HomeMy WebLinkAboutROWP23-0016 Approved Site PlanSE 2ND CT
SE 2ND ST
SE 2ND PL
SE 3RD PL
SE 138TH PL
SE 6TH PL
SE 7TH PL
SE 142ND ST
SE 141ST PL
SE 140TH PL
SE 139TH PL
SE 138TH PL
SE 143RD ST
SE 2ND LN
156TH AVE SESHADOW PLACE SETOLEDO AVE SEROSARIOPL SE152ND AVE SE154TH AVE SE150TH PL SE149TH PL SE148TH PL SE148THPL SESE 142N
D
P
L
SE 142N
D
P
L
SE 4TH PL
SE 5TH PLROSARIOAVE SEMAPLEWOOD PARK
WAPATO PL SESE 143RD PLSE139THCT0+00 1+00
2+00 3+00
3+61
1
2
3
4
TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
Know what's below.
before you dig.Call
R
253.383.2572 FAX
4
SK/MWGBRI/JT
REVISED PER KC COMMENTS DATED 11/9/23
REVISED PER KC COMMENTS DATED 1/4/24
REVISED PER KC COMMENTS DATED 6/28/24
7/22/2024
154TH AVE SE
DITCH IMPROVEMENTS
PERMIT SET
2221005.10
12600 SE 38TH STREET
BELLEVUE, WA 98006
CONTACT: DALTON SMITH
PHONE: (888)302-1252
CONNER HOMES
MAPLE HIGHLANDS
154TH AVE SE
DITCH IMPROVEMENTS
SW 1/4, SEC 14, TWN 23, RGE 5, KING COUNTY
MAPLE HIGHLANDS - 154TH AVE SE DITCH IMPROVEMENTS
OWNER
CONNER HOMES
12600 SE 38TH STREET
BELLEVUE, WA 98006
PH: (888) 302-1252
CONTACT: DALTON SMITH
SURVEYOR
AHBL
2215 NORTH 30TH STREET, SUITE 300
TACOMA, WA 98403
PH. (253) 383-2422
CONTACT: DAVE FOLLANSBEE, PLS
CIVIL ENGINEER
AHBL
2215 NORTH 30TH STREET, SUITE 300
TACOMA, WA 98403
PH. (253) 383-2422
CONTACT: SCOTT KAUL, PE
GEOTECH
THE RILEY GROUP, INC.
17522 BOTHELL WAY NE
BOTHELL, WA 98011
PH: (425) 415-0551
CONTACT: KRISTINA WELLER, PE
TRENCH NOTE
IF WORKERS ENTER ANY TRENCH OR OTHER
EXCAVATION FOUR OR MORE FEET IN DEPTH
THAT DOES NOT MEET THE OPEN PIT
REQUIREMENTS OF WSDOT SECTION
2-09.3(3)B, IT SHALL BE SHORED AND CRIBBED.
THE CONTRACTOR ALONE SHALL BE
RESPONSIBLE FOR WORKER SAFETY AND
AHBL ASSUMES NO RESPONSIBILITY. ALL
TRENCH SAFETY SYSTEMS SHALL MEET THE
REQUIREMENTS OF THE WASHINGTON
INDUSTRIAL SAFETY AND HEALTH ACT,
CHAPTER 49.17 RCW.
UTILITY NOTE
THE LOCATIONS OF EXISTING UNDERGROUND
UTILITIES ARE APPROXIMATE ONLY AND HAVE
NOT BEEN INDEPENDENTLY VERIFIED BY THE
OWNER OR ITS REPRESENTATIVE. THE
CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE
COMMENCING WORK AND AGREES TO BE
FULLY RESPONSIBLE FOR ANY AND ALL
DAMAGES THAT HAPPEN DUE TO THE
CONTRACTOR'S FAILURE TO LOCATE EXACTLY
AND PRESERVE ANY AND ALL UNDERGROUND
UTILITIES. AHBL ASSUMES NO LIABILITY FOR
THE LOCATION OF UNDERGROUND UTILITIES.
BASIS OF BEARING
WASHINGTON STATE PLAN COORDINATE
SYSTEM, NAD 83/91 NORTH ZONE 4601 PER CITY
OF RENTON COORDINATE SYSTEM.
