HomeMy WebLinkAboutLUA81-065 :. .
BEkIk '. .
OF FILE
• . .
. . .
FILE TITLE m lc RoFtmE
. _ .
0 f . . . . . (T.s a 4,n i c ti„„).
A _.4 ./ .,
. ,•
, ...,
, -
PI.- , ,,,,.
.. .
. , ,__ . .
........
, . ..„.. .
. ''
di/ 4. '
l . .
•
/1/7//
OF R�
0 q� ► CDTHE RENTON CITY COUNCIL
sail g. MUNICIPAL BUILDING • 200 MILL AVENUE SOUTH • RENTON, WASHINGTON 98055 . 235-2586
nO
It
FD SEP1 `'+'r ,1 F,��`
ip
T 7 ( Iu- ? P. ��
October 12, 1981
APPEAL FILED BY MUNICIPALITY OF METROPOLITAN SEATTLE, METRO
SPECIAL PERMIT SP-065-81 ; RENTON TREATMENT PLANT: 1200 MONSTER ROAD
To Parties of Record:
The Renton City Council ' s Planning and Development Committee will,
review this appeal at its meeting of Thursday, October 29, 1981 ,
at 4:30 p.m. in the sixth floor conference room of the Municipal
Building, 200 Mill Avenue South, Renton.
If you have any questions regarding this meeting, please phone the
Council secretary at 235-2586.
Thank you.
Randy Rockhill , Chairman •
Planning and Development Committee
RR:bd
. OF 1
iv
0 THE CITY OF RENTON
`0 0 Z MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
n sal BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
235- 2550
O Q'
• 0 SEP1E�O�
MEMORANDUM
October 26, 1981
TO: Planning and Development Committee
FROM: David R. Clemens, Acting Planning Director
RE: METRO APPEAL SPECIAL PERMIT 065-81, RENTON TREATMENT
PLANT
METRO has appealed the wording of Condition No. 4 of the Hearing Examiner's
decision dated September 8, 1981. METRO contends that the condition is worded in
such a fashion that it is not possible to determine the extent of the requirement. In
their request for reconsideration, dated September 10, 1981, METRO notes that it does
not have sufficient information to grant an easement which might interfere with future
expansion of the Renton Treatment Plant. The Examiner's response to the request for
reconsideration notes that expansion of the treatment plant beyond the current flood
protection berm would adversely impact the available flood storage capacity in this
vicinity. The Examiner concludes that the condition for a drainage easement remains
appropriate in this application.
The Public Works Director in his letter of September 28, 1981, describes the
requirements for the drainage easement to protect flood storage to elevation 16 from
periodic flooding inundations. The effect of the requirement for this drainage
easement would be to preclude development of this property until such time as the 100
year flood storage is no longer required on this prop,rty.
1. The applicant• has failed to state in his letter of appeal an error in fact or law
attributable to the Examiner's decision in this matter.
2. The requirement tor drainage easement to protect the flood storage capacity in
this vicinity is appropriate to provide constructive notice to METRO or any
future owner of the subject property, that no development may occur until such
time as the flood hazard has been remove.
3. The Public Works Department has adequately defined the required drainage
easement in its correspondence with METRO.
Recommendation: That the appeal by METRO in the case of Special Permit 065-81
should be denied and the Hearing Examiner's decision upheld.
cc: Richard C. Houghton, Public Works Director
sue -_
v �o ® PUBLIC WORKS DEPARTMENT- � G--
♦$ z
DESIGN/UTILITY ENGINEERING • 235-2631
z ,
. MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.88055 .
4
0,94Tso SEP-c •
BARBARA Y. SHINPOCH September 28, 1981
MAYOR
11.1
Mr. Joe Fernandes
Municipality of Metropolitan Seattle
821 2nd Avenue
Seattle, WA
Subject: SP-065-81
•
Dear Mr. Fernandes:
In accordance with your request for additional clarification concern-
ing condition No. 4 of the Land Use Hearing Examiner's findings for
SP-065-81 the following information is offered.
Since the P-1 channel and backwater pond have not been constructed
and said construction is in question, no new fill will be allowed
within the 100 year flood plan. Portions of Metro's property both north
and east of the berm which was installed in 1968 is in this flood plain.
This property cannot be filled therefore a drainage easement over said
property is being requested as a condition of your special permit.
This easement will identify the property below elevation 16.0 outside
of the berm and allow for periodic innundations of said property.
Hopefully this provides the clarification you requested. If not, or
you wish to discuss the matter further, please advise.
Very truly yours,
R. and C. Houghton
Acting Public Works Director
DGM:pmp
r..,..,,,
o a�TON TREATMENT PLANT EXPAN��ON - .
' t l
i i 0 1 ; \\
& c:P/://I ‘ -3 1
\ • \ , ' 1 OA \
// C.1 \\ I/
• \ 'i
11 \.
Nos.......... -1\1�
•
T
OysT \N.
` \ ;. •
'p P-1 DRAINAGE CHA::NE.:. \ \\ \
C.
s DIGESTERS \\
0 100 200 400r \ 404, .-.Is, / ' \ \\
GRAVI•:'% � '0
'
��a� Gl CX VERS .-ii7�.'(?r? \\\\
SCALE IN FEET I i O • t '..._"� �' -'r -��Ii,TER 1 'Li , III • \\
\....N. \
101 \\\\
G S 1 /-.j ...LE::: :..LE::_ .n \ \ •
� JI
F OVERY; 1 O©.-3t 0
k.
L_--��^S DISSOLVE) a:a I -i-^\t \ \
/ �'_ STORA=E FLO:ATI01 *, I y �� „t \ \
\ \\
w °•. R4COVEAY �'� \t\t t �?' p\ \ \
/ �' t \ to ttttl�. :tu.. • t\\ a ``
/ t t t A \11t,t��"tt ,• 1\\
I \ t 11\f T \\/ 1L\ s
t 'I l. � It%t t'� motA 1 t\\ 1 \.
4 <
V ® \ o \/� ` , , 0 1 \\\
8 PHY 11\1 i ;tr.- - \
t : 1'111PG
s slid'
\lU t.'���'��'�'tit �� , \\
ep b.: yr,A9tY -if _ % ° \\
,,,.\
„..
...."......„..... , - `•'!"4,1. stql- 00000,16 C2)..0.0,,,10/1_,, t.....1
1,,,„r ,c,„ ,; .... 0
•
\ fcp
Cb.. S R C
\ C/�,t\qEt
•
•
�lz�4D `:."'ATM
\ N . .
CHLORINE DLI'P":µ7,:li*Gt
STORAGE
SPURS
i
'` J LEGC!tD / .
r--.1 PHASE I
•
• / PHASE II
\ '
/ µpf
�/ ' Y
G� FUTUREL__J
OF4.
, + �s: ° THE CITY OF RENTON
�
MUNICIPAL BUILDING 200 MILL AVE. SO. FdE1VTON,WASH. 98055
p M=M = BARBARA' Y. SHINPOCH, MAYOR ® LAND USE HEARING EXAMINE/
•
o P FRED J. KAUFMAN. 235-2593
1 TF0 SEP-c '
September 16, 1981 r' •. 'G'
v
Mr. Raymond Drebin, Supervisor
Right-of-Way and Property
Metro •
Exchange Building
821 Second Avenue
Seattle, WA 98104 _-
RE: File No. SP-065-81 ; Request for Reconsideration.
Dear Mr. Drebin:
•
I have reviewed your letter, dated September 10, 1981 , regarding the
above entitled matter, and my response follows.
As was indicated by your letter, specific information about the
required easement will have to be provided by the Public Works
Department before said easement can be granted. At the same time,
any expansion of the plant beyond the current limits of the
protective berm will have a potential impact on the flood stage
capacity of that land outside the berm. Expansion plans will be
reviewed subject to both federal flood control regulations and
local requirements.
In addition, it is possible that various common law liabilities
may exist if the natural drainage and storm water holding capacity
of the land is altered.
The permit is subject to the condition that an easement to be
further defined by the Department of Public Works is granted by
Metro, and that determination stands. .
A new appeal period has now been established for this matter to
expire on September 30, 1981 .
Very truly yours,
A.'74S
Fred J. Kaufman
Hearing Examiner
cc: Parties of Record -
•• 48,
Municipality of Metropolitan mottle KECEiVEd
. ® 821 Second Ave.,Seater, O F FNTQ
Exchange
96104 fr +sarruG EkA
• l SE' j I •
September 10 , 1981 ' d�
—31466
City of Renton
Renton Municipal Building
Renton, WA. 98055
Attention: Mr. Fred J. Kaufman
Land Use Hearing Examiner
•
Gentlemen:
Renton Treatment Plant Fill Project
Your File: No. SP-065-81
Reference is made to the Report and Decision issued by your
office in response to the application filed by the Municipal-
ity of Metropolitan Seattle. Pursuant to Title IV, Section
3015 of the Renton Municipal Code, Metro is asking for clar-
ification of the intent of Condition No. 4 as contained in
the Decision conditions .
We do not have enough information to grant any easement which
might interfere with our future expansion of the Renton Treat-
ment Plant. The need to provide the quantity and quality of
' sewage treatment as is determined to be necessary demands that
we retain the flexibility to alter or increase existing facil-
ities .
Metro has demonstrated its willingness to cooperate with the
Green River Eastside Watershed Project in conformity with the
policies promulgated by the Metropolitan Council and we will
do our best to continue in this posture. Our paramount con-
cern© however, is the ability to use the Renton Treatment Plant
for the most efficient treatment of sewage and we do not want
to jeapordize our basic function.
Any assistance you may give us to understand Condition 4 will
be appreciated. -
Very truly yours ,
•
Raymond Drebin, Supervisor
Right-of-Way and Property
RD:pkd
cc: tMr. Boer Blaylock, Associate planner,_ City of Renton
r. JoeFernandes Pro ect Ensineer, metro
/ `�}'.sir_'. p M <-. ..� • .. i.
•?. �:,. :A:. "_.f}.ff 4':i T" ��. i;l+fi��f at .`� .. 4.:
•
G p_o6,s--- /
OF R4
o THE CITY OF RENTON
© MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
n $ BARBARA Y. SHINPOCH, MAYOR • DELORES A. MEAD
090 CITY CLERK • (206) 235-25(
O,9gTFO SEP1°°
November. 6, 1981
Municipality of Metropolitan Seattle
821 Second Avenue
Seattle, Washington 98104
Attention: Mr. Raymond Drebin
Subject: METRO Appeal of Special Permit SP 065-81
Renton Treatment Plant
Dear Mr. Drebin:
The Renton City Council at its regular meeting of November 2, 1981
concurred in the Planning and Development Committee recommendations,
concluding that the Hearing Examiner's September 8, 1980 recommendation
Conclusions No. 7 and 8 are erroneous as a matter of law; that the
decision be modified by deleting Condition No. 4 and affirming the
remainder of the report.
If you have further questions regarding the appeal determination,
please do not hesitate to contact this office. A copy of the City
Council Minutes of November 2, 1981 is enclosed for your information.
Yours very truly,
CITY OF RENTON
Delores A. Mead, C.M.C.
City Clerk
m
cc: Hearing Examiner
Mayor Shinpoch
Council President Stredicke
C\'rL
PLANNING AND DEVELOPMENT COMMITTEE
COMMITTEE REPORT
November 2, 1981
APPEAL BY METRO - SPECIAL PERMIT SP-065-81 (Referred 10-5-81)
The Planning and Development Committee has considered the above appeal by
Metro and finds that. the Hearing Examiner is in errorin conditioning the
granting of the Special Permit upon the execution by Metro of a natural
drainage easement since such a requirement is not related to the application
presented and is not within the considerations to be made by the Hearing
Examiner under Section 4-2303(2) (A) in the granting of a special permit.
Therefore, Conclusions No. 7 and 8 of the Hearing Examiner' s report dated
September 8, 1981 , are erroneous as a matter of law.
The Committee recommends that the City Council modify the decision of the
Hearing Examiner by deleting Condition of the decision and, as modified,
to affirm.
C4C)
Randy Rockhill , Chairman
Earl Clymer
CS)f
John Reed
RENTON CITY COUNCIL
Regular Meeting
November 2 , 1981 Municipal Building
Monday, 8: 00 P.M. Council Chambers
MINUTES
CALL TO ORDER Mayor Barbara Y. Shinpoch led the Pledge of Allegiance to the
flag and called the meeting of the Renton City Council to order.
ROLL CALL OF RICHARD M. STREDICKE, Council President; JOHN W. REED, THOMAS
COUNCIL W. TRIM, EARL H. CLYMER, ROBERT J. HUGHES, RANDALL ROCKHILL.
MOVED BY TRIMM, SECOND CLYMER, EXCUSE ABSENT COUNCILMAN CHARLES
F. SHANE. CARRIED.
CITY OFFICIALS BARBARA Y. SHINPOCH, Mayor; LAWRENCE J. WARREN, City Attorney;
IN ATTENDANCE DEL MEAD, City Clerk; MICHAEL PARNESS, Administrative Assistant;
WILLIAM E. BENNETT, Acting Finance Director; LT. RAY CALDWELL,
Police Department; MAXINE MOTOR, Deputy City Clerk/Recorder.
MINUTE APPROVAL MOVED BY STREDICKE, SECOND CLYMER, APPROVE COUNCIL MINUTES OF
OCTOBER 26, 1981. Councilman Reed requested correction Page 3,
Paragraph 4: (Street Resurfacing), Drains chipped, but manhole
covers not raised. MOTION CARRIED.
AUDIENCE COMMENT Raymond Drebin, 821 2nd Ave. , Seattle, representing the Municipality
METRO Appeal of Metropolitan Seattle, requested the Planning and Development
of Special Permit Committee report be presented. MOVED BY ROCKHILL, SECOND CLYMER,
SP-065-81 (Fill) SUSPEND RULES AND ADVANCE TO PLANNING AND DEVELOPMENT COMMITTEE
Renton Treatment REPORT, AGENDA ITEM 7. CARRIED. The Planning and Development
Plant Committee report noted review of the Special Permit SP-065-81 for
the Renton Treatment Plant at 1200 Monster Road to preload seven
acres with 126,000 cu. yds. fill materials to support a future
building program to increase the capacity of the existing sewage
treatment plant. The Land Use Hearing Examiner Fred Kaufman,
on 9/8/81 , recommended approval with conditions. METRO requested
reconsideration of Condition 4 contained in the 9/8/81 Examiner
decision, which was upheld by the Examiner 9/16/81. METRO filed
appeal of requirement for easement conveyance for natural drainage.
The Planning and Development Committee report found the Examiner
in error in conditioning the granting of the Special Permit upon
the execution by Metro of a natural drainage easement, since such
requirement is not related to the application presented and is
not within considerations under Code Section 4-2303(2) (A) in grant-
ing a Special Permit. The Committee report concluded that the
Hearing Examiner's Conclusions No. 7 and 8 are erroneous as a
matter of law. The committee recommended the decision be modified
by deleting Condition No.4 and affirming report. MOVED CLYMER, SECONE
ROCKHILL, CONCUR IN THE PLANNING AND DEVELOPMENT REPORT. Upon
inquiry by Council President Stredicke, Committee Chairman Rockhill
explained the fill permit was requested entirely within the berm
at the treatment plant site. MOTION CARRIED.
CORRESPONDENCE Letter from Mayor Shinpoch explained potential problem; an area
Proposed Appeal church has preliminary plans to construct a facility adjacent to
of Fire Code their existing building. The Fire Marshall has informed the
Decision church authorities that their proposal is unacceptable without
extensive protection to the existing structure. The minister has
sought an appeal of the decision; however, specific plans have not
been submitted; hence a specific denial has not occurred. The Fire
Code allows for appeal of administrative decision via a Board of
Appeals to be comprised of five members "qualified by training and
experience to pass upon pertinent matters." The Mayor's letter
expressed opinion the Board of Adjustment, nor the Hearing Examin
meet these requirements and an Appeals Board does not exist. Th
letter stated willingness to work with Council to resolve dilema
and suggested referral to the Public Safety Committee, urging a
early meeting to study the issue and make recommendation.
Sam Harvey, 1171 Camas Ave. NE, Minister of Calvary Baptist Ch
explained his opposition to Fire Dept. interpretation of Fire
Renton City Council
11/2/81 Page 2
Correspondence - Continued
Proposed Appeal requiring installation of sprinkler system in the old building
Continued as well as new at a cost of $45,000; that the congregation had
voted to appeal; noting problem in proceeding with plans. Mayor
Shinpoch noted Board of Appeals in Tukwila as possible solution.
MOVED BY TRIMM, SECOND HUGHES, REFER MATTER TO PUBLIC SAFETY
COMMITTEE. Rev. Harvey noted receipt of •letter from the City's
Fire Marshall stating proposed rejection. MOTION CARRIED.
CONSENT AGENDA The following items are adopted in one motion which follows those
business matters included.
Data Processing Letter from City Clerk reported seven bids received at the 10/26/81
Bid Opening bid opening for Electronic Data Processing System. See attached
tabulation. Refer bids to the Ways and Means Committee.
Damages Claim Claim for Damages was filed by Mary Baima Brown, 500 Burnett Ave. S,
in amount of $106.85 for water damage to basement bedroom, alleging
defective storm sewer line. Refer to City Attorney and Insurance
Carrier.
Court Case Court Case was filed by Metzdorf Restaurants, Inc. and Tony. Go's
Tony Go's Inc. Inc. vs. the City and Reiniga Corporation (Sunset Plaza Shopping
Flood Damage Center) in the amount of $250,000 for flood damage, alleging negli-
#81-2-15462-0 gence in drainage system. Refer to City Attorney.
Court Case Court Case was filed, by Bellco Electric & Supply, Inc. vs. Jack
Robert Taylor Benaroya Co. and the City in amount of $1,164.26 for personal and
Driver auto damage, alleging failure to provide adequate warning at the
termination of Valley Parkway near 180th located in Tukwila.
Refer to City Attorney.
Appeal of Appeal was filed by Dean W. Bitney, Leisure Estates, of Hearing
Bitney Short Plat Examiner's decision of 10/14/81 regarding Bitney Short Plat SP 074-
SP 074-81 and 81 and Waiver W-075-81; property located on the west side of
W 075-81 Union Ave. SE, adjacent to the South Annex of Leisure Estates
Mobile Home Park. The Land Use Hearing Examiner recommended approval
of short plat with conditions and denial of waiver. Refer to the
Planning and Development Committee.
Consent Agenda MOVED BY STREDICKE, SECOND CLYMER, ADOPT THE CONSENT AGENDA AS
Approval PRESENTED. CARRIED.
Student Observers Mayor Shinpoch welcomed students from Miss Oiler's Government Class.
OLD BUSINESS Public Safety Committee Report was presented by Committee Chairman
Public Safety Hughes regarding parking violations at city parks, main problem
Committee areas being Lake Washington Beach Park and Cedar River Trail Park.
Parking The infractions, such as parking in prohibited areas blocking
Violations in traffic and obstructing emergency vehicle movement, have
City Parks resulted in damage to park proerty. The committee recommended
that parking fines for park property be increased to $25 and that
this matter be referred to the Ways and Means Committee for proper
legislation. MOVED BY HUGHES, SECOND ROCKHILL CONCUR IN COMMITTEE
REPORT. Councilman Reed inquired re automobiles parking in boat
trailer stalls. Discussion ensued re seasonal need for trailer park-
ing;and upon inquiry, Police Lt. Caldwell advised common sense is
used in the enforcement. MOTION CARRIED. Council President
Stredicke requested his NO vote be recorded.
\lities Utilities Committee Chairman Clymer submitted committee report
'\ittee regarding the Rolling Hills sanitary sewer trunk line break and
'ng Hills recommended concurrence in the Public Works Department's recom-
`ry Sewer mendation to proceed on an emergency basis to repair the line.
dine Break The Committee further recommended acceptance of the bid supplied
by Frank Coluccio Construction. MOVED BY CLYMER, SECOND ROCKHILL,
CONCUR IN COMMITTEE REPORT. CARRIED.
0
3e
j I
RENTON CITY COUNCIL
Regular Meeting
October 5, 1981 Municipal Building
Monday, 8 :00 P.M. Council Chambers
MINUTES
CALL TO ORDER Mayor Barbara Y. Shinpoch led the Pledge of Allegiance to the
flag and called the meeting of the Renton City Council to order.
ROLL CALL OF RICHARD M. STREDICKE, Council President; RANDALL ROCKHILL,
COUNCIL ROBERT J. HUGHES, EARL H. CLYMER, THOMAS W. .TRIMM AND JOHN W.
REED. Absent: CHARLES F. SHANE.
CITY OFFICIALS BARBARA Y. SHINPOCH, Mayor; LAWRENCE WARREN, City Attorney; DEL
IN ATTENDANCE MEAD, City Clerk; LT. D. PERSSON, Police Department; MICHAEL
PARNESS, Administrative Assistant; M. MOTOR, Deputy Clerk/Recorder.
MINUTE APPROVAL Minutes of Council Meeting of September 28, 1981: Addition to
Second Item of CONSENT AGENDA re LID #314: "There is no.compensa-
tion for the property as the benefit exceeds the value of the
property given. " (Per City Attorney and Public Works Dept.)
MOVED BY STREDICKE, SECOND HUGHES, APPROVE COUNCIL MINUTES OF
SEPTEMBER 28, 1981. CARRIED.
CONSENT AGENDA The following items are adopted by one motion which follows
the business matters included:
Fund Transfer Letter from the Finance Department requested a resolution to .
for 2% Salary and transfer funds from the Contingency Fund to various tax supported
Housekeeping funds for the 2% salary increase effective 7/1/81 and other house-
keeping items for incorporation into the 1982 Preliminary Budget
for 1981 information. Refer to Ways and Means Committee.
LID 41325 Letter from Public Works Department, Design Division, requested
Preliminary date of 11/16/81 be set for Public Hearing on LID #325 for the
Assessment Roll construction of curbs, gutters, sidewalks, watermain, street
$581,425.00 lights and sanitary sewers in area south of Valley General Hospital
Public Hearing and east of SR 167. Petition was filed by Daryl Connell and was
11/16/81 certified as 100% of property owners within the boundary of the
Davis Ave. South proposed LID by the Public Works Department. Refer to Ways and
Means Committee for resolution setting hearing date.
Primary Election Letter from City Clerk Mead reported canvassed results of 9/15/81
Canvas Results Primary Election from King County Election Division for City Council
Position No. 3: Warren C. Gonnason 644 Votes (Nominated); Paul
Maxin 534 Votes; John W. Reed 1,133 Votes (Nominated to appear
on General Election Ballot 11/3/81). Information.
Metro Appeal ,Appeal has been filed by Metro (Municipality of Metropolitan
Special Permit Seattle) of the Land Use Hearing Examiner's recommendation of
SP-065-81 9/29/81 re Renton Treatment Plan fill project Special Permit No.
SP 065-81. The Examiner recommended approval with conditions.
Refer to Planning and Development Committee.
•
Damages Claim Claim for Damages was filed by Bill C. Arrowood, 118 NE 125th,
Seattle, alleged loss of cowboy boots while in jail; claim filed in .
amount of $71. Refer to the City Attorney and Insurance Carrier.
Consent Agenda MOVED BY STREDICKE, SECOND CLYMER, ADOPT ABOVE PORTION OF THE
Adopted CONSENT AGENDA AND THE FOLLOWING ITEMS BE CONSIDERED SEPARATELY
• (Items 5.b. , 5.e. and 5.g.). MOTION CARRIED.
Garbage Collection Letter from the Acting Public Works Director Richard Houghton
Call for Bids recommended Call for Bid for the City's garbage collection and
the date of 1/21/82 be set for bid opening. Councilman Stredicke
inquired re Utilities Committee report and Mayor Shinpoch advised
the matter had been referred from committee. MOVED BY STREDICKE,
SECOND CLYMER, CONCUR WITH THE PUBLIC WORKS DEPARTMENT RECOMMENDA-
TION AND CALL FOR BIDS ON GARBAGE COLLECTION. CARRIED.
nton City Council -
/5/81 Page 2
RRESPONDENCE AND CURRENT BUSINESS - Continued
.ffany Park Letter from the Public Works Department requested transfer of
lkway $10,000 from the Burnett Avenue: South Project into Street Mainte-
nance for improvements to Tiffany Park Walkway. Refer to Ways
and Means Committee for resolution. Council President Stredicke
called attention to Council request for cost estimate and use of
assistance from civic organizations for the walkway improvements.
Councilman Rockhill recalled willingness of area residents to make
contributions, noting other walkways also are in need of improve-
ments. Mayor Shinpoch indicated agreement. It was MOVED BY
STREDICKE, SECOND REED, REFER MATTER TO THE COMMUNITY SERVICES
COMMITTEE FOR REPORT. CARRIED.
:ewart Rezone Land Use Hearing Examiner recommended 9/15/81 approval with con-
ditions and restrictive covenants for the Vincent and Lois Stewart
iilding Moratorium Rezone R-067-81 of G to B-1, property located 300 ft. north of
inset Lift Station Sunset Blvd. NE on west side of Duvall Ave. NE. Concur and refer
to the Ways and Means Committee. Council President Stredicke
reported receipt of letter from Acting Public Works Director
Houghton concerning his request of 9/28/81 regarding moratorium
on area due to capacity of Sunset Lift Station and those hookups- -
previously approved. Stredicke reported the letter would be
distributed. MOVED BY STREDICKE, SECOND HUGHES, REFER'THE STEWART
' REZONE AND THE PUBLIC WORKS DEPARTMENT LETTER TO THE WAYS AND MEANS
COMMITTEE. CARRIED.
ells Ave. Bridge Letter from Renton Merchants Association, Toni Nelson, President,
thanked Councilman John Reed for his inquiry concerning the
Association's opinion of the proposed Wells Ave. Bridge. A poll
of the Association members at the 10/1/81 regular meeting revealed
a consensus that they did not want the Wells Ave. Bridge widened
to a four lanes, fearing it would eventually lead to removal of
parking on Wells Ave. in the downtown area and encourage more
traffic through downtown wanting to move quickly through. The
letter noted the area is already hindered with through traffic
which is a detriment to the general business area. MOVED BY REED,
SECOND BY STREDICKE, REFER THE MATTER TO THE TRANSPORTATION .
COMMITTEE. CARRIED.
•
LD BUSINESS
ommunity Services Community Services Committee Chairman Reed submitted committee
',ommittee report noting preliminary review of the Retrospective Insurance
Letrospective Program adopted 6/80. The program represents a change in
Insurance Program previous Comprehensive Liability Policies to the extent the City
now shares minimal risk with the insurance company and this is
an initial savings of approximately $56,000. The report stated
additional savings or cost is dependent on total dollars paid
by the insurance company on claims against the City; claims are
presently the same level as previous years. Full report will
be available 1/82. Information.
'lanning and Planning and Development Committee Chairman Rockhill presented
)evelopment committee report noting review of the Ralph Evans'• letter.regard-
committee ing setbacks and recommended referral to the Planning Commission,
Setbacks Ordinance Development Committee presently studying the subject
Ralph Evans' Letter of setbacks in general. MOVED BY ROCKHILL, SECOND CLYMER, CONCUR
IN RECOMMENDATION. CARRIED.
DRDINANCES AND RESOLUTIONS '
Ways and Means Ways and Means Committee Chairman Clymer presented committee
Committee report recommending second and final readings of the following
Ordinance #3578 ordinances :which had been on first reading 9/28/81:
Interim Financing .
LID #320 An ordinance was read authorizing the issuance and sale of warrants
to be drawn on LID No. 320 providing interim financing for construc-
tion of water mains, hydrants and appurtenances in vicinity of NE
27th St. between Edmonds NE and Devils Elbow. MOVED BY CLYMER,
• SECOND HUGHES, ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES.
MOTION CARRIED: •
pF RA,A
THE CITY OF RENTON
® Z MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
n rn BARBARA Y. SHINPOCH, MAYOR • DELORES A. MEAD
09 Oa' CITY CLERK • (206) 235-2500
09gT�D SEPI °��Q
October 7, 1981
CERTIFICATE OF MAILING
STATE OF WASHINGTON)
ss.
COUNTY OF KING
DELORES A. MEAD, City Clerk of the City of Renton, being first
duly sworn on oath, deposes and says that she is a citizen of the United
States and a resident of the State of Washington, over the age of 21 and
not a party to nor interested in this matter.
That on the 7th day of October, 1981, at the hour of 5:00 p.m. ,
your affiant duly mailed and placed in the United States Post Office at
Renton, King County, Washington, by first class mail, to all parties of
record, a true and correct NOTICE OF APPEAL OF THE HEARING EXAMINER'S
DECISION FILED BY MUNICIPALITY OF METROPOLITAN SEATTLE, METRO, RENTON
TREATMENT PLANT.. Special Permit SP-064-81.
/Ze'le't-e Tiee?
Delores A. Mead, City Cler
SUBSCRIBED AND SWORN TO BEFORE me this 7th day of October, 1981.
s.(Th �c c
Notary Public ini and for the State of
Washington, residing in King County
OF Re
A. .
o THE CITY OF RENTON
`$ ® Z MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
n rn BARBARA Y. SHINPOCH, MAYOR • DELORES A. MEAD
090 CITY CLERK • (206) 235-250
9 GIA
gTFo SEPS
October 7, 1981
APPEAL FILED BY MUNICIPALITY OF METROPOLITAN SEATTLE, METRO
SPECIAL PERMIT SP-065-81; RENTON TREATMENT PLANT: 1200 MONSTER ROAD
To Parties of Record:
Pursuant to Title 4, Chapter 30, City Code, written appeal of Land Use
Hearing Examiner's decision has been filed with the City Clerk, along
with the proper fee of $25.00.
NOTICE IS HEREBY. GIVEN that the written appeal and other pertinent
documents will be reviewed by the Council's Planning and Development
Committee and will be considered by the City Council when the matter
is reported out of Committee.
Please contact the Council Secretary at 235-2586 for date and time of
the committee and council meetings, should you desire to attend.
Yours very truly,
CITY OF RENTON
Delores A. Mead, C.M.C.
City Clerk
DM:gh
111
For se By City Clerk's Office Only
A. I . #
AGENDA ITEM
RENTON CITY COUNCIL MEETING
SUBMITTING
Dept./Div./Bd./Comm. City Clerk's Office For Agenda Of October 5, 1981
(Meeting Date)
Staff Contact Delores A. Mead, City Clerk
(Name) Agenda Status:
SUBJECT: Appeal of Hearing Examiner's Consent
Decision: Metro, Renton Treatment Plant Public Hearing
Correspondence
Fill Project SP 065-81
Ordinance/Resolution
Old Business
Exhibits: (Legal Descr. , Maps, Etc. )Attach New Business
Study Session
A. Appeal
Other
B. Hearing Examiner's Decision 9/29/81
C. City Clerk's Letter Approval :
Legal Dept. Yes No N/AX
COUNCIL ACTION RECOMMENDED: Finance Dept. Yes No. N/A X
Refer to Planning & Development Committee Other Clearance
FISCAL IMPACT:.
Expenditure Required $ Amount $ Appropriation-
Budgeted Transfer Required
SUMMARY (Background. information, prior action and effect of implementation)
(Attach additional pages if necessary. )
Appeal filed by Raymond Drebin, Supervisor Righhof-Way and Property for METRO, received
September 29, 1981.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
jmE-r - oMunicipality of Metropolitan Seattle ti`�212�29. 7
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104 S E P 198
RI RECEIVED
CITY of RENTON
September 28 , 1981 MRK'S OFFICE
`/4915livti4'y0
The Honorable Barbara Y. Shinpoch, Mayor and
Honorable Members of the Renton City Council
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Dear Councilmembers ':
Renton Treatment Plant Fill Project
Your File: No. SP-065-81
By this letter,. the Municipality of Metropolitan Seattle,
Metro, is respectfully appealing to the Renton City Council
under the terms of Title IV, Section 3016, for: reconsidera-
tion of Item 4 of the conditions contained in the Decision
dated September 8 , 1981. Metro appealed to Mr. Fred J.
Kaufman, the Land Use Hearing Examiner by letter dated
September 10 , 1981, and was informed by letter dated
September 16 , 1981, that the requirement to grant an ease-
ment to b.e further defined by the Department of Public Works
stands .
The original application . by Metro was for the right to
preload approximately 7 acres within the existing berm at
the Renton Sewage Treatment Plant with 126 ,000 cu. yds . ,
of fill material. The fill is necessary to support future
improvements to be constructed by Metro to provide additional
sewage treatment facilities . At some in the future, it
will be necessary for Metro to apply to the City of Renton
for the right to place additional fill and install additional
sewage treatment facilities outside the existing berm. These
improvements are a part of the Renton Treatment Plant expan-
sion studies , copies of which have previously been furnished
to the City of Renton.
The wording of Item 4 under Decision in the original Report
and Decision was too vague to be understandable and the
answer to our request for consideration does not rectify
the situation. A condition which demands that we grant an
easement to be further defined at a later date is one which
If
The Honorable Barbara Y. Shinpoch, Mayor and
Honorable Members of the Renton City Council
September. 28, 1981
Page Two .
we cannot ask the Metropolitan Council to accept.., Theo-
retically, Metro might be forced to grant an easement which
would be' completely' at odds with our development plans .
We are respectfully' requesting that the original Permit to
allow the 126,000 cu. yds of fill to be placed within the
existing berm be granted. We further suggest that a re-
quirement be included which states that any future plans to
increase the treatment facilities outside the existing berm,
be coordinated with' the City of Renton before they are
finalized.
Finally, Metro wishes to reaffirm its intention to cooperate
with King County and the City of Renton to solve the drain-
age problems in thee, area. Certainly, anyone filling or,
building in the flood plain will be obligated to satisfy all
legal obligations regarding drainage and water run-off. .
What must be understood, however, is that only the Metro-
politan Council has the authority to convey permanent
interests in real property such as easements or fee title.
Any conveyance of such interests can only occur when the
members of the .Counil' are aware of what they are conveying
and are convinced there are no deleterious affects occasioned
by the conveyance.
For these reasons, Metro is respectfully requesting the
Renton City Council' to remove the condition- to grant the
easement. Thank you for your consideration in this matter.
Very truly yours ,
Raymond Drebin, Supervisor
Right-of-Way and Property
RD:pkd
CITY OF RENTON No. 19996
FINANCE DEPARTMENT
RENTON, WASHINGTON 98055 19 C,�/
RECEIVED OF --1('r
.6Q1 la , L) _
TOTAL Q O
-GWEN E. MARSHALL FINANCE DIRECTOR
BY (1LO
September 29, 1981
OFFICE OF THE LAND USE HEARING EXAMINER
CITY OF RENTON
REPORT AND DECISION .
APPLICANT: I Municipality of Metropolitan Seattle FILE NO. SP-065-8
LOCATION: 1200 Monster Road.
SUMMARY OF REQUEST: The applicant seeks a special permit approval to preload the
subject property (126,000 cubic yards) for eight secondary
clarifiers, a new aeration structure, and a primary
sedimentation structure to increase the capacity of the
existing Renton Treatment Plant.
SUMMARY OF ACTION: Planning Department Recommendation: Approval with conditions.
Hearing Examiner Decision: Approval with conditions.
PLANNING DEPARTMENT The Planning Department preliminary report was received by the
REPORT: Examiner on August 19, 1981 .
PUBLIC HEARING: After reviewing the Planning Department report, examining
available information on file with the application, and field
checking the property and surrounding area, the Examiner
conducted a public hearing on the subject as follows:
The hearing was opened on August 25, 1981 at 9:05 a.m. in the Council Chambers of the Rento
Municipal Building.
Parties wishing to testify were affirmed by the Examiner.
It was reported that the Hearing. Examiner and the applicant had received and reviewed the
Planning Department preliminary report. Roger Blaylock, Associate Planner, presented the
report, and entered the following exhibits: into the record:
Exhibit #1 : Application File containing Planning Department
report and other pertinent documents
Exhibit #2: Vicinity Map
Exhibit #3: Site Plan
Responding to the Examiner's inquiry regarding whether the existing "G" zoning on the site
would permit construction or if a rezone to public use would be required, Mr. Blaylock
indicated that the matter would be researched,..and he suggested that approval of the fill
permit could be conditioned upon future site approval which would require either applicatio
for conditional use permit for the specific use or a rezone.
Mr. Blaylock discussed comments contained in Section L.4 of the staff report submitted by
the Engineering Division to require retention of the area east and north of the existing
berm in its natural state, granting of a drainage easement over that area, and dedication
to the city of property required for the P-1 Channel . He noted that a disagreement exists
between the applicant and city staff regarding the condition , but the city is concerned the
because construction of the P-1 channel is necessary, it must be completed in a timely mann
The Examiner requested Mr. Blaylock to indicate the property lines of the site and the
location where the P-1 Channel would cross the Metro property. Mr. Blaylock designated a
small portion of property on the northeast corner of the site.
The Examiner requested testimony by the applicant. Responding was:
Raymond Drebin
Metro
821 2nd Avenue
Seattle, WA 98104
•
Mr. Drebin, Right of Way and Property Supervisor, requested clarification of the Examiner's
previously stated concern regarding requirement for a conditional use permit or rezone of
the property. The ExaminerEindicated that the matter would be researched by the Planning
Department. Mr. Drebin advised that a conditional use permit had been obtained from the
city in 1961 for the purpose of construction of the Renton treatment plant which included
SP-065-81 Page Two
all future phases. He indicated a desire to conform to the city' s regulations, but to
require other action not under the aura, of the original use permit approval would cause a
hardship for Metro. Mr. Drebin advised that upon acquisition of additional property arounc
the facility, the site boundaries had changed from the existing boundaries of the Renton
treatment plant to the new boundaries of the drainage channel as it was established in 1971
He noted that the property was obtained by Metro both for purposes of future expansion and
because the seller, Burlington Northern, was unwilling to grant the P-1 Channel route
because development of that property would not then be possible and it would remain unused.
He stated that Metro has always been very supportive of the construction of the P-1 Channel
but the current application is for purposes of filling within the existing berm area which
should not have an effect either on the channel or the City of Renton. Mr. Drebin noted
that the current phase of construction for secondary structures in the southeast corner
and a small building in the center of the plat are located within the confines of the
existing berm, and expansion outside of that area will occur at a later date.
Mr. Drebin submitted the following exhibit into the record:
Exhibit #4: Drawing of Proposed Future Expansion
Mr. Drebin explained the process of conveyance of property by the Metro Council , noting
the existing uncertainty of the location of the alignment of the channel . He added that
if the actual alignment were finalized and legal descriptions made available, the matter
could be reviewed by the Metro Council , but at the current time, easements cannot be
granted because of Metro's unwillingness to obligate themselves to something that cannot
be fulfilled at a later date. He suggested that the fill permit be approved at this
time, and negotiations then commence between the city, King County and Metro to resolve
the specific location of necessary easements and dedications for the channel .
The' Examiner requested testimony in support or opposition to the proposal . There was no
response. He then requested questions from the audience. Responding was:
Versie Vaupel
400 Cedar Avenue S.
Renton, WA 98055
Mrs. Vaupel requested clarification of the extent of the fill project consisting of 126,000
cubic yards, and inquired if it would cover the entire seven acre site. The Examiner
referred to the site map, Exhibit #3, noting that the red cross-hatched areas will be
filled. Mr. Blaylock further clarified that there is a site elevation differential of
from 12 to 15 feet and the areas designated in red would be raised to the existing plain
of the treatment plant. Responding to Mrs. Vaupel 's inquiry regarding the level of the
remainder of the property, Mr. Blaylock stated that the rest of the undeveloped land and
the land inside the dike is down to elevations of 10 to 13 feet above sea level , and the
elevation of the developed portion is at approximately 26 feet. The Examiner inquired if
the borrow pit will be restored to useable contours or left as a ground pit. Responding wa
Joe Fernandes
Metro
821 2nd Avenue
Seattle, WA 98104
Mr. Fernandes, Consulting Supervisor for Metro, stated that use of the borrow pit is yet
indefinite, but it will be sloped, hydroseeded, and landscaped with shrubs and trees to
restore it to a more acceptable facility than currently exists.
Responding to the Examiner's request for final comments, Mr. Blaylock modified Section L.4
of the report, and stated that the department would have no objection to conditioning
approval by the Hearing Examiner to allow Metro, King County and the City of Renton to
negotiate the easements and right-of-ways necessary for the P-1 Channel alignment.
Since there were no further comments, the hearing regarding SP-065-81 was closed by the
Examiner at 9:40 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATIONS: Having reviewed the record in this matter, the
Examiner now makes and enters the following:
FINDINGS:
1 . The request is for approval of a special permit to allow filling and grading with
approximately 126,000 cubic yards of material to allow construction of new structures
at the Metro Renton Treatment Plant.
2. The application file containing the application, SEPA documentation, the Planning Depart
ment report, and other pertinent documents was entered into the record as Exhibit #1 .
SP-065-81 Page Three
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971 , R.C.W. 43.21 .C. , as amended, a Declaration of Non-significance
has been issued for the subject proposal by Metro, the lead agency.
4. Plans for the proposal have been reviewed by all City departments affected by the impac
of this development.
5. There was no opposition to the proposal expressed.
6. All existing utilities are available and in close proximity.
7. The subject property is located in the vicinity of 1200 Monster Road. The site is rela
tively level with some topographic relief in the west central and northeasterly portion
of the site. An existing berm protects the subject property from potential flooding.
The berm is located along the north and east sides.
8. The applicant proposes preloading the site for purposes of expanding the existing sew-
age treatment plant. Portions of the site are at a lower elevation than the existing
site, and Metro requires the elevations across the site to be equal .
9. The applicant proposes to utilize material from a borrow pit located on site but may no
be able to accomplish that objective and may have to resort to importing material to th,
site. Approximately 5,000 truck trips will be necessary to import the 126,000 cubic
yards of material .
10. The Comprehensive Plan designates the area in which the subject property is located as
suitable for the development of public and quasi-public uses.
11 . The subject site is currently zoned G (General ; Single Family Residential ; minimum lot
size - 35,000 sq. ft. ) . The G zone will not permit the expansion of the treatment
plant.
12. The applicant indicated that a conditional use permit to allow the current plant and
future additions was granted in 1961 . The applicant failed to produce documentation
of the permit.
13. The City requested that the applicant dedicate portions of the northeast corner of the
subject site for use by King County in the proposed construction of the P-1 Channel .
The applicant indicated that all conveyances of property by Metro must be approved by
the Metro Council . The exact legal description of the property would have to be pro-
vided.
14. The City further requested drainage easements along the north and east side of the sub-
ject site. As in the dedication, the Metro Council must approve _ all such legal convey.
ances of rights pertaining to Metro' s property. The applicant indicated that such
easements may interfere with proposed expansion plans north of the Metro berm.
15. The area outside of the berm is to remain in its natural state according to the Public
Works Department. This would accommodate natural drainage in accordance with the above
drainage easement.
16. If fill must be imported to the subject site, the traffic generated will have an impact
on the roads in the area; and the Police Department recommended restrictions on hours
of operation and the requirement of route posting and the posting of a bond to permit
City crews to clear debris from the roads.
17. There are a number of uses in the vicinity surrounding the subject site including the
Earlington Golf Course, which is the site of a potential industrial park, and the
Longacres race track south of the site. A mixture of commercial and industrial uses
are located east and south of the site.
CONCLUSIONS:
1 . The special permit to allow fill and grade of property to be used for the expansion of
the Metro Renton Treatment Plan appears to serve the public use and interest.
2. The applicant initially proposes to acquire the fill material from a borrow pit located
on site; and, therefore, there would be little or no interference with traffic in the
area.
3. Importation of fill would require approximately 5,000 trips by large trucks, which
would interfere with the heavy traffic in the area and potentially conflict with traf-
fic generated by the Longacres Race Track. In order to forestall interference with
SP-065-81 Page 'Four
the traffic, if importation of material should be required, a limitation on days and
hours of truck travel would be in order.
Since the area is industrial in nature, the hours of operation could occur as early
as 6:30 a.m. but should not extend past 2:30 p.m. so that there is no interference
with the afternoon traffic in the area.
4. The accumulation of debris must be removed by the contractor but, upon failure to
properly remove same, the City must be in the position to clear roads to maintain
safety; and, therefore, the applicant should post a bond to permit City crews to clear
the roads upon determination of the Police or Public Works Department.
5. The route selection should be approved by the Police and Public Works Departments.
6. No hauling should occur on weekends because inspection and clean up is not possible
at that time.
7. The creation of an easement for storm water flow required for flood control purposes
will have to be executed, and Metro will have to provide same. Metro cannot be in the
position of jeopardizing flood control measures in the Valley nor can it enhance the
damage potential due to its expanding operations. An easement will , therefore, be
required as further specified by the Public Works Department prior to the issuance of
the first annual license.
8. The Metro Council must approve any transfer of property for the use of the P-1 Channel ,
and the specific route must be defined so that Metro can work with other governmental
agencies to protect the Green River Valley from flooding.
DECISION:
The special permit, for fill and grade is approved subject to the following conditions:
1 . The applicant posts a cash bond in the amount of $3,000, (three thousand dollars) to
allow City crews to clear the streets of debris generated by the subject operation.
2. The hours and day of operation shall be limited to Monday through Friday from 6:30 a.m.
to 2:30 p.m.
3. The truck route shall be approved by the Police and Public Works Departments and posted
accordingly.
4. An easement for natural drainage be conveyed to the City.
5. The applicant works with the sponsors of the Green River Eastside Watershed Project to
define what portions of Metro' s property is required for the project and to determine
a satisfactory means of accomplishing a transfer o,f said property.
6. The applicant demonstrates that the land is zoned or otherwise regulated to permit the
expansion of the treatment plant.
ORDERED THIS 8th day of September, 1981 .
