Loading...
HomeMy WebLinkAboutMFP24005808.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24005808 IVR Number: 24005808 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:11/18/2024Application Date:3223059070Parcel Number: 18409 107TH PL SE Permit Type:12/13/2024Issue Date:Franchise Permit Work Class:12/15/2025Expiration Date:Minor Utility Job Number: 101157859Franchise Type:Electric Description: Puget Sound Energy Electric PRE CONSTRUCTION MEETING REQUIRED TO REVIEW TRAFFIC CONTROL IN THE FIELD. CREW TO UPGRADE TRANSFORMER AT 316258 166271. CREW TO OPEN/CLOSE SW 4968 AT 316251 166288 AND DE ENERGIZE LINE TO WORK AT V01. NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101157859 18409 107TH PL SE ADRIAN CENTENO 253-308-8953 MFP24005808 Monday Friday 8:00am 3:00pm Scott Warlick CED 12/13/2024 Pre-construction meeting required to discus traffic control Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 11/18/24 18409 107th Pl SE Renton WA 98055 USA 111111111191291115151111 11 11 SE 184TH LN 12121717108TH AVE SE - SR 515108TH AVE SE - SR 515SE 184TH LN SE 184TH LN107TH CT SE2222 107TH PL SE11912911 11912911 1111SE 186TH ST SE 18 6 T H S T SE 182ND ST 108TH AVE SE - SR 515P01 V01 S/ WCL O S E DR9-9S/WCLOSEDR9-9DETOURM4-9BALLOW 4' MIN FOR PEDESTRIAN BYPASS PROTECTIVE VEHICLE 108TH AVE SE - SR 515ARRW-BRDUSE TRAFFIC DRUMS WITH STEADY TYPE C BURNING LIGHTS CONETOPPER CONETOPPER KEEP R4-7B RIGHT KEEP R4-7B RIGHT 121212KEEPR4-7BRIGHTW1-4LW20-1ROAD WORK AHEAD CENTER LANE CLOSEDAHEAD W9-3W4-2LX'≥X'≥X'≥W20-1 ROADWORKAHEADX'≥ X'≥CENTER LANECLOSEDAHEADW9- 3 X'≥W20-1ROADWORKAHEADCENTER LANECLOSEDAHEADW9-3X'≥ W20-1 ROADWORKAHEADCENTER LANECLOSEDAHEADW9-3 X'≥X'≥CENTER LANECLOSEDAHEADW9-3X'≥W20-1ROADWORKAHEADX'≥W20-1ROADWORKAHEADX'≥W20-1ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2RX'≥X'≥X'≥W20-1 ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5R X'≥X'≥N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Greg Harwood (425) 424-6425 gregory.harwood@pse.com 1 OF 418409 107th Pl SE, Renton, WA 0 11918399 11/01/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, signaling and flaggers shall conform to WAC 296-155-305. Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. 9. Work area will be (fill in locations by CL: street/avenue etc). MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND POLE CHEVRON ARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAYX'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-11050'X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROADWORK AHEAD W20-1ROADWORKAHEADW20-11050' MFP24005808 18409 107th Pl SE Renton WA 98055 USA1111 11 11 11912911151511111111SE 184TH LN12121717 108TH AVE SE - SR 515108TH AVE SE - SR 515SE 184TH LNSE 184TH LN107TH CT SE2222 107TH PL SESE 186TH STSE 186TH STP01V01STOP 12 12 12 STO PSTOPSTOP W20-1 ROADWORKAHEADW20-4 ONE LANEROADAHEADX'≥X'≥W20-7AX'≥W20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥W20-7AX'≥W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥W20-1ROAD WORK AHEA D BEPREPA R E D TO STOP W3-4X'≥X'≥W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥W20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADX'≥FROM TO TOW AWAY AREA PHON E 8 88- 99 99 INFRASO U R C E L L C 0 0 0 0 0 00 0 00 NO PARKINGNO-PARK FROM TOTOW AWA Y A R E A PHONE 888 - 9 9 9 9 INFRASOURCE L L C 0 0 0 0 0 0 0 0 0 0 NO PARKI N G NO-PARK W20-4ONE LANEROADAHEADX'≥AFTER POLE WORKKEEP S/W OPENW20-1 ROADWORKAHEADW20-4 ONE LANEROADAHEADX'≥X'≥X'≥X'≥BEPREPAREDTOSTOPW3-4 W20-7A CROSS HERE S/W CLOSED R9-11ANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVGreg Harwood(425) 424-6425gregory.harwood@pse.com2 OF 418409 107th Pl SE, Renton, WA0 11918399 11/01/2024TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise ind icated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.9. Work area will be (fill in locations by CL: street/avenueetc).MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--84028" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYUG VAULTVaultMFP24005808Pre-construction meetingrequired to discus trafficcontrol 5'8'Cold Mix5' x 8'steel plate3/4"-1" thick,non-skidmaterialcold mixcold mixnon-skid plateSIDEWALKCLOSEDSIDEWALKCLOSEDCrew will create pedestrian/wheelchair ADA compliant rampsand assist pedestrians aroundwork area.TYPICAL CONFIGURATIONFOR PEDESTRIAN AND BIKEDIVERSION FOR SIDEWALK ORWALKWAY CLOSURES (OUTSIDE)5' MiniumumCrew will create pedestrian/wheelchair compliant rampsand assist pedestrians aroundwork area.Add additional conesfor safetySIDEWALKCLOSEDR9-9SIDEWALKCLOSEDR9-9 TYPICAL CONFIGURATIONFOR PEDESTRIAN AND BIKEDIVERSION FOR SIDEWALK ORWALKWAY CLOSURES (INSIDE)curb faceLevel Landingfrom Sidewalk to curb edgenon-skid materialLevel Landingfrom Ramp ontostreet surfacenon-skid materialRamp Surface ADA compliant (12:1 slope)non-skid material (crew will assist)Stabilized material forfull ramp support12:1 slope4' M in imum 6" Min ADA compliantdetectable strip8_X_10-PLATE CREW WILL USE ADA COMPLIANTRAMPS FOR PEDESTRIANDIVERSION(SEE ATTACHED SHEET