Loading...
HomeMy WebLinkAboutEx27_Renton_Fire_Authority_Comments_240911 M E M O R A N D U M DATE: September 11, 2024 TO: Mariah Kerrihard, Assistant Planner FROM: Corey Thomas, Lead Plans Review Inspector SUBJECT: Tsai Short Plat Environmental Impact Comments: 1. The fire impact fees are currently applicable at the rate of $421.98 per single family unit. This fee is paid at building permit issuance. Credit will be granted for any existing homes that are removed or retained. Fire Code Comments: 1. The fire flow requirements for a single-family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. One existing fire hydrant will meet the minimum requirements. 2. Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required within 150 feet of all points on the buildings. Dead end streets that exceed 150-feet in length require an approved turnaround. Dead ends up to 300-feet long are allowed to use hammerhead type turnarounds. Proposed hammerhead type turnaround is acceptable. 3. Applicant request for a fire code variance to install an approved fire sprinkler system in the proposed new home and eliminate the required fire apparatus hammerhead type turnaround is acceptable. EXHIBIT 27 RECEIVED 09/11/2024 MKerrihard PLANNING DIVISIONDocusign Envelope ID: E59390F3-F590-4F4B-85CA-AE9BC959928E