HomeMy WebLinkAboutOhno - Touchdown JV Bid Submitted By: I 7 2 p►"'' f I Z ` 2
Ohno-Touchdown JV
c/o 9416 Martin Luther King Jr. Way S. F. A-
Seattle, WA 98118
P: 206-325-1529 — F: 206-324-8063 CITY OF RENTON
E: estimating@ohnoconstruction.com
NOV 2 6 2024
RECEIVED
CITY CLERK'S OFFICE
Sealed Bid Enclosed
City of Renton
Renton City Hall — Office of the City Clerk — Lobby
1055 Grady Way
Renton, WA 98057
PROJECT: TALBOT HILL RESERVOIR PARK IMPROVEMENTS
Due Date: Tues., Nov 26, 2024
Due Time: Before 1:30PM
CIZil
Bid Submitted By: ( r 2.2 p (I/ Z
Ohno-Touchdown JV
c/o 9416 Martin Luther King Jr. Way S. F. A-
Seattle, WA 98118
P: 206-325-1529 — F: 206-324-8063
E: estimating@ohnoconstruction.com CITY OF RENTON
NOV 2 6 2024 /
RECEIVED
CITY CLERK'S OFFICE
Sealed Bid Enclosed
City of Renton
Renton City Hall — Office of the City Clerk — Lobby
1055 Grady Way
Renton, WA 98057
PROJECT: TALBOT HILL RESERVOIR PARK IMPROVEMENTS
Due Date: Tues., Nov 26, 2024
Due Time: Before 1:30PM
DIVISION 00 — CONTRACTING REQUIREMENTS
TALBOT HILL RESERVOIR PARK IMPROVEMENTS
Section 00 20 00 — Bidder's Qualification Statement
PART 1 —GENERAL
1.1 SECTION INCLUDES
A. Each Bidder submitting a Bid on Work included in these Contract Documents shall provide
as part of this Bid, the following information.
�. Name of Bidder: Ohno-Touchdown JV
2. Business Address: 9416 Martin Luther King Jr. Way S., Seattle, WA 98118
3. Telephone: 206-325-1529
4. How many years has said Bidder been engaged in the contracting business under the
present firm name? 6
5. Contracts now in hand (gross amount): $ 6,029,524
6. Experience with similar projects: at least three (3)projects accomplished within the last
five (5)years in which the Bidder constructed comparable projects of similar scope of
Work and value. Include the name, telephone number and email address of the Owner
or Owner's Representative responsible for the project. Describe how the project met
customer satisfaction. The City of Renton will discuss performance with the named
references. This information to be submitted with the Bid Form.
a. Provide FORM E—Contractor Qualifications,per Section 00 80 00 FORMS.
7. Provide a resume for the Project Manager, Superintendent, Foreman, and other key
personnel that will be assigned and committed to this Project. This information to be
Completed by Apparent Low Bidder Within 48 hours following Bid Submittal:Assigned
Key Personnel:
a. Provide FORM F—Qualifications of Project Key Personnel,per Section 00 80 00
FORMS.
PART 2—NOT USED.
PART 3—NOT USED.
END OF SECTION
Contract No.CAG-24-229 00 20 00-1
Talbot Hill Reservoir Park Improvements October 29,2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
TALBOT HILL RESERVOIR PARK IMPROVEMENTS
Section 00 42 10 — Bid Submittal Checklist
1.1 FORMS BELOW MUST BE TIMELY SUBMITTED FOR A BID TO BE CONSIDERED
RESPONSIVE:
1 . FORM A- BID FORM, includes CERTIFICATION OF COMPLIANCE WITH PREVAILING
WAGE PAYMENT STATUTE and NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF
ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT
2. FORM B- PROPOSAL BID BOND
3. FORM C- LIST OF SUBCONTRACTORS, PART ONE (SUBMISSION OF PLUMBING
AND ELECTRICAL SUBCONTRACTORS)
4. FORM D—LIST OF SUBCONTRACTORS, PART TWO (SUBMISSION OF STRUCTURAL
STEEL SUBCONTRACTORS)
5. FORM E—CONTRACTOR QUALIFICATIONS/EVALUATION
6. FORM F—QUALIFICATIONS OF PROJECT KEY PERSONNEL
7. FORM G—CONTRACT BOND FORM
1.2 Confirm Items Below Are Complete At Time of Bid Submission:
1. Have you included costs for Base Bid, and each of the Alternates(if any)as listed on the Bid
Form?
2. Do written amounts in the Bid Form agree with amounts shown in figures?
3. Have you certified receipt of addenda?
4. Has the Bid Form been properly signed?
5. Have you completed the Deposit or Contract Bond Form?
6. Has a Bid Bond or certified check been enclosed with your Bid?
7. Is the amount of the Bid Bond at least 5%of the total amount of the Base Bid amount?
8. Are Form A, Form B, and Form E listed above included in a sealed and properly endorsed
envelope?