Fred J. Kaufm
Land Use. Hearing Examiner
TRANSMITTED THIS 8th day of September, 1981 , by Affidavit of Mailing to the parties of
record: -
Raymond Drebin, Metro, 821 2nd Avenue, Seattle, WA 98104
Joe Fernandes, Metro, 821 2nd Avenue, Seattle, WA 98104
Versie Vaupel , 400 Cedar Avenue S. , Renton, WA 98055
Larry Brown, Western Pacific Properties, Inc. , : 13975 Interurban Ave
Seattle, WA 98168
TRANSMITTED THIS 8th day of September, 1981 , to the following:
Mayor Barbara Y. Shinpoch
Councilman Richard M. Stredicke
Richard Houghton, Acting Public Works Director
SP-065-81 Page/Five
David Clemens, Acting Planning Director
Michael Porter, Planning Commission Chairman
Barbara Schellert, Planning Commissioner
Ron Nelson, Building Director
Lawrence J. Warren, City Attorney
Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration must be
filed in writing on or before September 22, 1981 . Any aggrieved person feeling that the
decision of the Examiner is based on erroneous procedure, errors of law or fact, error in
judgment, or the discovery of new evidence which could not be reasonably available at the
prior hearing may make a written request for review by the Examiner within fourteen (14)
days from the date of the Examiner's decision. This request shall set forth the specific
errors relied upon by such appellant, and the Examiner may, after review of the record,
take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and meeting
other specified requirements. Copies of this ordinance are available for inspection in
the Finance Department, first floor of City Hall , or same may be purchased at cost in
said department.
OF I
lv
hn . ° THE CITY OF RENTON
U
Z MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
rt,
o MMM BARBARA' Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
p Q FRED J. KAUFMAN. 235-2593
ITF0 SEP.1E '
September 16, 1981
•
Mr. Raymond Drebin, Supervisor
Right-of-Way and Property
Metro
Exchange Building
821 Second Avenue
Seattle, WA 98104
RE: File No. SP-065-81 ; Request for Reconsideration.
Dear Mr. Drebin:
•
I have reviewed your letter, dated September 10, 1981 , regarding the
above entitled matter, and my response follows.
As was indicated by your letter, specific information about the
required easement will have to be provided by the Public Works
Department before said easement can be granted. At the same time,
any expansion of the plant beyond the current limits of the
protective berm will have a potential impact on the flood stage
capacity of that land outside the berm. Expansion plans will be
reviewed subject to both federal flood control regulations and
local requirements.
In addition, it is possible that various common law liabilities
may exist if the natural drainage and storm water holding capacity
of the land is altered.
The permit is subject to the 'condition that an easement to be
further defined by the Department of Public Works is granted by
Metro, and that determination stands.
•
A new appeal period has now been established for this matter to
expire on September 30, 1981 .
Very truly yours,
Fred J. Kaufman
Hearing Examiner
cc: Parties of Record
ET 140
® Municipality of Metro olitan Seattle RECEI
P VEd
Lire, OF
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104 H EARING LREN nA
ER
c�E
v
September 10 , 1981 7 8r.� ' ; 81
r10,11r1c', ' , Pti
..,..,4,5,E
A
City of Renton
Renton Municipal Building
Renton, WA. 98055
Attention: Mr. Fred J. Kaufman
Land Use Hearing Examiner
Gentlemen:
Renton Treatment Plant Fill Project
Your File: No. SP-065-81
Reference is made to the Report and Decision issued by your
office in response to the application filed by the Municipal-
ity of Metropolitan Seattle. Pursuant to Title IV, Section
3015 of the Renton Municipal Code, Metro is asking for clar-
ification of the intent of Condition No. 4 as contained in
the Decision conditions .
We do not have enough information to grant any easement which
might interfere with our future expansion of the Renton Treat-
ment Plant. The need to provide the quantity and quality of
sewage treatment as is determined to be necessary demands that
we retain the flexibility to alter or increase existing facil-
ities .
Metro has demonstrated its willingness to cooperate with the
Green River Eastside Watershed Project in conformity with the
policies promulgated by the Metropolitan Council and we will
do our best to continue in this posture. Our paramount con-
cern, however, is the ability to use the Renton Treatment Plant
for the most efficient treatment of sewage and we do not want
to jeapordize our basic function.
Any assistance you may give us to understand Condition 4 will
be appreciated.
Very truly yours,
Raymond Drebin, Supervisor
Right-of-Way and Property
RD:pkd
cc: Mr. Roger Blaylock, Associate Planner City of Renton
Mr. Joe Fernandes Pro ect En•ineer, 1G1etro
ag.
1
mE-rRo
„,„Municipality of Metropolitan Seattle �I j®id
� �EC-
irY °F RANT
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104 HEARrruG %[Rgir'Nl�r OA
September 10 , 1981
�M SEf E98l
City of Renton
Renton Municipal Building
Renton, WA.. 98055
Attention: Mr. Fred J. Kaufman
Land Use Hearing Examiner
Gentlemen:
Renton Treatment Plant Fill Project
Your File: No. SP-065-81
Reference is made to the Report and Decision issued by your
office in response to the application filed by the Municipal-
ity of Metropolitan Seattle. . Pursuant to Title IV, Section
3015 of the Renton Municipal Code, Metro:'-is asking for clar-
ification of the intent of Condition No. 4 as contained in
the Decision conditions .
We do not have enough information to grant any easement which
might interfere with our future expansion of the Renton Treat-
ment Plant. The need to provide the quantity and quality of
sewage treatment as is determined to be necessary demands that
we retain the flexibility to alter or increase existing facil-
ities .
Metro has demonstrated its willingness. .to cooperate with the
Green River Eastside Watershed Project in conformity with the
policies promulgated by the Metropolitan Council and we will
do our best to continue in this posture. Our paramount con-
cern, however, is the ability to use the Renton Treatment Plant
for the most efficient treatment of sewage and we do not want
to jeapordize our basic function.
Any assistance you may give us to understand Condition 4 will
be appreciated. . .
Very truly yours,
1;r"Zi7,4 43/4:71
Raymond Drebin, Supervisor
Right-of-Way and Property
RD:pkd
cc : Mr. Roger Blaylock, Associate 'lanner City of Renton
Mr. Joe Fernandes Pro ect En•ineer, I�Metro
•
AFFIDAVIT OF SERVICE BY MAILING
State of Washington)
County of King
Willis V. Roberts , being first duly sworn, upon oath
disposes and states:
That on the 8th day of September , 1981 , affiant
deposited in the mails of the United States a sealed envelope containing
a decision or recommendation with postage prepaid, addressed to the
parties of record in the below entitled application or petition.
Subscribed and sworn this 8 day of p�S. , 19a/.
Notary Public in and for he Stat of
Washington, residing a
Application, Petition or Case: Municipality of Metropolitan Seattle; SP-065-81
(The m.i.nute4s contain a.tbst o4 the paxti.ez o4 necond. )
/7G'T1-.0
/f
OF R 4,4/ /29Cia/,,ve l
N THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
NIL
BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
9A co. 235— 2550
0
9�TEC SEP100 July 15 , 1981
Rodney G. Proctor, Manager
Environmental Planning Division
Metro
821 Second Avenue; MS-63
Seattle, Washington 98104
RE: PROPOSED DECLARATION OF NON-SIGNIFICANCE FOR RENTON
SEWER TREATMENT PLAN SITE STABLIZATION
Dear Mr. Proctor:
The City of Renton Environmental Review Committee has reviewed
your Proposed Declaration of Non-Significance for the site
stabilization at the Renton Sewer Treatment Plant. The committee
endorses the proposed declaration with the single exception
that the question of the conflict between the flood hazard
maps provided by HUD and the existing bermed area surrounding
the Renton Treatment Plant must be resolved. It is our under-
standing that the berms were constructed in 1968 to provide
100 year flood protection for the Sewer Treatment Plant.
Assuming this is correct, this committee has no objections
to the proposed declaration.
Very ruly yo
II) ii77((//-1
David R. Clemens
Acting Planning Director for
the Environmental Review Committee
cc : Committee Members
mETRoceb
/, Municipality of Metropolitan Seattle jut 6 1981
�- r
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104 ------"----- .-. �,//
July 6 , 1981 .\/ijr/N
TO: Mr. Roger Blalock, Associate . Planner
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
RE: Proposed Declaration of Non-Significance for
Renton Sewage Treatment Plant Site Stabilization
Enclosed is a copy of a Proposed Declaration of Non-Signi-
ficance for the subject project as required by the Washington
State Environmental Policy Act of 1971 (RCW 43 . 21C) .
Comments are invited and will be received until July 20 ,
1981. Written comments should be addressed to :
Mr. Rodney G. Proctor, Manager
Environmental Planning Division
METRO
821 Second Avenue; MS-63
Seattle, WA 98104
Copies of this document may be obtained by visiting Metro
at the above address or by calling 447-6613.
The comment period for this proposal will expire on
July 20 , 1981. I anticipate that we will issue the Final
Declaration of Non-Significance on July 24 , 1981. The FDNS
will undergo a 15-day appeal period, ending on Aug.ust 7 , 1981.
Joe Fernandez (Consultant Supervisor) will be contacting
you regarding the submission of permits and scheduling of a
hearing date.
Very truly yours ,
Rodney G. Proctor, Manager
Environmental Planning Division .
RGP :gbj
Enclosure
fi r:;"r 9
' O� ENT,
kitj •
,45 • co.\,111,
•
Municipality of 1981 Me ropolitan Seattle ,Ut. 6
Exchange Bldg. 6821 Second Ave., $tle,Washin„ n 98104
/4, G Ds?!'•
PROPOSED/ X DECLA_RATION OF "�--
XT c /NON-SIGNIFICANCE
•
• Action: Site Stabilization at Renton Sewage Treatment Plant . •
Description of Proposal : The Renton Sewage Treatment Plant (see
map A for site location) has now reached its interim design
capacity. Continued population growth in the service area and
the desire to improve local water quality conditions now make it
necessary to identify alternatives which address expansion of
the Renton facility. These questions are now being addressed as
• part of the Renton facilities planning process . Regardless of the
selected treatment level alternative, some expansion of the Renton
Treatment Plant must take place , requiring the site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to include the.
addition of eight secondary clarifiers located immediately .east
of the existing eight secondary clarifiers, an aeration structure
located immediately east of the existing aeration structure and' (OV
Proponent: Municipality of Metropolitan Seattle (METRO)
Location of Proposal: The Renton Sewage Treatment Plant is
located' at 1200 Monster Road in the City of Renton (see map A) .
Lead Agency: METRO •
-
This proposal has been determined to. DaXMlnot have) a .
significant adverse impact upon the environment. An EIS •
his not) required under RCW 43 . 21C. 030 (2) (c) . . This
• decision was made after review by the lead agency of a •
completed environmental checklist and other information
on file with the lead agency.
•
Responsible Official: Rodney G. Proctor
Position/Title: Manager/Environmental Planning Division Date: - July 6 , 1981 Signature : !
•
• Environmental Planning Division
c:�'
•
Description of Proposal continued
possibly a primary sedimentation structure located to the north of-
the primary treatment structure- (see map B) .
•
The portion of the expansion addressed by this environmental action
includes the site stabilization for the proposed secondary clari-
fiers and the primary sedimentation- structure. The site stabili- -
zation project is presently proceeding on the assumption that
approximately 106 ,000 cubic yards of preload. material will be
acquired from Borrow Site "A" (see map B) . An additional 20 ,000
cubic yards of preload material will be acquired from outside the
treatment plant site.
Borrow Site "A" will be rehabilitated to protect .soils disrupted
during the borrow operation. The site .stabilization project
will begin September 19 , 1981.
A second option being considered is acquisition of the .entire •
• 126 ,000 cubic yards of preload material from outside the treat-
ment plant. Under this option, Borrow Site "A" will not be - . :
disturbed. The decision to use Borrow Site "A" or to use material
brought in from off-site will be made by the ..contractor and
will be based on cost considerations and availability of suitable
off-site material. Completion by either option is scheduled for
• September 1982 .
ETA* " - V-
Municipality of Metropolitan Seattle
Exchange Bldg. ® 821SecondAve.,Seattle,Washington98104
ENVIRONMENTAL CHECKLIST FORM - -
PROPOSED ACTION: Site Stabilization at Renton Sewage
Treatment Plant
I. BACKGROUND.
1. Name of Proponent Municipality of Metropolitan Seattle (METRO)
- 2. Address and Phone Number of Proponent:
Exchange Building; 821 Second Avenue; MS-63
Seattle , WA 98118 TELEPHONE: 206/447-6613
3. Date Checklist Submitted July 6 , 1981
4 . Agency Requiring Checklist METRO
5. Name of Proposal, if applicable: _
6. Nature and Brief Description of the Proposal (in-
cluding but not limited to its size, general design
elements, and other factors that will give an
accurate understanding of its scope and nature) :
The Renton Sewage Treatment Plant (see map A for site
location) has now reached its interim design capacity.
Continued population growth in the service area and the
desire to improve local water quality conditions now
make it necessary to identify alternatives which ad-
dress expansion of the Renton facility. These ques- .
tions are now being addressed as part of the Renton
facilities planning process . Regardless of the selected
treatment level alternative, some expansion of the
Renton Treatment Plant must take place , requiring the
site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to
include the addition of eight secondary clarifiers
located immediately east of the existing eight secondary
clarifiers , an aeration structure located immediately
east of the existing aeration structure and possibly -
a primary sedimentation structure located to the north
of the primary treatment structure (see map B) . (OVER)
!:-to,:-'aW I't ti`l
Nature and Brief Description continued
The portion of the expansion addressed by this environmental action
includes the site stabilization for the proposed secondary clari-
fiers and the primary sedimentation structure. The site stabili-
zation project is presently proceeding on the assumption that
approximately 106 ,000 cubic yards of preload material will be
acquired from Borrow Site "A" (see map B) . An additional 20 ,000
cubic yards of. preload material will be acquired from outside the
treatment plant site.
Borrow Site "A" will be rehabilitated to protect soils disrupted
during the borrow operation. The site stabilization project
will begin September 19 , 1981.
A second option being considered is acquisition of .the entire
126 ,000 cubic yards of preload material from outside the treat-
ment plant. Under this option, Borrow Site "10' will not be
disturbed. The decision to use Borrow Site "A" or to use material
brought in from off-site will be made by the contractor and
will be based on cost considerations and availability of suitable
off-site material. Completion by either option is scheduled for
September 1982.
•
•
.. /VIAP A .
R5.;,11-01.1 SE AGE TR EAT mE-_ivr PLANJr •
:..aPLINGFON - _
G7LF[nVRSo
AG
Ep #� �• a
t '
- - ���;L �yh `` cos
T
- soik re� � . - . -
S!B ����
B1.y , ROW&ACRc5
RACE
< 7AAGK
SCUTH cEur �t�.4 h
IF
0
. - `� w a ..
11,
Z2T$ _
$�A�.a? -
•
\- .. .
. . ..
._.
. _.. .._
. . . . ._
. _." . . ... _ .•" .
.. _ __
_._ ._. ... ._.
_ _.. . ... . _ . .
._
_ ... _ .. __ . ..
...._ ___. _ ______ _
. _ .
. ... . • .. __ _ ____ _ ___
. . . ..
..... .. •. .__ _ .. .
. . _ _., _____ ______._
. .
am. . . _ .
. .
. . ._ .. _ ... ___ _______ ._ __ _.
d II_ • FILTER FABRIC - . _ 0 50 100 10 430
"--'--`- ---- -
--- p( -SCALE ,r 7ECT ... --- --'-•
--
17, 111111111111r .411 ...1-1111-ioilii0 _ . - - - -- . • .... ..__
STRAW BALcS"...
Rrt
•
PRELOAD FoR FV•tvRE
_dal- PgIltr1RY ...SaDte✓16NTATIokI •- - --- '-- ---'--- ---
-- --- �P /u & ---S T F J TU R E . -- _ ._ .._ __. . --_.. _._ ... ..._... .--
AP!cam°g R° Y/III♦III _._....
PARKING I��Nd 5 F __--- ._ . -. _.
_____ -_.._. D2AlN5 �
PuriP
-- '--- ( $LCG. t/0•c47 SD - �t/fit
\v,} AEeilT101U _..tilaQ ►
sTRIXTURE �.AW - PzbLOAD FoR wEw
._ .3
?2inARY 11U�1•1 5a[oNDARA? ScDtit.MTAT1o&J
• �RPATHE. f 5TRc Tv RE _ ..
\ADi11N. 57RvCTURc r1�� aB. r 0 CDI I'
... . _ (a)01CalArnMr.IONSINP” . _ . . _ . .......
- s FtLTe.st. 'ASRtc
•
0 J • • . . .. . . _. . .... .....-.. __ .._ _._,. __
SECo�DARY `SEDtrcE-T crrfOnJ •
•
.Si2vx-ruREE . _ .. _. _ .-.
R��Vro�v SEWAGE " R.FATMEA/r- PLAPT
. 517E ST,�'sglL! ZAT Io N —
•
•
•
7 . Location of Proposal (describe the physical setting of the
proposal, as well as the extent of the land area affected.
by any environmental impacts , including any other information •
needed to give an accurate understanding of the environ-
mental setting of the proposal) :
•
The Renton Sewage Treatment Plant is located at 1200 Monster •
•
Road in the City of Renton (see map B) . Preload
material will cover approximately 7 acres ' of the treatment
plant site (4 .2 . acres for the proposed secondary clarifiers
• and 2 . 8acres for' the proposed primary sedimentation structure).
•
•
8 . Estimated Date for Completion of the Proposal: September 1982
9. List of all Permits , Licenses or Government' Approvals
. Required for the Proposal (federal , state and local --
including rezones) : Special Grading Permit and Annual
• License (City of Renton) •
10 . Do you have any plans for future additions , expansion, or •
further activity related to or connected with this proposal?
If yes, explain:
Yes. The areas of the Renton Treatment Plant undergoing site
stabilization will be used for expansion of the treatment •
• facility. Expansion to 72 mgd will include eight secondary
clarifiers , a new aeration structure, relocation of a sto.Laye
building and possibly a primary sedimentation structure.
11. Do you know of any plans by others which may affect the •
property covered by your proposal? If yes, explain:
No. •
•
•
•
12 . Attach any other application form that has been completed .
regarding the proposal; if none has been completed, but is
expected to be filed at some' future date, describe the • •
• nature of such application form: •
• Application for Special Grading Permit (City of Renton) and
•
Annual License (City of Renton) will be forthcoming.
II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe"
answers are required. ) .
Yes Maybe No
1) Earth. Will the 'proposal result in:
a) Unstable earth conditions or in .
changes in geologic substructures? X
b) Disruptions, displacements,
compaction or overcovering of the
soil? X
c) Change in topography or ground
surface relief features? • X •
d) The destruction, covering or
• modification of any unique geologic-
or physical . features? X
e). Any increase in wind or water -
erosion of soils, either on or .off .
• . • the site? X
f) Changes in deposition or erosion of
beach sands, or changes in siltation,
deposition or erosion which may
modify the channel of a river or .
stream or the bed of the ocean of
• any bay, inlet or lake? X
• • Explanation: (b&c) The intent of the project is to fill •
approximately 126 ;000 cubic yards of preload material -
to the sites for proposed secondary clarifiers and the
proposed primary sedimentation structure. If all or a.
• portion of this material is excavated from Borrow Site "A" (OVER;
2) Air. Will the proposal result in: •
a) Air emissions or deterioration of
ambient air quality? X - ' .
b) The. creation of objectionable odors? . . X • -
c) Alteration of air movement, moisture. . .
or temperature, or any change in .. • .
climate, either locally or
regionally? S • . X .
Explanation: (a&b) There will be a temporary increase
in air emissions and some diesel odors tram construction
equipment. No long-term impacts will result.
•
1 b&c continued
then the topography of the hill will be changed. The topography
of the sites intended for stabilization will change slightly,
with an elevation increase averaging 10-15 feet. Preloading is
designed to consolidate soils where new structures will be built.
Soil compaction caused by the movement of construction equipment
and by the application of preload material may alter the absorp-
tion rate during the construction period. If Borrow Site ''A"
is used, the area will be re-sloped at 2 :1 ratio to prevent soil
from sloughing.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Yes Maybe No _ _
3) Water. Will the proposal result in:
a) Changes in currents, or the course .
• or direction of water movements, in •
either marine or fresh waters? X •
b) Changes in absorption rates,
drainage patterns, or the rate and . •
amount of surface water runoff? • X '
c) Alterations to the course .or flow
• of flood waters? X
d) Change in the amount of surface . _ .
water in any water body? • X
e) Discharge into surface waters, or in -
. any alteration of surface water -
• quality, including but not limited
to temperature, dissolved oxygen or
turbidity? X _
f) Alteration of the direction or rate
. . of flow of ground waters? X
. . g) Change in . the quantity of ground • -
waters, either through direct
additions or withdrawals, or .
. through interception of an aquifer
• by cuts or excavations? X
h) Deterioration in ground water
. quality, either through direct - • •
-
. injection, or through the seepage .
of leachate, phosphates, detergents, .
•
waterborne virus or bacteria, or
other-substances into the ground • .
water? . , - X .
i) Reduction in the amount of water .
otherwise available for public
. water supplies? • X
• Explanation: b) The 'Delia surrounding the treatment
plant site provides an excellent barrier to prevent
sediment bearing runoff from leaving the site. During
. construction, drains located. in the berm (see map B)
will be screened with straw bales or sealed off to
prevent sediment transfer to local drainages . Filter
. . fabric will be installed at Borrow Site "A" and the .
(OVER) -_
•
•
• •
•
Explanation continued
preload site to prevent soil from sloughing over the berm at
either area (see map B) . Precautions will be taken during site
stabilization work to ensure that the runoff and drainage
patterns from the site are not changed.
c) A flood hazard analysis performed during the Renton treatment
facilities. planning process indicates that the treatment plant
•
will receive adequate protection from floods.
•
g) Site preparation may require some dewatering,. which could be
accomplished by use of well points or other means available to
• the contractor. Groundwater will not be .removed from the site
and no impacts are expected to result from any dewatering action.
I .
•
•
•
•
•
•
•
Yes Maybe No
4) Flora. Will the proposal result in:
a) Change in the diversity of species,
or numbers of any species of flora
(including trees, shrubs, grass, .
- crops, microflora and aquatic ..
plants) ? X
•
b) Reduction of the numbers of any
unique, rare or endangered species •
of flora? . X
c) Introduction of new species of flora
into an area, or in a barrier to the
normal replenishment of existing .
species? _ X
d) Reduction in acreage of any agri-
cultural crop? X
Explanation: a) Flora present at the preload sites is
predominated by native grasses , blackberry, etc. Flora
present at Borrow Site "A" is similar, but also includes
mature maple, alder and other native deciduous trees.
The site stabilization project will result in removal (OVER)
5) Fauna. Will the proposal result in: .
• a) Changes in the diversity of species,
or numbers of any species of fauna
(birds, land animals including
reptiles, fish and shellfish, benthic
organisms, insects or microfauna) ? X
b) Reduction of the numbers of any
unique, rare or endangered species
of fauna? X
•
c) Introduction of new species of fauna
into an area, or result in a barrier
to the migration or movement of
fauna? X
d) Deterioration to existing fish or .
wildlife habitat? X
Explanation: Although a number of rabbits and other small
mammals inhabit the treatment plant property, ample
jiabita exists on areas adjacent to the preload sites to
ensure that the wildlife population will be accommodated.
4a continued
of all vegetation at the preload sites and perhaps a significant
portion at Borrow Site "A" if this site is used. The project,
however, will include landscaping/vegetation plans to ensure
that some habitat is replaced and soils are protected from
erosion.
Yes Maybe No
6) Noise. Will the proposal increase .'
existing noise levels? X
Explanation: Noise levels will increase temporarily during
construction activities. Standard construction techniques
for minimizing noise impacts will be used. The immediate •
surrounding area' is zoned industrial and noise impacts
should be minimal. Temporary noise levels between 72-94 (OVER)
7) Light and Glare. Will the proposal
produce new• light or glare? X
Explanation:
8) Land Use. Will the proposal result in
the alteration of the present or
planned land use of an area? . X
Explanation: The proposal may allow some alteration;; of
present land use by enabling additional sewerage develop-
ment by Metro component agencies . The -proposal would not,
however, necessitate any land use changes . Land use changes. •
are governed by local. agencies with land use authority.
9) Natural Resources. Will the proposal .
result in:
a) increase in the rate of use of any
natural resources? • X
• b) Depletion' of any nonrenewable
natural resource? X
Explanation:
.10) Risk of Upset. Does the proposal involve
the risk of an explosion or the release •
of hazardous substances (including, but . •
not limited to, oil, pesticides, chemicals
or radiation) in the event of an accident
. or upset conditions? X
Explanation:
6 continued
dbA can be expected when machinery is operating. To mitigate
noise impacts , construction activity shall be restricted to
the hours between 8 a.m. and 5 p.m. In the cases of special
noise sensitivity, portable noise-reducing barriers shall be
used to control noise.
•
t
•
Yes Maybe No
11) Population. Will the proposal alter the
location, distribution, density, or
growth rate of the human population of
an area? X
Explanation: The project is the first element of plant
expansion which would accommodate additional flows into
the existing sewage service area, thereby allowing addi-
tional development to be served by sewers . However, the
location, distribution, density and growth rates are
governed by local land use plans and policies .
12). Housing. . Will the proposal affect
existing housing, or create a demand
for additional housing? X
Explanation: See Item 11
13) Transportation/Circulation. Will the
proposal result in: •
a) Generation of additional vehicular
movement? X
b) Effects on existing parking facilities
or demand for new parking? X
c) Impact upon existing transportation .
systems? X
•
d) Alterations to present patterns of
circulation or movement of people
and/or goods? X
e) Alterations to waterborne, rail or
air traffic? X
f) Increase in traffic hazards to
motor vehicles, bicyclists or .
pedestrians? X
Explanation: (a&b) A minimum of additional traffic may be
generated by workers travelling to and from the site during
the construction period. If all preload is acquired out-
side the site, approximately 6 , 320 roundtrips within a
6-mile radius of the treatment plant will be generated
by trucks bringing in preload material. This may result
in a slight impact to the existing transportation (OVER)
13 a&b) continued
circulation in the immediate area and along Monster Road. Site
stabilization for the new secondary clarifiers will require
the removal of an existing storage building and parking area.
This building and paved area will be relocated elsewhere on
the site.
f) The possible increase in traffic hazards along Monster Road
will be reduced by providing flagmen along the route and posting
warning signs as appropriate. Vehicle movement will be limited
to daylight hours .
Yes Maybe No
14) Public Services. Will the proposal have
an effect upon, or result in the need
for new or altered governmental services
in any of the following areas:
a) Fire protection? X
b) Police protection? X
c) Schools? X
d) Parks and other recreational
facilities? X
e) Maintenance of public facilities,
including roads? X
f) Other governmental services? X
Explanation:
15) Energy. Will the proposal result in:
a) Use of substantial amounts of fuel •
or energy? X
b) Demand upon existing sources of
energy, or require the development
of new sources of energy? X
Explanation: Total fuel consumption by machinery used. at
the construction site is estimated at approximately 18 ,000
gallons (gas and diesel) . Total fuel consumption if all
preload material is acquired from a site within a 6-mile
radius of the sewage treatment plant is estimated at (OVER)
16) Utilities. Will the proposal result in
a need for new systems, or alterations
to the following utilities?
a) Power or natural gas? X
b) Communications systems? X
c) Water? X
d) Sewer or septic tanks? X
e) Storm water drainage? X
f) Solid waste disposal? X
Explanation:
15 a) continued. . . .
approximately 36 ,000 gallons (gas and diesel) . This fuel
consumption will not be considered significant nor will it
result in energy-related impacts .
es Maybe No
17) Human Health. Will the proposal result
in the creation of any health hazard or
potential health hazard (excluding
mental health) ? X
Explanation : •
18) Aesthetics. Will the proposal result in
the obstruction of any scenic vista or
view open to the public, or will the • .
proposal result in the creation of an
aesthetically offensive site open to .
. public view? X
Explanation: J f sorrow Site "A" is excavated during site
• stabilization, some of the excavation may be visible from
Mon. ter Road. This area will be re-vegetated in a manner
similar to existing flora to minimize aesthetic impact. .
uy roseeding will be used to protect exposed slopes from (OVER)
19) Recreation. Will the proposal result in •
. an impact upon the quality or quantity •
of existing recreational opportunities? X .
Explanation: Improved multi-use recreation facilities are
being examined during the facilities planning process for
expansion of the Renton Sewage Treatment Plant.
20) Archaeological/Historical. Will the
proposal result in an alteration of a • • .
significant. ar.chaeological or historical
site,. structure, object or building? X
Explanation: Extensive archaeological/historical investi- .
gations have been performed at the Renton Sewage Treatment
Plant expansion site. These investigations conducted by
• the Office of Public Archaeology revealed no archaeological/ -
historical finds . No finds of significance are anticipated (OVER)
III. SIGNATURE -
• I; the undersigned, state that to the best of my knowledge
the above information is true and complete. It is understood
that the lead agency may withdraw any declaration of no significance- _
that it might issue in reliance upon this ecklist s ld there
be any misrepresentation or lack of f;:,1 i closure my part.
Proponent: t) _
Date: L6, 7 .A ( .
18 continued
erosion and reduce aesthetic impacts . Recommendations on
re-vegetation plans will be prepared by a landscape architect
and implemented during the construction period, Borrow Site
"A" slopes will be sloped at 2 :1 ratio to prevent erosion.
20 continued
at either Borrow Site "A" or the preload sites . If, however,
any evidence of archaeological/historical significance is
discovered during excavation, all construction activity will
be halted until the importance of the find can be evaluated
by the State,
OFFICE OF THE LAND USE HEARING EXAMINER
CITY. OF RENTON
REPORT AND DECISION.
APPLICANT: Municipality of Metropolitan Seattle FILE NO. SP-065-81
LOCATION: 1200 Monster Road.
SUMMARY OF REQUEST: The applicant seeks a special permit approval to preload the
subject property (126,000 cubic yards) for eight secondary
clarifiers, a new aeration structure, and a primary
sedimentation structure to increase the capacity of the
existing Renton Treatment Plant.
SUMMARY OF ACTION: Planning Department Recommendation: Approval with conditions.
Hearing Examiner Decision: Approval with conditions.
PLANNING DEPARTMENT The Planning Department preliminary report was received by the
REPORT: Examiner on August 19, 1981 .
PUBLIC HEARING: After reviewing the Planning Department report, examining
available information on file with the application, and field
checking the property and surrounding area, the Examiner
conducted a public hearing on the subject as follows:
The hearing was opened on August 25, 1981 at 9:05 a.m. in the Council Chambers of the Rentoi
Municipal Building.
Parties wishing to testify were affirmed by the Examiner.
It was reported that the Hearing Examiner and the applicant had received and reviewed the
Planning Department preliminary report. Roger Blaylock, Associate Planner, presented the
report, and entered the following exhibits into the record:
•
Exhibit #1 : Application File containing Planning Department
report and other pertinent documents
Exhibit #2: Vicinity Map
Exhibit #3: Site Plan
Responding to the Examiner's inquiry regarding whether the existing "G" zoning on the site
would permit construction or if a rezone to public use would be required, Mr. Blaylock
indicated that the matter would be researched, and he suggested that approval of the fill
permit could be conditioned upon future site approval which would require either applicatioi
for conditional use permit for the specific use or a rezone.
Mr. Blaylock discussed comments contained in Section L.4 of the staff report submitted by
the Engineering Division to require retention of the area east and north of the existing
berm in its natural state, granting of a drainage easement over that area, and dedication
to the city of property required for the P-1. Channel . He noted that a disagreement exists
between the applicant and city staff regarding the condition, but the city is concerned tha
because construction of the P-1 channel is necessary, it must be completed in a timely manni
The Examiner requested Mr. Blaylock to indicate the property lines of the site and the
location where the P-1 Channel would cross the Metro property. Mr. Blaylock designated a
small portion of property on the northeast corner of the site.
The Examiner requested testimony by the applicant. Responding was:
Raymond Drebin
Metro
821 2nd Avenue
Seattle, WA 98104
Mr. Drebin, Right of Way and Property Supervisor, requested clarification of the Examiner's
previously stated concern regarding requirement for a conditional use permit or rezone of
the property. The Examiner indicated that the matter would be researched by the Planning
Department. Mr. Drebin advised that a conditional use permit had been obtained from the
city in 1961 for the purpose of construction of the Renton treatment plant which included
SP-065-81 Page Two
all future phases. He indicated.a desire to conform to the city's regulations, but to •
require other action not under the aura of the original use permit approval would cause a
hardship for Metro. Mr. Drebin advised that upon acquisition of additional property around
the facility, the site boundaries had changed from the existing boundaries of the Renton
treatment plant to the new boundaries of the drainage channel as it was established in 1971 .
He noted that the property was obtained by Metro both for purposes of future expansion and
because the seller, Burlington Northern, was unwilling to grant the P-1 Channel route
because development of that property would not then be possible and it would remain unused.
He stated that Metro has always been very supportive of the construction of the.P-1 Channel ,
but the current application is for purposes of filling within the existing berm area which
should not have an effect either on the channel or the City of Renton. Mr. Drebin noted
that the current phase of construction for secondary structures in the southeast corner
and a small building in the center of the plat are located within the confines of the
existing berm, and expansion outside of that area will occur at a later date.
Mr. Drebin submitted the following exhibit into the record:
•
{ Exhibit #4: Drawing of Proposed Future Expansion
Mr. Drebin explained the process of conveyance of property by the Metro Council , noting
the existing uncertainty of the location of the alignment of the channel . He added that
if the actual alignment were finalized and legal descriptions made available, the matter
could be reviewed by the Metro Council , but at the current time, easements cannot be
granted because of Metro's unwillingness to obligate themselves to something that cannot
be fulfilled at a later date. He suggested that the fill permit be approved at this
time, and negotiations then commence between the city, King County and Metro to resolve
the specific location of necessary easements and dedications for the channel .
The Examiner requested testimony in support or opposition to the proposal . There was no
response. He then requested questions from the audience. Responding was:
Versie Vaupel
400 Cedar Avenue S.
Renton, WA 98055
Mrs. Vaupel requested clarification of the extent of the fill project consisting of 126,000
cubic yards, and inquired if it would cover the entire seven acre site. The Examiner
referred to the site map, Exhibit #3., noting that the red cross-hatched areas will be
filled. Mr. Blaylock further clarified that there is a site elevation differential of
from 12 to 15 feet and the areas designated in red would be raised to the existing plain
of the treatment plant. Responding to Mrs. Vaupel 's inquiry regarding the level of the
remainder of the property, Mr. Blaylock stated that the rest of the undeveloped land and
the land inside the dike is down to elevations of 10 to 13 feet above sea level , and the
elevation of the developed portion is at approximately 26 feet. The Examiner inquired if
the borrow pit will be restored to useable contours or left as a ground pit. Responding was:
Joe Fernandes
Metro
821 2nd Avenue
Seattle, WA 98104
Mr. Fernandes, Consulting Supervisor for Metro, stated that use of the borrow pit is yet
indefinite, but it will be sloped, hydroseeded, and landscaped with shrubs and trees to
restore it to a more acceptable facility than currently exists.
Responding to the Examiner's request for final comments, Mr. Blaylock modified Section L.4
of the report, and stated that the department would have no objection to conditioning
approval by. the Hearing Examiner to allow Metro, King County and the City of. Renton to
negotiate the easements and right-of-ways necessary for the P-1 Channel .alignment.
Since there were no further comments, the hearing regarding SP-065-81 was closed by the
Examiner at 9:40 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATIONS: Having reviewed the record in this matter, the
Examiner now makes and enters the following:
FINDINGS: .
1 . The request is for approval of a special permit to allow filling and grading with
approximately 126,000 cubic yards of material to allow construction of new structures
at the Metro Renton Treatment Plant.
2. The application file containing the application, SEPA documentation, the Planning Depart-
ment report, and other pertinent documents was entered into the record as Exhibit #1 .
n
•
SP-065-81 Page Three
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971 , R.C.W. 43.21 .C. , as amended, a Declaration of Non-significance
has been issued for the subject proposal by Metro, the lead agency.
4. Plans for the proposal have been reviewed by all City departments affected by the impact
of this development.
5. There was no opposition to the proposal expressed.
6. All existing utilities are available and in close proximity.
7. The subject property is located in the vicinity of 1200 Monster Road. The site is rela-
tively level with some topographic relief in the west central and northeasterly portions
of the site. An existing berm protects the subject property from potential flooding.
The berm is located along the north and east sides.
8. The applicant proposes preloading the site for purposes of expanding the existing sew-
age treatment plant. Portions of the site are at a lower elevation than the existing
site, and Metro requires the elevations across the site to be equal .
9. The applicant proposes to utilize material from a borrow pit located on site but may not
be able to accomplish that objective and may have to resort to importing material to the
site. Approximately 5,000 truck trips will be necessary to import the 126,000 cubic
yards of material .
10. The Comprehensive Plan designates the area in which the subject property is located as
suitable for the development of public and quasi-public uses.
11 . The subject site is currently zoned G (General ; Single Family Residential ; minimum lot
size - 35,000 sq. ft.) . The G zone will not permit the expansion of the treatment
plant.
12. The applicant indicated that a conditional use permit to allow the current plant and
future additions was granted in 1961 . The applicant failed to produce documentation
of the permit.
13. The City requested that the applicant dedicate portions of the northeast corner of the
subject site for use by King County in the proposed construction of the P-1 Channel .
The applicant indicated that all conveyances of property by Metro must be approved by
the Metro Council . The exact legal description of the property would have to be pro-
vided.
14. The City further requested drainage easements along the north and east side of the sub-
ject site. As in the dedication, the Metro Council must approve all such legal convey-
ances of rights pertaining to Metro's property. The applicant indicated that such
easements may interfere with proposed expansion plans north of. the Metro berm.
15. The area outside of the berm is to remain in its natural state according to the Public
Works Department. This would accommodate natural drainage in accordance with the above
drainage easement.
16. If fill must be imported to the subject site, the traffic generated will have an impact
on the roads in the area; and the Police Department recommended restrictions on hours
of operation and the requirement of route posting and the posting of a bond to permit
City crews to clear debris from the roads.
17. There are a number of uses in the vicinity surrounding the subject site including the
Earlington Golf Course, which is the site of a potential industrial park, and the
Longacres race track south of the site. A mixture of commercial and industrial uses
are located east and south of the site.
CONCLUSIONS:
1 . The special permit to allow fill and grade of property to be used for the expansion of
the Metro Renton Treatment Plan appears to serve the public use and interest.
2. The applicant initially proposes to acquire the fill material from a borrow pit located
on site; and, therefore, there would be little or no interference with traffic in the
area.
3. Importation of fill would require approximately 5,000 trips by large trucks, which
would interfere with the heavy traffic in the area and potentially conflict with traf-
fic generated by the Longacres Race Track. In order to forestall interference with
x,
SP-065-81 Page Four
the traffic, if importation of material should be required, a limitation on days and
hours of truck travel would be in order.
Since the area is industrial in nature, the hours of operation could occur as early
as 6:30 a.m. but should not extend past 2:30 p.m. so that there is no interference
with the afternoon traffic in the area. ' -
4. The accumulation of debris must be removed by the contractor but, upon failure to
properly remove same, the City must be in the position to clear roads to maintain
safety; and, therefore, the applicant should post a bond to permit City crews to clear
the roads upon determination of the Police or Public Works Department. -
5. The route selection should be approved by the Police and Public.Works Departments.
6. No hauling should occur on weekends because inspection and clean up is not possible
at that time.
7. The creation of an easement for storm water flow required for flood control purposes
will have to be executed, and Metro will have to provide same. Metro cannot be in the
position of jeopardizing flood control measures in the Valley nor can it enhance the
damage potential due to its expanding operations. An easement will , therefore, be
required as further specified by the Public Works Department prior to the issuance of
the first annual license.
8. The Metro Council must approve any transfer of property for the use of the P-1 Channel ,
and the specific route must be defined so that Metro can work with other governmental
agencies to protect the Green River Valley from flooding.
DECISION:
The special permit for fill and grade is approved subject to the following conditions:
1 . The applicant posts a cash bond in the amount of $3,000 (three thousand dollars) to
allow City crews to clear the streets of debris generated by the subject operation.
2. The hours and day of operation shall be limited to Monday through Friday from 6:30 a.m.
to 2:30 p.m.
3.• The truck route shall be approved by the Police and Public Works Departments and posted
accordingly.
4. An easement for natural drainage be conveyed to the City.
5. The applicant works with the sponsors of the Green River Eastside Watershed Project to
define what portions of Metro's property is required for the project and to determine
a satisfactory means of accomplishing a transfer of said property.
6. The applicant demonstrates that the land is zoned or otherwise regulated to permit the
expansion of the treatment plant.
ORDERED THIS 8th day of September, 1981 .
Fred J. Kauf .
Land Use Hearing Examiner
TRANSMITTED THIS 8th day of September, 1981 , by Affidavit of Mailing to the parties of
record:
Raymond Drebin, Metro, 821 2nd Avenue, Seattle, WA 98104
Joe Fernandes, Metro, 821 2nd Avenue, Seattle, WA 98104
Versie Vaupel , 400 Cedar Avenue S. , Renton, WA 98055
Larry Brown, Western Pacific Properties, Inc. , 33838 Pacific Hw. S. ,
Federal Way, WA 98003
TRANSMITTED THIS 8th day of September, 1981 , to the following:
Mayor Barbara Y. Shinpoch
Councilman Richard M. Stredicke
Richard Houghton, Acting Public Works Director
SP-065-81 Page Five
David Clemens, Acting Planning Director
Michael Porter, Planning Commission Chairman
Barbara Schellert, Planning Commissioner
Ron Nelson, Building Director
Lawrence J. Warren, City Attorney
Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration must be
filed in writing on or before September 22, 1981 . Any aggrieved person feeling that the.
decision of the Examiner is based on erroneous procedure, errors of law or fact, error in
judgment, or the discovery of new evidence which could not be reasonably available at the
prior hearing may make a written request for review by the Examiner within fourteen (14)
days from the date of the Examiner's decision. This request shall set forth the specific
errors relied upon by such appellant, and the Examiner may, after review of the record,
take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and meeting
other specified requirements. Copies of this ordinance are available for inspection in
the Finance Department, first floor of City Hall , or same may be purchased at cost in
said department.
•
EXE 3IT NO. 4 RECEIVED
CITY OF RENTON
ITEM NO; 5/Q i 66' -8/ WEARING EXAMINER
AUG 2 5 1981
e' ;--- ( I AM PEA
' •
FI
, •
, .
, k
, ,
\s., ,
,„ ......„,......„
\ ..t. /
..,'' \ 'y / I t ‘
. \ \ ..• / /
. \ \ •
iiiiii
•
' \ .
I\I� \
T �� • 1
\ N. 1
Sr9G P-1 DRAINAGE CHANNEL \\ \ \\ \
\ \ • \
9C r---, DIGESTERS --- \\\
i()D 2� �0 1 k°9p ,i i I l �\\\
. \ ,
GRAVII�Y
TH CK ERS c) s�� -:::--CI
- I !\\.\\\ \ •
SCALE IN FEET I .I ,...1.,
\1 • i '%WATER I ID 4§',\tli. �7'" I\ ,,L J • \\\��
STORAGE \ __ DEWATERING \-- \ \�
TOWER G BLEND TANK
% \�
RECOVERY ©©\_i %
O/ j 1QGAS DISSOLVED AIR .----- \\ \\\
,I('+- L--1 STORAGE FLOTATION \\\ \ \
K • ENERGY ,�Zn\ 1 x:r% \\\ \\
.:• RECOVERY ��-� .- \\\\\\\\% \\\\ \\\\1 % \\
e, 1 .. . \\ \\\ \\\
NO% \\---./ \\ ----- \ \ ...' • \
/I/
/� ram 1\ \% )\1 , \\\\
\\" �`, , \\\ c
1 .
Ogy
•
la
14 9L00 p$4AT SURE \\\\\\\ , e•----. II\''..--'\ \\\ \\\.
\\
....----. r\C)
A9 SF
``\ fptyUe 9LD0 2 RUC,F\yg£ , I °Lox)
r3 \
gY
\ \ Cyr MF` G .`.;"a". .
•� �� a` �1,�F C BLO 11, TUCTUR£ '•• w„
• \ N
RAjLROM rAG D£W L2:N-6-. \a.TN .
\ .\
4h1
CFILORINE
STORAGE
\ a SPURS
\ i
J u
•
\ LEGEND
\ / PHASE I
`--1 PHASE IZ
`
\./'
V•3"9`L WpY r -1
L--J FUTURE
- r'
PLANNING DEPARTMENT
PRELIMINARY REPORT,. TO THE HEARING EXAMINER
PUBLIC HEARING
:AUGUST 25, 1981
•
APPLICANT: MUNICIPALITY OF METROPOLITAN ,SEATTLE
'FILE NUMBER: SP-065-81
A. SUMMARY & PURPGS is OF ' }mUEST:
. . The applicant seeks a Special Permit approval to preload
the subject site (126,000 cubic yards) for 8 secondary
•clarifiers, a new aeration structure, and a primary
sedimentation structure to increase the capacity of
the existing Renton Treatment Plant.
B. • GENERAL INFORMATION:
1 . Owner of Record: Raymond Drebin
2. Applicant: METRO
3. Location•.
(Vicinity Map Attached) Vicinity of 1200
Monster Road.
4. Legal Description: A detailed legal
description is available
on file in the Renton
Planning Department.
5. `Size of Property: + 7. 0 acres
6. Access: Via Monster Road
7. Existing Zoning: "G" , General Classification
District, Minimum
lot size 35,000 square feet.
8. Existing Zoning in the Area: "G", M-P, Manufacturing Park
9. Comprehensive. Land Use Plan: Public%Quasi-Public
10. Notification: The applicant was
notified in ,writing
of the hearing, .date. Notice
was proper.ly2 published in
the. Daily Record Chronicle
on August 10', 1981
and posted in three
places on or near •
the site as required
by City Ordinance
• on August 7, 1981 .
C. IS'ORY/RcxGRou1 D :
The subject . site• was annexed into the City by Ordinance
#1745 of April 14,; 1959 at which time the present zoning
classification was applied.
PLANNING DEPARTMENT
PRELIMINARY RE^"-�T.-.TO• THE HEARING EXAMINEF;'
• PUBLIC HEARING ►ugust 25, 1981
MUNICIPALITY OFMMETROPOLITAN SEATTLE: FILE NO. SP-065-81
PAGE TWO
D. PHYSICAL BACKGROUND:
1 . Topography: Much of the site is level, although
there are some minor rises and falls in the west
central and northeasterly portions of the property.
