Loading...
HomeMy WebLinkAboutMFP24005223.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24005223 IVR Number: 24005223 Permit Information Permit Name: Luffman Byers FO cable overpull Address/Location:10/14/2024Application Date:3779200160Parcel Number: 501 MONSTER RD SW Permit Type:10/31/2024Issue Date:Franchise Permit Work Class:10/31/2025Expiration Date:Minor Utility Job Number: P.004576 22415Franchise Type:Telephone Description: Level 3 to access two existing manholes in Renton R/W to overpull new fiber cable through existing conduits. Contacts Name Address PhoneTypeBilling Craig McPherson K&B Technical Solutions 6566 SE Lake Rd Suite F Milwaukie, OR 97222 B: (971) 282-2149ApplicantX Anthony Carmouche Lumen B: (281) 618-3988 C: (832) 205-1717 Contact Cory Humbert Mastec North America C: (253) 244-0677Contact Mastec North America Inc 800 S Douglas Road, 1200 Coral Gables, FL 33134 Contractor Business License Number: 51687Construction Contractor: MASTENA991KJ 501 MONSTER ROAD LLC 9125 10TH AV S SEATTLE , WA 98108 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Scott Warlick CED 10/31/2024 Monday Friday 8:00am 3:00pm Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) MONSTER RD SW ROWROWROWROW BNSF R O W BNSF ROW500 MONSTER RD SW PARCEL: 3779200-180 500 MONSTER RD SW PARCEL: 3779200-170 501 MONSTER RD SW PARCEL: 3779200-160 DRAWING NAME: LUMEN ENGINEER: ENGINEERING FIRM: LOCATION: Lumen National_P.004576_Span3_Tacoma, WSDOT#2, Renton, King.Co. Permit_Site Plan.dwg NO. 1 3 PROJECT NUMBER: 2 Anthony Carmouche - 832.205.1717 K&B Technical Solutions P.004576 (LUM WA-49808-22415) 47.475330°, -122.248960° TO 47.479457°,-122.253710° 501 MONSTER RD SW, RENTON, WA 98057 1 2SHEET: OF CONSTRUCTION NOTES ATTENTION: Washington law requires an excavator to provide the notice to a one-number locator service not lessthan two business days and not more than ten businessdays before the scheduled date for commencement ofexcavation, unless otherwise agreed by the excavator and facility operators. If an excavator intends to work at multiple sites or at a large project, the excavator must takereasonable steps to confer with facility operators to enablethem to locate underground facilities reasonably in advance of the start of excavation for each phase of the work. R MATCH TO SHEET2MFP24005223 ROW ROW 500 MONSTER RD SW PARCEL: 3779200-190 501 MONSTER RD SW PARCEL: 3779200-160 13802 BEACON-COAL MINE RD S PARCEL: 3779200-237 13728 BEACON-COAL MINE RD S PARCEL: 3779200-241 MONSTER RD SW TO 68TH AVE S BEAC O N COAL MINE RD S - DRAWING NAME: LUMEN ENGINEER: ENGINEERING FIRM: LOCATION: Lumen National_P.004576_Span3_Tacoma, WSDOT#2, Renton, King.Co. Permit_Site Plan.dwg NO. 1 3 PROJECT NUMBER: 2 Anthony Carmouche - 832.205.1717 K&B Technical Solutions P.004576 (LUM WA-49808-22415) 47.475330°, -122.248960° TO 47.479457°,-122.253710° 501 MONSTER RD SW, RENTON, WA 98057 2 2SHEET: OF CONSTRUCTION NOTES ATTENTION: Washington law requires an excavator to provide the notice to a one-number locator service not lessthan two