HomeMy WebLinkAbout5719.05 S 2024 1010Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 3 Report ID 5719.05 S 2024 1010 Date Thu 10/10/2024 Weather 65°F Cloudy Arrival/Departure Time(s) 9:45AM; 10:45AM Travel Time (hr) 0.75 Project Name Solera Location 2902 NE Sunset Blvd, Renton ESNW Rep., CESCL No., Phone No. & Report Statement Willem Scherwin, ECO-3-2282208, (206) 793-8569, JB “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact Heartland Construction, LLC | Mike Vaughan, Benham Hansen Permit No(s). WAR310291 Reviewed By JB Initials/Date N/A Field Supervisor Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 0.11 inches Precipitation in last 24 hours (approximate): 0.00 inches Phase of active construction (check all that apply):  Pre-construction  Clearing, demolition, or grading  Infrastructure or roads  Concrete pours  Vertical construction  Utilities  Off-site improvements  Site temporarily stabilized  Final stabilization Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Hanna Turbidity Meter No. 034 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes MP 1 NE 10th St - - N/A MP 2 Infiltration facility - - N/A MP 3 N Kirkland Ave NE - - N/A MP 4 S Kirkland Ave NE - - N/A MP 5 NE 12th St - - N/A MP 6 Harrington Place NE - - N/A Report ID 5719.05 S 2024 1010 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N High visibility fence along landscaped planters. Construction fence around site perimeter. 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck G N Jefferson Ave NE and NE 11th St entrances are paved. Quarry spall entrance at Block C. 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N Infiltration facility under Building B. 4. Install Sediment Controls • Silt Fence • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck G N Silt fence around Blocks C and D. 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles G N Final pavement throughout majority of site roads. SW corner is actively being worked. Buildings A and B are landscaped. Block C is hydroseeded; grass is growing in. Block D is stabilized with gravel. 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors - - N/A 7. Protect Drain Inlets • Catch Basin Inserts G N Inserts in catch basins along S perimeter of Buildings A and B. No construction activity along Jefferson Ave NE and NE 11th St. 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets - - N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N Concrete washout onsite. Chemical/material storage onsite. 10. Control Dewatering - - N/A 11. Maintain BMPs G N Maintain BMPs. 12. Maintain SWPPP & Site Logbook G N Available upon request. 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement G N Bioretention ponds and swales are mulched and hydroseeded. Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Report ID 5719.05 S 2024 1010 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND MONITORING POINT HYDROSEEDED ACTIVE HOMEBUILDING FINAL LANDSCAPED CHEMICAL/MATERIAL STORAGE JOB SHACK INFILTRATION FACILITY BIORETENTION RAIN GARDEN BIOSWALE CONSTRUCTION ENTRANCE GRAVEL PAVEMENT SILT FENCE HIGH VISIBILITY FENCE CHAIN-LINK FENCE CONCRETE WASHOUT CATCH BASIN INSERT MP 1 MP 3 MP 4 MP 5 MP 6 MP 2