Loading...
HomeMy WebLinkAboutSWP2702248 ........................ ........... .. .............. ...... ..... ................................................ ... .. .. ............. .. ........... ............. ... . ... ........ ...... ...... ..... ..... ...... ..... ....... ...... CITY OF RUJTON E E , „ E GEOTECHNICAL REPORT ,,::::.:: U 5 3 BU ILDING Fire Station #14 Lind Avenue SW and SW 19th Street >` Renton, Washington Project No. T-2802 :: .... ........................ . ....... . Terra Associates, Inc. ► , �. 1 Prepared for: Mr. Jim Paxton City of Renton Renton, Washington RAC AR 2 � 1995 So March 24, 1995 .... . .::: .. r-- 1 TERRA ASSOCIATES, Inc. Consultants in Geotechnical Engineering, Geology A. .y and Environmental Earth Sciences March 24, 1995 Project No. T-2802 F Mr. Jim Paxton CIP Coordinator City of Renton 200 Mill Avenue South Renton,Washington 98055 Subject: Geotechnical Report Fire Station#14 Lind Avenue SW and SW 19th Street Renton, Washington Dear Mr. Paxton: The attached report presents the results of the geotechnical engineering study we completed for the subject project. We conducted our work in accordance with your instructions and authorization. The test borings drilled at the site indicate the site is generally underlain by about 7 to 11 feet of medium dense fill soils followed by 7 to 12 feet of compressible peat. Below the peat, medium dense to dense water-bearing sands interbedded with clay layers are found to a depth of about 30 feet followed by very dense sandy gravel and coarse sand. With the compressible layer, analysis indicates that any additional loads imposed will result in time- dependent settlements. Because of these conditions, in our opinion, the building should be supported on a pile foundation. Full discussion and recommendations pertaining to specific geotechnical design issues are included in i� the text of this report. r We appreciate the opportunity to be of service to you on this project. If you have any questions or need additional information, please call. Sincerely yours, TERRA ASSOCIATES,INC. inesh R. Katti, Ph.D. Project Engineer eheodore J. Sch per,P.E. L- Principal Engineer ocPtAEs 6/18/95 DRK/TJS:jk 12525 Willows Road, Suite 101, Kirkland, Washington 98034 • Phone (206) 821-7777 t TABLE OF CONTENTS Page 1.0 Project Description 1 2.0 Scope of Work 2 3.0 Site Conditions 2 3.1 Surface 2 3.2 Subsurface 2 tl 3.3 Groundwater 3 .� 4.0 Discussions and Recommendations 3 4.1 General 3 4.2 Site Preparation and Grading 4 4.3 Excavations 5 4.4 Pile Foundations 5 4.5 Underground Tank Walls 6 4.6 Exterior Grading and Drainage 6 4.7 Pavements 6 4.8 Utilities 7 4.9 Detention Ponds 7 5.0 Additional Services 7 6.0 Limitations 8 Figures Vicinity Map Figure l Exploration Location Plan Figure 2 Soil Classification System Figure 3 Boring Logs Figures 4 through 13 R Grain Size Analyses Figures 14 through 17 Appendix Field Exploration and Laboratory Testing Appendix A t (i) 4 a Geotechnical Report Fire Station #14 Lind Avenue SW and SW 19th Street Renton, Washington i if 1.0 PROJECT DESCRIPTION The project site is located southeast of the intersection of Lind Avenue SW and SW 19th Street in Renton, Washington. The approximate site location is shown on the Vicinity Map, Figure 1. The proposed fire station building will be a single-story building along with fire engine bays, a paved training area, parking areas, and stormwater detention ponds. We also understand it is planned to construct a four story training tower in the training area south of the building. A drafting pit for testing fire engine pumps is also planned. Although the finish floor elevations were not known at the time of our study, the project architect indicated to us that the grades would likely be close to existing grades. The fire station building will be of wood-frame or light gage steel construction. Some areas may have Concrete Masonry Unit (CMU) block bearing walls. Based on discussions with your structural engineer, the structural loads will be about 15 kips for isolated columns and 1.8 to 2 kips per foot for continuous bearing walls. The floor loads in the fire engine bays will be about 300 pounds per square foot (psf). The training area and the driveway leading out of the engine bays will be heavily loaded. Other parking areas will consist of passenger cars and will be lightly loaded. The training tower will be designed as a four story CMU block building with grouted cells. The tower will be 20 feet wide and 20 feet long with an exterior stairway. The bottom level will be 20 feet wide and 40 feet long. The structural loads for the tower were not available. The plans for the drafting pit were not prepared at the time of our study. The pits are generally below ground and extend to a depth of 12 