Page; 3
Project;
19S6 Small Bridge Repai, and Gwd
Fail
Contract Number:
CAG Cr59-B6
Contractor
Coral Construction ED Estimate
Mumber*
I Closing Date:
December 31,
1986
Item, &ars
WscripUm T
X
Onit
Est.
Quantity
unit Pre,ims Pre,lous This
Price Quantity Pfmnt Quanti ty
This Total
Amount Quanti ty
Total
pdoLlnt
NO. MD.
01.
SDEXU C'
Epoxy Grout Bridge Deck Holes
,,w Sum
1.00
�,100.00 0.00
0.00
0.00
0.00
0 .00
Total Schedule C
0.00
0.01
0.00
01.
SDIEJXU
Epoxy Grwt Bridge Dec� Holes
Lump Sum
I.DD
3,100.00 0.00
0.00
0.00
0.00
0.0-0
Total Schedule D''
0.00
0.00
0.00
01.
SDEDLI-E E
Clean Bridge Dwnel
LWp S�
1.00
2,WIJ.00 0.00
0.00
0.00
0.00
G.00
02.
Asphalt Patch o4 Deck Pavement
Lump Sum
1.00
600.00 0.00
O.Do
0.00
0.00
0.00
Total Schedule E
0.00
0.00
O.Do
01.
SDERILE F
Removal of Structure t Obstruction
Lump Sum
1.00
11000.00 0.00
O.Do
0. Do
0.00
0.00
Reooye and Dispose, Existing Bridge
Deck
02.
Clew Bridtie Channel
Lump Sum
1.00
2,000.00 0.00
0.00
0.00
0.00
0.00
03.
Furnish k Install " Bridge Deck
Lump Sum
1.00
9,5W.00 O.M
0.00
0.00
O.W
0.00
Total Schedule F
(1.00
0.00
0.00
6