No preview available
HomeMy WebLinkAbout56Vitt: 31-DK-B6 CItY Of Renton Deliarti�nt of Enginc-ing Project: 1996 Ssail Bridge Repair and Guard Rail Contract Nuker: CAG (,59-86 Contractor C,,ral Construction Co Estimate Number: J Closiny Date: Deceber 31, 198k. Itm Bars Description T Unit Est. Llnit Pre�lms previous Ths This Total Total NO. No. Quantity PI ice Quantity Ar-nt Quantity Amount ouantity Amount SCHEDULE - A 01. Beim Guard Tai I TYPE I Lineal Feet 190.0 20.00 0.00 0.00 1955. SO 910.00 1 �5. 50 3910.00 02. Portland Ceseni. Concrete Walk Square Yard 33.0 20. DO 0.00 0. DO 33.00 660.00 ,3. DO 660.00 D3. Be" Gawd Rail Anchor TYFE I Each 4.0 400.00 0.00 0.00 4.00 1600. w 4.00 1600.00 04. 10''xlO'' Treated Timber Posts Each 12.00 110.00 0.00 0.00 12.00 1320.00 12.00 1320.00 05. Misc. Site Work, Rpw�e Walks, Lamp Suii 1. 00 1, 5w. 00 0. (KI Adjust Manhole, Relocate Land- scaping and Irrigation Total Schedule - 4' ' 0.00 1.00 1500. DO 1.00 1500.00 O.Do Rm.00 0990.00 vt�- V-41