FOR DETAILS)Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVGreg Harwood(425) 424-6425gregory.harwood@pse.com3 OF 418409 107th Pl SE, Renton, WA0 11918399 11/01/2024NPEDESTRIAN BYPASS DETAILPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES ”” – Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Greg Harwood (425) 424-6425 gregory.harwood@pse.com 4 OF 418409 107th Pl SE, Renton, WA 0 11918399 11/01/2024 Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027 gregory.harwood@pse.com (425)424-6425 '18412'107TH PL SESE 184TH LN '18406' '18418' '18405' '18409' '18417' '10754' '18401' '18402'108TH AVE SEREPLACE EXST XFMR W/ 50kVA 120/240V V01 316258 166271 37.5kVA120/240V P01 316251 166288 40TX4968 JOB SITE V01 316258 166271 37.5kVA120/240V REPLACE EXST XFMRW/ 50kVA 120/240V P01 316251166288 40TX4968 Potelco, Inc.DESIGNED BY THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11918399 101157859 N/A N/A N/A 584049619 594XXXXXX For contacts below dial 1-888-CALL PSE (225-5773) Contact Information FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met. N/A N/A N/A GENERAL UNDERGROUND NOTES: CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS. OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRENCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING. INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE. PROVIDE3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. THE REMAINING BACKFILL MAY CONSIST OF NATIVE MATERIALS IF SUITABLE (I.E.; FREE FROM ROCKS, SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUITS). IF NATIVE MATERIALS ARE UNSUITABLE,AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED.THE SPOILS PILE MUST BELOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH.THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING-SERVICE: THE CUSTOMER'S SERVICE TRENCH MUST MEET STATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH WORK PIT MUST BE PROVIDEDAT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADGACENT UTILITY SERVICES. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK IS TO BE USED AS THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTIBLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & THE SIDES OFTHE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GRADE STAKES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'SFACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. SITE PLAN SCALE: 1:50 Removed at site:Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01316258-16627137.5kVA Installed at site:Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information V01316258-16627150kVA 120/240v6247100 EXISTING UG MAP: 2305E127 SCALE: 1:100 101157859_R1VICINITY MAP UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. CENTENO 253-308-8953 08/15/24 A. CRAWFORD 425-559-5712 08/15/24 N/A N/A N/A K. BUCKLEY 253-308-8947 08/15/24 N/A CITY OF RENTON OTEP PAN-15 TRANSFORMER REPLACEMENT UPGRADE (1) PM TRANSFORMER 18409 107TH PL SE, RENTON, WA 98055 N/A N/A 101157859 AS NOTED 1 OF 1 KING N/A N/A QCSOKE T23N-R05E-32S N/A N/A 2305E127 2305E136 2305E127 PAN-15 8/15/24 K.BUCKLEY ADDED WORK AT P01 N/A N/A N/A N/A N/A N/A K. STOKES 253-308-7359 08/15/24 JOB SITE POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Anydeviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED onthe Foremans' Copy.2. All switching arrangements and/or outage arrangements are to be made with the Project Manager atleast three (3) working days in advance.3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior tocommencing work to get the underground facilities located.4. All work is to be done in accordance with local municipal and county permit requirements asapplicable.5. Inclement weather conditions may cause delays in construction times and dates. TRANSFORMER Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Electric Construction Notes LB DC V01 316258 166271 EXST36X42X38 Unistrut HHMatid: 7663001 NEW PM XFMR 50kVA, 120/240V Matid: 6247100 2 - SITE SPECIFIC NOTES V01 (316258-166271) - REMOVE EXISTING 37.5kVA 120/240v TRANSFORMER.2-45X- INST NEW 50kVA 120/240v TRANSFORMER IN EXISTING VAULT.- INST 2 NEW 1/0 PRI ELBOWS (6041.1000 ELB10J)2-57 (2) -RECONNECT EXIST SEC SVCS XFMR SELECTION Existing XFMR Proposed XFMR Location Nameplate Rating (kVA) Residential Peak Demand Peak Demand Percent of Nameplate (%) Max. Allowable Peak Demand Percent of Nameplate (%) (Sec. 6315.0032) kW kVA Nameplate Rating (kVA) Peak Demand Percent of Nameplate (%) V01 37.5 40 42.1 112.3 100 50 84.2 P01 (316251-166288) - OPEN SW X4968 TO DE-ENERGIZE PRI CABLE FOR WORK AT V01 - CLOSE SW X4968 WHEN WORK AT V01 IS COMPLETE Signature _________________________________________ KATHERINE STOKESPrint Name _________________________________________ POTELCO DESIGN AND QUALITY ASSURANCE This design complies with PSEDesign/Engineering Standards.Any/all variations have been pre-approved/documented by theappropriate PSE Representative. Date _________________08/15/24 X MFP24005808Pre-construction meeting required to discus traffic control