VERTICAL DATUM
NAVD 88 - CONTRACTOR TO VERIFY
ELEVATIONS TO LOCAL SITE CONTROL PRIOR
TO CONSTRUCTION.
FILL SPECIFICATION
FILL MATERIAL SHALL NOT CONTAIN
PETROLEUM PRODUCTS, OR SUBSTANCES
WHICH ARE HAZARDOUS, DANGEROUS, TOXIC,
OR WHICH OTHERWISE VIOLATE ANY STATE,
FEDERAL, OR LOCAL LAW, ORDINANCE, CODE,
REGULATION, RULE, ORDER, OR STANDARD
SITE ADDRESS
154TH AVE SE RIGHT-OF-WAY, NORTH
OF SE 142ND ST
SITE
VICINITY MAP
SCALE: 1"=500'
EXISTING LEGEND
154TH AVE SE NGRAPHIC SCALE
0 20 40
1" = 20 FEET
10
DATE: July 19, 2024 FILENAME: Q:\2022\2221005\10_CIV\CAD\_King County ROW\2221005-SH-COVR.dwg
C0.1
1
COVER SHEET
DITCH
SHEET INDEX
Sheet Number Sheet Title
C0.1 COVER SHEET
C1.1 154TH AVE SE DITCH TESC PLAN
C2.1 154TH AVE SE DITCH PLAN & PROFILE
C2.2 DITCH NOTES AND DETAILS
08/08/2024
King County DLS - Permitting Approval
Review Engineer Date
Senior Engineer Date
Development Engineer Date
ROWP23-0016
ROWP23-0016 Sheet 1 of 4
8-29-2024
8/29/2024
CL
REMOVE DEBRIS AND
SEDIMENT FROM CULVERT
PROTECT EXISTING
UTILITIES (TYP.)
REMOVE DEBRIS AND
SEDIMENT FROM CULVERT
REMOVE DEBRIS AND
SEDIMENT FROM CULVERT
PROTECT EXISTING
UTILITIES (TYP.)377377
3
7
8
378380377378379REMOVE DEBRIS AND
SEDIMENT FROM CULVERT
1
2
3
4
TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
Know what's below.
before you dig.Call
R
253.383.2572 FAX
4
SK/MWGBRI/JT
REVISED PER KC COMMENTS DATED 11/9/23
REVISED PER KC COMMENTS DATED 1/4/24
REVISED PER KC COMMENTS DATED 6/28/24
7/22/2024
154TH AVE SE
DITCH IMPROVEMENTS
PERMIT SET
2221005.10
12600 SE 38TH STREET
BELLEVUE, WA 98006
CONTACT: DALTON SMITH
PHONE: (888)302-1252
CONNER HOMES
MAPLE HIGHLANDS
154TH AVE SE
DITCH IMPROVEMENTS
SW 1/4, SEC 14, TWN 23, RGE 5, KING COUNTY
MAPLE HIGHLANDS - 154TH AVE SE DITCH IMPROVEMENTS
154TH AVE SE NGRAPHIC SCALE
0 20 40
1" = 20 FEET
10
DATE: July 19, 2024 FILENAME: Q:\2022\2221005\10_CIV\CAD\_King County ROW\2221005-SH-TESC.dwg
C1.1
2
154TH AVE SE DITCH
TESC PLAN
TESC AND DEMO LEGEND
CLEARING LIMITS
EXISTING GRADE CONTOUR
FINISHED GRADE CONTOUR
CL
ELEV
NOTES
1.CLEAR ALL CULVERTS OF DEBRIS AND
SEDIMENT WITHIN THE PROJECT LIMITS.
2.CONTRACTOR TO POTHOLE AND VERIFY
LOCATION AND ELEVATION OF EXISTING
UTILITIES.
LIMITS TO INCLUDE SEDIMENT AND
DEBRIS REMOVAL ALONG THE DITCH
AND CULVERTS
ELEV
1.APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN
(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.)
2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE
RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED.
3.THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING, IF REQUIRED, PRIOR TO
CONSTRUCTION (KING COUNTY SWDM APPENDIX D). DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5.THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE
THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, FLOW CONTROL BMP LOCATIONS (EXISTING AND PROPOSED), AND
ADJACENT PROPERTIES IS MINIMIZED.