feet. We will provide specific geotechnical recommendations for the design and construction of the drafting pit once the plans are prepared. The recommendations contained in the followingsections of this report are based on our understanding of the P above design features. If actual features vary or changes are made, we should review them in order to modify our recommendations as required. We should review final design drawings and specifications to verify that our recommendations have been properly interpreted and incorporated into project design. L L L March 24, 1995 Project No. T-2802 ' 2.0 SCOPE OF WORK T We outlined our scope of work in detail in our proposal to the City of Renton dated January 24, 1995. Our proposal was accepted and we received authorization to proceed with our study on February 24, 1995. On February 27 through March 3, 1995, we advanced ten test borings to a depth of 16.5 to 51.5 feet below existing surface grade. Using the soil information obtained, we performed analyses to develop geotechnical recommendations for project design and construction. Specifically, this report addresses the following: i0 Soil and groundwater conditions • Site preparation and grading Foundation support alternatives,including pile capacities • Lateral earth pressures • Site drainage recommendations • Characterization of settlement potential of site soils • Utility construction • Pavements • Detention ponds 3.0 SITE CONDITIONS 3.1 Surface The site is located to the southeast of the intersection of Lind Avenue SW and SW 19th Street. The site measures approximately 640 feet in the north-south direction and 420 feet in the east-west direction. The site is presently undeveloped and is covered with field grass, some young trees, and brush. Wetlands are located to the east and south. Smaller isolated wetlands are located in the southern portion of the site. Two mounds are located in the northern portion of the site. These mounds are approximately three to four feet high above adjacent ground surface. The remaining portion of the site is relatively flat. The property west of the site beyond Lind Avenue SW is developed and consists of a large office building. 9 3.2 Subsurface Near-surface soils consist of 7 to 11 feet of fill. Our study of the aerial photographs indicates that this fill was placed between 1967 and 1968. These fills are generally medium dense and are composed of silty sands with gravel. The fills are underlain by 7 to 12 feet of soft to stiff peat. Medium dense to dense black sand interbedded with stiff wet organic clay or silt layers were encountered underneath this layer to a depth of about 30 feet. The interbedded clay/silt layers varied in thickness from about six to eight inches to six feet. Below a depth of about 30 feet,we generally encountered very dense sandy gravels or coarse sands. L LPage No. 2 March 24, 1995 Project No. T-2802 Two mounds located in the northern portion of the site consist of up to four feet of very loose and wet silty sand '- with considerable organic matter and debris. The debris we encountered consisted of rubber tires, bottles, cans, mattresses, and isolated chunks of concrete. These mounds will be referred to as "spoils" in this report. Our review of aerial photographs indicates that these spoils were dumped on the site between 1980 and 1985. i- The preceding discussion is intended as a general review of the soil conditions we encountered. For a more detailed description,please refer to the attached Boring Logs, Figures 4 through 13. a 3.3 Groundwater 7 +�+ We encountered groundwater in nine of the ten borings drilled on-site. We did not encounter groundwater during drilling of Boring B-6, which was drilled to a depth of about 15 feet. The water levels observed ranged from 6 to 14 feet below existing surface grades. Where groundwater was encountered, the sands underneath the peats generally heaved. The groundwater levels are shown on the Boring Logs,Figures 4 through 13. The water levels will fluctuate depending on seasonal conditions. Our reconnaissance of the site a few days after heavy precipitation indicated two to six inches of standing water over the entire site. 4.0 DISCUSSIONS AND RECOMMENDATIONS 4.1 General Based on our study, it is our opinion that construction of the fire station is feasible from a geotechnical engineering standpoint. The primary geotechnical concern that will impact development as planned is the presence of the compressible peat layer. This stratum is susceptible to excessive time-dependent settlements if building and slab loads are imposed on it. We recommend that the structures be pile supported. The piles will need to extend into the very dense gravel/coarse sand zone. We estimate pile tip elevations of 35 feet below existing