HomeMy WebLinkAboutFULL RPT Renton Highlands 2-BASINS TIR 11-14-24Deccio Engineering Inc.
17217 7th Avenue W.
Bothell, WA. 98012
(206) 390-8374
Fax: (425) 741-8214
Renton Highland 6-Lot Short Plat
LUA24-000078
Drainage Design Report,
O&M Manual & SWPP Report
Property Location:
5815 NE 8th Street
Renton, WA
October 20, 2023
Revised: February 14, 2024
Revised: October 14, 2024
Revised: October 22, 2024
Revised: November 14, 2024
Prepared for:
Sazei Design Group LLC
11/14/2024
Deccio Engineering Inc Page i
TABLE OF CONTENTS
SECTION 1 PROJECT OVERVIEW 1
o Figure 1: TIR Worksheet 2
o Figure 2: Site Location Map 7
o Figure 3: Existing Site Characteristic, Drainage Basins, and Sub-Basins 8
SECTION 2 CONDITIONS & REQUIREMENTS SUMMARY 10
King County Requirements
SECTION 3 OFF-SITE ANALYSIS 13
Sensitive Areas Map 14
Drainage Complaint Map 15
o Figure 4: Upstream and Downstream Flow Map 15
o Figure 5: Downstream System Table 16
SECTION 4 FLOW CONTROL & WATER QUALITY ANALYSIS AND DESIGN 15
o Figure 6: Soils Logs 16
o Figure 7: Developed Conditions Map 16
o Infiltration Requirements 17
o Soil Management Plan 18
SECTION 5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN 21
SECTION 6 SPECIAL REPORTS AND STUDIES 33
SECTION 7 OTHER PERMITS 33
SECTION 8 SWPPP ANALYSIS AND DESIGN 33
SECTION 9 BONDS, SUMMARIES AND COVENANTS 37
SECTION 10 OPERATIONS AND MAINTENANCE MANUAL 38
Operations and Maintenance Procedures
Appendix A
Pipe Conveyance Charts
Pump Charts
WWHM12 Results
Pit Infiltration Report
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
1 | Page
TIR SECTION 1 PROJECT OVERVIEW
Project:
Renton Highlands 6-Lot short plat
Site Information:
The proposed project is the construction of a six lot short plat. The site is located at
5815 NE 8th Street More generally the site is located within SW ¼ of Section 11,
Township 23 North, Range 05 East, W.M., (Parcel# 1123059068) see Figure 2:
Vicinity Map. The site is bordered by residential properties on the north, south, east,
and west sides of the site.
Pre-developed Site Conditions:
The site is 84,070 sf in size, is vacant with a cover of trees. The lot is split into two
sub-basins with runoff leaving the site to the south for Sub-basin 1 and to the west then
north for Subbasin 2. The lot is flat with slopes less that 2%. There are no known
sensitive areas on-site. Please refer to Figure 3: Existing Conditions Map..
Developed Site Conditions:
The project will consist of construction of a 6-lot short plat with the average lot size of
9,000 sf. Drainage from Sub-basin 1 (Lots 1 to 4) will drain to an onsite vault for storage
and discharge. The drainage from Sub-basin 2 (Lots 5 &6) will be disbursed using basic
dispersion and partial infiltration. Half street frontage improvement will be required on
Pasco Place NE consisting of curbs, gutters and sidewalks. The city is only requiring a
sidewalk fronting NE 8th street.
Flow control for Sub-basin 1, will be provided in the form of a closed detention vault. The
site will be served by public water and sewer. Please refer to Figure 7: Developed
Conditions Map
The total PGHS area for Sub-basin 2 is over 5,000 requiring enhanced basic water
quality in the form of a Filterra filter system.
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
2 | Page
Figure 1: TIR Worksheet
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
3 | Page
Figure 1: TIR Worksheet
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
4 | Page
Figure 1: TIR Worksheet
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
5 | Page
Figure 1: TIR Worksheet
filterra
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
6 | Page
Figure 1: TIR Worksheet
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
7 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
8 | Page
Figure 2: Site Location Map
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
9 | Page
Figure 3: Drainage Basins, Sub-basins and Site Characteristics
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
10 | Page
TIR SECTION 2 CONDITIONS & REQUIREMENTS SUMMARY
The City of Renton has adopted the City of Renton 2022 storm water manual which governs the
design of stormwater systems to serve this project. The Core and Special Requirements are being
met in the following manner:
City of Renton 2022 Storm Water Manual Core Requirements:
1. Discharge at the Natural Location Under 1.2.1-2, The surveyed contours show the site is contained within two subbasins:
Sub-Basin 1 drains to the south and Sub-basin 2 drains to the west, then north. Each sub-
basin will drain to its current location thereby maintain the natural discharge location
2. Off-site Analysis The Level 1 downstream analysis showed that there will be minimal impacts on the
downstream conditions for both basins, since the site proposes to use detention and basic
dispersion to address all stormwater runoff.
3. Flow Control The site will meet the flow control standards using on-site detention in the form of a
detention vault and on site BMPs.
4. Conveyance System Sub-Basin 1: The site is using catch basins and 12” storm pipe to collect the on-site runoff
sending it to the detention vaults which discharge it to an existing 12-inch storm pipe
located at the south end of Pasco Street.
Sub-Basin 2: The site is using BMPs for runoff dispersion, therefor there are no pipes or
conveyance systems other than the roof drains.
5. Temporary Erosion & Sediment Control All TESC measures proposed will conform to the 2022 Renton Stormwater Manual during
construction. Refer to Section 9 of this TIR for additional information. The measures
shown on the TESC plans include: Clearing limits, sediment control, soil stabilization,
BMP’s maintenance and construction sequence
6. Maintenance & Operations Maintenance and Operations manual has been provided at the back of this report. Note
that a “Declaration of Covenant” may be required. See Section 10.
7. Financial Guarantees & Liability A completed bond quantity worksheet maybe required
8. Water Quality The total PGHS area is over 5,000 sf and therefore, water quality in the form a Contech
Filterra system is proposed to meet the enhanced basic treatment requirement. Refer to
Section 4 of this report.
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
11 | Page
9. Flow Control BMP’s
Both basins were was reviewed for Flow Control. Sub-Basin 1 will use detention and porous
pavement. Sub-basin 2 will use partial infiltration and dispersion
on-site BMP’s (see review of BMP’s Below)
City of Renton 2022 storm water manual Special Requirements:
1. Other Adopted Area-Specific Requirements There are no area-specific requirements for this project site.
2. Floodplain/Floodway Delineation A review of the FEMA FIRM panels for the site, shows that the site and area of work is
outside any floodplain areas and site does not contain any floodplain/floodway
delineations.
3. Flood Protection Facilities There are no flood protection facilities located on or directly adjacent to the site.
4. Source Control The final site does not meet the threshold for source control requirements.
5. Oil Control The final site does not meet the threshold for oil control requirements.
6. Aquifer Protection Area None known.
REVIEW OF BMP’S
SUB-BASIN #1 ROOFS:
1. Full Dispersion in accordance with BMP T5.30 is infeasible because a 65 to 10
ratio of forested or native vegetation area to impervious area cannot be achieved.
Downspout Full Infiltration Systems in accordance with BMP T5.10A is
infeasible. Per the Geotech report from Ages Engineering the lots on Sub-
basin 1 are not suitable for infiltration .
2. Rain Gardens in accordance with BMP T5.14A and Bioretention in accordance
with Chapter 7 is infeasible since the soils consist of dense to very dense sand/silt
at 1 to 4 feet as noted by the geotechnical engineer and there is no positive outfall
for the BMP..
3. Downspout Dispersion Systems in the form of dispersion trenches in accordance
with BMP T5.10B are not feasible since the site cannot meet the required flow
paths.
4. Perforated Sub-out Connection will be used
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
12 | Page
Other Hard Surfaces:
1. Full Dispersion in accordance with BMP T5.30 in Volume V, Chapter 5 of this manual. Is
not feasible since site cannot meet the 100-ft flow paths for the site.
2. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V, (Permeable
Pavement will be used on the driveways.)
SUB-BASIN #2 ROOFS:
1. Full Dispersion in accordance with BMP T5.30 is infeasible because a 65 to 10
ratio of forested or native vegetation area to impervious area cannot be achieved.
