Meter in Sidewalks Retrofit Program
Update 07/05/2023
Project Status Update
Sean:
• Add 86 meters to route for MIS retrofit
• Meter boxes in driveway approaches weren’t included in the sidewalk routes.
o Driveways are not part of sidewalks and there was no GIS data reflecting location of
meters in driveways
• Adding meters to the cleanup routes. There haven’t been very many in the South and North,
but many were added in SE and NE.
o Stopped putting these in the routes, because it would have added a couple hundred
more and we are down to our last 100 brackets.
• Ordered 700 more brackets on 3/1/23. The order has been delayed and we don’t expect them
until August/September.
• If driveway approaches in the SE and NE should be added I can do another cleanup route after
we receive the brackets.
Sherry:
• Continues working on WO’s and WO revisions
Emina:
• Review of all closed Cityworks work orders
• Data extract, processing, and formatting for GIS update
• MIS Routes and Service Connection layers are up to date
Kevin:
• N/A
Josh: Developed Dashboard with Open/ Closed WO’s
https://rentonwa.maps.arcgis.com/apps/dashboards/101ca308ab334189a88ef756cc53f22d
Next meeting TBD – as and when needed.