Loading...
HomeMy WebLinkAboutCommittee of the Whole - 14 Oct 2024 - Agenda - Pdf CITY OF RENTON AGENDA - Committee of the Whole Meeting 4:45 PM - Monday, October 14, 2024 7th Floor Council Chambers/Videoconference 1. 2025/2026 BIENNIUM BUDGET, DEPARTMENT PRESENTATIONS a) Presentation If you would like to attend this week's meeting remotely, you can do so by going to https://us02web.zoom.us/j/86753290028?pwd=M2pOc09HWWNrY05uVnlIWnpGS1E4UT09 Zoom Meeting ID: 867 5329 0028, Passcode: 881839 You can call through Zoom at (253) 215-8782 and use the Meeting ID. 2025-2026 Preliminary Budget Department Presentations Committee of the Whole October 14, 2024 AG E N D A I T E M # 1 . a ) 25-26 Biennium Council Workshops October 7: Committee of the Whole •Mayor delivers budget message •Proposed budget presented to council October 14: Committee of the Whole •Department presentations ➢Public works, Parks & Recreation, Police •Council deliberation October 14: Regular Council Meeting •Public Hearing #2: Revenue sources & proposed budget as required by RCW 35A.34 October 21: Committee of the Whole •Department presentations •Council deliberation October 21: Regular Council Meeting •Public Hearing #3 October 28: Committee of the Whole •Department presentations (if needed) •Council deliberation/consider draft committee report November 4: Regular Council Meeting •Adopt committee report •1st reading of budget-related legislation November 18: Regular Council Meeting •2nd reading and enactment of all budget-related legislation AG E N D A I T E M # 1 . a ) Public Works 2025-2026 Budget See Department Details Starting on Page 3-83 of the Preliminary Budget Document AG E N D A I T E M # 1 . a ) Mission Statement Mission Statement The public works department manages and maintains the City of Renton’s utility, transportation systems, and municipal facilities in a skillful, professional, and caring manner to improve the lives of our residents and business customers. Core Services The department is responsible for developing, constructing, and maintaining streets, sidewalks, water and wastewater systems, surface water management, the airport, and public building infrastructure.Oversees recycling and refuse collection, as well as the procurement and maintenance of the city's vehicle fleet. AG E N D A I T E M # 1 . a ) Public Works AG E N D A I T E M # 1 . a ) Statistics Airport –What we maintain Area (in acres)170 Runway Length (in feet)5,382 Total Based Aircraft (including 7 based jets) 269 Total takeoff and landings 119,984 Number of Boeing 737 Commercial Aircraft Operations 362 Commercial (large leases)17 City tie-downs 22 City hangars 31 Total number of leases 70 AG E N D A I T E M # 1 . a ) Statistics Transportation –Maintaining our Transportation Assets Traffic Signals 144 Streetlights 5,624 Flashing School Beacons 93 Radar Speed Feedback Signs 56 Crosswalk Flashers 38 Traffic Street Signs 20,442 Channelization Lines (centerline, crosswalk, edge, stop) 1.8M linear feet/345 miles Thermoplastic Paint Arrows 3,781 Traffic Surveillance Cameras 35 Vehicle Radios 1,729 AG E N D A I T E M # 1 . a ) Statistics Streets –What we maintain Street Center Lines Miles 318 Lane Miles 753 Lane Miles of Pavement Markings 450 Alley Miles 8 AG E N D A I T E M # 1 . a ) Statistics •Pavement Condition Ratings will be updated in 2025 •Current Citywide Pavement Condition Rating is 73 •2020 Pavement Condition Index by Planning Area •Comparison of pavement condition inventory of city-maintained streets •Total centerline miles = 319 AG E N D A I T E M # 1 . a ) Statistics Solid Waste 2021 2022*2023 2024** Customer Count***26,127 26,258 26,385 26,336 Service Area (square miles)25.23 25.23 25.23 25.23 Garbage Tons Collected 43,575 45,240 45,699 45,093 Recycle Tons Collected 13,702 13,808 13,312 12,937 Organics Tons Collected 15,444 14,587 13,936 14,702 *status updated from earlier projections used in the proposed 23/24 COR Budget presentation **projected tons collected ***customer count based on August each year Note: All tonnage date provided by Republic Services AG E N D A I T E M # 1 . a ) Statistics Utilities - What we inspect, maintain and operate Statistic Water Wastewater Surface Water Number of Customer Accounts 18,533 19,174 24,761 Service area (square miles) 17 18.8 (inside city) 3.3 (outside city) 24 2023 Total Water Sales (gallons) 2,754,296,000 Infrastructure 318 miles of pipe 9 wells, 1 spring 10 reservoirs and elevated tanks 2 treatment facilities 18 pump stations 38 pumps 50 PRV stations 3,893 hydrants 12,345 valves 5,020 backflow test reports 235 miles of pipe 20 lift stations 5.13 miles of force main 6,300 maintenance access structures 294 miles of pipe 479 facilities 17,690 catch basins & maintenance access structures 3 pump stations AG E N D A I T E M # 1 . a ) Statistics Facilities - What we maintain Total Square Footage Maintained by Facilities 878,110 sq. ft. Contracted Services: 200-Mill and Landing Parking Garage 237,057 sq. ft In-House Maintenance 641,053 