Renton City Hall -Talbot Hill Reservoir Park Improvements
City of Renton
Office of the City Clerk
Lobby, Renton City Hall
1055 S. Grady Way
Renton, WA 98057
BID DATE/TIME: 11/26/24, 1:30PM
Section 00 80 00 - Bid Form
Revised - Addendum E November 22, 2024
CITY OF RENTON
HAND DELIVER TO: OFFICE OF THE CITY CLERK
RENTON CITY HALL— LOBBY
1055 S. GRADY WAY, RENTON, WA, 98057
BID FORM
for the
TALBOT HILL RESERVOIR PARK IMPROVEMENTS
CAG-24-229
Bids Due: 1:30 PM PST November 26, 2024
Bidder's Name: A-1 Landscaping and Construction, Inc
Address: 20607 State Route 9 SE, Snohomish, WA 98296
Telephone: (425) 402-9900
(MUST BE COMPLETED AND SIGNED)
Having carefully examined the Bidding Documents and Instructions to Bidders,the Project site and
conditions affecting the Work,and all Addenda, the undersigned Bidder certifies that: (i) it has the
personnel and means to complete the Work and (ii) it will furnish all labor, materials,equipment, and
management to perform all Work required by,and in strict accordance with, the above-named documents
for the following sum within the time fixed. All Bid amounts shall include overhead, profit, bonds,
insurance, WA State Sales Tax (WSST) and any other expense required to complete the Work.
The undersigned Bidder certifies that it is,at the time of submitting the Bid, and shall remain throughout
the period of the Contract, licensed by the State of Washington to perform the type of work required
under the Contract Documents. It further certifies that it is skilled and regularly engaged in the general
class and type of work called for in the Contract Documents.
Talbot Hill Reservoir Park Improvements Bid Form
Page 1 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22. 2024
A. BID SCHEDULE
Insert values for Unit Price (Dollars.Cents) and Total Price (Dollars.Cents) into Bid Table.
Measurement and payment descriptions for each item listed in the Schedule of Bid items are set forth in
Section 01 20 00.
Approx. Unit Price Total Amount
Item No. Qty Unit Description of Item Dollars.Cents Dollars.Cents
Mobilization & Demobilization
(not to exceed 8%of Total Base 9L', thy,.' it(0,000
A-1 1 LS Bid)
A-2 1 LS Erosion&Sediment Control 3 10C) 33,700
A-3 1 LS Demolition &Salvage //0, 000 it U, 000
A-4 1 LS Clear& Grub z 7, IQ// 17, (vl/
Earthwork&Subgrade
A 5 1 LS Preparation 1/ci, coo it 9, clot)
A-6 25 TON Structural Fill 85 .2, I?.S
A-7 1 EA ADA Parking Stall Sign w/Footing L f 00 000
A-8 71 TON Crushed Surfacing Top Course C1 S to, 45
_
A-9 57 TON HMA Cl.3/8 IN. PG58H-22 14 42-,4�5
A-10 1 LS Asphalt Parking Lot Crack Repair to,S Do L',Sbu
A-11 6900 SF Asphalt Parking Lot Sealant 2 i 3, 'oo
Cement Concrete Pavement w/
A-12 11 CY Reinforcing 3, Zc{v 3,:;,(v
Reservoir Concrete Lid: Diamond LZ,yc 2.Z, L
A-13 1 LS Grind & Drainage Joint Retrofit
A-14 240 LF Extruded Cement Concrete Curb Z s 6'7 L0
Asphalt Pavement I40 3, /yu
A-15 1 LS Markings& Striping
Sport Court Surfacing, Leveling,
A-16 1 LS Crack Repair, &Striping / DO ,k.00.)
Replace Wood (Studs& Panels) &
A-17 1 LS Repaint Practice Wall 3 k'O"`' v�I.
Fabric Shade Structure including
Engineering Plans/Calculations for 2, 100 2,1 00
A-18 1 EA Building Permit
Fabric Shade Structure Four
Footings,Attachments, & 17,04.., i 7, OC.3
A-19 1 LS Reinforcing
Talbot Hill Reservoir Park Improvements Bid Form
Page 2 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
A-20 1 EA Bicycle Rack w/Attachments '•>" `)Sv
Two Removable Bollards w/ Four
A-21 1 LS Receivers 'v'Lk:v i lo,0(.1
Chain Link Fence w/Sleeved Posts,
A-22 1 LS Gates,& Windscreen 1 t-, `)Ov 9L, 4406
Drinking Fountain & Utilities
A-23 1 LS (Water&Sanitary Sewer) to,Utx0 (0, u`j(20
A-24 1 EA Drinking Fountain I L,000 `L,(..,..'is:,
A-25 1 EA Trash Receptacle 4, No 4, f ou
Six Moveable Pickleball Nets &
A-26 1 LS Nine Pickleball Paddle Racks 2 g`�` `'� `'�"'
Planting(Sod, Soil, Mulch,
A-27 1 LS Watering) $,-7Oc) g,100
A-28 255 LF 12" Depth Root Barrier 5S 14, OLS
A-29 10 EA Boulders Installation 8SD 3, Sk
Bench w/ Back,Wood Beam,&
A-30 4 EA Chain w/ Pad Lock y' 560 i S, Uut:%;
Divider Net Structure, Nets,&
A-31 2 EA Footings S' l U` 1(', Z(
Pedestrian Bridge—Shop
Fabricated Aluminum Structure
including Engineering 7
Plans/Calculations for Building
A-32 1 LS Permit
Pedestrian Bridge—Four Concrete
Footings, One Headwall, &Two
Wingwalls,w/Attachments & ``'~'' �"" i.", ` �`�
A-33 1 LS Reinforcing
Plumbing, Traffic Control Plan,
Environmental Stormwater C
Discharge, and other regulatory
A-34 1 LS permits as required
A-35 3 EA Tennis Court Nets ' 0' L'tO
y
A-36 3 EA Pickleball Court Nets
J GU !,'l 1 tois
Additional Work for Minor
A-37 1 LS Changes $65,000 $65,000
SUBTOTAL= $ gi7iVAt . oU
WA STATE SALES TAX (10.3%) = $ /0i, 7 It) , ", q
Talbot Hill Reservoir Park Improvements Bid Form
Page 3 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
TOTAL= $ �� O$ 1 . Sy
B. BASE BID
The Bidder agrees to complete the Work for this Project for the following Base Bid amount:
One /hi//ivf e'ribh j hint Itiou.a.hei one hundred rdieby DOLLARS(words)
$ 1, 0 31, I / , S c (numerals)
C. TRENCH EXCAVATION SAFETY PROVISIONS
The Base Bid amount includes any trench-excavation safety provisions required for compliance with
Chapter 39.04 RCW and Chapter 49.17 RCW,as applicable,and the amount included in the Base Bid
is: $ 5,Qt)1)
D. SUBCONTRACTOR LISTING
If the project is expected to cost$1,000,000 or more, as required by RCW 39.30.060, every Bidder
must complete and provide the included Subcontractor listing forms (Forms C and D) in
accordance with the applicable timing requirements.