1.3 Form To Be Completed Within 1 hour of Bid Submission:
1. Form C—List of Subcontractors, Part One (Submission of Plumbing, and Electrical
Subcontractors)
1.4 Form To Be Completed Within 48 hours of Bid Submission:
1. Form D—List of Subcontractors, Part Two (Submission of Structural Steel Subcontractors)
1.5 Forms To Be Completed By Apparent Low Bidder Within 2 Business Days of Notice by
Owner of Apparent Low Bid:
1. Form F—Qualifications of Key Personnel
END OF SECTION
Contract No.CAG-24-229 00 42 10-1
Talbot Hill Reservoir Park Improvements October 29,2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
DIVISION 00 —CONTRACTING REQUIREMENTS
TALBOT HILL RESERVOIR PARK IMPROVEMENTS
SECTION 00 80 00 - Forms
1.1 Submit With Bid
1 . Form A — Bid Form
2. Form B — Proposal Bid Bond
3. Form E — Contractor Qualifications/Evaluation
1.2 Forms Required Only if Bid is $1,000,000 or More:
1 . To Be Submitted Within 1 Hour of Bid Submission:
Form C — List of Subcontractors, Part One (Submission of HVAC, Plumbing
and Electrical Subcontractors)
2. To Be Submitted Within 48 hours of Bid Submission:
Form D — List of Subcontractors, Part Two (Submission of Structural Steel and
Rebar Subcontractors)
1.3 Forms to be Completed by Apparent Low Bidder Within 48 hours following Bid
Submittal:
1 . Form F— Qualifications of Key Personnel
1.4 Submit With Executed Agreement Between Owner and Contractor:
1 . Form G — 100% Contract and Performance Bond Form
2. Required Insurance Certificates
END OF SECTION
Contract No.CAG-24-229 00 80 DO-1
Talbot Hill Reservoir Park Improvements October 29,2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
CITY OF RENTON
HAND DELIVER TO: OFFICE OF THE CITY CLERK
RENTON CITY HALL— LOBBY
1055 S. GRADY WAY, RENTON, WA, 98057
BID FORM
for the
TALBOT HILL RESERVOIR PARK IMPROVEMENTS
CAG-24-229
Bids Due: 1:30 PM PST November 26, 2024
Bidder's Name: Ohno-Touchdown JV
Address: 9416 Martin Luther King Jr. Way S., Seattle, WA 98118
Telephone: 206-325-1529
(MUST BE COMPLETED AND SIGNED)
Having carefully examined the Bidding Documents and Instructions to Bidders, the Project site and
conditions affecting the Work, and all Addenda, the undersigned Bidder certifies that: (I) it has the
personnel and means to complete the Work and (ii) it will furnish all labor, materials,equipment, and
management to perform all Work required by,and in strict accordance with, the above-named documents
for the following sum within the time fixed. All Bid amounts shall include overhead, profit, bonds,
insurance, WA State Sales Tax (WSST) and any other expense required to complete the Work.
The undersigned Bidder certifies that it is, at the time of submitting the Bid, and shall remain throughout
the period of the Contract, licensed by the State of Washington to perform the type of work required
under the Contract Documents. It further certifies that it is skilled and regularly engaged in the general
class and type of work called for in the Contract Documents.
Talbot Hill Reservoir Park Improvements Bid Form
Page 1 of 9
Section 00 80 00— Bid Form
Revised — Addendum E November 22, 2024
A. BID SCHEDULE
Insert values for Unit Price (Dollars.Cents) and Total Price(Dollars.Cents) into Bid Table.
Measurement and payment descriptions for each item listed in the Schedule of Bid items are set forth in
Section 0120 00.
Approx. Unit Price Total Amount
Item No. Qty Unit Description of Item Dollars.Cents Dollars.Cents
Mobilization & Demobilization
(not to exceed 8%of Total Base VS OW,00 gc (1(0,CV
A-1 1 LS Bid)
A-2 1 LS Erosion&Sediment Control 30,OW•60 30. 000. 00
A-3 1 LS Demolition &Salvage I.5T,000„00 t"; oc d, cc
A-4 1 LS Clear&Grub IS; OW.00 iSj000 ,0a
Earthwork&Subgrade
A-5 1 LS Preparation SO/000,60 50/ 060 , a
A-6 25 TON Structural Fill 3 60,0U -7,s-00. 0o
A-7 1 EA ADA Parking Stall Sign w/ Footing ti <o, 00 t!Cc0 ,Od
A-8 71 TON Crushed Surfacing Top Course t cUt v v , G, tS0, Od
A-9 57 TON HMA Cl.3/8 IN. PG58H-22 4 60 , 0(6 761220,0d
A-10 1 LS Asphalt Parking Lot Crack Repair 2, 000.0 2r ow , d a
A-11 6900 SF Asphalt Parking Lot Sealant 0.9 0 2; 7 60.06
Cement Concrete Pavement w/
A-12 11 CY Reinforcing 2-/ i S`00 23/ -1 q
25. 0J
Reservoir Concrete Lid: Diamond f�
A-13 1 LS Grind &Drainage Joint Retrofit `U, 00.00 90i 000/0
