Meter in Sidewalks Retrofit Program
Update 08/10/2024
Goal, Initial Assessment, Data Collection, Findings…
Goal:
To retrofit meter boxes (lids, mushrooms) and prevent hazards citywide,
specifically targeting meters located on sidewalks and driveways.
Historical or Pre-existing Data:
None available.
Initial Assessment, Data Collection, and Findings:
•GIS Data Collection:Collected and compiled comprehensive GIS data on
meter box locations on sidewalks and driveways throughout the city.
•Visual Inspection:Conducted inspections to assess the condition of meter
boxes, including lids, mushrooms, brackets, and plugs.
•GIS Data Updates:Revised GIS data to add or remove meters from the MIS
category and update driveway locations.
09/18/2024
2
GIS Analysis, Cityworks
Analysis:
•Heat Mapping: Utilized GIS to create heat maps identifying concentrations of
meters needing repairs, with a focus on high-severity areas, particularly in
downtown.
•Route Mapping: Defined routes for inspections and retrofits, continually
updating GIS data to reflect accurate site conditions.
•GIS Dashboard: Developed for efficient review, tracking work orders, and
visualizing progress.
Cityworks:
•Work Order Management: Created and managed work orders for all assets
requiring retrofitting, including a tailored work order template and email
notifications.
•Dashboard Development: Created an interactive mapping and tracking
dashboard for real-time project oversight.09/18/2024Add a footer
3
Internal PW Shops, PW Util., IT, GIS Involvement
Project Components:
•GIS: Data research, geoprocessing, route planning, and configuration;
Mapping Atlas and heat map creation.
•Cityworks: Configuration, work order management, progress tracking, and
reporting.
•PW Shops: Managed field operations, including ordering parts, hiring, training,
and supervision.
09/18/2024Add a footer
4
Challenges
Challenges and Delay Causes:
•Part Orders: Delays due to backorders and late deliveries.
•Staffing: Onboarding and training new hires.
•Technical Issues: Radio communication problems, reporting, and billing issues.
•Cityworks Issues: Minor work order template and email notification problems.
•GIS Data Accuracy: Initial inaccuracies in GIS data required updates; no GPS
was used.
•Asset Management: Adjusting work orders to add or remove assets based on
site conditions.
09/18/2024
5
Statistics
Summary:
•Total Work Orders: 2,013
•Total Repairs: 1,257
•No Repairs Needed: 756
•Total Cost: $44,527
•Material Costs: $21,332
•Labor Costs: $22,098
•Equipment Costs: $1,097
•Meter Types:
•Domestic Meters: 1,930
•Fire Meters: 17
•Irrigation Meters: 66
09/18/2024Add a footer
6
Total MIS Hours
Emina 162
Sean 21.91
Ryan 191.74
Bailey 59.3
Douglas 27.04
Shane 21.04
Downtown Area - highest concentration of Repairs - Before
Citywide Locations
Initial Citywide Analysis for Repairs based on GIS, Service Connections/ Meters and Transportation Sidewalk Data
Hot Spots
Downtown Area identified as area with highest concentration of potential repairs.
Sidewalk/ Driveway Retrofit - After
09/18/2024
Water Meter Installation and Maintenance
Procedures
1. Prevention Measures:
•Design Requirements: Water meter design requirements outlined in the System Plan and Construction Standards.
•Installation Restrictions: Do not install meters on sidewalks.
2. New Survey 123 App:
•Purpose: The app is designed for:
•Adding new meters
•Removing meters
•Cutting and capping meters
•Functionality:
•Meter Details: Capture details including type, size, and location.
•Location Verification: Confirm if the meter is on a sidewalk or not.
•Permit Information: Record permit issue numbers.
•Meter Information: Include MXU, register, and model.
•Cityworks Integration: Record the work order number or request.
•Documentation: Attach photos and additional notes if needed.09/18/2024
11
Water Meter Installation and Maintenance
Procedures
09/18/2024
12
3. Application Access and Usage:
•Platform: Available via ArcGIS Online.
•Devices: Accessible via iPads, laptops, or smartphones.
•Submission: Every new record is sent via email to:
•Sandra Zier (Meter Tech)
•Sean Campbell (WM Supervisor)
•Anna Hopkins (Utility Billing)
•Emina Sulych (PW Util GIS)
•Tyler Schwartzenberger (Backflow Prevention)
•Shane Graver, Douglas Dean, Joe Ferrer, Meter Techs performing work
•4. Implementation and Evaluation:
•Implementation Date: As of 08/01, the application is fully implemented.
•Review: The application will be evaluated as needed to ensure effectiveness.
09/18/2024
Service Connection – Survey App
https://rb.gy/twvodz
09/18/2024
Water Meter Design Requirements – WSP2019
Construction Standards
09/18/2024Add a footer