Number Condition Text Applicant Response City Staff Response
1
The Applicant shall comply with the five (5) mitigation
measures included as part of the Determination of Non-
Significance – Mitigated on February 6, 2023 by the Renton
Environmental Review Committee:
Applicant is in compliance with all
SEPA requirements.
SEPA
Condition 1
The Applicant shall adhere to the recommendations in the
geotechnical report, prepared by Terra Associates, Inc and
dated August 5, 2021 and revised February 15, 2022, or future
addenda.
Applicant is in compliance with the
Geotechnical recommendations
outlined in the original report and
addendum. Additionally, Terra is
actively monitoring site construction
to ensure compliance with
recommendations. See letter.
SEPA
Condition 2
The geotechnical engineer shall submit a sealed letter stating
that he/ she has reviewed the construction and building
permit plans and in their opinion the plans and specifications
meet the intent of the report(s).
Letter will be provided by Terra once
Building Plans are available for
review.
SEPA
Condition 3
The Applicant shall submit a revised geotechnical report
prepared by a licensed geotechnical engineers that analyzes
the protected slope on the northern portion of the site and
makes a specific finding regarding the feasibility of locating
structures within the 50-foot setback identified in the original
geotechnical report. The updated report shall be submitted
with the civil construction permit plans to be reviewed and
approved by the Current Planning Project Managerprior to
permit issuance
The original Geotechnical Report was
updated February 15, 2022 to include
the placing of structures within the 50-
foot setback (see pages 11& 12 of the
report on file with the City).
All Recommended Conditions of Approval, numbered 1 through 34, as set forth on pages 24-29 of the HE Prelim Plat Decision dated April 6, 2023 and updated April 13,
2023 (conditions 6 and 16), are included and republished below as Conditions of Approval for the Towns on 12th Preliminary Plat.
Towns on 12th
SEPA
Condition 4
The Applicant shall coordinate with King County Metro prior to
submitting construction permits to identify any needed
accommodations for the abutting transit stop on NE 12th St
that need to occur during construction of the site. Evidence of
the coordination with King County Metro and the
accommodation(s) shall be shown on the civil construction
permit plans to be reviewed and approved by the Current
Planning Project Manager prior to permit issuance.
The applicant coordinated with King
County Metro regarding the bus stop
as required, and permits have been
issued for the project.
SEPA
Condition 5
The Applicant shall submit an archeological survey prepared
by a qualified professional prior to the start of any construction
and provide notification of the survey to Tribes’ cultural
committee and the Washington State Department of
Archeology and Historic Preservation.
The applicant submitted a cultural
resources assessment prepared by
Westland Enginnering &
Environmental Services dated August
8, 2022.
2
The Applicant shall utilize a tree species from the Approved
Street Tree List and Spacing Guidelines document for the NE
12th St, new future roadway on the site (identified as Road A on
site plan) and NE Sunset Blvd ROW street trees. The revised
street trees shall be shown on an updated Detailed
Landscaping Plan submitted with the civil construction permit
application for review and approval by the Current Planning
Project Manager prior to civil construction permit issuance.
The final detailed landscape plans
were reviewed and approved by the
Planning Manager (Alex Morganroth)
on November 16, 2023. See Landscape
Plans.
Towns on 12th
3
The Applicant shall submit a final detailed landscape plan that
identifies compliance with the partial or fully-obscuring
landscape buffer on the west side of the site. Use of a partial or
fully- obscuring buffer shall be determined by the width of the
buffer. The final detailed landscape plan shall be reviewed and
approved by the Current Planning Project Manager prior to
issuance of a civil construction permit.
The final detailed landscape plans
were reviewed and approved by the
Planning Manager (Alex Morganroth)
on November 16, 2023. See Landscape
Plans on file with the City.
4
The Applicant shall substitute native large-stature native tree
species such as Western red cedars, Douglas fir, and Western
hemlock or similar for at least half ( 21 total) of the Incense
cedar trees identified on the landscape plan and half of the
flowering cherry trees identified on the west site in the
landscape buffer. The trees shall planted in a triangular pattern
with understory shrubs and groundcover to provide better
privacy and noise attenuation. The trees and understory shall
be shown on an updated Detailed Landscaping Plan
submitted with the civil construction permit application for
review and approval by the Current Planning Project Manager
prior to civil construction permit
issuance.
