HomeMy WebLinkAboutMFP24006030.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP24006030
IVR Number: 24006030
Permit Information
Permit Name: Zayo Bandwidth Northwest, Inc
ZayoID 0756 - NE12th & UnionAddress/Location:12/03/2024Application Date:0423059262Parcel Number: 3816 NE 12TH ST
Permit Type:12/12/2024Issue Date:Franchise
Permit Work Class:12/12/2025Expiration Date:Minor Utility
Job Number: ZayoID 0756Franchise Type:Cable
Description: Zayo Bandwidth Northwest (Ord 5497) Relocation of Zayo fiber from poles that are being removed to conduit placed
by developer. Pull a new 144ct fiber from existing Zayo vault on Union Ave to pole line on NE 12th. Overlash to existing
strand 3 spans west.Pull through existing riser and conduit placed by developer to existing pole to teh west of
development and create a new aerial splice case. Remove old fiber and strand from existing poles once fiber is
spliced. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Ron Desmet
Fibe Solutions
604 W Meeker St., Suite 103
KENT, WA 98032
C: (206) 571-2230ApplicantX
Scott Morrison
Zayo
B: (206) 832-4862
C: (253) 441-0653
Applicant
Terry Cromwell
Fibe Solutions
B: (206) 793-0637
H: (206) 793-0637
C: (206) 793-0637
Applicant
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
Scott Morrison
Zayo
B: (206) 832-4862
C: (253) 441-0653
Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ZAYO - Billing 1805 29th St, 2050
Boulder, CO 80301
B: (253) 655-1100Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 3/18/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/18/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
▪ Include map(s) showing the location of the project and work area.
▪ Be legible lettering and clear, contrasting, symbols of viewing or printing.
▪ Must indicate street names, and north arrow and scale.
▪ Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
X
X
98354
MFP24006030
Monday Friday 8:00am 3:00pm
Scott Warlick CED 12/12/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 3/18/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
• Must have approved Traffic Control Plan (TCP) prior to commencing the work.
• Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
• WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
• All permit conditions shall be met.
NOTES:
• Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
• In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 3/18/2021
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
WORK AREAROADAHEADWORKROADAHEADWORKGENERAL NOTES:PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.SHOULDERWORKSHOULDERCLOSEDTRAFFIC CONTROL PLANSHORT DURATION WORK ZONEFOR UNDERGROUND WORKTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMROADAHEADWORKNE 12TH STUNION AVE NE
AL NAGELTRAFFIC CONTROL SUPERVISORTCS# ES2000210EXPIRES 05/31/2027APPROVED 05/15/2023253.324.8260ANAGEL@FIBESOLUTIONS.COMAl Nagelbefore you digCallMFP24006030
AL NAGELTRAFFIC CONTROL SUPERVISORTCS# ES2000210EXPIRES 05/31/2027APPROVED 05/15/2023253.324.8260ANAGEL@FIBESOLUTIONS.COMAl NagelTYPE OF WORK:WORK HOURS:AERIAL WORKM-F 7AM-5PMTRAFFIC CONTROL PLANSHORT DURATION WORK ZONEFOR AERIAL WORKROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADNE 12TH STUNION AVE NEPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.GENERAL NOTES:AERIALCROSSINGROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPWORK AREAWORK AREAbefore you digCallMFP24006030
ROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADNE 12TH STWORK AREA
STAGING AREA GENERAL NOTES:TYPE OF WORK:WORK HOURS:AERIAL / UGM-F 7AM-5PMPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.TRAFFIC CONTROL PLANSHORT DURATION WORK ZONEFOR AERIAL / UNDERGROUND WORKAL NAGELTRAFFIC CONTROL SUPERVISORTCS# ES2000210EXPIRES 05/31/2027APPROVED 05/15/2023253.324.8260ANAGEL@FIBESOLUTIONS.COMAl Nagelbefore you digCallMFP24006030
WORKAREAROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPNE 12TH STNE 11TH PL / SHELTON AVE NEROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPTYPE OF WORK:WORK HOURS:AERIAL WORKM-F 7AM-5PMROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADGENERAL NOTES:PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.TRAFFIC CONTROL PLANSHORT DURATION WORK ZONEFOR AERIAL WORKAL NAGELTRAFFIC CONTROL SUPERVISORTCS# ES2000210EXPIRES 05/31/2027APPROVED 05/15/2023253.324.8260ANAGEL@FIBESOLUTIONS.COMAl Nagelbefore you digCallMFP24006030
ZayoID - 0756 - NE 12TH & UNION3816 NE 12TH STRENTON, WA 98056 1 - COVER SHEET AND PROJECT LOCATION 2 - ZAYO GENERAL NOTES 3 - LINE TYPE & SYMBOL LEGEND 4 - PLAN VIEWPROJECT LOCATIONCONTACT PERSON:SHEET INDEX:CITY OF RENTONZayo GroupOSP Project Manager - Pacific NWKim Bodtker4905 Pacific Hwy E Suite #4Fife, WA 98424(Cell) 206.841.5545(Email) kim.bodtker@zayo.com4Fibe SolutionsProject ManagerTerry Cromwell604 W Meeker St, Suite 103Kent, Washington 98032(Cell) 206.793.0637(Email) tcromwell@fibesolutions.comPROJECT DESCRIPTIONMFP24006030
before you digCallMFP24006030
SYMBOL LEGENDBOREPITLINE TYPE LEGEND#R100 SCALE LINE TYPE LEGENDXXXXXXXX144CTSPLICEXXX'HATCH TYPES#POLE ATTACHMENT BLOCK144CTbefore you digCallMFP24006030
XXXXXXXXXXXXXX144CT144CT144CT144CT144CTEXISTINGSPLICE(102927)318640-167126
318638-167121
318640-167104
318639-167091
318640-167080
318639-167065
318640-167052318642-166990NEWSPLICE200'EXISTINGSTORAGE12A124B4566667AAB88318639-167110345678
33A46A553before you digCallMFP24006030
4905 Pacific Hwy E Suite #4
Fife, WA 98424
Dec 04, 2024
RE: requesting an exemption from Renton undergrounding code
Zayo job: ZayoID 0756 – NE 12th & Union
Job Address: 3816 NE 12th St Renton, WA 98056
Fibe Solutions has been contracted to design and engineer this fiber relocation project on behalf of Zayo Group. Zayo Group is
requesting that the City of Renton grant a variance to the undergrounding code.