2. Soils : Urban land (Ur) is soil that has been modified
by disturbance of the naturalllayers with additions .
of fill material several feet .thick to accommodate
large industrial and housing installations. The
erosion hazard is slight to moderate. No capability
of woodland classification.
3. Vegetation: Scrub brush and blackberries are the
dominant features.
4. Wildlife: The existing .vegetatidn provides some
• habitat for birds and small mammals.
5. Water: Other than the water utilized for treatment,
no surface water was observed on the subject site.
6. Land Use: The site presently consists of a sewage
treatment facility. The Earlington Golf Course
is to the north and east while railroad tracks
are to the south and the Green River to the west.
E. NEI. :i ,t' 'A:00D CHARACTERISTICS:
•
The surrounding properties consist of a variety of land
uses 'but public/quasi-public is the most, common,
F. PUBLIC SERVICES:
1 . Water and Sewer: a 12" water main extends north-south
on Monster Road adjacent to the subject site while
the Metro Gravity sewer is located on Monster Road
along the southerly portion of the property.
2. Fire Protection: Provided by :the City of Renton
as per Ordinance requirements.
3. Transit: N/A
4 . Schools: N/A •
5. Recreation: N/A
G. APPLIC LE SECTItS OF THE ZONING CODE:
•
1 . Section. 4-729, General Classification District
H. APPLICABLE SECTIONS OF THE .C r C!I:,r:+r,l SI E PgAN OR DER
OFFICIAL CITY DOCUMENT:
1 . Policies Element, Comprehensive Plan (1981 ) , 1 .M. 2,
8.D..
I. IMPACT ON THE NATURAL OR BUS ENVa '' 'o I' ' ; : '
1 . Natural Systems : Grading and filling:.will remove
some vegetation, disturb the soils, .increase storm
water runoff, and have an effecton traffic'°and
noise levels in the area. However, through proper
drainage and dust control methods, many of these
impacts can be mitigated.
PRELIMINARY REPORT TO, THE HEARING EXAMINER
PUBLIC HEARING: AUGUST 25, 1981
MUNICIPALITY OF - a: TROPOLITAN SEATTLE: FILE NO. •SP-065-81
PAGE THREE
•
2. Population/Employment: Minor
-3... Schools: N/A
•
4. Social: N/A
5. Traffic:Preloading the 'site with 126,000 cubic
yards of fill will result in approximately 5040
truckloads of additional traffic (25 cubic yards/truck)
J. I;;:#11ipiC:erillian ASSESSMENT/' HRES„OLD DETERMINATION:
Pursuant to the City of Renton 's Environmental Ordinance
and the State Environmental Policy Act of 1971, as amended,
RCW 4.3-21C, METRO has taken lead agency status and issued
proposed and final declaration of non-significance for
the subject proposal. .
K. AG IPS/19EPARTMEN "S CONTACTED:
1 . City of Renton Building Division.
2. City of Renton Engineering Division.
3. City of Renton Traffic Engineering Division. .
4 . City of Renton Utilities Division.
5. City of Renton Fire Department.
6. City of Renton Parks Department.
L. PLANNING DEPARTMENT ANALYSIS:
•
1 . The proposed filling operation is consistent with
the Comprehensive Plan description of Public/Quasi-Public
and "G" zoning for the subject site and surrounding
area.
2. As submitted, the applicant proposes a site stabilization
project (filling operation) utilizing approximately
106,000 cubic yards of preload material to be acquired
from a Borrow Site "A" on the subject property
(see map) . An additional 20,000 cubic yards of
preload. material will be acquired from outside
the subject site. Borrow Site "A" will be rehabilitated
to protect soils disrupted during the borrow operation.
This material will serve as a base for future construction
of secondary- clarifiers and a. primary sedimentation
. structure. (There is a possibility that the preload
• material will be acquired entirely off-site, depending
upon availability and cost considerations of the
contractor. )
3. No landscaping plan has been submitted with the
subject proposal, although the applicant indicates
in the Environmental Checklist Form that the project
will include landscaping/ vegetation plans-:to ensure
that some habitat is replaced and soils are protected
from erosion. The substantial setbacks of the
existing buildings and the location of the berm
would not require extensive plantings. However,
a detailed plan of proposed revegetation will be
necessary prior to issuance of the grading permit
by the Building .Department.
•
. 4. The Engineering Division of the Public Works Department
advises that the area east and north of the existing
• berm is to remain in its natural state- and a drainage
easement over the area must be granted to the City. In
addition, property required for the P-1 Channel
.must be deeded to the City. See other comment.
PLANNING pEPARTMENT pc
PRELIMINARY REPO TO THE HEARING EXAMINER
PUBLIC HEARING: ._,JGUST 25, 1981
MUNICIPALITY `OF METROPOLITAN SEATTLE: FILE NO. SP-065-81
PAGE FOUR
5. A latecomer 's agreement for water will be required
and community facilities charges for water and
• sewer will apply as per Utilities Engineering Division
comment.
6. The Police Department has devised several requirements
which the applicant must fulfill and observe during
'" the proposed .operation. They are as follows:
• a. Hauling hours to be 6 :30 a.m. to 2: 30 p.m.
due to the .heavy traffic in the area.
b. The street will be kept clear of dirt and
debri at all times.
c. A three thousand dollar ($3, 000) cash bond
be posted with the City of Renton for street
clean-up, if the contractor does not clean
up the street.
d. No hauling on Saturdays or Sundays unless
• the contractor hires a police officer to monitor
the hauling.
e. Hauling route to be approved by Traffic Engineering
Division and Police Department.
- f. Signing of area per Traffic Engineering requirements.
M. DEPARTkENTAL REC.;'III'oufni*ATICS
Based upon the• above analysis recommend approval of
. .the Special Permit subject to the satisfaction of items
L-3 through L-6.
r
j 1 I „ s - •w I + arc .-,..�` I '` �i'��''����p�///� . ��P�`�,�,'e•�i�y1
��������''�:�a. <'��������� �t. ����ri���8
, . / .,' r10 , r� IM
>� M — aitiet
- -
/ . i • I r �tr ♦ :e,� it Via'
iti
�.,ABANOOivEO '�•f•�
•-ik:-...
�'_._' „ ,la,
EC1 \
•
_____
_____ _ 0.. .„__I______ r•
1 .
1 . ,,, .. .1 Ito . S. w— 7Ti,
, 1 •
\Ilk:0
, , .....„.............. --(1.:„.
.. .. -%viii: _ .. i
l\ 1 �' 7y� I' . l
-
•
•
II i - 11111-1411§kk‘,,
__ Y.r ; �' rJU '�
`C i„cw4 4 14:000' I '1111111M11
' �ruulirltlU' :., II Yjlr.
�-�, ,� �p11,.U11111111 ijill IN :•yl I •A '�4 !•It' if
_ ��') �Ufllllllllhlf :;:,,i(,II yIIII1111N 551/P� 11-�11., . ;
1 • : -101) s t 't� 2 tulu —
, 11 11111
11111111
<.a. aamaans
te. i'' L'i
y'
,,,
\ /� `I I'Y,li 10! .•311.111' ."1::111tJ''1 srit. •-- :.
• � R. :U U` LLJ,1 Ll�i IIL lIJ1 LIi r -
' -- - - -4•-1
.
wee )
I-- . :•� — .
, ._v ----7-) ;'. __ ....14-.::: 10-1,i.-:Litt
-4), ..,. 1 ,_ ,_
•
\ :::::(w.7-,A_E---,tc.,-:=4:.- ,-44. ...--t-,
.. •-- si i : . : ryi )
. , __ . __,
1 . --,- _ \\ • I 1 < . • ,, zi . • -.;-_-_-_ie. 2:I_ ._I': !. - ! -
f_--: - '•- :
__L�� do • mot. ' ' NR
-. . v ME •ER DO►15:_fieA —
-_ .
•
MUNICIPALITY OF METROPOLITAN SEATTLE (METRO)
SPECIAL PERMIT, File SP-065-81
•
APPL I CANT METRO TOTAL AREA
+ 7.0 acres
PRINCIPAL ACCESS Via Monster Road
EXISTING ZONING G, General Classification District
•
EXISTING USE ' METRO Treatment Plant (Renton Treatment Plant)
PROPOSED USE Increased capacity of existing Renton- Treatment Plant
COMPREHENSIVE LAND USE PLAN Public/Quasi-Public
COMMENTS
!
. .
- . .
. ,
• "..;
•
. .. .
' .
•
,
....--- ,
.
-........„,
..,
..--- . . . ..
. ....,. .i ..
i . ..
..,.
5-" ,••
1\ eine4h*--.5 •.••
...c : L --
..,
I
\. zirjii4\O 0
jr;,.4 . :.•
V. - • .4 . • ' • i. . C", .-:''
• ,'-- . 3,16 A
. ,,..-,..,- . .. #
' .1.. /'1'. qa #.
40• - ...i 1111 ..L Allik\:_.C. A
• --4 1r,
..b .-,.. ,
%IP,
", ,. , . .;..,..`'. 4...
a / •
• . .4,, 4,rlife 0
:filN )1 -: •„ -
i•-?! - \\. ,,
/ . . . .
n N
-.' . - -1"..... .......* • lb.
....., 11 \
' t, 4 ) ../.. • .•,, .
• 2 \
tli . :, FmAneLit.p rawr
00
"II'
--,..-.....s:
\
•• AFAVAPL.FAANPIC.ifoo.
CC•••••fp . .. . .
'
' ........
•,,....
.t.'
/
• \.
'A!IP -2.2 1 -
, 1 •itleNT
..............
. 4 . - u •40.c010,
..,
SCALE" . I
1. • -
• "..;;T:,,,,..- • .Irgrur"..---.
....--.
. ....•
riterAraseNT ••••
PLANT e.
11.1. •
:
N
.
lle
t dr( ZAllikeT fire
1.• • r•••••
.‘..- •
. .
.71 -Po - _ ..rdea IN MLLES
111 ,.. ' 0
1 ' e • a r .
•Ir 1 -1
. iriir' '.... p. • 2.2 J.2 j . •
•••
_ •,.....4": lir Ow*• .'. .
L ...rA,,,,,, . , ....•I ...
. . L
• , - _,• ,...f,r181 IN, 4.,, , • . sel .
vicuirry NAP .
GO •'''• *111 • 'IPA- a 011• *Pa. --- .\ .
. ,
INDEX TO DfIAWINGS . .
11111.0.:0-111-ItilifiMilill
. /yea \ - . 4 1 1 •
ire4.1(( Ni. \•,
..••••"-- •
1
. . ' arillii\11111111111..-111. j0
• 14
. -
Oft .
. .
It l'
-4(4t 1
• ,.....4 .:
.,
fit ,,.........:::
1 ;
• - , .
k 1
u .-.
. .
/. 1. S. iSAIW▪ r .
.
:V. , ; • NOM NOM
• f ..t. • - Peen NJAANNI OA almas Imo ICA X, 4 I..:,' •WAIL 8641•611C6111-11111Hfasalau
. .
. • , .-.:• faareffr a -
ut
f I
\\ i LOCATION II A P
SCALE.1%400'
-...." .1* kig fTT1t
uwaso4arrok.Oeffimeen•low*
"11
I a NOM 411110111 VIIMATIWIT PLANt ""'AL OM
...*1112012 • .
1 . i •••••••• . •r If •••••=..ass ailLaitatileST U.,641.11/Et X ....- C44 i
,...... LOCATION ANO VICINITY NAPS "."..j". .;:z.1.1.___J. 2 •
•
•
:I!!1L
w
Y
a
4
• J
J
;�.r7,,r .�a,,, . r
14 !
': •'I sill I.SSG' S.
r3 <,
•
' /"..% ••••-::::::::....' .,.•..,::::::-* • . •L.... ..5.•41Y....*Z'os. ''',.1.1 s'••- . . -41 4410
-.' ( ..::•• 4 :;-.7:;.--,•'- .•-•. - ' .---• /IA fisa. '' ,....0,a, ,,, ..: li
. :a.. . SIVA .... .'.. .;:. 1 a‘ ' MI e, a
. y .-t.-63,,-.407:-.- .-- so ---- 110P-irtif Vt-.. '1''' IiiiP l'::
, .. ,... ,• \ jAgitille____Aaigi
, . (,,:f., ,...11t:r.-;-....:..,L-:-..-:-...:-...fitsav9F.7. --....•:-.:::.'..-i-_;,-i-A-; , `k.(04gf'''''.1'. . P.1\ s •
.f.,\.,,,,,,,,,
-, •�- •..r.••. 1
let
'.:: :•!i.'4°- : I iss------------" --.44400 ,Ztli 'Silk\ 1 t. \
1, I..$1 ‘ss•.'...'• IN6)**
640)
. ..
• ....... i .......,.. ,...„:„.„, . *
•
illi"•'''/ -,.. /.''.. ,4114,0".41W, , i 1;
'.....'., ,' ... WI ,., i .„ . %Se' , : ,
•
•
'('�'�...ys'..eip •• 33J.i - �,,�_.....J (ram.\\i • b� \ ', •' r ;\II
,,
r'
•
....S....1' •••k%. .. , : . '......':' - ..
.5.; •
• .
t
Revision 3/1981
•
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
•
Application P&7,4L /EAlj?irtsi• eigs•80 Pvit sta14 ig rrfoexis1
(lactosoviskor S r�►iaa r e1*...for' a stew cteralrer .�iLocdtr o�nfh 'tf1« V ,►e"/• S'/Iepr&se shlee t� ®�
. T.�..�-famert"i A, '` ' lie t
mho Mbsd Al •
Applicant:ifierR®
I .: ❑Public Works Department
Engineering Division SCHEDULED ERC DATE: o
Traf ' n Division
g' SCHEDULED HEARING DATE: 2/42147
ti • ies Eng. Division
ire Department
®Parks Department
Building Department
Police Department
Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P.M.
fi /si •
REVIEWING DEPARTMENT/DIVISION: ---thef
Approved Approved with• Condi 0 Not,Approved
i 1;
•
DATE: e t 4/
Signature of Director or A hor,ized .,Representati.v.e ;.•
•
REVIEWING DEPARTMEt r/DIV•.IS'tON - ' IAMAT'6S
EKpproved ['Approved with Conditions Ej Not Approved
•
DATE: r/I4%`8/
Si gnat re of Director or Authorized Representative
•
•
•
•
•
Ufl I ; APPROVAL. SMUT TO
rO
LATE COMERS AGREEMENT • WATER Ld-z 2
LATE CIMEI$ ASIIEEMERI • SEWER
111111.111111111
SYSTEM DEVELOPMENT CRAM • WATERS
SYSTEM DEVELOPMENT CRUDE • SEWER _� ''" •� '
SPECIAL ASSESSMENT AREA CHANCE • WATER � �
No •
APPROVED WATER PLAN
APPROVED SEWER PtAII 111111111.1111111111111
APPROVED FIRE HYDRANT LOCATIONS
NY FIRE DEPT. ES=
FIRE FLOW ANALYSIS
• REVIEWING DEPARTMENT, VISION:
a Approved 12rApproved with Conditions [] Not Approved
.gc.74.___ 47, -
74'
DATE: crh3/di
Signature of Director or Aut •rued Repuse tative /eGz 4
J�ro��7Zi /���ZC 55q�zy� 2- _/ 12�un2&1] tz) 61
l l l pL.
REVIEWING DEPARTMENT/DIVISION: / 2i�/:•_f-/C EkJ Jj /I / /!�
Approved Approved with Conditions Not Approved
eltfrj DATE
/ /
Signature of Director or Authorized Representat' e
REVIEWING DEPARTMENT/DIVISION:
Fl Approved [' Approved with Conditions ID Not Approved
•
DATE: '-'/O'-6 1
Signatur Director or Authorized Representative
•
•
REVIEWING DEPARTMENT/DIVISION: ' POLICE
[]Approved Q Approved with Conditions (] Not Approved
1) Hauling hours be 0630 A.M. to 02 :30 P.M. due to the heavy traffic in the are
2) Th±ee thousand dollar($3, 000) cash bond be posted with the City of Renton foz
street clean up if the contractor does not clean up the street.
3) Street be kept clear of dirt & debri at all times--if not city would clean &
4)Ntake funds from street cleaning bond.
o hauling on Saturdays or Sundays unless contractorhires police offic
monitor hauling. We do not have enough personnel to moni er to
c�r�Ehauling on,, week
e
Signature of DiRtutoi �d Representative
5) Route of haul be approved by traffic Eng. & Poli Dept.
6) Signing of area per Traffic Eng.
REVIEWING DEPARTMENT/DIVISION: Lt ' .R. Persson 8/4/81
Approved Approved with Conditions EjNot Approved
.t113
-'' M ; I:3
t r ;
Munic. .ty of Metropolitan Seattle
Exchange _g. • s21 Second Ave.,Seatt1e,Washington 98104
•
RR R 2 /FINAL DECLARATION OF
SXMXXXX XN$$/NON-SIGNIFICANCE
Action: Site Stabilization at Renton Sewage Treatment Plant
Description of Proposal: The Renton Sewage Treatment Plant (see *
map A for site location) has now reached its interim design
capacity. Continued population growth in the service area and
the desire to improve local water quality conditions now mage—it
• necessary .to identify alternatives which address expansion of
the Renton facility. These questions are now eing a esse . as
part of the Renton facilities planning process . Regardless of the
selected treatment level alternative, some expansion of the Renton
Treatment Plant must take place, requiring the site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to include the
actdl.t3.on of eight secondary clarifiers located immediately east
of the existing eight secondary clarifiers , an aeration structure
located immediately east of the existing aeration structure CuvER)
Proponent: Municipality of Metropolitan Seattle (METRO)
Location of Proposal: The Renton Sewage Treatment Plant is
located at 1200 Monster Road inthe City of Renton (see map AL
Lead .Agency: METRO
This proposal, has been determined to (day/not have) a
significant adverse impact upon the environment. An EIS
(ix/is not) required under RCW 43.21C. 030 (2) (c) . This •
decision was made after review by the lead agency of a
completed environmental checklist and other information _
on file with the lead agency.
•
Responsible Official: Rodney G. Proctor
Position/Title: Manager/Environmental Planning Division
Date: July 21, 1981 Signature:, 9N,44e
67
Environmental Planning Division
Description of Proposal continued
and possibly a -primary sedimentation structure located to the
north of the primary treatment structure (see map B) .
The portion of the expansion addressed by this environmental
action includes the site stabilization for the proposed secondary
clarifiers and the primary sedimentation structure. The site
stabilization project is presently proceeding on the assumption
that approximately 106,000 cubic yards of preload material will
be acquired from Borrow. Site "A" (see map B) . An additional
20 ,000 cubic yards of preload material will be acquired from
outside the treatment plant site.
Borrow Site "A" will be rehabilitated to protect soils disrupted
during the borrow operation. The site stabilization project
will begin September 19, 1981.
•
A second option being considered is acquisition of the entire
126,000 cubic yards of preload material from outside the treat-
ment plant. Under this option, Borrow Site "A" will not be
disturbed. The decision to use Borrow Site "A" or to use
material brought in from off-site will be made by the contractor
and will be based on cost considerations and availability of
suitable off-site material. Completion of either option is
scheduled for September 1982. '
•
•
•
•
•
,. - -- - - - --- - •• -- ••---
\ •
•
•
_ -- - -- ____
Fu.r_,2 f..a�tc —-�— -----
• f p..% O :o rue rf. «o _ _
c •
- t • - •
mow \gi .00000 ..._ ... __ _ _ . . . __ . __________
-- -. BotQot.J AREA A --. - p 81.Am . --- ` —.
---
-�-� _ ?12-'.LIPID e•DR �RJZS .� _ __._ .._- . --..rr- .�-----
- .•- _ -7 �.!► I?RIA4 ar -SII.;rteirirar!oJ -. .....
- -- - - - -
. !�" _ J 3r�w Za_ _ — —_ — — --- - -
�;a+'. P.. ^�Op� -- - ..... -- • -- - -- - - -- -• �— -.. �_:.�y
-
•
- -- ASV,Tfotl tZT� - - -- -
?iL'rW:ZY r i • -' •, • k i ^y W.40.,ARY 5::,ZtPLI lTi AI
TA_ArNx. v l 7'T� tI . Sr- Z
XiCiMi STzuGTL•R2 _ .. / �{ :1�� �,T Wyt�+J. _ .
„1. It
. (.3.
0"I- in:SIC lr . L - -•----- -
• .- 0 •
_. -- s►sDe4RY 'sat:z rnca+ ". , -4 -—---
R E NTO W SE;AJAGL TREAT aAitT
- SITE STA Sal ZATtoIv • __ -
6. .
P A
•
RENtGN SE�LJAG . TREA-rM 'Jr PLANT : _
.. . / 4oti rajas
vr't
© e,a , •
I
00
'p 4 • r -
sou,
li
sj y�4srpe - - -
8 1 A •It V . LON6ACRES
. . -
_ . ... ._ < TRaG.K _ - .
. . _.
SCVTH as/TA t:&.i
.I. _
. w
i •
•
4 4
OF R�‘i,
A. o NA
O
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
omem ° BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
�•o co' 235- 2550
o941,-et) SEPSE-OAP
August 7, 1981
Municipality of Metropolitan Seattle
821 Second Avenue
Seattle, Washington 98104:
Attention: Gregory. Bush
Environmental Planner
Re: APPLICATION FOR SPECIAL PERMIT FOR FILL AND GRADE TO
ALLOW PLACEMENT. OF 126,000 CUBIC YARDS OF MATERIAL FOR
THE EXPANSION OF THE METRO RENTON SEWAGE TREATMENT PLANT;
file SP-065-81 ; property located in the vicinity of
1200 Monster Road
Gentlemen:
The Renton Planning Department formally accepted the above
mentioned application on July 31 , 1981 . A public hearing
before the City of Renton Hearing Examiner has been set for.
August 25, 1981 , at 9 :00 a.m.
Representatives of the applicant are asked to be present.
All interested persons are invited to attend the hearing.
If you have any further questions, please call the Renton
Planning Department, 235-2550.
Very truly yours ,
c6tAltAtk
Ro e_ r_J. laylo
Associate Planner
RJB:wr
cc: Raymond Drebin, METRO
Rodney G. Proctor, METRO
r_-
$v F.
.
1
j .
.
-
. . . , ..:,
, - . ., .
sto",',..6.."..-4,• •-• '. • • ' -•'.' ;31,...,,,...'••-,,,‘, • .".'6"E",•••"•,-,,z• --4',6't' •,,• ''. ., . . ,••
0 • i• b. , •. •• •
'•‘‘' •''... 1'44.„ '-,.'''' ,
. . ...
. . .. , . . i, •
.„ • ,to,,,,, .
•k•. ' •P - , • •• ' ' •
' '': '. . ."•'•--4'''' * • 4:r.,t.i,.
,:. ., . - - -
.,,. . •• ., ,...- •
.4..
„,,..,
,,: , '',, .' '-..‘ • "A; 'f'.3.. ,,,,,,:.- •). .'''
, •
. ,. ,.(:. -..,..-1 ' . •.-3:11 7i. • : - -5t - , • ... . .,.... . -r-,tf'q-44 kii,,"x+,)
, . . ..c. . , - ' .. • -''..,. -r.,.., 0- 4..,.. V
l'Seive! '•'4•'1.1" ' " . .. .m . .- -V,' elk,44, • * c • •''.'-`,,. i.,.-iiii,r• ;,,,fq
:-. -I - .:- , • • -., +,-, :'.,:A- v,43...„..-..., A, e• '' .4= , •." fr- , t *4' L
.;''',''it•''t 4; T. - ::, • . ' ." .. A' .•' '" ' ,. ..,,,,,- ' - Ara '-'' L. ,r:.' . . ''''A'`‘ ..'. s.' ' '- '•,- ...It,".•,r,. , _ '• .. '''..' 'al,
,„ 4,1`. , .'. ..••:,i;.-,,.:-....,.., : , • i.• •,;,'..- ... -'Ai
... .,,,,, *4", ''',,''1•.'' - ..,,., '. - '...S•4.';'; ' ' ,.,i. ...t,',', . c','
,;la' : • ,,, ' i7 . . , ri.,.. ,.,, , ; , . , , -."
1r.,4g-.,,:,,;.',$,.•-,, ‘ •,.. • • , - .•,..., - --,-. .--.,..-‘,-.., : ..'.•..,,,,,;•,,. . '• , . •-„,,-. .,.... ;„ :: ,. , . ..".s:,*- • ,.•.. .., ,.•..,: . ,.. ;: - ... , •,,y;,',,,., :::, .-:*-;:,'.1.,,,!.,411.1
1,.::*,..f,,4i,:',:';,'::::. '.:.:. L.'-.. t.: '--':, ,, .......,7.:': - ,„1: - '•-•••.....1k;!, :Li::1.'.•.' .4.:,, ,:',1..,',.'I. AL. ''74.! '''',''''.'' '•:11,' :,,,I'f', .:' ."'::,:;;;,.''...'.. :,.,:...:1•'',:' 1:"Ilii,'. 7":::'n'IL
...4,. . . '1.''' • , ' '','" • ,, ...i, ;-'' ;`.. - .: ...: '
. ••
:;•St..;'' ''.. • . . , .• ' ..^•,,
',. . .
* ,
'. !-4'' i 1.' . ,. ,„ ,f....i. e, ,.., . ..... .'....,jr„k,,,, : .;?.1,,,,•tA,"..'
4' -•7..; ' ;
}c.,'-'..•• ' '.,-==.A ,.. '2,••4':k, ...i.-'.-"; `4•
?,.... ,
;... r.Yfirs,. . ' .., ' • . " ,.., "?„,,44to. — ' ... 1•,--•- ' '''. ••-• i, .e.c, -i*,' '''''741'1'
. •= -: .44.,
.., : - 4„ e , • ...1%.,„.0. = .r•
:...40--, ?'AP:,_'._ . ,. • -,_ .. . • ,soc', ,-,,,, .v....., -p,,... _- . . ... •,.„,..„i.-. .;..... ,. ..... .. :.04 ,.., ik•44t• '•'• '•''' 'le'''4 it I
r' C.,"' '..V.• '' ••:.. -•' i• -- .•...•••44' .'64,', ,',,-'.-i't_6 •o •. 41,V't•-...4: ...3.1,4V‘ .., `i .• ' ' . . ' '",,I:--6;,k4.1r.'-._,..,6.u.,-.6-6 -u• •Y-',',4 46.-7„-V.4.+.k. k ' t,, ; „,, ' ,,,.. .
.'•/1'-;-:,'...;"'"L,i'''I''' , .T4-"'`, .,.....';.,:sq,•..--7-' :',.7 ilf-., . ''''-,,,,-*„...,,, .•.,? :2,, ..,!..t,I.' .7:'•- '-' ' . ' '''-'''''' .47:'iv '''•:: =..: '.''''‘ u••••(4•44.'''' -•44••'•:•3i4•k,';';,r. ",:t.:',., '`4-'0)."-4,'•: '•
•3 ii.-`L '.''.1,';.,„,' ., , '',?-yMf..10.„..„.,. , ,,#,.....:,...,, -, •,1.1....3.... .,-; •. ,,,r '', ••, - _jok •, ..,,;, ,;.,..",,,,41k.x.,„....•... ti.,,,,,,,,,,..."„,z, ,,,,.......:,..,,,....%;:.„1,P',.:.4,.... . • , . .' -.?, :,',:.y.:%. '1:',..',1 t.,„„s
'• tikr'*'UtI Tio -Amp •AL.. LOCA , . „,-p.OR ADORES : . ,,,,f,....,-,e-,....,f ir,"'i-.'-,-,- '62-6 .i '-;...'t•-,.6-6-6;i6,-.''66.•.• .-• .,'•,-6,-4,,,,,', 4 k'.t,!3k7•,',7*,'1. '
.,,/. • ...4,4,,,,,•,,,,,,,‘:, „ ,,,,:k.,, .',.?t'' • .,,,' ? •, ,,'' •,-, .. *,r. '.k..t'br,,• •-;Zretit. ,•
';.4.% ' *-‘ • ' 's' i''' ' .' •S 4.1' ' -'. .1 •'44 ' ' ;•:11"...".: -. ':„ 1:k • '•Z --
- ,'.(• ,1-' ., , ., ,,RtIA -.:,•„, ,.,,,•. ,,-, .,.,,,,;.,,,,, ,-„,. ,•.....4..p. , z..,„. , ,.,.,... ,...,.
.,f 1.....*it'.. OPERTY LOCATED ,.- --.1'4' "i'' 'it •••t,k' '•'," 4 • •'-`,C...,-1.1 i j t',.' ''. ,. 3
' '''t '. '• '",,:}. t'''-J..,":;',.. . .•, 'l'Re '' •• . .'• zre
Ili .THSk VICINITY ,OF 1200 MONSTER. -,, , .... ,P...,,... ,,
...,.‘.,,.., ,-,. ..-- . .,, ,, ,,,,., ,,y-• - ..-- . ":,,-J . 6 .
,,- -,,,, ,, , ‘ ,......i,..-,,. ..,....w. ..- .ti ., •. . ., ,.. :r., -,.., -., . "....,-ue' -.--....,
gi •,t:4 ,...:-., •,..,. --. ..•,-,4
..,. ,
"k LEGAL- ' DESCRIPTION. ,;,zi.. . '.. ,-. - --r . _-_--. .,
..71,. „
'•‘
77.7 -: ---..,,, ' t..i.-4i,,,:'.',L.:',,T' " . . •
s,..:, - '-‘.' ' , ..,:•. .....r...,''-rit't''',,,.- .,' ,,t .,,.,. ', .,. , ..• 1..-„.,, .,,'. .. . ,,,, .-- 4'5.,....,1,*`.,F,:.
, •to•-,,,. ,.,.Of.... ' • " ,,,.:,,,.,,..1 ,. — •
;;T:.,: -.6-..1 - '• - `..,--, --,7,::'-' - ,,.," _. k;---' - -..%.44;:,'.•,,;•••'•f; n , ...,. ,,,-
L E.- GA'. L DE'S'.C'RIPTI.:'ON , 'N-„F' ,i IN
T H,E R ENTON'PLA'N'4114DEP.-A fiENT :
- • ..- —.A.:•..• • • . .- • . ..„... ..
.. :-.. .4... , - •' . .-,•,.- — -.-..;, At• ','..7'. -' :-..': • ': f:•i .
, 1,* • !.. ,,•,...;,.. ., ., 7••,..'•', ' •• .... , , ',s' '1,,.',•'.34,i,/
'''''''''6r•''.• •.':. .„'„.e•+4'''- ' , j, ..,': ... .'• •.' ' . -. ..: k''',..r.'1,1,.,'-r4
- . ;.ikk • - ' „:,'• .•'..+.?•,'''• '1' 4%* , ';.. , `." 4,, ' '1' . '_ -,''' , .
1 41..r:41I,'4,.ri' ',',,.' '.1.. ''' .' ' - .1,.‘;/'; ,,,, 1,;%,?.'',.;;'.S, • .`, I:'''''.' ..' L.)'''.''''' '. 0 ,'•' ' ' 'ili$,, -4 ,-•-',,,,.r. ...1,-.,,., 4'.
,- -.1•.‘: ,.1r' ."-• : .,,.. -.S.iV" '•. ,-•' .•-,...a-.-i=,'t!,.•'7' ''..,' ',1,'`ii . „''''.:‘, '`
' l'1''',-.' ''' . ''','''''.•"it"'-•:e .' .t' I* %.,- '' ....'-,-.'-',.' ''', '', fy ,.'•.'r...4,i,
, 4,-.-...,-"' ''..4. : .k.•":1'•14..,...iti•:."--'.• : '',1' ..,`,,'..„.•-••''','• * .4.'4•la;'•= ..;,"0-..1'•• ' , '' •..:'",'',.'4' '4" •`.1:,4,:d4 4.::,•'••• ••!•'•••••.i•r:•''-'=;: '=',3`.' '4','•.'-'• '''''q' , ' '•''-",:i''-'''
r„4..!...., '.' ' ''.111'' .''-.4 v..' 1 ''...i.,i,ljte-.4 '''..,,," : ', P-':'. ',:''=,`*`e: •,'•• fr;.:„:'4-„:2,... '.':.; 4.•'(,
N
...,t, ,, ti,';,:',.',,,,,:..- •e.L,,,`.t:';:...',,i,- i-1.-:;,,,(0,,i..1F-VS:....i.-rz.,;.. ';;A:•.:;•, ,.;'"‘.- -;-•.'17,.4, ....k..».:.3
-' ...7,,,,,'.. ,‘•• 4,?,..--.4.'..:i• . ,`-.:. .. --',CI-A.,•,..417,;. '..,-,':',;h4fic•-„...,%'-,'„,;..., . :. ,,,..., -•.. .. '. !,g., ., ..::4ii,9!.4,,fr"e,'-'I'' 7'..1-'1,:`q.,,,,,,,e1.4,1•7,id.4,:4,,'4,1-;-....,,, ,er P 7:, it-.4.,'.,=='Y,.,4
'CL'iir" ''s,-'' ;• e ,
t..'.c.'•+.'''.'V,-4 4iS‘'•'..e-„4•',.'3.'?''.''.-"'".)•.'4,.'`''g',''''--'`•.C,,li•,k',,.4:...:,,.,.,A,'4r:„.4,s:-,,..,4,.'t',„•rz...4...if 4.,1','•1';.''-.,.*,.=I.;-=-,•kt e.,',,:','.t..-..:.:'."-:•r‘=3•?,','i'.:,'
,4'.iS'.r i.',..''.,=i, •="4':.,;':..'.'L,•7,...:V:•',.,,.,,•.i,'•,',.,;"'4,'i-,:,,,.4:;::f•:F,-f.3r.i.-.,„r.-.'."',;_..1.i..--6'.'',-:'-4-,...;:..,6.,106,.,6,,„4I-.,i,,.i"46,c,l.i--.',!.t 3`4..,...,,3-,33...4'14..%-,3.4.-,.6,`..-.6:'.,.:-1.',,,.'-;6.,-;..•'4.•.-.--,,--..•:'!•.,.:,--,6-i•' . ..4kk.t-',.',..,-,.:',"6.,.'.:44••6:-';W:,.•-',•,,7:1,i.x.!-',.-*,g..:a,,'.:2•.=:'4.'-q.4"7/:2i'-•:'`-,'6.-P t.,1',:''14e',.,'7,,..,'•:7r,.!"..',4•'_.,.'1•‘/1'•,.,''-.';'..;.in'',•.i1 z‘„9INr,:9.s t•'t'4i'....t•V':;'','Th'?'4:"-%/+•1.,44'V''"^'0':'',6.-.2..'%.,'4'3','•'4,:'i-'':,4•r,6'r4'6;.',:'4.•-..,.!.'*.,'''.1'''',',.''.,'.l.,"'e0-'lb'6f-''6.r--'..‘...."..,'.,i,..r,,,'J:-.`k,.,4,-i-•.i',,,i'l.$3i'1.1;t.')!..l"'ik.k'4'l..t.4'i9i.'*...4'4*;'.,,%.'-.•q:).:A•..;,r.'q.',44":+.t,..'i't4k.-',•+`.',',•i•-4.,3 rV"'/•
. ..4i,,, ,,--1,..,,',.... , ...! ->4. '... . ...' 4,..;. '-6 ,., /ee-,,,•• Ay.v4 ,,,, ., '4
:ii,", 'k" , 4'!` :," ,,.;'. +;',4 ."''',''''.'-7('.'•''•4e 4#' ' . •.,., '• .41k ''' ' ' " ',.' •e.1''' i --I"--if st,7, `4'- .-','"'-'` :'i..'•• 4.1.4,-.4itev.',• 412.i..!
" ',',:h..1.'•1''' -,-°,,,Kr.".
V."'.* -?.- ,-- -... -I . ii pry•, -, 1, .7. .;.. -r. .4?g., . ,.i t i --„..13,,t...- ,... .. , •.'''':',. .-14...,„,6?••4 '. attr$4,.
,', ''iNbt• ' '.••..... .', •-f• "...-. 4... ..4 . * ••• c. • 1 ` , -
'''''..'4.10:- ',i. • -.... .4' ... t '''''44 '''*-J l'e".••;;4 A.' 4E,z,A ii4•44..* sr, ri',*J..t•'''l ,;,••zi,,.-., .,:r,,'..4r,v1;r';',44,,,0-'1.1,„'''..-V.tt 1.*1-'`r ,,...,:;4fr.-......ir',A44-2,$.'44,;;-z!.,b''''''' ,-s 1,*4c 714,-.4,41'4';4t::.,,,,',I,?..;,:..11"..,,e,,,,.,;',4;,i,„.;
', • •-7 V --r . ' ; .-A,'...r ',,,•;114- 44. . irk l'",'7:.=tr*.'4,-• ,'..rkt''',•: ,,;4,•:...i. r'i ,'"..".:".' ' '.'-'4 ..-' '. 4,..:i--. ,... - --L w.4.,.t•,,,'''''' ,..., . .."--.',,'A4A- k' ''-''',I!•c'''0"' . ..;'.;:r
,'x..1 4. ,..''-• ','.,..' 4,.'::-."..*.,,,z.,,:jtplie.::'''.'.- ,...,. ,.,„,:',1 , t -.,k..-g'-,-- F*. •• lk.,. '''',.,*,:, i'.,;':',•,::', '',,a,,t,
" ' '''' '‘..4',.4 1.-• 4.4 re-
•V,', , . .•'..L;i, *:.1E.,,'•''''):4:t'.'''''. it. -.,'"`k_-, ?"`.:••71-••• ;41.••:.'.., : 't`,1"'''.4,7•„:', - ,it.:N. '..,.:.,,.: ; . ' .i604 '`144.,;.i r... ,.: ,. ...e ,tt, ,')',0`• -:. ',' ;2-14
*
' .' '',4...- .,•,'.1.•;# `•'.'''''',;',?•:,y.,-H- -' • ,' 1 "-. , A. - !}. Ir!... '' .4: .1 .•'•''':0.1 .'114IN''' . -' .'''; '.'..;', : L :•''.'A
';' ''. ' ,,;,-;•.:10 'it 16'.0.4.40.., ..-, ,.
, .... , ', -,.,..4:•2,- ,--.-0,,., . . . kl","_ • .,,-„•, ••:".••••• ' A,• .":, •'•-• • 14,••••, ' ..t,•-•',- .111`3'-",- 3,
' 4 4 ,,L4.4.' .. ''ild. . ..,,'• ,.v to*7;.4 k'A Wk. 1 . " *4IF •L'A •••40ci;10",,..'r,..e.„A:,,
4,-,„,fr.L, ' ,, .4 L -',:',•it: VI , riki...4'.-".''s ...3 41 '0,•• ir: ...g i k• -„ . -.5'". i,,,.,2,1.-'. .;.',,•..•••,.
-. ..,:.-„. ' ,a ki•• ..,e,'...,,, ;.4, 10;i, , '; ,...pr. ., .,,,,,.„,,,,3 , • ..,--e , .. ...... r,,,, . Iv ,-..-?,,,,.. ,._sr..;.'. ..',..
i
.1T'.. • '‘..'Air ' .. ,,.4,:f ..'••''''. . ' ' '. . .,A. ',,•;,'.• .,,,, , •. 70.,• ,., -•••... . •Iir•1.1111..;"?''.i..' fl ,.::,:,.....4A7,*1..''\if.,:t.1• .,Ilir.. .,- 41';..}.0. ..1., ..,,.• •
.,.::!,...' .:...1 • ..7P,...P', . ,40 . ' ••,, .I.:.,,1.4,...71,.:4....i.,....;r.r,4'.'..!... '.4.'f'............ ,.''''.., '..•...• •',:,,. .7''''.',t'..•,,r.• .'..4 S••''•...I.V,I''2,,,N.'i7i'IF•••;,•'•.04,1.-4.:?. :•4,... ',A**,:.4.c.e'fr i.".fs'A, '''.'){,e'!:.'z.f.,,,
y: „;..lpr•,-'''•''rz.„, .e.2.,....,,,,-,..e.,.'4'r.,,.•*.',Ifg•'.'`i.-I:414 ',.. •?,.',*',..f..,' ^', ' z.,;,?,,,,r4'..,10# ; ',.....,•‘,, .4!",'..-1t,',..r-t:TO.7.'?;7••'''''''1,1*_....4 it . ''''' A,,,:•' 7,0,•,'•• Yi'..V.:''' L:••••4'..- ,'
S' rs. - •bg*. ' ‘• • ' k - •... ' 4,),? 445,••:4,,,y t••••1•>. '' .444,-)Vii.t":n4 ••'' ' ` •‘' l''' VI '11'4' 4,6,irg 6- fk.-f....1- ."1*,••`-r4 ."4-#7e,''. .• ; `44,...r".'10;:.t, 1•..;yl ' .?
.4.,'. ..,r,,*;'lit :.'. ..' .1 i k)'V','.'.,' ..'"". .'''' ' ''.i.:!,..",,;1‘,.'';V,1'•irr+9,! .'t . A ..'e, . ..,,,,,, w,A., ....".-r'' 1 - .-Ir • P.'' '-,...-' - '3( • -,.. -'..-40.ky., .' . '''''-
,.''''.....-'.,:•,,, ''' ,'" '''' -,'''''..--.1::''''f.,--•. ''' '--' ,s...c. '.......,?.,vot.,4 ,... icii..- .‘. .-. - f -.14,...L.,..,.-4,..,. ,,,..-.:;,..-!,,,i,;.,,,,.,„.•.,..„.... .,._4,4„a,--4,:./..,L....4., ., 01.1.4F'.44;k: .:414. '.•;,*,,,,'.,,t'..„/.10.,A4, ... ,
1,..-, ,4 -,-,',44,4'..''-':igi-,i' ..,-,"3,,, si. -1 '....,„--:•4,4q44',,, if,„-:,-,,.,..ei.4,,,. •••,4,,• .,,4 ,,,.. •,.. ,'‘,•-1.1,,,Iiirlif,4.-.:4`,.-.4",;-:,,",-;'V ,t,' .‘.'111,.N..7rP, ' *4"4"..".:Tt`f.';A:?.1f41 ',4-4••;;'.4i
‘-''',',,'' .l';;-4.'•''..;i,,,i,lrf-.,. ,• .44:4*.J, ‘":-.;v..•.,V!,i."7',-54` •'r- r.,,,,,....,,,,...,:•••'--.;-.?, :,,‘-•,C'.,',l''-'','"...t',.'•'i W.;.C,f,'t.','".f..f•-t4:'".-.,,.b.'f;. 6-•..-..„.4„4.,4,,''..••','',',','-'',I.
.k..i,,,-:.44' •.,i•-- -` :4..-A.t* "f-,4,...' •'., -co.. S,/,•,/. 1, -..••:---r-,e s-,.'...44.,,:f.:41::11/#''4,2 4.'.'.4'.k',.:'''''4'.'.",,,,,,4......2.-r,,..A7,i1•l i'4*.-1,,1,,'t;.,i,,,i3_/,Y k-.4.1,.:77-.41;'1.rp,..i'.r;!.tt i..,l,I,e..,4,'';.'',',.41•e 77 3.•4•-"A.....''„•',,4,''f0..,'...cfy•..A•4'','•,..;;."I'fiio.:;',i.''',•A t''.*;,,.:•f,'.....,...t..s"'b...,••'"•,4.:.'.'?•'•,.'-•/•
4,4 0:,4,,, 4-,,,,,„,,,1 sr .,,.0„,,,,,,14.1,,,,,,,,.,-,71SK' -,, ,37 '4':4,f.k; ilg',•it'•:,,,-• ,,,,, ,
''' :t '.,'.-'' .It-4: •.''= OA- A'-. ..0'' '•.1='!4• , -.J4,1t'il'''.4.4- ;•'' 1 15, .' '' '''•;.,•... :.''.4-%4'.-",::,...1;.•.' '+.4it5''.i*,‘''''t'''''',*1:''*;4Vik.,,'4'44 -.4.77 4-4*.rtN: ''''''''F 014;'^• :itj 1
,''.0':'.., *4.1 •41',k•''...i..',.,c„kr,,•••••••-,4,:.;41:'.4.°•;' .•ri''',:'-ig,t,c14.••,'.. •:•.°0,...,...40,', ' .. .
,', -:-.,, • -si,„ ..i .t,... _ 4,.,...,,„ ,..twr.. ir 16-:.:7,. ,4,..,.,;,,,',„,,,l'-,.., .,.....et:11(0)1 .' ;;;',%." : ?..,P,..,0:4''?'4,..0.4,1'.i.,:i/C:lii.:A..,,,04:4'.17...„:41,4,..c.:,.....1 ',',. ,01.4,...,+.7. ...14...,t.1.4;,t,,,,i?,.'!.,,f..„•,:e_..4,,•,f.,:.,s.',....,,i;.7...,,
,•'.•',,,ii,•••4410 r• .. .711 '' • 4 ' ' ' ''' ' '',:. iti:14;.'.:'';'.-.*'' ':.,7,.;',445;W•to 41 ..ii "4'''•• ...k, ,'' ,, -'''•*4'4,‘...r 1..!.-25
•.,';'4.-,2‘;',• ‘if` .'• V-'''''• : ''''''.1%'''.4- . l' . 41*.'.'1' ':''' ' ." ' ' •.-t:Ibrt',,k ,.4, ,'•_
.. ,i• . ... '', ... • •-/-4 It. `. 1)61 1 ' ' 0 ..e''•-t'a'''`4 b' ' - '..'
t. - - •+' -'-',* *i -'• ''': . =•, ..• • ' ' • . ' '• '. ''- '/-lb'""b''iti•-, •,:''-rf.14'.4 1:.-•• 4' ' l',' ,':,..i''-',...44'4",,.. . •+, •' Nit4'''"'
,S; ' ' '•' '.,, '- ' -, •-' ' '" .' • .,. ;" •, ".!: -',''''•'''', )-.,- : ''.. .:f.i.... `7.1,Y%".Pif,q.eritl."110 '• -.C.,' " ', 'F''''..