E. RECEIPT OF ADDENDA
Bidder acknowledges receipt of the following addenda:
Addendum No. A Addendum No. D
Addendum No. B Addendum No. E
Addendum No. C Addendum No.
All requirements therein are included in the appropriate Bid amount.
F. CONDITIONS OF PROPOSAL
1. Determination of Low Bidder:
a. The City of Renton (alternatively referred to as"Owner" or "City") reserves the right
to award the Contract for the Project based on the Contractor's Base Bid and any
selected Alternates(s), in whatever manner is in the City's best interest.
2. Overhead and Profit:
All of the above Bid Prices shall include overhead, profit, bonds, insurance, and any other
expense required to complete the Work.
G. PERIOD OF BID VALIDITY/ACCEPTANCE OF BID
The undersigned hereby agrees that this Bid shall be a valid and firm offering for the period of sixty
(60) days from the Bids Due date.
Within sixty (60) days from the Bids Due date, the City will act either to accept the Bid from the
lowest responsive and responsible Bidder, or to reject all Bids. The City reserves the right to
Talbot Hill Reservoir Park Improvements Bid Form
Page 4 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
request extensions of such Bid acceptance period.
The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract to the
Bidder whose Bid is under consideration for acceptance,together with a request to furnish a bond
(if required), evidence of required insurance to execute the Agreement set forth in the Contract
Documents,and other designated documents.
H. EXECUTION OF CONTRACT
If the written Notice of Intent to Award Contract is mailed, telegraphed,or delivered via facsimile
to the undersigned within the period of Bid validity noted above, or any time thereafter before
this Bid is withdrawn,the undersigned will,within ten(10)days after the date of such notification,
execute the City of Renton Standard Form of Agreement Between Owner and Contractor where
the basis of payment is a Stipulated Sum ("Agreement") set forth in the Contract Documents.
I. TIME FOR COMPLETION
Substantial Completion-The undersigned hereby agrees to Substantially Complete all the Work
under the Base Bid (and accepted Alternates)no later than May 23, 2025, following Notice to
Proceed.
Notice to Proceed—Anticipated date for Notice to Proceed is January 6, 2025.
Final Completion—All the Work shall achieve Final Completion in accordance with the Contract
Documents within 30 calendar days after the date of Substantial Completion.
J. LIQUIDATED DAMAGES
The undersigned agrees to pay the Owner as liquidated damages the sum of$750.00 for each
calendar day beyond the date upon which Substantial Completion of the entire Work is required
to be complete until Substantial Completion is achieved, in accordance with the Contract
Documents.
K. BID SECURITY (As per the Bidding Documents)
If applicable, Bid Security must be submitted with the Bid Form.
L. BID FORM ATTACHMENTS TO BE COMPLETED WITH BID FORM
The following document is attached to the Bid Form and must be executed by the Contractor in
connection with the Bid From for it to be complete:
• Attachment 1—Non-Collusion,Anti-Trust and Minimum Wage Affidavit
M. ACKNOWLEDGMENT
The undersigned acknowledges that it has read, understands, and agrees to comply with all
federal and state non-discrimination laws, regulations, and policies during the performance of the
Work.
Talbot Hill Reservoir Park Improvements Bid Form
Page 5 of 9
Section 00 80 00— Bid Form
Revised — Addendum E November 22, 2024
Legal Name of Person or Entity Submitting Bid: A-1 Landscaping and Construction, Inc
NOTE:►f Bidder is a corporation,write State of Incorporation;if a partnership,give full names and addresses of all parties below.
Authorized Signatory: Title: President
Printed Name: Naeem Igbal
Address: 20607 State Route 9 SE
City: Snohomish State: WA Zip Code: 98296 Date: 11/26/24
Telephone: (425) 402-9900 Fax: (425) 489-0222
Washington Contractor's License No.: Al LANCI056DP Federal Tax ID#: 91-1675193
E-mail address: naeem@alland.com
Washington State UBI No.: 601605 837 Expiration Date: 02/28/2025
Talbot Hill Reservoir Park Improvements Bid Form
Page 6 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
CERTIFICATION OF COMPLIANCE WITH PREVAILING WAGE PAYMENT STATUTES
The undersigned Bidder hereby certifies, under the penalty of perjury, that within the three-
year period immediately preceding the Bid Submission date, the Bidder has not been
determined by a final and binding citation and notice of assessment issued by the
Department of Labor and Industries, or through a civil judgment entered by a court of
limited or general jurisdiction,to have willfully violated, as defined in RCW 49.48.082, any
provision of chapters 49.46, 49.48, or 49.52 RCW.
