McIntosh
Property Manager
GPM:ks
t .,: Y t i" , N 1 k4'(y'i}Yt'7Fi"s-" yr ,
4
S
r
i '. t ...e^sN, i tr;i aka"•.rs- 7d3.
ATTACHMENTS "A"
RECLASSIFICATION APPLICATION
CITY OFRENTON _
Monterey Terrace Associates/Environmental Research and L5 v 5 ii Cd]
Development Corporation DEC 13 1982
BUILDING/ZONING DEPT.
Legal Description
All that portion of the Northeast one-quarter and of Government Lots
7 and 8 within Section 17, Township 23 North, Range 5 East, W.M.
described as follows:
Beginning at the southwest corner of the southeast one-quarter of the
northeast one-quarter of said Section 17; thence north along the west
line of said subdivision a distance of 252.23 feet to the true point
of beginning; said point also designated as Point "A"; thence south
89'45' 17" east a distance of 526.41 feet; thence south 88°52'04" east
a distance of 799 feet to the east line of Section 17; thence south
along said east line to the east one-quarter corner of Section 17;
thence continuing south along the east line of said section to an
intersection with the northerly right-of-way line of State Road No. 5
St. S.R. #169) (Maple Valley Highway) ; thence in a general north-
westerly direction along said northerly right-of-way line to an inter-
section with a line that lies north 89°45' 17" west a distance of 653.91
feet from Point "A"; thence south 89°45' 17" east a distance of 653.91
feet to Point "A" and the true point of beginning.
t.c,F' 9y.., p1,T c. r.{„(. «+
8:
r _fA" ' ^7[ 453"'7r '•zf"
Y'
4,*
r ,!"` '
ry' —?1. r
t,. .
r '
lS . br<i . e
N Nst-f.
it r:<
t
a 5..!2f J -i
s S r•
t :x j• 3. ` 'j' off%+ _
r
y'p x'4',<
I
arl:. 'f• Ae *1i ;;,tVi"
4?
k. f.' " " 'F `N 7 lkC2tit
t, '+
Y` 43 3`'4lt ixs
t r w
r ii
NORTHEAST
RENTON
COMPREHENSIVE
PLAN
ilia
Mitt
fil i
hilol. es I
eln 4' T.... _
sh II4 CITY OF RENTTOON
IARIa :i @ E N
linii-
a!
11i L DEC 13 1982
TOW WASHINGTO Northeast `
Vala_. Irk
BUILDING/ZONING DEPT,i. Planning Area II
hefor-A h 1P _. .i•Al: dri 1 r a.
z. te._-• -.3 \ pima .... I
i J
f\-ELF.vi p•' ii vl 0'c a 1
6 1Milii at
pa
1 It
Mo` \ , 4 = .r
saeh ;
1 NTEREY TERRACE ASSOC. /
g'Pur 11 1 ENVIRONMENTAL RESEARCH
IMVII li .
11
ir
psi-- w IPII
it•
DEVELOPMENT CORP.
AwtatufgpmeIs
1'i1:1Ia-ai' _ i liitiblval ATTACHMENT "C"
it. `\I ii,, ai` l is n. I.;., ` i
J vyIlimtwing I * , I
I Reclassification Application
4.
qAll gi_ IM V L_-_ - cityof renton1 '
ii,,f"r
l!ifii 111 1 planning dept
december 1981
IIsr-
1 i I I.MUM
y 'SC' ! 9Yti" . rKt'. H •
a 4 yy N ''I•
k tl r S i 1 . S y
1 ft F
pI
d. Y 'X ,}. '~,
y,'F t'.+
AFw+y4i!'+,'
A.r• 'ttw.?
a'",
1 L ti T y r F'' '
r `,;
f * '
Y" 'Z '' b ' '
s ...w a.4 •
k'TY'td
7.
DESCRIPTION OF THE NORTHEAST C.OMPREHENSIVE PLAN
The Northeast Planking Area is the third of four areas targeted for review and update of
the original Comprehensive Plan, which was adopted in 1965. The Comprehensive Plan
represents a long-range framework for decision-making related to the issues of growth
and physical development of the City. Adoption of the Northeast Quadrant
Comprehensive Plan, like the previously adopted Southeast and Green River Valley
Plans, will supercede those portions of the 1965 city-wide plan which are in conflict
with this revision.
The Northeast Quadrant Committee used a sub-area approach In preparing this plan
amendment. Sixteen sub-areas of the Northeast Quadrant were identified and at least
three different land use arrangements were developed for each sub-area. For the
purpose of an early analysis and comparison, a weighted environmental matrix was
used to qualitatively rank each of the sub-area alternatives. Three plans were then
created by combining sub-area alternatives with low, medium and high estimated
environmental consequences. These plans generally reflect a range of land use
intensities and are titled the LOW, MEDIUM and HIGH Density Plans. The recommended
NORTHEAST COMPREHENSIVE PLAN is a composite of the three working draft plans.
MAP 1)
L SCOPE OF PLAN PROPOSALS
The Northeast Quadrant Comprehensive Plan provides a policy framework for growth
and development for those areas of Renton north of the Cedar River and east of the
1-405 Freeway and Lake Washington. Although the Land Use Element map Illustrates
the ultimate pattern of development, actual development of property will occur over the
next 20 to 50 years. Not all areas designated for urban uses in the Land Use Element
will be appropriate for development within the 1990 time-frame of the Plan. As a
result, The discussion of Issues such as utilities, transportation and other services are
only adequate for projected development through the year 1990.
The proposed Northeast Quadrant Plan covers nearly 11,700 acres, with the projected
development of 4590 households providing for a population increase of about 12,750
persons between 1978 and 1990. The following figures Illustrate some of the changes
expected by 1990.
NORTHEAST PLANNING AREA
1978 Single Family Households 8,680
Multiple Family Households 2,140
Total Population 30,300
1990 Single Family Households 11,410 +' 02,730
Multiple Family Households 4,000 t 4340
Estimated Population 43,050 .. j2/7S-0
r ull development (After the year 2000)
Single Family Households 35,000
Multiple Family Households 15,000
Estimated Population 110,000
a y l. 3`'k<'of ,r
1e "^
YF
3ft .i
tr 9,+'-y_- i,., •s S4
L t, a. r tS'+ ` ^ {i treys tv"'nr a w" 7*
A*r .'S yaz;a + , ` ' ''e r 3 N.a ,•, ,,,1^t[ar:*',t s.;.y .
y',.
r zr ss
t-.7 l 4; .ejp.r .a,.ara.t-f7C iA.xd r._ 1, %!
i...- ." .t r" rrrirV,.
ue,
A.4,,
Tie currently available public service, utility and transportation systems are not capable
of accommodating full development of the Planning area. Further, unknown or
unforeseen dimensions of policy, energy, environmental and other considerations will
affect future decisions 'ori land use within the Planning area. Therefore, the Plan
Elements which address the infra- structure for accommodating physical development
illustrate only those facilities which wUl be required to support 1990 population levels.
However, the location of specific developments Is difficult to anticipate, so the
infrastructure plans will, in most cases, provide service to a population base which
would not exist before the mid-1990's.
Current City policy states that urban growth and development, as well as services and
utilities to support such growth, should only occur in a logical and timely progression.
The distinction between lands which are "potentially appropriate" and sites which are
ready now" for a specific land use Is important.
Section 3.A. of the adopted Policies Element of the Comprehensive Plan recommends
maximizing the use of available utility and service resources and provides crucial
guidance to the Hearing Examiner and City Council in making this distinction.
3.A :LAND DEVELOPMENT O84ECT#VE;z Growth and development should
occur in a timely and logical progression of the existing urban area
to maximize the use of existing services.
LPOLiCIES:
tt;i. To minimize the necessity for redevelopment, premature
development should only be allowed where it can be
shown to be compatible with future uses In the vicinity.
2 : . Development beyond the urban fringe should only be
allowed where It is a consistent extension of urban services.
3. Vacant land surrounded by developed land should be
given priority for development.
C. Land where adequate public utilities are available should
be given priority for development.
5. A balance of residential, commercial, and industrial areas
should be achieved.
6. The upgrading and/or redevelopment of marginal areas
should be encouraged.
7. The City should identity Its sphere of influence.
8. Annexations should have logical boundaries.
9.To reduce processing time and effort and provide for
efficient use of existing public facilities, large annexations
should be encouraged.
10. Annexations that are economically advantageous should
be encouraged.
Development requirements should be definite and reasonable.
The fiscal Impacts of prudent consideration of these policies is obvious. If new growth
can be accommodated at an average cost of, for example, $5.00 per person, it would
not be appropriate to develop a service system which costs $10.00 per person. By
consciously directing future land use and Infrastructure decisions to certain
nc+ighberhoods or corridors, both fiscal and ,.ri.ii, ,nrri=nt yi consequences can be
reduced.
14.7 N}^ ud7 £?--y,
1 '
l a ^r: aKMt; '} a•
l i-M- .t !c TM '3s 4
V'l7, c
d w .r¢, v4f 'A d+t'Lt „'t s r;
c .K ' ar.y+y
fi
Of equal importance, however, Is the need to remain flexible to future needs of the
planning area. If population growth substantially exceeds the projections considered In
this Plan, adjustments in both policy and service development must be made. It would
be just as inapproprldte to fag to accommodate a demonstrated need for expanded
development, as it would to over-zone or over-extend utilities and services.
II.ELEMENTS OF THE PLAN -- Land Use
The land use distribution within the plan closely follows the primary transportation
corridors. Higher intensity land uses (multiple family, commercial and employment) are
concentrated primarily along NE 3rd/NE 4th and Sunset Blvd. Other areas of multiple
family or commercial development are located adjacent to 1-405 Freeway at the Maple
Valley Highway, north of Park Drive along Lake Washington Blvd. and near NE 44th.
Neighborhood commercial areas are planned at SE 72nd and Coal Creek Parkway and
SE 128th and 164th Avenue SE. The plan also designates single family,
public/quasi-public, recreational and greenbelt uses.
In addition to the land use categories currently found in the Comprehensive plan, the
Northeast Quadrant Plan contains another designation. Within the planning area there
are a number of areas which are not appropriate for residential purposes, but which
could adversely Impact the natural environment if developed to typical commercial
standards. Therefore, a new land use classification of OFFICE PARK Is proposed which
Is Intended to allow the broadest range of commercial, professional or administrative
offices to be located In a "park-like" or "campus" setting. Development within an
OFFICE PARK should institute the highest degree of architectural compatibility to the
site, include major setbacks from public streets and adjacent uses, provide for up to
20% of the site to be retained In landscaped open space, and integrate significant
natural elements contained on the site Into the overall design.
Community Facilities
The Community Facilities Element recognizes those facilities, such as schools, parks,
fire stations, libraries and related similar uses, which are public/quasi-public. The plan
proposes some expansion of existing park areas and school facilities to Improve their
recreational capabilities. Recognizing the rapidly urbanizing nature of the Planning
Area, there Is a significant need for active recreational facilities normally included in a
park with a minimum site area of five to ten acres.
As urbanization Increases, the need for such park facilities as baseball diamonds,
playground equipment, and tennis courts will substantially increase and these facilities
should be provided. Potential park areas, as Indicated on Map 2 and the land use map,
may show a general area of need rather than a specific site or location. The Plan as
proposed does not project the need for additional school facilities In view of the existing
facilities available, declining school enrollment In some areas, and the possibility of
bussing students to gain maximum use of present facilities and the public Investment
therein. Generally, fire stations, libraries and other public facilities are Indicated Just as
they currently exist.
Transportatl npCirculation
Circulation within the Northeast Quadrant Is dominated by three east-west and three
north-south corridors.
1 °
Kcst' '.,t-1• fit'
3 :
7i
t 2
sJ
F" 4'A 4Y
7 '
441 ttxY.
a- tom .
r
r
a''
a '}'"c. • C}.,.'"X -.
c', !
NOP'*k-"EAST RENTON P
E COMI . . ItHENSIVE PLAN
MAP 1
I 0SINGLEt1sih0FAMILY COMMERCIAL
LOW DENSITY z OFFICE/
MULTI-FAMILY OFFICE PARK
I1 i;., h'r DENSITYMEDIUMDENS
RECREATION
r ) MULTI-FAMILY r..e.
i ... •-- . em. w.J MI HIGH DENSITY
MULTI-FAMILY gli GREENBELT
i i4.•
l
PUBLIC/
tx'si • I< .J QUASI-PUBLIC
I
i I
t.LAND USE ELEMENT
A 1
I, Ili =1,-. N,?:‘.... Allth
lEiNimrMMII
gIl'.
LAKE :•,:.,
4\'. .%
C.
4.
II!f0.
1
V1i21 4,
i\..'''i',i„,.44.:.
4..",:s01,:
1 7.til.
4.
v.i'0sN*W4forEa-
i
k
j J
Pe 17.72 Z., r-
A li •••••...41.11„f4......d A. _ .
V. t -...., NAZ, T,:,,....,.,..,,, . . \ ,..,11.„.,.: , .„, . ...... 7174,- -,u tv:fs.:11.....N Vi:_ ',:,-
411
Hr C:. Vi 14• .$A MIL 4-
I ... ,, . 116. 4.--- 1-40 di' ifokON\Ali I... ,ii:it".'aiat tit
i+17 -
fl'alW Ill 1 S. 11111111111.111111/1. .A. . ' Oak
Pin ,1140
IN-~. ..
ifI,
4/114
11116 l
4 -
11
f >" tali d. J'tdA.• t• 1
i''4I..-',‘.ir,•ai
t4km,.
s).•.
7..,...
i,*?.•.,.,.'.s..,
i:./.„.,i..,„,..,
k.„
i,1i 1 ) :,"./$:ffpit
7..1.,
y;
I1„.
1.Milt r. 1 .i::•.Imo' 1
r
I
r
E4..,,..,7,7- •.. • ,-,
lam,---. ik l\
Alio
NORTI-IPPT RENTON . .„.L.,
1:01APREHENS 'i,_-AN , SetailsI.
III COMMUNITY FACILITIESst
a ..... , : , ,SchoolsParics
EismentaryExisting
Proposed/Um/Dv. Middle/High
VocationalVi111... • I Fire Stations
Privots
LAKE
i m__ r4f ' ,, Library
Existing04= Proposed1WAINNGIONI1
FEET 0 1000 3000 500(
1 IMILES:40,
L4
ME,i
1
s :
I••• IIII
3.3,......
il.ff.11 to>44gN 0
AVcjN....„..--ilk123 •
N,•
l k
GI)
1 '
N.......
3...1 IP61.
1. 4.
to _--
t Ill ail
2...
811111111111.- k
I-k 4 a
c, q
r
r i
NN.
kk 40. ,.. .:
1,...• [..
At 4.21
III
tikr1 1
I . Ei t
r1.-.
IN
T-----7 x„a.ire7/1......41. D ik V f
c,..„,,.
E:1
4.
rA. ..,dirilmor . p --: 01
1
i. 1
1 i A„les91 41E1 I 7 NM 1 .— -1`
a>' i
I 1111pr....0 ._
I'WP II:. 1
IN 71a4 -J
it,AiCitiAil\ 1
12: th
1
0 N E 4 thirrki.;mil
i
1-1
I i
I-
4,14111111114t,
J . t
i
11111•.‘iwAti I t
IQ_.
ilTo -- 1 C] t
1111111/ 0•.....1.1111.1 ILoollii*:,161ig01_,Is - r .._.
1
111PIPI1
io...
am- •
1 s
II1Ii
dwki1---n
I
3' ^
r
i 0
Ill
I 1.....1.... 10,
0 1
g
A X
4K-----1----......... ......__-
a
t) i ,..,....Z.1 filly
s.,..-.,,,...-4,-;-.-;---. --%,,--
Tiort.--.4441,t.., r?, , • -t' -- •41-,-,...v„„z,,t,tz-43, ,,• ..s.-.1„..,4.,...t.,..,,tx„. ,f......,-,7-.....0-,---6-„Jr%_-..-.. ,--„--:_--e-. ,--,•,-- ,.: . - ---.1'-•• - .,. -;.--..•-•:-...--
NO RTI /4t. T RENTON
I COMPREHENSIVE PLAN MAP 3
CIRCULATION ELEMENTIIII1SI
rre Major Arterial Freeway
J. a Secondary Arterial Proposed
w I 11 ma le Collector Arterial Roadway
i FEET,_. 0 1000 3000 50C
f I i444
1 f 1 MILESS 0
N--.--i
i
t 4 k
i I 444k
c. A
le.1_711 ,
es \ %
lak...ci, \ \Wm L
j— .. . '0.
1 Ikrril...11
ri,„ Ni:, q I \111.11, liri II
i
il I;.#.
1
j'''..:
6.
PM _._ _.
4_4,
iii-Ktil.di g1
wC ] IT1 t
1 J• 1 j .4:kI I V J •
ilitl/WAV.: ill I .iiiiir - 7-77tt. -4m • 1..A-__ • 1 k. Pli id
I
v.. ! 1. _ 1
1 r=-
5 •
V, I i i
r
ti,2.,
t
v ,
y.
mod- Yn,,, y.,, .,..
4
f
i
4 " .
rs..,
Cd
t rys
h• Yra.v `...'
i
r}.:.
L- ••
East-West North-South
Maple Valley Highway Interstate 405 Freeway
N.E. 3rd/4th/S.E. 128th Lake Washington Blvd.
Sunset Blvd. Coal Creek Parkway/
Renton-Issaquah Road 138th Avenue S.E.
Besides these arterial corridors, numerous collector and minor streets provide access to
individual parcels.
The Circulation Element Map (Map 3) recognizes existing streets and arterials as the
circulation network for the Northeast Planning Area. In addition, the Plan Identifies two
corridors 'which are expected to augment circulation in the planning area. First,
Edmonds Avenue N.E. Is proposed to be extended from N.E. 3rd southerly to Maple
Valley Highway. This link will help to reduce traffic which must currently utilize the
Sunset Blvd. N. Intersections at Bronson Way and N.E. 3rd for local access trips. The
second improvement, which was previously Identified in the Southeast Quadrant Plan,
calls for an arterial link connecting the East Renton and Soos Creek plateaus. The
Intent of this corridor is to connect the 138th Avenue S.E. and 140th Place S.E. systems
across the Cedar River Valley. No specific route is proposed by the Plan.
The proposed Plan recognizes the difficulty in attempting to accommodate anticipated
new development while retaining the existing emphasis upon the single occupant
vehicle as the primary transportation mode. The Plan proposes the Implementation of
non-roadway solutions to circulation problems wherever the cost effectiveness of those
approaches exists. The Plan encourages alternatives to the private automobile,
including transit, carpool and park-n-ride opportunities. The efforts of METRO Transit,
the Department of Transportation and local Jurisdictions to provide these services In a
manner which discourages private automobile use at peak hours is endorsed. The Plan
calls for Implementation of park-n-ride/park-n-pool facilities at locations east of 138th
Avenue S.E. to serve East Renton Plateau residents. Transit and carpool facilities
should be emphasized in those areas where development density Is sufficient to support
their utilization. High occupancy vehicle lanes on FAI-405 and key arterial corridors
are also endorsed by the Plan where the cost/benefit relationship warrants such
installations.
Utilities
The majority of the Incorporated land within the planning area has water, sanitary
sewers and storm drainage available. The Renton Public Works Department has
developed Comprehensive Plans for additional water and sewer service within the city
franchise areas. Storm drainage, however, Is currently handled on a case-by-case
basis. The Northeast Quadrant Plan recognizes these existing utility plans, as well as
W.D. 90 and W.D. 107 plans, while endorsing those sections of the POLICIES ELEMENT
related to utility development and extension.
For those segments of the planning area where utilities are unavailable, the Plan
recognizes the need for their extension to serve the land use development expected
through 1990. However, the Plan recommends the Installation of utldties only in those
areas where the utility extensions logically enhance new development potentials.
These areas are Identified generally as located west of 142nd Avenue S.E. from the Cedar
River Vaitey northerly to the May Creek Valley. North of May Creek, new utilities should
be concentrated west of 116th Avenue S.E. north to the Lake Boren area.
g d le}'
f'.frV5 rt *14.+f 4 f:
A':'644"„4lt x y.G•vii'li,e7,,••w r'.'.r r,s1 4.Y. .,,. .• }' F r.• =sue t ,+t' 't _ i_. N.Rr'•r.+
l TJQ ,xatr ?Sr
t y rC
i ,r K.v..,l r.§r5 •Y.. T.Ca"'FFt, " Z -4 .:
1. 4 '.
Extension of utilities to currently unserviced areas should be consistent with good
engineering practice and existing policies of the Comprehensive Plan. Cost
effectiveness of utility extensions should consider both capital and maintenance and
ope ating costs, in conjunction with the relative costs versus benefits of extending
urban development Into the new service areas.
Pollees
The Policies Element of the Comprehensive Plan was adopted by the City Council in
Feb vary 1981. These goals, policies and objectives apply to the city as a whole, but
are Incorporated specifically within the Northeast Quadrant Comprehensive Plan. The
Land Use Element and other elements of the proposed Plan should not be viewed
without recognition of the policy guidelines provided by this document.
NORTHEAST COMPREHENSIVE PLAN
IMPLEMENTING POLICIES
7-LAN) USE OBJECTIVE:
The Land Use Element of the Northeast Quadrant Comprehensive Plan Is intended to be
a ge-ieral guide to land use decision making.
POL CIES:
1. Land use decisions within the Northeast Quadrant should be consistent with
available transportation, community facilities, and utilities.
2. The Land Use Plan illustrates full development, and not every parcel is
appropriate for development within the 1990 time-frame of the plan.
3. Land development should progress logically from west to east on the Ea.:t
Renton Plateau and from south to north In the Kennydale and Hazelwood areas.
4.To help balance home to work traffic trips the Land Use Plan strongly endorses
employment opportunities In the vicinity of N.E. 44th and Interstate 405 and the
vicinity of N.E. 4th and Duvall Avenue N.E.
5. An Office Park land use classification should be developed consistent with the
following design criteria:
a.Provide for a transitional land use intensity consistent with both
commercial and residential areas and the natural environment.
b. Provide for a broad range of commercial, professional and administrative
offices In a "park-like" or "camp, '° setting.
c. Provide for a high degree of architectural compatibility with the site
including major setbacks from public streets and adjacent uses.
eiar eri e•u e, ,c, ., f -< f[ 4. PV- ' `e yy ca pry
t 3 tr jY s: K • z r:4+r"Ln a :t "'+n4t 'x iw_
e
F`
ram,,,?i ,, .. •5nH :,•
T
s
d7 •1+tY yew y, ja
hf + S"i •.
1 +w saw .TT.t
r._: •
r r
r7 }sr it';,r
t r
rx Sr a {• -. r .
M1, ire
e"i'+rtw` .''°"3R'n"
Y
C7't• 1P-F•
4 sad" ' Iv"yi 1 t f*"
c
t
r
Ik. t d•-,
t
d. Provide for up to 20% of the site to be retained In landscape open space.
e. Integrate signiticant natural elements contained on the site Into the
overall design.
f.Provide for accessory retail uses consistent with an office setting.
6. Approximately 60 acres of office park should be accommodated along N.E. 4th
generally between Union and Duvall in accordance with land use policy #4
above.
7.Where appropriate design can be developed, mixed residential and business uses
should be accommodated In commercial land use designations.
8.Upon implementation of the community shopping center allowed by Commercial
Development Policy #6, the land uses adjoining the commercial and office land
use designations should be re-evaluated in light of location of the community
shopping center.
COMMERCIAL DEVELOPMENT OBJECTIVE:
The Land Use Plan should provide for sufficient retail services to accommodate the
projected residential population.
POLICIES:
1.Commercial uses developed along N.E. 4th Street and along Sunset Boulevard
N.E. should be oriented within shopping centers or other sizeable complexes.
2. Strip commercial development should only be allowed when no other design
alternative Is available.
3.Commercial development should be designed to limit the number of access
points to arterial streets.
4.Commercial development along major arterials should be designed with private
perimeter access roadways which concentrate arterial street access at a
minimum number of points.
5.Multiple family residential uses should be encouraged as buffers between
commercial uses and less intensive uses.
6. The Land Use Plan recognizes that one Community- scale retail shopping center
20+ acres) Is justified by the anticipated market for the area along N.E. 4th
within the City limits during the life of the plan. Sufficient area is designated at
N.E. 4th St. and Union Avenue N.E. to provide for community shopping facilities
at the northwest, northeast, and southeast corners and available at the
northeast corner of N.E 4th and Duvall. Only one of these corners should be
developed as a retail shopping center. Upon Implementation of one shopping
complex, the Comprehensive Plan should be evaluated for appropriate use of
the remaining corners.
3 yW#
w'
Y rMx
u 'G+6' '•
Y'Tjr,t,P, +•
y ^ "7 5` P °°' jf'xr 1rD x3"
7. Retail commercial facilities at S.E. 128th St. and 164th Avenue S.E. should be
sufficient to serve residents of the unincorporated East Renton Plateau without
requiring retail trips to be extended into the city of Renton.
8. Retail commercial uses along the Maple Valley Highway should be generally
located immediately east of the Cedar River Park and not extended In strip
development easterly along the Highway.
COMMUNITY FACILITIES OBJECTIVE:
Community facilities should be sufficient to accommodate the level of population
anticipated in the Plan.
POLICIES:
1. To protect life and property, the Highlands Fire Station should be moved easterly
to the vicinity of Sunset Boulevard N.E. and Union Avenue N.E., while a new fire
station should be developed in the Kennydale area.
2.Priority park Improvements should focus on fulfilling existing recreational needs.
3.Neighborhood parks should place a first priority on providing for active
recreational activities, with resource based parks maintaining a lower priority.
4. The Comprehensive Park Plan should serve as the guide to new park
construction and design.
TR1 NSPORTATION OBJECTIVE:
The Northeast Quadrant Plan proposes an integrated transportation system including
private vehicles and pedestrian/bicycle facilities.
POLICIES:
1.The Northeast Quadrant Comprehensive Plan strongly endorses the need for a
traffic study to thoroughly evaluate all of the transportation requirements to
accommodate the proposed level of development.
2. All east/west arterial corridors including the Maple Valley Highway, N.E.
3rd/N.E. 4th/S.E. 128th Streets and Sunset Boulevard streets should be primarily
utilized for arterial street purposes. Land use activities which disrupt arterial
street movements should be minimized.
3. Mass transit opportunities through effective land use design should be
encouraged.
4. Park and ride and park and pool facilities should be provided at strategic
locations, with particular emphasis upon facilities east of the current city limits to
minimize Impacts upon existing City streets.
5. Pedestrian and bicycle paths and trails should be developed between residential
and commercial areas to minimize the requirement for vehicular trips to provide
for convenience shopping.
y' .v.e4 t -+? ..+ 'T"4i '0.lT;t, .`Jr'} ;yK$7• 'tl'=
h..{rd'' .%
ri'ti ¢> i
P t r, r.
T''
rs:w. L " K t •L ter h
1`r
a s
a ,,:,L,. 1 4 •.ny .f.` >.; •i ••T •} ` .,..'• 3 (er"1{"}A • ^. '.
s'iT"`'
c
cARTERIAVS`7<RE APROVEMENT'OBJECTIVE:
To provide for sufficient vehicular movement opportunities, the arterial street system
should be expanded.
POLICIES:
1.138th Avenue S.E. should be extended southerly in an alignment which will
provide for connection to 140th Place S.E. connecting the East Renton Plateau
and the Soos Creek Plateau with a north/south arterial connection.
2. Edmonds Avenue N.E. should be extended southerly from N.E. 4th Street to the
Maple Valley Highway.
3.An arterial street extension should be extended westerly from the southerly
terminus of Union Avenue S.E. to the proposed southerly extension of Edmonds
Avenue S.E. on an alignment at approximately S.E. 3rd Street.
4. An environmental and engineering analysis should be accomplished to determine
the feasibility of extending Edmonds Avenue N.E. across May Creek to connect
with 116th Avenue S.E.
5.Development along Duvall Avenue N.E. (138th Avenue S.E.) should be designed
with specialized setbacks and landscaping design to create a "boulevard"
architectural effect.
UTILITIES OBJECTIVE:
To accommodate the proposed level of growth safe and healthful public utilities should
be provided.
POLICIES:
1. The availability of sanitary sewers should be a prerequisite for new land
development.
2. The Honeycreek Sewer interceptor should be constructed.
3. Sanitary sewer Interceptors should be constructed In the Maplewood Creek
Sewer Drainage Basin.
4. During the life of the plan, City utilities should only be extended to 142nd
Avenue S.E. south of May Creek, and 116th Avenue S.E. north of May Creek.
5. The May Creek Basin Plan for storm drainage should be Implemented by the City
in conjunction with other jurisdictions.
6. Development proposals should be conditioned or modified to maintain
compliance with the May Creek Basin Plan.
7. Stream corridor guidelines, as set forth in the May Creek Basin Plan should be
implemented during development review for all greenbelt streams in the
Northeast Planning Area.
a e tX -
e'
F"i., s(+1 yyK" , e:,
A
w
8.Areas designated as "greenbelt" should be considered critical areas for storm
drainage purposes.
9. Geographical areas'upstream from critical storm drainage areas should also be
considered critical storm drainage areas.
y
a
v
b.
is
r +i'-`g K iR ;ri ;+-.:.y'...i• - ",.+,,' b 4 w
t ieA i1 tZrjr ' .: ei •L `"K ,y,'`'`, -yam,} ti' ` ' "'
i•
t' ri =F Y
t r., +i woe,
A .,.s+. t', ^y^ .9 ;'C..
S C" lI;'`i.4 i.°" s
z-+r i'+'+ ..i.:.. . r t 1 E•.
r ar•
i'v:
x < > stf .
n
R4v
r
R1Y ,'
R tw+ T L
K 1iV4 k,
i M',
4 4 R,
r J
h !fa -
t
aY
z
r F. *
iY`",r ty a
1
Real Estate•
Investments Securities•Development
CITY OF RENTON
November 29, 1982
DEC 3 1982
12PMf.$ 0W1R [j
City of Renton
Planning Department
City Hall
Renton, Wash.
Subject: Rezone - Monterey Terrace
Gentlemen:
Included herewith is our application to rezone the subject property.
We are requesting this rezone to conform with the City of Renton North-
east area comprehensive plan adopted December, 1981.
Thank you for your consideration.
Respectfully,
ENVIRONMENTAL RESEARCH &
DEVELOPMENT CORPORATION
enn A. McIntos
Property Manager
18000 Pacific Highway South,Suite 1115,Seattle, Washington 98188 (206)244-0080
y. 'j_
r ';,
e "_. .y,yy. '
A .`4 4 yr w
1'
x i r J``F P T"i +.'•2 f G1'`J
v.t`f,+2ti y> u y{ vt+ti'q '
rt 1. u+ Y. l v ...
F
j
xa
Z i h
y>+ h .!t..
Y
x
1
4=r
fr .i ,tt.. s i.,4Z, -'! .``u5 µ,.'r y{ eh(r
4
OF R
THE CITY OF RENTONb © Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 58055
o BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
9,
0 235- 2550
0gT6-O SEP-ce°-
February 3 1982
MEMORANDUM
TO: ALL CITY DEPARTMENTS
j
FRO 0: ROGER J. BLAYLOCK, ZONING ADMINISTRATOR 11'
RE: ERADCO PRELIMINARY PUD
Pleased be advised that the applicant has submitted a revised application plan for the
Preliminary PUD application. Review this application and fill out the attached
comment sheet as you normally would for a new application.
OF R4.
of •. z
THE CITY OF RENTON
POLICY DEVELOPMENT DEPARTMENT o 235-2552
bail •
eo MUNICIPAL BUILDING 20U MILL AVE. SO. RENTON,WASH. 98055
te
0 P
91TED SEP-Cf•g,O
BARBARA Y. SHINPOCH
MAYOR
February 1 , 1982
Richard U. Chapin
Inslee, Best , Chapin,
Uhlman & Doezie, P. S.
P.O. Box C-90016
Bellevue, Washington 98009-9016
RE: MONTEREY TERRACE ORDINANCE 3113
Dear Mr. Chapin :
This department has reviewed this rezone ordinance and the
covenants required in its approval. These covenants require
submission of a Planned Unit Development application within
certain time limits and beginning of construction within
one year of the commencement of the approval process. Having
reviewed these documents and previous correspondence, it
is our conclusion that the requirement for submission of
a PUD application by February 1 , 1982, still applies and
has been complied with. Due to the remaining restriction
on the requirement for commencement of construction within
one year, this department must conclude that no further exten-
sions may be granted.
In order to resolve all of the issues surrounding these matters,
we would recommend that a new rezone application be submitted
so that it may be processed concurrently with the PUD applica-
tion. To provide you with an ample opportunity to prepare
this application, we will grant an extension of the application
time until February 16th. Should there be any questions,
please feel free to contact this office.
Very truly you s
7 ,
D id R. Clemens
Policy Development Director
cc : Roger Blaylock, Zoning Administrator
cry
y.4.
urban properties company
UPC-651
anuary 28 , 1982
Mr. Roger Blalock
Planning Department
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Lear Roger:
Enclosed are six copies of the revised ERADCO P . U. D. Preliminary
Plan Application. As you know the environmental review is now
complete on this project and the Environmental Review Committee
has asked that ERADCO revise the application in accordance wita
the new P .U.D. Ordinance . The updating of this document has
been made as a result of our meeting on Tuesday, 19 January 1982 .
If you should have any questions , please do not hesitate to
contact me .
Sincerely yours ,
U1BAN PROPERTIES COMPANY
1/S1
S'isan Ottesen Prentke
P -o j ect Manager
Si)P/b j g
Enclosures
C0: : Ms . Jackie Steven, ERADCO
Mr. Richard Chapin, Inslee , Best, Chapin, Uhlman & Doezie
1(0 116th Avenue S.E., P.O. Box 6728, Bellevue, WA 98007, Phone 206-451-1010
INS;. .,VEST, CHAPIN, UHLMAN & L. _ LIE, P. S.
Deborah S Berg ATTORNEYS AT LAW James F.HooverJeromeD.Carpenter SUITE 900.ONB PLAZA Evan E.InsleeRichardU.Chapin 10800 N.E.8th William C.IrvineDonE.Dascenzo P.O. BOX C-90016 William J.Lindberg.Jr.Thomas H.De Buys BELLEVUE.WASHINGTON 98009-9016 Patricia A MurrayEMichaelDoezieJohnT.flossierStanleyE.Enckson 2720 RAINIER BANK TOWER Milan Gail RyderMichaelM.Fleming SEATTLE.WASHINGTON 98101 Wes UhlmanThomasHGrimm
Joe E.WishcamperHenryRHansenJr.
David Alpheus Best.of Counsel
200)455-1234
PLEASE REPLY TO: Bellevue
January 26 , 1982
Mr. David R. Clemens
Planning Department
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Re: Monterey Terrace - Ordinance No. 3113
Dear Mr. Clemens :
It is respectfu-ly requested that the time for approval of
the submission for preliminary PUD approval for the Monterey
Terrace Development be extended to 1 'l e Z
As you know, the last extension expires on February 1, 1982.
In 1977, when the subject property was rezoned to its current
zoning classification in compliance with the then existing Compre-
hensive Plan, the City was in the process of examining its long-
range growth and development policies . At that time, the Council
concluded that it was necessary to establish some time limit for
development of the property so that if the Comprehensive Plan was
later changed, the City would not be "stuck" with zoning on this
property which might not be consistent with such future plan changes .
Since that time there has been a long series of events , in-
cluding change of ownership of the property, which have combined
to prevent finalization of the development. Throughout, the City
administration has been extremely cooperative in continuously work-
ing with the owners and their consultants to achieve a development
which meets the needs of the City, as well as accomplishing the
goals of the owners.
The many many plan changes have finally been completed, the EIS
has been finalized, the ERC has completed its review and analysis,
the application has been amended to meet the requirements of the
existing PUD Ordinance and the matter is now ready for a hearing by
the Dxamin r and final action by the Council .
Y ITT 7:337:i 1 !- ''
J tO
ii. ,
Mr. David R. Clemens
Planning Department
City of Renton
Page Two
Re: Monterey Terrace - Ordinance No. 3113
In the meantime, the City has completed its Comprehensive
Plan review and it has recently affirmed the existing Comprehensive
Plan for this area. In other words, although there may be some
engineering type issues remaining to be resolved by the Hearing
Examiner, the existing zoning on the property is consistent with
current City policies as expressed in the Comprehensive Plan to
achieve "in filling" at the existing zoning densities on this
property.
Consequently, we believe that the interests of the City, the
public and the owner will be best served by rapid completion of
the Master Plan-PUD process. This is particularly important at
a time when there is a critical need for new housing and new employ-
ment, both of which will be afforded by new residential development.
We do not believe any worthwhile purpose will be accomplished
by allowing the property to revert to its pre-1977 zoning. Such
action will necessitate a rezone application to return the property
to its current status. The resulting administrative time, money
and inconvenience of processing such application would not be of
substantial benefit to either the City or the owner.
For all of the foregoing reasons, we request that the City
exercise its discretion to consider extensions on a case by case
basis and grant an extension for completion of the PUD process on
this property to J ,.w.& I J 1cP 7.- This will give ample time
for the City to schedule 'nd hold a public hearing and allow the
Council to take final action on the merits of the application.
Very truly yours,
INSLEE, BEST, CHAPIN,
UHLMAN & DOEZIE, P .S.
Richard U. Chapin
RUC/pjm
cc: Ms . Susan Prentke
iir':,:, '
Environmental Research & Development Corporation
18000 Pacific Highway South.Suite 1115.Seattle,Washington 98188
ReNJanuary15, 1981 Phone-(206)244-0080
1
n(q
Mr. Dave Clemens t
PlanningDivision l i' 1531City f Renton, JAN
Municipal Building of
200 Mill Avenue South
Rentoi, Washington 98055 fin'
Dear lave:
This letter is to formally request of your department an extension of
approximately one year to provide for an orderly approval process and
timel;i start of construction on the Monterey Terrace Contract Rezone
Maste^ Plan.
We feel that diligent good faith efforts have been made to make progress
on developing the site. Surely, since ERADCO has become involved with this
propel-ty substantial progress has been made, with all deadlines imposed by
the C ty of Renton having been met by us. However, due to the long time
in queue and your subsequent request for supplemental traffic analysis and
data, the revised EIS is just today being submitted.
UnforLunately, we will now be required to wait for review and printing of
this E.IS revision and will also be re-scheduled for hearing. In view of these
facts the approval process has caused a significant time delay. Time needed
for final master plan approval , final engineering design, bidding, and permit
approval could well represent a year before construction could begin.
It is with this in mind, and for the reasons outlined above, that we are
reque! tirig an extension to 2/1/82 to ensure adequate coordination with all
interEsted parties.
Thank you for your consideration of this extension. Should you so desire,
you mzy approve this request by signing below.
Sincerely yours,
Roberta M. Hayhurst
Operations Manager
6/1/
t approved` 11!
avid emens
for the City of Renton
E-DA, sucuritios
is
t
1
I,;
C RpA.
I (ty
1)/k...,
y ® ° TI-IE CITY OF RENTON
ia "°'MUNICIPAL BUILDING 200 MILL AVE SO. RENTON, WASH. 98055Zo
p u.,
e °' BARBARA Y. SHINPOCH, MAYOR 0 LAND USE HEARING EXAMINER9,
0 co-
0P FRED J. KAUFMAN, 235 -25939
TEC SEP1 '
O-
October 19, 1981
TO: Members , Environmental Review Committee
FROM: Fred J . Kaufman, Hearing Examiner
RE: Letter from Representatives of ERADCO RaisingPotentialAppealIssuesRegardingActionsof
the ERC
This office has received correspondence regarding the above
entitled decision of the ERC and will await further action by your
committee before proceeding to make proper disposition of the
matters referred to in that correspondence.
ic— —•QtV(itiAN4,
0
ri g.-
t F rJ.'C;
OF RE•
a ` ,--': 2 THE CITY OF R.E NTO ITT
MUNICIPAL BUILDING 200 MOLL AVE. SO. RENTON,WASH. 98055
oit ~ BARBARA Y. SHINPOCH. MAYOR o PLANNING DEPARTMENT
0 0%. May 14, 1980 235 - 2550
4rFD iEpTE r6
Roberta M. Hayhurst
Propc rty Manager
Envitonmental Research L Development Corporation
1800(e Pacific Highway South, Suite 1115
Seattle, Washington 98188
RE : MONTEREY TERRACE P .U .D .