Downspout Full Infiltration Systems in accordance with BMP T5.10A is A
PIT test supporting a design infiltration rate of 1.22-inch/hour is proposed
for 3,000 sf of roof area for Lots 5 and 6. This will reduce the net runoff to
under 0.15 cfs and allow the use of the remaining BMPS
2. Rain Gardens in accordance with BMP T5.14A and Bioretention in accordance
with Chapter 7 is infeasible since the site is to flat with no positive outfall.
3. Downspout Dispersion Systems in the form of splash blocks with 100-ft flow
paths in accordance with BMP T5.10B (will be used for the roof areas.)
4. Perforated Sub-out Connection N/A
Other Hard Surfaces:
1. Full Dispersion in accordance with BMP T5.30 in Volume V, Chapter 5 of this manual. Is not
feasible since site cannot meet the 100-ft flow paths for the site.
2. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V, (Permeable
Pavement will be used on the driveways.)
City of Renton Conditions
FINDINGS/CONCLUSIONS:
To be determined
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
13 | Page
TIR SECTION 3 OFF-SITE ANALYSIS
TASK 1 – STUDY AREA DEFINITIONS AND MAPS
Overview
This section of the TIR is a Level 1 Downstream Analysis per the City of Renton 2022 storm
water manual Section 2.3. The site is 84,070 sf in size and contains an existing cover of trees and
landscaping .
Upstream Drainage Analysis / Upstream Contributing Area
Based on the site contours, all upstream off-site runoff is intercepted by NE 8th Street, therefore
there is little if any off-site runoff enters onto the site.
TASK 2 – RESOURCE REVIEW
Adopted Basin Plan
The site is located in two sub-basins, the May Creek Sub-basin and the Cedar River/Lake
Washington Basin
Basin Reconnaissance Summary Report
We are not aware of a current Basin Reconnaissance Summary Report for this area.
Critical Drainage Area
The site is not considered to be within a critical drainage area as defined by the City of Renton
2022 storm water manual
A review of the DOE “water quality assessment” web site shows that the section of the site
discharges into is not on the DOE 303(d) list.
Sensitive Area Maps
Per City of Renton the site does not contain any sensitive areas..
Soils Survey
The Geotech report prepared for the site, shows the soils to be a dense sand-silt
Wetland / Stream Inventory
There are no wetlands or stream noted
A review of the FEMA FIRM panels for the site, shows that the site is outside any floodplain
areas and site does not contain any floodplain/floodway delineations.
Drainage Complaints
There appeared to be 14-drainage complaints downstream of the two sub-basins, and all were
closed by 2006. (See “Drainage Complaints Map”)
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
14 | Page
TASK 3 – FIELD INSPECTION
A Level 1 site inspection was performed on October 10, 2023. The weather was clear. The
inspection focused on identifying potential downstream drainage and water quality problems
SUB-BASIN #1
As previously indicated, the site slopes from north to south with all runoff leaving the site and
discharging onto the adjacent property to the south.
TASK 4 – DRAINAGE SYSTEM DESCRIPTION, AND PREDICTED DRAINAGE AND
WATER QUALITY PROBLEMS
OFFSITE LEVEL ONE DOWNSTREAM ANALYSIS
1. The runoff leaves the site and flows into the storm system on NE 7th Place where it flows
west for 700 feet to Nile Avenue NE and flows south for a distance of 2,200. At the
intersection of Nile Ave NE and ne 4th street the drainage turns and flows west in the
storm drainage system serving NE 4th street for a distance of over 1,300 feet.
The total distance covered is just under 1-mile
Sub-Basin 1 Predicted Drainage and Water Quality Problems
There appeared to be no issues downstream and since detention is provided for the site
improvements, the proposed project should have little if any impact on downstream conditions.
TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
The project proposes to provided detention and water quality to address the storm water runoff
from the proposed site improvements, thus mitigating any downstream impacts.
SUB-BASIN #2
As previously indicated, Lots 5 and 6 slope from east to west with all runoff leaving the site and
discharging onto the adjacent property to the south. The drainage from NE 8th flows west to Nile
Ave NE.
TASK 4 – DRAINAGE SYSTEM DESCRIPTION, AND PREDICTED DRAINAGE AND
WATER QUALITY PROBLEMS
OFFSITE LEVEL ONE DOWNSTREAM ANALYSIS
1. The runoff leaves the site flows overland to the west for 300-ft and into the storm system
serving Nile Avenue NE where it is joined by the runoff from NE 8th Street, where it turns
and flows north for a distance of 1,300 feet to SE 117th Street. At this intersection of the
drainage flows the to west and discharges into a wetlands were it then flows north-west in
an unnamed stream for a distance of over 3,200 feet.
The total distance covered is just under 1-mile
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
15 | Page
Note: There were no indications of issues noted. Where visible the stream channel appeared to be
in good condition and well vegetated. However, most of the downstream was on private property
and not accessible to inspection.
Sub-Basin 2 Predicted Drainage and Water Quality Problems
There appeared to be no issues downstream and since basic dispersion is proposed for the site
improvements, the proposed project should have little if any impact on downstream conditions.
TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
The project proposes to use dispersion to address storm water runoff from the proposed site
improvements, thus mitigating any downstream impacts
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
16 | Page
Figure 5: Upstream Area and Downstream Flow Map
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
17 | Page
Figure 6: Downstream System Table
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
18 | Page
Drainage Complaints
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
19 | Page
1) Complaint number 2009-0889 Complaint type FI Date received Problem REM Date closed 12/30/2009 Address 11840 148TH AVE SE
2) Complaint number 2000-0528 Complaint type FCC Date received Problem MMG Date closed 8/29/2000 3) Complaint number 2001-0027 Complaint type C Date received Problem DDM Date closed 2/2/2001 4) Complaint number 1994-1000 Complaint type RN Date received Problem FLOODING Date closed 3/21/1995 Address 11615 148TH AVE SE Parcel 1023059390 Comments LACK OF CONVEYANCE THROUGH PVT PROP 5) Complaint number 1995-0009 Complaint type C Date received Problem EROSION Date closed 1/24/1995
6) Complaint number 1996-0552 Complaint type R Date received Problem FLDG Date closed 4/8/1996 7) Complaint number 1996-0185 Complaint type C Date received Problem FLDG Date closed 2/26/1996
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
20 | Page
8) Complaint number 1989-0150 Complaint type C Date received Problem DRNG/ERO Date closed 3/24/1989 9) Complaint number 1988-0790 Complaint type C Date received Problem DRNG Date closed 1/24/1989 10) Complaint number 1999-0151 Complaint type C Date received Problem DRAINAGE Date closed 3/8/1999 11) Complaint number 1989-0776 Complaint type C Date received Problem FLDG Date closed 2/22/1990 12) Complaint number 1995-0104 Complaint type C Date received Problem H2OLEVEL Date closed 2/14/1995 13) Complaint number 1996-0323 Complaint type C Date received Problem WETLAND Date closed 2/26/1996 Address 12227 148TH AVE S 14) Complaint number 2006-0515 Complaint type C Date received Problem RFN Date closed 8/30/2006 15) Complaint number 1996-0880 Complaint type WQC Date received Problem EROSION Date closed 12/3/2008
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
21 | Page
TIR SECTION 4 FLOW CONTROL & WATER QUALITY ANALYSIS
AND DESIGN
SUB-BASIN #1
The WWHM Ver.12 Hydraulic Simulation Model was used to calculate the pre-developed and
developed flows for the Hydrographs for the 2-year and 50-year, 24-hour duration design storm
events for the existing and developed conditions.
Pump System: In lieu of using the standard control structure design, the vault was sized using
SSD (stage-storage-discharge) input tables to size the pumps to release 50-percent of the 2-year
peak flow through the 50-year flow in order to provide the required detention for the developed site
runoff. The hydrographs were generated using the following information:
WWHM12 Input Information
• Regional Gage Station: SeaTac
• Precip Scale: 1.00
• Soils Type: Till
Sub-Basin-1: Existing Site Hydrology
The Sub-Basin is 1.51 acres in size The WWHM12 runoff was calculated using existing
forested conditions to determine the total allowable release rate from the Existing Site. (See
Figure 3: “Existing Site Conditions”).
The site soils are identified as Till Type C,.
