HomeMy WebLinkAboutCOR Approved_KC I-Line - Storm TIR_Signed_240920
Final June
2024
Technical Information Report
City of Renton
King County Metro Transit Department
33200
06/12/24
SURFACE WATER UTILITY
JFarah 09/03/2024
DEVELOPMENT ENGINEERING
Michael Sippo 09/20/2024
King County Metro Transit
Department
Greg McKnight, KCM Line Lead/Project Manager
Consultant Team
Stephanie Forman, Lead Civil Engineer, Forman Consulting Services
Angela Villar, Renton Civil Lead, Jacobs
Brian Magee, Kent Civil Lead, HDR
Andrea Stott, Auburn Civil Lead, Jacobs
Richard Hutchinson, Lead Traffic Signal Design Engineer, DKS
Meagan Powers, Lead Communications & Technology Design Engineer,
Concord Engineering
William Hickey, Drainage Lead, Jacobs
Other Publication Information
Project Number: W3X86400
Project Locations: Auburn, Washington; Kent, Washington; Renton, Washington
i King County Metro Transit Department
Contents
Acronyms and Abbreviations ............................................................................. iv
1. Project Overview ..................................................................................... 1-5
1.1 Drainage Basin .................................................................................. 1-5
1.2 Soils .................................................................................................. 1-5
2. Conditions and Requirements Summary .................................................. 2-1
3. Offsite Analysis (Core Requirement 2) ..................................................... 3-1
4. Flow Control, Low-impact Development, and Water Quality Facilities
Analysis and Design ................................................................................. 4-1
4.1 Existing Site Hydrology (Part A) ....................................................... 4-1
4.2 Developed Site Hydrology (Part B) ................................................... 4-1
4.3 Performance Standard (Part C) ......................................................... 4-2
4.3.1 Area-specific Flow Control Facility Standard ................................. 4-2
4.3.2 Conveyance System Capacity Standards ..................................... 4-2
4.3.3 Water Quality Standard ............................................................ 4-3
4.4 Flow Control System (Part D) ........................................................... 4-4
4.4.1 Flow Control System (Core Requirement 3).................................. 4-4
4.4.2 Onsite Flow Control BMPs (Core Requirement 9) ........................... 4-4
4.5 Water Quality System (Part E) .......................................................... 4-5
5. Conveyance System Analysis and Design ................................................. 5-1
6. Special Reports and Studies ..................................................................... 6-1
7. Other Permits .......................................................................................... 7-1
8. Construction Stormwater Pollution Prevention Plan Analysis and
Design ..................................................................................................... 8-1
8.1 Erosion and Sediment Control Plan Analysis and Design (Part A) ..... 8-1
8.2 Stormwater Pollution Prevention Plan Design (Part B) ..................... 8-2
8.2.1 Construction in Sensitive Areas and Buffers ................................. 8-3
8.2.2 Maintenance Requirements ....................................................... 8-3
ii King County Metro Transit Department
8.2.3 Final Stabilization .................................................................... 8-3
8.2.4 Roads and Utilities ................................................................... 8-4
9. Bond Quantities, Facility Summaries, and Declaration of Covenant ......... 9-1
9.1 Bond Quantities ................................................................................ 9-1
9.2 Facility Summaries ............................................................................ 9-1
9.3 Declaration of Covenant .................................................................... 9-1
10. Operations and Maintenance Manual ..................................................... 10-1
11. References ............................................................................................. 11-1
Tables
2-1 Threshold Discharge Area Summary ............................................................. 2-3
4-1 Pipe Sizes and Lengths between Structures ................................................... 4-3
4-2 TDA 4 Water Quality Treatment BMPs ........................................................... 4-6
Figures
1-1 Project Vicinity Map ................................................................................... 1-6
1-2 Soil Map .................................................................................................. 1-7
2-1 Project Site Location Map .......................................................................... 2-2
Appendices
Appendix A Technical Information Report Form
Appendix B Downstream Analysis Resources Review, TDA and Discharge
Path Maps
Appendix C Drainage System Tables
Appendix D Field Inspection Photos
Appendix E Flow Control Model Outputs
Appendix F Water Quality Model Outputs
Appendix G Conveyance and Backwater Calculations
iii King County Metro Transit Department
Appendix H TDA Minimum Requirement Areas
iv King County Metro Transit Department
Acronyms and Abbreviations
BMP best management practice
CB catch basin
ESC erosion and sediment control
ft2 square foot
fps feet per second
KCSWDM King County, Washington, Surface Water Design Manual
Metro King County Metro Transit Department
MH manhole
NPDES National Pollutant Discharge Elimination System
PGIS pollution-generating impervious surface
ROW right‐of‐way
SWDM Surface Water Design Manual
SWPPP stormwater pollution prevention plan
TDA threshold discharge area
1-5 King County Metro Transit Department
1. Project Overview
Project improvements being constructed as part of the RapidRide I Line Project will affect several
roadways within the City of Renton (the City) (Figure 1-1). Improvements may include, but are
not limited to, a reallocation of existing roadway section widths through restriping, roadway
widening, upgrading intersection signalization, adding new pedestrian crossings, constructing new
bus stations with Americans with Disabilities Act access, and adjusting or relocating utilities.
The Renton portion of the project corridor begins near the Renton Transit Center and ends at the
southern city limits along 108th Avenue SE. The corridor is currently served by the following
existing bus routes and consists of eight separate arterials with various roadway sections:
S Grady Way
Talbot Road S/Benson Drive S
S 21st Street/Talbot Road S
SE Carr Road
SE Carr Road/105th Place SE
180th Street
108th Avenue SE
The RapidRide I Line Project is a transportation redevelopment project with multiple discharge
locations and threshold discharge areas (TDAs). This document is a final Technical Information
Report to establish the code requirements and describes how this project meets the City’s
requirements. The Technical Information Report Form is included as Appendix A.
1.1 Drainage Basin
The project improvements are generally located within the Duwamish-Green Watershed-Water
Resource Inventory Area 9. Within Water Resource Inventory Area 9, the stormwater runoff from
the project drains to different stream basins.
TDA 1 has been removed from the project. TDAs 2, 3, 4, 5, and 6 drain to Rolling Hills Creek.
TDAs 7, 8, 9, and 10 drain to Panther Creek. TDAs 11, 12, 13, 14, and 15 drain to an unnamed
Panther Creek tributary. Figure 1-1 shows the vicinity of the site location.
1.2 Soils
The project is located in an urban developed area. The Natural Resources Conservation Service
soil survey indicates the soil within the project corridor includes Urban (Ur), Beausite (BeD),
Alderwood (AgC and AgD), Indianola (InC), and Arents/Alderwood (AmC). Urban, Beausite,
Alderwood, and Arents/Alderwood soil belong to hydrologic soil group C, or till soil. The soil has
limited hydraulic conductivity. Indianola soil is in hydrologic soil group A, which is outwash soil
that has a high hydraulic conductivity for infiltration. The soil types in the project area are shown
on Figure 1-2.
1-6 King County Metro Transit Department
Figure 1-1. Project Vicinity Map
1-7 King County Metro Transit Department
Figure 1-2. Soil Map
2-1 King County Metro Transit Department
2. Conditions and Requirements Summary
The stormwater design will adhere to the requirements in the following codes and standards:
City of Renton Surface Water Design Manual (SWDM) (City of Renton 2022)
o Section 1.1, Drainage Review
o Section 1.1.2.4, Full Drainage Review
o Section 1.2, Nine Core Requirements
o Section 1.3, Six Special Requirements
City of Renton – Standard Details
King County, Washington, Surface Water Design Manual (KCSWDM) (King County
2021)
Because the overall project will create more than 2,000 square feet (ft2) of new and replaced
impervious surface, a full drainage review is required. According to Table 1.1.2.A of the City of
Renton SWDM, all nine core requirements and all six special requirements apply under a full
review type, except where exemptions occur (City of Renton 2022).
There are 15 TDAs along the RapidRide I Line route within the city of Renton, each of which has
been analyzed separately. Figure 2-1 shows an overview of the TDAs.
Table 2-1 provides a summary of additional information and applicable requirements for this
project.
2-2 King County Metro Transit Department
Figure 2-1. Project Site Location Map
2-3 King County Metro Transit Department Table 2-1. Threshold Discharge Area Summary TDA New PGIS (ft2)a Total New Impervious Surface (ft2)a Core Requirements b,c Special Requirements d,e 2 – Offsite Analysis 3 – Flow Control Facilities 4 – Conveyance System f 8 – Water Quality Facilities 2 – Flood Hazard Area Delineation 5 – Oil Control 6 – Aquifer Protection Area 01 TDA removed from project 02 1,924 2,217 Yes No Yes No No No Yes 03 4,459 4,670 Yes No Yes No Yes No Yes 04 22,489 22,846 Yes Yes Yes Yes No Yes Yes 05 0 127 Yes No No No No No No 06 0 64 Yes No No No No No No 07 0 486 Yes No Yes No No No No 08 0 893 No No Yes No No No No 09 23 1,244 No No Yes No No No No 10 0 644 No No Yes No No No No 11 0 105 Yes No No No No No No 12 1,054 960 Yes No No No No No No 13 0 101 No No No No No No No
2-4 King County Metro Transit Department TDA New PGIS (ft2)a Total New Impervious Surface (ft2)a Core Requirements b,c Special Requirements d,e 2 – Offsite Analysis 3 – Flow Control Facilities 4 – Conveyance System f 8 – Water Quality Facilities 2 – Flood Hazard Area Delineation 5 – Oil Control 6 – Aquifer Protection Area 14 69 744 No No Yes No No No No 15 0 310 No No Yes No No No No a Because the project is a transportation redevelopment project and will not affect more than 50% of the ROW, the target surface area used to determine requirements does not include replaced PGIS or replaced impervious area. b Core Requirements 1 (Discharge at the Natural Location), 5 (Construction Stormwater Pollution Prevention), 6 (Maintenance and Operations), and 7 (Financial Guarantees and Liabilities) are required for all TDAs. c Core Requirement 9 (Onsite BMPs) is not feasible for all TDAs. d Special Requirement 1 (Other Adopted Area-specific Requirements) does not apply to any TDAs at this time. e Special Requirements 3 (Flood Protection Facilities) and 4 (Source Controls) are both not applicable for all TDAs. f No analysis required for existing conveyance systems that exhibit no change in flow characteristics as referenced in Section 1.2.4.2 of the City of Renton SWDM (City of Renton 2022). BMP = best management practice PGIS = pollution-generating impervious surface ROW = right-of-way
3-1 King County Metro Transit Department
3. Offsite Analysis (Core Requirement 2)
A Level 1 Downstream Analysis was performed in accordance with Core Requirement 2 of the City
of Renton SWDM to identify and evaluate potential offsite flooding, erosion, and water quality
problems that could be aggravated by the proposed project.
The following findings from the field inspections were reported:
No reported problems were identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
No existing or potential flooding, erosion, or water quality issues were observed
within the study area at the time of the field visit.
Underground storm drains were not visible for inspection at the time of the field visit.
No significant destruction of aquatic habitat or organisms were identified.
The following are exceptions to the findings:
TDA 3. It was observed that approximately half of the outfall pipe to Rolling Hills
Creek was full of sediment (Appendix D - Photo 1).
TDA 6. It was observed that an area adjacent to the TDA (on the western side)
indicates erosion. However, this area is not part of the downstream flow path of the
project (Appendix D - Photo 3). No erosion was observed at the outlet where a
30-inch culvert discharges into an open channel portion of Rolling Hills Creek
(Appendix D - Photo 4).
TDA 11. During the site inspection, an undermined tree was observed to the north of
SE Carr Road, which indicates evidence of erosion (Appendix D - Photo 7).
4-1 King County Metro Transit Department
4. Flow Control, Low-impact Development, and Water
Quality Facilities Analysis and Design
Flow control facilities will be evaluated at locations with more than 5,000 ft2 of new impervious
surface or more than 0.75 acre of new pervious surface. These locations will meet both
area-specific and implementation requirements as laid out in Sections 1.2.3.1 and 1.2.3.2 of the
City of Renton SWDM (City of Renton 2022). Flow control facilities are based on the Surface
Water Standard Details for a typical detention tank (City of Renton 2020).
4.1 Existing Site Hydrology (Part A)
The project consists of multiple sites that are located within the City’s existing roadway system.
The roadways are generally asphalt or concrete-paved roadways with concrete sidewalks. The
roadway storm drain system consists of catch basins, storm drainpipes, or roadside ditches.
Stormwater runoff from the roadway is collected by the catch basins, then conveyed into the
storm drains system. Appendix B provides the downstream analysis for the storm drain discharge
locations.
The existing roadway storm drain pipes range from 6 to 18 inches and are made from a variety of
materials, including concrete, corrugated metal pipe, ductile iron, and polyvinyl chloride or other
thermoplastic types.
4.2 Developed Site Hydrology (Part B)
The developed site conditions will typically add catch basins to the new curb line with a short
storm drain that connects to the nearby existing storm drains or catch basin. The existing catch
basins that are no longer at the curb line will remain, but the grates will be replaced with solid
covers. New catch basins will be placed at the proposed curb line and low spots as needed from
proposed bus station pullouts or a widened roadway section. The project will maintain the existing
discharge locations in each TDA.
The following are significant roadway improvements:
S Grady Way between Lake Avenue S and Talbot Road: Proposed catch basins will be
placed at the new curb line and will connect back to the existing 12-inch storm drain
on the northern side of the road. Catch basins will be spaced at a maximum of
150 feet given that the proposed cross-slope of the roadway is less than 1 percent.
Talbot Road S between S Grady Way and S Renton Village Place: Proposed catch
basins will be placed at the new curb line and will connect back to the existing storm
4-2 King County Metro Transit Department
drain at multiple locations. A detention pipe system is proposed within the designated
turn lane along Talbot Road immediately north of S Renton Village Place.
The offsite storm drains from private properties will be generally maintained. At the
Tesla dealership parking lot, new catch basins are proposed at the back of the new
sidewalk to capture the stormwater runoff from the parking lot. The existing
detention vault and oil/water separator will remain as they are. This system was
partially within the City’s ROW, and the project will take additional property as City
ROW such that this system will be completely within the City’s ROW.
At TDA 4, a proposed detention tank system would have a new impervious surface
area exceeding the TDA minimum requirements (see Section 5.4). Pre-engineered
(proprietary) treatment units are proposed that would provide enhanced basic
treatment and oil-control treatment in TDA 4 (see Section 5.5). King County is
committed to providing treatment for stormwater from new PGIS on a project basis,
even if not required by code, by capturing and treating additional PGIS than required
by code or by removing existing PGIS.
4.3 Performance Standard (Part C)
4.3.1 Area-specific Flow Control Facility Standard
TDA 4 is within the city of Renton along the RapidRide I Line route where flow control will be
required. The following is a summary of the location- and area-specific flow control facility
requirement for TDA 4:
Location – TDA 4 is located at the intersection of Grady Way and Talbot Road. It
extends approximately 0.1 mile west along Grady Way and 0.25 mile south along
Talbot Road. Figure 2 in Appendix A shows a study area map.
Area Designation – The Peak Rate Flow Control Standard (Existing Site Conditions)
area according to the Flow Control Applications Map is provided in reference Section
15A of the City of Renton SWDM (City of Renton 2022).
Requirement – Match existing site conditions for the 2-, 10-, and 100-year peak-rate
runoff so as not to create a downstream flooding problem.
TDA 4 has not been identified as having a downstream problem and does not directly discharge to
a major receiving water; thus, TDA 4 is likely to meet the minimum performance standards as
indicated in the respective area designations.
4.3.2 Conveyance System Capacity Standards
New pipe systems will be designed with enough capacity to convey and contain the 25-year peak
flow. Pipe structures may overtop during runoff events higher than the 25-year design capacity.
4-3 King County Metro Transit Department
The 100-year storm event should not create flooding or erosion problems, and overflow must
discharge at the natural location.
Table 4-1 lists the pipe design criteria from Chapter 4 of the City of Renton SWDM.
Table 4-1. Pipe Sizes and Lengths between Structures
Upstream
Structure to
Downstream
Structure
Pipe
Diameter
(inches)
Minimum Slope (%) and
Minimum Full Flow Velocity
(fps) at Design Flow
Maximum
Length
(feet)
Where
Allowed
Inlet to CB/MH 12 0.5%, 3.0 fps 60 Publica
Inlet to CB/MH 8 0.5%, 3.0 fps 40 Private
CB to CB 8 0.5%, 3.0 fps 100 Private
CB/MH to CB/MH 12 or greater 0.5%, 3.0 fps 300 Public
Source: City of Renton 2022
a Minimum pipe size will be 12 inches in diameter. An 8-inch-diameter pipe may be permitted on cross-street
laterals less than 66 feet to avoid utility conflicts or to meet shallow grade.
CB = catch basin
fps = feet per second
MH = manhole
4.3.3 Water Quality Standard
TDA 4 is located in a commercial area and on roadways with expected average daily traffic of
more than 7,500 vehicles; thus, the Enhanced Basic Water Quality Menu is applied. The goal of
the Enhanced Basic Water Quality Menu is to remove 80 percent of the total suspended solids for
flows up to the water quality flow. An additional goal is to achieve greater than 30 percent
reduction in dissolved copper and greater than 60 percent removal of dissolved zinc because
these heavy metals are associated with commercial land use and high-traffic volumes and have
been found to be toxic to fish and other aquatic life.
Although the Enhanced Basic Water Quality Menu is required under Core Requirement 8,
additional water quality facilities will be sized to meet Special Requirement 5 (Oil Control) when
the improvement is in a high-use sites as defined by the City of Renton SWDM. Specifically, this
TDA includes an intersection with measured average daily traffic counts of more than 25,000
vehicles (City of Renton 2022). The goal of the Oil Control Menu is to no visible sheen of runoff
leaving the facility, or less than 10 mg/L total petroleum hydrocarbons (TPH) in the runoff.
4-4 King County Metro Transit Department
4.4 Flow Control System (Part D)
4.4.1 Flow Control System (Core Requirement 3)
One flow control facility will be installed onsite and will receive only onsite flows. The analysis will
be done with the MGSFlood computer program, which uses continuous flow simulations as
required in the City of Renton SWDM. Because no fully dispersed surfaces have been identified at
this time, no sizing credits have been applied. No onsite best management practices (BMPs) are
being considered in the design; thus, no sizing credits have been applied. Section 4.4.2 provides
more information regarding onsite BMPs.
The proposed flow control facility is an underground detention pipe located within the center two-
way left-turn lane along Talbot Road S north of S Renton Village Place. This 120-linear-foot length
of 48-inch detention pipe will provide detention for approximately 23,759 ft2 of impervious surface
area, with live storage of 1,483 cubic feet.
4.4.2 Onsite Flow Control BMPs (Core Requirement 9)
Onsite flow control BMPs are required where a proposed project creates more than 2,000 ft2 of
new and replaced impervious surface and more than 7,000 ft2 of land-disturbing activity will
occur. Onsite flow control BMPs include the preservation of native vegetated surface to fully
disperse runoff, use of pervious surfaces to disperse runoff, roof downspout infiltration,
permeable pavements, bioretention, infiltration systems, and reduction of development footprint.
The following are the onsite BMPs:
Full infiltration – Full infiltration is only feasible where existing soils are coarse sands
or cobbles or medium sands and cannot be composed of fill. In addition, infiltration
from pollution-generating surfaces is only allowed when soil beneath the BMP has
properties outlined in Section 5.2.1 of the City of Renton SWDM that reduce the risk
of groundwater contamination. A geotechnical exploration was conducted to obtain
soil samples, and results showed that the hydraulic conductivity of the soil was low.
The geotechnical engineer did not recommend applying infiltration BMPs on the site
because of the low probability of attaining effective infiltration rates given the current
soil conditions (Davis 2023).
Limited infiltration – Limited infiltration is only feasible where existing soils are fine
sands, loamy sands, sandy loams, or loams. The groundwater protection properties
required for full infiltration of PGIS also apply. A geotechnical exploration was
conducted to obtain soil samples, and results showed that the hydraulic conductivity
of the soil was very low. The geotechnical engineer did not recommend applying
infiltration BMPs on the site because of the low probability of attaining effective
infiltration rates given the current soil conditions (Davis 2023).
Bioretention – ROW restrictions prevent the implementation of bioretention cells,
swales, and roadside ditches within the project limits.
4-5 King County Metro Transit Department
Permeable pavement – The roadway expansion, new sidewalks, and stations are the
only surfaces where permeable pavement will be considered. The City has expressed
concern about the difficulty of maintaining permeable pavement, making this an
unfavorable option. Also, the roadway expansion will accommodate a bus route
through the city of Renton, and the traffic loading associated with the bus route
makes roadway permeable pavement infeasible. Permeable pavement applied to
proposed sidewalks was evaluated during final design. Application of permeable
pavement was not preferred by the City because of maintenance and functionality
concerns. Soil samples also presented low hydraulic conductivity rates, indicating that
infiltration was not favorable at any station locations. While official infiltration testing
was not performed, infiltration through application of permeable pavement was not
recommended by the geotechnical engineer (Davis 2023).
Basic dispersion – ROW restrictions prevent the implementation of native vegetated
and other pervious surfaces used in runoff dispersion within the project limits.
New pervious surfaces – Soil moisture holding capacity of new pervious surfaces will
be protected in accordance with the soil amendment BMP provided in Section C.2.13
of Appendix C of the City of Renton SWDM (City of Renton 2022).
4.5 Water Quality System (Part E)
Because the total new impervious surface within the project limits is less than 50 percent of the
existing impervious surface, the Surface Exemption for transportation redevelopment projects
according to Section 1.2.8 of the City of Renton SWDM applies to all of the TDAs (City of Renton
2022). Therefore, water quality facilities are only required in TDAs under the following
circumstances:
More than 0.75 acre of new pollution-generating pervious surface will be added.
More than 5,000 ft2 of new PGIS that is not fully dispersed will be added.
King County Metro Transit Department (Metro) has also made an environmental commitment to
treat the pollution-generating surfaces created by the Project where feasible, even where not
required by the City of Renton SWDM. The City prefers the Washington State Department of
Ecology-approved modular wetland to provide enhanced treatment for the roadway stormwater
runoff. One 7-foot by 9-foot modular wetland (with the internal dimensions of 6-foot by 8-foot) is
proposed at the intersection of S Grady Way and Talbot Road S. One 13-foot by 9-foot modular
wetland (with the internal dimensions of 12-foot by 8-foot) is proposed along Talbot Road S near
the proposed detention facility. Table 4-2 provides water quality treatment BMPs for TDA 4.
4-6 King County Metro Transit Department
Table 4-2. TDA 4 Water Quality Treatment BMPs
Identification PGIS Area
Treated (ft2)
Treatment
Level BMP Type BMP Size
(feet)
Treatment MW (1-1) 10,355 Enhanced Modular Wetland 6 x 8
Treatment MW (1-2) 19,472 Enhanced Modular Wetland 12 x 8
Oil/Water Separator
(1-1)
10,355 Oil Control Coalescing Plate
Oil/Water Separator
7.5 x 5
Total 29,827 (>22,123
requireda)
a The total PGIS required to treat includes the total new PGIS (30,018 ft2) minus the total removed PGIS
(7,895 ft2) across all TDAs.
The total new PGIS created for the project is 30,018 ft2 while the required target treatment area
is 22,489 ft2. The total treated PGIS from the water quality devices are 29,827 ft2 and the project
will remove 7,895 ft2. Therefore, the project meets the Core Requirement 8 and the County’s
environmental commitment.
The intersection of S Grady Way and Talbot Road S is considered to be a high-use intersection.
Two legs of this intersection, the west leg on S Grady Way and south leg on Talbot Road S will be
widened. A coalescing plate oil/water separator are proposed at the southwest corner of S Grady
Way and Talbot Road S to provide treatment of the Talbot Road left turn lane as this intersection.
The oil/water separator will be upstream of the modular wetland treatment unit (MW 1-1). This
oil/water separator will be oversized to allow designed high peak flow rates flows through the
vault without high flow bypass to reduce the head loss from the high flow bypass structure.
The use of proprietary facilities is allowed if it has been demonstrated that it is likely to meet
pollutant removal goals as mentioned above. In Table 14.A, Proprietary Facilities – Current
Approvals of the City of Renton SWDM, the Modular Wetland system is listed as a City of
Renton-approved facility. The General Use Level Designation Letter from Ecology for this device is
used for sizing and maintenance requirements and can be found in Reference 14 of the City of
Renton SWDM. (City of Renton 2022)
5-1 King County Metro Transit Department
5. Conveyance System Analysis and Design
New pipe systems shall be designed with enough capacity to convey and contain the 25-year
peak flow. Storm drains may overtop for runoff events higher than the 25-year design capacity.
The 100-year storm event should not create flooding nor erosion problems and overflow must
discharge at the natural location.
New catch basins and inlets are proposed at the new curb line near the existing catch basin, and
new pipe connects the new catch basin to the existing catch basin. All new pipes were analyzed
for the 25-year storm event using the uniform flow method and the backwater method as stated
in the City’s stormwater manual. The calculation is included in Appendix G.
All new storm drain pipes conveying roadway runoff will be 12-inch diameter. However, in
locations along the corridor, the existing downstream pipe is 8-inch diameter, but conveyance
calculations were conducted at these locations to ensure adequate capacity remained in the
system. Storm drain pipes with less than 2 feet of cover will use ductile iron pipe otherwise
thermoplastic pipes will be used. Minimum pipe slope will be 0.5%.
Additional analysis has been performed for the impacted existing storm drain systems for the
10-year storm event. Offsite contributing area from private properties has been further delineated
from field visits and the conveyance analysis have been updated.
Retaining walls are located throughout the corridor at several station locations. Underdrain piping
will be required for retaining wall structures higher than 3-feet and the underdrain will be 4-inch
perforated pipe. Associated cleanouts at located at each end or bend throughout the system. The
underdrains have been sized to conform with standard 4-inch underdrain sizes as outlined in
Metro standard wall details. Collected water will then be discharged to nearby stormwater
structures if feasible or daylighted to nearby landscaping areas. Runoff directed to landscaping
has been assessed to ensure that no runoff will be directed to private property.
All downspout piping as part of the Metro transit shelter structures will be 3 inches in diameter.
These have been sized to accommodate runoff from the Tier 1 RapidRide station shelters and
convey the stormwater to the adjacent roadway curb and gutter or nearby landscaping strip.
Landscaping receiving runoff has been assessed to ensure that no runoff will be directed to
private property.
6-1 King County Metro Transit Department
6. Special Reports and Studies
The following reports and studies were reviewed or are being prepared for the project:
Geotechnical Report
Basis of Design
Stormwater pollution prevention plan (SWPPP)
7-1 King County Metro Transit Department
7. Other Permits
The following permits or approvals are anticipated for the project:
National Pollutant Discharge Elimination System (NPDES) Permit Notice of Intent –
Washington State Department of Ecology
Clearing and Grading Permit – City of Renton
Land Use Permit Type II – Critical Area Permit – City of Renton
8-1 King County Metro Transit Department
8. Construction Stormwater Pollution Prevention Plan
Analysis and Design
An erosion and sediment control (ESC) plan will be developed for the contract plans in accordance
with the City of Renton’s amendments to the KCSWDM (City of Renton 2022) and the KCSWDM
(King County 2021).
To avoid erosion and the transport of sediment offsite, the contractor will implement temporary
control measures during the construction phase of the project. During construction, stormwater
runoff will be conveyed in the existing conveyance systems, which are primarily storm drains.
ESC measures will be needed to prevent runoff from causing erosion and discharging sediment
into the existing drainage system during and after construction. Appropriate ESC measures will be
needed for construction activities on existing storm drain systems. The contractor will be
responsible for the phasing of ESC measures so that they are coordinated with the staging of
construction activities. Additionally, the contractor will be responsible for inspection and
maintenance of ESC measures during construction, including removal of accumulated sediment,
and for the removal of the BMPs and the remaining accumulated sediment at the end of
construction.
The project will follow the requirements listed in the NPDES General Construction Stormwater
Permit. The contractor will prepare an SWPPP following the 12 elements listed in the KCSWDM
(King County 2021), and the SWPPP will be updated as site conditions change.
Permanent measures will be implemented where needed to stabilize disturbed soils at project
completion.
8.1 Erosion and Sediment Control Plan Analysis and Design
(Part A)
The following ESC measures will be provided, as further detailed on ESC plan sheets:
1. Clearing Limits – Clearing limits will be delineated on the construction plans. Silt fence or
wattles will be installed downslope of any fill slopes to prevent offsite sediment migration.
2. Cover Measures – The contractor will provide temporary and permanent cover measures
where needed to protect disturbed areas. Mulching will be used in accordance with Erosion
and Sediment Control Standards, which is provided in Appendix D of the KCSWDM (King
County 2021), to provide immediate, temporary protection from erosion and to enhance plant
growth. Nets and blankets may be used according to Erosion and Sediment Control Standards
to provide additional protection and to hold seed and mulch in place on slopes. Disturbed
areas will be seeded as a permanent cover measure to reduce erosion.
8-2 King County Metro Transit Department
3. Perimeter Protection – To reduce the transport of sediment offsite, the contractor will
provide silt fence and compost socks as indicated on the drawings and as needed.
4. Sediment Retention – Catch basin filters will provide sediment retention at the locations
shown on the drawings.
5. Surface Water Control – Surface water control will be provided by using the existing and
new drainage conveyance systems. No base flows are expected while the existing storm drain
is replaced; however, any flows encountered should be diverted around the construction.
6. Dust Control – If necessary, the contractor will use water according to Section 3.8 of the
KCSWDM (King County 2021) to prevent wind transport of soil. Exposed soils will be sprayed
until wet and resprayed as needed. When using water for dust control, the contractor will
spray exposed soils until they are wet, but runoff should not be generated by spraying. Oil will
not be used for dust control. At the contractor’s option, a tackifier may be used with approval
from the engineer and the City of Renton.
8.2 Stormwater Pollution Prevention Plan Design (Part B)
The proposed ESC measures for the project will be further detailed in the contract plans.
If soils are exposed between October 1 and March 31, the contractor will mulch and seed as much
disturbed area as possible by the first week of October to provide grass cover for the wet season.
The contractor will also conform to the following wet season special provisions:
1. Apply cover measures to disturbed areas that are to remain unworked for more than 2 days.
2. Protect stockpiles that are to remain unworked for more than 12 hours. No area is to be left
uncovered or denuded longer than 12 hours.
3. Provide onsite supplies of cover materials sufficient to cover all disturbed areas.
4. Seed all areas that are to be unworked during the wet season by the end of the first week of
October.
5. Apply mulch to all seeded areas for protection.
6. Maintain a minimum of 50 linear feet of silt fence (and the necessary stakes) onsite for every
acre of disturbed area.
7. Provide construction road and parking lot stabilization areas for all sites, unless underlain by
coarse-grained soil.
8. Provide sediment retention as required.
8-3 King County Metro Transit Department
9. Provide additional surface water controls as required.
10. Implement construction phasing and additional BMPs for construction activity near surface
waters (to be evaluated by contractor).
11. Treat runoff generated from dewatering activities using suitable methods for the site.
12. Review and maintain ESC measures on a weekly basis and within 24 hours of any
runoff‐producing event.
8.2.1 Construction in Sensitive Areas and Buffers
Because of the project’s location, it is not anticipated that construction will be within a stream
buffer, a wetland or associated buffer, or within 50 feet of a lake.
8.2.2 Maintenance Requirements
ESC measures will be inspected and maintained regularly following the maintenance requirements
listed for each BMP, as described in Erosion and Sediment Control Standards (Appendix D of
KCSWDM [King County 2021]). The contractor will designate a certified ESC supervisor and will
give his or her name, address, and phone number to the City before construction begins.
The ESC supervisor will inspect the site at least once a month during the dry season, weekly
during the wet season, and within 24 hours of each runoff‐producing storm. If the City of Renton
requires a written record of maintenance activities, a standard ESC maintenance report will be
used as a written record of all maintenance.