6.THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD,
THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS
(E.G. ADDITIONAL COVER MEASURES, ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, PERIMETER PROTECTION ETC.).
7.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING.
WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES.
8.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN
DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC
COVERING, ETC.).
9.ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
10.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH (MORE FREQUENTLY AS REQUIRED BY THE
DLS-PERMITTING SITE INSPECTOR) OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
11.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE
LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
12.ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL
MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE
TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY. FLOW CONTROL BMP FACILITY AREAS (EXISTING OR PROPOSED) SHALL NOT BE USED AS TEMPORARY FACILITIES AND SHALL BE PROTECTED FROM
SEDIMENTATION AND INTRUSION.
13.COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE KING COUNTY SURFACE WATER DESIGN MANUAL.
14.PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN
PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF
THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE DLS-PERMITTING INSPECTOR FOR REVIEW.
EROSION AND SEDIMENT CONTROL NOTES
(1)PRE-CONSTRUCTION MEETING.
(2)POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF
CONSTRUCTION SIGN).
(3)FLAG OR FENCE CLEARING LIMITS.
(4)INSTALL FLOW CONTROL BMP AREA PROTECTION AS REQUIRED.
(5)INSTALL PERIMETER PROTECTION.
(6)CONSTRUCT SURFACE WATER CONTROLS SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY.
(7)MAINTAIN EROSION CONTROL AND SWPPS MEASURES IN ACCORDANCE WITH KING COUNTY STANDARDS AND MANUFACTURER'S
RECOMMENDATIONS.
(8)RELOCATE EROSION CONTROL AND SWPPS MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE
EROSION AND SEDIMENT CONTROL AND POLLUTANT PROTECTION IS ALWAYS IN ACCORDANCE WITH THE KING COUNTY
CONSTRUCTION STORMWATER POLLUTION PREVENTION STANDARDS.
(9)COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE
WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT.
(10)STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
(11)SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
(12)UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE.
CONSTRUCTION STORMWATER POLLUTION
PREVENTION RECOMMENDED CONSTRUCTION SEQUENCE
08/08/2024
King County DLS - Permitting Approval
Review Engineer Date
Senior Engineer Date
Development Engineer Date
ROWP23-0016
ROWP23-0016 Sheet 2 of 4
8-29-2024
8/29/2024
65+0066+0067+0068+0069+00
380
377378379
3773783
79
376
377
375376
EG: 375.90
EG: 376.61
EG: 376.39
EG: 376.98 EG: 376.48
PROTECT EXISTING WOOD
EDGE BARRIERS (TYP.)
PROTECT EXISTING WOOD
EDGE BARRIERS (TYP.)
EG: 377.18
385382383384384384385383384PROTECT EXISTING
UTILITIES (TYP.)
PROTECT EXISTING
UTILITIES (TYP.)
EG: 380.40
ROAD RESTORATION
PER CITY OF RENTON
PERMIT
PROTECT EXISTING
UTILITIES (TYP.)
EG: 378.59
EG: 381.00
A
C2.1
B
C2.1
C
C2.1
EG: 377.99EG: 379.30
EG: 377.79
EG: 375.85
EG: 379.08
377
378
379 376370
375
380
370
375
380
0+00FG FG0+50FG 374.77FG154TH AVE SE
ROW
154TH AVE SE
ROW
154TH AVE SE
CENTERLINE
EXISTING EDGE OF
GRAVEL ROADWAY
EXISTING GRADE
AT CROSS SECTION
EXISTING GRADE
AT CROSS SECTION
FINISHED GRADE
AT CROSS SECTION
DITCH
WIDTH
VARIES
11.16'
30.00'30.00'
FINISHED GRADE
AT CROSS SECTION
1
C2.22H:1V3
APPROXIMATE
HEDGE LIMITS.
PROTECT HEDGES.