Existing Area:
1. Onsite Area 1.51 acres (forested)
Total Area: 1.51 Acres
Sub-Basin: Developed Site Hydrology
The runoff from the developed site conditions including roof areas, driveways, and landscaping, will
be collected and conveyed in catch basins and pipes to the storm water detention vault located in the
along the south side of the site. Discharge from the site will be pumped up and into an existing storm
pipe system located on Pasco Place. (See Figure 6: “Developed Site Conditions”)
The total area to be detained 1.51 acres. It is assumed that each lot will have 4,000 of
impervious area (3,400 sf roof & 600 sf driveways)
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
22 | Page
Impervious Areas: Developed Sub-Basin
New Roofs: 4 Total (3,400 sf each) 0.310 acres
Driveways (600 sf each) 0.055 acres
Pasco Place Pavement: 0.160 acres
Side Walks: 0.050 acres
Tract Access Drive: 0.136 acres
Total Impervious Area: 0.711 acres (Impervious)
Pervious Area:
Lawn Area/Landscape: Pervious 0.799 acres
Total Pervious Area: 0.799 acres (Lawn/Landscape)
Total Site Area: 1.51 acres
Results of WWHM12 Computer Analysis:
Storm Event Mitigated. Site Predev. Site
• 2-year, return period: 0.018138 cfs 0.030877 cfs
• 50-year, return period: 0.073620 cfs 0.085596 cfs
• 100-year, return period: 0.092800 cfs 0.095251 cfs
The runoff from the site improvements will be detained and released at the required pre-
developed rates. See Appendix A for WWHM12 calculation results.
Maintenance Access: The paved access drive to the vault will provide the required maintenance
access to the control structure.
Detention Calculation Results:
A summary of the detention calculations and vault design are shown on the following pages.
The concrete vault will provide the required flow control for the site improvements.
BMP SELECTION: Due to the site constraints, and soils type the only BMP that is feasible to use is
having all downspouts tied into perforated stub outs prior to discharging into the storm drain
system
• Soil Amendment BMP’s: Will be used on site
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
23 | Page
Figure 3: Sub-basins and Existing Site Conditions
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
24 | Page
Figure 7: Developed Site Conditions
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
25 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
26 | Page
WWHM12 SSD RESULTS
SUB-BASIN #1: FLOW CONTROL SYSTEM
Results From WWHM12 Calculations:
Retention/Detention Facility
Type Of Facility: Detention Vault
Side Slopes: Vert Conc Walls
Pond Bottom Width: 59-ft (Actual: 52-ft)
Pond Bottom Length: 59-ft (Actual: 67-ft)
Pond Bottom Area: 3,481- sf (Actual: 3,484-sf)
Effective Live Storage Depth: 6.0 ft
Live Storage Volume Required: 20,886 cu.-ft
Live Storage Volume Provided: 20,904 cu.-ft (at Vault Size Designed)
Dead Storage Volume Req’d: 1,741 cu.-ft (at 0.5-ft depth)
Dead Storage Volume Provided: 1,742 cu.-ft (at 0.5 ft depth)
Water Quality System: Filterra
The results of the WWHM12 calculations are included in Appendix A
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
27 | Page
PUMP DESIGN:
Per Table 1.2.3.A of Core Requirement #3, under Forested Conditions the discharge must match
the peaks for the 50% of the 2-year and 10-year return periods. Per the WWHM12 results:
• 50% of 2-Year Predeveloped Flow: = 0.020 cfs or 9 gpm
• 10-Year Predeveloped Flow: = 0.050 cfs or 22.5 gpm
The duplex pump system was designed to match the required flow rates per the table below;
The Pump Table above, lists the allowable flow rates in GPM and the required pumps to be used.
• Pump 1 Zoeller Model 264 (or equal) @ 9.0 gpm
• Pump 2 Zoeller Model 266 (or equal) @ 22.5gpm
• A backup emergency generator is required for the pump system
See Appendix B for WWHM12 calculation results and pump tables
SUB-BASIN #2
(Lots 5 & 6)
The WWHM Ver.12 Hydraulic Simulation Model was used to calculate the pre-developed and
developed flows for the Hydrographs for 100-yr, 24-hour duration design storm events for the
existing and developed conditions. The hydrographs were generated using the following
information:
The trenches are designed to infiltrate 3,000 sf (1,500 sf per lot) of the roof areas
The PIT infiltration test performed on the site showed a design rate of 1.22 inch per hour. Under
the City of Renton design manual, only the infiltration BMP can be used as a flow credit.
INFILTRATION DESIGN
A PIT Infiltration test and Standard Subsurface Investigation Report by Hamid Koresan PE,
dated August 22, 2024 prepared for the site showed the site soils to be a silty-sand (SM) - series
to a depth of 5-ft with no signs of groundwater. The “PIT” Infiltration tests performed estimated
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
28 | Page
the Measured Infiltration rate at approximately 3.43 -inches per hour with a Design Rate of 1.22
in/hr. (See Appendix A)
The project will address the stormwater runoff as follows:
• Each lot will infiltrate 1,500 sf of roof areas (3,000 sf total). This area can then be
removed for the 100-flow calculations
The WWHM12 program was the used to size the trench with the following results:
Roof/Driveway Trench Sizing:
• Total Roof Area: 3,000 sf : 0.068 acres (roof)
• Trench Size for one lot: 1,500 sf or 0.034
• Design Infiltration rate: 1.22 inch per hr
Results:
• Trench Size: 50-ft x 5-ft x 2-ft deep (two required)
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
29 | Page
Lots 5 and 6 Infiltration Results
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
30 | Page
Sub-basin 2: 100-Year Flow calculations:
The WWHM12 results show the difference between the site flow for the 100-year pre and post
flows is under the 0.15 cfs making Subbasin 2 eligible for small site BMPS which will include:
• Downspout Full Infiltration Systems in accordance with BMP T5.10A
o For 1,500 sf of each roof (Allowed as a credit in the WWHM12 program)
• Downspout Dispersion Splash blocks w/100 ft flow paths in accordance with BMP T5.10B
o This BMP is not allowed in the WWHM12 modeling program
• Pervious Pavement Driveways
o This BMP is not allowed in the WWHM12 modeling program
WWHM12 Input Information
• Regional Gage Station: SeaTac
• Precip Scale: 1.00
• Soils Type: Till
Sub-Basin-2: Existing Site Hydrology
The Sub-Basin is 0.53 acres in size The WWHM12 runoff was calculated using existing
forested conditions to determine the pre-developed 100-year flow for the Existing Site. (See
Figure 3: “Existing Site Conditions”).
The site soils are identified as Till Type C,.
Existing Area:
Existing Pavement 0.074 acres (Impervious)
Onsite Area 0.456 acres (Forested)
Total Area: 0.530 Acres
Sub-Basin: Developed Site Hydrology
The runoff from the developed site conditions including roof areas, driveways, will be managed
through the use of drainage BMP’s. (See Figure 6: “Developed Site Conditions”)
The total area to be detained: 0.461 acres = 0.53 acres – 0.069 acres (To be infiltrated)
Impervious Areas: Developed Sub-Basin
New Roofs: 6,000 sf – 3,000 sf (to be infiltrated) 0.069 acres
Driveways: 1,200 sf 0.027 acres
Ex Pavement NE 8th St 0.074 acres
Total Impervious Area: 0.170 acres (Impervious)
Pervious Area:
Lawn Area/Landscape: Pervious 0.291 acres
Total Pervious Area: 0.291 acres (Lawn/Landscape)
Total Site Area: 0.461 acres
WWHM12 Flow Results
o Developed 100-yr 0.2258 cfs – Pre-dev 0.0851 = 0.14070 cfs < 0.15 cfs,
Therefore, sub-basin 2 is eligible for on-site BMPs to control the stormwater runoff.
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
31 | Page
WATER QUALITY
Sub-Basin 2: The total PGHS areas for Lots 5 and 6 is 1,200 sf. The added PGHS area for the
widening of NE 8th has a net area new area of 1,200 sf for a total of 2,400 sf which is under the
5,000 sf threshold. Therefore, water quality is not required
Landscaping: BMP T5.13 “Post Construction Soil Quality and Depth”
The top soils will be stockpile on-site and reused per BMP T5.13 “Post Construction Soil Quality and
Depth” which requires “Stockpile existing top soils during grading and replace it prior to
planting…” In addition, the soils will be required to be tested for organic compliance. (See work
sheets on following pages).
