No preview available
HomeMy WebLinkAboutMeeting Minutes 07.14.2023Public Works Utilities and Public Works Maintenance Meter in Sidewalks Retrofit Program Update 07/05/2023 Project Status Update Sean: • Add 86 meters to route for MIS retrofit • Meter boxes in driveway approaches weren’t included in the sidewalk routes. o Driveways are not part of sidewalks and there was no GIS data reflecting location of meters in driveways • Adding meters to the cleanup routes. There haven’t been very many in the South and North, but many were added in SE and NE. o Stopped putting these in the routes, because it would have added a couple hundred more and we are down to our last 100 brackets. • Ordered 700 more brackets on 3/1/23. The order has been delayed and we don’t expect them until August/September. • If driveway approaches in the SE and NE should be added I can do another cleanup route after we receive the brackets. Sherry: • Continues working on WO’s and WO revisions Emina: • Review of all closed Cityworks work orders • Data extract, processing, and formatting for GIS update • MIS Routes and Service Connection layers are up to date Kevin: • N/A Josh: Developed Dashboard with Open/ Closed WO’s https://rentonwa.maps.arcgis.com/apps/dashboards/101ca308ab334189a88ef756cc53f22d Next meeting TBD – as and when needed.