8.2.3 Final Stabilization
Before obtaining final construction approval, the following conditions must be met:
1. All disturbed areas of the site should be vegetated or otherwise permanently stabilized. At a
minimum, disturbed areas will be seeded and mulched to provide a high likelihood that
sufficient cover will develop shortly after final approval. If seeded during the dry season, the
seeded area will be irrigated as necessary to maintain the sprouted vegetation until the start
of the wet season.
2. Structural measures such as silt fences, pipe slope drains, construction entrances, and storm
drain inlet protection will be removed.
3. Permanent surface water facilities, including catch basins, manholes, pipes, ditches, and
channels, will be cleaned.
8-4 King County Metro Transit Department
8.2.4 Roads and Utilities
Given the linear nature of the project and limited ROW along the project, the contractor may
propose other measures to better fit project conditions and provide reasonable protection. These
measures may include alternative and experimental measures.
9-1 King County Metro Transit Department
9. Bond Quantities, Facility Summaries, and Declaration
of Covenant
9.1 Bond Quantities
Because this is a Public Works project, this section does not apply.
9.2 Facility Summaries
Because this is a Public Works project, this section does not apply.
9.3 Declaration of Covenant
Because this is a Public Works project to be owned and operated by the City of Renton, a
Declaration of Covenant is not required.
10-1 King County Metro Transit Department
10. Operations and Maintenance Manual
All proposed stormwater BMPs will be maintained by the City, and do not have any special
nonstandard features. Therefore, no O&M Manual will be included in this report.
11-1 King County Metro Transit Department
11. References
Davis, Paul. 2023. Geotechnical Engineering Report. Jacobs. July 23.
City of Renton. 2022. City of Renton Surface Water Design Manual. City of Renton Public Works
Department, Surface Water Utility. June 22.
https://edocs.rentonwa.gov/Documents/0/edoc/625664/Surface%20Water%20Standard%20Deta
ils.pdf.
King County. 2021. King County, Washington, Surface Water Design Manual. King County
Department of Natural Resources and Parks. July 23.
https://your.kingcounty.gov/dnrp/library/water-and-land/stormwater/surface-water-design-
manual/2021/2021-kcswdm-full-manual.pdf
Appendix A
Technical Information Report Form
Page 1 of 7
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2022 City of Renton Surface Water Design Manual 6/22/2022
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
King County Metro Transit Department
William Hickey, P.E.
Jacobs Engineering
RapidRide I Line
N/A
23N
5E
17, 18, 19, 20, 29, 30, 32
Page 2 of 7
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
Black Hills, Rolling Hill Creek, Panther Creek
N/A
N/A
N/A
N/A
Page 3 of 7
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 9 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Alderwood
Arent/Alderwood
Beausite
Urban
11
TDA 2 to 15
TDA 4: Peak Rate Flow Control Standard
N/A
TBD
Page 4 of 7
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
On-site BMPs Describe:
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
N/A
N/A
N/A
Coalescing Plate Oil/Water Separator (TDA 4)
TBD
Page 5 of 7
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Description Water Quality Description On-site BMPs Description
Detention
Infiltration
Regional
Facility
Shared
Facility
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Vegetated
Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Full Dispersion
Full Infiltration
Limited Infiltration
Rain Gardens
Bioretention
Permeable
Pavement
Basic Dispersion
Soil Amendment
Perforated Pipe
Connection
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Detention Pipe
Oil Water Separator
Modular Wetland
Page 6 of 7
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-6
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
____________________________________________________________________________________
Signed/Date
William Hickey 02/06/2023
Page 7 of 7
N/A N/A
Appendix B
Downstream Analysis Resources Review,
TDA and Discharge Path Maps
Page 1 of 33
Renton Offsite Analysis
Per Section 2.3.1.1 of the City of Renton SWDM, an informational review was conducted and
extends 1 mile downstream of the project site (Task 2). A map of the study areas is included
below.
Task 2: Resource Review
The following information was reviewed and generally is consistent throughout all TDAs:
· Basin Plans: There are no adopted basin plans for the Black River Drainage basin
noted as of the date of this report.
· Basin Reconnaissance Summary Reports: No Basin reconnaissance summary reports
appear to be available for the areas that are within one mile of these project sites.
· FEMA Maps: A FEMA map Flood Insurance Rate Maps were reviewed to determine if
parts of the Project site exist within a floodplain. The project sites and areas within a
mile downstream of the project sites are not located within a 100-year floodplain. A
map showing the FEMA preliminary 100-year floodplain is included below.
· Offsite Analysis Reports: Other offsite analysis reports were not available for review
at the time of this study.
· Sensitive Areas Folios
The study area was reviewed for sensitive areas on the King County iMap, and the
outcomes are briefly summarized below.
o Wellfield Capture Zone: Mapping identifies that the TDAs are not located within
wellfield capture zones.
o Seismic Hazard Areas: No seismic hazard areas are identified on the project sites.
o Erosion Hazard Areas: Mapping indicates that areas within a mile downstream of
the project sites are located within erosion hazard areas.
o Landslide Hazard Areas: Mapping identifies areas within a mile downstream of the
project sites are located within landslide hazard areas.
o Wetlands Inventory: No wetland was identified on-site and within a quarter mile
downstream of the project sites. However, it is noted that portions of Rolling Hills
Creek, Springbrook Creek, and Panther Creek within 1 mile downstream of some
project sites are considered wetlands.
o Designated Water Quality Problems: The project sites discharge to streams that
do not have any water quality problems within a mile downstream of the project
site.
B-2
Page 2 of 33
o Designated Water Quality Problems: No water quality issues were found within 1
mile downstream of any TDA.
Reference the resource reviews in the following sections for exceptions to the general findings of
Task 2 listed above.
A field inspection (Task 3) and Drainage System Description and Problem Descriptions (Task 4)
were completed for all TDAs to a point 0.25 miles downstream of the project site. Furthermore, a
detailed description of drainage system components (Drainage System Table) is also provided in
Appendix C.
1.1 TDA02
Task 1: Study Area Definition and Maps
TDA02 consists of two areas with separate discharge locations and combine within 0.25 mile
downstream (as determined by the shortest flow path). The eastern part is located at the
intersection of S Grady Way and Lake Avenue S and the western part is on S Grady Way east of
Lake Avenue S in Black River Drainage basin. The proposed development in TDA02 will add
more than 2,000 square feet of new impervious surface and is therefore subject to Core
Requirement #2. It is not expected that the proposed development will cause any backwater
effects upstream of the project site; conveyance calculations are provided in Appendix G.
Task 2: Resource Review
· Sensitive Areas Folios:
o Wellfield Capture Zone: Mapping identifies that the project site is located within a
10-year wellfield capture zone and areas downstream of the project site are
within 5- and 10-year Wellfield capture Zones.
Task 3: Field Inspection
A field visit was conducted on September 30, 2020 to observe surface conditions of the project
site and downstream drainage features within the study area up to the 0.25-mile downstream
point. The weather was mostly sunny and the last rainfall that had occurred consisted of 0.04
inch on September 27, 2020. Inspections were completed using the guidelines for a downstream
analysis as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following field
observations were noted:
· TDA02 is located in an area mainly with a commercial setting which is mostly paved and
impervious (full of parking lots).
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
B-3
Page 3 of 33
· Underground storm drains were not visible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs Engineering Group Inc. (Jacobs), GIS
shows that runoff -discharges from the western part of TDA06 through a series of catch basins
and 12-inch pipes and flows northeast and then eastward for about 350 feet, combining with the
runoff from the eastern part of the TDA through a series of catch basins and 18-inch pipes. The
combined runoff continues to flow north mainly under parking lots through 18-inch pipes for
approximately 800 feet and enters a 36-inch pipe. After that, the runoff flows westward through
36- to 60-inch pipes along S 7th Street for about 460 feet reaching the point 0.25 mile
downstream of the project site.
From the point 0.25 mile downstream, the runoff continues flowing west along SW 7th Street
through a series of catch basins and 60-inch pipes and ultimately reaches the point 1 mile
downstream of the project site.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1-mile downstream of the TDA02.
1.2 TDA03
Task 1: Study Area Definition and Maps
TDA03 is located northeast of the Interstate (I-)405 – State Route (SR) 167 interchange at the
South Grady Way between Shattuck Avenue S and Rainier Avenue S in the Black River Drainage
basin. The proposed development in TDA03 which will add more than 2,000 square feet of new
impervious surface and is therefore subject to Core Requirement #2. It is not expected that the
proposed development will cause any backwater effects upstream of the project site; conveyance
calculations are provided in Appendix G.
Task 2: Resource Review
· Sensitive Areas Folios:
o Wellfield Capture Zone: Mapping identifies that the project site is located within
10-year wellfield capture zone.
o Wetlands Inventory: No wetland was identified onsite and within 0.25 mile
downstream. However, it is noted that portions of Rolling Hills Creek within 1 mile
B-4
Page 4 of 33
downstream of the project site south of I-405 and west of SR 167 are considered
a wetland.
Task 3: Field Inspection
A field visit was conducted on July 23, 2020 to observe surface conditions of the project site and
downstream drainage features within the study area up to the 0.25-mile downstream point. The
temperature was around 65 degrees Fahrenheit (°F) with slightly cloudy skies and the last
rainfall that had occurred consisted of 0.06 inch on July 18, 2020. Inspections were completed
using the guidelines for a downstream analysis as given in Section 2.3.1.1 of the 2017 City of
Renton SWDM. The following field observations were noted:
· TDA03 is located in an area mainly with a commercial setting which is mostly paved and
impervious.
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· Underground stormwater drains were not visible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· During the field visit, it was observed that approximately half of the outfall pipe to Rolling
Hills Creek was full of sediment (Appendix C - Photo 1).
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs, showing that there is a storm drain
system in the southwest corner of the proposed project in TDA03 that runs southward under the
parking lots in a series of catch basins and 12- to 36-inch pipes and eventually discharges into
the Rolling Hills Creek located on the north side of I-405. The water flows west in the creek to a
point 0.25 mile downstream and this terminates the 0.25-mile downstream of the project area.
From the point 0.25 mile downstream, the water continues to flow westward within the creek for
approximately 500 feet which becomes piped southward under I-405 for approximately 1,360
feet. On the south side of I-405, the creek daylights and becomes a wetland located east of SR
167 for about 1,200 feet and is then piped west under SR 167 and becomes an open channel
flowing west through several culverts until it reaches the endpoint of the full downstream
analysis 1 mile downstream of the site.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1 mile downstream of TDA03.
B-5
Page 5 of 33
1.3 TDA04
Task 1: Study Area Definition and Maps
The southern part of TDA04 is located near the intersection of Talbot Road South and S Renton
Village Place on the east side of the I-405 – SR 167 interchange in the Black River drainage
basin. The TDA then continues north and takes a sharp left at S Grady Way and ends right next to
where TDA03 starts. The proposed development in TDA04 will add more than 2,000 square feet
of new impervious surface and is therefore subject to Core Requirement #2. It is not expected
that the proposed development will cause any backwater effects upstream of the project site,
because flow control devices will be provided to mitigate the increased runoff to the existing
storm drain system.
Task 2: Resource Review
· Sensitive Areas Folios:
o Wellfield Capture Zone: Mapping identifies that the project site is located within
5- and 10-year wellfield capture zones.
o Wetlands Inventory: One wetland was identified on the east side of the Talbot
Road S close to where TDA04 is located. It is also noted that the portions of
Rolling Hills Creek within 1 mile downstream of the project site are considered
wetlands, as shown on the maps below.
Task 3: Field Inspection
A field visit was conducted on July 23, 2020 to observe surface conditions of the project site and
downstream drainage features within the study area up to the 0.25-mile downstream point. The
temperature was around 65°F with slightly cloudy skies and the last rainfall that had occurred
consisted of 0.06 inch on July 18, 2020. Inspections were completed using the guidelines for a
downstream analysis as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following
field observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
· Underground storm drains were not visible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· TDA04 is located in an area mainly with a commercial setting which is mostly paved and
impervious.
B-6
Page 6 of 33
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs, showing that runoff leaves TDA04 from
two discharge locations that combine within 0.25 mile downstream (as determined by the
shortest flow path). Runoff from the northern portion of the site at S Grady Way flows to the
south mainly under parking lots through a series of catch basins and 12- to 48-inch pipes.
Runoff from the portion of the site located at Talbot Road South discharges to piped segment of
Rolling Hills Creek consisting of a 60-inch pipe flowing south and 72-inch pipe flowing west.
Ultimately, the runoff combines from the two discharge points, flows west and south along the
piped portion of Rolling Hills Creek and this terminates the 0.25-mile downstream of the project
area.
From the point 0.25 mile downstream, stormwater flows south until the creek daylights and
parallels I-405 westward and then becomes piped southward under I-405 for approximately
1,360 feet. On the south side of I-405, the creek daylights and becomes a wetland located east
of SR 167 for about 1,200 feet and is then piped west under SR 167 and becomes an open
channel flowing west with intermittent culverts until it reaches the endpoint of the full
downstream analysis 1 mile downstream of the site.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1 mile downstream of TDA04.
1.4 TDA05
Task 1: Study Area Definition and Maps
TDA05 is located on the east side of Benson Drive South near the intersection of S Puget Drive in
the Black River drainage basin. The proposed development in TDA05 is located within erosion
and landslide hazard areas and is therefore subject to Core Requirement #2. The proposed
development does not increase flows to the existing storm drain system; therefore, there will be
no backwater impacts to any upstream areas.
Task 2: Resource Review
· Sensitive Areas Folios:
o Erosion Hazard Areas: Mapping indicates that the project site is located within
erosion hazard areas. Appropriate erosion control measures will be taken during
design and construction.
o Landslide Hazard Areas: Mapping identifies a portion of the site is located within a
moderate landslide hazard area. Appropriate control measures will be taken
during design and construction.
o Designated Water Quality Problems: The project discharges within 1 mile to
Rolling Hills Creek, which is listed for bioassessment on the Washington State
B-7
Page 7 of 33
Department of Ecology (Ecology) 303d list. A map showing the water quality
problem is included below.
Task 3: Field Inspection
A field visit was conducted on September 30, 2020 to observe surface conditions of the project
site and downstream drainage features within the study area up to the 0.25-mile downstream
point. The weather was mostly sunny and the last rainfall that had occurred consisted of 0.04
inch on September 27, 2020. Inspections were completed using the guidelines for a downstream
analysis, as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following field
observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
· Underground storm drains were not visible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· The storm drain system downstream of the project site is probably connected to a detention
pond, but the team was unable to confirm it in the field during the site inspection (Appendix
C - Photo 2).
· TDA05 is located in an area mainly with a residential setting, while portion of the
surrounding area includes green vegetation and is pervious.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs, showing that there is a storm drain
system on the north side TDA05 consists of series of catch basins and 12- to 42-inch pipes that
capture runoff from the site and travel to the north, possibly flowing through a detention pond,
but this was not confirmed. This system then joins a piped segment of Rolling Hills Creek
downstream of the detention pond and then runs under I-405. The piped creek then continues
to flow north to a point 0.25 mile downstream of the project area.
From the point 0.25 mile downstream, the creek continues to flow north approximately 200 feet
d and turns west in the 72-inch pipe, which is coming from TDA04. The creek then flows south
until it daylights and parallels southbound I-405 and then enters a pipe that flows southward
under I-405 for approximately 1,360 feet. On the south side of I-405, the creek daylights and
becomes a wetland located east of SR 167 for approximately 700 feet south to a point 1 mile
downstream.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1 mile downstream of TDA05.
B-8
Page 8 of 33
1.5 TDA06
Task 1: Study Area Definition and Maps
TDA06 is located on the west side of Benson Drive S near the intersection of S Puget Drive in the
Black River drainage basin. The proposed development in TDA06 is located within erosion
hazard areas and is therefore subject to Core Requirement #2. The proposed development does
not increase flows to the existing storm drain system; therefore, there will be no backwater
impacts to any upstream areas.
Task 2: Resource Review
· Sensitive Areas Folios:
o Erosion Hazard Areas: Mapping indicates that the project site is located within
erosion hazard areas. Appropriate erosion control measures will be taken during
design and construction.
o Wetlands Inventory: Two wetlands were identified on the northwest side of where
runoff leaves the TDA. They are located approximately 420 and 700 feet within
the northern portion of the TDA. Furthermore, it is noted that the portions of
Rolling Hills Creek within 1 mile downstream of the project site are considered
wetlands, as shown on the map below.
Task 3: Field Inspection
A field visit was conducted on September 30, 2020 to observe surface conditions of the project
site and downstream drainage features within the study area up to the 0.25-mile downstream
point. The weather was mostly sunny and the last rainfall that had occurred consisted of 0.04
inch on September 27, 2020. Inspections were completed using the guidelines for a downstream
analysis as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following field
observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding or water quality issues within
the study area at the time of the field visit.
· Underground storm drains were not feasible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· It was observed that an area adjacent to the TDA (on the west side) indicates some erosion.
However, this area is not part of the downstream flow path of the Project (Appendix C -
Photo 3).
· No erosion was observed at the outlet where 30-inch culvert discharges into an open
channel portion of Rolling Hills Creek (Appendix C - Photo 4).
B-9
Page 9 of 33
· TDA06 is located in an area mainly with a residential setting, while portion of the
surrounding area includes green vegetation and is pervious.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs, showing that there is a storm drain
system that captures runoff from the northern portion of TDA06, which is located on Benson
Drive South just before the intersection with S Puget Drive. The runoff is captured by a series of
catch basins and 12-inch pipes flowing northwest and discharges into Rolling Hills Creek (within
a wetland) approximately 420 feet from the TDA (Appendix D - Photo 5). The creek then leaves
the wetland and crosses in a 12-inch culvert under Smithers Avenue S and drains into another
wetland (becomes a wetland again), which is located about 700 feet from the TDA (Appendix D -
Photo 6). The water then continues to flow northwest through a 30-inch culvert running under I-
405 and eventually discharges into an open channel portion of Rolling Hills Creek located on the
north side of the I-405; and this terminates the 0.25 mile downstream of the project area.
From the point 0.25 mile downstream, stormwater flows south until the creek daylights and
parallels I-405 westward and then becomes piped southward under I-405 for approximately
1,360 feet. On the south side of I-405, the creek daylights and becomes a wetland located east
of SR 167 for about 1,200 feet and is then piped west under SR 167 and becomes an open
channel flowing west with intermittent culverts for approximately 800 feet to the endpoint of
the full downstream analysis 1 mile downstream of the TDA.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1-mile downstream of TDA06.
1.6 TDA07
Task 1: Study Area Definition and Maps
TDA07 is located on Talbot Road S at the corner with S 23rd Street (northeast side of the TDA is
on S 23rd Street close to the intersection) in the Black River drainage basin. The proposed
development in TDA07 is located within moderate landslide hazard areas and is therefore
subject to Core Requirement #2. The proposed development does not increase flows to the
existing storm drain system; therefore, there will be no backwater impacts to any upstream
areas.
Task 2: Resource Review
· Sensitive Areas Folios:
o Landslide Hazard Areas: Mapping identifies a portion of the TDA is located within
a moderate landslide hazard area. Appropriate control measures will be taken
during design and construction.
o Wetlands Inventory: One wetland was identified on the east side of SR 167 within
1 mile downstream of the TDA. Furthermore, it is noted that the point 1 mile
B-10
Page 10 of 33
downstream of the project site is also located within a wetland on the west side of
the SR 167.
Task 3: Field Inspection
A field visit was conducted on September 30, 2020 to observe surface conditions of the project
site and downstream drainage features within the study area up to the 0.25-mile downstream
point. The weather was mostly sunny and the last rainfall that had occurred consisted of 0.04
inch on September 27, 2020. Inspections were completed using the guidelines for a downstream
analysis as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following field
observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
· Underground storm drains were not feasible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· TDA07 is located in an area mainly with a residential setting, which is mostly paved and
impervious.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs showing that stormwater drains from
the southern portion of TDA07 that is located on Talbot Road S and the runoff is captured by a
series of catch basins and 12- to 24-inch pipes. The runoff enters to a 24-inch pipe and
continues to flow south for approximately 320 feet, and this terminates the 0.25 mile
downstream of the project area. The runoff flows south and discharges into an unnamed Panther
Creek tributary and then is directed to Panther Creek through a 48-inch culvert which crosses
under Talbot Road S. Panther Creek is considered a wetland as it flows north alongside SR 167
and then takes a sharp left draining into a 48-inch culvert crossing under SR 167, which
ultimately becomes another wetland approximately 200 feet west of the SR 167. This terminates
1 mile downstream of the project area.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within the 1 mile downstream of TDA07.
1.7 TDA11
Task 1: Study Area Definition and Maps
TDA11 is located at the intersection of SE Carr Road and 103rd Avenue SE in the Black River
drainage basin. The proposed development in TDA11 is located within steep slope hazard areas
B-11
Page 11 of 33
and is therefore subject to Core Requirement #2. The proposed development does not increase
flows to the existing storm drain system; therefore, there will be no backwater impacts to any
upstream areas.
Task 2: Resource Review
· Sensitive Areas Folios:
o Wellfield Capture Zone: Mapping identifies that the TDA is located within 5- and
10-year wellfield capture zones.
o Landslide Hazard Areas: Mapping identifies that TDA11 is located within
moderate landslide and steep slope hazard areas. Appropriate control measures
will be taken during design and construction.
o Wetlands Inventory: One wetland was identified along Panther Creek on the east
side of SR 167 within 1 mile downstream of the TDA.
o Designated Water Quality Problems: The project discharges within 1 mile to
Panther Creek, which is listed for bioassessment on the Ecology 303d list. A map
showing the water quality problem is included below.
Task 3: Field Inspection
A field visit was conducted on September 22, 2020 to observe surface conditions of the project
site and downstream drainage features within the study area up to the 0.25-mile downstream
point. The weather was mostly sunny and the last rainfall that had occurred consisted of 0.33
inch on September 20, 2020. Inspections were completed using the guidelines for a downstream
analysis, as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following field
observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding or water quality issues within
the study area at the time of the field visit.
· During the site inspection, an undermined tree was observed to the north of SE Carr Road,
which indicates evidence of erosion (Appendix C - Photo 7).
· Underground storm drains were not feasible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· TDA11 is located in a residential setting, which is mostly paved. However, the downstream
area to the north is covered with vegetation.
B-12
Page 12 of 33
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs showing that stormwater flows east on a
storm drain system running alongside South Carr Road that consists of a series of catch basins
and 12-inch pipes for approximately 330 feet. The runoff then drains into a vegetated ditch
through a 24-inch pipe on the north side of the South Carr Road. The flow within the ditch is
then directed to the northwest for about 890 feet and discharges into an unnamed tributary of
Panther Creek. The tributary then flows to the east for about 100 feet, a point 0.25 mile
downstream of the project area.
From the point 0.25 mile downstream, the unnamed tributary continues to flow east until it joins
Panther Creek which becomes a wetland to the east of SR 167 which flows north until it reaches
the endpoint of the full downstream analysis approximately 0.4 mile further.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within 1 mile downstream of TDA11.
1.8 TDA12
Task 1: Study Area Definition and Maps
TDA12 is located on SE Carr Road between Benson Drive S and 105 Place SE to the west of SR
167 in the Black River drainage basin. The proposed development in TDA12 will add more than
2,000 square feet of new impervious surface and is therefore subject to Core Requirement #2. It
is not expected that the proposed development will cause any backwater effects upstream of the
project site, because a flow control device will be provided to mitigate the increased runoff to the
existing storm drain system.
Task 2: Resource Review
· Sensitive Areas Folios:
o Wetlands Inventory: One wetland was identified downstream to the west of 105th
Place SE that is not part of the downstream flow path. The unnamed tributary the
TDA discharges to flows through a small wetland which is located approximately
900 feet to the west of the TDA. Also, a wetland was identified along Panther
Creek on the east side of SR 167 within 1 mile downstream of the TDA.
o Designated Water Quality Problems: The project discharges within 1 mile to
Panther Creek, which is listed for bioassessment on the Ecology 303d list. A map
showing the water quality problem is included below.
Task 3: Field Inspection
A field visit was conducted on July 23, 2020 to observe surface conditions of the project site and
downstream drainage features within the study area up to the 0.25 mile downstream point. The
B-13
Page 13 of 33
temperature was around 65°F with slightly cloudy skies and the last rainfall that had occurred
consisted of 0.06 inch on July 18, 2020. Inspections were completed using the guidelines for a
downstream analysis as given in Section 2.3.1.1 of the 2017 City of Renton SWDM. The following
field observations were noted:
· There were no reported problems identified under Task 2 to investigate up to 0.25 mile
downstream of the site.
· There were no observed existing or potential issues of flooding, erosion, or water quality
issues within the study area at the time of the field visit.
· Underground storm drains were not visible for inspection at the time of the field visit.
· No significant destruction of aquatic habitat or organism were identified.
· There is an outfall to the west of the TDA that discharges the runoff into the unnamed
Panther Creek tributary through a 36-inch pipe (according to the available GIS data). Since
the unnamed tributary is located down a steep ravine, the outfall was not observed.
· TDA12 is located in an area mainly with a commercial setting, which is mostly paved and
impervious.
Task 4: Drainage System Description and Problem Descriptions
A level 1 downstream analysis was conducted by Jacobs, showing that there is a storm drain
system on SE Carr Road. It consists of a series of catch basins and 12- to 60-inch pipes that
capture runoff from the east side of the TDA close to 105th Place SE and discharge it to an
unnamed tributary of Panther Creek. The tributary flows through a short 60-inch diameter
culvert, through another 60-inch culvert under 103rd Avenue SE into a wetland on the other side
before flowing west. This tributary joins Panther Creek, flowing into a wetland on the east side of
SR 167, then flows north until it reaches the endpoint of the full downstream analysis.
Drainage Complaints: King County IMap data shows that there are no relevant open drainage
complaints (closed complaints were omitted) within 1 mile downstream of TDA12.
B-14
Page 14 of 33
King County, EagleView
King County iMap
Date: 10/7/2021
Notes:
The information included on this map has been compiled by King County staff from a variety of sources and is subject tochange without notice. King County makes no representations or warranties, express or implied, as to accuracy,completeness, timeliness, or rights to the use of such information. This document is not intended for use as a surveyproduct. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including,but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map.Any sale of this map or information on this map is prohibited except by written permission of King County.±
Legend
Potential steep slopehazard areas (2016,see explanation--->)
Erosion hazard (1990SAO)
Stream (1990 SAO)Stream (1990 SAO)
class 1
class 2 perennial
class 2 salmonid
class 3
unclassified
Wetland (1990 SAO)
Watercourses (pathsLandslide outline(polygon contains allfeatures of deep-seated landslide)
Headscarp and flanks(cliff like slopes on topand side of a slide)
Landslide body (wheredebris from a slide hasgone)
Potential landslide
Receiving Waterbody
Threshold Discharge
Area (TDA) Boundary
Existing TDA
Discharge Location
I Line - Renton Drainage Map
Black River
TDA: REN-TDA01 - REMOVED FROM PROJECT
Location: S 2nd St and Morris Ave S, S 2nd St and
Whitworth Ave S, S 2nd St and Shattuck Ave S
S
p
r
i
n
g
b
r
o
o
k
Cr
e
e
k
TDA: REN-TDA02 (0.32 ac)
Location: S Grady Way and Lake Ave S,
S Grady Way and Shattuck Ave S
TDA: REN-TDA03 (0.43 ac)
Location: S Grady Way
S Grady W
a
y
S 2nd St
Whitworth Ave SShattuck Ave SMorris Ave STalbot Rd SS Gr
a
dy
Wa
y
167
167
167
515Benson Dr
S
TDA: REN-TDA04 (2.80 ac)
Location: S Grady Way and Talbot Rd S
S 15th St
S 21st StTalbot Rd STDA: REN-TDA05 (0.01 ac)
Location: Benson Rd S
TDA: REN-TDA06 (0.01 ac)
Location: Talbot Rd S and S 15th St
515
Rolling HillsCreek
Rolling Hills Creek
S 23rd St
Talbot Rd STDA: REN-TDA07 (0.14 ac)
Location: Talbot Rd S and S 23rd St
Panther Creek
S 32nd St
S 38
t
h
C
t
SE Ca
r
r
R
d
108th Ave SE105th Pl SESE Petrovitsky Rd
SE 192nd St
SE 186th St
SE 182nd St
SE 180th St
108th Ave SEPan
t
h
e
r
C
r
e
e
k
TDA: REN-TDA08 (0.05 ac)
Location: Talbot Rd S and S 32nd St
TDA: REN-TDA09 (0.32 ac)
Location: Talbot Rd S and S 38th Ct
S 177th StTDA: REN-TDA10 (0.16 ac)
Location: Talbot Rd S
TDA: REN-TDA11 (0.02 ac)
Location: SE Carr Rd and Mill Ave S
TDA: REN-TDA12 (0.46 ac)
Location: SE Carr Rd and 105th Pl SE
TDA: REN-TDA13 (0.19 ac)
Location: SE 180th St
TDA: REN-TDA14 (0.29 ac)
Location: 108th Ave SE
TDA: REN-TDA15 (0.06 ac)
Location: 108th Ave SE and SE 92nd St
P
a
n
t
h
e
r
C
r
e
e
k
Panthe
r
Lake
REN-TDA01 and REN-TDA02
Discharge Location
REN-TDA03
Discharge Location
REN-TDA04 and REN-TDA05
Discharge Location
REN-TDA06
Discharge Location
REN-TDA07
Discharge Location
REN-TDA08
Discharge Location Panther CreekREN-TDA09
Discharge Location
REN-TDA10
Discharge Location REN-TDA12, REN-TDA13, and REN-TDA14 Discharge
Location
REN-TDA11
Discharge Location
REN-TDA15
Discharge Location
SE Carr Rd
SE 200th St
SE 196th St
SE 204th St
SE 208th St
Springb
r
o
o
k
C
r
e
e
k
Page 15 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>kjREN-TDA1
3530
3 0
35
3030
30
35
35
30
353
5
303 0
30
3 5
35353035
6-in
6-in
6-in
6-in8-in6-in
8-in
12-in
6-in
6-inUNK
6 -in6-in6-in8-in12-in6-in
12-in24-in6-in
12-in
6-in
12-in
8-in4-in
6-in
6-in 6-in1
2
-in6-in12-in6-in12-in12-in1
2
-in
4-in24-inUNK18-in8-in6-in12-in
21-in
6-in
8
-in6-in8-in
12-in12-inUNK8-in
12-in8-in12-in
6-in
12-in
12-inUNK 8-in12-in
12-inUNK21-in
6-in 8-in8-inUNK12-in
8-in
12-in
UNK
12-in6-in1
2
-i
n8-in12-in 12-inUNK1 2 -in
18-in
8-inUNK
12-in12-in
Figure -TDA Area and Discharge PathREN-TDA1 1
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060Feet
Shatt
uck
Ave
S
S
2
n
d
S
t
B-16Page 16 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>!.kjREN-TDA2REN-TDA32525
25
25
2525
2525
35
25
2
5
30
2530 25253025
25
25 3025
25
12-in
24-in
8-in
12-in
1 2 -in
6-in12-in12-in
8-in
12-in1 2 -in8-in6-in1 2 -in
8-in12-in
12-in
1 5-i n
8 -i n
UNK8-in 12-in8-in
8-in
1
8
-i
n12-in
12-in
8-i
n
12-in
8
-in 24-
i
n48-in
12-in8-i
n12-in18-in
24-in1 2 -in
18-in
12-in
1 2 -in
12-
i
n1
5
-i
n27-in36-in8-i
n8-in12-in
12-in
12-in21-in60-in8-in
UNK
8-in
12-in
12-in 8-in
UNK12-in10-in6-in
15-in12-in15-in
8-inUNK12-in18-in1
2
-in
12-in8-
i
n24-i
n12-in12-inUNK
8-in12-i
n10-in
UNK
12-in8-in6-in8-in
12-in
15-in8 -in
8-in15-i
n18-in12-in 12-in12-in
UNK UNK
12-in
24-i
n Figure -TDA Area and Discharge PathREN-TDA2 2
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060FeetS Grady Way
Shattuck
A
v
e
S
B-17Page 17 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>!.!.kjkjkjREN-TDA2REN-TDA3Rolling Hills CreekRolling Hills CreekRol
l
i
ng Hil
l
s Creek257
0 2525
25
25453025253030
30
652535
45
252
5
120115110105455055606535758070100859
0
95 4030
12-in
12-in 8-in8
-i
n8-i
n8-
i
n1 2 -in12-
i
n1
5
-i
n27-in8-i
n12-in12-in
8-in12-in
8-in
6-in18-in
UNK12-in8-in8-in8-in10-in15-in1
8-in 8-in15-in12-in8-
i
n8-in
6-inUNK 12-in8-in
8-in48-in12-i
n24-in12-i
n1
2-in
24-in
12-in 10-in 8-in12-in36-in 12-in
15-in8-in8-in12-in
24-in
18-in60-in 24-in18-in12-in
UNK
18-in 18-in18-
i
n12-in
24-
i
n Figure -TDA Area and Discharge PathREN-TDA3 3
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet S Grady WayB-18Page 18 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>
!.