A-14 240 LF Extruded Cement Concrete Curb 31 . 0 v 7, 440, 00
Asphalt Pavement 1 500,00 i SOG, U�
A-15 1 LS Markings&Striping
Sport Court Surfacing, Leveling, ; S 3 000.00 �S; (�, 00
A-16 1 LS Crack Repair, &Striping /
Replace Wood (Studs& Panels) &
A-17 1 LS Repaint Practice Wall I I)/ 000.,U0 13, 000 , 00
Fabric Shade Structure including
Engineering Plans/Calculations for -2d /1r�,1 OA �� uv J.D�
A-18 1 EA Building Permit i UW I
Fabric Shade Structure Four
Footings,Attachments,& 24;i000.0O ea OW,00
A-19 1 LS Reinforcing i
Talbot Hill Reservoir Park Improvements Bid Form
Page 2 of 9
Section 00 80 00 — Bid Form
Revised —Addendum E November 22, 2024
A-20 1 EA Bicycle Rack w/Attachments 3; 2-0J0 , 00 3,2,00 400
Two Removable Bollards w/Four A-21 1 LS Receivers /-7
1 S O 0 m o 71500 .0d
Chain Link Fence w/Sleeved Posts,
A-22 1 LS Gates,&Windscreen �i Ui� �i) �� �� ��
Drinking Fountain& Utilities (� ` ,
A-23 1 LS (Water&Sanitary Sewer) l /O0O,A Ib1UOd ,d0
A-24 1 EA Drinking Fountain 12,000.00 12/O60 .Oe
A-25 1 EA Trash Receptacle `i (40o, 00 060 .06
Six Moveable Pickleball Nets&
A-26 1 LS Nine Pickleball Paddle Racks HZ/000,00 42-/ 000•00
Planting (Sod, Soil, Mulch, l.� �1
A-27 1 LS Watering) 10 000,D 0 40, 000.00
A-28 255 LF 12" Depth Root Barrier 11.06 I-1,,(2 14S:Ot)
A-29 10 EA Boulders Installation g So. DO 9,SOO,00
Bench w/ Back,Wood Beam,& 1te50-, ,� �00 40 M0
A-30 4 EA Chain w/Pad Lock / t 50,0
Divider Net Structure, Nets,& n�1
A-31 2 EA Footings 19, NO.00 2g/ (0.00
Pedestrian Bridge—Shop
Fabricated Aluminum Structure V / 000`
including Engineering (), VV 6'6/000 00
Plans/Calculations for Building
A-32 1 LS Permit
Pedestrian Bridge—Four Concrete
Footings, One Headwall,&Two r��
00
Wingwalls,w/Attachments& i L�/0 '
A-33 1 LS Reinforcing
Plumbing,Traffic Control Plan,
Environmental Stormwater
Discharge, and other regulatory �/coo '�o �/S1�0 ' �6
A-34 1 LS permits as required
A-35 3 EA Tennis Court Nets yIs00.0O 13,700.o6
A-36 3 EA Pickleball Court Nets ► SC)0 '0 0 13, 500 .vb
Additional Work for Minor
A-37 1 LS Changes $65,000 $65,000
SUBTOTAL= $ I / 11 Li / 7610 . o 0
WA STATE SALESTAX (10.3%) = $ 1H / 2-3 . 37
Talbot Hill Reservoir Park Improvements Bid Form
Page 3 of 9
Section 00 80 00 — Bid Form
Revised —Addendum E November 22, 2024
TOTAL= $ Yi 2Z9 '
� ( 3�
B. BASE BID
The Bidderd agrees to complete the Work for this Project for the following Base Bid amount:
V 1 fn;11t0/1 I WC) `Vl1nJrtla Twtnf — Mini HI"�SG.�
y DOLLARS(words)
Z S 4..nd.'�,� fh;ri't€" Wks
$ ` Z� (J o H (4) —sev?1 CM+ S (numerals)
C. TRENCH EXCAVATION SAFETY PROVISIONS
The Base Bid amount includes any trench-excavation safety provisions required for compliance with
Chapter 39.04 RCW and Chapter 49.17 RCW,as applicable,and the amount included in the Base Bid
is: $ 500 e (X
D. SUBCONTRACTOR LISTING
If the project is expected to cost$1,000,000 or more,as required by RCW 39.30.060, every Bidder
must complete and provide the included Subcontractor listing forms (Forms C and D) in
accordance with the applicable timing requirements.
E. RECEIPT OF ADDENDA
Bidder acknowledges receipt of the following addenda:
Addendum No. A Addendum No. D
Addendum No. B Addendum No. E
Addendum No. C Addendum No.
All requirements therein are included in the appropriate Bid amount.
F. CONDITIONS OF PROPOSAL
1. Determination of Low Bidder:
a. The City of Renton (alternatively referred to as"Owner" or "City") reservesthe right
to award theContract for the Project based on the Contractor's Base Bid and any
selected Alternates(s), in whatever manner is in the City's best interest.
2. Overhead and Profit:
All of the above Bid Prices shall include overhead, profit, bonds, insurance, and any other
expense required to complete the Work.
G. PERIOD OF BID VALIDITY/ACCEPTANCE OF BID
The undersigned hereby agrees that this Bid shall be a valid and firm offering for the period of sixty
(60) days from the Bids Due date.
Within sixty (60) days from the Bids Due date, the City will act either to accept the Bid from the
lowest responsive and responsible Bidder, or to reject all Bids. The City reserves the right to
Talbot Hill Reservoir Park Improvements Bid Form
Page 4 of 9
Section 00 80 00— Bid Form
Revised —Addendum E November 22, 2024
request extensions of such Bid acceptance period.