Dear Mrs . Hayhurst :
We hive reviewed your letter of May 12 , 1980 , and concur
that the time schedule set forth on March 19 , 1980 , should
be revised to reflect current conditions . Therefore , after
consultation with R . W. Thorpe Associates , we have revised
the time schedule to meet both the consultant ' s and our
requirement . We have also discussed your cash flow concerns
with our Finance Department . It will be necessary to make
cash deposits with the City . However , we have proposed to
separate the cost into three (3) deposits to be dated June
1st , July 1st , and September 1st. We believe that this will
meet both of our needs .
Time schedule for project :
June 1* Initial deposit equal to amount of one-half
of the estimated Draft EIS cost placed in
City account - ERADCO .
July 1* Submit 10 copies of preliminary Draft EIS
preparation not to exceed 60 days) - con-
sultant . Deposit of remaining one-half
of Draft EIS cost - ERADCO.
August 1 Completion of review of preliminary DRAFT
EIS - ( review not to exceed 30 days) - City .
Billing 01 for staff review costs - City .
August 15* Payment to EIS account for Billing /0l -
ERADCO .
Septenber 1* Completion of final Draft EIS (preparation
not to exceed 30 days from City comments )-
consultant .
Deposit of estimated cost of Final EIS -
ERADCO.
1111
r-.
Roberta M. Hayhurst
Environmental Research & Development Corporation
May 14, 1900
Page Two
September 15 Concurrence in final Draft EIS (not to
exceed 15 days from receipt ) - City
Commence printing Draft EIS - consultant .
October 1 Mail Draft EIS ; comence 35-day review
period - City ; payment to R . W. Thorpe
Associates for Draft EIS - City .
Billing #2 for staff review costs - City .
October 15* Payment to EIS account for Billing 112-
ERADCO.
November 5 End of referral period.
November 10 Review of comments - City/consultant .
December 1 Complete Final EIS (preparation not to
exceed 21 days) - consultant .
Circulate Final EIS - City ; payment to
R . W. Thorpe Associates for Final EIS
30 days following circulation of Final
EIS - City.
Final billing for EIS preparation and
review - City .
December 8* Final payment for preparation and review
of EIS - ERADCO.
December 9 Public hearing on Master Plan before
Hearing Examiner.
As previously agreed, unless all dates noted with an asterisk
are met by the applicant, the rezone application, approved
by Ordinance 3113 pursuant to restrictive covenants dated
February 22, 1977, shall be deemed to have expired , and the
zoning shall automatically revert to previous zoning.
Should you have any questions, please feel free to contact
this office .
Very truly yours ,
Cor n Y. Er ' cksen
Plating Dire br
J
C t ram'Ora i e e s
Senior Planner
DRC : wr
st,
f:
r T
Environmental Research & Development Corporation
18OW Pacific Highway South.Suite t 1 15.Seattle.Washington 98188
t tuOne-(ZUb)244-UU60
May 12, 1980
Mr. Dave Clemens
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Dear tor. Clemens:
Pursuant to our phone conversation of today, we hereby request written
clarification of the time schedule set forth by the Planning Department
with regard to the Monterey Terrace P.U.D.
Inasmuch as you have had unforeseen deviations from the schedule to-date,
ERADCO feels it timely to re-establish the working calendar in order
to monitor the P.U.D. as it proceeds through the proper processing.
Additionally, it is hoped that we will be able to affect a means bywhichourdepositfortheE. I.S. preparation can be in the form of a
note or other negotiable instrument in lieu of the cash deposit called
for in your letter of March 19, 1980.
Your further direction in this matter will be greatly appreciated.
Thank you.
Sincerely yours,
1`,. < r fo!'""
Roberta M. Hayhurst
Property Manager
RMH/d
r r('
I
G11
EDT Investments
securuios
nLaly
OF I
THE CITY OF RENTONpo
Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON.WASH. 98055
o BARBARA Y. SHINPOCH, MAYOR 0 PLANNING DEPARTMENT
IO 235- 25500,9
TE0 SEPS (
c,
P
April 15 , 1980
MEMORANDUM
IC : Public Works Director
FROM : Gordon Y. Ericksen , Planning Director
By : David R . Clemens , Senior Planner
RE : MINUTES OF MEETING RE : MT . OLIVET CEMETERY AND
PROPOSED ERADCO ROAD
The following people attended a meeting at 1 : 30 p .m. on TuesdayApril15 , 1980 regarding the above :
Warren Gonnason
David Clemens
Roger Blaylock
Larry Warren
Ron Nelson
Dick Houghton
Jim Colt , Mt . Olivet Cemetery
Ted Gathe , Attorney for Mr . Colt
Bob DeBoer , Stoneway Sand and Gravel
Pat Easter , ERADCO
Discussed in brief were the problems surrounding the concurrent
completion of the Mt . Olivet Special Permit for filling and
grading and the construction of the ERADCO roadway. It was
noted that the Mt . Olivet permit would expire on May 9 , 1980,
and would require extension . Also, the permit for the ERADCO
roadway required approval of a Special Permit , if not constructed
in accordance with the Mt . Olivet permit (roadway on an easement
over the Mt . Olivet property ) .
Several alternatives were considered to resolve the problem
of an extension of the Mt . Olivet permit , and to make the
ERADCO road construction coincide with the Stoneway rezone
application approval . It was concluded that:
1 ) The Mt . Olivet permit will expire and requires
extension by the submission of a new permit .
2 ) The ERADCO roadway can only be constructed in accord-
ance with the Mt. Olivet permit .
a _d
P•ri ,r4 r.
p G
Page 2
Warren Gonnason
April 15 , 1980
3) ERADCO may construct the road at their own risk
until such time as the PUD approval requirements
of the Stoneway rezone are complied with.
At the conclusion of the meeting , Mr . Colt indicated that
they would be submitting a new special permit , and that they
would also request that the construction portion of their
current permit remain in force until such time as the Examiner
acts upon the new application . The City Attorney and Public
Works Director indicated that they would consider such a
request .
ERADCO discussed their concerns related to the PUD approval
estimated Lo occur early in 1981 due to the EIS preparation
required ) , and its relationship to the roadway . The Planning
staff indicated that until the PUD is approved , that the
roadway cannot be considered as acceptable access to the
ERA )CO ( former Stoneway ) property . Any roadway construction
would therefore be at the risk of ERADCO in that the access
may not be approved as proposed due to environmental or other
prol)lems .
The meeting closed with Mt . Olivet proposing a new application
and a request to allow continuing operations until the Examiners
decision on the new permit . ERADCO indicated that they would
consider whether to continue work on the roadway in accordance
with the Mt . Olivet permit requirements or halt work until
the PUD is approved .
DRC : do
1
111cc : Mayor Shinpoch
Mt . Olivet file
ERADCO file
t-1
Environmental Research &
Development Corporation
April 1, 1980 Sea-Tac Office Building • Phone: 12061244.0080
18000 Pacific Highway South . Seattle,WA.98188
Mr.
0‘
Dave Clemens V..Senior Planner
Planning Department 1 2:
t..200 Miii Avenue South
1
Renton, Washington 98055
Re: Monterey Terrace ii11NG c)
Dear Ir. Clemens :
We have reviewed the letter of March 19th from Gordon Ericksen in which
he has indicated that an extension approval will be granted in the
above mentioned P.U. D. submitted for the purposes of preparing an E. I.S.
It is further our understanding that said extension is granted subject
to the time schedule included in your letter. Upon careful review, we
find this schedule acceptable to our needs and shall proceed towards a
successful completion of the tasks as outlined.
Inasmuch as Thorpe and Associates has ably assisted us in the data collection
efforts for the P.U. D. submittal , we would ask your approval and confirmation
of the choice of this firm for the E. I.S. preparation in lieu of the
circulation of a proposal request as mentioned in your letter.
Your written confirmation of receipt of this letter and discussion regarding
our using Thorpe and Associates for the E. I.S. will be appreciated. Thank
you.
Sincerely yours,
v'
Roberta M. Hayhurst
Property Manager
RMH/d
OF RFC
o THE CITY OF RENTON
V " -41) z
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055
BARBARA Y. SHINPOCH. MAYOR © PLANNING DEPARTMENTdL • 'w
235- 25509 Pam.
9gT
p SE.1°A
March 19, 1980
Stephan J. Klos
Execuive Vice President
Environmental Research & Development Corp .
Sea-Tac Office Building
18000 Pacific Highway South
Seatt:.e , Washington 98188
RE : MONTEREY TERRACE PROJECT
Dear Mr . Klos :
We hate reviewed the background of the rezoning of the subject
property and the requirement for an extension pursuant to
the covenants. We have concluded that extending will be
acceptable for the purposes of preparing an EIS . This extension
is granted subject to the time schedule established below
for Master Plan application revisions and EIS preparation .
Acknowledgement of this program must be received by April
1st.
Pursuant to the Renton Environmental Ordinance 4-2814(8)
the applicant shall pay a fee of $100 plus $25 per acre and
shall deposit with the City an amount equivalent to the estimated
cost of the EIS preparation , and provide payment for direct
costs to the City incurred in preparation or review. Your
company will circulate a request for proposal to prepare
the EIS , and the City and yourselves will mutually decide
upon the firm(s ) who will prepare the EIS. All payments for
services will be provided by the City from your deposit .
The following time schedule is set forth to prescribe the
time limits which must be maintained to retain ..he existing
zoning in force , and also to assist ERADCO, the City and
the EIS consultant .
f:Rai F i.hy;
P#iera.N`p
y ,z
i
Letter to Stephen Klos
March 19, 1980
Page -2-
Time Schedule for Review of Monterey Terrace Project- ERADCO
Apri] 1* Commence request for proposal on EIS-ERADCO
Complete staff review of Master Plan application-
City
April 15* Re-submit revised Master Plan- ERADCO
City/applicant concurrence on consultant
May 1* Acceptance of Master Plan application- City
Initial deposit equal to amount of EIS proposal
placed in City account- ERADCO
Initial meetings on EIS- City/consultant
July 1 Submit 10 copies of preliminary DRAFT EIS
preparation not to exceed 60 days )- consultant
Augus : 1 Completion of review of preliminary DRAFTEIS- (review not to exceed 30 days)- City
Billing #1 for staff review costs- City
August. 15* Payment to EIS account for Billing #I1- ERADCO
September 1 Completion of final DRAFT EIS (preparation
not to exceed 30 days from City comments)-
consultant
September 15 Concurrence in final DRAFT EIS (not to
exceed 15 days form receipt)- City
Commence printing DRAFT EIS- consultant
October 1 Mail DRAFT EIS , commence 35 day review period-City
Billing #2 for staff review costs- City
October 15* Payment to EIS account for Billing #2- ERADCO
November 5 End of referal period
November 10 Review of comments- City/consultant
Decembtt3r 1 Complete FINAL EIS (preparation not to exceed
21 days )- consultant
Circulate FINAL EIS- City
1°'1 jM 7+ ry' x
Yt`
bb ..fir
1.`ly7't ..
r-
Letter to Stephen Klos
March 19, 1980
Psge -3-
Final billing for EIS preparation and review-
City
December 8* Final payment for preparation and Review of
EIS- ERADCO
December 9 Public hearing on Master Plan before Hearing
Examiner
Unless all dates noted with an asterisk (*) are met by the
applicant , the rezone application , approved by Ordinance
3113 pursuant to restrictive covnenats dated February 22 ,
1977 shall be deemed to have expired and the zoning shall
automatically revert to previous zoning .
Due to our increasing workload, this department will be using
a teem approach in the review of the project and EIS . I
will be available for consultation on policy issues , however ,
procedural and administrative details will be handled by
David Clemens , Senior Planner and Steve Munson, Assistant
Planner .
Very Vuly yours
a
14:, 7.
or on Y . icksen ,
Planning iZector
GYE :DZC .sh
y;1!,.!, Ail•,•r
h
V
i/
C
Environmental Research &
Development Corporation
February 28, 1986 Sea-Tac Office Building • Phone: (206)244-0080
18000 Pacific Highway South • Seattle,WA.98188
P -7 D - off/ J6
Mr. Gordon Erickson
Planning Director
City of Renton, Planning Division
Municipal Building
200 Mill Avenue, South
Renton, WA 98055
Dear Mr. Erickson:
As indicated in our letter of February 21, 1980, we are
herewith submitting a Draft Master Plan Proposal as
stipulated in the Contract Rezone and Restricitve Covenant
dated February 22 , 1977. Because there has been relatively
little opportunity to review our proposal, we are prepared
to work closely with your office to review these plans in
the best interests of the City of Renton and Environmental
Research & Development Corporation, respectively.
The Master Plan format and material fulfill the requirements
as set forth in the City of Renton Planned Unit Development
Master Plan Procedures, dated September 1, 1976 . It is our
understanding that this is intended to be a general document,
outlining the scope of the development proposal. As indicated
in the text, we expect to provide a full Environmental
Impact Statement in cooperation with your department. To
this end, we anticipate the submittal of more detailed analysis
for your consideration.
Your counsel and suggestions will be greatly appreciated.
Sincerely,
ENVIRONMENTAL RESEARCH
DEVELOPMENT CORPORATION
eg4jr/8/
1
ate en J. KlosG;.
I
r '
Executive Vice President y t"
C>
JK/jcs I FEB
r
31913t"1`•;is+ °, 47,.
y ,t t3SvjyYi'+ ,' did` ,:•'"' "••
ec
L J
5
Environmental Research &February 21, 1980 Development Corporation
Sea•Tat Office Building • Phone: (206)244-0080
18000 Pacific Highway South • Seattle,WA.98188
Mr. Gordon Erickson, Planning Director
City of Renton , Planning Division
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Erickson:
This letter is to formally request of your department an extension of
90 days..to_pr•ovi de for..the appropriate approval processing on thetcpntereyTerraceContractRezoneMasterPlan. It should be made clear
that`we do intend to submit the Master Plan bf the February 28th deadlinetoyouroffice. This Master Plan will contain those items outlinedinourmemotoyoudatedFebruary2, 1980.
Thouch we have taken what we believe to be significant steps toward
complying with the Contract Rezone Covenant, we do feel it would greatlybenefitallpartiesconcernedifwecouldhavesufficienttimetoreview
all details with your office prior to submitting the plan for hearingsandfinalapproval . We feel that it is imperative that our plan meet
both the desires of the City of Renton for development of the east side
as well as the financial goals of ERADCO investors.
Therefore, we are formally requesting an extension for purpose of planapproval , based upon the following circumstances which have mitigated
against an adequate planning process shared between our offices.
1. Late closing of property purchase: all escrowed funds were
held pending closure until January 18th, 1980, thus tieing
up those funds necessary to proceed with the various contracts
necessary to complete the planning process.
2. Washington State SEC Stop Order: On June 11, 1979, ERADCO was
served a Stop Order by the State of Washington, Securities
Division. At that point in time, all efforts of ERADCO personnel
were channeled toward meeting the conditions of the Stop Order
and obtaining a Consent Decree whereby Monterey Terrace syndica-
tion already in progress could be closed out. Said approval
for Monterey Terrace sales was given and syndication was closed
out October 11, 1979. It was at this time that a new team of
staff were brought on at ERADCO and the Contract Rezone efforts
were begun in earnest. In essence, four months were lost for
the formulation of the necessary procedures for PUD application.
Y I
t~' Eri c.kson, 2/21/8
J:
t }
Page two
3. Easement delay the access easement, required in the land
covenant, could not be completed until Ja,ivary 1980. Since
lack of such an easement would jeopardize the whole project,
most effort by ERADCO was focused in this direction.
Witt- the above legal , fiscal , and time constraints ERADCO was prohibitedfromdevotingstaffeffortstowardmeetingtheplanningrequirementsofthecontractrezoneuntillatein1979. It was at this time, that UrbanPropertiesInc. was contracted to manage the planning processes necessarytomeettheMasterPlansubmittaldeadline.
Though we do plan to have the plan ready for submittal , 4:e do feel it isimperativethatv._ proceed toward approval with the full support and
advice of the City Planning Department. It is for these reasons then
that we are requesting an extension of time to assure adequate care begiventowardfinalplanhearingsandapproval .
Sincerely yours,
elVetA•
7
Roberta M. Hayhurst
PropErty Manager
RMH/c
Q. _.
l u
9
R4.
o THE CITY OF RENTON
U O;v r
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
tem
o A ,BARBARA Y. SHINPOCH, MAYOR o PLANNING DEPARTMENT
Co' 235- 2550
9I tco sEP1°
1'
MEMORANDUM
February 19 , 1980
TO: Warren C. Gonnason , Public Works Director
FROM: Gordon Y. Ericksen, Planning Director
RE : ROAD CONSTRUCTION SOUTH OF N.E. 3RD STREET
BY ERADCO CORPORATION
Recently , the Planning Department has noticed that a roadway
is presently under construction on the east side of the 111t ,
Olivet Cemetery south of N.E. 3rd Street by the ERADCO Corpora-
tion . The...new,..street will provide access to property rezoned
under rile. No:.'LR-.391-76` Stoney!aY i.Con.c.xete, ;.;Inc, )2_:I
That original approval anticipated that an access road would
have to be constructed along the powerline right-of-way ; how-
e'•er , it required review by the Hearing Examiner prior to the
actual construction of the road. It appears that in July of
1979 , the Public Works Department issued a permit for the
construction of the road without the approval of the Hearing
Examiner. The Planning Department was totally unaware that
the Public Works Department was considering such a request .
Presently, the Planning Department is uncertain of the legal
impact that granting a permit in apparent violation of the
requirements of the rezone will have on the status of the
rezone. Therefore, we would request that the Public Works
Department place a stop work order on the project until a
legal interpretation can be obtained from the City Attorney.
IIJB: wr
y 4
r• * f I=L.
urban properties company
UPC-7
February 2, 1980
Mr. Gordon Erickson
Planning Director f.
City of Renton, Planning Division
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Erickson:
Enclosed is the draft of notes on the meeting held last Tuesday,
January 29, 1980 in your offices regarding the Rezone Contract of
Monterey Terrace. As indicated in our discussion these are presented
for your approval or correction.
Also enclosed is the list from James Badoia representing his thinking
concerning material to be submitted as part of the Master Plan Package.
In addition we would expect to include in the package engineering
analysis for storm and sanitation sewers , soils analysis , utilities
and traffic analyses . Also a text would expand on our general goals
and objections for site development.
Lastly I have enclosed a transmittal form indicating materials which
we have delivered to you to date.
We look forward to your comments and suggestions concerning the
enclosed and our planning to date. I want to personally assure you
that we will be working closely with you each step of the way, as you
direct us . I hope to hear from you presently, in order that we might
plan the necessary steps and proceedures .
Regards ,
URBAN PROPERTIES COMPANY
y id_
James T. Reynolds
Project Manager
JTR:e l j
Enclosures
1934 132nd Avenue N.E. P.O. Box 6728 Bellevue, WA 98007 Phone 206 682-3678
1 ,' t as yt.
urban properties company
Transmittal
Date:February 1, 1980
To: Gordon Erickson, Planning Director
City of Renton Planning Division
From: Urban Properties Company, James T. Reynolds , Project Manager
Subject: Documentation List
Enclosures: 2
Remarks:Listed below are the documents delivered to your office
Monday, January 29 , 1980.
Correspondence file pertaining to access road, PUD, Land
Use Contract, etc.
Engineering drawings for access road
Architectural rendering, preliminary, site slope analysis
Architectural rendering, preliminary, site traffic circulation
plan
Architectural rendering, preliminary, site plan showing
zoning and covenant restrictions and resultant site density
proposals .
Documents inclosed with this transmittal :
Drawing list, to be submitted with Master Plan
January 29, 1980 meeting notes - for your approval
JTR: elj
1934 132nd Avenue N.E. P.O. Box 6728 Bellevue, WA 98007 Phone 206 682-3678
it y .
urban properties corm any
Memorandum
To : File
Date : 1-30-80
From: James Reynolds
Subject : Notes on Meeting held at Renton City Planning Offices ,
Tuesday, January 29 , 1980 , 10 : 30 a.m.
Present : Representing the City of Renton: Gordon Erickson,
Roger Blaylock, David Clem coons
Representing Property Owner : Roberta Hayhurst, ERADCO ,
George Rolfe and James Reynolds , Urban Properties Company
James Badoia, Mithun Associates , Architects
George Rolfe began the meeting with a brief historical sketch of
Urban Properties involvement in the development of the ERADCO property
indicating that UPCO was brought on as project manager in November
1979 when ERADCO felt the need for development consultation. Since
coming on board several consultants have begun to gather infolwation
to assist toward the development of the Master Plan, namely : a soils
expert , traffic consultant, and Robert Thorpe, who is assisting with
environ nental issues .
George Further addressed the access road issue , indicating the
Developer' s desire to work closely with the planning department ,
and hoping that previous misunderstandings will not work to the
detriment of the project completion.
Gordon Erickson spoke briefly to the nature of the restrictive
covenant and it' s requirements regarding the content of and time
frame for the submittal of a Master Plan. He indicated the City
was accepting February 28, 1980 as the Master Plan submittal target
date. '_t was further pointed out by Mr . Erickson that extensions of
this ta:-get date were possible, with the proper supporting documenta-
tion. :_t was reiterated, relative to several issues by Mr. Erickson
that in order to facilitate the smooth processing of our proposals that
all issues concerning the proposal and Master Plan completion should
pass before the Planning Department. Mr. Erickson pointed out both
the desirability and the requirement that his Department carry out the
interface with other City Departments , rather than the developers
performing this task.
The issue of subdivision and platting of the property was discussed
briefly. Mr. Erickson pointed out the necessity of exploring the
ramification should the developers decide to subdivide, that is , road
1934 132nnd Avenue N.E. P.O. Box 6728 Bellevue, WA 98007 Phone 206 682-3678
tt•k.
Memorandum To File -
January 30 , 1980
Page Two
specifications , etc . Mt. Rolfe indicated that the present state of
the developer' s planning had not fully discussed this issue, while
Mr. Erickson indicated that platting was not a requirement for
completior of the Master Plan.
James Badoia presented several plans to indicate the direction of the
developer' s thinking to date. These plans included a slope analysis ,
a composite of traffic circulation within the plot , and a preliminarysiteplanwithdensityindications .
Relative to site access during construction Mr. Erickson indicated
that it would very likely be possible to use Blaine Avenue for small
vehicle access , while larger vehicles would use the new access road.
This utilization of the Blaine Avenue access would have to meet time
frames acceptable to both the city and the residents of MontereyTerrace.
To date the developers have turned over to the planning department
the following materials :
Correspondence file pertaining to the access road,
PUD, Land Use Contract, etc.
Engineering drawings for the access road
Slope analysis draft
Composite site plan, showing in site circulation patterns
and housing density.
Next steps include :
The developers will submit a list of that data which they plan to
submet as part of the Master Plan. The developers request the
Planning Department to respond to this listing, indicating changes
necessary or deficiencies .
The developers will complete an Environmental Impact Check List,
nd request a City determination regarding an EIS.
Mr. Erickson indicated that his department will respond to all
material submitted as quickly as possible but wanted us to recognize
office work load and potential delays in response. From his perusalofthematerialpertainingtotheaccessroad, the preliminarydrawingssubmittedofthesiteanalysisandcomposition, Mr. Erickson
indicated he would offer his response regarding the developer 's
progress to date, potential pitfalls and areas for further work.
JR: elj
JOB NOTES
January 29, 1980
Re: Steve Klos PUD
Job No. 79107
Drawing list to be submitted for review and approval to City of Renton'sPlanningDepartment.
1. Slope Analysis - 1" = 100'
Breaking down the entire property into the following catagories:0 - 6%
7 - 15%
16 - 25%
25% and over.
2. Composite Analysis Plan showing:
Existing zoning boundries
Existing vegetation
Soil types
Views and sun orientation
Natural circulation patterns through site
Drawing scale at 1" = 100'
3. Density Analysis Plan showing:
Proposed density for four distinct portions of the property.An outline of development covenants which the City and the
developer--would. impose upon any development of the site.
4. Representative Site Plan showing:
A physical interpretation of the density and covenant
restrictions imposed by Zoning and by the master plan
proposal .
This drawing is intended to only serve as an example of the
possible development permitted under the design covenants .
5. Site Sections at 1" = 20'
Several sections through three portions of the site examining
existing land forms, proposed grade modifications and building
relationships to the site, to each other, and to the surroundingcommunity.
2000 1121H AVENUE N. E.BELLEVUE, WASHINGTON 98004 454 . 3344
r• ite»U,1y,t• ,e i4 , p
Sw PyiZWs.R. 3. iyh
7
ACIL )^-41/1-7 /P--e",,
OF RE,
c:
A.
U °v ' Z OFFICE OF THE CITY ATTORNEYS RENTON,WASHINGTON
h I POST OFFICE BOX 626 100 2nd AVENUE BUILDING • RENTON.WASHINGTON 98055 255-8678
is
00 . LAWRENCE I.WARREN, CITY ATTORNEY DANIEL KELLOGG, ASSISTANT CITY ATTORNEY
1/40'
oii)
ItED sEFt
O?,
August 21, 1979
r -_~`
OF RFi i•.
RECEIVED 8\
v
3 pJ AUG 24 9 :' (1
P Y 9
ck*
t1`i
Mr. Stephen Mills lNG DEP
Transamerica Title Insurance Co.
222 Williams
Renton, Washington 98055
Dear Steve:
Could you please issue the City final Title Insurance
on the two parcels they recently acquired from Kent-
Highlands, Inc. , formerly Stoneway Concrete, Inc.
These two parcels are covered under your Order No.
427310 and 427303. You could also forward a bill along
to me for the insurance and I will promptly remit the
same to the City of Renton.
Very truly yours ,
Lawrence J. Warren
LJW:nd
cc: Mayor
Council President
PLanning Director
tY,:..
s4'4tt'yyyt , t',
o a '{4;31M1(y
1 1.54HL.S sht;,
u,
OF Rom.
4
i
r- 0 THE CITY OF RENTON
2
s•:`' Z MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
CHARLES J. DELAURENTI , MAYOR 0 PLANNING DEPARTMENT
AZ
0Q' 235-2550
41q'
EO cFPit--
October 27, 1978
Marcus K. Partin
Vice President
Real Estate Planning Division
Environmental Research & Development Corporation
Sea-Tac Office Building
18000 Pacific Highway South
Seattle, Washington 98188
RE: R-891-76, STONEWAY CONCRETE, INC. , ORDINANCE 3113
Dear Mr. Partin:
We have reviewed the covenants dated February 22, 1977, relating to the
above referenced item. The covenants require approval of a master plan
by February, 1979, and substantial development by February, 1980. The
covenants further provide for extension of these time periods by the
Planning Department for reasonable cause.
We have evaluated your six reasons for considering the requested exten-
sion provided in your letter of October 18, 1976, and compared them to
the original concerns expressed at the time of the rezoning action. The
timing requirement appears to have been established to insure continuity
in the development process from rezoning through construction. The basic
request for additional time to provide for proper planning of the project
appears to be consistent with the original rezone approval . However, the
requested 18 months does appear to go beyond the original intent. There-
fore, based upon the fact that ERADCO is a prospective new owner, the
access roadway plans have just been completed, and good planning princi-
pals suggest that alternatives be developed and considered, the Planning
Departmt+it extends time limits specified in covenants for one year.
Therefore, a master plan for the total development is required to be
approved by the City by February, 1980, and construction commenced by
February, 1981.
If you have any questions, please feel free to call .
Very ul yours,
Gordon Y. Eri ckl 'ij7, Planning Director
1,,,,/ /./, ,/,/_____ ,,,,/,,
David R. Clemens, Associate Planner
DRC:wr
b. ,1 t!!; • 1; nab ;.r 1-;,.
FLJ
Environmental Research &
October 18, 1978 Development Corporation
Sea-Tac Office Building • Phone: (206)244-0080
18000 Pacific Highway South • Seattle,WA.98188
Pr. David R. Clemens and
Mr. Michael Smith, Chief Planners U
ity of Renton, Planning Division
c)
1/.` Pr(' -(\/ED 0
Municipal Building 2200MillAvenueSouthti
Renton, WA 98055 JCT 231978
o
Re: Ordinance #3113
y
47 t/
Gentlemen: G pEpP
Pursuant to my discussion with you on October 13, 1978, this letter is a
formal request for an extension of the land use contract which expires in
February, 1979, and is included in the above referenced zoning ordinance.
It would be extremely difficult, if not impossible, to formulate and
mplement an effective development plan by this date. We will require at
east 18 additional months to complete our site research and to create a
quality development plan for property being purchased from the Stoneway
Company.
We feel that such an extension is in order for the following reasons :
1 . As the prospective new owner of the property, Environmental
Research and Development Corporation (ERADCO) has insufficient
time to complete necessary research and planning before the
current contract expires.
2. Only recently have final plans meeting city specifications of
an access road to the N.E. corner of the subject property
completed the review and revision process.
3. The access problem is further complicated by the restrictive
covenant on the property limiting access to Blaine Avenue N.E.
Additional time is necessary to develop a harmonious access plan
that can be presented to the city and residents of Monterey
Terrace for review and approval .
4. Adequate planning time prevents the ill effects that can be
generated by a plan that is developed in haste in order to
meet a suspense deadline.
5. It is the desire of ERADCO to minimize the impact of site
development and construction activity upon the surrounding
community. Additional preparation time will assure ERADCO an
opportunity to investigate a substantial number of alterna-
tives, and choose the best of many instead of the best of a
few.
yr.«0 11 11 ,
t as
w ,
2-
6. An 18 month extension of the land use contract does not appear
to adversely affect anyone related to the subject property,
including the city planning department, the neighboring com-
munity, and the owners. However, it does appear to enhance
the predictability of the nature, degree, and direction of
future development and the peripheral effects and demands
generated by that development.
Thank you for your consideration of this request. An early response will
to appreciated.
incerely,
40V
Ma cus K. Parti n
Vice President
F.eal Estate Planning Division
N.KP:ma
pF -AP
o THE CITY OF RENTON
6f MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
ii a.
p
O ' ? ` ^+CHARLES J. DELAURENTI • MAYOR 0 PLANNING I)EPARTNIENT
O
Q- 235-2550
Oeo SF Pit
Jule 7 , 1977
Robert DeBoer
Stoneway Concrete , Inc .
P . 0 . Box 509
Reston , WA 98055
Dear Mr . DeBoer :
RE : ACCESS ROAD FOR STONEWAY CONCRETE COMPANY PROPERTY
Pursuant to your request , the Planning Department and Public
Works Department have reviewed the location and improvement
reluirements for a proposed access road from N . E . 3rd Street
to the Stoneway property just south of Mt . Olivet Cemetery .
It is our recommendation that the proposed street consist
of 64 feet of dedicated right-of-way , which should be suf-
ficient to provide a minimum 44 foot curb-to-curb width .
Standard improvements could be developed as a phased program
with initial construction at a lesser width . It would also
be necessary to determine the extent of the public right-of-
way portion of the roadway that would be sufficient to
serve the general area . This requirement is based on the
potential developmental density of the subject site ,
together with the comprehensive plan designation for a
future boulevard street to serve anticipated additional
residential and recreational densities for the area .
While there are some sight restrictions at N . E . 3rd Street
due to a vertical curve on the uphill side , the proposed
lol:ation does not appear to create any significant sight
di ;stance problems . Signalization will ultimately be
required at N . E . 3rd Street , when traffic demands warrant
it Adequate provisions will also be required to handle
storm drainage from the proposed street .
We hope that this will assist you in planning the subject
access road . You should submit proposed plans for our
review and approval .
11,
c4
I
0,
1)
i
5
Robert DeBoer
June 7 , 1977
Page Two
If you have any questions , please do not hesitate to contact
this department or the Public Works Department .
Very truly yours ,
Gordon Y . Ericksen
Pl anI ng Di ector .
Michael L . Smi'th
Associate Planner
MLS : wr
cc : C . J . Delaurenti , Mayor
W. C . Gonnason , Public Works Director
Hugh G . Goldsmith
3 'Irria
t; t i
1
I
1
irl/ '•/if '
N/IN\.•••...
is•-•• .,
1
11 ;
167 \ Tt 1-..1.4 ic,1.1 11,A1 , ..., 1
A\ \-----
r
iti81
Nit
111 1 in
i\
Tili
i i I
It\
Z- 1
11 ::cri ' ^emu. c-:''
s I ..,
1- ••,. .., ......,.\\
i\t Ili' I
c
T.MAI-
I,
777
MEMORANDUM
May 31 , 1977
TO : GORDON ERICKSEN
Planning Director
Attention: Mike Smith
FROM: WARREN GONNASON
Public Works Director
RE : ACCESS FOR STONEWAY CONCRETE PROPERTY
Pursuant to your memo of May 19 , the following comments are made
relative to the provision of access for the development of the
Stoneway Concrete property located southerly from NE 3rd Street as
per your sketch.
As I understood it , the proposed R-2 and R-3 development on the
Stoneway property could involve as many as 200- 300 residential
units . A two- lane roadway facility would be adequate to serve
the population from such a development. You did indicate , however ,
that there is additional potential development in the area to the
east that could be served by such an access road , and it would
be appropriate to have that portion of the roadway that serves
the larger area have a curb-to-curb width of 44 feet to allow for
turning movements and storage at the intersection with NE 3rd
Street . Ultimately signalization would probably be required at
NE 3rd Street when traffic demands require this . Therefore ,
right-of-way sufficient to provide 44- foot curb- to- curb width
should be provided at the outset , and initial construction could
be programmed to a lesser width . This should be a dedicated
public right-of-way of 64 feet in width ; and while there are some
sight restrictions at NE 3rd Street due to a vertical curve on
the uphill side , we do not anticipate this would create any sight
distance problems .
Adequate provisions would be required for handling the drainage
waters from such a development , and the developer should submit
proposed plans for our consideration and approval, and alignment
as shown on your vicinity map would appear to be acceptable .
6) (2 9-)
WCG : cah
cc: Mayor Delaurenti
Del Bennett
Dick Houghton
THE CITY OF RENTONRMUNICIPALBUILDING200MILLAVESO. RENTON. WASH. 980552c
CHARLES J. DELAURENTI , MAYOR • I'LANNINC; I>EI'. ier i ENT
O,
4T,
SEP c_01'
235- 2550
MEMORANDUM
May 19 , 1977
TO : Warren Gonnason , Public Works Director
FROM: Gordon Ericksen , Planning Director
By: Michael Smith , Associate Planner
RE : ACCESS FOR STONEWAY CONCRETE PROPERTY
Stoneway is desirous of obtaining access to the recentlyrezonedpropertyassoonaspossibleduetoapendingsale
to a development firm. They have discussed the matter of
utilizing a portion of the Puget Power Transmission line R/W
with puget , and are working with Mt . Olivet Cemetery on the
remaining portions . Although there is a planned future publicR/W in the approximate area a temporary private access mightbepossibleintheinterimwithagreementtoparticipatein
a future public road . A map is attached indicating the
approximate location of the proposed private access road .
We would appreciate your review and response to several
questions including ;
1 . What is the extent of the improvements to be
required at this time?
2 . Will the proposed location of the intersection with
N . E . 3rd Street present any problems in terms of
sight distance and turning movements ?
3 . Any other requirements or problems that your
department would foresee for the proposed access
road ?
We would appreciate your response as soon as possible so that
Stoneway can continue its negtiations with the various partiesinvolved . If you need additional information or wish to meet
regarding this matter please advise .
MLS : LML
Attachment
I/ / .,..•
I
r I
I
c)
C4fre\
i.\..........s--c s...„----_-_-_-_---• ..-
4
Ae .• , A
Pr1r)JECT
il
z' t',.1•'..;t•; ‘ ; .:. I.: •.
I
m.-.:.....
1.--:::::::=
1......m----.....ir--,-.=-r .it,. •
I 1 : ,. 1•,;',..:1.-
1 I_
tit I c7It,.1 ,i El
i • Ik% .
I
IN'.\‘'. • '
I
i
i is
1 11 \ ..t .
i ,.. ;.• i .—1 I
1 1 a::.:....,:-.2=C....3 c....3 c:-...,..:
pa.--1 R-3 1
i,,..
I / /.
0. PA/:•.; . R.-II
t ....C.. 1 1 .
2.. ,\,..,
k.
VICNI -T- Y MAP
4 00.
5g -71-...A.J1•,,,s.s,ON/ 1".1 CS
M4.5 1.1•10.41... '-it.EQ-0 f sT.
1',P.E111.1..4.1'.". ..
n...1%1 ..'.: ."
1.,•:c4.1:;.. •::; .'.....:.• '
1.? t•A'':• . • . a
t • •• . •,..
1.,i, e
c.: : ::•1 .
rofirfiv9J-24
p/r1-141a-treln-
ZP- IJidjr',p .i o5- Lca I 4 zo »
a it 5-rAcret5 eN
Av..44i
ç—C ) -vtercx
fit Az"v
54.1 4 a v
zr` 4°-.1P filP4
P°2 (;4 r41)41j
00-z fiove cy-v 0 0414 61,w/ f,ye J'
a,
17ey Ito
f4Q1D eG,
WYG5-7r/V171d
577 14Ip
raft e ra14 M4 T 100(1
1.
7417-C. irIT "-a--TFV -7feirr-dfd
110-5145
g741.40?
of I' er 11-W
of R
10 o THE CITY OF RENTON
V z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON. WASH 98055
A CHARLES J. DELAURENTI , MAYOR 0 PLANNING DEPARTMENT
15 O• 235- 2550
C09•I1EO ;E Pj
c,
0
MEMORANDUM
April 27 , 1977
TO : Files
FROM : Michael L . Smith , Associate Planner
RE : STONEWAY CONCRETE , REZONE SITE
I net today with Bob DeBoer of Stoneway Concrete , Inc . , and
Hugh Goldsmith , his engineer , regarding future development
potentials for the site. Mr. Goldsmith mentioned possible
platting of the property and sale of smaller portions of the
si :e to individual developers . I indicated that this was
not the intent of the rezone approval and restrictive cove-
naits . According to these documents , the subject site is
to be master planned through the P. U . D . ordinance with a
first phase for specific initial site planning and develop-
ment . I further indicated that it may be possible to sub-
diHde concurrently with the P . U . D . concept .
We also discussed the status of the access road , required
improvements , standards , and dedication . Mr . DeBoer said
he has been working with Puget Power and Mt . Olivet Cemetery
and is making progress . I said that we would have to deter-
mine the specific requirements for construction of a street
from N . E . 3rd St . to the Stoneway property . I said that we
would check out what the requirements would be . It appears
that it is Stoneway ' s intention to develop the street as a
condition prior to sale of the property to a developer .
MLS :wr
cc : G . Ericksen
iy 1
A ft•.
c.
Nei' 1 r
t• Invoice Noas" 596
CITY OF RENTON
200 MILL AVENUE SOUTH
RENTON, WASH I NGT ON 98055
CITY CLERK
Department or Division
Date _._ Marrh 11 , 1977
Please make checks
Stoneway Concrete, Inc .payable to
P . 0. Box 509 Finance Department
Renton, Wash . 98055 City of Renton
L. Atto : Mr . Robert H . DeBoer
Declaration of Restrictive Covenants ( recording fees ) 4 . 00
Ordinance #3113
Rezone File # R-891-76
Recording # 7703010782
copies attached
1nt.a1 t)ua __$4 . 0Q,__..____.
1t'.
CITE or RENTON, WASHINGTON
ORDINANCE NO. 3113
AN ORDINANCE OF THE CITY OF RENTON , WASHINGTON ,
CHANGING THE ZONING CLASSIFICATION OF CERTAIN
PROPERTIES WITHIN THE CITY OF RENTON FROM
RESIDENCE DISTRICT (R-1) AND SUBURBAN RESIDENCE
DISTRICT (S-1) TO RESIDENCE DISTRICT (R-1 , R_2 ,
R-3 and R-4)
WHEREAS under Chapter 7 , Title IV (Building Regulations)
of Ordinance No. 1628 known as the "Code of General Ordinances of
the City of Renton" , as amended, and the maps and reports adopted
in conjunction therewith, the` property hereinbelow described has
heretofore been zoned as Residence District (R-1) and Suburban Residence
District (S-1) ; and
WHEREAS a proper petition for change of zone classification ,
of said property has been filed with the City Clerk on or about October
11, 1976 , which petition was duly referred to the Planning Commission
for investigation, study and public hearing, and a public hearing
having been held thereon on or about November 10 , 1976, and which
matter was continued to January 19, 1977 , and having been duly considered
by the Planning Commission and said zoning request being in conformity
with the City ' s Comprehensive Plan, as amended, and the City Council
having duly considered all matters relevant thereto, and all parties
having been heard appearing in support thereof or in opposition
thereto, NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON , DO
ORDAIN AS FOLLOWS:
SECTION I : The following described property in the City
of Renton is hereby rezoned to Residence District (R-1, R-2 , R-3 and
R-4) as hereinbelow specified; the Public Works Director and the
Planning Director are hereby authorized and directed to change the
maps of the Zoning Ordinance , as amended, to evidence said rezoning ,
to-wit:
See Exhibit "A" attached hereto and made a part
hereof as if fully set forth herein,
2-
y •
Property located east of SR-169 (Maple Valley
Highway) south of Monterey Terrace and Mt. Olivet
Cemetery and westcf Bonneville Power Right of Right)
SUBJECT, HOWEVER, to :that certain "DECLARATION OF
RESTRICTIVE COVENANTS" dated February 2 , 1977 which is incorporated
herein and made a part hereof as if fully set forth, and which said
Declaration is recorded in the office of Director of Records and
Elections , King County Receiving No.