I certify under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
A-1 Landscaping and Construction, Inc
Legal Name of Person or Entity Submitting Bid
Signature of Authorized Official*
Naeem lqbal
Printed Name
President
Title
11/26/24 Snohomish Washington
Date City State
Check One:
Sole Proprietorship ❑Partnership ❑Joint Venture C 'Corporation ❑ LLC ❑
State of Incorporation, or if not a corporation, State where business entity was formed:
Washington
If a co-partnership, give firm name under which business is transacted:
`If a corporation, proposal must be executed in the corporate name by the president or vice-president
(or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership.
proposal must be executed by a partner
Talbot Hill Reservoir Park Improvements Bid Form
Page 7 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
Bid Form —Attachment 1
This form must be submitted with the Bid Form
NON-COLLUSION AFFIDAVIT
The undersigned, having been duly sworn, deposes and says,that he/she is the identical person who
submitted the forgoing Bid, and that such Bid is genuine and not sham or collusive or made in the
interest or on behalf of any person not therein named, and further,that the deponent has not directly
induced or solicited any other Bidder on the foregoing Work or equipment to put in a sham Bid, or any
other person or corporation to refrain from Bidding, and that deponent has not in any manner sought by
collusion to secure to himself or to any other person any advantage over the other Bidder or Bidders.
AND
CERTIFICATION RE:ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER
The City of Renton ("City") and Bidder recognize that in actual economic practice overcharges resulting
from anti-trust violations are in fact usually borne by the Bidder. Therefore,the Bidder hereby assigns
to the City any and all claims for such overcharges as to goods and materials purchased in connection
with this Contract, except as to overcharges resulting from anti-trust violations commencing after the
date of the bid, quotation,or other event establishing the price under this Contract. In addition,the
Bidder warrants and represents that such of his suppliers and subcontractors shall assign any and all
such claims to the City, subject to the aforementioned exception.
AND
MINIMUM WAGE AFFIDAVIT FORM
The undersigned, having been duly sworn,deposed, says and certif that in connection with the
performance of the Work of this Project, (a) I will pay each classification of laborer,workman,or
mechanic employed in the performance of such Work; not less than the prevailing rate of wage or not
less than the minimum rate of wages as specified in the principal Contract and (b) that I have read the
above and foregoing statement and certificate, know the contents thereof and the substance as set
forth therein is true to my knowledge and belief.
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Bid Form —Attachment 1
Page 8 of 9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND
MINIMUM WAGE AFFIDAVIT
A-1 Landscaping and Construction, Inc
Legal Name of Person or Entity Submitting Bid
Signature of Authorized Official*
Naeem Igbal
Printed Name
President
Title
11/26/24 Snohomish WA
Date City State
Subscribed and sworn to before me on this 26 day of November , 2024 .
End of Bid Form
Talbot Hill Reservoir Park Improvements Bid Form—Attachment 1
Page 9 of 9
Talbot Hill Reservoir Park Improvements
Proposal Bid Bond—FORM B
FORM B
Proposal Bid Bond
KNOW ALL MEN BY THESE PRESENTS, That we, [Contractor] A-I Landscaping and Construction, Inc.
of[address]20607 SR 9 SE,Snohomish,WA 98296 as
Principal, and[Surety] Liberty Mutual Insurance Company
a corporation duly organized under the laws of the State of Massachusetts
and authorized to do business in the State of Washington, as Surety, are held and firmly bound unto the
City of Renton in the sum of five(5) percent of the total amount of the Bid of said Principal for the Work
hereinafter described, for the payment of which, well and truly to be made, we bind ourselves, our heirs,
executors, administrators and assigns, and successors and assigns,jointly and severally, firmly by these
presents.
The condition of this bond is such, that whereas the Principal herein is herewith submitting his/her or its
sealed Bid for the following construction, to wit:
Talbot Hill Reservoir Park Improvements
said Bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, if the said proposal Bid by said Principal be accepted, and the Contract be awarded
to said Principal, and if said Principal shall duly make and enter into and execute said Contract and shall
furnish performance bond as required by the City of Renton within a period of ten (10) days from and after
said award, exclusive of the day of such award, then this obligation shall be null and void, otherwise it
shall remain and be in full force and effect.
IN THE EVENT the Principal, following award, fails to execute an Agreement with the City of Renton in
accordance with the terms of the Bidding Documents and furnish a performance bond with Surety or
Sureties approved by the City of Renton within ten (10) days from and after said award, then Principal
shall forfeit the Bid Bond/Bid Proposal Deposit or Surety shall immediately pay and forfeit to the City of
Renton the amount of the Proposal Bid Bond, as set forth in RCW 35A.40.200 and RCW 35.23.352.
IN TESTIMONY WHEREOF. the Principal and Surety have caused these presents to be signed and
sealed this 21st day of November , 2024
A-1 Landscaping and Construction,Inc. Liber qt al Insurance Company
[Principal][Surety] .00w*k N, Q�. q
46
[Signature of authorized official] [Sigh�tu,-R' 1912 0
.�g•a ed'.-;;
T h 0
ACHO-
Naeem Igbal,President Rgger"Ka4 Qch'Attorney- act 8j
[Title] [Attorney-in-Fact] ' �O , � - —=
0r� O °°�� Seal No.5690
•2233 112th Avenue NE,Bellevue,WA 9860,4d1g c\ ��%•
[Address] .............••
(425)709-3600
[Phone Number]
BID BOND PAGE 1 OF 1
w•
.,%` ,, Liberty POWER OF ATTORNEY
ro , Mutual. Liberty Mutual Insurance Company Certificate No. 8212602-023001
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of The State of Massachusetts,and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint Alec
Gumpfer,Andrew Kerslake,Deanna M French,Elizabeth R.Hahn,Guy Armfield,Jana M.Roy,John Claeys,Katelyn Cooper,Mindee L.Rankin,Nicholas
Fredrickson,Roger Kaltenbach,Scott Fisher,Scott Garcia,Scott McGilvray,Susan B.Larson,Kyle Dozier,Janteane Blyton,and Alex Giannini of Bellevue,WA;
Ronald J.Lange,Chris Larson and Greg Lagreid of Spokane,WA;Drew D.Neessen,Michael S.Cranston,Nicholas Warren,Gregory C.Ryerson and William M.