The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract to the
Bidder whose Bid is under consideration for acceptance,together with a request to furnish a bond
(if required), evidence of required insurance to execute the Agreement set forth in the Contract
Documents,and other designated documents.
H. EXECUTION OF CONTRACT
If the written Notice of Intent to Award Contract is mailed,telegraphed,or delivered via facsimile
to the undersigned within the period of Bid validity noted above, or any time thereafter before
this Bid is withdrawn,the undersigned will,within ten(10)days after the date of such notification,
execute the City of Renton Standard Form of Agreement Between Owner and Contractor where
the basis of payment is a Stipulated Sum ("Agreement")set forth in the Contract Documents.
I. TIME FOR COMPLETION
Substantial Completion-The undersigned hereby agrees to Substantially Complete all the Work
under the Base Bid (and accepted Alternates)no later than May 23,2025, following Notice to
Proceed.
Notice to Proceed—Anticipated date for Notice to Proceed is January 6, 2025.
Final Completion—All the Work shall achieve Final Completion in accordance with the Contract
Documents within 30 calendar days after the date of Substantial Completion.
J. LIQUIDATED DAMAGES
The undersigned agrees to pay the Owner as liquidated damages the sum of$750.00 for each
calendar day beyond the date upon which Substantial Completion of the entire Work is required
to be complete until Substantial Completion is achieved, in accordance with the Contract
Documents.
K. BID SECURITY (As per the Bidding Documents)
If applicable, Bid Security must be submitted with the Bid Form.
L. BID FORM ATTACHMENTS TO BE COMPLETED WITH BID FORM
The following document is attached to the Bid Form and must be executed by the Contractor in
connection with the Bid From for it to be complete:
• Attachment 1—Non-Collusion,Anti-Trust and Minimum Wage Affidavit
M. ACKNOWLEDGMENT
The undersigned acknowledges that it has read, understands, and agrees to comply with all
federal and state non-discrimination laws,regulations,and policies during the performance of the
Work.
Talbot Hill Reservoir Park Improvements Bid Form
Page 5of9
Section 00 80 00 — Bid Form
Revised — Addendum E November 22, 2024
Legal Name of Person or Entity§u., itti, : Ohno-Touchdown JV
NOTE:If Bidder is a corporation,write, of Inc po ro ,if a partnership,give full names and addresses of all parties below.
Authorized Signatory: Title: Manager
Printed Name: Michio Ma us Ohno
Address: 9416 M Luther King Jr. Way S.
City: Seattle State: WA Zip Code: 98118 Date: 11/26/24
Telephone: 206-325-1529 Fax: 206-324-8063
Washington Contractor's License No.: OHNOTJ*825CE Federal Tax ID#: 82-425-7756
E-mail address: estimatingAohnoconstruction.com
Washington State UBI No.: 604-208-782 Expiration Date: UBI: 01/31/2025 -WA Lic: 02/05/2026
,,'‘�-cOVCHOp'',,,
:SEAL.
Fsr. 20��••'�
`'%'1,S °HIN6\�,•.`
Talbot Hill Reservoir Park Improvements Bid Form
Page 6 of 9
Section 00 80 00 — Bid Form
Revised —Addendum E November 22, 2024
CERTIFICATION OF COMPLIANCE WITH PREVAILING WAGE PAYMENT STATUTES
The undersigned Bidder hereby certifies, under the penalty of perjury, that within the three-
year period immediately preceding the Bid Submission date, the Bidder has not been
determined by a final and binding citation and notice of assessment issued by the
Department of Labor and Industries, or through a civil judgment entered by a court of
limited or general jurisdiction,to have willfully violated, as defined in RCW 49.48.082, any
provision of chapters 49.46, 49.48, or 49.52 RCW.
I certify under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
Ohno such.. n dV
Legal ,(17• e of�,' or Entity Submitting Bid
Signature of Authorized Official*
chit Marcus Ohno
Pr'd Name
Manager
Title
Nov. 26, 2024 Seattle WA
Date City State
Check One:
Sole Proprietorship ❑Partnership Joint Venture fEiCorporation ❑ LLC ❑
State of Incorporation, or if not a corporation, State where business entity was formed:
N/A
If a co-partnership, give firm name under which business is transacted:
if a corporation,proposal must be executed in the corporate name by the president or vice-president
(or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership,
proposal must be executed by a partner.
lllll
�GUCHO -,
'o/ 0FFIC/4 4-%
SEAL
.9 20�8.
`''%9SN1NG ....
Talbot Hill Reservoir Park Improvements Bid Form
Page 7 of 9
Section 00 80 00— Bid Form
Revised —Addendum E November 22, 2024
Bid Form—Attachment 1
This form must be submitted with the Bid Form
NON-COLLUSION AFFIDAVIT
The undersigned, having been duly sworn,deposes and says,that he/she is the identical person who
submitted the forgoing Bid,and that such Bid is genuine and not sham or collusive or made in the
interest or on behalf of any person not therein named,and further,that the deponent has not directly
induced or solicited any other Bidder on the foregoing Work or equipment to put in a sham Bid,or any
other person or corporation to refrain from Bidding, and that deponent has not in any manner sought by
collusion to secure to himself or to any other person any advantage over the other Bidder or Bidders.
