Meter in Sidewalks Retrofit Program
Update 12/08/2022
Project Status Update:
- 328 Completed MIS (Meters in Sidewalk) Work Orders
- 38 Meters not in the sidewalk
- Total Cost $9,586
- 22 MIS Routes completed
Feedback:
No meeting took a place, only email correspondence during this time.
Sean:
• Ordered 1,300 more plugs and 700 more brackets.
• Issues detected in the S 3rd St / Logan / Tobin area – probable location issue (100 brackets
installed in Highlands area and no issues detected)
• 17 meters were not reporting – worked on the solution and came up with different installation
ways to accomplish reporting.
• Will get manual reads if needed to for billing – more time will take to accomplish but reads
would be fresh / accurate
• Will continue to monitor reads daily.
• Will continue with the project next week.
Sherry:
• Continues working on WO’s and WO revisions related to UB Reference Numbers vehicle
time, cost, employee
• Monitor open WO’s every morning and adds missing data as needed
• Modify tasks within work orders to close once they are completed (initiates emails sent
to Emina)
• Coordinated with Kristin cost on material – should be reflected on entire project/ WO
template
Kevin:
• Completed e-mail notification configuration
• Josh: N/A
Emina:
• Review of all closed Cityworks work orders
• Data extract, processing and formatting for GIS update
• MIS Routes and Service Connection layers are up to date
Next meeting TBD – as and when needed.