SECTION 5: CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Sub-Basin 1: The piping and conveyance system for the interception of the drainage from the site was
designed to convey the runoff from the 100-year, 24-hour storm event. (See Flow Charts Appendix
A)
The following conveyance capacity calculations for the on-site systems were calculated using the 100-
year developed flow results from roadways, Parking and Driveway’s and the SBUH Method for the
storm calculations.
Design results:
Storm Event Dev. On Site
• 100-year, return period: 1.90 cfs: Dev flows for 12-inch pipe from the site
improvements to the vault
PIPE CAPACITY: ROADWAYS TO VAULT
The 12- HDPE pipe from the Roads to vault was sized to handle the runoff from the 100-year storm.
(See Appendix A “Pipe Conveyance Charts”)
Using D.O.T. Chart 35 "Design Charts For Open Channel Flow":
12" HDPE Pipe Slope: 0.50 % Minimum Slope,
Mannings: n = .012
100-Year Dev. Flows: 1.90 cfs Design Flow
Capacity Results:
12" Pipe Capacity: = 2.70 cfs (flowing full) > 1.90 cfs required
Velocity: = 3.95 fps > 3.00 fps required
Therefore the 12" HDPE is adequate.
12-INCH POND STANDPIPE OVERFLOW:
The 12- Stand pipe used as a the vertical over flow for the vault was sized to handle the runoff from
the 100-year developed storm. (See Appendix A “Figure III-2.38 “Riser Inflows Curves”)
Concrete Vault:
Peak Stage above overflow: 0.5 feet from overflow to top of vault lid
Capacity Required: 1.90 cfs Capacity Provided: 4.80 cfs
Therefore, overflow ok.
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
32 | Page
WATER QUALITY:
Landscaping: BMP T5.13 “Post Construction Soil Quality and Depth”
The top soils will be stockpile on-site and reused per BMP T5.13 “Post Construction Soil Quality and
Depth” which requires “Stockpile existing top soils during grading and replace it prior to
planting…” In addition, the soils will be required to be tested for organic compliance. (See work
sheets on following pages).
Roadway, Parking & Driveway Water Quality: Water quality will be provided by installing a
“Filterra Peak Diversion” (FTPD) filter structure from Contech StormWater Management Inc.
Contech Stormwater Management provided the sizing letter on the following page, based on the site
plans. (Sizing will be provided upon preliminary approval by the City)
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
33 | Page
SAMPLE
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
34 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
35 | Page
TIR SECTION 6 SPECIAL REPORTS AND STUDIES
• Structural Vault calculations,
TIR SECTION 7 OTHER PERMITS
Below is the list of anticipated permits required for this project. Other permits may be required
that are not mentioned below.
• Building Permit – New apartment building
• Structural Vault Permit
TIR SECTION 8 CSWPPP ANALYSIS AND DESIGN
For the purposes of this report, several standard erosion control procedures will be utilized by the
contractor to minimize the amount of erosion and sedimentation perpetuated by the construction
of the site. Furthermore, these techniques are proposed for the Construction Stormwater Pollution
Prevention Plan (CSWPPP) and should be reviewed and instituted by the onsite contractor.
Some of the measures include filter fabric fence, and standard ground cover practices. A
construction sequence will also be used to minimize the impacts of erosion due to construction.
ESC Plan Analysis and Design (Part A)
1. At 1.51 acres and 0.52 acres in size, the sub-basins small requiring only minimal ESC
measures. The 13-Elements of a Construction CSWPPP listed below, discuss and describe
the appropriate ESC measure to be used.
2. Due to the small size of the site, no ESC facilities are proposed. Therefore, no analysis of the
site’s ESC facilities was required. The proposed BMPs consist of standard items including:
filter fences, construction entrance, CB inlet protection and plastic cover, etc. No sediment
traps are proposed. If required, the vault can be used as a temporary sediment pond.
3. The area of the development with any high erosion are minimal and will be controlled by the
filter fence around the perimeter of the site.
4. There were no special reports done for the site.
5. No exceptions or modifications are proposed of the “Erosion and Sedimentation Control
Standards”
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
36 | Page
THE 13 ELEMENTS OF A CONSTRUCTION CSWPPP
1. Preserve Vegetation/Mark Clearing Limits: The clearing limits are indicated on the plan sheet.
Furthermore, clearing and grading will be limited to only areas that need to be disturbed for
grading/construction of the road surface to preserve as much natural vegetation as possible. Field
marking the clearing limits shall be completed prior to clearing and grubbing activities.
BMP's: Preserve Natural Vegetation (VEG)
Field Marking Clearing Limits (CL)
2. Establish Construction Access: Access to the construction site shall be limited to the rock
construction entrance. The construction entrance shall be extended to provide access to the
construction vehicle/equipment staging and employee parking areas.
BMP's: Stabilized Construction Entrance (CE)
3. Control of Flow Rates: Storm water detention: No detention is proposed for the site since the
increase in volume is minimal
4. Installation of Perimeter Sediment Controls: Sediment control will be provided through a
combination of filtration through the surround on-site vegetation, filter fence, straw bails,
BMP's: Silt Fence (FF)
5. Soils Stabilization: Temporary and permanent soil stabilization will be provided. Temporary
stabilization will be provided through the application of straw and/or plastic sheeting to exposed,
worked earth. From October 1 until April 30, no exposed soil may remain exposed and unworked
for more than two days; after May 1, no exposed soil may remain exposed and unworked for
more than seven days.
BMP's: Plastic Sheeting,
6. Slope Protection: Slopes shall be protected from erosion through cover and prevention of
concentrated surface runoff flows.
BMP's: Plastic Sheeting,
7. Protection of Permanent Drain Inlets and Dust/Mud Control: Inlet protection will be
provided for all catch basins.
BMP’s: Inlet Protection
BMP’s: Street Sweeping and watering of dust areas
8. Stabilization of Channels and Outlets: All channel slopes shall be constructed and protected
against erosion in accordance with City of Renton
BMP's: None required
9. Pollutant Control: Pollutants shall be controlled as described in the Potential Pollutants section
of this SWPPP.
10. Dewatering Control: De-watering: Interception of the water table is not expected to occur, even
if there is an increase in precipitation. However, should ground water flows be encountered, the
flows can be directed to on site native vegetation for cleanup.
BMP's: Native vegetation (As Required)
11. BMP Maintenance: All BMP's and SWPPP elements shall be inspected daily and maintained as
required.
12. Project Management: The project shall be managed in a cooperative effort by the project
manager, contractor, engineer, and the county inspector. During the construction process, if
unforeseen issues arise that cannot be resolved on site, construction activity (other than SWPPP
maintenance) shall be halted and the county inspector and the project engineer are to be contacted
and informed of the situation. The Erosion Control Lead TBD
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
37 | Page
13. Protect On-Site Stormwater Management BMPs For Runoff From Roofs And Other Hard
Surface
On-site stormwater management BMPs used for runoff from roofs and other hard surfaces
include: full dispersion, roof downspout full infiltration or dispersion systems, perforated stubout
connections, rain gardens, bioretention systems, permeable pavement, sheetflow dispersion, and
concentrated flow dispersion. The areas on the site to be used for these BMPs shall be protected
from siltation and compaction during construction by sequencing the construction in a fashion to
install these BMPs at the latter part of the construction grading operations, by excluding
equipment from the BMPS and the associated areas, and by using the erosion and sedimentation
control BMPs. BMP C102: Buffer Zone
Since the project is for residential apartments, under the City of Renton 30.63 A.530, (2) the project
does not fall under the “High Use Sites” covering commercial or industrial sites.
BMP C-151: Concrete Handling (Design and Installation Specifications)
Concrete truck chutes, pumps, and internals shall be washed out only into formed areas awaiting
installation of concrete or asphalt. Unused concrete remaining in the truck and pump shall be
returned to the originating batch plant for recycling.
Hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels shall be
washed off only into formed areas awaiting installation of concrete or asphalt.
Equipment that cannot be easily moved, such as concrete pavers, shall only be washed in areas that
do not directly drain to natural or constructed stormwater conveyances.
Washdown from areas such as concrete aggregate driveways shall not drain directly to natural or
constructed stormwater conveyances.