sq. ft. Average Area Per Technician, Per Day: 91,579 sq. ft. Security Systems 346 cameras, 30 panic buttons, 19 fire alarm systems, and 172 badge readers Restroom fixtures cleaned daily 197 sinks, 226 toilets, and 73 urinals Completed work orders 2023: 5,976 work orders 2024: 992 AG E N D A I T E M # 1 . a ) PW Administration Accomplishments for 2023-2024 • • • AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Airport •Completed Airport Office Relocation •Added Hangar and Tie-down Rates to Fee Schedule •Repainted taxiway alpha and bravo and boundary line on bravo •Awarded a $1.6M grant to design the taxiway alpha rehabilitation project AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Maintenance Acquired a used concrete truck Maintained a pavement condition index (PCI) rating of 73 •2023: 2,892 tons of asphalt •2024-present: 2,134.86 tons of asphalt Repaired and cleaned city rights-of-way Provided high-quality water Ensured security and quality of water distribution system Complied with regulatory requirements Maintained water, wastewater and surface water infrastructure Created a replacement and repair plan for existing infrastructure Ensured smooth operations of our vehicles and equipment Maintained a fleet replacement plan •27 vehicles purchased and received in 2023 •17 vehicles purchased and received in 2024 AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Sustainability & Solid waste •Commercial Organics & Recycling Waste Prevention Program •Special Recycling Events •Shift Green Oil & Oil Filter Recycling •Electric Vehicle Implementation Plan •Water Quality Reporting •Natural Yard Care & Water Conservation •Envision •Litter Prevention •First Halloween Costume Swap in collaboration with Community and Economic Department AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Transportation Lake Washington Blvd N Speed Cushions •Total Construction cost: $131,143.61 Park Ave North Extension •Total Project Costs: $11.2M Transportation Benefit District (TBD) •$2.0M annually for new sidewalk infrastructure •$1.5M for pavement maintenance Rainier Ave South Corridor Improvements – Phase 4 Project •Anticipated to finish in Winter of 2025 Developed a Comprehensive Walkway Plan Developed a 10-year Pavement Preservation Plan AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Utility Systems Plans, Programs and Regulatory Requirements: •Awarded "Envision Verified"rating for the NE 16th St and Jefferson Ave NE Green Stormwater Infrastructure project •Launched the Source Control Inspection program •Developed a Stormwater Management Action Plan for the Johns Creek basin •Updated the Water System Risk and Resilience Assessment and Emergency Response Plan •Publication of annual Water Quality Report •Completed testing for PFAS in drinking water •Completed Lead Service Line Inspection and Reporting required by EPA •Maintained the highest-level of compliance with the Department of Health Water System Operating Permit requirements AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Utility Systems Projects: •Monroe Avenue NE Infiltration Facility ($21.5 Million, grant funded $13.23 Million) •2014- 2024 Stormwater Pond Fencing Program (2023-2024 costs $117,468) •Thunder Hills Sewer Interceptor Rehabilitation ($3,131,449) •Sunset Gardens Offsite Water System Improvement ($933,170) •Maplewood Water Treatment Plant Filter Media Replacement ($643,942) •Burnett Avenue S Sidewalk & Utilities Replacement ($1,002,536) •Aberdeen Ave NE and S 26th St Storm Pipe Replacement and Rehabilitation ($383,000) •Sanitary Sewer Lift Station and Force Main Improvement Projects Phase 2 and Phase 3,12 lift stations upgraded,($1,403,529) •West Hill Booster Pump Station Improvement and Standby Emergency Power,50% completion, ($3,371,703) •Rainier Avenue South Phase 4 - Water System and Sewer System Improvements,60% completion,($628,325) •Sanitary Sewer Rehabilitation Project Phase 1,construction started, ($210,267) •Windsor Hills Utility Improvements Project,construction started, ($394,627) •Burnett Ave S and Williams Ave S Storm System Improvement,construction started, ($262,000) AG E N D A I T E M # 1 . a ) Accomplishments 2023-2024 CIP and Grant Funding expenditures Section 2023-2024 Total Expenditures Grant Funded (Percent) Water Utility $7,803,666 23% Wastewater Utility $6,051,925 4% Surface Water Utility $20,492,322 36% Total CIP Expenditures $34,347,913 Grant Funded $9,369,156 27% As of September 30, 2024 AG E N D A I T E M # 1 . a ) Accomplishments for 2023-2024 Family First Community Center $14,967,326.63 (contracted amount) •A welcoming and inclusive environment where individuals and families of all background can access services and program that support their physical, emotional, and social well-being. Project was spearheaded by the City of Renton and Doug Baldwin Jr. Energy Service Companies (ESCO) Phase 3 Project $2,022,666 •Focused on executing strategic infrastructure enhancements at the City of Renton Community Center and Public Works Building