Loading...
HomeMy WebLinkAboutR-417610J 5� G O Z U) 0 M� W LLJ Ld z L, DocuSign Envelope ID 345B681D-914F-4F2D-AB59-7C192D3B78A3 ALL 90 TURNS SHALL BE ACCOMPLISHED — BY MEANS OF A WYE WITH CLEANOUT AND 4" BEND AS REQUIRED (NO GREATER 45 BEND TWO 45' BENDS SHALL NOT BE THAN 45- BEND) EVERY 2ND CHANGE 4" CLEANOUT WYE MATH ACCEPTABLE (SEE NOTE 11) IN DIRECTION OR GRADE WALL REQUIRE 45 BEND AND PLUG A CLEANOUT WYE (SEE NOTE 11) I (SEE NOTE 11) z J Z J Z J HOUSE �I HOUSE aI HOUSE gI HOUSE a a It 3 -0" MIN I. 4 SEWER PIPE SVRFACE CLEANOUT E v (TYPICAL) 6'k 6"x6" WYE r4"WYE a" SEWER PIPE, SEE NOTES 2 (SEE STD PLAN - 407) 4" TEST TEE WITH AND 3 MINIMUM LINE SIZE FOR I PLUG FACE UP OTHER THAN SINGLEFAMILY IS 6R 0 W LINE _ (TYPICAL) I — R 0 W LINE 3' MIN 0 10 6"x 4" REDUCER F F z (TYPICAL) F x MAIN SEWER LINE x ^ x X z IF THE BUILDING SEWER SERVES ANY FIXTURE HAVING FLOOD LEVEL RIMS LOCATED BELOW THE ELEVATION i(4" cOF THE NEXT UPSTREAM MANHOLE COVER OF THE PUBLIC SEWER SYSTEM, A BACKFLOW PREVENTION o ZDEVICE SUCH AS CLEAN CHECK EXTENDABLE inBACKWATER VALVE OR APPROVED EQUAL SHALL BE a)INSTALLED u4" FLEXIBLE COUPLING (FERNCO OR EQUAL) Z o J WSURFACE CLEANOUT m 4"x 4"x4" WYE PIPING PLAN BUILDING DRAIN FOR LOW ELEVATION HOUSE MAIN TO 5 FEET R 0 W LINE R 0 W. LINE TO CLEANOUT MAX. SIDE SEWER BUILDING SEWER BUILDING STUB DRAIN 3 FEET Mp%IIN��—JJFF11��1�� ILJ r�i : m r1 rn rn+ D + n O m Om r� O C �y NZ: _> O A + v fx> Om O O rri m v ,�- v" Z p+ m O x r -0 M m r m m + C'f Z 0 n M v r-Q-� C) Z O > - m Z A 0> n O� > > m 0 M g p g C > 9 � Z Z rn rn r O X Z o + o 0 C: rn Z, v m PLAN BUILDING SEWER INSTALLATION NOTES 1 PRIOR TO INSTALLATION OF A SANITARY SEWER CONNECTION, A SIDE -SEWER PERMIT MUST BE PURCHASED FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. 2 FOR INSPECTION OF SIOE SEWER, CALL 24 HOURS IN ADVANCE THE INSPECTION PHONE NUMBER IS ON THE SIDE SEWER PERMIT SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE ON SITE WHEN INSPECTOR ARRIVES AT APPOINTED TIME DO NOT BACKFILL THE DITCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR 3 SIDE SEWER PIPE AND FITTINGS SHALL BE PVC SDR 35 WITH RUBBER GASKET JOINTS UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT 4 A MINIMUM GRADE OF 2% (1/4" PER FOOT) MUST BE MAINTAINED WITH A 4" PIPE IN THE EVENT A 2% GRADE CANNOT BE MAINTAINED WITH THE APPROVAL OF THE PUBLIC WORKS INSPECTOR, THE CONTRACTOR MAY INSTALL A 6" DIAMETER SIDE SEWER AT NO LESS THAN 1X 5 INSTALL SIDE SEWER WITH 2' MINIMUM COVER 18" COVER IS ALLOWED AT THE HOUSE IF OUTLET IS SHALLOW 6 ALL BUILDING SEWER AND SIDE SEWERS SHALL HAVE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405 7 WHENEVER FEASIBLE, THERE SHALL BE A MINIMUM 5 FOOT HORIZONTAL SEPARATION BETWEEN SANITARY SIDE SEWERS AND ALL OTHER UTILITIES 8 SIDE SEWER TESTING SHALL CONSIST OF