When no formed areas are available, washwater and leftover product shall be contained in a lined
container. Contained concrete shall be disposed of in a manner that does not violate groundwater or
surface water quality standards
Maintenance Standards:
Containers shall be checked for holes in the liner daily during concrete pours and repaired the same
day
Soil Management Plan for “Post Construction Soil Standard”
The top soils will be stockpile on-site and reused per “Implementation Options #4b “Amend existing
soil in place per the Post Construction Soil Standard” which requires “Stockpile existing top soils
during grading and replace it prior to planting…” In addition, the soils will be required to be tested
for organic compliance. See the following requirements.
Amend Existing Soils, Purpose and Definition
Naturally occurring (undisturbed) soil and vegetation provide important stormwater functions including: water
infiltration; nutrient, sediment, and pollutant adsorption; sediment and pollutant biofiltration; water interflow storage
and transmission; and pollutant decomposition. These functions are largely lost when development strips away
native soil and vegetation and replaces
it with minimal topsoil and sod. Not only are these important stormwater functions lost, but such landscapes
themselves become pollution- generating pervious surfaces due to increased use of pesticides, fertilizers and other
landscaping and household/industrial chemicals, the
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
38 | Page
concentration of pet wastes, and pollutants that accompany roadside litter.
Establishing soil quality and depth regains greater stormwater functions in the post development landscape, provides
increased treatment of pollutants and sediments that result from development and habitation, and minimizes the need
for some landscaping chemicals, thus reducing pollution through prevention.
Applications and Limitations
Establishing a minimum soil quality and depth is not the same as preservation of naturally occurring soil and
vegetation. However, establishing a minimum soil quality and depth will provide improved on-site management of
stormwater flow and water quality.
Soil organic matter can be attained through numerous materials such as compost, composted woody material,
biosolids, and forest product residuals. It is important that the materials used to meet the soil quality and depth BMP
be appropriate and beneficial to the plant cover to be established. Likewise, it is important that imported topsoils
improve soil conditions and do not have an excessive percent of clay fines.
Design Guidelines
Soil retention. The duff layer and native topsoil should be retained in an undisturbed state to the
maximum extent practicable. In any areas requiring grading remove and
stockpile the duff layer and topsoil on site in a designated, controlled area, not adjacent to public resources
and critical areas, to be reapplied to other portions of the site where feasible.
Soil quality. All areas subject to clearing and grading that have not been covered by impervious surface,
incorporated into a drainage facility or engineered as structural fill or slope shall, at project completion,
demonstrate the following:
I. A topsoil layer with a minimum organic matter content of ten percent dry weight in planting beds,
and 5% organic matter content (based on a loss-on-ignition test) in turf areas, and a pH from 6.0
to 8.0 or matching the pH of the original undisturbed soil. The topsoil layer shall have a
minimum depth of eight inches except where tree roots limit the depth of incorporation of
amendments needed to meet the criteria. Subsoils below the topsoil layer should be scarified at
least 4 inches with some incorporation of the upper material to avoid stratified layers, where
feasible.
2. Planting beds must be mulched with 2 inches of organic material
3. Quality of compost and other materials used to meet the organic content
requirements:
a. The organic content for -pre-approved” amendment rates can be met only using compost that
meets the definition of -composted materials” in WAC I73-350-220. This code is available online
at: http://www.ecy.wa.gov/programs/swfa/facilities/350.html.
Compost used in bioretention areas should be stable, mature and derived from yard debris, wood waste, or other
organic materials that meet the intent of the organic soil amendment specification. Biosolids and manure
composts can be higher in bio-available phosphorus than compost derived from yard or plant waste and therefore
are not allowed in bioretention areas due to the possibility of exporting bio-available phosphorus in effluent.
The compost must also have an organic matter content of 35% to 65%, and a carbon to nitrogen ratio below 25:I.
The carbon to nitrogen ratio may be as high as 35:I for plantings composed entirely of plants native to the Puget
Sound Lowlands region.
b. Calculated amendment rates may be met through use of composted materials as defined above; or
other organic materials amended to meet the carbon to nitrogen ratio requirements, and meeting
the contaminant standards of Grade A Compost.
The resulting soil should be conducive to the type of vegetation to be established.
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
39 | Page
Implementation Options: The soil quality design guidelines listed above can be met by using one of the
methods listed below.
I. Leave undisturbed native vegetation and soil, and protect from compaction during construction.
2. Amend disturbed soil according to the following procedures:
b. Scarify subsoil to a depth of one foot
c. In planting beds, place three inches of compost and till in to an eight-inch depth.
d. In turf areas, place two inches of compost and till in to an eight-inch depth.
e. Apply two to four inches of arborist wood chip, coarse bark mulch, or compost mulch to
planting beds after final planting.
Alternatively, disturbed soil can be amended on a site-customized manner so that it meets the soil quality
criteria set forth above, as determined by a licensed engineer, geologist, landscape architect, or other
person as approved by City of Renton.
3. Stockpile existing topsoil during grading, and replace it prior to planting. Stockpiled topsoil must be
amended if needed to meet the organic matter and depth requirements by following the procedures in
method (2) above).
4. Import topsoil mix of sufficient organic content and depth to meet the organic matter and depth
requirements.
5. More than one method may be used on different portions of the same site. Soil that already meets the
depth and organic matter quality standards, and is not compacted, does not need to be
amended.
Maintenance
Soil quality and depth should be established toward the end of construction and once established,
should be protected from compaction, such as from large machinery use, and from erosion.
Soil should be planted and mulched after installation.
Plant debris or its equivalent should be left on the soil surface to replenish organic matter.
TIR SECTION 9 BONDS, SUMMARIES AND COVENANTS
All the necessary documents listed below will be included after first review comments are
received.
These will include:
• Bond Quantities,
• Flow Control and Water Quality Facility Summary Sheet and Sketch
• Declaration of Covenant for Privately Maintained Flow Control and WQ Facilities
• Declaration of Covenant for Privately Maintained Flow Control BMPs
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
40 | Page
TIR SECTION 10 OPERATIONS AND MAINTENANCE MANUAL
Stormwater System Description
The stormwater system for the site is fairly basic and contains the following elements:
• 12”-inch storm pipe
• Catch basin
• Detention Vault
• Filterra
• Pump System
• Infiltration
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
41 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
42 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
43 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
44 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
45 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
46 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
47 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
48 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
49 | Page
Renton Highlands 6-Lot SP TIR Revised November 14, 2024
50 | Page
APPENDIX A
PIPE CAPACITY
PUMP CURVES
LOT 5&6 INFILTRATION WWHM12 RESULTS
BASIN-2 100-YR FLOW WWHM12 RESULTS
DETENTION VAULT WWHM12 RESULTS
PIT INFTRATION RESULTS
WWHM2012
PROJECT REPORT
default[60]10/25/2024 9:33:12 AM Page 2
General Model Information
WWHM2012 Project Name:default[60]
Site Name:
Site Address:
City:
Report Date:10/25/2024
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2023/01/27
Version:4.2.19
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
default[60]10/25/2024 9:33:12 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 0.034
Pervious Total 0.034
Impervious Land Use acre
Impervious Total 0
Basin Total 0.034
default[60]10/25/2024 9:33:12 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
ROOF TOPS FLAT 0.034
Impervious Total 0.034
Basin Total 0.034
default[60]10/25/2024 9:33:12 AM Page 6
Mitigated Routing
Gravel Trench Bed 1
Bottom Length:50.00 ft.
Bottom Width:5.00 ft.
Trench bottom slope 1:0.01 To 1
Trench Left side slope 0:0.01 To 1
Trench right side slope 2:0.01 To 1
Material thickness of first layer:2
Pour Space of material for first layer:0.33
Material thickness of second layer:0
Pour Space of material for second layer:0
Material thickness of third layer:0
Pour Space of material for third layer:0
Infiltration On
Infiltration rate:1.22
Infiltration safety factor:1
Wetted surface area On
Total Volume Infiltrated (ac-ft.):5.262
Total Volume Through Riser (ac-ft.):0.001
Total Volume Through Facility (ac-ft.):5.262
Percent Infiltrated:100
Total Precip Applied to Facility:0
Total Evap From Facility:0
Discharge Structure
Riser Height:1.9 ft.
Riser Diameter:6 in.
