HomeMy WebLinkAboutD_Windsock Apron and 243 Apron_SME_241120_v3_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Renton Windsock and 243 Building Aprons Project
PLANNING DIVISION
CERTIFICATE OF EXEMPTION
FROM SHORELINE SUBSTANTIAL DEVELOPMENT
EVALUATION FORM & DECISION
DATE OF DECISION: November 26, 2024
PROJECT NUMBER: LUA24-000299, ECF, SME
PROJECT NAME: Renton Windsock and 243 Building Aprons Project
PROJECT MANAGER: Alex Morganroth, Prinicipal Planner
APPLICANT: William Adams
616 W Perimeter Rd, Renton, WA 98057
CONTACT: Wes Holden, DOWL, LLC
15325 SE 30th Pl, Ste 300, Bellevue, WA 98007
OWNER: City of Renton – Renton Municipal Airport
616 W Perimeter Rd, Unit A, Renton, WA 98057
PROJECT LOCATION: 243 W Perimeter Rd and 749 E Perimeter Rd (APN 0723059007)
PROJECT DESCRIPTION: The applicant, the City of Renton, is requesting a Shoreline Exemption for a
maintenance and improvement project at the Renton Municipal Airport site located at 243 W Perimeter Rd
and 749 E Perimeter Rd (APN 0723059007). The airport site totals 152.5 acres in area and is located within
the Medium Industrial (IM) zone. The site is within the Comprehensive Plan Employment Area (EA) land use
designation. The proposed work includes rehabilitation of pavement sections at two (2) aprons at the airport.
The first apron, designated as the 243 Building Apron, is located at the SW corner of the airport site. The
second apron, designated as the Windsock Apron, is located around the mid-point of the runway on the east
side of the airport adjacent to E Perimeter Rd and the Cedar River. The applicant is proposing full depth
pavement repair, replacement of aircraft tiedowns, and minor stormwater conveyance system
improvements at both project locations. In addition, the 243 Building Apron includes a publicly accessible
parking lot proposed for full depth pavement repair and restriping. No parking stalls are proposed for removal.
Work is proposed within 100 feet (100’) of the Cedar River ordinary high-water mark (OHWM), but no in-water
work is proposed (Attachment B). A high seismic hazard area, high erosion hazard area, sensitive and
protected slopes, and Wellhead Protection Area Zones 1 and 2 are mapped on the airport site according to
City of Renton (COR) Maps. A Flood Hazard Area pursuant to the FEMA Flood Insurance Rate Maps (FIRM) is
also located on the subject site. The hazard area on the site, a Special Flood Zone AE (base flood elevation
determined), is classified as a 100-year flood plain. The FIRM maps indicate the base flood elevation to be
26 feet (26’) Mean Sea Level (MSL). No vegetation is proposed for removal.
The project site is located along the western shore of the Cedar River, a Shoreline of the State. Reach A of the
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Development
Renton Windsock and 243 Building Aprons Project LUA24-000299, ECF, SME
Permit Date: November 26, 2024 Page 2 of 4
Renton Windsock and 243 Building Aprons Project
Cedar River Shoreline is designated as High Intensity at the Windsock Apron project location. Due to the
location of the work proposed on the Windsock Apron, within 200 feet (200’) of the OHWM of the Cedar River,
the applicant submitted a Habitat Data Report, prepared by DOWL, LLC, dated July 22, 2024, and a Stream
Assessment, prepared by DOWL, LLC, dated July 22, 2024 (Attachments C and D).
According to the Stream Assessment, the Windsock Apron project area is entirely covered with pavement and
the surrounding areas to the south and west are mowed grasses. Therefore, the proposal would not impact
any vegetation in the vicinity of the Cedar River. The Cedar River, which provides instream habitat for salmonid
species and prey species including sculpin and lamprey, serves as an important migration corridor and
outlets to Lake Washington and eventually to the Puget Sound.
However, the Stream Assessment notes that the reach of the Cedar River flowing through Renton has limited
ecological functions due to significant urban development adjacent to the river. While trees and shrubs along
the bank provide some shading and nutrient input, the riparian corridor is limited due to adjacent
development of the airport site and Boeing manufacturing plant. The report concludes that the proposal
would not result in any impacts to the Cedar River and therefore achieves no net loss of ecological functions.
The Habitat Data Report identifies little to no habitat features on either the Windsock Apron or 243 Building
Apron sites. According to the report, the maintained lawn near the 243 Apron proposed for removal provides
limited habitat for small mammals and city birds. In addition, the Washington Department of Fish and Wildlife
(WDFW) Priority Habitats and Species map tool show there are no priority wildlife species present of the
airport. However, the Cedar River contains priority species including sockeye (Oncorhynchus nerka), coho
(Onchorhynchus kisutch), chinook (Oncorhynchus tshawytscha), cutthroat trout (Oncorhyncus clarkii),
kokanee (Oncorhyncus nerka), steelhead (Oncorhyncus mykiss), Dolly Varden (Salvelinus malma), and bull
trout (Salvelinus confluentus). The report concludes that, similar to the Stream Assessment, the project
would not result in any impacts to wildlife near the airport site and therefore no specific on-site mitigation is
recommended.
SEC-TWN-R: NE 07-23-05
LEGAL DESCRIPTION:
(King County Assessor)
POR SECS 7 & 18-23-5 & POR TOBINS D C INCL POR PLATTED & VAC STS LY WLY
OF COMM W W # 2 N OF N LN DIXIE AVE & ELY OF STATE HWAY # 5 & ELY & SLY OF
FOLG LN BEG ON ELY MGN SD HWAY AT PT 5 FT S OF N LN OF LOT 8 BLK 18 BRYN
MAWR TH E 89.23 FT TH N 05-16-51 E 438.90 FT TH N 40-09-47 E 188.55 FT TH N
60 FT TH N 29-00-40 W 197.07 FT TH S 88-27-28 E 90.83 FT TH N 01-32-32 W 40 FT
TH S 88-27-28 E 234.53 FT TH S 35-00-00 E 142.41 FT TH E 403.70 FT LESS LOTS
19 TO 22 INCL BLK 4 RENTON REAL ESTATE COS 1ST ADD LESS PORTION FOR
LANE HANGAR CONDOMINIUM -TGW POR OF RAINIER AVE N PER RENTON VAC
ORD #5780
WATER BODY/REACH: Cedar River/Reach A
EXEMPTION JUSTIFICATION/DECISION: An exemption from a Shoreline Management Substantial
Development Permit is hereby Approved on the proposed project in accordance with RMC 4-9-190C
“Exemption from Permit System’ and for the following reasons:
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Development
Renton Windsock and 243 Building Aprons Project LUA24-000299, ECF, SME
Permit Date: November 26, 2024 Page 3 of 4
Renton Windsock and 243 Building Aprons Project
Normal maintenance or repair of existing structures or developments, including damage by accident, fire or
elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a
lawfully established condition. "Normal repair" means to restore a development to a state comparable to its
original condition, including but not limited to its size, shape, configuration, location, and external
appearance, within a reasonable period after decay or partial destruction, except where repair causes
substantial adverse effects to shoreline resource or environment. Replacement of a structure or development
may be authorized as repair where such replacement is the common method of repair for the type of structure
or development and the replacement structure or development is comparable to the original structure or
development including but not limited to its size, shape, configuration, location and external appearance and
the replacement does not cause substantial adverse effects to shoreline resources or environment.
Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on
October 28, 2024, the Environmental Review Committee issued a Determination of Non-Significance -
Mitigated (DNS-M) for the Renton Windsock and 243 Building Aprons project with two (2) mitigation measures
(Attachment A). A 14-day appeal period commenced on October 28, 2024, and ended on November 12, 2024.
A SEPA environmental impact statement (EIS) was not required under Revised Code of Washington (RCW)
43.21C.030(2)(c). No appeals of the threshold determination were filed.
Repair, remodeling, and maintenance activities. The following activities shall be categorically exempt: The
repair, remodeling, maintenance, or minor alteration of existing private or public structures, facilities, or
equipment, including utilities, recreation, and transportation facilities involving no material expansions or
changes in use beyond that previously existing, except that, where undertaken wholly or in part on lands
covered by water, only minor repair or replacement of structures may be exempt (examples include repair or
replacement of piling, ramps, floats, or mooring buoys, or minor repair, alteration, or maintenance of docks).
Staff Comment: The proposal for a maintenance and improvement project at the Renton Municipal Airport
would qualify as an Exemption from a Shoreline Substantial Development Permit under the allowance for
Maintenance and Repair. The proposed maintenance and improvement work noted in the ‘Project
Description’ section above would allow the airport, an important transportation infrastructure element for the
entire region, to continue operating in a safe and efficient manner and therefore is classified as a Maintenance
and Repair project. The proposal would not impact any vegetation or habitat and would result in no net loss of
ecological functions and values on the project site.
FINDINGS: The proposed development is:
i. Consistent with the policies of the Shoreline Management Act.
ii. Not Applicable to the guidelines of the Department of Ecology where no Master Program
has been finally approved or adopted by the Department.
iii. Consistent with the City of Renton Shoreline Mater Program.
SIGNATURE & DATE OF DECISION:
_____________________________________ ______________________________
Matthew Herrera, Planning Director Date
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
11/26/2024 | 2:58 PM PST
City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Development
Renton Windsock and 243 Building Aprons Project LUA24-000299, ECF, SME
Permit Date: November 26, 2024 Page 4 of 4
Renton Windsock and 243 Building Aprons Project
RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be
reopened by the approval body. The approval body may modify his decision if material evidence not readily
discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After
review of the reconsideration request, if the approval body finds sufficient evidence to amend the original
decision, there will be no further extension of the appeal period. Any person wishing to take further action
must file a formal appeal within the 14-day appeal time frame.
APPEALS: This administrative land use decision will become final if not appealed in writing to the
Hearing Examiner on or before 5:00 PM on December 10, 2024. An appeal of the decision must be filed
within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Appeals must be submitted
electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub
Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at
a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the
first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and
additional information regarding the appeal process may be obtained from the City Clerk’s Office,
cityclerk@rentonwa.gov.
EXPIRATION: Two (2) years from the date of decision (date signed).
ATTACHMENTS:
Attachment A: Environmental (SEPA) Review Committee Determination of Non-Significance - Mitigated
(DNS-M), dated October 28, 2024
Attachment B: Civil Construction Plans
Attachment C: Habitat Data Report, prepared by DOWL, LLC, dated July 22, 2024
Attachment D: Stream Assessment, prepared by DOWL, LLC, dated July 22, 2024
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
Project File Numbers: LUA24-000299 / PR24-000063
Project Name: Renton Windsock and 243 Building Apron Project
Applicant: William Adams / 616 West Perimeter Rd, Renton, WA 98057
Project Location: 243 W Perimeter Rd and 749 E Perimeter Rd (APN 0723059007)
Project Description: The applicant, the City of Renton, is requesting Environmental (SEPA) Review and a
Shoreline Exemption for a maintenance and improvement project at the Renton Municipal Airport site located at
243 W Perimeter Rd and 749 E Perimeter Rd (APN 0723059007). The airport site totals 152.5 acres in area and is
located within the Medium Industrial (IM) zone. The site is within the Comprehensive Plan Employment Area (EA)
land use designation. The proposed work includes rehabilitation of pavement sections at two (2) aprons at the
airport. The first apron, designated as the “243 Building Apron,” is located at the SW corner of the airport site. The
second apron, designated as the “Windsock Apron,” is located around the mid-point of the runway on the east side
of the airport adjacent to E Perimeter Rd and the Cedar River. The applicant is proposing full depth pavement repair,
replacement of aircraft tiedowns, and minor stormwater conveyance system improvements at both project
locations. In addition, the 243 Building Apron includes a publicly accessible parking lot proposed for full depth
pavement repair and restriping. No parking stalls are proposed for removal. Work is proposed within 100 feet of the
Cedar River ordinary high water mark (OHWM), but no in-water work is proposed. A high seismic hazard area, high
erosion hazard area, sensitive and protected slopes, and Wellhead Protection Area Zones 1 and 2 are mapped on
the airport site according to City of Renton (COR) Maps. A Flood Hazard Area pursuant to the FEMA Flood Insurance
Rate Maps (FIRM) is also located on the subject site. The hazard area on the site, a Special Flood Zone AE (base flood
elevation determined), is classified as a 100-year flood plain. The FIRM maps indicate the base flood elevation to
be 26 feet Mean Sea Level (MSL). In addition, a portion of proposed improvements are located within Reach A of the
Cedar River, a Shoreline of the State, with an Environmental Designation of Shoreline High Intensity. No vegetation
is proposed for removal.
Lead Agency: City of Renton
Environmental Review Committee
Department of Community & Economic Development
Date of Decision: October 28, 2204
Mitigation Measures:
1. The applicant shall comply with the recommendations found in the submitted Geotechnical Report,
prepared by HWA Geosciences, Inc., dated November 2, 2023, and any future addenda.
2. The applicant shall submit an Archaeological Monitoring and Inadvertent Discovery Plan (MIDP) to the
Department of Archaeology and Historic Preservation (DAHP) and any interested tribes for review prior
to the start of any ground disturbing activities. Documentation of the submittal shall be provided to the
City of Renton prior to the issuance of building or construction permits.
The City of Renton Environmental Review Committee has determined that probable significant environmental
impacts from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required
under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review
Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to
Docusign Envelope ID: D31D61AF-180E-439C-B708-0C917E2644A7
Attachment A
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
Environmental Review Committee Determination
October 24, 2024
Page 2 of 2
SIGNATURES:
Martin Pastucha, Administrator
Public Works, Chair
Date Anjela Barton, Fire Marshal
Renton Regional Fire Authority
Date
Maryjane Van Cleave, Administrator
Parks and Recreation
Date Gina Estep, Administrator Date
Community and Economic Development
mitigate environmental impacts identified during the environmental review process. Because other agencies of
jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 12,
2024. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall
1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be
collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on
the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and
additional information regarding the appeal process may be obtained from the City Clerk’s Office,
cityclerk@rentonwa.gov.