. ' .' air 3 IVA M i ' '',9''';''.';i'.'it'l,4410t2' .,;;;.c- 5'.0k,i.4-.3•14,;;;441k;!.,'!‘ ilt,,, 4,,,,..„.,.....•
,
,,,.,,,•,• .t.;... .,. ,•'.. 'CONCERNING 1 g va .,,,,.„.,:•.41,,,,, ,. 1...„;_,.::::.•. ".w., .,,,, ;,,117-,s,•••-.. 6:_-•;66....
, .' '6"i---'. '-•,,"'-'14;4,,‘,-;,',.116:-'....,,..i...'•"*.'%in;',.....). '' •‘'.1-''‘ • -r.-..,,,..'`."...'' 4 ''.I.t...,
... ..,. ., ',qt. •,,r* ' - ..p.,.. .4r,...i,... .W.,••• , ..-, .., . ---.
.. ' .:.,.:‘,,41,',;:.,,o-ti.,:e. , „..„......• * •r.•• ',.
-"-''. - .•',4-44&-.-''...,-'-`4,''..Y.`•:.otitii-,,-''-"----,,'. '" -.44'''''.',.4,‘'i' 4., '‘' •
, .. . , -. ,.... wci...< • -• .0-1'.-W.- / 10,"'ii3O,--:.4r .tt',,,,,1 ...:'!
• •• '• ",;',..*, ' ' *‘*?'°'-'f,•,„'",'„.'P...t. A "";.' 'N'',a-,,,":, ,,,I • 4.,4'..',,,,, ')I'`F.
. - .
L , '-• '-', !,:,',r,..,;2.Ytic..„,,,..:4.4 .', -. '• ,'• ;It; . ,t Yr.e. .. ''
. • .6.''''[•irvi' '• 0".3• . 1.4s. ' s-'-6 ..*!'9V ' ii- • ' - .6' : ' ',:hk-
4 .... .,...; •,,00,..,,,,Z", ;16,44,. .7,367...."•,--.1,6.n14,.. ?i6r,,,.7,.,-.**,,,,,,,,,...e4,11,e ..1:441t,- '16.,:',6,.,, ,,....,,,,.
. ,.
s..
. ..
' ''''' 2''' ' - . ''''.ir.,.'•" .P1'..' i . 'lig; • ' --0. ,e', .11.,,,,,
,„, • .,
PERMIT ,
. , ..,, , ,,,„...., ,,..,. , ...i,..L.',,,:'S''4,-,..,410..-''•'',"•,;,,_;:i '..., ' ,;.:",,,.',...,tr..:ii.p.. ,..:.-
... „II
• , -
- • •,,,•' ,"----;36-•!'t‘,:i„,":/."-,..,- t•f.• ''';1'...!•" N. f, ...,.. -,.','., ,,11.,;,'X,•4 ..'•r, .4„? i';,..S.. 4
l'y,,,.'''il• ' , • *- - ': ' , ...6.
' . '...' ,,.f..,-,r, •-•'`,•.'.....•!:.'36';‘A.-'11V.,'",'
•IMO
. 4 . 4,,*,.,,,...„ •...vir.„,„., ,‘,•• •••,• • •,..,, yfoie,-..,,. . , ..- ..fs,;,,,,,.:.:4,.: ;;;
I . ;4. '' .•••,, . •: ...I- :61-•'., ,6. ''', 4.".'",, ..6r.- „ ..A.4.-,„,,,, - sr, . q...:. ,.,,, s,4'1, ,,,,,,• i,.; -r---,i,.. .. 0- 40L'.,Allit.',iv.. .
,...',',,,,--.4,c' •.- Y 3,..?, ,',..'"..:. .1 ',;, • .„! , - :,..- ,,,I.:tly.0!./Si., ,.:.,:,,,i ir,,:. .„..,,,,.• .44,.. .,,ir.,.„4 •;,4,•-.,,-•.t=4=,,„ , ,.r.a.• ; . .•
- •'''''.f:4",.. -;••••:••.: : 0 00;-•'', .'-,Lit lit.,‘. 11-. • -Ps,,,,,' 4,,,,„,03'4','4.E,A„4,.,,,;',-, ,4.„..4,. • - !-:;•,. :. 1/1.1; •„.,;---7.!,',4 '--,:l ',,ir, s‘..,,,&,...•4':',4:---'....,t•rs4tt, `40"?e,-;..4";-4'.*,;14i!,• ..)4i''.,fi Alt,.,.;,••4i:., '''...1.'4• 4
-,.. '.-..''.:..4-4,,., 4;44 .x.,4„-, .. .,,.:..i.-..'"IA-.1.::.-.A. 'I,' ' .,-,,,,,,,.,'''•1);,;',..'!-',,,,'W. 4,,4"-!.'e:,:i.t_4,.,1,i4,4',":'',,,'',i•-"+":,,,„0,'4,14...,.,t.,!,,,''‘...,,,•.„.,I.f...:4*,...'4-0-:,,/:41.'4,,".1,3,
A , . -t;. :.- -„...,, 4...,,,..-:,-.7,-...w,-,ifelf,..._,!:-.„4,,ttit- ,i,...:,,: :••f45;'• -6‘:3'''.,..-:.•::', .,Ii,jikk.::::r4vi..,,,,,,, ;11i.:,.i.4.,,.,o.t. .'`..i.4 . :',.... ,
•'',..'"T'..r,i'll.a....0..,$ II ' '7' a s',4,7;-,,,,ft t: '1,.4',,,':,; ':?..N.1.1;:',':.1"r,t....!'', ,.11,....4,0, .,:.i:;?•,,,;4.,,,„,.. .....::;i,.....4,4r-0„(,..ir,..-4,i;.,...,!.-.. 11. _:4,,t..,,..,-,p1,,4^ ; ',,t
,. ,., . ,....,.,‘ -,•,',' •. ,-,,,...,,'•'1','1'4 • 4, .),',co":',...4 ,',...;- 44,k,i,,,,I,Vt-,".{,•• .•-•`' ,441t.'" ''•• -••• ' -'- •' i 't , t 4s" k„.. ,. •,,
. ...
..„...•.,•-•,..,:q-,,,,,,,,,..,••- ,,,,,,,,,,..:.. .....,,. •-:.:,,,.,•-_...4. ,.,,,,.!'4;4 At.lti.,...0.4,.., ,- 1..: -, ....' ',-, r, • .•- to, .4.t..- ., 1.,.. ,.....„,..0 ..,,c... .,_„. ,i, .,,, - z, • --.r.;,, :IA 4 . {, ',,,,.. ,!,,,,„•,,,,
,„:•.:-,-. 1,.::..,;,...,%-,,A..,,,, ,i,&•:-.4. ....:. k• -•-•••=•.4.1-r'.i ,' ,,.‘''''..„x=',!'i f 114 c - • -- , .....ftt 4 &'6.'7: t' •. .4 4. , to. ...• • ..4 .,.., ., i5 ,. t , .. .. -
ki.' . .• , E : 1-• -4 i -440' • q sr. ''- '. -",, -. 44-: -• , • 1c •.... ••-. ... ...6,6, A,.,‘. ,, , . • .',...I I. ;•. i
41
'' , .• 1 ”. 3 IS,' i it:,'6;7%6 i '1. ' .' ' ‘. , .„.• : .1..` ., ..',. J.-A .. •, . ,.,,,6.i,L, .." . . 4,,,,:"." .76 "1.,,.4 ,`' •:6; 6'.'"..• 06- ..
4;:,4*.ir.-.'-',-,0 ' Fa .4. .,. ii, 7 r- '`.41 t ,N ..i ,4i; .,.,.. 1,.,,,t,.}..P.rt" ,.'. -. ...:1,. ',-..., ..f,,,A. ;,' .:.*:...1. ,' -.3' , ''..-•''' ".- - . .F. „:. . . .
, ...,,,,, ..,.., ,, • ...... -..,„.,,,,,,,..,- ,...i..„).„„,,,,,,,-..•.- lek„,,,,k,.., .... ,..,...,..,•. ,:..„.-7?. ., , -...„.,••:,:,. i ,,,. • . ,......, .•,... . •-• ::,.. . ...-.,, .,,,,,, •. 4,• .,.
.„„:-.,....4i...A,10..... ..-;,....,.. , _-.., ..c47sfil...- -,,i_-s: ., , ,-,',..V"i' - ...44,-,,T,';,', ,:.•,.i.,,.. .', ,,,',-4..,`,„',',..„,;. . .•,•.. ..;,,,..t., ''' ,, f-- •.:'' . '..; ,:. • ....-.i. • , ,.. ,,>,t
4
. . ....,.1..,... 7: . ., ,,,,o. . .. ?,..., •.. ,n,....,...,,.. . . , , ..... .
'''. *1 ,•::..4 r''',?'? .r?" i',, .-r, .,,!-,.. 'r:',“r..' .,,,,r:, .r.'". . ,,:`,.,'.., $.;. :Lr'.',..401:5,,..*,'rit•1 rlit tr.; ... ,.....'c .,- : ,, f',7 ,''' 4.',", ;', -0•A,,- , . tr. ,,
' 7'' , . ''sr' 7•.;!!".1..**T ''''...... - .,''',74.,,.'it',,., . ''..;'' .4 6'.'-, :'.f,. ' "C. ;.'40‘" .' -.-N 4.14,ft'•• , 4.3•,,- .• . ., ,,,, r, . ,_ . . ,.I. . „_ ,, ._ .
,,,,
.v... f.-ir.otior ..,',...L41,-.,,i 4,,,,r,ac ., 4.,,,,.. .‘,-..,'_•-,..---a- . .- - ,,• ,„ . ... '. --,,.•.,- , - •..•-::•- , k, •ft
',:;,-"'0 i6.---*-..''',-4.,-4'1'4'.`,,,,i;-•;, ',,-.•;,..-,•••.i''',;,-.-.7;,-c.-.,,,,Airot•,:*;,,,,- •-•,,:.-- -ott-.4.- .•,, . ,,... ,ir,,.-t,f„). .,',;, .•;.-. '•... :21" .'' ..,,,. :',+,t .,,,,', -'.',.,. - ,,I, . ..'.'
,iiiii-fl 7,,,,r-.C.':.t.,7,-'..',...‘,04-'...-,7,4!.. , "...;,.' -, .-t,,- - ,".1,‘'-'41,.•.?"1"-"''...,ix,f=4" •••,.: ;1141k4rit..44••'4'''' • • • - -1'• A". -.3o - • ,-'.-* '.II. - , ' ' . ' •
•-kr."••sr ••,;..13kkk,-4:•....,..‘. ..„ •.,,,.. ,. ... .,4.-- .„..,,,,..,.„*.,,,.,..4„. ..,: t . ., ,,„„, k.: ,,,.. . ..,.,,, .,,,,,, , , , ,,
,reil, ..i - ..-, 441•1/4:,-4,....-• C.-- 1,,44.?•••-4, ....'=4:.''''''''',1-i.1.-,..•.4,‘,4s. 4.,..,.;.,..:44. - ''.4'.;- ,,--,'4,k:,4:). .- 4
....•
..4 '!.,.. l'''''.1' .' l' ..1. ..',...‘8,. 4:'.r''''t ..'.44.4.'1' -.:.‘• '.Lt. ‘‘'''..'.4' '4.4.'', k .'4 *'4.<-.4-1P'; '...!k:-'••••".: .7% .''';'''.i.,:: •`:.••• 6 . :.::. . ,.';Ce'''' '. `. -' .."--,;"-,• i',+` ‘
.„.„,=,,,,,v,i,.%=:•440.:•-47;•..".,:,4 f.4 .,,,'•44(•,-.i.•• .1.4:cc•'..,41,*t2r-,••., ,..14,:f:' ";,:,.,0-,P:' •'*,,,„•-•':,...... .. . 't,. '•••*-,".4•*. -•,--k,- - -,,. -f.,'" :, ,' 6 ,-.• • -.••,3 - ..,, •i . ,,.- -,.. 7,., -.%
* 4•Y'RC. • ,*•••i;',,, i,,, ..•1! ,A'.',,;',.'; ....'-.1,'•:‘64%'',e4..,.',': 4f:2:`":"!,, ;„ ,.`.....•,*1',,..‘*,'4-4.,...,4;,1 i :'-' 14f: ,. A. ,.,,,,, ,.• .. , , .4...,,,.7.,
...,‘::-.., . -.-.......' ..., , .•7.3-3436,4414,-.•-•-lart.r;,. ,••••4-1:'-6." --riv..‘„, 6- . ' -{te. •••, , I * s..,...• :,•:, --- --,, .. •_,.. . . ; • ... ••••• . 13-.. ,
pi
•%.4 ."'' • ft- "':t'llig S';' , . k.i 10 —k•i 4'44\1;#tii'',k ,''+`,'• 1...- . . •-'e•',-. -' ,,je . . .lik,' . ,,,,, •-•_AL. +6, -4 ., .,,,..
.,•,-.'t ittA • •'r.„.-!..-•!---c.''','. - -,,,j,..,t- .„...tsA..„4,,!-N„-?. 7 A.a.,. . ,- , .-.-.-.24,..,-.:.,-`.- '' - .---.,k -.- - • .- s;:,',. ' !..•%,-. .. - ',Pr '-.4--Ark- .•-•:,,,''
Air. ..,r 14t..1..1‘.5.:...4:A7, 1 , 41t7.;it.,4,.4.'.,..: `!-',(1:071,...,.r '... r:,.,',....egr y AS. i..... 3. i".'',.i,. ,...e.i ' 'r,‘ r 7% . . ' . - Itvi 4, 'u"'-,•-
. ,7". .l'• ''% ',mi'i- , ..4111Y,y,zia3.• Li_. *4,41.- -.4.4044,k. ..-', ...'•••':...4 ..4....••,,,, .4:- "*-rv. -,- ,.,..% . •• ; - , •• ., .•• '7 • • •,_ .t..0. 4
. . . . IP ...-„•
,4••• 1 ,„,.,-, " '..‘..._, .,.),,...ti....-...-. - • aviii... . ,..,..„,, , : wt.,. ,,0 ., v.,,,,.t ,,r, .„ ,,,, * ,..1 4* ..- : : ,3 ,...:,,,.,• ,
-' ie.- le, .-4.4'.„4,..4 i6 ' 4 ....0,- s, , • Alt 1, ei •,,,' ' r A R t' ".,S., „ . . '.......4. . ,' 4.„.'t':,,,, ..f- li.v*,,„; , I.- k '311/71`:., ,. .,•
k'••It
IS . ••4' Vb.. .''•,''..•.'-,f,::." ,. ...,..,•,-;,...,, ,.,.,.,,,,,...x.,,,, ...:,.. .,.,,,,,t4..,,,,,.„.,. ,, „. ..... A l''. $• 3
,,.., .,.
.
' ?.... 1::'446.' • .•'-'-'''.-4,.•-•'•'--• ,-fii,3.•..*:-*/*- t•:-.W16•,Y.1".6",-.46,-.•• .i....e, ,.i, ,..•,:.„ . ;,,;-:,,•:...A.,. . .,..,,.., ,,..-..,,_,,, . .... r • -r. .. • • •
" .'•- -3.- --•,41,. -•.4,--.4 --c• ,• •••• A - ,, -.. .,;..,....,- ,,' ...i.1•.'ilf..11. .,_• : ' - . - - ..
litL;:tt' ''. * +,' ,,!: .',..:. _ -:-..•;-.1..:.‘:.,‘, . ,:-..!:. R.,_;
NOTICE OF PUBLIC HEARING
RENTON LAND USE HEARING EXAMINER
RENTON, WASHINGTON
A PUBLIC HEARING WILL BE .HELD BY THE RENTON LAND USE HEARING
EXAMINER AT HIS REGULAR MEETING IN THE COUNCIL CHAMBERS,
CITY HALL, RENTON, WASHINGTON, ON AUGUST 25, 1981 , AT 9:00
A.M. TO CONSIDER THE FOLLOWING PETITION:
MUNICIPALITY OF METROPOLITAN SEATTLE
Application for a special permit for fill and grade
to allow placement of 126,000 cubic yards of material
for the expansion of the METRO Renton Sewage Treatment
Plant, file SP-065-81 ; property located in the vicinity
of 1200 Monster Road.
Legal description of the file noted above is on file in the
Renton Planning Department. •
ALL INTERESTED PERSONS TO SAID PETITION ARE INVITED TO BE
PRESENT AT. THE PUBLIC HEARING. ON AUGUST 25, 1981 , AT 9 : 00
. A.M. TO EXPRESS THEIR OPINIONS.
PUBLISHED: August 10, 1981 DAVID R. CLEMENS
ACTING PLANNING DIRECTOR
CERTIFICATION
I, STEVE. MUNSON, HEREBY CERTIFY THAT THREE COPIES OF THE
ABOVE DOCUMENTS WERE POSTED BY ME IN THREE CONSPICUOUS PLACES
ON THE PROPERTY DESCRIBED ABOVE AS PRESCRIBED BY LAW.
ATTEST: Subscribed and sworn to
before me, a Notary Public, in
and for the State of Washington
residing in King County, on the
7th `day. Of. August, 1981 .
SIGNED: iiiit&4904150141riN
—r s6. W®
• imvision 3/1981
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
Application• ire ;`, �.; jlt �1r, z• ' Seca ,.
'l® g Aerentilet P deP a p'f t errsti a 0, Ste aenraliori . ff dim f
Locition: �� "r
'Tr Kf .
lab° Moscestoir .
Applicant: METAD
®Publ i c Works' Department
SCHEDULED ERC DATE: `�'
=� ngineering Division .
Traffic Eng. Division SCHEDULED HEARING DATE: VOAS/01,
®Utilities Eng. Division
['Fire Department
:Parks Department
® Building Department
® Police Department
®Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P .M. ON
•
- 1
REVIEWING DEPARTMENT/DIVISION:
]Approved 121Approved with Conditions E] Not Approved
z_) • -2=1- •
�v , G - p
DATE: 8/4r/cry
Signature of Director or Autrr rT zed Rep ese tati ve /c c�/e� �`
Fro, -/L /t/eZ&�SAr2/ /o 7G -/ IFe v112L-D G(-
-4 .
REVIEWING DEPARTMENT/DIVISION :
['Approved ®Approved with Conditions ® Not Approved
DATE:
Signature of Director or Authorized Representative
•
i
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
I
I
1
•
•
•
•
•
1 .. ..
•
s/y/w/
I ision 3/1981
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
Application;5PR7.L PERMiT(sP- x-9, ,e f4 ,ore.loi.osi/e
(ic,OO V Y1
S3 'fdr 9 3e onia ryCIO r,4r 'rty' a ir�w aerate/Ion S'fn4ir
11
�
Lolteioans `' eI1r-r « 64ru&reli Aerertr7 � ct' oedr c �rfd pit ..POWirfAM I g44 .1R.00 Mop r •Ad.
Applicant: /WM0
L: Public Works Department
❑Engin -r'i'ng Division SCHEDULED ERC DATE: °"""
raffic Eng. Division SCHEDULED HEARING DATE:
Utilities Eng. Division ���5" ��
❑
Fire Department
Parks Department
Building Department
Police Department
❑ Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P .M. ON
941/49/ - .
REVIEWING DEPARTMENT/DIVISION: S/P/1�-_F/c EA/ 6/N t i_ I N c
Approved [' Approved with Conditions ❑ Not Approved
� 2 C' eftlfijDATE: f /i Vg,/
Si nature of Director or Authorized Re resentat''ve !
9 P
REVIEWING DEPARTMENT/DIVISION:
['Approved ❑Approved with Conditions Not Approved
DATE:
Signature of Director or Authorized Representative
°'" ision 3/1981
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
Application;5p mt , Ain FT tsp.44(.8 F g,5m I1
(iai , st'440 ®r 9 seeepaelr sets fter , a mew(Repro/tan sfiThitebro
eptelorteitimaerap&vevio €reel vole avadte• reify wipe
Locteon:
a4
moo MootCI
Applicant: AD
LQ. ®Public. Works Department
®Engineering Division
SCHEDULED ERC DATE:
®Traffic Eng. Division SCHEDULED HEARING DATE: 44/1rAt
•
®Utilities Eng. Division
Fire Department
Parks Department
uilding Department
Police Department
Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P.M. O84/9/
REVIEWING DEPARTMENT/DIVISION: � �
`/ Approved Approved with Conditions ® Not Approved
DATE: (Aa
Signatur Director or Authorized Representative A , .
REVIEWING DEPARTMENT/DIVISION:
,®Approved []Approved with Conditions ® Not Approved
DATE:
Signature of Director or Authorized Representative
v® wq
. Rovision 3/l981
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
Application ,P 4 1'!A IT(SR .. .e - .0) ii:4006414 iocre/ s'/1
(iagt000vkte -614. 6 aele. afar e.14,1".Ef ffieses , a kinevo -ertrifora .sgfiv,grh,
Loct► Ae� ®ea �St A Veli. 6441 t r to ee' (lPfie a ¢e.
tionr
Applicant: ti"","A
111: ®Public Works Department
['Engineering Division
SCHEDULED ERC DATE: '''''
Traffic Eng. Division SCHEDULED HEARING DATE: 10440
D Utilities Frig. Division
® Fire Department
®Parks Department
® Buile*ng Department
Police Department
Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P .M. 0
REVIEWING DEPARTMENT/DIVISION: POLICE
®Approved D Approved with Conditions ® Not Approved
1) Hauling hours be 0630 A.M. to 02 : 30 P.M. due to the heavy traffic in the arE
2) Three thousand dollar ($3 , 000) cash bond be posted with the City of Renton foz
street clean up if the contractor does not clean up the street,:'
3) Street be kept clear of dirt & debri at all times--if not city would clean &
take funds from street cleaning bond.
4)No hauling on Saturdays or Sundays unless contractor hires police officer to
monitor hauling. We do not have enough personnel to monitEmE:hauling on,aweek(
Signature of DiTttc-toi •c# gad eR presentative
5) Route of haul be approved by traffic Eng. & Polic. Dept.
6) Signing of area per Traffic Eng. LtG% 441sson 8/4/81
REVIEWING DEPARTMENT/DIVISION:
®Approved ®Approved with Conditions ® Not Approved
DATE:
Signature of Director or Authorized Representative
'elt ve %vas
'-vision 3/1981
RENTON PLANNING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
Application• s J r Sa eF iguiSee0
�rimo % 4 ®� w y e lle M e re&w •'e ee ®f c flatx all
Location:ilivesho
etes 0- A J.
Applicant: inlerA IA
Ia: 0 Public Works Department
Engineering Division
SCHEDULED ERC DATE:
®Traff'- ng. Division
d SCHEDULED HEARING DATE: % 2S/94
, u ;VA id ities Eng. Division
2 ire Department
®Parks Department
® Building Department
® Police Department
® Others:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN
WRITING. PLEASE PROVIDE COMMENTS TO THE PLANNING DEPARTMENT BY 5 :00 P .M. 0
d r
REVIEWING DEPARTMENT/DIVISION: �--�/2
Approved 0 Approved with Conditio,n:s-= :_,, D Not Approved
.... .� §.
Signature of Director or A horizedReprese,ntati.ve ..':'.``:.:.'' : -
f , i
r
REVIEWING DEPARTMENNi/DI'V1-SI'ON —`- — ' --1A I( 17`G`5
dpproved ®Approved with Conditions ® Not Approved
DO -
DATE: r/19'eei
Si gnat re of Director or Authorized Representative
•
" Vf
Liu.APPRDVEII. SUD9ECT iD •
LATE COMERS AGREEMENT • WATER uj_242,
LATE COMERS AGREEMENT • SEWER
SYSTEM DEVELOPMENT CHARGE • WATER
SYSTEM DEVELOPMENT CHARGE • SEWER
SPECIAL ASSESSMENT AREA CHARGE • WATER No
SPECIAL ASSESSMENT AREA CHARGE - SEWER NO
APPROVED WATER PLAN - ;
APPROVED SEWER PLAN
APPROVED FIRE HYDRANT LOCATIONS
BY FIRE DEPT.
FIRE FLOW ANALYSIS
2JmETRD
Municipality of Metropolitan Seattle
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 98104
July 29 , 1981
Mr. Roger Blalock
Associate Planner
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98005
RE: Final Declaration of Non-Significance for
Renton, Sewage Treatment Plant Site Stabilization
Dear Mr. Blalock:
(- s :per your request, :enclosed is a copy of the FDNS for
the Renton Sewage Treatment Plant Site Stabilization
project. Please feel free to call me if I can be of
further assistance (447-6899 ) .
Very truly yours ,
Gregory Bush
Environmental Planner
GMB:oj
Enclosure
RE
yFR:
///,.
UL 311991
ja,- lin . _ .
Municipality of Metropolitan Seattle O� - �.I�/T�,,,\
• ��B1dg. * 821 and Ave.,Seattle,W c3.ningeon 9.0 A�C\\�t '
ir_
July 21, 1981 I U Sa. 31 lga� 1- 1
+�A,.
1\ "6 •-"---- A, ,'
\'- , NIAG'`�E/r
TO: Department of Ecology -
Environmental Review Section
RE: Final Declaration of Non-Significance for
Renton Sewage Treatment Plant Site Stabilization.
a
Enclosed is a final declaration of non-significance for the
subject project as required by the State Environmental
Policy Act of 1971 (RCW 43. 21C) and WAC 197-10-340 (7) . '
A proposed declaration of non-significance for this project
has been reviewed by agencies with jurisdiction and all
comments received during the 15-day review period have been
considered.
This document is being sent to you for listing in. the "SE;A
Register" as specified in WAC 197-10-831. .
Very truly yours, -
•
. I 4g676;D - -
Rodney G. Proctor, Manager
Environmental Planning Division
RGP:gbj .
Enclosure
H t:^�2`' :: -:'»1':. ..` <: 2-; ..'`r- _4 '''' _ .W ,>- .'"..;W.r:'k.-3. -`+..7...iti.: `•:-4,;"' SX.�`t; 7
oua.�a�s i.m�..ri.a es.m.esa����®.e'tmes oa ss.w..n.r.i P�wllOilY�E�—
Sja 2- 5
Municipality of Metropolitan Seattle
Exchange Bldg. G 821 SesondAve.,5attie,Was'inggton 98G4
RRaR2 /FINAL DECLARATION OF
SXNNANgE/NON-S IGN IF ICANCE •
Action: Site Stabilization at Renton Sewage Treatment Plant
Description of Proposal: The Renton Sewage Treatment Plant (see '
map A for site location) has now reached its interim design
capacity. Continued population growth in the service area and .
the desire to improve local water auality conditions now make it
necessary to identify alternatives which address expansion of
the Renton facility. These questions are now being addressed as
part of the Renton facilities planning process . Regardless of the
selected treatment level alternative, some expansion of the Renton
Treatment Plant must take place, requiring the site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to include the
addition of eight secondary clarifiers located immediately east
of the existing eight secondary clarifiers , an aeration structure
located immediately east of the existing aeration structure (ovER)
Proponent: Municipality of Metropolitan Seattle METRO)
Location of Proposal : The Renton Sewage Treatment Plant is
located at 1200 Monster Road in the City of Renton (see map A) .
Lead Agency: METRO
This proposal has been determined to (lug/not have) a
significant adverse impact upon the environment. An EIS
( /is not) required under RCW 43 . 21C. 030 (2) (c) . This
decision was made after review by the lead_ agency of a
completed environmental checklist and other information .
on file with the lead agency.
Responsible Official: Rodney G. Proctor
Position/Title: Manager/Environmental Planning Division
Date : July 21, 1981 Signature:
Environmental Planning Division
•
Description of Proposal continued '
and possibly primary sedimentation structure_ located to the
. north of the primary treatment structure (see map B) . -
The portion of the expansion addressed by this environmental
action includes the site stabilization for the proposed secondary
clarifiers and the primary sedimentation structure_ .The site
stabilization project is presently proceeding on the assumption
that approximately 106 ,000 cubic yards of preload material will .
be acquired, fromBorrow. Site "A" (see map B) . An additional .
20 ,000 cubic yards of preload material will be acquired from
outside the treatment plant site. •
Borrow 'Site "A" will be rehabilitated to protect soils disrupted
during the borrow operation. The site stabilization project .
will begin September 19 , 1981.
A second option being considered is acquisition of the entire
126 ,000 cubic yards of 'preload material from outside the treat
ment plant. Under this option, Borrow Site "A" .will not be
disturbed. The decision to use Borrow Site "A" or to use
material brought in from off-site will be made by the contractor .
. and will be based on cost considerations and availability of
suitable off-site material. Completion of either option is .
scheduled for September 1982 . • . .
Pit fa. �,
REU-1GN 5E G TRE.Arm�U► PLAfqr _
CALF L^U25c
rm
r Y _
. -. \\ '�j
A
. MST ! f
i )
,1j, - . - -
410 5
SOvey`
t-.4,7., . ge _ .
g‘v 9• 1 L0N6ACRfi5 _
RACE
_ , _ . . _ ‘11
t TRAL<
SCVTi?C£ :Z �"
CZ)
. :_ us.. -
►i -
). .'
. _ ".. -.. _._ . (IT) ,..... - _ .
- - .../ .. ....
.-. - _ Sere- '� /-__.- __ ---
i
_______ 7.,a) wa-_,7.• .3r.art-.------_—--—7,-
-- -- _ - /f �^!> >7-inii zr -sZ9t:�73id.-Artez+ - : -- --' --. -- -- -- . - _--- . _ _.__
! t 1 r vcrvz . . - - -- - - ---•--—- ---
vzr- f 1 + t -
- - -.DAR:1t-7Ct i , I i i - -- Dv,m1S <_1.rD cg -_ - - • -•- - -
NSW a=u,T cs1 - — — - - - —
-- - - 05LL'Cr. . ,5/(F,2.,...4...-...,) ----r-"','''. LA
- - EQfi7larJ • '17Q t t
2 ,. } •t + •; :Lair Q� =SJL!! 1.1rirtD:3
- - • - — -— -
.. 0 .) j
_. . .
_ . R c)TCW -5ctLIr?G� �"z.r:f i't r. PLAI4-1—
. .. _ _ .. . _ _ . _ ._. ... :__ . .. _ _. .._ _ . _ _ _
-5i 5 STAE1LI� T0 A M - ---_ .
CITY OF RENTON 7h-'\ RF(;ENE
APPLICATION FOR SPECIAL PERMIT JUL 27 1981
FOR OFFICE USE ONLY 4/y/ //
G DEPAj�
File No . SP- D(OS Date Rec' d.
Application Fee $ /''/,/),Uq- Receipt No . /9/91
Environmental Review Fee $ //4 ,
.77&'� -) ./'Fee__-o�o,.e/
APPLICANT TO COMPLETE ITEMS 1 THROUGH 6 :
1. Name Municipality of Metropolitan Seattle Phone 447-6686
Address R21 Second Avenue, Seattle WA 98104
2 . Property location 1200 Mutter Road, Renton
3. Legal description (attach additional sheet if necessary)
The location of the work within the existing Renton Treatment
Plant is shown on the drawing entitled "Renton Treatment Plant -
Enlargement II, Phase I Layout" attached to this application
and by this reference made a part hereof. The description of
the Renton Treatment Plant is on the attached sheet.
4 . Number of acres or square feet 7 . 0 acres Present Zoning M-1
f24,0009 ay.LG y/Neos
5 . What do you propose to develop on this property? Preload the site
for eight secondary clarifiers, a new aeration structure and a primary sedi-
mentation structure to increase the capacity of the existing Renton Treatment Plant.
6 . The following information shall be submitted with this application :
A. Site and access plan (include setbacks , Scale
existing structures , easements , and other
factors limiting development) 1" = 10 ' or 20 '
B. Parking , landscaping and screening plan 1" = 10 '
C. Vicinity map (include land use and zoning
on adjacent parcels) 1" = 200 ' to 800 '
D. Building height and area -(existing and proposed)
E. A special permit required by the Renton Mining , Excavation and
Grading Ordinance shall submit the information listed in
Section 4-2307 . 5 in addition to the above.
7. LAND USE HEARING EXAMINER' S ACTION:
Date Approved
Date Denied
Date Appealed
Appeal Action
Remarks
Planning Dept.
1-77
oF
AFFIDAVIT 77/. 4 Pgilii)
-JUL 27 1°a.
I Raymond Drehin , being duly swor ik eclar t ]
am the owner of the property involved in this application a'�b �ih_WP
foregoing statements and answers herein contained and the inforttat-ion
herewith submitted are in all respects true and correct to the best of
my knowledge and belief.
Subscribed and sworn before me
this 27th day of July , 1981
Notary Public in and for the State of
Washington, residing at Seattle •
Municipality of Metropolitan
Seattle by
411aLta ItY eat/4.144..e....r9
1N, e of Notary Public) (Si nature of Owner)
Supervisor , Right of Way
and Property
821 Second Avenue
Seatt1P, WA 981f4 821 Second Avenue
(Address) (Address)
Seattle , WA 98104
(City) (State)
- (206) 447-6642
(Telephone)
(FOR OFFICE USE ONLY)
CERTIFICATION
This is to certify that the foregoing application has been inspected by me
and has been found to be thorough and complete in every particular and to
conform to the rules and regulations of the Renton Planning Department
governing the filing of such application .
Date Received , 19 By:
Renton Planning Dept .
2-73
1
•
RENTON TREATMENT PLANT LEGAL DESCRIPTION
•
Parts of Government Lots 2, 5 and 6, the NE 1/4 of the NW 1/4
and the SW 1/4 of the NE 1/4 of Section 24, Township 23 North,
Range 4. E. , W.M. , King County, Washington, as more particularly •
described herein below:
Commencing at the Northwest corner of Section 24, Township 23
North, Range 4 E. , W.M. , as established by King County Aerial
Survey Coordinates (Existing Monument) ; thence South 87°26 ' 48"
East along the north line of Section 24, a distance of 2692. 56 -
feet, more or less, to the North 1/4 corner of said Section,
established by a survey and the ties thereto, together with the .
King County Aerial Survey Coordinates, filed with the King County
Engineer; thence South 0°55'30" West along the north-south center -
line of said Section 24, the bearing of which is based on the angle -
in the southwest quadrant at the North 1/4 corner as determined
from King County Aerial Survey Subdivision of said Section 24, a
distance of. 609.118 feet to the true point of beginning of this
- description; thence South 89°04'30" East along a line perpendicular
to said north-south center line of Section 24, a distance of. .
470. 00 feet; thence South 0°55' 30" West along a line which is
470. 00 feet easterly of and parallel with said north-south center
line of Section 24, a distance of 1402. 37 feet, more or less, to
the intersection thereof with the northerly line of the right of
• way of the Northern Pacific Railway Company; thence southwesterly,
westerly, and northwesterly, along said northerly line of right -
of way, to .the intersection thereof with the northeasterly line
of 72nd Avenue South; thence northwesterly, northeasterly and
northerly along the easterly line of 72nd Avenue South to the
intersection thereof with a line bearing North 89°04'30" West
from said true point of beginning; thence South 89°04'30" East
along said last mentioned line, 10466.33 feet, more or less, to •
said true point of beginning of this description.
ALSO -
An irregular shaped parcel of land all situate in the Northwest-
1/4 and the Northeast 1/4 of Section 24 , Township 23 North, Range
4 East, W.M. , in King County, Washington, containing 11. 48, more
or less, acres described more particularly as follows: •
Beginning at a point on the North margin of right-of-way of the
Burlington Northern Inc . , "Former Northern Pacific Railway Company" _
470. 0 feet easterly .as measured at right angles to the North-South .
quarter line of said. Section 24; thence North 0°55' 30" East 1402. 37
feet; thence North 89°04' 30" West 1516.33 feet, more ,or less, to
the Easterly margin of County Road No. 24-23-4-1 "Monster or Steel
Hill Road" ; thence northerly along said easterly margin to a
point hereinafter described; "Commencing at a point on the east"
line of the Northeast quarter of the Northwest quarter of Section 24,
Township 23 North, Range 4 East. , W.M. , in King County, Washington,
which point is 1804. 20 feet north of the center of said Section 24 ;
thence South 89°34' 43" West 1050 feet, more or less, to the easterly
margin of County Road No. 8; 72nd Avenue South "Monster or Steel Hill
RENTON TREATMENT PLANT LEGAL DESCRIPTION
Road" ; thence northerly along said easterly margin 404.0 feet to
said point; thence continuing above description; thence North
89°34' 43" East 200. 0 feet; thence northerly at right angles to a -
point on the south margin of a hereinafter described tract of land. - .
"A tract of land of varying width all lying- in the north half of
Section 24, Township 23 North, Range 4 East, W.M. , in King County,
Washington, the centerline being described as follows:
Commencing at the northwest corner of. said Section 24; thence
South 87°26' 48" East 1826. 61 feet on and along the north _line
of Section 24; thence North 22°26° 02" West 13. 12 feet to a
beginning of a curve and the true point of beginning of this.
description; thence continuing with a tract of land 300 feet in
width, being -150 feet on each side of the following described
centerline:. . thence southeasterly along a tangent curve to the left
having a radius of 572.96 feet a distance of 666. 41 feet; thence
South 89°04' 30" East 783. 81 feet; thence southeasterly along a -
tangent curve to the right having a radius of 159. 15 feet a distance
of 215.27 feet; thence South 11°34' 46" East 311. 39- feet to a .point
which is the end of 300-foot width of said tract, thence continuing
with a tract of land 280 feet in width, being 140 feet on each side
of the following described centerline; thence South 11°34' 46" East
1100. 00 feet to a point which is the end of 280-foot width of said
tract; thence continuing with a. tract of land 140 feet in width;
being 70 feet on each side of the following described centerline;
thence South 11°34' 46" East 29.00 feet; thence South 12°48' 36" East.
to a point on the- north margin of Burlington Northern Inc. right-
of-way "Former Northern Pacific Railway Company" and the end of - -
this description"
Thence continuing with the abovedescription: Thence easterly
along south margin of said tract of land to a point North 89°04' 30"
West 344. 81 feet of a point South 00°55' 30" West 459 . 118 feet of
the north quarter of Section 24; thence South 89°04' 30" East 783 . 81
feet; thence southeasterly along a tangent curve to the right having
• a radius of 9 . 15 feet a distance of 12 .38 feet; thence South 11'34' 46" _
East 311.39 feet; thence North 78°25° 14" East •10. 00 feet; thence
South 11°34' 46" East 1100. 00 feet; thence North 78°25' 14" East
70. 00 feet; thence South 11°34° 46" East 29. 75 feet; thence South
. 12°48' 36" East to a point on the north margin of Burlington Northern
. Inc. right-of-way "Former Northern Pacific Railway Company" ; thence
southwesterly along said north margin to the true point of beginning
and end of this description. Containing in total 64. 48 + acres.
cg.\\[-b 10
JUG �� 1981
• .
•
• , .
. - , . • ,‘ ":1•:•:,. 'r,Z,:.z.z...
•
,
...".',--1 f.' ,-•:%,.'2; A:i.) --/--------
, ' Aix--::•:••s—, , s;', ''....•:,3-.• t;:.-. ,--
\ I ." '';:i -' .. '
.LI _ s,'.--‘%:',, ., i.•
‘• •'‘1:2* ., • :. : ''`•• / - sZ „ "ssIs.s.
..1 '-- , '''',./ _,W, ' • \ \• s, .7....4................... / *.• ',,,V.1 . , . `..
' 'N't„..1/'•,',' `,
,
•
1 tP7-316---G PIO 20 ' ` \ '4 ; •\‘', .. *.
•".22,13,, IN kir&•:„1* •• •. i..., =.,,;
•
SCALE,r• loo• — --Th-q.' .' :. •... ('‘ ( '\\ s.,:' 4-i \ssYsy, . .- ' ,,,- ;_igia- 01001#&._0*--,ittrit „..' ,.„ . ... ,,,...... ,. \ ...
\;, '.,,,
vigiOmprialisillivorP---,0,,‘ , s• s , usigv,., i-N•t:.. ....,..•
k
• .,- ,#at;% 1
allialiMP- !I :\ 11'::'.I\
• .. . .
\ \1,4::,!:,,.:,:,,,\.1:CI:, s.:\ 40110111P ir ,: .. 1 ; - .,,,,,
• „ ,,..,4.;„::::$,,,,c,,,,,, ,.swat •
00.0111 ,, ; 1, ; -=,,,,, ..:,,,. , . •.10,0 :',... ,...• t.,,h, .,,,, , . _ ‘, ,• 4 . ,,•
S'•‘.11,..'"; Willi ss'44 s ‘‘1'.1.1.'110......11:11011011 • . '' ...\-.j. i t*...:i I\ t ; • NOSII .0, ss. •':•,, •.\•, % . 1 t s.
EXIST WATER , s • ..........."01 .
STORAGE TANX ' .-) . \ ! ': ', ''
ka--'s•:\ / l..167- \,•., .—---, ; / ,•-;,;;:i ; ! .., ; ; .:;: 411110.4-art"-tip . •
• ; ; , ,;.r s, •-• -,
..7.1j.r,' i I .:%_-:..§ .. \---,, '----t..-----,s-s. /2/ ,"" 'It:: ".2•-.,,"..,..., ',:',11rsrai--laINIW, '. '. '; „.2•.:, ',,, 's, ,...'
' PROPOSED
. . BORROW 1."....• II '`....-- 1 ...."-/ / rl ‘, ,.,..‘,,i , ,Tip,:, ,... .. ,.. ‘.. ., ,, ,-„.:. .,,...,,,, •BITE s I ••
•'As ..----.'' IA i : is • s ° • • #4' X .0,...' , . I
. . § I , • . s . I , I . ,. .. .
'S 'i I I, . . % „...... ............•../ / 0;:,..rs.i , i•I I'' : . I „Aga', `, . '• : • ', .,:1 ..,e,. ,,. •..
• 1 ; s / •°:"5":" ''.\ ' I'',0---') , tj . , , , ,' . ,•
' / ' C,; ...APO'''. .., lc, )//.. •:,z„;'2'";'....- ..,..1:::::ikil:::;,:•:41kNj 11111 ' ' . :
. , ,, , A__
, ._::::--------- ;. •-- •-. ,,f,:..,,,:.-.2.4-.-., ..„,-.„:1-4-..0,.,-,,-(,-3.,.-..z:.,„, .. , 0.. ,. :: ; ,,./:;...,.,,,,,
. . ,,,1;:.•-_: ... zi-ski..,.ki,•--•,- --1,,, .., . . . •• • •.;•.• ..:;:. ...,:,.. •,.
_,-_-_ _....--.-,?.;;;;.,..‘;-- ,f 7 . ,, .,f ., . ._.-y-t:-,.-g---if ‘.--.•.,.3 ,.; .s.
.-...si..-t_f.-_,---..----•----;--- - ..;•:,.-ft,,..•. /? ! ,,, ,:-...„„if,pif.-•:: -.;,,--f--,--- -;t4 ;..:1110,,,,.",,-; ; i • , ....... 1z,
r,.A.'::•::%,1:,::::;;;•4: , - ,,U.140:11'ibr:' -----=;. \
A,i:t-- •' ., ..•...---- v_-_t_.:::,._:,,,....;.,,,,,,,•... 0 ;, .
N;....; Alglik\WA, ...-- ;,, • ,- ,... ,,..-v,..,.:,
'';010\filliiiii-
. • ....
• __- ve• ,.• ,,,...
.--• r to' , , „
c .,„,,,,,,.. ' ;_-,.----• 'I1'
13$ Kcio 4.• ,..;:,,,,,
`',,i..,:e• „,••••• VA IIPPI: 44' : % ‘, • ,
. ,.,
i At• 51°C1'1C17/
. . i
•:::.;:‘,s-ss::‘,.r,451",•'. ' I/ WNiAli i 1
• • ,‘ 1 11.1 , ., I; .... '.. ' ' 1\ \
10,10, si,00.0° , ,2::$ .%_1;00e:7,, , ' 'A/ 1151STI / 3 .. •SlICE
\. \ .. -- 1 •
;' • 'k -s, `!;;;.''''' '-', :,/,':',1, ',. icy.... — _-__ tw' id.,
•
-- - • vo• --‘, try / ,, , 4,13
.:-------___ ' -----r , ...\,,,,,,,, • L 0,:‘,,,,,, ,, , ,,/,/ /,,g;t0vP,,,,t"...:Iiivw_iti.\.
004s
• . • ...
• / % ,
__ -.....,.. _.•-.•
' v.t4i.._•-4 ‘11‘4.,i011'" 11911t.°6:1610 ---- -00-;---..-;. 1.k
--,...,, -.41/1,N, --•---...._--.-..' 0,0:0° 's i • `11.0./.1.t.rai-'_.„,././
I 0%30 __ .••• ,,,A111-4>iiiitiat
--,'-'•-,''' __ ----2':7::::" °cf. c '.:..-- ' • •-• siso ....,::,-,---------• •N*
- .-.N.,' itosc , -............w.01 •••::-
! , --"4144•4/..._ ost* ;
'.... .—,.,, ‘, ..:::=:. •,...0 „
..,
''"N.,............ : .;;.;..__ __..-
_•••• .-
IMMO PROPOSED FILL AREA
72.1-:IF.---
' liF. ..
. .
.'.
—
—.:—I--- J F Cig METR JUL 1981
nwn O IskartkicHlIty of NSPN0P.OtAA Smmtl......
-•-•-• NOTED RENTON TREATMENT PLANT .••.A12010
ENLARGEMENT II-PHASE E ma: C46
111•••••...MIA
GENERAL PLAN 2
•••••••••
••
i�J 0Nt\
7 •-...
T r !
Q
Z
\i ce'/`/16 �0
--.....1%.,.. 47 .<2..z______L______,7
...._ • ___...• .,
} �",� clrr Ll7ra /•
,\,
A,
,: AVL 11:
ity\._ eyY \\
•
'•\
•
.11.f. lRTSN • ' \ \V •f .3.7 v •
�v
y o t ` /a r s,a
v ° ;: 1 '�' \• � /•�/ jai~ �c�e F
O {Q ` 4,
\ , �.RfNTDN a .! - -I. _ /AC t./N6TON a
(it)
Arar
•
. V TACLTAIAj 0e RCN7AN •\ •\ u
INr.V[1l1 JElYAGE CO UA!S! �! -
. ..