Element Flows To:
Outlet 1 Outlet 2
Gravel Trench Bed Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.005 0.000 0.000 0.000
0.0222 0.005 0.000 0.000 0.007
0.0444 0.005 0.000 0.000 0.007
0.0667 0.005 0.000 0.000 0.007
0.0889 0.005 0.000 0.000 0.007
0.1111 0.005 0.000 0.000 0.007
0.1333 0.005 0.000 0.000 0.007
0.1556 0.005 0.000 0.000 0.007
0.1778 0.005 0.000 0.000 0.007
0.2000 0.005 0.000 0.000 0.007
0.2222 0.005 0.000 0.000 0.007
0.2444 0.005 0.000 0.000 0.007
0.2667 0.005 0.000 0.000 0.007
0.2889 0.005 0.000 0.000 0.007
0.3111 0.005 0.000 0.000 0.007
0.3333 0.005 0.000 0.000 0.007
0.3556 0.005 0.000 0.000 0.007
0.3778 0.005 0.000 0.000 0.007
0.4000 0.005 0.000 0.000 0.007
0.4222 0.005 0.000 0.000 0.007
0.4444 0.005 0.000 0.000 0.007
0.4667 0.005 0.000 0.000 0.007
0.4889 0.005 0.000 0.000 0.007
default[60]10/25/2024 9:33:12 AM Page 9
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.034
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:0.034
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.001
5 year 0.00157
10 year 0.001893
25 year 0.002236
50 year 0.002447
100 year 0.002628
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0
5 year 0
10 year 0
25 year 0
50 year 0
100 year 0
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.001 0.000
1950 0.001 0.000
1951 0.002 0.000
1952 0.001 0.000
1953 0.001 0.000
1954 0.001 0.000
1955 0.001 0.000
1956 0.001 0.000
1957 0.001 0.000
1958 0.001 0.000
default[60]10/25/2024 9:33:51 AM Page 32
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2024; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
default[60]10/25/2024 8:08:07 AM Page 2
General Model Information
WWHM2012 Project Name:default[60]
Site Name:
Site Address:
City:
Report Date:10/25/2024
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2023/01/27
Version:4.2.19
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
default[60]10/25/2024 8:08:07 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 0.456
Pervious Total 0.456
Impervious Land Use acre
ROADS FLAT 0.074
Impervious Total 0.074
Basin Total 0.53
default[60]10/25/2024 8:08:07 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.291
Pervious Total 0.291
Impervious Land Use acre
ROADS FLAT 0.074
ROOF TOPS FLAT 0.069
DRIVEWAYS FLAT 0.027
Impervious Total 0.17
Basin Total 0.461
default[60]10/25/2024 8:08:07 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.456
Total Impervious Area:0.074
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.291
Total Impervious Area:0.17
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.035654
5 year 0.047469
10 year 0.055828
25 year 0.067021
50 year 0.075831
100 year 0.085054
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.084923
5 year 0.117182
10 year 0.140638
25 year 0.172735
50 year 0.19848
100 year 0.225836
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.050 0.126
1950 0.046 0.123
1951 0.044 0.078
1952 0.026 0.051
1953 0.023 0.054
1954 0.030 0.068
1955 0.035 0.073
1956 0.034 0.073
1957 0.040 0.095
1958 0.027 0.064
default[60]10/25/2024 8:09:03 AM Page 28
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2024; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
default[10]11/13/2024 6:22:01 AM Page 2
General Model Information
Project Name:default[10]
Site Name:
Site Address:
City:
Report Date:11/13/2024
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
default[10]11/13/2024 6:22:01 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 1.51
Pervious Total 1.51
Impervious Land Use acre
Impervious Total 0
Basin Total 1.51
Element Flows To:
Surface Interflow Groundwater
default[10]11/13/2024 6:22:01 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.799
Pervious Total 0.799
Impervious Land Use acre
ROADS FLAT 0.296
ROOF TOPS FLAT 0.31
DRIVEWAYS FLAT 0.055
SIDEWALKS FLAT 0.05
Impervious Total 0.711
Basin Total 1.51
Element Flows To:
Surface Interflow Groundwater
SSD Table 1 SSD Table 1
default[10]11/13/2024 6:22:01 AM Page 6
Mitigated Routing
SSD Table 1
Depth:6 ft.
Element Flows To:
Outlet 1 Outlet 2
SSD Table Hydraulic Table
Stage Area Volume
(feet) (ac.) (ac-ft.) Manual NotUsed NotUsed NotUsed NotUsed
0.080 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.200 0.080 0.016 0.020 0.000 0.000 0.000 0.000
0.400 0.080 0.037 0.020 0.000 0.000 0.000 0.000
0.600 0.080 0.052 0.020 0.000 0.000 0.000 0.000
0.800 0.080 0.069 0.020 0.000 0.000 0.000 0.000
1.000 0.080 0.091 0.020 0.000 0.000 0.000 0.000
1.200 0.080 0.106 0.020 0.000 0.000 0.000 0.000
1.400 0.080 0.112 0.020 0.000 0.000 0.000 0.000
1.600 0.080 0.128 0.020 0.000 0.000 0.000 0.000
1.800 0.080 0.144 0.020 0.000 0.000 0.000 0.000
2.000 0.080 0.160 0.020 0.000 0.000 0.000 0.000
2.200 0.080 0.176 0.020 0.000 0.000 0.000 0.000
2.400 0.080 0.192 0.020 0.000 0.000 0.000 0.000
2.600 0.080 0.208 0.020 0.000 0.000 0.000 0.000
2.800 0.080 0.224 0.020 0.000 0.000 0.000 0.000
3.000 0.080 0.240 0.020 0.000 0.000 0.000 0.000
3.200 0.080 0.256 0.020 0.000 0.000 0.000 0.000
3.400 0.080 0.272 0.020 0.000 0.000 0.000 0.000
3.600 0.080 0.288 0.020 0.000 0.000 0.000 0.000
3.800 0.080 0.304 0.020 0.000 0.000 0.000 0.000
4.000 0.080 0.320 0.020 0.000 0.000 0.000 0.000
4.200 0.080 0.336 0.050 0.000 0.000 0.000 0.000
4.400 0.080 0.352 0.050 0.000 0.000 0.000 0.000
4.600 0.080 0.368 0.050 0.000 0.000 0.000 0.000
4.800 0.080 0.384 0.050 0.000 0.000 0.000 0.000
5.000 0.080 0.400 0.050 0.000 0.000 0.000 0.000
5.200 0.080 0.416 0.050 0.000 0.000 0.000 0.000
5.400 0.080 0.432 0.050 0.000 0.000 0.000 0.000
5.600 0.080 0.448 0.050 0.000 0.000 0.000 0.000
5.800 0.080 0.464 0.050 0.000 0.000 0.000 0.000
6.000 0.080 0.480 0.050 0.000 0.000 0.000 0.000
default[10]11/13/2024 6:22:01 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.51
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.799
Total Impervious Area:0.711
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.044395
5 year 0.069724
10 year 0.084079
25 year 0.099286
50 year 0.108697
100 year 0.116701
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.022484
5 year 0.030506
10 year 0.03675
25 year 0.045782
50 year 0.053398
100 year 0.061827
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.044 0.020
1950 0.054 0.020
1951 0.098 0.050
1952 0.031 0.020
1953 0.025 0.020
1954 0.038 0.020
1955 0.061 0.020
1956 0.049 0.020
1957 0.039 0.020
1958 0.044 0.020
default[10]11/13/2024 6:22:27 AM Page 8
1959 0.038 0.020
1960 0.066 0.041
1961 0.037 0.020
1962 0.023 0.020
1963 0.032 0.020
1964 0.042 0.020
1965 0.030 0.020
1966 0.029 0.020
1967 0.060 0.020
1968 0.038 0.020
1969 0.037 0.020
1970 0.030 0.020
1971 0.032 0.020
1972 0.073 0.050
1973 0.033 0.020
1974 0.036 0.020
1975 0.049 0.020
1976 0.035 0.020
1977 0.004 0.020
1978 0.031 0.020
1979 0.019 0.020
1980 0.069 0.050
1981 0.028 0.020
1982 0.053 0.020
1983 0.048 0.020
1984 0.029 0.020
1985 0.017 0.020
1986 0.077 0.020
1987 0.068 0.020
1988 0.027 0.020
1989 0.018 0.020
1990 0.142 0.034
1991 0.086 0.038
1992 0.033 0.020
1993 0.034 0.020
1994 0.012 0.020
1995 0.049 0.020
1996 0.104 0.050
1997 0.087 0.050
1998 0.020 0.020
1999 0.082 0.037
2000 0.034 0.020
2001 0.006 0.020