AND
CERTIFICATION RE:ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER
The City of Renton ("City") and Bidder recognize that in actual economic practice overcharges resulting
from anti-trust violations are in fact usually borne by the Bidder. Therefore,the Bidder hereby assigns
to the City any and all claims for such overcharges as to goods and materials purchased in connection
with this Contract, except as to overcharges resulting from anti-trust violations commencing after the
date of the bid,quotation,or other event establishing the price under this Contract. In addition,the
Bidder warrants and represents that such of his suppliers and subcontractors shall assign any and all
such claims to the City,subject to the aforementioned exception.
AND
MINIMUM WAGE AFFIDAVIT FORM
The undersigned, having been duly sworn,deposed,says and certif that in connection with the
performance of the Work of this Project, (a) I will pay each classification of laborer,workman,or
mechanic employed in the performance of such Work; not less than the prevailing rate of wage or not
less than the minimum rate of wages as specified in the principal Contract and (b) that I have read the
above and foregoing statement and certificate, know the contents thereof and the substance as set
forth therein is true to my knowledge and belief.
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Bid Form—Attachment 1
Page 8 of 9
Section 00 80 00— Bid Form
Revised — Addendum E November 22, 2024
FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND
MINIMUM WAGE AFFIDAVIT
Ohnq- ouchdo
Legal N` e of Per .► . - Entity Submitting Bid
f,
Si nat ,re of °uthorized Official*
chio arcus Ohno
Pri ted ame
Manager
Title
Nov. 26, 2024 Seattle WA
Date City State
Subscribed and sworn to before me on this 26th day of November , 20 24 ,
End of Bid Form „,,,,• OUCHO�,,-,,,,
os,•`'OFFICIq�' ,G:
SEAL
, .. Sr. 20N�.. '
•,I t
SHING
Talbot Hill Reservoir Park Improvements Bid Form—Attachment 1
Page 9 of 9
Subscribed and sworn to before me this 26th day of Nov., 20 24.
Notary Public in and for the
State of Washington
\\\���"1j`I Residing at 9416 ML King Jr Way S.
`s���P�NE AGE ii�� Seattle, WA 98118
01 A 4/i e
TA i My Commission Expires: 05-14-2026
� �
;a �o Ryp"�
147995 `"%
N /i '°U a`‘' = Z•
i
ilia'' .WAS NI.'
*,
Talbot Hill Reservoir Park Improvements
Proposal Bid Bond—FORM B
n'
FORM B
Proposal Bid Bond
KNOW ALL MEN BY THESE PRESENTS, That we, [Contractor] Ohno-Touchdown JV
of[address]9416 Martin Luther King Jr. Way. S.. Seattle. WA 98119 as
Principal, and [Surety] Travelers Casualty and Surety Company of America
a corporation duly organized under the laws of the State of CT
and authorized to do business in the State of Washington, as Surety, are held and firmly bound unto the
City of Renton in the sum of five (5) percent of the total amount of the Bid of said Principal for the Work
hereinafter described, for the payment of which, well and truly to be made, we bind ourselves, our heirs,
executors, administrators and assigns, and successors and assigns,jointly and severally, firmly by these
presents.
The condition of this bond is such, that whereas the Principal herein is herewith submitting his/her or its
sealed Bid for the following construction, to wit:
Talbot Hill Reservoir Park Improvements, Project No. CAG-24-229
said Bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, if the said proposal Bid by said Principal be accepted, and the Contract be awarded
to said Principal, and if said Principal shall duly make and enter into and execute said Contract and shall
furnish performance bond as required by the City of Renton within a period of ten (10) days from and after
said award, exclusive of the day of such award, then this obligation shall be null and void, otherwise it
shall remain and be in full force and effect.
IN THE EVENT the Principal, following award, fails to execute an Agreement with the City of Renton in
accordance with the terms of the Bidding Documents and furnish a performance bond with Surety or
Sureties approved by the City of Renton within ten (10) days from and after said award, then Principal
shall forfeit the Bid Bond/Bid Proposal Deposit or Surety shall immediately pay and forfeit to the City oi
Renton the amount of the Proposal Bid Bond, as set forth in ROW 35A.40.200 and RCW 35.23.352.
IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be signed and
sealed thi day of November , 2024 _
Ohno/ouchdow Travelers Casualty and Surety Company of America
[Pri/'pal] [Sur- ] —
%�
Signature cf authorized official] [Signature of authorized official]
(NIHkO '(CI-) C-1-4t U Mt1 • G�� By: Jim S. Kuich, Attorney-in-fact
itle] :,,.....; 4
941. Martin Luther King Jr.Way.S.,Seattle,WA 98119 PO Box 3018,Bothell,WA 98041-3018
[Address] (425)489-4500
(206)325-1529
[Phone Number]
BID BOND PAGE 1 OF 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Travelers Casualty and Surety Company of America
Adak Travelers Casualty and Surety Company
TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut(herein collectively called the
"Companies"),and that the Companies do hereby make,constitute and appoint Heather L Allen,Dana Brown,Natalie C Chau, Emma C Doleshel,
Jim W Doyle,Chad M Epple,Jim S Kuich,Theresa A Lamb,Maxwell Martin,Michael A Murphy,Andy D Prill,S M Scott,Steve Wagner,Adam
Howard of Bothell,WA,their true and lawful Attorney(s)-in-Fact to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional
undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,
guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings
allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 21st day of April,
2021.