AIRPoRT W rRUTMENT � \4,,
pr PLANT / _ \
6 •RENT h b - -
W
- \ ~� t
-
10.4
. / vP LA MT
11
Lk" -PUYALLUP \ \ ] in 4
:(Q�S•(CiC• ��' ! ~ y 3
L / �\ V� ��� � 17 V 1V ; v x. 3 T r
VICINITY MAP \ a\\ Qg�• f 1,/ ` /31
i
\ \\ .c" c...-----
INDEX TO DRAWINGS _
ro. A
N.
Y R/VCR_ s
ill) • h •
I � W
u Z
c: �
2ct
o
h laI14 V £ONCACREs
K 0. RACE" TRACK
•
5 Iv, 3r _ DATUM NOTE
—' - ' ► AGI ELEVATION Io0 EQUALS M[An SEA
LEVEL DATUM LLiG AGS-MI I1.47A4)11
• 1 v
I %/�/y/�/ IFUTU EEMENT II
u LOCATION MAP
I I I \\ 1/ SCALE.1%400.
• -..o.ea J.F. Yyj �f"S L•�®
eh Munkto fy of Metropolitan 5ot1. F.JUL 19i
~•� O.W.4 L= RENTON TREATMENT PLANT ••••.A1201
• NOTED ENLARGEMENT II-PHASE I Par C46
rr...�a•a LOCATION AND VICINITY MAPS ''�•"`I
.e ee.,e,a. I WY OAT( a.•a r 1 0 2
C h a 5 •
4 \ T.•
„I r,4 z:.. *1 ti • • 7;"'N 6 ' • -.
0Municipalityof Metropolitan Seattle (..) 39
• „���
.
Exd &B . 9 8-2i Second Ave.,Seatt:e,Wa hingioi t 98104 - •
\, <,;. -
t,
PROPOSED/TM3 DECLARATION OF
Z1 .-.xr� :•'. Z/NON-S1GNIF ICA.NCE
- • • Action: Site Stabilization at Renton Sewage Treatment. Plant
• Description of Proposal: The Renton Sewage Treatment Plant (see
map A for site location) has now reached its interim design
capacity. Continued population growth in the service area and
• the desire to improve local water quality conditions now make it
- necessary to identify alternatives which address expansion of •
the Renton facility. These questions are now being addressed as
part of the Renton facilities planning process. Regardless of the
selected treatment level alternative, some expansion of the Renton
Treatment Plant must take place, regui_rinq the site stabilization.
The Renton Treatment Plant expansion, to 72 mgd is to include the -
addition of eight secondary clarifiers located immediately .east
. of the existing eight secondary clarifiers, an aeration structure
located immediately east of the existing aeration structure and (0
Proponent: Municipality of Metropolitan Seattle (METRO)
Location of Proposal: The Renton Sewage Treatment Plant is - .
located at 1200 Monster Road in the City of Renton (see map- A) .
. _ Lead Agency: _ METRO
This proposal has been determined to (11XXU/not have) a •
significant adverse impact upon the environment. An EIS
•
t /is not) required under RC:•7 43. 21C. 030 (2) (c) . This .
decision was made after review by the lead agency of a -
completed environmental checklist and other information
on file with the lead agency.
Responsible Official : Rodney G. Proctor
Position/Title: Manager/Environmental Planning Division •
Date: July 6 , 1981 Signature: . 71, ..4zr..,f L`i ,,%,ce --T
a .
Environmental Planning Division .
•
s`” 'sa. - -' `re ` "f'.`. �.x.7 `� :.- .- .o ma's., 4-1.-a�
a' '"?
-rd_`
Nature and Brief Description continued
The portion of the expansion addressed by this environmental action
includes the site stabilization for the proposed secondary clari-
fiers and the primary sedimentation structure. The site stabili-
zation project 'is presently proceeding on the assumption that
approximately 106 ,000 cubic yards of preload material will be
acquired from Borrow Site "A" (see map B) . An additional 20 ,000
cubic yards of preload material will be acquired from outside the
treatment plant site.
Borrow Site "A" will be rehabilitated to protect soils disrupted
during the borrow operation. The site stabilization project
will begin September 19 , ..1981. . .. .
A second option being considered is acquisition of the entire
126 ,000 cubic yards of preload material from outside the treat-
ment plant. . Under this option, Borrow Site "A".` will not be
disturbed. The decision to use Borrow Site 'A" or to use material
brought in from off-site will be made by the contractor and
will be based on cost considerations and availability of suitable
off-site material. Completion by either option is scheduled for
September 1982.
•
•
. . • - c.,.-9 2-3- -- :7.. , .. 7. 41' : . -,:jail - .
C7.4:gt-:-. =i .
Municipality of metropolitan Seattle •
Exchange Bldg. 821 Second Ave.,Seattle,Washington 98104 .
.. ENVIRONMENTAL CEECK:_.?ST FORM _ •• .
PROPOSED ACTION: sit„ ff-abi 1 i7Ft4 on 7,f-. Rnn-E=on Sey:acrn .
•
• Treatment Plant -
I. BACKGROUND . . .- .
1. Name of Proponent Municipality of Metropolitan Seattle MT.
• . - - 2. Address and. Phone Number of .Proponent: -
. •• 'Exchange Building; 821•
. Second- Avenue;. MS763 • . - .
. Seattle, WA 98118 : TELEPHONE: 206/447-6613 - ' .
3. • Date Checklist Submitted - July 6 , 1981
4 . Agency Requiring Checklist METRO - - - • . -
5. Name of Proposal, if .applicable: - - - • -
6. Nature and Brief Description of the Proposal (in-
cluding but .not limited to its size, .general design .
elements , and other factors that will give an -
accurate understanding of its scope and naturel : •
The Renton Sewage Treatment Plant (see map A for site
location) has now reached its interim design capacity.- .
Continued population growth in the service area and the .-
desire. to .improve local water quality conditions now .-
. make it necessary to identify alternatives which ad- _
dress expansion of the Renton facility. These ques- .
tions are now being addressed as part of the Renton
facilities planning process . Regardless of the selected
- treatment level alternative , some expansion of the •
Renton Treatment Plant must take place, requiring the .
• site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to
include the addition of eight secondary clarifiers
located immediately east of the existing eight secondary
clarifiers , an aeration structure located immediately - -
_ east of the existing aeration structure and possibly -
a primary sedimentation structure located to trie nofEh _
. • , of the primary treatment structure (see map B) . (OVER)
Description of Proposal continued
possibly a primary sedimentation structure located to the north of
the primary treatment structure (see map B) .
The portion of the expansion addressed by this environmental action.
includes the site stabilization for the proposed secondary clari-
fiers and the primary sedimentation structure. The site stabili-
zation project is presently proceeding on the assumption that
approximately 106 ,000 cubic yards of preload material will be
acquired from Borrow Site "A" (see map B) . An additional 20 ,000
cubic yards of preload material will be acquired from outside the treatment plant site.
Borrow Site "A" will be rehabilitated to protect soils disrupted.
during the borrow. operation. The site stabilization project
will begin September 19 , 1981.
A second option being considered is acquisition of the entire
126,000 cubic yards of preload material from outside the treat-
ment plant. . Under this option, Borrow Site "A" will not be - -
disturbed. The decision to use Borrow Site "A" or to use material
brought in from off-site will be made by the contractor and
will be based on cost considerations and availability of suitable
off-site material. Completion by either option is scheduled for
September 1982.
. . 1 •1 A F /-\ . _ .
R.e-_,JTou sct.a.)AGL TE A;u='il i pLA`JT _-- -- —
•
tivG:or+
-- ' - �� 47Va
tT
b
, Y
sorry c. _ - -
s�8 r
SEL'7F Cc +: •
n _
e
-
o
a
r _ _
1"!A� - -- - -
•
\ ___ _ _ _ _
_ _ _
_ . . ._ __ _ . __ _____
. _
. • . _. __ _ . _ __ _ _
. .
. . _ _ _
_ _ _
. .. _
.__ .
. _ __. _ __ _ ____ __
. . ._ _
. ..
__.
a PLY-ER F.%v321= o Sa rem j o _ —- --
9 "c;`STAaulSALE'S - --- - ------ - --------
--- p F�R40taJ A2�AA _ 1 3-SKr, - - -- --- - - �-._
- — ;a ?RShrjRI, .,.SEDr:�1stiTRrlo31- - -- -. _ - —
/ .1 t ! ,/ STRcJcrvR�
-- —. PARttvG ; i - D2A.0,75 s�-x.=3 OFF - _- - -
N=rJ?svZATIc0
gocuM?
AE2R7(OnJ iZ r7 t
1 ,STRcCfVR, I t +, ( 1
1ii
?Q=tJri:DD i}p� Shrcihs
LTri
_. � �
\IN
- ADriIU. ✓ � j� i :�, - -- -BLDCT-
--• • 0 Si?)
SEC�1.%DA?Y •-S.DL!:E cr;c.J - - - - - --'_— ..
S:zvcTv2I--- - _ -- -- -- - • --. - - -
R E J i ory 5EwA& 1 f)j - L , ;
Slims ST?.EILl2 ATIOAt _.:- --.
7. .. Location of _ _2oposal (describe the ph1 -_%_al setting of the
proposal, as well as the extent of the land area- affected
by any environmental impacts , including any other information
needed to give an accurate understanding of the environ-
mental setting of the proposal) : -
The Renton Sewaae Treatment Plant is located at 1200 Monster
Road in the City of Renton (see map B) . Preload
material will cover approximately 7 acres of the treatment .
plant site (4 .2 acres for the proposed secondary clarifiers
and 2 .8 -acres for the proposed primary sedimentation structure),
8 . Estimated Date for Completion of the Proposal: September 1982
9. List of all Permits, Licenses or Government Approvals - -
Required for the Proposal (federal, state and local --
including rezones) : Special grading Permit and Annual
License (City of Renton)
10 . Do you have any plans for future additions , expansion, or-
further activity related to or connected with this proposal?
If yes, explain:
Yes . The areas of the Renton Treatment Plant undergoing site
• stabilization will be used_ for expansion or -tile creatm arc
facility. Expansion to 72 mgd will include eight secondary
clarifiers , a new aeration structure, resocaciOn o. a stuic_ye
building and possibly a primary sedimentation structure.
11. Do you know of any plans by others which may affect the
property covered by _Your proposal? If yes , explain:
No.
•
12 . Attach any other application form that has been coin feted
regarding the proposal; if none has been completed, but is
expected to be filed at some future date, describe the.
• nature of such application form:
Application for Special Grading Permit (City of Renton) and
Annual License (City of Renton) will be forthcoming.
II. ENVIRONMENTAL . IMPACTS (Explanations of- all "yes" and `maybe" _
answers are required.) -
Yes Maybe No
1) Earth. Will the proposal result in: - - '
a) Unstable earth conditions or in
changes in geologic substructures? X
b) Disruptions, displacements, _
compaction or overcovering of the
soil? X
• c) Change in topography or ground •
surface relief features? X
-
(
d) The destruction, covering or = `
modification of any unique geologic
or physical . features? . .
e). Any increase in wind or water
erosion of soils, either on or off . . -
the site? .
f) Changes in deposition or erosion of
beach sands, or changes in siltation,
deposition or erosion which may - . - - .-- -- -
modify the 'channel of a river or
stream or the bed of the ocean of X -
any bay, inlet. or lake? _
• Explanation: (b&c) The intent of the project is to fill
approximately 126 ,000 cubic yards of preload material
- to the sites for proposed secondary clarifiers and the
proposed primary sedimentation structure. If all or a.
portion of this material is excavated from Borrow Site "A" (OVE
2) Air.- Will the proposal result in: :
- a) Air emissions or deterioration of
ambient air quality? _ .
b) The creation of objectionable odors? X
-
c) Alteration of air movement, moisture`
or temperature, or any change in - - -
-
climate, either locally or k
regionally?
Explanation:. (a&b) There will be a temporary increase
in air emissions and some diesel odors from construction
equipment. No long-term impacts will result.
•
I b&c continued
then the- topography of the hill will be changed. The topography
of the sites intended for stabilization will change slightly,
with an elevation increase averaging 10-15 feet. Preloading is
designed to consolidate soils where new structures will be built. .
Soil compaction caused by the movement of construction equipment .
and by the application of preload material may alter the absorp-
tion rate during the construction period. If Borrow Site "A"
is used, the area will be re-sloped at 2:1 ratio to prevent soil
from sloughing. _
•
•
•
•
Yes Maybe No
3) Water. Will the proposal result in:
a) Changes in currents, or the course
or direction of water movements, in
either marine or fresh waters? X
b) Changes in absorption rates,
drainage patterns, or the rate and
amount. of surface water runoff? X
c) Alterations to the course or flow
of flood waters?
d) Change in the amount of surface
water in any water body?
e) Discharge into surface waters, or in
any alteration of surface water
. _
quality, including but not limited . _
to temperature, dissolved oxygen or - -
turbidity? - X
f) Alteration of the direction or rate
• of flow of ground waters?
. g) _ Change in--the quantity of ground
- waters, either through direct
additions or withdrawals, or
• through interception of an aquifer
by cuts or excavations? X
h) Deterioration in ground water
quality, either through direct
injection, or through the seepage
• of leachate, phosphates, detergents,
waterborne virus or bacteria, or - -
other- substances into the ground -
- water?
•i) Reduction in the amount of water
otherwise available for public
water supplies? . X
Explanation: b) The berm surrounding the treatment
• plant site provides an excellent barrier to prevent
sediment bearing runoff from leaving the site. During
• construction, drains located, in the berm (see map B)
will be screened with straw bales or sealed off to
prevent sediment transfer to local drainages _ Filter
fabric will be installed at Borrow Site "A" and the -
(OVER)
•
• _ -
•
Explanation continued .
preload site to prevent soil from sloughing over the berm at
either area (see map B) . Precautions will be taken during site_
stabilization work to ensure that the runoff and drainage
patterns from the site are not changed.
•
c) A flood hazard analysis. performed during the- Renton treatment
facilities planning process indicates that the treatment plant .
will receive adequate protection from floods. ..
g): Site preparation may require some dewatering, which could be
accomplished by use of well points or other means available to
the contractor. Groundwater will not be removed from the site
and noimpacts - are expected to result from any dewatering .action.
•
•
•
•
-_`
. r
.r. Yes Maybe No
4) Flora. Will the proposal result in: -
• a) Change in the diversity of species, ' =
or numbers of any species of flora
(including trees, shrubs, grass,
- - crops, microflora and aquatic plants) ?
b) Reduction of the numbers of any -
unique, rare or endangered species
of flora? V _ X
c) Introduction of new species of flora _
into an area, or in a barrier to the -
normal. replenishment of existing
species? g
d) Reduction in acreage of any agri-
cultural crop? X
Explanation: a) Flora present at the preload sites is
predominated by native grasses , blackberry, etc. Flora
present at Borrow Site "A" is similar, but also includes
mature maple, alder and other native deciduous trees .
The site stabilization .project will result in removal (OVER)
5) Fauna. Will the proposal result in:
a) Changes in the diversity of species,
or numbers of any species of fauna - -
(birds, land animals including
reptiles, fish and shellfish, benthic
organisms, insects or microfauna) ? V X
b) Reduction of the numbers of any -
unique, rare or. endangered species . . -of fauna? . X
c) Introduction of new species of fauna
into an area, or result in a barrier
to the migration or movement of -
fauna? X
d). Deterioration to existing fish or V -
wildlife habitat? - X .
Explanation: Although a number of rabbits and other small
mammals inhabit the treatment plant property, ample
'n�h" atexists on areas adjacent to the preload sites to -
ensure that the wildlife population will be accommodated.
•
4a continued
of all vegetation at the preload sites and perhaps a significant
portion at Borrow Site "A" if this site is used. The project,
however, will include landscaping/vegetation plans to- ensure
that some habitat is replaced and soils are protected from
erosion.
Yes Maybe No .
6) Noise. Will the, proposal increase
existing noise levels? X
Explanation: Noise levels will increase temporarily during
construction activities . Standard construction techniques
. for minimizing noise impacts will be used. The immediate
surrounding area is zoned industrial and noise impacts
should be minimal. Temporary noise levels' between72-94 (OVER
7) Light and Glare_ Will the proposal
produce new- light or glare? X - -
Explanation:
8) Land Use. Will the proposal result in
the alteration of the present or - .
planned land use of an area? X
Explanation: The proposal may allow some alteration-, of
present land use by enabling additional sewerage develop=
ment by Metro component agencies . The proposal would not,
however, necessitate any land use changes. Land use changes
are governed by local agencies with land use authority_ .
9) Natural Resources.. Will the proposal -
•
result in: -
a) Increase in the rate of use of any -- -
natural resources? X
b) Depletion of any nonrenewable -
natural resource? X
Explanation: _ , -
10) Risk of Upset. Does the proposal involve
the risk of an explosion or the release
of hazardous substances (including, but - - -
not limited to, oil, pesticides, chemicals
or radiation) in the event of an accident -
or upset conditions? ` X
Explanation:
6 continued
dbA can be expected when machinery is operating. To mitigate --
noise impacts , construction activity shall be restricted to
the hours. between 8 a.m. and 5 p.m. In the cases of special
noise sensitivity, portable noise-reducing barriers shad be
used to control noise.
.1
' • Yes Maybe No
11) Population. Will the. proposal alter the • .
location, distribution, density, or
. growth rate of the human population of
• an area? . X .
. Explanation: The project is the first element of plant. .
• expansion which would accommodate ad itiona flows into
•
the existing sewage service area, thereby allowing addi-
tional development to be served by sewers. however, the .
location, distribution, density and growth rates are .
governed by local- land use plans and policies.
12) housing. . Will the proposal affect .
existing housing, � or create a demand • - X
. _. •• for additional housing? •
. Explanation: See Item 11
13) Transportation/Circulation. Will the
proposal result in:
a) Generation of 'additional vehicular -
movement? . � . x
. b) Effects on existing parking facilities
• or demand for new parking? X
c) Impact upon existing transportation ._ . . , -
. systems? . . . X -
d) Alterations to present patterns of .
circulation or movement of people
. * and/or goods? • X
e) Alterations to waterborne, rail or .
air 'traffic? X -
f) Increase in traffic hazards to . •
- motor vehicles, bicyclists or -
pedestrians? X - .
Explanation: (a&b) ' A minimum of additional traffic may be
generated by workers travelling to and- from the site during
the construction period. If all preload is acquired out-
•
• side the site, approximately 6, 320 roundtrips within a
6-mile_radius of .the treatment plant will be generated .
' by trucks bringing in preload material. This may result
in a slight impact to the existing transportation (OVER)
13 a&b) continued - .
circulation in the immediate area and along Monster Road. Site
stabilization for the new secondary clarifiers will require
the removal of an existing storage building and parking area.
This building and paved area will be relocated elsewhere on
the site.
f} . The possible increase in traffic hazards along Monster Road
will be reduced by providing flagmen along the route and posting
warning signs as appropriate. Vehicle movement will be limited
to daylight hours .
.o
Yes Maybe No
14) Public Services. Will the proposal have
an effect upon, or result in the need
for new or altered governmental services -
in any of the .following areas: .
a) Fire protection? X
b) Police protection? X
c) Schools? x ; '
d) Parks and other recreational
facilities?. X
e) Maintenance 'of public facilities, =
including roads? - X .
f) Other governmental services? X
Explanation:
15) Energy. Will the proposal result in:
a) Use of substantial amounts of fuel -
or energy? - X
b) Demand upon existing sources of
energy, or require the development
of new sources of energy? . X
Explanation: Total fuel consumption by machinery used at
the construction site is estimated at approximately 18 ,000
gal 1 n7is (gas and diesel) . Total fuel consumption if all
preload material is acquired from a site within a 6-mile
radius of the sewage treatment plant is estimated at (OVER)
16) Utilities. Will the proposal result in
a need for new systems, or alterations -
to the following utilities?
a) Power or natural gas? X
b) Communications systems? - - X'
c) Water? X
d) Sewer or septic tanks? X
e) Storm water drainage? x
f) Solid waste disposal? x
Explanation:
15 a) continued. . . .
approximately 36 ,000 gallons (gas and diesel) . This fuel
consumption will not be considered significant nor will it
result in energy-related impacts .. -
'4
•
- es Maybe No -
{
17) Human Health_ Will the proposal result
in the creation of any health hazard or - .
potential health hazard (excluding •
mental health) ?' X
Explanation_: _ -
•
18) Aesthetics- Will the proposal result in • -: .- : -
the obstruction of any scenic vista or _ -
• • • view open to the public, or will the -
' , proposal result in the creation of an . - . - - -
aesthetically offensive. site open to -
public view? • X
Explanation: _If Borrow Site "A" is excavated during site
•
stabilization, some of the excavation may be visible from
- Monster Road. This area will be re-vegetated in -a manner
similar to existing flora to minimize .aesthetic impact.
•
Hvdroseeding_ will be used to protect exposed slopes from (OVER)
19) Recreation. Will the proposal result in
. _ an impact upon the quality or quantity .
of existing recreational opportunities? X
• Explanation: Improved multi-use recreation facilities are
being examined during the facilities planning process for •
pvnans-ion of the Renton Sewage Treatment Plant.
20) Archaeo`logical/Historical. T:i ll the ' . : • .
proposal result in an alteration of a
- - . significant archaeological or historical .
. site, structure, object. or building? . X
Explanation: ` Extensive archaeological/historical investi- • - .
. gations have been performed at the Renton Sewage Treatment
Plant expansion site. These investigations conducted bv
the Office of Public Archaeology revealed no archaeological/
• . historical finds . No finds of significance are anticipated .(OV
III. SIGNATURE '
• I, the undersigned, state that to the best of my knowledge,
the above information is true and complete. It is - understood .
that the 'lead agency. may withdraw any declaration of no '-significance
that it might issue in reliance upon this eecklist sh• iild there
be any misrepresentation or lack of f.-1 , jsclosur .. d ay part_
VIT4� PP /Proponent L-Xl / .PAW
. . . Bate 1 S
. 0
t
18 continued
erosion and reduce aesthetic impacts . Recommendations on
re-vegetation plans will be prepared by a landscape architect .
and implemented during the construction period. Borrow Site
"A" slopes will be sloped at 2 :1 ratio to prevent erosion.
20 continued_ .
at either Borrow. Site "A" or the preload sites . If, howeverr,
any evidence of archaeological/historical significance is .
discovered during excavation, all construction activity will
be halted until the importance of the find can be evaluated.
by the State.
429 114kio 044
•
rnEia
Municipality of Metropolitan Seattle
Exchange Bldg. ® 821 Second Ave.,Seattle,Wasitingion
July 29 , 1981
Mr. Roger Blalock
Associate Planner
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98005
RE: Final Declaration of Non-Significance for
Renton Sewage Treatment Plant Site Stabilization
Dear Mr. Blalock:
As per your request, :enclosed is a copy of the FDNS for
the Renton Sewage Treatment Plant Site Stabilization
project. Please feel free to call me if I can be of
further assistance (447-6899) .
Very truly yours ,
Gregory Bush
Environmental Planner
GMB :o j
Enclosure
17/1
•
,nr.1 ;,y x�,y{ 4l 4' .5 ,tf;txy1 r .yyt f_..Y,, I f .. o 3Y t.3,S•uyr yn r
.-.�.tbW"`�'i5.`F; .#Sf4`.#�..�� !����i��-F.h�[�•�3�� 7-!'8.�'�r7 .�n�^MsM. �r R*f.�G• ,�+•x�� x 4;.}„t5. ,R R�iXI� y.`.w. :'!t✓a x . .....
Ai ,,3ni� tali Of Metropolitan Seattle t •
Ex r e Bidg. ® at Secord Ate.,Se ,Wa ping n 981 <C
lice - � � ��r'31.
July 21, 1981 •
TO: Department of Ecology
Environmental Review Section
RE: Final Declaration of Non-Significance for
Renton Sewage Treatment Plant Site Stabilization
Enclosed is a final declaration of non-significance for the
subject project as required by the State Environmental
Policy Act of 1971 (RCW 43. 21C) and WAC 197-10-340 (7) .
A proposed declaration of non-significance for this project
has been reviewed by agencies with jurisdiction and all
comments received during the 15-day review _period have been
considered.
This document is being sent to you for listing in the "SEPA
Register" as specified in WAC 197-10-831.
Very truly yours ,
al a,
•
Rodney G. Proctor, Manager
Environmental Planning Division
RGP:gbj
Enclosure
`."��'.7ZI" *"i ;"w ."414w:� f.3�•'" �" » �r� �,,iCl�_,C's .y;, t'SP1,i7
-1 �'r. W'k=`f'=�
•
•_
"Za- *F-, ',..1111171
Municipality of Metropolitan Seattle
Exchange Bldg. ® 821 Second Ave.,Seattie,Washington 9S?04
RIUR /FINAL DECIJ.PATION OF
EXGXXXXZXN /NON-S IGN IF ICANCE
Action: Site Stabilization at Renton Sewage Treatment Plant
Description of Proposal : The Renton Sewage Treatment Plant (see
map A for site location) has now reached its interim design
capacity. Continued population growth in the service area and
the desire to improve local water quality conditions now make it
necessary to identify alternatives which address expansion of
the Renton facility. These questions are now being addressed as
part of the Renton facilities planning process . Regardless of the
selected treatment level alternative, some expansion of the Renton
Treatment Plant must take place, requiring the site stabilization.
The Renton Treatment Plant expansion to 72 mgd is to include the
addition of eight secondary clarifiers located immediately east
of the existing eight secondary clarifiers , an aeration structure
located immediately east of the existing aeration structure (( VER)
Proponent: Municipality of Metropolitan Seattle [METRO)
Location of Proposal : The Renton Sewaae Treatment Plant is
located at 1200 Monster Road in the City of Renton (see map A) . .
Lead Agency: METRO
This proposal has been determined to (kx /not have) a
significant adverse impact upon the environment. An EIS
(b/is not) required under RCW 43. 21C. 030 (2) (c) . This
decision was made after review by the lead agency of a
completed environmental checklist and other information .
on file with the lead agency.
Responsible Official : Rodney G. Proctor
Position/Title: Manager/Environmental Planning Division
Date : July 21, 1981 Signature: e, Q,y o ` ee..i.
Environmental Planning Division
.,,..,, � %4i• r...r•ry, e[,i„t.• Y..,� *-hrv��„` '`T`i+`.r'ls._" ,'y`4.`;>: :r,: r". :.,s '- '-''-]';tir>-{`"�,•'..t'•.'T_"'s.�si�,�yt'La. •^r,'�=�'4+iCf't'x
Description of Proposal continued
•
and possibly a -primary sedimentation structure located to the
north of the primary treatment structure (see map B) .
The portion of the expansion addressed by this environmental
action includes the site stabilization for the proposed secondary
clarifiers and the primary sedimentation structure. .The site
stabilization project is presently proceeding on the assumption
that approximately 106 ,000 cubic yards of preload material will
be acquired from Borrow Site "A" (see map B) . An additional •
20 ;000 cubic yards of preload material will be acquired from
outside the treatment plant site.
Borrow Site "A" will be rehabilitated to protect soils disrupted
during the borrow operation. The site stabilization project
will begin September 19 , 1981.
A second option being considered is acquisition of the entire
126,000 cubic yards of preload material from outside the treat-
ment plant. Under this option, Borrow Site "A" will not be
disturbed. The decision to use Borrow Site "A" or to use
material brought in from off-site will be made by the contractor
and will be based on cost considerations and availability of
suitable off-site material. Completion of either option is •
scheduled for September 1982 .
•
•
•
•
•
•
:_.
,_..1
. ,
•• il,c4,p A
,.. .
. . _
. .
. . .
. .
. .
_ . .
. .
. .
. .
. . .
_ .
. . . .
$E Lk)A G 5. TA EA-r I-1.=::::J-r PLA
. .
.. . .. .
_..
. _
. . .
. • . - . .. _ . .
_ . . .
. _ .• . • .
A .3.AF LIN GTOM 1 .
. . - . . . .
. .
.or.
• •
. _ •
. . ;
. s z
.1. .
. z
s ...
. ..
_
. _
. .
-
• Sour .
. . .
- .
. .
. 0, • . . . .
RAC-E -
. 11
{
_ •• -- • • • -
. - . .
. .,•
•A . . ..
RI
. N.,... . .cf
. %. . . .__ . . .
. . . _ . .
. . . .
a .113
. ....____ . . . .. _. .
___ _ ••
41, .
.. . . _ . . .
•,ip - .— - .
tIt.
. — . .
. - . . . . . .
' ...t.1
' . .
• ' I .
• I
...1 . . . . .
- .
_ .
. " .
.. .
• . . .
- . .
. . . _
• . .
. .
. . .
. . -
. -
. . .
, . . . .
. . _
. _ .
. .
. .
. .
. .
. .
. .
. .
. . .
• ' . .
. .
. . . .
_ -
. .
. .
. ,
•
. .
. . .
. . - .
L:\ ......
..,.
. .
. .. . .
. - .
. .
• . .
t
L.
- ? . _ - •-- — - .
. . . (?)4 .. -______ .__
a - /
A pari.,.; 1-'A-321-= . . _
- '.1t \ . ' ... ___ . -. . -
.... Idi / ...-.. _ .- _ .
-)
__ .----.. ::::15 -- •-
Vusu ux.. 375:2.11
-- -- -- / _' ?Zin.±R; -s:71p1G14.TA--las1 - -- - - • -- - -- - ---- _ --- --•
1 , - SY3w T4R=
aw
-- _ _-PAR NC? f I i f - - - -• - - -
�Q J5
• \ %VIP f.-11-7,2...,44n-i R.--Z. .. _ \
•
- -- - O
. ...t.,•,zygra= •... •-.7.• j•kr,m _• 1
3 -
• .
• ,, ;'
•
ZR=A%:i R, f 1 \ 110'f'^-mot :! "P
3LDG- ,i, --'^t
siS. 1.4,••-•-,!....... i • I!N. : .," ' • / - -- •
- . . 0 i -- - - -- - .7. __ , ____ _ _ ---- -
- • _ -_ Sc�31.;.DA Y ••5a'9trc at3Ca - - _ . ..
- -
- - - - S;�vc.vim - - -- - - -- --_— -- __ •-- - - --
;eceipt #
CITY OF RENTON
PLANNING DEPARTMENT
NAME ' • ) C' if/ DATE
PROJECT & LOCATION
,+.
Application Type Basic Fee Acreage Fee Total
• • L' • 6,
Environmental Checklist
Environmental Checklist Construction Valuation Fee
TOTAL FEES Please take take this receipt and your payment to the Finance Department on the first floor.
Thank vou.
M1
i
(,,,-,:,-(0,,,,, T �',
c,,,,
CANNING �cBFi .
ConverseWard Davis Dixon
•
MICROFILMED
-1444
7/4' lsf
��.�� ► c
Anchorage, AK •
Seattle,WA
San Francisco, CA
Pasadena, CA
Anaheim, CA
Las Vegas, NV
Denver, CO
Cincinnati, OH
Caldwell, NJ
ga' , • ConverseWard Davis Dixon
Geotechnical Consultants
•
•
REPORT ON GEOTECHNICAL EXPLORATION AND STUDY
Renton Treatment Plant
Phase I Expansion
• Site Preparation
Renton, Washington
•
•
Conducted for:
Municipality of Metropolitan Seattle
•
•
•
•
(s RE/ )
ckcp,b
CWDD Project No. 81-5148-01
July 24, 1981
Converse Ward Davis Dixon, Inc.
300 Elliott Avenue West •
Suite 150
Seattle,Washington 98119
Telephone 206 285-5200
}
I5iPk ConverseWard Davis Dixon . .
<IV Geotechnical Consultants
July 24, 1981 81-5148-01
Municipality of Metropolitan Seattle
Exchange Building
821 Second Avenue
Seattle, Washington 98104
Attention: Mr. Joe Fernandes
Acting Consultant Supervisor
REPORT
Geotechnical Exploration and Study
Renton Treatment Plant
Phase I Expansion
Site Preparation
INTRODUCTION
This report presents the results of our geotechnical exploration and
engineering study for the site preparation of the .proposed Phase I.
expansion of the Renton wastewater treatment plant. Briefly, it is
planned to prepare the site for the construction of eight additional
secondary sedimentation structures, an additional aeration structure and
possibly two primary clarifiers. The locations of the proposed struc-
tures, in relation to the existing plant facilities, are shown on Draw-
ing 1.
The purpose of this exploration was to provide geotechnical recommenda-
tions for site preparation and for foundation design of the proposed
facilities. The scope of the work included review of the existing soils
information developed previously during the Predesign, Initial , and
Converse Ward Davis Dixon, Inc.
300 Elliott Avenue West
Suite 150
Seattle, Washington 98119
Telephone 206 285-5200
�I + -2-
Enlargement I soils explorations by Metropolitan Engineers. Also in-
cluded was the review of borings drilled during construction, supple-
mented by examining construction and settlement records as well as the
writer's knowledge of the site construction. In addition, four test
pits were excavated in the hill north of the plant to evaluate it as a
! source of possible site fill material .
j This work was carried out in accordance with your Request for Proposal
of May 15, 1981 and our proposal letter of May 29, 1981 as authorized by
your Purchase Order No. C-10318 dated June 8, 1981.
•
SITE HISTORY
Prior:to any construction, the site was used as pasture and a golf driv-
ing range. The original ground surface was relatively level except for
shallow drainage courses or swales with the ground surface ranging from
elevation 113* to about elevation 118.
The initial explorations disclosed that the site was underlain by natur-
al compressible soils, interpreted as predominantly floodplain deposits,
in turn underlain at depth by sandy and gravelly soils which were in
turn underlain generally by weathered bedrock (encountered near the high
ground at the northeast part of the site) . To cause the anticipated
differential settlements to occur prior to construction of the plant
structures and final site grading, the preload method of site prepara-
tion was selected.
A site preparation contract (Contract 61-5) was let and carried out in
the late summer and fall of 1961. At structure locations where founda-
tions were above original ground surface, compacted select granular fill
was placed from the ground surface to above foundation level . Where
foundations extended to or below original ground surface, the natural
soil was excavated to elevation 108 and replaced with compacted granular
fill to above foundation level . Compacted granular fill was not placed
_-1
*elevation 100 = mean sea level
Converse Ward Davis Dixon,Inc.
-3-
for future units. Unclassified random fill compacted by hauling units
was placed to preload elevations above the compacted fill and outside
the building locations.
}
As noted in Metropolitan Engineers' soils report of September 3, 1962,
difficulty was encountered in excavating the natural soils to elevation
108. Pumping or boiling of the exposed soils occurred under the re-
peated passage of construction equipment. Generally, wheeled or tracked
equipment could operate down to about elevation 110 depending on the
equipment routing. Little free water was encountered except that caused
by "pumping" under equipment passage. Limited well point dewatering was
attempted; however, it was not possible to correct the saturated condi-
tion of the upper natural soils once they were disturbed. Dewatering
continued throughout the excavation phase and until the compacted fill
i, was placed up to elevation 112. A Gradall was used with good results
but much of the lower excavation was completed with a dragline with the
teeth removed from the bucket.
The initial plant units were constructed during 1962-1964 under Contract
62-6 in the site-prepared area. Surplus excavated material from that
contract was placed as preload essentially to the east, including the
currently-proposed aeration structure area. However, during Contract
62-6 and the subsequent plant Enlargement I (Contract 71-2), overexcava-
tion and replacement with compacted granular was not utilized at future
structure locations but rather random fill was placed directly on the
existing ground surface to preload elevations. This has resulted in the
present ground surface topography shown on Drawing 1.
Except for Primary Structure 2S, which was prepared under Contract 61-5,
the structures (maintenance annex, aeration gallery extension, secon-
dary sedimentation tanks 5S, 6S, 7S and 8S) constructed during Contract
71-2 were supported on random fill or on a six-inch layer of drain rock
and six-inch layer of uncompacted Metro Type A granular fill placed
directly on the exposed natural soils consolidated by previously-placed
preload fill . Dewatering by sand-packed well points was successfully
Converse Ward Davis Dixon,Inc.
-4-
carried out for the deeper structures extending below the groundwater
level . Limited overexcavation and replacement of the natural soil was
necessary--usually during wet weather.
SUBSURFACE CONDITIONS
The proposed borrow area, Borrow Area B, was explored by surface recon-
naissance and digging four test pits at the locations shown on Drawing
1. A .description of the field explorations, together with the test pit
logs and laboratory test results are contained in Appendix A. A sum-
marization of the conditions encountered and our recommendations are
discussed later.
The borings drilled previously by Metropolitan Engineers were utilized
in evaluating the subsurface conditions at the proposed structure loca-
tions. The locations of the pertinent borings are shown on Drawing 1.
The logs of those borings are contained in Appendix B. Also included in
Appendix B are copies of the Plot Plans showing all exploration borings
previously drilled as well as the locations of existing settlement
plates and piezometers. It should be pointed out that these borings
were generally drilled prior to the placement of any site fill . Thus,
the elevation and thickness of individual strata do not reflect any
settlement or consolidation of compressible layers.
At the location of the proposed secondary sedimentation structures, gen-
erally loose to soft silty very fine sands, containing organic material
or layers and some wood fragments, were encountered from the original
ground surface down to depths ranging from elevation 107 in B-57 to ele-
vation 100 in B-56, B-58 and B-59. Loose fine or fine to medium sand
was encountered below this layer, increasing to medium dense with depth.
Fine to coarse medium compact sand was encountered at depths ranging
from elevation 90 in B-57, B-58 and B-59 to about elevation 95 in B-56.
This layer was underlain by silty fine sand with pebbles and shell frag-
ments to the depths penetrated. At B-12, a three-foot surface layer of
J
Converse Ward Davis Dixon,Inc.
-5-
silty sand was encountered underlain by fine sand to elevation 86 where
denser sands were encountered. In general , the underlying soils ap-
peared to grade sandier to the east.
Currently filled to elevation 126 with random fill at the proposed aera-
tion structure, the underlying natural soils appear to generally grade
siltier and thicker to the north. At B-30, brown silt was encountered
from the original ground surface to about elevation 101 underlain by
fine sand which in turn was underlain by coarser sandy soils. At the
other borings, soft to moderately soft silt to silty clay was encoun-
tered from the original surface down to depths ranging from elevation
100 at 6-5 to elevation 90 at B-4 and B-60. At B-4 and B-60, the silt
contained interbedded sand. Below the silt, sandy soils were encoun-
tered which increased in compactness with depth.
Random fill has been placed partially at the location of the proposed
north primary structures and ranges up to elevation 132. At the boring
locations, the original ground surface was underlain with soft to moder-
ately soft sandy to clayey silt to depths ranging from elevation. 105
(B-14 and B-17) to elevation 110 (B-27) . Peat to peaty silt was encoun-
tered around or above sea level varying from elevation 103 (B-14) to
elevation 100 (B-23) . Generally sandy soils were encountered below the
peaty soil . Weathered or decomposed sandstone bedrock was reported at
elevation 96 in B-23 and elevation 55 in B-14.
The lettered series of borings (B-A through B-E) were drilled with
auger-type drilling equipment. Samples were not secured; however,
general identification of the subsoils reportedly was made on the basis
of the material on the auger flights. Moderately firm to soft alluvial
soils were logged from the original ground surface down to depths rang-
ing from elevation 105 at B-A to elevation 84 at B-E. Medium black sand
was logged at B-B and B-C down to elevation 102 and 97, respectively.
Decomposed sandstone (?) was reported at depths ranging from elevation
104 (B-A) to elevation 84 (B-E) .
Converse Ward Davis Dixon,Inc.
-6-
As reported by Metropolitan Engineers during the previous investiga-
tions, groundwater observations were made of the water levels in the
borings at the time they were drilled. In December 1967, eight piezom-
eters were installed at various locations around the plant site to ob-
serve the fluctuation of groundwater throughout the year. These con-
sisted of Clayton well point screens with 1 1/4-inch diameter PVC riser
pipes to the existing grade. The tips were set at depths of 21 to 38
feet below the then present ground level , i .e., elevation 85 to eleva-
tion 98. The locations of the piezometers are. shown in Appendix .B and
the measured groundwater elevations are tabulated at the upper right of
the plate.
The measurements show that the groundwater level fluctuates over the
year--being higher in the winter months and lower in the late summer.
The maximum groundwater level observed in the piezometers was elevation
112 and the minimum was elevation 107--the difference in water levels
between piezometer locations on a given day ranged from 0.6 foot to 1.4
feet.
DISCUSSION AND RECOMMENDATIONS
General
It is understood that the foundation levels for the planned Phase I
Expansion structures will range from elevation 102.5 at the center of
the secondary sedimentation structures to elevation 121 at the primary
treatment structures. Based on our review of the settlement records of
the existing structures, it is concluded that .preload filling will
permit the structures to be supported by foundation slabs and footings
provided comparable settlements are acceptable. Subject to the recom-
mendations discussed below, satisfactory behavior of the structures may
be anticipated following construction.
{ Converse Ward Davis Dixon,Inc.
-7-
Settlement Record Review
Prior to fill placement during the previous contracts, settlement gauges
were installed either on the original ground or the excavation bottom
and periodic settlement measurements were taken during and following
filling. When construction at structure locations required abandonment
of the gauges, the records were transferred to nearby permanent settle-
ment points on the structures. Additional settlement points also were
• installed on the structures later to observe differential settlement
following construction.
At secondary sedimentation tanks 1S, 2S, 3S and 4S, the natural soils
were excavated to elevation 108, replaced with compacted fill to eleva-
tion 112 and random fill to elevation 125 during site preparation Con-
tract 61-5. Additional preload fill was placed to elevation 132 for 3
1/2 months prior to constructing the tanks. The tanks are supported
by a base slab at elevation 111.83 with the center sump extending to
elevation 108. During excavation and prior to pouring the base slab,
rebound measurements averaged 1.4 inches at the centers of the tanks.
Settlement points were established at the quarter points of the slabs
following slab pour and then transferred to the tops of the walls prior
to backfilling. The settlements from slab pour in September 1963 to
February 1980 are shown at the upper part of Drawing 2.
Partial preload fill was placed for tanks 5S, 6S, 7S and 8S during Con-
tract 62-6. Placed directly on the original ground surface, the random
fill varied from elevation 127 on the west to about elevation 121 on the
east. Additional preload fill was placed to elevation 132 for seven
months prior to constructing these tanks in 1972. The tank base slabs
are at elevation 107.75 with the center sump base at elevation 102.5 and
are supported on six inches of drain rock and six inches of uncompacted
granular fill placed directly on the natural soils. The settlements
which have occurred since completion of the. tank walls are shown at the
lower right of Drawing 2.
Converse Ward Davis Dixon,Inc.
-8-
For the purpose of comparing the two support methods, the settlements of
tanks 1S through 4S following wall completion are shown for a similar
time period at the lower left of Drawing 2. As shown, tanks 5S through
8S have settled about 65 percent more than tanks 1S through 4S in the
first 7 1/2 years following construction. In part, it is believed that
this is due primarily to the compacted fill reducing the rebound and
thus the recompression under the earlier tanks.
Constructed in 1963-1964, the existing aeration structure is supported
on compacted fill at about elevation 111. The natural soils were exca-
vated to elevation 108 and replaced with compacted fill to elevation 112
and random fill to elevation 125 under the site preparation contract.
Continuous records since construction are available only for the north-
west corner where 2 1/2 inches of settlement has been measured from Sep-
tember 1963 to February 1980. However, additional settlement points
were established in September 1970. The observed settlements from that
time to February 1980 are shown at the right of Drawing 3. During that
period of 9 1/2 years, about 70 percent of the settlement occurred in
the first 5 1/2 years and about 30 percent in the next four years as
shown at the left of Drawing 3. The average settlement rate reduced
from about 0.1 inch per year for those first 5 1/2 years to 0.05 inch
per year over the latter four years.
The existing primary treatment structures are supported on compacted
fill placed during the initial site preparation contract. The easterly
structure was constructed in 1963-1964 and settlements of about 1/2 inch
at the northeast corner, one inch at the northwest corner and about 2
1/2 inches at the center have been measured through February 1980. At
the center, two inches occurred in the first nine years and about 1/2
inch in the next seven years. The westerly structure was constructed in
1971-1972. From February 1972 to February 1980, settlements of about
1/2 inch were observed at the northeast and northwest corners over the
deeper hopper sections and about 3/4 inch to one inch at the high level
tank section.
Converse Ward Davis Dixon,Inc.
-9-
On-site Borrow Area Excavation
It is understood that the high ground northeast of the plant is under
consideration as a source of fill for site preparation. Designated
Borrow Area A on Drawing 1, the ground rises to about elevation 200. A
portion of the knob was excavated during Contract 61-5 and the material
used as random fill . Towards the lower part of the excavation, it was
necessary to rip the material with a dozer. In general , the material .
could be loaded by scrapers; however, some rock fragments up to five
feet in diameter could not be ripped. Difficulty was experienced in
handling the material in wet weather.
A boring B-1 drilled during the initial site exploration extended to
elevation 120. As shown by the boring log in Appendix B, weathered to
fresh unaltered sandstone, andesite and tuffaceous breccia was encoun-
tered in the boring. The boring data and surface reconnaissance was
supplemented by four test pits dug with a backhoe at the locations shown
on Drawing 1. While some sandy silt was encountered at the surface of
TP-3 and TP-4, predominantly silty clay to clayey silt (highly weathered
rock) was encountered down four feet to seven feet where refusal was met
with an International Harvester 3414 backhoe.
Sieve analyses run on representative samples from the test pits indi-
cated that 35 to 64 percent of the material was finer than the No. 200
sieve. Because of the high silt/clay content, the material will be
quite sensitive to increases in moisture content and would be easily
disturbed by construction traffic when wet. Because of these charac-
teristics, the material will be difficult to handle in wet weather. The
material would be acceptable as random or area fill for preload weight.
Borrow Area B is located in the dike at the east property boundary.
Constructed as part of Contract 71-6, the dike contains unclassified
material , including topsoil , and is assumed 'to be quite variable. It is
expected that most, if not all , of the material would be moisture sensi-
tive and difficult to handle in wet weather.
Converse Ward Davis Dixon,Inc.