370
375
380
370
375
380
0+00FG FG 375.69154TH AVE SE
ROW
154TH AVE SE
ROW
154TH AVE SE
CENTERLINE
30.00'30.00'
FINISHED GRADE
AT CROSS SECTION
DITCH10.5'±
EXISTING GRADE
AT CROSS SECTION
EXISTING GRADE
AT CROSS SECTION
EXISTING EDGE OF
GRAVEL ROADWAY
12.73'
1
C2.22H:1V3
APPROXIMATE
HEDGE LIMITS.
PROTECT HEDGES.
FINISHED GRADE
AT CROSS SECTION370
375
380
370
375
380
0+00FG FG 376.860+50FG154TH AVE SE
ROW
154TH AVE SE
CENTERLINE
30.00'
154TH AVE SE
ROW
30.00'
FINISHED GRADE
AT CROSS SECTION
DITCHWIDTH
VARIES
EXISTING
GRADE
AT CROSS
SECTION
EXISTING GRADE
AT CROSS SECTION
FINISHED GRADE
AT CROSS SECTION
EXISTING EDGE OF
GRAVEL ROADWAY
13.42'
1
C2.24H:1V2H:1V2.00'
1
2
3
4
TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
Know what's below.
before you dig.Call
R
253.383.2572 FAX
4
SK/MWGBRI/JT
REVISED PER KC COMMENTS DATED 11/9/23
REVISED PER KC COMMENTS DATED 1/4/24
REVISED PER KC COMMENTS DATED 6/28/24
7/22/2024
154TH AVE SE
DITCH IMPROVEMENTS
PERMIT SET
2221005.10
12600 SE 38TH STREET
BELLEVUE, WA 98006
CONTACT: DALTON SMITH
PHONE: (888)302-1252
CONNER HOMES
MAPLE HIGHLANDS
154TH AVE SE
DITCH IMPROVEMENTS
SW 1/4, SEC 14, TWN 23, RGE 5, KING COUNTY
MAPLE HIGHLANDS - 154TH AVE SE DITCH IMPROVEMENTS
154TH AVE SE NGRAPHIC SCALE
0 20 40
1" = 20 FEET
10
DATE: July 22, 2024 FILENAME: Q:\2022\2221005\10_CIV\CAD\_King County ROW\2221005-SH-154TH AVE SE DITCH.dwg
C2.1
3
154TH AVE SE DITCH
PLAN & PROFILE
MAX 2:1 DITCH SIDE SLOPE ADJACENT
TO YARDS.
MAX. 4:1 DITCH SIDE SLOPES ADJACENT
TO ROADSIDE.
MAINTAIN EXISTING DITCH SIDE SLOPE
ALONG ROADSIDE.
PROTECT CULVERT INLET/OUTLET.
CUT BACK 6" ROOF DRAIN PIPE TO EDGE
OF WIDENED DITCH. MAINTAIN EXISTING
DISCHARGE.
DITCH TOE.
WHITE DELINEATORS.
4' FLEXIBLE GUIDE POST WITH
REFLECTIVE BANDS, GROUND
MOUNTED.
1
2
3
4
5
6
7
KEYNOTES
1
2
3
1 1
3
4 4
4
6
6
6
7
A SCALE; H:1" = 20', V:1" = 2
DITCH SECTION A B SCALE; H:1" = 20', V:1" = 2
DITCH SECTION B C SCALE; H:1" = 20', V:1" = 2
DITCH SECTION C
4
57
7
08/08/2024
King County DLS - Permitting Approval
Review Engineer Date
Senior Engineer Date
Development Engineer Date
ROWP23-0016
ROWP23-0016 Sheet 3 of 4
8-29-2024
8/29/2024
1
2
3
4
TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
Know what's below.
