HomeMy WebLinkAboutM_Shoreline Tracking Worksheet_180126_v1 - 1 - 09/16
City of Renton Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
The City of Renton is required by the Washington State Department of Ecology to track and evaluate the
effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with
respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline
Master Program report every eight years to comply with the Shoreline Management Act requirements.
SHORELINE STABILIZATION
1. Is there currently a bulkhead on your site? Yes x No; If yes, fill out table below.
If no, see “Site Conditions”, Section 2 below.
What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard
Materials:
Linear Feet of Soft
Materials:
Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants);
Combination-soft materials at the water with hard materials furtherer inland, or a
combination of hard and soft materials at the water.
SITE CONDITIONS
2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g.
2,000 sq. ft. house, 125 sq. ft. greenhouse).
1,150 square feet of an aluminum pedestrian bridge, with a concrete abutment
3. If any part of the structure is within 100 ft. of the waterline, list its distance to the water.
List each item separately and include buildings as well as hard surfaces like patios, parking
areas, and decks.
All 1,150 square feet of the bridge and abutment are over or within 100 feet of the
waterline. The underside of the bridge is at least three feet above the 100 year flood zone.
SHORELINE TRACKING
WORKSHEET
- 2 - 09/16
4. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings should not be counted.
Shrubs, Cottonwood trees, Alder trees, Cedar trees.
5. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings should not be counted.
51 native shrubs will be planted around the abutment, or approximately 150 square feet.
IN WATER AND OVER WATER STRUCTURES
6. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring
piles, boatlifts)? X Yes No; If yes, fill out the table below.
Describe the in and over water structures on your site
Type
(e.g. dock, float, bridge,
mooring pile, boat lift, etc.)
Surface Area
(in square feet, if
applicable)
Light Penetrating Materials
(the percentage of the
surface area that is made of
material that allows light to
reach the water)
Existing
structures
to remain
Pedestrian Bridge 1,150 sf 100%
Existing
structures
that will
be
removed
None
Proposed
structures
None