SECTION 11: This Ordinance shall be effective upon its
passage , approval and five ( 5) days after its publication.
PASSED BY THE CITY COUNCIL this 28th day of February, 1977 .
Mead it Ci rDeloresy
APPROVED BY THE MAYOR this 28th day of February, 1977 .
1
les 7;
C.•
Char Delaurenti, Mayor
Approved as to form:
44
G_rax d M. b ellan, City Attorney
Late of Publication: March 4 , 1977
2-
EXHIBIT "A"
DARCEL " A"
The west 850. 32 feet of the north 100 feet , (the west
850. 32 feet being measured along the North line , and the north
100 feet being measured at right angles to the North line )
of the following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W . M . described as follows :.
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north alor"q the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89045 ' 17" east a 'distance of 526. 41 feet ; thence south
88052 ' 04" east a `,distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89045 ' 17 " west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel "A" lying within the Green-
belt area as shown on the Comprehensive Plan revision dated
May 17 , 1972 , said Greenbelt area also known as Parcel " E" .
PARCEL " B"
The west 1180. 32 feet , as measured along the North line ,
of the following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township
23 North , Range 5 East , W . M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
38°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 (St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17 " west a distance of 653 . 91 feet from
Point " A" ; thence South 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel " B" lying within the
north 100 feet of the west 850. 32 feet , as measured at right
angles to and along the North line thereof. This exception
also known as Parcel "A" .
ALSO except any portion of said Parcel " B" lying within
the Greenbelt area as shown on the Comprehensive Plan revision
dated May 17 , 1972 , said Greenbelt area also known as Parcel
E
PARCEL " C"
The east 799 feet as measured along the North line of the
following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south .
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89945 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel "C" lying within the
Greenbelt area as shown on the Comprehensive Plan revision
dated May 17 , 1972 , said Greenbelt area also known as Parcel
E"
ALSO except the area known as Parcel " D" and more partic-
ularly described as follows :
Beginning at the Northeast corner of the above described
main tract :
Thence southerly along the easterly line thereof a distance
of 300 feet to the true point of beginning ; thence westerly
parallel with the North line of the main tract herein
described a distance of 300 feet to an intersection with
a line which is parallel with and 300 feet westerly of ,
as measured at right angles to , the east line of said
main tract ; thence southerly along said parallel line to
an intersection with the northeasterly line of the Green-
belt area as shown on the Comprehensive Plan revision
dated May 17 , 1972 , said Greenbelt area also known las
Parcel " E" ; thence southeasterly along the Northerly line
of said Greenbelt area to an intersection with the East
line of said main tract ; thence northerly along the East
line thereof a distance of 800 feet more or less to the
point of beginning .
2-
PARCEL " D"
Beginning at the NE corner of the MAIN TRACT as described
telow :
Thence southerly along the easterly line thereof a distance
of 300 feet to the true point of beginning ; thence westerly
parallel with the North line of the main tract herein des-
cribed a distance of 300 feet to an intersection with a
line which is parallel with and 300 feet westerly of , as
measured at right angles to , the East line of said main
tract ; thence southerly along said parallel line to an
intersection with the northeasterly line of the Greenbelt
area as shown on the Comprehensive Plan revision dated
May 17 , 1972 , said Greenbelt area also known as Parcel
E" ; thence southeasterly along the northerly line of the
Greenbelt area to an intersection with the East line of
said main tract ; thence northerly along the East line
thereof a distance of 800 feet more or less to the point
of beginning .
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17 " east a distance of 526. 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the . Northerly right-of-way line of State Road
No . 5 ( St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89045 ' 17 " west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
PARCEL " E"
All that portion of the following described main tract
designated as a Greenbelt area as shown on the Comprehensive
Plan revision dated May 17 , 1972 .
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W . M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17 " east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R . #169 ) (Maple Valley Highway ) ; thence in
3-
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89045 ' 17 " wes89a45istancesofa653 . 91 feet from
Point "A" ; thence South beginning .
feet to Point " A" and the true point of beg g •
74:•
i•
IlTris,
1
1.
1.
44...,•.,•-•,:•.•
iiii,.
r,;,,
4-•: •
4••-
1**-' ,
4,..
er
T,
l' ,,,
415- ;
43',
i',*``
1,
1„.?,
y,
s.::
14,:::,.
t",
13.:'!
1:
4a":
k• '
v."'
L .
4Arisvit7F,
Ait"::,•,,,'
fr;:
t",:
rt' ,..
t•:•; /•
i,--..
1 .
b,
1 ' , •
I
i
1 •
e. .,
I
I
i.
I ,
i
1-
7
1 ;
ii
I ;*.
ii ;
s. • ...
s- •
ie! - .
Li
r/
I.
1...,
1 , ,
i
i
1 ,...,
6,- •,....., )
ils*,\. -,..., ,"„,,, •. • -, , -: ---
qj • , -.•,••
s. -•,•-•,....„ • •,
i • .,. •••
4........ ,
141 ' •.
1 . . \,. .,
i• .
j '
i...,, . :
1,......
1 \
1. ,
4
JF . • ,.....( ,.,
I,. , • \\ ,
1 •..
4.
L•'. • . :- • ?" ,
I,.
i110:
S.. •
ill?
V..••,,.. •
N
V..% ' !':'
rl(:'.\\::;;.
34
4311 ,...
14-••'•••• ,
lo,..•
N.•.
Allo
N.,. ..
ss.,.
Not,.
N....•......),.;•••„.
c ':
6`
4
t)
1
IV\;
0 :
S
t.'
s \\ '
I
ri:'
t) •
rl?
4%,
s,. \'.
0
4.. ‘ ••' .
4 ''
1
011,.- . , . •• -
44.
1 . •,
1
e'...
N.
1 .'•-•,,,•.
1....
07
3,./.,,,• .. ,..
4
1. ..• .
p .,, • • - "..
Niiire
i „. •••
70.•,,
l''‘
i ' • . :`,.....„,,.
N...:.• ' ' °
t
4,
1i,' \',.• ‘
9f
110Wi
ij
fr
4
G ,
D
s:,•., •,
1
il -
r- . ,.
t.
Iiv., .
k,,..
i:
71(::‘, .
t.........-- '
73
11
I
I
i
8I
I.
6' #
1
9
0\\\,,..
c)
e,"''' \
i„----
f
1
is',
1.
1'
viips•
S,
I
so,"
si..
1
i
i
I •
s, :
19
1
ts' ...
4
II ,--::.-"•:::;.-.::•••-:--,
1
I :.•
aJpv
c- ••:•.,:,:
7--
limy
1
1 _..
4, .
9. .
St
leavtij
3` ..„. •
Is-
s'.
i
1
1.
c
i
J........
C .
1 • .
Ave- '.
I •. ,
i
I 11.; • -
cl.
1.
4' .. '
00"
lif. : ,
0 •
Iwo
I. .
t'
Zi---
1-!
ff
1•
1=
f-
il:*.
E.2),'''
L.-
i-.
1['
4.] /\
4
7444N
V
I •
It
r • '
l
i
s
1 ?
7,.....„.
4.
1.........
t, • , • . ............,..... • .,,
if, :,:".'
L
1
I,..:i.:.).,•
l••
t-.„
i-•..:.)
7.,=
Ifi-.-.
i'!::::
i,'l
1le11111111
00
111117
z3—iN..
D. .•.,;....
1.4L1Y:.
1.•.&.„
i. (.':
I<
j":t;:
l': :
Ij.
vgC.--.
ilIa..Rs,Pr.
l,•'•'
Z,,27•
11i,,.(...
08-,07P
3,
17,L4.
4c,t:.....&,
6,-•,,
M es,.•
s 1E11CCV1,
a-n n<4\
11i'
1iEli-.17._.."i,:!..
i,.111i
11
IEg
5
1
1rtj ..•
I:i•i1 '.,
1;I,
i„•
I.
1
r.,
1 :
V ,.,..
g---• • •
ail,• :
1,
1:
C1 • •• ••/'
1 •
1w
4- --...
12,2--- :- • '
i,
6.--•
113-.
3
fr,
ri
ix,-. •
2.,-. .
k,...
L._.... ,,,- -----
4
C7
716.,.
9.:,..
t.:. .,
i •,,....,..
1 .. .
e7,...,,,,...
s
1
7,
i'...:: ;
7.-
1. : .....,-,
ri. ,..
v.•.
17.
1, ,
1 ,
0 .•':'+,' *
j`•
L
Is/
1'
11.,
ive; .: ..
Z. :.,... ,
tc.. .,..
or ..,.
i,..•
e. :
U ,
t, ''
1
so
1
o \
Ad
11
IC
41
1
1/..
1-
10
VI
I.
4'
it
j
EY
1.
il
fal
I ••
0
t.'..;" ./
4,,.‘':‘?,
P
r• .
4_
k•-.,.--_.=... __........:_.)
k
f-
1, \
440
s‘
w.
r! --.„: .
s.,,
y. ••••-•-• ..--,!..
L.r..
y/
Nom,
4.1 •, ....
1
rrt .
7
r-..__
i /
111,
1*
411
0.
i.
e•Zi
Of? .
r4 • • ‘
C+
1.:,.
3 '
1
1
I
0 ;'-
4,.../.
4_,—
2,
1 , '•
e --
I
a..•
X
t•
I
1‘... .. ........' , .•
i /
s. .
1.
0 ...',....'..- .
1
t ....''-''."
1
I
e. .... ............
7...-. .....
I'
4
C. .:•••
ill. . . .
r---;--- —
1. .:••• .
v•
ilt
1.r.
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Kent Highlands , Inc . , successor by merger to Stone
way Concrete , Inc . , a firm incorporated in the State of Washington ,
is the owner of real property in the City of Renton , County of King ,
State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
CVRange 5 East , W. M. described as follows :
Pe Beginning at the southwest corner of the southeast one-
quarter of the northeast one-quarter of said Section 17 ;
thence north along the west line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the east line
of Section 17 ; thence south along said east line to the
east one-quarter corner of Section 17 ; thence continuing
south along the east line of said section to an intersec-
tion with the northerly right-of-way line of State Road
No . 5 (St. S . R. #169 ) (Maple Valley Highway) ; thence in
a general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence south 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant , and impose restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to the
use by the undersigned , their successors , heirs and assigns , as •
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , ( Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
property as described above shall be submitted to and
approved by the City of Renton pursuant to the abovemen-
tioned ordinance prior to preparation of specific develop-
ment plans .
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-
five ( 35 ) feet when located within the westerly 1100 feet
of above described property as measured from the northwest
corner along the north property line ( including Parcels A
and B , as noted on attached Exhibit A ) .
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway ( SR- 169 ) , indicated as
greenbelt on the City of Renton Comprehensive Land Use
P an as revised May 17 , 1972 , shall be retained in its
ni;tural state . No buildings , structures , roads , drive-
wzys , or parking shall be constructed in said greenbelt
N
area ( Parcel E , Exhibit A ) .
OD
ACCESS
CD
A primary access street shall be provided to the site
from N . E . Third Street , subject to City of Renton approval
of its design and location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E . subject to Renton Traffic Division and
Fire Department approval . Installation of appropriate
traffic control devices ( including channelization , light-
ing , signing and traffic signals ) at N . E . Third Street
will be provided by the property owner and/or developer
when required by the City of Renton .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050 . It is further agreed and covenanted
by the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two ( 2 ) years and substantial construction begun
within three ( 3 ) years of the filing of these covenants ,
and said construction and development diligently prosecu-
ted toward completion thereafter, the zoning of said
property shall without further City action revert back to
the zoning which existed prior to the filing of this docu-
ment , and these restrictive covenants shall become null
and void . The term "substantial construction" shall mean
the physical alteration of the land for construction pursu-
ant to City approved development plans as per the above-
mentioned Planned Unit Development Ordinance and a valid
building permit , or construction of required utilities for
such development . The abovementioned time periods may be
extended for reasonable cause upon written request to and
2 -
approval by the Renton Planning Department . Such reason-
able cause shall include , but may not be limited to , the
requirement of an environmental impact statement pursuant
to the State Environmental Policy Act of 1971 .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
ing subject property who are adversely affected by said breach .
IN WITNESS WHEREOF the parties hereby affix their hands this
CD
day of 1977
KENT HIGHLANDS , INC .
r
By
president
By
Secre ry
STATE OF WASHINGTON )
COUNTY OF KING
On this._...? 2 dP day of /--4-/3, e ,>/<j'- 197-7
before me personally appeared L1 0„.;
and
to me known
to be the L'j e c ....-s=-c; , ,r,v r ____—__
and Y
respectively , of KENT HIGHLANDS , INC . , the corporation that executed
the within and foregoing instrument , and acknowledged said instrument
to be the free and voluntary act of said corporation for the uses and
purposes therein mentioned , and on oath stated that they were author-
ized to execute said instrument and that the seal affixed is the
corporate seal of said corporation .
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
official seal the day and year first above written .
Not ry PUT- is in nd for the State o
C
Washingt , resi ing ate 7z'CC
ram:
J ,r ^` t_.
3 -
Renton City Council
2/28/77 Page 7
Old Busines! by Council - Continued
Park & Ride recommended that immediate steps be taken in talks and negotiations
Continued with Boeing for an "interim" facility in the north-end of Renton. The
letter noted discussions held on proximity of the northeast Boeing
parking lot with FAI-405 and the committee suggested that a portion
of the lot might be made available while studies proceed on permanent
location; further noting this would not effect the 2nd and Burnett
location and have no effect on single family residential areas , yet
be close to the Highlands area. MOVED BY SHINPOCH, SECONDED BY BRUCE,
COUNCIL CONCUR IN COMMITTEE REPORT. CARRIED.
Park & Ride The Public Services Committee report also recommended that criteria
Continued for park and ride lots be established immediately. The report explained
discussions of effects on single family homeowners and recommended the
site criteria prior to permanent facility selection, and would deal
with economic feasibility, effects on community, protection of abutting
residential areas, setbacks and access , environmental considerations ,
rider convenience and service and costs of construction and maintenance.
MOVED BY PERRY, SECONDED BY THORPE, COUNCIL CONCUR IN RECOMMENDATION.
Upon inquiry, Councilwoman Seymour-Thorpe noted criteria would be set
by the Highway Department and the committee; Stredicke noted committee
to continue with park and ride problem. MOTION CARRIED.
Park & Ride The Public Services Committee report also recommended that the City,
Continued State and Metro proceed on a study for permanent park and ride sites
in the two geographical areas of Renton, with two lots,rather than one.
The report noted that upon criteria establishment, study should begin
on two sites; that to maintain State funding, locations must be close
to freeway access and proposed Metro bus route. MOVED BY PERRY ,
SECONDED BY GRANT, COUNCIL CONCUR IN RECOMMENDATION. CARRIED.
Public Seri ices The Public Services Committee, Aviation Division, submitted report
Aviation Report noted 2/10 bid opening for seaplane base development wherein four bids
Seaplane Base received ranging from $86,200 to $76,280, excluding tax. The report
Bid Awarded recommended acceptance of the low bid submitted by Tripp Construction,
234 SW 16th St. , in the amount of $76,280Dlus tax. The report recommended
that the Mayor and City Clerk be authorized to execute the Acceptance
of Grant Offer which was initially in amount of $50,000 and has been
increased to $60,000 by FAA. MOVED BY PERRY, SECONDED BY THORPE, COUN-
CIL CONCUR IN RECOMMENDATIONSOF COMMITTEE AWARDING BID AND AUTHORIZING
ACCEPTANCE AGREEMENT. CARRIED.
NEW BUSINESS BY COUNCIL
ASPO Conference Upon request by Councilman Perry to attend ASPO Conference in San Diego
in April , it was moved by Grant, and seconded by Thorpe to concur in
request. SUBSTITUTE MOTION BY STREDICKE, SECONDED BY BRUCE, TO REFER
THE CONFERENCE REQUEST TO THE COMMITTEE OF THE WHOLE MEETING OF 3/8/77.
ROLL CALL: 4-AYE: PERRY, BRUCE, SHINPOCH, THORPE; 2-NO: GRANT AND
STREDICKE. SUBSTITUTE MOTION CARRIED.
Ways & Means Councilwoman Shinpoch submitted Ways & Means Committee report recom-
Committee eport mending appointment of Beth Borst to the Human Rights Affairs Commission.
Appointment MOVED BY GRANT, SECONDED BY BRUCE, COUNCIL CONCUR IN COMMITTEE REPORT.
CARRIED.
ORDINANCES AND RESOLUTIONS
Ways & Means The Ways & Means Committee report recommended second and final readings
Committee Report of an ordinance amending the City's Comprehensive Land Use Plan involv-
Ordinance fi3112 ing property in the general vicinity of 138th St. and Sunset Blvd. N.E.
138th & Sunset NE generally known as the Loveless/Powell property. Following readings
Loveless/Powell ) it was MOVED BY PERRY, SECONDED BY GRANT, COUNCIL ADOPT ORDINANCE AS
Comprehensive Plan READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance #3113 ! The Ways & Means Committee report recommended second and final readings
Stoneway Rezone ' of an ordinance changing the zoning from Residence District (R-1 ) to
IR-1 , R-2, R-3 and R-4, generally known as the Stoneway Rezone. Follow-
ing readings of the ordinance rezoning property located east of SR-169
Renton City Council
2/28/77 Page 8
Ordinances & Resolutions - Continued
Stoneway Rezone ' (Maple Valley Highway) south of Monterey Terrace and Mt. Olivet
Continued Cemetery and west of Bonneville Power Right of Way, it was MOVED BY
PERRY, SECONDED BY BRUCE, COUNCIL ADOPT ORDINANCE AS READ. ROLL CALL:
ALL AYES. MOTION CARRIED. MOVED BY STREDICKE, SECONDED BY GRANT, THAT
THE RESTRICTIVE COVENANTS AS FILED BE ACCEPTED BY THE CITY. CARRIED.
Ordinance MOVED BY GRANT, SECONDED BY STREDICKE, ITEMS 2 and 4 OF COMMITTEE
First Reading REPORT BE PLACED ON FIRST READING (Other items being in committee) .
Spendiff Rezone AS RECOMMENDED. CARRIED. City Clerk Mead read ordinance changing the
zoning from S-1 to SR-1 generally known as the George Spendiff property
located 807 Union Ave. NE. MOVED BY GRANT, SECONDED BY STREDICKE, COUN-
CIL REFER ORDINANCE BACK TO THE WAYS AND MEANS COMMITTEE. CARRIED.
Ordinance City Clerk Mead read ordinance rezoning certain property from G to
First Reading B-i known as the Norwood Rezone and located at the northeast corner
Norwood Rezone of N. 30th and Park N. MOVED BY STREDICKE, SECONDED BY BRUCE, COUNCIL
REFER ORDINANCE BACK TO THE WAYS AND MEANS COMMITTEE. CARRIED.
Resolution #2092 The Ways & Means Committee report recommended reading and adoption
Seaplane Ramp of a resolution authorizing the Mayor and City Clerk to execute docu-
FAA Grant ments accepting a grant offer from FAA which provided for a maximum
Acceptance grant of $60,000 involving the Will Rogers-Wiley Post Memorial Sea-
plane Base Improvements. MOVED BY GRANT, SECONDED BY SIIINPOCH, RESOLU-
TIONS BE READ. CARRIED. Following rcading,MOVED BY GRANT, SECONDED BY
STREDICKE, RESOLUTION BE ADOPTED AS READ. CARRIED.
Resolution #2093 The committee report recommended reading and adoption of a resolution
West Hill Joint requested by the Public Works Department providing for the participa-
Water Supply tion in a Comprehensive Water System Plan with various water districts
and the city, providing for pro rata participation in the plan. The
initial budgetary contribution is $7,498. MOVED BY GRANT, SECOND BRUCE,
COUNCIL ADOPT RESOLUTION A5 READ. CARRIED.
MOVED BY STREDICKE, SECONDED BY BRUCE, LAST ITEM OF THE RESOLUTION,
FINANCING, BE REFERRED TO THE WAYS AND MEANS COMMITTEE. CARRIED.
Resolution #2094 The committee report recommended reading and adoption of a resolution
Opposing opposing Senate Bill #2430 pending before the Washington State Senate
Senate Bill #2430 45th Regular Session providing for the transfer of authority and
re Transfer of operation from a Metropolitan Municipal Corporation to the County
Metro Authority Executive authority and eliminating direct representation of the people
without a direct vote of the people. Following reading, it was MOVED
BY THORPE, SECONDED BY BRUCE, COUNCIL ADOPT THE RESOLUTION AS READ.
CARRIED.
ADJOURNMENT MOVED BY THORPE, SECONDED BY PERRY, COUNCIL ADJOURN. CARRIED. The
meeting of the Renton City Council adjourned at 11 :29 p.m.
Delores A. Mead, Ci Clerk
ri
OFFICE OF THE CITY ATTORNEY • RENTON,WASHINGTON
ry6 "r POST OFFICE BOX OSB, 100 and AVENUE BUILDING • RYNTON,WASHINGTON 90065 256.8878
pA O
0 42` GERARD M.SHELLAN,CITY ATTORNEY LAWRENCE J.WARREN, ASSISTANT CITY ATTORNEY
7'
ED SEP1tw February 10, 1977
MEMORANDUM
TO : Del Mead, City Clerk
FROM: Gerard M. Shellan, City Attorney
Re : Stoneway Concrete, Inc. Rezone
Dear Del:
Enclosed herewith is the original of a proposed Rezone Ordinance as above
captioned.
Please be sure that the Planning Department in Exhibit "A" spells out
the correct legal description of all four parcels rezoned to R-1,
v R-2, R-3 and R-4 respectively.
We also note that the Restrictive Covenant form does not have any
date of execution. This should be changed on the last page showing
when the document has been executed. A clause indicating this would
be appropriate above the signature as follows :
In witness whereof the parties hereby affix their
hands this day of
Gerard M. S - lan
GMS :nd
Encl .
Del : Please fill in the record• ni data for the •Restrictive
Covenants on page 2 .
IfK i' t J' u:Cl,,,jytCSt',.'.; ;..
City of Rentc n
2/14/77 PagE 6
Ordinances & Resolutions - Continued
Ordinance #3i09 Springbrook Watershed Annexation. Following readings, it was MOVED BY
Springbrook PERRY, SECONDED BY STREDICKE, COUNCIL ADOPT ORDINANCE AS READ. ROLL CALL:
Watershed 5-AYES: PERRY, CLYMER, BRUCE, SHINPOCH AND STREDICKE; ONE-NO: THORPE.
Annexation MOTION CARRIED.
Ordinance #3110 The Ways & Means Committee report recommended second and final readings
Senior CitizEn of an ordinance establishing certain special rates for qualified senior
Pet Licenses citizens relating to pet licenses, wherein qualified senior citizens may
purchase special permanent animal licenses at regular cost and shall not
be required to annually purchase a new license for the lifetime of such
licenses animals(up to three cats or dogs) . Following readings, it was
MOVED BY CLYMER, SECONDED BY BRUCE, COUNCIL ADOPT ORDINANCE AS READ. ROLL
CALL: ALL AYES. CARRIED.
Ordinance 3111 The Ways & Means Committee report recommended second and final readings
Austin RezonE of an ordinance rezoning certain property from General Classification
District to Light Industry District, known as the Austin Rezone. Follow-
ing reading, it was MOVED BY CLYMER, SECONDED BY BRUCE, COUNCIL ADOPT
ORDINANCE AS READ. MOVED BY STREDICKE, SECONDED BY THORPE, AMEND THE
MOTION TO INSTRUCT CITY CLERK TO WITHHOLD PUBLICATION UNTIL RESTRICTIVE
COVENANTS HAVE BEEN FILED. AMENDMENT CARRIED, MOTION AS AMENDED, CARRIED.
First Readinc The Ways & Means Committee report recommended first reading and referral
Stoneway Rezone back to committee of an ordinance rezoning certain property from Resi-
dence District and Suburban Resident District to Residence District
R-1 , R-2, R-3 and R-4) for the Stoneway property. Following reading,
it was MOVED BY CLYMER, SECONDED BY SHINPOCH, REFER ORDINANCE BACK TO
THE WAYS & MEANS COMMITTEE. Councilman Stredicke inquired regarding the
restrictive covenants and was advised by City Clerk Mead that covenants
have been executed. MOTION CARRIED.
First Reading The Ways & Means Committee report recommended first reading and referral
Comprehensive back to committee of an ordinance amending the city`s Comprehensive
Plan Vicinity Land Use Plan relating to certain property in the vicinity of 138th
138th & SunsEt NE and Sunset Blvd. N. E. (Loveless-Powell property) . MOVED BY CLYMER,
SECONDED BY SHINPOCH, REFER THE ORDINANCE BACK TO THE COMMITTEE FOR
TWO WEEKS. CARRIED.
Resolution #C090 The Ways & Means Committee report recommended reading and adoption of
Travel Funds a resolution transferring $6,585.00 from the Contingency Fund to the
current fund for Operating Budget Travel Accounts as shown in the reso-
lution. MOVED BY PERRY, SECONDED BY SHINPOCH, COUNCIL AMENDS BY PRIOR
ACTION OF COUNCIL TO ADD $100 TO PLANNING ADMINISTRATION FROM CONTINGENCY
FUND, AMENDING TOTAL TO $6,685. CARRIED. MOVED BY CLYMER, SECONDED BY
THORPE, COUNCIL ADOPT RESOLUTION AS READ AND AMENDED. CARRIED,
Resolution C091 The Ways & Means Committee report recommended reading and adoption of a
Rescinding resolution rescinding prior Resolution #1987 which declared surplus
Resolution #i987 certain property owned by the city at 1511 Lake Ave. S. which property
Surplus PropErty was donated to the city for park purposes by Max Farr, Property Agent
Lake Ave. Sotth for Olympic Pipeline Co. Council had determined that it is in the best
interest of the city if such property remains as "open space. " Follow-
ing reading, Councilman Stredicke reported request of Councilman Grant
that resolution be held one week.Clymer noted no contact had been
made with the committee. MOVED BY THORPE, SECONDED BY SHINPOCH, COUNCIL
ADOPT THE RESOLUTION AS READ. CARRIED.
ADJOURNMENT MOVED BY STREDICKE, SECONDED BY THORPE, COUNCIL MEETING ADJOURN. CARRIED.
The meeting adjourned at 11 : 14 p.m.
Zia,,,,,.7_,
Ci
7) .
Delores A. Mead, ty Cl?erk
Renton City Council
2/14/77 Page 5
Old Business - Continued
Public Services Committee took no action because of earlier review by Public Works
Committee Report Committee and rate adjustment by administration. (5) PWT referral of
Referrals 10/25/76 re regrading of Aberdeen and NE 24th - Committee took no action
Continued concurring in recommendation of Public Works Committee and the administra-
tion to deny request. (6) TC referral of 10/6/75 re guardrail on Lake
Ave. S. - Committee recommends no action be taken. (7) TC referral of
11/3/75 re overtime parking fines - Committee recommends no action be
taken. (8) PWT referral of 6/7/76 re portable covered unit - Committee
recommends no action. (9) PWT referral re Sound Ford letter - No action
required. (10) PWT referral of 8/23/76 re question of withholding a
percentage of contractors' fees - Committee recommends referral to admini-
stration for recommendation.
Aviation The Public Services Committee recommended it serve as the Aviation Com-
Committee mittee and continue to hold monthly public meetings with tenants and
Meetings interested parties as it has for the past three years, and that these
meetings be restricted to airport business. MOVED BY CLYMER, SECONDED
BY PERRY, COUNCIL CONCUR IN RECOMMENDATIONS OF THE COMMITTEE. CARRIED.
Seaplane Base Bid Councilman Stredicke called attention to bid opening for seaplane base
improvements , noting additional funds have been requested from the North-
west region of the F.A.A. Committee will be meeting and report to Coun-
RR R/W cil on 28th. Councilman Stredicke also discussed railroad right-of-way
along Cedar River which the city plans to acquire and which has been
designated by Transamerica Title Co. as reverting to the Henry Yesler
Estate if not used for railroad property. Stredicke was advised by the
Public Works Director that only a portion of the right-of-way is so desig-
nated and that the matter is under further study.
School Levy Councilwoman Shinpoch thanked Council for full support given at the
Committee of the Whole meeting for Renton School levy.
CETA Employees Administrative Assistant Custer reported the city has been authorized
to employee three CETA employees . one being Don Camp who will be doing
research and located in Councilman Bruce' s office.
Metro Take Over Councilwoman Seymour-Thorpe called attention to proposed transfer of
Senate Bill #2430 authority from Metro Council to King County Council , noting loss of rep-
resentation to cities. Mayor Delaurenti noted Suburban Mayor's Assoc.
had voted against this senate bill which would allow absorbing of Metro
by majority vote of King County Council , noting need for vote of people.
MOVED BY THORPE, SECONDED BY CLYMER, COUNCIL AUTHORIZE THE WAYS AND MEANS
COMMITTEE TO DRAFT A RESOLUTION TO FORWARD TO THE STATE LEGISLATURE OPPOS-
ING SENATE BILL NO. 2430 AND ESPECIALLY THAT PART RELATING TO NO DIRECT
VOTE BY THE PEOPLE. MOVED BY CLYMER, SECONDED BY THORPE, REFER THE MATTER
TO THE CITY ATTORNEY AND MAYOR'S OFFICE WITH COPIES TO BE SENT TO LEGISLA-
TURE AND COUNTY COUNCIL. CARRIED.
L.E.O. F. F. Councilwoman Shinpoch reported Association of Washington Cities plans to
Revision revise L. E. O. F. F. laws. Councilman Clymer explained AWC Board was appointed
for solutions, noting regional meetings to be conducted by Auburn Mayor
Kersey.
Meeting Extended The time having reached 11 :00 p.m. , it was MOVED BY PERRY, SECONDED BY
SHINPOCH, COUNCIL CONTINUE MEETING PAST SCHEDULED TIME UNTIL ORDINANCES
AND RESOLUTIONS ARE READ. CARRIED.
ORDINANCES AND RESOLUTIONS
Ways & Mears Ways and Means Committee report was submitted by Chairman Clymer recom-
Committee Feport mending second and final reading for an ordinance annexing certain ter-
ritory to the city generally known as the Olympic View property which is
Ordinance A3108 located between SE 165th & S. 24th St. (SE 164th) . Following reading, it
Olympic ViEw was MOVED BY PERRY, SECONDED BY STREDICKE COUNCIL ADOPT ORDINANCE AS READ.
Annexation ROLL CALL: ALL AYES. CARRIED.
Ordinance #3109 The Ways and Means Committee report recommended second and final reading
Springbrook of an ordinance annexing certain territory to the city known as the
Watershed Annex.
Renton City Council
2/7/77 Page 3
Consent Agenda - Continued
Consent Agenda MOVED BY CLYMER, SECONDED BY THORPE, COUNCIL APPROVE THE CONSENT AGENDA
Approved AS PRESENTED. CARRIED.
CORRESPONDEN( E AND CURRENT BUSINESS
Stoneway Concrete Letter from Planning Director Ericksen presented Planning Commission
Rezone of area recommendation for approval of Stoneway Concrete Co. request for rezone
South of of 43 acres (24 acres of buildable area) from R-1 and S-1 to R-1 , R-2,
Monterey Terrace R-3 and R-4. Property located east of Maple Valley Hwy, south of Monterey
East of Terrace and Mt. Olivet Cemetery and west of the Bonneville Power line
SR-169 right-of-way. The letter explained the existing use as a former gravel
excavation site and the proposed use as multi-family residential , with
proposed access to be located on the east side of f1t. Olivet Cemetery.
The letter explained approval of the rezone is contingent upon restric-
tive covenants relating to the development of the property, building
height limitation in the R-2 parcel , hillside-open space preservation,
access and traffic control , which covenants are agreed upon and executed.
MOVED BY PERRY, SECONDED BY BRUCE, COUNCIL CONCUR IN RECOMMENDATION OF
THE PLANNING COMMISSION AND REFER THE MATTER TO THE WAYS AND MEANS COM-
MITTEE FOR LEGISLATION. Discussion of protection to Monterey Terrace
residents ensued wherein Planning Director Ericksen noted the area
community club had concurred in the covenants, that compliance with
Planned Unit Development ordinance is required , that public hearings
will be held on plans when submitted. Councilwoman Thorpe asked that
covenants include restrictions that proposed buildings are not placed at
higher elevation that present homes. MOTION CARRIED APPROVING REZONE .
MOVED BY STREDICKE, SECONDED BY THORPE, COUNCIL ACCEPT COVENANTS AS
FILED. CARRIED.
lympic View Letter from City Clerk Mead reported the King County Boundary Review
Terrace Board has reported favorably on the annexation of 2.2 acres to the
nnexation city located between S. E. 164th St. (S. 27th St. ) and S.E. 165th St.
south of the city limits and east of Benson Rd. S. , known as the Olympic
View Terrace Annexation. The letter noted no protests were received
and that the Boundary Review Board did not choose to invoke jurisdic-
tion. It was further recommended that the Council proceed with the
annexation and refer the matter to the Ways & Means Committee for the
annexation ordinance. MOVED BY PERRY, SECONDED BY BRUCE, COUNCIL CON-
CUR IN THE RECOMMENDATION AND REFER THE MATTER TO THE WAYS & MEANS
COMMITTEE. CARRIED.
pringbrook Letter from City Clerk Mead reported the King County Boundary Review
atershed Board has reported favorably on the annexation to the City of Renton of
onnexation 37. 3 acres located adjacent to Springbrook Road east of 96th Ave. S. ,
west of 104th Ave. S. E. and not contiguous to the city, however, city
owned. The Boundary Review Board has received no request for review
and has not chosen to invoke jurisdiction. The letter recommended that
Council proceed with the annexation and refer the matter to the Ways &
Means Committee for the annexation ordinance. MOVED BY CLYMER, SECONDED
BY BRUCE, COUNCIL CONCUR IN THE RECOMMENDATION. CARRIED.
I . D. #288 Letter from Deputy Finance Director Bennett recommended borrowing of
ihitman Court 50,493. 36 from Street Forward Thrust Fund to Road & Street Construction
street ImproNeement account for L. I .D. #288 at an interest rate of 5.25% per annum to be
und Borrowirg repaid by 2/78. The letter explained the total cost of LID 288 was
158,340.69 of which $99,877 was assessed against the property and the
remaining $58,463. 69 was to be paid by the city; $7,970.23 transferred
from Cumulative Reserve to the LID Fund by Resolution 2082. MOVED BY
GRANT, SECONDED BY BRUCE, COUNCIL CONCUR IN RECOMMENDATION AND REFER
THE MATTER TO THE WAYS & MEANS COMMITTEE TO READ THE RESOLUTION AT THIS
TIME. CARRIED.
esolution #2088
ID 288 Ways & Means Committee Chairman Clymer presented resolution recommending
and Transfer reading and adoption of resolution transferring funds in amount of
50,493.46 from Street Forward Thrust Funds for LID No. 288, Whitman
Court street and lighting improvements. Following reading, it was MOVED
BY GRANT, SECONDED BY CLYMER, COUNCIL CONCUR IN RECOMMENDATION AND ADOPT
RESOLUTION AS READ. CARRIED.
pF R,
THE CITY OF RENTON
2
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
CHARLES J. DELAURENTI , MAYOR O PLANNING IDEP..%wr ENT
0 Q, 235-2550
ED SFP'I-
February 4 , 1977
The Honorable C . J . Delaurenti , Mayor
Members of the Ci tv Council
Renton , Washington
V
RE : PLANNING COMMISSION RECOMMENDATION
STONE+.IAY CONCRETE , IN . Aare No . R-891-76 ; rezone from
R- 1 and S- 1 to R- 1 , R-2 , R-3 , and R-4 ; property located
east of SR- 169(Man1e Valley Highway) south of Monterey
Terrace and Mt . Olivet Cemetery and west of Bonneville
Power Right-of-way .
Dear Mayor and Council Members :
The Plannina Commission completed its review of the subject
aonlication . Two public hearings and special committee
meetings with the applicant and interested residents ?•:ere
conducted .
The property has the following characteristics :
Total Area -- ±43 acres with ±24 acres cf buildable area
Access - Existing -- Blaine Avenue N . E .
Proposed -- Proposed access to be located on
east side of Mt . Olivet Cemetery .
Existing Zoning -- R- 1 , S- 1 and GS- 1
Existing Use -- A former gravel excavation site .
Proposed Use -•- Multi -family residential
Comnrehensive Land Use Plan -- Low density , medium density
and high density multi -family ; greenbelt
along steep hillside above Maple Valley
Highway .
The Planning Commission recommended that the Stoneway Concrete
Company annlication for rezone from R- 1 and S- 1 to R- 1 , R-2 ,
R-3 , and R-4 be approved with restrictive covenants relating
to development of the property , building height limitation
The Honorable C . J . Delaurenti , Mayor
Members of the City Council
Renton , Washington
February 4 , 1977
Page Two
in the R-2 parcel , hillside-open space preservation , and access
and traffic control . The applicant has concurred in the restric-
tive covenants ( note signed copy and Exhibit A attached ) .
The recommended zoning is in agreement with the Comprehensive
Land Use Plan .
Very ruully yours ,
y/
Gordon /Ericksen
Planni g Director
GYE :wr
Attachments
cc : City Attorney
City Clerk
s!01)4% 4 1
r,.s.d'' r,,,,. , ,,,
1: hr../..,1: . ..,, ,,,,,,•., ,
i,u..••• .5 .F .,.\,,, , . . 1 . 1 .. , ....., . . 4.. e.,0-, ..<ko,„ . . . . ,. .L;LH :t .,..., ‘.. ... •,„.. ,
7 ) 1I % GS-I 1 f
F, i:6 r
1 t
1 • L_I
1._._._...._ ._I
r , / 1:it:j STONEWAY CONCRETE , INC .I
Al-I' Fr!
1 REZONEi
s p—1 \ • iii.w.,011.7.....' _ .. ._ 4,, 1
ICl/
I I
RENTON• CITY LIMITS• .
11 r
X -._ - -- .
40
1 1
0 4:, ).-i„,,,,,./
7,
6' . ,,,.
7
9.
t e :1,171 11.r7T.'.r.r.;'''''•,,,„.
pay;
nIT CC
G ------ : ----- -' ,,- ..,
1,4 - "l
P
i
REZONE :
STONEWAY CONCRETE , INC . ; Appl_ No . R-891-76 ; rezone from R- 1 and S- 1 to
R_- I R-2__,_ _R 3 ,__and R-4 property located ea tsofSR- 169 _(tlaple Valley
Highway) south of Monterey Terrace and Mt . Olivet Cemetery and west of
Bonneville Power Right-of-way .
p43 . 1 acres with
APPLICANT STONEWAY CONCRETE , INC . TOTAL AREA 24.0 buildable area
PRINCIPAL ACCESS Last side of Mt . Olivet Cemetary .
EX! S.11NG ZONING R- 1 , S- 1 and GS- 1
EXISTING USE Abandoned gravel pit.
Rezone to Higher Density from R-1 through R-4 for
PROPOSED USE future residential development.
Single family, low density, medium density
COMPREHENSIVE LAND USE PLAN and high density multi-family; greenbelt
along steep hillside above Maple Valley Highway.
COMMENTS
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Kent Highlands , Inc . , successor by merger to
Stoneway Concrete , Inc . , a firm incorporated in the State of Wash-
ington , is the owner of real property in the City of Renton ,
County of King , State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W . M. described as follows :
Beginning at the southwest corner of the southeast one-
quarter of the northeast one-quarter of said Section 17 ;
thence north along the west line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89 °45 ' 17" east a distance of 526 . 41 feet ; thence south
88 °52 ' 04" east a distance of 799 feet to the east line
of Section 17 ; thence south along said east line to the
east one-quarter corner of Section 17 ; thence continuing
south along the east line of said section to an intersec-
tion with the northerly right-of-way line of State Road
No . 5 ( St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north 89 °45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence south 89 °45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
rant , and impose restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to the
use by the undersigned , their successors , heirs and assigns , as
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject. to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , ( Building Regulations ) of
Ordinance 1628 known as " Code of General Ordinances of the
City of Renton . " A master development plan for the entire
property as described above shall be submitted to and approved
by the City of Renton pursuant to the abovementioned ordi -
nance prior to preparation of specific development. plans .