-10-
Site Preparation
The planned foundation levels will extend into the underlying natural
1 soils, except at the high level part of the primary treatment structure.
Based on our review of the settlement records of the existing struc-
tures, it is recommended that preload fills be placed for the proposed
secondary sedimentation structures and the primary treatment structures.
Fill need not be placed for the aeration structures.
At the secondary sedimentation structure, it is recommended that the
area be preloaded to elevation 132 for a period of at least six months
before constructing the units. The preload fill should extend ten feet
outside the tank periphery on the west and east and slope down at not
steeper than 1H:1V (horizontal to vertical ) to the west and 2H:1V to the
east. .. At the south, the fill should extend at least ten feet south of
the north wall of the chlorine contact channel and slope down to the
crest of the dike. At. the north, the fill should extend across the
location of the mixed liquor channel and slope down at not steeper than
3H: 1V, but preferably to the crest of the dike.
At the primary treatment structures, it is recommended that the fill be
placed to elevation 130 and extend at least 30 feet beyond the limits of
the structures and slope down at 5H: 1V. It is recommended that the pre-
load fill remain in place at least six months before constructing the
structures. The time the actual preload fill is left in place will de-
pend on the settlement rates which occur.
Where the fill will be placed on the existing original ground surface,
it is recommended that the existing sod or grassy surface remain and not
be stripped or broken. Removal of this organic mat would destroy the
supporting value of the surface and cause soft or rubbery spots to
develop during initial fill placement. Trees and brush should be cut
off at the surface. At the primary structures, topsoil and sod should
be stripped from the existing fill area between elevation 122 and eleva-
' tion 118. The new fill should be notched into the existing slopes.
i .
Converse Ward Davis Dixon,Inc.
-11-
Random fill has already been placed below foundation level over part of
the primary structure location. Therefore, random fill may be used for
the new fill at both the primary structures and the secondary sedimenta-
tion structures. The material for random fill may be any type provided
that it does not contain organic matter or debris and that it can be
satisfactorily placed, operated across, and be susceptible to sufficient
compaction in order that future settlement of the fill itself will not
be objectionable.
The use of granular material for preload random fill would have the ad-
vantages of rapid placement, easy compaction, placement could continue
during periods of inclement weather, and the granular material could be
used later for backfill around structures. Granular material meeting
gradation of Metro Type A or Type B material would be acceptable. How-
ever, the selection of random fill material could be left to the con-
tractor subject to the recommendation that, if the material is at exces-
sive moisture content or such that during wet weather construction
equipment cannot operate across the fill without heavy rutting, the work
should be suspended until satisfactory operations can be resumed.
It is recommended that the random fill be placed in 12-inch loose hori-
zontal layers and be compacted. If granular material is used, it is our
opinion that adequate compaction can be obtained by routing the hauling
equipment evenly across the layer so as to give complete coverage before
i ,
placing additional layers. If clayey or silty soils are used, it is
recommended that compaction be obtained with at least two complete
passes of a loaded sheepsfoot roller, each layer being compacted before
additional layers are placed. In addition, the hauling units should be
routed so as to give even distribution over the fill layers.
Consolidation of the underlying compressible soils will occur under the
weight of the preload fills. This will be reflected as settlement of
the fill and the original ground surface. In addition to soil con-
ditions, the settlement will also vary with fill height. At the secon-
dary sedimentation' structures, settlement analyses indicate that fill
settlement for B-59 conditions and fill to elevation 132 above original
Converse Ward Davis Dixon,Inc.
-12-
ground' surface is expected to range from six to eight inches. For B-12
soil conditions and similar fill depths, the settlement is expected to
range from four to six inches. The settlements of course will be less
where existing fill is already in place, probably on the order of about
two inches where the fill is presently at elevation 126.
At the primary structures, existing fill ranges up to elevation 132. At
the southeast corner of .the easterly structure, the ground surface is
presently at about elevation 123. Based on B-17 soil conditions and
fill to elevation 130, it is estimated that the settlement will be about
four inches. For B-B conditions at the northeast corner, settlement on
the order of 8 to 12 inches is expected. Near B-C,. it is expected that
six to eight inches of settlement will occur. It is expected that the
settlement near the northwest corner will be less than two inches.
Allowable Bearing Values
The proposed secondary sedimentation structures are understood to be
similar to tanks 5S through 7S and will be supported at elevation 107.75
with the center sump at elevation 102.5. The 135-foot by 345-foot
aertion structure will be supported at about elevation 111 with the RAS
pipes founded at elevation 107.5. These structures will extend beneath
the existing fills into the underlying natural soils. Similarly, the
primary structure hoppers extend to elevation 106 and will be supported
on natural soils. The base of the high level slab will range from ele-
vati on 119.5 adjacent to the hoppers to elevation 121 at the north end
and be supported on random fill .
The allowable bearing values will be controlled by settlement rather
than soil strength. The supporting soils will have been preloaded by
fill . The existing structures supported on the natural and fill soils
have performed satisfactorily where bearing pressures have not exceeded
preload pressures by about 500 pounds per square foot (psf) . In view of
this performance, an allowable bearing value of preload stress plus 500
psf at the foundation level may be utilized for dead plus permanently-
applied live load. This bearing value may be increased by one-third for
short-term wind and seismic loading.
Converse Ward Davis Dixon,Inc.
-13-
It is understood that pressure relief valves will be installed in the
base slabs to reduce the hydrostatic uplift during maintenance. A six-.
inch layer of drain rock should be placed beneath the slab to provide
a drainage path to the relief valves. For an area two feet square at
each valve, the thickness of the drain rock should be increased to 12
inches. To prevent the penetration of concrete into the drain rock
during pouring, a plastic membrane should be provided beneath the slab.
Material meeting the following gradation requirements would be satis-
factory for use as drain rock:
U.S. Standard Percent Passing,
Sieve Size by Dry Weight
1 1/2 inch 100
3/8 inch 0 - 2
It is recommended that a filter layer at least six inches thick be pro-
vided between the bottom of the drain rock and the top of the subgrade
material . Material meeting the following Metro Type A gradation re-
quirements would be acceptable: _....
U.S. Standard Percent Passing,
Sieve Size by Dry Weight
3/4 inch 100
3/8 inch 70 - 100
No. 4 55 - 100
No. 10 35 - 95
No. 20 20 - 80
No. 40 10 - 55
No. 100 0 - 2
Excavation
The proposed construction will require excavation into the underlying
natural soils. It was reported that during the initial site prepara-
tion (Contract 61-5) the repeated passage of excavation equipment caused
"pumping" or "boil" conditions in the natural soils at various locations
Converse Ward Davis Dixon,Inc.
-14-
on the site. Metropolitan Engineers recommended that the operation of
construction equipment below elevation 115 be restricted to prevent dam-
1 age to the supporting foundation soils. Where the total of all equip-
ment passages over the same spot did not exceed three passes per day,
operation of construction equipment was permitted between elevation 115
and elevation 112. Except for small compaction equipment, no equipment
was operated directly on natural or fill foundation soils below eleva-
tion 112.
It is understood that this was satisfactory and we concur in this recom-
mendation for construction of the structures.
Groundwater Control
Provisions must be made for the proper groundwater control in view of
the depth of excavation required below the observed groundwater table.
The silty fine to very fine sandy or clayey silt soils may not yield
troublesome quantities of water because of their less permeable nature
than the coarse granular materials. However, seepage caused by the
groundwater trying to flow into the bottom during excavation can cause a
softening and loosening of the bottom and a resulting loss of strength
of these soils.
It will be necessary to excavate into sands which underlie or are inter-
bedded with finer-grained soils. Since these sands are below the water
table, they will be water-bearing and under a hydrostatic head that will
be equal to the depth below the groundwater table. If these underly-
ing or interbedded soils are not dewatered prior to excavation, they
will form "boils" or become "quick" when encountered in the excavations.
This can also occur where the excavation does not extend completely down
to the sands but a layer of silty soil remains at the bottom of the
excavation. It is recommended that the static water level be drawn down
and maintained during construction at least two feet below the base of
the excavation, to minimize or eliminate "quick" or "boil " conditions
in the supporting soils. In certain instances, pressure relief of an
underlying sand layer will be necessary. Since observing the static
Converse Ward Davis Dixon,Inc.
-15-
groundwater level within or immediately underlying the excavation will
not necessarily reflect the hydrostatic pressure conditions underlying
the silty layers, liberal use of piezometers or observation well points
is advisable. Of course, dewatering systems should not be shut down
during off-work hours, on weekends or holidays until the structures are
constructed and backfilling completed to at least the static groundwater
level and adequate resistance to uplift is attained.
On the basis of the piezometer measurements, groundwater will be encoun-
tered in open excavations at elevations between elevation 112 and eleva-
tion 107, depending on the time of the year. The static water level
should be drawn down and maintained at least two feet below final exca-
vation grade during excavation to prevent damage to the foundation
soils. Where limited excavations extend three feet or less below the
natural groundwater levels, cased open sumps could be permitted for
dewatering provided they are properly filtered to prevent the removal of
fines. Excavations extending below that depth will require well points.
Sanding around the well points will be necessary to provide filtering as
well as drainage of interbedded sand layers or lenses.
Dewatering of excavations will be necessary adjacent to existing struc-
tures. Therefore, the installation and operation of dewatering systems
should be carefully carried out so as not to damage or endanger the
existing structures.
Backfill
Much of the on-site excavated material will be saturated silty very fine
to fine sand or clayey silt. Because of the high moisture content, it
will not be possible to properly compact these soils. Where subsequent
backfill settlement is not a consideration, excavated material can be
used for backfill . Where some moderate settlement can be tolerated, im-
ported granular material or select sandy or gravelly excavated material
meeting Metro Type A or Type B gradation should be used. Metro Type B
gradation is:
Converse Ward.Davis Dixon,Inc.
-16-
U.S. Standard Percent Passing,
Sieve Size by Dry Weight
3 inch 100
1 1/2 inch 95 - 100
No. 4 35 - 100
No. 10 10 - 100
No. 40 0 - 60
j No. 100 0 - 30
No. 200 0 - 10
The uniformity coefficient should be 2.5 or greater.
The Type A and Type B material should be placed in layers not exceeding
two feet in thickness and each layer compacted by two passes of a
mechanical compactor such as a vibratory plate or a vibratory drum
roller.
Where backfill settlement must be restricted, it is recommended that
Type A or Type B material be used for backfill . The material should
be placed in eight- to ten-inch thick loose layers and each layer be
compacted by mechanical or power-operated compaction equipment to 95
percent of the maximum dry density as determined by ASTM D698, method D
prior to placing subsequent lifts. Where the backfill will be used to .
support foundations or will be placed lower than adjacent foundations,
it is recommended that the backfill be compacted to 100 percent of the
ASTM D698, method D maximum dry density. Around structures ,and behind
retaining walls, if it will not be used to support foundations, it is
recommended that the backfill be compacted to 95 percent of the ASTM
D698, method D maximum dry density.
Lateral Earth Pressures
The lateral earth pressure against backfilled walls is dependent on the
properties of the backfill , the stiffness of the wall , and the slope
above the wall . The majority, if not all , of the walls are understood
Converse Ward Davis Dixon,Inc.
-17-
to be rigid walls in that they are restrained from yielding or deflect-
ing laterally at the top a distance equal to 0.005 times the wall
height. Thus, the lateral wall pressures are "at rest" and are greater
than those for the "active" condition where yield is permitted.
Assuming that compacted granular backfill will be placed, it is recom-
mended that the walls be designed for a lateral equivalent fluid pres-
sure of 55 pounds per cubic foot (pcf) above and 90 pcf below the
groundwater table for a rigid wall retaining a level backfill . The
latter figure includes the hydrostatic pressure.
For an unrestrained wall , it is recommended that a lateral equivalent
fluid pressure of 35 pcf above and 80 pcf below the groundwater table be
used for level backfill .
Structure Uplift Resistance
The groundwater was observed to range from elevation 112 to elevation
107 in the piezometers. As discussed earlier, the groundwater is. ex-
pected to fluctuate with the seasons. In addition, groundwater levels
will be influenced by site subsurface drain systems.
The majority of the structures will extend below the groundwater level
to various depths. Thus, they will be subjected to uplift forces due to
hydrostatic pressures acting on the base of the structures. The weight
of the structures may not be sufficient to resist the uplift forces. If
not, additional resistance to uplift would be provided by soil friction
on the walls from the compacted backfill . An increasing value of 20
pounds per square foot per foot of depth (psf/f) may be used above the
water table and 10 psf/f below.
Alternately, the base slab could be extended beyond the walls and the
weight of the backfill above the slab lip utilized. The backfill unit
weight may be taken as 130 pcf above and below the water table. This
includes hydrostatic pressure below the water table. For this configu-
ration, the additional resistance to uplift will be provided by soil
Converse Ward Davis Dixon,Inc.
-18-
friction acting across a vertical plane extending up from the edge of
the slab lip rather than soil friction against the wall . Values of 25
psf/f above and 12 psf/f below the water table may be used.
Settlement Measurements
As pointed out in previous reports, the observation of foundation be-
havior is a vital necessity in the effective utilization of this site.
This is particularly important during and following site preparation and
the Phase I expansion since these structures will be supported directly .
on natural soils rather than on previously-prepared and preloaded com-
acted foundation fill used forth
e p t e existing structures. Therefore,
every effort should be made to maintain continuous records of the set-
tlement gauges during and following this construction. While it should
be the contractor's responsibility to protect the gauges, measurements
should be taken by the engineer.
The gauges must be protected from damage at all times. Where additional
preload fill is to be placed, existing gauges should be extended. Dur-
ing excavation, the riser pipes should be periodically reduced. Accur-
ate elevation measurements should be made immediately before and after
each extension or reduction of the riser pipes. Where possible, gauge
measurements should be transferred to permanent points on structures to
maintain observation continuity.
Where new fill is to be placed as part of this contract, additional
settlement gauges should be installed to observe settlement behavior
prior to placing the fill . The recommended locations for these addi-
tional gauges are shown on Drawing 4.
Limitations
The findings and recommendations of this report were prepared in accord-
ance with generally accepted professional engineering principles and
practice. We make no other warranty, either express or implied. The
findings and recommendations are based on the results of the field and
Converse Ward Davis Dixon,Inc.
-19-
laboratory investigations, combined with an interpolation of reported
soil conditions between boring and test pit locations. If conditions
are encountered during construction that appear to be different from
those shown by the borings and test pits, this office should be notified
so that we may review and verify or modify our recommendations.
Respectfully submitted,
CONVERSE WARD DAVIS DIXON, INC.
c'°�Eugene R. McMaster a ��� L:; � .�t�
Vice President W " — + 13
�
ERM/kpp `"
o
(10 copies submitted) {. '/ONO' '
Converse Ward Davis Dixon,Inc.
‘ \--\ \ , \ \ \ - x�l[` IILI\ / , 1 I
/ \\ it t410,,:„. •\'‘‘C.\.‘
\I
•
`��,'\ \ �'Ill` \`\ \\\ ' 1 \ 1 I I i I II I \ • \1
III\\ \\\ ,\ I` 11 \ \ \ /'\\ \\ r\ •
\\ -I:::,\Itl\/:/\11:IIII ' I' 1 I \ 0 1110ral1"
\ \ ..�\ \ '\ `�\\1 1 \ I \ oli r I ' t \ \ ` \ \ 1 \
, \ — \ / 1, ii,,. t_ \ '-°-
•
11.1111. l'i i 1 i r t„, , r 1 1 I , / ,, , \ . s t t-tr —
•
EXIST. WATER \ .1/s' ' r 11 a L ` li110 , \ ,,
STORAGE TANK :2, \ r, �� ; i\ m r ' `
, ,, :
If BCIRROW AREA " " ;i;''.; I �\.............. \ '\
, , , -.,& ... : : ,.. -
\\\\ i
gyp_` ;�,.,\6�',/ �� /,�,,, ,
•
i'I \\\\ t1 I\III I/ , , 0� ' p'' I I I �r\`` , \ r ^' ,..
..AYAJED , I ,,/3 , I , I
\ 1.' B— r I , I /� /��// ice``\ , i 1 I � ` it,,",,,,, \. �_\a
`\ CO1dZR1�CT ,) 1 \I�\l I • J•BrB 'l /i-- �.. %„/'�ii%\ \, \�\ �`` / \ a ji '\ ,Ii11 \� 'p�
\ y \ 1 ,r'" ; i2.` ii/ ,tl I...-���5��!�� --��\\\\ ;� r I'1 I • Nr 'Ira
' %�4 `=.i7,,:ii/1,',c�,��5,����' \\\\\\\\ I ''I,\
\%.� �;�\>�"' ,1 4'�', ..� \\ I, ///I"/z. �`. `- r_;�' sue� \\\\\\\\\ \, I `�`\ BbR�OW AREA,, « n�• ,', ,; ,„- - r, '�'I \ \,�C1. ? _li .k , //i,�/ `ir. ,I'f4'aIS��' � \\\\\\\\\ 1 ' `\` , _ 'i 1 \ ,\\
-23 . r :,1 `',1i \ic\ Ur /r •r ,''i-.-!-sc ? ,-g5:s126 \\\\\ . I I _ N -- / \
RY,i ti
1 .tRPt\ON .i+.�' 133 B-27 B—1 7 1\1,,,`o\I\\„ r �\\\Ilk,.
`` �`••� 1, 11
I rry 0 P o\N� P 'gt;R • B—6 0 ,, \ ,, ; �,��' ���� . -
1 j V tit' 0U\L P�M O i\'\`,\\�,II\, \ 1 ` ����ii�_ ��;1^ ' ' O \ \
B-14 • 6V\\,�\NG •t\ON AA.RF- ,\"i,\I\;�` \ ,`'i � � •
/^..- 1' o \ \
1 ti0 oc
P ^k ;;, G`\\\._ �\►�,,O ct
a 1.
\% \ !lfl�C1 v\Gt R "u \1 / Z % \
s REP SIR ?,\\\ //j / pp� f� ,2 f
I ‘I 1 \
oitt
-.
`\ e ems_, __
/ N ` \'\\ ,,\\fit,,,•,,,,
\ / m ii k3c 15
• 1
5
,.-.,-,_\ `•t,,N_-___
--,,,,.
\
B- i • � ' CPC\0 " '‘\'\ / i r ,
.r1e_ --41[. _ - Fe Q\ME 7S `,e t`I \\i\\,' ,/ 1 � ' 0 _ -�
NPNGE ' r R`! 3S : ss _ \ 1 �WO /� 1 - - --- ,j1d 1j5
•,,,:\ '» ttPe�\Lp\N r 1 S SSG 1 \i 0 .\ , -�y., S 8S i
,:'
VFtE \ Ar. r o
-..,? a NZ pNG 4 S S11° "
• P I J
100 0 100 200 ' -1I26 - — _
a --
SCALE IN FEET
SITE PLAN
LEGEND: RENTON PLANT - PHASE 1 EXPANSION SITE PREPARATION Scale NOTED Project No.
Renton, Washin ton Date 81-5148
B-1 • Approximate boring location (from previous exploration) g JULY 1981
for Municipality of Metropolitan Seattle Prepared by JM Drawing No
TP-1 ■ Approximate test pit location .
Checked by ERM 1
ConverseWard Davis Dixon Geotechnical Consultants Approved by ERM
1.34 1.32
1.28 1 S 1.24 1.50 3S 1.96
1.22 1.13
1.52 1.35
1.67 2S 1.48 1.66 4S 1.63 6S 8S
1.88 1.22
SETTLEMENT OF FIRST FOUR SECONDARY
SEDIMENTATION TANKS AT QUARTER POINTS
FROM SEPT 1963 TO FEB 1980*
•
.64 .60 1.6 1.08
.86 1 S .73 .60 3S .97 1.19 5S 1.24 . 1.14 7S 1.46
.71 .65 1.24 1.31
I....70 .54 1.36 1.22
.86 2S .67 .71 48 .86 1.18 6S 1.08 1.12 8S 1.22
1.03 .78 1.15 1.12
0
0
FROM MAR1964 FROM OCT' 1972
TO JUNE 1971 TO FEB 1980
SETTLEMENT OF EXISTING SECONDARY SEDIMENTATION TANKS AT QUARTER POINTS*
0
* Settlement in inches
a
a
Q ..
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
CO Renton, Washington 81-5148
n for Municipality of Metropolitan Seattle
23
Drawing No.
0 fl*
r
,��► �onverseWardDavisDixon Geotechnical Consultants 2
„O 'm+,...,-:*- '$•'41:7,04" it-5*!1ito..S.N 4-'--, _ .4. .0 t 4C-' ,,-tt .>. +,.--•Jk..1SCP S01,k'7 :w'.-. rr 44A4A,.-ti,a4A,rxat„a t ;,. _ti-.0••
h.8 ..>sa..•F;'.: ...�^xa...••r.. ,r 1 a-'1r ram:..•r.. �;M_r�y: S-air: .r.�r.6+: ;r::,<.r r„:.ae+uC:.'.aa: "W",.+..=,-.1. r,:rt t, •.._ .. •Vr?'.
•
FROM SEPT 1970 TO FEB 1980
.58 .88 .88
•
•
.88 .60 .92
•
•
.41 .47 .60
•
FROM MAR 1976 TO FEB 1980
•
.22 .30 .31
•
•
•
.26 .20 * .32
.16 .11 .13 •
_ c
0
0
* Settlement in inches
0
SETTLEMENT OF EXISTING AERATION TANKS
a
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION ProjectNo.
•
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
`jon,/erJceY1/ard®aV{SD{x®{7 Geotechnical Consultants . 3
ryv�ia :M^,,7-r��,,.; n. .,.?Ny^rt i."w!i; ,'i::'?'�i`. arwvr.�+'r:*rx`r. w. ..,'ic,f:+�t.i.:;3 r:K, r;r'e,,3`�='.a a`z.?laraq=`rs1.,,:r 0.... � uFms d,„ 2 .o.. r`u..: . ,h�5'i. . _x
ti..,�'Ksl+'+ •a•r':.,��ecAr,i."Ti^4pst`i�.,*S'`,!.`.ga.0k? LL- .. a�Y1n''i.. m:,^vs,,•nS.p..M i1.4",:,.'`t.,.. v'.,-a l..ii..p5aRi.r,v'c:i:',.",..;10F" n,...y„1, 4,04000tvetttl>T,S?4;
?"Q st'D. ex-
met I-3/3?"Hot&
,_— IN 70f'Of CAP
I
c.I
NI f/NAG f/GG I.RAD: •
?''Sr0.. PIPE TYR
I SOJC PLACED AROUND gA4e 8-5/8°¢eo6T$ compare
,°Cq. PIPE TO Imp fNGG P ACeatENT W/r/eX.NUTS-,OtT up 7JGHT
CPGq. rYP.
J'r... ORIt6 /2-3/3Z"HOtdS. ,
C4 HOLtS IN 7i/ d 6EVe6S o
- SPACE-0 ?"J re- 4 HOCES
(N MC/' GeVEG 5HAG6 BE • 11".
v .
j
DRIGGED fl 70°L. 1111
'TYP
?" srD PJPE
COUPGNC ?LAYERS Of ?x 6 ROUH D.f
CONTkw!) mo // kg SP/MD TO95THe e
_aim ally. gR0UN0
ELEVATION PLAN
NO SCALE NO SCALE
INSTALLATION PROCEDURE
1. THE SETTLEMENT GAGE SHALL BE INSTALLED ON THE NATURAL GROUND SURFACE OR
ON THE EXCAVATION BOTTOM PRIOR TO FILL PLACEMENT AT THE LOCATIONS INDICATED
IN THE TABLE BELOW. INSTALLATION SHALL BE UNDER THE SUPERVISION OF THE
ENGINEER.
2. THE BASE OF THE SETTLEMENT GAGE SHALL BE CAREFULLY BEDDED ON A THREE-INCH
LAYER OF PAVING SAND SUCH THAT UNIFORM BEARING OVER THE ENTIRE BASE IS
OBTAINED.
3. THE FIRST PIPE SECTION SHALL BE INSTALLED AND THE JOINTS TIGHTENED FIRMLY
WITH WRENCHES. THE PIPE SHALL BE ERECTED PLUMB BY ADJUSTMENT OF THE GRAN-
ULAR FILL UNDER THE BASE AND CHECKED WITH A CARPENTER'S LEVEL.
4. HAND COMPACTED GRANULAR FILL SHALL BE PLACED AROUND AND ABOVE THE BASE OF
THE GAGE FOR A MINIMUM HEIGHT OF THREE FEET. THE HAND COMPACTED FILL
SHALL PROVIDE THE NECESSARY STABILITY FOR THE SETTLEMENT GAGE DURING THE
INITIAL FILL PLACEMENT.
5. THE CONTRACTOR SHALL ADD PIPE SECTIONS TO THE GAGES AS THE FILL PLACEMENT I SETTLEMENT TOTAL COORDINATES
a PROCEEDS. THE MAXIMUM LENGTH OF ANY PIPE SECTION SHALL BE SIX FEET. AS GAGE PIPE LENGTH N E
EACH SECTION IS ADDED, HAND COMPACTED FILL OF THE SPECIFIED TYPE AND COM- A 20 15 FEET 525 2750
PACTION FOR THAT LOCATION SHALL BE PLACED AROUND THE PIPE SECTION. THE A 21 16 FEET 410 2750
LEVEL OF THE HAND COMPACTED FILL SHALL BE MAINTAINED AT OR ABOVE THE LEVEL A 22 16 FEET 525 2910
OF THE IMMEDIATE ADJACENT MACHINE PLACED FILL. A 23 19 FEET 410 2910
6. THE GAGES SHALL BE PROTECTED BY HEAVY TIMBER RAILINGS TO PROTECT THE GAGE A 24 9 FEET 1070 1860
AGAINST THE IMPACT OF CONSTRUCTION EQUIPMENT AND SHALL BE MARKED BY A MARK- A 25 15 FEET 1300 1860
ER TRIPOD DURING THE ENTIRE FILL PLACEMENT. THE TRIPOD SHALL BE OF SUCH A A 26 11 FEET 1190 1720
HEIGHT AS TO BE CLEARLY VISIBLE TO EQUIPMENT OPERATORS. A FLASHER OR RO- A 27 14 FEET 1300 1720
o TATING TYPE LANTERN SHALL BE ATTACHED TO THE TRIPOD AND KEPT LIGHTED DURING A 28 5 FEET 1300 1550
•io OPERATIONS TO SERVE AS WARNING TO EQUIPMENT OPERATORS.
U
.O
m
O
V
>
2
a. NEW SETTLEMENT GAGE LOCATIONS
a.
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
Renton, Washington 81-5148
In for Municipality of Metropolitan Seattle
- o
o Drawing No.
z ConverseWard Davis®Oxon Geotechnical Consultants 4
f
c,
0 *, n.' -.g.u'�`. titwFi .vt,v-::..3o. ,e.,,4„,,.;Ni i c .•fir 'a t"F: t-R a li' ,,,,:a 0 �i
x
4I
a)
1\ ert-ton itx A
161
APPENDIX A
FIELD_ EXPLORATIONS AND LABORATORY TESTING
The supplementary exploration of Borrow Area A was carried out by
digging a series of four test pits (TP-1 through TP-4) at the locations
indicated on Drawing 1.
} The test pits were excavated with a tractor-mounted backhoe (Interna-
tional Harvester model 3414 furnished and operated by Metro) capable of
penetrating to depths of about 12 feet. The logging and sampling of the
the test pits was carried out under the continuous supervision of our
soils engineer at the time of the excavation. In addition, groundwater
conditions and the stability of the excavated tests pit walls were
noted. . Representative bulk samples of the soils encountered were se-
cured for visual examination, classification and limited laboratory
testing. The soils encountered are shown on the test pit logs, Drawings
A-1 through A-4. _ _
All test pits were backfilled at the conclusion of the field explora-
tion. . Test pit locations and elevations were determined by taping and
hand leveling based on topographic maps furnished by you.
Representative samples obtained from the test pits were subjected to
limited laboratory tests. As an aid in evaluating the suitability for
use of fill , sieve analyses were run on certain soil samples. The
resulting grain-size distribution curves are presented on Drawings A-5
and A-6.
Converse Ward Davis Dixon,Inc.
**WO:.,:>t k.Mx,;''i'i4tM7ti��',Y�'Y" i �-'}wp'�"'r"�'�,- ..4;4*,-51a`"•'�$v;aWa'v`.�+ira��"4nk�S�t�.""v`+ �^��"`?7" Skc ''"% `t-t'K. .�'M�w3^a��'��y':"^.k«,�.vtsa!�Wn`;: .�"'7 c`''.M-R�v.��``✓?.a+ti+:.,+;""ais:0.
LOG OF TEST PIT NO. 1
Location: Borrow Area A Elevation: Approx. 168
Surface Conditions: Grass
at
o .0 DESCRIPTION REMARKS
3 N V
light brown to brown, fine
1- to medium sand, some gravel ;
slightly moist, med. dense abundant weatherer
2-� 1 SM CLAYEY, SANDY SILT light brown silt differen- rock which may be
broken by hand to
ti ted from brown silt by
3- 70� dip to south clayey silt
4-,
5-
= becomes dense at 52' as
6- noted by operator
7
Bottom of test pit at depth 7' due to refusal with
8" International Harvester 3414 Backhoe
Very minor sloughing
9- No groundwater -encountered
Completed 6/26/81 .
10-
11-
12-
13-
14-
-` 15
r ... .... S'i:i .Ir.rl..t.,E:'.r WsR:%. -,�...P x . �.h.i revf.'1 'e":..1...,. n...k..:r..-.[�. .:....i k1. '+..i..':,.i.rur rl,f •r:..w.ri .1 '..Y.'it- .. `f+ . .,
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION ProlectNo.
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
ConverseWard Davis Dixon Geotechnical Consultants A— 1
J+,uraa?:f1-4 iaF� _ �. k:. _:. :w.;"' ,, cr.T;Y; ?.
�.: '*`a„ s;'�.:cR���.T i���'��,,n?> '".',�• �r-+' `�'� v. �_aa�.:�''�' r�''�
LOG OF TEST PIT NO. 2
Location: Borrow Area A Elevation: Approx. 182
Surfiace Conditions: Tall weeds & grass
a,} y -8 DESCRIPTION REMARKS
c o a
N
light brown, brown, dark
1- brown, intermixed with
clayey silt, little gravel highly weathered
2- SILTY CLAY and fine sand; slightl moist rock up to 6" dia.
medium dense easily hand broker
to silty clay &
3- 1 . . clayey silt
4- grades to gray-brown, clayey SILT;
slightly moist, medium dense
5-
6-
7
$ Bottom of test pit at depth 7' due to refusal with
International •Harvester 3414 Backhoe
Very minor sloughing
9- No groundwater encountered
Completed 6/26/81
10-1
11-
12-
13-
14-
15
ro
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
Converse and Davos Dixon Geotechnical Consultants A-2
b r { 0a~^3 610.:. °`Y'i. .* 3 .. . > rlia2
�t:"b - r€•'•� ,, �"�, k< a`..�w,��;�';""t. •a.t,.�;3«:"� S"'.'�'�.«" Itx'�� u`+��,.`�;J4�� X;��} •;�'.R�3,e�,'",,a'��� w�$x,� :• �, 2'u�'°? '.ae''`r�`;2��.� ".?t�'a?cr o ;
LOG OF TEST PIT NO. 3
Locations Base of Borrow Area A Elevation: Approx. 130
Surface Conditions: Shrubs, balckberry bushes
(1)
,+? .' E 4 DESCRIPTION REMARKS
0 c
SANDY SILT dk. brown, organics; slightly
1- ____ (Toesoil ) moist, loose
SANDY SILT light brown to brown, some
2- ____ clay; sl . moist, med. dense
CLAYEY SILT brown, some fine sand;
3- slightly moist, med. dense weathered rock
which can be easily
4 1 indistinct bedding, broken to clayey
undeterminable dip
5-
silt
6-
•
Bottom of test pit at depth 62' due to refusal with
International Harvester 3414 Backhoe
8 No sloughing
No groundwater encountered
9~ Completed 6/26/81
10-
11-
12-
13-
14-
15 •
0
`o
a
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
Convers°4.'1f and Davis Dixon Geotechnical Consultants A-3
;,;. ,,, r ? i t
LOG OF TEST PIT NO. 4
Location: Base of Borrow Area A Elevation: Approx. 132
Surface Conditions: Blackberry bushes, trees
a151
, - DESCRIPTION REMARKS
.0 0, V)) V)
SANDY SILT dk. . brown, organics;
1- (Topsoil ) slightly moist, loose ___ _
'light'brown to dark brown, abundant, highly.
CLAYEY SILT some fine sand; slightly weathered rock up
2-
moist to moist, med. dense to 11/21 dia. may be
Indistinct bedding, undeter- broken .by hand to
3- 1 minable dip clayey silt
becomes. dense. at 2 2'
4- intermixed with gray, clayey
silt at 3' ; difficult diggirg/
5� Bottom of test pit at depth 4' due to refusal with
International Harvester 3414 Backhoe
No sloughing
6-, No groundwater encountered
Completed 6/26/81
7-�
8-
9-
10-
11-
12-
13-
14-
,
15
s
M:n-.=•M1n„..:r.=.✓d ..n:eY,.'.-k✓..'M;•..'R.+'.7*....i. '--r;r7•YaIUA• .b/i3,">$"WKaati'"' S t'+'.-SLw"23w.r,Cv..:.A.:L..,y.. •:m... +:'s..a... r:» ..Y.:..+_x.Y,,R.. -N. ^nrfi•".1iv.:.'.s. *+...rFi r, Project
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
Converse\Ward Davis Dixon Geotechnical Consultants
A-4
--.RAIM -•- -NALY----SOIL- ---",DESI• .N:0,--
t...
FC I. 02 - App7-----".pr pu,'-'--"'-.);n _ — . — .
, •
CLAY--->-.4( SILT >r SAND ), GRAVEL )
41E-------FINE-->•1*--MEDIUM--->i COARSE FINE-44--COARSE----).
SIEVE SIZE NUMBER 270 200 140 100 60 40 20 10 4 3/,
'a 3/4” 1" 1,ip 2" 3"
1/2
100- !ilk! l'i I-.i 1- i 7-11 ,717-1 ''F I 1 1-1 -1 i 7'7-'7 TIF-f171 -r71 -: .1 i.i I TIT-- -,1-ft tit':-•:q-ri-T1 TITI1,1'.1,-.- 1-I-i ::i--L1.•;iiii"'!:"--tti..7. 7;71 .Ttii 71-Tt'71'.--; : 1 i 1 - 'ii.1 T,7[111,... 7';''.I jii, 111.:•:,
1
11-'1'111111--'-1"-1111 N1'111;1;1 r,11-y-i-i 1-- Oil ',11; 111;1..1::r.:1:,'.--. 11 Ili.':: 1 1!i 111 11.11114:1111 .,..1:111.1 11,11..„:-4-4,-_11 1,11,. .11,1.1 I.,' ,,1;''.1 .-i. :Iiii.. .. • ; ; .i.,ill 1;rh ::: ,,..•. '-.;; ,,.,1.•ci.-;-i. 11!1 •;11 11i.:•:•;.: ••.,..i.,di,:.11 :::":',' I l ', 1 i 1 1-1 ri,. lw LA'...,•:-Ir':'1'. 'I,'. i 1 r11! ;'1 Hi !II!l'il .A.iii.:"t".7..11„ i ' I ! ! I I !.. .: i.,,..„.. l! ' ''' •
1 .111 111; di;;': .1. ,., ,,.....,.., LW ,,i'. •,!i.I.. ..'''.[; ' i''i;''
V i'i,• ii,'. :'''.,i.1.- “...•.. 'd1; 11.;,:::': • I i I' , 'jii :iii :'.11.'!:',1,':'' 1 i', . 1;1; 1 ill ;hi '!i'.11.;.,*:..,.!111:'1:':, :1' ' i I 1 I I I 1111 114 11.i.P.1'...1".'.., 1.:!.:.:,..... .. . 1.-.1.-1 1-11 HI! ••.• .;;.'::'......,.. -,,I. i....,., [. ..: ,:.;:.,........,-.1". 4.- , I I i II H'I •IiI II";I:•III-III II III''IHIIC ;Il 1 II,, ;III! ;,..1k d.I..,III II. I 1 1 I I III: 1[I, ;III II • 1 WTI'I'•I"' ! ; ,'. ''';'-
W I I I.
_Li I.I.L.L.. :...-............._ ...• .r..i ,i- I 1 I I ' '-,1--. -':--- ,..- . .,,-.L.-• • ' . 1 „1, t',,i-%.i ,..-110.• • - " i,. 1 1, .'. I "I I ''" '' ',I'IL .! .' Li •'
im,.. ,.. .: _ 11 i. , _.A., 1 , ..•-,: .• , , ,,,...,..., ---1-•! 1 ,i. • .•h•1 • • • , • •.1.• - ! . - .•. 1 i il III i !;11•1:11; :i1;1•H11•!;1• .1 ;111 ii•ii• - - iiii I i p II: ,Ii1 1111111 111:1 illi HI; ;i •:. -Li i! 1_11_1 i.1; ,„.i..i... .1.1.,i , 1.1, :iiii .•• ...;•--, .- ••,..••• • -
_ !• ii•iiiiii•:;.iii!. "I" :1•1 '11•1:—: •1 1 I LI III 1 1 1 1! ',L'.' 1.!:.1:....;!., .! 1:'.;.'.'.'..c:. —-i-1 -1,1- i, i:I! ;!:1,ii;:1—:r!,i, 1 r,11;1'.;••.•',. —1 LI i ,. i 11. i 1'- ;IIII 1 ..1 .1.1! 0. ....!...
toLI 1 , - .: ; .,,,1 .;. ; 11,. .,.1.,.., __, i , 1•I 1. 1_,, • , ,,. .1••..::r,! • ::,,,,, .:, 1 II ,- ,,.,1 .„, I-: „„.,,I .. .,•1 . .: .1
,.. .. .... [I, ,11,. Ip :„„„. .,„ ,I,...: . • ;_, ,.1 I 1 I I;Ii IP I II ill !I.Il. I, I 1 ' I I II ,1; "I III II III: II: ;PI II I
W 1; ;;;!I !;;; ;;;;Ii;.;;;;;I. :II' r.i;:!.:I!'.'. I II; HI I. I.tIl..Ii I....I
" IT. ",I• II;.....j I • . , ;I. • I, I I I I .1, ,III I I III I., 0 ''' I 11! 'I. 1.....LVIII .1 III;JIIII._.!ii II; II II• I I I I I 1; I. ..!,11 di. • , HI ,,, I I i. , _u_7 ..
.1 . ''I.. L -7'.-.
80 -----, .ii.--7t "-41-7"-- ,.7-:, , i li IT, ; ; 1 1,1 i 11 1'1 1111 111 1111_1 '.,. I11 11:11; 1;.,1111 .1 ' 111 LIII 1111 'X1;111..1111 11:111„,;"11:!ii•I. 1 1 1 !I I; 1111 1:- 111::I, -111.111 '11:'1,
W "1. LI--1-11- .",,j--.:'-' • :1.: :•.!'";,:- 1;1: •,11:1' 11..'r.•'it, 1 1.!;;; :. .1 ;:r. ...• 1:;: • ,-;,•;• ,:, ,;
1_ A 12;1 1111 111. 11111I .1. ._, 1,..• 1 ,•;1.' • ,....„.•••I•„ .....:-. :.• . -1- , ;
I! -,-...1 .:11 'Ai.'.',.. - •, ; ,..:. .; -1 ! ; 111.: :•', 11;', r1i.'1".1.-1,' .11 I'"..1,..:. 1..vi • 11111 11! II 1 11111. I,14, I!11!111•:.• •'.111: - -1 ri 1 -1' 11[1! III' i1111''''.:"11:• 1'1'1: Yli!:1.1. " 1 -1 11 i i, !Hi ' .• :I 1,11.':i 11'.........,
_
J... "Hi. .1....... 1 I-I ! 1111 lh ,Ili 111".*:::!LI: -11 i!,,! •:i: z 1 1 ,1,1 ill li , ,i p.:.;!.!,iii, !ill!J.. ,..,:r 1 „ , i li j,i . i 1.. ;..:Hi ;.,, . 1 .1 1 ,.,. , .., . ..i .1. i .. , .
Li........,. .H ,,.:,.,...._,.„ 11_ ii!! II, .,0,..:,:i.iiii., ,:.ii. ..,:,, ! .1-, .,i-, 1,j. di 1.11 iii, ,.,1. :, [ ! , , ,-1 ii.i. :,i,A,',, l• "• Y... , . ! : „7.4
Z •- .. ... A.. J . ' :4.1 . :. LI 1. ' '...-11-• : ' .1' . . dr-1 i 1, ;1 1, ;ill ;,,, ; ii!,:. ..,,1 1 : , I 11 li: ,III id ,:i.:,11,1Hi... 111,1111;:11: :.. '. _ 1 1_ : : WI, ; ,1'• ..1,:l.:1;;!'...
-1-if-71'i '.1::'-'....- 171 7 '' ' - I 1 I 1 '' T 1''1 H !1'11i''''"''''' '''11 1.1.'''1H--1 - ' -I I 1 j-, II1 1111 1 11 III 1:i]1',Ili ill 'ii- •••••:'.-1 • i i 11 i i hi I, iiii .I "1:11....,...:• 1.11,1 ;I;I .. .1
li,'.H '!.:.1.;,.....;.... 1.1;',...:::.::::.....I.1-1-i . : [II! ;[!; :.!! ,i;'!•;;',. -11-1 1 id ;II it,: i II'.;H!'': '1111 IP!i'l.: ''',.. : 1- -1 i 1 I i WI 1111ii.i..7 I.'II il:.li i i !.1 i l. .•:.' ' ...., :. .,j ..., •: .:
!i i 11.1!!.!::1..:...1...I, ''' ! .,. ;. .. 1 I1 1, .1 i .1.1i; 1..t.'II'..iH .: 11, :f, :•:;.. . 1 1 1 ! -1-1,,, 111 ihr 11,1111.',1.':1., Hi! id'r..' ..1: ' 1 [ ' I 1 1 i': i 1.'1 Ilii ;:::...';':'.:-... .Ir.1, il.!;.'ci.'_:... . -i.I-I !_ i!. i ,, . .!.1::, ...:i,1 •:: !•'.'i!.
Z i'! 11.1!!'i 'i... I, ;•.••,i•;!•' -•.•::. -I-I--. -1-.1-; ''I! ''ii l'HI:'1 .'":ii'i 11'i;,ii-;',,"''.ir ;- I I I hi- ,t,i, lin nit 1,,,:i..!IHI.r.ini, ii.r.:ii.. . 1 1 1 I 11.! ;viiiii, ,i1:;.....41..I,T., .: ,:i• .. ..:. 1 ! ,, : !: .1 t ,
0 60 '. "'' .1:1---:' --:-7.-1--- -ii.44'• . , I I .1., I:.,, ,111,, ,•,• ,!I :i,. :, :.. .
a.
u) ! ' i " it 111' 1111111 11111;111,11i III;1'.; i , _1__1.1 .1..1! 17411 1 11 1'1;1;.„1-;.::,..i 1111 -,i,„;;,......;;. , . „1..k., :1..; ..,..:il .„; p
1., 1:1; 11Fi ii.,....1..1 ti- 11 -111H1 I 1111 In:1[.11111:- 11-1111-':1111'‘.1 I.1 ; 1 11 1 II' II 1 LI 11, 111,1,:1 1 1' 11',, 11111. , I I 1 WI 1.111 111.!II ..,!!U::::11, 1-1 III; i! ..1.,- -11 11. •',..1
W H-'-•1 HI-1.1--!'" 1•1:': 111'',''111'111. -1-11 -i- j, II 1 111! 111!.1111111':1. :',1 ild: :1; : 1_1 I 1 ir.-L11 1-11.HIJI.,..c,1!1,1 r.;. ,.1,..ii li.i. _.1 _ I 1.111 I 111.i 11;1„I„.. II :d.1 :,:..i',, i, _ .1 : !HI, ..„ ;.!,;'„,•:....: ....,,,i, :„ .i:! 1111 ,ill.11.," :.1.1 1.1„1-„; ';r; „ II, ,iiii 111 kJ;..111 T.,7.,1; di; k i.r...;; ':*; n-r; -111-: 1„; i t, iv][pi!i.,ii•i*,,,1 •,1 ilk!!!.,ii.p!'• ,_ i_ J. II LI' lid :11.1:1:.-'4'..1;';i1,III.' .!' 1 ' '...1:- !:',.. .. 0;i
CC _II1 '.-''.1.• •'1,''.;'''.:...: 1 li 114, 1.""t"I il•I ';;H;' 1.:,1 hil:''.':-.': i 1 I !, Tii I ;i'' 11 1 11 1-'.111101.it'i -1.-1.-1-.1--!4-j- ;',11 : 1:1:
X :.,:.-1.....‘..-i-.....
0 I I I ; • "t I I •HI ILII Nil:I.!. 4."! ILL I II-A_" .III. 1_-LI 'ILI ILI :L I 1111.;III:1 III.. [II TI..,;I• I;I:;.; I, Fl_[ LH! ;Ili.jilt', JI. !i.2 .q '.J.!It:I.-. -I,-il I- 1 I I • `rill i; •'.1 III:. IiIJI I,,It•II
IIIIII,III.iiiI iII.- tifi iiii ,I 1 IJI:II..III IIiI, II I:II I II,..1 III i I I II ILI I I III; •:.II III! 1. I II'IL .1.i. , , 1.11;i nII III .11:.1.1l....,..,.4,1 I,1. :. :.. . .1-1.,-I-..11 I !:,; IIJI II,4; II •I;I, I.,II 7:
.11!..I.I1.. -I - :11-,. liTi'.,ji Id;•;1;1•:-, 1111 .;1:I ,iii .1.:111!''1,•:.:11,1: 1; .... .,: 1:....1,_i Li.,,,i i ,:in •....! 1,, ...;..,..'.1; .1 .1.