before you dig.Call
R
253.383.2572 FAX
4
SK/MWGBRI/JT
REVISED PER KC COMMENTS DATED 11/9/23
REVISED PER KC COMMENTS DATED 1/4/24
REVISED PER KC COMMENTS DATED 6/28/24
7/22/2024
154TH AVE SE
DITCH IMPROVEMENTS
PERMIT SET
2221005.10
12600 SE 38TH STREET
BELLEVUE, WA 98006
CONTACT: DALTON SMITH
PHONE: (888)302-1252
CONNER HOMES
MAPLE HIGHLANDS
154TH AVE SE
DITCH IMPROVEMENTS
SW 1/4, SEC 14, TWN 23, RGE 5, KING COUNTY
MAPLE HIGHLANDS - 154TH AVE SE DITCH IMPROVEMENTS
DATE: July 22, 2024 FILENAME: Q:\2022\2221005\10_CIV\CAD\_King County ROW\2221005-SH-154TH AVE SE DITCH.dwg
C2.2
4
DITCH NOTES AND
DETAILSMAX. 4H:1VADJACENT TORO
A
DW
A
Y
WIDTH VARIES
PER PLAN
HEIGHT
PER PLAN
MAX. 2H:1V18"
LINER*NATIVE SOIL
* IMPORTED SOIL COMPACTED TILL LINER
SHALL MEET THE FOLLOWING SPECIFICATIONS:
1.LINER THICKNESS SHALL BE 18 INCHES
AFTER COMPACTION.
2.SOIL SHALL BE COMPACTED TO 95%
MINIMUM DRY DENSITY, MODIFIED
PROCTOR METHOD (ASTM D-1557).
3.SOIL SHOULD BE PLACED IN 6 INCH LIFTS.
4.SOILS MAY BE USED THAT MEET THE
FOLLOWING GRADATION:
SIEVE SIZE PERCENT PASSING
6 INCH 100
4 INCH 90
#4 70 - 100
#200 30 - 100
(1)ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH PERMIT CONDITIONS, THE KING COUNTY CODE (KCC), THE KING COUNTY ROAD DESIGN AND CONSTRUCTION STANDARDS (KCRDCS),
WASHINGTON STATE DOT (WSDOT) STANDARD SPECIFICATIONS AND THE CONDITIONS OF PRELIMINARY APPROVAL. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL
CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TO
KING COUNTY.
(2)THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO THE KING COUNTY DEPARTMENT OF LOCAL SERVICES, PERMITTING DIVISION(DLS-PERMITTING) ENGINEERING REVIEW
CHECKLIST. SOME ELEMENTS MAY HAVE BEEN OVERLOOKED OR MISSED BY THE DLS-PERMITTING PLAN REVIEWER. ANY VARIANCE FROM ADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY
APPROVED BY KING COUNTY PRIOR TO CONSTRUCTION.
(3)APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE,
GAS, ELECTRICAL, ETC.)
(4)BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE DLS[1]PERMITTING'S DEVELOPMENT INSPECTOR, THE APPLICANT, AND THE
APPLICANT'S CONSTRUCTION REPRESENTATIVE.
(5)A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
(6)GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY THROUGH SATURDAY AND 10 A.M. TO 5 P.M. ON SUNDAY, UNLESS OTHERWISE APPROVED WITH A
WRITTEN DECISION BY THE REVIEWING AGENCY.
(7)IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF-SITE WORK. EASEMENTS REQUIRE REVIEW AND
APPROVAL PRIOR TO CONSTRUCTION.
(8)FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL
REQUIREMENTS OF KCRDCS CHAPTER 8 ARE SUBMITTED TO THE DLS-PERMITTING'S DEVELOPMENT INSPECTOR THREE DAYS PRIOR TO CONSTRUCTION.
(9)DATUM SHALL BE NAVD88 UNLESS OTHERWISE APPROVED BY DLS-PERMITTING.
(10)DEWATERING SYSTEM (UNDERDRAIN) CONSTRUCTION SHALL BE WITHIN A RIGHT-OF-WAY OR APPROPRIATE DRAINAGE EASEMENT, BUT NOT UNDERNEATH THE ROADWAY SECTION. ALL UNDERDRAIN
SYSTEMS MUST BE CONSTRUCTED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATIONS.
(11)ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT MAXIMUM DENSITY PER WSDOT STANDARD SPECIFICATIONS 2-03.3(14)D, METHOD C.
(12)OPEN CUTTING OF EXISTING ROADWAYS FOR NON-FRANCHISED UTILITY OR STORM WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY DLS-PERMITTING AND NOTED ON THESE APPROVED
PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH KCRDCS.
(13)THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE,
HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD) SHALL APPLY. WORK IN RIGHT-OF-WAY IS NOT AUTHORIZED UNTIL A TRAFFIC CONTROL PLAN IS APPROVED BY KING COUNTY.