2002 0.038 0.020
2003 0.048 0.020
2004 0.062 0.050
2005 0.045 0.020
2006 0.053 0.020
2007 0.106 0.050
2008 0.136 0.050
2009 0.067 0.020
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1423 0.0500
2 0.1363 0.0500
3 0.1056 0.0500
default[10]11/13/2024 6:22:27 AM Page 9
4 0.1040 0.0500
5 0.0978 0.0500
6 0.0870 0.0500
7 0.0857 0.0500
8 0.0815 0.0500
9 0.0769 0.0410
10 0.0728 0.0380
11 0.0690 0.0368
12 0.0681 0.0341
13 0.0669 0.0200
14 0.0661 0.0200
15 0.0621 0.0200
16 0.0610 0.0200
17 0.0604 0.0200
18 0.0544 0.0200
19 0.0530 0.0200
20 0.0526 0.0200
21 0.0494 0.0200
22 0.0486 0.0200
23 0.0485 0.0200
24 0.0480 0.0200
25 0.0475 0.0200
26 0.0446 0.0200
27 0.0441 0.0200
28 0.0436 0.0200
29 0.0419 0.0200
30 0.0392 0.0200
31 0.0383 0.0200
32 0.0379 0.0200
33 0.0377 0.0200
34 0.0376 0.0200
35 0.0373 0.0200
36 0.0368 0.0200
37 0.0359 0.0200
38 0.0352 0.0200
39 0.0344 0.0200
40 0.0343 0.0200
41 0.0331 0.0200
42 0.0330 0.0200
43 0.0325 0.0200
44 0.0319 0.0200
45 0.0308 0.0200
46 0.0308 0.0200
47 0.0304 0.0200
48 0.0300 0.0200
49 0.0294 0.0200
50 0.0289 0.0200
51 0.0276 0.0200
52 0.0269 0.0200
53 0.0249 0.0200
54 0.0232 0.0200
55 0.0197 0.0200
56 0.0186 0.0200
57 0.0175 0.0200
58 0.0174 0.0200
59 0.0116 0.0200
60 0.0062 0.0200
61 0.0042 0.0200
default[10]11/13/2024 6:22:27 AM Page 11
Duration Flows
The Facility PASSED
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0222 17567 3052 17 Pass
0.0231 16164 2992 18 Pass
0.0239 14970 2935 19 Pass
0.0248 13858 2881 20 Pass
0.0257 12814 2810 21 Pass
0.0266 11813 2721 23 Pass
0.0274 10904 2659 24 Pass
0.0283 10121 2601 25 Pass
0.0292 9388 2532 26 Pass
0.0301 8729 2468 28 Pass
0.0309 8147 2415 29 Pass
0.0318 7599 2357 31 Pass
0.0327 7060 2297 32 Pass
0.0336 6590 2239 33 Pass
0.0344 6149 2173 35 Pass
0.0353 5777 2121 36 Pass
0.0362 5433 2072 38 Pass
0.0371 5097 2029 39 Pass
0.0379 4808 1989 41 Pass
0.0388 4526 1952 43 Pass
0.0397 4252 1915 45 Pass
0.0405 4017 1886 46 Pass
0.0414 3784 1868 49 Pass
0.0423 3546 1852 52 Pass
0.0432 3339 1832 54 Pass
0.0440 3138 1810 57 Pass
0.0449 2952 1789 60 Pass
0.0458 2787 1773 63 Pass
0.0467 2597 1746 67 Pass
0.0475 2447 1729 70 Pass
0.0484 2306 1711 74 Pass
0.0493 2160 1686 78 Pass
0.0502 2026 0 0 Pass
0.0510 1898 0 0 Pass
0.0519 1790 0 0 Pass
0.0528 1688 0 0 Pass
0.0537 1584 0 0 Pass
0.0545 1483 0 0 Pass
0.0554 1381 0 0 Pass
0.0563 1292 0 0 Pass
0.0571 1219 0 0 Pass
0.0580 1154 0 0 Pass
0.0589 1098 0 0 Pass
0.0598 1048 0 0 Pass
0.0606 997 0 0 Pass
0.0615 930 0 0 Pass
0.0624 883 0 0 Pass
0.0633 837 0 0 Pass
0.0641 789 0 0 Pass
0.0650 743 0 0 Pass
0.0659 713 0 0 Pass
0.0668 668 0 0 Pass
0.0676 630 0 0 Pass
default[10]11/13/2024 6:22:27 AM Page 12
0.0685 595 0 0 Pass
0.0694 565 0 0 Pass
0.0703 539 0 0 Pass
0.0711 496 0 0 Pass
0.0720 473 0 0 Pass
0.0729 434 0 0 Pass
0.0737 399 0 0 Pass
0.0746 366 0 0 Pass
0.0755 348 0 0 Pass
0.0764 323 0 0 Pass
0.0772 296 0 0 Pass
0.0781 272 0 0 Pass
0.0790 256 0 0 Pass
0.0799 235 0 0 Pass
0.0807 217 0 0 Pass
0.0816 195 0 0 Pass
0.0825 180 0 0 Pass
0.0834 158 0 0 Pass
0.0842 145 0 0 Pass
0.0851 129 0 0 Pass
0.0860 119 0 0 Pass
0.0869 109 0 0 Pass
0.0877 97 0 0 Pass
0.0886 91 0 0 Pass
0.0895 82 0 0 Pass
0.0903 76 0 0 Pass
0.0912 68 0 0 Pass
0.0921 61 0 0 Pass
0.0930 54 0 0 Pass
0.0938 48 0 0 Pass
0.0947 41 0 0 Pass
0.0956 38 0 0 Pass
0.0965 33 0 0 Pass
0.0973 27 0 0 Pass
0.0982 22 0 0 Pass
0.0991 21 0 0 Pass
0.1000 20 0 0 Pass
0.1008 19 0 0 Pass
0.1017 17 0 0 Pass
0.1026 14 0 0 Pass
0.1035 12 0 0 Pass
0.1043 9 0 0 Pass
0.1052 4 0 0 Pass
0.1061 3 0 0 Pass
0.1069 3 0 0 Pass
0.1078 3 0 0 Pass
0.1087 3 0 0 Pass
default[10]11/13/2024 6:22:27 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
default[10]11/13/2024 6:22:27 AM Page 14
LID Report
default[10]11/13/2024 6:22:34 AM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
default[10]11/13/2024 6:22:34 AM Page 16
Appendix
Predeveloped Schematic
default[10]11/13/2024 6:22:35 AM Page 17
Mitigated Schematic
default[10]11/13/2024 6:22:35 AM Page 18
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 default[10].wdm
MESSU 25 Predefault[10].MES
27 Predefault[10].L61
28 Predefault[10].L62
30 POCdefault[10]1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 10
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
10 C, Forest, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
10 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
10 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
default[10]11/13/2024 6:22:35 AM Page 19
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
10 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
10 0 4.5 0.08 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
10 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
10 0.2 0.5 0.35 6 0.5 0.7
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
10 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATE1
default[10]11/13/2024 6:22:35 AM Page 20
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 10 1.51 COPY 501 12
PERLND 10 1.51 COPY 501 13
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
default[10]11/13/2024 6:22:35 AM Page 21
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
END MASS-LINK
END RUN
default[10]11/13/2024 6:22:35 AM Page 22
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 default[10].wdm
MESSU 25 Mitdefault[10].MES
27 Mitdefault[10].L61
28 Mitdefault[10].L62
30 POCdefault[10]1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 1
IMPLND 4
IMPLND 5
IMPLND 8
RCHRES 1
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 SSD Table 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
default[10]11/13/2024 6:22:35 AM Page 23
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
1 ROADS/FLAT 1 1 1 27 0
4 ROOF TOPS/FLAT 1 1 1 27 0
5 DRIVEWAYS/FLAT 1 1 1 27 0
8 SIDEWALKS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
1 0 0 1 0 0 0
4 0 0 1 0 0 0
5 0 0 1 0 0 0
8 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
1 0 0 4 0 0 0 1 9
4 0 0 4 0 0 0 1 9
5 0 0 4 0 0 0 1 9
8 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
default[10]11/13/2024 6:22:35 AM Page 24
# - # CSNO RTOP VRS VNN RTLI ***
1 0 0 0 0 0
4 0 0 0 0 0
5 0 0 0 0 0
8 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
1 400 0.01 0.1 0.1
4 400 0.01 0.1 0.1
5 400 0.01 0.1 0.1
8 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
1 0 0
4 0 0
5 0 0
8 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
1 0 0
4 0 0
5 0 0
8 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.799 RCHRES 1 2
PERLND 16 0.799 RCHRES 1 3
IMPLND 1 0.296 RCHRES 1 5
IMPLND 4 0.31 RCHRES 1 5
IMPLND 5 0.055 RCHRES 1 5
IMPLND 8 0.05 RCHRES 1 5
******Routing******
PERLND 16 0.799 COPY 1 12
IMPLND 1 0.296 COPY 1 15
IMPLND 4 0.31 COPY 1 15
IMPLND 5 0.055 COPY 1 15
IMPLND 8 0.05 COPY 1 15
PERLND 16 0.799 COPY 1 13
RCHRES 1 1 COPY 501 16
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
default[10]11/13/2024 6:22:35 AM Page 25
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
1 SSD Table 1 1 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
1 1 0.01 0.0 0.0 0.5 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
