Minor Franchise Permit: MFP24005903
IVR Number: 24005903
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:11/24/2024Application Date:7461410010Parcel Number: 1002 NEWPORT CT NE
Permit Type:12/12/2024Issue Date:Franchise
Permit Work Class:12/12/2025Expiration Date:Minor Utility
Job Number: 101176680Franchise Type:Electric
Description: Puget Sound Energy Electric BORE APPROXIMATELY 455' WITHIN ROW TO REPLACE PRIMARY POWER CABLES
IN NEW CONDUIT. ACCESS P01, V01 V02. CABLES 13449, 1345. POTHOLE ALL EXISTING UTILITIES.
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101176680
1002 NEWPORT CT NE
CARRIE YLENNI 253-720-9700
MFP24005903
Monday Friday 8:00am 3:00pm
Scott Warlick CED 12/12/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
11/24/24
1002 Newport Ct NE Renton WA 98056 USA1616161614141414NE 10TH STNE 10TH STNEWPORT CT NEP01V01BP-1BP-222222222MONROE AVE NEMONROE AVE NENE 10TH STSTO
P
STOP STOPX'≥W20-7AW20-1ROAD
WORKAHEAD W20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥W20-1ROADWORKAHEAD BEPREPAREDTOSTOPW3-4X'≥X'≥W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥
S/W
CLOSED R9-9S/WCLOSEDR9-9SIDEWALKCLOSEDAHEAD R9-11SIDEWALKCLOSEDAHEADR9-11THE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVIna Ustemchuk425-398-6063ina.ustemchuk@pse.com1 OF 31002 Newport Ct NE, Renton, WA0 11941477 11/20/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 012928Card Exp. 07/31/2025Ina.Ustemchuk@pse.com(425)424-6063MFP24005903
1002 Newport Ct NE Renton WA 98056 USA161616161414NE 10TH STNE 10TH STNEWPORT CT NEV01BP-2BP-322222222MONROE AVE NEMONROE AVE NENE 10TH STSTOP STOPW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROADWORK
AHEAD
BEPREPARED
TOSTOP W3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADTHE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREAS/WCLOSEDR9-9 S/WCLOSEDR9-9Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVIna Ustemchuk425-398-6063ina.ustemchuk@pse.com2 OF 31002 Newport Ct NE, Renton, WA0 11941477 11/20/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 012928Card Exp. 07/31/2025Ina.Ustemchuk@pse.com(425)424-6063NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP24005903
1002 Newport Ct NE Renton WA 98056 USA161616161414NE 10TH STNE 10TH STNEWPORT CT NEV02BP-3BP-422222222MONROE AVE NEMONROE AVE NENE 10TH STSTOP STOPW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROAD
WORK
AHEAD
BEPREPARED
TOSTOP W3-4X'≥X'≥X'≥W20-7ATHE CREW SHALL CEASEWORK AND ESCORT PEDESTRIANSAROUND/THRU WORK AREARESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 684-5444
NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREAS/WCLOSEDR9-9
S
/W
C
LO
S
E
D
R9-9W20-1ROADWORKAHEADProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVIna Ustemchuk425-398-6063ina.ustemchuk@pse.com3 OF 31002 Newport Ct NE, Renton, WA0 11941477 11/20/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 012928Card Exp. 07/31/2025Ina.Ustemchuk@pse.com(425)424-6063NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP24005903
OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on
the neutral bus, replace it.
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All
copper shall be coiled and returned the day it is removed from the poles. Remove all unused
pins and insulators.
- Return all Street lights, area lights and floodlights.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re-issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
Traffic /Pedestrian control notes
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs, barricades, and traffic control in conformance with local permit regulations.
-Provide route for pedestrians when working on or near sidewalks.
-Maintain traffic flow as required by permitting agency.
NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS
UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT.
REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE
J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0
JACKETED CABLE.
UNDERGROUND CONSTRUCTION
Additional notes to standards.
-Erosion control must be placed before construction starts. Silt bags must be installed in
downstream catch basins.
Existing Utilities:
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
structures to support and protect underground utilities while exposed during construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings. Maintain
24" minimum separation between new trench or tunnel and parallel existing utilities or as
required by the permit agency.
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
36" of cover for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
- No rocks larger than 8" shall be included in backfill.