grade will be required. We have considered both driven timber pile and augercast concrete piles for the building support. However, the presence of medium dense to dense sands would likely prevent driving of timber piles through the sand zone to the desired tip elevations. For this reason, the use of driven timber piles has not been presented as an option. Consolidation testing was completed on an undisturbed peat sample to evaluate primary and secondary consolidation characteristics of the peat. Using the laboratory test results, analysis indicates that the slab subjected to 300 psf loading will undergo approximately two inches of settlement within 30 days. In addition, secondary consolidation settlements of about 1.5 inches within the first year and another 1.5 inches in the next ten years could potentially occur. Therefore, we also recommend designing the building slabs as structural slabs supported on augercast piles. L Page No. 3 March 24, 1995 Project No. T-2802 As mentioned earlier, an underground drafting pit is planned at the site. However, plans for the pit were not available at the time of our study. The drafting pit will likely require pile support. In addition, dewatering will need to be considered if the pit extends below the groundwater table. We will provide specific recommendations for the design of the foundation support and construction of the pit when plans become available. i_ The following sections of this report provide detailed geotechnical recommendations for project design. 4.2 Site Preparation and Gradine 3 ' + To prepare the site for construction of the parking lots, driveways, and training area pavement, it will first be necessary to strip organic surface soils. Stripping depths of about six inches should be expected. The spoils located in the northern portion of the site should also be removed. The spoil heights vary from three to four feet. After removing the topsoil and the spoils,the exposed native soils should be proofrolled with heavy construction equipment. If the subgrade does not appear stable after proofrolling, overexcavation and replacement with structural fill may be necessary. If excavation depths are excessive, you may consider using a geotextile fabric such as Mirafi 50OX in conjunction with a structural fill to obtain a stable subgrade. Where soft subgrade soils are found, geotextile fabric beneath 18 inches of a clean granular structural fill would generally provide a stable subgrade. The stability of the subgrade and the procedures used to improve conditions, where required, should be evaluated in the field at the time of construction. Structural fill used to raise the site grades in pavement areas should consist of an inorganic free-draining granular material which meets the following minimum grading requirements: Maximum Aggregate Size 6 inches Minimum Retained on the No. 4 Sieve 25 percent Maximum Passing the No.200 Sieve* 5 percent *Based on the minus 3/4 inch fraction. Native soils or lower quality imported soil could be used in non-structural areas such as landscaping. Structural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of 95 percent of its maximum density, as determined by ASTM Test Designation D-1557 (Modified Proctor). The moisture content of the soil at the time of compaction should be within approximately two percent of its optimum, as determined by this same method. L LPage No.4 March 24, 1995 Project No. T-2802 i 4.3 Excavations All side slopes for temporary excavations for installation of utilities or other subterranean structures should be shallower or equal to 1:1 (Horizontal:Vertical) in inclination. Groundwater seepage should be expected for excavations extending five feet or more below existing grade. The contractor should be prepared to dewater where required. Groundwater seepage may also affect the stability of the excavation slope. Therefore, the n contractor should be prepared to flatten the slopes or use shoring, where required. 4.4 Pile Foundations Augercast piles are constructed using a hollow stem auger. The auger is advanced into the ground to a pre- determined tip elevation. When the bearing depth is reached, grout is injected under pressure through the stem of the auger, and the auger is slowly extracted from the ground. Reinforcing steel, as required, is then set into the completed grout column. We recommend advancing augercast piles to a minimum depth of 35 feet below existing surface grades. At this depth, a 16-inch diameter pile can be designed for an allowable axial load of 30 tons and an allowable lateral capacity of three tons. The axial capacity includes a safety factor of two and the lateral capacity includes a safety factor of 1.5. Pile settlements are expected to be less than 1/4 inch, most of which should