R
E
N
-
T
D
A
4
Rolling Hills Creek259030
35
959580753525309530
35
903030
908085808535
7025657560553035
504540303
5
8-in
8-i
n8-in 8-in8-in
8-in8-in8-in12-in
1 2 -in
1 5 -in
8-in
1
2
-in
8-in
8-in1
8-in
8 -in
8-in12-in12-in15-in12-in12-in12-in12-
i
nU N K
12-in12-
i
n6-inUNK
12-in12-in12-in10-in 12-in
36-in
12-in15-in12-in 12-in12-in
8-in12-in
12-in
8-in12-inUNK12-in12-inUNK
49-in
1 8 -in
1 2 -in12-inUNK24-in12-in
8-in
UNK
1
2-inUNK
48-in Figure -TDA Area and Discharge PathREN-TDA4 4
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060Feet
S Gra
d
y
W
a
y Talbo
t
Rd
S
B-19Page 19 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 8:52:51 PM</ACP>
!.
kj
kj
kj REN-TDA4RollingHillsCreek Rol
li
ngHi
ll
s CreekTri
but
aryRolling Hills CreekRolling Hills Creek Rol
l
i
ng Hi
l
l
s CreekRolling Hills CreekRolling Hills Creek 9517535
160301201708580
35
603 5
2 5
1
0
5
16016540 903 5
3 5
1551501453535140135100130125
55120115110501051009545 309090 95
4530
5055608075657085304035
42-in12-in
8 -in 8-in12-in12-in 12-in12-in12-in1
2-in 8-in12-in
6-in12 -in 18-inUNK15-in
15-in 12-in12-in18-in60-in18-in
60-in
18-in18-in12-in72-in
12-in8-i n
12-i
n12-in12-in12-in
6-in 12-
i
n1 2 -in
48-in
12-inUNK12-in18-in
12-in12-in15-in
1
2
-i
n
12-in1 2 -in
12-in
12-in12-in10-in8-in12-in12-in12-inUNK
12-in
12-in30-in 18-in24-in12-in
12-in48-in12-in42-in Figure -TDA Area and Discharge PathREN-TDA4 5
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060Feet
Pipe Observed in
the Field
REN-TDA4 (Continue)Talbot Rd SB-20Page 20 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>!.!.kjkjkjREN-TDA4
REN-TDA5
REN-TDA6
R o l li n gHillsCreek
R olling H ills C re e k
Rolling Hills CreekRolling Hills Creek
Rolling Hills Creek
Rolling H ills C reekRolling Hills CreekRolling Hills Creek
120200
6
0
35
357 530
9555 185
70180
6530 5550
60175
401154035170
1103535
160 165
1058 0
55
155
145
140
45135
150
130
125
120
85115
1 0 0
110
105
95
100
95
90
90657
0 8085754035
6045
5550 8-in12-in42-in
12-in 8-in8-in12-in12-in12-in18-in8-in
12 -in
6-in12-in
8-in12-in18-in 18-in12-in
12-in12-in18-in
18-in
12-in
8-in6-in 12-in8-in
12-in
8-in60-in12-in12-in12-in
12-in18-inU N K
30-in
12-in
72-in36-in
12-in10-in8-i
n1 2-i n
30-in8-in8-in
12-in1 2 -in
12-
i
n12-in
12-in
1
2-in
12-in
12-in 12-in12-in
12-in12-in12-in
12-in
8-in12-i
n
12-in
36-
i
n18-in12-in8-in
Figure -TDA Area and Discharge Path 6
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet
REN-TDA5 & REN-TDA6
T
a
l
b
o
t
R
d
SS 15th StB-21Page 21 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>!.kj75
1 9 0
45
215 215
5 0 5 560
6519070
75
205210 8085
2520 30354045 5060556570759 0
80 8590200195
2 0 519095
115
105
1 2 0
110
1251 0 0
130135
185140
1601801551451651 5 0
175170
6-in
6-in6-in8-in6-in
6-in8-in
8-in
12-in 6-in8-in8-in8-in8-in12-in18-in8-in8-in8-
i
n12-in12-in
8 -in
8-in 12-in8-in
12-in
8
-i
n
UNK
12-in12-in
18-in 12-in15-in24-in
12-in
12-in
UNK12-inUNKUNK8-inU
N
K
UNKUNK4 8 -in
UNK12-in Figure -TDA Area and Discharge PathREN-TDA7 7
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet
RE
N
-
T
D
A
7
Talbot
R
d
S
S 23rd StB-22Page 22 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>
!.
kj
Pant
her Cr
eekPanther Creek180
105130205100
200
95
19519025202025185
10545
5
0
4
0
1
1
5
135
5
5
35
2
5
20
30
95
1
2
01256
0
1
4
0
1
0
0
6
5
1601
3
0110 1
4
5
155
7
0
7
5
165
150
1
8
080
85
170
90
17512-in18-in
8-in12-in8-in8 -in
12-in1
2-in
12-in
21-in
15-in8 -in
12-in1
2-in
18-in12-in12-in12-in
18-in
15-in
12-in
18-in
12-in
8-in18-in Figure -TDA Area and Discharge PathREN-TDA8 8
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060FeetREN-TDA8Talbo
t
Rd
S
S 32nd
S
t
B-23Page 23 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>!.!.!.kjkjPanther Creek10590 95 9 56010510595454025258520
105807570 456065100
95
20
25
30
35
40
45
60
65
8 5
80
90
5
055
757018-in 30-in18-in8-in
12-in6-in12-in6-in
12-in8-in
8-in
8-in
12-in8-in18-in12-in
18-in12-in12-in
12-in6-in
12-in12-in12-inUNK 6-in12-in12-in8-i n
UNK
UNK
4-in8-in12-in
6-in12-in 12-in12-in8-in72-in72-in72-in72-in Figure -TDA Area and Discharge PathREN-TDA9 9
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet
REN-
T
D
A
9
Talbot
R
d
SS 37th StB-24Page 24 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>
!.kjPanther Creek956030 15015535 135
125
453
0
125
130 120
3
0
5 0
1501101453
0
145
140
30 100120
65
110701057513580
11560
125 130955055
854035 9
0
456 -in
4 -in
1 2 -in 12-i
n
U N K
UNK
24-in
12-
i
n8-in12-i
n1
2
-in
8 -in
12-in
8-in8 -in
8 -in
8-in
24-
i
nUNK12-in15-
i
n12-in12-in1 2 -i n
4-inUNK1 2 -in
UNK1 2 -in
1 2 -in 8-in12-inUNK
6-in
UN K
4 -in
1
8-i
n8-in8-in12-in
12-i
n6-in12-in8-i
n12-in12-in
27-in 8-
i
n12-in
12-in
6-in12-in
12-
i
nUNK12-in6-in42-in
1
2
-in
1
2-in
12-in 8-in3 0 -in
U N K6 -in8-inUNKUNK12-i
n1 2 -in
8-in
1 2 -i n15-in12-in
8-i
n12-in8 -in
36-
i
n8-i
nU N K
30-in1 8 -in
6-in12-in
8-in24-in24-
i
n12-in
71-in3
6-in
2 7 -in
4-in
30-in
Figure -TDA Area and Discharge PathREN-TDA10 10
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet REN-TDA10Talbot Rd SB-25Page 25 of 33
<ACP>C:\Users\TakeshA\Documents\Projects\KC_ILine\GIS\Maps\Working\TDA & Flowpath_Renon_11x17.mxd TAKESHA 8/14/2020 7:46:28 PM</ACP>
!.
!.
kj
kj
U nn a me dPanther Cre ekTributary
P
a
nth
er
C
re
e
k
PantherCreekPanther Creek
U n n a m e d P a n th e r
C re e k T r ib u ta ry
Unnamed PantherCreek Tributary
P
a
nth
er
C
re
e
k
355350150350
2
1
0 32095
3451 8 5
155
350
2052001 8 0
160
250
1
9
5190 175165
185
180100175
1 7 0 34510
5
330335
340320325110250225215115
305190295245290240220205300310275230315270
185195235280200210 2652851751
2
0
1
8
0 2552601251301451351701501
4
0
15516016512-in12-in12-in8-in12-i
n12-in
8-in24-in
12-in
12-in12-in12-in12-in12-in 8-inUNK
1
2-in
12-in
1
2
-i
n
UN
K 12-inUNK12-in18-in12-in
54-in12-in7 1 -in UNK Figure -TDA Area and Discharge PathREN-TDA11 11
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060Feet REN-TDA11SE Carr Rd 103rd Ave SEB-26Page 26 of 33
<ACP>\\seafpp01\Proj\KingCountyWa\W3X86400ILine\2100_Ph2Design\2130_PrelimDesign\Drainage\GIS\Maps\Working\TDA & Flowpath_Renon.mxd TAKESHA 1/14/2022 11:39:02 AM</ACP>
!.
kj
kj
R E N -TD A 12S 38TH CT
U nn am edPanther C re ekTributary U n n a m e d P a n th e r
C r e e k T r ib u t a r y
Unnamed PantherCreek Tributary
365 38030019019
0
18 0
190 370
340185
250
380190 365375 3703652
50
2
4
52
4
0
2
3
5
2
3
0
2202102
1
5205 225
280275270
285
265
290
255260200 330
295 3
2
5
320300195335 360305
3 4 0 3553
1
0
315
345
3 5 0
12-
i
n12-in36-in
8-in
8
-in
3 6 -in
12-in
8-in6
-in
12-in
1 2 -in
12-in12-in12-in12-in
18-in1
8-in
36 -i n
3
6-in
60-in1 2 -in
24-in
60-in
12-in6-in1 2 -in
12-in
6-in
18-in
8-in
12-in4-in4-in12-in12-in
12-in 4-in8-in12-in12-in12-in12-in12-in1 2 -in 15-in8-
i
n1
2
-in
8-in8 -in8-in8-in12-in8-in3 6 -in
12-in8-in15-in8-in
30-in36-in
12-in
12-in
42-in12-i S 38TH CT
10
6
T
H
P
L
S
E
103RDAVESE Figure -TDA Area and Discharge PathREN-TDA12 12
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
±
0 120 240 36060Feet
SE CAR
R
R
O
A
D
105TH PL SEPage 27 of 33
<ACP>\\seafpp01\Proj\KingCountyWa\W3X86400ILine\2100_Ph2Design\2130_PrelimDesign\Drainage\GIS\Maps\Working\TDA & Flowpath_Renon.mxd TAKESHA 1/14/2022 11:39:02 AM</ACP>kjkjR
E
N
-
T
D
A
1
2
REN-TDA13400 400
375
400 350345
400380 400385380
380
385
385
390
3 6 0365 350380
3 5 0
405
3 7 5 3703803
8
5
360
355
400
390
365
370
400 375380
385
395390 36-in12-in24-in8-in12-in12-in12-in12-in60-in
8-in12-in12-in12-in
12-in 12-in12-in12-in12-in 12-in12-in
24-in 48-in12-in
60-in
24-in
15-in 36-i
n30-in24-in12-in18-in
24-in
2 4 -in
36-in
3 6 -in
6 -in12-in18-in1 2 -in
8-in8-in8-in8-in8-in1
2
-i
n4-in
12-in
8-in
4-in 8-in12
-i
n
12-in12-in12-in8-i
n4-in12-in
12-in24-
i
n8-in
8-in18-in30-in
8-in12-in12-i
n12-in12-in
18-in15-in
12-in
1 2 -in
12-in
12-in12-in30-in8-in9 6 -in
12-in
9 6 -in
12-in36-i
n12-in 12-in12-i
n48-in
12-in
15-in12-in 36-in30-in
12-in
12-in
1 2 -in
24-in 3 6 -in
24-in12-i
n12-in
108TH AVE SE BENSON DR SESECARRRDSE 180TH ST107THPLSE106TH PL SE
105TH PL SE
Figure -TDA Area and Discharge PathREN-TDA13 13
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet
Page 28 of 33
<ACP>\\seafpp01\Proj\KingCountyWa\W3X86400ILine\2100_Ph2Design\2130_PrelimDesign\Drainage\GIS\Maps\Working\TDA & Flowpath_Renon.mxd TAKESHA 1/14/2022 11:39:02 AM</ACP>kjREN-TDA14
430 4204454 3 0430 3
9
0
440485
3
9
0
425
380
48 5
4153 8 5
480390
400475445470 395405
465
410460
415
450
455 435430445440
420
42 5
18-in8-in12-in
3 6 -in
18-in
12-in12-in
12-in12-in12-in12-in
12-in12-in12-in12-in12-in18-in12-in12-in15-in 30-in
12-in12-in12-in
24-in24-in
12-in
12-in8-in
8-in
12-in
12-in 8-in6-in8-in 12-in12-in
12-in12-in
1 2 -in
12-in12-in
12-in
12-in30-in
54-in107TH CT SE
SE183RDPLSE 184TH LN108TH AVE SE
107TH AVE SE
SE 182ND STSE186THST109T H AV E SE
SE 180TH ST108TH PLSE
SE 181ST ST107TH PL SE
Figure -TDA Area and Discharge PathREN-TDA14 14
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
kj 1/4 Mile from TDA
!.Outfall
Threshold Discharge Area
TDA Flowpaths
5' Contours
Wetlands
Structure Type
"?B Inlet
!!2 Manhole
Pipe
Private Pipe
Erosion Severity
High
Renton Streams
Stream Level
1
2
3
4 - 5
6 - 7
FEMA Flood Zones Regulatory
Slope Percent Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)±0 120 240 36060Feet
Page 29 of 33
C:\USERS\TAKESHA\DOCUMENTS\PROJECTS\KC_ILINE\GIS\MAPS\WORKING\DOWNSTREAM ANALYSIS_RENTON.MXD TAKESHA 8/17/2020 3:15:25 PM
!.
!.
!!
REN-TDA1
R E N -T D A 3
R E N -T D A 2 R E N -TD A 420 0
1002 0 0
100 20010 0200
100
200
1 0 0
Springbrook Creek
Black River
Figure - Level 1 Downstream Analysis Resources Review 1
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
!One Mile from TDA
!.Outfall
20' Contours
Renton Streams
TDA Flowpaths
Threshold Discharge Area
Slope Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Landslide Severity
Very High
High
Moderate
Unclassified
Wellfield Capture Zone
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture Zone
FEMA Flood Zones - Regulatory
FEMA Flood Zones - Non Regulatory
Wetlands
Erosion Severity
High ±0 360 720 1,080180Feet
Renton TDAs
REN-TDA1REN-TDA2
ECY303d List-
Dissolved Oxygen,
Bioassessment,
Bacteria XX
X 1/4 Mile from TDA
B-32Page 30 of 33
C:\USERS\TAKESHA\DOCUMENTS\PROJECTS\KC_ILINE\GIS\MAPS\WORKING\DOWNSTREAM ANALYSIS_RENTON.MXD TAKESHA 9/18/2020 3:27:59 PM
!.
!.!.
D
D
D
D D
!
!
!
!
!
R E N -T D A 3
R E N -T D A 2 R E N -TD A 4REN-TDA6 REN-TDA5
2001002001002 0 0
100 20
0
1
00
2
0
0
100
20 0100
30030
0100200
1 0 0
Rolling Hills Creek Rol
li
ngHil
l
s Cr
eekTri
butaryT
h
u
n
d
e
r Hills Cr
e
e
k
Rolling Hills CreekSpringbrook Creek Rolli
ng Hill
s Cr
eek Figure - Level 1 Downstream Analysis Information Review 2
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
D 1/4 Mile from TDA
!One Mile from TDA
!.Outfall
Renton Streams
TDA Flowpaths
Threshold Discharge Area
Slope Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Landslide Severity
Very High
High
Moderate
Unclassified
Wellfield Capture Zone
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture Zone
FEMA Flood Zones - Regulatory
FEMA Flood Zones - Non Regulatory
Wetlands
Erosion Severity
High
20' Contours
±0 360 720 1,080180Feet
Renton TDAs
ECY303d List-
Dissolved Oxygen,
Bioassessment,
Bacteria
ECY303d List-
BioassessmentREN-TDA3 REN-TDA6
REN-TDA5
REN-TDA4
B-33Page 31 of 33
C:\USERS\TAKESHA\DOCUMENTS\PROJECTS\KC_ILINE\GIS\MAPS\WORKING\DOWNSTREAM ANALYSIS_RENTON.MXD TAKESHA 8/17/2020 3:15:25 PM !.!.!.!.!.!!!!!!!!REN-TDA7REN-TDA8REN-TDA9
REN-TDA10
2001
0
0 2001002 0 0
1 0 0
2 0 0100200
100
2 0 0
100
200
100
200
2 0 0
200200
100
100
100
100Unnamed PantherCreek TributaryPanther Creek
PantherCreek Panther Creek Figure - Level 1 Downstream Analysis Resources Review 3
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
!One Mile from TDA
!.Outfall
20' Contours
Renton Streams
TDA Flowpaths
Threshold Discharge Area
Slope Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Landslide Severity
Very High
High
Moderate
Unclassified
Wellfield Capture Zone
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture Zone
FEMA Flood Zones - Regulatory
FEMA Flood Zones - Non Regulatory
Wetlands
Erosion Severity
High ±0 360 720 1,080180Feet
Renton TDAs
REN-TDA8
REN-TDA7
REN-TDA9
REN-TDA10REN-TDA11
REN-TDA12
REN-TDA13
REN-TDA14
ECY303d List-
Bioassessment
X
XXX
X 1/4 Mile from TDA
B-34Page 32 of 33
\\SEAFPP01\PROJ\KINGCOUNTYWA\W3X86400ILINE\2100_PH2DESIGN\2130_PRELIMDESIGN\DRAINAGE\GIS\MAPS\WORKING\DOWNSTREAM ANALYSIS_RENTON.MXD TAKESHA 1/14/2022 12:13:04 PM !.!.DDDD!!R
E
N-TD
A11
R
E
N
-
T
DA
1
2
REN-TDA13REN-TDA14 3002 0 0
300
200
3 0 0
2 0 0
4003 0 0
2 0 0
400
300
400
2 0 0
400
3 0 0
400300400
300
400 4 0 0400400
400
4 00
400
400400
200200
200
Panther CreekUnnamed Pant
herCreek Tr
i
but
aryP a n t h e r C r e e k
Figure - Level 1 Downstream Analysis Information Review 4
RAPID I LINEMETRO TRANSIT CAPITAL DIVISIONKING COUNTY METRO
Legend
D 1/4 Mile from TDA
!One Mile from TDA
!.Outfall
Renton Streams
TDA Flowpaths
Threshold Discharge Area
Slope Range
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Landslide Severity
Very High
High
Moderate
Unclassified
Wellfield Capture Zone
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture Zone
FEMA Flood Zones - Regulatory
FEMA Flood Zones - Non Regulatory
Wetlands
Erosion Severity
High
20' Contours ±0 360 720 1,080180Feet
Renton TDAs
REN-TDA14 ECY303d List-
Bioassessment
ECY303d List-
Bioassessment
Page 33 of 33
Appendix C
Drainage System Tables
Page 1 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Springbrook Creek TDA Number: 02
Symbol Drainage
Component
Type, Name,
and Size
Drainage Component Description Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map
Type: sheet flow,
swale, stream,
channel, pipe, pond;
Size: diameter,
surface area
drainage basin, vegetation, cover, depth, type
of sensitive area, volume % ¼ ml = 1,320 ft.
constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other
erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
Western Part
1a 12″ PIPE
Collects drainage from the north side of the
western part and flows northeastward through
a series of catch basins and 12-inch pipes.
N/A 0 to 352 ft
None
observed None None
Eastern Part
1b 18″ Pipe
Collects drainage from the north side of the
eastern part and flows northward through a
series of catch basins and 18-inch pipes and
then combines with the runoff from the
western part.
N/A 0 to 102 ft None
observed None None
2b_Combined 18″ Pipe
Collects drainage and flows northward through
a series of catch basins and 18-inch pipes and
enters a 36-inch pipe.
N/A 102 to 885 ft None
observed None None
3b_Combined 36″ Pipe
Collects drainage and flows westward along S
7th St through a series of catch basins and 36-
inch pipes and then enters a 60-inch pipe.
N/A 885 to 901 None
observed None None
4b_Combined 60” Pipe
Collects drainage and flows westward along S
7th St through a series of catch basins and 60-
inch pipes reaching the point one-quarter mile
downstream (as determined by the shortest
flowpath).
N/A 901 to 1362
None
observed
None None
Page 2 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Rolling Hills Creek TDA Number: 03
Symbol Drainage
Component
Type, Name,
and Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map
Type: sheet flow,
swale, stream,
channel, pipe,
pond; Size:
diameter, surface
area
drainage basin, vegetation, cover, depth, type
of sensitive area, volume % ¼ ml = 1,320 ft.
constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision, other
erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
1 12″ PIPE
Collects drainage from the project and
flows southward through a series of
catch basins and 12-inch pipe and then
enters an 18-inch pipe.
0.5 -0.7 0 to 470 ft
None
observed None None
2 18″ Pipe
Flows southward through a series of
catch basins and 18-inch pipe and then
enters a 24-inch pipe.
0.7 470 to 647 ft None
observed None None
3 24″ Pipe
Flows southward through a series of
catch basins and 24-inch pipe and then
enters a 36-inch pipe.
1.3 647 to 810 ft None
observed None None
4 36″ Pipe
Flows southward through a series of
catch basins and 36-inch pipe and
ultimately discharges to the Rolling Hills
Creek on the north side of I-405.
N/A 810 to 1084 Outfall
sedimentation
Might create
capacity issues if
not maintained.
Outfall pipe was half full of
sediment (Appendix C - Photo
1)
5
Rolling Hills
CREEK
Heavily vegetated stream bank consisted
of trees and other plants with steep side
slopes (Photo is included in Appendix B).
N/A 1084 to 1320
None
observed
None None
Page 3 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Rolling Hills Creek TDA Number: 04
Symbol Drainage
Component
Type, Name,
and Size
Drainage Component
Description
Slope Distance from
site
discharge
Existing
Problems
Potential
Problems
Observations of
field inspector,
resource reviewer,
or resident
see map
Type: sheet flow,
swale, stream,
channel, pipe, pond;
Size: diameter,
surface area
drainage basin, vegetation, cover, depth, type
of sensitive area, volume % ¼ ml = 1,320 ft.
constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision,
other erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
1a 12″ PIPE
Collects runoff from Northern portion
of TDA04 and flows southward through
12-inch pipes and a series of catch
basins and then enters a 24-inch pipe.
1.9 0 to 245 None observed None None
2a 24″ PIPE
Flows southward through 24-inch pipes
and a series of catch basins and then
enters a 42-inch pipe.
0.5 245 to 614 None observed None None
3a 42″ PIPE
Flows southward through a 42-inch
pipe and a series of catch basins and
then enters a 48-inch pipe.
0.5 614 to 988 None observed None None
4a 48″ PIPE
Flows southward through a 48-inch
pipe and catch basin and then
combines with runoff flowing from the
east, discharging into the Rolling Hills
Creek.
N/A 988 to 1025 None observed None None
1b 60″ PIPE (Rolling
Hills Creek)
Piped portion of Creek. Flows to the
south through a 60-inch pipe and a
series of catch basins
0.2 - 0.35 0 to 480 None observed None None
2b 72″ PIPE (Rolling
Hills Creek)
Piped portion of Creek. Flows westward
through a 72-inch pipe and a series of
catch basins then combines with runoff
flowing from the north and discharges
into the Rolling Hills Creek.
0.2 480 to 1190 None observed None None
Page 4 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Rolling Hills Creek TDA Number: 05
Symbol Drainage
Component
Type,
Name, and
Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map Type: sheet flow,
swale, stream,
channel, pipe,
pond; Size:
diameter,
surface area
drainage basin, vegetation, cover, depth, type of
sensitive area, volume
% ¼ ml = 1,320 ft. constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision, other
erosion
tributary area, likelihood of problem,
overflow pathways, potential
impacts
1 12″ PIPE
Flows northward through a series of catch
basins and 12-inch pipes and then enters
an 18-inch pipe.
3.8 0 to 795 ft
None
observed None None
2 18″ PIPE
Flows northward through a series of catch
basins and 18-inch pipes and then enters a
42-inch pipe.
4.0 795 to 1096
None
observed
None
May discharge to Detention
Pond, but not confirmed in the
field (Appendix C - photo 5)
3
42″ PIPE
(Rolling Hills
Creek)
Piped portion of Creek. Flows northward
through a series of catch basins and 42-
inch pipes, running under I-405 and enters
a 72-inch pipe which is flowing east to
west from TDA04.
1.8 1096 to 1320
None
observed
None None
Page 5 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Rolling Hills Creek TDA Number: 06
Symbol Drainage
Component
Type, Name,
and Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map Type: sheet flow,
swale, stream,
channel, pipe, pond;
Size: diameter,
surface area
drainage basin, vegetation, cover, depth, type
of sensitive area, volume
% ¼ ml = 1,320 ft. constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other erosion
tributary area, likelihood of problem,
overflow pathways, potential
impacts
1 12″ PIPE
Flows northwest through a series of
catch basins and 12-inch pipes and
discharges into a wetland.
0.25 0 to 420 ft
None
observed None None
2 Wetland/Stream Heavily vegetated depression N/A 420 to 583 ft None
observed None Refer to Appendix C - Photo 5
3 12″ Culvert
Water from the first wetland enters a
12-inch culvert (creek is piped) crossing
under Smither Avenue South and drains
into a second wetland.
N/A 583 to 710 None
observed None None
4 Wetland/Stream Heavily vegetated depression N/A 710 to 870
None
observed
None
Refer to Appendix C - Photo 6
5 30″ PIPE
Flows northwest through a series of 30-
inch pipe running under I-405 and
discharges to the Rolling Hills Creek.
2.5 870 to 1320 None
observed None Refer to Appendix C - Photo 4
Page 6 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Panther Creek TDA Number: 07
Symbol Drainage
Component
Type,
Name, and
Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problem
s
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map Type: sheet flow,
swale, stream,
channel, pipe,
pond; Size:
diameter,
surface area
drainage basin, vegetation, cover, depth, type of
sensitive area, volume
% ¼ ml = 1,320 ft. constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other
erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
1 12″ PIPE
Flows southward through a series of catch
basins and 12-inch pipes and then enters
an 18-inch pipe.
3.5 – 8.2 0 to 640 ft
None
observed None None
2 18″ Pipe
Flows southward through a series of catch
basins and an 18-inch pipes and then
enters a 24-inch pipe.
3.7- 4.4 640 to 1128 ft None
observed None Lids may be labeled “sewer”
3 24″ Pipe
Flows southward through a series of catch
basins and 24-inch pipes to the one-
quarter mile downstream point.
2.4- 3.9 1128 to 1320 ft None
observed None Lids may be labeled “sewer”
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
Page 7 of 9
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Subbasin Name: Panther Creek TDA Number: 11
Symbol Drainage
Component
Type, Name,
and Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map Type: sheet flow,
swale, stream,
channel, pipe,
pond; Size:
diameter, surface
area
drainage basin, vegetation, cover, depth, type
of sensitive area, volume
% ¼ ml = 1,320 ft. constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision, other
erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
1 12″ CMP PIPE
Flows northwest through a series of
catchbasins and 12-inch pipes and a
series of catch basins and enters a 24-
inch pipe.
10 0 to 330 ft
None
observed None None
2 24” CMP PIPE Discharges to the vegetated ditch. N/A 330 to 362 ft None
observed None None
3 Vegetated Ditch
The runoff then drains into a vegetated
ditch through a 24-inch pipe on the north
side of the SE Carr Road. The flow within
the ditch is then directed to the
northwest and discharges into an
unnamed Panther Creek Tributary.
N/A 362 to 1254 ft None
observed None
There was an undermined
tree indicating erosion
(Appendix C - photo 7). Creek
was not observed once it
turned away from ROW and
further into private property.
4
Unnamed
Panther Creek
Tributary
The unnamed tributary continues to flow
east and reaches the point one-quarter
mile downstream of the project site.
N/A 1254 to 1320 ft None
observed None
In private property, not
observed
Page 8 of 9
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Basin: Black River Drainage basin Subbasin Name: Panther Creek TDA Number: 12
Symbol Drainage
Component Type,
Name, and Size
Drainage Component
Description
Slope Distance
from site
discharge
Existing
Problems
Potential
Problems
Observations of field
inspector, resource
reviewer, or resident
see map
Type: sheet flow, swale,
stream, channel, pipe,
pond; Size: diameter,
surface area
drainage basin, vegetation, cover, depth, type of
sensitive area, volume % ¼ ml = 1,320 ft.
constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other erosion
tributary area, likelihood of
problem, overflow pathways,
potential impacts
1 12″ PIPE
Collects runoff and flows westward
through 12-inch pipes and a series of
catch basins
0.7455 0 to 36 ft None observed None None
2 60″ pipe Flows westward through a 60-inch pipe
and a series of catch basins N/A 36 to 254 ft None observed None None
3 36″ PIPE
Discharges runoff to the Unnamed
Panther Creek Tributary through 36-inch
outfall pipe.
N/A 254 to 265 ft None observed None
Outfall not observed, it
was not accessible due to
steep slope of the ravine.
(see Appendix D – photo 8)
4
Unnamed Panther
Creek Tributary
The unnamed Panther Creek Tributary
flows westward and then is piped under
103rd Ave SE.
N/A 265 to 720 ft None observed None
Refer to Appendix D Photo
8
5 60″ Circular Culvert
Two 60-inch culverts directing the flow to
the west and one is running under 103rd
Ave SE.