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
as required by the permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Hand holes
- Refer to PSE standard 6775.0040 "Vault and Hand hole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with
final grade when placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- Civil crew to install Conduit plug on each end until new cable to be installed.
- All "spare" conduits shall be capped at each end.
Surface Restoration
Restore ground surface to original contour and original condition or better. Restore asphalt
and concrete in accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
SCOPE OF WORK
The general scope of this project is to remediate primary cables within the project area by the most economic
means possible using replacement, or abandonment.
The project involves replacing existing electrical cables in new conduit.
Project type : Planned
Project location :
Number of Cables : 2
Cable Footage Estimated : 505'
Cable Numbers Injected : 0
Cable Numbers Repaired : 0
Cable Numbers Abandoned : 0
Cable Numbers Replaced : 13449, 13450
Trench Footage Estimated : 505'
There will be an advance notice provided by the contractor
24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their
driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to
manage access.
Traffic Revisions
Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work
hours.
For more information on the project
24-hour project information (888) 471-7339, (360) 825-5236
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
JOB SITE
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENANCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11941477 101176680
N/A
108157746
OVERHEAD CIRCUIT: MAP # .
SCALE 6" = 1 MILE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 10/14/24
A. NAWFAL 253-259-7147 10/14/24
N/A N/A N/A
A. VORNBROCK 253-677-2164 10/14/24
REQ-CITY OF RENTON
PRE-11 NEWPORT CT NE CRP 2026
CABLE REMEDIATION PROGRAM
1002 NEWPORT CT NE, RENTON, WA 98056
N/A N/A
N/A 101176680
AS NOTED 1 OF 3
KING N/A N/A QSEPRE
NE 09-05-23 N/A N/A
2305E033 2305E040 2305E033 PRE-11
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 1011766801002 NEWPORT CT NE, RENTON, WA 98056
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN, PRE-POST CONSTRUCTION UNDERGROUND MAP
PAGE 3 - PRIMARY CABLE/CONDUIT DIAGRAM, EXISTING CABLE MAPPING
Overflow
Filter fabric walls for
Catch Basin Grate
dewatering sedimentCollected Sediment
Catch Basin Insert
MID 9995728
Filter fabric skirt
Secured with grate.
EROSION CONTROL
NOT TO SCALE
2305E040
LEGEND
SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV
THREE PHASE WIRE/CABLE - 12.5 KV
CABLE TERMINATION BUS (J-BOX)
NEW OVERHEAD TO UNDERGROUND CABLE
OVERHEAD TO UNDERGROUND CABLE TERM.
10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE
TOTAL UNDERGROUND XFMR (T.U.T.)
NEW COMBINATION J-BOX/PADMOUNT XFMR
UNDERGROUND COMBINATION J-BOX/XFMR
N.T.S. = NOT TO SCALE
X.F.M.R. = TRANSFORMER
P.E. = POLYETHYLENE
ABBREVIATIONS
PRIMARY METERING
CABLE SPLICE
FAULT INDICATOR
WILL NOT PHASE (WNØ)
NORMAL OPEN (N.O.)
FUSED DISCONNECT:
SOLID BLADE DISCONNECT
HANDHOLE
PULL VAULT
UNDERGROUND SWITCH
UNDERGROUND J-BOX
NEW PADMOUNT XFMR
NEW UNDERGROUND XFMR
PAD MOUNT XFMR
ELECTRONIC MARKER
COMBINATION J-BOX/PADMOUNT XFMR
NEW UNDERGROUND COMBINATION J-BOX/XFMR
TERMINATION
CABLE TO REPLACE
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
EASEMENT
CL
Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
(ROW) 36" MIN Cover
(PVT PROP)
36" MIN
48"
Max
Backfill
(No rocks over 8" diameter)
3" Bedding Clean Native Soil, Sand or 5/8" Minus
12" Typical
TRENCH DETAIL
NOT TO SCALE
12" Min Shading Clean Native Soil, Sand or 5/8" Minus
- A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter.
FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL
PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN
12"
MIN
48" MAX
36" MIN
EXISTING
PAVEMENT / SIDEWALK
VERTICAL SAW
CUT LINE
CRUSHED SURFACING
MATERIAL COMPACT
TO 95% MAX DENSITY.
