HomeMy WebLinkAboutEX15_CM_Construction_Mitigation_Description_Re-Align_Environmental_240729_v11 Variance Applica�on Purelander SFR 1828 NE 20th St. Renton, WA 98056 PRE21-000363 Construc�on Mi�ga�on Descrip�on a. Proposed construc�on dates (begin and end dates) June 2025 through July 2026 b. Hours of opera�on; All construction activities conducted outdoors are expected to be during normal weekday hours (8:00 – 5:00). Once the buildings are dried in, interior construction may take place outside of normal workday hours, as needed. c. Proposed hauling/transporta�on routes; No designated hauling or transportation routes are proposed. The proposal is a single-family residential home with an ADU on a previously-developed lot. All construction related transportation would be via existing City roads to NE 20th Street, and to the existing driveway. d. Measures to be implemented to minimize dust, traffic and transporta�on impacts, erosion, mud, noise, and other noxious characteris�cs; Dust Control: As a single-family project in a wooded area, fugitive dust is expected to be minimal. Dust control strategies, if needed, will include: • Standard erosion control measures such as mulching or erosion control blankets over bare soil areas; and • Watering to moisten bare soil surface areas that are found to be liberating dust. Traffic and Transportation: The proposal is a new single-family residence and ADU on a property that was previously developed as a single-family residence. As a result, no traffic modeling has been performed. It is estimated that during construction, approximately 10 trips per day would result, including cars, pickup trucks, and construction vehicles. The completed re-development project would result in 3 - 5 vehicular trips per day, with no projected peaks. No truck or non- passenger vehicle trips are anticipated after completion of construction. A traffic impact analysis is required when estimated vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in either the AM (6:00 - 9:00) or PM (3:00–6:00) peak periods. Therefore, no traffic impact analysis has been prepared for this project Erosion/Mud: Standard erosion and sediment control measures will be implemented to minimize erosion of soils and to prevent sediment transport off of the worksite. These include: Docusign Envelope ID: 104DBDA6-11CD-4791-91FF-7DA2A96942C7 2 • Silt Fence or wattles to prevent run-on into bare soil, and to capture mobilized sediment; • Mulching or covering temporary bare soil areas; • A construction entrance at NE 20th St.; and • Permanent soil stabilization, including seeding, landscape plantings, and mulching. Noise: Construction-related noise is expected during the construction period. These noises would be limited to the normal workday hours. This noise could include traffic, heavy equipment, chainsaws, and power tools. Upon completion of the project, typical residential noise, described above, is to be expected. Noise-generating construction work would be limited to normal workday hours. Once the buildings are dried in, interior construction may take place outside of normal workday hours, as needed. e. Any specialty hours proposed for construc�on or hauling (i.e., weekends, late nights); None. f. Preliminary traffic control plan. This driveway access is the current driveway into the site and it was the access to the site when it was previously developed. The proposal is a new single-family residence and ADU on a property that was previously developed as a single-family residence. As a result, no traffic modeling has been performed. It is estimated that during construction, approximately 10 trips per day would result, including cars, pickup trucks, and construction vehicles. The completed re-development project would result in 3 - 5 vehicular trips per day, with no projected peaks. No truck or non- passenger vehicle trips are anticipated after completion of construction. A traffic impact analysis is required when estimated vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in either the AM (6:00 - 9:00) or PM (3:00–6:00) peak periods. Therefore, no traffic impact analysis or traffic control plan has been prepared for this project. Docusign Envelope ID: 104DBDA6-11CD-4791-91FF-7DA2A96942C7