N/A 720 to 817 ft None observed None None
6
Unnamed Panther
Creek Tributary
Creek was heavily vegetated (Photo is
included in Appendix B). N/A 817 to 1320 ft None observed None Refer to Appendix D Photo
9
Page 9 of 9
Appendix D
Field Inspection Photos
Page 1 of 6
Photo 1 – 36-inch outfall pipe half-full of sediment (TDA03)
Photo 2 – Detention pond (TDA05)
D-2
Page 2 of 6
Photo 3 – Erosion to the west of the site (TDA06)
Photo 4 – Outlet (TDA06)
D-3
Page 3 of 6
Photo 5 – First wetland/stream east of Smithers Ave S (TDA06)
Photo 6 – Second wetland/stream west of Smithers Ave S (TDA06)
D-4
Page 4 of 6
Photo 7 – Undermined Tree (TDA11)
Photo 8 – Creek (TDA12)
D-5
Photo 8 - Unnamed Panther Creek Tributary (TDA12)
Page 5 of 6
Photo 9 – Unnamed Panther Creek Tributary (TDA12)
D-6
Page 6 of 6
Appendix E
Flow Control Model Outputs
Page 1 of 8
E-2
Page 2 of 8
—————————————————————————————————MGS FLOODPROJECT REPORTProgram Version: MGSFlood 4.58Program License Number: 200710001Project Simulation Performed on: 05/13/2024 12:29 PMReport Generation Date: 05/13/2024 12:31 PM —————————————————————————————————Input File Name: Renton TDA-04 - Combined.fldProject Name: Renton TDA4 DetAnalysis Title: CombinedComments: —————————————————————————————————Routing Not Up to Date. Changes were Made to Model Input Since Last Routing was Performed Click the Simulate Tab and then Click Route to remove this message———————————————— PRECIPITATION INPUT ————————————————Computational Time Step (Minutes): 15Extended Precipitation Time Series SelectedFull Period of Record Available used for RoutingClimatic Region Number: 15Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097Evaporation Station : 961040 Puget East 40 in MAPEvaporation Scale Factor : 0.750HSPF Parameter Region Number: 1HSPF Parameter Region Name : Ecology Default ********** Default HSPF Parameters Used (Not Modified by User) ************************************* WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area SummaryPredeveloped Post Developed Total Subbasin Area (acres) 0.730 0.730 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 0.730 0.730----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Subbasins: 2 ---------- Subbasin : Combined Basin PreDev ---------- -------Area (Acres) --------C, Lawn, Mod 0.530----------------------------------------------Subbasin Total 0.530 ---------- Subbasin : Flow-through Area ---------- -------Area (Acres) --------C, Lawn, Mod 0.100ROADS/MOD 0.100----------------------------------------------Subbasin Total 0.200----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Subbasins: 2Renton TDA04 MGSFlood Output Results
For Flow Control
Page 3 of 8
---------- Subbasin : Combined Basin PostDev ---------- -------Area (Acres) --------ROADS/MOD 0.530----------------------------------------------Subbasin Total 0.530 ---------- Subbasin : Flow-through Area ---------- -------Area (Acres) --------C, Lawn, Mod 0.100ROADS/MOD 0.100----------------------------------------------Subbasin Total 0.200************************* LINK DATA *******************************----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Links: 1------------------------------------------Link Name: POC Link Type: CopyDownstream Link: None************************* LINK DATA *******************************----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Links: 1------------------------------------------Link Name: Combo Tank Link Type: StructureDownstream Link: None User Specified Elevation Volume Table Used Elevation (ft) Pond Volume (cu-ft) 25.11 0. 25.31 28. 25.51 79. 25.71 142. 25.91 215. 26.11 296. 26.31 382. 26.51 472. 26.71 565. 26.91 660. 27.11 756. 27.31 852. 27.51 947. 27.71 1040. 27.91 1130. 28.11 1215. 28.31 1296. 28.51 1369. 28.71 1432. 28.91 1483. 29.11 1511. 29.31 1511. 29.51 1511. 29.71 1512. 29.91 1512. 30.11 1512. 30.31 1512. 30.51 1512. 30.71 1512. 30.91 1513.Page 4 of 8
31.11 1513.Hydraulic Conductivity (in/hr) : 0.00Massmann Regression Used to Estimate Hydralic GradientDepth to Water Table (ft) : 100.00Bio-Fouling Potential : LowMaintenance : Average or BetterRiser GeometryRiser Structure Type : CircularRiser Diameter (in) : 12.00Common Length (ft) : 0.000Riser Crest Elevation : 29.01 ft Hydraulic Structure Geometry Number of Devices: 2 ---Device Number 1 ---Device Type : Circular Orifice Control Elevation (ft) : 25.61Diameter (in) : 1.65Orientation : HorizontalElbow : No ---Device Number 2 ---Device Type : Circular Orifice Control Elevation (ft) : 27.91Diameter (in) : 2.00Orientation : HorizontalElbow : Yes**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Subbasins: 2Number of Links: 1********** Link: POC ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)Tr (yrs) Flood Peak (cfs)====================================== 2-Year 0.104 5-Year 0.155 10-Year 0.208 25-Year 0.291 50-Year 0.387 100-Year 0.481 200-Year 0.505 500-Year 0.534----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Subbasins: 2Number of Links: 1********** Link: Combo Tank ********** Link WSEL Stats WSEL Frequency Data(ft) (Recurrence Interval Computed Using Gringorten Plotting Position)Tr (yrs) WSEL Peak (ft)====================================== 1.05-Year 26.738 1.11-Year 26.948 1.25-Year 27.069 2.00-Year 27.543 3.33-Year 27.967Page 5 of 8
5-Year 28.138 10-Year 28.371 25-Year 28.939 50-Year 29.052 100-Year 29.091 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Combined Basin PreDe 64.771Subbasin: Flow-through Area 12.221Link: POC 0.000_____________________________________Total: 76.992 Total Post Developed Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Combined Basin PostD 0.000Subbasin: Flow-through Area 12.221Link: Combo Tank 0.000_____________________________________Total: 12.221Total Predevelopment Recharge is Greater than Post DevelopedAverage Recharge Per Year, (Number of Years= 158)Predeveloped: 0.487 ac-ft/year, Post Developed: 0.077 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Links: 1********** Link: POC ********** 2-Year Discharge Rate : 0.104 cfs 15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.02 cfs Off-line Design Discharge Rate (91% Exceedance): 0.01 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 171.84 Inflow Volume Including PPT-Evap (ac-ft): 171.84 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 171.84 Secondary Outflow To Downstream System (ac-ft): 0.00 Volume Lost to ET (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Links: 1********** Link: Combo Tank ********** Basic Wet Pond Volume (91% Exceedance): 2874. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 4311. cu-ft 2-Year Discharge Rate : 0.101 cfsPage 6 of 8
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.10 cfs Off-line Design Discharge Rate (91% Exceedance): 0.06 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 304.56 Inflow Volume Including PPT-Evap (ac-ft): 304.56 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 306.13 Secondary Outflow To Downstream System (ac-ft): 0.00 Volume Lost to ET (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00% ***********Compliance Point Results *************Scenario Predeveloped Combination Compliance Link: POC Scenario Postdeveloped Combination Compliance Link: Combo Tank *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting PositionPredevelopment Runoff Postdevelopment RunoffTr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)---------------------------------------------------------------------------------------------------------------------- 2-Year 0.104 2-Year 0.101 5-Year 0.155 5-Year 0.164 10-Year 0.208 10-Year 0.190 25-Year 0.291 25-Year 0.240 50-Year 0.387 50-Year 0.337 100-Year 0.481 100-Year 0.474 200-Year 0.505 200-Year 0.488 500-Year 0.534 500-Year 0.504 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals**** Flow Duration Performance ****Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): 3134.4% FAILMaximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): 3134.4% FAILMaximum Excursion from Q2 to Q50 (Must be less than 10%): 299.9% FAILPercent Excursion from Q2 to Q50 (Must be less than 50%): 56.8% FAIL-------------------------------------------------------------------------------------------------FLOW DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------**** LID Duration Performance ****Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): 92.1% FAILMaximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 3209.8% FAIL-------------------------------------------------------------------------------------------------LID DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------Page 7 of 8
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122233432323232 32 32323232323234
34
3
4
34 323232323434 323232303032323219+0020+0021+0022+0023+00SD SDSD
EX SDCB (1-E11)1TAL-B 20+46.20, 41.08 RTRIM EL = 31.19IE = 28.60 (12" E)IE = 28.86 (12" NW)SDCB (1-29) CONC INLET22TAL-B 19+34.16, 40.31 RTRIM EL = 31.22IE = 28.22 (12" E)SDCB (1-28B) CB TYPE 2-54"TAL-B 19+40.70, 3.53 RTRIM EL = 32.17913IE = 25.61 (36" S)IE = 28.06 (12" W)IE = 25.61 (36" N)SDCB (1-28D) CB TYPE 2-48"TAL-B 20+32.31, 3.57 RTRIM EL = 32.06139IE = 28.53 (12" W) INIE = 28.53 (12" NW) OUTSDCB (1-28C) CB TYPE 2-54"TAL-B 20+09.14, 3.54 RTRIM EL = 32.11913IE = 27.11 (12" SW)IE = 25.61 (36" N)FCS (1-28A) SDMH 54"TAL-B 18+72.40, 3.53 RTRIM EL = 32.32169IE = 25.61 (12" W)IE = 25.61 (36" S)48 LF 12" PP SD2 LF 36" SRPE SD37 LF 12" PP SD2 LF 36" SRPE SD2 LF 36" SRPE SD60 LF 48" SRPE SD40 LF 12" DI SD6 LF 12" PP SD7 LF 12" PP SD2 LF 36" SRPE SDEX SDMH (1-E2)2TAL-B 18+60.40, 49.85 RTRIM EL = 33.78IE = 23.80 (12" E)IE = 26.50 (12" S)60 LF 48" SRPE SDOUTINOUTINIE = 23.55 (15" W) OUTOUTINOUTIN ININ INC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.06PLOTTED: May 28, 2024-03:22:34pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SI-405 SB OFF-RAMP(TAL-B-LINE)S RENTON VILLAGE PLRENTON SEGMENTDRAINAGE PLANTAL-B 18+50 TO TAL-B 23+501DR.06219J. GREENH. JOHNSONJ. ETULAIN TREATMENT MW (1-2)TAL-B 20+21.84, 3.53 RTRIM EL=32.68IE=28.51 (12" S) INIE=27.18 (12" N) OUT77511521R-4214219TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Flow Control [FCS (1-28A)] Tributary AreasPollution Generating Impervious Surface (PGIS) = 23,759 ft2 (0.55 ac)Non-pollution Generating Impervious Surface (NPGIS) = 3,456 ft2 (0.08 ac)Non-pollution Generating Pervious Surface (NPGPS) = 4,227 ft2 (0.10 ac)Total Area = 31,442 ft2 (0.72 ac)19,473 sf2,380 sf300 sf2,506 sf467 sf1,254 sf4,286 sf776 sf3434 323232NC INLET0.47 RT4517TDA04 Flow Control Tributary AreasPage 8 of 8
Appendix F
Water Quality Model Outputs
Page 1 of 14
Size (ft) Treatment Area (sq ft) WQ Flow (cfs) WQ Flow (gpm) gpm per sf (Max 1 gpm/SF)
1-1 Int.6x8 24.00 0.04 17.95 0.75
1-2 Talbot 8x12 42.56 0.07 31.42 0.74TDA4
MW
GULD - Modular Wetland Sizing Calculations
Page 2 of 14
—————————————————————————————————MGS FLOODPROJECT REPORTProgram Version: MGSFlood 4.58Program License Number: 200710001Project Simulation Performed on: 05/13/2024 12:34 PMReport Generation Date: 05/13/2024 12:35 PM —————————————————————————————————Input File Name: REN-TDA4 Intersection OWS.fldProject Name: REN-TDA4 Filterra WAnalysis Title: Comments: ———————————————— PRECIPITATION INPUT ————————————————Computational Time Step (Minutes): 15Extended Precipitation Time Series SelectedFull Period of Record Available used for RoutingClimatic Region Number: 15Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097Evaporation Station : 961040 Puget East 40 in MAPEvaporation Scale Factor : 0.750HSPF Parameter Region Number: 3HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) ************************************* WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area SummaryPredeveloped Post Developed Total Subbasin Area (acres) 0.320 0.320 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 0.320 0.320----------------------SCENARIO: PREDEVELOPEDNumber of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) --------Till Grass 0.030Impervious 0.290----------------------------------------------Subbasin Total 0.320----------------------SCENARIO: POSTDEVELOPEDNumber of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) --------Till Grass 0.030Impervious 0.290----------------------------------------------Subbasin Total 0.320************************* LINK DATA *******************************Renton TDA04 MGSFlood Output Results
For WQ Structure - Oil Water Separator
(1-1) and Modular Wetland (1-1)
Page 3 of 14
----------------------SCENARIO: PREDEVELOPEDNumber of Links: 0************************* LINK DATA *******************************----------------------SCENARIO: POSTDEVELOPEDNumber of Links: 1------------------------------------------Link Name: New Structure Lnk1Link Type: StructureDownstream Link: NonePrismatic Pond Option UsedPond Floor Elevation (ft) : 100.00Riser Crest Elevation (ft) : 103.00Max Pond Elevation (ft) : 104.00Storage Depth (ft) : 4.00Pond Bottom Length (ft) : 100.0Pond Bottom Width (ft) : 50.0Pond Side Slopes (ft/ft) : Z1= 3.00 Z2= 3.00 Z3= 3.00 Z4= 3.00Bottom Area (sq-ft) : 5000.Area at Riser Crest El (sq-ft) : 8,024.(acres) : 0.184Volume at Riser Crest (cu-ft): 19,374.(ac-ft) : 0.445Area at Max Elevation (sq-ft) : 9176.(acres) : 0.211Vol at Max Elevation (cu-ft): 27,968.(ac-ft) : 0.642Hydraulic Conductivity (in/hr) : 0.00Massmann Regression Used to Estimate Hydralic GradientDepth to Water Table (ft) : 100.00Bio-Fouling Potential : LowMaintenance : Average or BetterRiser GeometryRiser Structure Type : CircularRiser Diameter (in) : 24.00Common Length (ft) : 0.000Riser Crest Elevation : 103.00 ft Hydraulic Structure Geometry Number of Devices: 1 ---Device Number 1 ---Device Type : Circular Orifice Control Elevation (ft) : 100.00Diameter (in) : 1.00Orientation : HorizontalElbow : Yes**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************----------------------SCENARIO: PREDEVELOPEDNumber of Subbasins: 1Number of Links: 0----------------------SCENARIO: POSTDEVELOPEDNumber of Subbasins: 1Number of Links: 1********** Link: New Structure Lnk1 ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)Page 4 of 14
(Recurrence Interval Computed Using Gringorten Plotting Position)Tr (yrs) Flood Peak (cfs)====================================== 2-Year 0.000E+00 5-Year 0.000E+00 10-Year 0.000E+00 25-Year 0.000E+00 50-Year 0.000E+00 100-Year 0.000E+00 200-Year 0.000E+00 500-Year 0.000E+00 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Subbasin 1 3.666_____________________________________Total: 3.666 Total Post Developed Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Subbasin 1 3.666Link: New Structure Lnk1 0.000_____________________________________Total: 3.666Total Predevelopment Recharge Equals Post DevelopedAverage Recharge Per Year, (Number of Years= 158)Predeveloped: 0.023 ac-ft/year, Post Developed: 0.023 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPEDNumber of Links: 0----------------------SCENARIO: POSTDEVELOPEDNumber of Links: 1********** Link: New Structure Lnk1 ********** Basic Wet Pond Volume (91% Exceedance): 1309. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 1964. cu-ft 15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.04 cfs Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 136.05 Inflow Volume Including PPT-Evap (ac-ft): 136.05 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 136.05 Secondary Outflow To Downstream System (ac-ft): 0.00 Volume Lost to ET (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00% ***********Compliance Point Results *************Page 5 of 14
Scenario Predeveloped Compliance Subbasin: Subbasin 1Scenario Postdeveloped Compliance Subbasin: Subbasin 1 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting PositionPredevelopment Runoff Postdevelopment RunoffTr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)---------------------------------------------------------------------------------------------------------------------- 2-Year 0.111 2-Year 0.111 5-Year 0.142 5-Year 0.142 10-Year 0.166 10-Year 0.166 25-Year 0.212 25-Year 0.212 50-Year 0.260 50-Year 0.260 100-Year 0.310 100-Year 0.310 200-Year 0.319 200-Year 0.319 500-Year 0.331 500-Year 0.331 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals**** Flow Duration Performance ****Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): 0.0% FAILMaximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): 0.1% FAILMaximum Excursion from Q2 to Q50 (Must be less than 10%): 0.5% PASSPercent Excursion from Q2 to Q50 (Must be less than 50%): 2.1% PASS-------------------------------------------------------------------------------------------------FLOW DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------**** LID Duration Performance ****Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): 0.0% FAILMaximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 0.0% FAIL-------------------------------------------------------------------------------------------------LID DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------Page 6 of 14
oldcastleprecast.com/wilsonville
File Name:
PO Box 323, Wilsonville, Oregon 97070-0323
Tel: (503) 682-2844 Fax: (503) 682-2657
Issue Date:
576-CPS
2018
020ECO576CPS1
576-CPS
OIL / WATER SEPARATOR
COALESCING - 140 GPM
576-CPS
7.0
TOP
No. 576-T-2-332P
BASE ASSEMBLY
No. 576-CPS-B
OPTIONAL TOP
HEAVY TRAFFIC
No. 576-T-CPS-HD
Renton TDA04
Oil Water Separator (1-1) Cut Sheet
Page 7 of 14
A A
PLAN VIEW
SECTION AA
Issue Date:
File Name:
PO Box 323, Wilsonville, Oregon 97070-0323
Tel: (503) 682-2844 Fax: (503) 682-2657 oldcastleprecast.com/wilsonville
576-CPS
2018
020-576CPS
576-CPS
OIL / WATER SEPARATOR
COALESCING - 140 GPM
576-CPS
7.1
Page 8 of 14
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222334
34 32343434323234343234
36
3636 3434343232 303032
32323232
3434
3636LPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PSS\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\SDSDSDSDSDSDSDSDSDSDSD24+00 25+00 26+0010+0010+0011+0012+0013+0014+004 LF 12" DI SD200 LF 12" PP SD31 LF 12" DI SD31 LF 12" DI SD41 LF 12" PP SD16 LF 12" DI SD11 LF 12" PP SD7 LF 12" DI SDSDCB (1-21), TYPE 18TAL-B 10+73.55, 83.46 RTRIM EL = 31.12IE = 28.30 (12" NW) OUTEX SDCB (1-E13)TAL-B 10+99.55, 48.22 RTRIM EL = 31.0361IE = 28.80 (8" NE) OUTEX SDCB (1-E8)TAL-B 10+82.21, 35.96 LTRIM EL = 31.4116IE = 28.30 (12" W) OUTSDMH (1-3), 54"23TAL-B 10+37.73, 24.64 RTRIM EL = 31.38IE = 27.20 (12" E) INIE = 26.10 (12" S) INIE = 25.60 (12" NE) INIE = 25.60 (18" SE) OUTSDCB (1-22) TYPE 1TAL-B 10+82.51, 41.16 LTRIM EL = 31.20118IE = 28.32 (12" SE) INIE = 28.32 (12" SW) OUTSDCB (1-23) TYPE 1TAL-B 12+79.65, 41.15 LTRIM EL = 34.86812IE = 29.32 (12" NW) OUTSDCB (1-18), TYPE 2-48"9TAL-B 10+43.62, 91.02 RTRIM EL = 30.87IE = 28.10 (12" SE)IE = 28.60 (6" SW) INIE = 28.10 (12" N)IE = 28.60 (6" SW) INIE = 28.10 (12" NE) OUTSDMH (1-2), 48"10TAL-B 10+66.32, 53.74 RTRIM EL = 31.22IE = 26.31 (12" W) INIE = 26.31 (12" N) OUTSDCB (1-20), TYPE 18TAL-B 10+42.73, 58.24 RTRIM EL = 31.05IE = 28.30 (12" W) OUT6 LF 12" DI SDSDCB (1-19), TYPE 18TAL-B 10+36.68, 89.10 RTRIM EL = 30.78IE = 28.14 (12" E) INIE = 28.06 (12" S) OUTIN28.60IN28.10 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.04PLOTTED: May 28, 2024-03:16:59pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAY
TALBOT RD S(TAL-B-LINE)(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 24+00 TO TAL-B 14+001DR.04217J. GREENH. JOHNSONJ. ETULAIN OWS (1-1), 7.50'x5.00'TAL-B 10+46.34, 79.46'RT RIM EL=30.33 IE=28.04 (12" S) IN IE=27.81 (12" N) OUTTREATMENT MW (1-1)TAL-B 10+57.53, 64.61'RTRIM EL=30.59IE=27.71 (12" S) INIE=26.38 (12" N) OUT14177220158 LF 6" DI SDR-4214217TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128171717LUA22-000260 PR21-000132 C21001128Treatment (1-1) and OWS Tributary AreasPollution Generating Impervious Surface (PGIS) = 10,355 ft2 (0.24 ac)Non-pollution Generating Impervious Surface (NPGIS) = 2,019 ft2 (0.05 ac)Non-pollution Generating Pervious Surface (NPGPS) = 1,313 ft2 (0.03 ac)Total Area = 13,687 ft2 (0.31 ac)10,355 sf1,002 sf1,005 sf245 sf1,068 sfTDA04 Treatment (1-1) and OWS Tributary AreasPage 9 of 14
—————————————————————————————————MGS FLOODPROJECT REPORTProgram Version: MGSFlood 4.58Program License Number: 200710001Project Simulation Performed on: 05/13/2024 12:33 PMReport Generation Date: 05/13/2024 12:33 PM —————————————————————————————————Input File Name: REN-TDA4 Talbot MW.fldProject Name: Renton TDA4 DetAnalysis Title: MW 1-2 TalbotComments: ———————————————— PRECIPITATION INPUT ————————————————Computational Time Step (Minutes): 15Extended Precipitation Time Series SelectedFull Period of Record Available used for RoutingClimatic Region Number: 15Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097Evaporation Station : 961040 Puget East 40 in MAPEvaporation Scale Factor : 0.750HSPF Parameter Region Number: 3HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) ************************************* WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area SummaryPredeveloped Post Developed Total Subbasin Area (acres) 0.580 0.580 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 0.580 0.580----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Subbasins: 1 ---------- Subbasin : Combined Basin PreDev ---------- -------Area (Acres) --------Till Grass 0.070Impervious 0.510----------------------------------------------Subbasin Total 0.580----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Subbasins: 1 ---------- Subbasin : Combined Basin PostDev ---------- -------Area (Acres) --------Till Grass 0.070Impervious 0.510----------------------------------------------Subbasin Total 0.580************************* LINK DATA *******************************Renton TDA04 MGSFlood Output Results
For WQ Structure - Modular Wetland (1-2)
Page 10 of 14
----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Links: 0************************* LINK DATA *******************************----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Links: 1------------------------------------------Link Name: Combo Tank Link Type: StructureDownstream Link: None User Specified Elevation Volume Table Used Elevation (ft) Pond Volume (cu-ft) 100.00 0. 100.20 27. 100.50 111. 100.60 136. 100.80 206. 101.00 283. 101.20 366. 101.40 452. 101.60 541. 101.80 632. 102.00 724. 102.20 816. 102.40 907. 102.60 996. 102.80 1083. 103.00 1165. 103.20 1242. 103.40 1312. 103.60 1373. 103.80 1421. 104.00 1448. 104.20 1448. 104.40 1449. 104.60 1449. 104.80 1449. 105.00 1449. 105.20 1449. 105.40 1449. 105.60 1450. 105.80 1450. 106.00 1450. 107.00 1451.Hydraulic Conductivity (in/hr) : 0.00Massmann Regression Used to Estimate Hydralic GradientDepth to Water Table (ft) : 100.00Bio-Fouling Potential : LowMaintenance : Average or BetterRiser GeometryRiser Structure Type : CircularRiser Diameter (in) : 12.00Common Length (ft) : 0.000Riser Crest Elevation : 103.50 ft Hydraulic Structure Geometry Number of Devices: 2 ---Device Number 1 ---Device Type : Circular Orifice Control Elevation (ft) : 100.50Diameter (in) : 1.25Orientation : HorizontalPage 11 of 14
Elbow : No ---Device Number 2 ---Device Type : Circular Orifice Control Elevation (ft) : 102.80Diameter (in) : 2.00Orientation : HorizontalElbow : Yes**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Subbasins: 1Number of Links: 0----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Subbasins: 1Number of Links: 1********** Link: Combo Tank ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)Tr (yrs) Flood Peak (cfs)====================================== 2-Year 0.000E+00 5-Year 0.000E+00 10-Year 0.000E+00 25-Year 0.000E+00 50-Year 0.000E+00 100-Year 0.000E+00 200-Year 0.000E+00 500-Year 0.000E+00 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Combined Basin PreDe 8.555_____________________________________Total: 8.555 Total Post Developed Recharge During SimulationModel Element Recharge Amount (ac-ft)-----------------------------------------------------------------------------------------------Subbasin: Combined Basin PostD 8.555Link: Combo Tank 0.000_____________________________________Total: 8.555Total Predevelopment Recharge Equals Post DevelopedAverage Recharge Per Year, (Number of Years= 158)Predeveloped: 0.054 ac-ft/year, Post Developed: 0.054 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED COMBINATIONNumber of Links: 0----------------------SCENARIO: POSTDEVELOPED COMBINATIONNumber of Links: 1Page 12 of 14
********** Link: Combo Tank ********** Basic Wet Pond Volume (91% Exceedance): 2324. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 3486. cu-ft 15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.07 cfs Off-line Design Discharge Rate (91% Exceedance): 0.04 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 242.73 Inflow Volume Including PPT-Evap (ac-ft): 242.73 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 243.93 Secondary Outflow To Downstream System (ac-ft): 0.00 Volume Lost to ET (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00% ***********Compliance Point Results *************Scenario Predeveloped Combination Compliance Subbasin: Combined Basin PreDevScenario Postdeveloped Combination Compliance Subbasin: Combined Basin PostDev *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting PositionPredevelopment Runoff Postdevelopment RunoffTr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)---------------------------------------------------------------------------------------------------------------------- 2-Year 0.196 2-Year 0.196 5-Year 0.252 5-Year 0.252 10-Year 0.293 10-Year 0.293 25-Year 0.380 25-Year 0.380 50-Year 0.462 50-Year 0.462 100-Year 0.555 100-Year 0.555 200-Year 0.570 200-Year 0.570 500-Year 0.589 500-Year 0.589 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals**** Flow Duration Performance ****Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): 0.0% FAILMaximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): 0.2% FAILMaximum Excursion from Q2 to Q50 (Must be less than 10%): 2.1% PASSPercent Excursion from Q2 to Q50 (Must be less than 50%): 4.3% PASS-------------------------------------------------------------------------------------------------FLOW DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------**** LID Duration Performance ****Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): 0.0% FAILMaximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 0.0% FAIL-------------------------------------------------------------------------------------------------LID DURATION DESIGN CRITERIA: FAIL-------------------------------------------------------------------------------------------------Page 13 of 14
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122233432323232 32 32323232323234
34
3
4
34 323232323434 323232303032323219+0020+0021+0022+0023+00SD SDSD
EX SDCB (1-E11)1TAL-B 20+46.20, 41.08 RTRIM EL = 31.19IE = 28.60 (12" E)IE = 28.86 (12" NW)SDCB (1-29) CONC INLET22TAL-B 19+34.16, 40.31 RTRIM EL = 31.22IE = 28.22 (12" E)SDCB (1-28B) CB TYPE 2-54"TAL-B 19+40.70, 3.53 RTRIM EL = 32.17913IE = 25.61 (36" S)IE = 28.06 (12" W)IE = 25.61 (36" N)SDCB (1-28D) CB TYPE 2-48"TAL-B 20+32.31, 3.57 RTRIM EL = 32.06139IE = 28.53 (12" W) INIE = 28.53 (12" NW) OUTSDCB (1-28C) CB TYPE 2-54"TAL-B 20+09.14, 3.54 RTRIM EL = 32.11913IE = 27.11 (12" SW)IE = 25.61 (36" N)FCS (1-28A) SDMH 54"TAL-B 18+72.40, 3.53 RTRIM EL = 32.32169IE = 25.61 (12" W)IE = 25.61 (36" S)48 LF 12" PP SD2 LF 36" SRPE SD37 LF 12" PP SD2 LF 36" SRPE SD2 LF 36" SRPE SD60 LF 48" SRPE SD40 LF 12" DI SD6 LF 12" PP SD7 LF 12" PP SD2 LF 36" SRPE SDEX SDMH (1-E2)2TAL-B 18+60.40, 49.85 RTRIM EL = 33.78IE = 23.80 (12" E)IE = 26.50 (12" S)60 LF 48" SRPE SDOUTINOUTINIE = 23.55 (15" W) OUTOUTINOUTIN ININ INC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.06PLOTTED: May 28, 2024-03:22:34pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SI-405 SB OFF-RAMP(TAL-B-LINE)S RENTON VILLAGE PLRENTON SEGMENTDRAINAGE PLANTAL-B 18+50 TO TAL-B 23+501DR.06219J. GREENH. JOHNSONJ. ETULAIN TREATMENT MW (1-2)TAL-B 20+21.84, 3.53 RTRIM EL=32.68IE=28.51 (12" S) INIE=27.18 (12" N) OUT77511521R-4214219TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C2100112819,472 sfTDA04 Treatment (1-2) Tributary AreasTreatment (1-2) Tributary AreasPollution Generating Impervious Surface (PGIS) = 19,472 ft2 (0.45 ac)Non-pollution Generating Impervious Surface (NPGIS) = 2,685 ft2 (0.06 ac)Non-pollution Generating Pervious Surface (NPGPS) = 2,973 ft2 (0.07 ac)Total Area = 25,166 ft2 (0.58 ac)2,380 sf300 sf2,506 sf467 sfPage 14 of 14
Appendix G
Conveyance and Backwater Calculations
Page 1 of 20
I Line_Renton_Conveyance_Calcs_Ad-Ready
Rational25
JACOBS
6/4/2024, 3:24 PM
PIPE INFORMATION WATERSHED CHARACTERISTICS Tc AND PEAK FLOW RATE MORE PIPE INFORMATION REMARKS
SUM Upstream Downstream Upstream Downstream
Pipe ID Upstream ID Downstream ID Length Dia.Manning's "n"
Onsite
Impervious
Area
Onsite
Impervious
Area C
Onsite
CA
Offsite
Impervious
Area
Offsite
Impervious
Area C
Offsite
CA
Other
CA SumCA K T0 Tr Tc Tc I Q
Other
Q Total Q
Rim
Elevation
Rim
Elevation Inlet Elev Outlet Elev
Slope of
Pipe
U/S
Cover
D/S
Cover
Full Flow
Capacity
Full Flow
Velocity
Design Flow
Less than
Capacity?