Smith of Portland,OR;Abbie A.Bonney,Sandy L.Boswell,Janie Ma,Brenda S Nolin and Sharon Pope
all of the city of Anchorage state of AK each individually if there be more than one named,its true and lawful attorney-in-fact to make,
execute,seal,acknowledge and deliver.for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 2I st day of October , 2024
Liberty Mutual Insurance Company
Fv\N5tj, P,ZY INSUR to \NSU,pq The Ohio Casualty Insurance Company
„ G°PP°kg,O+c, QJGOpPORq,Q9� \P2oRP°Rq,�'!'� West American Insurance Company
• 1912 0 0 1919 0 f 1991 � 0ifall/ A/
0 d�9SSgcNUS`-'ya O 4' .*� 3 t
NAMP`+ •ail At
8i> * I,P ''yl t t,� dM + 1`� By:
ca = Nathan J.Zangede,Assistant Secretary
co State of PENNSYLVANIA
a) vt County of MONTGOMERY ss gj
U
m On this 21st day of October , 2024 before me personally appeared Nathan J.Zangerie,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance g n
o ro Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
. Co
IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. cr
to
0 0 PggT v
Q�4�MpNyyE tc� Commonwealth of Pennsylvania-Notary Seal
ai (s C Teresa Pastelta.Notary Public
Montgomery County /,,,',, - 1 .(/ /J/�
O OF My commission expires March 28.2025 By• I . / C,(2L� T—_
c 3 Commission number 1126044
LA Teresa Pastella,Notary Public
4J if. —L ,G Member,Pennsylvania Associabwn of Notaries b a)
N N Aqy�� O
o This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company,Liberty Mutual Insurance o
E--- Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: PJ
ARTICLE IV—OFFICERS:Section 12.Power of Attorney. d
o co Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President and subject to such limitation as the Chairman or the President p
72 >, may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety any and all cn
u c undertakings,bonds,.recognizances and other surety obligations.Such attomeys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall have full rra
power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.When so executed,such instruments shall F
Z• u be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under the provisions of this
article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authorty. t-
ARTICLE XIII—Execution of Contracts:Section 5.Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,
bonds,recognizances and other surety obligations.Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation—The President of the Company, acting pursuant to the Bylaws of the Company,authorizes Nathan J. Zangede, Assistant Secretary to appoint such
attorneys-in-fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and
other surety obligations.
Authorization—By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I.Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company,and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 21st day of November ,2024
P�mso,Qq P,.tY INs„ \NSURq
, ,,,.q .'C` ,,ePORq O y. `Q'GovoRq O t^
▪ 1912 0 0 1919 f 1991 0) Llr�y�
�-,>; ,,us aya� ;���HAMPS��yD `(s �NDIANp' ya3 By:Renee C.Llewellyn.Assistant Secretary
> yl , t' dy1 , 1,d
LMS-12873 LMIC OCIC WAIL Multi Co 02/24
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part One—FORM C
CITY OF RENTON
EMAIL TO: bsevertsen@rentonwa.gov
LIST OF SUBCONTRACTORS, PART ONE
Submission of HVAC, Plumbing, and Electrical Subcontractors
If Bid amount exceeds$1,000,000,this list must be submitted within one(1) hour of the time and date
specified for Bid Submission.
Bidder's Name: A-1 Landscaping and Construction, Inc.
Project: Talbot Hill Reservoir Park Improvements
1055 S.Grady Way
Renton,WA 98057
CAG-24-229
SUBCONTRACTOR LISTING
If the bid amount exceeds$1,000,000 or more including Washington State Sales Tax,Bidder must list the Heating,
Ventilation,and Air Conditioning(HVAC),Plumbing,and Electrical Subcontractors as required per RCW 39.30.060.
Subcontractor Name Work Category A
1. `O( HVAC
2. lk,,w6 JA4td) I71((t( (krOC46,rx1 Plumbing
3. O Electrical
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Page 1 of 2
List of Subcontractors—FORM C October 29,2024
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part One—FORM C
G'T Y o�
ENTOc�
Legal Name of Person or Entity Submitting Bid: A-1 Landscaping and Construction, Inc.
NOTE: If Bidder is o corporation,write State of Incorporation;if a partnership,give full names and addresses of all parties below.
Authorized Signature: ' Title: President
Printed Name: Naeem Igbal
Address: 20607 State Route 9 SE
City: Snohomish State: Washington Zip Code: 98296 Date: 11/26/24
Telephone: (425) 402-9900 Fax: (425) 489-0222
Washington Contractor's License No.: Al LANCI056DP Federal Tax ID#: 91-1675193
E-mail address: naeem@a1land.com
Washington State UBI No.: 601 605 837 Expiration Date: 02/28/2025
End of Form
Talbot Hill Reservoir Park Improvements Page 2 of 2
List of Subcontractors—FORM C October 29,2024
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part Two—FORM D
Y
is
CITY OF RENTON
EMAIL TO: bsevertsen@rentonwa.gov
LIST OF SUBCONTRACTORS, PART TWO
Submission of Structural Steel and Rebar Installers
If Bid amount exceeds$1,000,000,this list must be submitted within forty-eight (48) hours of the time
and date specified for Bid Submission.
Bidder's Name: A-1 Landscaping and Construction, Inc.
Project: Talbot Hill Reservoir Park Improvements
1055 S. Grady Way
Renton,WA 98057
CAG-24-229
SUBCONTRACTOR LISTING
The Project is erected to cost $1,000,000 or more. Every Bidder must list the Structural Steel and Rebar
Subcontractors as required per RCW 39.30.060.
Subcontractor Name Work Category
1. A-1 Landscaping and Construction, Inc. Structural Steel Installer
2. A-1 Landscaping and Construction, Inc. Rebar Installer
If different from the list above,the Subcontractors we propose to use if an Alternate Bid is accepted are described
below. (RCW 39.30.060 requires,in part,that the Bidder not list more than one Subcontractor for each category of
Work identified,unless a Subcontractor will vary depending on which Alternate Bids are accepted,in which case the
Bidder must indicate which Subcontractor will be used depending on which Alternate is accepted.)