Implementation of 14 On-Call Contracts for Emergency Repair Services •Emergency repair services using the Department of Enterprise Services (DES) Master Contracts and Municipal Research and Services Center (MRSC) Roster. AG E N D A I T E M # 1 . a ) Public Works Preliminary Budget Proposal Additions: •Add an asset management program - $390K •Increase training budget - $65k per year •Add professional services for restroom cleaning at city parks - $500K per year 2023 2023 2024 2024 2025 2026 (in millions)Adopted Actual Adopted Estimate Proposed Proposed Operating Budget Summary $107.5 $106.7 $111.6 $123.3 $118.8 $122.9 Position Summary 203.5 203.5 203.5 204.5 207.5 209.5 AG E N D A I T E M # 1 . a ) Public Works Preliminary Budget Proposal •Position Changes: •2 Asset Management positions – $375K per year •Water quality/treatment plant operator - $160K per year •Wastewater/surface water maintenance supervisor - $200K per year •Civil engineer III in 2026 - $200K in 2nd year •Increase Transportation ITS part-time secretary I to full time - $45K per year •2 facilities technicians •One added in 2025 by using open maintenance custodian - $95K per year •One in 2026 - $165K in 2nd year •Convert existing lead maintenance custodian to custodial supervisor - $30K per year AG E N D A I T E M # 1 . a ) Transportation Capital Requests 2025-2026 •$2.0M annually (TBD funded) Walkway Program •$1.5M annually (TBD funded) Pavement Preservation Program •$250,000 annually ITS Program (fund 305 funded) •$120,000 annually Traffic Signal Preservation Program •$50,000 annually Project Development and Pre-design Program •$81,000 annually Arterial Circulation Program AG E N D A I T E M # 1 . a ) 2023-2024 Grants Received $49M •$750,000 from the State Transportation Budget in 2023. Work is being led by WSDOT with coordination from City staff Grady Way & Rainier Ave Intersection Improvements, TIP #24-27 •$2,975,154 state Transportation Improvement Board (TIB) grant SW 43rd Street Improvements, TIP #24-03 •$790,000 from Sound Transit through the Stride Programs station access allowance Lake Washington Blvd HAWK Signal, TIP #24-08.4 •$2,500,000 federal Surface Transportation Block Grant (STBG) Sunset Trail, TIP #24-17.1 •$3,196,076 federal Surface Transportation Block Grant (STBG) Rainier Ave Corridor Improvements Phase 5, TIP #24-19 •$110,000 from Sound Transit through the Stride Programs station access allowanceSW 7th Street Corridor Safety Improvements, TIP #24-23 •$400,000 federal grant through PSRC via the Safe Streets for All (SS4A) ProgramCitywide Vision Zero Safety Action Plan, TIP #24-32.1 •$22,850,000 from Sound Transit NE 44th Street/I-405 Park and Ride, TIP #24-50 •$7,950,000 - EcologyMonroe Ave NE Infiltration Facility • $2,975,000 -EcologySE 172nd St Green Stormwater Infrastructure Project •$206,550 - EcologySpringbrook Terrace Water Quality Retrofit AG E N D A I T E M # 1 . a ) 2023-2024 Grants Received $49M •$927,000 – Ecology, $194,950 – King County Flood Control District (KCFCD) 2023 Opportunity FundBurnett Ave S and Williams Ave S Water Quality Retrofit Project •$250,000 – KCFCD, $297,500 - EcologyLind Ave SW Storm System Improvement Project •$150,000 – KCFCD via WRIA 9 Watershed Ecosystem ForumSpringbrook Creek Restoration Action Plan •$1,472,037 – Department of Commerce Connecting Housing to Infrastructure Program (CHIP)Sunset Gardens Offsite Water System Improvement Project Grant •$490,000 – Department of Commerce Direct Appropriation Capital Projects ProgramBurnett Avenue S Sidewalk and Utility Replacement Project •$195,853 – KCFCD 2024 Opportunity Fund.Panther Creek Culvert at Talbot Road Slip-Lining Project •$205,000Ecology NPDES Permit Compliance Capacity Grant •$79,680 Early Implementation Climate Planning Grant •$74,000 WA Electric Vehicle Charging Program Grant (EVCPG)WA State Dept of Commerce •$15,000 Direct Pay Incentive for Electric Vehicle Purchase Federal Internal Revenue Service •$157,700 Renton Energy Efficiency and Conservation Block Grant (EECBG)US Department of Energy AG E N D A I T E M # 1 . a ) 2025-2026 Grants Received $5.5M •FAA Taxiway Alpha Design Grant $1,660,999Airport Improvement Grant •Siting study for new Air Traffic Control Tower: $600,000 Bipartisan Infrastructure Law Grant •Rebate (Match for EVCPG) $16,000Puget Sound Energy •Community Development Block Grant (CDBG): $403,000 •Covid Relief Fund: $483,000 Senior Center Facility Improvement Project •Department of Commerce Grant: $267,676 Energy Service Companies (ESCO) Phase 4 Project •King County Park Grant $1,004,000 Henry Moses Aquatic Center Renovation Project •Small Business Association Grant $1.5M Pavilion Conversion – Renton Market Project AG E N D A I T E M # 1 . a ) PW Administration Goals for 2025-2026 • • • • AG E N D A I T E M # 1 . a ) Airport Mission Statement To operate the City of Renton’s municipal airport in a sustainable, innovative, safe, and fiscally responsible manner in support of general, business, and manufacturing aviation users. To administer