HomeMy WebLinkAbout5719.05 S 2024 1010Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 5719.05 Page 1 of 3 Report ID 5719.05 S 2024 1010
Date Thu 10/10/2024 Weather 65°F Cloudy
Arrival/Departure Time(s) 9:45AM; 10:45AM Travel Time (hr) 0.75
Project Name Solera
Location 2902 NE Sunset Blvd, Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Willem Scherwin, ECO-3-2282208, (206) 793-8569, JB
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Heartland Construction, LLC | Mike Vaughan, Benham Hansen
Permit No(s). WAR310291
Reviewed By JB
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.11 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 034
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 1 NE 10th St - - N/A
MP 2 Infiltration facility - - N/A
MP 3 N Kirkland Ave NE - - N/A
MP 4 S Kirkland Ave NE - - N/A
MP 5 NE 12th St - - N/A
MP 6 Harrington Place NE - - N/A
Report ID 5719.05 S 2024 1010 Page 2 of 3
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N High visibility fence along landscaped planters.
Construction fence around site perimeter.
2. Establish Construction Access • Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
G N Jefferson Ave NE and NE 11th St entrances are
paved.
Quarry spall entrance at Block C.
3. Control Flow Rates
• Stormwater Vault or Facility • Straw Wattles
• Check Dams
G N Infiltration facility under Building B.
4. Install Sediment Controls • Silt Fence
• Vegetation
• Straw
• Sediment Ponds, Traps & Filters • Treatment
• Water Truck
G N Silt fence around Blocks C and D.
5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting • Stockpiles
G N
Final pavement throughout majority of site roads.
SW corner is actively being worked.
Buildings A and B are landscaped.
Block C is hydroseeded; grass is growing in.
Block D is stabilized with gravel.
6. Protect Slopes • Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
- - N/A
7. Protect Drain Inlets
• Catch Basin Inserts G N
Inserts in catch basins along S perimeter of
Buildings A and B.
No construction activity along Jefferson Ave NE and
NE 11th St.
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam • Outlet Protection
• Nets and Blankets
- - N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling G N Concrete washout onsite.
Chemical/material storage onsite.
10. Control Dewatering - - N/A
11. Maintain BMPs G N Maintain BMPs.
12. Maintain SWPPP & Site Logbook G N Available upon request.
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
G N Bioretention ponds and swales are mulched and hydroseeded.
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Report ID 5719.05 S 2024 1010 Page 3 of 3
Earth Solutions NW, LLC
BMP LEGEND
MONITORING POINT
HYDROSEEDED
ACTIVE HOMEBUILDING
FINAL LANDSCAPED
CHEMICAL/MATERIAL STORAGE
JOB SHACK
INFILTRATION FACILITY
BIORETENTION RAIN GARDEN
BIOSWALE
CONSTRUCTION ENTRANCE
GRAVEL
PAVEMENT
SILT FENCE
HIGH VISIBILITY FENCE
CHAIN-LINK FENCE
CONCRETE WASHOUT
CATCH BASIN INSERT
MP 1
MP 3
MP 4
MP 5
MP 6
MP 2