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-five
35 ) feet when located within the westerly 1100 feet of above
described property as measured from the northwest corner
along the north property line ( including Parcel A and B . as
noted on attached Exhibit A ) .
6
OPEN SPACE
The hillside slope area along the south orooerty line
northeast of Maple Valley Highway (SR-169) , indicated as
greenbelt on the City of Renton Comprehensive Land Use Plan
as revised May 17, 1972, shall he retained in its natural state.
No buildings , structures, roads , driveways , or parking
shall be constructed in said greenbelt area (Parcel E,
Exhibit A) .
ACCESS
A primary access street shall be provided to the site
from N.E. Third Street, subject to City of Renton approval
of its design and location as part of the total development
plan. Access to existing Blaine Avenue N.E. shall he
for emergency purposes only. A suitable harrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N.E. subject to Renton Traffic Division and
Fire Department approval. Installation of appropriate
traffic control devices (including channelization, lighting ,
signing and traffic signals) at N.E. Third Street will he
provided by the property owner and/or developer when
required by the City of Renton.
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted by
the undersigned that if a master plan for total development
of the property is not submitted to the City of Renton
pursuant to the Renton Planned United Develooment Ordinance
within two (2) years and substantial construction
begun within three (3) years of the filing of these
covenants , and said construction and development dili-
gently prosecuted toward completion thereafter, the
zoning of said property shall without further city
action revert back to the zoning which existed prior
to the filing of this document, and these restrictive
covenants shall become null and void. The term
substantial construction" shall mean the physical
alteration of the land for construction pursuant to
city approved development plans as per the above-mentioned
Planned Unit Development Ordinance and a valid building
permit, or construction of required utilities for
such development. The above mentioned time periods
may be extended for reasonable cause upon written
request to and approval by the Renton Planning Department.
Such reasonable cause shall include, but may not be
limited to, the requirement of an environmental impact
statement pursuant to the State Environmental Policy
Act of 1971.
Any violation or breach of these restrictive covenants may
be enforced by proper legal Procedures in the Superior Court of King
County by either the City of Renton or any property owners adjuin-
inq subject property who are adversely affected by said breach '
KENT HIGHLANDS , INC .
By
X/ - President
By
STATE OF WASHlNGTON )
COUNTY OF KING
On this d ly.7y , before
me personally appeared 0 and
to me known to
be the 7</ dnd—X~
l7 '---' -- -' ' ' - -
respectively , of KENT HIGHLANDS , INC . , the corporation that
executed the within and foregoing instrument " and acknowledged said
instrument to be the free and voluntary act of said corporation for
the uses and purposes therein mentioned , and on oath stated that
they were authorized to execute said instrument and that the seal
affixed is the corporate seal Of Said corporation .
IN NlTNESS NHEREOF^ { have hereunto set my hand and affixed my
official seal the day and year first above written '
V F8 y Public in and for-the State
Washington , residing at
11
7.,..,,,.,,,
4 ,lill Av•Ns'ai,11 •.-
I',k;qej#
J 1 I
lj r'\. \C t
t4
V ; iil •fr.,+ `,., t'rhi.. V*
7. • t
i•s i•.. \V i
P4Vlts d3 hi v: '$81 / c:li y\..•
JO
1;
11),
it%
y;!
fm+ t•'';+
jam.
i':
I
6 r....,.,.,
L.,
f 4w
t G{'07 I1AVN9 7 UNL': ACM.1
g(
11: 8 gill . .
N -- , -------- i . c_
A . 2v,,, f A.:: II • 1
ti
Z•s* -
r-- ' \
P• -, .-- .
7
43...1 .2
C2..,t
trjalt6- -!.1.:.• .
t ,
tea s . IJ•, ''A -I-
w
1/<
1.9"14'14/.:f7 lake ii70 \,.
c
f, oil t. f _b
J
i
L J
v
i r-•;..or,.r•.'.-..---
i
AN3111141 fly //'• 'I
fV'
t—
y •
I
c l
x, II' II 1141101N rf/r /Wo" I ,
1 % Z.
t ii D r
1!
d 16 L
r D Via f~ti .t9si
o ff. ii vijp-i maid IA. 5oi 1.
g. =
I1 -r -
I;dE' 3 41- , tiM 1
r
A to II u
Si It• •SIR e r
L3'.,'
u f ' , '.'
c.1Gij
js* 5--M
rM'
Yf "; m 1,_+• it rn
a r
y 8,ail 7 , vineiN r• W • t.0110.•
lliag i•1 NOW
IlII1M 91t i,
I. ',
f
i
SU3JECT TO
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Kent Highlands , Inc . , successor by merger to
Stoneway Concrete , Inc . , a firm •incorporated in the State of Wash-
ington , is the owner of real property in the City of Renton ,
County of King , State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W.M . described as follows :
Beginning at the southwest corner of the southeast one-
quarter of the northeast one-quarter of said Section 17 ;
thence north along the west line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89 °45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the east line
of Section 17 ; thence south along said east line to the
east one-quarter corner of Section 17 ; thence continuing
south along the east line of said section to an intersec-
tion with the northerly right-of-way line of State Road
No . 5 ( St . S . R . # 169 ) (Maple Valley Highway ) ; thence in
a general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence south 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant , and impose. restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to the
use by the undersigned , their successors , heirs and assigns , as
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , ( Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
property as described above shall be submitted to and approved
by the City of Renton pursuant to the abovementioned ordi -
nance prior to preparation of specific development plans .
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-five
35 ) feet when located within the westerly 1100 feet of above
described property as measured from the northwest corner
along the north property line ( including Parcel A and B , as
noted on attached Exhibit A) .
cif L/wc'/ C i c
j/e', /ems 2E/ :i/ G4/ — //''Y/II
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway (SR-169 ) , indicated as
greenbelt on the City of Renton Comprehensive Land Use Plan
as revised May 17 , 1972 , shall be retained in its natural
state . No buildings , structures , roads , driveways , or
parking shall be constructed in said greenbelt area ( Parcel
E , Exhibit A) .
ACCESS
A primary access street shall be provided to the site
from N . E . Third Street , subject to City of Renton approval
of its design and location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E . subject to Renton Traffic Division and
Fire Department approval . Installation of appropriate
traffic control devises ( including channelization , lighting ,
signing , and traffic signals ) at N . E . Third Street will be
provided by the property owner and/or developer when
required by the City of Renton .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted by
the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two (2 ) years and substantial construction begun
within three ( 3) years of the filing of these covenants ,
and said construction and development diligently prosecuted
toward completion thereafter , the zoning of said property
shall without further city action revert back to the zoning
which existed prior to the filing of this document . The
term " substantial construction " shall mean the physical
alteration of the land for construction pursuant to city
approved development plans as per the abovementioned Planned
Unit Development Ordinance , or construction of required
utilities for such development .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
ing subject property who are adversely affected by said breach .
KENT HIGHLANDS , INC .
By_
President
By
Secretary
STATE OF WASHINGTON )
COUNTY OF KING
On this day 19 before
me personally appeared and
to me known to
be the and_—___—
respectively , of KENT HIGHLANDS , INC . , the corporation that
executed the within and foregoing instrument, and acknowledged said
instrument to be the free and voluntary act of said corporation for
the uses and purposes therein mentioned , and on oath stated that
they were authorized to execute said instrument and that the seal
affixed is the corporate seal of said corporation .
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
official seal the day and year first above written .
Notary Public in and for the State of
Washington , residing at
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Stoneway Concrete , Inc . , a firm incorporated in
the State of Washington , is the owner of real property in the City
of Renton , County of King , State of Washington , described as follows ;
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W .M. described as follows :
Beginning at the southwest corner of the southeast one-
quarter of the northeast one-quarter of said Section 17 ;
thence north along the west line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°.45 ' 17" east a distance of 526 .41 feet ; thence south
88° 52 ' 04" east a distance of 799 feet to the east line
of Section 17 ; thence south along said east line to the
east one-quarter corner of Section 17 ; thence continuing
south along the east line of said section to an intersec-
tion with the northerly right-of-way line of State Road
No . 5 (St. S . R. #169 ) (Maple Valley Highway) ; thence in
a general northwesterly direction along said northerly
right-of-way line to an intersection with a line that
lies north 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ' thence south 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish , grant ,
and impose restrictions and covenants running with the land as to the
use of the land hereinabove described with respect to the use by the
undersigned , their successors , heirs and assigns , as follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , (Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
property as described above shall be submitted to and approved
by the City of Renton pursuant to the abovementioned ordi -
nance prior• to preparation of specific development plans .
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-five
35) feet when located within the westerly 1100 feet of above
described property as measured from the northwest corner
along the north property line . ( including Parcel A and B , as
noted on attached Exhibit A) .
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway (SR-169) , indicated as
greenbelt on the City of Renton Comprehensive Land Use Plan
as revised May 17 , 1972 , shall be retained in its natural
state . No buildings , structures , roads , driveways , or
parking shall be constructed in said greenbelt area (Parcel
E , Exhibit A) .
ACCESS
A primary access street shall be provided to the site
from N . E . Third Street , subject to City of Renton approval
of its design and location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E. subject to Renton Traffic Division and
Fire Department approval . Installation of appropriate
traffic control devises ( including channelization , lighting ,
signing , and traffic signals ) at N . E . Third Street will be
provided by the property owner and/or developer when
required by the City of Renton .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted by
the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two ( 2 ) years and substantial construction begun
within three ( 3 ) years of the filing of these covenants ,
and said construction and development diligently prosecuted
toward completion thereafter , the zoning of said property
shall without further city action revert back to the zoning
which existed prior to the filing of this document . The
term "substantial construction " shall mean the physical
alteration of the land fur construction pursuant to city
approved development plans as per the abovementioned Planned
Unit Development Ordinance , or construction of required
utilities for such development .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton •or any property owners adjoin-
ing subject property who are adversely affected by said breach .
STONEWAY CONCRETE , INC .
By
President
By
Secretary
STATE OF WASHINGTON )
COUNTY OF KING
On this day of 19 before
me 'personally appeared and
to me known
to be the and
respectively , of STONEWAY CONCRETE , INC . , the corporation that
executed the within and foregoing instrument , and acknowledged said
instrument to be the free and voluntary act of said corporation for
the uses and purposes therein mentioned , and on oath stated that they
were authorized to execute said instrument and that the seal affixed
is the corporate seal of said corporation .
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
official seal the day and year first above written .
Notary Public in and for the State of
Washington , residing at
RENTON PLANNING COMMISSION
PUBLIC HEARING MEETING
JANUARY 19, 1977
MINUTES
COMMIS: ION MEMBERS PRESENT: James Akers , Thomas Buckingham , Logan
Garriscn , Sandra Gist , James Kirkman , Anthone Mola , Clark Teegarden ,
Joan Wflker , Bylund Wik .
COMMISSION MEMBERS ABSENT: None .
CITY OFFICIALS PRESENT: George Perry , Councilman ; Patricia Seymour-
Thorpe , Councilwoman .
PRESS : Don Smith , Record Chronicle .
CITY S1AFF PRESENT: Gordon Ericksen , Planning Director ; Willis
Roberts , Recording Secretary .
1 • CALL TO ORDER:
ThE meeting was called to order at 8 : 10 p . m . by Chairman Garri -
sor , who led the Pledge of Allegiance .
2 . ROLL CALL was taken by Secretary Gist . All members responded
prE sent.
3 • INTRODUCTION OF NEW PLANNING COMMISSIONERS :
Noi.ing the presence of new members on the Planning Commission--
James Akers , James Kirkman , and Thomas Buckingham--the Chairman
welcomed the Commissioners and introduced them to the audience .
George Nelson , who was present in the audience , was also intro-
duced by Chairman Garrison . Mr . Nelson has been appointed to
the Planning Commission effective February 1 , 1977 .
4 • APPROVAL OF MINUTES :
The Chairman called for corrections or additions to the minutes
of December 8 , 1977 . As there were none offered , IT WAS
ACYION :
MOVED BY WALKER , SECONDED BY TEEGARDEN, THAT THE MINUTES BE
APPROVED AS WRITTEN. MOTION CARRIED.
5 . OLD BUSINESS :
REZONE:
X f , STONEWAY CONCRETE , INC . ; Appl . No . R-891- 76 ; rezone from R- 1 ,
S- 1 , and GS- 1 to R- 1 , R-2 , R-3 , and R-4 ; also hillside area
to remain as greenbelt ; property located east of SR- 169
Maple Valley Highway ) south of Monterey Terrace and Mt .
Olivet Cemetery and west of the powerline right-of-way .
Noting continuation from the November public hearing , the Chair-
man requested an up-date from the staff.
The Planning Director pointed out the area under review on the
vicinity map and noted parcels requested for rezoning to permit
higher density development . He cited significant development
in the vicinity and described topographical conditions of the
site. Mr. Ericksen advised that the matter had been referred
to the Special Studies Committee for study and indicated that
their committee report was available this evening .
Renton Planning Commission
Meeting January 19 , 1977
Page Two
Slides and aerial photographs were then viewed . Development in
the area relative to the site was noted ; current Comprehensive
Plan designations were indicated ; and the matter of existing
and potential access was discussed . Former and proposed use
for the site was reviewed . It was noted that at the time the
Comprehensive Plan for the area was amended in 1972 , restric-
tive covenants specifying single family development were
attached to the 100 feet adjacent to the single family resi -
dential district directly south of Monterey Terrace . The need
for regrading and recontouring of the site prior to develop-
ment was indicated .
Noting no questions of the Planning Director by the Commission ,
the Chairman invited comment from the applicant .
Robert DeBoer , Manager , Stoneway Concrete Company , referred
the Commission to the Planning Director ' s review this evening
and his own comments made at the November public hearing .
He noted his attendance at committee meetings and stated that
Stoneway would concur in proposed covenants addressing concerns
of the residents to run with the land .
Noting no questions of Mr . DeBoer by the Commission , the Chair-
man called for the committee report .
Commissioner Wik , Chairman of the Special Studies Committee ,
advised that the committee had met on three occasions with
the applicant and representatives of the community to discuss
aspects of the rezone request and its relationship to the
Comprehensive Plan . He then read the committee ' s report into
the record . Items of concern were noted : access , circulation ,
potential traffic impacts , development of the site including
possible development through the Planned Unit Development
P . U . D. ) Ordinance and time- frames for its implementation ,
preservation of the steep natural hillside area , and a building
height limit . Commissioner Wik reviewed the potential impact
on traffic presented by the proposed development . He noted the
Traffic Engineering Division ' s response concerning existing and
projected traffic flows along N . E . 3rd Street , potential traf-
fic impacts of the proposed rezone and development of the site ,
and provision for traffic controls including financing should
a primary access road be constructed east of Mt . Olivet Ceme-
tery .
Other committee concerns were noted by Commission Wik : the
development of the site so that all zones can be integrated ,
the time- frame for development , preservation of the steep
natural hillside area along the southerly portion of the
property , the availability of utilities , and possible view
obstruction . Proposed restrictive covenants addressing major
areas of concern were reviewed . Restriction of building heights
were discussed , and it was noted by the Planning Director that
the R- 1 area is limited to 35 feet at present and that the
clause referring to a 35 foot height restriction will apply to
the R-2 designated parcel in proximity to Monterey Terrace .
Commissioner Wik then advised that the committee recommends
approval of the rezone request , the covenants , and considera-
tions noted this evening . It is also recommended that should
the rezone be granted , the different zoning classifications
should be described in legal form and on an exhibit map .
Questions from the Commission were invited by the Chairman .
Commissioner Teegarden inquired regarding provisions for access ,
noting that the proposed covenants restrict access to N . E . 3rd
from other than Maine Ave . N . E .
Renton Planning Commission
Meeting January 19 , 1977
Page Three
The Planning Director discussed the developer ' s responsibility
corcerning access and typical provisions for roads and utili -
ties should development be accomplished as a P . U . D . Mr . Tee-
garden also inquired regarding the definition of the term
sutstantial construction in the proposed restrictive covenants .
The general descriptions of the particular zoning classifica-
ticns were then discussed .
Conmissioner Gist raised the question of provision in the
restrictive covenants for a traffic light for control of traf-
fic onto N . E . 3rd , when the development is first initiated .
Discussion followed regarding the current traffic situation
at the access of Monterey Terrace to N . E . 3rd , the effect of
development to the east on N . E . 4th and N . E . 3rd , impact of
prcposed annexation to the east of the subject site , and
future opportunity for traffic impact review at the time of
development . IT WAS THEN
ACTION:
MOVED BY MOLA , SECONDED BY GIST, THAT A CLAUSE BE ADDED TO THE
RESTRICTIVE COVENANTS THAT AT SUCH TIME THE TRAFFIC ENGINEER
FEELS TRAFFIC SIGNALIZATION IS REQUIRED IT SHALL BE PROVIDED
I BY THE APPLICANT. MOTION CARRIED UNANIMOUSLY.
The Chairman called for comments in favor of the application .
None were offered .
Chairman Garrison then called for comments in opposition .
Roi Brady , 142 Blaine Ave . N . E . , noting that the Stoneway Com-
paiy has been a good neighbor , indicated his primary concern
is the access situation . He requested that the covenants be
more specific regarding the location of the access road . Mr .
Brady also indicated that he felt it would be desirable to
deidend Blaine Avenue N . E .
Li )yd Salter , 76 Monterey P1 . N . E . , stating that he had no
objection to the rezone of the property , requested that the
covenants be more specific regarding the time of construction
of the access road . He suggested that the access road be con- '
structed prior to issuance of the development permit so that
it may be used during the construction period .
Discussion among the Commissioners followed relative to the
effect of heavy construction equipment on the access road or
Blaine Ave . N . E . , should it be used for temporary access dur-
ing development . IT WAS THEN
ACTION:
MOVED BY WIK, SECONDED BY MOLA , THAT UNDER THE CLAUSE "ACCESS"
IN THE PROPOSED RESTRICTIVE COVENANTS THAT IT BE SPECIFIED
THAT BLAINE AVE . N . E . IS NOT TO BE USED AS TEMPORARY ACCESS
DURING CONSTRUCTION.
Further discussion ensued relative to possible hardship to the
builder , the impact of construction on the neighborhood , the
possibility of establishing a preliminary access road , and
the appropriateness of reviewing the question at the time of
consideration of the development as a P . U . D .
On the question , a roll call vote was requested with the follow-
ing results :
AKERS - NO MOLA - AYE
BUCKINGHAM - NO TEEGARDEN - AYE
GIST - NO WALKER - NO
KIRKMAN - NO WIK - AYE
MOTION FAILED.
Renton Planning Commission
Meeting January 19 , 1977
Page Four
The Chairman invited further comment from the audience .
Robert DeBoer of the Stoneway Company indicated that it is his
feeling that the restrictive covenants should be limited to
aspects regarding the rezone application . He stated that they
have no intent on this site for the use of Blaine Ave . N . E . ,
although it will have to be utilized to bring in equipment to
begin the construction of access to N . E . 3rd .
Chris Wright , 120 Monterey Pl . N . E . , stated that he would like
to see some time limit set on how long the contractor can bring
heavy construction equipment up Blaine .
Paul Houser, 57 Monterey Dr . , questioned the 35 foot height
limit in the R- 1 zone , indicating that it is his feeling that
it is a little high . He stated he preferred a natural area
buffer along Monterey Terrace . He also noted his concern that
the problem of the location of the access road should be
addressed .
William Cokeley , 64 Monterey P1 . N . E . , inquired regarding how
construction would be accomplished in the R- 1 zone , noting the
topography of the property .
It was noted by Mr . DeBoer, the Chairman , and the Planning
Director that a definite proposal for development is not avail -
able at this time . However, when it is submitted , further
public review will be offered .
Mr. Salter , noting that construction is going to cause some
disruption , stated he is more concerned about the quality of the
development .
Noting no further public input , IT WAS MOVED BY GIST , SECONDED
BY WIK, THAT THE PUBLIC HEARING BE CLOSED . MOTION CARRIED.
IT WAS THEN
AC ^ION:
MOVED BY WIK, SECONDED BY MOLA , THAT WE RECOMMEND TO THE CITY
COUNCIL APPROVAL OF THE SUBJECT APPLICATION FOR REZONE IN
ACCORDANCE WITH THE COVENANTS THAT WERE PRESENTED THIS EVENING
AN,!) AS AMENDED THIS EVENING , NAMELY THE AMENDMENT TO RESTRICT
BUILDING HEIGHT IN THE R-2 PARCEL TO 35 FEET AND THE AMENDMENT
TO THE ACCESS SECTION OF THE COVENANTS THAT THE DEVELOPER
INSTALL TRAFFIC LIGHTS WHEN REQUIRED AND DETERMINED AS NECESSARY1BYTHETRAFFICENGINEERINGDIVISION. MOTION CARRIED.
A recem;s was declared by the Chairman at 10 : 00 p . m . The meeting
resumed at 10 : 15 p . m . with all members noted ab ove present .
5 - ADMINISTRATIVE :
A. COMMITTEE REPORTS
No committee reports were offered in response to the Chair-
man ' s request .
B. COMMITTEE REFERRALS - LISTING UP-DATE
The Planning Director noted that the listing was based on
the existing committee structure and the purpose of the
report was to bring everyone up to date at this time . The
Chairman indicated the items would be reviewed later fol -
lowing establishment of new committees .
ZONING DESIGNATIONS FOR STONEWAY SITE
The following general descriptions should apply to the particular
zoning classification established on the property described below :
R- 1 (BUFFER AREA) - PARCEL A
The easterly 470 feet of the westerly 720 feet of the
northerly 100 feet of the above described property .
R-2 - PARCEL B
The easterly 800 feet of the westerly 1100 feet of the above
described property ; except the R- 1 area (Parcel A) and
except that portion defined as greenbelt on the Comprehensive
Plan as revised on May 17 , 1972 , and noted as the hillside
area along the south property line and northeast of Maple
Valley Highway (SR- 169 ) .
R-3 - PARCEL C
The westerly 800 feet of the above described property except
the southerly 1380 feet of the easterly 300 feet thereof.
R-4 - PARCEL D
The northerly 1100 feet of the westerly 300 feet of the
above described property , except the northerly 300 feet
thereof.
GREENBELT - PARCEL E
That portion defined as greenbelt on the Comprehensive Plan
as revised on May 17 , 1972 , and noted as the hillside area
along the south property line and northeast of Maple Valley
Highway ( SR- 169 ) .
LEGAL DESCRIPTION OF ENTIRE STONEWAY SITE
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast
one-quarter of the Northeast one-quarter of said Section
17 ; thence north along the West line of said subdivision
a distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89 °45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. # 169 ) (Maple Valley Highway) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653. 91 feet from
Point "A" ; thence South 89 °45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
RE : SONEWAY CONCRE CO . - PUBLIC HEARING 1/ 1_ 7
Public Notices delivered to Monterey Terrace neighborhood 1/6/ 77
by Bili Turner .
25 ) notices given to Paul Houser for distribution to Monterey Club
1/ 5/77
In addition , following mailed :
Robert DeBoer
S :oneway Concrete Co .
P 0 . Box 509
Renton , WA 98055
Bonneville Power Admn .
415 - 1st North
Seattle , WA 98109
Seattle City Light
1015 3rd Ave .
Seattle , WA 98104
Washington Natural Gas Co .
815 Mercer
Seattle , WA 98109
Pushpakant R. Patel
D vision Engineer
Puget Sound Power and Light Co .
6;_0 So. Grady Way
Renton , WA 98055
Renton School Dist . No . 403
Attn : Mr. Belmondo
1101 Hoquiam N . E .
Renton , WA 98055
Don Smith
Record Chronicle
801 Houser Way So.
Renton , WA 98055
a f >
r. ft
Yw.
M
ti r,•jr s`L II!'
4--__
11 11, , _ X'Y -Rl6P.
Li
V 17,i INO
4%,
RIAzA,
0 l
Akv--C14Akr-WE A
Mv
V;
aw,n1l
AO F
nV 1,4Ny
W'I LL,HE B --THE"'.RENTO I'ONA P6BLIiC`_HEARtNG'_.TLANNING C' O'
CHAMBERS,vz'C 17Y,,HALL RENTON,*-'_WASHINGTONJITHE' COIUNCIL" ON
JAlJUARY,;'_,,-l9.`-l977 8:"00 T"fl, JO' CONSIDER ,THE.' ITEM
t
ESCRIBED B E LO W.
REZONE:
rezone--f r6m : R-1 l ' to , ,STONEWAY CONCRETE INC.';Kppl'.,`: N R'.*891 ' 76 ; an& S
R R of. SR!-169 (Maple- Valley1 -2 ,i, R-3,,-an ...R-4;_.,properlty.
r--1 oc ted_ ecist',
T eme'tery ofHigway).--south.--of'..Monfe'rey', errace::an'd" Mt., 0 1"1 v'e't C
ig Y-Bonnevi 11 e-Powei, 'R hi-of a*
R,
Ile
1p- V
Rm STONEWAY CONCRETE ,. INC.I .Awq a drvIv REZONE
jg..ONW 1A.W mr(Xiver3pi 'nip is IrcemerrRyK
40, RENTON C-ITY LIMI 71
B
011414 OWE
due
low.mmmcrmll"
Immo -Xv,11 44
71
0
XPTHEPUBLICIS - INVITED TO ATTEND AND ,TO `E RESS OPINIONS OR .SUBMIT
COMMENTS IN WRITING@
IF ADDITIONAL*.', INFORMATIOk4,:IS DESIREDs,'CONTACT,:
mmiss
C TY L OF RENTON ' ' .'-PLANNING;PDEPARTMENTL* 235-2550
MILL-AVE S200,,1UNICIPAL B 0 1 LD I N
Mr ,,98055il.",-Vb t`RENTK:!,
S/a.,/r (Lit'/
i
rf L i i/ Cj
1 t1+,,
Affidavit of Publication Jr.., i '
Dtomic <
9t ,, ,
STATE OF WASHINGTON
r
f A Cs;
COUNTY OF KING ss.
C.1 '1(‘:.k'•: C,.
S 5 Ul i't \rY
4,0f
Barbara Campagna
being first duly sworn on
l.r" .t`,
oath,deposes and says that s he is the chief clerk of
THE RENTON RECORD-CHRONICLE, a newspaper published four(4)
times a week.That said newspaper is a legal newspaper and it is now and
has been for more than six months prior to the date of publication referred
to, printed and published in the English language continually as a news-
paper published four(4)times a week in Kent,King County,Washington,
and it is now and during all of said time was printed in an office maintained
at the aforesaid place of publication of said newspaper.That the Renton NOTICE OF I
Record-Chronicle has been approved as a legal newspaper by order of the PUBLIC HEARING •
Superior Court of the County in which it is published,to-wit,King County, RENTON
PLANNING COMMISSION
Notice of Public RENTON,WASHINGTON
Washington.That the annexed is a i A public hearing will be '
H a i PlanningCommission - Petitions ommIssoneld by the
at is regular8.. ' s tCommission at its regular
meeting in the council
chambers,city hall,Renton,
as it was published in regular issues(and Washington,on January 19t,not in supplement form of said newspaper)once each issue for a period 1977,at 8:00 p.m.to consid 1,
er the following petitions:
REZONE FROM R-1
of
one
consecutive issues,commencingon the
AND SD TO R-1, (' '
NDR-4;fileN
9 January 7 jj 0ropertylocaed ..
day of 19 and ending the
eas o R-169 (Maple
Valley Highway)south of:
Monterey Terrace and
r.;Mt.Olivet Cemetery and '.'
day of 19 both dates west of Bonneville Power
inclusive, and that such newspaper was regularly distributed to its sub- Right-of-way..
scribers during all of said period. That the full amount of the fee All Interested persons to
said petitions are invited to
be•present at the planning.
charged for the foregoing publication is the sum of $,H?.99 which commission meeting on
has been paid in full at the rate of per folio of one hundred words for the January 19, 1977 at 8:00firstinsertionandperfolioofonehundredwordsforeachsubsequentp.m. to express theirinsertion.
opinions.
Sandra Gist
Secretary
9 ` - f ..('a:'1" J tc"Renton'Planning Commis
JJ / sion
chief clerk Published in the Renton
Record-Chronicle January,
9, 1977. R4116.
Subscribed and sworn to before me this 9 day of
Januar 7Y19.7..7...
Q
Notary Publi m nd for the State of Was ' ton, 1J Z
residing at Kent, King only. I -p
A 26 191JP'
9
Passed by the Legislature,1955,known as Senate Bill 281,effective June 04/a#9th, 1955.
Westcra Union 'Telegraph Co. rules for counting words and figures,
C
EPAR
adopted by the newspapers of the State.
V.P.C.Form No.87
NOTICE OF PUBLIC HEARING
RENTON PLANNING COMMISSION
RENTON , WASHINGTON
A PUBLIC HEARING WILL BE HELD BY THE RENTON PLANNING COMMISSION AT ITS
REGULAR MEETING IN THE COUNCIL CHAMBERS , CITY HALL , RENTON , WASHINGTON ,
ON JANUARY 19 1977 , AT 8 :00 P . M. TO CONSIDER THE FOLLOWING
PETITIONS :
REZONE FROM R- 1 AND S- 1 TO R- 1 , R-2 , R-3 AND R-4 ; file No .
R-891-76 ; property located east of SR- 169 (Maple Valley Highway )
ouch of Monterey Terrace and Mt. Olivet Cemetery and west of
Lunneville Power Right-of-Way .
ALL INTERESTED PERSONS TO SAID PETITIONS ARE INVITED TO BE PRESENT AT
THE PLANNING COMMISSION MEETING ON JANUARY 19 , 1977
AT 8 : 00 P . M. TO EXPRESS THEIR OPINIONS .
SANDRA GIST , SECRETARY
PUNISHED _Jinukrx 9 , 1977 RENTON PLANNING COMMISSION
CERTIFICATION
I , MICHAEL L . SMITH HEREBY CERTIFY THAT THREE COPIES OF THE ABOVE
DOCUMENT WERE POSTED BY ME IN THREE CONSPICUOUS PLACES ON THE PROPERTY
DESCRIBED ABOVE AS PRESCRIBED BY LAW.
ATTEST : Subscribed and sworn
z:///'
to before me , a Notary Public , SIGNE
on the __ day of „ ,, , , ,, r
9 _if
REUMNAY
DECLARATION OF RESTRICTIVE COVENA p 'JLCT TO REVISION
WHEREAS, Stoneway Concrete , Inc . , a firm incorporated in
the State of Washington , is the owner of real property in the City
of Renton , County of King , State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant , and impose restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to. the
use by the undersigned , their successors , heirs and assigns , as
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , ( Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
parcel shall be submitted to and approved by the City of
Renton pursuant to the abovementioned ordinance prior to
preparation of specific development plans .
OPEN__ SPACE
The hillside slope area along the south property line
northeast of Maple Valley highway ( SR- I69 ) , indicated as
greenbelt on the City of Renton Comprehensive Land Use
Plan as revised May 17 , 1972 , shall be retained in its
natural state . No buildings , structures , roads , drive-
ways , or parking shall be constructed in said greenbelt
area .
j - 77
At:LI-.)'
1 I,i imdry I rup I p uv i 1I4•4I I u
from N . E . Third Street , subject to City of Renton approval
of its design and location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E. subject to Renton Traffic Division and
Fire Department approval .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted by
the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two (2 ) years and substantial construction begun
within three ( 3) years of the filing of these covenants ,
and said construction and development diligently prosecuted
toward completion thereafter , the zoning of said property
shall without further City action revert back to the zoning
which existed prior to the filing of this document . The
term " substantial construction" shall mean the physical
alteration of the land for construction pursuant to City
approved development plans as per the abovementioned
Planned Unit Development Ordinance , or construction of
required utilities for such development .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
ing subject property who are adversely affected by said breach .
STONEWAY CONCRETE , INC .
By
President
By .....-. _ ..
Secretary
SIATI. 0r WASHINGTON )
COUNTY OF KING
On this day of 19 before me
personally appeared and
to me known
to be the
respectively , of STONEWAY CONCRETE , INC . , the corporation that executed
the within and foregoing instrument , and acknowledged said instrument
to be the free and voluntary act of said corporation for the uses and
purposes therein mentioned , and on oath staled that they were authorized
to execute said instrument and that the seal affixed is the corporate
seal of said corporation .
IN WITNESS WHEREOF , I have hereunto set my hand and affixed my
official seal the day and year first above written .
Notary .Public.. in and for the State of
Washington , residing at
PROPOSED ADDENDUM TO COVENANTS - STONEWAY CONCRETE, INC. :
BUILDING HEIGHT
No building or structure shall exceed a height of thirty-
fivE ( 35 ) feet when located within the westerly 1100 feet
of above described property.
C• r `,`,
t . "
q {,te1
f Yr ,
PLANNING COMMISSION • RENTON, WASHINGTON
MUNICIPAL NUIID' . . • FEN TON WASHINGTON 99055 • 235-2550Rter
January 18 , 1977
TC : Members , Planning Commission
FROM : Special Studies Committee , Bylund Wik , Chairman
RE : STONEWAY CONCRETE , INC . , REZONE APPLICATION R-891-76
MEETINGS HELD :
Two committee meetings have been held on November 18 , 1976 ,
and January 6 , 1977 , to discuss the proposed rezone with
concerned residents of the area and the applicant . Another
meeting prior to the Planning Commission meeting on Janu-
ary 19 , 1977 , was scheduled .
FACTS AND CONSIDERATIONS :
1 . The area residents were primarily concerned about access
on Blaine Ave . N . E . from the higher density area when
developed . The committee reviewed the Comprehensive
Land Use Plan for the area together with the general cir-
culation element providing for future access to N . E . 3rd
Street . The committee felt that only emergency vehicle
access should be allowed to Blaine Ave . N . E . from any
future development of the subject site .
2 . The committee also studied the matter of potential
traffic impacts to N . E . 3rd St . with the creation of a
new street located east of Mt . Olivet Cemetery . They
asked for a report from the Traffic Engineering Division .
See attached report . )
3 . Another major committee concern is the development of
the site , and adequate city control of such development .
It was felt that the degree of impact to the surrounding
community will ultimately dependon the planning and
specific development . The committee therefore reviewed
with the applicant the possibility of development through
the Planned Unit Development ( P . U . D . ) Ordinance . This
was agreeable with the applicant and assures further
city control of the specific development aspects of the
property .
1.4
fit ,, •
r
t`:ttt?,..Wi;.:;`.4'•
tubers , Planning Commission
nuary 18 , 1977
age Two
4 . The committee also reviewed possible provisions for
stimulating development of the property within a rea-
sonable time period , rather than granting the rezone
only to allow the resale of the property while the
site remains undeveloped as is the case in other areas
of the city . The committee established reasonable
time frames for master planning and commencing develop-
ment to be two and three years respectively .
5 . The committee is also concerned about preservation of
the steep natural hillside area along the southerly
portion of the property . The applicant proposed to
maintain the area in its natural state . The committee
is in full agreement with this concept .
6 . The question of utilities was studied . It was felt
that present city requirements were sufficient to
insure adequate utilities for future development .
A 16 inch water main exists along N . E . 3rd Street ,
and a Metro Sewer Interceptor is available along
Maple Valley Highway .
7 . The committee studied possible view obstruction to
adjacent properties resulting from development of the
site . The height limit of the R-2 zoning classification ,
which would be most proximate to Monterey Terrace if the
rezone were approved , together with the 100 foot buffer
area previously established by restrictive covenant ,
may provide sufficient height limitations and view
protection . However , because of the height limit
flexibility of the P . U . D. Ordinance an additional
clause regarding maximum heights near Monterey Terrace
should be added to the restrictive covenants .
8. The committee studied means of assuring that the above
consideration would be secured as part of the rezone .
The attached restrictive covenants involve the major
areas of concern and would run with the land to guide
its general development.
The committee also feels that if the rezone is granted ,
the different zoning classifications on the subject
site should be specifically described in legal form
and on an exhibit map similar to that which is attached .
trAv
t
MEMORANDUM
DATE: January 17, 1977
TO: Del Bennett
FROM: Paul Lumbert
SUBJECT: Stoneway Concrete -- Request for 'Rezone
The following traffic data is in response to the Planning Department mem:
regarding the rezone request by Stoneway Concrete, Inc.
1. The existing traffic volume on NE 3rd Street at Blaine Ave.
NE is 21,612 vehicles per day. The projected volume in
twenty years will be 38,902 vehicles per day.
2. Approximately 700 to 900 vehicle trips would be generated
by 300 - 350 multi-family residences. That would put say
an additional 1,000 vehicles per day into the traffic flow
on NE 3rd Street.
3. Stop signs would control traffic exiting this new roadway
initially with increased control (traffic signal, channelizaticn,
etc.) later as the traffic volume grows. NE 3rd Street
traffic is generated from a large area that has a vast
potential for future development and the traffic volume
will grow •at the, same rate as the area development. The
additional roadway nets as indicated on the comprehensive
land use plan would help to disperse the traffic entering
and exiting NE 3rd Street which would tend to lessen the
impact of traffic at any one point.
Pea,/ 41/‘e/e/T—
PL:ad
roF
2\
RICENED
JAN 17 1977
v i
t : d.. .
1 ' .
tY r r:
THE CITY OF RENTON
V4 1
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
z o
CHARLES J. DELAURENTI , MAYOR s PLAtiNI\G DEPARTMENT
4
Q 235-2550
gTFO S_P1C- '
January 13, 1977
MEMORANDUM
RECEIVED
TO : Del Bennett , Traffic Engineering Division JAN 13 77
FROM : Michael Smith , Planning Department cjNC,,4r.;j3,POOL C ••vCMt:3
RE : STONEWAY CONCRETE , INC . , REZONE REQUEST
The Planning Commission Special Studies Committee is pre-
sently reviewing the subject request . The committee has
requested additional information and response from the
Traffic Engineering Division regarding :
1 . Existing and projected traffic flows along
N . E . 3rd Street .
2 . Potential traffic impacts of the proposed
rezone and development of the site ( approximately
300-350 additional units ) .
3 . What type of traffic controls , if any , would be
necessary at N . E . 3rd St . , if a primary access
road were constructed east of Mt . Olivet Cemetery
to serve the development? ( See the attached copy
of the Comprehensive Plan for the area with the
general location of such a street indicated . )
Who would be responsible for financing such
traffic controls ?
The committee would appreciate your review and response as
soon as possible .
MLS : wr
Attachments
1' 'IttO z'
L 1 tryy
n !.. ,
2
w _
R
r 15' A
e.
is 14./• ' •../ 1 ..'.'• • T• _'(,,, ;/; .`,
11A, •4 1J,,.T'-1..''rl/ir,')•if1:,X)i ff.U'/I.,// ,,- N
i,,.
yy-/
i.r.'4.%.f)>
er,7.,'
ft 1i: lr 1.'' yrui•.' ip'./ 1 rf11 -.•_ 1n....*.......
1
i/ _c if,'
f r,• '!. JJ/,• Y,•
J1t•
r Y 1r y;.;.,
Z-•_tP.. .•-l1 y{1.•
y.r• ....c. , /,'; .t
4, I!' l•..'j / i iiii. :.::
ons. .
A
w'-'1:: :1.'l ',. 1 N
x• ', ,' r r'1./ •/••lr:v,'t!,`.
I• I I I I! I I I I I (1 ! '
G. „L• ,1 a7
ter' --+ + ti` 1 J'4 F ,ff• l,•+ '1
1
1''=- / I-—y i '
G /y f it[ ` ` ' •n%
f 4f+i:j • I I
J/.•'• /C j' .'pt /
1 I l 1
I j I..i_I I I, r, •_
iF 1 1 trey 7, .;
L':..
l_ .
r' ".. ' rt,., , ,•...: , •`f ''--SS ATI;Oki / ,' i,.:41d r,:...l'/....
v,,,
1 T.5
4
wo
NA i II 0.! wase IN .fiti.V. '„.: e •
NNI4‘omen=i •l1.j r.
i c`Jltii'
V•
C
tip• r .
T• • ••• :{ i'" ^
S'I'ONEwAY EXHIBIT A" as revised March 8 , 1972
PROPOSED CHANGE TO THE CITY OF RENTON ' S COMPREHENSIVE LAND USE PLAN
Property Description: That general area included within the ioi:c.,.:.::.
uoundaries, FAI 405 , NE 3rd and 4th streets , Union Avenue ":E clnd SL ,
and the bluff line north of Maple Valley Highway .
