Good Morning,
The updated Civil Plan Set and TIR were routed to the Corey Thomas and Yong Qi for review and to determine
whether or not their review comments had been addressed. Corey has determined that the proposed
hammerhead turnaround design on the civil plan set is acceptable and would meet emergency access
requirements, provided each of the new homes is equipped with a fire sprinkler system.
The updated Civil Plans and TIR did not address the review comments provided by Development Engineering,
please see the attached response provided by Yong. Please update the proposal to address the outstanding
review comments. If you are having difficulty understanding the code related requirements or if you have
questions, feel free to reach out to Yong directly.
Once all comments have been addressed, please contact me for a link to the City’s FTP site where the revised
materials can be uploaded for review. At this point the application review remains on hold until all review
comments have been addressed. We look forward to receiving your revised submittal so that we can continue our
review of the application.
Thanks,
JILL DING, Senior Planner
City of Renton // Planning
Virtual Permit Center // Online Applications and Inspections
office 425-430-6598
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Daniel Finnigan <dansfinnigan@hotmail.com>
Sent: Monday, October 28, 2024 3:46 PM
To: Jill Ding <JDing@Rentonwa.gov>
Cc: Hamid Korasani <hamidkorasani@yahoo.com>
Subject: Re: Serv-U File Sharing Link [expires 10/23/2024 12:00:00 AM]
Jill,
The files have been uploaded to the portal.
Please let me know if you have any questions or concerns.
Thanks,
Daniel
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
From: Jill Ding <JDing@Rentonwa.gov>
Sent: Monday, October 28, 2024 2:51 PM
To: Daniel Finnigan <dansfinnigan@hotmail.com>
Cc: Hamid Korasani <hamidkorasani@yahoo.com>
Subject: RE: Serv-U File Sharing Link [expires 10/23/2024 12:00:00 AM]
Daniel,
Please use the following link to upload your submittal documents:
https://fileshare.rentonwa.gov:8443/?ShareToken=9DE3F1F8C4E3FB20C7754FBA1C0171D5F9F832CF
I look forward to receiving your resubmittal and continuing to review this project.
Thanks,
JILL DING, Senior Planner
City of Renton // Community and Economic Development
1055 S Grady Way, Renton, WA 98057
office (425) 430-6598 // email jding@rentonwa.gov
Virtual Permit Center // Online Applications and Inspections
From: Daniel Finnigan <dansfinnigan@hotmail.com>
Sent: Friday, October 25, 2024 11:43 PM
To: Jill Ding <JDing@Rentonwa.gov>
Cc: Hamid Korasani <hamidkorasani@yahoo.com>
Subject: Re: Serv-U File Sharing Link [expires 10/23/2024 12:00:00 AM]
Jill,
The file share link that you sent on October 16, 2024 has expired.
Can you please send a new link?
We are ready to upload the correction response
Thanks,
Daniel Finnigan
From: Hamid Korasani <hamidkorasani@yahoo.com>
Sent: Friday, October 25, 2024 10:28 PM
To: Daniel Finnigan <dansfinnigan@hotmail.com>
Subject: Fwd: Serv-U File Sharing Link [expires 10/23/2024 12:00:00 AM]
FYI
From: "Serv-U - fileshare.rentonwa.gov on behalf of Jill Ding (JDing@Rentonwa.gov)"
<noreply@rentonwa.gov>
Date: October 16, 2024 at 9:00:01 AM PDT
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
3
To: hamidkorasani@yahoo.com
Subject: Serv-U File Sharing Link [expires 10/23/2024 12:00:00 AM]
Reply-To: Jill Ding <JDing@rentonwa.gov>
You have received access to a Serv-U File Share from Jill Ding. The link to transfer your file(s) will expire
on Wednesday, October 23, 2024 12:00 AM.
https://fileshare.rentonwa.gov:8443/?ShareToken=8853C5C246F3B76D23A2ABF6CC7EBA88A375DB17
Virus-free.www.avg.com
SAZEI Design Group, LLC
6608 110th Ave. N. E. Tel: (425) 214-2280
Kirkland, WA. 98033
October 25, 2024
Jill Ding
Senior Planner
City of Renton Community & Economic Development
Planning Division
1055 South Grady Way,
Renton, WA 98057
Project: Renton Highlands Short Plat / LUA24-000078
Project Address: 5815 NE 8TH ST RENTON, WA 98059
Parcel #: 112305-9068
Subject: Response to City of Renton Plan Review Comments
Dear Jill Ding,
This is in response to your plan review comments revived via email dated October 17, 2024.