occur as loads are applied. The above allowable capacities include negative loading due to settlement of the adjacent peats. Full single pile capacities can be used provided pile spacing is at least three pile diameters. For closer spacing, there will be a slight reduction in the allowable single pile capacity due to group effects. The amount of this reduction will depend on the number of piles in the grouping and their spacing. We should be contacted to provide this information, if required. The pressure used to inject the grout and construct the pile column will compress.the soils immediately adjacent the pile. As a result, the amount of grout needed to form the pile will be greater than the computed volume for the particular pile diameter. The contractor will need to take this into consideration in estimating grout volumes. The installation sequence should be such that piles are constructed at a minimum clear spacing of six pile diameters. Installation between these locations can be completed once the grout has achieved its initial set, usually in 24 hours. The auger should be extracted slowly and uniformly below a sufficient and consistent head of grout. If the auger is extracted too quickly,the pile may neck down and soil may collapse into the pile, reducing its structural integrity. At some point along the injection line, the piling contractor should have a pressure gauge to monitor the grout pressure during construction. A means for determining the amount of grout used in forming the pile should also be provided. Page No. 5 r March 24, 1995 Project No. T-2802 4.5 Underground Tank Walls r Earth pressure development on underground tank walls will depend on the quality of the backfill, drainage conditions, and the degree of wall restraint. For backfill soils that are properly placed and compacted as structural fill, earth pressure development can be considered as an equivalent fluid load of 50 pounds per cubic - foot (pcf). The portion of the wall below the groundwater level should be designed for an equivalent fluid pressure of 90 pcf. However, if adequate drainage is provided behind the wall, the entire height of the wall may be designed for an earth pressure of 50 pcf. i The walls and the slabs of the underground tank will behave as internally braced members and will need to be designed as such. If surcharge loading adjacent the retaining elements is anticipated, it must be included in the wall design. 4.6 Exterior Grading and Drainage Roof drains should be tightlined separately from the subsurface drains to the storm drain system. Final grades adjacent the structure must promote positive drainage away from it. We recommend using minimum drainage gradients of three percent in unpaved areas and 1.5 percent in paved areas. 4.7 Pavements If fill is used to raise parking grades, final paving should be delayed until primary settlements are complete. We anticipate a period of 30 days for a major portion of the primary consolidation settlements to be completed. In our opinion, a surface consisting of six to eight inches of crushed rock base (CRB) over a subgrade prepared as described in the Site Preparation and Grading section of this report would provide a suitable temporary travel surface for passenger vehicles and light commercial trucks. Prior to paving, the subgrade should be proofrolled to determine if any isolated soft yielding areas are present. If any soft non-yielding areas are found, they should be overexcavated to firm bearing and replaced with structural fill. We anticipate traffic use in the parking areas will be relatively light, with limited heavy axle loads applied. Accordingly, for pavement construction in light traffic areas,the following sections could be considered: 1. Two inches of asphalt concrete(AC) over four inches of CRB 2. Two inches of AC over three inches of asphalt treated base (ATB) In driveway areas used by fire trucks and in the paved training area, the section would need to be increased. Accordingly, for pavement construction in heavy traffic areas, the following sections could be considered: 1. Three inches of AC over eight inches of CRB 2. Three inches of AC over five inches of ATB ! Page No. 6 a f i March 24, 1995 Project No. T-2802 The paving materials used should conform to the Washington State Department of Transportation (WSDOT) t' specifications for Class B asphalt concrete,ATB, and CRB. i , Long-term pavement performance will depend on surface drainage. A poorly-drained pavement section will be subject to premature failure as a result of surface water infiltrating into the subgrade soils and reducing their i- supporting capability. For optimum performance, we recommend surface drainage gradients of at least two percent. Some degree of longitudinal and transverse cracking of the pavement surface should be expected over a_ time. Due to the compressible nature of the soils, some minor cracking of pavements should be expected, even after long-term settlements are complete. Regular maintenance should be planned to seal cracks when they occur. 