ft in sq ft ac sq ft ac Q3 min min min min in/hr cfs ft ft ft/ft cfs fps
S Grady Way
S Grady Way & Lake Ave S (NW Intersection)
Material Type
DI = 0.012
PP = 0.012
SPRE = 0.011
1 SDCB 1-1 SDCB 1-2 148 12 0.012 2,632 0.060 0.90 0.054 3040 0.070 0.90 0.063 0.117 50.00 0.00 0.69 0.69 6.30 2.73 0.32 0.32 25.49 24.92 23.13 22.38 0.0051 1.36 1.54 2.75 3.51 YES
2 SDCB 1-2 SDCB 1-E1 11 12 0.012 4,478 0.103 0.90 0.093 5102 0.117 0.90 0.105 0.198 50.00 0.71 0.04 0.75 6.30 2.73 0.54 0.54 24.94 25.33 22.38 22.3 0.0073 1.56 2.03 3.30 4.20 YES
S Grady Way & Shattuck (NW intersection and continuing east down grady way)
3 SDCB 1-3 SDCB 1-4 64 12 0.012 1,835 0.042 0.90 0.038 2166 0.050 0.90 0.045 0.200 50.00 0.00 0.30 0.30 6.30 2.73 0.55 0.55 25.8 25.37 22.85 22.53 0.0050 1.95 1.84 2.74 3.48 YES
4 SDCB 1-5 SDCB 1-6 150 12 0.012 3,933 0.090 0.90 0.081 3686 0.085 0.90 0.076 0.157 50.00 0.00 0.71 0.71 6.30 2.73 0.43 0.43 26.88 26.46 24.06 23.31 0.0050 1.82 2.15 2.74 3.48 YES
5 SDCB 1-6 SDCB 1-7 86 12 0.012 5,715 0.131 0.90 0.118 5716 0.131 0.90 0.118 0.394 50.00 0.71 0.41 1.11 6.30 2.73 1.08 1.08 26.46 26.22 23.31 22.88 0.0050 2.15 2.34 2.74 3.48 YES
6 SDCB 1-7 SDCB 1-E3 35 12 0.012 3,393 0.078 0.90 0.070 3064 0.070 0.90 0.063 0.527 50.00 1.11 0.17 1.28 6.30 2.73 1.44 1.44 26.22 26.26 22.87 22.7 0.0049 2.35 2.56 2.70 3.43 YES
7 SDCB 1-E3 SDCB 1-E2 93 12 0.014 0 0.000 0.90 0.000 0 0.000 0.90 0.000 0.527 50.00 1.28 0.95 2.23 6.30 2.73 1.44 1.44 26.26 25.73 22.7 22.6 0.0011 2.56 2.13 1.09 1.38 NO
8 SDCB 1-E2 SDCB 1-4 9 12 0.012 0 0.000 0.90 0.000 0 0.000 0.90 0.000 0.527 50.00 2.23 0.03 2.26 6.30 2.73 1.44 1.44 25.46 25.37 22.6 22.53 0.0078 1.86 1.84 3.41 4.35 YES
9 SDCB 1-4 SDCB (Offsite)92 12 0.014 3,352 0.077 0.90 0.069 5347 0.123 0.90 0.110 0.707 50.00 2.26 0.33 2.59 6.30 2.73 1.93 1.93 25.37 24.4 22.6 21.8 0.0087 1.77 1.60 3.09 3.94 YES
10 SDCB 1-8 SDCB 1-9 52 8 0.014 2,322 0.053 0.90 0.048 6653 0.153 0.90 0.137 0.185 50.00 0.00 0.28 0.28 6.30 2.73 0.51 0.51 25.95 25.89 24.1 23.9 0.0039 1.18 1.32 0.70 2.00 YES
11 SDCB 1-10 SDCB 1-11 40 12 0.012 915 0 0.90 0.019 0 0.000 0.000 0.019 50.00 0.00 0.19 0.19 6.30 2.73 0.05 0.05 27.42 27.59 24.73 24.53 0.0050 1.69 2.06 2.74 3.48 YES
12 SDCB 1-11 SDCB 1-E4 3 12 0.012 915 0 0.90 0.019 0 0.000 0.000 0.019 50.00 0.19 0.01 0.20 6.30 2.73 0.05 0.05 27.59 27.83 24.53 24.5 0.0100 2.06 2.33 3.87 4.93 YES
13 SDCB 1-14 SDCB 1-15 58 12 0.012 6,245 0.143 0.90 0.129 8368 0.192 0.90 0.173 0.302 50.00 0.00 0.27 0.27 6.30 2.73 0.83 0.83 28.06 27.87 25.05 24.76 0.0050 2.01 2.11 2.74 3.48 YES
14 SDCB 1-15 SDCB 1-16 134 12 0.012 2,178 0.050 0.90 0.045 3538 0.081 0.90 0.073 0.118 50.00 0.27 0.63 0.91 6.30 2.73 0.32 0.32 27.87 27.5 24.76 24.09 0.0050 2.11 2.41 2.74 3.48 YES
15 SDCB 1-16 SDCB 1-17 118 12 0.012 5,238 0.120 0.90 0.108 7466 0.171 0.90 0.154 0.262 50.00 0.91 0.56 1.46 6.30 2.73 0.72 0.72 27.5 27.17 24.09 23.5 0.0050 2.41 2.67 2.74 3.48 YES
16 SDCB 1-17 SDCB 1-E5 19 12 0.012 4,558 0.105 0.90 0.094 5257 0.121 0.90 0.109 0.203 50.00 1.46 0.09 1.55 6.30 2.73 0.55 0.55 27.17 27.39 23.49 23.4 0.0047 2.68 2.99 2.66 3.39 YES
17 SDCB 1-21 SDCB 1-18 31 12 0.012 11,056 0.254 0.90 0.228 0 0.000 0.90 0.000 0.228 50.00 0.00 0.13 0.13 6.30 2.73 0.62 0.62 31.12 30.87 28.3 28.1 0.0065 1.82 1.77 3.11 3.96 YES
18 SDCB 1-20 SDCB 1-19 31 12 0.012 1,134 0.026 0.90 0.023 0 0.000 0.90 0.000 0.023 50.00 0.13 0.14 0.27 6.30 2.73 0.06 0.06 31.05 30.78 28.3 28.14 0.0052 1.75 1.64 2.78 3.54 YES
19 SDCB 1-19 SDCB 1-18 7 12 0.012 0 0.000 0.90 0.000 1134 0.026 0.90 0.023 0.023 50.00 0.00 0.03 0.03 6.30 2.73 0.06 0.06 30.78 30.87 28.14 28.1 0.0057 1.64 1.77 2.93 3.72 YES
20 SDCB 1-18 TREATMENT MW 1-1 22 12 0.012 1,456 0.033 0.90 0.030 12190 0.280 0.90 0.252 0.282 50.00 0.03 0.06 0.09 6.30 2.73 0.77 0.77 30.87 30.59 28.1 27.71 0.0177 1.77 1.88 5.15 6.56 YES
21 TREATMENT MW 1-1 SDMH (1-3)41 12 0.012 0 0.000 0.90 0.000 13646 0.313 0.90 0.282 0.282 50.00 0.09 0.17 0.25 6.30 2.73 0.77 0.77 30.59 31.38 26.38 26.1 0.0068 3.21 4.28 3.20 4.07 YES
22 SDCB 1-23 SDCB 1-22 200 12 0.012 16,548 0.380 0.90 0.342 0 0.000 0.90 0.000 0.342 50.00 0.00 0.94 0.94 6.30 2.73 0.93 0.93 34.86 31.2 29.32 28.32 0.0050 4.54 1.88 2.74 3.48 YES
23 SDCB 1-22 SDCB 1-E8 4 12 0.012 16,548 0.380 0.90 0.342 0 0.000 0.90 0.000 0.342 50.00 0.94 0.02 0.96 6.30 2.73 0.93 0.93 31.2 31.41 28.32 28.3 0.0050 1.88 2.11 2.74 3.48 YES
Talbot Rd S
Talbot Rd S
24 SDCB 1-24 SDCB 1-26 23 12 0.012 16,525 0.379 0.90 0.341 0 0.000 0.90 0.000 0.341 50.00 0.00 0.11 0.11 6.30 2.73 0.93 0.93 33.45 33.36 29.67 29.55 0.0052 2.78 2.81 2.80 3.56 YES
25 SDCB 1-25 SDCB 1-26 116 12 0.012 6,875 0.158 0.90 0.142 0 0.000 0.90 0.000 0.142 50.00 0.00 0.55 0.55 6.30 2.73 0.39 0.39 32.13 33.36 30.13 29.55 0.0050 1.00 2.81 2.74 3.48 YES
26 SDCB 1-26 SDCB 1-E10 70 12 0.012 23,400 0.537 0.90 0.483 0 0.000 0.90 0.000 0.483 50.00 0.11 0.33 0.44 6.30 2.73 1.32 1.32 33.36 32.76 29.55 29.2 0.0050 2.81 2.56 2.74 3.48 YES
Talbot Rd S and S Renton Village PL
27 SDCB 1-E11 SDCB 1-28D 40 12 0.012 22,911 0.526 0.90 0.473 0 0.000 0.90 0.000 0.473 50.00 0.00 0.32 0.32 6.30 2.73 1.29 1.29 31.19 32.06 28.6 28.53 0.0018 1.59 2.53 1.62 2.06 YES
28 SDCB 1-28D SDCB 1-28C 13 12 0.012 22,911 0.526 0.90 0.473 0 0.000 0.90 0.000 0.473 50.00 0.00 0.01 0.01 6.30 2.73 1.29 1.29 32.06 32.11 28.53 25.61 0.2246 2.53 5.50 18.34 23.35 YES
29 SDCB 1-28C SDCB 1-28B 64 36 0.011 22,911 0.526 0.90 0.473 0 0.000 0.90 0.000 0.473 50.00 0.32 0.14 0.46 6.30 2.73 1.29 1.29 32.11 32.17 27.11 25.61 0.0234 2.00 3.56 121.00 17.12 YES
30 SDCB 1-29 SDCB 1-28B 37 12 0.012 5,532 0.127 0.90 0.114 0 0.000 0.90 0.000 0.114 50.00 0.00 0.05 0.05 6.30 2.73 0.31 0.31 31.22 32.17 28.22 25.61 0.0705 2.00 5.56 10.28 13.09 YES
31 SDCB 1-28B SDCB 1-28A 64 36 0.011 28,443 0.653 0.90 0.588 0 0.000 0.90 0.000 0.588 50.00 0.46 0.30 0.76 6.30 2.73 1.61 1.61 32.17 32.32 25.61 25.61 0.0000 3.56 3.71 0.00 0.00 NO
32 SDCB 1-28A SDMH 1-E2 48 12 0.012 28,443 0.653 0.90 0.588 0 0.000 0.90 0.000 0.588 50.00 0.76 0.08 0.84 6.30 2.73 1.61 1.61 32.32 33.78 25.61 23.8 0.0377 5.71 8.98 7.51 9.57 YES
S 23rd St and Talbot Rd S
33 SDCB 1-30 SDCB 1-E12 19 12 0.012 555 0.013 0.90 0.011 3904 0.090 0.90 0.081 0.092 50.00 0.00 0.03 0.03 6.30 2.73 0.25 0.25 194.97 195.07 191.97 191.2 0.0405 2.00 2.87 7.79 9.92 YES
34 SDCB 1-31 SDCB T2-1 43 8 0.014 2,549 0.059 0.90 0.053 1517 0.035 0.90 0.031 0.084 50.00 0.00 0.13 0.13 6.30 2.73 0.23 0.23 93.02 93.11 90.8 90.3 0.0116 1.55 2.14 1.21 3.48 YES
35 SDCB 1-33 SDCB 1-34 38 12 0.012 1,206 0.028 0.90 0.025 1771 0.041 0.90 0.037 0.062 50.00 0.00 0.13 0.13 6.30 2.73 0.17 0.17 93.91 94.02 92.35 92 0.0092 0.56 1.02 3.71 4.73 YES
Talbot Road S (North of S Carr Rd intersection)
36 SDCB 1-35 SDCB 1-36 48 12 0.012 1,650 0.038 0.90 0.034 0 0.000 0.90 0.000 0.034 50.00 0.00 0.23 0.23 6.30 2.73 0.09 0.09 108.42 108.63 105.97 105.73 0.0050 1.45 1.90 2.74 3.48 YES
37 SDCB 1-36 SDMH 1-4 9 12 0.012 4,335 0.100 0.90 0.090 0 0.000 0.90 0.000 0.090 50.00 0.23 0.01 0.24 6.30 2.73 0.24 0.24 108.63 108.48 105.73 104.71 0.1133 1.90 2.77 13.03 16.59 YES
S Carr Rd
38 SDCB 1-E31 SDCB 1-37 5 12 0.014 1,191 0.027 0.90 0.025 1106 0.025 0.90 0.023 0.047 50.00 0.00 0.01 0.01 6.30 2.73 0.13 0.13 351 350.31 347.4 346.92 0.0960 2.60 2.39 10.28 13.09 YES
39 SDCB 1-37 SDMH 1-E3 14 12 0.014 1,191 0.027 0.90 0.025 1106 0.025 0.90 0.023 0.095 50.00 0.01 0.02 0.02 6.30 2.73 0.26 0.26 350.31 350.77 346.92 345.71 0.0864 2.39 4.06 9.75 12.42 YES
S Grady Way (NW side)
S Grady Way and Talbot Rd S
S 37th St and Talbot Rd S
S Grady Way and Talbot Rd S (NE side)
Page1 of 1Page 2 of 20
I Line_Renton_Conveyance_Calcs_Ad-Ready
back25
JACOBS
6/4/2024
STORM PIPE DESIGN COMPUTATIONS - 25 YEAR CONVEYANCE (BACKWATER ANALYSIS)
Project: I-Line Renton
Proj. No: W3X86400 by: E. Conley
Junc Q
Pipe ID Upstream ID
Downstream
ID Total Q Length Dia.
Manning's
"n" Inlet Elev Outlet Elev Slope
Barrel
Area
Barrel
Velocity
Velocity
Head
TW
Elev1
Friction
Slope
Friction
Loss
Entrance
HGL Elev
Entr.
Loss
Coeff.2
Entr
Head
Loss
Exit
Head
Loss
Outlet
Control
Elevation Inlet Condition
Critical
Depth3
Critical
Area
Specific
head at
critical
depth
Inlet
HW/D4
Inlet Control
Elevation
Inlet or
Outlet
Control
Approach
Velocity
Head
Bend
Angle
Bend
Loss
Coef.5
Bend
Head
Loss Q3 Q1
Junction
head loss HW Elev
Ground
Elev Difference
cfs ft in ft ft ft/ft sq ft fps ft ft ft/ft ft ft ft ft ft ft sq ft ft ft ft Deg ft cfs cfs ft ft ft ft
1 2 3 4 6 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20
TDA 1
S Grady Way and Lake Ann S
2 SDCB 1-2 SDCB 1-E1 0.54 11 12 0.012 22.38 22.30 0.0073 0.785 0.69 0.01 23.00 0.00019 0.00 23.00 0.50 0.00 0.01 23.01 Unsubmerged 0.397 0.29 0.45 0.45 22.83 Outlet 0.00 80 1.08 0.003 0.000 0.541 0.000 23.01 24.92 -1.91
1 SDCB 1-1 SDCB 1-2 0.32 148 12 0.012 23.13 22.38 0.0051 0.785 0.41 0.00 23.01 0.00007 0.01 23.02 0.50 0.00 0.00 23.03 Unsubmerged 0.120 0.05 0.68 0.68 23.81 Inlet 0.00 90 1.32 0.000 0.000 0.320 0.000 23.81 25.33 -1.52
S grady way & shattuck
3 SDCB 1-3 SDCB 1-4 0.55 64 12 0.012 22.85 22.53 0.0050 0.785 0.70 0.01 23.09 0.00020 0.01 23.10 0.50 0.00 0.01 23.11 Unsubmerged 0.120 0.05 1.75 1.75 24.60 Inlet 0.00 90 1.32 0.000 0.000 0.546 0.000 24.60 25.37 -0.77
9 SDCB 1-4 SDCB (Offsite) 1.93 92 12 0.014 22.60 21.80 0.0087 0.785 2.46 0.09 22.48 0.00338 0.31 22.79 0.50 0.05 0.09 22.93 Unsubmerged 0.361 0.26 1.25 1.30 23.90 Inlet 0.05 90 1.32 0.069 0.000 1.932 0.000 23.92 24.40 -0.48
8 SDCB 1-E2 SDCB 1-4 1.44 9 12 0.012 22.60 22.53 0.0078 0.785 1.83 0.05 23.92 0.00138 0.01 23.93 0.50 0.03 0.05 24.01 Unsubmerged 0.376 0.27 0.82 0.85 23.45 Outlet 0.05 50 0.48 0.025 0.000 1.441 0.000 23.98 25.46 -1.48
7 SDCB 1-E3 SDCB 1-E2 1.44 93 12 0.014 22.70 22.60 0.0011 0.785 1.83 0.05 23.98 0.00188 0.17 24.16 0.50 0.03 0.05 24.24 Unsubmerged 0.376 0.27 0.82 0.85 23.55 Outlet 0.05 70 0.85 0.044 0.000 1.441 0.000 24.23 26.26 -2.03
6 SDCB 1-7 SDCB 1-E3 1.44 35 12 0.014 22.87 22.70 0.0049 0.785 1.83 0.05 24.23 0.00188 0.07 24.30 0.50 0.03 0.05 24.37 Unsubmerged 0.426 0.32 0.74 0.77 23.64 Outlet 0.03 90 1.32 0.038 0.000 1.441 0.000 24.38 26.22 -1.84
5 SDCB 1-6 SDCB 1-7 1.08 86 12 0.014 23.31 22.88 0.0050 0.785 1.37 0.03 24.38 0.00105 0.09 24.47 0.50 0.01 0.03 24.52 Unsubmerged 0.376 0.27 0.62 0.64 23.95 Outlet 0.00 50 0.48 0.002 0.000 1.076 0.000 24.51 26.46 -1.95
4 SDCB 1-5 SDCB 1-6 0.43 150 12 0.012 24.06 23.31 0.0050 0.785 0.55 0.00 24.51 0.00012 0.02 24.53 0.50 0.00 0.00 24.54 Unsubmerged 0.376 0.27 0.42 0.42 24.48 Outlet 0.00 70 0.85 0.000 0.000 0.430 0.000 24.54 26.88 -2.34
10 SDCB 1-8 SDCB 1-9 0.51 52 8 0.014 24.10 23.90 0.0039 0.349 1.45 0.03 24.43 0.00202 0.10 24.54 0.50 0.02 0.03 24.58 Unsubmerged 0.395 0.22 0.48 0.75 24.60 Inlet 0.00 90 1.32 0.000 0.000 0.507 0.000 24.60 25.95 -1.35
S grady Way
16 SDCB 1-17 SDCB 1-E5 0.55 19 12 0.014 23.49 23.40 0.0047 0.785 0.71 0.01 24.05 0.00028 0.01 24.05 0.50 0.00 0.01 24.07 Unsubmerged 0.299 0.20 0.42 0.42 23.91 Outlet 0.01 90 1.32 0.017 0.000 0.554 0.000 24.07 27.17 -3.10
15 SDCB 1-16 SDCB 1-17 0.72 118 12 0.014 24.09 23.50 0.0050 0.785 0.91 0.01 24.07 0.00047 0.05 24.13 0.50 0.01 0.01 24.14 Unsubmerged 0.345 0.24 0.48 0.49 24.58 Inlet 0.00 90 1.32 0.003 0.000 0.718 0.000 24.58 27.50 -2.92
14 SDCB 1-15 SDCB 1-16 0.32 134 12 0.014 24.76 24.09 0.0050 0.785 0.41 0.00 24.58 0.00009 0.01 24.59 0.50 0.00 0.00 24.60 Unsubmerged 0.499 0.39 0.51 0.51 25.27 Inlet 0.02 0 0.02 0.000 0.000 0.323 0.000 25.25 27.87 -2.62
13 SDCB 1-14 SDCB 1-15 0.83 58 12 0.014 25.05 24.76 0.0050 0.785 1.05 0.02 25.25 0.00062 0.04 25.29 0.50 0.01 0.02 25.31 Unsubmerged 0.376 0.27 0.52 0.53 25.58 Inlet 0.00 50 0.48 0.000 0.000 0.825 0.000 25.58 28.06 -2.48
12 SDCB 1-11 SDCB 1-E4 0.05 3 12 0.014 24.53 24.50 0.0100 0.785 0.07 0.00 25.19 0.00000 0.00 25.19 0.50 0.00 0.00 25.19 Unsubmerged 0.376 0.27 0.38 0.37 24.90 Outlet 0.00 70 0.85 0.000 0.000 0.052 0.000 25.19 27.59 -2.40
11 SDCB 1-10 SDCB 1-11 0.05 40 12 0.014 24.73 24.53 0.0050 0.785 0.07 0.00 25.19 0.00000 0.00 25.19 0.50 0.00 0.00 25.19 Unsubmerged 0.426 0.32 0.43 0.42 25.15 Outlet 0.00 90 1.32 0.000 0.000 0.052 0.000 25.19 27.42 -2.23
S Grady Way and Talbot Rd S
21 TREATMENT MW 1-1 SDMH (1-3)0.77 41 12 0.014 26.38 26.10 0.0068 0.785 0.98 0.01 26.75 0.00054 0.02 26.77 0.50 0.01 0.01 26.79 Unsubmerged 0.299 0.20 0.54 0.54 26.92 Inlet 0.01 90 1.32 0.013 0.000 0.771 0.000 26.93 31.05 -4.12
20 SDCB 1-18 TREATMENT MW 1-10.77 22 12 0.014 28.10 27.71 0.0177 0.785 0.98 0.01 26.93 0.00054 0.01 26.94 0.50 0.01 0.01 26.96 Unsubmerged 0.299 0.20 0.54 0.54 28.64 Inlet 0.00 90 1.32 0.000 0.000 0.771 0.000 28.64 30.78 -2.14
19 SDCB 1-19 SDCB 1-18 0.06 7 12 0.012 28.14 28.10 0.0057 0.785 0.08 0.00 28.64 0.00000 0.00 28.64 0.50 0.00 0.00 28.64 Unsubmerged 0.299 0.20 0.30 0.30 28.44 Outlet 0.00 90 1.32 0.000 0.000 0.064 0.000 28.64 30.87 -2.23
18 SDCB 1-20 SDCB 1-19 0.06 31 12 0.012 28.30 28.14 0.0052 0.785 0.08 0.00 28.64 0.00000 0.00 28.64 0.50 0.00 0.00 28.64 Unsubmerged 0.299 0.20 0.30 0.30 28.60 Outlet 0.02 90 1.32 0.029 0.000 0.064 0.000 28.64 30.59 -1.95
17 SDCB 1-21 SDCB 1-18 0.62 31 12 0.012 28.30 28.10 0.0065 0.785 0.80 0.01 26.93 0.00026 0.01 26.93 0.50 0.00 0.01 26.95 Unsubmerged 0.177 0.09 0.86 0.87 29.17 Inlet 0.00 90 1.32 0.000 0.000 0.625 0.000 29.17 31.12 -1.95
S Grady Way and Talbot Rd S (NE side)
23 SDCB 1-22 SDCB 1-E8 0.93 4 12 0.012 28.32 28.30 0.0050 0.785 1.19 0.02 28.95 0.00058 0.00 28.95 0.50 0.01 0.02 28.98 Unsubmerged 0.299 0.20 0.65 0.66 28.98 Outlet 0.02 90 1.32 0.029 0.000 0.935 0.000 28.99 31.20 -2.21
22 SDCB 1-23 SDCB 1-22 0.93 200 12 0.014 29.32 28.32 0.0050 0.785 1.19 0.02 28.99 0.00079 0.16 29.15 0.50 0.01 0.02 29.18 Unsubmerged 0.299 0.20 0.65 0.66 29.98 Inlet 0.00 90 1.32 0.000 0.000 0.935 0.000 29.98 34.86 -4.88
Talbot Rd S
26 SDCB 1-26 SDCB 1-E10 1.32 70 12 0.014 29.55 29.20 0.0050 0.785 1.68 0.04 29.85 0.00158 0.11 29.96 0.50 0.02 0.04 30.03 Unsubmerged 0.299 0.20 1.00 1.02 30.57 Inlet 0.00 90 1.32 0.005 0.000 1.322 0.000 30.57 33.36 -2.79
25 SDCB 1-25 SDCB 1-26 0.39 116 12 0.012 30.13 29.55 0.0050 0.785 0.49 0.00 30.57 0.00010 0.01 30.58 0.50 0.00 0.00 30.59 Unsubmerged 0.299 0.20 0.36 0.36 30.49 Outlet 0.00 90 1.32 0.000 0.000 0.388 0.000 30.59 33.45 -2.86
24 SDCB 1-24 SDCB 1-26 0.93 23 12 0.014 29.67 29.55 0.0052 0.785 1.19 0.02 30.59 0.00079 0.02 30.61 0.50 0.01 0.02 30.64 Unsubmerged 0.299 0.20 0.65 0.66 30.33 Outlet 0.00 90 1.32 0.000 0.000 0.933 0.000 30.64 32.13 -1.49
Talbot Rd S and S Renton Village PL
32 SDCB 1-28A SDMH 1-E2 1.61 48 12 0.014 25.61 23.80 0.0377 0.785 2.05 0.06 24.41 0.00234 0.11 24.52 0.50 0.03 0.06 24.62 Unsubmerged 0.211 0.12 2.96 2.98 28.59 Inlet 0.00 90 1.32 0.001 0.000 1.607 0.000 28.59 32.17 -3.58
31 SDCB 1-28B SDCB 1-28A 1.61 64 36 0.014 25.61 25.61 0.0000 7.069 0.23 0.00 27.22 0.00001 0.00 27.22 0.50 0.00 0.00 27.22 Unsubmerged 0.211 0.22 1.05 0.35 26.66 Outlet 0.00 90 1.32 0.003 0.000 1.607 0.000 27.22 32.32 -5.10
30 SDCB 1-29 SDCB 1-28B 0.31 37 12 0.011 28.22 25.61 0.0705 0.785 0.40 0.00 27.22 0.00005 0.00 27.22 0.50 0.00 0.00 27.22 Unsubmerged 0.299 0.20 0.34 0.30 28.52 Inlet 0.00 90 1.32 0.000 0.000 0.313 0.000 28.52 32.17 -3.65
29 SDCB 1-28C SDCB 1-28B 1.29 64 36 0.014 27.11 25.61 0.0234 7.069 0.18 0.00 28.52 0.00000 0.00 28.52 0.50 0.00 0.00 28.53 Unsubmerged 0.299 0.37 0.49 0.15 27.57 Outlet 0.04 90 1.32 0.056 0.000 1.294 0.000 28.54 31.22 -2.68
28 SDCB 1-28D SDCB 1-28C 1.29 13 12 0.011 28.53 25.61 0.2246 0.785 1.65 0.04 28.54 0.00094 0.01 28.55 0.50 0.02 0.04 28.61 Unsubmerged 0.299 0.20 0.97 0.88 29.41 Inlet 0.04 90 1.32 0.056 0.000 1.294 0.000 29.43 32.11 -2.68
27 SDCB 1-E11 SDCB 1-28D 1.29 40 12 0.012 28.60 28.53 0.0018 0.785 1.65 0.04 29.43 0.00111 0.04 29.47 0.50 0.02 0.04 29.53 Unsubmerged 0.120 0.05 9.25 9.27 37.87 Inlet 0.00 90 1.32 0.000 0.000 1.294 0.000 37.87 31.19 6.68
S 23rd St and Talbot Rd S
33 SDCB 1-30 SDCB 1-E12 0.25 19 12 0.012 191.97 191.20 0.0405 0.785 0.32 0.00 191.81 0.00004 0.00 191.81 0.50 0.00 0.00 191.81 Unsubmerged 0.211 0.12 0.28 0.26 192.23 Inlet 0.00 90 1.32 0.000 0.000 0.252 0.000 192.23 194.97 -2.74
S 37th St and Talbot Rd S
34 SDCB 1-31 SDCB T2-1 0.23 43 8 0.014 90.80 90.30 0.0116 0.349 0.66 0.01 90.74 0.00041 0.02 90.76 0.50 0.00 0.01 90.77 Unsubmerged 0.211 0.09 0.30 0.45 91.10 Inlet 0.00 90 1.32 0.000 0.000 0.230 0.000 91.10 93.02 -1.92
35 SDCB 1-33 SDCB 1-34 0.17 38 12 0.014 92.35 92.00 0.0092 0.785 0.21 0.00 92.61 0.00003 0.00 92.61 0.50 0.00 0.00 92.61 Unsubmerged 0.211 0.12 0.24 0.24 92.59 Outlet 0.00 90 1.32 0.000 0.000 0.168 0.000 92.61 93.91 -1.30
Talbot Road S (North of S Carr Rd intersection)
37 SDCB 1-36 SDMH 1-4 0.24 9 12 0.012 105.73 104.71 0.1133 0.785 0.31 0.00 105.32 0.00004 0.00 105.32 0.50 0.00 0.00 105.32 Unsubmerged 0.211 0.12 0.27 0.22 105.95 Inlet 0.00 90 1.32 0.000 0.000 0.245 0.000 105.95 108.63 -2.68
36 SDCB 1-35 SDCB 1-36 0.09 48 12 0.012 105.97 105.73 0.0050 0.785 0.12 0.00 105.95 0.00001 0.00 105.95 0.50 0.00 0.00 105.95 Unsubmerged 0.299 0.20 0.30 0.30 106.27 Inlet 0.00 90 1.32 0.000 0.000 0.093 0.000 106.27 108.42 -2.15
S Carr Rd
39 SDCB 1-37 SDMH 1-E3 0.26 14 12 0.014 346.92 345.71 0.0864 0.785 0.33 0.00 346.32 0.00006 0.00 346.32 0.50 0.00 0.00 346.32 Unsubmerged 0.211 0.12 0.28 0.24 347.16 Inlet 0.00 90 1.32 0.001 0.000 0.259 0.000 347.16 350.31 -3.15
38 SDCB 1-E31 SDCB 1-37 0.13 5 12 0.014 347.40 346.92 0.0960 0.785 0.17 0.00 347.16 0.00002 0.00 347.16 0.50 0.00 0.00 347.16 Unsubmerged 0.299 0.20 0.31 0.26 347.66 Inlet 0.00 90 1.32 0.000 0.000 0.130 0.000 347.66 351.00 -3.34
NOTES:
1. If downstream facility is not included, the assumption is made that the TW Elevation equals the average of critical depth and full flow depth.