,4 slREry.°n ,,A,q,
a`f . ( •
HARTFOAO, Pl 2. , j MOW
3 fa CONK �i 't. CONK,
l
�& v a i . A
State of Connecticut By:
Robert L. Raney,Senior Vice President
City of Hartford ss.
On this the 21st day of April, 2021, before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of each
of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on
behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal. >
My Commission expires the 30th day of June,2026
wacac j Anna P.Nowik,Notary Public
This Power of Attomey is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,
which resolutions are now in full force and effect,reading as follows:
RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President, any Vice President, any
Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign
with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of
a bond,recognizance,or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and
revoke the power given him or her;and it is
FURTHER RESOLVED,that the Chairman,the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation
is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED,that any bond, recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a)signed by the President, any Vice Chairman, any Executive Vice President, any
Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or(b)duly executed (under seal, if
required)by one or more Attomeys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one
or more Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED,that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,any
Vice President, any Assistant Vice President,any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any
Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for
purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attomey or
certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified
by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to
which it is attached.
I,Kevin E.Hughes,the undersigned,Assistant Secretary of each of the Companies,do hereby certify that the above and foregoing is a true and correct
copy of the Power of Attomey executed
�by.,said Companies,which remains in full force and effect.
Dated this2-/Sf— day of N- V t4 r,) .7.07__ y
s h a ,74 ,
. HAqT-ORo, as'MAMMA 0 ,."1 C
CONK .o'- % COIL n -7 le.-- (",�'; '`ar + !*tKefvintantsecreary
To verify the authenticity of this Power of Attorney,please call us at 1-800-421-3880.
Please refer to the above-named Attomey(s)-in-Fact and the details of the bond to which this Power of Attorney is attached.
i
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part One—FORM C
CITY OF RENTON
EMAIL TO: lasevertsen@rentonwa.gov
LIST OF SUBCONTRACTORS, PART ONE
Submission of HVAC, Plumbing, and Electrical Subcontractors
If Bid amount exceeds$1,000,000,this list must be submitted within one(1) hour of the time and date
specified for Bid Submission.
Bidder's Name: Ohno-Touchdown JV
Project: Talbot Hill Reservoir Park Improvements
1055 S. Grady Way
Renton,WA 98057
CAG-24-229
SUBCONTRACTOR LISTING
If the bid amount exceeds$1,000,000 or more including Washington State Sales Tax,Bidder must list the Heating,
Ventilation,and Air Conditioning(HVAC),Plumbing,and Electrical Subcontractors as required per RCW 39.30.060.
Subcontractor Name Work Category
1. N/A HVAC
2. P.iv Coit51-nccf-i-oi, Plumbing
3. Sn e C 1 C k1' C le cki ehl S=rv,Co) (c. Electrical
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Page 1 of 2
List of Subcontractors—FORM C October 29,2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part One—FORM C
Legal Name of Person or Enti /.ubmi n. Ohno-Touchdown JV
NOTE: If Bidder is a corporation,w /tate of In on . ion;if a partnership,give full names and addresses of all parties below.
Authorized Signature: % Title: Manager
Printed Name: Michio M:rc . Ohno
Address: 9416 Martin utrer King Jr. Way S.
City: Seattle State: WA Zip Code: 98118 Date: 11/26/24
Telephone: 206-325-1529 Fax: 206-324-8063
Washington Contractor's License No.: OHNOTJ*825CE Federal Tax ID#: 82-425-7756
E-mail address: estimating@ohnoconstruction.com
Washington State UBI No.: 604-208-782 Expiration Date: UBI: 01/31/2025 -WA Lic: 02/05/2026
End of Form
,
'OFFIC/ ••'�ti
le./ C,42 S
. S7. 20®
Talbot Hill Reservoir Park Improvements Page 2 of 2
List of Subcontractors—FORM C October 29,2024
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part Two—FORM D
CITY OF RENTON
EMAIL TO: bsevertsen@rentonwa.gov
LIST OF SUBCONTRACTORS, PART TWO
Submission of Structural Steel and Rebar Installers
If Bid amount exceeds$1,000,000,this list must be submitted within forty-eight(48) hours of the time
and date specified for Bid Submission.
Bidder's Name: Ohno-Touchdown JV
Project: Talbot Hill Reservoir Park Improvements
1055 S. Grady Way
Renton,WA 98057
CAG-24-229
SUBCONTRACTOR LISTING
The Project is expected to cost $1,000,000 or more. Every Bidder must list the Structural Steel and Rebar
Subcontractors as required per RCW 39.30.060.
Subcontractor Name Work Category
1. i.e Mx L CUv r'a 60^ Cot 9 41 Structural Steel Installer
2. Z e w4L L C 5I hoiN Co mon Rebar Installer
If different from the list above,the Subcontractors we propose to use if an Alternate Bid is accepted are described
below. (RCW 39.30.060 requires,in part,that the Bidder not list more than one Subcontractor for each category of
Work identified,unless a Subcontractor will vary depending on which Alternate Bids are accepted,in which case the
Bidder must indicate which Subcontractor will be used depending on which Alternate is accepted.)