Docusign Envelope ID: D31D61AF-180E-439C-B708-0C917E2644A7
10/28/2024 | 3:28 PM PDT
10/28/2024 | 1:41 PM PDT
for
10/28/2024 | 1:39 PM PDT
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A
DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNS-M: The City of Renton Environmental Review Committee (ERC) has determined that the proposed action has
probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using
the optional DNS process in WAC 197-11-355. There is no further comment period.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
October 28, 2024
PROJECT NAME/NUMBER: PR24-000063 Renton Windsock and 243 Building
Aprons Project / LUA24-000299, ECF, SME, LUA
Number
PROJECT LOCATION: 243 W Perimeter Rd (APNs 0723059007)
APPLICANT/PROJECT CONTACT
PERSON:
William Adams / 1055 S Grady Way Renton, WA 98057 /
wadams@rentonwa.gov
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/2bfcyv
PROJECT DESCRIPTION: The applicant, the City of Renton, is requesting Environmental (SEPA)
Review and a Shoreline Exemption for a maintenance and improvement project at the Renton Municipal Airport
site located at 243 W Perimeter Rd and 749 E Perimeter Rd (APN 0723059007). The airport site totals 152.5 acres
in area and is located within the Medium Industrial (IM) zone. The site is within the Comprehensive Plan
Employment Area (EA) land use designation. The proposed work includes rehabilitation of pavement sections at
two (2) aprons at the airport. The first apron, designated as the “243 Building Apron,” is located at the SW corner
of the airport site. The second apron, designated as the “Windsock Apron,” is located around the mid-point of the
runway on the east side of the airport adjacent to E Perimeter Rd and the Cedar River. The applicant is proposing
full depth pavement repair, replacement of aircraft tiedowns, and minor stormwater conveyance system
improvements at both project locations. In addition, the 243 Building Apron includes a publicly accessible parking
lot proposed for full depth pavement repair and restriping. No parking stalls are proposed for removal. Work is
proposed within 100 feet of the Cedar River ordinary high water mark (OHWM), but no in-water work is proposed.
A high seismic hazard area, high erosion hazard area, sensitive and protected slopes, and Wellhead Protection
Area Zones 1 and 2 are mapped on the airport site according to City of Renton (COR) Maps. A Flood Hazard Area
pursuant to the FEMA Flood Insurance Rate Maps (FIRM) is also located on the subject site. The hazard area on the
site, a Special Flood Zone AE (base flood elevation determined), is classified as a 100-year flood plain. The FIRM
maps indicate the base flood elevation to be 26 feet Mean Sea Level (MSL). In addition, a portion of proposed
improvements are located within Reach A of the Cedar River, a Shoreline of the State, with an Environmental
Designation of Shoreline High Intensity. No vegetation is proposed for removal.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 12,
2024. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the
City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk
at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding
the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties
notified.
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
CITY OF RENTON
RENTON MUNICIPAL AIRPORT (RNT)
WINDSOCK & 243 BLDG. GA APRON &
PARKING LOT REHABILITATION
JUNE 2024
SHEET INDEX
SHEET NO.SHEET NAME
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
PROJECT LOCATION
VICINITY MAP
PROJECT
SITE
243 BLDG
WIND SOCK
GA APRON
C1
CO
V
E
R
S
H
E
E
T
LEGEND ABBREVIATIONS
Attachme
nt B
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RAMP
PAVED
PAVED
PAVED
PAVED PARKING
PAVED
PAVED
PAVED
WIND SOCK AIRPORTPROPERTY
FH
PAVED
PAVED
PAVED
MBX
TAXIWAY A
RAINIER AVE N
LOGAN AVE
N
RUNWAY 16-34
W. PERIMETER R
O
A
D
600 BLDG500
BLDG
540
BLDG
RAINIER
FLIGHT
E. PERIMETER ROA
D
TAXIWAY B
WIND SOCK
GA APRON
APRON CAPRON B
AIR
P
O
R
T
W
A
Y
APRON D
COMPASS
ROSE
APRON R
PRO-FLIGHT AVIATION
A7
B
7 B6
A6
B5
A5
B4
A4
B3
A3
A2
A1
TAXIWAY B
AIRPORT OFFICE & ATCT
AIRPORT BEACON
AIRPORT MAINTENANCE BLDG
243
BLDG
WORK AREA #1
WORK AREA #2
BOEING AIRCRAFT BRIDGE
VEHICLE GATE V10
VEHICLE GATE V7
APRON A
PED GATE P10
CEDAR RIVER C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C2
CO
N
S
T
R
U
C
T
I
O
N
S
I
T
E
P
L
A
N
GENERAL NOTES:
LEGEND:
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RAMP
PAVED
PAVED
PAVED
PAVED PARKING
PAVED
PAVED
PAVED
WIND SOCK AIRPORTPROPERT
Y
FH
PAVED
PAVED
PAVED
MBX
TAXIWAY A
RAINIER AVE N
CEDAR RIVER C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
LOGAN AVE
N
RUNWAY 16-34
W. PERIMETER RO
A
D
E. PERIMETER RO
A
D
TAXIWAY B
WIND SOCK
GA APRON
APRON CAPRON B
APRON A
AIR
P
O
R
T
W
A
Y
APRON D
COMPASS
ROSE
APRON R
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C3
SU
R
V
E
Y
C
O
N
T
R
O
L
P
L
A
N
SURVEY NOTES:SURVEY CONTROL:
LEGEND:
CONTROL POINT TABLE:
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
CEDAR RIVE
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
COMPASS
ROSE
TAXIWAY B
BLDG 749B
BLDG 749A
TW
Y
B
4
T
W
Y
B
5
E. PERIMETER
R
O
A
D
RUNWAY 16-34
PROPERTY LI
N
E
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
BLOCK OFF PEDESTRIAN ACCESS
21' MIN
100-YEAR FLOOD LINE
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C4
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 28 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1
WEEK PRIOR TO PROJECT COMMENCEMENT.
2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE
AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW
FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE
START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT
RECONSTRUCTION WITH THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES
AROUND WORK AREAS.
3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
4)INSTALL NEW TIEDOWN ANCHORS
5)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF
PHASE 1.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #1 - PHASE 1 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
CEDAR RIVE
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
COMPASS
ROSE
TAXIWAY B
BLDG 749B
BLDG 749A
TW
Y
B
4
T
W
Y
B
5
E. PERIMETER
R
O
A
D
RUNWAY 16-34
PROPERTY LI
N
E
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
BLOCK OFF PEDESTRIAN ACCESS
21' MIN
100-YEAR FLOOD LINE
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C5
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED
FOR WORK AREA 2)
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF
WORK AREA 1 PHASE 2.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #1 - PHASE 2 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
62.00'
AI
R
P
O
R
T
W
A
Y
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
243
BLDG
DRIVE L
A
N
E
APRON
EXISTING
HANGAR
PARKING
LOT
TW
Y
A
7
TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
VEHICLE GATE V7
PR
O
P
E
R
T
Y
L
I
N
E
APRON B
WORK AREA
PEDESTRIAN
GATE P10
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C6
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 13 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:NORTH HALF OF 243 BUILDING APRON
CLOSED, WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM
EXISTING HANGAR PRIOR TO START OF CONSTRUCTION.
2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR
TO PROJECT COMMENCEMENT.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT
OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO
GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH
THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)INSTALL NEW TIEDOWN ANCHORS
6)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK
AREA 2, PHASE 1..
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #2 - PHASE 1 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
62.00'
AI
R
P
O
R
T
W
A
Y
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
243
BLDG
DRIVE
L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TW
Y
A
7
TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
VEHICLE GATE V10
PR
O
P
E
R
T
Y
L
I
N
E
APRON B
WORK AREA
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
PEDESTRIAN
GATE P10
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C7
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION
ALLOWED DURATION: 5 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN
APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED,
ALL OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2.