2. Headwall Square Edge, KCSWDM Table 4.3.1.B
3. See FlowMaster calculations.
4. Per KCSWDM Section 4.3.1.2 (Pages 4-39 to 4-40)
5. Bend loss coefficient, KCSWDM Figure 4.2.1.K
1Page 3 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222326 262626262626262628282826 32302826
2
6
26
2828262626282828302
8 2626SDSDSDSDSD18+2917+0018+0010+0011+0012+0013+0014+0011 LF 12" DI SD148 LF 12" DI SDEX SDCB (1-E1)GRA 11+05.97, 27.80 LTRIM EL = 25.5361IE = 22.30 (12" N) INIE = 22.30 (12" SW) OUTSDCB (1-2) TYPE 1GRA 11+05.98, 38.68 LTRIM EL = 24.92128IE = 22.38 (12" E) INIE = 22.38 (12" S) OUTSDCB (1-1) TYPE 1GRA 12+55.26, 38.68 LTRIM EL = 25.49128IE = 23.13 (12" W) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.01PLOTTED: May 28, 2024-03:08:11pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAYLAKE AVE S(LAK-LINE)(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 10+00 TO GRA 14+001DR.01214J. GREENH. JOHNSONJ. ETULAIN 761R-4214214TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128 PIPE ID 1PIPE ID 2Page 4 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122232628282626 28282626282828283028
28282828282828
30282828282828282826262626 2628262826
28282828\\\\\\\\\\\\T&T\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\SDSDSDSDSDSDSDSDSDSDSDSD14+0015+0016+0017+0018+0019+0035 LF 12" PP SD3 LF12" PP SD9 LF 12" DI SD86 LF 12" PP SD64 LF 12" DI SD150 LF 12" DI SD40 LF 12" PP SD40 LF12" DI SDSDCB (1-9) TYPE 1GRA 15+02.29, 88.20 RTRIM EL = 25.89118IE = 24.00 (10" NW) INIE = 23.90 (8" NE) INIE = 24.10 (8" SW) INIE = 23.90 (10" S) OUTSDCB (1-7) TYPE 1GRA 16+17.43, 38.66 LTRIM EL = 26.22128IE = 22.88 (12" E) INIE = 22.87 (12" SW) OUTSDCB (1-6) TYPE 1GRA 17+04.66, 38.65 LTRIM EL = 26.46128IE = 23.31 (12" E) INIE = 23.31 (12" W) OUTEX SDCB (1-E2)GRA 14+88.95, 33.58 LTRIM EL = 25.7316IE = 22.60 (12" E) INIE = 22.60 (12" NW) OUTEX SDCB (1-E3)GRA 15+82.21, 36.04 LTRIM EL = 26.2616IE = 22.70 (12" NE) INIE = 22.70 (12" W) OUTSDCB (1-8) TYPE 1GRA 15+52.48, 79.56 RTRIM EL = 25.95118IE = 24.10 (8" N) INIE = 24.10 (8" SW) OUTSDCB (1-4) TYPE 1GRA 14+83.40, 40.43 LTRIM EL = 25.37118IE = 22.53 (12" SE) INIE = 22.53 (12" W) INIE = 22.53 (12" NW) OUTSDCB (1-5) TYPE 1GRA 18+56.20, 38.67 LTRIM EL = 26.88812IE = 24.06 (12" W) OUTSDCB (1-3) TYPE 1GRA 14+18.98, 38.66 LTRIM EL = 25.80128IE = 22.85 (12" E) OUTSDCB (1-10) TYPE 1GRA 18+94.64, 55.33 LTRIM EL = 27.42812IE = 24.73 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.02PLOTTED: May 28, 2024-03:11:08pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAYSHATTUCK AVE S
(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 14+00 TO GRA 19+001DR.02215J. GREENH. JOHNSONJ. ETULAIN 176157417445171757614R-4214215TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 3PIPE ID 4PIPE ID 5PIPE ID 6PIPE ID 7PIPE ID 8PIPE ID 9PIPE ID 10PIPE ID 11Page 5 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222328282828303032323232
3034342828282832SSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDUDUDUDUD19+0020+0021+0022+0023+0024+003 LF12" PP SD19 LF 12" PP SD118 LF 12" PP SD58 LF 12" PP SD134 LF 12" PP SD40 LF 12" PP SD40 LF12" DI SDSDCB (1-14) TYPE 2-48"GRA 22+73.31, 37.74 LTRIM EL = 28.06912IE = 25.20 (8" NW) INIE = 25.05 (12" SW) OUTEX SDCB (1-E5)GRA 19+44.83, 27.37 LTRIM EL = 27.3961IE = 23.40 (12" NE) INIE = 23.20 (12" NW) INIE = 23.40 (6" N) INIE = 23.30 (12" SE) OUTSDCB (1-11) TYPE 1GRA 19+35.25, 55.33 LTRIM EL = 27.59128IE = 24.53 (12" SW) INIE = 24.53 (12" SE) OUTEX SDCB (1-E4)GRA 19+35.25, 51.84 LTRIM EL = 27.8361IE = 24.50 (12" NW) INIE = 24.00 (18" NE) INIE = 24.00 (18" S) OUTSDCB (1-12) TYPE 1GRA 20+58.75, 55.33 LTRIM EL = 27.82812IE = 24.44 (18" NW) INIE = 24.44 (18" SE) OUTSDCB (1-13) TYPE 1GRA 21+55.71, 55.34 LTRIM EL = 28.11128IE = 24.40 (18" NW) INIE = 24.40 (18" SE) OUTEX SDCB (1-E7)GRA 21+56.68, 52.45 LTRIM EL = 28.1116IE = 24.40 (18" NW) INIE = 24.40 (18" SW) OUTSDCB (1-16) TYPE 1GRA 20+79.60, 38.67 LTRIM EL = 27.50128IE = 24.09 (12" NE) INIE = 24.09 (12" SW) OUTSDCB (1-15) TYPE 1GRA 22+14.97, 38.67 LTRIM EL = 27.87128IE = 24.76 (12" NE) INIE = 24.76 (12" SW) OUTSDCB (1-17) TYPE 1GRA 19+60.13, 38.66 LTRIM EL = 27.17128IE = 23.50 (12" NE) INIE = 23.49 (12" SW) OUTEX SDCB (1-E6)GRA 20+60.22, 51.86 LTRIM EL = 27.9516IE = 24.40 (18" NW) INIE = 24.40 (18" NE) INIE = 24.30 (18" SW) OUT28.10 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.03PLOTTED: May 28, 2024-03:13:58pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAY(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 19+00 TO GRA 24+001DR.03216J. GREENH. JOHNSONJ. ETULAIN 2157171717171719444455559 LF 3" SD185214" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.07CLEANOUTIE = 30.30CLEANOUTIE = 30.30CLEANOUTIE = 29.80CLEANOUTIE = 29.40R-4214216TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 11PIPE ID 12PIPE ID 13PIPE ID 14PIPE ID 15PIPE ID 16Page 6 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222334
34 32343434323234343234
36
3636 3434343232 303032
32323232
3434
3636LPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PSS\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\SDSDSDSDSDSDSDSDSDSDSD24+00 25+00 26+0010+0010+0011+0012+0013+0014+004 LF 12" DI SD200 LF 12" PP SD31 LF 12" DI SD31 LF 12" DI SD41 LF 12" PP SD16 LF 12" DI SD11 LF 12" PP SD7 LF 12" DI SDSDCB (1-21), TYPE 18TAL-B 10+73.55, 83.46 RTRIM EL = 31.12IE = 28.30 (12" NW) OUTEX SDCB (1-E13)TAL-B 10+99.55, 48.22 RTRIM EL = 31.0361IE = 28.80 (8" NE) OUTEX SDCB (1-E8)TAL-B 10+82.21, 35.96 LTRIM EL = 31.4116IE = 28.30 (12" W) OUTSDMH (1-3), 54"23TAL-B 10+37.73, 24.64 RTRIM EL = 31.38IE = 27.20 (12" E) INIE = 26.10 (12" S) INIE = 25.60 (12" NE) INIE = 25.60 (18" SE) OUTSDCB (1-22) TYPE 1TAL-B 10+82.51, 41.16 LTRIM EL = 31.20118IE = 28.32 (12" SE) INIE = 28.32 (12" SW) OUTSDCB (1-23) TYPE 1TAL-B 12+79.65, 41.15 LTRIM EL = 34.86812IE = 29.32 (12" NW) OUTSDCB (1-18), TYPE 2-48"9TAL-B 10+43.62, 91.02 RTRIM EL = 30.87IE = 28.10 (12" SE)IE = 28.60 (6" SW) INIE = 28.10 (12" N)IE = 28.60 (6" SW) INIE = 28.10 (12" NE) OUTSDMH (1-2), 48"10TAL-B 10+66.32, 53.74 RTRIM EL = 31.22IE = 26.31 (12" W) INIE = 26.31 (12" N) OUTSDCB (1-20), TYPE 18TAL-B 10+42.73, 58.24 RTRIM EL = 31.05IE = 28.30 (12" W) OUT6 LF 12" DI SDSDCB (1-19), TYPE 18TAL-B 10+36.68, 89.10 RTRIM EL = 30.78IE = 28.14 (12" E) INIE = 28.06 (12" S) OUTIN28.60IN28.10 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.04PLOTTED: May 28, 2024-03:16:59pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAY
TALBOT RD S(TAL-B-LINE)(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 24+00 TO TAL-B 14+001DR.04217J. GREENH. JOHNSONJ. ETULAIN OWS (1-1), 7.50'x5.00'TAL-B 10+46.34, 79.46'RT RIM EL=30.33 IE=28.04 (12" S) IN IE=27.81 (12" N) OUTTREATMENT MW (1-1)TAL-B 10+57.53, 64.61'RTRIM EL=30.59IE=27.71 (12" S) INIE=26.38 (12" N) OUT14177220158 LF 6" DI SDR-4214217TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128171717LUA22-000260 PR21-000132 C21001128PIPE ID 17PIPE ID 18PIPE ID 19PIPE ID 20PIPE ID 21PIPE ID 22PIPE ID 23Page 7 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223343432
34
36
3234323232323434
3232323236
3232323434343634343432PSE EASEMENT PERNO. 8208270358FIRE EASEMENT PERNO. 8612221310FIRE EASEMENT PERNO. 8612221310
WATER LINE EASEMENT PER
NO. 8710090448
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PLSDSD
SDSDSDSD14+0015+0016+0017+0018+0070 LF 12" PP SD116 LF 12" DI SDSDCB (1-24) TYPE 1TAL-B 15+17.80, 40.31 LTRIM EL = 33.45128IE = 29.67 (12" S) OUTSDCB (1-26) TYPE 1TAL-B 15+39.27, 40.28 LTRIM EL = 33.36128IE = 29.55 (12" N) INIE = 29.55 (12" S) INIE = 29.55 (12" W) OUTSDCB (1-27), CONC INLET22TAL-B 18+44.23, 40.47 RTRIM EL = 31.44SDCB (1-25) TYPE 1TAL-B 16+48.68, 40.34 LTRIM EL = 32.13811IE = 30.13 (12" N) OUTEX SDCB (1-E10)1TAL-B 15+38.87, 29.59 RTRIM EL = 32.76IE = 29.20 (12" E) INIE = 29.20 (12" S) OUT23 LF 12" PP SDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.05PLOTTED: May 28, 2024-03:19:49pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-B-LINE)RENTON SEGMENTDRAINAGE PLANTAL-B 14+00 TO TAL-B 18+501DR.05218J. GREENH. JOHNSONJ. ETULAIN 44752451754R-4214218TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 25PIPE ID 24PIPE ID 26Page 8 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122233432323232 32 32323232323234
34
3
4
34 323232323434 323232303032323219+0020+0021+0022+0023+00SD SDSD
EX SDCB (1-E11)1TAL-B 20+46.20, 41.08 RTRIM EL = 31.19IE = 28.60 (12" E)IE = 28.86 (12" NW)SDCB (1-29) CONC INLET22TAL-B 19+34.16, 40.31 RTRIM EL = 31.22IE = 28.22 (12" E)SDCB (1-28B) CB TYPE 2-54"TAL-B 19+40.70, 3.53 RTRIM EL = 32.17913IE = 25.61 (36" S)IE = 28.06 (12" W)IE = 25.61 (36" N)SDCB (1-28D) CB TYPE 2-48"TAL-B 20+32.31, 3.57 RTRIM EL = 32.06139IE = 28.53 (12" W) INIE = 28.53 (12" NW) OUTSDCB (1-28C) CB TYPE 2-54"TAL-B 20+09.14, 3.54 RTRIM EL = 32.11913IE = 27.11 (12" SW)IE = 25.61 (36" N)FCS (1-28A) SDMH 54"TAL-B 18+72.40, 3.53 RTRIM EL = 32.32169IE = 25.61 (12" W)IE = 25.61 (36" S)48 LF 12" PP SD2 LF 36" SRPE SD37 LF 12" PP SD2 LF 36" SRPE SD2 LF 36" SRPE SD60 LF 48" SRPE SD40 LF 12" DI SD6 LF 12" PP SD7 LF 12" PP SD2 LF 36" SRPE SDEX SDMH (1-E2)2TAL-B 18+60.40, 49.85 RTRIM EL = 33.78IE = 23.80 (12" E)IE = 26.50 (12" S)60 LF 48" SRPE SDOUTINOUTINIE = 23.55 (15" W) OUTOUTINOUTIN ININ INC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.06PLOTTED: May 28, 2024-03:22:34pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SI-405 SB OFF-RAMP(TAL-B-LINE)S RENTON VILLAGE PLRENTON SEGMENTDRAINAGE PLANTAL-B 18+50 TO TAL-B 23+501DR.06219J. GREENH. JOHNSONJ. ETULAIN TREATMENT MW (1-2)TAL-B 20+21.84, 3.53 RTRIM EL=32.68IE=28.51 (12" S) INIE=27.18 (12" N) OUT77511521R-4214219TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 27PIPE ID 28PIPE ID 29PIPE ID 31PIPE ID 32PIPE ID 30Page 9 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223Water Valve6528393.15 8284868884 86888692909290
94
96
94
94
96
100
98
106
104
102 10210098969484 33+0034+0035+0036+0037+0038+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.07PLOTTED: May 28, 2024-03:24:25pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'BENSON DR S (SR 515)S PUGET DRS 15TH ST
(TAL-B-LINE)RENTON SEGMENTDRAINAGE PLANTAL-B 33+00 TO TAL-B 38+001DR.07220J. GREENH. JOHNSONJ. ETULAIN NO PROPOSED DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214220TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 10 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223198 196198200202196190192194 20220019819619219419420018218418618818618418218
8 190192194196198200190
186186186192194 19619424+0025+0026+0027+0028+0029+00SDCB (1-30) CONC INLET22TAL-21 25+47.37, 33.93 LTRIM EL = 194.97IE = 191.97 (12" N) OUT19 LF 12" DI SDEX SDCB (1-E12)TAL-21 25+32.69, 21.30 LTRIM EL = 195.73IE = 191.19 (12" S) INIE = 192.90 (12" NE) INIE = 191.20 (12" SW) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.08PLOTTED: Jun 04, 2024-02:40:02pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SS 23RD ST(TAL-21-LINE)TALBOT CREST DR S
RENTON SEGMENTDRAINAGE PLANTAL-21 24+00 TO TAL-21 29+001DR.08221J. GREENH. JOHNSONJ. ETULAIN 4512127R-4214221TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 33Page 11 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223929496981001021041061081021041069692949696949698100102100100100969854+0055+0056+0057+0058+0059+00UDUDUDUDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.09PLOTTED: May 28, 2024-03:28:06pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-21-LINE)S 32
N
D
S
T
RENTON SEGMENTDRAINAGE PLANTAL-21 54+00 TO TAL-21 59+001DR.09222J. GREENH. JOHNSONJ. ETULAIN 4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.02UNDERDRAINIE = 95.55WHERE DAYLIGHTINGTO LANDSCAPED AREACLEANOUTIE = 95.85CLEANOUTIE = 95.6CLEANOUTIE = 95.65CLEANOUTIE = 95.85R-4214222TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 12 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122238688909294969290929494 9698 10092949692
9494949496
96
969896969494
94 9494949272+0073+0074+0075+0076+00SDSDCB (1-33) TYPE 1TAL-21 75+48.98, 36.40 RTRIM EL = 93.91812IE = 92.35 (12" S) OUTSDCB (1-34) TYPE 1TAL-21 75+86.65, 36.85 RTRIM EL = 94.02812IE = 92.00 (12" N) INIE = 92.00 (12" E) OUTSDCB (1-31) TYPE 1TAL-21 73+71.42, 23.19 RTRIM EL = 93.02128IE = 90.80 (8" E) OUT38 LF 12" DI SDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.10PLOTTED: May 28, 2024-03:30:00pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SS 37TH STS 37TH ST
S 38TH CT
S 38TH CT (TAL-21-LINE)RENTON SEGMENTDRAINAGE PLANTAL-21 71+00 TO TAL-21 76+001DR.10223J. GREENH. JOHNSONJ. ETULAIN 111171744451R-4214223TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 34PIPE ID 35Page 13 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222311211010810810610410811011211210810611211011010410610
8
11086+0087+0088+0089+0090+0091+00UDUDUDUDUDSD
SDCB (1-35) TYPE 1TAL-21 89+06.19, 21.99 RTRIM EL = 108.42118IE = 105.97 (12" E) OUTSDCB (1-36) TYPE 1TAL-21 88+86.30, 21.92 LTRIM EL = 108.63128IE = 105.73 (12" W) INIE = 105.73 (12" S) OUTSDMH (1-4) 48"10TAL-21 88+94.27, 25.98 LTRIM EL = 109.09IE = 105.70 (12" N) INIE = 105.70 (12" S) INIE = 105.70 (12" N) OUT48 LF 12" DI SD9 LF 12" DI SDSDCB (1-32) TYPE 1TAL-21 88+11.86, 24.14 LTRIM EL = 108.48813IE = 104.71 (12" S) INIE = 104.71 (12" N) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.11PLOTTED: May 28, 2024-03:32:07pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-21-LINE)RENTON SEGMENTDRAINAGE PLANTAL-21 86+00 TO TAL-21 91+001DR.11224J. GREENH. JOHNSONJ. ETULAIN 181189 LF 3" SD9 LF 3" SD4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.04UNDERDRAINIE = 106.00AT LOW POINT OF WALL,DAYLIGHT TO LANDSCAPED AREA4" PERFORATED PVC PIPE. SEERETAINING WALL PLAN ANDELEVATION, SHEET 1R1.0310 LF 4" PVC UDCLEANOUTIE = 109.87CLEANOUTIE = 110.37CLEANOUTIE = 106.04CLEANOUTIE = 106.00CLEANOUTIE = 106.3117171717R-4214224TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 36PIPE ID 37Page 14 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223240242244246248250252254256258
2
6
0
262
264
266
268
270
272
274
276
278
280
26
6
26
4
2
6
2
2
6
0
2
5
8
2
5
0
24
8
246244242240238 236
2
5
2
2
5
4
2
5
6
234 232 230244246248250250254256258248260
262
2
6
4
266268270252 254260 32+0033+0034+0035+0036+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.12PLOTTED: May 28, 2024-03:34:16pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'SE CARR RDM
I
L
L
A
V
E
S
WELLS AVE S
(CAR-LINE)RENTON SEGMENTDRAINAGE PLANCAR 32+00 TO CAR 36+501DR.12225J. GREENH. JOHNSONJ. ETULAIN NO PROPOSED DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214225TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 15 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223360358356354352350348346344342340338336340342340338348346
350
35
2
3
5
2
350
3
5
4
3
5
6
354
354
356
3
6
4366368
370372362360358 352348346
350352
342344346
348
3
5
4
3
5
03523
5
2354 43+0044+0045+0046+0047+0010+
0
0
11+
0
0 SDCB (1-36x) TYPE 18CAR 43+41.88, 21.24 RTRIM EL = 340.22EX SDMH (1-E3)2105TH 10+88.32, 35.52 RTRIM EL = 350.77IE = 345.71 (12" E) INIE = 338.20 (36" SE) INIE = 336.30 (36" SW) OUTSDCB (1-37) TYPE 1105TH 10+92.38, 22.78 RTRIM EL = 350.31812IE = 346.92 (12" E) INIE = 346.92 (12" W) OUTSDCB (1-39) TYPE 1105TH 10+08.85, 32.99 LTRIM EL = 351.11128C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.13PLOTTED: May 28, 2024-03:37:56pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'105
T
H
PL
S
E
RENTON SEGMENTDRAINAGE PLANCAR 42+50 TO CAR 47+501DR.13226J. GREENH. JOHNSONJ. ETULAIN 11SE CARR RD641717189 LF 3" SD17117189 LF 3" SDR-4214226TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128PIPE ID 37PIPE ID 38Page 16 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223348350352354356352 352354 11+0012+0013+0014+0015+00105TH 10+92.38, 22.78 RTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.14PLOTTED: May 28, 2024-03:42:18pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'RENTON SEGMENTDRAINAGE PLAN105TH 11+00 TO 105TH 15+001DR.14227J. GREENH. JOHNSONJ. ETULAIN (105TH-LINE)105TH PL SENO DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214227TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 17 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223382382382384384384384386386386
38638638838438638839039238423+0024+0025+0026+0027+0028+00WWWWWWWWWWWWWWWWWWC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.15PLOTTED: May 28, 2024-03:46:47pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'RENTON SEGMENTDRAINAGE PLAN105TH 23+00 TO 105TH 28+001DR.15228J. GREENH. JOHNSONJ. ETULAIN SE 180TH ST(105TH-LINE)18111 LF 3" SD189 LF 3" SDR-4214228TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 18 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222346446
8
4
6
8468 458456468468476464466468462460466 460470470460456458460462464458 456
46
2 46246646446246
4 46246
6
47047247447647847447247647028+0029+0030+0031+0032+0033+0011+00 UDUDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.20.dwg | Layout: 1DR.16PLOTTED: May 28, 2024-04:02:04pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-RDWY_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; 18229-SV-BS_Kent.dwg; X-IL_RENTON.dwg; X-LEGEND.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'108TH AVE SE (SR 515)SE 186TH ST
SE 184TH LN (108TH-LINE)SE 186TH ST
RENTON SEGMENTDRAINAGE PLAN108TH 28+00 TO 108TH 33+001DR.16229J. GREENH. JOHNSONJ. ETULAIN 118189 LF 3" SD9 LF 3" SD4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.06CLEANOUTIE = 465.877 LF 4" UD (DI)CURB CUT FOR WALLUNDERDRAIN IE=464.00CLEANOUTIE = 467.87R-4214229TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128Page 19 of 20
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHP OHP OHPOHPOHPOHP
OHP OHP OHP OHP OHP OHP OHP OHP
OHPOHPOHP
OHPOHPOHPWATER PER GIS
WATER PER GIS458
456
45
6
4
5
8 460454452450448446444454
45
2
460
462
464466468470 51+0052+0053+0054+0055+0056+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.20.dwg | Layout: 1DR.17PLOTTED: May 28, 2024-04:06:44pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-RDWY_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; 18229-SV-BS_Kent.dwg; X-IL_RENTON.dwg; X-LEGEND.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'108TH AVE SE (SR 515)SE 192ND STCITY OF RENTON(108TH-LINE)CITY OF KENTSEE VOLUME 2FOR CITY OF KENTIMPROVEMENTSRENTON SEGMENTDRAINAGE PLAN108TH 51+00 TO 108TH 56+001DR.17230J. GREENH. JOHNSONJ. ETULAIN 188 LF 3" SD1R-4214230TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128
OHPPage 20 of 20
Appendix H
TDA Minimum Requirement Areas
Page 1 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
192305-9101192305-9102 192305-9103
192305-9032
18+29
17+0
0
18+0010+00
11+00 12+00 13+00 14+00//////////////////////////////
//
//
//
//
//
//
//
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
LAK 17+12.04, 45.61' LT
PT
LAK 17+01.23, 1.21' LT
PC
GRA 14+43.87, 41.17' RT
5.
0
'
LAK 16+97.41, 27.74' LT
PT LAK 17+03.83, 30.83' LT
PCR3
4
.
5
'
R24.5'
GRA 10+91.32, 18.00' LT
PT
GRA 10+37.38, 29.66' RT
GRA 11+20.25, 53.00' LT
R47.6'
GRA 13+68.85, 41.57' RT
GRA 13+71.32, 41.56' RT
5.0'5.0'5.5
'
4.
6
'
LAK 17+93.06, 35.82' RT
LAK 17+89.54, 33.92' RT
R3802.0'LAK 16+76.05, 19.29' LT1
6
.
1
'
LAK 16+76.66, 24.75' LT
GRA 11+70.32, 18.00' LT
PC
LAK 16+74.12, 1.82' LT
17.4'4.5'
LAK 16+78.64, 24.53' LT
PC
GRA 11+26.35, 53.00' LT
LAK 16+90.37, 66.58' LT
LAK 16+81.13, 78.85' LT
C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.01.dwg | Layout: 1C4.01PLOTTED: May 28, 2024-03:54:47pm By AV059753XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-TREE-PROTECTION_RENTON.dwg; X-ROW_RENTON.dwg; X-PARCEL-INFO.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
S GRADY WAYLAKE AVE S(LAK-LINE)(GRA-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
GRA 10+00 TO GRA 14+00
1C4.01
85
A. VILLAR
C. WILCOX
A. STOTT
2 CURB & GUTTER
2043
2 LANE LINE
2MONITORING WELL
1CURB
R-421485TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128TDA02
TDA03
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
2,899 sf
973 sf
127 sf
6,062 sf
3,883 sf
5,285 sf
11,737 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 2 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
192305-9043
192305-9096
192305-9032
14+00 15+00 16+00
17+00
18+00
19+00
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//
//
//
//
//
//
////
////////////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//
//
//
//
//
//
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
/
/
//
//
//
//
//
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////
//
//
//
//
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
////////
GRA 15+54.05, 17.50' LT
PC
GRA 15+60.16, 85.89' LT
GRA 16+09.41, 59.50' LT
PT
GRA 17+84.01, 59.50' LT
GRA 17+83.99, 67.00' LT
GRA 18+32.63, 67.50' LT
GRA 18+32.61, 60.00' LT
GRA 14+43.87, 41.17' RT
GRA 15+10.45, 27.29' RT
GRA 15+00.69, 99.49' RT
GRA 14+97.55, 78.63' RT
GRA 14+83.12, 64.27' RT
PT
GRA 14+65.71, 54.74' RT
PC
GRA 14+53.08, 54.69' RT
GRA 15+51.68, 89.83' RT
GRA 15+70.29, 65.53' RT
GRA 15+83.83, 55.39' RT
GRA 16+09.87, 54.66' RT
GRA 16+19.18, 41.09' RT
GRA 15+47.00, 27.70' RT
5.5'
6.0'
11.5'9.7'
2.5'12.0'
2.5'
10.9'12.5'5.0'6.0'11.7'9.7'
14.7'R27.0'R21.5'R3802.0'GRA 15+25.24, 18.00' LT
PT
R3802.5'5.1'5.3'3.1'
GRA 15+81.81, 85.30' LT
PC
GRA 14+16.72, 57.00' LT
17.4'4.5'
GRA 15+15.16, 83.77' LT
PT
GRA 14+96.20, 77.06' LT
PT
GRA 14+69.15, 57.00' LT
PC
8.0'R
2
7
.
5
'
GRA 14+99.13, 84.09' LT
PT GRA 15+58.94, 91.92' LT
2.0'GRA 15+44.00, 17.60' LT
2.0'GRA 14+59.72, 18.00' LT GRA 14+69.77, 18.00' LT
C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.01.dwg | Layout: 1C4.02PLOTTED: May 29, 2024-11:10:09am By AV059753XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-TREE-PROTECTION_RENTON.dwg; X-ROW_RENTON.dwg; X-PARCEL-INFO.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
S GRADY WAYSHATTUCK AVE S(GRA-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
GRA 14+00 TO GRA 19+00
1C4.02
89
A. VILLAR
C. WILCOX
J. LIM
2CURB & GUTTER
2 FENCE 2 CURB2CURB & GUTTER
2FENCE
2CURB
2 CURB
2TRAFFIC ISLANDS
2 CURB
2 TRAFFIC ISLANDS
2 CURB & GUTTER
2CURB & GUTTER
3
2039
2040
2044
2041
2042
2045
2046 2047
2048 2049
2050 2052
2053
2051
2 CROSSWALK
2CROSSWALK
2 LANE LINE
2 LANE LINE
3
3
3
148
3
3
2CURB
R-421489TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128162 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
1,368 sf
1,976 sf
2,527 sf
2,356 sf2,769 sf
TDA02TDA03
2,884 sf
TDA04
2,165 sf
2,180 sf
749 sf
802 sf
1,459 sf
407 sf
177 sf
170 sf
433 sf
900 sf
1,054 sf
486 sf
195 sf
487 sf
941 sf
415 sf
805 sf
721 sf
2,805 sf
7,491 sf
8,550 sf
71 sf
4,488 sf
3,208 sf
181 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 3 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
192305-9070
192305-9023
192305-9070
19+00
20+00 21+00 22+00 23+00
24+00
S
G
R
A
D
Y
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////
////////////////////////////
//////////////////////////////
//////////////////////////////
////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
GRA 18+32.63, 67.50' LT
GRA 21+99.25, 57.50' LT
GRA 22+17.05, 62.91' LT GRA 22+81.85, 63.00' LT
GRA 22+61.18, 68.18' RT
GRA 23+62.74, 65.41' RT
GRA 22+47.54, 40.64' RT
GRA 23+60.75, 68.87' RT
R
1
1
.
0
'R9.0'GRA 22+59.20, 71.64' RT
GRA 23+53.37, 66.00' RT
GRA 21+60.06, 60.00' LT
15.7GRA 20+05.12, 67.50' LT
2.5'4.7'//////////////////////////////////12.2'5.0'GRA 19+30.76, 67.50' LT
GRA 19+30.76, 60.00' LT
GRA 20+05.10, 60.00' LT
GRA 22+60.89, 72.64' RT
PC
GRA 22+71.89, 71.01' RT
PT
GRA 22+73.07, 69.60' RT
PC GRA 22+81.06, 66.00' RT
PT
GRA 23+46.38, 17.50' LT
PTR3802.5'GRA 19+31.96, 17.50' LT
PT
GRA 19+59.08, 17.50' LT
PC
C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.01.dwg | Layout: 1C4.03PLOTTED: May 26, 2024-07:57:22pm By LEEN3XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-TREE-PROTECTION_RENTON.dwg; X-ROW_RENTON.dwg; X-PARCEL-INFO.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
S GRADY WAY
(GRA-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
GRA 19+00 TO GRA 24+00
1C4.03
90
A. VILLAR
C. WILCOX
J. LIM
2 FENCE
2 FENCE 2CURB
2 CURB
2 CURB
2 CURB & GUTTER
5 SIGN
2054 2055
2056
2057
2058 2059 2060 2061 2062 2063
2093 2090 2089 2088
2087
2064
2065 2066
2067
2068
2 LANE LINE
2 CURB
2 CURB & GUTTER
4BUS SHELTER AND AMENITIES
1MONITORING WELL
2 CURB2CURB
1CURB
R-421490TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128TDA04
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
21,208 sf
3,225 sf 1,375 sf
1,674 sf
929 sf
780 sf
1,057 sf
1,182 sf1,624 sf
954 sf
3,034 sf
323 sf
629 sf
1,273 sf
703 sf
1,859 sf
2,076 sf
797 sf
2,449 sf
1,040 sf
382 sf
6,283 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 4 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL PL
PL PL915460-0005 915460-0010
192305-9
0
2
3
24+0025+0026+0027+0010+0010+00 11+00 12+00 13+00
14+00
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//
//
//
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////6.0'GRA 24+77.10, 77.93' LT
GRA 24+44.25, 22.28' LT
GRA 25+07.51, 27.55' RT
5.4'TAL-B 12+12.35, 48.10' RT11.9'TAL-B 12+64.29, 25.33' RT
TAL-B 12+48.79, 49.56' RT
TAL-B 12+59.55, 49.55' RT
6.3'6.0'TAL-B 14+68.70, 45.34' RT
TAL-B 14+47.32, 46.25' RT
TAL-B 10+47.47, 20.12' RT
TAL-B 10+47.31, 35.12' RT5.5'10.0'5.9'10.9'
TAL-B 11+70.88, 49.57' RT
5.98.9GRA 25+56.52, 81.04' LT
GRA 25+52.32, 18.62' RT
17.5'
3.9'
TAL-B 13+87.99, 90.50' LT
4.9'
TAL-B 10+70.21, 63.50' LT
TAL-B 10+97.42, 61.34' LT
TAL-B 13+46.72, 61.25' LT
TAL-B 12+43.64, 61.20' LT
R761.2'GRA 25+98.42, 40.49' LT
GRA 25+45.36, 28.65' LT R13.5'TAL-B 13+68.54, 73.92' LT
4.5'4.0'
2.8'
TAL-B 13+61.00, 74.47' LT17.1'
TAL-B 13+79.19, 48.85' RT2.3'16.8'
5.2'
TAL-B 10+56.61, 76.53' LT
PC
TAL-B 12+58.39, 24.85' LT
PC
TAL-B 13+43.24, 25.00' LT
PTR666.5'7.8'5.7'TAL-B 13+89.93, 48.42' RT
13.9'TAL-B 13+92.46, 68.05' RT
TAL-B 13+72.76, 68.11' RT
GRA 24+88.70, 42.35' LT
GRA 25+04.88, 42.70' LT
GRA 25+05.28, 22.71' LT
TAL-B 10+35.23, 76.05' LT
GRA 26+62.80, 29.24' LT
GRA 26+84.19, 6.45' LT
GRA 26+92.08, 5.79' RT
GRA 26+94.30, 17.77' LT
GRA 26+95.75, 17.06' RT
GRA 25+33.27,
71.32' LT
GRA 25+00.57,
72.66' LT
GRA 25+21.84, 71.80' LT
GRA 25+14.06, 72.15' LT
TAL-B 12+01.80, 64.38' RT
TAL-B 11+99.79, 49.55' RT
TAL-B 11+89.79, 49.55' RT
TAL-B 11+85.80, 64.36' RT6.08.813.7'9.7'TAL-B 10+40.23, 66.77' LT
GRA 24+45.55, 15.94' RT
GRA 24+45.28, 4.91' RT
GRA 24+44.83, 6.66' LT 27+005.0'
N=175704.031
E=1300407.312 6.1'5.0'2.4'4.0'N=175629.965
E=1300119.693
15.2'C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.01.dwg | Layout: 1C4.04PLOTTED: May 29, 2024-11:26:45am By AV059753XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-TREE-PROTECTION_RENTON.dwg; X-ROW_RENTON.dwg; X-PARCEL-INFO.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'S GRADY WAYTALBOT RD S
(TAL-B-LINE)(GRA-LINE)RENTON SEGMENT
SITE PREPARATION PLAN
GRA 24+00 TO TAL-B 14+00
1C4.04
91
A. VILLAR
C. WILCOX
J. LIM
2070
2069
2083
2085
2086
2084 2095 2098
5R 2072
2073
2074
2075 2076
2077
2078
2079
2080
2081
2082
2140
2139
2138
2137
2096
2CURB
2LANE LINE
2 LANE MARKING
2 LANE MARKING
2LANE MARKING
2LANE LINE
2 CURB & GUTTER
3
3
1 CURB
3 3 3 3
3
3
3
2462
1CURB
2CURB
2 CURB & GUTTER
2CURB & GUTTER
1MONITORING WELL S GRADY WAY2 CURB
2071
1SIGN
1SIGN
2 CURB & GUTTER
TALBOT RD S
2 TRAFFIC ISLANDS
2TRAFFIC ISLANDS
2 CROSSWALK & STOP BAR
2CROSSWALK & STOP BAR
2LANE LINE
2TRAFFIC CURB
3
2493
3
2495
3
2494
2 CROSSWALK & STOP BAR
R-421491TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011282 CROSSWALK & STOP BAR
2,871 sf
1,808 sf
15,805 sf
2,027 sf
10,245 sf
4,776 sf
5,961 sf
9,949 sf
68 sf
4,248 sf
1,916 sf
200 sf
5,932 sf
TDA04
60 sf
144 sf
199 sf
303 sf
56 sf
253 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
749 sf749 sf
26 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 5 of 35
PLPLPL
PL
PLPLPL
PL
PLPLPL
PL
PLPL
PLPL
PL
PLPLPL
PL
PLPLPLPL
PLPL
PLPL
PL
PLPLPL
PL
PL
192305-9094
202305-9007
192305-9
0
2
3
14+00
15+00
16+00
17+00
18+00
//
//
//
//
//
//
//
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////
//
//
//
//
//
//
//
//
//5.4'TAL-B 15+38.91, 75.37' RT TAL-B 15+85.71, 79.73' RT
PT
TAL-B 16+74.39, 60.19' RT
TAL-B 16+52.67, 60.20' RT
TAL-B 17+78.22, 60.20' RT
TAL-B 17+99.99, 60.20' RT
TAL-B 14+48.23, 15.20' LT
TAL-B 14+68.70, 45.34' RT
TAL-B 14+47.32, 46.25' RT
6.0
'5.9
'
TAL-B 15+11.20, 44.98' RT
TAL-B 15+27.82, 69.92' RT
PT R21
.