The final detailed landscape plans
were reviewed and approved by the
Planning Manager (Alex Morganroth)
on November 16, 2023. The replanted
trees meet the specifications of this
condition.
5
The Applicant shall create a Homeowners’ Association (“HOA”)
that maintains all improvements and landscaping in the
common open space, critical areas, and storm drainage tracts
and any and all other common improvements. The HOA
documents shall be submitted to, and approved by, the
Current Planning Project Manager prior to recording of the
Unit Lot Subdivision. Such documents shall be recorded
concurrently with the Unit Lot Subdivision.
The HOA has been created, see
certificate from the Secretary of State.
Towns on 12th
6
The Applicant shall either retain additional trees or plant new
trees to meet the minimum tree density for the area of the
parent site within the R-10 zone. In addition, the Applicant shall
substitute native large-stature native tree species such as
Western red cedars, Douglas fir, and Western hemlock or
similar for at least half of replacement trees identified on the
landscape plan. The Applicant shall demonstrate compliance
by submitting an updated tree density calculation. The
retained or new trees shall be shown on an updated Detailed
Landscaping Plan submitted with the civil construction permit
application for review and approval by the Current Planning
Project Manager prior to civil construction permit issuance.
The final detailed landscape plans
were reviewed and approved by the
Planning Manager (Alex Morganroth)
on November 16, 2023. The plans
demonstrate compliance with the
tree retention requirement.
7
The Applicant shall submit a revised landscape plan that
demonstrates compliance with the fence and retaining wall
regulations for review and approval by the Current Planning
Project Manager at the time of civil construction permit
application.
The final detailed landscape plans
were reviewed and approved by the
Planning Manager (Alex Morganroth)
on November 16, 2023.
8
The Applicant shall submit an architectural lighting plan at the
time of building permit review for review and approval by the
Current Planning Project Manager. To ensure safety and avoid
excessive brightness, pedestrian scale lighting should be
provided on the primary entries of each unit, rear elevations
facing the alley, along the interior pedestrian walkways as
necessary to provide sufficient lighting for pedestrian safety
while minimizing light spill and glare onto adjoining
properties.
Architectural lighting plan will be
submitted with the Building Permit
applications.
Towns on 12th
9
The Applicant shall submit a site-wide lighting plan be
provided at the time of civil construction permit review for
review and approval by the Current Planning Project Manager
prior to Civil Construction Permit issuance. To ensure safety
and avoid excessive brightness, pedestrian scale lighting
should be provided in all common areas and along all common
pedestrian walkways, including the walkway down to NE
Sunset Blvd.
The Lighting Plan was prepared,
submitted and approved by the City.
10
The Applicant shall submit revised floor plans for the
townhomes that identify adequate storage area in the
attached garages of the townhome units for both a bicycle and
the individual trash and recycling containers. The revised floor
plans shall be reviewed and approved by the Current Planning
Project Manager prior to issuance of a building permit.
Revised floor plans will be submitted
with the Building Permit applications
demonstrating adequate storage
area.
11
The Applicant shall provide more variation in corner and
interior individual unit lot setbacks across the unit lot
subdivision to create a greater variety of home sizes and
vertical modulation. A revised preliminary plat plan shall be
provided at the time of building permit review for review and
approval by the Current Planning Project Manager.
Revised side-entry plans will be
submitted with the Building Permit
applications demonstrating additional
variation.
Towns on 12th
12
The Applicant shall submit additional information with the civil
construction permit application demonstrating the project’ s
the Applicant submit additional information with the civil
construction permit application demonstrating the project’ s
compliance with the common open space requirements
including but not limited to, maximum slope, contiguousness
to the majority of the dwellings, location in a highly visible area,
and lack of obstructions such as retaining walls or fences. The
common open space plan would be subject to review and
approval by the Current Planning Project Manager.
The open space plan (Sheet L3.01)
requirements are included within the
Approved Landscape Plans on file
with the City.
13
The Applicant shall provide an open space programming plan
that includes specifications on proposed furniture, recreational
activities, and other activities as appropriate within the
common open space for review and approval by the Current
Planning Project Manager at the time of civil construction
permit.