Describe any change to list if Alternates are accepted:
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Page 1 of 2
List of Subcontractors—FORM D October 29,2024
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part Two—FORM D
G‘1 Y 0
+ +
�FNT0
Legal Name of Person or Entity Submitting Bid: A-1 Landscaping and Construction, Inc.
NOTE: If Bidder is a corporation,write State of Incorporation;if a partnership,give full names and addresses of all parties below.
Authorized Signature: Title: President
Printed Name: Naeem lqbal
Address: 20607 State Route 9 SE
City: Snohomish State: Washington Zip Code: 98296 Date:11/26/24
Telephone: (425) 402-9900 Fax: (425) 489-0222
Washington Contractor's License No.: Al LANCI056DP Federal Tax ID#: 91-1675193
E-mail address: naeem@alland.com
Washington State UBI No.: 601 605 837 Expiration Date: 02/28/2025
End of Form
Talbot Hill Reservoir Park Improvements Page 2 of 2
List of Subcontractors—FORM D October 29,2024
Talbot Hill Reservoir Park Improvements
Contractor QualificationslEvaluation - FORM E
(Must submit with Bid Form)
Contractor Name: A-1 Landscaping and Construction, Inc. Date Incorporated: 02/14/1995
Mailing Address: 20607 State Route 9 SE, Snohomish, WA 98296 State Incorporated: Washington
Business Phone: (425)402-9900 Owner/President's Name: Naeem Igbal
Contact Name and Title: Naeem lqbal, President Other or Former Organization Name(s)
Contact Phone: (425) 402-9900 Contact Email: naeem@alland.com Reason for Name Change(s):
PERFORMANCE EXPERIENCE
• Has company been disqualified (debarred) from performing public work by State of Washington or federal government?
• Yes ❑ No 7
• Are there any judgments, claims, arbitration proceedings or suits pending against company or its officers? Yes ❑ No 12
If Yes, please describe: Judgments
• Has company ever failed to complete any work awarded to it? Yes ❑ No EZ If Yes, please describe:
• Has company been obligated for liquidated damages within the past 5 years? Yes ❑ No E]
If Yes, lease describe:
FINANCIAL INFORMATION
1 1 Average total annual value of construction work performed during the past 5 years:
2. Provide at least three trade references.
• Name/Contact HD Fowler, PO Box 160, Bellevue, WA 98009, 800-487-5290
• Name/Contact CalPortland (Glacier Northwest), PO Box 94707, Seattle, WA 98124-707, 206-764-3024
• Name/Contact Cedargrove Compost, 7343 East Marginal Way South Seattle, WA 98108, 206-832-3000
3. Provide sure com•an and asent name: Suret Libert Mutual Insurance Com.an 10 Street James Avenue Boston, MA 02116
PROJECT EXPERIENCE — Projects of Similar Scope Requiring Prevailing or Davis Bacon Wages within Past 5 Years
(3 Required)
PROJECT#1 Description Of Project: Original Contract Amount Final Contract Amount:
Project Name: SEE ATTACHED
Location/Address: Percent of Work Performed by Substantial Completion Date
Own Forces:
Firm was General Contractor: If not GC, describe role:
Yes❑ No ❑
Owner Name: Architect Name: Project Required Prevailing or Yes❑ No ❑
Davis Bacon Wages?
Talbot Hill Reservoir Park Improvements 1
Contractor Qualifications/Evaluation—FORM E
Talbot Hill Reservoir Park Improvements
Contractor QualificationslEvaluation - FORM E
(Must submit with Bid Form)
Phone: Phone:
Email----- --- Email:
PROJECT#2 Description Of Project: Original Contract Amount Final Contract Amount:
Project Name:
LocationlAddress: Percent of Work Performed by Substantial Completion Date
Own Forces:
Arm was General Contractor: If not GC, describe role:
Yes❑ No LI
Owner Name: Architect Name: Project Required Prevailing or Yes❑ No ❑
Davis Bacon Wages?
Phone: Phone:
Email: Email:
PROJECT#3 Description Of Project: Original Contract Amount Anal Contract Amount:
Project Name:
LocationlAddress: Percent of Work Performed by Substantial Completion Date
Own Forces:
Firm was General Contractor: If not GC, describe role
Yes❑ No n
Owner Name: Architect Name: Project Required Prevailing or Yes❑ No ❑
Davis Bacon Wages?
Phone: Phone:
Email: Email:
Talbot Hill Reservoir Park Improvements 2
Contractor Qualifications/Evaluation—FORM E
Talbot Hill Reservoir Park Improvements
Qualifications of Project Key Personnel —FORM F
(Must submit within 48 hours following Bid Submittal)
Email to: bsevertsen@rentonwa.gov
PROJECT MANAGER SEE ATTACHED
Name Current Position with Company Years'Experience
Total With Current Firm
Firm Name and Location(City and State):
Training/Education/Specialization:
Years of Experience in the Proposed Rde:
RELEVANT PROJECT 1 of 3(Minimum,
Project Title: Year Completed
Project Owner:
Brief Description(Brief scope,size,cost,etc.)and specific role Check if project performed with current firm. ❑
If performed with different firm list the firm name
Reference Name&Contact Information:
Project Owner: Architect:
Name: Name:
_Phone: Phone:
E-mail E-mail:
RELEVANT PROJECT 2 of 3(Minimum
Project Title: Year Completed
Project Owner: — _Brief Description(Brief scope,size,cost,etc.)and specific role: Check if project performed with current firm. ❑
If performed with different firm list the firm name
Reference Name&Contact Information:
Project Owner: Architect:
Name: Name:
Phone: Phone
E-mail E-mail:
RELEVANT PROJECT 3 of 3(Minimum)
Project Title: Year Completed
Project Owner: _
Brief Description(Brief scope,size,cost,etc.)and specific role: Check if project performed with current firm. ❑
If performed with different firm list the firm Name
Reference Name&Contact Information:
Project Owner: _ Architect:
Name: Name:
Phone: Phone:
E-mail E-mail:
Talbot Hill Reservoir Park Improvements
Qualifications of Project Key Personnel—FORM F Page 1 of 2
Talbot Hill Reservoir Park Improvements
Qualifications of Project Key Personnel — FORM F
(Must submit within 48 hours following Bid Submittal)
Email to: bsevertsen@rentonwa.gov
SUPERINTENDENT SEE ATTACHED
Name Current Position with Company Years'Experience
Total With Current Firm
Firm Name and Location (City and State):
Training/Education/Specialization:
Years of Experience in the Proposed Rde:
RELEVANT PROJECT 1 of 3
Project Title: Year Completed
Project Owner:
--- -------------
Brief Description(Brief scope,size,cost,etc.)and specific role: Check if project performed with current firm. ❑
If performed with different firm list the firm name
Reference Name&Contact Information:
Project Owner: Architect:
Name: Name:
Phone: — _------ Phone: ___ -_----_- - ---_-_
E-mail E-mail:
RELEVANT PROJECT 2 of 3
Project Title: Year Completed
Project Owner
Brief Description(Brief scope,size,cost,etc.)and specific role: Check if project performed with current firm. ❑
If performed with different firm list the firm name
Reference Name&Contact Information:
Project Owner: Architect:
Name: Name:
Phone: Phone:
E-mail E-mail:
RELEVANT PROJECT 3 of 3
Project Title: Year Competed
Project Owner:
Brief Description(Brief scope,size,cost,etc.)and specific role: Check if project performed with current firm. ❑
If performed with different firm list the firm Name
Reference Name&Contact Information:
Project Owner: Architect:
Name: Name:
Phone: Phone:
E-mail E-mail:
End of Form
Talbot Hill Reservoir Park Improvements
Qualifications of Project Key Personnel—FORM F Page 2 of 2
A-1 Landscaping and Construction,Inc.