EXCAVATION AND HARD RESTORATION DETAIL
NOT TO SCALE
12" MIN
3" Sand Bedding or 5/8" Minus
12" Min Sand Shading or 5/8" Minus
12" MIN
ASPHALT PATCH, 2" MIN
MATCH EXISTING
Conduit
(ROW) 36" MIN
(PVT PROP)
36" MIN
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
PSE: PLANNER
355 - 110TH AVE NE
BELLEVUE, WA 98004
STEPHEN HARTNETT
425-283-9970
ABANDONING PRIMARY CABLES PSE std. 6825.6200
In a Vault if the cable is
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot
from the vault wall. Install a cap on the tail.
-When practical, attach the old cable
number to the cable stub.
______________________________________________________________________________________
In a Minipad hand hole
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical. Install a cap on the tail.
-When practical, attach the old cable number to
the cable stub.
-Stuff the tail into the bottom of the
handhole. Be sure the new cables are not
trapped by the old cables or the concentric
neutrals.
______________________________________________________________________________________
At Risers if the cable is
______________________________________________________________________________________
In Conduit -Remove Cable
______________________________________________________________________________________
Direct buried or it cannot be pulled out, -Cut off the cable at the top of the riser. Install a cap on the tail.
and the pole will remain. -When practical, attach the old cable number to the cable stub.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Remove the riser.
and the pole will be replaced -Cut off old cable just below grade.
-Re-fill ground back to existing grade.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Cut off the cable just below grade.
and the pole will be removed
______________________________________________________________________________________
NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets
(unless they support other conduits).
NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000,
"Transite Pipe Removal and Disposal."
_______________________________________________________________________________________
-Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in
place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant
to moisture, low temperature, and corrosive agents).
-For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager
(206-994-3186) to have a contractor dispatched.
Procedure to Abandon Primary Cables:
1. Call the Systems Operator to request a clearance.
2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice
0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator.
3. Obtain a clearance from the Systems Operator on the cable to be abandoned.
4. Cut the ends of the cable.
5. The cable number tag may be left on the abandoned cable.
NOTE: The cable number shall not be reused.
6. Call the Systems Operator and release the clearance.
7. Remove all "Danger Do Not Operate" tags.
8. The System Operator will then close the O# (Operations number).
Existing System:
Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable
existing system only to make cutovers and connections as directed by PSE System Operator.
Trench Method:
CABLE REPLACEMENT
Approximate Trench Footage:
Abandon Cable Segments:
Approximate New 1Ø Cable Footage:
Approximate 2" Poly Conduit Footage:
Replaced Cable Segments:
BORE
455'
0'/455'
0
2
520'
Vaults:
455'
Approximate Trench PVT/ROW:
0
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
VICINITY MAP
10/18/24253-259-7147A. NAWFAL
NAWFAL ALJARAH
10/18/2024
MFP24005903
1002
40T
65T
X9849
T93460
1010
1006
1014
10181022
1026
1030
1034
1033
1029 1025
1001
916
3301
3305 3309
3313
3317
3401 3405
NE 10TH ST (PAVED)MONROE AVE NE (PAVED)P# 7461410010
P# 7461410140
P# 7461410020
P# 7461410030
P# 7461410040
P# 7461410050P# 7461410060
P# 7461410070
P# 7461410080
P# 7461410090
P# 7461410100
P# 7461410110 P# 7461410120
P# 0424000015
P# 0424000020P# 0424000025
P# 0424000030P# 0424000035P# 0424000040
P# 0424000045P# 0424000050
EOP=36'
ROW=60'
FHFH
CB
CB
CB
CB
FH
CB
CB
BP-1BORE ~ 185'OPEN TRENCH ~ 5'
BP-2BP-3BP-4
B
O
R
E
~
5
0
'
PH-1
PH-2
PH-3NEWPORT CT NE (PAVED)1002
P# 7461410130
EOP=35'
ROW=50'
ROW=50'
EOP=38'
S/W
S/WS/W
S/W S/W
S/W
S/WBORE ~ 215'
40T
X9849
CUT AND
ABANDON
AØ13450
NEWPOR
T
C
T
N
E
NE 10TH ST
CUT AND
ABANDON
AØ13449
65T
T93460NEWPORT
CT
NE
NE 10TH ST
AØ - EJX056
AØ - EJX057
SITE PLAN
SCALE: 1:50
CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY.