1 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
FTABLE 1
31 4
Depth Area Volume Outflow1 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)***
0.080000 0.000000 0.000000 0.000000
0.200000 0.080000 0.016000 0.020000
0.400000 0.080000 0.037000 0.020000
0.600000 0.080000 0.052000 0.020000
0.800000 0.080000 0.069000 0.020000
1.000000 0.080000 0.091000 0.020000
1.200000 0.080000 0.106000 0.020000
1.400000 0.080000 0.112000 0.020000
1.600000 0.080000 0.128000 0.020000
1.800000 0.080000 0.144000 0.020000
2.000000 0.080000 0.160000 0.020000
2.200000 0.080000 0.176000 0.020000
2.400000 0.080000 0.192000 0.020000
2.600000 0.080000 0.208000 0.020000
2.800000 0.080000 0.224000 0.020000
3.000000 0.080000 0.240000 0.020000
3.200000 0.080000 0.256000 0.020000
3.400000 0.080000 0.272000 0.020000
3.600000 0.080000 0.288000 0.020000
3.800000 0.080000 0.304000 0.020000
4.000000 0.080000 0.320000 0.020000
4.200000 0.080000 0.336000 0.050000
default[10]11/13/2024 6:22:35 AM Page 26
4.400000 0.080000 0.352000 0.050000
4.600000 0.080000 0.368000 0.050000
4.800000 0.080000 0.384000 0.050000
5.000000 0.080000 0.400000 0.050000
5.200000 0.080000 0.416000 0.050000
5.400000 0.080000 0.432000 0.050000
5.600000 0.080000 0.448000 0.050000
5.800000 0.080000 0.464000 0.050000
6.000000 0.080000 0.480000 0.050000
END FTABLE 1
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL
RCHRES 1 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 2
PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 2
MASS-LINK 3
PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 3
MASS-LINK 5
IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 5
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
MASS-LINK 16
RCHRES ROFLOW COPY INPUT MEAN
END MASS-LINK 16
END MASS-LINK
END RUN
default[10]11/13/2024 6:22:35 AM Page 29
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2024; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Lots 5 and 6 Renton Infiltration Report Page 1
PIT INFILTRATION TEST AND STANDARD SUBSURFACE INVESTIGATION
REPORT
October 20, 2024
INTRODUCTION
The proposed project is the construction of a six lot short plat. The site is located at 5815 NE 8th Street .
The drainage from Sub-basin 2 (Lots 5 & 6) is proposing to use partial infiltration of 3,000 sf of roof
area. This report is being prepared using Section 5 of the 2022 Renton Stormwater Management
Manual.
SUBSURFACE CONDITIONS
The soils were visually classified in general as Ground Moraine Deposit (Qgt) as well as a Alterwood
Sandy Loam (AgC) with slopes less than 3-percent, presented in Figure 1. The logs of the test pits are
attached to this report and are presented as Figure 2.
HYDROGEOLOGIC CONDITIONS
The soils were moist with no indication of high groundwater including seepage when the test pit was
excavated down to 5.0 feet after the PIT infiltration test was performed.
INFILTRATION TESTING:
A small-scale Pilot Infiltration Test (PIT) was performed to evaluate the infiltration rate of the soil.
The infiltration test was conducted at a depth of 2.5-feet below the ground surface, which is close to
the anticipated bottom of the infiltration facility.
Setup: The test pit dug was rectangular in shape, and measured roughly 4.0’x 4.5’x 3.0’ (width x
length x depth). A vertical measuring rod was installed in the pit for the purpose of measuring the
depth of ponded water
Based on the geometry of the test pit dug for SL-1, the total plan area of the bottom of the test pit is
calculated as follows:
Test Pit Bottom Area =
(4.01)(4.51) Test Pit
Bottom Area = 18.0 ft2
Soaking Period: In preparation for the soaking period, the test pit was filled with water to a depth of
over 12-inches. A plastic tray was utilized as a splash block to help prevent water flowing into the
test pit from disturbing soils at the bottom of the pit, and the hose administering water to the pit was
held in place over the splash block using a clamp. The water level in the pit was maintained at a
depth of a minimum of 12-inches for over 6-hours, as required by the test procedure.
Measurement of Infiltration Rate: Upon completion of the soaking period, the water was allowed
to drain until achieving a water depth of between 8 and 16 inches, and the flow rate of the water into
the test pit was adjusted to a rate that was expected to maintain the water level at the same point
between 8 to 16 inches in depth over the course of an hour. The instantaneous flow-rate and water
depth were then measured and recorded every 15-minutes (approximately) over the course an hour. A
summary of this recorded data is provided in the table below
Lots 5 and 6 Renton Infiltration Report Page 2
Table 1: Measured Infiltration Data During Flow Period
15-min Interval Time of Measurement Instantaneous Flow
Rate Water Depth
- hour:minute gal/min inches
1 1:00 0.000 12
2 1:30 0.218 10.1
Stabilized Flow Period:
3 1:45 0.436 9.25
4 2:00 0.436 8.38
5 2:15 0.436 7.50
6 2:30 0.436 6.64
Average Stabilized Flow Rate = 0.436
The flow-rate was adjusted after the first two 15-minute intervals, so that a stabilized flow rate was
achieved that would maintain a depth of water at the same point over a one-hour time period.
Accordingly, readings shown in table 1 above represent data collected during this 1-hour period of
stabilized flow.
Measured Stabilized Flow Rate Calculation: From the data presented in table 1, the measured
stabilized flow infiltration rate was computed by dividing the average flow-rate by the horizontal bottom
area of the test pit and converting to inches per hour
Drawdown Time: Upon completion of the 1-hour stabilized flow period, the water flowing into the test
pit was shut off to allow the water-level in the test pit to drop. During this “drawdown” time,
measurements of the water-level were taken periodically for three-hours. The data measurements are
provided in table 2 below:
Table 2: Measured Infiltration Data for Drawdown Time
Time Δ Time Depth Δ Depth Infiltration Rate
hour:minute minutes inches inches inches/hour
1:00 - 16 - -
1:30 30 14.23 1.77 3.54
2:00 30 12.48 1.75 3.50
1:30 30 10.73 1.75 3.50
3:00 30 8.98 1.74 3.48
3:30 30 7.24 1.76 3.52
4:00 30 5.49 1.75 3.50
Average Infiltration Rate = 3.48
Measured Infiltration Rate: Based the measured infiltration data above it was determined that the
average infiltration rate is 3.48 inches per hour ( I measured ) which will be used for the base rate and then
apply the correction factors per Section 5.2 of the KCSWM Manual.
Lots 5 and 6 Renton Infiltration Report Page 3
I measured = 3.48 incℎes⁄ℎour
F testing = 0.50 For PIT test
F Geometry = 4 D/W + 0.05 = 4 (2/4) + 0.05 = 2.05
= 1.0 (Must be between 0.25 & 1)
F plugging = 0.7
I Design = 3.43 x 0.50 x 1.0 x 0.7 = 1.22 inches/hour
Therefore, the design and sizing of the infiltration rate will be based on a rate of
I Design = 1.22 in/hr and the WWHM3 design program.
10/20/24
Lots 5 and 6 Renton Infiltration Report Page 4
FIGURE 1
Lots 5 and 6 Renton Infiltration Report Page 5
FIGURE 2
Lots 5 and 6 Renton Infiltration Report Page 6
UNIFIED SOIL CLASSIFICATION