GENERAL NOTES
(1)PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO DLS-PERMITTING PRIOR TO THE CONSTRUCTION OF THE DRAINAGE FACILITIES, PREFERABLY AT
THE PRECONSTRUCTION MEETING.
(2)ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH WSDOT SPECIFICATIONS. THIS SHALL
INCLUDE LEVELING AND COMPACTING THE TRENCH BOTTOM, THE TOP OF THE FOUNDATION MATERIAL, AND ANY REQUIRED PIPE BEDDING, TO A UNIFORM
GRADE SO THAT THE ENTIRE PIPE IS SUPPORTED BY A UNIFORMLY DENSE UNYIELDING BASE.
(3)STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
(4)ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES, NOT LOCATED WITHIN A TRAVELED ROADWAY OR SIDEWALK, SHALL HAVE SOLID
LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS.
(5)ALL CATCH BASIN GRATES SHALL CONFORM TO KCRDCS, WHICH INCLUDES THE STAMPING "OUTFALL TO STREAM, DUMP NO POLLUTANTS" AND "PROPERTY
OF KING COUNTY", EXCEPT THAT PRIVATE DRAINAGE SYSTEMS SHALL NOT HAVE THE WORDS “PROPERTY OF KING COUNTY”.
(6)ALL DRIVEWAY CULVERTS LOCATED WITHIN KING COUNTY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE
EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. CULVERTS SHALL HAVE BEVELED END SECTIONS TO MATCH THE SIDE SLOPE PER KCRDCS.
(7)ROCK FOR EROSION PROTECTION OF ROADWAY DITCHES, WHERE REQUIRED, MUST BE OF SOUND QUARRY ROCK, PLACED TO A DEPTH OF 1 FOOT, AND
MUST MEET THE FOLLOWING SPECIFICATIONS: 4"-8" ROCK/40%-70% PASSING; 2"-4" ROCK/30%-40% PASSING; AND 2" ROCK/10%-20% PASSING. INSTALLATION
SHALL BE IN ACCORDANCE WITH KCRDCS.
(8)DRAINAGE OUTLETS (STUB-OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY KING
COUNTY. STUB-OUTS SHALL CONFORM TO THE FOLLOWING:
a)EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING
DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED
USE. EACH OUTLET SHALL HAVE FREE-FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL
LOCATION.
b)OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE-FOOT-HIGH, 2" X 4" STAKE MARKED "STORM" OR "DRAIN". THE STUB-OUT SHALL EXTEND ABOVE
SURFACE LEVEL, BE VISIBLE, AND BE SECURED TO THE STAKE.
c)PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN KCRDCS AND, IF NON-METALLIC, THE PIPE SHALL CONTAIN WIRE OR
OTHER ACCEPTABLE DETECTION.
d)DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS.
e)THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUB-OUT CONVEYANCE LINES WITH RESPECT TO THE UTILITIES
(E.G. POWER, GAS, TELEPHONE, TELEVISION).
f)ALL INDIVIDUAL STUB-OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOME OWNER.
(9)ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE MUST DEMONSTRATE ONE OF THE FOLLOWING, IN
ACCORDANCE WITH KCC AND THE LOW IMPACT DEVELOPMENT (LID) COMPONENTS OF THE APPROVED SITE PLAN: THE EXISTING DUFF LAYER SHALL BE
STAGED AND REDISTRIBUTED TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL, OR; AMENDED SOIL SHALL BE ADDED TO MAINTAIN THE MOISTURE
CAPACITY.
(10)SEASONAL CLEARING IS LIMITED BETWEEN OCTOBER 1 AND APRIL 30 INCLUSIVE, UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY THE
REVIEWING AGENCY.
(11)IMPROVEMENTS AND/OR BUILDINGS SHALL NOT BE INSTALLED UNTIL DRAINAGE FACILITIES ARE “IN OPERATION”, (KCC 9.04).
DRAINAGE NOTES
1 NOT TO SCALE
DITCH
ROADSIDE PROPERTY SIDE
08/08/2024
King County DLS - Permitting Approval
Review Engineer Date
Senior Engineer Date
Development Engineer Date
ROWP23-0016
ROWP23-0016 Sheet 4 of 4
8-29-2024
8/29/2024