CIRCUIT FEET REMOVED: 507'
CIRCUIT FEET ADDED: 455'
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT
LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED
UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT
INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL
WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT
ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE
RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS
(FOREMAN'S COPIES) AT THE END OF THE JOB.
PRE-CON UNDERGROUND MAP: # .
SCALE: 1:100
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 10/14/24
A. NAWFAL 253-259-7147 10/14/24
N/A N/A N/A
A. VORNBROCK 253-677-2164 10/14/24
REQ-CITY OF RENTON
PRE-11 NEWPORT CT NE CRP 2026
CABLE REMEDIATION PROGRAM
1002 NEWPORT CT NE, RENTON, WA 98056
N/A N/A
N/A 101176680
AS NOTED 2 OF 3
KING N/A N/A QSEPRE
NE 09-05-23 N/A N/A
2305E033 2305E040 2305E033 PRE-11
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
2305E033 101176680FOREMAN NOTE:
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7
BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE
TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS &
BODILY INJURY.
Potelco, Inc.DESIGNED BY
MAPS & RECORDS NOTE:
UPDATE THE LOCATION OF THE FOLLOWING EQUIPMENT.
P01 IS APPROX. 6' SOUTH & 10' WEST OF EXISTING PSE MAPS LOCATION.
V01 IS APPROX. 14' SOUTH & 3' WEST OF EXISTING PSE MAPS LOCATION.
V02 IS APPROX. 22' SOUTH & 13' EAST OF EXISTING PSE MAPS LOCATION.
EXISTING WATER
EXISTING POWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING STORM DRAIN
EXISTING SEWER
LEGEND
EXISTING FIBER OPTIC
STREET CENTER LINECL
RIGHT OF WAY
CABLE TO REPLACE
BORE PIT
BORE PIT"BP"-
NEW J-BOX VAULT
PROPERTY LINE
EASEMENT
POT HOLE
POT HOLE"PH"-
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
TOP VIEW
CONDUIT RISER REPLACEMENT DETAIL @ P01
NOT TO SCALE
CONSTRUCTION NOTES
P01
-CUT OFF CABLES AT TOP OF RISER
-INSTALL A CAP ON THE TAIL
-ATTACH OLD CABLE # TO CABLE STUB
-REMOVE OLD C/O & TERM
-INSTALL 1Ø LI C/O TERM F:65T STD 6043.1000 (TSU1C1)
-INSTALL 1-2" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS2CSS)
-INSTALL SW# T93460 STD 6300.0750
-INSTALL SWITCHBOARD 12' ABOVE GROUND STD 6300.4000
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
ABANDONED
CABLE LEFT IN
PLACE
ABANDON
CIRCUITRYFROM TO
13449 10507249 P01 V01 216 YES NO
1345 10507264 V01 V02 291 YES NO
TOTAL CIRCUIT FEET 507'
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
V01 318494
166905
EXISTING
VAULT
75kVA TUT XFMR
120/240v
EXISTING
2 -
REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V01 318498
166880
EXISTING
VAULT
75kVA TUT XFMR
120/240v
EXISTING
1 -
REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
TOTALS :3 -
POST-CON UNDERGROUND MAP: # .
SCALE: 1:100
2305E033
Electric Cable in HDPE Conduit
Final Grade
24" Typical
(6" Min)
36" Min
Cover
Backfill shall not damage the conduit.
Backfill hard surface w/
while directional drilling
36" Min
Depth
Final Grade
24" Typical
(6" Min)8' Longcrushed rock 5/8 minus
Backfill soft surface with
clean natural material
PLAN VIEWTYPICAL BORE COVER
Will maintain 36" Min. depth
BORE PIT DETAIL
NOT TO SCALE
BORE PIT
POT HOLE
*NOTE:BORE PITS, TRENCH HATCHING & POTHOLES ARE NOT
SHOWN TO SCALE FOR VISUAL PURPOSES. PLEASE SEE BORE
PIT DETAIL FOR TYP. BORE PIT & TRENCH DIMENSIONS.
