HomeMy WebLinkAboutChange Order - 26Docusign Envelope ID: 85DF6470-FD9A-4D4D-BEBB-5B41 C1 B003EA ./
Contract Title:
Contractor:
Contract No.:
Federal Aid No.:
Change Order No. 26
Rainier Ave S Corridor Improvements -Phase 4
Pivetta Brothers Construction, Inc.
CAG-22-163
STPUL-1615(005)
IZI Ordered by Engineer IZI Force Account □Proposed by the Contractor (VECP)□Bid Item□Unilateral
Affects DBE Work: □No IZI Yes
Original Contract:
Current Contract:
Estimated Net Change This Order:
New Contract:
Reviewed By:
Reviewed By:
lo
Reviewed By:
City Attorney
26
□Bid Item Price Adjustment□Lump Sum
If yes, must receive concurrence from Local Programs
prior to execution.
Date
10/5/2024
Date
Date
Date
Amount Working Days
$28,284,172.90 500
$35,210,539.62 654
$3,800.00 0
$35,214,339.62 654
�� ng,��tauo,
Design Manager)
Consent By:
Surety (Greater than 25% cost and/or 20%
time increase)
Endorsed By:
Bi II Ad a ms g���11o�i��d0�1�il��:�:i�.OO'
Contractor
Executed By: GDocuSigned by:
Martin Pastucha
8B8131 EP98B449P City of Renton Public Works
Administrator/ Mayor
Date
11/5/2024
Date
11/22/2024 I 3:43 PM
Date
Change Order No.
Contract Title: Rainier Ave S. Corridor Improvements -Phase 4
Contract No. CAG-22-163
Page 1 of 6
CAG-22-163, CO #26-24
Approved by Cheryl Beyer via email 11/5/2024
Docusign Envelope ID: 85DF6470-FD9A-4D4D-BEBB-5841 C1 B003EA
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description:
This Change addresses an additional private power service connection to be installed
and creates a new bid item to address the added service connection.
Proposal Schedule of Prices:
ADD the following bid item to Schedule A:
26-A188 Additional Electrical Service Connection at Parcel 1, 1 EST @ $3,800.00 =
$3,800.00
Specification and/or Special Provision:
8-35.3(7) SP, first paragraph, point 1. is supplemented as follows:
Parcel 1-Vader Investment LLC
Building Meter
8-35.3(7) SP, second paragraph, point 1. is supplemented as follows:
Parcel 1-Vader Investment LLC
Building Meter
Materials:
None.
Measurement :
8-35.4 SP is supplemented with:
No specific unit of measurement shall apply to the force account item of "Additional
Electrical Service Connection at Parcel 1."
Payment:
Plans:
8-35.5 SP is supplemented with:
"Additional Electrical Service Connection at Parcel 1," by force account as provided
in Section 1-09.6.
None.
Reason for Change:
The plans and specifications did not require the Contractor to connect the existing
electrical service feeding the building meter at Parcel 1. When the new PSE distribution
system is activated, the old system will be deactivated. It was determined that to
maintain power to the business, the Contractor needed to make this connection.
Change Order No.
Contract Title:
Contract No.
26
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 2 of 6
Change Order No. 26
Contract Title: Rainier Ave S. Corridor Improvements Phase 4
Contract No. CAG 22 163
Page 3 of 6
Equitable Adjustment:This Change Order does include an equitable adjustment per Section 1
09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached.
Estimated Cost: $3,800.00
Extended Overhead: $ 0.00
Force Account Time related
damages per 1 09.6.6.d:
$ 0.00
Total: $3,800.00
* Type dollar amounts in for each of the 1st 3 rows, then right click
dollar amount on fourth row and select update Field.
26 A188 Additional Electrical Service Connection at Parcel 1
An independent cost estimate was prepared using estimated production, crew
composition, labor and equipment rates, and material costs for the item to
compensate the Contractor for the Electrical Service Connection. This cost was
calculated to be $3,790.81 and has been rounded to an estimated cost of $3,800.00.
Extension of Time:The Time for Completion is extended __0__ Working Days.
Affects DBE Work:
This Change order adds $3,800.00 of electrical connection work to Golden Gate Electric.
Sections 1 04.4 and 1 04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Docusign Envelope ID: 85DF6470-FD9A-4D4D-BEBB-5841 C1 B003EA
To be attached to Change Order:
□1-Field Directive/Request for Information Response
�2-Estimated Change Order Cost
□3-Plans
�4-Change Order Quotation
□5-Project Labor List
□6-Force Account Equipment Rate Request {DOT Form 422-010 EF)
□7-Equitable Adjustment Determination
□8-Additional Working Days Calculation
Change Order No.
Contract Title:
Contract No.
26
Rainier Ave S. Corridor Improvements -Phase 4
CAG-22-163
Page 4 of 6
Docusign Envelope ID: 85DF6470-FD9A-4D4D-BEBB-5841 C1 B003EA
Added Electrical Service Connection at Parcel 1 -Estimated Change Order Cost
Change Order Cost (Equitable Adjustment)
Project Name:
Contractor:
Contract No:
Federal Aid No:
Construction Manager:
Item No.
Rainier Ave S Corridor Improvements -Phase 4
Pivetta Brothers Construction, Inc.