business days and not more than ten businessdays before the scheduled date for commencement ofexcavation, unless otherwise agreed by the excavator and facility operators. If an excavator intends to work at multiple sites or at a large project, the excavator must takereasonable steps to confer with facility operators to enablethem to locate underground facilities reasonably in advance of the start of excavation for each phase of the work. RMATCH TO SHEET1MFP24005223 DATEDESCRIPTION9/20/24ORIGINAL ISSUE---DESIGN BY K & B TECHNICAL SOLUTIONSDESIGN---DRAWNC.M.---J.T.M.---LUFFMANBYERS - SEATTLE-PORTLAND OVERPULL 501 MONSTER RD SE PROJECT: P.004576 CITY OF RENTON, KING COUNTY, WASHINGTON SHEET INDEX SHT DESCRIPTION 1 COVER SHEET/VICINITY MAP 2 GENERAL NOTES 3 - 4 TRAFFIC CONTROL PLAN DESIGN BY K&B TECHNICAL SOLUTIONS P.O. BOX 2529 CLACKAMAS, OR 97015 OWNER / APPLICANT CONTACT: ANTHONY CARMOUCHE OFFICE: (281) 618-3988 MOBILE: (832) 205-1717 E-MAIL: ANTHONY.CARMOUCHE@LUMEN.COM SHEET PROJECT ID 1LUFFMANBYERS - SEATTLE-PORTLAND OVERPULL501 MONSTER RD SERENTON, WA 98057PROJECT: P.004576COVER SHEET / VICINITY MAPP.O. Box 2529, Clackamas, OR 97015Jack Nygard - (503) 544-5749Jack_Nygard@kbmail.netCONTACT: JACK NYGARD MOBILE: (503) 544-5749 EMAIL: JACK_NYGARD@KBMAIL.NET / PERMITS@KBMAIL.NET LUM WA-49808-22415 WORK LOCATION AT MANHOLE MH-0680-1304 SEE SHEET 3 WORK LOCATION AT MANHOLE MH-0680-1212 SEE SHEET 4 Anthony CarmoucheMobile: (281) 618-3988anthony.carmouche@lumen.comMFP24005223 DATEDESCRIPTION9/20/24ORIGINAL ISSUE---DESIGN BY K & B TECHNICAL SOLUTIONSDESIGN---DRAWNC.M.---J.T.M.---SHEET PROJECT ID 2 PROJECT: P.004576GENERAL NOTESWARNING SIGN WORK AREA CONE/CHANNELIZING DEVICE LEGEND: TYPE II BARRICADE TRAFFIC SIGNAL ARROW BOARD SPOTTER FLAGGER WORK VEHICLE RURAL HIGHWAYS RURAL ROADS RURAL ROADS & URBAN ARTERIALS RURAL ROADS, URBAN ARTERIALS, RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SIGN SPACING 60 / 65 MPH 45 / 55 MPH 25 / 30 MPH 25 MPH OR LESS 35 / 40 MPH 800'± 500'± 350'± 200'± (2) 100'± (2) FREEWAYS & EXPRESSWAYS 55 / 70 MPH 1500'± CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 40 30 80 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH (FEET) SHOULDER WIDTH (FEET) 8 10 25 40 40 30 35 40 45 50 55 60 65 70 40 60 90 120 130 150 160 170 190 60 90 90 150 170 190 200 220 240 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THAN 8' POSTED SPEED (MPH) MINIMUM LANE CLOSURE TAPER LENGTH (FEET) LANE WIDTH (FEET) 10 11 25 105 115 30 35 40 45 50 55 60 65 70 150 205 270 450 500 550 --- 165 225 295 495 550 605 660 -- POSTED SPEED (MPH) 12 125 180 245 320 540 600 660 720 780 840 BUFFER DATA LENGTH (FEET) 25 155 30 35 40 45 50 55 60 65 70 200 250 305 360 425 495 570 645 730 LONGITUDINAL BUFFER SPACE SPEED (MPH) TRANSPORTABLE ATTENUATOR MINIMUM HOST VEHICLE WEIGHT 15,000 LBS. THE MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATION. 