20607 State Route 9 SE§Snohomish,WA 98296-8316
Phone:425-402-9900§Fax:425-489-0222
Prevailing wage projects of similar nature:
PROJECT NAME OWNER DISCRIPTION ARCHITECT CONTRACT COMPLETION
AND ADDRESS OF PROJECT AMOUNT DATE
Athletic Field Improvments at Madison MS Seattle School District DA Hogan
&W Seattle HS Construction of new restroom facility(mens,womens,and family)with
3429 45th Ave SW Fallen Kongsaeng future concession,storage,outdoor seating,lifeguard headquarters,and Jeffrey Burke $ 2,659,644.00 2024
3000 California Ave SW outdoor flex space to replace two existing restrooms at the site.
Seattle,WA 98116 206-252-0566 206-285-0400
Edmonds Civic Center Playfield City of Edmonds Sidewalk improvements along 6th Avenue,two sports courts,a plaza with Walker Macy
310 6th Ave N, Kyle Woods terraced seat walls,shade structure,concrete seat walls,six petanque 1218 3rd Ave,Suite 1310,Seattle
courts,two natural grass soccer fields,skate park,play area,concrete
and asphalt paths,planting&irrigation,pedestrian and sports lighting, $ 11,077,478.68 2023
utility and stormwater improvements,an Owner furnished restroom
Edmonds,WA 98020 425-599-3847 building,water feature with unit pavers,rubber track surfacing,a scramble 206-582-3874
wall,and tree grates on 6th Avenue.
Mattson Middle School Field Renovations Kent School District AHBL
16400 SE 251st Street Brett Scribner field renovation of Mattson Middle School athletic fields,softball,baseball, Lucas Johnson 2023
footballlsoccer fields,and track renovation by stripping the existing fields
and rebuilding sand-based fields with drainage systems,installing a new $ 2,004,000.00
Covington,WA 98042 253-373-7277 irrigation system,topdressing the existing track,and miscellaneous other 253-383-2422
improvements.
Lake Tye Park All Weather Field City of Monroe DA Hogan
Selective demo of undeground utilities,excavation,grading,installation of
14964 Fryelands Blvd Mike Farrell new electrical service,installation of storm drainage,irrigation system Eric Gold
infrastructure,installation of subsurface drainage systems;Installation of $ 4,069,404.95 2021
athletic field lighting,chainlink fencing,concrete curbs and pavements;
Monroe,WA 98272 360-794-7400 asphalt paving;Installation of synthetic turf surfacing and landscaping. 206-459-5473
Woodland North Apartments Woodland North LLLP ARC
3611 NE 155th St, King County Housing Authority Work includes,but is not limited to,the renovations to retainer walls,finish
grading,and drainage improvements;work also includes tree removal and
pruning,planting of native shrubs&ground covers,enhancement of soils
and planting beds for visual appearance and to improve long term stability $ 4,045,250.00 2021
Darrell Westlake of surfaces;and the installation of walkways,planting beds,and water
Lake Forest Park,WA 98155 206 693 6415 conserving irrigation&sprinkler systems;and other tasks as described in 206 322-3322
the bid documents.Install picnic shleter in place of existing pool area.
Steve Cox Synthetic Turf Field King County The work is to construct a multi-use synthetic turf field at existing natural King County Parks and Recreation
1321 SW 102nd St Tri Ong grass Ballfields#2 and#3.Work includes excavation and filling Capital Project Manager/Engineer IV
operations,concrete loop path,chain link fencing,baseball backstop,
baseball dugouts,team benches,under field storm water detention and $ 2,010,223.00 2019
water quality treatment system.Coordination is required with the
Seattle,WA 98146 206-477-3591 installation by others of synthetic turf and field lighting,utility trenching for Tri.Ong@kingcounty.gov
power supply and installation of light poles.
Kent-Meridian HS Practice Field Kent School District AHBL
Renovation Strip and replace the existing baseball field,two softball fields,and soccer
10020 SE 256th St,Kent,WA 98030 Dave Bussard practice field at Kent-Meridian High School.The renovation will also 2215 N 30th St $ 2,263,887.64 2019
include the installation of storm detention,new underdrains,new grass
(253)373-7277 field and the restoration of the baseball and softball diamonds. Tacoma,WA 98403
Casey Kramer
A-1 Landscaping and Construction, Inc.
