No preview available
HomeMy WebLinkAbout52Datei 104*-07 Cat,� of flentom . DoWtomot oi Engineering pawt 5 Project: 1996 Small Brldgw P4ir and Suard Rail Contract Wimbar: CM 059-% Contractor Coral Constrtzctiu Co Estimate *Ambw: 2 Closing Datir J~y 30, 1997 It= Sees DrAcription T ilai t Est. Uni t Previon Prrviws 'his This Total Total NIL NIL x QMMtLtY Price Cimantity Aminint aAwtity knont QwAity Asiant 14. Cament Czaarte Curb aid Gutter - EAch 485.00 9.00 0.00 0.00 0.00 0.00 0.00 TYPE "A" 15. Feasivo misting rail and post Each 15.00 250.00 5.00 1250.00 0. OD 5.00 IMAD 16. Otaimp Dralor 1 2 LAp Sim, 0.00 1,300.00 0.00 1.00 13M. 00 1.00 13".00 Donny Amatawwt %wJ Rail Repair Total Sctiodiila " G" 31786.00 16234.20 48020.20 focal SctmWs -A- $8,99D.00 M.00 09,440.00 Total SdwW a "B" $0.00 JiZ,619,2D $Z,619.2D ToW Schodiala, "C" $0.00 90.00 $0.00 Total ktwdmlo "D" $0.00 $0.00, moo Total Schodal a ''E" IND. DO $2, OW. 00 S2,00,0.00 Tat al 5chodole " F" $0.00 $14,500.00 $14,500.00 Total Schamlml a "B" szi, 786, 00 $16,ZS4.20 $4,020.20 Total All Silim*dos $0,7-&00 $U,W3.40 40 Nu v, V