PLACING A PLUG IN THE TEST TEE AND INSTALLING A 4-FOOT RISER PIPE ON THE CLEANOUT AT THE BUILDING. THE SIDE SEWER PIPE SHALL BE FILLED TO WITH WATER TO THE TOP OF THE RISER PIPE NO LOSS OF WATER SHALL OCCUR FOR A PERIOD OF 10 MINUTES. THE SIDE SEWER MAY BE CONNECTED TO THE BUILDING FOLLOWING THE SUCCESSFUL COMPLETION OF THE LEAK TEST 9 THE CLEANOUT AT THE RIGHT-OF-WAY SHALL BE INSTALLED PER STANDARD PLAN 4061 THE CLEANOUT AT THE BUILDING SHALL BE INSTALLED TO SURFACE GRADE ALL OTHER CLEANOUTS SHALL BE INSTALLED TO WITHIN 12" OF THE SURFACE 10 IF SIDE SEWER STUB IS NOT AVAILABLE THE OWNER SHALL BE RESPONSIBLE FOR ITS INSTALLATION PER STANDARD PLAN 4061 ALL WORK WITHIN STREET RIGHT-OF-WAY SHALL BE DONE BY A LICENSED AND BONDED CONTRACTOR 11 ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110 2 12 ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT (WISHA) TYPICAL BUILDING SEWER STD. PLAN -406,2 PUBLIC WORKS E88@"1PD988449D E'bSigAe°'1 DEPARTMENT FROM PROPERTY LINE TO artin PastUCFJ@V26/2021 BUILDING CONNECTION Ipb1 DATE AS -BUILT CALL 811 BEFORE YOU DIG or go to www callbeforeyoud,g org NO AS —BOIL T INFORMA 71ON ON THIS SHEET. "I CERTIFY THAT 7HE /NFORMA77ON SHOWN HEREON WHICH WAS AS —BUILT BY D.R. STRONG, AND MAY INCLUDE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND AS —BUILT COMMENTS, ACCURATELY REFLECTB EXIS77NG FIELD COND177ONS AS DETERMINED BY ME OR UNDER MY DIRECT SUPERVISION ON THIS DATE- 912412025." r Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) 15 D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 - 7th AVENUE KIRKLAND, WA 98033 0425.8273063 F 425.827.2423 1 12: NW 1/4 SECTION 17, TOWNSHIP 23 N, RANGE 5 W, W.M. BA SSA NO MUL TI=FA MIL Y ZURN® SPECIFICATION SHEET Z1188 TAG LARGE CAPACITY OIL INTERCEPTOR Dimensional Data (inches and [ mm ]) are Subject to Manufacturing Tolerances and Change Without Notice LEX HEAD SET SCREW— EEMOVE SCREWS TO USE TT HANDLES, REPLACE SCREWS ONCE COVER IS N PLACE AND HANDLES ARE REMOVED. INLET G= WIDTH OF BODY OUTLET Flow Rate GPM[L] Min Inlet/ Outlet Size Water Capacity Gal. [L] App.Wt. LIDS. [Kg] No. of Covers Dimensions In Inches C D/E F G J L 75 [284] 3 [76] 65 [246] 332 [151] 1 22-3/4 [578] 18-1/2 [470] 36 [914] 28-5/8 [727] 6-7/8 [175] 25-3/4 [654] 100 [379] 3 [76] 1 110 [306] 432 [196] 1 27 [686] 23 [584] 42-3/4 [1086] 33-5/8 [854] 11-3/8 [289] 30-1/8 [765] 125 [473] 3 [76] 1 150 [568] 780 [354] 2 30-1/8 [765] 24-1/2 [622] 49-1/4 [1251] 40 [1016] 12-7/8 [327] 36-5/8 [916] 7350[13725]6 [127] 460 [1741] 1438 [625] 2 41 [1041] 36 [914] 71 [1803] 51-3/8 [1305] 23-3/8 [594] 56-5/8 [1438] [127] 660 [2498] 1840 [835] 2 46-1/4 [1175] 39-5/8 [1006] 80 [2032] 58-3/8 [1483] 27 [686] 65-5/8 [1667] [152] 860 [3255] 2180 [989] 2 50-1/2 [1283] 43-7/8 [1114] 87 [2210] 63-5/8 [1616] 30-3/4 [781] 74-1/8 [1882] 