LI ,, 11 I111 :11.:•-: ,.„'...'1.1.1 ii!1,111 ::1',111.1 Ill.J, I 111: 1 ' In'..•:'i,:1•;:'111'1.1:1'1;r:1;1. ; , ,1.,-1 i,-,' • ,H,.,0,i,',id..,11 1:11o: 1.!i',,; 1 1 , i 1 1 1111 WI ',I;j!,,'11 !Hi , rj ; ; I i Li! 1.1.!Li .,.! ii;:', '...!:-, ;.:;z -I, 1 i[ i;i! ;',:'. ••• —Ii!ri. ' '"I'. .11'.' ...i LI 11.1.1 iiiiiliii !Ili •i..1.•,;;Iii"• in',,••,..iii . , ' 1 I 1 i -1, ,iii 4 IiI! I.:, -.1,i•;;- -,i::••-f-r-h-".-1 I; ',It; .,iii, Ti!i1:-...: : ;1;7 ' " -'.. .-: ; i . I I' ',:•1 ! ''''i........1:.../...i. ' '...
An -V. 1111 1:II..'''.i. ''.1.',Li, V,:H.:', !, 1 1 . I 111: !HI; ;I I'',::; '..•'.. ! .01: ', _ : I 1 ' i I• I'Li l',-"' ! III1 1:,,,.44. :,. •• 1 ! 4 1 „ ' •-•7",----"17". . . ' ,I .,1,M - ,1:11 •,.' ", .,:
< liU —"-1.-7.t„ . '1 i , .1 1; , 7 1 1 • 1 11 : ,111:,:•; ,;..1.1:„.,. '1 .;::: ,•:, .; i 1 , , ::; ..! :,.., i I': :Ill ri...1.!,..1111 4:0_1'. .;'.:1_1 : 1...1- 041 .11.14 1111.11111•11:•;i.1. 1•',1-.• -.1- ---'-1 r.'-., ...,,;. 1-1-1- -'.'-.
1 14 1'.• ;H:..."••'..,•1:- '111;i:1 -1, :11-1-'--- -1-1-1 HT l'In TI III-7.;T IIII II;;;HI IT." .: I 1-" ;ri r 111 ' l'i 11111 i'''1'1,1111h:1111 111 •,,' I 1 I 11j 1 'II' ill,;:h1,1.,.1.1 ,1';1:;:ii, -I 1-1.- 11! t-i . 1 •-•111''' •.1 -•1: -1.'•1'.
•1. ,!,0:: . i. •i... ••• ,I I I 1 1,1 t, i.i..1 ..;w:: ... :.i. .1 ,.'.,: .
'' I 1!I i 11] Hi!....1'±.11';"P.; !';:').-: --,-.-1,- II d '/ I ,'H 1.11 j!1',.': ',. . 1 .,• ' , r, 1 : i.i i, .1-1 li I rim!! !c, . 1 :II.,Il ii o' 1 1 I I it 011 ,l ! ill l'i - 1 ...1! ii!:i'. .1. 1 i 1..11.: .;.':i •.' '.1! .'.: .;.. ...! , !:I.X I; il:i 1,il 1 ',. ..:,'!., H,' ,''.; 1..cr, 1 1 1 .1 I I I ilk 111,1,q..1!11.1„ .11 C!. ..'..4..•. 1 . ',-- 1- ' ,I1L it.o.,•,•1•;;HI ti,!TT •1•:',- -1-11 1I I ,. i t,.! . ••,• ,• - ..i -1,. * I :,.: 1 i 1:...
-,, '-•• •I :-r-----1,- lir:',11. ,,,;-,.: 1 i 11 1 1 -(1.11 ,,:!, ,1H,, 4•,., :, 111,1......,., ... i I , ;:;I 1.1 : I 41 'V'', :1!I,•• r.,,.•, '..i• 1 iil i 1,,,11 :,:: 1,,,'. .,:.,'• .: • ': ,, ',-.W
' 1 1 H hi•ii.I&itli,11,,:I 1 1,!, 1,1_1_1 I_ 1 1 i 1, Li:il JAI!. .'j. i‘p.• :, I,:•.i......-,,,'• _i ', i ! ':.1 :;:-'1: ' '1'.1•'. '. --I.:
. IHI 1 •'".'i'' ' 14 Li __i_l 1• l• •,I ,+•••••;••-••1 l• 11,1 7,i.ki• 1 , 1, -LH • - 1.! •!, • •• I ID -I! •• • i ! ! •i• ,i1 .: •;',!:. .....: .., ,i,
Li !=I. . iii,. r...i.:ii,'.A:i:AJ 1-1_1, i I I I. -11-11, iii",I'lli i,.'1-';,,::.:, .A qr..: .„ „ ; 4 i 7.'. .t I 1,1j 1:r1I'i'!::.'s 1 i•;'. :! .f. 1 ' '. .,I. i'.' '..'....,. : . :.' . ''
.--.
HI IL:''.::.!.1.:• !..., •!rj.i!: !.'*'1:.--i-iti --- ;I Ifil iii.; 11 :',.;',;:'' t',ill•r;:;! ." '..4." -I "'ill ti! ITII 111 riii;I:'11.1, i 11.1,11.1r1:.i;i'..i--'---n iu Li. .;:il Ali :_III!Iii.;,.. .1,1114..!!:,:i.. .__1].1., ':i I HI, ...,. ];i.,; ::.,...1 :'!
-1-i Ilii d 1-'lir: lia"H:l' Li i i illi Ili i.. ' I 11 III. Ili IIII Hi Pk:I d':0,!Il.i! 1.10.!iIi. ii:il.:. Ti _1.1:: iii iiii I , !.;!„ i.1 1, .1.1 li;:.. i 1 , IA;, . Hi :„ 1.,„1,..,..
1- _;_,. i::, ,,,,h:,......,,,,., ,. i.., nil ,,_11 :;11,-.. :., ..17.III:TT .11-i tr.1:,1-;,--1! -1-1-i 1 - 1-1;i ..11 !ft T.Ird,:hls idl :: "1 1 ' ,'•' III' •:!::;; :" 11! ;";'!' 1-;.•'..L 1'Z 20 i!ii-,,, ,,,, ,„. -; '.1- 1,•• .•.•-•.i. ', 1. lj I JI I: :'.11.'1! 1.'.::::,:!: :;- i!!ii; - 1... .... 'A 1.1 1 I'1,i. !It 11:il ;ILI 1.jri: '.'.:.:,Ir.1.1;:!!....',,i, ,: 1 !,..'i_i !II r .1.iL. :, ,..,,i :....._.., . WI: .1..1,ii.:.,, ..._r_i_H_ .i_, ..„.i„, .:_i ,,,,!. ...1.1 :.• ,t;:i...
W -.'1'.." 1:".. %I!',.i. TT'. TIT...".7.V 1 1 1 j-. I I '11Y"I'' '..1 1'11'11-, "I 11. ' 1' - 1 : 11 i I I !I; C.1.1. :1',11.:., • :11 jii:11•11.::. . '....1_4„.1.1. 1._:11 11.i. 111; '.!'..,i ..; .•;111 ';:;1..! 1., .__I-3.4-1- „..1 11;;;1 ;• ;;Ii; ..1. . ,,, 1i..;1.;.
U
Ir 1:1:1: 1.-..1i..1: :1•1.11-1-11'.:11-.;:-1.-11-,.!.''.1.1-1'-i.:':11.111!..'I''•;.:1;.;-11-1-1:1-,rill 1r11-11 Hill:',F11111.1-!i:11;::i.,;..11-.1:1 icii:-••-;.!.:.-' :•:1 11-1/1 li,i'l 1.1!,.ii•I;11 i1r1!;11: ':,1111i"iiii! 'Ili':''.11......'.. 1 11 III irlill rill 1111111,:1'11::•11:': ',.:1:Ill.;-Y''..1 -t H I I LI":' s1'1
.11 flTipi.1„,.1:,,'1., 1,11 ;111,-11..1,11y11:,_11. .1_1. I;1.i rill kill yli1; 11„: .1;1 LioiI; i 111: ,..11.,; iiiiii lilik, :.i:1.1 , ! !Ili ..ii ii 1 i .1.[ ,i.ii . 11 ; ..,i.;1;..1 !him ; .,;.:..,. il 1.;
. 1 i .1 .„,..,._. I•,II , 1 "/ •-......., -.....*I.
W J. Ildi.I ... ' II ,I !,,ri..I.J . I
a. .7* i.' 111! T.mi'71 .1 1 i i ' i i !Ali i.I!1777. ,_.. i.i.i: ,...ii A:..::: i 1.A.i A;III 'i ..AA,....w, ow A!.p.A.q!,,..,:,..._LAJ,.4...-LI .1,1.111 ii.k i;.,...,:.i.,. .. , pl, 'i.,.,.7 t F-1-1: -11-.,-1 ' ' • '..... ‘!'.,[11-!Ili 1.1- L'Ll [ jl ,1 1 I 1., '1.1[!!!:,:i!: :ii:•[;:.,... :. IA i ,..1 ,.... ...,......,',. .:..... ..r, ;.!..:.. .
' "1'''..; IP:: 1,_: 1I I 1 ..11', 1111;Ail..411;:1;:. ..,.111*,i, ,„ !,,--.. il--1-. i-11: ";i•li.11 .,t;i ..11. Hdi 411 II,;111'1 --1 1 I 11 IT III 4-11 11,.iii.,.:ill! Irillii..:,.ii.! _..1. I i.. i!,., I. i!..ii.,.,, ,...,...H., ,i,,,.,
1
T.: ...-,..H. il:f itT:.;.:,. -1;•., ii;, ,.,..,iii.:,i.pti:!ii.1,_._.!_i, .4 J Lill ll:', ,..i.idii.. ,,iii ,!i,: ,. - ' 1-1, , ,- .:; :,..ii ,,p.,„;1, ,,iili,-,:..1;11111,..1.1.,iy 1 i_
.. : •: .-, 1,. .,,,,o,; ., ,_, II ii [di liu it...,!,......,!.,.: [Li 1:;:.1- :'• • I!- ;II-;.1.4, ,10 0:• "1i IN' •:It.''rill l'III1-A-jj- " 1.11 1 ri I 11111 ',lir!ill!.!di' Th: 11111:!:ivF,.!'',L;.11.: --1i--11 i- 1.11 HIII;1 1,:d 11 :,1 ' :1:, !;.i .1
-; I-1III 1 1:1: 10i Pi;/4' il'.',, "ill'' ' ! I ' I ' ';' 1,, 1,0_1,'I'W.'.:I , '.I •-,',
0
.005 .01 .05 0.1 0.5 1.0 5.0 10.0 50.0
PARTICLE DIAMETER IN MILLIMETERS
TP-1, S-1, depth 2'
GRAIN-SIZE DISTRIBUTION CHART
TP-2, S-1, depth 3' • RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION Project No.
Renton, Washington
•
for Municipality of Metropolitan Seattle 81-5148
Drawing No.
, @ ConverseWardDavisDixon_ Geotechnical Consultants A-5
_._ ....,....,..„„„.„,..--.4,:,_‘......fr.,_,:.:,.. . .... ,,,,...4• OU,r1.` ;gm,.
FC ). Di '-'- App'^•'""4 1or pl•~I•^^'',on _ — hV " GRAIN-SIZE ANALYSIS OF SOILS ASTM DESIGNAI ION:O+cc
--CLAY SILT ** SAND > < GRAVEL
-( FINE TIF—MEDIUM >I COARSE < FINE—'IE---COARSE—>.
SIEVE SIZE NUMBER 270 200 140 100 60 40 20 10 4 3/" 3/a" 1" 11/2" 2" 3"
100 �'
1 : :1 h' H
! --- —
I 1:II _ .I � '' 111,. I : I I III , }11, :,I _LI 1. I 1! .1:_ _ _ r: _ � I,IiIj I• .! !If iIiI ! !1` 'liai !II: I: I I 'i•I ! 'I'; lij::lr,i Ill; 11 I Ill": 11 i•..I IIII I: 'il I 1� .' I. :id . I L I:I I, .I,:. I .II II',.' 1 I Ill: ,I j, :,!I Ih. it i;i; it .I I ly I;I I l , ill! !il,. j1i, ,III.II: i I I ., 'I:
I. I 1' I I I I _ !I
N I „I,I !. ,! ...I' ,I,'.:..::....:.: _i-1- ! !II l I1! �'! :I;,: i:.!I•II !• I I11 IIII IIIII1':!,;;, ..,il: i'I;'1,;,
~ .I ,I I! I • •• T
i i I I i ,i Ili}i{I;;il�. .:I i'I' • i!' I i II; II ;; i. itl • •;, l I !I ' I I' IIII' , jl ,l,l, , ,.. .1 I! j! J� Ia` ,L. l;
1. .II! ." 'II.
!I! ! 1 I_I -. "I 1 !!I:!.. 1„I '�,. I_. :I :.I I: ``I' it I �I!1 ill; I:'11.I1.. ..I; 41IIr._I.7I I 1 ILI I I Il I II,,; i'' j;'I !I „
N ..I.� ,;I. I 1 Ii II I '11•
r!ii it IIII. I-1 I, !,, II ,II III I' I-1; I,li ill! III .I I. I. 1' ' ,I I''
,I I I . i
' ',I i!:' ,III �: - - - - I. i.. _ I: I' :,'j .:I,. i. 'i- I I. _l !Ili. i
I CI '{ ,I;I!11 :I: I %, I!: IIII' r
!' Il11;;. I III I 1,1; :1l' !! II.' ! 111 :,I r1:,11. I I, I I Ill! 111 11;1 W' ;I.. 11 'i'1 I i I
: }. ::: .: I-I _ _I i.I I .- :1 L I !11 .11. ., }"1 .I. hit
II ,,_1 1 I-
il' •: .I I 'I' �1 ,�I 'li � 1� 'I� 1 i lil II. I! • 1 ��' ' I _ _
j II !I' � 1� I Ill li'!' 1! I I II
I I I I
/I. !i'1 L... l J ...
i
, I
W ,Iw•II,:IT i-I-; ill! 'i' ':i: HI! ! i `i' I' �l!ul; I!' l' �_ I!11 l' II '11 I i .t.. ';",' •,! il.
,ii it i.I I. I! ..I"
•
I�
,
,I .I, ,il: il, � i 'i I..11' 1 .I;, I I iIi II I 11i I, I.I.
L
1, 1} ,._I L' • 1'I 1'i ;i';I ' 'C�lIIII ,'I • 1.: H, I I'�Ii . I I , 1,,il: ,;, :,I _j :I ,.I
I: 'I I 1ii I1 f, ii'. ll' i., I '}" III Li,IIL.� ! • I 1�' I: . �I' , �Ali ll . . i I � 1 i _ . �
z :l "11:I;, ,, :., .•I :, 1 I I I,l I...! I t. I II' 1I III'.,1, ' 1 1 11� 1' !i" „'1 I I :I,:
_ •.. 1 .,.. .,.... :I, 111_ _. ,.i II':L:: ,- - - - i ,:i; :j;: _..L. i, :I, ': _1_.
, I:I.i !1".,. ! ,, ' , f I 1 '•I• ,•'1 I I i i-I II+' ill'ii.' :1, I I i' ,!1 IIII il` 'I 1;!.�i, i., I_! I 1 '.I'. I I
.1. , I ,I IHi i .. _I! Ili III .11, i-i I ..._i._L. ,.,• .1i1 I• __ 'I
❑ I• ,., I •I ..,'t;'i`i l' , 'i H
1^ .. I• ..I:i: I' ; '�L...111. I !i!. j/' .II ' II,,I IH
1 I I ,I 'I.I L, it l Ii1.. Iii:: ; .. I. _.. I ,, :11 �! .. J L, -- - !1 11 -i-
1 - 'l 1
`I:.i .ii .i.1; ii
1 •i. � 1 if'L � I � ' ,I ,' II' 1�1Ij •I! 'i: �i, I'I _ I iI .i
I 1. .'1i
_ l f
.1'' a �.l ,i 1 �i. I I .�;' ,, -, !. 1 . I:� � _ _l i. :i _:i' il 1 li i, i1;:ii;1 , I j I ! ! !i ,! i 'III ,'� i � � IIII, II III i :IL I I
/�• 60 -..i.. 1 r —�• .
lL '11 i ,.l.'Oh 1 IIII 'I I,'.,,I ,!: 1 I'l; , !,I 1 ;Ili , I'I': _ i I II III;I ,I III; IIII,' - ! 1 i.: it •il- .il�, _u !'I! _ �".I � I i ,.I! III.. .j_ 11' L! .1 •I.: y•,' -__ - L._., LIJ I ,+.' _-
j� .i11.1 i I:I,II: � II'.. I -1 i I I 1, 'iil 1, i'i ,11 !1" I' I;:II' d' .1
Ili!I !;i ,1, i.'i 111,' 1'11•r, 1 I I I11 i 'I' .1 1 . I i ''11I II i111 } !Il; i •I III ;j1 ::I III I I: •1; .!; I. III I
N �l. ,.�,. .II,I. - - I_ f 11I. i11:17. ,1.. - '"j 11. I j,l 1I i;: :111' ., : .L't•.---. _..,. I.! IIII,,.;. ,I� ;,;:..,II _ _
'1"1 .I', '! I'll• - .I '1' 1 III::I'I, .I' ,I, 1 , 1 ,1 I' IIII f1'il�l, •Iii.' 'll.: .I: II I' I :11,, I;! 111' !1 1 'I ii I, :1i ,'I;
,
w I ii i1.1 11 I I I 1 "I .' r � . �i..
!I l�ii Ill.'!' .i.:• .I, I,i u� _i._ _L. L..rn. ::1:'�I'� ,i i_.., .i I, .11 !: , ,i'. •_�_-._ .! i _, ..,, I-.,(i I 1.:,, :..,, .I-}_ .i_., ;1.. ;,
'I uul I� II II'1•!, - I ..I 111,I'li ill ii!� I II1IIII-iiI '!iiilj'�. !1' � 11 I Ii !' 1� •II`..I 'f !III IIII !I ! III I,I: "'I' I,II L:i.
I
r•i.; I III •!
ii
I '11 I -is:
;
[C 'I I I'�.� __ 1 ._I J_i_..
t: ! I'll,11. II ;,II II;'•'i; I 11 ,Ili"::,I,,:i.,. Ili Ill; I I 'i'! }' H:j 1 : ..•; !Iii ! !'i'!
[C !l I. :,li, h f 1 lit 1 ' ! J I I' I. fr' I'rr i I ,I. �ii'i,1i , }
,i j 11 .I'I 1 1 'll' it'I! ill il, '1 • .I I!'lll i,jI111.1 ' ! I, j 11' 'I .III' 1 Iii'• I ii:il •I
,0 11i:'I!,I,.t;l:: ! III__ _ ,I iri: :1- i,_I. :i, .ij; ,I,,,___ _.i 1: I11 III; !:I: .1,: _ _ ..I .II ill I'; ii, 'L.
O l i_ :I i1 •I,� 1 I I'I I I� i I II"1•il; ';i• I1 iI l I-1.: !. 1 ,i .Li ,L: ;iI• '1 �I ,ill ii': 11! .I,�'ii' l i,!I f4li 11;I i
�" Ill; 1; 111,!I,!11 J ! 111, I ,1' } II' •• _ III I •1 i1 , !:. III! :, ! I li :1i1 . 11 ,' I ! ' . li' ::h
_., III; I u: ,a. L _.._r; .{,• .;., L:.1 L. �.--- I I •�i ;�.i' ', -- -- I iI - -- --1; ..�
U , I' , .I'j , I• i, I;I�.11, '+j; Ii 'I'•�• 1 I 'i I 'I!' i! 1 If r �iii; -� . ., i �i1
I Ill.! 111 1, II,I I 1'i1,•1 1'11 I,:, i ! 11 I' Id.'! ,II Ili •'! lilt III, , 1.: I' 11 'I,.
I '
1 II'� 1 i t I '_I I :l:I
: : ., � l'' I IL...A I I IIII!'::,,,..:: �_-.L. ,.1 _ � ..II. �!! -- - la 11.. !,
I I I; ' III ,,-. - , ��' Pill, l;.: 1.i_ .:I-I: !� �} , �! 1!' I' I!� ;,I 1 '!�'k-1
�Sl �
i Ili ill; 1 I.b,1I, i I:' ! •11': ;II 11' ',, 1, 1,I Il 1 1 l:II 111i 1l1 f 1' IT, II,;1 :!i ,,
.__I I'I ,.I!
Z __!. I. i ' I L,,...,:.'...: I:I:...,L.:;...., _'_. _ . _l i .... . ...... _I. I,: ., ,1,,..I _ _I-I_ .� I .!._. _ .1:;! �-�- -
'1 I:If . 1: 1•'1 1 i 1 III I! :'1. Ii !Ili I 11 I 11,..1!' 1111! 'i 1 Ili I Itl I. ,i !ji .'"} 111 ;;,11':`' 1 1 1 1; !11. .,:I.!
Q 40 ---�-�-,I!"�: '1~ I ,1..;1� I�1 fill it I .I I W. 11. I � I _
'i, 'III 11. i II I 'I' •, : 'I%! 111 ;I ''II, 1 11I ,1 :1 11; I • I
I
„ I
i J"" 11 ..l 1,.: 11, _.I. I .li: ..I _I_1__.__Il_ i:• __I_�_ . i. ,!i
!u.la:. :.l_ ,1. 11 yi:.l,. .__.�- -.I .!I .:i: .- 1 _ _ ,� .L. .,r, : a' ._1' :.I 'J. CHI � :.I:•.. ia�.
_ 'i' :,1 i. l,t i' I'!I Iii ''' '11 I ,,1 '!- I !� 1 1I I' , 'i ! !1 ,li•!III i I i i ilj; �II III I,: Ill!i'i!I'i" I !ill, ! iil
ii'I ,,i:il„i;; :..Jii!il,r!r�`.I:!! ---- �?_I, 1 ,1, .,! i, li - - II .1, :III: --- - i -I 1 ---- } � ;r1'
I— I I III 111. if!! lI '1i: 1. 1 11 !•I'I,1'i ! :1 i !. I;'i :r 1,1' t 1 ,1 _ I I: I 1I 1 ,I ''i 1
r� i I: I 1 I( I Ill! {'I 1 'i. I, , I i-I i I I' it l I I I '! I, L. .1 �II I II lI ! I. !1 , -! !!; 11;;il;
,I .I1 ,.I: �_ 1 I .I:: ill!: :a: .IIII-: - 11 :.,, .,:. - .-1--J 1 1 IIII. L... _ _�_ _ _ _l
�1'' ',: - i'!r• - 1 :I� l i 'ti r - I: I :Th.." :! :! '11
i,,l. i :;ii' :I i ,II: 'i4. ,' H 11i1! ! I'! IIII I I 1 , :i
I !I !ILA:I.., 1: 'I' ,II'1 ,:1 C-- 4l' !. I i :!1 ,• 1,:, :} _!,:!:.i• i_il: '1 1 'i.l' _l_� r, 111 , ,!!`i 11,. . , __I LL. ..1 � {. .,1IIII , „ l :i. I_ii I ,! .i iti(I:. !1' , I -- I (i .. II 11't i.i' - j-} ;-�I lI ''1! i! 1 I . LE .11'I' 'III'1 11 ,l,I I: II
: I I I•I '!:, •II h;H:1 j1:' ill' '' I 1 11,-11 III' f _ 1.1, .,.. :Mil_ ,, ' „'I
1, i t :I '1,1 ,',:,111 1:1. ,I I I I, 'l: ,Ill 11! 1 II,I' I,!:. :IIII, bl 1 1 111�1,1 }.::I' it . ! I;l 1 1'. "I'!II !,,,
IIll :II' .1. „I. 1__'_`.J-- "I i 11.I I I!'i:i;l .!.. __ _�J i ,111. ii;i _ _ _ _I-. .I, .,. Ii 5'� -----
i,
z 11. I1 i!:: .:I : , � ! , ,t1 i ��} i 1 i i' it !" I ,(! `7 i, I..h!;,_�' II'I 'l�, � .i' i' iI'I'
1 I LIP II Ii� 'I-'III Iii, I I 1 1 IiI!• I"•i' ii 1;!' I II. II 1r, I i l'I ,L' ll l 1 ;1;: �'' I I '
:1 Iii: �.__ I ,•I L: I_ _I L. }I; 1. -.- ___1, ,I ;;;i _ I _, ,,'
1 i' I� I !,, b' I1 :,, '� i 1!' I ,Ill
Iii 1'P �' 1 ,,: 1 IIII 11 l !1i
(L 1ill Jill it lc:ai,,'i I I. I I� . 'Ii I. III i,, !II'l•il L, P _:I Il'
,, II. il::iU:. i I � . •V-- - !i ,.,,. ,i . .L.. - -- - - - Ill
_1-} .I I: 11_L_.__ } ! Hi I„ li .!I. Jr,..L�i�i .i-,-- -I�1' '! .!: I I _ ',•+: I ,,;;
1 'i 11 11. II,I, HI 'i': : I:::. i _( i ! 'i•1'I ! '' 'Il i'' I
II. li I, I �:I: '!I'I l I ' .I IIil;l; I' '1" I i 1 i . IT ill jl. i 'I 1. 1, 11.:10• I!: II• 'I� II
. 1 . ! :. "!I;,i'• , 1111 it 11.I __111 ,. I,, is 11 _I. _ ! 1 ,k 1_ t ��! a ,
r. I , } �,:I. �: � � I •11 j :i,:. ,1.., _ � ! 'l I� , :! l� :I lI
r 1 l I'll 1;1 I,I I I" MI "I' ;i: ;II r1;11'"'! I i ! l �:i 1 'it ! I t r ;Il;ii1 I'. , !iIi ,,,, '1!!, I;',,i,, I' 1 I I i I.i, Iii, !,,
z 20 :1 1 ill' l ! !Ili it j+ 'r: , ''l } 1 i11,, IIII i �i' `:
I'I I I1.I 7-1. .11, ,1 I 1111 !111 11 I 'f:Ili' 'III. '1! III 1•: I I i I' III' ,II.1 -J. -- .1 11 ''I-li... ...III, .I;:II 1---I.1 ,.1: 1.1 I! '''! !•I:
W 1 l: .l,:u: :I::!ii: I r'- if I -•I ,}; :I. 1, I, .L: .1,',' 1' !- - t. I} 1 i I III'1 II, , I� } l } IF ii ' t; i
1! III 11i'1;1; I1,1 i' 1'L 11 I, II 1111 , Ill I+1 I '!' !71i1111I' I 1III ,:'II: - 1 l,1
:
,
-,- l,.l ., ... ,....t...I:..,. :}!,.1..,,..,,.. _ _I. .I I: I:,I ., :l, ,:1 _!.� -I lI I I i._ ..I, ----- -- 1�1 'f: 11,.i _ ..1.
U I 1 1 '�' 1 I 11! ! rI a.i id. . VI •11 I :II,, I IIIIf ' I1l !I .1. il, Ili
I.I' I ,111 ,11: 1 I. .II I .:I!!il 'I, n I III' II! } it li :f
,_, :1,1 iIi �i„ 1 _ 1.-i_. 71,I71 .ii I ,iJ. LJ__, l�lf_ .i I 1 11 .I.,,.:I;:, ; u;�: ,..- -- -�.. ill. .:L.,..1; .I _ _i_. �i 'I:r - 1: i;...
111! 'I: .1 I., ,n• ,1 , 1 tl I i1; ,I i!.1. :l. !I:ill i III I 1 I li!'. y' 1,il 11 1!I I I _ II II:' iI I 1'I 1 Ili
i• I
'', ,!.11.:, ':... ;.: I'd!::,.!''1 �__ _ _ L,. I .I l,i .,.. .,L. ___{__ (.I 1, _ ___ ,_ 1,
W I, 11, .111; 1 111;,11H:1 H 1 11 1�1.1 11 I;II I:1;.;! . ! !;.' 11 I 1;;! 'I} i Ii ill
'i :111,i:'I' i 11 II ,I 11,1 !!!l 1. II IIII i' I ! III I, 1 1 .,,
n I I I I; I , �lI I ! 1 I I 'I 1 � 1 "
Li.. III '1 '' I 1: il'I . II` '1. !I: I•; :I:.
, ..I: I1ii ,I I .II.. !', 1:1,11:' II: I I I' „ i
II'• :. . .:�'. h ..'' .:.,..:--- -+ 1-- II Ili.; ,. 1_ I. :IIII:', ,
i. 1 i. .1,. .,1 ;c' ':,: j..: :I, :I �. 111' i, I'i! �. u.. 'in
.I' ;1 rii I,' - lr: ',,. 1 'I�-1 - L.,. h 'i' ! I ',II'1:' �1, ,1• 11! ii '� ,I
1,: Ill;: 'i 1,if i!' .:, IIII I 1i I 1 i' ( 11, I II 111 !'. I _ } '1 _ i '1. I
I. .I. .:.r:.1:1. .L: _I- L1.1 ,I .I IL, .I I�� i_Lij : J i:a.�:f li: .i1. IIII. f .! ( ,::, I _rl_i �I � : ;.:. .�.
:II, - - ( 1111:.I.,.!. :1' I �' N ;I ilI n.11, _ 1 I 1 ii t!III'
1,: lL .-;. :1'1'1;
! 1''di; III. I , 1 I 1 :,I IIII l,I d'''' H I: 1 1 11 ! 'll' II I II', !j !I •,I II 11 [ill' '11; 1;1i 1 ii jl
ii, i'� -_I-_.- .t: ,.1. :!'. ,.I: � ,ill I ,' - -L ,;I: ;: L.III: L.. _; , :�i:I
ii L :1 :ill i1 :1 I ,: :li I it�fi I iI ,I�� I I i 'I: 1 l 'Ili i' i• .'I' I.
I i i i ! '1. 'r, i` �T,.' i. II
1: I i°�1l '} '; _I :1 1. I) i, _I_ 1 :t,
i- , - -
� iI •I'• -1
•i l I ,I 1•I I: i i i. I'I I I
1 ;I: , I I:1� , I���C i(;: II I �1 I i�il 111 , , I ���� , f I I I it I I.
� �j i� `j : : ,�f
:..... . ,• .01 .05 •
,..0.1 0.5 1.0 5. ,.:
O .0050' 10.0 50.0
PARTICLE DIAMETER IN MILLIMETERS •
TP-3, S-1, depth 32'
GRAIN-SIZE DISTRIBUTION CHART
TP-4, S-1, depth 2' ' Project No.
RENTON TREATMENT PLANT-PHASE I EXPANSION SITE PREPARATION
Renton, Washington 81-5148
for Municipality of Metropolitan Seattle
Drawing No.
ConverseWard Davis Dixon Geotechnical Consultants A-6
•a.t. -. .. _ v.. .....t r . .Y:t•; . -, .a iy:,.;+ .-r t••. '_1-1!'•3 ,'Y^..'.'., ° N _ `,-'(Y i' iL t -Ls i. 7:"d/,s1`ti..tAllAY. MSi.,I.P,1:
' e=a
2 2
0 2 8 SECC, 0.2' ScJ/MENihr.O,,
pr. ,
...)
p � � j'?LJCTUl7:5
.!-/0 1 DN4 ��
0 — -7\:, B29
1 I L _ - h !,6 1IAeRAT,o/v sr.?uCrURE--- lDH3 IIii
s - I�992 20005 - -- , \ xaao c
,>��� ems,3 \ 1. ■ o � ) (C:-.11112)(
44-- — - a'! DH5
■ d
NORTH-Sour" `12
rUA,.EL DH2 I + I13
•
i I
--r� ----. A/.S a-lB---
1-- - -----7?'..111.-1 1
I
OI1. I I ��
- . I /
12-
1111111
- - / M:INTEVANCE BLDG /
GRIT NANOL•A.G
• - STRUCTURE
I Eli !■■■■Iffl■II 2/I*L1
a.c a
PUMA D:Sc,aaRG= /e /�11�/ l !4 ,Ui ■■■■■1�� `1 \
SrRUCTUR� - [] A■■■ �I■ • 7!—L
- .... ..:
'17
11-1:-
87
1-7
OUMP BU/LO/NG rll11 I I ( 1 I), •
•
.—PR,MARy ;2EATMENT STQUCT ,/
N/715.00 ' SOUTH CHLORINE CONTACT.
.----WATER STORAGE ANC 8-I CHANNE(
LLt - /
LEGEND
`I \. •RAW SEWAGE CONDUITS AN TYPE 14Q SETTiEMENT GAGES
'` \ h] TYPE I SEffLEMENT GAGE
`\ \ (8 TYPES 5ET1(EMENT GAGE
/BOO E 1_�. •• \
/'JOO£.
8.2e \
_ _ \\ aas \
\ \
_ - . i /
7::::
• . l.rp_. 'r--�r-r' 1 \\ \\ -
•
\ i I ~9•4 \
r # IC On
5 24 •
G l' \-N / A ZS
-.JD.Y1lN/STRA'(C)N /NCLUE•\' cnNrao. n
• '9 ? 2 BU/L D,14G .
2
n § THIS DRAWING REDUCED
/p.c:X. h :36J c TO HALF SIZE
2z
METROPOLITAN ENGINEERS •
L. ' ' RENTON SEWAGE TREATMENT PLANT B- 1
R 2OOA RENTON
I-•5O' �,�MAY 1962 SYSTEM PLOT PLAN
v -J \
\ •
e�, jy %-' p-rs ' —- /
A a ) - -
—
z � - ,
T — S— —
� — \\ . —"\
% /b'�p•3Oy ) `�"ii�/ '
1-�i ce
\\ i
-
© '
V.
�\ \ �r�- - 1\ \ ' 1 I.
i LEGEND
,1-�p-B ` \ 1 \ , 4: 00 N NEW CONSTRUCT/ON
EXISTING CONSTRUCT/ON
too ortA4.51%__ ,� i- 11\ ,\ 1\ A•/1 ;\`1\ ------ FUTURE CONSTRUCT/ON
�/ // C' \..„.........A3‘
Art \ °� A•!s\ 1 \ -- BOUNDARY of rroRK
j� 1 \ 11 \ \ © ;
// I 1 ` \\ \\ \\ e- \ \ \ s SURVEY MONUMENT
! �►,\ \\ ORif�r A RE \\�\\\ ���- A 1�\`I a� A EXISTING SETTLEMENT GAGE
,/ \ sfR �� \\ t p\ $1
/ - /'" / \ �.yf0........- i \`\ /f �• \1\\\ A SET7L@MENT GAGE RECOMMENDED
P• TO BE //STALLED aY CONTRACTOR
% /
•� / , \'' �~ A•s D 1 \\ ` --�---\\ • BORINGS DRILLED FOR TN/S
r3TRArrpN� �•' A1.06•\ ' �•••�• frON •, 0 A4D \\\������ -�� �i�i-' '� \ ■ EXISTING PIEZOMETER LOCATION
• ADM oio0 \�'' . \ AtRJOfuR C1vRt� �-- �_ f1_`00,--L-�.,t \ \
AU N \ .'' D1R fro/ g;tNsp/r� -�� \�s�'�- s =.�\ / �1\ 1 �pN
..1 5O�fg{ \t EA Bag - / I
t M pR�MA�tNt pia -- ,,�g�.�`I,/ : ‘\;1 / NOTE: FOR LOCATION OF SETTLEMENT POINTS
50�R� \rleALICTle4011 `\ • ( _ \ \ ON EX/STING PRIMARY TREATMENT
CX �f Nf fPo Mtoreg is \ �� -E 5f� M4`1j / \\ r-- 1 1 STRUCTURE JS AND TANKS /8,2S,SS A4S
\ ;• ® SEE PLATE C-23
fRaWeE 8'• 1fR�j s `, e•ss `e�b D \\\„ i 1,1 �\\\ \�\I\1
11
-.7.,\.% ,N‹ .1 1 %
''• 8-61 l' 1--1 "---- 1:\-c-: ' riA 40 - 54111111111e /- 41/4.0•11 Ig ‘114 ....-, ....); .--." , •
\ / f Nam' • sS ' r ti -- _. - --
� ►rA 6048 •
. act Ogg LANK A• '. - - ... -
$ INftrµ t r5 >t n a s • 1'-� ��% -
10
\ ' cy NNts 562 - - K 16 1 -: �- I
�oRp's° fAN -
c' - s •S
\ �� 1 t , se _ _ _,✓
CNN` • ;�. /
�N ' 4YLe� • •'
.ARi
Z.
.- S !
pp .P �� - - �� Nft O� O
Ay;D N Br°'�
5tcfp .
I
%
•
•
LOCATION PLAN
BORINGS, SETTLEMENT GAUGES a PIEZOMETERS
SCALE I'• 200'
•
PLATE B-2
• .
•
•
GROL/NDw4rE,! &E✓AT/ONS "PENTON S.T.P. P/EZOMFTERS
•
ZS J
II i�/ 1\ PG PO OS P/? P/5 P/7 P27 PL9
\,,, . Ib i
,� ,-�-L --` \ e[BK GnO //7. _/2G.7 ltl.! /lo.j /lz,o /2l.9 /52,2 l24.4
\ - ��✓` i 1 !l!V ['Cr SEC ///.67 /C/.i/ /5/•7/ /26.2E
//7./7 /26.54 /t7•/6 LW,
L - ) - w' /--� �i-/- A4TS HAP/-'LOW a OW
��P� �� ,
km 1 �^ i / /•/6-ce ///C //0.6 1/0.5 ,puts //0.6 //o.3 %lo.7 /10.4 ln.2 -//o.f210.9'
94 16.2p JO' l \\�. .....
�%" \� / // t•7 64 //l.J 110.7 /10.7 Aga r //o.li it/O.G //0.0 //0.6 ///.!- /10.6=0.)'
z - - --/� \
1 -9•65 /09l /oe.e /oe.9 /09.4 n0•S /04,9 /09./ /09.5 /o9.4-/oe.S'p•9'
CD el 1
/ \ I
Z \\ \\ (�' \ \\'\ \\ 7-/6-60 /0e.4 /0a./ /04./ /00.7 /00.0 100.1 /08.4 /08.6 /00.7 •/oe.0 i0)'
'1\' �� \\ -- \ ' 4 p p to Ie ca //o.o /09.3 /09.4 ,n�p /0 9.7 /09.5 /09.5 N j°3 //O.o -/09,4■A b'
1 BpN
�-� \\\ \ \ \ \ I 6•/y 49 /09.0 /08.c /OO.6 ply J /oe.2 /08.e /00.7 „psi 4 /09.0-lodt 2 ,o.Q'
��a���� ` \\\ \\ 1 \ \ \ 0./8.69 /00./ /07.8 /07.0 /03.5 /07.8 /07.9 /07.0 NOIet 4 /0a 5-/o7.Q 0 7' .
/// //� C \..,....... .A)k \\ \\\ 1\\\\\ /-/S"70 M.c ///./ ///,t ,�oe2 ///. 5 ///.0 ///./ 4,4f.h ///,• •///.o ■r.,
\ ��� \ \•\ ? 24-70 /09.4 /0e.7 /oe.7 /09.4 /0e.4 /08.9 /09.0 n09.9 /o91i•/oe.4.%•0'
,f / \\ `\ 1 . 401-11j611\\\\ \•17 4 - \ \ \
>' /-' \ 6RTRaOtURg �/ \11 \ 1\ 1 9 /-70 /07.B /07.2 /07.2 /07.0 /07.0 /07.4 /o7.J /043 /oaJ-/07.o=/.!'
�, ' 1\ P.21• // /.•\- P.11 \\\ \ I 9•/2-70 /07.7 /07.4 /07.4 /o),9 /07 0 /07.7 /07..5 /08.4 /08.4-/07 0,/.4'
.. / \ \ \ -�
•
�.• ���1 , ra. \ \ \\ ,\
/.•'", C \, \ \ / 9 2/-70 /0).9 /o),c /07.6 /oe,/ /07.6 /0); 7 /o7s7 /oB.7 /09.7 -/074s/./'
/ ,t UMP ' •.1 \ \ \ \---
��.��i/� /�-- 1 I•LS• 7/ ///.4 ///,O ///.? ///.e ///.2 ///.J III./ //2./ //l./t///.Os/.I'
N ^. P - .'�'::' , \ \ \ ram. 'i \
SfR7flp 0�G �• 71pN 1j.S \\,_-''� -� �..����_'\
AD-- \ ALRuorelRt CT�R� �!.��� �� \\\ Noras. /- /OR99 BEFORE e•/4-69 AND//I,C AFTER S/4 69
•
g�IC •` : 0J7M� \ • 91R \ A/tEAvo 5 /
%NsiON'\_'.- �f��� I �6�``\1Y1 \I\ \ 5�° 2-,q. t/NA/JLEG WATER TO LOCATE
P/EZOMETSRS
J \
5•
1! L[ ,G +� \ / \ \ 4- AvaARENTLY DESTRoyBO- EOl//RMENT
• G SaM,�R{f•\fRLR 1�Pg"TiAtgR` -- ��1, \\� .- \ \ HAS /TO.�KED /N AREA.
pN X1511NNf PR f1'lLNt 31 10 \, -�� \\\1 I �. �/ \1\ /, \ \
Ipp \ L '��L L 7RtAG1dR 1 \ 1\ i-� 1 \ \
INoNfpO�RE SfR�t S � 1 / \ 1 / � \.I I 1
NILNANG 1 -7.*-*. , • 35 K 1 i\f\--/_.j i‘: - ;--"-'-
. . '... * ..7...•.....,6‘0•,.-,.•.0,0•.••,..",.,,.s.s.-....6•... . ::-.4.'..:-Z.v.k4 v••,••--........... „1.:.\....•c....,..\.
'•�/ Af�Rµlllpl �'�NCt 1AN 1�N0 �,_ 1,%. ' .
'• .1 N LEGEND
c'f'�oa,� fANK 65 NeW CONSTRUCT/ON
•iIis, �' \ ' • T/�NK l) ''C/I t .--- ... EX/ST/NG CONSTRUCT/ON
4c \ 4 9I
'CNN` ,�.. / ___
4i -... ' ..� furuRG oav?TRucT/oN
- D - __ - BOUNDARY OF sYORK
m SLcomt� ,ION So SURVEY MONUMENT
PAyEtpN 51R� • ■ XLST/NG-P/EZOMETER LOCATION
OCT'
S -!RACKS
-- N.AR' -
•
GROUNDWATER LEVEL MEASUREMENTS
SCALE I"' 200'
PLATE B-3
•
r
I
-, B 0 RIl / q,- O ,zo - SOP ! !VG
m
- Et_ //L._ . D :L.LEL': 1/-9-5. F-L //7.3 CR/LLED: 11-9-54
S \�//
to l/S v •..
MODERATELY CIRM
TO soPr AL c_uv/AL
1 //o SOlL5 MODERATELY F-aRM
i/o TO S At- VIAL-
•. EO O LU
o C) \\ - 3O/L5
3 K
\ �� i rn
D
10 I rn0 n
I __ N /o- Jam N � \ -10 C
I -� BROWN 5/L7Y SANG �` /D� , - r f
W ITH SOME 6.RAY Q ' r — D
i snors lN
kj rn - 4
CJ z! _AND5TU�/E f �1 \ ME Divn.4 A . D DO
I- " /P'LY' CLFAN Zi rn
;O /00 -
�'...AGI< 5AAJ C z Z
1G) l oo c) 0 U)
'i _ o z
_ zrn l
O fl rl
-T1 ?: M —1
:;: : UN
0 9 S r%�;i
G) '
`.. BROWN 5/LTV SAND
N 0 r E = 90 FI P M (DE:an.1nn 5E0
SAWt'STO7 /E ?)
ELEVAr/ON = /00.o EQG/ALS
MEAN SEA LEVEL Ei-E/A770A/=0.0
0
I -p
_.
, _ _ ,_ _ _ _... _ .
. _ ______
F D �
m 9 O R I +�J c © B O R ".J L"@
1r5
EL /13.O DR/L Z.EL)://-9 59
tic - EL /74.5 OR/L LED:. //-J-:;9 ' �
1l0 N \
1 \
o ! \ /05 ti 3
. 1 z ��, h
\r \/o� 11-'OCER4cn ,3ToSOFT ALL uV/Q/- `j\ SO1L5 -1 O L-
`Z 1 , 100 K.dOOERATELY �'/L7M m D
mr } OSpST ALLc./V/AL. Z H
�4 I F/AMER i Z Z
0 G)
I 0 =
O I 95 2
zm I1
-n FAIRLY F1RM 95 m (71
-I � \ 23 -I
co
N
0 FI&/ '
E SAI .0
Z :
O RE FUSA L.
L.
GRAY F'I NE TO
85 MEDIUM . AND -
N 0 T E = (rx-r-o,v1Po5- D SAND-
3TONE ,
D1 r L LED W/TN GONr,,V c/oc 5
0 A-LIG-14T Au6ER !'/a+
al EL_EVAT/OIL/•/OO,O E:QuA<-5 MEAN •
SEA LEVEL ELEVATION= 0. 0
, CALCULATION SHEET
METROPOLITAN ENGINEERS ,
SEATTLE , WASHINGTON
1
---, e 4 R / 1.1 G u
/1s ri
.EL //3 5 DRILL EL): //-9-59 .
' \ A I 4 RA L'e.' Y E/RM
To SOFT ALLOY/AL
. SO/L S
- ' j //0
1
•
1 l05 •
i
- SOME .54AJ 5
1 I
I ,. 100
. u;
1 95 1 \ .
I
I 1
I NOTE = qo
'; E L VAT1O1‘1= IOQ. O
• EQuALS ILEA/`/ SEA
LE/ .L ELE VAY/OIl/s-O.O
85
I GQE8N SPAY SAJD
1 W1T- SOME C,rA'AVEL
•
• - ; S LI DCE//L Y FIRM
i (DEGOMPOSEO SAND-
sroi-IE ?)
_ 80
.
IDATE BY JOB NO TITLE
- I 1 R - 100 , LOG OF BORING ,B-6
CALCULATION • SHEET
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
•
By/? ;`/J Lc
/acI I FL E,� /( / i`R _� , EL; ..//l/0-/2/{
9
_;
I T1 ;kk bKLi' '•VvV FR.ABL4" Sit.IYSA"/L% /'✓/T1
�'= T,5
`T1 •L/ :T A/ t,/ 7-`' 5.4.VD Vc.•'✓F•; .