4" Min Shading Clean Native
Soil, Sand or 5/8" Minus
2" Min Bedding Clean Native
Soil, Sand or 5/8" Minus
A. NAWFAL 10/18/24253-259-7147
MFP24005903
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
65T
T93460
EJX056 - AØ
118.33 lbs 49.92 lbs137.10 lbs 138.58 lbs
EJX057 - AØ
1-2" - L______'
2-2" - L______'
65T
T93460
1-2" - L______'
1002
40T
65T
X9849
T93460
1010
1006
1014
10181022
1026
1030
1034
1033
1029 1025
1001
916 3301
3305 3309
3313
3317
3401 3405
NE 10TH ST (PAVED)MONROE AVE NE (PAVED)P# 7461410010
P# 7461410140
P# 7461410020
P# 7461410030
P# 7461410040
P# 7461410050P# 7461410060
P# 7461410070
P# 7461410080
P# 7461410090
P# 7461410100
P# 7461410110 P# 7461410120
P# 0424000015
P# 0424000020
P# 0424000025
P# 0424000030P# 0424000035P# 0424000040
P# 0424000045P# 0424000050
EOP=36'
ROW=60'
BP-1BORE ~ 185'OPEN TRENCH ~ 5'
BP-2BP-3BP-4
B
O
R
E
~
5
0
'
PH-1
PH-2
PH-3
LEGEND
CLP= CENTER LINE OF PAVEMENT
EOB= EDGE OF BUILDING
PROP= EDGE OF PROPERTY LINE
RM= ROAD MONUMENT
EOR= EDGE OF ROAD
EXISTING CABLES LOCATION PROVIDED BY:
LOCATES TICKET # ___ ____________
EXISTING ___' E EOR
PROPOSED 7' E EOR
BUILT ___' E EOR NEWPORT CT NE (PAVED)EXISTING ___' N EOR
PROPOSED 22' N EOR
BUILT ___' N EOR
EXISTING ___' E EOR
PROPOSED 8' E EOR
BUILT ___' E EOR
1002
P# 7461410130
EOP=35'
ROW=50'
ROW=50'
EOP=38'
S/W
S/WS/W
S/W S/W
S/W
S/WBORE ~ 215'
PRIMARY CABLE DIAGRAM
NOT TO SCALE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 10/14/24
A. NAWFAL 253-259-7147 10/14/24
N/A N/A N/A
A. VORNBROCK 253-677-2164 10/14/24
REQ-CITY OF RENTON
PRE-11 NEWPORT CT NE CRP 2026
CABLE REMEDIATION PROGRAM
1002 NEWPORT CT NE, RENTON, WA 98056
N/A N/A
N/A 101176680
AS NOTED 3 OF 3
KING N/A N/A QSEPRE
NE 09-05-23 N/A N/A
2305E033 2305E040 2305E033 PRE-11
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101176680CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC
ALL 2" - 45° BENDS SCH-80 PVC
- ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL
CABLE IS INSTALLED
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO
SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
P01 V01 2 1 190 49.92 118.33 1/0 AL JKT 235 EJX056 --0.6
V01 V02 2 1 265 137.10 138.58 1/0 AL JKT 285 EJX057 --0.9
TOTAL 2"455'TOTAL 1Ø 520'TOTAL LUBE 1.5
PRIMARY CONDUIT DIAGRAM
NOT TO SCALE
EXISTING CABLE MAPPING
SCALE: 1:50
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION PROPERTY
CLASSIFCATION
SIZE (FT) REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
COMMON SURFACE
TYPES
REMARKS
BP-1 BORE PIT ROW 2 X 8 X 3 1.8 1.8 ASPHALT
BP-2 BORE PIT ROW 2 X 8 X 3 1.8 1.8 CONCRETE
BP-3 BORE PIT ROW 2 X 14 X 3 3.1 3.1 CONCRETE
BP-4 BORE PIT ROW 2 X 8 X 3 1.8 1.8 CONCRETE
OPEN TRENCH TRENCH ROW 1 X 5 X 3 0.6 0.6 CONCRETE
TOTAL PVT PROP CU YDS (APPX)0.0 0.0
TOTAL ROW CU YDS (APPX)9.0 9.0
TOTAL CU YDS (APPX)9.0 9.0
A. NAWFAL 10/18/24253-259-7147
MFP24005903