The open space plan (Sheet L3.01)
requirements are included with the
approved Landscape Plans on file
with the City. This plan sheet depicts
the amenities that are required.
14
The Applicant shall demonstrate compliance with the
standards for private yards and open space guidelines by
incorporating a combination of ground amenities, porches, or
decks. The proposed private open space shall be reviewed and
approved by the Current Planning Project Manager at the time
of building permit application review.
The open space plan (Sheet L3.01)
includes the private yard and open
space requirements are included with
the approved Landscape Plans on file
with the City.
Towns on 12th
15
The Applicant shall incorporate addition concrete pathways
with a minimum width of four-feet (4’) at the following
locations: North/south connections between units 62 and 63,
57 and 56, 48 and 49, 28 and 27, 19 and 20, 7 and 8, 2 and 3, 12
and 13, and 34 and 35; connection between Tract L and the NE
12th St ROW along the west side of ROW 4; connection
between Tract G and the new sidewalk in future Road A. The
location of the pathways shall be reviewed and approved by
the Current Planning Project Manager prior to issuance of the
civil construction permit
The additional walkways were
incorporated into the Site Plan.
16
The Applicant shall record a public access easement over the
all pathway connections on the site from the Road A Right of
Way to NE Sunset Blvd, except for those not located in a
common open space area or tract. Private Access will be
provided within common open space tracts for the
homeowners and guests.
The public access easement will be
dedicated by the Final Plat.
17
The Applicant shall submit a revised preliminary plat plan and
landscape plan that identifies pedestrian connections for all
unit lots. Public sidewalks shall be 5 feet or 8 feet wide,
depending on the street section. Common open space
pathways shall be a minimum width of 3 feet and front yard
entry walks on private property ( i.e. the individual lots) shall be
a minimum width of 3 feet with a maximum of 4 feet. The
revised plans shall be reviewed and approved by the Current
Planning Project Manager prior to construction permit
issuance.
The additional walkways were
incorporated into the Site Plan.
Towns on 12th
18
The Applicant shall submit revised elevations providing the
required three and one-half inches ( 3 1/2") minimum trim
surrounding all windows and doors and one of the following
architectural details: shutters, knee braces, flower boxes, or
columns. Alternatively, the Applicant may submit a
modification request to vary from any of these standards. The
revised elevations or modification request shall be submitted
to the Current Planning Project Manager for review and
approval at the time of building permit review.
This condition will be addressed on
the Architectural Plans. The plans will
be submitted to the city once
completed.
19
The Applicant shall submit a materials board and color palette
coded to each building elevation, be provided to the Current
Planning Project Manager for review and approval at the time
of building permit review. The color palette provided shall
utilize a minimum of four (4) hues and may not exclusively
utilize shades of blue, grey, or similar neutral colors.
This condition will be addressed on
the Architectural Plans. The plans will
be submitted to the city once
completed.
20
The Applicant shall submit a detailed landscape plan with
utility box locations and any utility boxes that are visible to the
public shall be screened with berms and/or landscaping. The
final Detailed landscape plan shall be reviewed and approved
by the Current Planning Project Manager prior to civil
construction permit approval
The approved Landscape Plans on file
with the City (Sheets L2.02 & L2.02)
includes the utility locations.
21
The Applicant shall submit the draft Native Growth Protection
area easement documents at the time of construction permit
Application submittal for review and approval by the Current
Planning Project Manager. The Applicant shall be required to
record the easement and related documents at the time of
final Plat recording.
A draft of the NGPA easement was
submitted on April 21, 2023 with the
civil construction initial application.
Critical Area/NGPA tracts will be
created by the final plat.
Towns on 12th
22
The Applicant shall place all common open space, including
the pedestrian easements fronting proposed units, into
separate tracts. A revised detailed preliminary plat plan and
open space plan identifying the tracts shall be submitted to
and approved by the Current Planning Project Manager prior
to issuance of a civil construction permit.
The open space plan (Sheet L3.01)
includes the tract designations
required by this condition.