• • ;. (i•:E.LL•,��CriL;>r•C SAD ,1..__ "�/.':i:!L."ram ,I
. • -- /•y.5 >-.'•%':...Ev' ....4 b•p �:;:_
/Bo . . . _ I
-} { ,t_.JG.2:, /L:-V .5C,�7- A/1/L, p1./AB2 Cal
I .I
� I f ! i1
/7 ,, t_t �LLE - .BRAYS/LTY S.�-i,VD. VERY f/R,•-/ ,
{ G __I 1/ .(=7Z> - /VE /E;c'EG A/✓OES/TT,
1 I i_ , .SL. y7�/'' =, .€L.-7d_E )
•
t, I -.- - i
1.-y / Qi �L, I• i
11
I . , I , �
,; T J PAR T L Y n/rA:N.E�E'EG 6 EA/-6,�Y
.G, 4•:-! 'TL`F.4CE�'[:S 8REC C/A /1//TH F�AS.4-1.5/JT.;i
F PC',C/-�idY:E'/T/C B, S;iT i
50 i • .. • . . • 1 ''•
<' , I
I
I. I 0-:4 5/71 /JAM 4 T;RFD L/6,7'7- 6RA Y
6 I
" + 1 ZC�,.0, L4///6 /-.'4'TER S''f1.E,VLY AT ' .
/401 ' .EL4/ �J
A7 E_�. ?:• L J'v6 .4".4/L.L I v-7T,�W A^.T S'i. ••
qi
i - ATE 35 Lc=.•iV G. L.47/!L i•IATER .4r s-/o
C7!-'/ti>• �•FEO'y L/7-7-4E. RE:ti/:'.V :-:"'A-:Ce./7-7/A/6si
1 1 1 •
I ,PQ1TLy'rV 1TNF.�B^ 1A/Y C/eA 1
rc:' .U.rF•i::-L.:-L.S B C.:",:t= 1 V,7,-// 4.:."4./EA.7S
. 1 '-•'- ,EEC,.^.•c-/A/✓DE=/T E 4,Vr 2L4.:K
i 1 i /V, ;FA' �."%�,tit;_S 4-'FL -Y<?
io-c'1---1--.--------
,
12D� - C 2 /N .'/s:AJ�TE t �Tr.= Ee;7 I ��—/J�/�T Y•�L " ."EEC .4,1//:,�5/T�
' i _ „ �
2.5'. FISH TA/L B:T '
•
± 3.S Pi v 4.441t 7-4-: -S.A%< fi/-..-
-a- 3 c//.i 71e/ ((-n"r- 8J7. /VOTE: L^ . -i'L.S .' JV.1%4 /71:.5'z/D sPL •r-.5F-t%':,A'. AMPLER
r--�---� --r-- - —, oV G)•4'/N,- R:i^. ,v r.'-i p&<..E.^✓7.:ir7L o.=
25 20 .5 /0 5 0 h Ri..CVE%'}' :WA," 7:- ih%s- _EFT
r ri+. ; e,---z •- 27.4'/ S.- /Y/TY .Ti',: :f.^.'.' ONG.-f'7.E 1'/LE CC
✓R/LL /� - /!v""/ ,A CH/c4 :' F'/V'EL/A/ %‘.:" R07.41/✓)" .c:Er hIG✓c" 8ND
_.G 57•i- 7 P: . .:- -- - - - • C.' 'ED rvi 7,> 5 r; 8X CoR- B;F'RE L
DATE BY JOB NO. TITLE
R- I00 LOG OF BORING B-7.
CALCULATION SHEET ••.
METROPOLITAN ENGINEERS `
SEATTLE , WASHINGTON
' ' ,.`,
.
•
I ! L--?V'1 7. / . o__Q,? ...EG //1/9-201/4r9i
•
-- --- - .. N107-7-LF✓ BR4.-2/1%V/St/ 5-RAY S/47 /'✓/Tt/
/!C - - -: - • Zi,V Res T.5
7. . . i
l_
•
t - ii SOrT RAY v'E r'_J' F/!VE SAI�'L%)'.SILr
_:1 •
I I :;ZEA'V BLA,.i� /=u ME TO Af4D/Lih4-SI-'VD 1
E'L.,
.
--- { OCCr',510NA� _, .�L.L CTRA✓FL
• C.1 i 4_:. 6R4 Y-S/LT /V/T� SOM..E C34GA/V/C- .
:, — 1__:L . /VIA TT ER A.4.D _SWELLS
- i 9L •
• i --- r---1 GRAY SA.V:' %�T' S. .498 S/L7-A.'IL . Ai'tL
.•
1 I'
y i C' :.Ai•riit:i''1�._ ,:; aT L4/1'f/Nr;''A..5
_,I I 8. , ''Y ti/LTY A.2.vE- -1 O/a 41 .:a/gyp 11✓.•77-1 .
•
{ v 70;-------'--- .._ ;® t w '1 SF..,. �;LA.4 �a AD GR. 1/El_ 1't-; Th' .SOM �.E SiS/ I
® k17.41
• i
1 �jjj
i
Eoi { •{ .
1
1 + I1
0 i + ,
{ f f
INSAMGLLP !t'!Th' ' 'J SPLlT- RR.L 1R:VE
1 j ti4.ti1FCER
I ; • i I•
0 �Ah1/=LEL' !V/TA/ i'%.7"ID SPL/T-SPOcv _TAMP LER-
L____i_____i______i____1_=_______I
•
{ � SA�1r�LE /11/SSF..r�
ion 841 6o 4o. 20 0 !VAT,..r? CO.V''.Eh'T, .'.C:' IN a Gf PRY'/14E76,i'T
, t
/5o /20 90 60 30 0 �7hY D�ti'SiTY, df,, /Ai pci--
1 1 /00 Be 60 46 2C O C:7 II-r:A,=f:1 P4r--v .'-AAY'::/"/ i,5%. 'V .9 IVS. Tr ,
DATE BY JOB NO. TITLE
L_____
R- I00 LOG OF BORING B-8
CALCULATION SHEET
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
/2 r____ .___,_._____r________
1 F:'K/,V 5 L=s
!• `• - 4/.rV4,TYG.A✓ //4. o 47R.'L%p ///2 5-24%:
,.4/07 rLE0 ,5%?C,VA 4,Vi SRAM ,1,--z.f.<;YFY
I :SiL;'
/u j -- - - - ' -' • - - i
-. BLU/.DH G1-Z4Y VERY F//./E .5A/VVY-_S/L7'
i ; Jv/T.L/ cc-asp-•s.'4L ✓.?6.4,V/C A'f,IT TER
/c', — - __.-. • !_ LccAh; DGkhC 6Q.4✓ Fi, . :C A-,F-.'UA1
• —• `• 6;3.z •.A/% 7 _5 2,41 E _57- r f`.+.',:`_,MAL-.`
•
O0 • 0• _'_,.
•
II ' . . ... . . 1‘,
. .4 + @ i-a�-i 0C._AS/0,VA_ <VO L' FRf:5A :E/J`S
1 ! _ -C1+;-' S/Z.TYr//Vr ..S4 NZ,' W/TH .5.4/ELLS
^' .- - - -I- G._� I /1- .44A�L Gait;1/E L.
1 •
, •
• 0 • a--
•
j1 7 C--- -- - - - -- --- - . !_' G-� Y" G .4.,'E t.1-' S.4 Al:: rV/Tr. �1).ti E
- „ ] ..:',/27
- 1 ® 4 .1
1 a
f ._o. _ .. ..-_ -. --
•
■ /. t E.• iV/:r 2.�...-TL SPi/7-Eti4RREL PR/VE
i . ® 54AfP..f"D /V'TH /3ed.TDSPi/7--S/00G'NSAX/Pi-4R •
/oo do— -bO—' 4C ter. o /'VAT�c CaVT._/VT. IV_ :n, '.�of 1),QY1-1/.e/ENT
'so /20 90 6n 3.,O o v�Y LE,vs/;--r-, r . /iy f`r
/ -0 6 ®0 40 ?v o "T,4/,/Dg RD PENETRAT/ON TEST, N, &O/t/J/{
ram.4.�.::"J k.rC:-'//' U -rc i -v
`-- DATE BY JOB NO. TITLE
R- 100 LOG OF BORING B-9
CALCULAT ION SHEET .
. r
METROPOLITAN ENGINEERS
SE AT T L E , WASH INGTON
, .
Li -- I / Ai. C- A/C. B /2
- A- , . :- - .L-7/"A•......:. i..-_, :
z_..'....::-p•, . .., • .' ,_.
. i -----1
iV .: . -'. '••':'..- —.:...-.: a f'/. "_':';•4 - ti•c..-; Y" ..5-,'L T.).• ,74.'..`, •-•••
I 1
•
,
•! 1. 11.... ".""s''""...''.'"...n.m.1"1 11, ' ,., ; : L_.'-',.- ;--..A._: - 14.i .'• si...• , '0,:f.....E
3 ! ;
. ;
, . I ' ' .1 ,.-.V.,c,^' :::::`:/'.' --•'.1:: 7 '! - ;'.'..7/?' ;_)C.7 . 1.-',-1__.
. .
. _ .
i , I • '; - ' ..- : -. , -— ""
; ; • 1 - _ . : --1'.:., ,._.4 kf.A.:.-1,-'..- V -
I 1 .
/-:.,.-:,..:,:.- ,,--,.- ,f---.A i: -. . .--c
1 ,
! t
I •
. i
I
• i • '--I .
.
i • ! i
. . 1
• ; ••:!"...4-* ...,-. V..... 5 ,.::.,....1'--. ;. . ,'' . .: *-.':_•_ .'..'.'....-
I ,
•
. 1
1
1 .
I d 1
; .
; ; • :
. 1
, ; — • ----.— r—•
P----i.. ,1-7,4‘i •• .:--:Iv': .,4..!:-:,,_-A.., r.-/. 7: ` , -' ....;: 1:•':71
, , ..... . i i .... —.— ,...... — ... . .,. . .
. i
ii.'C•X"..-.I- -f i,42r4•1±•-% r'
I
1 I 1
.k. .
1
2-9 i 1
i .:.4.•9,..2r. ''.. . f-
, -.... • : 1 ' —..-- , ..- ... A . ..c• — •
1 i
1 , i
1 I
i i i I, •: .
i r ....7 iii
! ; ; I. ''. i 'e.:_p.::..-.41 5. •:.:.'../;... - _...:-- ..` _,,,,!.,.2'; i '.:.2.... i'.9. 9- I
" N.."1.* •C C"
i
. .
i .
. I
I j i
. .,
1 ‘•• .. : ' ' . . ./''.''' .. ... i . . .
•
1 i j I
• .
._.,
, ! .
1 1-'..,----
,
. . .
• .
„ .
1 i i
••
i .•••
0
; .
.1., .,----- ' 7. • . , -,.. ;',.•.-ris c C.,"•ti ':-.7'. -,LA.', q`.• : .; ,:;v--LA,' "
1 1 - f•-•
t • --, •f- -
1 :J !....' al 4..•..., ic....' .... ..-
- -
. .
, ..--.:;/;• C.-: g.i.;'.1 i A'i L' 7,7..7 2 L L O. Z
, .
, . .
f„,,,) • .
•
•.- ,
•
DATE BY I JOB NO - I TITLE -
LOG C F B 0 .1 kJ G B- 1 O.
. .
, .
CALCULAT ION SHEET
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
• • •
I; 7,
12G
, .
i /1/' 6 / 0. B 14 . .
i/3.8 t, ,,L.L E I"' _fj/.-- -••..77:4::-<1
7 ---- -/..71' -'r. , E RC'AV FN 4' E ..`....,427:r" F;L " A'..Tr:'
.. . L.
I 1 i A C.;(.:: .5 •-[ 4".V 0 .
i
•
• ,"10 ; I . .,........1
. ! A i DT T Z. r: 43.P-7)WA/ ::::••ZZ
i. .
r. t.....-,:.-?
I
,. • ;
I • "t I
110.6ii ... tA 77' ficc:»1'\,' . 7- L./1'Z.) 5.E.G i'v'.'y'-e:/ti4.r Pi,-• 7 Y- :
I (! .C.i 5/LT i•11.'71-:' 'r--7C. 1'4.:.: i...7^-------- /A' ;•._,4>'r:
---,4T-- . ___,.
-:..._..-:-.•._ ____--.. .___ 1 .....,..1.11
100
. _ _______,
.. __..i... .. , . .
I ; . '
:7-14 2,.• " ;" GA:4;? r.'A...-F .5 4A,G' -C L EA/1/4../
. 1 .
,......, ..-...„. ! 1,1 sk. ..,..:j
4,
•,
• 1--1----: 1 71".. C7/7.1.."•„r....V 4:. s'A.11.0 :V'7-47 -1-7C,:t1.:_-
. _ • 1 i ____.' ______ _ 4;....._:,., 7,..
1 ' 1,4 I I ' 1 ; .• ;i .. .4 i t r .5/"If; ,"1/,'7.'7' 5:.;,,..4%:: ni',!.!.... Cr 1, :_.
; • ;
, II 1.• 1 i
, .
--- - .J.''- -,•-• 1
1.
_ .
./ I • I ' •--- - .. a ••I
ifj •
i : . •
, . 1 •
--- 80 - —; • , ,--.„-4-,A N.,' -:I 7[...--4--•Al 4-- ,4 1...- • ....,Ay; [-;:r.,,.•.k.'‘...; .-. i .
, 4
i I ;
[ I !
I .1 • -I
...: ... . • .
C -. C.-77:A E.5 C GA R.:7 S/Z.' A AIL) LE:."..7 ::L7).
? ....,.,..,i i. . I _ IKI-7'''..::, .,.-.:-...t,•..- -.;.-c-,/, N--•.•.-_:: A...:7--;:. .5.A 1
, . .
LENSES •
[
I . .. .
C.5X.4.7- :..--/Z.T./- 5-4•A i D).-
; •.,
--- , I A Q ! • .
t. . it,--:: CAA*''. 5,,'(-7.",' :7,1.1v....) . -': ::•':_:-....4.f....4-. ..:571..fri..L.:.-: .t.:
.- .1" G,fl;'./- :17:.7."'. .- .7-1!..;'...; .7,--', .L..:_.., .4,"...i.:'
•
ik..ii. L7.....-/::1.:.(1)._ • Di TEC-%.7-5.—....."::5-:.7 C:,:',71---:
.77:t771i..:..'.; r:cLr-C(-:;,..,1,/,f'4:,?-•::,..5-1';',--:.7 ..7.,F11A:711-
. .
i 1
i I •fi,. '
r•:,.,;•.4 1
K.1.7PER 4. vE,•:.. i AAJD POINT mds7444-ez; -. I •
. k-
. __ . . 1,•, , 24e w ii."'11, -/Je.
I ft' . I- 47 . 2-i..:i. .....5.9 -....... ':',..t"••••-
.
-- • . .47 ..:.' /.:...-‘ ,. .
' 4.;C •• :
1 !
* i . 1 .•
...N.:-typL E : .,'T:.I 4i7z,:• . 57'...7 B.Alt E.:.f.- .,?:•A.•lvt- •;.•
40 -- ; a z..,-..4.4,4',LE N.1.7.-.....-6--.D
- CZ 5-.A ;
'.- . /OC 50
4 2r:)--- viz•j --, ( •/ tV.•'.•- : .Z E 7 5 „. .
1 i I i .
n A',, ./...;e','1.7/7" - a yrc," , v fr'',..:;L-
AT a a 0 `,7 C GC 30 G - • , . __ . -
DATE BY I JOB NO •1 TITLE
. --,
LOG OF E.OR ; NIG
B- 1.1
•
• .
_.,
CALCULATION SHEET
•
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
. •
/2 45C.) //jC- IJO. 6 /7
I . . •
• I
E LEI/4.7/0N //3-.7 Diii/ L 4-:). A•4 j_:::.:
`.•!' I ' = y..--1 5i.0 i'://,' ,.:*::/,`•-•E;r"" SR-7- -DR r AN F.i,JZ,'4
_,...,
• •
C
-I- 1
I 1
I i m i•a m mg•m s-X-11:- .4
-;'... ..•.• •i GY AND RE I.r fri OAW F:Al E SAND
_..:.,
--- ..,......j•• • ' WITH 5-04-?.E 5ii 7 --.2771{E-lk•CL .
II. ,
,,,•, • I . I •
• r___
i - •.' ;•1 G ,4 tY k' -W N..A.7/7)- ItE. _TAI)
US ' I
i.--:. () jtri .I. . - - ''is i 8R0 YV,N. ,•'E A7 -5:::' 7
s,- .." - • -
t.•.1 /04.2 .:Ti- r-i-
;.1 -. ...m....ammommiss -1.'....1 0,4.<k GR4y.... /...:-/A/,4- ANC'J.. _
o . 1 1...1..1 •
t•- . , 1;• -•-1 - k.7 7.•V,D ES CO4R5
i .. l'-
..
- .
: •
•
_ __ . 1_,.,.... .._,::-.,,,c s-'4,/,,V;• •-- SiL 7" .L.4 )--Ek
r
1•.• z , • Ig:,-;-I ..
4,
1 ''' I Gi".."-Vi' 5A.V Z.-, ND
.
I i
I• •
1•
. •
,. 1 , II •.'
0
_ s
i• .-,.:1 .50mz sz.i No
: -1
17.:71H .
---- 4-_! -- - -•4-- • -- - — - I - •
-a 1..•
CON7-..i.'.1.'S :70;4 E .7;'.,I.:.•,'"
Li-j , . . . 1 -• •
. . .. .•
. ' I IL 4...1 OKAY 5.4/v1.) NI!I ti 5.-.i 7•1. Z.5 -
r-- g_.1' 0 4.4 VE.L.. ,.4.NO .5':',/E 5/LT •
70 i
, ....
• i IL CON T.4 d•-...5 SC 0.:(-4 4 k:i C rt,lci 7 C7f.1 4!-
I 'i . . i 1 • ' • ...--.
'• t
I• I
•
i
! ' 1—L_
a ',
SA.A.0fPLEC WIT/1 2.4 'i'L 5:Pi-,'7" 3,4 .1 E.' Z...:.. R/V f -
, . •. .
/QC a 0 6 0 4C. 20 . 0 V...4 7:. ..... .::..'•'7.r.' ....,../. .,'v ?,... ..;FT.':- ..,•_:7, Li: •....
L •
• i 1 I 1 i /".•) :). ,...."--7"V.5. 7-'1'' ro' I i‘.• 1-•;;/'
/fO /Z0 57:.i. r_;(_), 30 • 0
. . - . .
. .
•
.,. ' .. .., ,...:,(....5. .','zi• zi:• ../..' 7 70 ..t-— • ;••.F. •,-- •. .
• .
- .
. .
, , •
•. .
• -
. . . •
•
, .
DATE BY 1 JOB NO I TITLE
• .
L 7_,3 OF F:.:,: R N .3 B— 1 2
i___.____i
•
CALCULATION SHEET .
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON .
1
!s1.--�— --- — --
I C'5 F. /AIG NO. 823 .
•
�.? I I ' 7. `-`T Y .,Ti J/L'• Y':'- Try .', 2- . .Z. E
Y vs�,,7,•' G ti. ..7/L , }'- tVE.r' ,- F./h/E
•
• ; _ - --- , . I
I 6 SG Mt?CL 4'. Pi 4z I .SPL/T-L.;R..,. .` D.• .'Y'r
p- - -- ----- .SArvFLEA 4
c. PC v _ C,% 14:4; .� CON Tt ki7 W, MI % CF DRY �v`•G.`'7
- l .fiC)-- ..^�_<'.Vs/Tr rd ;ry PC" _....
ICE 9ti c - 7.
C,...2.-?i Jc j fc:=.:,-,J.!i.:7 C- t a_ . 4Jr 4
••
•
•
DATE BY JOB NO. TITLE
R. n o_ 1 A I OG OF BORING B- 13
• . .
CALCULATION SHEET . . •
. ,
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
, •
. .
, r---- 1 1--- 1 f o,f- /A/G No. -5 27
1 .
, , •
t ' I i z-.,f• zi';'-,/(..7.),V 1 if-/ D /1_,.:F....? /I/...,: (_"'i 1 .
I ,
SILT -ir/R 4/1
1 ..-
1 ,
__I •
I I
.-.
I__________________t. ___. ' -•••• m 0-7--71 i---„) e;..,r;c,',/AI GA }' .F,'1,.%E 5.4.'k,'D
, I •• i SILT
1---•••! c_"; r..r.7 70 S/L77.--- A-//VE -5-Z NG
' •\, ! ; . • : 1.--;
, 1
-,; \•3 ; -- •,:--..: G RIS i." i/E• Y ,4 7 NI- 54 trb,--.5-7 LT 1•4//777' i
; I . ! 3-41R•K GRAY .1-7AIE SAND LA KE k5"- SOFT I
, ... 1 • I
. •
, .
I I ur.: 6 k ..- PL.--',::-:-.)• :57L7 ,Z.VD eR.0 i'VN P.E--.47- ;
'`I /COI . -----:----- - ----- - --.-• : 'V 1 Z v 5 R 5 •
, • 41 ,._____ , _:
. !
,..,• •---I
. •
• ; l'!• '
V)
• ; --- -- — . • • f)..:1..71'.' GA )' tz•-• i:.-•:--MED/CiA4 SAND Vy17:=7" I
. I - -.5.0 A.!c Th..;•,A I (5,4 7'A ' SILT 1 A-Ns 4-5,
\_ • i . 1 Gic:4D-E5- CLEA Alf k
GgA.v TiLT- "G',c-,r fl.
. -, . 1 •
. _____--i
.. . •
-------- -,j,
I i ' 11"7"--"' GRA)-' tc I\••E -7 G N 3 A A.•L F i 1.‘"E .5 A IV i;I•- 3 7":-i i
I
0
i ; I
1 • .--
, - i 4 4.4,/s1 A-77 c,:•:,.41..S.
' ----L-- ....i..... ---•r:::.:1 ii 1 ; GRA Y' SAN‘'. A,Vi) G.'Av'.FL - C.'...FAIV
1 •
I
., . i-- •. T---- 1 , , t
, .
1 -. GRAY 5Alv.i..) -FA i."K 1_}-' C L.EA 8," • •I •
.:, --' 8C.: •
Li j 1
•
1-11 .
4 In'-'7--------T ."‹... G 11!-- -c-,'LT':.- .F I N f ..5-.A-VI) 14.7 MI 3 0'/±.
• 1 '. - 7./-•.--,' LS A,.\,1 c.7.• C.•C C.A.:-,':2 N Z L CC ' • I --
,4"".z".'4 G ii•:'.E"A17_5' ,
. i
. I .
• I 7 0 i.
; r---". 3-;:. i-"" 1 7 IA;E-1/r.-..'. • 41.. ,(1,•. 5 t i 1.) AY71-:( .5 0 4'5• ;
. '
. •
;
.
------ ---;.;=:---7_1.7=--,--.....-.L.i..--47..-=.E.--27-7.--i--.1 . ,,:_ 7 4 V t SA.'7.-1L-1 G 12 VI L (-7:C.- 5 A'- ••
0.:'CA ./'E ,L 1,12 ....)0
••1 GR4,V ..S .1\111 LAJL •
. • .
r .....-L-- . . .
., • : : • .
- I ! • •
• _..-.-- • . - .
,
G 0:-—
_ ...-
, ___
, __ ,,..,„. _ ,,,, ,v ....,„.. n„,. , wrz c7./7.7
L. ,i .-1/ Z.--14, :_-1,.'i t •V i dig.), ,11. /0 l..." ,... c1
I CC 50 Z C •=1 C <2 0 _.
DR.I • Di-N.3-17'Y, rd, /N PC F
I TO I 2G 90 4;0 30 0
•
• .
. ,
•
, .:-/.:.,.......,, ...7; z ../".::f-.C• TO
....,
1. •
f, •
DATE BY IJOB NO. I TITLE
• 7 0 ' '—, • . LCG OF E. OP
i
1
CALCULATION SHEET
METROPOLITAN ENGINEERS
' SEATTLE , WASHINGTON
c
/_'- --r e /' G c B.. 0
.SW N�/- !
i ,'_`::' ERC i4'// 5�:�.vp}' S/L T LG Y=RS
•
{ � r _
,;"r 1 1 �_�1 -~ 5/l:�t''.•".V-Gk..:)• •'YY. TTL r3 f7/�'.; 54.,Ii.)
y 1 a' Y FN5 5'G "Y[' -SOME TILT
14; R .
•
ki
`RA' 4'
' `- .; ;.4k 5,&A r• f•'ti'E M�: L!.' S!NG•
_
----- f: :CC,LO/G.N.4L 77-/;:V S/L7 Ld'7'E..:
It, 7s.L- -__ • - __._. ( '..... . - ..-.... r-..
I�, I I i---, _ _
I i .,..1 5/L. 6./A/...EIN
i 7
i I O&4 Y /v_r;,,,,1, 54•ti!, r<V''y O'Oti E GRAVEL
'n I-. . - �- _,4 .1 ND _C:S;0NAz_ /H;N r/L T LA Y.4-/C
I 4 i•!F_EC. Yv..,T;T 2 r ID 7.r,_:7-5 iRR rl DRIVE
I i i ..•.A,Pi.Ek
} ,
•
•
inn• - -- f --- -
--- i ---
-- -4. •• " •
nf:, r.{, L•'4 /
7ER C � ENT,.U, IN % c,F"LI Y W�/C:i:' .
-4./J.-- <.t-:.'c-' re- • .
•'.'L-. . f _
•
>J
•••- .r."::.i.._i. , ✓Yi"i..; Zvi ....-- - /%/..'":✓C- .._ . j .j5
:rc : .--.
a-. L;:zi.r' .rT.i.,e ..',. i - '.1' e.:/.'.:,ic: ,'..+VS,:
1
.4/1_- 1.. i A i &... /:.!. 7.
•
•
DATE BY IJOB NO I TITLE
1
F 20: - ' .7_,G CF BOP I NG B- 15
CALCULATION SHEET
METROPOLITAN ENGINEERS
SEATTLE , W'ASHINGTO4
•
iv //,/� G�;;G o�rG,��l �;�✓ ��� CZ:V7 o, Z-'i ir//car
D.-Y -0�i�/si2 y /Al POUNDS PeR CLie3 .roc r
A/' C '3L o 1-✓S R Zvi.=? 94i.//Z 7:7-/cf•
EACH G ;vC//65. . /-7PL`.1,? av - i�,� li2i,�i/VG
,z-/..J L/.IA.0 r/S7ZAYC& = "y
,2,54/4PL 6 7,4 k�.1/ WI T// 3%"Gv ( 4-2„ ID) 5 ,4PG cF?.
7TTMP 'Wirt, No r�=Co✓cr2r'
I _
TA/ 7a W///C f-/ C45,AJC WAY Re cp J/'?v vuRi V 7?I .
(ith'450<q6-.I) .y/du/ s7 ✓Vr/? LEVEL
•
•
DATE SY JOB NO. TITLE Lc(: 6-A
,\)200r . La B- 16
CALCULATION. SHEET
METROPOLITAN ENGINEERS
- , SEATTLE , WASHINGTON •
/ EL 5VAT/O/V 5/2, ..3- - 1: —_.
W 1�d Al LO CA /c)A./; A/.593.'c;' 2276:4 -.
1 f r/30 DATC D/c/LL D,' c3-I/- 69
$'Ofr7V,//o G,VA' S/-7 A//D s/L?Y 54A//� G✓%///
i 1°-�I 50/v1a FP'ia L�5 7-7!L%',: C/J•i1 G0/;1.:4 c7
e
/2p � .� is/ /0 /4 // ��...A •
O I. D
i .
-, t�N 20.v /c 2 7 F // . =I-6
ti
-.4NO36.3 81- / 2 3 ,J•:_.;1 ti>OTTI�U- -.C/„Y A,•/o e/F0P//�/ 5/47V Y./'Y
P/// SA;tee //D G%/TH SO.k/c O/c'G,4i//C
_ .• _Cri i_j
_ /mac,=1T7':=/R -SOFT
4.S;Z d3 •• / 2 2 C G '.;Ur_'S' G/�=�Yt�
.
.
l /00 34.4- 3'/ / 4 5 L s..s .
- ..._�1.-' I. 6.74Y F/iV -/'i':D/./J/,t- COA i S4. 9J4//0 •4/ID
/r.8 73 2 4 6I E : GRAB&L i'76/ 1YOO.2 Gi1-„5i/7S-,5'Ur'T
I ,4 3a
- / 6 - .
4 .
...1
.27. 3 /to 4- 6 6 ..• . .
.4
b• e
//. 6 20 G•, 6/FAY /LTY F//!_ r',7/✓,� A/t/O F/Mri -Mi. O//.lM
I s9 .. CO.4125'E SAN.o Gv/TH /'�,C",3/3L-:i AA,/O S</.''LL
FR C741:.;✓TS -- CO4t/3,1CT•
• /S.o //7 /2. do,„� r e '.��.� .
'! 70'
NOTe5 • .
- a/, apot/ COn,//?L-57/ON CA$///G ,247.4-/c.wea ,4/VD , ORING
IYA C/; /L!:""-D 11V/TH Pt:A G,:'A✓1 L
. t2, MTh"? LrVEL ,1/cr R crQDED . .
i -
F
' DATE DY JOG NO. TITLE
. R zoo ic ZOO- O,� r$c,Q//•/G B- 17
•
CALCULATION SHEET
METROPOLITAN ENGINEERS '
SEATTLE , WASHINGTON
:3 . 75 56 ..
Y
I ��/ •
- L2 VAr/0,V.s I20.9--_ _.-----.-------_---
W rld Zoc4T/O,/ ' . �v52.�. //- E240.5./
pc( / 2 3 DATc G,c Ll ED : a-/2- a9-
.• 8,�D Y/// AI/D C.F4Y 6/LT I-V/TA/ OCC,45/Q/'/i�5G
/2v 1 e Pt 1 3 A//D Or'Gid///C ,wMTT4/ .5
< .q , ?Ii. 3 5 6 W _sl . .
-- N. ' . GRAY 5/4TY VE,Z/F/// ?:vo w/TH ? //,..M
j //0 37o 83 / / 2 -! 13k."0rYv SYLT LAY ,•?5, D,?GA1V/C /./ATIE'/iS
I•: A,VD Pt-F i 5 :iOPT .
;, v
g 8 - / 2 2r-. :.
. . . . .
...
6
/00_ 3q.5 8? / 2 2 .1 D/4//! C-,ti,.9V SATy r/� Y.:.,? 'I /� �,
`~
7 - 4 oa n/L ' 0/7T
- [..;c1
��.
0 Is.
99 3 .3 a G 2 6 9 ` ;..-si
CZ /5A/G E-D 6/7,4✓eZ . .
-- l}. GRAY.
F/A.4 —MATC1/4f,'✓f—CO..- ?, a" .JA/VD
�i ' .a
' kV/rH. G„',4 V -- ,4' L caf,.9cr
ea- /6..t. /i8 2 4 9 a.
•
_Gi f y.S/LTY F//•/F= '4 h9 4//ID Fi'•/ti-/.','f'/? e./,',
a .c0.4 , .5• _ter' ' /-V//'H P, Q/F.:::S4,L'
• -2/ /o6 2 . 5 9 -i :__ -SHEL IT'F/;AGik/'=:,',/7.5-,VE-",O/..ji,, CO/e/fc-14CT
.
r--;1
/o'•- " /3 2 /2 /2 /4 =Lf q`
I 7� .
-
'( = .lo76 S :
/./ li-at./ GQ/ °Z. r/0,.,/ y4 5/A/G, l', OVI- ) 4A,/D /COR/,`/G
• - 54CKP/4G.D d//TH '°M G/"AV L
• czj Well 7E ' LEYEL ,NG7" ,'C',WDED.
DATE BY JOii'�10. G TITLE /r Q� c, B- 1 Q
. /r' 'NO.
Cal'//•./e) 8
. CALCULATION SHEET
METROPOLITAN ENGINEERS
SEATTLE , WASHINGTON
i/ d'd -;C/.._ CO C47/0//.'_-. t/3 v?.3/E24.00.3
= TRI:0WA/ 4'JD G2-iY 5/L r-`✓/TH OCC45YOiAL
/2d' r'�: PE,5,54£-S (F/C[) -MoD,�-=R/TeL?J A-WM
• --• -234 /co 5 8 /o II .
/ / I• Gi34 !//G &?O,I S/LTY 1/8RY-F//rt 54,V✓D ;%p/
• 110- a�.cj / / 2 .s: OCC4S/04/AZ O.2G,-?1V/C NI,�JTER
4 ILL::iGRAD, S TO F///� -N D/ //I SAND -. 1a•4 7/ 2 4 s
� •
/C 2 4 5 .
2 .I 94 2 6 8 Fi -
d :30.2 87 3 5 8 • .
• .90 )74 . 76 4 & /0 .•.•...j
- --.1 GRAY F/NE -/•/i O/L/,v-CO4:?S4 SA;1.0 r?//O
.7 GRfi Vc L -/1,/ D/L/A9 COA IP.4 CT
7,? 4 8 /8 Li:: .. .I
, , : o�
2 5" /6 —i.? e 1
t � G2AY 5/LT F/N S4//D4'•///) P/V A' /J/./4,/- •
2c.7 /c7 4 6 /0 i :•
j
4/.2 / P. ,�' - CO, 5 r401/0 ,ivir ,?!L-S is///J 5i : LL
•
1 PRA YIE/JT,�r -Ivide/u,:1.CO61P/GT
,i �� _ 16.2 //zf. 2 4 6 h.7 %a•. :• C/) z1PON CO//PL.:7/OWN C4 7/H(a , -i'OYG D /;/•1D /30R/,VG
.f_?ACX F/Ll ED WITH PEA 61A vEL .
C- J Yt/QT= Le-7/:z. Af/OT /?Ecc.?D6D
DATE BY JOD NO. • TITLE
,? 209,c L o& OF of/,vG B- 19
CALCULATION SHEET . -
' - METROPOLITAN ENGINEERS -
SEATTLE , WASHINGTON
I`
. 48O,/iVG _ . 358. . .
i. ezE/APOA/ : //7.8 ::- .. _ _
... N.39S.5Z.E2505.2..::_.-.-.._
/zo 6/ �'c'� / z -L71TE ,c//E I. D 8.13-a9
I:_: .f320f✓1 A//D &,?, Y' 5'/LT Y 1/ R r- //✓L •
-
• I`._ i •54A/0 - 60 icI .
1
ir' 7'
p //G I
•
I
�� zizQ" �I _
3/•4 aS / / 3 ' r-
s IGG ;t" . PEAT' 5',4" T' S/4T '''o'1j /FT. &
7/WC
.. GA14 4%- 5 TO r=/A4.5 -/; ::'D/ tt1i/ 5'A//D
�, -24 41 77 G /0 2c L •• ::' .
`L. 2).7 /cz 4 . 9 /9 L 1
;r . !0
6 • I.•.' G/?'4 c//&:-//1;i7/JM-CQf�R '� .54A/4fi 4/iD
I1 -••7 6/'%-+'YZ:L '/t1t.v1U/✓1 C04-/PAC`
ti /3.c /27 ? 3 6 r'a•
Ct .-i .
l [...: IG,?A,04=S TO F/M(/4-/n.eD JA1-COAR9 T•:i//3I. ' Z.1 23./ /c3 3 • .5" /2 `Ii .6,.
V
• q
/8. /0? 4 6 /s C ?
,•:.d 6RAY 5'/%TY f1,Vc" 5;4,va Akio flh//4F-AJ'i)/L/A'/-
7 -a I COA, SE J'A1VO frV/TN/ /0c/351jc, S AI'.+i
- .3.0 /c c 5• 7 9 [I 5Hc-L.L 6;el c 441:-:'✓T:3- NZ1.1 ?)/J COIW/;14Ct
• 70 o ..l
,0.8 C o.
• . - doT�S
.
(b L1/%O:./ COidi /..tir•T/O,V CA S'//V y 2 /.,/0V:: AND
13oRm/v F',4CKflf L:_O il'/7;I P.L=A G-2r-1 J' L.
• • L2✓ ;�VArc2 LE✓ G Nor R�CORvW©
I - .
- ' DATE BY ' . JOB NO. TITLE / /�
R coo F [OC, `J/' /5o '//✓G 13-20
•
• CALCULATION SHEET •
METROPOLITAN ENGINEERS
• SEATTLE , WASHINGTON
it
,8ae/iV :: 3 59.
f✓► L' V,,L6 7/0//: //7 3 .--- -
W rd . . LoC4T/o1A/,. /v529.8/•-2.508. 4
i20 / ci ` Z 3 VAIL- Ogia10 -:8 /s-�'9-
T. -8A,PVN .4 MO C�'.�Y /LTY VERY.P/.A/£.-
r-' . 5 D',4iV - SOFT
-.I
'.\ 24.7 9/ 3 2 / r[::. 1 .
: , Q //a • ,
/ 2,, / •
G434Dr 5' TO G/?,-W F/;:/C SA".40 'T/7'
'Gi 10' ?9.4 9/ / /: / r: _ . . WC op F,^.4G/�/CA/T'S
�. •' 27. ' 97 / . 3 4
. 2 -9 $.t' 4 . 6 /2 1
ti Cu . 62AY F//I�:-�A-/ ^/U/!-C.OA,?5-7 5',�'V ,410�rrvrt -�� - /�,/ co,+i /7c .. .ti /0.2 //3 3 4 7 E:'1[::'..1
;
it) D`°
ril
/?.s /°7 7 S 5 n +GRAY S/LTY F/i.IE 5,4,VD,4,VO Fl,v:3--Ade 0/[li,1- -
70 ,
/.t-.3 /i9 2 4 /g r, -o
•
;VOTS .
</.)-ZJPon/ COMP./ET/ON CAS//,IG R.,M.1oV4-F D A,v.D Sv,2/NG:
13AC/lF//Lc/J /%/TH P9A G/?4V1f4
• . (.2j -WATE.4' L EVEL A/OT i�EC2QDED
; C . . •
DATE DY JOD NO. TITLE
. n, 200 G. L06 0 . f'cr/N& B-21
CALCULATION SHEET
METROPOLITAN ENGINEERS •
SEATTLE , WASHINGTON
_ ,80 //1/G a 60 •
/30 . p/ d'r/ IL/ .LOC4T/O/J: N8o6-.o/L-'2283...6_.
T:~ 6R4 -' iS,','O%%✓ 5/Li-J' 5 4A/n �,'r/D. G:•.'.;;/L7L
.. (...L) - /Y/._o/1U;,•/ Co;,/p44C7
� 20 ...
/s 7 // 4 /0 9 •.a. •
1.,_!.....
V/7.y -��o ,5 I 6 •-
•:-¢. .
11 .7
1/0 3 G . v"s 2 2 2 � ' M-/oTrt -D /?;'O' 2✓ cLAY )-' 5/.!#//�) vt:-�
-., •S f//✓c 44/O1 SILT sy/TH occ;,4 5/O/,/AL
Gz . 1.-.:•••fsO"'G41V/C '/4 7 R/4!6 -5'OFT
f0.3 79 rii.
Z' /00 22.6 /r4" 7 // /6 F.: ,DA/e/C G,2AtF/,V::: .54,VO -,41.9O/ /M COMT'.-?CT
Q _ ' 44,4-//A/,7r D G,�9Y Y4"r?Y r'/,V ;: ;�/n f
,4A/0 P
t P/NE 5,4//GY SiL7- SOFT
G/�,14e /illi. -ivid-: /e/4f— f/OA l�SE- $,4VD 4/Y 0
v. 90 /o.� /;siN // 6 /4 /Z' E`a. G2.�1/cL COMPACT
/). /2S" 6 /2 /5 r •. e•
1.1.;
. Pia9.3, /33 / • 4 /0 a.:
/?.c 1/3 rf = r';Z-7s= G/ A r- 5/1.;,,.F/,(.i:: 5 h'O 40,'i, ' -//r.GA,u r/-
J - •
COA/?bE .534,v1 kY/TH FEFr3Lc-s ,41./A
SHELL Fi?4G�///4/✓T.0' --CO/2ACT
-gores . - _
• (/) .L./Pail COti pL eT/ON C-1 S//✓G /Emo vED r4N0 g o.;/A/G
- /9,4 C./<'F/L L�D iwril Pea GR,4 V L
•
C2J v/P,7.6R LGVVL NOT A''Cc'v&D
•
•
•
DATE - DY - JOB NO. . TITLE
n, 200F Loy 6)1 75oRiwG B-22
•
•
_------ , \\< 414' ...z..,,,, 44:
/ .5'.."_ - I CITY.LIMITS A'q.LR Q>e y �1.�A� h' • 1�—
•
\ ts..\.. .Lr-,..zx . Z..,,e.* - . ...44: .._‘..,...,-, ,i
,E41- ERToN .__ - ' %6(ticill ,-- . , 4„,- ,, •Zy..,.s'"V - 0 te
• f- -. n _, � . %ice • pQ/ - -
t .�
�- /
tl Q ] \�RENTON _ - _�I._____ E.O?L1N6TON ----- -
-,d SEATTLE �l , l `\\ \� GOLF � /
'TACONAj 4' RENTON /' . L '
` ANTAOL CBI YWAGE \ co cows E S.W. TT AYE.
AIRPORT W TREATN£NT \ - ,\
PLANT \ ` _ V
I , 2 + oKENT I lu 9
e , \\ h y
;I - E7 •AUBURN \ \\ I % e
111 \ %\ 2 ° RENTON" ►�, .1 O
\ • Q A T RPL.AHT �� W S
1I -
�`, �C1 �y J. *CALL' _ �\ / / 41 - O _
C.J - IN MILLS • - s r`'i
' , Il
� R: �
I J / Q �. �i. ®x 4061
�r I �i S r
\.,,,.......\....,...:
VICINITY MAP / QgW - {. h .' ,,. v y`
/, ,
•
,c'
INDEX TO DRAWINGS \ w •
RIVER °+ 4
x
•
.\ : e
4.1
(ri1;
411 V 1
+ y x �'k LONGACRES -
• p F
Q I 1, RACE TRACK
I �. s - Isa T/+ sr. _ - DATUM N01E�
/ SEA
e_ LEVEL• PROJECT
Y LL$. 8AS EQUALS AOJJ
- n I•y - j�jj/ E NLAR E)MENT II
I.I 1
If LOCATION MAP
\ \ . \\ I
SCALE`1'•900 — -
_ -- — unc" J.F. iC0 I1111.�TL'1t© Mmliioaliev o(MeteemdlW Seattle ,-
''"
J
UL 1961
-`" RENTON TREATMENT PLANT ••e•'A12010
- - .•�Y„D.W.G. NOTED ENLARGEMENT II-PHASEI •..r. C96
LOCATION AND.VICINITY MAPS `r".
•
;::--1:\v,•,:'. ,‘‘,I.s'ff:',41..:Nss,. .-' ‘-i__-.•- N. / ,-- ••. ‘. ••.: '
. ;;:i i.,, .* r I...,,,c:":;;:_ ,,'":
. • V,.‘:"V‘;1 \ I,' . : t.. , ", ,,
. .
, .-
. .......
, ..... , .
N r, ;;', J I , '` a .:. ,�I = '
• ,. _
•. .
•
....,...., • .,
SCALE:I� 100• `+�\, ` �` ' __ �`` .. • ,, .
. ..
,.
, ..• I / . ,,. , I
+•-_ k`-- - , `` ; • ��1011"111-10.Kettea ,,; \
ik.,.. s:, -,:\ ss;
''•%.•':.1, 1,k;st00, 'C'.'s 40W71101 I 1. : ' 1 ' ''''" ''' '‘''' '\‘' \:' — ss
. . . ; - •,,\, . ;,‘,,;.:--, 4f,.,:;,...,t,,,,...atil = ‘--. ', ;IiI;;'.-,. -:- Itigits:is.• . ..; ssk• ss .- ', •. .
EXIST.WATER '' `\III • i�1. w + X1� 45' . 0M04, `. .
STORAGE TANK __ / .4� y_- - ; 0d •.t ..
li
1
] ,
7-111111111INF '• '. -' , .
` ` ` ` �
,
SITE SI ---�� t'i •a --- ' I. , , ^ �• .'� .
. ' ' 1. vI , _- ,. '+ 11,r � 1 ; ; •_ 5 •
• � ":,
f �33+, Ii ;
. - • I "'�•'.�.-.;% •`s- �� �, `i '�� '.w.-. mi _�� V '• i , / ( - • IV i1 L7i�i�l = \
`-_M ` %i `1 •` j4== = \U- • ,I tJti ;s u ,I i:: . '�,
\„,,,,01 !,.''...*IMP-',:".- ‘; . .4.% ' :,:.• ._-_-_-• I:\ • .
•
- off}� , y ;�,I�': 71116147,—/Ak‘:-11111`"----4er(ri,'114.'\:-
�� .
" - . : i , 0- . 1 :- . ,;...;#. S . z . ow' . - w,',1;;;:‘.'‘ --,..'2,'-- 45:1112LITAIt /CT"' I ''' • .. \.„ ,
f ►ea's\pN sN� • ��� � 1 ; •I is\ .
a
• • ` _ _____f=-• sit NES / / �,. TOP IOF DIKE
•
• _ 0 ; : i `� _ __-_�__-_ / 0. k;"+ .' y( 0.jam/ l�l{� - __ ,
.,,_` , '_-a- - _ • pIMENtAN %`'^\O�JN/��j/n.r'-✓//�,jW ,Y�I�I� \ _ -•� } I _ •
if . :,,.
•
.-...:--s:::' mi,s112C,Ittf • . a& ' co, 4,„ .,,‘..).,,,,..0i .
•
"ram®I -•ia•." --- ' _ __ Imo PROPOSED FILL AREA
{ ` - I. ate`_-
.......• J.F 3li� TETAO At@IdPdaP of At a�wlu.A s.�u. ."JUL 1981
"' RENTON TREATMENT PLANT av A120I0
O,W,G. NOTED ENLARGEMENT II-PHASE I' •'a: C46
....
GENERAL PLAN �2....
.. ... .. ....
OF FILE
FILE TI • •
•
t. (1.00e0 .12,2.:00k)
• •
, A • /
•.