Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_240903_v1.pdf Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net Date: July 15th, 2024 To: City of Renton, Department of Community and Economic Development From: Encompass Engineering & Surveying on behalf of Amani Imran Re: Construction Mitigation Description for the Imran Townhomes _____________________________________________________________________________________ APPLICANT Amani Imran 212 Chelan Ave NE Renton, WA 98059 Amani.Seattle@gmail.com 206-391-1871 SITE ADDRESS 2811 NE 13th Street, Renton, WA 98056 CONSTRUCTION MITIGATION DESCRIPTION a. The proposed approximate construction start date is anticipated to begin late Winter/early Spring 2025 with an approximate timeline of six (6) months. b. Hours of construction operation will be Monday through Friday, between 7:AM and 5:PM. c. The proposed hauling and transportation route is east on NE 13th Street, south on Harrington Ave, west on NE 12th Street, south on Edmonds Avenue NE and then west onto NE Sunset Boulevard (Highway 900) which connects to I-405. d. Water trucks, street sweepers and any other requirements deemed necessary will be implemented to minimize construction impacts. e. There are no anticipated weekend, late night or holiday work hours proposed for the construction or hauling at this time. f. Flag persons will be employed and signs will be installed for traffic control, when necessary. WSDOT Standard Traffic Control Plan is attached. Methods will be adapted to the proposed construction and route.