23
The Applicant shall reduce the paved width of all the alleys,
except ROW 4, to twelve (12’) with two feet ( 2’) of clear space
on each side, unless otherwise approved by the Current
Planning Project Manager or as required by Renton Regional
Fire Authority. A revised detailed preliminary plat plan showing
the new alley widths is required to be submitted and approved
prior to issuance of a civil construction permit.
The road sections were revised and
approved as part of construction
plans on file with the City under File C:
23002010.
24
The Applicant shall incorporate a landscape center island with
a radius of twenty feet 20’) into the cul- de-sac. A revised
detailed preliminary plat plan and landscape plan showing the
center island is required to be submitted and approved prior to
issuance of a civil construction permit.
The island was incorporated as shown
on approved landscape plans on file
with the City and per construction
plans on file with the City under File C:
23002010.
25
The Applicant shall install Maxiforce collapsible bollards ( Item
# MCSW- SS3- EZ) within ROW 4 adjacent to the NE 12th St
sidewalk. The location of the bollards shall be reviewed and
approved by the Current Planning Project Manager Prior to
issuance of a civil construction permit
The bollards are included on Sheet
C3.41-Road Standard Details of the
approved plans on file with the City
under File C: 23002010.
Towns on 12th
26
The Applicant shall submit a separate detailed utility and
landscape plan set identifying the location and screening
provided for all surface and roof top utility/ mechanical
equipment required for each townhome. The surface mounted
utility plan shall include cross- section details and screening
measures consistent with the overall design of the
development with the civil construction permit application.
The Applicant shall work with franchise utilities to ensure, as
practical, utility boxes are located out of public ROW view,
active common open spaces, and they shall not displace
required landscaping areas. The utility and landscape plan set
shall be reviewed and approved by the Current Planning
Project Manager prior to permit issuance.
The approved Landscape Plans
(Sheets L2.02 & L2.02) includes the
utility locations.
27
The Applicant shall submit a plan identifying a safe walking
route from the proposed subdivision to Honey Dew Elementary
School. The submitted plan, as well as any infrastructure
proposed to support the safe route included in the plan, shall
be reviewed and approved by the Public Works plan reviewer
prior to issuance of the civil construction permit.
Safe Walk Routes plan was accepted
by the City November 2023.
28
As identified in Finding of Fact No. 5H, the Applicant’ s floor
plans shall be revised for building permit review to conform to
applicable parking dimension standards.
This condition will be addressed on
the Architectural Plans. The plans will
be submitted to the city once
completed.
29 Street names shall be approved by the City and street signs
shall be installed if required by City staff.
Noted and understood.
30
Sanitary sewers shall be provided by the developer at no cost
to the City and designed in accordance with City standards.
Side sewer lines shall be installed eight feet (8') into each lot if
sanitary sewer mains are available.
The approved sewer plan provides
side sewer per city standards.
Towns on 12th
31
All utilities designed to serve the subdivision shall be placed
underground. Any utilities installed in the parking strip shall be
placed in such a manner and depth to permit the planting of
trees. Those utilities to be located beneath paved surfaces shall
be installed, including all service connections, as approved by
the Department. Such installation shall be completed and
approved prior to the application of any surface material.
Easements may be required for the maintenance and
operation of utilities as specified by the Department.
Noted and understood.
32
Any cable TV conduits shall be undergrounded at the same
time as other basic utilities are installed to serve each lot.
Conduit for service connections shall be laid to each lot line by
subdivider as to obviate the necessity for disturbing the street
area, including sidewalks, or alley improvements when such
service connections are extended to serve any building. The
cost of trenching, conduit, pedestals and/ or vaults and laterals
as well as easements therefore required to bring service to the
development shall be borne by the developer and/ or
landowner. The subdivider shall be responsible only for conduit
to serve this development. Conduit ends shall be elbowed to
final ground elevation and capped. The cable TV company shall
provide maps and specifications to the subdivider and shall
inspect the conduit and certify to the City that it is properly
installed.
Noted and understood.
33
Lot corners shall be marked as required by RMC 4-7-210. Noted and understood. Markers will
be placed as construction is
completed
Towns on 12th
34
As required by RMC 4-7-090F8a, the title of the final plat shall
include the term “ unit lot subdivision.”
Noted and understood.