WORK AREA #2 - PHASE 2 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
AI
R
P
O
R
T
W
A
Y
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
243
BLDG
DRIVE L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TW
Y
A
7
TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
EXISTING VEHICLE
GATE V7
PR
O
P
E
R
T
Y
L
I
N
E
APRON B
WORK AREA
62.00'
PEDESTRIAN
GATE P10
RELOCATED VEHICLE
GATE V7
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C8
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA)
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER
3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES.
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A.
WORK AREA #2 - PHASE 3 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
AI
R
P
O
R
T
W
A
Y
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
243
BLDG
DRIVE L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TW
Y
A
7
TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
PR
O
P
E
R
T
Y
L
I
N
E
APRON B
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
62.00'
PEDESTRIAN
GATE P10
PROPOSED VEHICLE
GATE V7
WORK AREA
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C9
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK):
1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE EXTRUDED CURB REMOVAL
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)CONSTRUCT LANDSCAPE ISLANDS.
7)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4.
WORK AREA #2 - PHASE 4 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
62.00'
AI
R
P
O
R
T
W
A
Y
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
243
BLDG
DRIVE L
A
N
E
APRON
EXISTING
HANGAR
TW
Y
A
7
TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
VEHICLE GATE V7
PR
O
P
E
R
T
Y
L
I
N
E
APRON B
WORK AREA
PEDESTRIAN
GATE P10
PARKING
LOT
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C10
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
P
L
A
N
WORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER
APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN
RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER.
3)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK):
3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #2 - PHASE 5 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
CO
N
S
T
R
U
C
T
I
O
N
S
A
F
E
T
Y
&
PH
A
S
I
N
G
D
E
T
A
I
L
S
LOW PROFILE BARRICADE DETAIL
LOW PROFILE BARRICADE NOTES:
LOW PROFILE BARRICADE
PRE-APPROVED PRODUCTS:
C11
1.AIRCRAFT ALWAYS HAVE THE RIGHT OF WAY. CONTRACTOR SHALL YIELD TO AIRCRAFT AT ALL TIMES.
2.THE WORK AREAS AND CONTRACT TIME FOR COMPLETION OF EACH PHASE IS DESCRIBED IN THE CONSTRUCTION PHASING SUMMARY
TABLE ON SHEETS C4-C10. LIQUIDATED DAMAGES WILL BE ASSESSED PER THE CONTRACT DOCUMENTS FOR FAILURE TO SUBSTANTIALLY
COMPLETE EACH PHASE WITHIN THE ALLOTTED DURATION.
3.ALL WORK WITHIN EACH PHASE SHALL BE SUBSTANTIALLY COMPLETE PRIOR TO BEGINNING WORK IN THE NEXT PHASE, EXCEPT AS NOTED
ON THE PHASING SUMMARY TABLE.
4.A FOD INSPECTION SHALL BE PERFORMED BY THE CONTRACTOR AT THE END OF EACH PHASE, ON ALL WORK AREAS IN THAT PHASE, PRIOR
TO RE-OPENING. ALL DEBRIS AND POTENTIAL FOD SHALL BE REMOVED FROM AIRFIELD SURFACES PRIOR TO RE-OPENING THE WORK AREA.
5.CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 48-HOURS IN ADVANCE OF ANY CHANGES TO CONSTRUCTION PHASING.
6.CONTRACTOR SHALL PLACE AND MAINTAIN ALL BARRICADES, INCLUDING REPLACING LIGHTS ON LOW-PROFILE BARRICADES. GAPS
BETWEEN BARRICADES SHALL BE NO MORE THAN 4-FEET.
7.WHERE MULTIPLE WORK AREAS ARE PROVIDED, WORK SHALL OCCUR SIMULTANEOUSLY.
GENERAL CONSTRUCTION SAFETY AND PHASING NOTES:
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
CEDAR RIVE
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
TAXIWAY B
BLDG 749B
BLDG 749A
TWY
B
4
T
W
Y
B
5
E. PERIMETE
R
R
O
A
D
PROPERTY L
I
N
E
44.50'
44.50'
SAWCUT ALONG EXISTING JOINT
21' MIN
TRAVEL LANE
100-YEAR FLOOD LINE
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C12
SI
T
E
P
R
E
P
A
R
A
T
I
O
N
&
T
E
S
C
P
L
A
N
LEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
REMOVE EXISTING PAINT MARKING
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL NOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C14.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION NOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.REMOVE EXISTING PAINT MARKING.
8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
62.00'
AI
R
P
O
R
T
W
A
Y
243
BLDG
DRIVE LAN
E
EXISTING
HANGAR
TW
Y
A
7
TAXIWA
Y
A
W. PERIMETER ROAD
PR
O
P
E
R
T
Y
L
I
N
E
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
RELOCATE EXISTING
VEHICLE GATE V7, FENCE AND
ALL ASSOCIATED EQUIPMENT,
SEE SHEET C19.
PEDESTRIAN
GATE P10
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C13
SI
T
E
P
R
E
P
A
R
A
T
I
O
N
&
T
E
S
C
P
L
A
N
LEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
REMOVE EXISTING PAINT MARKING
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL NOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C14.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION NOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.REMOVE EXISTING PAINT MARKING.
8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
SI
T
E
P
R
E
P
A
R
A
T
I
O
N
&
TE
S
C
D
E
T
A
I
L
S
TRIANGULAR SILT DIKE DETAIL
C14
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
WIND SOCK
CEDAR RIVER C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
TAXIWAY B
BLDG 749B
BLDG 749A
TWY
B
4
T
W
Y
B
5
E. PERIMETER RO
A
D
15'
TYP.15'
TYP.
23.3
3
2
3
.
3
3
23.3
2
2
3
.
3
3
23.3
6
23.3
9
23.4
2
2
3
.
4
3
23.4
2
2
3
.
4
8
23.5
5
2
3
.
6
1
23.2
6
2
3
.
2
5
23.2
6
2
3
.
2
8
23.3
1
23.3
3
23.3
4
2
3
.
3
4
23.3
4
2
3
.
4
0
23.4
8
2
3
.
5
5
23.1
7
2
3
.
1
8
23.1
9
2
3
.
2
2
23.2
5
23.2
8
23.2
7
2
3
.
2
6
23.2
5
2
3
.
3
2
23.4
0
2
3
.
4
9
23.0
8
2
3
.
0
9
23.1
2
2
3
.
1
6
23.1
9
23.2
3
23.2
1
2
3
.
1
9
23.1
7
2
3
.
2
4
23.3
3
2
3
.
4
2
23.0
1
2
3
.
0
2
23.0
5
2
3
.
0
9
23.1
3
23.1
7
23.1
5
2
3
.
1
2
23.0
9
2
3
.
1
7
23.2
7
2
3
.
3
8
22.9
5
2
2
.
9
6
22.9
8
2
3
.
0
3
23.0
8
23.1
2
23.0
8
2
3
.
0
5
23.0
1
2
3
.
1
0
23.2
3
2
3
.
3
6
22.9
0
2
2
.
9
0
22.9
1
2
2
.
9
6
23.0
2
23.0
7
23.0
2
2
2
.
9
7
22.9
3
2
3
.
0
3
23.1
9
2
3
.
3
5
22.8
8
2
2
.
8
4
22.8
4
2
2
.
9
0
22.9
6
23.0
1
22.9
6
2
2
.
9
0
22.8
5
2
2
.
