Loading...
HomeMy WebLinkAboutM_Shoreline Tracking Worksheet_180126_v1 - 1 - 09/16 City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site?  Yes x No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials furtherer inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). 1,150 square feet of an aluminum pedestrian bridge, with a concrete abutment 3. If any part of the structure is within 100 ft. of the waterline, list its distance to the water. List each item separately and include buildings as well as hard surfaces like patios, parking areas, and decks. All 1,150 square feet of the bridge and abutment are over or within 100 feet of the waterline. The underside of the bridge is at least three feet above the 100 year flood zone. SHORELINE TRACKING WORKSHEET - 2 - 09/16 4. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings should not be counted. Shrubs, Cottonwood trees, Alder trees, Cedar trees. 5. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings should not be counted. 51 native shrubs will be planted around the abutment, or approximately 150 square feet. IN WATER AND OVER WATER STRUCTURES 6. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)? X Yes No; If yes, fill out the table below. Describe the in and over water structures on your site Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain Pedestrian Bridge 1,150 sf 100% Existing structures that will be removed None Proposed structures None