HomeMy WebLinkAboutR-427701NE 7th Ct
I�
NE 7th St Z �a NE 7th St NOT TO SCALE
NF 6th 0- �
s
I
I
, PI
0
"T 6th pl -1
a NE
NNE
6th PI z
a
SITE n
NE 6th St � w t NE 6th St
Z 0
m
LL
NE Sth Ct >
w W Sth pi a NE Sth Ct
v s z °
n
o u D NE Sth St
NE5thN
2� s NE 4th PI
o�
A
a
�E, NE 4th Ct
;t s
VICINITY MAP
GENERAL SITE DEVELOPMENT NOTES:
1. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE GOVERNING
AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUCTION OPERATIONS.
2. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO
COMMENCING WORK.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION AND
DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION WHETHER SHOWN ON THESE PLANS
OR NOT. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. ONLY THOSE UTILITIES
WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND SURFACE OR SHOWN ON RECORD
DRAWING PROVIDED BY OTHERS ARE SHOWN HEREON. EXISTING UNDERGROUND UTILITY
LOCATIONS SHOWN ARE APPROXIMATE ONLY AND ARE SUBJECT TO A DEGREE OF UNKNOWN
VARIATION. SOME UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM
PUBLIC RECORDS. TEBALDI ENGINEERING, LLC ASSUMES NO LIABILITY FOR THE ACCURACY OF
PUBLIC RECORDS OR RECORDS OF OTHERS. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR
SHALL CONSULT TEBALDI ENGINEERING, LLC, TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING
WITH CONSTRUCTION.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND
SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION OF
CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF
CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL
CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE
SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL
REGULATIONS AND CODES.
5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE UTILITIES
INVOLVED PRIOR TO CONSTRUCTION.
6. INSPECTION OF SITE WORK WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE AUTHORITY
HAVING JURISDICTION. INSPECTION OF PRIVATE FACILITIES WILL BE ACCOMPLISHED BY A
REPRESENTATIVE OF THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY
THE INSPECTOR OF THE AUTHORITY HAVING JURISDICTION 24 HOURS IN ADVANCE OF
BACKFILLING ALL CONSTRUCTION OR AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL CONTACT
THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY REQUIRED
PRE -CONSTRUCTION MEETING(S). CONTRACTOR SHALL PROVIDE 72 HRS MIN. ADVANCE
NOTIFICATION TO OWNER, FIELD ENGINEER AND ENGINEER OF PRE -CONSTRUCTION MEETINGS.
8. THE CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND SHALL COMPLY WITH
THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER AGENCY HAVING JURISDICTION
FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE
CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION
AND/OR TRENCHING PROCEDURES.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY
DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT
THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION
WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE
TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT
LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED.
10. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL ADJACENT
PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY SERVICES THAT ARE TO
REMAIN OPERATIONAL WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR NOT SHOWN ON
THE PLANS.
11. STRUCTURAL BMPs MUST BE ACCESSIBLE FOR INSPECTION BY THE AUTHORITY HAVING
JURISDICTION DURING REGULAR BUSINESS HOURS.
12. TWO (2) COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS. ONE (1) SET WITH RECORDS OF AS -BUILT INFORMATION
SHALL BE SUBMITTED TO TEBALDI ENGINEERING, LLC AT COMPLETION OF PROJECT.
APPLICANT
GOFEASIBILITY
PO BOX 1176
SUMNER, WA 98390
ENGINEER:
TEBALDI ENGINEERING, LLC
PO BOX 121
SUMNER, WA 98390
TEL: (206) 450-5096
CONTACT: CHRIS TEBALDI, P.E.
SURVEYOR:
BBA LAND SURVEYING
12014 SE 157TH PL
RENTON, WA 98058
TEL: 206-406-1257
GASPAIRE SINGLE FAMILY RESIDENCE -FRONTAGE IMPROVEMENTS
EX. ROW LINE
INSTALL CATCH BASIN INSERTS
AT NEAREST DOWNSTREAM
CATCH BASIN /
(TYP.)
EXISTING SDMH
RIM=416.33' I
IE(N)=409.38' 8"CONC o
IE(W)=409.23' 12"CONC N
---- OH I II
OZ I
�---- SD -- -- SD ----
CORE DRILL AND CONNECT
TO EX. SDMH it
IE=409.23 (12") I I
I
UTILITY CROSSING ' �I
IE=412.5f (8" W)----W------ ----- I W-I
T.P.=410.48 (12" SD)
MAINTAIN 18"-ithlN. SEPARATOW
IF 18" MIN. SEPARATION IS NOT POSSIBLE
I
CONTRACTOR TO INSTALL ETHAFOAM At
II
CROSSING TO SATISFACTION OF CITY �
OF RENTON INSPECTOR
19 LF 12" PVC SDR-35 SD ® ^.70% �j
CATCH BASIN #2, TYPE 2�:a48"
W/SOLID LID �-
- STA. _Cj_+8237 0' RT
RIM=417.10
IE=409.75 (12' E, N)
SEE DETAILS O�N SHEET 4.