30 FEET MIN. TO 100 FEET MAX. BUFFER VEHICLE ROLL AHEAD DISTANCE PROTECTIVE VEHICLE MAY BE A WORK VEHICLE STRATEGICALLY LOCATED TO SHIELD THE WORK AREA. NO SPECIFIC DISTANCE REQUIRED GENERAL NOTES: TRAFFIC CONTROL PLAN AND ALL DEVICES SHALL COMPLY WITH CURRENT MUTCD AND LOCAL STANDARDS. SIGNS AND OTHER TRAFFIC CONTROL DEVICES (TCD) SHOWN ARE THE MINIMUM REQUIRED. WHEN FLAGGING DURING HOURS OF DARKNESS OR LOW VISIBILITY FLAGGER STATIONS SHALL BE ILLUMINATED. FLAGGERS SHALL WEAR A HIGH-VISIBILITY ENSEMBLE WHICH INCLUDES ANSI/ISEA 107 CLASS 2 OR 3 VEST IN AN APPROVED COLOR, ANSI/ISEA 107 CLASS E LOWER GARMNET, AND A HIGH VISIBILITY HARD HAT WITH 12 SQUARE INCHES OF RETROREFLECTIVE MATERIAL PLACED TO PROVIDE 360 DEGREES OF VISIBILITY. ALL SIGNS ARE 48"X48" UNLESS OTHERWISE SHOWN. USE FLUORESCENT ORANGE SHEETING FOR THE BACKGROUND OF ALL TEMPORARY WARNING SIGNS. DO NOT LOCATE SIGN SUPPORTS IN LOCATIONS DESIGNATED FOR BICYCLE OR PEDESTRIAN TRAFFIC. MAINTAIN PEDESTRIAN ACCESS TO/THROUGH CROSSWALKS AND/OR SIDEWALKS. IF ACCESS CANNOT BE MAINTAINED, PROVIDE AN ADA COMPLIANT PATH AROUND/THROUGH THE WORK ZONE. MAINTAIN LOCAL/DRIVEWAY ACCESS. PLACE NO PARKING SIGNS 48 HOURS IN ADVANCE. COVER STOP SIGNS AND/OR DISABLE SIGNALS WHEN AT A CONTROLLED INTERSECTION. CONTACT THE LOCAL TRAFFIC SIGNAL AUTHORITY 7 DAYS IN ADVANCE TO COORDINATE SIGNAL MODIFICATIONS OR SHUTOFF. ADJUST TO FIELD CONDITIONS AS NEEDED. K&B TECHNICAL SOLUTIONS, AS THE PREPARER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THIS APPROVAL.P.O. Box 2529, Clackamas, OR 97015Jack Nygard - (503) 544-5749Jack_Nygard@kbmail.netLUM WA-49808-22415Anthony CarmoucheMobile: (281) 618-3988anthony.carmouche@lumen.comLUFFMANBYERS - SEATTLE-PORTLAND OVERPULL501 MONSTER RD SERENTON, WA 98057MFP24005223 WORK W20-1ROADAHEAD3 5 0 ' ±MONSTER RD SW35 MPHRRRRWORKW20-1ROADAHEAD3 5 0 ' ± CONTRACTOR WILL MAINTAIN STAGING AREA AND PERFORM ALL WORK FROM BNSF ROW AND USE RAILROAD FLAGGERS. BNSF T R A C K S TO OA K S D A L E A V E S W 501 MONSTER RD SW PARCEL: 3779200-160 500 MONSTER RD SW PARCEL: 3779200-170 DATEDESCRIPTION9/20/24ORIGINAL ISSUE---DESIGN BY K & B TECHNICAL SOLUTIONSDESIGN---DRAWNC.M.---J.T.M.---SHEET PROJECT ID 3 PROJECT: P.004576TRAFFIC CONTROL PLANP.O. Box 2529, Clackamas, OR 97015Jack Nygard - (503) 544-5749Jack_Nygard@kbmail.netNOT TO SCALE LUM WA-49808-22415Anthony CarmoucheMobile: (281) 618-3988anthony.carmouche@lumen.comLUFFMANBYERS - SEATTLE-PORTLAND OVERPULL501 MONSTER RD SERENTON, WA 98057MFP24005223 Additional approval from BNSF will be required for work in their ROW. MONSTER RD SW35 MPHMONSTER RD SW35 MPH B E ACON COA L M INE R D 2 5 MPHSHOULDERWORKW21-51 0 0 ' ± SHOUL D E R WORK W21-5 1 0 0 ' ± CONTRACTOR TO MOVE CONCRETE BARRIERS AS NEEDED TO PERFORM ALL WORK FROM GRAVEL SHOULDER.DATEDESCRIPTION9/20/24ORIGINAL ISSUE---DESIGN BY K & B TECHNICAL SOLUTIONSDESIGN---DRAWNC.M.---J.T.M.---SHEET PROJECT ID 4 PROJECT: P.004576TRAFFIC CONTROL PLANP.O. Box 2529, Clackamas, OR 97015Jack Nygard - (503) 544-5749Jack_Nygard@kbmail.netNOT TO SCALE LUM WA-49808-22415Anthony CarmoucheMobile: (281) 618-3988anthony.carmouche@lumen.comLUFFMANBYERS - SEATTLE-PORTLAND OVERPULL501 MONSTER RD SERENTON, WA 98057MFP24005223