Loading...
HomeMy WebLinkAbout20220609-22291-FR-SkyHorse-B21004426-TJD060922B-RCDAILY FIELD REPORT AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 Inspection Date 06/09/2022 Report Number TJD060922B Inspectors Signature Inspectors Name Tony Dalzell Report Date 06/09/2022 Reviewers Signature Reviewed By Teajalam (TJ) Gounden Reviewed Date 06/12/2022 5270e64939402c42-1654803853656 CLIENT INFORMATION PROJECT INFORMATION Contact Tony Project No.22-291 Company DR Horton Project Name Sky Horse Address 11241 Slater Ave NE, Ste 200 Address 16327 SE 132nd Street City Kirkland City Renton Contractor Superior Permit No.B21004426 INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S) Reinforced Concrete Detention Vault Enclosure / South DV Weather Rainy Temperature (°F) 58 Start Time 09:30 AM End Time 01:30 PM DRAWINGS / DOCUMENTS REFERENCED Approved plans INSPECTION OBSERVATION / REMARKS Arrived on site as requested to inspect and test concrete and Grout. Miles supplied 32.5 cyds of mix design 1835AF & 4.5 cyds of mix 10550 Concrete & Grout have been placed by boom pump and consolidated via rake & mechanical vibration. Concrete field test results were as follows: Sample 1: Truck 1149, Ticket No. : 276389, slump: 5", and Concrete Temp: 67 Grout field test results were as follows: Sample 2: Truck 1528, Ticket No. : 276381, slump: 9", and Concrete Temp: 67 Items inspected are in conformance with approved plans, specifications and jurisdictional requirements DAILY FIELD REPORT AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 Inspection Date 06/09/2022 Report Number TJD060922B Inspectors Signature Inspectors Name Tony Dalzell Report Date 06/09/2022 Reviewers Signature Reviewed By Teajalam (TJ) Gounden Reviewed Date 06/12/2022 5270e64939402c42-1654803853656 PHOTOS South Detention Vault Placing mix design 1835AF