44 LF 12" P C SDR-35 LSD ® 9.10%
CLO INTERSECTION
SfA. 10+00 (6TH)
LIMITS OF
(TYP.)
0
PORTION OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON, STATE OF WASHINGTON
Ul
�
Z
W
Q.1,111AI
I
/1A
11 MAf IA1 IK.111111 I.
/-EX. FIRE 4YDRANT
SEE DETAIL ON SHEET- 2 __
4!18`Q4 -
kir
PROPOSED ADA RAMP. SEE DETAILS FL01 ' ,
ON SHEET 5
0 CATCH BASIN #3, TYPE 1
W/STANDARD GRATE
STA. 10+26.63, 29.45' RT
RIM=418.04 418.76
IE=414.00 (12" N) BACK OF L
SEE DETAILS ON SHEET 4.
PROPOSED TYPE 3 BARRICADE
o_
PROPOSED SSCO
RIM=419.0f\0
IE=410.00 (6") \ v
SEE DETAIL ON SHEET 3
7 LF 6" PVC SS @ 2.00% 0J
0
0
I �
VERTICAL CONTROL
Pn 45 BEND
a
p c
15 LF 6" PVC SS ® 2.00%
ao
, v ..
T
VERTICAL DATUM: NAVD88
ELEVATIONS SHOWN ON THIS DRAWING WERE DERIVED FROM
INFORMATION PROVIDED BY CITY OF RECENT SURVEY
CONTROL DATABASE
LOCATION:
COR NO. 1503 - CONCRETE MONUMENT WITH
BRASS PLUG, DOWN 0.7' IN CASE, AT THE INTX. OF NE
4TH ST AND UNION AVE NE
ELEVATION: 401.019 FEET
EXISTING TOPOGRAPHY/SURVEY INFORMATION NOTE:
THESE DRAWINGS HAVE BEEN PREPARED BASED ON TOPOGRAPHIC SURVEY PREPARED BY
BBA LAND SURVEYING DATED OCTOBER 2021.
TEBALDI ENGINEERING, LLC DOES NOT WARRANT THAT THE TOPOGRAPHY SHOWN ON
THESE DRAWINGS IS REPRESENTATIVE OF WHAT IS CONSTRUCTED. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE OWNER TO HAVE ALL
IMPROVEMENTS FIELD VERIFIED PRIOR TO CONSTRUCTION. DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO WORK.
TEBALDI ENGINEERING, LLC
PO BOX 121
SUMNER, WA 98390
(206) 450-5096
LEGEND
o
= FOUND REBAR W/CAP
O
= FOUND IRON PIPE
®
= FOUND MONUMENTIN CASE
®
= BOLLARD
CB ❑
= CATCH BASIN
}
= CULVERT
FH C(
= FIRE HYDRANT
Gv
D4
= GAS VALVE
0
= LUMINAIRE
o
= MAIL BOX
PPS
= POWER POLE
G�LPA
= UTILITY POLE ANCHOR
Os
= SANITARY SEWER MANHOLE
TR ❑
= TELEPHONE RISER
WWI®
= WATER METER
Qw
= WATER VALVE
= GRAVEL DRIVEWAY
= CONCRETE
= ROCKERY
= TEMPORARY BENCHMARK (TBM)
�_
43524 ��
s �C/ S T �R, \��
S/0NA L ECG
2/12/24
3
IREVISED PER CITY COMMENTS
CMT
2
REVISED PER CITY COMMENTS
CMT
1
REVISED PER CITY COMMENTS
CMT
NO.
REVISION
BY
- OH ----- OH -- OH ----- OH --- OH -----
ICKENED EDGEAl
-OH ----- OH ----- OH�----- OH --
I
EX. PAVEMENT FLOWLINE- - EX. POWER ruLt
Q _ _ TO REMAIN
I I I
I I \
-i ---i---W----- W----- W----- W ----- W
pti--W----- W----- W----- W-----W
I II -�-
I I 6TH S � ,9- : of
I I
n
I L_ j M
IdNT
ti M N F F;OR W
418.8± o p
' M.E.
0
. . N ,8$'5721' W. 861.a4 1•�(8n1.37' MEAS.)
�. . . . . . . . . . . . . .