Based on review of the comments, we have prepared and formulated our response to each
comment as listed in your letter. Please refer to the red comment response on the attached
correction letter to view the responses.
If you have any questions or require further clarifications, please feel free to contact me at
(425) 214-2280, or via e-mail at hamidkorasani@yahoo.com . Your swift response to this
matter is greatly appreciated.
Sincerely,
SAZEI Design Group, LLC Hamid Korasani
Hamid G. Korasani, P. E.
Principal
From:Hamid Korasani
To:Richard Deccio
Subject:Fw: Renton Highland Short Plat Corrections LUA24-000078
Date:Thursday, October 17, 2024 4:03:48 PM
Attachments:image002.png
image003.emz
image004.png
Hi Richard,
Please see attached.
Many Thanks.
Hamid
----- Forwarded Message -----
From: Jill Ding <jding@rentonwa.gov>
To: Hamid Korasani <hamidkorasani@yahoo.com>; Amin Gilani <amingilani@gmail.com>; Clark Close
<cclose@rentonwa.gov>; Nathan Janders <njanders@rentonwa.gov>
Cc: Daniel Finnigan <dansfinnigan@hotmail.com>; Yong Qi <yqi@rentonwa.gov>; Altaf GILANI
<ultimahomesllc@gmail.com>
Sent: Thursday, October 17, 2024 at 07:46:02 AM PDT
Subject: RE: Renton Highland Short Plat Corrections LUA24-000078
Good Morning,
Thank you all for taking the time to meet yesterday. I think that the meeting we had
was productive and hopefully provided clarification of the outstanding items that
needed to be addressed before the short plat review could move forward. I have put
together a summary of outstanding comments that need to be addressed, please see
the comments below:
Fire Comments:
1. A cul-de-sac turnaround is the code requirement to provide emergency access
to the proposed short plat. The Fire Department would consider granting a
variance to this requirement, provided a hammerhead turnaround is provided at
the intersection of Pasco Pl NE and NE 8th Street and all individual homes
within the short plat are equipped with fire sprinkler systems.
Engineering Comments:
1. The project site drains to both the Lower Cedar River and May Creek basins. To
comply with Core Requirement #1 of the City of Renton Surface Water Design
Manual (RSWDM), the applicant would need to demonstrate that runoff will be
mitigated for within each drainage basin as per the project site’s topography.
2.Infiltration tests for the project site prepared by a licensed civil/geotechnical
engineer needs to be provided for both Basins, which will be used to evaluate if
the site is suitable or unsuitable for infiltration per 2022 RSWDM.
3.The downstream analysis only discusses the Cedar River/Lake Washington
watershed however, it needs to assess both separate drainage basins (Lower
Cedar River and May Creek) within the watershed.
4.The TIR would need to be revised to include a discussion on how the proposed
pump design complies with the durational flows for “matching forested site
condition” as specified in Core Requirement #3.
5.The setback to tract lines for vaults is 5-feet per Section 5.1.3.1 of the 2022
RSWDM. The northwest corner of the vault is shown crossing a tract line (into
the shared driveway tract), this encroachment would need to be removed and
the facility would need to demonstrate compliance with the required 5-foot
setback requirement.
6.Lot impervious surface coverage is calculated individually for each lot. Per
Section 1.1.2.1 of the 2022 RSWDM, the minimum impervious surface coverage
for a residential subdivision shall be assumed as 4,000 SF or the maximum
allowed per RMC 4-2-110A, whichever is less. The modeling within the TIR
would need to be updated to comply with this requirement.
7.After confirming with Nate Janders and Section 1.2.3.1.B of Minimum Required
performance in 2022 RSWDM, the replaced impervious surface (down to base
course or bare soil) within the NE 8th Street that is not fully dispersed as
specified in Appendix C is considered as target surfaces, and shall use forested
condition as existing to size the detention facility.
8.The civil construction plan set and TIR need to be revised to match the updated
site plan with hammerhead turnaround required by Fire Authority.
We look forward to receiving the updated short plat submittal items so that review of
your short plat can continue.