20607 State Route 9 SE • Snohomish, WA 98296-8316
Office: 425-402-9900 •Cell: 425-419-6474
Fax: 425-489-0222 •casey@alland.com
EXPERIENCE:
From 2004 to Present at A-1 Landscaping and Construction: Project Superintendent and Concrete
Foreman. Skilled at reviewing and analyzing architectural and structural blueprints; submitting RFIs and
materials for use on jobs; supervise day-to-day activities; preparing materials lists; coordinating project
layout and scheduling. Maintain a daily log for the job site's operations.
Extensive experience with architectural and decorative concrete including colored, stamped and
textured.
Major Projects:
Edmonds Civic Center Park Redevelopment— Project value $11,321,663
Renovation of existing park including installation of underground utilities, construction of a
sports field, skate park, extensive architectural and decorative cast-in-place concrete features,
playground, jogging path with rubber track surfacing, tennis and multi-use courts, a petanque
grove and an Owner-furnished restroom
SR 524 Locust Way Vic to Larch Way Vic Drainage Repair— Project value $761,675
Demolition of existing improvements and Installation of culverts, new catch basins and storm
sewer pipe, replacement of HMA pavement, pavement markings, temporary erosion control,
and temporary traffic control.
Woodland North Apartments Retaining Wall — Project value $4,244,945: Scope includes
Installation of a cantilever soldier pile wall and CMU block retaining walls, drainage
improvements, installation of concrete plaza area with picnic shelter, walkways, stairs, curb and
gutter, irrigation and restorative planting.
Early Learning Center Frontage Improvements— Project value $1,256,884: Construction of new
frontage improvements, underground utilities, extensive sidewalk curb and gutter, curb ramps.
Baker Park Addition Development— Project value $591,155: Concrete paving, curb and
decorative concrete band. Play and fitness equipment, synthetic playground grass surfacing,
site furnishings, irrigation system, Electric lighting fixtures.
Northwood Middle School Field Renovations Phase II — Project value $1,060,744: Renovation of
existing turf field including drainage infield sand, irrigation, and drill seed field.
Kent-Meridian Practice Field Renovation — Project value $$2,263,887: Renovation of baseball
field, two softball fields and a soccer practice field. Installation of new underdrainage system.
Steve Cox Synthetic Turf Field — Project value $2,010,040: Construction of a multi-use synthetic
turf field, under field storm water detention and water quality treatment system, concrete loop
path, baseball dugouts with team benches.
Issaquah Middle School Athletic Field — Project value $2,287,943: Construction of new Softball,
Track and Field. Subgrade, drainage, washwater system, concrete sidewalks and curbs, site
furnishings.
Skagit Valley College Athletic Field — Project value $1,487,491: Renovation of natural turf
soccer and softball field into synthetic turf playing surface. Site utilities, retaining walls field and
site lighting,
Cedar Valley Community School Natural Turf Field Improvements — Project value $1,554,786:
Construction of natural turf sports field imported sand and natural turf root zone materials,
subsurface drainage systems, perimeter storm and detention systems, permeable perimeter
pathway, concrete curbs, anchors, slabs, pervious concrete pathway.
Cedar Way Elementary Traffic and Pedestrian Safety Improvements —Contract value
$1,074,942: Scope includes installation of underground utilities, concrete sidewalks, curb and
gutter, site lighting, irrigation, and landscaping.
From 1999-2004 at DKS: Carpenter
Utilized blueprints to construct projects according to plans and specifications. Coordinated project
layout and scheduling. Increased construction knowledge with tools, equipment, and a multitude of
materials.
QUALIFICATIONS:
Experienced in state and city standards and specifications
Professional experience with decorative structural facilities
Experienced in the management of crews
Certified Pervious Concrete Installer
Certified in CPR
Confined Space
Naeem Iqbal
A-1 Landscaping and Construction,Inc.
20607 State Route 9 SE •Snohomish, WA 98296-8316
Office: 425-402-9900 •Cell:206-571-8954
Fax: 425-489-0222 •Naeem@A 1 Land.coin
EXPERIENCE:
CEO and Project Management Professional with 20 years of experience in project management, contracts
management, project controls, claim analysis and construction field engineering. Experience spans across
infrastructure, sports field and wetland mitigation sectors, providing services to the Western Washington market.
Project values range from $100,000 to $13.50 Million. Proficient in the use of SureTrack, Primavera Project
Planner (P6, P3 3.1) and MS Project 2005 software, accounting software.
Has a very diverse background. From developing and managing a construction company to developing a Native
Plant Nursery and a recent endeavor, an Organic Farm.
President of A-1 Landscaping and Construction, Inc., 1995 to Present. Manages company financials,
estimating,field and office operations as well as prime and subcontracts. Exceptional instructor demonstrating
Project Controls, and Financial Management. The company has experienced significant growth under his
tenure.
Madrone Homes—Project value$8,500,000
Construction of 18-unit luxury townhomes with premium finishes,including underground utilities,foundations,
framing,interior and exterior finishes,extensive cast-in-place concrete and parking lot.
Edmonds Civic Center Park Redevelopment—Project value$11,321,663
Renovation of existing park including installation of underground utilities,construction of a sports field,skate park,
extensive architectural and decorative cast-in-place concrete features,playground,jogging path with rubber track
surfacing,tennis and multi-use courts,a petanque grove and an Owner-furnished restroom.
Woodland North Apartments—Project value $4,045,250
Improvements to an existing apartment complex including cast-in-place concrete retaining walls including
pilings with a shotcrete finish. Underground utilities including water, sewer and storm drainage
improvements. Tree removal and pruning,planting of native shrubs& ground covers, enhancement of soils
and planting beds; installation of walkways,planting beds, and water conserving irrigation& sprinkler
systems. Construction of a plaza area with covered picnic area.
Early Learning Center Frontage Improvements—Project value$1,045,000
Construction of frontage improvements at a multi-lane public roadway, including, selective site demolition,
earthwork; underground utility installation,construction of ADA compliant pedestrian path/vehicular access,
asphalt paving and thermoplastic pavement marking,rock retaining wall,chain link fencing, irrigation
system improvements,hydroseeding and planting.