)INT V�. . . . . . . . . ;
NEIGHBOUR,HOQD
WATCH . •,.,• . \
)IN .
_ LIMITS • OF CLFARINGI o
(TYP.)
.44 I
41 WLINE PROPOSED.ADA RAMP. SEE DETAILS
FLCON SHEET 5
•PROPOSED 16' WIDE CEMENT oy
CONCRETE DRIVEWAY APPROACH
SEE DETAIL ON SHEET 2
PROPOSED WATER METER �y
AND SERVICE. 1-INCH
WATER METER INSTALLED BY
a X----ITY-0E-RENTON. SEE DETAIL ON SHEET 2 0
PROPOSED 5' WIDE SIDEWALK
SEE DETAIL ON SHEET 2
/ PROPOSED TYPE 3 BARRICADE
)I oy
/ 419.16
ALK BACK OF WALK
PROPOSED ROW LINE �y
/ I ,
I \
--/ x
I `
\
oy
x \
LINETYPE LEGEND
G GAS PAINT LOCATE
T TELEPHONE PAINT LOCATE
W WATER PAINT LOCATE
-0-0- CHAIN LINK FENCE
0 o WOOD FENCE
EDGE OF ASPHALT
TOE OF SLOPE
TOP OF SLOPE
SITE LEGAL DESCRIPTION
-- 0-�--- OH --- OH ---- - -
EPP \
A Ir1TC�►.
1. INSTALL UTILITIES PER STANDARD DETAILS ON SHEETS 2 THROUGH 4
THAT PORTION OF THE NORTH 130 FEET OF THE NORTH HALF OF
THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER IN
SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST OF THE
WILLAMETTE MERIDIAN, LYING WESTERLY OF A LINE DESCRIBED AS
FOLLOWS:
BEGINNING AT A POINT ON THE NORTH LINE OF SAID NORTH HALF
WHICH BEARS NORTH 88° 57'11" WEST 540.45 FEET FROM THE
NORTHEAST CORNER THEREOF;
THENCE SOUTH 0°22'15" WEST TO THE SOUTH LINE OF SAID
NORTH 130 FEET AND THE TERMINUS OF SAID LINE.
EXCEPT THE WEST 60 FEET THEREOF.
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON
BBA LAND SURVEY
osa�
2/12/24 CMT CHAT
1 1 /25 CMT °` CHAT
10/21 CMT CHAT
DATE APPR
HOF0 1'-10'
VERT. N/A
mmi "mm
DATU M
0 Know what's below.
p Call before you dig.
® Dial 811
W- 4 2 7 7 01 R- 4 2 7 7 01 Or Call 1-800-424-5555
UTILITY CONFLICT NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION,
AND DEPTH OF ALL EXISTING UTIILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY
POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION
PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @
1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS
OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST.
LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE
UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS
SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE ENGINEER TO RESOLVE ALL
PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Surface Water Enginering DEVELOPMENT ENGINEERING c � IL
JFarah 07/11 /2024 0 yqi 07/10/2024 '
REGIONAL FIRE AUTHORITY eNTo
WATERABDOUL UUTILIITY FWASTEWATER UTILITY APPROVED d �
ell 07/11 /2024 cthomas 07/11/2024 4<FIPEa<
CITY OF GASPAIRE SFR OFFSITE IMPROVEMENTS
RENTON
Planning/Building/Public Works Dept. GASPAIRE FRONTAGE IMPROVEMENT PLAN
39XX NE 6TH STREET
2/4/23
iL•
0
141
0
0
N
U
HOF0 1'-10'
VERT. N/A
mmi "mm
DATU M
0 Know what's below.
p Call before you dig.
® Dial 811
W- 4 2 7 7 01 R- 4 2 7 7 01 Or Call 1-800-424-5555
UTILITY CONFLICT NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION,
AND DEPTH OF ALL EXISTING UTIILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY
POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION
PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @
1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS
OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST.
LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE
UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS
SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE ENGINEER TO RESOLVE ALL
PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Surface Water Enginering DEVELOPMENT ENGINEERING c � IL
JFarah 07/11 /2024 0 yqi 07/10/2024 '
REGIONAL FIRE AUTHORITY eNTo
WATERABDOUL UUTILIITY FWASTEWATER UTILITY APPROVED d �
ell 07/11 /2024 cthomas 07/11/2024 4<FIPEa<
CITY OF GASPAIRE SFR OFFSITE IMPROVEMENTS
RENTON
Planning/Building/Public Works Dept. GASPAIRE FRONTAGE IMPROVEMENT PLAN
39XX NE 6TH STREET
2/4/23
iL•
0
141
0
0
N
U