The purpose of this project is a relocation of existing aerial fiber to underground conduit in front of the new development at
NE12th st and NE11th PL.
The project consists of replacing the existing fiber on 431’ of existing Zayo strand and removing the old fiber when splicing is
completed and placing 508’ of fiber into existing conduit. This project reduces the amount of Zayo Fiber plant that is aerial.
This work can be completed in a few days with minimal impact to the residents and ongoing construction projects. Zayo Group
will clean up the spans as necessary and identify the old fiber from the strand.
The variance requested does not constitute the granting of special services to Zayo Group because Zayo Group is agreeing to
obligate the cable system to be placed underground when all other utilities are placed underground. Such as the 508’ that is
being placed underground by this project.
The variance is necessary to prevent an undue hardship due to the increased construction costs if forced to install the proposed
extension underground. As well as increased impact to the ROW and disturbance to residents.
The granting of the variance will not be materially detrimental to the public welfare because Zayo Group does agree to
underground the cable system, but they are waiving the obligation into the future when all other utilities are undergrounded to
prevent an undue hardship against Zayo Group currently.
Upon the granting of the Variance, Zayo Group will coordinate construction and traffic control as per your requirements. Zayo
Group and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set
forth by the City of Renton to insure safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project please contact Terry Cromwell at 206-793-0637
On behalf of Zayo Group,
Terry Cromwell
Project Manager
Fibe Solutions
Attachments:
1. Application for ROW permit
2. 11” x 17” Site Plan
3. Proposed TCP app and Traffic Control Plan
December 11, 2024
Terry Cromwell
Fibe Solutions
495 1pacific Hwy E Suite #4
Fife, WA 98424
Via Email: tcromwell@fibesolutions.com
SUBJECT: Request for Undergrounding Exemption (JB#0756, MFP24006030, 3816 NE 12th St)
Dear Mr. Cromwell:
The City of Renton has reviewed your request to grant Zayo an exemption from Renton Municipal Code (RMC) 4-
6-090(C) which states that all new electrical or communication facilities shall be required to be installed
underground, pursuant to the standards of the section of RMC.
Zayo proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 297 lineal feet to
existing Puget Sound Energy (PSE) poles along NE 12th Street, within the City. See the enclosed Site Plan showing
the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5497 grants Zayo,
the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the
streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3 of the franchise
ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications
service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service
Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s
distribution cables underground within that area; provided that such underground locations are actually capable
of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’
signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to
the existing Zayo aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any
existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore,
the City is granting an exemption with conditions, per the Zayo franchise agreement which allows new overhead
facilities to be placed overhead provided there are other similar providers overhead as well. Zayo is required to
obtain all necessary private utility easements for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as
requested by the applicant is approved with conditions subject to the conditions below as the request complies
with the Zayo Franchise Agreement.
Zayo Job JB#0756
Page 2 of 2
December 11, 2024
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New
aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction
is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take place until
the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the
future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are
undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case the Applicant shall participate in the joint use trench installation for the
purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that
will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or
approved otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the
date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk,
along with the required appeal fee, by 5:00 pm, December 25, 2024. Appeals must be submitted electronically to
the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The
appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is
submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department.
Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal
process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Director
cc: Justin Johnson, Construction Engineering Manager
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
ZayoID - 0756 - NE 12TH & UNION3816 NE 12TH STRENTON, WA 98056 1 - COVER SHEET AND PROJECT LOCATION 2 - ZAYO GENERAL NOTES 3 - LINE TYPE & SYMBOL LEGEND 4 - PLAN VIEWPROJECT LOCATIONCONTACT PERSON:SHEET INDEX:CITY OF RENTONZayo GroupOSP Project Manager - Pacific NWKim Bodtker4905 Pacific Hwy E Suite #4Fife, WA 98424(Cell) 206.841.5545(Email) kim.bodtker@zayo.com4Fibe SolutionsProject ManagerTerry Cromwell604 W Meeker St, Suite 103Kent, Washington 98032(Cell) 206.793.0637(Email) tcromwell@fibesolutions.comPROJECT DESCRIPTION
before you digCall
SYMBOL LEGENDBOREPITLINE TYPE LEGEND#R100 SCALE LINE TYPE LEGENDXXXXXXXX144CTSPLICEXXX'HATCH TYPES#POLE ATTACHMENT BLOCK144CTbefore you digCall
XXXXXXXXXXXXXX144CT144CT144CT144CT144CTEXISTINGSPLICE(102927)318640-167126
318638-167121
318640-167104
318639-167091
318640-167080
318639-167065
318640-167052318642-166990NEWSPLICE200'EXISTINGSTORAGE12A124B4566667AAB88318639-167110345678
33A46A553before you digCall
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP24004904
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
2 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1