Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMeeting Minutes 08.14.2023Public Works Utilities and Public Works Maintenance
Meter in Sidewalks Retrofit Program
Update 08/14/2023
Project Status Update
Sean:
• All routes are completed.
• There are meters in driveway approaches near the sidewalk area that were not in routes
originally
• Follow -up routes will be created (as second part of the project) and mushrooms, lids
will be replaced when we receive more brackets in September/October
Sherry:
• Continues working on WO’s and WO revisions
*Not all Work Orders are completed and need to revise the material and cost
Emina:
• Review of all closed Cityworks work orders
• Data extract, processing, and formatting for GIS update
• MIS Routes and Service Connection layers are up to date
*Map will be updated once Sherry complete work orders
Kevin:
• N/A
Josh:
• Developed Dashboard with Open/ Closed WO’s
https://rentonwa.maps.arcgis.com/apps/dashboards/101ca308ab334189a88ef756cc53f
22d
*Cityworks and Cityworks dashboard app do not show all completed Work Orders.
Next meeting TBD – as and when needed.