leases, fees, and user charges, and implement capital improvement programs to maintain and improve infrastructure in accordance with the Federal Aviation Administration (FAA) polices and procedures. Budget 2025 2026 Operations $2,737,523 $2,826,855 Capital $2,412,000 $1,588,000 Revenues $4,903,287 $4,903,287 Staff 10.5 10.5 AG E N D A I T E M # 1 . a ) Capital Funding for 2025-2026 •Secure siting study grant for new control tower $600,000 •FAA Taxiway Alpha Construction Phase 1 and Phase 2 $17M •Runway Fog Seal & Restripe Grant $1.5M •Windsock Tie-down & 243 Apron Repave Construction $1.5M •Security Upgrade Project Construction $1.7M •Seaplane Base Dredging Construction $3M •Seaplane Base Dock and Ramp Construction $3M AG E N D A I T E M # 1 . a ) Maintenance Services Mission Provide high-quality customer service to our citizens by maintaining and improving our city’s infrastructure. Support the operating sections of the public works maintenance division by advocating for the availability of adequate resources and equipment. Work closely as a team by planning, budgeting, goal setting, training, and managing to provide the best services possible to our customers. Provide purchasing and inventory support. Establish effective liaison and project coordination with our engineering departments, and perform administrative, customer service contact, and record systems management to insure efficient use of taxpayer funds. Budget 2025 2026 Operations $48,900,940 $49,267,081 Capital $3,243,923 $3,755,923 Staff 95.75 95.75 AG E N D A I T E M # 1 . a ) Goals for 2025-2026 •Street Maintenance •Keep the City of Renton’s rights-of-ways well maintained and litter free. •Use new concrete truck to more effectively perform street and sidewalk repairs. •Perform routine preventative maintenance and yearly asphalt repairs in alignment with pavement maintenance program. •Acquire additional specialty equipment to increase cleaning and maintaining the City of Renton’s rights-of-ways. •Water Maintenance •Minimize water loss from systems defects and implement strategies to reduce water loss caused by future leaks, systems malfunctions,and other operation issues. •Wastewater and Surface Water Maintenance •Comply with an attempt to exceed annual inspection and maintenance requests of the National Pollutant Discharge Elimination System permit. •Fleet Maintenance •Begin integration of electric vehicle into the city’s fleet. •Continue to provide vehicles and equipment for city’s operations. AG E N D A I T E M # 1 . a ) Sustainability & Solid Waste Budget 2025 2026 Operations $1,040,795 $1,062,755 Mission Statement Provide leadership, planning, resources, and programs that enable the department to advance zero waste, prevent pollution, reduce carbon emission, and conserve natural resources in a manner that is responsive to the needs of customers and the community, delivers value, and is consistent with the city’s business plan. AG E N D A I T E M # 1 . a ) Goals for 2023-2024 Grant Funding Implementation of city’s EV charging infrastructure Solid Waste Utility Zero Waste Plan Adopt the Solid Waste Utility’s Zero Waste Plan, which provides a roadmap and specific strategies to reduce waste Solid Waste Collection Contract Procurement Lead and manage the procurement process for a new solid waste collection contract in preparation for the city’s transition to improved solid waste collection services in April 2027 COMMERCIAL WASTE PREVENTION Continue to provide waste prevention and recycling technical support to Renton businesses to improve the overall quality of materials composted and recycled and reduce the amount of solid waste landfilled ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT IMPLEMENTATION Lead the transition of Public Works & Parks Maintenance two-stroke landscape equipment from gas-powered to battery-electric to reduce noise pollution and GHG emissions and improve air quality and worker health and safety ELECTRIFICATION INVESTMENT STRATEGIC MASTER PLAN Initiate phase one of a strategic electrification investment master plan that provides technical and feasibility analyses for site specific fleet and public EV charging infrastructure, solar and other sustainable systems GREEN TEAM Partner with Community and Economic Development to initiate and support a City of Renton Green Team that activates and promotes the implementation of Renton’s Clean Economy Strategy 2.0 and raises awareness of sustainable practices to stimulate ideas and actions for environmental and system improvements. CITY ADVOCACY Represent the city’s interests through participation in regional forums such as K4C, the Metropolitan Solid Waste Advisory Committee (MSWAC), the RE+ task force, and other opportunities that arise. AG E N D A I T E M # 1 . a ) Transportation Mission Statement To plan, design, construct, operate, and maintain the city’s transportation system to assure the health, safety, and mobility of the public in a skillful and professional manner. The division aggressively