LEGEND
Single Family Residential Public Use or __ _
V,/ Low Density Multi 1r:iiy Res . 1' Recreation
r ; .'._ .. _ . ,.. -::
S'."' ::' + tl Family '^_
fl Greenbelt
i:S
L• 'e tR,{.-'+ •.•.' ri TrJ"'`y,_
ZONING DESIGNATIONS FOR STONEWAY SITE
The following general descriptions should apply to the particular
zoning classification established on the property described below :
R- 1 ( BUFFER AREA) - PARCEL A
The easterly 470 feet of the westerly 720 feet of the
northerly 100 feet of the above described property .
R-2 - PARCEL B
The easterly 800 feet of the westerly 1100 feet of the above
described property ; except the R- 1 area ( Parcel A ) and
except that portion defined as greenbelt on the Comprehensive
Plan as revised on May 17 , 1972 , and noted as the hillside
area along the south property line and northeast of Maple
Valley Highway (SR- 169 ) .
R-3 - PARCEL C
The westerly 800 feet of the above described property except
the southerly 1380 feet of the easterly 300 feet thereof .
R-4 - PARCEL D
The northerly 1100 feet of the westerly 300 feet of the
above described property , except the northerly 300 feet
thereof .
GREENBELT - PARCEL E
That portion defined as greenbelt on the Comprehensive Plan
as revised on May 17 , 1972 , and noted as the hillside area
along the south property line and northeast of Maple Valley
Fighway ( SR- 169 ) .
LEGAL DESCRIPTION OF ENTIRE STONEWAY SITE
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M . described as follows :
Geginning at the Southwest corner of the Southeast
cne-quarter of the Northeast one-quarter of said Section
17 ; thence north along the West line of said subdivision
a distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
E9 °45 ' 17" east a distance of 526 . 41 feet ; thence south
88 °52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. # 169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89 °45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89 °45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
114ki:LiAlliNARY
DECLARATION Ur= RESTRICTIVE COVENAN`faJECT TO REVISION
WHEREAS, Stoneway Concrete , Inc . , a firm incorporated in
the State of Washington , is the owner of real property in the City
of Renton , County of King , State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real properly .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant , and impose restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to . the
use by the undersigned , their successors , heirs and assigns , as
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title 1V , ( Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
Marcel shall be submitted to and approved by the City of
Renton pursuant to the abovementioned ordinance prior to
preparation of specific development plans .
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway ( SR- 169 ) , indicated as
greenbelt on the City of Renton Comprehensive Land Use
Plan as revised May 17 , 1972 , shall be retained in its
natural state . No buildings , structures , roads , drive-
ways , or parking shall be constructed in said greenbelt
area .
llttI
A primary acce`,s street. shall he provided to the site
from N . L . Third Street , subject to City of Renton) approval
of its design and location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E . subject to Renton Traffic Division and
Fire Department approval .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050 . It is further agreed and covenanted by
the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two (2 ) years and substantial construction begun
within three ( 3) years of the filing of these covenants ,
and said construction and development diligently prosecuted
toward completion thereafter, the zoning of said property
shall without further City action revert back to the zoning
which existed prior to the filing of this document . The
term "substantial construction" shall mean the physical
alteration of the land for construction pursuant to City
approved development plans as per the abovementioned
Planned Unit Development Ordinance , or construction of
required utilities for such development .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
ing subject property who are adversely affected by said breach .
STONEWAY CONCRETE , INC .
By
President
By
Secretary
slAll. Or WASHINO [ON )
COUNTY 0r KING
On this day of 19 before me
personally appeared end
to me known
to be the and
respectively , of STONEWAY CONCRETE , INC. , the corporation that executed
the within and foregoing instrument , and acknowledged said instrument
to be the free and voluntary act of said corporation for the uses and
purposes therein mentioned , and on oath stated that they were authorized
to execute said instrument and that the seal affixed is the corporate
seal of said corporation .
IN WITNESS WHEREOF , I have hereunto set my hand and affixed my
official seal the day and year first above written .
Notary Public in and for the State of -
Washington , residing at
PROPOSED ADDENDUM TO COVENANTS - STONEWAY CONCRETE, INC. :
BUILDING HEIGHT
No biilding or structure shall exceed a height of thirty-
five ( 35 ) feet when located within the westerly 1100 feet
of a )ove described property .Y .- \1
1111111
7 T • wl`i I.IF,
K
r
Y
r{r++nr r•ri9 , i lw
iii
l:
5'
7 GS-I . ---,--§ems Ci
l'ia • 1UIz4' CS-1\
STONEWAY CONCRETE , INC .
j REZONEY'll
ili
ntrouver
1
x/
r r.
c 354 EME rear
p—i ‘ . Ammo di
5.._... . ,, \ ..
f "'T,RENTON”'UTY 'LIMITSTy' °1h'
1i'. „„,
10\
N , id ,,,, ,,,t,: ,.
c
B_1
tir ...., , - ---
4 ,,, ,
a
H- I A 4.
1
1\
111 1 , l\
C,
P'
REZONE :
STONEWAY CONCRETE , INC. ; Appl . No . R-891-76 ; rezone from R- 1 and S- 1 to
R- 1 , R-2 , R-3 , and R-4 ; property located east of SR- 169 (Maple Valley
Highway) south of Monterey Terrace and Mt. Olivet Cemetery and west of
Bonneville Power Right-of-way.
43 . 1 acres with
APPLICANT STONEWAY CONCRETE , INC . TOTAL AREA 24.0 buildable area
PRINCIPAL ACCESS East side of Mt . Olivet Cemetary .
EXISTING ZONING R- 1 , S- 1 and GS- 1
EXISTING USE Abandoned gravel pit .
Rezone to Higher Density from R-1 through R-4 for
PROPOSED USE future residential development.
Single family, low density, medium density
COMPREHENSIVE LAND USE PLAN and high density multi-family; greenbelt
along steep hillside above Maple Valley Highway.
COMMENTS
2ND J [1 .,.
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Stoneway Concrete , Inc . , a firm incorporated in
the State of Washington , ' is the owner of real property in the City
of Renton , County of King , State of Washington , described as follows :
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88° 52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R . # 169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17" east a distance of
6E3 . 91 feet to Point "A" and the true point of beginning .
WHEREAS, the owner of said described property desires to
impose the following restrictive covenants running with the land as
to use , present and future , of the above described real property .
NOW, THEREFORE, the aforesaid owners hereby establish ,
grant , and impose restrictions and covenants running with the land
as to the use of the land hereinabove described with respect to the
use by the undersigned , their successors , heirs and assigns , as
follows :
DEVELOPMENT
Any and all development of the subject property shall be
subject to City of Renton approval and shall comply with
all the requirements of the Planned Unit Development Ordi -
nance , Chapter 27 , Title IV , ( Building Regulations ) of
Ordinance 1628 known as "Code of General Ordinances of the
City of Renton . " A master development plan for the entire
parcel shall be submitted to and approved by the City of
Renton pursuant to the abovementioned ordinance prior to
preparation of specific development plans .
OPEN SPACE
The hillside slope area along the south property line
northeast of Maple Valley Highway ( SR- 169 ) , indicated as
greenbelt on the City of Renton Comprehensive Land Use
Plan as revised May 17 , 1972 , shall be retained in its
natural state . No buildings , structures , roads , drive-
ways , or parking shall be constructed in said greenbelt
area .
2ND REvisg ( - poi.
1 17 77
ACCESS
A primary access street shall be provided to the site
from N . E . Third Street , subject to City of Renton approval
of its design and 'location as part of the total develop-
ment plan . Access to existing Blaine Avenue N . E . shall be
for emergency purposes only . A suitable barrier and gate
shall be constructed at the existing south terminus of
Blaine Avenue N . E . subject to Renton Traffic Division and
Fire Department approval .
DURATION
These covenants shall run with the land and expire on
December 31 , 2050. It is further agreed and covenanted by
the undersigned that if a master plan for total develop-
ment of the property is not submitted to the City of Renton
pursuant to the Renton Planned Unit Development Ordinance
within two ( 2 ) years and substantial construction begun
within three ( 3) years of the filing of these covenants ,
and said construction and development diligently prosecuted
toward completion thereafter , the zoning of said property
shall without further City action revert back to the zoning
which existed prior to the filing of this document . The
term "substantial construction" shall mean the physical
alteration of the land for construction pursuant to City
approved development plans as per the abovementioned
Planned Unit Development Ordinance , or construction of
required utilities for such development .
Any violation or breach of these restrictive covenants may be
enforced by proper legal procedures in the Superior Court of King
County by either the City of Renton or any property owners adjoin-
ing subject property who are adversely affected by said breach .
STONEWAY CONCRETE , INC .
By --
President
By
Secretary
STATE OF WASHINGTON )
COUNTY OF KING
On this day of 19 before me
personally appeared and
to me known
I'd' be t h e — — — --- and
respectively , of STONEWAY CONCRETE, INC . , the--corporation that executed
the within and foregoing instrument , and acknowledged said instrument
to be the free and voluntary act of said corporation for the uses and
purposes therein mentioned , and on oath stated that they were authorized
to execute said instrument and that the seal affixed is the corporate
seal of said corporation .
IN WITNESS WHEREOF , I have hereunto set my hand and affixed my
official seal the day and year first above written .
Notary Public in and for the State of
Washington , residing at
A
THE CITY OF RENTON
07.....R MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
CHARLES J. DELAURENTI 1
MAYOR 0 PLANNING DEPARTMENT
13 V
0 c 235-2550
q'
F0 SI:PIC--
January 13, 1977
MEMORANDUM
TO : Del Bennett , Traffic Engineering Division
FROM : Michael Smith , Planning Department
RE : STONEWAY CONCRETE , INC . , REZONE REQUEST
The Planning Commission Special Studies Committee is pre-
sently reviewing the subject request . The committee has
requested additional information and response from the
Traffic Engineering Division regarding :
1 . Existing and projected traffic flows along
N. E . 3rd Street .
2 . Potential traffic impacts of the proposed
rezone and development of the site (approximately
300-350 additional units ) .
3 . What type of traffic controls , if any , would be
necessary at N . E . 3rd St . , if a primary access
road were constructed east of Mt . Olivet Cemetery
to serve the development? ( See the attached copy
of the Comprehensive Plan for the area with the
general location of such a street indicated . )
Who would be responsible for financing such
traffic controls?
The committee would appreciate your review and response as
soon as possible.
MLS : wr
Attachments
w
Yf 2• + r:s :
r .•o1 , .y ir• r y
1
pr' HP
1'
A.THE CITY OF RENTON
0 © J
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
OV mil E5
A
CHARLES J. DELAURENTI , MAYOR • PLANNING 1)EPARTNIENT
235-2550
O4)4.
1 4'0 SE Pitl°
MEMORANDUM
December 13 , 1976
TO: George Perry, Chairman
Council Planning & Development Committee
FROM: Gordon Y. Ericksen, Planning Director
RE: PLANNING COMMISSION PUBLIC HEARING - STONEWAY
Due to the complex nature of the request, the Stoneway
application was originally continued to January 12 ,
1977 . In view of the conflict with the initial
planning seminar on the 12th, the Commission recom-
he Stoneway public hearing be held on
January 19th.
Since the Stoneway application will be the sole item
on the agenda, I see no reason why the hearing cannot
be concluded -a. --that date.
Oil
GYE :wr L e
cc : Mayor
hirV -
ia.,
d
1/1/4
1, e, a A(....... /
11.---- 7 A44, ,,/, 7,,,,,,,
j.„,
foe Cit6 K f o
k 4 0 K. - 6 1
s a// -
e_.
4-- ,,,,, ,
7../'
A c't.
Renton Planning Commission
Meeting December 8 , 1976 ,
Page Fourteen
Committee stated that he has already gone on record as being
opposed to such an installation , and he did not wish to
prejudice the Commission ' s action . The Chairman then
referred the matter to the Special Studies Committee and
requested additional staff input .
B. COMMITTEE REPORTS
It was noted that all committee reports had been given earlier
this evening in connection with business before the Commission .
C. PROPOSED PLANNING SEMINAR — STATE OFFICE OF COMMUNITY
DEVELOPMENT
The Chairman referred the Commission to his memorandum regard-
ing a proposed planning seminar offered by the Washington
State Office of Community Development tentatively scheduled
for January 12 , February 9 , and March 16 , 1977 . It was noted
that the intent is to conduct an orientation session , study
state laws , bring the Commission up- to-date , and also to
discuss any specific items the Commission may wish to con-
sider . The Commission ' s attention was directed to two docu-
ments that had been distributed that would be the basis for
discussion : " Land Use Planning in the State of Washington :
The Role of Local Government" and " Ideas and Resources from
the Small Towns Institute--Planning for Quality of Life and
Economic Prosperity in your Community . " Ron Clark of the
Office of Community Development will hold the meetings in
Renton .
Favorable discussion among the Commissioners followed . It
was the general consensus that the seminar would provide a
good basis for the new role of the Commission .
It was also noted that other City officials and representa-
ti ‘ es would be encouraged to participate .
D. OTHER
The matter of review of the STONEWAY REZONE APPLICATION
that had been continued to January 12 , 1977 , was con-
sidered . The complexity of the request was discussed . Fol -.
louing discussion , IT WAS
ACTION:
MOVED BY GIST, SECONDED BY TEEGARDEN, THAT THE PLANNING COM—
MISSION MAKE A REQUEST TO THE CITY COUNCIL THAT THEY BE
GRANTED PERMISSION TO CONTINUE AND CONCLUDE THE STONEWAY
CONCRETE COMPANY REZONE APPROVAL REQUEST IN THE MONTH OF
JANUARY. MOTION CARRIED .
The Chairman requested that the staff advise the Council of
their action .
In view of the proposed seminar and the need to restructure
the Planning Commission , IT WAS
ACTION:
MOVED BY TEEGARDEN, SECONDED BY WALKER, THAT THE PLANNING
DIRECTOR CHANGE THE PUBLIC HEARING FROM JANUARY 12 TO
JANUARY 19, 1977 , IF THE COUNCIL AUTHORIZES THE PLANNING
COMMISSION TO CONTINUE THEIR WORK ON THE STONEWAY MATTER .
MOTION CARRIED UNANIMOUSLY.
Renton Planning Commission
Meeting December 8, 1976
Page Thirteen
EXCEPTION TO SUBDIVISION ORDINANCE :
F. EMMETT KINDLE ; Appl . E-900-76 ; request for exception to
subdivision ordinance for a three-lot short plat ; property
located in the vicn n ity of 2625 Jones Ave . N . E .
The Chairman opened the item for consideration and requested
staff review. The Planning Director and Associate Planner
Smith advised that the applicant has revised his request
from a three- lot short plat to a four-lot short plat and is
requesting an exception to the Subdivision Ordinance to allow
serving the two rear lots with 170 foot long pipestems .
Alternatives were considered ; lot sizes were noted ; and access
was reviewed . It was indicated that the proposed configuration
would allow for best utilization of the property , and the staff
recommends approval .
Commission discussion followed concerning off-site improvements ;
existing improvements were noted ; and Associate Planner Smith
advised that the applicant is aware of Subdivision Ordinance
requirements but has not asked for a waiver of off-site improve-
ments . The Planning Director advised that the Planning Commis-
sion recommendation would be submitted to the City Council and
indicated findings that the Commission must make prior to any
recommendation for approval . Location of the pipestems adja-
cent to each other were cited .
Further Planning Commission review ensued , and the following
were considered : location , width , and length of the pipestems ;
the possibility of a cul -de-sac configuration ; and provisions
for access . It was noted that the question before the Commis-
sion was whether or not it is reasonable that the pipestems
be 170 feet in length rather than 150 feet as required by ordi -
nance . Considration was also given to the conditions for
improvement of the pipestem. IT WAS THEN MOVED BY WALKER ,
SE :ONDED BY TEEGARDEN , THAT THE PUBLIC HEARING BE CLOSED .
MOTION CARRIED .
The following action was then taken :
ACTION:
MOVED BY WALKER, SECONDED BY MOLA , THAT THE PLANNING COMMISSION
APPROVE THE ALTERNATIVE FOUR-LOT SHORT PLAT (EXHIBIT B) WITH
TWO 170 FOOT PIPESTEMS, SIDE BY SIDE AND IMPROVED TO CITY
SPECIFICATIONS AT THE TIME OF DEVELOPMENT. MOTION CARRIED
UNANIMOUSLY.
6 - ADMINISTRATIVE :
1' . COUNCIL REFERRAL:
KENNETH R . ZEHM TO BUILD A MARINA AS PART OF THE LAKE
WASHINGTON BEACH PARK DEVELOPMENT
The Chairman suggested that the item be referred to committee
fo • study and recommendation and discussion in January and
requested that Mr . Zehm present his proposal .
The Planning Director advised that the Park Board is presently
considering the comprehensive development of Lake Washington
Beach Park . The Council has requested Planning Commission
study of the request .
Discussion followed regarding the appropriate committee for
referral , inasmuch as Commissioner Teegarden of the Land Use
MEETING NOTES
MEETING : PLANNING COMMISSION SPECIAL STUDIES COMMITTEE
DATE: November 18, 1976
SUBJECT: STONEWAY CONCRETE , INC . , FILE NO . R-891-76
ATTENDANCE :
Bylund Wik , Chairman ; Tony Mola , Committee member ;
Michael Smith , Planning Department ; Robert DeBoer,
Stoneway Concrete ; Jim Colt , Mt . Olivet Cemetery .
DISCUSSION :
1 . Briefly reviewed the site characteristics , surround-
ing uses , zoning , Comprehensive Plan , utilities , and
access problems related to the subject request .
2 . Both the applicant and committee felt that alternate
access was necessary . The eventual closing of
Blaine Ave . to the site and its utilization for
emergency access only was discussed.
3 . Potential densities and possible development under
the P . U . D. Ordinance were discussed . The applicant
agreed that P. U . D. development would be the most
applicable alternative for the site .
4 . The committee also reviewed the possibility of the
zoning , if granted , reverting back to its existing
zoning if a master P . U. D. plan is not submitted
and construction begun within certain established
time periods .
5 . The committee discussed the options of contract
zoning and conditional zoning with restrictive
covenants running with the land establishing
certain specific conditions of approval .
6 . View obstructions and open space related to the
site were also reviewed .
7 . It was indicated to the applicant that an Environ-
mental Impact Statement will more than likely be
required at the time of development .
CONCLUSIONS :
The committee felt that staff should explore further the
alternatives of contract zoning and conditional zoning
and the detailed conditions that would be necessary .
Proper safeguards to the community , access controls , and
development controls , and reversionary zoning were the
primary concerns of the committee .
RE : PLANNING COMMISSION PUBLIC HEARING, NOV . 10TH
STONEWAY CONCRETE , INC .
ACTION : REFERRED TO SPECIAL STUDIES COMMITTEE FOR STUDY
AND REPORT BACK JANUARY 11 , 1977 .
Speaking for the application : Robert DeBoer, General Mgr.
Stoneway _ ^, G. _
Speaking against the
application :Donald Capps
63 Monterey Dr .
1 Chris Wright
120 Monterey P1 . N . E.
I Margaret Wright
120 Monterey P1 . N . E.
I.
Gary McKnight
58 Monterey
V Louis Peretti 7
115 Monterey P1 . N. E.
Harold Lee -- , / :-
r ,: '
J7l
77 Monterey P1 . N . E.
Lloyd Salter
76 Monterey P1 . N . E . 171G
Createst concern expressed : ADEQUATE ACCESS
some suggestions : Two ( 2 ) accesses - not through Monterey
Terrace.
Going east of Mt . Olivet Cemetery .
Blocking off of Blaine Ave . N . E.
special Studies Committee - 7 : 30 p . m. , Nov . 18th , 3rd fl .
conf . rm.
fti
rw
A Zo•ve.
Renton Planning Commission
Meeting November 10 , 1976
Page Three
2 . A 20 ' SETBACK FROM THE NORTHWEST CORNER OF THE BUILD-
ING SIZE ON LOT "A . "
3 . PROVISION FOR CONSTRUCTION OF A DECK WHICH EXTENDS
NO MORE THAN 6 ' INTO THE SETBACK FROM THE WATER' S
EDGE.
APPROVAL IS FURTHER SUBJECT TO THE REPLATTING OF THE SIX
LOTS INTO FOUR LOTS, CONFIGURATION OF EACH TO BE APPROXI-
MATELY 62 ' IN WIDTH, AND PROVISION FOR ADEQUATE PARKING
AND TURNAROUND AND ACCESS ON MOUNTAIN VIEW AVENUE NORTH.
Commissioner Wik indicated his desire to amend the motion
to include the reasons for the variance as follows :
1 . THE APPLICATION DOES APPLY TO SECTION 8 . 02. 01 WITH
REGARD TO EXCEPTIONAL OR EXTRAORDINARY CIRCUMSTANCES
OR CONDITIONS WHICH APPLY TO THE SUBJECT PROPERTY OR
TO THE INTENDED USE THEREOF THAT DO NOT APPLY GENERALLY
TO OTHER. PROPERTIES OR SHORELINES IN THE SAME VICINITY.
2. THE APPLICATION DOES APPLY TO SECTION 8 . 02. 03, WHICH
STATES THE VARIANCE PERMIT WILL NOT BE MATERIALLY
DETRIMENTAL TO THE PUBLIC WELFARE OR INJURIOUS TO
PROPERTY ON THE SHORELINES IN THE VICINITY.
3. THE VARIANCE IS NECESSARY FOR THE PRESERVATION AND
ENJOYMENT OF PROPERTY RIGHTS, IN ACCORDANCE WITH
SECTION 8 . 02. 02.
The Vice-chairman polled the affirmative votes for approval
of the variance , Commissioners Gist and Mola . Both indicated
their agreement .
MOTION CARRIED, Teegarden dissenting.
5 • NEW BUSINESS :
Items of new business were opened for consideration by the Vice-
chairman .
REZONE :
A, STONEWAY CONCRETE , INC . ; Appl . No . R-891- 76 ; rezone from R- 1 ,
S- 1 , and GS- 1 to R- 1 , R-2 , R- 3 , and R-4 ; also hillside area
to remain as greenbelt ; property located east of SR- 169
Maple Valley Highway ) south of Monterey Terrace and Mt .
Olivet Cemetery and west of the powerline right-of-way .
At the request of the Vice-chairman , the Planning Director
reviewed the Stoneway Concrete rezone application , noting the
following : size and location of the site ; relationship to
residential areas , roadways , and other significant development
in the vicinity; Comprehensive Plan designations.; topography
of the parcel ; and former use . Mr. Ericksen noted previous
action relative to the Comprehensive Plan designations which
include restrictive covenants with reference to the property
near the Monterey Terrace residential development that provide
for a buffer area adjacent to the residential area . Proposed
rezone configurations were described and greenbelt areas indi -
cated .
The matter of access was discussed , and the Planning Director
noted that at the time of Comprehensive Plan review it was
indicated that an alternative access should be considered . It
was also noted that the applicant does not proposed to develop
the property and does not have any specific plans other than
selling it.
Renton Planning Commission
Meeting November 10, 1976
Page Four
Slides , maps , and aerial photographs denoting the character of
the area were viewed . Previous use of the site was described ;
covenants pursuant to the concerns of the residents of Monterey
Terrace established in conjunction with a study of the Compre-
hensive Plan in March 1972 were noted ; and current land use in
the vicinity was cited.
Comments from the applicant were invited by the Vice-chairman .
Robert DeBoer, General Manager , Stoneway Concrete , stated that
they were basing their application on Ordinance 2708 dated
April 1972 , relative to the study of the Comprehensive Plan in
the area and associated restrictive covenants . He indicated
that they have a prospective buyer and that the sale is
dependent upon rezone approval as requested .
A review of the provisions of the covenants ensued , including
a discussion of the concerns expressed by the residents of
Monterey Terrace at the time of the Comprehensive Plan study
in the area .
Vice-chairman Walker called for comments from the audience in
favor of the proposal . None were received . She then invited
comments in opposition .
Comments expressing the need for additional access east of Mt.
Olivet Cemetery , rather than through Monterey Terrace , were
offered by those listed below:
Donald Capps Chris Wright
63 Monterey Drive 120 Ponterey Pl . N . E .
Gary McKnight Louis Peretti
58 Monterey 115 Monterey Pl . N . E .
Margaret Wright Harold Lee
120 Monterey P1 . N . E .77 Monterey P1 . N . E .
Lloyd Salter
76 Monterey P1 . N . E .
In addition , concerns were indicated relating to increased
density , potential vandalism , noise , traffic control , notifica-
tion of other interested parties , and the need for further study .
Alternative access through the Maple Valley Highway was recom-
mended . It was also suggested by Mr. Salter that Blaine Ave. N . E .
be closed by the City .
Following indications by the Commission that further review was
necessary , IT WAS
ACTION:
MOVED BY TEEGARDEN, SECONDED BY MOLA, THAT THE STONEWAY CONCRETE
COMPANY APPLICATION FOR REZONE BE CONTINUED AND REFERRED TO THE
SPECIAL STUDIES COMMITTEE FOR STUDY AND REPORT BACK.
Discussion ensued relative to an appropriate time for report
back , and the following factors were considered : the antici -
pated lengthy agenda for the next scheduled public hearing ,
the effect of the new Planning Commission and Land Use Hearings
Examiner Ordinances , possible continuation of Comprehensive
Plan application review to January , expected applications for
December review , the possibility of an extra public hearing ,
and personal holiday commitments . In response to an inquiry
concerning the effect of waiting until January for a decision ,
Mr. DeBoer of Stoneway indicated that time would be satisfactory .
Renton Flanning Commission
Meeting November 10 , 1976
Page Fie
IT VAS THEN
ACTJ ON:
MOVED BY TEEGARDEN, SECONDED BY GIST, THAT THE ORIGINAL MOTION
BE AMENDED TO INCLUDE THAT THE SPECIAL STUDIES COMMITTEE REPORT
BACK CONCERNING THE STONEWAY CONCRETE REZONE APPLICATION ON
JANUARY 12, 1977. MOTION CARRIED.
On the original motion to continue the public hearing and refer
the matter to the Special Studies Committee for study , MOTION
CART'I ED.
The audience was advised that those interested in attending
committee meetings should either leave their names , addresses ,
and telephone numbers with the Recording Secretary or contact
the Planning Department , and they would be notified .
REZONE:
B, ALBERT HEGLUND , JR . ; Appl . No . R-892-76 ; rezone from R- 1 to
B- P ; property located at 437 South Whitworth Avenue .
The item was opened for consideration , and staff review was
requested by the Vice-chairman .
The Planning Director noted previous consideration of the
area in connection with the applicant ' s substation rehabili -
tation project to provide additional parking . Mr . Ericksen
discussed the character of the area ; plans for removal of
an existing house on the property ; site dimensions and
proximity to the commercial development ; and the existence
of restrictive covenants relating to setbacks , landscaping ,
and site development of the original site . He noted the
applicant ' s agreement that the restrictive covenants be
extended to the subject site .
Slides , maps , and aerial photographs depicting the proposal
were viewed and described . It was noted that access is pro-
posed from Shattuck Avenue only .
The Vice-chairman invited comment from the applicant .
Albert Heglund , Jr. , 3202 38th Ave. W . , Seattle , noted that
the proposed parking would provide up to one hundred off-
street parking stalls , which are more than required by City
ordinance , and will eliminate employee parking on Whitworth
Avenue and access to the railroad and produce a better flow
of parking . He described proposed retention of trees , park-
ing lay-out , internal circulation , fencing , and screening .
He noted plans for development of a street-end park on Whit-
worth Ave. So. in conjunction with the total development .
sir. Heglund then responded to questions from the Commission
regarding relocation plans for the house . Discussion among
the Commissioners ensued relating to permitted uses in a B-P
zone.
Comments in favor of the proposal were requested by Vice-
chairman Walker , but none were offered . She then called for
comments in opposition to the proposal .
Harry Larsen , 419 Whitworth Ave . So . , noted that he was seek-
ing more information regarding the proposal and inquired
concerning provisions for prevention of access to Whitworth
and policing of the area at night . He noted concern regard-
ing the disruption of a quiet neighborhood due to increased
traffic on Shattuck .
Renton Panning Commission
Meeting November 10, 1976
Page Six
The Planning Director advised regarding restrictive covenants
provding for limitation of access to Shattuck , plans for fenc-
ing , landscaping , and probable lighting of the area . Mr. Erick-
sen noted a proposal regarding the Shattuck underpass that will
prob<<bly also increase the traffic on Shattuck .
Mr. Heglund then responded to Mr. Larsen ' s concerns regarding
protection of the neighborhood , noting that it is his opinion
that the park will be a deterrent to additional traffic on
Whitworth , plans for high fencing around the parking lot , and
provisions for adequate lighting . He also indicated that he
had received the support of contiguous property owners and
renters .
The Planning Director noted further review by the Planning Com-
miss on and the Planning and Public Works Departments when plans
are :submitted.
Further audience comment was invited. Noting none , IT WAS
MOVED BY GIST , SECONDED BY WIK, THAT THE PUBLIC HEARING BE
CLOSED. MOTION CARRIED.
Following a brief discussion , the following action was taken :
ACTION:
MOVED BY W1K, SECONDED BY MOLA , THAT THE PLANNING COMMISSION
RECOMMEND APPROVAL OF THE REQUESTED REZONE TO THE CITY COUNCIL,
AS IT AGREES WITH THE COMPREHENSIVE PLAN AND ADJACENT USES IN
THE AREA , SUBJECT TO THE APPLICANT' S FILING RESTRICTIVE COVE-
NANTS TO RUN WITH THE LAND AS LONG AS IT IS USED COMMERCIALLY
PERTAINING TO THE FOLLOWING:
1 . PLANNING DEPARTMENT APPROVAL OF A DETAILED LANDSCAPE PLAN
ESTABLISHING A MINIMUM 5 ' LANDSCAPE STRIP AND FENCE ALONG
THE NORTH PROPERTY LINE AND A MINIMUM 10 ' BERMED LANDSCAPE
STRIP AND FENCE ALONG WHITWORTH AVE. SO .
2. PROVISION FOR ADEQUATE INTERIOR LANDSCAPING AND LIGHTING
TO THE PROPOSED PARKING AREA .
3 . PERMITTED ACCESS FROM SHATTUCK AVE. SO. ONLY.
4. PROHIBITION OF OUTDOOR STORAGE ON THE SITE.
MOTION CARRIED.
A recess was declared at 9 : 58 p . m. The meeting was resumed at 10 : 11 p . m.
with all members noted above present.
REZONE:
C, F. BARTOW FITE ; Appl . R-893-76 ; rezone from G to M-P ; property
located on West Valley Highway approx. 450 ' north of S . W. 43rd
St.
Staff review of the subject application was requested by the Vice-
chairman .
The Planning Director described the property location , size , sig-
nificant development in the area , Comprehensive Plan designation ,
and character of the site . He noted that there are no develop-
ment plans at present. It was decided not to view slides of the
area .
Comments from the applicant were invited by the Vice-chairman .
Bartow Fite , 5010 - 92nd S . E . , Mercer Island , noted that adja-
cent property to the north is zoned M-P ; the Comprehensive Plan
J/e./Cf aJ ,\ ee, nC
Renton Planning Commission
Meeting November 10 , 1976
Page Nine
disrupt , that installation of sidewalks could possibly affect
the grade of Meadow, and that he is willing to file restrictive
covenants agreeing to participation for a future L . I . D. should
a waiver be granted.
As there were no questions of the applicant , the Vice-chairman
invited comments in favor of the application from the audience .
None were offered . She then called for comments in opposition .
Jerry Davis , 2407 Meadow Ave . No . , inquired regarding the spe-
cifics of the application . Mr. Ericksen explained the proposal ,
noting ordinance requirements and willingness of the applicant
to agree to covenants requiring participation in an L . I . D . at a
later date. Mr. Davis then indicated that he was not opposed
to the request .
Discussion followed regarding the lack of off-site improvements
and a street elevation system for the area , and IT WAS MOVED BY
TEEGARDEN , SECONDED BY MOLA , THAT THE PUBLIC HEARING BE CLOSED .
MOTION CARRIED. The following action ensued :
ACTION:
MOVED BY MOLA, SECONDED BY TEEGARDEN, THAT THE COMMISSION APPROVE
AN INDEFINITE DEFERRAL OF OFF-SITE IMPROVEMENTS SUBJECT TO Tt1E
FILING OF RESTRICTIVE COVENANTS REQUIRING PARTICIPATION IN A
FUTURE L. I. D. INITIATED BY THE NEIGHBORHOOD OR CITY INITIATION
OF OFF-SITE IMPROVEMENTS.
There was further discussion regarding the character of the area
and justification for the request .
On the question , MOTION CARRIED, Gist dissenting.
6 - ADMINISTRATIVE :
A. COMMITTEE REPORTS
1 . LAND USE COMMITTEE
Chairman Teegarden advised that the committee had met
on November 3rd with the Kennydale community representa-
tives regarding the Comprehensive Plan in the No . 30th
and Park Ave. No . area , and a written report to the
Commission will be forthcoming shortly . Commissioner
Teegarden advised that a memorandum is being sent to
the Special Studies Committee relative to the Glen
Norwood rezone request in the area advising them of
the Kennydale residents position on the matter.
The next meeting of the Land Use Committee is scheduled
for November 17 , 1976 , to consider the Comprehensive
Plan in the Ripley Lane Planning Area .
2 . SPECIAL STUDIES COMMITTEE
Y- ' Chairman Wik called a meeting for November 18 , 1976 ,
at 7 : 30 p . m. to consider the Stoneway Concrete Company
rezone request .
B. OTHER
1 . MEETING WITH CITY OF TACOMA OFFICIALS
Vice-chairman Walker reported to the Commission regard-
ing the meeting with the Tacoma Planning Commission ,
Hearings Examiner, and Planning Department representa-
tives on November 4th . She noted that she had written
Renton Planning Commission
Meeting November 10 , 1976
Page Ten
a report concerning the implementation of the system ,
current composition and role of the Planning Commission ,
relationship and liaison with the Hearings Examiner
and Council , formulation of goals and policies , and
areas of review. It was decided that a thank you
letter should be written to the Tacoma representatives
from the Acting Chairman .
PLANNING COMMISSION - COUNCIL LIAISON
Vice-chairman Walker indicated that it had been sug-
gested that either the Planning Commission or a com-
mittee from the Planning Commission meet with the
Planning and Development Committee in view of estab-
lishing a liaison between the two groups .
All Commissioners indicated an interest in meeting
with the Council committee . It was requested that the
Planning Director indicate that some of the members
could meet on November 17th at 4 : 30 p . m.
3. COMMUNITY DEVELOPMENT PLAN - HOUSING ASSISTANCE PLAN
Copies of the Community Development Plan and Housing.
Assistance Plan were distributed for Planning Commis .-
sion information .
As there was no further business before the Commission , IT WAS MOVED
BY GIST, SECONDED BY TEEGARDEN , THAT THE MEETING BE ADJOURNED .
MOTION CIRRI ED.
The meeting was adjourned at 11 : 30 p . m.
1
C.,/
Sandra- Gist , Secretary
Joan Walker , Vice-chairman
11111
NOTICE OF PUBLIC HEARING
RENTON PLANNING COMMISSION
RENTON , WASHINGTON
A PUBLIC HEARING WILL BE HELD BY THE RENTON PLANNING COMMISSION AT ITS
REGULARREMBERIN IN THE COUNCIL CHAMBERS , CITY HALL , RENTON , WASHINGTON ,
ON 19 AT 8 : 00 P . M. TO CONSIDER THE FOLLOWING
PETITIONS :
1 . VARIANCE FROM THE SHORELINE MASTER PROGRAM REQUIREMENTS ;
file No . V-880-76 ; property located in the vicinity of
2700 Mountain View Ave . No .
2 . REZONE FROM G TO B- 1 ; file No . R-889-76 ; property located at
the southwest corner of Sunset Highway and 138th Ave . S . E .
F- 3 . REZONE FROM R- 1 AND S- 1 TO R-1 , R-2 , R-3 AND R-4 ; file No .
R-891-76 ; property located east of SR- 169 (Maple V alley
Highway ) south of Monterey Terrace and Mt . Olivet Cemetery
and west of Bonneville Power Right-of-Way .
4 . REZONE FROM R- 1 TO B-P ; file No . R-892-76 ; property located
at 437 South Whitworth Ave .
5 . REZONE FROM G TO M-P ; file No . R-893-76 ; property located on
West Valley Highway approx . 450 ' north of S . W . 43rd St .
6 . REZONE FROM G TO M-P ; file No . R-894-76 ; property located on
Lind Ave . S . W. and S . W . 10th St . within Earlington Industrial
Park .
7 . SITE APPROVAL FOR OFFICE/WAREHOUSE IN AN M-P ZONE ; file No .
SA-895-76 ; property located on Lind Ave . S . W . and S . W . 10th
St . within Earlington Industrial Park .
8 . WAIVER OF OFF-SITE IMPROVEMENTS FOR A TWO LOT SHORT PLAT ;
file No . W-888-76 ; property located at 2415 Meadow Ave . No .
Legal descriptions of all applications noted above on file in the
Renton Planning Department .
ALL INTERESTED PERSONS TO SAID PETITIONS ARE INVITED TO BE PRESENT AT
THE PLANNING COMMISSION MEETING ON NOVEMBER 10 , 1.97.6
AT 8 : 00 P . M. TO EXPRESS THEIR OPINIONS .
SANDRA GIST , SECRETARY
PUBLISHED October 31 , 1976 RENTON PLANNING COMMISSION
CERTIFICATION
I , MICHAEL L . SMITH HEREBY CERTIFY THAT THREE COPIES OF THE ABOVE
DOCUMENT WERE POSTED BY ME IN THREE CONSPICUOUS PLACES ON THE PROPERTY
DESCRIBED ABOVE AS PRESCRIBED BY LAW.
ATTEST : Subscribed and sworn
to before me , a Notary Public , SIGNED,., L_/_
on the 28thday of October
19 76 ---
PREL1MINAyRY
RENTON PLANNING DEPARTMENT SUBJECT TO REVISION
STAFF REPORT
NOVEMBER 10 , 1976
APP _ ICANT : STONEWAY CONCRETE , INC .
APP _ ICATION : REZONE FROM R- 1 , S- 1 , AND GS- 1 TO R- 1 , R-2 ,
R-3 , and R-4 ; ALSO HILLSIDE AREA TO REMAIN
AS GREENBELT .
LOCATION : East of SR169 (Maple Valley Highway ) south
of Monterey Terrace and Mt . Olivet Cemetery
and west of the powerline right-of-way .
FINDINGS AND
COM1ENTS : 1 . Request is compatible with the Comprehen-
sive Plan as amended on March 8 , 1972 , per
Ordinance #2708 .
2 . Existing street (Blaine Ave . N . E . ) does not
have the capability of handling additional
traffic from such higher densities . At
least two additional access roads will be
necessary .
3. Proposal would establish single family
residential and low density multiple
residential south of Monterey Terrace
with graduated increase in density east-
ward away from Monterey Terrace .
4 . Other City departments had concerns regard-
ing adequate access , utilities , and pro-
tection of adjacent properties .
5 . Provisions for restrictive covenants may
be necessary to provide binding agreement
for proper access , utilities , greenbelt
and open space provisions , and development
by City P . U . D . Ordinance only .
DECISION
CONSIDERATIONS : Referral to Special Studies Committee for study
and report .
ZONING DESIGNATIONS FOR STONEWAY SITE
The following general descriptions should apply to the particular
zoning classification established on the property described below :
R- 1 ( BUFFER AREA) - PARCEL A
The easterly 470 feet of the westerly 720 feet of the
northerly 100 feet of the above described property .
R-2 - PARCEL B
The easterly 800 feet of the westerly 1100 feet of the above
described property ; except the R- 1 area ( Parcel A) and
except that portion defined as greenbelt on the Comprehensive
Plan as revised on May 17 , 1972 , and noted as the hillside
area along the south property line and northeast of Maple
Valley Highway (SR- 169 ) .
R-3 - PARCEL C
The westerly 800 feet of the above described property except
the southerly 1380 feet of the easterly 300 feet thereof .
R-4 - PARCEL D
The northerly 1100 feet of the westerly 300 feet of the
above described property , except the northerly 300 feet
thereof.
GREENBELT - PARCEL E
That portion defined as greenbelt on the Comprehensive Plan
as revised on May 17 , 1972 , and noted as the hillside area
along the south property line and northeast of Maple Valley
Highway ( SR- 169 ) .
LEGAL DESCRIPTION OF ENTIRE STONEWAY SITE
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M . described as follows :
Beginning at the Southwest corner of the Southeast
one-quarter of the Northeast one-quarter of said Section
17 ; thence north along the West line of said subdivision
a distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89 °45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. # 169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89 °45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
1 i ..,,..
