No preview available
HomeMy WebLinkAbout42Date: city o4 Renton Department o4 Engineering Page; 3 Project; 19S6 Small Bridge Repai, and Gwd Fail Contract Number: CAG Cr59-B6 Contractor Coral Construction ED Estimate Mumber* I Closing Date: December 31, 1986 Item, &ars WscripUm T X Onit Est. Quantity unit Pre,ims Pre,lous This Price Quantity Pfmnt Quanti ty This Total Amount Quanti ty Total pdoLlnt NO. MD. 01. SDEXU C' Epoxy Grout Bridge Deck Holes ,,w Sum 1.00 �,100.00 0.00 0.00 0.00 0.00 0 .00 Total Schedule C 0.00 0.01 0.00 01. SDIEJXU Epoxy Grwt Bridge Dec� Holes Lump Sum I.DD 3,100.00 0.00 0.00 0.00 0.00 0.0-0 Total Schedule D'' 0.00 0.00 0.00 01. SDEDLI-E E Clean Bridge Dwnel LWp S� 1.00 2,WIJ.00 0.00 0.00 0.00 0.00 G.00 02. Asphalt Patch o4 Deck Pavement Lump Sum 1.00 600.00 0.00 O.Do 0.00 0.00 0.00 Total Schedule E 0.00 0.00 O.Do 01. SDERILE F Removal of Structure t Obstruction Lump Sum 1.00 11000.00 0.00 O.Do 0. Do 0.00 0.00 Reooye and Dispose, Existing Bridge Deck 02. Clew Bridtie Channel Lump Sum 1.00 2,000.00 0.00 0.00 0.00 0.00 0.00 03. Furnish k Install " Bridge Deck Lump Sum 1.00 9,5W.00 O.M 0.00 0.00 O.W 0.00 Total Schedule F (1.00 0.00 0.00 6