pursues mobility improvements that benefit the City of Renton, and the region, consistent with the city’s business plan goals. Budget 2025 2026 Operations $8,354,475 $8,651,804 Capital $6,876,000 $6,209,000 Staff 32.25 32.25 AG E N D A I T E M # 1 . a ) Transportation Capital Funding •Increase funding for capital improvement projects for Transportation by $13.1 million over the biennium. Projects include: •Arterial Circulation program •Comprehensive Vision Zero safety action plan* •Bridge Inspections and repair* •Oakesdale Ave SW* •Rainier Ave* •Roadway Safety & Guardrail Program* •Street overlay and sidewalk program •Sunset Trail •Traffic Calming Program* •Traffic Safety Program* •Traffic Signal Preservation AG E N D A I T E M # 1 . a ) Projects for 2025-2026 • AG E N D A I T E M # 1 . a ) Projects for 2025-2026 Traffic Safety Program •Improves pedestrian crossing safety at marked crosswalks •Proposed multiple small-scale RRFB projects located near Honey Dew Elementary, and Hazen High School •Capital Funding Requests: $500,000 (2025), $500,000 (2026) Traffic Calming Program •Reduces speeding and improves traffic safety on neighborhood local and collector streets •Proposed speed cushions on NE 12th St, between Olympia Ave NE and Union Ave NE for 2025, and on SW 5th Pl, between SW 5th Ct and Hardie Ave SW for 2026 •Capital Funding Request: $335,000 (2025), $335,000 (2026) AG E N D A I T E M # 1 . a ) Projects for 2025-2026 Roadway Safety & Guardrail Program •Prevents roadway departure/object crashes •Potential project locations currently being reviewed •Capital Funding Request: $50,000 (2025), $50,000 (2026) Oakesdale Ave SW Pavement Preservation Project will resurface Oakesdale Ave SW 34th St to SW 16th, install bike lanes, update channelization, and upgrade intersection ramps to current ADA standards. •Design Just Underway •Construction for Late 2025 •Capital Funding Request: $1,500,000 Current 5-Lane Arterial Boeing CEC Alaska Airlines Seattle Sounders Kaiser Permanente Federal Reserve Bank N AG E N D A I T E M # 1 . a ) Project for 2025-2026 Rainier Ave S Corridor Phase 5 Project •Improves excess roadway capacity, lack of bicycle facilities, and substandard sidewalks •Transition the number of lanes from 5 lanes at NW 3rd Place to 3 lanes at the northern city limits + complete extension of the Lake Washington Loop Trail •Capital Funding Request: $499,000 (2025)AG E N D A I T E M # 1 . a ) Project for 2025-2026 Vision Zero Safety Action Plan •Initiate the City’s first comprehensive Vision Zero safety action plan •Partnership with Puget Sound Regional Council for $400,000 in grant funds, city will match with $100,000 •Establishes a working group task force comprised of city officials, enforcement, and community members •Completion of plan qualifies City for additional federal and state funds for strategic projects and programming •Compete plan by Spring 2026 AG E N D A I T E M # 1 . a ) Projects Under Construction in 2025 Rainier Ave Corridor Improvements – Phase 4 7th Street Corridor Improvement SW 43rd St Improvements Oakesdale Ave SW Preservation Project South 116th Sidewalk Project Street Overlay (pavement preservation) Maplewood Sidewalk Rehabilitation Houser Way Bridge – Seismic Retrofit and Painting Williams Ave Bridge – Seismic Retrofit and Painting Sunset Trail along Sunset NE 44th Park and Ride AG E N D A I T E M # 1 . a ) Mission Statement: Dedicated to performing the planning, engineering, capital construction, regulatory compliance programs and asset management functions for the city’s water, wastewater, and surface water utilities, in a sustainable manner that ensures public health and safety, superior customer service, meets all regulatory requirements, protects environmental resources, is financially sound, and supports the city’s business plan. Budget 2025 2026 Operations $44,636,970 $46,242,268 Capital $9,616,000 $10,384,000 Staff 26 27 Utility Systems Division AG E N D A I T E M # 1 . a ) Water Utility CIP Budget, Fund 425 Project Name 2025 Budget Request 2026 Budget Request Total 2025-2026 Budget Request Emergency Power to Water Facilities $ 300 $ 300 $ 600 Emergency Response Projects $ 100 $ 100 $ 200 Highlands Water Main Improvements $ 233 $ 200 $ 433 Minor (small) Water Capital Improvement Projects $ 200 $ 200 $ 400 Pressure Reducing Valve (PRV) Replacement $ 300 $ 300 $ 600 Reservoir Recoating and Seismic Upgrade $ 200 $ 200 $ 400 Telemetry Improvements $ 100 $ 100 $ 200 Water Main Oversizing $ 100 $ 100 $ 200 Water Main Replacement $ 1,500 $ 1,500 $ 3,000 Water Pump Station Rehabilitation $ 700 $ 500 $ 1,200 Water System Security $ 50 $ 50 $ 100 WSDOT I-405 Water Relocations $ 113 $ - $ 113 TOTAL BUDGET $ 3,896 $ 3,550 $ 7,446 Rounded to nearest $1K AG E N D A I T E M # 1 . a ) Water Utility CIP Map AG E N D A I T E M # 1 . a ) Highland 435-Zone Reservoir •Objective •Replace existing reservoir that is seismically vulnerable, leaks, and to increase storage for future growth. •Scope/Schedule •Construct the