9
7
23.1
5
2
3
.
3
4
22.9
0
2
2
.
8
1
22.7
7
2
2
.
8
3
22.9
0
22.9
6
22.8
9
2
2
.
8
3
22.7
6
2
2
.
9
0
23.1
1
2
3
.
3
2
22.9
1
2
2
.
7
7
22.7
0
2
2
.
7
7
22.8
4
22.9
1
22.8
3
2
2
.
7
6
22.6
8
2
2
.
8
3
23.0
6
2
3
.
2
8
22.9
4
2
2
.
7
4
22.6
2
2
2
.
7
0
22.7
8
22.8
5
22.7
7
2
2
.
6
9
22.6
0
2
2
.
7
5
22.9
9
2
3
.
2
4
22.9
6
2
2
.
7
3
22.5
5
2
2
.
6
6
22.7
4
22.8
0
22.7
4
2
2
.
6
5
22.5
4
2
2
.
6
8
22.9
4
2
3
.
2
0
22.9
8
2
2
.
7
5
22.6
0
2
2
.
6
8
22.7
6
22.8
4
22.7
5
2
2
.
6
6
22.5
7
2
2
.
6
9
22.9
3
2
3
.
1
6
23.0
2
2
2
.
8
0
22.6
6
2
2
.
7
3
22.8
1
22.8
8
22.7
9
2
2
.
7
1
22.6
2
2
2
.
7
4
22.9
5
2
3
.
1
7
23.0
9
2
2
.
8
7
22.7
2
2
2
.
7
9
22.8
6
2
2
.
9
2
22.8
4
2
2
.
7
6
22.6
7
2
2
.
7
9
22.9
8
2
3
.
1
9
23.1
6
2
2
.
9
3
22.7
8
2
2
.
8
4
22.9
1
2
2
.
9
7
22.8
9
2
2
.
8
0
22.7
2
2
2
.
8
1
23.0
0
2
3
.
1
8
23.2
0
2
2
.
9
8
22.8
4
2
2
.
8
9
22.9
5
2
3
.
0
1
22.9
3
2
2
.
8
5
22.7
8
2
2
.
8
4
22.9
9
2
3
.
1
5
23.2
1
2
3
.
0
2
22.9
0
2
2
.
9
5
23.0
0
2
3
.
0
5
22.9
8
2
2
.
9
0
22.8
3
2
2
.
9
0
22.9
7
2
3
.
0
8
23.2
7
2
3
.
0
8
22.9
5
2
3
.
0
0
23.0
5
2
3
.
1
0
23.0
3
2
2
.
9
7
22.8
9
2
2
.
9
7
23.0
4
2
3
.
0
0
23.3
5
2
3
.
1
6
23.0
1
2
3
.
0
6
23.1
0
2
3
.
1
4
23.0
9
2
3
.
0
4
22.9
9
2
3
.
0
6
23.1
3
2
3
.
1
7
2
3
.
2
0
23.0
7
2
3
.
1
1
23.1
5
2
3
.
1
8
23.1
5
2
3
.
1
3
23.1
0
2
3
.
1
5
23.2
1
2
3
.
2
5
2
3
.
1
6
23.1
2
2
3
.
1
3
23.1
7
2
3
.
2
2
23.2
3
2
3
.
2
2
23.2
0
2
3
.
2
4
23.2
8
2
3
.
3
1
2
3
.
0
2
23.0
6
2
3
.
1
2
23.1
7
2
3
.
2
7
23.3
1
2
3
.
3
2
23.3
2
2
3
.
3
3
23.3
5
2
3
.
3
7
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
6
±
2
3
.
6
±
2
3
.
6
±
2
3
.
7
±
2
3
.
6
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
23.5
±
2
3
.
7
±
23.4±23.3
±23.2
±23.1
±23.0
±23.0
±22.9
±
22.9
±
23.0
±
23.0±23.1
±23.1
±23.1
±23.1
±23.2
±23.3
±23.3
±23.3
±23.3
±23.4±23.4
±23.2
±23.1
±22.8
±
22.8
±
2
2
.
8
±
2
3
.
0
±
2
3
.
1
±
2
3
.
1
±
2
3
.
3
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
23.4
±
23.3
9
23.3
3 23.28 23.2
3
23.1
7
23.1
2
23.0
2
22.9
6 22.9
1
22.86 22.8
0
22.8
4
22.8
8
23.2
7
23.3
±
START GRID
N=182932.69
E=1299021.95
44.50'
44.50'
100-YEAR FLOOD LINE
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C15
GR
A
D
I
N
G
P
L
A
N
-
W
I
N
D
S
O
C
K
AP
R
O
N
GENERAL NOTES
LEGEND:
EXISTING GRADE CONDITIONS
FINISHED GRADE CONDITIONS
ASPHALT PAVEMENT
RECONSTRUCTION
TAXIWAY OBJECT FREE AREA (TOFA)
FG ELEVATION
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
243 BUILDING
W. PERIMETER ROAD
DRIVE LANE
AIR
P
O
R
T
W
A
Y
EXISTING HANGAR
TWY
A
7
W. P
E
R
I
M
E
T
E
R
R
O
A
D
FC: 30.26
FC: 30.39
FC: 30.39
FC: 30.22
FC: 30.22
FC: 30.22
FC: 30.37
FC: 30.62
FC: 30.56
FC: 30.19
FC: 30.20
FC: 30.34
FC: 30.35
FC: 30.47
3
0
.
5
3
3
0
.
4
6
30.4
3
30.3
8
30.3
5
30.3
1
30.2
7
30.2
1
30.1
6
30.2
0
30.3
6
3
0
.
5
1
3
0
.
4
4
30.3
9
30.3
5
30.29
30.2
3
30.1
6
30.0
7
30.02
30.0
4
30.1
8
3
0
.
4
1
30.3
6
30.3
1
30.2
4
30.1
6
30.0
5
29.9
4
29.8
5
29.8
2
29.8
6
29.2
7
29.5
8
29.7
0
29.8
1
29.9
5
30.0
9
30.2
1
30.2
8
30.3
3
3
0
.
4
±
30.3
2
30.3
0
FC: 30.46
FC: 30.30
FC: 30.41
FC: 30.36
FC: 30.39
FC: 30.40
FC: 30.55
FC: 30.22
FC: 30.22
FC: 30.54
FC: 30.42
FC: 30.57
FC: 30.42
FC: 30.41
FC: 30.54
FC: 30.54
FC: 30.64
FC: 30.30
FC: 30.38
FC: 30.44
FC: 30.38
FC: 30.12
2
9
.
9
3
2
9
.
7
9
2
9
.
6
6
2
9
.
5
0
2
9
.
3
3
2
9
.
2
0
2
9
.
1
4
2
9
.
0
8
2
9
.
0
1
28.9
5
2
8
.
9
0
2
9
.
0
2
2
9
.
8
1
2
9
.
6
1
2
9
.
4
4
2
9
.
2
6
2
9
.
0
7
2
8
.
9
3
2
8
.
8
7
2
8
.
8
1
2
8
.
7
4
2
8
.
6
8
2
8
.
6
3
2
8
.