Describe any change to list if Alternates are accepted: A"/A -
[SIGNATURE PAGE FOLLOWS]
Talbot Hill Reservoir Park Improvements Page 1 of 2
List of Subcontractors—FORM D October 29,2024
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Talbot Hill Reservoir Park Improvements
List of Subcontractors, Part Two—FORM D
140
Legal Name of Person or En ' Submi id: Ohno-Touchdown JV
NOTE: If Bidder is a corporation, State of I c ration;if a partnership,give full names and addresses of all parties below.
Authorized Signature: Title: Manager
Printed Name: Michio arc s Ohno
Address: 9416 Martin ut er King Jr. Way S.
City: Seattle State: WA zip Code: 98118 Date: 11/26/24
Telephone: 206-325-1529 Fax: 206-324-8063
Washington Contractor's License No.: OHNOTJ*825CE Federal Tax ID#: 82-425-7756
E-mail address: estimating@ohnoconstruction.com
Washington State UBI No.: 604-208-782 Expiration Date: UBI: 01/31/2025 -WA Lic: 02/05/2026
End of Form
pr '•OFFIC�q'' �2z
IS•
...goo l../1,,,,,,
Talbot Hill Reservoir Park Improvements Page 2 of 2
List of Subcontractors—FORM D October 29,2024
Talbot Hill Reservoir Park Improvements
Contractor Qualifications/Evaluation-FORM E
(Must submit with Bid Form)
Contractor Name:Ohno-Touchdown JV Date Incorporated: Not a corporation-Licensed 02/05/2018
Mailing Address: 9416 Martin Luther King Jr.Way S.,Seattle,WA 98118 State Incorporated:State of Formation:Washington
Business Phone: 206-325-1529 Owner/President's Name: Michio Marcus Ohno,Manager
Contact Name and Title: Michio Marcus Ohno,Manager Other or Former Organization Name(s) None
Contact Phone: 206-325-1529 Contact Email:marcus@ohnoconstruction.corn Reason for Name Change(s): N/A
PERFORMANCE EXPERIENCE
• Has company been disqualified(debarred)from performing public work by State of Washington or federal government?
• Yes❑ No IX
• Are there any judgments,claims,arbitration proceedings or suits pending against company or its officers? Yes❑ No
If Yes,please describe: Judgments Note:one subcontract termed
• Has company ever failed to complete any work awarded to it? Yes❑ No ® If Yes,please describe:for convenience by mutual
no
• Has company been obligated for liquidated damages within the past 5 years? Yes Li No ® consent under partner,JVV partner,in CA
If Yes,please describe: Not Applicable in 2018.
FINANCIAL INFORMATION
1. Average total annual value of construction work performed during the past 5 years: $32,846,536(Ohno Construction&Subsidiaries Consolidated
2 Provide at least three trade references: Financial Reports 2019-2023)
• Name/Contact HD Fowler-425-746-8400-PO Box 160,Bellevue,WA 98009-ACCT#151200
• Name/Contact Cedar Grove-206-832-3000-7343 E Marginal Way,Seattle,WA 98108-ACCT#008346
• Name/Contact Cal Portland-206-764-3024-PO Box 3601,Seattle,WA 98124-ACCT#102889
3. Provide surety company and agent name: Surety Traveler's Casualty&Surety Co.of America-Agent:Jim Kuich-HUB International-425-489-4500
PROJECT EXPERIENCE—Projects of Similar Scope Requiring Prevailing or Davis Bacon Wages within Past 5 Years
(3 Required)
PROJECT#1 Description Of Project: Original Contract Amount Final Contract Amount:
Project Name:Delridge Playfield $3,417,750 $3,709,650
Replacement of synthetic turf sports
LocationlAddress: field wtih drainage,ADA improvements Percent of Work Performed by Substantial Completion Date
4458 Delridge Way grading,fencing,hardscape,curbs, Own Forces:45% 03/15/2024
Seattle,WA 98106 landscaping/irrigation,drinking fountain Firm was General Contractor: If not GC,describe role:
Yes® No ❑ N/A
Owner Name: Architect Name: Project Required Prevailing or Yes I No Li
of Seattle-Parks&Rec AHBL Davis Bacon Wages?
Talbot Hill Reservoir Park Improvements 1 I P a 9 e
Contractor Qualifications/Evaluation—FORM E
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Talbot Hill Reservoir Park Improvements
Contractor Qualifications/Evaluation-FORM E
(Must submit with Bid Form)
Phone: 206-640-4371 Sai Fang Phone: 206-658-2663-Craig Skipton
Email: sai.fang@seattle.gov Email: cskipton@ahbl.com
PROJECT#2 Description Of Project: Original Contract Amount Final Contract Amount:
Project Name:
Lake City Landbanked Park Conversion of vacant lot into public $1,134,000 $1,240,257
LocationfAddress: park with sport court,block wall,hard percent of Work Performed bySubstantial Completion Date
scape,paving,picnic tables,play area, P
12510 33rd Ave NE site furnishings&landscaping Own Forces: 64% 08/23/2023
Seattle,WA 98125 Firm was General Contractor: If not GC,describe role:
Yes® No ❑ N/A
Owner Name: Architect Name: Project Required Prevailing or Yes® No ❑
City of Seattle-Parks&Rec Board&Vellum Davis Bacon Wages?