transmission mains from Edmonds Ave NE to Queen Ave NE in 2025-2026. Estimated Cost: $8,000,000 •Construct 6.2 MG reservoir in 2027-2028. •Budget •2023 – 2024 budget: $20.637 Million •Total Estimated Project cost: $26.5 Million •Request for approval of additional funding to be submitted to Council before construction of new reservoir in the 2027-2028 budget cycle. AG E N D A I T E M # 1 . a ) Wastewater Utility CIP Budget, Fund 426 Project Name 2025 Budget Request 2026 Budget Request Total 2025-2026 Budget Request Force Main Rehab-Replacement $ 500 $ 500 $ 1,000 Kennydale Lakeline Sewer Upgrade $ 5,138 * $ - $ 638 Lift Station Rehabilitation $ 500 $ 500 $ 1,000 Miscellaneous/Emergency Projects $ 200 $ 200 $ 400 Sanitary Sewer Rehab-Replacement $ 2,000 $ 2,000 $ 4,000 Septic To Sewer Program **$ 500 $ 500 $ 1,000 TOTAL BUDGET $ 4,338 $ 3,700 $ 8,038 Rounded to nearest $1K *Anticipated grant funding of $4.5 million, not included in the total budget **New program for 2025-2026 AG E N D A I T E M # 1 . a ) Wastewater Utility CIP Map AG E N D A I T E M # 1 . a ) Kennydale Lakeline Sewer Upgrade •Objective •Replace the lakeline and install individual grinder pumps for 57 homes and Kennydale Beach Park. Decommission the existing 50-year-old lakeline. •Pursue grants through Community Project Funding and Congressionally Directed Spending programs. •Scope/Schedule •$12.6 million total project cost including design and construction estimated at $9.1 million. •Final design is expected to be completed in 2025 with the construction contract awarded in late 2025. •New Funding Request •2025 budget: $638,000, $4.5 Million (anticipated grant funding) AG E N D A I T E M # 1 . a ) Septic to Sewer Program •Objective •Assist and encourage property owners with existing septic systems in the City of Renton wastewater service area to connect to the public sewer system. •Reduce health risks and improve water quality by transitioning from septic systems to a reliable public sewer system. •Allows homeowners to avoid costly septic system repairs. •Facilitates additional development on lots in line with zoning and growth management requirements, increases housing availability, and stimulates economic growth in the city. •Staff will return to City Council with recommended funding options and incentive programs in 2025. •New Funding Request •2025 budget: $500,000 •2026 budget: $500,000 AG E N D A I T E M # 1 . a ) Surface Water Utility CIP Budget, Fund 427 Project Name 2025 Budget Request 2026 Budget Request Total 2025-2026 Budget Request Big Soos Creek at 116th Ave SE Improvement Project ** $ - $ 500 $ 500 Cedar River Gravel Removal (Maintenance Dredge) Project $ - $ 500 * Copper Ridge Storm System Improvement **$ - $ 400 $ 400 East Valley Road Storm System Improvements $ 102 $ 104 $ 206 Sedimentation Facility Cleaning $ - $ 150 $ 150 Small Scale Stormwater Projects $ 600 $ 400 $ 1,000 Stevens Ave NW to Lind Ave NW Storm System ** $ 350 $ 500 $ 850 SW 23rd Street Drainage and Fish Passage Improvements $ 250 $ 500 $ 750 Talbot Hill Area Mosquito Abatement Program $ 80 $ 80 $ 160 Taylor Ave Phase 2 Drainage Improvement **$ - $ 500 $ 500 TOTAL BUDGET $ 1,382 $ 3,134 $ 4,516 Rounded to nearest $1K * Anticipated grant funding, not included in the total budget ** New projects for 2025-2026 AG E N D A I T E M # 1 . a ) Surface Water Utility CIP Map AG E N D A I T E M # 1 . a ) Copper Ridge Storm System Improvement •Objective •Replace sections of 50-years old corrugated metal pipes extending from Davis Avenue S on the north side of the Copper Ridge development. •Reduce flood and landslide risk due to pipe failure. •Scope/Schedule •A design contract is anticipated to be executed in 2026 with construction anticipated in 2028. •New Funding Request •2025 budget: $0 •2026 budget: $400,000 AG E N D A I T E M # 1 . a ) Facilities Mission Statement Maintaining and enhancing the infrastructure of our community through effective management, maintenance, and development of municipal buildings and facilities. We strive to provide safe, functional, and efficient environments that support the diverse needs of our residents, employees, and visitors. Our team is committed to sustainability, innovation, and excellence in service delivery, ensuring that our facilities contribute to the overall well- being and vibrancy of our city. Budget 2025 2026 Operations $8,698,087 $9,067,320 Capital $3,550,000 $4 Staff 35.5 36.5 AG E N D A I T E M # 1 . a ) Facilities Capital Funding • • • • • • • • • • • AG E N D A I T E M # 1 . a ) Projects for 2025-2026 Senior Center Facility Improvement Project HVAC System Replacement, Roof Rehabilitation and Building Envelope Refurbishment. Energy Service Companies (ESCO) Phase 4 Project Exterior Lighting Retrofit & City Hall HVAC Control Optimization. City Hall Customer Service Counter Project Relocation & Reconfiguration, Security upgrades, Centralized Customer Service Hub and Future Space Planning. Henry Moses Aquatic Center Renovation Project Activity Pool Renovations, Splash Pad Removal and Area Reconfiguration, Concessions & Office Upgrades and locker room enhancements. AG E N D A I T E M # 1 . a ) Projects for 2025-2026 Renton Historical Museum – 6,000 sf Hazardous material abatement and comprehensive renovation of the Renton Historical Museum to ensure safety and modernize the facility. Pavilion Conversion – Renton Market Project Convert existing Renton Pavilion into a dynamic, enclosed market featuring vendor stalls and anchor tenant spaces. 