7
1
29.6
7
29.4
2
29.2
2
29.02
28.8
1
28.6
5
28.6
0
28.5
4
28.4
7
28.4
0
28.3
5
28.4
4
29.5
9
29.3
4
29.1
4
28.9
4
28.7
3
28.5
7
28.5
3
28.4
7
28.3
9
28.3
2
28.2
8
28.3
7
29.5
5
29.3
3
29.14
28.9
5
28.7
6
28.6
3
28.5
7
28.5
1
28.4
5
28.39
28.3
6
28.4
0
29.4
9
29.3
0
29.13
28.9
6
28.7
8
28.6
9
28.6
3
28.5
8
28.5
2
28.4
6
28.4
2
28.4
1
29.3
9
29.2
0
29.0
2
28.8
7
28.7
5
28.7
3
28.7
1
28.6
7
28.64
28.5
9
28.5
4
28.4
8
29.2
7
29.0
5
28.8
8
28.80
28.8
0
28.8
0
28.7
9
28.7
7
28.76
28.7
4
28.6
9
28.6
1
29.1
±
28.9
±
28.9
±
28.9
±
28.9
±
28.9
±
28.9
±
28.9
±
28.9
±
28.9
±
28.8
±
28.8
±
2
9
.
0
0
28.7
3
28.6
1
28.5
8
28.57 28.47 28.5
1
28.5
6
28.6
±
29.87
28.9
0 28.85 28.86 28.8
5
28.8
0
30.2
1
TAXIWAY A
28.9
±
28.9
±
28.9
±
28.9
±
28.8
±
28.8
±
28.6
±28.7
±
28.9
8
29.1
±29.3±
2
8
.
9
±
28.7
9
28.7
±
28.7
±
28.8
±
2
9
.
3
±
2
9
.
5
±
2
9
.
6
±
2
9
.
8
±
2
9
.
8
±
2
9
.
9
±
28.7
±
2
9
.
1
±
2
9
.
5
±
2
9
.
5
±
2
9
.
9
±
3
0
.
1
±
29.8
±
2
9
.
2
±
2
9
.
4
6
2
9
.
4
7
29.6
6
29.7
2
2
9
.
8
3
29.8
1
30.4
±
30.5
±
30.5
±
30.4
±
30.4
±
30.4±
30.4
±
30.3
±
30.3
±
30.4
±
3
0
.
5
±
3
0
.
5
±
3
0
.
6
±
3
0
.
4
±
3
0
.
3
±
3
0
.
4
±
3
0
.
6
±
3
0
.
3
±
30.5
±
3
0
.
6
±
30.7
±
30.5
±
3
0
.
5
±
3
0
.
2
±
30.5
±
3
0
.
1
3
3
0
.
1
1
3
0
.
1
5
3
0
.
1
9
3
0
.
2
3
3
0
.
2
5
3
0
.
2
9
3
0
.
3
1
3
0
.
3
8
3
0
.
3
4
3
0
.
3
3
3
0
.
3
4
3
0
.
3
6
3
0
.
3
7
30.5
±
30.5±
30.5
±
30.4
±
30.4
±
30.4
±
30.4
±
30.5
±
30.4
±
FC: 30.39
3
0
.
0
6
2
9
.
9
4
2
9
.
8
7
2
9
.
9
4
3
0
.
0
0
3
0
.
0
6
3
0
.
1
3
3
0
.
4
4
30.3
5
30.25
30.1
8
30.2
0
30.2
3
30.2
7
FC: 30.52
3
0
.
4
±
3
0
.
5
±
3
0
.
5
±
3
0
.
5
±
3
0
.
8
±
3
0
.
1
±
29.9
±
2
9
.
7
7
3
0
.
6
±
3
0
.
2
±
30.1
5
3
0
.
1
1
30.0
5
3
0
.
1
5
29.8
9
29.7
3
29.5
8
2
9
.
4
0
2
9
.
2
3
3
0
.
0
±
2
9
.
2
±
3
0
.
0
±
3
0
.
1
±
3
0
.
3
±
3
0
.
7
±
3
0
.
7
±
3
0
.
7
±
3
0
.
7
±
3
0
.
7
±
3
0
.
6
±
3
0
.
6
±
28.8
0
28.7
8
28.8
2
28.86
28.7
428.7
3
28.6
9
28.6
428.6
3
28.5
3
28.4
7
28.4
3
28.3328.3
1
3
0
.
0
8
3
0
.
0
1
29.9
330.0
5
28.98
28.4
8
28.3
9
28.4
9
28.3
6
28.2
4
28.3
0
28.3
7
28.4
4
28.5
1
28.5
4
28.7
2
28.9
3
29.1
5
29.3
5
29.6
2
29.9
0
14'
TYP
14
'
TY
P
2
9
.
9
±
2'
15'
TYP
15'
TYP
START GRID
N=180196.38
E=1298454.88
START GRID
N=180359.59
E=1298346.30
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C16
GR
A
D
I
N
G
P
L
A
N
-
B
U
I
L
D
I
N
G
2
4
3
A
P
R
O
N
&
PA
R
K
I
N
G
L
O
T
GENERAL NOTES
LEGEND:
EXISTING GRADE CONDITIONS
FINISHED GRADE CONDITIONS
ASPHALT PAVEMENT
RECONSTRUCTION
TAXIWAY OBJECT FREE AREA (TOFA)
FG ELEVATION
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
243
BLDG
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
10+00
11
+
0
0
11+4
0
1 SSMH #1
N=180235.13
E=1298418.71
1 SSMH #2
N=180251.91
E=1298400.80
2 24.5LF
@ 0.5%
2 78.3LF
@ 0.5%
4
20
25
30
35
20
25
30
35
10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+4011+40
6" PVC 3034 SDR35
24.5LF @0.50%6" PVC 3034 SDR35 78.3LF @0.50%
SSMH #1
STD PLAN 400.1
RIM = 29.94
INV IN (SW) = 27.37
INV OUT (NW) = 24.52
SSMH #2
STD PLAN 400.1
RIM = 28.97
INV IN (SE) = 24.40
INV OUT (W) = 24.30
EX SSMH
RIM = 28.55
INV IN (E) = 23.91
INV OUT (N) = 23.81
STORM CROSSING
1.5' MIN
FINISHED GRADE
EXISTING GRADE
243
BUILDING
EXISTING 6" D.I. SIDE SEWER
FOUNDATION
243
BUILDING
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C17
SA
N
T
I
A
R
Y
S
E
W
E
R
P
L
A
N
&
PR
O
F
I
L
E
SANITARY SEWER CONSTRUCTION NOTES:
1.INSTALL 48" SANITARY SEWEER MANHOLE. SEE
PROFILE ON THIS SHEET FOR STRUCTURE
INFORMATION. SEE COR STD DTL 400.1.
2.INSTALL 6" SANITARY SEWER LATERAL. SEE
PROFILE VIEW FOR PIPE INFORMATION.
3.CORE DRILL AND CONNECT TO EXISTING SANITARY
SEWER MANHOLE. SEE DTL ON SHEET C21.