6
'
TAL-B 16+24.99, 55.20' RT
TAL-B 16+07.52, 55.20' RT
PT
TAL-B 15+89.88, 62.19' RT
PC
TAL-B 15+87.24, 62.29' RT
TAL-B 14+03.83, 88.24' LT
TAL-B 17+01.59, 98.23' LT
TAL-B 16+97.73, 27.96' LT
TAL-B 16+97.73, 18.46' LT
R42.5'
TAL-B 16+69.82, 54.97' LT
TAL-B 14+17.28, 76.34' LT
PC
TAL-B 14+30.48, 64.50' LT
PRC
R75.0'R15.0'TAL-B 13+79.19, 48.85' RT
2.0'6.5'2.0'2.0'
5.2'7.3'
TAL-B 17+17.88, 102.30' LT
PT
TAL-B 17+05.59, 38.58' LT
PC
R727.0'
TAL-B 16+55.58, 18.54' LT
PT
R671.5'10.0
'
TAL-B 16+65.42, 28.70' RT
PT
TAL-B 15+11.50, 28.69' RT
PC
TAL-B 15+08.52,
53.11' RT, PC
TAL-B 16+99.18, 97.55' LT
PT
TAL-B 16+88.90, 56.48' LT
PC
R764.5'R26.5'TAL-B 16+69.71, 56.37' LT
TAL-B 16+45.29, 64.50' LT
PT
7.8
'8.7'5.7'TAL-B 13+89.93, 48.42' RT
13.9'TAL-B 13+92.46, 68.05' RTTAL-B 13+72.76, 68.11' RT
TAL-B 17+85.61, 34.17' LT
TAL-B 17+79.86, 36.85' LT
TAL-B 17+84.58, 43.61' LT
TAL-B 17+88.68, 40.75' LTTAL-B 17+88.68, 40.75' LT
TAL-B 17+93.86, 48.19' LT
TAL-B 17+89.36, 45.00' LT
TAL-B 17+78.15, 48.17' LT
TAL-B 17+83.31, 55.55' LT
TAL-B 17+83.60, 48.98' LT
TAL-B 15+36.74, 20.86' LT
TAL-B 15+41.60, 20.77' LT
TAL-B 15+41.49, 28.69' RT
TAL-B 15+36.27, 28.69' RT
13.7'15.4'15.6'5.8'10.7'23.5'5.9'TAL-B 17+87.14, 41.83' LT
TAL-B 17+81.41, 45.83' LT
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
C:\pw_workdir\den003\jeg_limj\d0601389\1 C4.01.dwg | Layout: 1C4.05PLOTTED: May 28, 2024-05:08:34pm By LIMJXREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-TREE-PROTECTION_RENTON.dwg; X-ROW_RENTON.dwg; X-PARCEL-INFO.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD S
(TAL-B-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
TAL-B 14+00 TO TAL-B 18+50
1C4.05
92
A. VILLAR
C. WILCOX
J. LIM
2136
2135
2134
2133
2132 2131 2130 2129
2128
2097
2100 2101
2102 2103 2104
6R
2105
2 LANE LINE
2 CURB
2 TRAFFIC ISLAND
2CURB
2CURB & GUTTER
6BUS SHELTER AND AMENITIES
3
3 3 3
3
3
2460
3
2461
3
2459
2099X
2LANE LINE
2 CURB & GUTTER
1MONITORING WELL
3
3
2CURB & GUTTER
1 CURB
1 CURB
1 CURB
2371
3
2370
3
R-421492TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011282 CURB
2TRAFFIC ISLAND
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
629 sf
949 sf
2,636 sf
7,797 sf
15,076 sf
14,392 sf
1,994 sf
TDA04
7,238 sf
99 sf
1,389 sf
2,330 sf
1,046 sf
248 sf
201 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 6 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
202305-9008
192305-9001 723160-0595 19+00 20+00 21+00 22+00 23+00
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////
//
//
//
//
//
//
//
//
////////////////////////////////////////////////////////////////////R29.5'
TAL-B 22+58.42, 20.65' RT
TAL-B 22+34.72, 89.98' RT
TAL-B 20+26.56, 58.20' RT
TAL-B 19+87.11, 58.20' RT
TAL-B 21+48.58, 10.44' RT
TAL-B 21+92.48, 51.65' LT TAL-B 22+06.49, 51.75' LT
TAL-B 22+09.71, 41.84' LT
TAL-B 22+04.25, 41.91' LT
TAL-B 22+04.29, 35.83' LT
TAL-B 21+98.21, 35.84' LT
TAL-B 21+98.29, 30.53' LT
TAL-B 21+92.79, 30.43' LT
TAL-B 20+22.86, 70.58' RT
TAL-B 21+19.99, 71.02' RT
TAL-B 21+19.01, 60.40' RT
TAL-B 20+39.54, 6.28' LT
TAL-B 20+89.37, 30.56' RTTAL-B 20+39.39, 28.69' RT
TAL-B 22+07.52, 30.64' RT
PC
TAL-B 22+04.95, 60.14' RT
PC
TAL-B 22+53.25, 71.17' RT
PT10.0'TAL-B 22+49.71, 87.53' RT
TAL-B 18+64.00, 6.50' LT
TAL-B 22+34.21, 85.94' RT
PT R46.0'TAL-B 21+87.92, 11.76' RTTAL-B 18+64.00, 18.72' RT
TAL-B 20+39.49, 18.45' RT
10.0'//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////
//
//
//
//
//
//
//
//
////////8.7'6.0'
3.8'
9.0'
TAL-B 18+76.36, 30.43' LT
TAL-B 18+86.36, 30.38' LT
6.0'C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.06PLOTTED: May 26, 2024-08:14:58pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD S
I
-405
SB
OFF
-RAMP
(TAL-B-LINE)S RENTON VILLAGE PLRENTON SEGMENT
SITE PREPARATION PLAN
TAL-B 18+50 TO TAL-B 23+50
1C4.06
93
A. VILLAR
C. WILCOX
J. LIM
7R 8R
9R
10R
11R
17R
21112110
2114
2113
2112
2115
2116
2 CURB & GUTTER
2CURB
2TRAFFIC ISLAND
2LANE LINE
3
3
3
2117
3
2118
2106 2107
2108 210912RX
13RX
14R 149R
3
150R
3
3
3
3
33
3
3
3
R-421493TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
252 sf
6,073 sf
444 sf
22,731 sf
TDA04
2,133 sf
4,696 sf
60 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 7 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
722200-0250
722200-0010
722200-0245
33+00 34+00 35+00 36+00 37+00 38+00
6.0'6.0'5.4'1.5'5.0'5.1'8.0'8.1'TAL-B 34+77.50, 38.33' RT
TAL-B 35+06.46, 37.04' RT
TAL-B 34+80.32, 45.72' RT TAL-B 35+04.30, 44.65' RT
TAL-B 37+29.41, 30.20' LTTAL-B 37+00.42, 30.44' LT
TAL-B 37+01.99, 43.45' LT TAL-B 37+29.45, 43.30' LT
TAL-B 34+80.51, 50.01' RT 1.5'C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.07PLOTTED: May 26, 2024-08:18:30pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
BENSON DR S (SR 515)S PUGET DRS 15TH ST(TAL-B-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
TAL-B 33+00 TO TAL-B 38+00
1C4.07
94
A. VILLAR
C. WILCOX
J. LIM
22R 24R
7899
23R
7900
2141
2143
2142
2144
1 CURB & GUTTER
1 CURB & GUTTER
1BARRIER 3 33
R-421494TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128142 sf
194 sf
370 sf
334 sf
TDA05
TDA06
139 sf
218 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 8 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
72292
8
-
0
1
0
0
72220
0
-
0
1
6
3
85570
0-
0
1
4
0
855700-0010 85570
0-
0
0
2
0
30230
5-
9
0
7
3
24+00 25+00 26+00 27+00 28+00
29+00R30.00'////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////8.2'4.9'2.0'7.0'5.5'12.5'2.0'2.2'5.9'
16.0'
5.6'4.0'4.0'TAL-21 25+56.44, 48.04' RT
TAL-21 25+65.90, 43.39' RT
TAL-21 25+76.67, 42.32' RT
TAL-21 25+70.62, 30.00' RT
TAL-21 25+86.32, 30.00' RT
TAL-21 25+36.57, 7.54' RT
TAL-21 25+39.71, 9.85' LT
TAL-21 25+96.91, 2.84' LT
TAL-21 26+12.66, 17.83' LT
TAL-21 25+22.91, 42.48' LT
TAL-21 25+58.57, 44.01' LT
TAL-21 25+97.46, 36.35' LT
TAL-21 26+16.72, 36.32' LT
TAL-21 28+29.98, 17.50' RT
TAL-21 28+34.89, 18.87' RT
TAL-21 28+34.89, 35.00' RTTAL-21 27+72.89, 35.58' RT
TAL-21 27+71.27, 21.40' RT
TAL-21 26+12.66, 2.84' LT
TAL-21 25+43.31, 2.86' LT
TAL-21 25+31.44, 2.82' LT
TAL-21 26+16.66, 18.35' LT
TAL-21 25+96.91, 8.57' RT
TAL-21 28+10.16, 11.72' RT
TAL-21 27+77.09, 20.29' RT
TAL-21 25+96.91, 25.12' RT
10.5'
10.8'5.7'C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.10.dwg | Layout: 1C4.08PLOTTED: May 28, 2024-04:18:38pm By AV059753XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD S S 23RD
ST
(TAL-21-LINE)TALBOT CREST
DR
S
RENTON SEGMENT
SITE PREPARATION PLAN
TAL-21 24+00 TO TAL-21 29+00
1C4.08
95
A. VILLAR
C. WILCOX
J. LIM
27R
26R
25R
2CROSSWALK
2CURB & GUTTER
2CURB & GUTTER
2 FENCE
3
3
2 CURB & GUTTER
1 ROCK WALL
3
3
2 LANE LINE
1 RRFB
1 RRFB
R-421495TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011281,303 sf
1,826 sf
TDA075,289 sf
1,395 sf
656 sf
192 sf 753 sf
740 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 9 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
S 32ND
S
T
302305-9029
302305-9116302305-9114
302305-9115
302305-9030
302305-9019
948575-TRCT
54+00 55+00 56+00 57+00 58+00
59+00
//////////////////////////////////////////////////
TAL-21 57+36.25, 15.14' RT
TAL-21 57+41.25, 15.53' RT
TAL-21 57+41.35, 30.00' RT
TAL-21 56+43.01, 16.47' RT
TAL-21 56+22.00, 33.84' LT
TAL-21 56+22.04, 24.78' LT
TAL-21 56+22.05, 19.83' LT
TAL-21 56+51.02, 33.98' LT
TAL-21 56+51.04, 24.94' LT
TAL-21 56+51.05, 19.97' LT
TAL-21 56+38.01, 16.48' RT
TAL-21 56+38.21, 30.00' RT
TAL-21 56+42.95, 12.32' RT TAL-21 57+36.23, 11.70' RT
TAL-21 56+26.02, 35.38' LT TAL-21 56+46.78, 35.49' LT
C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.09PLOTTED: May 26, 2024-08:26:47pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD S
(TAL-21-LINE)S 32ND STRENTON SEGMENT
SITE PREPARATION PLAN
TAL-21 54+00 TO TAL-21 59+00
1C4.09
96
A. VILLAR
C. WILCOX
J. LIM
28R
29R
30R
3
3
3
2CURB
1 CURB & GUTTER
R-421496TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128300 sf
TDA08
411 sf
1,819 sf1,443 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
444 sf
144 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 10 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
855860-0035 855860-0040
302305-9040
302305-9044
855860-0125 855860-0130 855860-0135
302305-9109
302305-9054
71+00 72+00 73+00 74+00 75+00 76+00
//////////////////////////////////////////////////////////////////////////////////////////////////////////
//
////
//////////////////////////////////////////////////////////////////////////////////////
7.1'2.0'
TAL-21 72+59.49, 72.05' LT
TAL-21 72+46.65, 58.70' LT
TAL-21 72+48.99, 46.30' LT
TAL-21 72+80.12, 75.24' LT
TAL-21 73+01.96, 55.39' LT
TAL-21 73+15.38, 34.64' LT
TAL-21 71+48.59, 3.98' LT
TAL-21 72+50.62, 33.11' LT
TAL-21 73+57.98, 11.02' RT
TAL-21 73+72.64, 49.30' RT
TAL-21 73+73.00, 33.02' RT
TAL-21 75+27.89, 36.16' RTTAL-21 74+62.00, 37.72' RT
TAL-21 74+42.96, 33.03' RT
TAL-21 75+35.02, 43.31' RT
TAL-21 75+57.25, 11.04' RT
TAL-21 71+67.59, 33.00' LT
TAL-21 73+18.38, 30.00' LT
TAL-21 75+16.46, 11.03' RTTAL-21 74+45.46, 11.10' RT
TAL-21 73+66.15, 49.16' RT
TAL-21 75+49.72, 32.39' RT
PT
TAL-21 75+82.21, 12.39' RT
2.0'8.0'8.3'5.0'5.0'7.0'
5.0'
6.2'
TAL-21 75+48.89, 52.91' RT9.7'9.8'TAL-21 73+83.00, 10.48' LT26.0'TAL-21 75+85.33, 46.26' RTR28.0'21.3'19.8'TAL-21 76+12.26, 21.97' RT
12.6'5.9'5.5'5.5'14.1'
TAL-21 71+67.35, 30.00' LT
6.5'TAL-21 72+36.71, 3.98' LT
TAL-21 73+67.31, 47.98' RT
TAL-21 75+24.46, 16.54' RT
PC
TAL-21 72+51.16, 58.12' LT
PC
TAL-21 72+60.11, 67.04' LT
PT
//
TAL-21 73+64.48, 34.12' RT
PC
TAL-21 73+82.48, 16.52' RT
PT
R1
8
.
0
'
R1
7
.
5
'
TAL-21 75+92.88, 46.53' RT
TAL-21 75+93.62, 41.91' RT
PC
TAL-21 76+03.41, 31.08' RT
PT
TAL-21 76+10.94, 30.00' RT
TAL-21 73+69.30, 30.00' LT
TAL-21 73+69.30, 33.00' LT
TAL-21 73+53.77, 30.00' LT
TAL-21 73+53.77, 33.00' LT
R8.
0
'
TAL-21 74+92.46, 35.92' RT
TAL-21 74+84.42, 37.87' RT
C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.10.dwg | Layout: 1C4.10PLOTTED: May 28, 2024-04:13:15pm By AV059753XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD SS 37TH STS 37TH STS 38TH CTS 38TH CT(TAL-21-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
TAL-21 71+00 TO TAL-21 76+00
1C4.10
97
A. VILLAR
C. WILCOX
J. LIM
32R
31R
2145
2CURB & GUTTER
3
7MAILBOX
2FENCE
3
2CURB & GUTTER
R-421497TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
3,559 sf
7,449 sf5,292 sf
5,336 sf
967 sf
TDA09
1,377 sf
700 sf
1,401 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
68 sf
Page 11 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
761680
-
0
0
3
0
761680
-
0
0
1
0
885767
-
0
0
2
0
312305
-
9
1
3
4
312305-9025 86+00 87+00 88+00 89+00 90+00 91+00
//////////////////////////////////////////////////////////////////////////////////////////////////////14.0'5.9'8.0'4.9'12.5'6.1'4.9'10.0'13.9'4.9'7.5'17.0'
17.8'
TAL-21 89+31.28, 7.00' LT
TAL-21 89+31.28, 7.00' RT
TAL-21 89+13.50, 22.12' RT
TAL-21 88+28.24, 22.04' RT
TAL-21 89+31.12, 39.98' RT
TAL-21 89+13.16, 39.99' RT
TAL-21 88+23.24, 22.61' RT
TAL-21 88+17.25, 40.00' RT
TAL-21 88+08.28, 21.92' LT
TAL-21 88+08.28, 37.42' LT
TAL-21 88+96.30, 30.00' LT
TAL-21 88+79.28, 37.42' LT
TAL-21 88+87.28, 14.92' LT
TAL-21 88+87.27, 14.99' RT
TAL-21 88+17.24, 27.51' RT
TAL-21 88+08.37, 6.84' LT
TAL-21 88+28.30, 6.84' LT
TAL-21 88+96.28, 6.98' LT
2.6'6.1'C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.11PLOTTED: May 26, 2024-08:30:52pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
TALBOT RD S
(TAL-21-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
TAL-21 86+00 TO TAL-21 91+00
1C4.11
98
A. VILLAR
C. WILCOX
J. LIM
2146 2147
2148
2149 2150
2151
2152
2157
2156 2155
2154
2153
2 CROSSWALK
2 CROSSWALK
3
3 3
3
3
3
3
3333
2CURB & GUTTER
2 CURB & GUTTER
1 WALL
1 WALL
4 BUS SHELTER, AMENITIES, AND CURB PAINT
1 RRFB
1RRFB
4BUS SHELTER, AMENITIES, AND CURB PAINT
2RAILING & WALL
R-421498TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011283,268 sfTDA107,132 sf
1,176 sf
754 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 12 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
3
2
2
3
0
5
-
9
0
8
1 3
2
2
3
0
5
-
9
1
5
6
3
2
2
3
0
5
-
9
0
7
9
322305
-
9
0
7
9
32+
0
0
33+00
34+00 35+00 36+009.2'4.5'6.0'6.2'6.1'9.1'4.54.6CAR 34+04.45, 24.19' LT
CAR 33+32.27, 22.75' LT
CAR 33+85.69, 22.78' RT
CAR 33+32.00, 38.33' LT
CAR 33+58.05, 38.17' LT
CAR 33+85.39, 35.02' RTCAR 33+63.09, 34.89' RT
CAR 33+85.54, 28.82' RT
CAR 33+62.94, 24.22' RT
CAR 33+57.66, 24.57' LT1.8'C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.12PLOTTED: May 26, 2024-08:35:09pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
SE CARR RD
MILL AVE SWELLS AVE S(CAR-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
CAR 32+00 TO CAR 36+50
1C4.12
99
A. VILLAR
C. WILCOX
J. LIM
2158
3
1 CURB & GUTTER
1 CURB & GUTTER
1 RAILING & STEM WALL
R-421499TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128TDA11
169 sf
117 sf
450 sf110 sf
223 sf
291 sf
109 sf
16 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 13 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
322305-9053
322305-9237
322305-9299
322305-9040
292305-9151
43+00
44+00
45+00 46+00
47+0010+0011+00//////////////////////////////////////////////////////////////////////////////////
//
//
//
//
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////11.5'1.9'4.9'2.1'9.0'
11.0'
5.0'
12.0'
CAR 45+40.36, 83.96' RT7.9'3.1'
CAR 45+71.02, 33.22' LT
CAR 43+83.81, 33.77' LT
CAR 45+99.81, 10.98' LT
CAR 44+72.17, 11.48' LT
CAR 44+52.69, 1.30' LT
CAR 43+97.19, 7.95' RT
CAR 46+15.67, 22.78' RT
CAR 44+05.73, 41.63' RT
CAR 43+83.86, 40.30' LT
CAR 43+87.12, 49.69' LT CAR 45+61.12, 43.19' LT
CAR 45+51.82, 45.74' LT
CAR 45+40.68, 45.61' LT
CAR 45+25.09, 49.70' LT
105TH 11+73.18, 26.00' RT
105TH 11+40.73, 30.42' RT
105TH 11+40.55, 28.37' RT
105TH 11+35.59, 5.91' LT6.4'CAR 44+44.84, 43.53' RT8.0'CAR 45+24.33, 30.21' LT
PT 8.0'CAR 44+47.60, 30.14' LT
PC
CAR 44+68.21, 50.17' RT
PC
R
6
.
0
'
R6.
0
'5.8'21.7'5.5'
CAR 43+43.58, 22.56' RT
CAR 45+67.16, 11.06' RT
CAR 45+66.63, 0.07' RT
CAR 46+15.73, 33.28' RT
PT
CAR 46+09.69, 39.35' RT
PC
CAR 45+92.80, 39.43' RT
PT
CAR 45+87.78, 41.98' RT
PC
CAR 44+86.29, 71.57' RT
PTR1261.0'R18.0'
CAR 43+82.83, 49.71' LT
C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.13PLOTTED: May 26, 2024-08:39:35pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
SE CARR RD
105TH PL SE(CAR-LINE)
RENTON SEGMENT
SITE PREPARATION PLAN
CAR 42+50 TO CAR 47+50
1C4.13
100
A. VILLAR
C. WILCOX
J. LIM
2 CURB & GUTTER2CURB
139R
3 138R
3
137R
3
136R
3 135R
3
134R
3
3
132R
3
131R
3
130R
3
1 PRIVATE SIGN
2 PAVEMENT MARKING
2CURB & GUTTER
2490
3
2489
3
2160
3
2159
2161
2 TRAFFIC ISLAND
(105TH-LINE)133R
2 CURB & GUTTER
2CURB
2PAVEMENT MARKING
2 MONITORING WELL
1 MONITORING WELL
2 MONITORING WELL
3
3
2 BOLLARD
R-4214100TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011285,024 sf
2,177 sf
1,003 sf
TDA12
12,490 sf
10,582 sf
1,566 sf
282 sf
527 sf
1,375 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 14 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
322305-9299322305-9016
11+00 12+00 13+00 14+00 15+00
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////11.0'5.0'12.0'5.0'2.4'105TH 11+91.13, 17.96' RT
105TH 12+21.45
CAR 44+05.73, 41.63' RT
105TH 11+73.18, 26.00' RT
105TH 11+40.73, 30.42' RT
105TH 11+40.55, 28.37' RT
105TH 11+35.59, 5.91' LT
6.4'
CAR 44+44.84, 43.53' RTCAR 44+68.21, 50.17' RT
PC11.1'CAR 45+92.80, 39.43' RTCAR 45+87.78, 41.98' RT
R18.0'C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.10.dwg | Layout: 1C4.14PLOTTED: May 26, 2024-08:47:35pm By LEEN3XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
RENTON SEGMENT
SITE PREPARATION PLAN
105TH 11+00 TO 105TH 15+00
1C4.14
102
A. VILLAR
C. WILCOX
J. LIM
(105TH-LINE)
105TH PL SE
2 PAVEMENT MARKING
2484
3
2485
3
2486
3
2 PAVEMENT MARKING
2 CURB AND GUTTER
3
2162
3
3
2487
2488
2482
3
2483
3
R-4214102TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128TDA12
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
2,533 sf
2,052 sf
461 sf
22 sf
Page 15 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
322305-9016
322305-9361
322305-9065
322305-9362
23+00 24+00 25+00 26+00 27+00 28+00
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////5.0'5.0'10.9'6.1'5.9'5.0'5.0'17.2'R
2
.
0
8
6.9'
105TH 26+95.00, 17.43' LT
105TH 26+57.71, 39.50' LT
105TH 26+32.74, 43.42' LT
105TH 27+15.26, 17.98' RT
105TH 25+36.11, 17.18' LT
105TH 27+15.26, 30.00' RT
105TH 26+24.67, 46.86' LT
105TH 26+24.68, 30.97' LT
105TH 26+22.67, 28.50' LT
105TH 25+30.93, 28.47' LT
105TH 26+43.66, 43.34' LT
105TH 26+58.34, 42.93' LT
105TH 26+65.21, 32.40' LT
105TH 26+72.98, 26.72' LT
105TH 26+84.21, 26.51' LT
105TH 26+21.06, 27.00' RT R5.00105TH 26+68.08, 32.82' LT
105TH 26+68.08, 31.72' LT
105TH 26+84.21, 29.55' LT
105TH 26+14.17, 26.94' RT 2.9'105TH 26+01.40, 0.00' RT 17.4'16.7'16.5'105TH 26+01.40, 16.65' RT
105TH 26+97.25, 30.00' RT
105TH 26+97.25, 26.96' RT
105TH 26+22.73, 27.00' RT
105TH 26+22.73, 30.00' RT 105TH 26+37.73, 26.99' RT
105TH 26+38.01, 30.12' RT
105TH 26+13.40, 0.00' T
105TH 26+01.40, 9.44' RT
105TH 26+13.40, 9.44' RT
105TH 27+15.26, 0.00' RT
105TH 27+15.18, 9.44' RT
105TH 26+21.32, 0.01' LT
105TH 26+21.32, 9.44' RT
C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.10.dwg | Layout: 1C4.15PLOTTED: May 28, 2024-04:06:18pm By AV059753XREFS: X-TOPO.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; X-SHEETCUTS_Overall.dwg; X-LEGEND.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwg; X-SITE-PREP_RENTON.dwg; X-RDWY_RENTON.dwg; X-SN-CHANN_RENTON.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
RENTON SEGMENT
SITE PREPARATION PLAN
105TH 23+00 TO 105TH 28+00
1C4.15
103
A. VILLAR
C. WILCOX
J. LIM
SE 180TH ST
(105TH-LINE)
2477
3
2476 2475 2474
2 PAVEMENT MARKING
2
2 CURB AND GUTTER
1 FENCE
2CURB AND GUTTER
2CURB AND GUTTER
2CURB
2 RAILING
1POLE AND LUMINAIRE
RAILING
2CURB
2471
129
3
128
3
127
3
140
3
141
3
142
3
R-4214103TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011281ROCKERY
TDA13
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
4,540 sf
8,180 sf
1,488 sf
481 sf
212 sf
39 sf 374 sf
Page 16 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
322305-9070
322305-9082
911710-0160
322305-9135
322305-9111
28+00 29+00 30+00 31+00 32+00 33+00
11+00////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////
//
//
////
////////////////////////////////////////
////////////////////////4.0'108TH 29+61.11, 30.00' LT 10.0'5.0'108TH 30+31.10, 40.00' LT
108TH 30+82.85, 29.57' LT5.0'108TH 31+07.85, 30.06' LT5.0'5.0'108TH 30+75.59, 40.00' LT
108TH 30+84.92, 40.00' LT
108TH 30+48.85, 40.00' RT
10.0'108TH 30+48.85, 30.03' RT
108TH 30+86.23, 40.00' RT
108TH 31+10.85, 49.04' RT
108TH 31+90.90, 80.74' RT
108TH 31+93.14, 152.64' RT
108TH 32+04.71, 58.51' RT
108TH 32+09.71, 58.35' RT
108TH 32+08.65, 24.54' RT
108TH 30+90.25, 65.85' RT
108TH 31+01.65, 66.73' RT9.0'108TH 29+66.11, 29.48' LT
108TH 32+63.08,
25.63' RT
108TH 32+35.31, 49.46' RT3.4'3.4'5.0'5.0'2.0'2.0'108TH 32+07.51, 147.96' RT
108TH 32+04.51, 148.06' RT
108TH 32+07.19, 137.99' RT
108TH 32+13.92, 17.04' RT
108TH 31+64.69,
49.04' RT8.5'17.9'7.5'108TH 30+87.79, 59.99' RT
108TH 31+06.45, 63.95' RT
3.0'
108TH 32+18.00, 147.64' RT
108TH 31+68.60, 29.42' LT
108TH 32+12.41, 65.49' LT
108TH 32+03.80, 54.14' LT
108TH 31+99.00, 55.69' LT
108TH 31+97.48, 62.15' LT
108TH 31+97.16, 56.28' LT
5.0'5.0'2.0'5.2'
2.2'
5.5'
108TH 30+53.85, 29.54' RT
108TH 30+77.86, 7.43' RT
108TH 30+77.86, 6.64' LT108TH 30+48.36, 6.59' LT
108TH 30+48.37, 7.38' RT
3.5'108TH 29+81.61, 44.99' LT
108TH 29+75.79, 50.88' LT
108TH 29+82.90, 57.91' LT
108TH 29+91.84, 48.87' LT
108TH 29+91.93, 44.99' LT5.09.7'108TH 30+82.86, 16.95' RT
7.6'108TH 30+77.86, 24.54' RT 9.4'108TH 30+77.86, 24.56' LT
5.0'
5.0'C:\pw_workdir\den003\ch2mhill_av059753\d0601389\1 C4.20.dwg | Layout: 1C4.16PLOTTED: May 28, 2024-04:00:38pm By AV059753XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-BS_Kent.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
108TH AVE SE (SR 515)SE 186TH STSE 184TH LN(108TH-LINE)SE186THSTRENTON SEGMENT
SITE PREPARATION PLAN
108TH 28+00 TO 108TH 33+00
1C4.16
105
A. VILLAR
C. WILCOX
J. LIM
43R
44R
45R
46R
2174
2181
2191
2182
2190
2183
2184
2185
2189
2186
2188
2187
2456
2455
2457
2458
2454
2453
2451
2452
2450
2CURB & GUTTER
1 FENCE
2 CURB & GUTTER
2 FENCE
2 CURB
1BUSINESS SIGN 4 BUS STOP & AMENITIES
3
2176
2177
2178
2175
1 FENCE & GATE
3
3
3
3
3
3
3
1FENCE
1POLE
1 POLE
ALL EXISTING TREES IN THIS AREA TO BE PRESERVED AND
PROTECTED UNLESS SHOWN AS REMOVAL
2 CURB & GUTTER
2 STOP LINE
(186TH-LINE)121R
3
122R
3
2 CURB & GUTTER
R-4214105TED-40-4214TED-40-4214LUA22-000260PR21-000132C21001128TDA14
3,546 sf
7,963 sf
401 sf
1,380 sf
3,834 sf
339 sf
566 sf695 sf
320 sf
1,311 sf
1,179 sf
129 sf
58 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
307 sf
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
656 sf1,140 sf
Page 17 of 35
PRESERVE AND PROTECT FEATURE AS NOTED
REMOVE FEATURE AS NOTED
PRESERVE AND PROTECT EXISTING TREE
REMOVAL OF FEATURE BY OTHERS (METRO)
REMOVE OR RELOCATE FEATURE BY OTHERS
RELOCATE FEATURES BY OTHERS (METRO)
RELOCATE FEATURES BY CONTRACTOR
SITE PREP GENERAL NOTES
SITE PREP NOTES
1
1.SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES.