200 Mill Building Compliance and Modernization Project Multi-phased initiative designed to ensure full compliance with the Washington Clean Air Act while enhancing the building’s operational efficiency and sustainability. City Hall Structural Repairs Project Critical infrastructure initiative aimed at addressing unexpected deterioration in the roof structure and surface parking lots of Renton City Hall AG E N D A I T E M # 1 . a ) Projects for 2025-2026 Public Works Shops Improvements Project Address critical infrastructure deficiencies within the Public Works facilities, focusing on major repairs and upgrades to the restrooms and shower areas. Carco Theater Building Repairs and Upgrades Project Preserving and modernizing the 11,095 sf, 300 seat theater. Repairing the exterior masonry to prevent further water intrusion and freeze-thaw damage. Verifying the adequacy of past seismic repairs and upgrading the HVAC system. Boathouse Improvements Project Upgrades to enhance the safety, security, and operation efficiency. Renton Community Center Upgrades and Repairs Upgrades to the security system, repairs to interior and exterior surfaces, and replacement of high-traffic flooring to maintain the facilities functionality and appeal. Highlands Neighborhood Center Gym Floor Replacement Replace the existing gym floor with a new, high-quality surface that meets modern safety and performance standards, supporting the diverse recreational needs of the community. AG E N D A I T E M # 1 . a ) Proposed 2025-2026 Utility Rates Average monthly single- family bill 2023 2024 2025 2026 Water $37.56 $37.56 $38.31 $38.31 (average = 5/8" meter and 650 cf usage)Increase $0 0 $0.75 0 Increase %0 0 2% 0% Wastewater $32.69 $33.67 $33.67 $34.34 Increase $$0.95 $0.98 0 $0.67 Increase %3%3%0 2% King County Rate Stabilization Fee 0 0 0 0 Surface Water $16.39 $17.05 $17.64 $18.25 Increase $$0.63 $0.66 $0.60 $0.62 Increase %4%4%3.5%3.5% TOTAL $86.64 $88.28 $89.62 $90.91 Increase $$1.58 $1.64 $1.35 $1.29 Increase %1.86%1.89%1.53%1.44% AG E N D A I T E M # 1 . a ) Proposed System Development Charges Fees for a typical new single-family home connection 2023-2024 2025-2026 Water $4,850 $5,025 Increase $$350 $175 Increase %7.78%3.6% Wastewater $3,650 $4,025 Increase $$150 $375 Increase %4.29%10.3% Surface Water $2,300 $2,350 Increase $$200 $50 Increase %9.52%2.2% Total $10,800 $11,400 Total Increase Increase $$700 $600 Total Percentage Increase Increase %6.93%5.6% AG E N D A I T E M # 1 . a ) Utility Rates vs. Inflation 2015-2024 Historical Rate Increases Historical Inflation Rate (CPI- U)* Year Water Wastewater Surface Water June-to-June 2015 0%0%4%1.6% 2016 0%0%4%1.8% 2017 0%4%4%3.0% 2018 0%4%4%3.3% 2019 0%0%0%2.3% 2020 2%2%2%0.9% 2021 2%2%2%5.5% 2022 2%2%2%10.1% 2023 0%3%4%4.6% 2024 0%3%4%3.8% Totals 6%20%30%37% 10-year Average 0.6%2.0%3.0%3.7% * S E A T T L E -T A C O M A -B E L L E V U E W A AG E N D A I T E M # 1 . a ) 2024 Monthly Utility Rate Comparison AG E N D A I T E M # 1 . a ) Proposed Budget, Rates &changes Solid Waste/Recycling/Composting Customer Class 2025 2026 Single-Family 6.0%6.0% Commercial &Multifamily 3.9%3.9% Roll-off 2.3%2.3% Overall 4.7%4.7%AG E N D A I T E M # 1 . a ) Solid Waste Utility Rates Single Family Residential Commercial and Multifamily Commercial Roll Off TOTAL 2023 7.75%6.90%5.70%7.20% 2024 7.75%6.80%5.00%7.10% Proposed 2025 6.00%3.90%2.30%4.70% Proposed 2026 6.00%3.90%2.30%4.70% 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 7.00% 8.00% 9.00% Solid Waste Rates AG E N D A I T E M # 1 . a ) Questions? AG E N D A I T E M # 1 . a ) Parks and Recreation 2025-2026 Budget See Department Details Starting on Page 3-71 of the Preliminary Budget Document AG E N D A I T E M # 1 . a ) Parks and Recreation Preliminary Departmental Budget Proposal Position changes: o Reclassify 3 parks Maintenance positions added for encampment clean up - $20K per year o Add a Capital Project Manager - $180K per year o Remove vacant Parks, Planning & Natural Resources Director reallocating salary savings and utilize existing budget for the following new positions ▪Recreation Supervisor ▪Associate Planner 2023 2023 2024 2024 2025 2026 (in millions)Adopted Actual Adopted Estimate Proposed Proposed Operating Budget Summary $21.6 $22.3 $22.1 $25.2 $24.5 $25.2 Position Summary 83.5 84.5 82.5 83.5 85.5 85.5 AG E N D A I T E M # 1 . a ) Parks and Recreation Preliminary Budget Proposed – CIP Projects Proposed Capital Improvement Projects (CIP) Increase funding for Capital Improvement Projects (CIP) by $7.6M over the biennium. Projects include: •Cedar River Trail Flood Repairs •Earlington Park renovations •Edlund-Carr Park development •Liberty Park improvements •NE Renton Park (May Creek Park) •SW Renton Park (Cleveland Richardson) •Springbrook Boardwalk •World Cup Legacy Square •Cedar River park Expansion AG E N D A I T E M # 1 . a ) Parks and Recreation Preliminary Budget Proposal – Golf Course •Increase golf course fees by 14% offset by an increase in inflation, cost for services and supplies. 