4.CONNECT EXISTING SANITARY SEWR LATERAL TO
PROPOSED MANHOLE.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
EXISTING SANITARY SEWER LINE
EXISTING SANITARY SEWER MANHOLE
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY SEWER MANHOLE
SANITARY SEWER EXTENSION - PLAN VIEW
SANITARY SEWER EXTENSION - PROFILE VIEW
3
#
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
TAXIWAY B
BLDG 749B
BLDG 749A
TWY
B
4
T
W
Y
B
5
E. PERIMETE
R
R
O
A
D
PROPERTY L
I
N
E
31.60'31.60'
44.50'
44.50'
31.60'31.60'31.60'31.60'
TIEDOWN
N=182611.31
E=1299207.48
TIEDOWN
N=182607.47
E=1299161.64
TIEDOWN
N=182603.63
E=1299115.81
TIEDOWN
N=182599.79
E=1299069.97
TIEDOWN
N=182680.70
E=1299063.18
TIEDOWN
N=182684.54
E=1299109.02
TIEDOWN
N=182688.38
E=1299154.86
TIEDOWN
N=182692.23
E=1299200.70
TIEDOWN
N=182723.40
E=1299175.01
TIEDOWN
N=182719.56
E=1299129.17
TIEDOWN
N=182715.71
E=1299083.33
TIEDOWN
N=182794.70
E=1299053.63
TIEDOWN
N=182829.71
E=1299073.77
TIEDOWN
N=182798.54
E=1299099.47
TIEDOWN
N=182833.56
E=1299119.61
TIEDOWNN=182802.38E=1299145.31
TIEDOWN
N=182837.40
E=1299165.45
TIEDOWN
N=182806.23
E=1299191.15
TIEDOWNN=182920.23E=1299181.59
TIEDOWN
N=182916.38
E=1299135.75
TIEDOWN
N=182912.54
E=1299089.91
TIEDOWN
N=182908.70
E=1299044.07
START 6" YELLOW ℄
N=182653.69
E=1299227.01
START 6" YELLOW ℄
N=182767.69
E=1299217.46
START 6" YELLOW ℄
N=182881.69
E=1299207.90
END NON-MOVEMENT AREA MARKING
N=182932.47
E=1299022.10
START NON-MOVEMENT AREA MARKING
N=182576.20
E=1299052.03
N85°12'31"E
211.70'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=45°39'49"
R=19.00'
L=15.14'
S39°32'42"W
9.27'
N85°12'34"E
206.43'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
N85°12'34"E
206.52'
Δ=90°00'00"
R=19.00'
L=29.85'
S4°47'29"E
357.53'
51.20'51.20'
GRADE BREAK
N=182585.92
E=1299157.92
GRADE BREAK
N=182941.19
E=1299126.20
46.00'
TYP
46
.
0
0
'
TY
P
46
.
0
0
'
TY
P
46
.
0
0
'
TY
P
CEDAR RIVE
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C18
SI
T
E
A
N
D
S
T
R
I
P
I
N
G
P
L
A
N
-
WI
N
D
S
O
C
K
A
P
R
O
N
SITE PLAN AND MARKING NOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP).
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22.
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP).
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101.
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21.
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22 .
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22.
10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
GRADE BRAKE
FLOODWAY
100-YEAR FLOOD LINE
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
62.00'
AI
R
P
O
R
T
W
A
Y
243
BLDG
DRIVE LAN
E
EXISTING
HANGAR
TW
Y
A
7
TAXIWA
Y
A
W. PERIMETER ROAD
PR
O
P
E
R
T
Y
L
I
N
E
W.
P
E
R
I
M
E
T
E
R
R
O
A
D
TIEDOWN
N=180286.16
E=1298517.67
TIEDOWN
N=180282.18
E=1298471.85
TIEDOWN
N=180278.19
E=1298426.02
TIEDOWN
N=180274.21
E=1298380.19
START
N=180320.24
E=1298349.72
N85°01'48"E
211.34'
Δ=43°52'08"
R=19.00'
L=14.55'
N41°09'40"E
65.39'
Δ=85°39'49"
R=19.00'
L=28.41'
14.25'
START 4" WHITE EDGE LINE
N=180159.13
E=1298651.03
START 4" WHITE EDGE LINE
N=180126.90
E=1298655.14
END 4" WHITE EDGE LINE
N=180379.50
E=1298535.00
END 4" WHITE EDGE LINE
N=180375.26
E=1298514.85
20.00'
TYP
15.00'
TYP
25.00'
TYP
END 4" DASHED WHITE ℄
N=180371.67
E=1298526.24
START 4" DASHED WHITE ℄
N=180175.23
E=1298623.52
46.00'
TYP
GRADE BREAK
N=180151.26
E=1298454.84
GRADE BREAK
N=180167.15
E=1298468.92
GRADE BREAK
N=180145.12
E=1298595.75
GRADE BREAK
N=180162.02
E=1298586.67
GRADE BREAK
N=180286.64
E=1298382.88
GRADE BREAKN=180281.18E=1298356.50
GRADE BREAK
N=180247.43
E=1298349.24
GRADE BREAK
N=180282.84
E=1298363.34
GRADE BREAK
N=180297.16
E=1298540.26
GRADE BREAK
N=180373.03
E=1298500.79
10.00
'
TYP
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22C19
SI
T
E
A
N
D
S
T
R
I
P
I
N
G
P
L
A
N
-
B
U
I
L
D
N
G
2
4
3
AP
R
O
N
&
P
A
R
K
I
N
G
L
O
T
SITE PLAN AND MARKING NOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP).
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22.
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP).
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101.
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21.
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22 .
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22.
10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
GRADE BRAKE
FLOODWAY
R15.00'
R2.50'
R1.25'
R10.00'
R4.00'
R3.50'
R84.75'
R20.00'
R2.00'
R301.10'
R1.00'
R35.00'
R1.00'
R1.00'
R2.50'
RELOCATE AND REUSE
EXISTING V7 VEHICLE GATE AND
ALL ASSOCIATED APPARATUES
PEDESTRIAN
GATE P10
PROPOSED SANITARY
SEWER EXTENSION
SEE SHEET C17
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
TY
P
I
C
A
L
S
E
C
T
I
O
N
S
C20
CONSTRUCTION NOTES
KEY NOTES
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
CI
V
I
L
D
E
T
A
I
L
S
C21
CONSTRUCTION NOTES:
AIRCRAFT MOORING EYE NOTES
PLAN VIEW SECTION A-A SECTION B-B
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
RE
N
T
O
N
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
(
R
N
T
)
-
R
E
N
T
O
N
,
W
A
WW
W
.
D
O
W
L
.
C
O
M
WI
N
D
S
O
C
K
&
2
4
3
B
L
D
G
.
G
A
A
P
R
O
N
&
P
A
R
K
I
N
G
L
O
T
R
E
H
A
B
I
L
I
T
A
T
I
O
N
22
MA
R
K
I
N
G
D
E
T
A
I
L
S
C22
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
ATTACHMENT 24: HABITAT
DATA REPORT
Attachment B
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
425-869-2670 ■ 15325 SE 30th Place, Suite 300 ■ Bellevue, Washington 98007 ■ www.dowl.com
Critical Areas Found on the Site
The City of Renton critical area maps show that the entire Renton Municipal Airport
property is within a Zone 2 Aquifer Protection Area. The City of Renton Flood Hazard
Map shows the entire Renton Municipal Airport property is mapped as within a FEMA
Flood Zone X – Non-Regulatory. Flood Zone X indicates an area with moderate to low
risk for floods.
There are no other critical areas mapped within the Renton Municipal Airport property.
However, the Cedar River, a Shoreline of the State, is immediately adjacent to the
eastern property boundary. The proposed project is entirely outside of the floodway and
floodplain.
Habitat Found on the Site
The Renton Municipal Airport contains little to no habitat features. The site is
predominately paved areas, with mowed grasses. The airport site contains numerous
buildings and structures used for aviation facilities and operations.