7, ••,1, \A 0.,;...., ,. .,,..: ,,-;,,1: ,, : # V.7.
1.--,...i...-!/\,-...... .:, : ". '
9 if i I I
7.Is:j:
III/
4' ,
Oti ';tr .1 \ '
j\ •
I I • r
r:11,1 i it' / • 11
I . A ‘`,00111,E3,4''''. ' -. ' I A
1 I /
4„,r .
1 /'V
C
t
GetT
STONEWAY CONCRETE , INC .BI =I;
n,rawEr
REZONE
4 CEMETERY I •
TI /, _._.. 0,
p—I way 4
RENTON GITY •LIMITS 7. •!
111 ,II ,,//,
1 r\ \
Ks- i
1
N'
V
1
t-,i.-
si*. ,..,,
1/44
IR'
34, .411-'.'. '.
f..-.a....'..
4..',.„.
4_•
0-.
A; _P•O1\—
I'
II
I'
I4
t
i
I'
Y,
I‘
1
I
1‘
I'
T
It‘,‘,,.,
7
5 .. .
Flt.
4‘:.4•.
le.
iIIIi•':
a 1'..
lr1 j..f
Amy/ r`
1
G
A'tarb% , , .--- '''• .4'
1 1
1I
py]
j
1 ,
Ay \1 '
REZONE :
STONEWAY CONCRETE , _INC. ; _Ap_p_1__ No . R-891-76 ; rezone from_ R- 1 and S- 1_ to
R- 1 , R-2 , R-3 , and R-4; property located east of SR- 169 (Maple Valley
Ifighway) south of Monterey Terrace and Mt. Olivet Cemetery and west of
Bonneville Power Right-of-way .
i-43 . 1 acres with
APPLICANT STONEWAY CONCRETE , INC . TOTAL AREA 24.0 buildable area
PRINCIPAL ACCESS East side of Mt . Olivet Cemetary .
EX! S.IING ZONING R- 1 , S- 1 and GS- 1
EXISTING USE Abandoned gravel pit .
Rezone to Higher Density from R-1 through R-4 for
PROPOSED USE future residential development.
Single family, low density, medium density
COMPREHENSIVE LAND USE PLAN and high density multi-family; greenbelt 1
along steep hillside above Maple Valley Highway.
COMMENTS
i
t
1LL4
Ifr .-•-
SidnPe.- )'j
V It
Affidavit of Publication I
I 1- ;1
Col'NTY 111' KING c
ss.
trtt.-q2'A Cff,•n: ' ne being first duly sworn on
NOTICE OF SITE IMPROVEMENTS
p
he c h i e f clerktr'< PUBLIC HEARING FOR A TWO LOT SHORT
outh.dcdeposes is of RENTON PLANNING PLAT; file No. W-888-76:
TIIE RENTON RECORD-CHRONICLE,a newspaper published four(4) COMMISSION property located at 2415
times a week.That said newspaper is a legal newspaper and it is now and RENTON, WASHINGTON Meadow Ave. No.
has been for more than six months prior to the date of publication referred A PUBLIC HEARING Legal descriptions of all
to. printed and published in the English language continually as a news- WILL BE HELD BY THE applications noted above on
paper published fi ur t4 t times a week in Kent,King County,Washington, RENTON PLANNING COM- file in the Renton Planning
and it is now and d iring all of said time was printed Man office maintained MISSION AT ITS REGU- Department.
lit the atoresa:d p:.,ce of publication of said newspaper. That the Renton LAR MEETING IN THE ALL INTERESTED
Record-Chronicle has been approved as a legal newspaper by order of the COUNCIL CHAMBERS, PERSONS TO S AI 0superiorCourtoftheCountyinwhichitIspublished,to-wit,King County, CITY HALL, RENTON, PETITIONS ARE INVITED
W A S H I N G T O N, ON TO BE PRESENT AT THE
eo t i c e c f a uLl i s NOVEMBER 10, 1976, AT PLANNING COMMISSIONWashingtonThattheannexedisa
8:00 P.M. TO CONSIDER MEETING ON NOVEMBER
C'tt2'tr 2 i'Zn'''1'll:lr? Conitnis::icn — Pet ii: '-s
THE FOLLOWING 10, 1976AT8:00P.M. TO
PETITIONS: EXPRESS THEIR
1. VARIANCE FROM OPINIONS.
THE SHORELINE MASTER Sandra Gist.
as it was published in regular issues(and PROGRAM R E - Secretary
not in supplement form of said newspaper) once each issue for a period QUIREMENTS; file No. V- Renton Planning
880-76; property located in Commission
the vicinity of 2700 Mountain Published in the Renton
C.,a View Ave. No. Record-Chronicle October
of consecutive issues,commencing on the 2. REZONE FROM R•1 31, 1976. R4026 •
AND S-1 TO R-1, R-2, R-3
l day of October 19 76 ,and ending the property]ilatedeastofSR-
169(Maple Valley Highway)
south of Monterey Terrace
day of 19 both dates and Mt.Olivet Cemetery and
Inclusive• and that such newspaper was regularly distributed to its sub- west of Bonneville Power
scribers during all of said period. That the full amount of the fee Right-of-Way.
3. REZONE FROM R-1
TO B-P; file No. R-892-76:
charged for the foregoing publication is the sum of $.?.3.!.-3,`•'which property located at 437
has been paid in full at the rate of per folio of one hundred words for the South Whitworth Ave.
first insertion and per folio of one hundred words for each subsequent 4.REZONE FROMGTO
insertion.M-P; file No. R-893-76;
i property located on West
Y
Gis.6 •.. k:it !:.'-<: 2 c r w.
Valley Highway approx.450'
north of S.W. 43rd St.
5.REZONE FROM G TO
chief clerk M-P; file No. R-894-76:
property located on Lind
Ave.S.W.and S.W.10th St.
Subscribed and sworn to before me this 31 day of within Earlington Industrial
Park.
1 6. SITE APPROVAL
C ..00er 19
7...(b, FOR OFFICE/WARE•
1 HOUSE IN AN AM-P ZONE:
Ni, 1, si t
file No.SA-895-76;property
located on Lind Ave. S.W.
Notary Public in and for the State of Washington, and S.W. 10th St. within
residing at Kent, King County. Earlington Industrial Park.
7. WAIVER OF OFF-
Passed by the Legislature.1955,known as Senate Bill 281,effective June
9th. 1955
We,tcrn I•nt•'n Telegraph Co. rules for counting words and figures,
oloplea I lie iic\%•papers of the state
4,4
1111
PUILIC NOTCE
PUBLIC HEARING
CITY OF RENTON
PLANNING COMMISSION
A PUBLIC HEARING WILL BE HELD BY THE RENTON PLANNING COMMISSION
IN THE COUNCIL CHAMBERS, CITY HALL, RENTON, WASHINGTON, ON
NOVEMBER 10, 1976 - 8:00 P.M.TO CONSIDER THE ITEM
DESCRIBED BELOW:
REZONE :
STONEWAY CONCRETE , INC . ; Appl . No . R-891-76 ; rezone from R- 1 and S- 1 to
R- 1 , R-2 , R-3 , and• R-4 ; property located east of SR- 169 (Maple Valley
Highwayl south of Monterey Terrace and Mt. Olivet Cemetery and west of
Bonneville Power Right-of-way.
Q
7j iii L.1.' k1/'
a
NON•
G
I
N, B.I ;It as STONEWAY CONCRETE , INC .
a ale: 1+ \Mr o
TER -..
GS1 , ;
R E Z O N E
N irua CEA ETERv I
1
y.\719;17/L of '
i RENTON CITY LIMITS' 1 r
1 q / I •
z..'
1, //,//' 1
1
ram. S_ I j
1
1
L•
Q2. 11
1
3m
r 1 1
1; f •• 1 grit.. ..r, :.r...tjt
4 ' .G 1
11774
THE PUBLIC IS INVITED TO ATTEND AND TO EXPRESS OPINIONS OR SUBMIT
COMMENTS IN WRITING,
IF ADDITIONAL INFORMATION IS DESIRED, CONTACT:
CITY OF RENTON - PLANNING DEPARTMENT, 235-2550
MUNICIPAL BUILDING, 200 MILL AVE. S.
RENTON, WA. 98055
EXHIBIT "A"
PARCEL "A"
The west 850. 32 feet of the north 100 feet , ( the west
850. 32 feet being measured along the North line , and the north
100 feet being measured at right angles to the North line )
of the following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W . M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel "A" lyino within the Green-
belt area as shown on the Comprehensive Plan revision dated
May 17 , 1972 , said Greenbelt area also known as Parcel " E " .
PARCEL " B"
The west 1180. 32 feet , as measured along the North line ,
of the following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township
23 North , Range 5 East , W . M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17 " east a distance of 526 . 41 feet ; thence south
38°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 (St . S . R . #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17 " west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel " B" lying within the
north 100 feet of the west 850. 32 feet , as measured at right
angles to and along the North line thereof. This exception
also known as Parcel "A" .
ALSO except any portion of said Parcel " B" lying within
the Greenbelt area as shown on the Comprehensive Plan revision
dated May 17 , 1972 , said Greenbelt area also known as Parcel
E" .
PARCEL " C"
The east 799 feet as measured along the North line of the
following described main tract :
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W . M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. #169) (Maple Valley Highway) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
Except any portion of said Parcel " C" lying within the
Greenbelt area as shown on the Comprehensive Plan revision
dated May 17 , 1972 , said Greenbelt area also known as Parcel
E"
ALSO except the area known as Parcel "D" and more partic-
ularly described as follows :
Beginning at the Northeast corner of the above described
main tract :
Thence southerly along the easterly line thereof a distance
of 300 feet to the true point of beginning ; thence westerly
parallel with the North line of the main tract herein
described a distance of 300 feet to an intersection with
a line which is parallel with and 300 feet westerly of ,
as measured at right angles to , the east line of said
main tract ; thence southerly along said parallel line to
an intersection with the northeasterly line of the Green-
belt area as shown on the Comprehensive Plan revision ,
dated May 17 , 1972 , said Greenbelt area also knownias
Parcel " E" ; thence southeasterly along the Northerly line
of said Greenbelt area to an intersection with the East
line of said main tract ; thence northerly along the East
line thereof a distance of 800 feet more or less to the
point of beginning .
2-
PARCEL "D"
Beginning at , the NE corner of the MAIN TRACT as described
below .
Thence southerly along the easterly line thereof a distance
of 300 feet to the true point of beginning ; thence westerly
parallel with the North line of the main tract herein des-
cribed a distance of 300 feet to an intersection with a
line which is parallel with and 300 feet westerly of , as
measured at right angles to , the East line of said main
tract ; thence southerly along said parallel line to an
intersection with the northeasterly line of the Greenbelt
area as shown on the Comprehensive Plan revision dated
May 17 , 1972 , said Greenbelt area also known as Parcel
E" ; thence southeasterly along the northerly line of the
Greenbelt area to an intersection with the East line of
said main tract; thence northerly along the East line
thereof a distance of 800 feet more or less to the point
of beginning .
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17 " east a distance of 526. 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R . #169) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89045 ' 17 " west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
PARCEL " E"
All that portion of the following described main tract
designated as a Greenbelt area as shown on the Comprehensive
Plan revision dated May 17 , 1972 .
MAIN TRACT :
All that portion of the Northeast one-quarter and of
Government Lots 7 and 3 within Section 17 , Township 23
North , Range 5 East , W . M . described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 (St . S . R. #169 ) (Maple Valley Highway) ; thence in
3-
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17 " west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17 " east a distance of
653. 91 feet to Point "A" and the true point of beginning .
4-
I I 1 III IfI NI MI \sloe r r r.....•.
N. . 7t.At 3
I 1.•71:7••••....:----------.117.......:-..:17::.---...
I.A
r' .
ctA.
p
1
Feit
Y. ;e. C'1
HG.W11121
1
1.60 Ac. EJd- ' 7. Ar
t
c '
I:.bl1vt '
Y•,-
y O.Jt MT.OLIVI I ChMIICHY
p 1 JI. 0 44 AC.
1 S111
W e K01 17 I 1 (V 2 I
S• 0)54.
gf.I''-
1
1. • I1711I
4
I 11i. 7 ,
It i 4d• ki -. 101 -_a' iiii
1 8
1
0 .re' 4 ., (C 12 3 09 n
O
Q
I+
I-
ERRA y.
a
p.It MI ' TI lin ' 12 A
T 1
I:;xc. w_s cv W a- 1iT..,[IVEI_ M IER_Y 'Q'°o
W Il
li
r
co '. ' _Z
2 \ --'- l•r)A: i'----1. 7 2 1
n 4j 1 0
vdd. ,. 1 V ' n J0Tp J 1 1 1 u w 4
t5 y ly 1 ''` 4. '1.
CMIEHY rrr,•,iis:Nl-- '
w,
I Ir 4 < Z — I
V •
6 Cd' 3 : ri: `1-{Ott} C 4 11 395Ac. an
213AC ,:
rerl' f 4iVw t
7 ti /D ir' ' I C _
M .
s r r • 9 PY
7:3' • 1
1
fl'
sue r V 0
j c2, rT..A. ri 4r Acre3
61
o
17 12
510 1-WAY SAND C GRAVE! co A
A 1 i le
io•sm*
I •
v\ .\ '
idtsb •
i
it
r A8 -gAUIStir A \. .
coAc. V>11141katdr)'' rr.rr
I4l P
r•
r •t`r `\
1
I
INIERPACE CORP l`
N.:7 .
0. 1% ', t^ 4E. gij 1,..:).i
tn1. ,..
Ncc-Ns _
It GCV.t. I-ot I it. \46,
y`•' 1 '1 Ares, •'N r;:'(
1,..
CISIIANE \`, f'f
s'. \•
I;, ,..:.'..,,.." iv>.,„ „, i'
I /I4S,11
ri.;....4;
p(/, t.4,y1
r
i 6 L .. a Itr.
i
1. y;
S
V
O
lib, 1
I r 7
Public Notices Public Notices
NOTICE OF SITE IMPROVEMENTS
PUBLIC HEARING FOR A TWO LOT SHORT
RENTON PLANNING PLAT; file No. W-888-76:
COMMISSION property located at 2415
RENTON,WASHINGTON Meadow Avo. No.
A PUBLIC HEARING Legal descriptions of all
WILL BE HELD BY THE applications noted above on
RENTON PLANNING COM- file in the Renton Planning
MISSION AT ITS REGU- Department.
LAR MEETING IN THE ALL INTERESTED
COUNCIL CHAMBERS, PERSONS TO SAI D
CITY HALL, RENTON, PETITIONS ARE INVITED
WASHING-ION, ON • TO BE PRESENT AT THE
NOVEMBER 10, 1976, AT PLANNING COMMISSION
8:00 P.M. TO CONSIDER MEETING ON NOVEMBER,
THE FOLLOWING 10, 1976 AT 8:00 P.M. TO
PETITIONS: EXPRESS THEIR
1. VARIANCE FROM OPINIONS.
THE SHORELINE MASTER Sandra Gist,
PROGRAM RE - Secretary
QUIREMENTS; filo No. V- Renton Planning
880-76; property located in Commission
the vicinity of 2700 Mountain Published in the Ronton
View Ave. No. Record-Chronicle October
2. REZONE FROM R-1 31, 1976. R4026
AND S-1 TO R-1, R-2, R-3 I
AND R-4;filo No.R-891-76;
property located east of SR-
169(Maple Valley Highway)
south of Monterey Terrace
and Mt.Olivet Cemetery and
west of Bonneville Power
Right-of-Way.
3. REZONE FROM R-1
TO B-P; filo No. R-892-76;
property located at 437
South Whitworth Ave.
4.REZONE FROM G TO
M-P; file No. R-893-76;
property located on West
Valley Highway approx.450'
north of S.W. 43rd St.
5.REZONE FROM G TO
M-P; filo No. R-894-76;
property located on Lind
Ave.S.W.and S.W.10th St.
within Earlington Industrial
Park.
6. SITE APPROVAL
FOR OFFICE/WARE-
HOUSE IN AN AM-P ZONE;
file No.SA-895-76;property
located on Lind Ave. S.W.
and S.W. 10th St. within
Earlington Industrial Park.
7. WAIVER OF OFF-
4.•,s i
s r
µV
0,i i. Via!fi a
tt •
M
r
ROUT= SCHEDULE
PLANNING DEPARTMENT DATE ROUTED I D/id'/7
PLEASE REVIEW THIS APPLICATION FOR:
ZONE S'jb1'.-VIAJA)/ 2 fjc MAJOR PLAT
SITE APPROVAL SHORT PLAT
SPECIAL PERMIT WAIVER
SHORELINE MANAGEMENT
PERMIT OR EXEMPTION
AND RETURN TO THE PLANNING DEPARTMENT
WITH ANY COMMENTS YOU MIGHT HAVE , BEFORE ///LS/7L
SIGNATURE
OR
INITAL DEPARTMENT APPROVAL DENIAL DATE
A' -/_,i,UILI GX I_
1 TRAFFIC ENG X l' -(- __.„; 1.
f",
ENGINEERING G,/ '
4-
o _20-7-6
FIRE t/ # D/•?G/7(
HEALTH
P U1,I, )t( l'Ae. ir)1265-6
REVIEWER ' S COMMENTS OR APPR VAL CONDITIONS :
x c- , n
6
k v4- I f + TN mil'i , ,. s CJ(itir,t t>r+G. ern 2 v, c,-I '" ,r./. u../c y fr st , r /.
j, ;i. /r, 1- 7' i. r( // '//'/!.
C;!
v-V,' , , . • 01, 67 U,- 1<;L rc,,J). o! . < e I-r ,
PLEASE SIGN THE E . I . W , :
z•i.",P:•:,igtkir-ici. 4z1i-
y ,fir
S ..
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
II
TO : Finance Department
Fire Department
Library Department
Park Department
Police Department
Public Works Department
Building Div. Traffic Engineering Div .
Engineering Div . Utilities Engineering Div.
FROM : Planning Department , (signed by responsible official or his
designee)
j d q ,&t=L. S... . Mc-1-4
SUBJECT : Review of ECF- Application No . :
Action Name : c- o J WA1 C.,2,-IutAr.`1- (A c.
Please review the attached . Review requested by ( date) :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : 02_D 6
Comments : 7 ,1) A 7
2.-. tl i -
C --^
7
C-P -''.7:te;•,"C.' 7 -airer"------- 1 .2-
Signature of Dir r or Authorized Representative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department : L.¢ '.G
tl..l.. •/G._„_. t,, /
Comments : >-; c. e-•r/: ,/,-.s.-r G.,i/,c-d oG ,yo/
4,/Nlt a s der`%;cad 6y ``>t.i. ..s c%1 r Gd /G-57 40•/eq/f.f.rzi-0,,,iv o:, 1/
J .`/ -1i C...Y /.....fro•..c./ .:.lrG. r7c.. c ii/I'c,ri ii r/ i7rr-ate
J,+lid /JAeit'
6
Signature of Director or Authorized Representative Date
6-76 OVER)
REVIEW BY OTHER CITY ,tPARTMENTS :
Department : v4% Id-r 5
Comments : /3't Z,,,F,,,,i,1 L 2 'd o Gq06 t uJtJv 4SSc, s
50-4-c f o t y s 11 J,,,/4 h dkv /11 cif,(c V' f/9, i /ri il.r cy
w dreA m ;...s Iive.,/G!lc 0,,., C ry gia,/ - /1/c 3 ``'V-
5'Ac I S ,5.+ .I 10 u 4- (t 7l,-J A£SC S.r~fs " Sac. ca t 7),e,,-
r (' , c'ki d/$ .
t,Q,-512 2. 13_4„4:7_,-D-4 ---- 0/242_6
Signature of Director or. Author6'zed Representative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department : 7 yfre 6 7 / -., -y /:1
Comments : f/,e e/ 47 Cc .S s' ,/ ;,
c....(, ,i .
lc, -7,- ii///if ) e- Gr S:4 . e / 4i .S .l it'c/ 4)/J' .1/411 7l_
r 1a U 717 :t.../11./ 6.) ./.,7" Cl
e/ e k/e z„S- c.?,;i e C 0 r./c: /..?
o i(i.>
L
c
Cam!-- , r-; 4 ..(/ -/T i 2,2j-e
Signature of Director or Authorized Rep 'entative ate—
REVIEW BY OTHER CITY DEPARTMENTS :
Department : -7'1 -
7 Comments 2, o o/(7 j 45-47/5 OC C-(c;e"'G S iv i21-Z-
nie64- c ) G4/I Vi? A/4r/c,S /tiro iV Yore li 77-.S 73 )36 ht/s//i/cc.:"
D 1 S 0, .S'eh'2=cic .5 / -'9 0 i ix o/CU ie% .
2/c" 4.—/7
r i/( /"G alx.J.
Signature of Director or Authorized Representative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department : (•PjQ._,,,
Comments :f
c a---A-.1.C-'(-- --__.-_ ,
2-- L-4:-/--"-t • ---74 .,(...---.-fr--x-2,- - 4.-,...,_ t'.._., A...c..(._A- _,L.- .:_._, Z.
A.-tom.. /- r//qf76,
Sign ture of Direc or or uthorized Representative Date
CITY OF RENTON, WASHINGTON
ENVIRONMENTAL CHECKLIST FORM
a R EhII_b c)
FOR OFFICE USE ONLY OCT 11 NZ'
Application No. J 7" - '/‘
1'.
Environmental Checklist No. eG•/Po' 7C
PROPOSED, date:FINAL , date :
N'
ElDeclaration of SignificanceDeclaration of Significance
ElDeclaration of Non-Significance . ; .. Declaration of Non-Significance
COMMENTS :
Introduction The State Environmental Policy Act of 1971. Chapter 43.21C, RCW, requires
all statU and local governmental agencies to consider environmental values both for their
own actions and when licensing private proposals . The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment .
The purpcse of this checklist is to help the agencies involved determine whether or not a
proposal is such a major action.
Please answer the following questions as completely as you can with the information
presently available to you. Where explanations of your answers are required , or where
you believe an explanation would be helpful to government decision makers , include your
explanation in the space provided, or use additional pages if necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant to :he answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
The following questions apply to your total proposal , not just to the license for which
you are currently applying or the proposal for which approval is sought . Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
of the agencies which will be involved to complete their environmental review now, with-
out duplicating paperwork in the future.
NOTE : This is a standard form being used by all state and local agencies in the State
of Washington for various types of proposals . Many of the questions may not apply to
your proposal . If a question does not apply, just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
I . BA:KGROUND
1 . Name of Proponent toneway Concrete, Inc.,
2 . Address and phone number of Proponent :
P. 0. Box 509
Renton, WA. 98055
226-1000
3. Date Checklist submitted 10-11-76
4. Agency requiring Checklist City of Renton Planning Department
5. Name of proposal , if applicable:
Renton Highlands
6. Nature and brief description of the proposal (including but not limited to its
size, general design elements , and other factors that will give an accurate
understanding of its scope and nature) :
Rezone of property approved for _onmprebensive land use plan under
Ordinance No. 2708 on May 8, 1972 with declaration of Restrictive
Covenants. Zoning of area request is for partial R-1, R-2, R-3
and R-I# and open apace as depicted on "Stoneway Exhibit A" dated
March 8, 1972.
2-
7. Location of proposal (describe the physical setting of the proposal, as well
as the extent of the land area affected by any environmental impacts , including
any other information needed to give an accurate understanding of the environ-
mental setting of the proposal ) :
Located east of SR 169 (Maple Valley Highway), south of Monterey
Terrace and Mt. Olivet Cemetery, west of Bonneville Power right of way.
8. Estimated date for completion of the proposal :
Unknown - rezone only
9. List of all permits, licenses or government approvals required for the proposal
federal , state and local--including rezones) :
Rezone
10. Do you have any plans for future additions , expansion, or further activity
related to or connected with this proposal?- If yes, explain:
No
11. Do you know. of..any plans by others which may affect the property covered by,
your proposal? .• If yes , explain: '
Yes. If rezoned and sold, to be used for multiple housing per
restrictive covenants.
12. Attach any other application form that has been completed regarding the pro-
posal ; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
Attached - Comprehensive Land Use approval..
II . ENVIRONMENTAL IMPACTS
Explanations of all "yes" and "maybe" answers are required)
1) Earth. Will the proposal result in:
a) Unstable earth conditions or in changes in geologic
substructures?
Pry-' MAYBE
b) Disruptions , displacements , compaction or over-
covering of the soil ?
YES ' MAYBE NO
c) Change in topography or ground surface relief
features? X
MIT Nir-
d) The destruction, covering or modification of any
unique geologic or physical features?
Trf-. MAYBE NO
e) Any increase in wind or water erosion of' soils ,
either on or off the site?
VET- RIMY NO
f) Changes in deposition or erosion of beach sands , or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake? X
1717- ' MAYBE ill
Explanation: r
1
3-
2) Air. Will the proposal result in:
a) Air emissions or deterioration of ambient air .
quality? X
Yam- MAYBE NU—
b) The creation of objectionable odors? . + ?
YES MAYIX NO-- •
c) Alteration of air movement, moisture or temperature,
or any change in climate, either locally or
regionally? X
YE$ MAYBE NO
tr'
Explanation:
3) Water. Will the proposal result in:
a) Changes in currents , or the course of direction of
water movements, in either marine or fresh waters? X
E— MAYBE NO
b) Changes in absorption rates, drainage patterns , or
the rate and amount of surface water runoff?X
YES MAYBE 0—
c) Alterations to the course or flow of flood waters?
YES MAYBE NO
d) Change in the amount of surface water in any water Xbody?
YES MAYBE. NO
e) Discharge into surface waters , or in any alteration
surface water quality, including but not limited to
temperature, dissolved oxygen or turbidity? X
YES MAYBE W-
f) Alteration of the direction or rate of flow of
Xgroundwaters?
YES MAYBE NO
g) Change in the quantity of ground waters , either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations? . IC
Y T AIAYYBE ,NO
h) Deterioration in. ground water quality, either through
direct injection, or through the seepage of leachate,
phosphates , detergents , waterborne virus or bacteria ,
Xorothersubstancesintothegroundwaters?
YES MAYBE NO
i ) Reduction in the amount of water otherwise available
for public water supplies?
YES MAYBE i
Explanation:
4) Flora. Will the proposal result in:
a) Change in the diversity of species, or numbers of any
species of flora (including trees , shrubs, grass , crops ,
microflora and aquatic plants)?
Y€s-, MAYBE 6—
b) Reduction of the numbers of any unique , rare or '
endangered species of flora?
YT MAYBE NO
c) Introduction of new species of flora into: an area , or
in a barrier to the normal replenishment of existing
species?
PEA- MAYBE 6
d) Reduction in acreage of any agricultural crop?
YrS MAYBE
Explanation:
q-,
5) Fauna. Will the proposal result in:
a) Changes in the diversity of species. or numbers of
any species of fauna (birds , land animals including
reptiles, fish and shellfish, benthic organisms .
insects or microfauna)? g
YES MAYBE N0
b) Reduction of the numbers of any unique, rare or
endangered species of fauna? X
YES MAYBE NO
W. , Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement
of fauna?
YES MAYBE NO
d) Deterioration to existing fish or wildlife habitat?
VET— MAYBE ND-
Explanation:
6) Noise. Will the proposal increase existing noise ' levels?
YES MAYBE NO
Explanation:
7) Light and Glare. Will the proposal produce new light or
glare? X
Pam- MAYBE AD
Explanation:
8) Land Use. Will the proposal result in the alteration of the
present or planned land use of an area?
VET Wit W
Explanation: S-1 to R-2, R-3, R-4 zoning
9) Natural Resources. Will the proposal result in:
a) Increase in the rate of use of any natural resources? X
YES MAYBE NO
b) : Depletion of any nonrenewable natural resource?
YES MAYBE NO
Explanation:
10) Risk of Upset. Does the proposal involve a risk of an
ex— plosion or the release of hazardous substances (including,
but not limited to, oil , pesticides , chemicals or radiation)
in the event of an accident or upset conditions? X
YET— MAYBE NO
Explanation:
11) Population. Will the proposal alter the location, distri-
bution, density, or growth rate of the human population
of an area? X
YES MAYBE NT—
Explanation: Rezoned for higher density population
5-
12) Housing. X Will the proposal affect existing housing, or, ,
create a demand for additional housing?
YES MAYBE NU
E x p l a n a t i o n: I1,1 011d1,A.„eA 1 eJt.[_.c.C4,
smJJ .'neeslq J'a esiflIIJu; on esri bned
13) Transportation/Circulation. , Will the proposal result in:
a) Generation of additional vehicular movement?YES MBE NO
b) ' •Effects on existing parking facilities, or demand
IVY-new parking?
YES M YBE NO
c) Impact upon existing transportation systems?
X MATTE N O
d) Alterations to present 'patterns of circulation or ,
movement, of people and/or goods? C
YTS- MMAYBE NO
e) Alterations to waterborne, rail or air traffic?
YES MAYBE NO
f) Increase':in .traffic hazards to motor, •vehicles,
bicyclists 'or pedestrians?
s 1 . YET- MAYBE H
Explanation: Higher ranei+y than pow zoned
14) Public Services. Will the 'proposal have an .effect upon, or
result in a need for new or altered governmental services
in any of the following areas :
X
a) Fire protection?
VET- MAfBE N
b) 'Police protection? '
YES MAYBE 0-
c) Schools? gIva-,MAYBE.r. -.'
d) . Parks or other recreational facilities?, g
t j YES .MrfBE NO
e) Maintenance of public facilities , Including roads? g
YES MAYBE 0-
f) Other governmental services? y
YET- MATeE 0-
Explanation: Higher density than nnw zoned
15) Energy. Will the proposal result in:
a) Use of substantial amounts' of fuel or energy?
YET- MAYBE NO
b) Demand upon existing- sources of energy. or require
the development of new sources of energy? ,
vrr- E
Y—
Er.A;j790a91't7edog
t 0
Explanation:
16) Utilities. Will the proposal result in a need for new
systems, or alterations to the following utilities :
a) Power or natural Xgas?
YES MAYBE N-
b) Communications systems?X
MAYBE NO
c) Water? Y
YES MAYBE NO
6-
d) Sewer or septic tanks?X
YES MAYBE i!O
e) Storm water drainage?
YES M-AITTiT WU- •
f) Solid waste and disposal?
YES MAYBE NO
Explanation: Land has no utilitiea 'at present time.
17) Human Health. Will the proposal result in the creation of .
any health hazard or potential health hazard (excluding
mental health)?X
7- MAYBE FT5
Explanation:
18) Aesthetics. Will the proposal result in the obstruction of
any scenic vista or view open to the public , or will the
proposal result in the creation of an aesthetically offensive
site open to public view? .
YES MAAYYBE NO
Explanation:
19) Recreation. Will the proposal result in an impact upon the
quality or quantity of existing recreational opportunities?7C
YET- MABE NO
Explanation:
20) Archeological Historical . Will the proposal result in an
ae ration of a significant archeological or historical
site, structure, object or building?
YES MAYBE
Explanation: •
I1I . SIGNATURE
I , the undersigned, state that to the best of my knowledge the above information
is true and complete. It is understood that the lead agency may withdraw any decla-
ration of non-significance that it might issue in reliance upon this checklist should
there be any willful misrepresentation or willful lack of full disclosure on my part.
Proponent:
signed)
name
Robels$Qer
City of Renton
Planning Department
5-76
LEGAL DESCRIPTION
The Northerly 100 feet, measured perpendicularly to the Northerly line of those
portions of the following described properties lying Westerly of a line drawn
Southerly, perpendicularly to said Northerly line, from the most Easterly
corner of Lot 17, Block 4, Monterey Terrace Addition, according to the plat
recorded in Volume 50 of Plats, page 36, records of King County, Washington:
said properties being described as follows:
Parcel A: (Tax Lot 3) A11 that portion of the Southwest one-quarter of the
Northeast one-quarter of Section 17, Township 23 North, Range 5 East; W.M. ,
lying East of State Road No. 5 (Maple Valley Highway) (SR 169) and South of a
line beginning at the East one-quarter corner of said Section; thence West
1,325.85 feet from said East one-quarter corner; thence North 1°00'00" East
a distance of 252.22 feet to the true point of beginning of said line; thence
West 653.91 feet to said State Road No. 5, and
Parcel B: (Tax Lot 109) Beginning at the Southwest corner of the Southeast
one-quarter of the Northeast one-quarter of Section 17, Township 23 North,
Range 5 East; W.M.; thence North along West line of said subdivision a
distance of 252.23 feet; thence East 526.41 feet; thence South 88°00'00"
East a distance of 799 feet to the East line of said Section 17; thence South
along said East line to the East one-quarter corner of said section 17; thence
West along the South line of said Northeast one-quarter to the point of
beginning.
L.yam::. ', i 4 . 04:c 11 Y
Ik`liks\ •;_.,iP 2r
a t
i
7 007
sc
per
6#44-44
4 Yo j° it/c,)
4/ D,e E at ,emu- r..
na. \ID 0,\.\\
CITY OF RENTON
u;;i i 1C76
REZONE APPLICATION
For Office Use Only: NG "DEW
APPL. NO. Jif PLANNING COMMISSION ACTION
50 FEE ; RECEIPT NO. y ll< APPEAL FILED
FILING DATE i6' •-// - 7c CITY COUNCIL ACTION
HEARING DATE io - it ORDINANCE NO. & DATE ,yi/.3 &,/9, y
APPLICFNT TO COMPLETE ITEMS 1 THROUGH 10 :
1. Name Stoneway Concrete, Inc. phone 226-1000
2. Address P. 0. Box 509, Renton, WA. 98055
3. Property petitioned for rezoning is located on Gov't Lot 8
between Monterey Terrace and SR 169 (Maple Valley Highway)
4 . Sqi are footage or acreage of property approximately 24 acres
5. Lecal description of property (if more space is required, attach
separate sheet)
See Attached
6. Existing zoning R-1 and S-1 Zoning Requested R-1, R-2 R-3, R-4
at . ir 270 f
NOTE TC APPLICANT: The following factors are considered in reclass-
ifying property. Evidence or additional information to substantiate
your request may be attached to this sheet. (See Application Procedure
sheet for specific requirements) . Submit this form in duplicate.
7 . Pre posed use of site. Varied density housing from R-1 thru R-4 as proposed
by City of Renton Ordinance No. 2708 with attached declaration of Restrictive
Co•renants.
8 . List the measures to be taken to reduce impact on the surrounding
area.
1. As proposed by Restrictive covenants
2. Access from NE 3rd St. from East side of Mt. Olivet Cemetery
3_ Greenbelt of Hillside along SR-169
9 . How soon after the rezone is granted do you intend to develop the
site?
One - two years
10. Two copies of plot plan and affidavit of ownership are required.
Planning Dept.
2-73
LEGAL DESCRIPTION
All that portion of the Northeast one-quarter and of Govern-
ment Lots 7 and 8 within Section 17 , Township 23 North ,
Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast one-
quarter of the Northeast one-quarter of said Section 17 ;
thence north along the West line of said subdivision a
distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89°45 ' 17" east a distance of 526 . 41 feet ; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 (St . S . R. #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89°45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
to
AFFIDAVIT
I , Robert H. DeBoer being duly sworn, declare that I
am thew g property involved in this application and that the
msforegoingsae and answers herein contained and the information
herewith submitted are in all respects true and correct to the best of
my knowledge and belief.
Subscribec}2 and sworn before me
this7LdaY of C 2 rf 19 ,1 ,
Notary Public in and for the ate of
Washington, residing at , -e' /!
77 d-2 •
L.---
c?,„,,
i\t-............7- (4 Ca.,...a------.
Name o A otary Publ Signature of 7
General Manager
f 47 i L.:- ,i. et,
P. 0. Box 509
Address) Address)
Renton, WA.
City) State)
226-1000
Telephone)
FOR OFFICE USE ONLY)
CERTIFICATION
This is to certify that:7the foregoing application has been inspected by me
and has been foun " toobelt h.prough and complete in every particular and to
conform to the r}qes (isn1irre'gu'l\ations of the Renton Planning Department
governing the f`l.inS ;bFI , i chC'a placation .
t CZ )
Date Received t I 1 +n
19 By: t
44/
Renton Planning Dept .
2-73
L j '
Ir+ aW,wDANRKRIlrS IL:'
r HUOL
r--- -4 _ _ __:
M
o L I I 6 5
j
L L
r ji ;e-- I . i
Ir c r
iyo 'jr: d:' )li.i (s ;(! ,_ 7 • 71 ' I} 1
Mt 1 lit f;bt";:./.()•• .T44.f„,224:,;.&;1/i'A...A.j.f).4,,,, I0d .:"‘' )r, e,1,
ppp ,p/
vJJ •'(`!•
Ijiy//-'Y
f
lI _ !y/f r . 1 .11
1111111111f t, t7l .`, 11111111
s-...:u
c BVWftl r f}!L ' A' .`1 J,7tiL J1 r
w• f (l f
1••I '*
it
f. ;• .-` "
1.`i
1[•14•`. .,,. .,1 / , .
1 /).1 II I nd
r.,x •4 f 4
z--__- \''t "v /li ....r: 1„i,,..); rY1' .- -----' . •.:1,5,
4%:-. ,-*., 0-. ' ..
1.• :::1112•.f., -Nii/.• . J,1,-, .'1= :'.\- N,'s,,,t.
v.
i .i."'";,;-,?t: •••
tIvIktt L ' .tom n{{ S \ ` `'` \' j
l' 4h A'4 •tet zf; ..tiI yds.-? • ' 1` i1
1•L'f1'1I1.,-- '1,'""i, ,..1
i:f- 1 ,,4 CLF.- P :1' i,.
1 y .til 54t ,i ce r•j'%f : . ._—. y::,.tlMe.
1' ..,,;‘,i4‘i.,i7.°.', 2;111-1- ilillitir • 1 .'.0% '
teere" %
r '. nor .... ..... ..;,iN0,-,‘..k.it.:
74,Ni G Dt,5o EWAY EXHIBIT A" as revised March 8 , 1972
PROPOSED CHANGE TO THE CITY OF RENTON' S COMPREHENSIVE LAND USE PLAN
Property Description: That general area included within the following
boundaries, FAI 405 , NE 3rd and 4th streets, Union Avenue NE and SE,
and the bluff line north of Maple Valley Highway.
LEGEND
Single Family Residential Public Use or Quasi-
1
7 Low Density Multi Family Res. Recreation
I"I' Medium Density Multi Family Res .1 Greenbelt
a ; High Density Multi Family Res.
Proposed Boulevard
ass' ,;5.• ,
1t y 1
Ly2 Y,,ffj`
t r °.
i
t C_
j% ORDINANCE NO. 1921
r2
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, REVOK1 G
AND ELIMINATING PARAGRAPHS (3) (a) and (b) CF SECTION
5-725 OF TITLE IV (BUILDING REGULATIONS) OF ORDINANCE NO.
1628 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF
RENTON"
BE IT ORDAINED BY THE MAYOR LND THE CITY COUNCIL CF THE CITY OF RENTON
AS FOL"'.0 'S:
SECTION I : Existing paragraphs (3) (a) and (b) of ::action 4-725 of
TITLE IV (BUILDING REGULATIONS) of "Code of General O, dinances of the
City of Renton" reading as follows:
3) Any ordinance granting and providing such change in use
district boundaries or reclassification of property, after petition
therefore by the property owner or owne
x\ereinabove provided,
shall remain effective for a period of years from the effect-
ive date o:: such ordinance, unless the property owner or any ono of
the owners originally petitioning , or their successors in interest ,
may t;c e, have commenced a change of use: during said -e reT
ea•:• ,,::riod. I c no change of use has been commenced within said
time, th'.' o--dinance granting such change in use district boundaries
or rec1:::;si ,i.cation shall be null and void, in which case the use and
cl:: : . r'.cation in existence immediately prior to the filing of said
petition sLall become effective again as to such property. The term
c•:m:neekTi a change of use" means
H) `i':lc physical alteration reguiring a building permit; or
h) Substantial evidence: of occupancy, cpc.raticn , usage or con-
duet. L . , ..•;l on such reclassification However, the ow r or owners o f
property so rezoned or reclassified may petition the t --4a 9AFIt
114
rt ice, A leaJt thirty (30) days prior to the expiration of said
c-F.; y`. r period, for an extension of such time limit. Such
petition i<< st be submitted in w ' -in atat the specific reason or
reason:, for Filch request. The X
may thereupon , if
it specifically finds proper cause to exist, extend such period up to
but not to exceed twelve. (12) months , and any such extension shall be
sub_j r.::t. to final approval by the City Council.
be and i.;i;: sr_.wu: are hereby repealed and cancelled in all respects.
