HomeMy WebLinkAbout7945.05 S 2024 1025Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 7945.05 Page 1 of 3 Report ID 7945.05 S 2024 1025
Date Fri 10/25/2024 Weather 56°F, Cloudy
Arrival/Departure Time(s) 1:50pm - 2:25pm Travel Time (hr) 0.5
Project Name Canopy Property
Location 4130 Lincoln Ave NE, Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Nathan Dalton | ECO-3-10172203 | (206) 355-9308
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Century Communities | Brian Monahan
Permit No(s). WAR311273
Reviewed By JB
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.33 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 31
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP-1 Beehive on Lincoln Ave NE - - - Discharge piped from vault to
beehive along Lincoln Ave.
Report ID 7945.05 S 2024 1025 Page 2 of 3
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N -Wall in at NE perimeter of site.
2. Establish Construction Access • Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
G N -Paved construction entrance off of Lincoln Ave NE.
-Little to no track-out visible at time of visit; continue
to utilize sweeper truck often.
3. Control Flow Rates
• Stormwater Vault or Facility • Straw Wattles
• Check Dams
G N -Stormwater vaults at NW corner of site.
-Sandbags at key locations on site to control water
flow on site roadways.
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers • Vegetation
• Straw
• Sediment Ponds, Traps & Filters
• Treatment • Water Truck
G N
-Silt fencing along roadway near active construction
area.
-Curbs throughout site; on-site roads paved with
base lift.
5. Stabilize Soils
• Nets & Blankets • Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting
• Stockpiles
G N
-Exposed soils are being actively worked at time of
visit or hydroseeded.
-Exposed soil on lots 35-36 are new active home
build site.
6. Protect Slopes
• Benching; Track-Walking • Pipe Slope Drains
• Plastic Sheeting; Anchors
G N -Slopes are hydroseeded.
7. Protect Drain Inlets
• Catch Basin Inserts G N -Inserts in catch basins near active construction
area.
8. Stabilize Channels and Outlets
• Channel Lining • Check Dam • Outlet Protection
• Nets and Blankets
- - N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling G N -Concrete washout lined with plastic and Eco-Pans
on site on lot 41.
10. Control Dewatering - - N/A
11. Maintain BMPs G N -Maintain BMPs.
12. Maintain SWPPP & Site Logbook G N -Available upon request.
13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities
• Permeable Pavement
- - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Report ID 7945.05 S 2024 1025 Page 3 of 3
Earth Solutions NW, LLC
BMP LEGEND
CONSTRUCTION ENTRANCE
STORMWATER VAULT
MONITORING POINT
HYDROSEED
SILT FENCE
ACTIVE HOMEBUILDING LOTS
CONCRETE WASHOUT
FINAL LANDSCAPED LOTS
SANDBAG
CATCH BASIN INSERT
WATTLE