Loading...
HomeMy WebLinkAbout7945.05 S 2024 1101Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.05 Page 1 of 3 Report ID 7945.05 S 2024 1101 Date Fri 11/1/2024 Weather 46°F, Raining Arrival/Departure Time(s) 10:10am - 10:40am Travel Time (hr) 0.5 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep., CESCL No., Phone No. & Report Statement Nathan Dalton | ECO-3-10172203 | (206) 355-9308 “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact Century Communities | Brian Monahan Permit No(s). WAR311273 Reviewed By JB Initials/Date N/A Field Supervisor Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 3.27 inches Precipitation in last 24 hours (approximate): 0.80 inches Phase of active construction (check all that apply):  Pre-construction  Clearing, demolition, or grading  Infrastructure or roads  Concrete pours  Vertical construction  Utilities  Off-site improvements  Site temporarily stabilized  Final stabilization Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Hanna Turbidity Meter No. 31 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes MP-1 Beehive on Lincoln Ave NE - - - Discharge piped from vault to beehive along Lincoln Ave. Report ID 7945.05 S 2024 1101 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N -Wall in at NE perimeter of site. 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck G N -Paved construction entrance off of Lincoln Ave NE. -Little to no track-out visible at time of visit; C\continue to utilize sweeper truck often. 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N -Stormwater vaults at NW corner of site. -Sandbags at key locations on site to control water flow on site roadways. 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck G N -Silt fencing along roadway near active construction area. -Curbs throughout site; on-site roads paved with base lift. -Straw wattle along lower roadway. -Straw on exposed soils around lot 34. 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles G N -Exposed soils are being actively worked at time of visit or hydroseeded. -Exposed soil on lots 35-36 are new active home build site. 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors G N -Slopes are hydroseeded. 7. Protect Drain Inlets • Catch Basin Inserts G N -Inserts in catch basins near active construction area. 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets - - N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N -Concrete washout lined with plastic and Eco-Pans on site on lot 41. 10. Control Dewatering - - N/A 11. Maintain BMPs G N -Maintain BMPs. 12. Maintain SWPPP & Site Logbook G N -Available upon request. 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Report ID 7945.05 S 2024 1101 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND CONSTRUCTION ENTRANCE STORMWATER VAULT MONITORING POINT PLASTIC SHEETING HYDROSEED SILT FENCE ACTIVE HOMEBUILDING LOTS CONCRETE WASHOUT FINAL LANDSCAPED LOTS SANDBAG CATCH BASIN INSERT WATTLE STRAW STOCKPILE