2019 Citywide School Walk Route Enhancement—Project value $1,950,000
Residential neighborhood frontage improvements incuding selective site demolition; earthwork;
underground utility installation;construction of ADA compliant,sidewalks and driveway aprons. Asphalt
pavement,block and rock retaining walls;wood and chain link fencing; storm drainage system
improvements.
SR 524 Locust to Larch Way Intersection Improvements—Project value$3,306,484
Roadway and utility structure excavation, installation of new retaining walls,drainage systems,detention
vault,water quality vault, construction of two concrete traffic circles,asphalt paving,pavement marking and
illumination system.
Monroe High School Field Improvements—Project value $2,923,750
Removal of existing natural turf field base, installation of new underfield drainage, base aggregate, artificial
turf, irrigation system,paving, CIP concrete and site furnishings.
Sunset Beach Bathhouse-Project value $1,959,254
Washington State Park covers approximately 43 acres. Scope includes demolition of an existing restroom
and replacement with a new 7,667 SF bathhouse with men's, women's, and family restrooms, future
concession area, storage, outdoor seating, lifeguard headquarters and outdoor flex space. Construction of
6,400 SF firelane.
Tam bark Creek Park- Project value$5,292,748
Development of a 40 acre community park. Scope includes TESC,selective demolition, survey,clearing and grubbing,
grading, storm water drainage installation, driveways, parking, sidewalk and trail improvements, cast- in-place
concrete, pervious and standard asphalt installation, water, sewer, electrical, and other utilities, sportsfield
construction, including subsurface drainage, fencing, surfacing and furnishings, miscellaneous site furnishings,
including a playground, irrigation, landscaping, shelters, pre-manufactured restroom, pre- manufactured
restroom/shelter, boardwalk, pre-manufactured bridges, and wetland mitigation.
Willis Tucker Park Phase 3A-Project value $1,280,905
A community park of approximately 8 acres. Performed TESC, minor demolition, clearing, grubbing, earthwork,
installation of utilities and associated appurtenances including storm drainage utilities, and electric conduit; site
access improvements, asphalt paving and surfacing, and planting.
South Lake Union Park Phase 2-Project value:$12,084,015
Development of a 12 acre city park. Performed TESC, clearing and re-grading of existing landscape. New park
entrance, tree grove, interactive water fountain of jets,grass, model boat pond, History Trail, boardwalk extension,
parking,pathways,beach for hand launched boats, landscape, landforms, furniture, lighting systems and irrigation.
In addition, work includes shoreline stabilization and planting on the lake edge.
Central Park Pad 3 Improvements-Project value:$2,098,796
Construction of synthetic turf athletic fields. Performed TESC, installed under field drainage, fencing, asphalt
paving, and athletic field lightingRainier Vista Redevelopment- Project value:$8,211,343
Site development for new low-income housing. Site preparation, infrastructure improvements, sub-grade
preparation, construction of new asphalt and concrete roads, concrete curb and gutter, curb ramps, sidewalks, and
driveways, underground water, sanitary, storm, electrical, gas and related services, right of way soil preparation
and irrigation, construction of parks
Washington Park Arboretum- Project value $1,252,591
Construction of a new park entrance, including entry gatehouse, gate structure, ticket booth, gift shop, meeting
room, restrooms,maintenance facilities, courtyard and storage structure. Site preparation,tree and plant protection,
TESC, site demolition, earthwork, granite dimension stone paving, water distribution system, storm sewer system
and sub-surface drainage, sanitary sewer systems, irrigation systems, galvanized chain link fencing,site furnishings,
soil preparation, sodding for lawn areas and athletic fields, landscape plantings, tree transplantation, cast-in-place
concrete, unit masonry, structural steel framing, metal fabrication, carpentry, painting, restrooms, plumbing and
mechanical, and electrical work.
Multi Use Synthetic Turf Baseball Fields#1  at Marymoor Park-Project value: $2,264,018
Project included converting the existing grass outfield of baseball field #1 and the outfield and infield of baseball
field #2 at Marymoor Park into a synthetic turf multi-use baseball/soccer field complex. Work included
installation of synthetic turf, base course, new sports field lighting, fencing, and site furnishings.
Paine Field Community Park-Project Value: $1,708,562
Project included clearing and grading of approximately 6 acres of undeveloped site. Work included the
installation of drainage, sewer, water and electrical utilities, expansion of existing baseball field parking area,
installation of ballfield lights on one field, installation of pedestrian paving, a restroom/picnic shelter and play area
and site landscaping.
Snohomish High School No.2 & Elementary School No. 10 Site Improvements- Project Value: $4,583,755
Site preparation for new high school and elementary school.Work included TESC,clearing,grubbing,earthwork,
installation of preliminary utilities, building pads, preparation of athletic fields and access road in addition to
construction of retaining walls.
Lewis Creek Park-Project Value $4,207,504
Development of two little league ballfields with a soccer field overlap. Construction of a 5,000 SF classroom
multi-purpose building with a grass roof and structural concrete. Construction of an extensive trail systems with
boardwalks installed on piles, play areas,basketball court, landscaping,wetland planting and a parking lot.Formally
developed areas comprise approx 8 to 10 of the 49 total acres.
Evergreen Hospital Medical Center Northern Detention Vault-Project Value $1,818,971
Construction of a detention vault system. Work included TESC, excavation, shoring, backfilling and grading.
Poured several thousand cubic yards of concrete on site to erect a complex concrete detention structure.
EDUCATION:
• M Phil in Philosophy from UCL
• Master of Arts from Government College Lahore, Pakistan
• Studied Construction Management at UW
• Bachelor of Arts from Government College Lahore, Pakistan
Non Profit Work:
Corporate Secretary for Center for Islamic Sciences, a 501 C corporation dedicated to promote research and
diffusion of knowledge on all aspects of Islam. CIS recently published a scholarly work integrated encyclopedia
of the Qur'an to promote the Islamic tradition of learning.