2
3
4
5
6
7
322305-9059
662340-0096 662340-0099 322305-9035
662340-0101 662340-0107 662340-0183 662340-0099 51+00 52+00 53+00 54+00 55+00 56+00
////////////////////////////////////////////////
108TH 51+96.27, 16.52' LT 3.5'8.0'5.1'108TH 52+86.27, 16.50' LT
108TH 52+05.09, 45.00' LT 108TH 52+77.42, 45.00' LT
108TH 52+89.41, 39.17' LT
8.0'3.5'5.0'5.6'108TH 52+88.38, 35.18' LT
108TH 51+96.27, 29.44' LT
108TH 52+86.27, 29.43' LT
C:\pw_workdir\den003\jeg_leen3\d0601389\1 C4.20.dwg | Layout: 1C4.17PLOTTED: May 27, 2024-12:18:23am By LEEN3XREFS: X-TOPO.dwg; X-SHEETCUTS_Overall.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_PROP.dwg; X-SITE-PREP_RENTON.dwg; X-LEGEND.dwg; 18229-SV-BS_Kent.dwg; X-ROW_RENTON.dwg; X-TREE-PROTECTION_RENTON.dwg; X-PARCEL-INFO.dwgIMAGES:
No.REVISION DATEBYAPP'D
DESIGNED:
DRAWN:
CHECKED:
CHECKED:
APPROVED:
PROJECT NO:
CONTRACT NO:
METRO TRANSIT CAPITAL DIVISION DATE:
DRAWING NO:
SHEET NO: OF
METRO
RAPIDRIDE I LINE JUNE 2024G. FRANCO
E00566E18
CXXXXXXXX 473K. CHANG YUEN
AD-READY SUBMITTAL
20'40'
SCALE: 1" = 20'
0'
108TH AVE SE (SR 515)SE 192ND ST(108TH-LINE)CITY OF KENTSEE VOLUME 2
FOR CITY OF KENT
IMPROVEMENTS
RENTON SEGMENT
SITE PREPARATION PLAN
108TH 51+00 TO 108TH 56+00
1C4.17
106
A. VILLAR
C. WILCOX
J. LIM
2CURB & GUTTER
4 BUS SHELTER, AMENITIES, AND CURB PAINT
CITY OF RENTONR-4214106TED-40-4214TED-40-4214LUA22-000260PR21-000132C210011282,550 sf
TDA15
1,039 sf
777 sf
PRE-DEVELOPED CONDITIONS
- EXISTING HARD SURFACE
- EXISTING LANDSCAPING
LEGEND:
SITE PLAN LIMITS
DISTURBED AREA
EXISTING HARD SURFACE
EXISTING LANDSCAPING
Page 18 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222326 262626262626262628282826 32302826
2
6
26
2828262626282828302
8 2626SDSDSDSDSD18+2917+0018+0010+0011+0012+0013+0014+0011 LF 12" DI SD148 LF 12" DI SDEX SDCB (1-E1)GRA 11+05.97, 27.80 LTRIM EL = 25.5361IE = 22.30 (12" N) INIE = 22.30 (12" SW) OUTSDCB (1-2) TYPE 1GRA 11+05.98, 38.68 LTRIM EL = 24.92128IE = 22.38 (12" E) INIE = 22.38 (12" S) OUTSDCB (1-1) TYPE 1GRA 12+55.26, 38.68 LTRIM EL = 25.49128IE = 23.13 (12" W) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.01PLOTTED: May 28, 2024-03:08:11pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAYLAKE AVE S(LAK-LINE)(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 10+00 TO GRA 14+001DR.01214J. GREENH. JOHNSONJ. ETULAIN 761R-4214214TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011285,285 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISTDA022,988 sf3,591 sf141 sf642 sf154 sf115 sf106 sf1,399 sfTDA032,899 sf3,742 sf10,473 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 19 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122232628282626 28282626282828283028
28282828282828
30282828282828282826262626 2628262826
28282828\\\\\\\\\\\\T&T\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\SDSDSDSDSDSDSDSDSDSDSDSD14+0015+0016+0017+0018+0019+0035 LF 12" PP SD3 LF12" PP SD9 LF 12" DI SD86 LF 12" PP SD64 LF 12" DI SD150 LF 12" DI SD40 LF 12" PP SD40 LF12" DI SDSDCB (1-9) TYPE 1GRA 15+02.29, 88.20 RTRIM EL = 25.89118IE = 24.00 (10" NW) INIE = 23.90 (8" NE) INIE = 24.10 (8" SW) INIE = 23.90 (10" S) OUTSDCB (1-7) TYPE 1GRA 16+17.43, 38.66 LTRIM EL = 26.22128IE = 22.88 (12" E) INIE = 22.87 (12" SW) OUTSDCB (1-6) TYPE 1GRA 17+04.66, 38.65 LTRIM EL = 26.46128IE = 23.31 (12" E) INIE = 23.31 (12" W) OUTEX SDCB (1-E2)GRA 14+88.95, 33.58 LTRIM EL = 25.7316IE = 22.60 (12" E) INIE = 22.60 (12" NW) OUTEX SDCB (1-E3)GRA 15+82.21, 36.04 LTRIM EL = 26.2616IE = 22.70 (12" NE) INIE = 22.70 (12" W) OUTSDCB (1-8) TYPE 1GRA 15+52.48, 79.56 RTRIM EL = 25.95118IE = 24.10 (8" N) INIE = 24.10 (8" SW) OUTSDCB (1-4) TYPE 1GRA 14+83.40, 40.43 LTRIM EL = 25.37118IE = 22.53 (12" SE) INIE = 22.53 (12" W) INIE = 22.53 (12" NW) OUTSDCB (1-5) TYPE 1GRA 18+56.20, 38.67 LTRIM EL = 26.88812IE = 24.06 (12" W) OUTSDCB (1-3) TYPE 1GRA 14+18.98, 38.66 LTRIM EL = 25.80128IE = 22.85 (12" E) OUTSDCB (1-10) TYPE 1GRA 18+94.64, 55.33 LTRIM EL = 27.42812IE = 24.73 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.02PLOTTED: May 28, 2024-03:11:08pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAYSHATTUCK AVE S
(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 14+00 TO GRA 19+001DR.02215J. GREENH. JOHNSONJ. ETULAIN 176157417445171757614R-4214215TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011282,158 sf2,153 sf2,769 sf445 sf276 sf893 sf385 sf517 sf346 sf45 sf2,270 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS785 sfTDA02TDA03301 sf2,246 sf229 sf2,839 sf578 sf23 sf2,612 sf877 sf230 sf587 sf1,469 sf433 sf534 sfTDA04529 sf481 sf409 sf486 sf415 sf8,560 sf305 sf265 sf4,340 sf2,180 sf475 sf531 sf633 sf392 sf7,630 sf1,976 sf181 sf2,960 sf1,368 sf203 sf350 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 20 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222328282828303032323232
3034342828282832SSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDUDUDUDUD19+0020+0021+0022+0023+0024+003 LF12" PP SD19 LF 12" PP SD118 LF 12" PP SD58 LF 12" PP SD134 LF 12" PP SD40 LF 12" PP SD40 LF12" DI SDSDCB (1-14) TYPE 2-48"GRA 22+73.31, 37.74 LTRIM EL = 28.06912IE = 25.20 (8" NW) INIE = 25.05 (12" SW) OUTEX SDCB (1-E5)GRA 19+44.83, 27.37 LTRIM EL = 27.3961IE = 23.40 (12" NE) INIE = 23.20 (12" NW) INIE = 23.40 (6" N) INIE = 23.30 (12" SE) OUTSDCB (1-11) TYPE 1GRA 19+35.25, 55.33 LTRIM EL = 27.59128IE = 24.53 (12" SW) INIE = 24.53 (12" SE) OUTEX SDCB (1-E4)GRA 19+35.25, 51.84 LTRIM EL = 27.8361IE = 24.50 (12" NW) INIE = 24.00 (18" NE) INIE = 24.00 (18" S) OUTSDCB (1-12) TYPE 1GRA 20+58.75, 55.33 LTRIM EL = 27.82812IE = 24.44 (18" NW) INIE = 24.44 (18" SE) OUTSDCB (1-13) TYPE 1GRA 21+55.71, 55.34 LTRIM EL = 28.11128IE = 24.40 (18" NW) INIE = 24.40 (18" SE) OUTEX SDCB (1-E7)GRA 21+56.68, 52.45 LTRIM EL = 28.1116IE = 24.40 (18" NW) INIE = 24.40 (18" SW) OUTSDCB (1-16) TYPE 1GRA 20+79.60, 38.67 LTRIM EL = 27.50128IE = 24.09 (12" NE) INIE = 24.09 (12" SW) OUTSDCB (1-15) TYPE 1GRA 22+14.97, 38.67 LTRIM EL = 27.87128IE = 24.76 (12" NE) INIE = 24.76 (12" SW) OUTSDCB (1-17) TYPE 1GRA 19+60.13, 38.66 LTRIM EL = 27.17128IE = 23.50 (12" NE) INIE = 23.49 (12" SW) OUTEX SDCB (1-E6)GRA 20+60.22, 51.86 LTRIM EL = 27.9516IE = 24.40 (18" NW) INIE = 24.40 (18" NE) INIE = 24.30 (18" SW) OUT28.10 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.03PLOTTED: May 28, 2024-03:13:58pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAY(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 19+00 TO GRA 24+001DR.03216J. GREENH. JOHNSONJ. ETULAIN 2157171717171719444455559 LF 3" SD185214" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.07CLEANOUTIE = 30.30CLEANOUTIE = 30.30CLEANOUTIE = 29.80CLEANOUTIE = 29.40R-4214216TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011281,057 sf883 sf1,040 sf4,245 sf1,484 sf3,236 sf331 sf1,270 sf892 sf222 sf392 sf272 sf541 sf347 sf799 sf999 sf52 sf1,163 sf982 sf38 sf21,359 sf1,148 sf1,393 sf588 sf382 sf551 sf760 sf248 sf1,375 sf1,674 sf506 sf6,311 sf1,296 sf3,030 sf214 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISTDA04443 sf465 sf103 sf286 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 21 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222334
34 32343434323234343234
36
3636 3434343232 303032
32323232
3434
3636LPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PSS\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\SDSDSDSDSDSDSDSDSDSDSD24+00 25+00 26+0010+0010+0011+0012+0013+0014+004 LF 12" DI SD200 LF 12" PP SD31 LF 12" DI SD31 LF 12" DI SD41 LF 12" PP SD16 LF 12" DI SD11 LF 12" PP SD7 LF 12" DI SDSDCB (1-21), TYPE 18TAL-B 10+73.55, 83.46 RTRIM EL = 31.12IE = 28.30 (12" NW) OUTEX SDCB (1-E13)TAL-B 10+99.55, 48.22 RTRIM EL = 31.0361IE = 28.80 (8" NE) OUTEX SDCB (1-E8)TAL-B 10+82.21, 35.96 LTRIM EL = 31.4116IE = 28.30 (12" W) OUTSDMH (1-3), 54"23TAL-B 10+37.73, 24.64 RTRIM EL = 31.38IE = 27.20 (12" E) INIE = 26.10 (12" S) INIE = 25.60 (12" NE) INIE = 25.60 (18" SE) OUTSDCB (1-22) TYPE 1TAL-B 10+82.51, 41.16 LTRIM EL = 31.20118IE = 28.32 (12" SE) INIE = 28.32 (12" SW) OUTSDCB (1-23) TYPE 1TAL-B 12+79.65, 41.15 LTRIM EL = 34.86812IE = 29.32 (12" NW) OUTSDCB (1-18), TYPE 2-48"9TAL-B 10+43.62, 91.02 RTRIM EL = 30.87IE = 28.10 (12" SE)IE = 28.60 (6" SW) INIE = 28.10 (12" N)IE = 28.60 (6" SW) INIE = 28.10 (12" NE) OUTSDMH (1-2), 48"10TAL-B 10+66.32, 53.74 RTRIM EL = 31.22IE = 26.31 (12" W) INIE = 26.31 (12" N) OUTSDCB (1-20), TYPE 18TAL-B 10+42.73, 58.24 RTRIM EL = 31.05IE = 28.30 (12" W) OUT6 LF 12" DI SDSDCB (1-19), TYPE 18TAL-B 10+36.68, 89.10 RTRIM EL = 30.78IE = 28.14 (12" E) INIE = 28.06 (12" S) OUTIN28.60IN28.10 (12" NE) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.04PLOTTED: May 28, 2024-03:16:59pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'S GRADY WAY
TALBOT RD S(TAL-B-LINE)(GRA-LINE)RENTON SEGMENTDRAINAGE PLANGRA 24+00 TO TAL-B 14+001DR.04217J. GREENH. JOHNSONJ. ETULAIN OWS (1-1), 7.50'x5.00'TAL-B 10+46.34, 79.46'RT RIM EL=30.33 IE=28.04 (12" S) IN IE=27.81 (12" N) OUTTREATMENT MW (1-1)TAL-B 10+57.53, 64.61'RTRIM EL=30.59IE=27.71 (12" S) INIE=26.38 (12" N) OUT14177220158 LF 6" DI SDR-4214217TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128171717LUA22-000260 PR21-000132 C210011285,876 sf2,143 sf696 sf1,280 sf2,525 sf4,495 sf1,397 sf1,801 sf10,284 sf733 sf243 sf216 sf188 sf1,795 sf15 sf8 sf1,993 sf9,591 sf15,840 sf1,713 sf1,039 sf2,251 sf1,112 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISTDA04164 sf569 sf1,562 sf67 sf60 sf143 sf85 sf56 sf30 sf1,083 sf112 sf95 sf80 sf50 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGIS200 sfPage 22 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223343432
34
36
3234323232323434
3232323236
3232323434343634343432PSE EASEMENT PERNO. 8208270358FIRE EASEMENT PERNO. 8612221310FIRE EASEMENT PERNO. 8612221310
WATER LINE EASEMENT PER
NO. 8710090448
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PLSDSD
SDSDSDSD14+0015+0016+0017+0018+0070 LF 12" PP SD116 LF 12" DI SDSDCB (1-24) TYPE 1TAL-B 15+17.80, 40.31 LTRIM EL = 33.45128IE = 29.67 (12" S) OUTSDCB (1-26) TYPE 1TAL-B 15+39.27, 40.28 LTRIM EL = 33.36128IE = 29.55 (12" N) INIE = 29.55 (12" S) INIE = 29.55 (12" W) OUTSDCB (1-27), CONC INLET22TAL-B 18+44.23, 40.47 RTRIM EL = 31.44SDCB (1-25) TYPE 1TAL-B 16+48.68, 40.34 LTRIM EL = 32.13811IE = 30.13 (12" N) OUTEX SDCB (1-E10)1TAL-B 15+38.87, 29.59 RTRIM EL = 32.76IE = 29.20 (12" E) INIE = 29.20 (12" S) OUT23 LF 12" PP SDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.01.dwg | Layout: 1DR.05PLOTTED: May 28, 2024-03:19:49pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; X-LEGEND.dwg; X-IL_RENTON.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-B-LINE)RENTON SEGMENTDRAINAGE PLANTAL-B 14+00 TO TAL-B 18+501DR.05218J. GREENH. JOHNSONJ. ETULAIN 44752451754R-4214218TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128949 sf1,315 sf7,790 sf1,724 sf1,317 sf1,000 sf2,283 sf709 sf1,895 sf119 sf98 sf15,076 sf90 sf1,016 sf875 sf382 sf2,637 sf3,034 sf1,994 sf14,392 sf2,363 sf1,038 sf603 sf455 sf629 sfTDA04443 sf87 sf247 sf244 sf824 sf111 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 23 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122233432323232 32 32323232323234
34
3
4
34 323232323434 323232303032323219+0020+0021+0022+0023+00SD SDSD
EX SDCB (1-E11)1TAL-B 20+46.20, 41.08 RTRIM EL = 31.19IE = 28.60 (12" E)IE = 28.86 (12" NW)SDCB (1-29) CONC INLET22TAL-B 19+34.16, 40.31 RTRIM EL = 31.22IE = 28.22 (12" E)SDCB (1-28B) CB TYPE 2-54"TAL-B 19+40.70, 3.53 RTRIM EL = 32.17913IE = 25.61 (36" S)IE = 28.06 (12" W)IE = 25.61 (36" N)SDCB (1-28D) CB TYPE 2-48"TAL-B 20+32.31, 3.57 RTRIM EL = 32.06139IE = 28.53 (12" W) INIE = 28.53 (12" NW) OUTSDCB (1-28C) CB TYPE 2-54"TAL-B 20+09.14, 3.54 RTRIM EL = 32.11913IE = 27.11 (12" SW)IE = 25.61 (36" N)FCS (1-28A) SDMH 54"TAL-B 18+72.40, 3.53 RTRIM EL = 32.32169IE = 25.61 (12" W)IE = 25.61 (36" S)48 LF 12" PP SD2 LF 36" SRPE SD37 LF 12" PP SD2 LF 36" SRPE SD2 LF 36" SRPE SD60 LF 48" SRPE SD40 LF 12" DI SD6 LF 12" PP SD7 LF 12" PP SD2 LF 36" SRPE SDEX SDMH (1-E2)2TAL-B 18+60.40, 49.85 RTRIM EL = 33.78IE = 23.80 (12" E)IE = 26.50 (12" S)60 LF 48" SRPE SDOUTINOUTINIE = 23.55 (15" W) OUTOUTINOUTIN ININ INC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.06PLOTTED: May 28, 2024-03:22:34pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SI-405 SB OFF-RAMP(TAL-B-LINE)S RENTON VILLAGE PLRENTON SEGMENTDRAINAGE PLANTAL-B 18+50 TO TAL-B 23+501DR.06219J. GREENH. JOHNSONJ. ETULAIN TREATMENT MW (1-2)TAL-B 20+21.84, 3.53 RTRIM EL=32.68IE=28.51 (12" S) INIE=27.18 (12" N) OUT77511521R-4214219TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011286,111 sf1,760 sfTDA0422,749 sf963 sf1,519 sf2,952 sf1,194 sf444 sf252 sf9,421 sf187 sf651 sf60 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 24 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223Water Valve6528393.15 8284868884 86888692909290
94
96
94
94
96
100
98
106
104
102 10210098969484 33+0034+0035+0036+0037+0038+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.07PLOTTED: May 28, 2024-03:24:25pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'BENSON DR S (SR 515)S PUGET DRS 15TH ST
(TAL-B-LINE)RENTON SEGMENTDRAINAGE PLANTAL-B 33+00 TO TAL-B 38+001DR.07220J. GREENH. JOHNSONJ. ETULAIN NO PROPOSED DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214220TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128 POST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS198 sfTDA0664 sf142 sf127 sfTDA05LEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 25 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223198 196198200202196190192194 20220019819619219419420018218418618818618418218
8 190192194196198200190
186186186192194 19619424+0025+0026+0027+0028+0029+00SDCB (1-30) CONC INLET22TAL-21 25+47.37, 33.93 LTRIM EL = 194.97IE = 191.97 (12" N) OUT19 LF 12" DI SDEX SDCB (1-E12)TAL-21 25+32.69, 21.30 LTRIM EL = 195.73IE = 191.19 (12" S) INIE = 192.90 (12" NE) INIE = 191.20 (12" SW) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.08PLOTTED: Jun 04, 2024-02:40:02pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SS 23RD ST(TAL-21-LINE)TALBOT CREST DR S
RENTON SEGMENTDRAINAGE PLANTAL-21 24+00 TO TAL-21 29+001DR.08221J. GREENH. JOHNSONJ. ETULAIN 4512127R-4214221TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128TDA07570 sf164 sf44 sf67 sf161 sf5,284 sf462 sf1,387 sf278 sf1,874 sf646 sf1,185 sf1,254 sf75 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS102 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 26 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223929496981001021041061081021041069692949696949698100102100100100969854+0055+0056+0057+0058+0059+00UDUDUDUDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.09PLOTTED: May 28, 2024-03:28:06pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-21-LINE)S 32
N
D
S
T
RENTON SEGMENTDRAINAGE PLANTAL-21 54+00 TO TAL-21 59+001DR.09222J. GREENH. JOHNSONJ. ETULAIN 4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.02UNDERDRAINIE = 95.55WHERE DAYLIGHTINGTO LANDSCAPED AREACLEANOUTIE = 95.85CLEANOUTIE = 95.6CLEANOUTIE = 95.65CLEANOUTIE = 95.85R-4214222TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128TDA08694 sf738 sf411 sf1,819 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS299 sf144 sf155 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 27 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.171819202122238688909294969290929494 9698 10092949692
9494949496
96
969896969494
94 9494949272+0073+0074+0075+0076+00SDSDCB (1-33) TYPE 1TAL-21 75+48.98, 36.40 RTRIM EL = 93.91812IE = 92.35 (12" S) OUTSDCB (1-34) TYPE 1TAL-21 75+86.65, 36.85 RTRIM EL = 94.02812IE = 92.00 (12" N) INIE = 92.00 (12" E) OUTSDCB (1-31) TYPE 1TAL-21 73+71.42, 23.19 RTRIM EL = 93.02128IE = 90.80 (8" E) OUT38 LF 12" DI SDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.10PLOTTED: May 28, 2024-03:30:00pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD SS 37TH STS 37TH ST
S 38TH CT
S 38TH CT (TAL-21-LINE)RENTON SEGMENTDRAINAGE PLANTAL-21 71+00 TO TAL-21 76+001DR.10223J. GREENH. JOHNSONJ. ETULAIN 111171744451R-4214223TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011287,431 sf330 sf716 sf198 sf382 sf734 sf921 sf1,170 sf5,286 sf3,552 sf775 sf460 sf5,336 sfTDA09POST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS207 sf23 sf440 sf335 sf334 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 28 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222311211010810810610410811011211210810611211011010410610
8
11086+0087+0088+0089+0090+0091+00UDUDUDUDUDSD
SDCB (1-35) TYPE 1TAL-21 89+06.19, 21.99 RTRIM EL = 108.42118IE = 105.97 (12" E) OUTSDCB (1-36) TYPE 1TAL-21 88+86.30, 21.92 LTRIM EL = 108.63128IE = 105.73 (12" W) INIE = 105.73 (12" S) OUTSDMH (1-4) 48"10TAL-21 88+94.27, 25.98 LTRIM EL = 109.09IE = 105.70 (12" N) INIE = 105.70 (12" S) INIE = 105.70 (12" N) OUT48 LF 12" DI SD9 LF 12" DI SDSDCB (1-32) TYPE 1TAL-21 88+11.86, 24.14 LTRIM EL = 108.48813IE = 104.71 (12" S) INIE = 104.71 (12" N) OUTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.11PLOTTED: May 28, 2024-03:32:07pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'TALBOT RD S(TAL-21-LINE)RENTON SEGMENTDRAINAGE PLANTAL-21 86+00 TO TAL-21 91+001DR.11224J. GREENH. JOHNSONJ. ETULAIN 181189 LF 3" SD9 LF 3" SD4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.04UNDERDRAINIE = 106.00AT LOW POINT OF WALL,DAYLIGHT TO LANDSCAPED AREA4" PERFORATED PVC PIPE. SEERETAINING WALL PLAN ANDELEVATION, SHEET 1R1.0310 LF 4" PVC UDCLEANOUTIE = 109.87CLEANOUTIE = 110.37CLEANOUTIE = 106.04CLEANOUTIE = 106.00CLEANOUTIE = 106.3117171717R-4214224TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011283,268 sf377 sf338 sf337 sfTDA10417 sf352 sf292 sf900 sf7,132 sf1,929 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 29 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223240242244246248250252254256258
2
6
0
262
264
266
268
270
272
274
276
278
280
26
6
26
4
2
6
2
2
6
0
2
5
8
2
5
0
24
8
246244242240238 236
2
5
2
2
5
4
2
5
6
234 232 230244246248250250254256258248260
262
2
6
4
266268270252 254260 32+0033+0034+0035+0036+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.12PLOTTED: May 28, 2024-03:34:16pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'SE CARR RDM
I
L
L
A
V
E
S
WELLS AVE S
(CAR-LINE)RENTON SEGMENTDRAINAGE PLANCAR 32+00 TO CAR 36+501DR.12225J. GREENH. JOHNSONJ. ETULAIN NO PROPOSED DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214225TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128 POST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISTDA11169 sf80 sf450 sf110 sf154 sf291 sf97 sf16 sf28 sf67 sf7 sf10 sfPage 30 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223360358356354352350348346344342340338336340342340338348346
350
35
2
3
5
2
350
3
5
4
3
5
6
354
354
356
3
6
4366368
370372362360358 352348346
350352
342344346
348
3
5
4
3
5
03523
5
2354 43+0044+0045+0046+0047+0010+
0
0
11+
0
0 SDCB (1-36x) TYPE 18CAR 43+41.88, 21.24 RTRIM EL = 340.22EX SDMH (1-E3)2105TH 10+88.32, 35.52 RTRIM EL = 350.77IE = 345.71 (12" E) INIE = 338.20 (36" SE) INIE = 336.30 (36" SW) OUTSDCB (1-37) TYPE 1105TH 10+92.38, 22.78 RTRIM EL = 350.31812IE = 346.92 (12" E) INIE = 346.92 (12" W) OUTSDCB (1-39) TYPE 1105TH 10+08.85, 32.99 LTRIM EL = 351.11128C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.13PLOTTED: May 28, 2024-03:37:56pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'105
T
H
PL
S
E
RENTON SEGMENTDRAINAGE PLANCAR 42+50 TO CAR 47+501DR.13226J. GREENH. JOHNSONJ. ETULAIN 11SE CARR RD641717189 LF 3" SD17117189 LF 3" SDR-4214226TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011289,663 sf991 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS1,219 sf5,017 sf289 sf344 sf1,076 sfTDA122,173 sf588 sf12,717 sf167 sf221 sf1,286 sf1,410 sf23 sf267 sf75 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 31 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223348350352354356352 352354 11+0012+0013+0014+0015+00105TH 10+92.38, 22.78 RTC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.14PLOTTED: May 28, 2024-03:42:18pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'RENTON SEGMENTDRAINAGE PLAN105TH 11+00 TO 105TH 15+001DR.14227J. GREENH. JOHNSONJ. ETULAIN (105TH-LINE)105TH PL SENO DRAINAGE IMPROVEMENTS ON THIS SHEETR-4214227TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128 POST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISTDA122,210 sf2,048 sf182 sf157 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 32 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223382382382384384384384386386386
38638638838438638839039238423+0024+0025+0026+0027+0028+00WWWWWWWWWWWWWWWWWWC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.10.dwg | Layout: 1DR.15PLOTTED: May 28, 2024-03:46:47pm By tluehrsXREFS: X-LEGEND.dwg; KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-ROW_RENTON.dwg; X-STATION_RENTON.dwg; X-DR_RENTON.dwg; X-RDWY_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-SURFACE_RENTON.dwg; X-UT_RENTON.dwg; X-IL_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'RENTON SEGMENTDRAINAGE PLAN105TH 23+00 TO 105TH 28+001DR.15228J. GREENH. JOHNSONJ. ETULAIN SE 180TH ST(105TH-LINE)18111 LF 3" SD189 LF 3" SDR-4214228TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C210011284,084 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS522 sfTDA13141 sf448 sf21 sf1,499 sf1,399 sf80 sf8,184 sf410 sf126 sf483 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 33 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.1718192021222346446
8
4
6
8468 458456468468476464466468462460466 460470470460456458460462464458 456
46
2 46246646446246
4 46246
6
47047247447647847447247647028+0029+0030+0031+0032+0033+0011+00 UDUDC:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.20.dwg | Layout: 1DR.16PLOTTED: May 28, 2024-04:02:04pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-RDWY_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; 18229-SV-BS_Kent.dwg; X-IL_RENTON.dwg; X-LEGEND.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'108TH AVE SE (SR 515)SE 186TH ST
SE 184TH LN (108TH-LINE)SE 186TH ST
RENTON SEGMENTDRAINAGE PLAN108TH 28+00 TO 108TH 33+001DR.16229J. GREENH. JOHNSONJ. ETULAIN 118189 LF 3" SD9 LF 3" SD4" PERFORATED PVC PIPE. SEE RETAININGWALL PLAN AND ELEVATION, SHEET 1R1.06CLEANOUTIE = 465.877 LF 4" UD (DI)CURB CUT FOR WALLUNDERDRAIN IE=464.00CLEANOUTIE = 467.87R-4214229TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128463 sf2,103 sfPOST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGIS257 sfTDA14392 sf69 sf14 sf147 sf885 sf311 sf852 sf45 sf93 sf700 sf401 sf1,380 sf3,666 sf342 sf566 sf27 sf3,546 sf7,882 sf459 sf622 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGIS1,231 sf656 sf1,140 sfPage 34 of 35
GENERAL NOTESADJUST INLET OR CATCH BASIN TO GRADEADJUST MANHOLE TO GRADEADJUST STORM DRAIN MANHOLE WITH 1' RISERREMOVE INLET OR CATCH BASINREMOVE STORM DRAIN PIPEREPLACE GRATE WITH SOLID LOCKING METAL COVER PERCITY OF RENTON PWD STD PLAN 204.10CONNECTION TO EXISTING DRAINAGE STRUCTUREINSTALL CATCH BASIN TYPE 1 PERCITY OF RENTON PWD STD PLAN 200.00INSTALL CATCH BASIN TYPE 2 PERCITY OF RENTON PWD STD PLAN 201.00INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STDPLAN 400.2INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OFRENTON PWD STD PLAN 203.00INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTONPWD STD PLAN 204.40INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTONPWD STD PLAN 204.10INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNITINSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNITINSTALL FLOW CONTROL STRUCTURE PERCITY OF RENTON PWD STD 237.00CONNECTION TO EXISTING PIPEINSTALL STATION SHELTER DOWNSPOUT THROUGH CURBDRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING,PER DETAIL 1, DRAWING NO. 1DRD.03INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OFRENTON PWD STD 240.10PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OFEXISTING STORM DRAINAGE PIPEINSTALL CONCRETE INLET PER CITY OF RENTON PWD STDPLAN 200.30INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN400.1STORM DRAINAGE NOTES123456789101112131415161.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET.2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLESLOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALKSHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PERPROJECT SPECIFICATIONS.17181920212223OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHP OHP OHPOHPOHPOHP
OHP OHP OHP OHP OHP OHP OHP OHP
OHPOHPOHP
OHPOHPOHPWATER PER GIS
WATER PER GIS458
456
45
6
4
5
8 460454452450448446444454
45
2
460
462
464466468470 51+0052+0053+0054+0055+0056+00C:\pw_workdir\den003\ch2mhill_tluehrs\d0601389\1 DR.20.dwg | Layout: 1DR.17PLOTTED: May 28, 2024-04:06:44pm By tluehrsXREFS: KCMTD-BORDER_2020.dwg; X-ALIGN.dwg; X-ROW_PROP.dwg; X-STATION_RENTON.dwg; X-RDWY_RENTON.dwg; X-DR_RENTON.dwg; X-UT_RENTON.dwg; X-PV_RENTON.dwg; 18229-SV-BS_Renton.dwg; 18229-SV-ROW.dwg; X-ROW_RENTON.dwg; 18229-SV-BS_Kent.dwg; X-IL_RENTON.dwg; X-LEGEND.dwg; X-SURFACE_RENTON.dwg; X-LD_RENTON.dwgIMAGES: No.REVISIONDATEBYAPP'DDESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISIONDATE:DRAWING NO:SHEET NO: OFMETRORAPIDRIDE I LINEJUNE 2024G. FRANCOE00566E18CXXXXXXXX473K. CHANG YUEN33200AD-READY SUBMITTAL20'40' SCALE: 1" = 40'0'108TH AVE SE (SR 515)SE 192ND STCITY OF RENTON(108TH-LINE)CITY OF KENTSEE VOLUME 2FOR CITY OF KENTIMPROVEMENTSRENTON SEGMENTDRAINAGE PLAN108TH 51+00 TO 108TH 56+001DR.17230J. GREENH. JOHNSONJ. ETULAIN 188 LF 3" SD1R-4214230TED-40-4214TED-40-4214
LUA22-000260 PR21-000132 C21001128LUA22-000260 PR21-000132 C21001128
OHP POST-DEVELOPED CONDITIONS - NEW HARD SURFACE - REPLACED HARD SURFACE - NEW PGIS - GRIND AND OVERLAP LIMITS - NEW/REPLACED LANDSCAPING - REMOVED EX PGISTDA15310 sf433 sf720 sf1,037 sf2,542 sfLEGEND: SITE PLAN LIMITS DISTURBED AREA NEW HARD SURFACE REPLACED HARD SURFACE NEW PGIS GRIND AND OVERLAP LIMITS NEW AND REPLACED LANDSCAPING SURFACE REMOVED PGISPage 35 of 35