CONTRACT:
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CAG-23-005 West Hill Booster Pump Station Improvement Project
WTR-27-04184
CONTRACTOR: Gary Harper Construction, Inc.
SUMMARY OF PROPOSED CHANGE:
Additional Pump Can and Pump Bay Excavation Requirement.
C.0.#1
The change order no. 1 is for the compensation for material, labor, and equipment costs for the contractor to
furnish and install three new pump bays, and pump cans to accommodate the new pumps to be installed as part
of the West Hill Booster Pump Station Improvements Project. The design plans for the project were developed
based on information from existing records of equipment in the pump station. After the removal of the existing
pumps, the contractor discovered that the three existing pump cans are shallower than anticipated. Three new
steel pump cans with longer lengths are needed to accommodate the installation of the longer bowls for the
new and larger pumps along with additional excavation and removal of soil materials under the existing pump
cans. The concrete bays supporting the pumps will need to be removed and replaced as part of the work.
Thirty (30) additional working days were approved for the additional work and lead time to get the new pump
cans and equipment. This change order will be paid as a lump sum.
ESTIMATED TOTAL CHANGE ORDER COST= $72,102.07
Additional Working Days added to the Contract for this Change Order: __l!L_
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE
THIS ORDER
$2,669,704.80 $2,669,704.80 $72,102.07
SIGNATURES: # ��
Contractor: t,.� �
. �e�'::::.::_-oo-�-ProJect Manager: 9 -�-,,,.�.,,-
ESTIMATED CONTRACT
TOTAL AFTER CHANGE
$2,741,806.87
Date: ll//?i/2<12y
Date: _1_1_/_19_/_2_02_4_
(:�00"�;9;•d by�. 11/22/2024 I 4: 02 PM PST Approved B0=1A,c?.l,=,..,.p.,=S'r:--:-,-:-r� ______________________ Date: _____ _ 9cEFEEA,Aoo54'lton Straka, Utility Systems Director
Approved By: __________________________ _ Date: _____ _
Martin Pastucha, PW Administrator
Approved By: __________________________ _ Date: _____ _
Armondo Pavone, Mayor
Attest: ______________________________ Date: _____ _
Jason Seth, City Clerk
Approved By: __________________________ _ Date: _____ _
Shane Moloney, City Attorney
H:\File Sys\WTR -Drinking Water Utility\WTR-27 -Water Project Files\WTR-27-04184 -West Hill BPS lmprovements\70 Construction\FA & CO\CO. No.
1 \CO No. 1-Pump Can
CAG-23-005, CO #1-24
12/5/2024
12/5/2024
Approved by Cheryl Beyer via email 11/18/2024
Docusign Envelope ID: 1590BC4A-81 F6-4EF8-B11A-E5C343D4D68B
v,Jest nill dooster r UI irp Jta.:ion II i1p V m ff. F oj ct c.,a g C d �c •.•
A di ·on c m en ati n rt e ork rel> ted t th need of additional pump cans and pump bay
excavations
cst·m t ·.,Ji' at- r r:osts For ArlditionaJ Works in Puma Bay No. 213 and 4 =======-=-='-'=-.:=,,;_::-=-=--='-'="----':-=S. 1111111-== == = -'==-----=---==: =- a;; -= --==-==-c-_,c= =-=
1A/orker Names and r:Jassifications
Ike Stolp- Foreman
ry H - p W· Eq p n P< at *
e olp F e n
Bryce Heil-Power Equipment Operator
Allan-eneral aborer
*This is the labor cost for the removal of the
existing pump can in Pump Bay No.2
e or wa pe or ed n .o pie d
g t2 24
,.ui,..m t
To Se ic r k.
Excavator Cat 308
Materials
Fwl .. 2 Ft, 8", C 0 ·vc .Ip
C re nd a· ca ·ng ·ns t
H le Prod ct• Bentonite Slur and Chips.
Pumptech 2 ea 75 HP pump cans.
Pumptech 1 EA 150HP Pump can.
R pi et,no sh nk g)
Qty Hours
4
4
36
36
36
.lt QY
1,0
1
.J.h. LS
2
1
1
2
1
18
Cost Per Hr
.,,93. 8
�95 3
Amount
; 73 2 t 8212
$3,358.08
$3, 39. 8
� §1 .f..
593.28
;,95.53
. 66 9
Overhead & Profit 29%
$9 935 24
$2,8&1.22 •••••
;,-----
T al,■ ,■.All .11
C tP H A ou
�32 44 $1,297.60
'.;155.12 $55.12
Su. Total $1,/5 .. 2
Overh - d Pr t 2 % $ .8 . '7
0
T al ----■-iCi ... •
A OU
$3 11 0 $7 22 0
$279 00 $279.00
$466.50 �466.50
.;,10,458. 0 ,,20, 16. 0
>9, 75 "O $9 75 0
--17 0 $ 06 0
Sub Total $38,864.50
Overhead & Profit 21% '.;,8,161.55
Total Y,,ll,,.JrJ!,.;}
Docusign Envelope ID: 1590BC4A-81 F6-4EF8-B11A-E5C343D4D68B
Subcontractor
Flo ha $1 36. e rip tr )
9!Y Hours ost
,7 .50
Sub Total
Ov he • & ofi 2 °/
Su >ota La rs, Equ>me t a d M .L rials)
Total cost of • roposed estimate without sales tax Sale Tax 10.3%
Cost of delay to contract due to this change may not be included in this proposal Totalut ill ac ss • at m eti of is an> or r.
ha e i tim to ntract completion·+/- _ _ 3Q. _ days
A un
3, 3.
$3,473.00
$ 6.
$6,733.01
$72,102.07