SF:t`TTC.1 IT_. All other parts and provisions of said Section not in-
consistentt with the foregoing shall remain in full force and effect .
S1;:77 ', 7 :r:7 This Ordinance shall bu in full force and eE feet : rom
and after its passage, approval and legal publication.
PASS::: ry ''*1E CITY COUNCIL this 21st day of November , 1961.
s/ Helmie Nelson
Helmie :1e1..:on , City Clerk
A2:1.1Z V. '.' . T4' _ 1_ :'-t1 "' "' this 21st day of November , 19•__
i'rank i l rm_rii.-•;. .p.r
APP''i0\' :n ,1 'r' .';`:':r : ORDINANCE NO. 1921
rl . . ' : . : it:•,' .)ttc::ui y
DECLARATION OF RESTRICTIVE COVENANTS
WHEREAS, Stbneway Concrete Inc. , a firm incorporated in
the State of Washington, are the owners of real property in the City
of Renton, County of King, State of Washington, described as follows :
The Northerly 100 feet, measured perpendicularly to
the Northerly line of those portions of the following
described properties lying Westerly of a line drawn
Southerly, perpendicularly to said Northerly line,
from the most Easterly corner of Lot 17 , Block 4 ,
Monterey Terrace Addition, according to the plat
recorded in Volume 50 of Plats, page 36 , records
of King County, Washington: said properties being
described as follows:
Parcel A: (Tax Lot 3) All that portion of the
Southwest one-quarter of the Northeast one-quarter
of Section 17, Township 23 North, Range 5 East; W.M. ,
lying East of State Road No. 5 (Maple Valley Highway)
SR169) and South of a line beginning at the East one-
quarter corner of said Section; thence West 1, 325. 85
f8et from said East one-quarter corner; thence North
1 00 ' 00" East a distance of 252 .22 feet to the true
point of beginning of said line; thence West ,653 . 91
feet to said State Road No. 5, and
Parcel B: (Tax Lot 109) Beginning at the Southwest
corner of the Southeast one-quarter of the Northeast
one-quarter of Section 17 , Township 23 North, Range 5
East; W.M. ; thence North along West line of said sub-
division a distance of 252 . 28 feet; thence East
526 . 41 feet; thence South 88 00 ' 00" East a distance
of 799 feet to the East line of said Section 17; thence
South along said Exist line to the East one-quarter
corner of said Section 17; thence West along the South
line of said Northeast one-quarter to the point of
beginning;
WHEREAS , the owners of said described property desire to
impose the following restrictive covenants running with the land
as to use, present and future, of the above described real property;
NOW, THEREFORE, the aforesaid owners hereby establish,
grant and impose restrictions and covenants running with the land •
as to the use of the land hereinabove described with respect to the
use by the undersigned, their successors, heirs , and assigns , as
follows :
NO BUILDING OR STRUCTURE, WITH THE EXCEPTION OF
DETACHED SINGLE FAMILY RESIDENTIAL STRUCTURES,
SHALL BE LOCATED OR CONSTRUCTED WITHIN ONE HUNDRED
100) FEET OF THE SOUTHERLY PROPERTY LINE OF THE
H. G. WHITE MONTEREY TERRACE ADDITION TO THE CITY
OF RENTON, AS RECORDED IN VOLUME 50 OF PLATS, PAGE
36 , RECORDS OF KING COUNTY, STATE OF WASHINGTON.
SUCH AREA SHALL BE MAINTAINED CONTINUOUSLY IN A
NEAT AND ('LEAN MANNER. IF NOT SO MAINTAINED, THE
CITY OF RENTON SHALL HAVE THE OPTION TO ASSUME
RESPONSIBILITY FOR SUCH MAINTENANCE AND SHALL
BILL THE PROPERTY OWNERS FOR THE COST THEREOF.
IF UNPAID FOR MORE THAN SIXTY (60) DAYS, SUCH BILL
SHALL BECOME A LIEN AGAINST THE PROPERTY.
Declaration ul 1tebLt'icLlve euvenant:;
Stoneway Concrete Inc.
Page 2
Any violation or breach of any of these restrictive covenants may
be enforced by proper legal procedures in the Superior Court of
King County by either the City of Renton or any property owners
adjoining subject property who are adversely affected by said
breach.
am..
l
i
Stoneway/Concrete Inc. , by:
Stoneway, Concrete Inc. , by:
STATE OF WASHINGTON
COUNTY OF KING
On this day of i';• •; ;' 19 , before me
personally appeared r
and • who executed the
within and foregoing instrument and acknowledged
said instrument to be tie free and voluntary act
and deed of said persons for the uses and purposes
mentioned therein. IN WITNESS WHEREOF, I have
hereunto set my hand and affixed my official seal
Llie day and year first above written.
Not ,pry Publ ii- i n ;Hid I"or Ulu Stale or Wa:;h.inctt can ,
residing at
0
0 , L 6. -> >
r r
Lh
ZONING DESIGNATIONS FOR STONEWAY S_IlL
The following general descriptions should apply to the particular
zoning classification established on the property described below:
R- 1 (BUFFER AREA) - PARCEL A
The easterly 420 feet of the westerly 720 feet of the
northerly 100 feet of the above described property .
R-2 - PARCEL B
The easterly 800 feet of the westerly 1100 feet of the above
described property ; except the R-1 area (Parcel A) and
except that portion defined as greenbelt on the Comprehensive
Plan as revised on May 17 , 1972 , and noted as the hillside
area along the south property line and northeast of Maple
Valley Highway (SR- 169 ) .
R-3 - PARCEL C
The westerly 800 feet of the above described property except
the southerly 1380 feet of the easterly 300 feet thereof.
R-4 - PARCEL D
The northerly 1100 feet of the westerly 300 feet of the
above described property , except the northerly 300 feet
thereof.
GREENBELT - PARCEL E
That portion defined as greenbelt on the Comprehensive Plan
as revised on May 17 , 1972 , and noted as the hillside area
along the south property line and northeast of Maple Valley
Highway (SR- 169 ) .
LEGAL DESCRIPTION OF ENTIRE STONEWAY SITE
All that portion of the Northeast one-quarter and of
Government Lots 7 and 8 within Section 17 , Township 23
North , Range 5 East , W. M. described as follows :
Beginning at the Southwest corner of the Southeast
one-quarter of the Northeast one-quarter of said Section
17 ; thence north along the West line of said subdivision
a distance of 252 . 23 feet to the true point of beginning ;
said point also designated as Point "A" ; thence south
89 °45 ' 17" east a distance of 526 . 41 feet; thence south
88°52 ' 04" east a distance of 799 feet to the East line
of Section 17 ; thence south along said East line to the
East one-quarter corner of Section 17 ; thence continuing
south along the East line of said section to an intersec-
tion with the Northerly right-of-way line of State Road
No . 5 ( St . S . R. #169 ) (Maple Valley Highway ) ; thence in
a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that
lies North 89°45 ' 17" west a distance of 653 . 91 feet from
Point "A" ; thence South 89 °45 ' 17" east a distance of
653 . 91 feet to Point "A" and the true point of beginning .
1
rr......_......... .a «.—
3
1,) .:-----..............• "•••-............--••••:::-..--••:-..._ _:
7................. ...,..!.7.
1.....-7'
1E-T....
I,ro•••:...,.tee 0
st. o 9:kc.
1 Ate'-• Ip/HG Wllllf
U• 68 At. 1• 114 c
1.3, MONTE/gFY 1L. ;,
i `` -ISQ • _IQ le"
Al
y . i •, ••'..
M,/ _YC A M7 OLIVI i LI-f41Itf1Y
I a
El
1 i..A i•" 6 Z' ---,mr... •I 044 AL
j1..
W .1fp111! w ; StIS:j N.,. ' , , ` -_ '
3
0,1.lc•
1
i I7
a 1 Id 14: ,1 :
Z, ,
1 '+
JS^
1
I
i1 t.Td.S! 4
e._ °Q !II I 4!6
I 1 > Pi R. 3 09 Ip
Q 1 0:t
eCpil 1\;9L,"i2'.._...i.Ei_Vl.
5 of AT (LIVEN CEMUERY (p
a
1
4 f.- Q 1' I `•1,
O.
I
dIJ I-
t
I°
1
r• 4/'' v I_. I1 If
k56, I r 1 ZI l
M 101.1Vt i ,I•_
t -
t ti_' ,
I•im
90 0 elec1
1'
ARCiJL AA"
t
R RODS
OrtMir
ac. \
tiG t l,5
6
II AO
i I
41
I 1 p
n •
Intl d:1V cram S. Glt 1:"I t.D
D
rgo dt
i 5 5 elf,
41:.
a,,o.
J fk. fj:
06(.
4....„.I:. '
NI O RPACC CORP .
1... Xi!-.\-.<
3 ‘,, ‘`•
N.„. , 1\ ,, \A, . . .1.,41, \\ ‘...,11. 1i '..
x...;;;.•...`.„,..., 11., g , .
1 A•r rs. .N,i C S/IANC - --....-
t A1III ', 1, \y, 1
i ml l. .
444.11,11' .4!. .r^I'-.1'.•'.'4'
f'!<Ti. ,o 1t, ic..1''?4 .Pl'.7.7."4,/ SYe ..rg4.^E'.t:._.E.•. I
LEGAL DESCRIPTION
The Northerly 100 feet, measured perpendicularly to the Northerly line of those
portions of the following described properties lying Westerly of a line drawn
Southe:•ly, perpendicularly to said Northerly line, from the most Easterly
corner of Lot 17, Block l+, Monterey Terrace Addition, according to the plat
recorded in Volume 50 of Plats, page 36, records of King County,,Washington
said properties being described as follows:
larvel A: (Tax Lot 3) All that portion of the Southwest one-quarter of the
hortt.eezt one-quarter of Section 17, Township 23 North, Range 5 East; W. M. ,
lying last of State Road No. 5 (Maple Valley Highway) (SR 169) and South of a
lint- beginning at the Fast one-quarter corner of said Section; thence West
1, 2 .65 feet fron, said East one-quarter corner; thence North 1000'00" East
a distance of 252.22 feet to the true point of beginning of said line; thence
i.eat u';.91 feet to said state hoad No. 5, and
Pa: cei Li: (Tax Lot 109) Beginning at the Southwest corner of the Southeast
or.c-ecarter of the Northeast one-quarter of Section 17, Township 23 North,
iit,rge 5 La,t; e.M. ; thence North along West line of said subdivision a
distance of 252.23 feet; thence East 526.41 feet; thence South 88°00'00"
Fact r distance of 799 feet to the East line of said Section 171 'thence South
along eeid fast line to the Eaat one-quarter corner of said section 17; thence
est alone the south line of said Northeast one-quarter to the point of
bee_ i:lnl,lE,,
l n. el C (lax Lot ?5) Section 17, Township 23 N, Range 5 E, portions of
I4ts 7 and 6, on a line Northeasterly of SR 169 (Maple Valley
ieetet )
Tax Lot 26) That portion lying Easterly of SR 169 (Maple Valley
9 . How soon after the rezone is granted do you intend to develop the
sit.:!?
On. - two years
10 . Two copies of plot plan and affidavit of ownership are required.
Planning Dept.
2-73 •
N„,,./
alrl?
S.
o - ''.III! ni m Ninr,
lb ... 5ft1.7”Ac
8.$r!
t c.i./0 1-'....••••1:1% "---.St
4--,./---.. „ . 1, 1r'• •• ''''. - •-
7.-s.
s.--\.s."-----. . ...:.........._•••••"--.--.114........1----...„--- Ts1... 5-: . 0 VAG.
7-
7
1
t ••
1.EIS'E3-I.
4 '.1..•,.-.,isi-s
r15-.41 VET-•F e:y'
A
7-''
s-----
6,
7Z.c61181u;1s:
A.....
L...-
E--17_,_-.!3.
k/1,
MON O -- 41a1 4'.-%
0 4d,-
I•.
I,IitI
it; °.12,!1• MT OLIVI 1 GEAR I L RY
L., . 0 44 AC
i
8J1Li .71,-,---= Lij 6./
15:.• •:
Y .
44j:
ri--- •
vti . - 14.:<\.
0354,.1
ii T.,..,,•
4 tr t151 ti,1 z ii, 14'• VTIV tyr.3:
IS•?,,,
35 c,
Sn ., .'
41:.
iL. , .
1.. .---::::
170 i.
i
t
I I 4-- 1-.5-
z..- B.5! 4 of. .r,IK.,VI I ' Lu i
b,Li ci ;•..„ I____ zr - i •
I
4 1 pi
ch 1.0-2 5
i 74- i ,23Q cc 1,
A I ,
II 14 n F . ..7
I _ 5 a . -2 . - '•
3 .1iT,_()LIVET CEMETERY...13x. •
Jj I. 9 p z„....j 012.1
7 0 ii• to . , ,rj 1 41 7.-..=7-•-:-•Z
s:-.::7-17.4-........
I:,4117.1. " *:..., ---
1r- Iv-JAC lii
8 13 i 1....
41 ' RA i:. ?zi -4-6 9! c'' Alf, yr II II!
i ..1•4 ._
z .... ... .,,. .1 C.) .isy :„. i,ii . .„2
MT OLIVLT it II
e. c4., ,,.:c.-0. ,, L.n.oehz.t!, . ,...#
AL' a 0.0 - •,•13 AC
Id 111 ..1 3 Ar.
t.
I I
1,•
864)1..
irkfirraitC ftc",7 , •
2 it..4 . I4.4-441" '. . ** R AV'i l • ., ..
5
3.'y
7
4,•::: ei 4
3 .3 AC. : i clzi, is f,..
nt.
S' Peitca---- I
s?
Ana._rop--.::;--,- .._•-) A C rt 3,
2.„- I I, ---: --- ::.; Is. ,\\,,$,\ pl.„,,,. s
s..
i-------- 4, .
s, i ! t 1.5 6C,..). !I. , R i.e,\ i
a.: . 41
I PlAcek- -,.,
3 _ __ _-le ef-_._..-_ I i p
7 71.::::_iiiatio
1
9? WJ
k...,\ 1.1..
i i
e• I 1 I ..2.
s i
2- ._,(-------...._,„, ,„__________ al -
4:
C4431., •
5 . . .. , , - -•\,..
3 MAL.
4$•••‘...,.„ ,
1,;':,.,...
i 41,
le..e''' '• \
1/4.....e/
z_.....i. ..,,,...
4,3_,',:
s, •:....
r .
N!,..,,i1":"....1 .4-...I\\k\
s'•,,, '''(.
s.
1-,, ..
sIZ,`, 0,1 I C It PACE CORP • A\c ., ".., N<C•.-.'N ‘,. .
ss:
ss
I.%
I
41 1, K.
A
1 lilt
ir ••••••••• $ ...... C 1j)
s-.. .••<./,./
t1/4..,
A.AC."...
G cvi ot ". :, .1,, . si;-•1 .---.: ',.,•• • ----::...___:::"WANE
1 : • - .. 31:L. A res, - 'ff•.\ , icl
c-4144
1 I s.:,,,,..
4-.
4 --'.:::--_
9
I i
1 I. ` ••,,.,.
i i'•-... ,.....-211'..,::,,i,;.:4,:::,..,
e V, \_\
1 !; • - .
fyip..,1..Or 4i1. ..k...•,...,
1 S.‘'N''''' %,,..,..'Ne.j./.'. 0 I A ' • z4s Iasi..
I i/45,,, 0 i, 4e. i,,,,,. :
V • •••••••
3,......... 14 % OA 1.1,,,., ,
e is -• -,
h -! --,- 4 .'-'-':-', '-- -
i i..,-.... ..7.7„..,..1301Ac
s••••• ". :' •
ril .t,
T . I
1 \-
f
4 .•;/.
P.?'
1":.?•• itill Ate
1-....„ - ,,,,..:,....‘,...„
4.„ , . .,
t,
f..., .gli 40 Ay '.......j• . .4.,,„ :
t."-.. ;
1.2,ic.4.
141s. ,:::-.. ..:::--_.
4 . ; •'.: (...:4.1'.
I. i
50.4N-;
4 _-_-:,
1 . I.
4. .0.44.01/01".$1,M01044,40111.444""--w-tifp-,. . , , •.: , :-- -...'..--;,.4, . .•:;.-2;•- •... • ;--• - - 7.,.- ,-.';,...• -,-..!..1::';
1"I
i ‘ : „ : ; •
Transamerica Transamerica
Title Insurance Company CITY OF RENTON
Title Services Box
1493111110635NortheastEighthStreet
Bellevue,Washington 98009 l
206) 628-4661 DEC 3 1982
REZONE CERTIFICATE
OUROHNNvntfiNC
Environmental Research and
Development Corporation Order No. 901841
18000 Pacific Highway South, Charge : $100 . 00
Suite 1115 Tax : 6 . 50
Seattle , WA 98188 Total : 5106 . 50
Attn: Glen McIntosh
Phone : 244-0080
FEE SIMPLE OWNER: KENT HIGHLANDS , INC. , a Washington corporation,
formerly STONEWAY CONCRETE, INC. , formerly
STONEWAY SAND & GRAVEL CO. , which acquired
title as STONEWAY DOCK.
DESCRIPTION:
as hereto attached -
CONTRACT PURCHASER:
1. CONTRACT OF SALE AND THE TERMS AND CONDITIONS THEREOF :
Seller: Kent Highlands , Inc. , formerly Stoneway
Concrete, Inc. , a Washington corporation
Purchaser: Environmental Research and Development
Corporation, Inc. , a Washington corporation,
the General Partner for Monterey Terrace
Associates , a Washington limited partnership
Dated: January 22 , 1980
Recorded: January 24, 1980
Recording No. : 800124-0812 (Ef 0577028)
Said contract has been amended by instrument recorded under
Recording No. 810814-0730.
No additional examination of the title has been made , and our
search is limited to the matters shown above. Liability is
limited to the amount paid therefor.
TRANSAMERICA TITLE INSURANCE COMPANY
B
o ert . verb-o Title Officer
628-5970)
RLI : cz
i '
Oy_.}4 Y: i ' ., r+e.u• gs1:;
Y__.
y
7 .e.t.d' -
5 C
F 4~r
l,',
v°
e CK'"Jl a• 9N
iF_, .
ca
fo7a *hCN' ^Fi $
r'
JM{'7tG 4,y 4 :
Y } ]:`£+.1' : ,.
5 y'= ' ! a
a '(:y*Fyk .-„r,j Y ,`. ; i'.1'.y i"
ar
e1'z
s
w ,t• ..,, #,
r.y f f t "x"`"-r'A riC :.y iti
t t
j a "..
a •
r:4 t r. ra, ' if••`' +Y4 •e74ste. - e
November 22, 1902
Order No. 901841
DESCRIPTION:
All that portion of the Northeast ; and of Government Lots 7 and 8
within Section 17 , Township 23 North, Range 5 East, W.M. , described
as follows:
Beginning at the Southwest corner of the Southeast 14 of the Northeast
4 of said Section 17 ;
thence North along the West line of said subdivision a distance of
252 . 23 feet to the true point of beginning, said point also
designated as Point "A" ;
thence South 89°45 ' 17" East a distance of 526.41 feet ;
thence South 88°52 ' 04" East a distance of 799 feet to the East line
of Section 17 ;
thence South along said East line to the East k corner of Section 17 ;
thence continuing South along the East line of said section to an
intersection with the Northerly right-of-way line of State Road No . 5
St. S . R. #169) (Maple Valley Highway) ;
thence in a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that lies North
89°45 ' 17" West a distance of 653 . 91 feet from Point "A" ;
thence South 89°45 ' 17" East a distance of 653. 91 feet to Point "A"
and the true point of beginning;
TOGETHER WITH an easement for road and utility purposes over, across
and along the following described tract :
A strip of land 100 feet in width, the Westerly margin of which
is the Westerly line of the Puget Sound Power and Light Company,
right-of-way and described as follows :
Beginning at the Southeast corner of the Northeast 4 of the Northeast-
of Section 17 , Township 23 North, Range 5 East , W.M. ;
thence North 01°07 ' 56" East along the East line of said subdivision 115
feet ;
thence North 89°36' 24" West 86. 83 feet to the East line of the Puget
Sound Power and Light Company right-of-way;
thence North 26°38' 54" West along said East line 235 . 23 feet to the
South margin of N.E . 3rd Street ;
thence South 71°49 ' 00" West along said South margin of N.E. 3rd Street
203 . 82 feet to the West line of said Puget Sound Power and Light Company
right-of-way and the true point of beginning;
thence South 26°38 ' 54" East along said West line 450 feet ;
thence North 63°21 ' 06" East 100 feet ;
thence North 26°38 ' 54" West 435 feet , more or less , to the South margin
of Northeast 3rd Street;
thence South 71°49 ' 00" West along said South margin to the true point
of beginning;
continued-
e, l P. v • 2v.}Y 1i,;v'`,; M ti f or'L `"Y-•
i. .b+X pry: s. '4 ti
y ^Hr t.
fw aa Y,?•
L':(:' •,
k`
wy,
nRGs•
jut
r
Kri;r.< a '
r r .1 +r'z
t:• eia-
Y,, .p At:. o r
fxr
Order No. 901841
DESCRIPTION (continued)
TOGETHER WITH a permanent easement and right-of-way for ingress ,
egress and utilities with necessary appurtenances described as a
strip of land 60 feet and width, the Easterly margin of which
is to lie one foot within the Easterly margin of American Memorial
Services , Inc. , property and described as follows :
A strip of land 60 feet in width over , under and across a portion
of the Southeast 4 of the Northeast ; of Section 17 , Township 23 North ,
Range 5 East , W.M. , more particularly described as follows :
Beginning at the intersection of the Southwesterly margin of the Puget
Sound Power and Light Company right-of-way with the North line of said
subdivision;
thence South 26°38' 54" East along said Southwesterly margin a
distance of 501 . 26 feet;
thence South 6°54' 11"East continuing along said Southwesterly margin
a distance of 138 . 35 feet to the East line of said subdivision;
thence South 1°07 ' 56" West along said East line a distance of
543 . 67 feet ;
thence North 88°52 ' 04" West a distance of 60. 00 feet ;
thence North 1°07 ' 56" East parallel to the distant 60. 00 feet
from the East line of said subdivision a distance of 539.46 feet ;
thence North 6°54' 11" West parallel to and 60. 00 feet distant
from said Southwesterly margin a distance of 123. 69 feet ;
thence North 26°38 ' 54" West continuing parallel with and 60. 00
feet distant from said Southwesterly margin a distance of 490. 82
feet ;
thence North 63°21' 06" East a distance of 60. 00 feet to the
point of beginning;
Situate in the City of Renton, County of King, State of Washington.
4 .+
t
yy-.,
r'y4r t a• .; 4 •`
r
r.
t
a'
f eF '.a,
t. 4.s.r.
i.c
w
arxi .}«s .. k !V+' '..•..'t'
r.:r eL' '''. , ..t 4 f - t+K:'".r f
f
f• ,C
Y A s
r
3..
a 1: e _
MEMORANDUM OF CONCURRENCE
APPLICATION NO(s) : R-077-82
DESCRIPTION OF PROPOSAL: Application to rezone 41 .5 acres of property
to R-i , R-2, R-3 and R-4, for up to 425
units for multi-family residential use in
the form of a Planned Unit Development.
PROPONENT: Environmental Research & Development
Corporation - General Partner/Monterey
Terrace Associates.
LOCATION OF PROPOSAL: Located north of SR-169 (Maple Valley
Highway), south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power
right-of-way.
LEAD AGENCY: Building & Zoning Department.
DATE OF ERC REVIEW: January 5, 1983.
Acting as the Responsible Official , the ERC has determined that the requested
modifications to the initial proposal reviewed under ECF-088-82 on January 5,
198:: , are withi n the scope of that original proposal and the environmental
disclosure is still valid.
Thi decision was reached following a presentation by Jerry Lind of the
Building & Zoning Department. Oral comments were accepted from: Ronald
Nelson, Robert Bergstrom, Roger Blaylock, David Clemens, Donald Persson,
Richard Houghton, Gary Norris and Jerry Lind.
Incorporated by reference in the record of proceedings of the ERC on
application R-077-82 are the following:
1 ) Environmental Impact Statement: Environmental Research and Development
Corporation (ERADCO) , dated: December 3, 1982.
2) Application( s) : REZONE (R-077-82) .
The Environmental Review Committee issues this Memorandum of Concurrence
subject to the following conditions:
1 ) A significant adverse impact on the environment will occur due to
traffic impact and associated secondary environmental impacts because of
traffic increases on N.E. 4th from this proposal , the Schneider Hilltop
Development (170 units, 1000 trips) , the Mastro 4th and Monroe and 4th
west of Union developments (544 units, 3200 trips), the Homecraft
Terrace project (290 units, 1700 trips) , and the proposed Cascadia
Development (500+ units, 3000 trips). Therefore, the City Council must
determine in the approval process that these impacts can be mitigated by
the proposal , or that overriding social , economic or environmental
considerations make approval of this PUD appropriate.
2) The access to the proposed PUD shall form a four (4) way intersection at
N.E. 3rd with the future northerly extension of Edmonds Avenue N.E. The
intersection shall be signalized and widened to provide for left turn
movements into and out of the project.
3) The proposed access roadway shall be constructed to collector street
standards consisting of a thirty-six (36) foot curb-to-curb section,
widened to fourty-four (44) feet at the intersection of N.E. 3rd. In
addition, sidewalks, street lights and other appurtenant improvements
shall be provided along the access roadway.
4) Participation in the amount of 4.4% of the operational improvements
necessary to accommodate traffic at the N.E. 3rd and Sunset Boulevard
i ntersecti on, including widening, paving or signal modification, shall
be provided by this development.
111
MEMORANDUM OF CONCURRENCE
January 5, 1983
Pace 2
5) Any exposed cut or fill slopes on the subject property shall be
immediately reseeded and stabilized with jute matting.
6) Blaine Avenue N.E. shall be improved from N.E. 3rd Street to the subject
property to accommodate public safety vehicles only. Improvements shall
include twenty-two (22) feet of paving and any necessary grading,
alignment or storm water drainage revisions.
7) The mitigating measures suggested by the Police Department shall be
included in the final building plans.
l
f f
Rona d G. Nelson Davi . lemens
Building Official Policy Development Director
16(24,€,?
7(LjeVek—u-‘/( 7
Richard C. Houghton ,
Public Works Director
EXPIRATION OF APPEAL PERIOD: JANUARY 19, 1983
MEMORANDUM OF CONCURRENCE
APPLICATION NO( s) : R-077-82
DESCRIPTION OF PROPOSAL: Application to rezone 41 .5 acres of property
to R-1 , R-2, R-3 and R-4, for up to 425
units for multi-family residential use in
the form of a Planned Unit Development.
PF OPONENT: Environmental Research & Development
Corporation - General Partner/Monterey
Terrace Associates.
LOCATION OF PROPOSAL: Located north of SR-169 (Maple Valley
Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power
right-of-way.
LEAD AGENCY: Building & Zoning Department.
DATE OF ERC REVIEW: January 5, 1983.
Acting as the Responsible Official , the ERC has determined that the requested
modifications to the initial proposal reviewed under ECF-088-82 on January 5,
1983, are within the scope of that original proposal and the envi rormental
d sclosure is still valid.
This decision was reached following a presentation by Jerry Lind of the
Building & Zoning Department. Oral comments were accepted from: Ronald
Nelson, Robert Bergstrom, Roger Blaylock, David Clemens, Donald Persson,
Richard Houghton, Gary Norris and Jerry Lind.
Incorporated by reference in the record of proceedings of the ERC on
application R-077-82 are the following:
1 Environmental Impact Statement: Environmental Research and Development
Corporation (ERADCO), dated: December 3, 1982.
2 ! Application( s) : REZONE (R-077-82) .
Tie Envi rormental Review Committee issues this Memorandum of Concurrence
s rbj ect to the following conditions:
1 ) A significant adverse impact on the environment will occur due to
traffic impact and associated secondary environmental impacts because of
traffic increases on N.E. 4th from this proposal , the Schneider Hilltop
Development (170 units, 1000 trips) , the Mastro 4th and Monroe and 4th
west of Union developments (544 units, 3200 trips) , the Homecraft
Terrace project (290 units, 1700 trips) , and the proposed Cascadia
Development (500+ units, 3000 trips). Therefore, the City Council must
determine in theapproval process that these impacts can be mitigated by
the proposal , or that overriding social , economic or environmental
considerations make approval of this PUD appropriate.
2) The access to the proposed PUD shall form a four (4) way intersection at
N.E. 3rd with the future northerly extension of Edmonds Avenue N.E. The
intersection shall be signalized and widened to provide for left turn
movements into and out of the project.
3) The proposed access roadway shall be constructed to collector street
standards consisting of a thirty-six (36) foot curb-to-curb section,
widened to fourty-four (44) feet at the intersection of N.E. 3rd. In
addition, sidewalks, street lights and other appurtenant improvements
shall be provided along the access roadway.
4) Participation in the amount of 4.4% of the operational improvements
necessary to accommodate traffic at the N.E. 3rd and Sunset Boulevard
i ntersecti on, including widening, paving or signal modification, shall
be provided by this development.
I
ENVIRONMENTAL REVIEW COMMITTEE
JANUARY 5, 1983
AGEND A:
Commcncing at 10:00 A.M.
Thirc Floor Conference Room.
NEW EUSINESS:
ECF-088-82 ENVIRONMENTAL RESEARCH & DEVELOPMENT CORPORATION
R-07 '-82 GEN. PARTNER/MONTEREY TERRACE ASSOCIATES
Application to rezone 4l .:.3 acres of property to R-1 ,
R-2, R-3 and R-4 for up to 425 units for multi-family
residential use in the form of a planned unit
development; property located north of SR-169 (Maple
Valley Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power
right-of-way.
OLD 3USINESS:
ECF-089-82 CITY OF RENTON PUBLIC WORKS DEPARTMENT
West Hill Reservoir, pump station, water transmission
mains and well No. 9 water system improvements. The
project is to improve the water supply for the West
Hill community served by the City of Renton and the
Lakeridge community served by Water District No. 63 in
a joint water system improvement project; the project
elements are scattered around the central and western
neighborhoods of the City and Lakeridge community.
I
ENVIRONMENTAL REVIEW COMMITTEE
JANUARY 5, 1983
AGEND A:
Commencing at 10:00 A.M.
Third Floor Conference Room.
NEW EUSINESS:
ECF-( 88-82 ENVIRONMENTAL RESEARCH & DEVELOPMENT CORPORATION
R-07; -82 GEN. PARTNER/MONTEREY TERRACE ASSOCIATES
Application to rezone 41 .b acres of property to R-1 ,
R-2, R-3 and R-4 for up to 425 units for multi-family
residential use in the form of a planned unit
development; property located north of SR-169 (Maple
Valley Highway) , south of Monterey Terrace and Mt.
Olivet Cemetery and west of Bonneville Power
right-of-way.
OLD 3USINESS:
ECF-J89-82 CITY OF RENTON PUBLIC WORKS DEPARTMENT
West Hill Reservoir, pump station, water transmission
mains and well No. 9 water system improvements. The
project is to improve the water supply for the West
Hill community served by the City of Renton and the
Lakeridge community served by Water District No. 63 in
a joint water system improvement project; the project
elements are scattered around the central and western
neighborhoods of the City and Lakeridge community.
T1-)NrifFIc
A
Date circulated : DECEMBER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No(s ) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : FRADCO PT,A n TINTT T)FVELOPMENT
Brief Description o f project : APPLICATION TO REZONE APPROX. 41.5 ACRES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
TISF TN THE PnPM OF A PLANNED UNIT DEVELOPMENT.
LOCAThU NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE
LOCATION : ANTI MT fT.TVFT rPME WRY AND WRST C F RONNFVIT R POWER RIGHT-OF-WAY.
SITE AREA : 41 _S Af'RFS BUILDING AREA (gross )
DEVELOPMENTAL COVERAGE (94) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3) Water & water courses :
4) Plant life :
5 ) Animal life :
6) Noise : Z--
7) Light & glare :
8 ) Land Use ; north:
east :
south :
west :
Land use conflicts :
View obstruction :
9 ) Natural resources : L---
lU ) Risk of upset :
1
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) : 9)5 4
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS : / 9/9 e f 7`-z-Le 7L1 v` 4.14P ivG
a f- iv 5f;
Prov-dam a-/.za , y /)Lf
r„ 1,!p '2,,/c rer ti *0f .1i ,7C.... s`: , ., 1.JC, rd ('
L. T'' D c r c-S7 a 3 - C DS7 Yt 4, S 1,14i,d c.J
30 ?a--t.a Pe+ e coS-t--
J y
eJ /V a-d
I wt'`F tio t"q C.1 o r ' 7
a,`ac_41
Recommendation: DNSI OS More Information
Reviewed by : di-424 Title : / S vWrZz
Date : 7/`/
1
FORM: ERC-06
I
4. Heavy equipment not to be used as access on Blaine Ave. NE.
5. Cash or bond deposit to maintain clean roadways to and from the site
of construction.
Date circulated : DECEMBER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s ) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : RRAnC'n PT ANNFT) T 1INTT DFVELOPMENT
Brief Description of Project : APPL_TCATION TO REZONE APPROX. 41.5 ACRES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
USE TN THF: paw OF A PLANNED UNIT DEVELOPMENT.
LOCATED NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MON EREY TERRACE
LOCATION : ANn Mr C)T,TVFT CFM7ITRRY AND WEST OF RONNFV1T T.F POWER RIGHT-OF-WAY.
SITE AREA: 41 .5 ACTTS BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (%) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3) Water & water courses :
4 ) Plant life :
5 ) Animal life : t
6) Noise :
7) Light & glare :
8) Land Use ; north:
east :
south:
west :
Land use conflicts :
View obstruction :
9) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services : d
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
Recommendation : DNSI DOS More Information
Reviewed by : r/ .._. Title :
Date : j ; o -
FORM: ERC-06
nOILoutxj
4 Zo1VIrVG
Date circulated : DECEMBER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : FRAM PT,ANNED TTNTT DEVELOPMMENT
Brief Description of Project : APPTJCATTON TO REZONE APP$OX. 41.5 jKTES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
USE TN THE. FnPM OF A PLANNED UNIT DEVELOPMENT.
LOCATED NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE
LOCATION : AND MT fT.IVF'P CPMPTERY AND WEST nF BONNWTT T E POWFR RIGHT-OF--WAY.
SITE AREA : 41 _S ACRES BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (%) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3) Water & water courses :
4) Plant life :
5 ) Animal life :
6) Noise :
7) Light & glare :
8 ) Land Use ; north:
east :
south :
west :
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health:
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
s.
Recommendation : NSI-_L_ DOS More Information_-'
Reviewed by : , iw'44 C )/4-, • Title :
Date : G K2- -- 2-,---(2,--
FORM: ERC-06
FIRE
Date circulated : DECEMBER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s ) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : FRAnAr PT,ANNEn UNIT DEVELOPMENT
Brief Description of Project : APPLICATION TO RE7,ONE APPROX. 41.5 ACRES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
USE TN THE FnBM OF A PLANNED UNIT DEVELOPMENT.
LOCATED NORTH OF SR-169 (MAPLE VALLEY HIGH[/1Y) SOUTH OF MONTEREY TERRACE
LOCATION : AT\Tn MT fT.TWP C'FMFTTTF.RY ANT) WEST OF RONNFVIT T,E POWER RIGHT-OF-WAY.
SITE AREA: 41 .5 AC`RF.S BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (%) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life :
6 ) Noise :
7 ) Light & glare :
B ) Land Use ; north :
r, r r'r( +n, ,
east :
south:
14 BAN 5 '28 3
west :
Land use conflicts:
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
1
13 ) Trip ends CITE ) :
traffic impacts :
14) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :Renton Fire Dzp,.
Fire"+averrKen D,rt a,
20 ) Archeology/history :
COMMENTS : ,,,
z41-->z,--0,-/eke-6‘e-&1344,:z co/3 fi
Err 2 0 1982
Recommendation :'' DNSI / DOS More Information
Reviewed by /i2i71 1 itle /i1
Date :2 3 X2-
FORM: ERC-06
Date circulated : DECEMBER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s ) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : FRADCO PLANNED UNIT DEVELOPMENT
Brief Description of Project : APPLICATION TQ REZONE APPROX. 41.5 ACRES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
ME TN THE. FnPM OF A PLANNED UNIT DEVELOPMENT.
LOCATED NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE
LOCATION : ANfl MT OLTVFT (TMF'PEPY AND Tn1FST OF RDNNFVILT,F POWER RIGHT-0F NAY.
SITE AREA : 41 _5 ACRES BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (o) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life :
6 ) Noise :
7 ) Light & glare :
8 ) Land Use ; north :
east :
south:
west :
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20) Archeology/history :
COMMENTS :
Tf E m c T O/v /2/9/E nd-I E
j
676 G/PeA'T/6A) ic-gc/L/T14 S
E ) / L /36- r»/irJc 2 i f aQ-LL 7HE s G6-6;1/z ' m /F/6NT,NG
77659.wee s i ) TrY THo/PP&- RePol?r &A- 9,,.,,Fp
TNL- ,1C 9 is>•T/off o F 'i 7#6.'P 0RP-1.14 p,9(7f-
v IL L
8C SSt'/' . 76 " Pecer 417''" .1 9,dOS Sr To PeoviD6.0
Recommendation: DNSI DOS More Information
l
Reviewed by : (;••> Are. title : ,' c Wit,
Date : 1 /b 'r
1 FORM: ERC-06
F V-T1u1c S
Date circulated : DECEMBER 20. 1982 Comments due : JAN[JARY 4, 1983
ENVIRONMENTAL CHECIKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s ) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GIN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : RRADCO PLANNED UNIT DEVELOPMENT
Brief Description of Project : APPLICATION TO UZONE APPROX. 41.5 ACRES OF
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
MP TN THE PORM OF A PLANNED UNIT DEVELOPMENT.
LOCN2ED NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE
LOCATION : AND MT OT.TVFT CRMPTFRY AND WF ST OF RONNEVIT E POWER RIGWT-OF--W2\Y.
SITE AREA: 41 _5 A(`RFS BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (%) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3) Water & water courses :
4) Plant life :
5) Animal life :
6) Noise :
7) Light & glare :
8) Land Use ; north: Girl OrEW1,ON
Di t i
l 6 t i heastj
south: lue
west :
J/1N 5 1 8',
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health:
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history : J
COMMENTS :
Recommendation: p SI 'N DOS More Information
iReviewedby : CO.,. . 6 • Title : //77i1Ty ix«
Date : /- 4 - 8-3
FORM: ERC-06
DeVELOPYIthr
Date circulated : DEER 20. 1982 Comments due : JANUARY 4, 1983
ENVIRONMENTAL CHECKLIST REVIEW SHEET
ECF - 088 - 82
APPLICATION No (s) . REZONE (R-077-82)
PROPONENT : ENVIRONMENTAL RESEARCH & DEVELOPMENT COPORATION-GEN. PARTNER/
MONTEREY TERRACE ASSOC.
PROJECT TITLE : E ADCO PLANNED UNIT DEVELOPMENT
Brief Description of Project : APPLICATION TO REZONE APPROX. 41.5 ACRES Oli'
PROPERTY TO R-1, R-2, R-3 and R-4 FOR UP TO 425 UNITS FOR MULTI-FAMILY RESIDENTIAL
t TSE TN TRF POPM OF A PLANNED UNIT DEVELOPMENT.
LOCATED NORTH OF SR-169 (MAPLE VALLEY HIGHWAY) SOUTH OF MONTEREY TERRACE
LOCATION : Am MT nL7VF.rr CF.MPTFTW ANn WEST OF RONNFVTT T,F POWER RIGHT-OF-WAY.
SITE AREA : 41 _S AC`RFS BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (o) :
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes : T
2 ) Direct/Indirect air quality :
3) Water & water courses :
4 ) Plant life :
5 ) Animal life : i<
6 ) Noise : i<
7) Light & glare : X.