Phone:206-615-0865-Scott Stevens Phone:206-673-2450-Leslie Batten
Email: scott.stevens@seattle.gov Email: leslie@boardandvellum.com
PROJECT#3 Description Of Project: Original Contract Amount Final Contract Amount:
Project Name:
Westside Park Park renovation and expansion with $1,391,000 $1,470,902
new timber log play structures,wetland
Location/Address: management,sport court,paved loop Percent of Work Performed by Substantial Completion Date
5810 156th Ave NE path,zipline,picnic shelter,native plant Own Forces:65% 09/30/2022
Redmond,WA 98052 garden,playfield,grading,utilities,drainage improvements,landscaping Firm was General Contractor: If not GC,describe role
Yes L No ❑ N/A
Owner Name: City of Redmond Architect Name: Board&Vellum Project Required Prevailing or Yes 2 No El
Davis Bacon Wages?
Phone: 425-556-2838-Rob Crittenden Phone: 206-673-2450-Leslie Batten
Email: rcrittenden@redmond.gov Email: leslie@boardandvellum.com
Talbot Hill Reservoir Park Improvements 2 I Page
Contractor Qualifications/Evaluation—FORM E
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Consent in Lieu of Special Meeting of Directors
In accordance with the provisions of the Washington Business Corporation Act for unanimous consent of the
directors in lieu of meetings, and for waiver of notice thereof, the undersigned, being all the directors of Ohno
Construction Company and members of Touchdown Construction LLC hereby, expressly in lieu of a special
meeting of directors and members, consent to and approve the resolutions set forth below.
RESOLVED, that the following persons are authorized to sign contracts on behalf of the Joint Venture between
Ohno Construction Company and Touchdown Construction LLC, known as "Ohno-Touchdown JV"
Yoshio A. Ohno, Manager/Ohno-Touchdown JV
Michio Marcus Ohno, Manager/ Ohno-Touchdown JV
SIGNED AND DATED as of July 3, 20
DIRECT S OF O RUCTION COMPANY:
Yo io A. Ohno is io M: - s O re
Tyler Bri z J .erdy
Sidney Fontenot
DI RS OUCHDOWN CONST T-ION
ichio M cus Ohno Yoshi ackary Ohno
F io aylor Ohno
Certified to be a true copy of a resolution duly and jointly adopted by the Board of Directors of
Ohno Construction Company and Members of Touchdown Construction LLC: ,,,,,,,,,,,,,,
NaTRUC ,,,
���O .GpRPd ...4''
fr// qAa(if Corporate Seal: off. Acl` �'
Jill Agnelli, Secretary SJ�►,4 T
Ohno Construction Company v •"_
Date: 1 3, 20 4 _ �''';sh'�NGTO�,,,,,,
114
ichio Ma cus Ohno, Partner/Member Corporate _ • ? ''•\SED L j •••S •,
. e'
Touchdo n Construction LLC = �La 9�.
Da e: my 3, 2024 ' F r 2
Executed Consent in Lieu of Corporate Meeting
Of Shareholders and Directors
In accordance with the provisions of the Washington Business Corporation Act for
unanimous consent of the directors in lieu of meetings, and for waiver of notice thereof,the
undersigned, being all the shareholders and directors of Ohno Construction Company hereby,
expressly in lieu of a formal meeting, consent to and approve the resolutions set forth below.
RESOLVED, That the following persons are authorized to sign bid documents and
contracts on behalf of the Corporation:
Yoshio A.Ohno, Chief Executive Officer
Richard L. Brangwin,Vice President Emeritus
Michio Marcus Ohno, President, Chief Operating Officer&Treasurer
Sidney Fontenot,Director of Estimating
Tyler Britz, Vice President/California
Justin Serdahl, Vice President/Washington
Kenneth Armsey, Equipment Manager
SIGNED AND DATED as of Nove er 10, of
DIRECT S: //
io . 0 Michio M' cus hno
P / /
Tyler B itz / Just' Ser
Sidney Fontenot
Certified to be a true copy of a resolution duly adopted by the Board of Directors of Ohno
Construction Company:
Corporate Seal • . """
,NSTR UC'Jill Corporate Secretary �Rpo0
O of
Date: November 10, 2023 S
•-J• �C.
NGTON
Consent in Lieu of Special Meeting of Members
In accordance with the provisions of the Washington Business Corporation Act for unanimous
consent of the directors in lieu of meetings,and for wavier of notice thereof,the undersigned,
being all the directors of Touchdown Construction LLC hereby, expressly in lieu of a special
meeting of members,consent to and approve the resolutions set forth below.
RESOLVED,that the following persons are authorized to sign contracts on behalf of the Corpo-
ration:
Michio Marcus Ohno, Member
SIGNED AND DATED as of October 1, 2020
7RS:
i io Ma , a LiMriliniwo-----
lit
lr� ':�.�Ohno
�� y
FumioT lorOhno
Certified to be a ue, .py/of a resolution duly adopted by the Members of Touchdown
Constr ction LLr.
4411
Mi io Marc s Ohno, embe- Corporate Seal:
Ovate: October 1 202
�\\p\NM111111 p1I,
QQa 1.rON'�.
=2OJG:� \TEDWN j' S'j�'•,
PAt 16 1.
''..;S.NGTON4,0,