Disturbed Areas
The entire airport property is disturbed, and a significant portion of the property is
paved.
Species Associated with Cover Type
The vegetative cover type is predominately mowed grasses which would provide limited
habitat for small mammals and city birds including crows and starlings.
Critical Wildlife Species
A review of Washington Department of Fish and Wildlife (WDFW) Priority Habitats and
Species (PHS) map tool showed there are no priority wildlife species present on the
airport property.
However, the Cedar River, adjacent to the airport property, contains the following
priority fish species: sockeye (Oncorhynchus nerka), coho (Onchorhynchus kisutch),
Chinook (Oncorhynchus tshawytscha), cutthroat trout (Oncorhyncus clarkii), kokanee
(Oncorhyncus nerka), steelhead (Oncorhyncus mykiss), Dolly Varden (Salvelinus
malma), and bull trout (Salvelinus confluentus).
Migration or Movement Corridors
The Renton Municipal Airport is within the Pacific flyway, a major migrating corridor for
birds in North America west of the continental divide. However, the project site itself is
DATE: July 22, 2024
APPLICANT: William Adams, Renton Municipal Airport
616 West Perimeter Road, Renton WA 98057
(206) 775 6862
wadams@rentonwa.gov
SUBJECT: Renton Aprons – Habitat Data Report Narrative and Critical Areas Study
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
MEMORANDUM
Page 2 of 3
not a known congregation point for migrating birds. Additionally, the Cedar River is an
important migration corridor for salmonid species.
Existing Habitat Functions and Values
The Renton Municipal Airport provides little to no habitat functions or values. The site is
so disturbed and dominated by urban development that the site provides little to no
benefit to wildlife species.
Impacts and Proposed Habitat Alterations
The proposed project will result in removal of approximately 3,900 square feet of grass
at the Building 243 project site. The site will be revegetated with several landscape
island which will include small trees and shrubs.
A habitat management program is not proposed because the project will not result in
any permanent habitat impacts.
Endangered Species Act Compliance
There are no Endangered Species Act listed species present on the airport site. There
are listed fish species documented in the Cedar River. The project does not include any
work that would result in impacts to the Cedar River and therefore, would not impact
any listed fish species.
Best Management Practices
A Temporary Erosion and Sediment Control Plan (TESC) and Stormwater Pollution
Prevention Plan (SWPPP) were developed for this site to provide temporary sediment
control measures while construction is ongoing. Temporary erosion control measures
will be in place during construction to minimize impacts.
Maintenance, Monitoring and Contingency Plans
No maintenance, monitoring or contingency plans are proposed because the project will
not impact any critical areas. No mitigation is proposed.
Accuracy and Best Available Science
The accuracy of this narrative is based on the accuracy of the available sources that
were reviewed in July 2024.
The project area incorporated the use of best available science by reviewing the
following sources:
• City of Renton Aquifer Protection, Coal Mine Hazard, Erosion Hazard, Flood
Hazard, Landslide Hazard and Steep Slopes Sensitive Areas Maps (2022)
• King County iMap layers for Environmentally Sensitive Areas, Flooding Info,
Hydrography and Hydrology, Landslides, Stormwater Services and Elevation
Contours
• Google Earth Satellite Imagery dated April 13, 2024
• Washington Department of Fish and Wildlife Priority Habitat and Species Map
Tool
• Northwest Indian Fisheries Statewide Integrated Fish Distribution online map tool
• U.S. Fish and Wildlife Service National Wetland Inventory Wetlands Mapper
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
MEMORANDUM
Page 3 of 3
Qualifications of Preparers
This report was prepared on July 11, 2024, by Michelle Brownell and reviewed by
Theresa Dutchuk. Michelle has a B.S. in Wildlife Ecology and over 5 years of
experience as an environmental consultant. Theresa has 15 years of NEPA and
environmental compliance experience. No field work was conducted to complete this
evaluation.
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
ATTACHMENT 20: STANDARD
STREAM OR LAKE STUDY
Attachment D
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
425-869-2670 ■ 15325 SE 30th Place, Suite 300 ■ Bellevue, Washington 98007 ■ www.dowl.com
Stream Classification
The Windsock Apron is adjacent to (within 200 feet of) the Cedar River and its floodplain area.
The Cedar River is classified as a Shoreline of the State by Renton Municipal Code (RMC) 4-3-
090. This project is entirely outside of and will not interact with the floodplain area.
Vegetative Cover
The Windsock Apron project area is entirely covered with pavement. The surrounding
areas to the south and west are mowed grasses. There is a narrow strip of grass to the
east and then a fence. Outside of the fence, there is a narrow strip of riparian vegetation
including trees and shrubs.
The proposal will not impact any vegetation in the vicinity of the Cedar River.
Ecological Functions
Overall, the reach of the Cedar River that flows through Renton has limited ecological functions
due to urban development. Access to the floodplain is limited and the channel has been
straightened. Trees and shrubs along the bank provide shading and nutrient input. However, the
riparian corridor is limited due to adjacent development.
The Cedar River provides instream habitat for salmonid species and prey species including
sculpin and lamprey. The Cedar River serves as an important migration corridor, as it outlets to
Lake Washington which outlets to the Puget Sound.
The proposal will not result in any impacts to the ecological functions provided by the Cedar
River.
Fish and Wildlife Use
The Cedar River provides habitat for resident and migratory salmonid species including sockeye
(Oncorhynchus nerka), coho (Onchorhynchus kisutch), Chinook (Oncorhynchus tshawytscha),
cutthroat trout (Oncorhyncus clarki), kokanee (Oncorhyncus nerka), steelhead (Oncorhyncus
mykiss), Dolly Varden (Salvelinus malma), and bull trout (Salvelinus confluentus). Other
documented fish species in the Lower Cedar River watershed include mountain whitefish
(Prosopium williamsoni), northern squawfish (Ptchochelius oregonensis), several species of
sculpin (Cottus sp.) and western brook lamprey (Lampetra richardsoni).
Observations on e-Bird for the Renton-Cedar River Trail (on the east side of the river, opposite
from the Renton Municipal Airport) included typical urban species including American crow,
European starling, Canada goose, mallard, dark-eyed junco, song sparrow, spotted towhee,
red-winged blackbird, American goldfinch. Waterfowl (including western grebe, ring-billed gull,
double-crested cormorant, red-breasted merganser, and various species of ducks) and raptors
(osprey, bald eagle and Cooper’s hawk) were also reported. There are no known nests or
feeding/foraging areas in the vicinity of the project area.
The proposal will not impact fish or wildlife species. Construction activities may result in
temporary noise impacts which may result in bird species temporarily avoiding the project area.
DATE: July 22, 2024
SUBJECT: Renton Aprons – Stream Assessment Narrative
Docusign Envelope ID: 2C143584-6B9F-4851-9A1A-D15703AE458C
MEMORANDUM
Page 2 of 2
However, the project is in an urban area and species in this area are already subject to noise
from urban and aviation activities. Therefore, construction noise is not anticipated to result in
any significant disturbance to any species.
Tree Protection Measures
The project does not include any tree removal. Therefore, no tree protection measures are
required.
No Net Loss of Ecological Functions
The project will not alter the existing conditions and will not result in any impacts to the Cedar
River. Therefore, the project will not result in any loss of ecological functions and is compliant
with the No Net Loss requirements described in RMC 4-3-090D2.