400 1514 6 152 1090 4126 2536 1150 3 54-1/4 1378 47-5/8 1210 94 2388 67 1702 34-1/2 876 79-1/8 2009 450 [1703] 1 6 [152] 1 1275 [4826] 1 2816 [1277] 1 3 1 55-1A [1403] 48-5/8 [1235] 1 100 [2540] 72 [1829] 35-1/2 [902] 85-3/8 [2168] 500 [1893] 6 [152] 1435 [5431] 2970 [1347] 3 57-1/4 [1454] 51-5/8 [1311 ]1 104 [2642] 74 [1880] 38-1/2 [978] 88-3/8 [2245] ENGINEERING SPECIFICATION: ZURN Z1188 Large capacity Acid Resistant Coated interior and exterior fabricated steel oil interceptor, with bronze cleanout plug and visible double wall trap seal, removable combination pressure equalizing/flow diffusing baffle and sediment bucket, horizontal baffle, adjustable oil drawoff and vent connections either side. Complete with secured, gasketed, non-skid cover with removable lift handles and flow control fitting. Regularly furnished with inlet and outlet in high position. OPTIONS (Check/specify appropriate options) PREFIXES Z Acid Resistant Coated Fabricated Steel* SUFFIXES -E Acid Resistant Coated interior and exterior fabricated steel extension section. (Specify 'C' Dim. required) for recessed installation. -HD Heavy-duty traffic cover rated at 10,000 Ibs [4536 kg.] maximum load. An incresed 'C' dim. is required when -HD option is specified. (See -HD option specification sheet) -K Anchor flange 1-3/4 [44] down from top and 2 [51] wide. A 3 [76] minimum extension height is required when -K option is specified. -KC Anchor flange 1-3/4 [44] down from top and 2 [51] wide with clamp collar. A 3 [76] minimum extension height is required when -KC option is specified. __-PW Plug wrench Regularly furnished unless otherwise specified. Zurn Industries, LLC I Specification Drainage Operation 1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 Ph. 855-663-9876, Fax 814-454-7929 In Canada I Zurn Industries Limited 3544 Nashua Drive, Mississauga, Ontario L4V 1 L2 - Ph. 905-405-8272, Fax 905-405-1292 www.zurn.com Rev. J Date: 08/21/14 C.N. No. 131407 Prod. I Dwg. No. Z1188 DocuSlgn Envelope ID 345B681D-914F-4F2D-AB59-7C192D3B78A3 ----------- EX. SEWER MAIN l PROPERTY LINE SPOOL I 1 1 Z I (LENGTH AS NEEDED) 1 i S-O" MIN � { 6" SEWER STUB ! ! ! I€�"KGB I FUTURE 4" SIDE SEWER I I I 1 I I I 1 I I I SEWER MAIN TEE X 6" TEE SIDEWALK i l �\ I I I I I I ` try COUPLING (TYP ) IL-JI -IL .......... >Q 13 I 0 II I" r-r _ _I 1 ------- L---- T J BEND AS 8" REQUIRED �I]c===_______3 /// 2"x 4" STUD MARKING POST PAINTED 6" CAP J WHITE WITH THE WORD "SEWER" STENCILED IN 3" HIGH BLACK LETTERS AND #6 WIRE WRAPPED AROUND THE STUD AND EXTENDED TO THE TOP OF THE STUD 6"X6"X6" SURFACE CLEANOUT WITH CAST IRON RING AND COVER (EAST JORDAN IRON WORKS PRODUCT NO 00367502 OR APPROVED EQUAL, SPECIFY "SEWER" ON LID), CLEANOUT TO BE CENTERED IN A 2'x2' CONCRETE PAD CONCRETE PAD TO BE 8" IN DEPTH LEXISTINGSANITARY IN —2.OR