CAG-22-163
STPUL-1615(005)
Perteet
Description Quantity Unit
Change Order No. 26
By: Shannon Tremper
Date: 8/01/2024
Unit Price Estimated Cost
Independent Cost Estimate
26-AlSS Additional Electrical Service Connection at Parcel 1 1 EST
26-A188 Labor -(Electrician) -GGE 5 Hours $ 108.00 $540.00
26-A188 Labor -(Electrician) -GGE 5 Hours $ 110.00 $550.00
26-A188 Labor -(Electrician Apprentice) -GGE 5.0 Hours $ 51.00 $255.00
26-A188 Labor -(Electrician Apprentice) -GGE 5.0 Hours $ 51.00 $255.00
26-A188 Labor Markup $1,600.00 Cents/Dollar $ 0.31 $496.00
26-A188 Equipment (Site Truck) -GGE 5 Hours $ 46.00 $230.00
26-A188 Equipment (Site Truck) -GGE 5 Hours $ 46.00 $230.00
26-A188 Equipment (Dump Trailer) -GGE 5.0 Hours $ 8.00 $40.00
26-A188 Equipment (Case Backhoe -OPERATING COST) -GGE 5.0 Hours $ 53.00 $265.00
26-A188 Equipment Markup $765.00 Cents/Dollar $ 0.21 $160.65
26-A188 Materials -(Electrical parts) -GGE 1 EA $ 300.00 $300.00
26-A188 Materials Markup $300.00 Cents/Dollar $ 0.21 $63.00
26-A188 Subcontractor Markup $3,384.65 Cents/Dollar $ 0.12 $406.16
CALCULATED TOTAL: $3,790.81
ESTIMATED TOTAL: $3,800.00
Item Change
26-A188 !Additional Electrical Service Connection at Parcel 1 I 1 I EST I $3,800.00 I $3,800.00
TOTALI $3,800.00
!Estimated Change Order Cost (Schedule A)$3,800.00!
Summary of Contractors Quotes:
Item Quote location Quoted Cost
N/A
Total Quoted Added Cost: $
Change Order #26, Page 5 of 6
Docusign Envelope ID: 85DF6470-FD9A-4D4D-BEBB-5841 C1 B003EA
Added Electrical Service Connection at Parcel 1 -DBE Change Order Table
Change Order DBE Tracking
Project name:
CAGNumber:
Date:
DBE
Golden Gate Electric
Cumulative
Cumutatlve
Cumulative
TotalS
Rainier Ave S Conldor Improvements• Phase 4($ 3rd St to NW 3rd Pl)
CAG-22-163
10/22/2024
Bid Item
Number
26-A188
Oescrtotlon
Fiber Ootic Siz:lnit
Change to Schedule 80
Procure JUT Materials
Overhead Added Oavs tor JUT Material OetiVerv
Victoria Sci'1 80 Conduit
Removal ot Private Lumianifes & Susi'less Sign in ROW
CMP tor Foundations
Resolution of Conflicts for Sitnal & Illumination
Electrtcal SetVice Connections
JUT Dewaterina and Utility Conflicts Impacts
Previous Chaille Order Totals:
Additlooal Electrical Connection
A.ddltlonal Etec1rlcat can-nectlon at Parcel 1
Change Contract COA Change Order
Order Commitment Amount (+/-1
4 $6,975,974.00 $38,616.76
5 $6,975,974.00 $174,913.89
7 $6,975,974.00 $99,090.00
8 $6,975,974.00 $231,454.42
9 $6,975,974.00 $103,853.14
14 $6,975,974.00 $26,000.00
16 $6,975,974.00 $38,225.00
17 $6,975,974.00 $50,000.00
21 $6,975,974.00 $195,000.00
22 $6,975,974.00 $146,498.27
$6,975,974.00 $1,103,651.48
26 $6,975,974.00 $3,800.00
$3.800.00
$6,975,974.00 $1,107,451.48
$0.00 $0.00
$0.00 $0.00
$6,975,974.00 $1,107,451.48
Net Change Order New COA DBE Participation Current COA DBE
Amount Assigned by Subcontractor and Bid Participation (maybe
toCDADBE Item chan .. d bv WSDDTI
$9,651.60 $6,985,625.60 $6,975,974.00
$148,411.10 $7,124,385.10 $6,975,974.00
$45,000.00 $7,169,385.10 $6,975,974.00
$27,000.00 $7,196,385.10 $6,975,974.00
$22,406.40 $7,218,791.50 $6,975,974.00
$13,000.00 $7,231,791.50 $6,975,974.00
$29,581.00 $7,261,372.50 $6,975,974.00
$25,000.00 $7,286,372.50 $6,975,974.00
$143,913.71 $7,430,286.21 $6,975,974.00
$130,593.72 $7,560,879.93 $6,975,974.00
$594,557.53 $7,560,879.93 $6,975,974.00
$3,392.86 $7,564,272.79 $6,975,974.00
$3,392.86
$597,950.39 $7,564,272.79 $6,975,974.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$597,950.39 $7,564,272.79 $6,975,974.00
Golden Gate Electric & Construction LLC ("Golden Gate") agrees with the extra work detailed in the above listed change orders. Furthermore, Golden Gate has not suffered damages due to the additional work.
Golden Gate Electric & Construction LLC
Bid Item
Non-COAOBE's Number OescrlPtlon
Cumulative
Cumulative
TotalS
Original Contract
Ctlange Original Contract Change Order Amount Assigned Net Change Order Amount
Order Amount Amount{•/-) to Non•COA DBE Asslrnedto Non-COAOBE
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0,00 $0.00
$0.00 $0.00 $0.00 $0.00
Current Contract COAD BE Participation:
Available Current Contract Non-COA DBE Participation:
Available Current Contract COA plus Non-COA DBE Pa11k:tpatlon:
Amount otCOA ptus Non-COA DBE Pank:tpatlon Applied to COA(must be ctlanged byWSOOT):
New Non-COA DBE
Status by
Subcontractor and Bid
$0.00
$0.00
$0.00
$6,975,974.00
$597,950.39
$7,564,272.79
$6,975,974.00
Change Order #26, Page 6 of 6