Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout64A�
Date; II-Dec-B6
CitY of Renton - I�partaent 0 E.g,n�inq
Fage;
FYojK t: 1986 Small aridge Repair arid Bwd Rail
Contract Number:
CAG C9-86
Corrtractor C�al Cmstruction Co
Estimate MAer: I Closing Date:
December 31, IM
It- Bws- Dpscription
T Onit
Est. Unit Previous Priwims
This This
Total
Total
NO.
X
Quantity Price Quantity Ammrit
Quantity Amount
Quawitity
Amount
SDIEUE ' C'
01. Epowy Grout Bridge Deck Holes
Lump Sun
1.00 71,100.0r) O.OD 0.00
0.00
0.00
0.00
Total Schedule C-
0.00
0.00
0.00
� - D
01. Epoxy Grout Bridge Deck Holes
Lump Sum
1.00 3,100.W 0.00 0.00
0.00
0.00
O.OD
Total Schedulz - D-
0.00,
0.00
0600
SCHEDULE - E"
01. Clow Bridge Ctwoel
Lump SuN
1.00 2,(J(Y).Oo 0.00 0.00
0 00
0 00
0 00
02, Asphalt Patch of Deck F,,emen t Lump Sum
1. M 6N. 00
0.00
0.01)
0.00 0.00
0.00
Total Schedule - E''
0.00
0.00
0.00
SCIULLE F
01. R-I 04 st,.Etve i Obst,-�tion L�mp S-
1.00 3,000.00
O.W
0.00
0.00 0.00
0.00
R1,01ove and Piso� Existing Bridge
Deck
02. Cle,in Bridge D-pl [�.p SUN
1.00 2,000).00
0.00
O.VO
0.00 0.00
0.00
03. Fur.:sh � lost, I Me- Bridge Deck Lump Suix
1.00 9,500.00
0.00
0.110
0. 00 0.00
0.00
Total Scnedtile F
0.00
0.00
0.00
�4