MIN \FUTURE 4" SIDE SEWER �6" SEWER �SLOPE U6"X6"X6" WYE FUTURE 6"x 4" REDUCER `SEWER MAIN SIZE X 6" TEE ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO EXISTING SEWER MAIN A VITRIFIED CLAY MAIN - CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). B CONCRETE MAIN - CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL) C PVC & C900 PVC MAIN - CUT IN NEW TEE USING RIGID COUPLINGS OR CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) D. DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) E LINED MAIN - CONNECTION TO SEWER MAINS THAT HAVE BEEN LINED (CIPP, ETC ), CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). F HDPE - CORE -DRILLED WITH A ROMAC SADDLE "INSERTA-TEE" MAY BE USED ON SEWER MAINS 12" DIAMETER OR LARGER G MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK -OUTS OR THE STRUCTURE SHALL BE CORE -DRILLED AND USE KOR-N-SEAL BOOTS OR APPROVED EQUAL NOTES 1 PRIOR TO INSTALLATION OF A SANITARY SEWER STUB, A SIDE SEWER STUB PERMIT MUST BE PURCHASED FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT 2 UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2 5' COVER AT PROPERTY LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER 3 SIDE SEWERS SHALL HAVE A MINIMUM 2 R SLOPE UNLESS APPROVED BY THE PUBLIC WORKS INSPECTOR 4 FOR INSPECTION OF THE SIDE SEWER STUB, CALL 24 HOURS IN ADVANCE. THE INSPECTION PHONE NUMBER IS ON THE SIDE SEWER STUB PERMIT SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE ON SITE WHEN INSPECTOR ARRIVES AT THE APPOINTED TIME DO NOT BACKFILL THE TRENCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR 5 ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110 2 6 THE SIDE SEWER STUB SHALL HAVE PIPE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405 7 ALL SIDE SEWER STUBS SHALL BE INSTALLED BY A CONTRACTOR LICENSED AND BONDED IN THE STATE OF WASHINGTON Aoallkllk SIDE SEWER STUB URISTD. PLAN - 406.1 PUBLIC WORKS APP V DEPARTMENT INSTALLATION Martin PaStUCh V26/202 (SEWER MAIN TO PROPERTY LINE) D9813" . Pm W.A. rom . DATE 2 CITY COMMENTS 7.3.24 YLP 08.23.24 YLP SURVEYED: SCALE: DJC VERTICAL: NAVD 1988 3 CITY COMMENTS 9.10.24 YLP 09.19.24 YLP DESIGNED: AS NOTED HORIZONTAL: NAD 1983/1991 4 STORM REVISION DUE TO DUCT BANK CONFLICT YLP 12.13.24 YLP YLP DRAWN: 5 UTILITY REVISION YLP 01.10.25 YLP GL.6 ONE INCH DATUM 6 UTILITY REVISION YLP 01.24.25 YLP CHECKED:Y� , v AT FULL SCALE IF NOT ONE INCH N 0. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY YLP 1 12: S-417604 R-41761 0 IN COMPLIANCE WITH CITY OF RENTON STANDARDS Avftk BASSANO MULTI -FAMILY DATE:11.20.20 pj� C TY OF STANDARD STORMWATER DETAILS AND NOTES FIELDBOOK: RENTON PAGE: 7 DRAWING NO: Planning/Building/Public Works Dept. 117 WELLS AVENUE S Ci 1 O RENTON, WASHINGTON 98057 SHEET: OF: 10 20 p 09 O N U N L^L I..L DRS PROJECT NO. 20070