8 ) Land Use ; north: ,Irefeez a/c°rVeast : 64 Q/
south : K/h 14/6/
west : J/'D ,,17/e:5/ 7•l
Land use conflicts :llp.9:0:5414 47 //f4 1c a j .5/, 4r440l/, /
View obstruction : /'//9 fr
9 ) Natural resources : x
10 ) Risk of upset : x
11 ) Population/Employment : X
12 ) Number of Dwellings : 4± X
13 ) Trip ends ( ITE ) : y(Q`p4'
traffic impacts : 6 . .6/' _.- r
14 ) Public services : f X
15 ) Energy : X
1
16 ) Utilities : X
17 ) Human health:
18 ) Aesthetics : A
19 ) Recreation : X
20 ) Archeology/history : X
COMMENTS :o /)4f/€S e1 fr4 e/f/T L'://if. G 6/j` Cf ieCQ 6f4
en'G/f YlOzit QGS .
c etweo% e/ co a44(eir s%ia /d) tS d a/Ac I s C
eX ciYtdr7 di /G4"4 6 15 Q 4
Recommendation : % 'SI DOS V. 'Or . More Information___
Reviewed by : 4 Ln,/_j 1it1e : 49.41e.e/'
Date : afr k
FORM: ERC-06
ti(sY o TY OF RENTC'LT FILE NO(S) : R /O / -82
is ® `` :BUILDING & ZONING DEPARTI1s._._T 088 eZ
wk
MASTER APPLICATION
NOTE TO APPLICANT: Since this is a comprehensive application form, only those
items related to your specific type of application(s) are to be completed.
Please print or type. Attach additional sheets if necessary.)
APPLICANT I I TYPE OF APPLICATION
NAME Envi ror,mental Research & Development
1
FEES
Corporation-Gen.Partner/Monterey Terrace Assoc. CI] REZONE*(FROM ro I ) 515.00
ADDRESS G-1
18000 Pacific Highway South Suite 1115 n SPECIAL PERMIT*
n TEMPORARY PERMIT*
CITY
Seattle , WA
ZIP
98188 Q CONDITIONAL USE PERMIT*
TELEPHONE
11 SITE PLAN APPROVAL
2C 6) 244-0080 ED GRADING AND FILLING PERMIT
No. of Cubic Yards:
CONTACT PERSON
Ii VARIANCEFrom Section:
Justification Required
NAME
Glenn I . McIntosh I
ADDRESS SUBDIVISIONS:
18000 Pac- fic Highway South Suite 1115 Q SHORT PLAT
CITY ZIP Q TENTATIVE PLAT
Seattle, WA 91888 Q PRELIMINARY PLAT
ce 1 i cr Rini- ON
TELEPHONE ED FINAL PLAT '-) 6;1 r'1 E i
206) 244-0080 Q 1WAIVER1 (kI _'? ?_I .I '
NO. OF LOTS:(
Justifi Re yired)
1'
OWNERDE.0 3 1982
NAME PLAT NAME:BUIL DiNG%ZONING DEP i
Montere , Terrace Associates
ADDRESS PLANNED UNIT DEVELOPMENT:
18000 Pacific Highway South Suite 1115 a PRELIMINARY
CITY
Seattle , WA
ZIP
98188 o FINAL
P.U.D. NAME:
TELEPHONE
203) 244-0080 E Residential ED Industrial
aCommercial n Mixed
LOCATION
MOBILE HOME PARKS:
PROPERTY ADDR=SS All that eorti on of the N.E. 4
and of Goy let 7 & 8 w'tlir Sec 17 twnshp 23N O TENTATIVE
R5,E,WM King Cty Legal anc Sketch attached O PRELIMINARY
EXISTING USE P{ESENT ZONI
Undeveloped
Pre i lml nary UD FINAL
in place 425 unit
PROPOSED USE PPUD-021-80)PARK NAME:
Multifaflily Residential
NUMBER OF SPACES:
ENVIRONMENTAL REVIEW COMMITTEE
SQ. FT. ACRES
1
AREA:approx. 41.5
TOTAL FEES
STAFF USE ONLY -- ADMINISTRATIVE PROCESSING
DATE STAMP APPLICATION RECEIVED BY:
APPLICATION DETERMINED TO BE:
0 Accepted
rIncomplete Notification Sent On By:
Initials)
DATE ROUTED ADDITIONAL MATERIAL RECEIVED BY:
1 iel, - 2.Q - gZ APPLICAJION DETERMINED TO BE:
Accepted
QIncomplete Notification Sent On By:
Initials)
ROUTED To-
4 Building Design Eng. Fire ER Parks
Police Policy Dev. apt Traffic Eng, ICR Utilities
REVISION 5/1982
Legal description of property (if more space is required, attach a separate sheet).
Beginning at the southwest corner of the southeast onequarter of the northeast
one-quarter of said Section 17; thence north along the west line of said sub-
division a distance of 252.23 feet to the true point of beginning: said point
lsn designated as Point "A"; thence south R9°4' 17" ; thence south along said
east line to the east one-quarter corner of Section 17; thence continuing
south along the east line of said section to an intersection with the northerly
right-of-way line of State Road No. 5 (St. S.R. #169) (Maple Valley Highway) ;
thence in a general northwesterly direction along said northerly right-of-way
line to an intersection with a line that lies north 89°45' 17" west a distance
of 653.91 feet from Point "A" ; thence south 89°45' 17" east a distance of
653.91 feet to Point "A" and the true point of beginning.
AFFIDAVIT
1, Glenn A. McIntosh being duly sworn, declare that I am
authorized representative to act for the property owner,[]owner of the property involved
in this application and that the foregoing statements and answers herein contained and the
information herewith submitted are in all respects true and correct to the best of my knowledge
and belief.
SUBSCRIBED AND SWORN TO BEFORE ME THIS
a4,1 DAY OF f,
Monterey Terrace Associates19Ya • Environmental Research &
Development Corporation
NOTARY PUBLIC IN AND FOR THE STATE OF General Partner
WASHINGTON,RESIDING AT
11101A Ally
Adir
Name of Notary Public) ignature of Ow er
John P. Kennedy,
Executive Vice 'resident
ca/LAS"-18000 Pacific w So. Suite 1115
Address) Address)
Seattle WA 98188
City) State) (Zip)
206) 244-0080
Telephone)
Acceptance of this application and required filing fee does not constitute a complete
application. Plans and other materials required to constitute a complete application are listed in
the "Application Procedure."
Real Estate•
hu'estments•Securities•Deveopment
December 9, 1982
CITY r FsFtFt``Kda
p\
i]
lll / D
Office of the Land Use Hearing Examiner DEC 1 3 1982
City of Renton
Renton, Washington 98055
Attachments: A. Legal Description
B. Assessors Map
C. N.E. Renton Comprehensive Plan
Gentlemen:
Environmental Research and Development Corporation as General Partner of
that property legally described on attachment "A" and indicated on the
attached assessors map (attachment "B") , herewith submit for your approval
the reclassification of the subject property to conform with the City of
Rentons northeast comprehensive plan dated December 1981 (attachment "C") .
As outlined in that comprehensive plan, we feel justification for the
reclassification is logical and timely and will address the scope of
plan and implementing policies that apply to that reclassification.
3.A. LAND DEVELOPMENT OBJECTIVE: Growth and development should occur in
a timely and logical progression of the existing urban area to maximize
the use of existing services.
POLICY COMMENTS:
1. The reclassification would not be a premature development in that it
is compatible with the present uses in the vacinity (re: proximity
to the downtown core and major work and recreational sites) .
2. The reclassification is within the urban fringe.
3. The reclassification is surrounded by either developed properties,
quasi-public land, recreational land or major arterials.
4. The reclassification has a 42-inch metro sewer trunk within 200'
feet of the property (Maple Valley Highway) .
5. The reclassification is in close proximity to the major commercial
and industrial sites of the city.
6. The reclassification would be an upgrade of the property.
7. Not applicable.
18000 Pacific Highway South,Suite 1115,Seattle, Washington 98188 (206)244-0080
Office of the Land Use Hearing Examiner
December 9, 1982
Page 2
8. Not applicable.
9. Not applicable.
10. Not applicable.
11. The reclassification is definite and reasonable in that the need for
housing near work centers is important in todays economy and the
buffering" of single family residences to high density multi-family
within the reclassification is in keeping with modern zoning concepts.
IMPLEMENTING POLICIES
LAND USE OBJECTIVES:
Policy 3. Land development should progress logically from west to east
on the east Renton plateau and from south to north in the
Kennydale and Hazelwood areas.
Comments: As the reclassification is on the westerly rim of the east
Renton plateau, it should have priority for reclassification.
COMMERCIAL DEVELOPMENT OBJECTIVE:
Not applicable.
COMMUNITY FACILITIES OBJECTIVE:
Policy 1. To project life and property, the Highlands Fire Station should
be moved easterly to the vacinity of Sunset Boulevard N.E. and
Union Avenue N.E. , while a new fire station should be developed
in the Kennydale area.
Comments: The existing fire station south of S.E. 128th on 156th S.E. would
serve the reclassification by both the Maple Valley Highway and
N.E. 3rd.
TRANSPORTATION OBJECTIVE:
Policy 2. All east west arterial corridors including the Maple Valley Hwy. ,
N.E. 3rd/N.E. 4th/S.E. 128th Streets and Sunset Boulevard should
be primarily utilized for arterial street purposes. Land use
activities which disrupt arterial street movements should be
minimized.
Comments: With the improvement requirements of the intersection at N.E.3rd
and Edmonds Avenue by Homecraft Land Development Co. , Inc. and
future latecomers, the reclassification would not disrupt the
anticipated arterial movements of N.E. 3rd.
Office of the Land Use Hearing Examiner
December 9, 1982
Page 3
ARTERIAL STREET IMPROVEMENT OBJECTIVE:
Policy 2. Edmonds Avenue N.E. should be extended southerly from N.E. 4th
to the Maple Valley Hwy.
Comments: The extension of Edmonds Avenue N.E. to the Maple Valley Hwy.
would pass in close proximity to the northeast corner of the
reclassification, thereby enhancing the need for that policies
objective.
UTILITIES OBJECTIVE:
Police 1. The availability of sanitary sewers should be a prerequisite
for new land development.
Comments: A representative of the Renton Sewer Utility has indicated that
a sewer tie-in to a metro 42-inch sewer trunk could be accom-
plished by installing an 8-inch line down the bluff along the
southwest side of the site and across the Maple Valley Hwy. ,
SR-169)(Dick Houghton, Renton Sewer Utility, 1/21/80.
Sincerely,
ENVIRONMENTAL RESEARCH &
DEVELOPMENT CORPORATION
g s
G1 n A. McIntosh
Property Manager
GAM:ks
ATTACHMENTS "A"
RECLASSIFICATION APPLICATION
L
C 1Y OF RENTON
Monterey Terrace Associates/Environmental Research and D n L; j 1J Lb
Development Corporation DEC 1 3 1982
OUII.DING/10NING DEPT.
Legal Description
All that portion of the Northeast one-quarter and of Government Lots
7 and 8 within Section 17, Township 23 North, Range 5 East, W.M.
described as follows:
Beginning at the southwest corner of the southeast one-quarter of the
northeast one-quarter of said Section 17; thence north along the west
line of said subdivision a distance of 252.23 feet to the true point
of beginning; said point also designated as Point "A"; thence south
89°45' 17" east a distance of 526.41 feet; thence south 88°52'04" east
a distance of 799 feet to the east line of Section 17; thence south
along said east line to the east one-quarter corner of Section 17;
thence continuing south along the east line of said section to an
intersection with the northerly right-of-way line of State Road No. 5
St. S.R. #169) (Maple Valley Highway) ; thence in a general north-
westerly direction along said northerly right-of-way line to an inter-
section with a line that lies north 89°45' 17" west a distance of 653.91
feet from Point "A"; thence south 89°45' 17" east a distance of 653.91
feet to Point "A" and the true point of beginning.
NORTHEAST
RENTOI
COMPREHENSIVE
PLAN
4
1':
47
A,,.
1\
4\—_.tri7t‘fiiF1,
1_.
Ir,._
i...
I.',
I:
1
1ti
R.'-.:::
41,'
in.:10l,
1r.
11i.a:
1'
411i111e61,
1
111'1il6lt11'
r‘
r,
t'
lli16.
1111‘
11
v6.t-:
1-
111 _..
1
ir—
i,-
ki g;‘17..
A:i
c__i._,
l_:-. .,,
r,
R e
mis,
1:ri
fr'
ASHINGToa I;
rtheastTiPlanningArea
1 :
I
1' ,1 -
i
S`00(
0
t00
s
ate--oe
ed
oc0°-
of
A a\so
e
co' areas
sr
ro J\
d b
ca\
a
e\` stofi
e9cen`
o
G\
i\ \
te6
a fcocc‘aceas
s
c tQoses•
s
JQs t‘a"
e
J
Pcea a9e 9
acea5 s`0
c
0•
dca aQrcGa c\k
Geo9 decea
Doc\
9•
A
NORTHEAST
RENTON
COMPREHENSIVE
PLAN
lia11B
11 q101tl
Iliep the.L,
fi.,„,11% . 1
JUL= ....- I CITY OF RENTON .
NI @ MIROiikur--3‘.! . to; --
BARE
wh.ty- uu DEC 131982
WASHINGTON I"- lNortheastI
1''
h i`. BUILDING/ZONING DEPT.TA11 - =i r"_ Planning Area I
7-1.14".T.. . uu __ 0 I;ji
a Ta 11
he`d ` -
merXre , MONTEREY TERRACE ASSOC.
u 'fir mif ate^ ''
a i ENVIRONMENTAL RESEARCH
ila SIC ii.t--- 4
it
DEVELOPMENT CORP .
ilk
3
I
I I _-I 16PVita%1--- J—-- ATTACHMENT C"
i. ..mia 1 *o1
Reclassification Application
I I I1 1:. I
i r
MTcityofrenton
i 11
planning dept
i december 1981
r RIBS I- :
M
DESCRIPTION OF THE NORTHEAST COMPREHENSIVE PLAN
The Northeast Planning Area is the third of four areas targeted for review and update of
the original Comprehensive Plan, which was adopted in 1965. The Comprehensive Plan
represents a long-range framework for decision-making related to the issues of growth
and physical development of the City. Adoption of the Northeast Quadrant
Comprehensive Plan, like the previously adopted Southeast and Green River Valley
Plans, will supercede those portions of the 1965 city-wide plan which are in conflict
with this revision.
The Northeast Quadrant Committee used a sub-area approach in preparing this plan
amendment. Sixteen sub-areas of the Northeast Quadrant were identified and at least
three different land use arrangements were developed for each sub-area. For the
purpose of an early analysis and comparison, a weighted environmental matrix was
used to qualitatively rank each of the sub-area alternatives. Three plans were then
created by combining sub-area alternatives with low, medium and high estimated
environmental consequences. These plans generally reflect a range of land use
Intensities and are titled the LOW, MEDIUM and HIGH Density Plans. The recommended
NORTHEAST COMPREHENSIVE PLAN is a composite of the three working draft plans.
MAP 1)
1.SCOPE OF PLAN PROPOSALS
The Northeast Quadrant Comprehensive Plan provides a policy framework for growth
and development for those areas of Renton north of the Cedar River and east of the
1-405 Freeway and Lake Washington. Although the Land Use Element map Illustrates
the ultimate pattern of development, actual development of property will occur over the
next 20 to 50 years. Not all areas designated for urban uses In the Land Use Element
will be appropriate for development within the 1990 time-frame of the Plan. As a
result, 'he discussion of Issues such as utilities, transportation and other services are
only adequate for projected development through the year 1990.
The proposed Northeast Quadrant Plan covers nearly 11,700 acres, with the projected
development of 4590 households providing for a population increase of about 12,750
persons between 1978 and 1990. The following figures Illustrate some of the changes
expected by 1990.
NORTHEAST PLANNING AREA
1978 Single Family Households 8,680
Multiple Family Households 2,140
Total Population 30,300
1990 Single Family Households 11,410 0273
Multiple Family Households 4,000 t /340
Estimated Population 43,050 7y 0
Full development (After the year 2000)
Single Family Households 35,000
Multiple Family Households 15,000
Estimated Population 110,000
The currently available public service, utility and transportation systems are not capable
of accommodating full development of the Planning area. Further, unknown or
unforeseen dimensions of policy, energy, environmental and other considerations will
affect future decisions on land use within the Planning area. Therefore, the Plan
Elements which address the infra- structure for accommodating physical development
illustrate only those facilities which will be required to support 1990 population levels.
However, the location of specific developments is difficult to anticipate, so the
infrastructure plans will, in most cases, provide service to a population base which
would not exist before the mid-1990's.
Current City policy states that urban growth and development, as well as services and
utilities to support such growth, should only occur in a logical and timely progression.
The distinction between lands which are "potentially appropriate" and sites which are
ready now" for a specific land use is important.
Section 3.A. of the adopted Policies Element of the Comprehensive Plan recommends
maximizing the use of available utility and service resources and provides crucial
guidance to the Hearing Examiner and City Council in making this distinction.
3.A. LAND DEVELOPMENT OBJECTIVE: Growth and development should
occur in a timely and logical progression of the existing urban area
to maximize the use of existing services.
POLICIES:
1. To minimize the necessity for redevelopment, premature
development should only be allowed where it can be
shown to be compatible with future uses In the vicinity.
2.Development beyond the urban fringe should only be
allowed where it is a consistent extension of urban services.
3.Vacant land surrounded by developed land should be
given priority for development.
4.Land where adequate public utilities are available shout
be given priority for development.
5.A balance of residential, commercial, and industrial areas
should be achieved.
6. The upgrading and/or redevelopment of marginal areas
should be encouraged.
7. The City should identify its sphere of influence.
8. Annexations should have logical boundaries.
9.To reduce processing time and effort and provide for
efficient use of existing public facilities, large annexations
should be encouraged.
10. Annexations that are economically advantageous should
be encouraged.
11. Development requirements should be definite and reasonable.
The fiscal impacts of prudent consideration of these policies Is obvious. If new growth
can be accommodated at an average cost of, for example, $5.00 per person, it would
not be appropriate to develop a service system which costs $ 10.00 per person. By
consciously directing future land use and infrastructure decisions to certain
neighberhoods or corridors, both fiscal and environmental consequences can be
reduced.
Of equal importance, however, Is the need to remain flexible to future needs of the
planning area. If population growth substantially exceeds the projections considered In
this Plan, adjustments In both policy and service development must be made. It would
be just as inappropriate to fail to accommodate a demonstrated need for expanded
development, as it would to over-zone or over-extend utilities and services.
Il.ELEMENTS OF THE PLAN -- Land Use
The land use distribution within the plan closely follows the primary transportation
corridors. Higher intensity land uses (multiple family, commercial and employment) are
concentrated primarily along NE 3rd/NE 4th and Sunset Blvd. Other areas of multiple
family or commercial development are located adjacent to 1-405 Freeway at the Maple
Valley Highway, north of Park Drive along Lake Washington Blvd. and near NE 44th.
Neighborhood commercial areas are planned at SE 72nd and Coal Creek Parkway and
SE 128th and I64th Avenue SE. The plan also designates single family,
public/quasi-public, recreational and greenbelt uses.
In addition to the land use categories currently found in the Comprehensive plan, the
Northeast Quadrant Plan contains another designation. Within the planning area there
are a number of areas which are not appropriate for residential purposes, but which
could adversely impact the natural environment if developed to typical commercial
standards. Therefore, a new land use classification of OFFICE PARK is proposed which
is intended to allow the broadest range of commercial, professional or administrative
offices to be located In a "park-like" or "campus" setting. Development within an
OFFICE PARK should institute the highest degree of architectural compatibility to the
site, include major setbacks from public streets and adjacent uses, provide for up to
20% of the site to be retained in landscaped open space, and integrate significant
natural elements contained on the site into the overall design.
Community Facilities
The Community Facilities Element recognizes those facilities, such as schools, parks,
fire stations, libraries and related similar uses, which are public/quasi-public. The plan
proposes some expansion of existing park areas and school facilities to improve their
recreational capabilities. Recognizing the rapidly urbanizing nature of the Planning
Area, there is a significant need for active recreational facilities normally included In a
park with a minimum site area of five to ten acres.
As urbanization increases, the need for such park facilities as baseball diamonds,
playground equipment, and tennis courts will substantially increase and these facilities
should be provided. Potential park areas, as indicated on Map 2 and the land use map,
may show a general area of need rather than a specific site or location. The Plan as
proposed does not project the need for additional school facilities in view of the existing
facilities available, declining school enrollment in some areas, and the possibility of
bussing students to gain maximum use of present facilities and the public investment
therein. Generally, fire stations, libraries and other public facilities are Indicated just as
they currently exist.
Transportation/Circulation
Circulation within the Northeast Quadrant is dominated by three east-west and three
north-south corridors.
t'
RTHEAST RENTON
r COMPREHENSIVE PLAN
seu MAP 1
L
SF ce s, tab..::.*':::::::: : ::::::::
h•:: . . . ...... .1
w 0 _r I.,
l'. ..':.....,....
i..., ........ : SINGE
COMMERCIALFAMILY
LOW DENSITY
I
v OFFICE/C MULTI-FAMILY A OFFICE PARK
41)\it. MEDIUM DENSITY
s,7\0 MULTI-FAMILYe RECREATIONT
r' f HIGH DENSITY
r• s' F MULTI-FAMILY GREENBELT
i PUBLIC/
If>itii ttiw1 QUASI-PUBLIC
i 4r
3" .,.: , I ; T -
y
LAND USE ELEMENT
440411 i
i
j1i;?,%, - alii ,t
1
S,‘
111.110.1. i 4 11‘ a.c,t::''
2'OP I I
LAKE
1.
tk
1 .11 b`' I
i',,"-,'..:--...',:.—.. .-.-,,:.'......,...:.............i...:-.. .,,'.,'' : . .,\\.
A..•''...\
I,
lii"..i.
1
g.g_.-14iN_,-.11V1t4t1i..Ta1m111C414I1:1V.,,"
1,.
1,:.4..
1"
6.
a..,...-
rI.r.,.
b.
1_._.::?.
fs.a;.:
t
T litr-i.-iiji '.L 11/4,rim .."=.-......—tei,;:.,A
omit.
ems
e
EMB
i
P ti .
w
g` o eta^
VI
1 leriftillr'%11'w lommiga . --
r>
F t lliii
A in. ra
x
tom : s s I 8 e'ero_
El'' ik:/ ., 11F,--- ,:o.:-:-.0/..Y.TIE-:::-:60°0:0:4&; law:-..._!_-7).: ..r.,,
o.
r eososoo°8o0• °
1 ill i '
ills n / • /
1
NORTHE. T RENTON
x -------
we 4 1 COMPREHENSIVE PLAN MAP la ,k.
1 COMMUNITY FACILITIES,
k Wse
1
J i Parks Schools1111411
j Existing E Elementary
W ,
Proposed/Undev. Middle/High
1 Private Vocational
arr"
ill Libra Fire Stations
p
Existing
LAIKE Proposedd
a
0_ _0 4
i i FE ET. 0000 3000 fOOC
Q n.........i......1„t I T
i
e
l' ' T----
idiol:11i6,
Illi MILES: 0 1
i
4
Z
L . ...I
p, 1
E
i
a8...
N....
SIM r
CA is II
f-,
TC]
i. .-- -
WIN- r__ \
i54 RP '‘'. .i 6-,-
4,,/
k.
i_-
rlb._o_., 411,,... c •k . :
JIIIMER illrillisp 4, an - -: 4: go,-
1 .—.—.1- . Ar-I •[:i fri! F-'---..A1 1 I
1 t 7 ;il
11 1
N
AY CAR: ' y t
a[)7ti'C)RY D N.E 4 th 1 12: th 1
II4 j III1..4,11
5 N
4111E1.1 .11.' 1
i t‘1
fI• ' k _ . oRifi 4 , ,
i1 I'
NOk , HEAST RENTON
COMPREHENSIVE PLAN MAP 3 •
r.
i CIRCULATION ELEMENT
M, f
iir, 4 i 1i.,
Major Arterial Freeway
I [c % Secondary Arterial
soon.
Proposed
Roadway
LAKE um 01 Collector Arterial`
f _. ' ` I' (7 1 t r- FEET 0 1000 3000 SO[
1 St h..ST 1
IA
I'
L---4-- 014 ii"WLMS.
M .
M1
MILES: 0
4 ! I .
1
I. N_
Lc,--
1.!% A17. ... .\14 %
i4-4AiliWi
q. M 1 I_. I l
kin. IN Mk,.
milm.s ..,........\\
41811lb,
PM riat
11111,tr), ' =II
I, 1 1:riji
s V N IR
a/ -ri i .i r W
el911111\lk.„4„ i
a
a j Ls
10_
16,41,14 / i t .., _ I 1 VI
Zi 1111111111F. • . 4' L
MIR 7 Ilk I
Fp[ r:i .! S 1- i
w ; . e 1 _ 1
East-West North-South
Maple Valley Highway Interstate 405 Freeway
N.E. 3rd/4th/S.E. 128th Lake Washington Blvd.
Sunset Blvd. Coal Creek Parkway/
Renton-Issaquah Road 138th Avenue S.E.
Besides these arterial corridors, numerous collector and minor streets provide access to
individual parcels.
The Circulation Element Map (Map 3) recognizes existing streets and arterials as the
circulation network for the Northeast Planning Area. In addition, the Plan identifies two
corridors `which are expected to augment circulation in the planning area. First,
Edmonds Avenue N.E. is proposed to be extended from N.E. 3rd southerly to Maple
Valley Highway. This link will help to reduce traffic which must currently utilize the
Sunset Blvd. N. Intersections at Bronson Way and N.E. 3rd for local access trips. The
second Improvement, which was previously identified In the Southeast Quadrant Plan,
calls for an arterial link connecting the East Renton and Soos Creek plateaus. The
intent of this corridor is to connect the 138th Avenue S.E. and 140th Place S.E. systems
across the Cedar River Valley. No specific route is proposed by the Plan.
The proposed Plan recognizes the difficulty in attempting to accommodate anticipated
new development while retaining the existing emphasis upon the single occupant
vehicle as the primary transportation mode. The Plan proposes the implementation of
non-roadway solutions to circulation problems wherever the cost effectiveness of those
approaches exists. The Plan encourages alternatives to the private automobile,
including transit, carpool and park-n-ride opportunities. The efforts of METRO Transit,
the Department of Transportation and local Jurisdictions to provide these services In a
manner which discourages private automobile use at peak hours is endorsed. The Plan
calls for implementation of park-n-ride/park-n-pool facilities at locations east of 138th
Avenue S.E. to serve East Renton Plateau residents. Transit and carpool facilities
should be emphasized In those areas where development density is sufficient to support
their utilization. High occupancy vehicle lanes on FAI-405 and key arterial corridors
are also endorsed by the Plan where the cost/benefit relationship warrants such
installations.
Utilities
The majority of the incorporated land within the planning area has water, sanitary
sewers and storm drainage available. The Renton Public Works Department has
developed Comprehensive Plans for additional water and sewer service within the city
franchise areas. Storm drainage, however, Is currently handled on a case-by-case
basis. The Northeast Quadrant Plan recognizes these existing utility plans, as well as
W.D. 90 and W.D. 107 plans, while endorsing those sections of the POLICIES ELEMENT
related to utility development and extension.
For those segments of the planning area where utilities are unavailable, the Plan
recognizes the need for their extension to serve the land use development expected
through 1990. However, the Plan recommends the Installation of utilities only in those
areas where the utility extensions logically enhance new development potentials.
These areas are Identified generally as located west of 142nd Avenue S.E. from the Cedar
River Valley northerly to the May Creek Valley. North of May Creek, new utilities should
be concentrated west of 116th Avenue S.E. north to the Lake Boren area.
Extension of utilities to currently unserviced areas should be consistent with good
engineering practice and existing policies of the Comprehensive Plan. Cost
effectiveness of utility extensions should consider both capital and maintenance and
operating costs, In conjunction with the relative costs versus benefits of extending
urban development Into the new service areas.
Policies
The Policies Element of the Comprehensive Plan was adopted by the City Council in
February 1981. These goals, policies and objectives apply to the city as a whole, but
are incorporated specifically within the Northeast Quadrant Comprehensive Plan. The
Land Use Element and other elements of the proposed Plan should not be viewed
without recognition of the policy guidelines provided by this document.
NORTHEAST C011APREHENSIVE PLAN
IMPLEMENTING POLICIES
LAND USE OBJECTIVE:
The Land Use Element of the Northeast Quadrant Comprehensive Plan is intended to be
a general guide to land use decision making.
POLICIES:
1.Land use decisions within the Northeast Quadrant should be consistent with
available transportation, community facilities, and utilities.
2.The Land Use Plan illustrates full development, and not every parcel is
appropriate for development within the 1990 time-frame of the plan.
3.Land development should progress logically from west to east on the East
Renton Plateau and from south to north in the Kennydale and Hazelwood areas.
4.To help balance home to work traffic trips the Land Use Plan strongly endorses
employment opportunities in the vicinity of N.E. 44th and Interstate 405 and the
vicinity of N.E. 4th and Duvall Avenue N.E.
5.An Office Park land use classification should be developed consistent with the
following design criteria:
a.Provide for a transitional land use intensity consistent with both
commercial and residential areas and the natural environment.
b.Provide for a broad range of commercial, professional and administrative
offices in a "park-like" or "campus" setting.
c.Provide for a high degree of architectural compatibility with the site
Including major setbacks from public streets and adjacent uses.
d. Provide for up to 20% of the site to be retained in landscape open space.
e. Integrate significant natural elements contained on the site Into the
overall design.
f.Provide for accessory retail uses consistent with an office setting.
6.Approximately 60 acres of office park should be accommodated along N.E. 4th
generally between Union and Duvall in accordance with land use policy #4
above.
7.Where appropriate design can be developed, mixed residential and business uses
should be accommodated in commercial land use designations.
8.Upon implementation of the community shopping center allowed by Commercial
Development Policy #6, the land uses adjoining the commercial and office land
use designations should be re-evaluated in light of location of the community
shopping center.
COMMERCIAL DEVELOPMENT OBJECTIVE:
The Land Use Plan should provide for sufficient retail services to accommodate the
projected residential population.
POLICIES:
1.Commercial uses developed along N.E. 4th Street and along Sunset Boulevard
N.E. should be oriented within shopping centers or other sizeable complexes.
2.Strip commercial development should only be allowed when no other design
alternative is available.
3.Commercial development should be designed to limit the number of access
points to arterial streets.
4.Commercial development along major arterials should be designed with private
perimeter access roadways which concentrate arterial street access at a
minimum number of points.
5.Multiple family residential uses should be encouraged as buffers between
commercial uses and less intensive uses.
6.The Land Use Plan recognizes that one Community- scale retail shopping center
20+ acres) Is justified by the anticipated market for the area along N.E. 4th
within the City limits during the life of the plan. Sufficient area is designated at
N.E. 4th St. and Union Avenue N.E. to provide for community shopping facilities
at the northwest, northeast, and southeast corners and available at the
northeast corner of N.E 4th and Duvall. Only one of these corners should be
developed as a retail shopping center. Upon implementation of one shopping
complex, the Comprehensive Plan should be evaluated for appropriate use of
the remaining corners.
7. Retail commercial facilities at S.E. 128th St. and 164th Avenue S.E. should be
sufficient to serve residents of the unincorporated East Renton Plateau without
requiring retail trips to be extended into the city of Renton.
8.Retail commercial uses along the Maple Valley Highway should be generally
located immediately east of the Cedar River Park and not extended in strip
development easterly along the Highway.
COMMUNITY FACILITIES OBJECTIVE:
Community facilities should be sufficient to accommodate the level of population
anticipated in the Plan.
POLICIES:
1.To protect life and property, the Highlands Fire Station should be moved easterly
to the vicinity of Sunset Boulevard N.E. and Union Avenue N.E., while a new fire
station should be developed in the Kennydale area.
2.Priority park improvements should focus on fulfilling existing recreational needs.
3. Neighborhood parks should place a first priority on providing for active
recreational activities, with resource based parks maintaining a lower priority.
4. The Comprehensive Park Plan should serve as the guide to new park
construction and design.
TRANSPORTATION OBJECTIVE:
The Northeast Quadrant Plan proposes an integrated transportation system including
private vehicles and pedestrian/bicycle facilities.
POLICIES:
1.The Northeast Quadrant Comprehensive Plan strongly endorses the need for a
traffic study to thoroughly evaluate all of the transportation requirements to
accommodate the proposed level of development.
2. All east/west arterial corridors including the Maple Valley Highway, N.E.
3rd/N.E. 4th/S.E. 128th Streets and Sunset Boulevard streets should be primarily
utilized for arterial street purposes. Land use activities which disrupt arterial
street movements should be minimized.
3. Mass transit opportunities through effective land use design should be
encouraged.
4. Park and ride and park and pool facilities should be provided at strategic
locations, with particular emphasis upon facilities east of the current city limits to
minimize impacts upon existing City streets.
5. Pedestrian and bicycle paths and trails should be developed between residential
and commercial areas to minimize the requirement for vehicular trips to provide
for convenience shopping.
ARTERIAL STREET IMPROVEMENT OBJECTIVE:
To provide for sufficient vehicular movement opportunities, the arterial street system
should be expanded.
POLICIES:
1.138th Avenue S.E. should be extended southerly in an alignment which will
provide for connection to 140th Place S.E. connecting the East Renton Plateau
and the Soos Creek Plateau with a north/south arterial connection.
2. Edmonds Avenue N.E. should be extended southerly from N.E. 4th Street to the
Maple Valley Highway.
3. An arterial street extension should be extended westerly from the southerly
terminus of Union Avenue S.E. to the proposed southerly extension of Edmonds
Avenue S.E. on an alignment at approximately S.E. 3rd Street.
4. An environmental and engineering analysis should be accomplished to determine
the feasibility of extending Edmonds Avenue N.E. across May Creek to connect
with 116th Avenue S.E.
5. Development along Duvall Avenue N.E. (138th Avenue S.E.) should be designed
with specialized setbacks and landscaping design to create a "boulevard"
architectural effect.
UTILITIES OBJECTIVE:
To accommodate the proposed level of growth safe and healthful public utilities should
be provided.
POLICIES:
1. The availability of sanitary sewers should be a prerequisite for new land
development.
2. The Honeycreek Sewer Interceptor should be constructed.
3. Sanitary sewer interceptors should be constructed in the Maplewood Creek
Sewer Drainage Basin.
4.During the life of the plan, City utilities should only be extended to 142nd
Avenue S.E. south of May Creek, and 116th Avenue S.E. north of May Creek.
5. The May Creek Basin Plan for storm drainage should be implemented by the City
in conjunction with other jurisdictions.
6.Development proposals should be conditioned or modified to maintain
compliance with the May Creek Basin Plan.
7. Stream corridor guidelines, as set forth in the May Creek Basin Plan should be
implemented during development review for all greenbelt streams in the
Northeast Planning Area.
8. Areas designated as "greenbelt" should be considered critical areas for storm
drainage purposes.
9.Geographical areas upstream from critical storm drainage areas should also be
considered critical storm drainage areas.
Real Estate•
Investments•Securities•Development
CT(OF REiiTO n
DEC 3 1982November29, 1982
City of Renton
Planning Department
City Hall
Renton, Wash.
Subject: Rezone - Monterey Terrace
Gentlemen:
Included herewith is our application to rezone the subject property.
We are requesting this rezone to conform with the City of Renton North-
east area comprehensive plan adopted December, 1981.
Thank you for your consideration.
Respectfully,
ENVIRONMENTAL RESEARCH &
DEVELOPMENT CORPORATION
b
enn A. f Intos
Property Manager
18000 Pacific Highway South,Suite 1115,Seattle, Washington 98188 (206)244-0080
Transamerica Transamerica
Title Insurance Company
Title Services Box 1493
mug frog
10635 Northeast Eighth Street
41,1111 Bellevue,Washington 98009 RENT ON
206) 628-4661
g
CITY ©
11
DEG 3 198
REZONE CERTIFICATE
Environmental Research and
v, ,(r1(',;7-)NING DEPT,
Development Corporation brc er No. 901841
18000 Pacific Highway South, Charge : $100 .00
Suite 1115 Tax : 6 . 50
Seattle , WA 98188 Total : 106 . 50
Attn : Glen McIntosh
Phone: 244-0080
FEE SIMPLE OWNER: KENT HIGHLANDS , INC. , a Washington corporation,
formerly STONEWAY CONCRETE, INC. , formerly
STONEWAY SAND & GRAVEL CO. , which acquired
title as STONEWAY DOCK.
DESCRIPTION:
as hereto attached -
CONTRACT PURCHASER:
1. CONTRACT OF SALE AND THE TERMS AND CONDITIONS THEREOF :
Seller: Kent Highlands , Inc. , formerly Stoneway
Concrete, Inc. , a Washington corporation
Purchaser: Environmental Research and Development
Corporation, Inc. , a Washington corporation ,
the General Partner for Monterey Terrace
Associates , a Washington limited partnership
Dated: January 22 , 1980
Recorded: January 24, 1980
Recording No. : 800124-0812 (Ef 0577028)
Said contract has been amended by instrument recorded under
Recording No. 810814-0730.
No additional examination of the title has been made , and our
search is limited to the matters shown above. Liability is
limited to the amount paid therefor.
TRANSAMERICA TITLE INSURANCE COMPANY
B
obert . ver n , Title Officer
628-5970)
RLI : cz
November 22, 1902
Order No. 901841
DESCRIPTION:
All that portion of the Northeast 14 and of Government Lots 7 and 8
within Section 17 , Township 23 North, Range 5 East, W.M. , described
as follows :
Beginning at the Southwest corner of the Southeast k of the Northeast
of said Section 17 ;
thence North along the West line of said subdivision a distance of
252. 23 feet to the true point of beginning, said point also
designated as Point "A" ;
thence South 89°45 ' 17" East a distance of 526 . 41 feet;
thence South 88°52 ' 04" East a distance of 799 feet to the East line
of Section 17 ;
thence South along said East line to the East k corner of Section 17 ;
thence continuing South along the East line of said section to an
intersection with the Northerly right-of-way line of State Road No . 5
St. S . R. #169) (Maple Valley Highway) ;
thence in a general Northwesterly direction along said Northerly
right-of-way line to an intersection with a line that lies North
89°45 ' 17" West a distance of 653 . 91 feet from Point "A" ;
thence South 89°45 ' 17" East a distance of 653 . 91 feet to Point "A"
and the true point of beginning;
TOGETHER WITH an easement for road and utility purposes over, across
and along the following described tract :
A strip of land 100 feet in width, the Westerly margin of which
is the Westerly line of the Puget Sound Power and Light Company ,
right-of-way and described as follows :
Beginning at the Southeast corner of the Northeast k of the Northeast
of Section 17 , Township 23 North, Range 5 East , W.M. ;
thence North O1°07 ' 56" East along the East line of said subdivision 115
feet ;
thence North 89°36' 24" West 86. 83 feet to the East line of the Puget
Sound Power and Light Company right-of-way;
thence North 26°38' 54" West along said East line 235 . 23 feet to the
South margin of N.E . 3rd Street;
thence South 71°49 ' 00" West along said South margin of N.E . 3rd Street
203 . 82 feet to the West line of said Puget Sound Power and Light Company
right-of-way and the true point of beginning;
thence South 26°38 ' 54" East along said West line 450 feet ;
thence North 63°21' 06" East 100 feet ;
thence North 26°38 ' 54" West 435 feet , more or less , to the South margin
of Northeast 3rd Street;
thence South 71°49' 00" West along said South margin to the true point
of beginning;
continued-
Order No. 901841
DESCRIPTION (continued)
TOGETHER WITH a permanent easement and right-of-way for ingress ,
egress and utilities with necessary appurtenances described as a
strip of land 60 feet and width, the Easterly margin of which
is to lie one foot within the Easterly margin of American Memorial
Services , Inc. , property and described as follows :
A strip of land 60 feet in width over, under and across a portion
of the Southeast 4 of the Northeast 34 of Section 17 , Township 23 North ,
Range 5 East , W.M. , more particularly described as follows :
Beginning at the intersection of the Southwesterly margin of the Puget
Sound Power and Light Company right-of-way with the North line of said
subdivision;
thence South 26°38' 54" East along said Southwesterly margin a
distance of 501 . 26 feet;
thence South 6°54' 11"East continuing along said Southwesterly margin
a distance of 138 . 35 feet to the East line of said subdivision;
thence South 1°07 ' 56" West along said East line a distance of
543 . 67 feet ;
thence North 88°52 ' 04" West a distance of 60. 00 feet ;
thence North 1°07 ' 56" East parallel to the distant 60. 00 feet
from the East line of said subdivision a distance of 539.46 feet ;
thence North 6°54' 11" West parallel to and 60. 00 feet distant
from said Southwesterly margin a distance of 123. 69 feet;
thence North 26°38 ' 54" West continuing parallel with and 60. 00
feet distant from said Southwesterly margin a distance of 490. 82
feet;
thence North 63°21' 06" East a distance of 60. 00 feet to the
point of beginning;
Situate in the City of Renton, County of King, State of Washington.
ENDING •
OF FILE
Fig TITLE
0$040chofuntt . 08:06th
einublair
8ai