Meter in Sidewalks Retrofit Program
Update 11/03/2022
Attending: Sean Campbell, Sherry Lovgren, Kevin Trinh, Josh Boulware, Emina Sulych
Project Status Update:
- 178 Completed MIS (Meters in Sidewalk) Work Orders
- 25 Meters not in the sidewalk
- Total Cost $5,438
- 14 MIS Routes completed
Feedback:
Sean: Project started going well. However, as of last week we are dealing with persistent
problem – 40 + radio issues that need to be addressed. There will be more probably.
Plugs need to be removed and replaced with brackets. Additional WO’s to be created to
re-visit location in question and fix the problem. Plugs can be re-used, but on different
location. Radio signals are monitored in Sensus Analytics and reported by Sandy Zier. As
for cost – it will be added for labor and equipment. Cost of plug is $5, backet $12. So
far, 300 brackets are ordered.
Sherry: Continues working on WO’s and WO revisions. Update on cost – must go back to
WO’s and adjust tasks and cost once she receives more info from Kristin. Cost for meters
not being in sidewalk is configured based on 15 minutes for labor inspection. She will
continue sending WO’s in Cityworks once Kevin revises the template.
Kevin: working on 2 modifications: e-mail notification for Emina and Account ID/ print
template for Sherry.
Josh: will be working on testing extract data from Cityworks and prepping for
dashboard.
Emina: review of all closed WO received via email and data extract from Cityworks, joining info
with GIS and updating Service Connection Layer. Will be working with Josh on project update
dashboard.
Communication with the team is excellent!
Next meeting TBD – as and when needed.