2023 2023 2024 2024 2025 2026 (in millions)Adopted Actual Adopted Estimate Proposed Proposed Operating Budget Summary $2.9 $3.9 $3.2 $3.7 $4.7 $4.9 Position Summary 12 12 12 12 12 12 AG E N D A I T E M # 1 . a ) Parks and Recreation Department Realignment & Delivery Model AG E N D A I T E M # 1 . a ) Departmental Realignment and Priorities •2025/2026 Proposed Re-structure Purpose is to align with the department with the City’s Business Plan and the National Recreational and Park Association’s “Three Pillars”: •Conservation •Equity •Health & Wellness Department Vision: To foster a vibrant, inclusive, and sustainable community through the enhancement of Renton's parks and recreational services, promoting health, equity, and environmental stewardship. AG E N D A I T E M # 1 . a ) Parks and Recreation Health & Human Services The Health & Human Services Division actively engages service providers and community organizations to improve service systems that promote safety, health, and security. Its five roles in community partnerships are: Inspire: Highlight impactful programs and advocate for more funding. Evaluate: Continuously assess community needs and agency outcomes. Educate: Share information on community needs and available resources. Connect: Build stakeholder networks and promote a systems approach. Invest: Allocate public funds to address needs, focusing on prevention and crisis stabilization. The Health & Human Services Division distributes funds to local nonprofits and partners with schools, businesses, and other entities to meet residents' needs, while participating in regional human service efforts. AG E N D A I T E M # 1 . a ) System Integration Is The Direction for Health & Human Services Government Funding Sources Service Providers Systems Engineers Police (Navigator Program) Human Services Division (Community Development Block Grants, Housing Repair Program, and 46 Huma Services Contracts) Opioid Settlement Funds HB 1590 Human Services Funding Renton Fire Authority (FD Cares) Additional Coordinating Depts. (Parks & Recreation, Public Works, CED and our Municipal Court) Project Be Free Health Commons REACH AG E N D A I T E M # 1 . a ) Parks and Recreation Preliminary Budget Proposal – Student Health Hub •Expansion of Human Services: •$3.5 million of 1590 funds spent over 26 months. •“65-70% of respondents support using City tax dollars to fund services that address mental & behavioral health, food insecurity, and resource connection. Respondents support the idea of partnering with other agencies…to provide these health and human services.” 2024 Budget Survey AG E N D A I T E M # 1 . a ) Parks and Recreation Preliminary Budget Proposal – Human Services AG E N D A I T E M # 1 . a ) Parks and Recreation 2025/2026 Goals Business Operations Pivot and host the 2025 Farmers Market at an alternate site near downtown. Equity & Access* Housing Repair program to allocate $400 thousand grant for heat pump installations in 20 to 25 eligible Renton households. Health & Wellness*Partner with Police DET Unit to activate the Cedar River Trail Capital & Planning Overhaul Park, Recreation and Natural Areas Plan to reflect current community priorities. Grants & Acquisitions*May Creek Trail, and East Rail Operations & Maintenance* Complete the urban forest tree canopy cover assessment and leverage data to better target tree planting efforts in low canopy cover areas. AG E N D A I T E M # 1 . a ) Questions? AG E N D A I T E M # 1 . a ) Police Department 2025-2026 Budget See Department Details Starting on Page 3-54 of the Preliminary Budget Document AG E N D A I T E M # 1 . a ) Police Budget Overview 2023 2023 2024 2024 2025 2026 (in millions)Adopted Actual Adopted Estimate Proposed Proposed Operating Budget Summary $49.3 $49.8 $51.3 $54.4 $54.2 $56.9 Position Summary 171 171 171 171 176 180 AG E N D A I T E M # 1 . a ) Commissioned Officers •Additional 8 commissioned full- time employees •4 in 2025 and 4 in 2026 •Reduced response time, overtime costs •Increase community & officer safety AG E N D A I T E M # 1 . a ) Non- Commissioned FTE •One new non-commissioned FTE in 2025 •Evidence Technician AG E N D A I T E M # 1 . a ) Market Rate Wage Adjustment • • AG E N D A I T E M # 1 . a ) Other services and supplies • • • AG E N D A I T E M # 1 . a ) QUESTIONS? AG E N D A I T E M # 1 . a ) Next Steps Public Hearing #2: 14 OCT 21 OCT Department Presentations: CED Executive Legal Finance Human Resources Court AG E N D A I T E M # 1 . a )