Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout58Cit of Benton Dppart�t of Engin�. ing Faqe. L
Oat" -:-Dec-Ok
pro,mt:
19B6 5-11 Bri * Repair and 6uard Rail
Contract Number:
CAG
Contractor
Cnral Const,uction CO
Estimate Number: I
Closing Date:
December 31, 1906
Itee Bars
Description
T Unit
Est. Unit
Previous Previous
This This
Total
Total
NO.
I
Quantity Pr i EP
Quantity A�nt
Want I t V k0unt
Qumt i ' Y
Amount
01.
C..
Epmy Brout Bridge Deck Holes
Lump So
1.00 3,100.00
0.00
0.00
0.00
0.00
Total Schedule C"
0.00
0.00
0.00
Ol.
SCHEDULE " D
Epovy Grout Bridge Deck Holes
Lump Sum
1.00 "10,m)o
0.00
0.00
0.00
0.00
0.00
Total Schedule '' D''
0.00
0.00
0.00
01.
SCHEDULE ' E''
Cleu. Bridge Ch.n.1
Lump Sum
1.00 2,0DO.W
0.00
0.00
0.00
0.00
0.00
02.
Asphalt Patch of DKk Pavw�t
Lujr,, Sum
1.00 600.00
0.00
0.00
0.00
0.00
0. O-D
li,tal Schedule E
0.00
0.00
0.00
SCHEDULE - F"
Removal 0 St-rture L Obstruction
Lump Sum
1.01) 3,ODO.00
0.00
O.W
0.00
0.00
0.00
Remove and Dispo� E.tsting Bridge
Deck
02,
Clean Ewidq� Char -I
Lump Sup
1.00 2,000.00
0.00
0. VO
0.00
0.00
0.00
03.
Furnish L Irst,11 New bridge �eck
LmP 1-
1.00 q,500.00
0.06
0. (Y)
0.00
O.W
0. 00
Total Schedule F,
0.00
0.00
0.00
*16
'r