4.8 Utilities Excavations made for utility installation should be expected to encounter groundwater seepage if they are more than a few feet deep, particularly during the winter season. Plans should be made for temporary dewatering of the utility trench excavations. All utility bedding and backfill should be completed in accordance with American Public Works Association(APWA) specifications. Soils from trench excavations are likely to be wet. These materials will not be suitable for reuse as fill if wet,thereby requiring import structural fill as described in the Site Preparation and Grading section. i4.9 Detention Ponds The plans indicate that stormwater detention ponds are planned in the eastern portion of the site. However, details pertaining to final grades in the pond area were not available at the time of our study. The recommendations given below should be considered general guidelines. We can provide specific recommendations once the plans for the ponds are finalized. Interior embankment slopes for the ponds should be no steeper than 3:1. Exterior slopes can be graded to 2:1. All grading work and fill placement should be conducted in conformance with recommendations in the Site Preparation and Grading section. Seepage may be expected during construction and would depend on the depth of excavation and when the ponds are constructed. We recommend that the groundwater observations presented in the Groundwater section of this report be considered during the design of the ponds since groundwater seepage into the pond could significantly reduce the capacity of the pond. I 5.0 ADDITIONAL SERVICES Terra Associates, Inc. should be retained to provide geotechnical services during construction of this project in order to observe compliance with design concepts, specifications, and recommendations. This will also allow design changes if subsurface conditions vary.from those anticipated prior to construction. L Page No. 7 w March 24, 1995 Project No. T-2802 We should provide the following services during construction: r Observe initial stripping of organic surface materials and spoils • Observe installation of piles L • Observe structural fill placement and conduct compaction tests on these soils • Observe installation of subsurface drainage systems, if required • Observe proofrolling of pavement subgrade areas to verify non-yielding conditions have been obtained prior to paving 6.0 LIMITATIONS The analyses and recommendations submitted in this report are based upon the data obtained from the test borings drilled at the site. The area of the test borings in relation to the site is relatively small, and variations in soil and groundwater conditions can occur. The nature and extent of these variations would not become evident until construction. If variations appear, we should re-evaluate the recommendations presented in this report prior to proceeding with construction. We prepared this report in accordance with generally accepted geotechnical engineering practices. This report is the property of Terra Associates, Inc. and is for specific application to the Fire Station #14 project. This report is intended for the exclusive use of City of Renton and their authorized representatives. No other warranty, expressed or implied, is made. Page No. 8 S r— ` ST .M Q S f • = t2,MN, ..[.�, ST 11N��,ss .:`..sue._' 3! .r 7• 1 I.: N =I 6TN qC ,p',1.5 /`• FS ;B �; 1 1\� F N S�� {. in ,�s ?/ �,•NIM S F rrn : zj 0 s = J' a ti T� ST s 127nr n� �, �I �� r�?�!s g gsL`:. �, <i ' '•< <'�<' <'g S�I 128TH ! ST 3 r mlzerN Sr rj ,.,I .•sin N lift« 110 ST _ �� it �� <'15�'29T PC <t�ST <' �.Q �x —�3 r < < W : ' I �J 1100 � NTH w.f-m j r s'<<;inry �• sr t , b N z w cc 3 3R0 ` Sr m r i1J1* S ej LANGSTDN I�R0^� e,0�`w• wno t i} a RfNrcx sj W �ravoRr ro x R a i �L� J 17�Aro afvrc« g 9� , r N AIR ORT WY rr ■ < 3 'n r tttw STS 133RD S�1rM■ S 132N0 ST ' S TIEIItI.�I!5T rn-:� i�b 5i`3 Y '3 NE ST < S TOBiN [TutaN 8 lla0 . x R Kfy ''317}I sr'S s sGr <'I I $ �-a S 1IYICTORI 7 S ii1 ST 13a �I - CrORr �T ..� as Y•� U 17Z JU d r"�'I sr a sr; n 1I 18 a°n°"X. "'ec' sB L46K NIU� 13 .M a cT H s+ wcT I a S ( 2NDaLmr t3_8TN Wy ST 'Ir S .es` c? u d >mp z7uRF E �! •Ir - t: ----r N v rl r r1l S 0 a „a�5 s 3 and S n5 T �:. / �, 1 tt �� s ` s STN• si `` d \\° s� (fit` s 10 /1 Y F 5 6TN SE. 3 E' 9 ` ♦� y$t �{g _tS g � < Pi RIDE (jMo� g i -3� - E 9� p6 aI �p :k ! '" N'. _ 'N - MRY/VILLAGE 1 v AAIIX�,y �ir'. etM:. '�• M ENTON l >E�, - � ys�� ; _ �Y[IUGE PI , 511TNST SE A05 _. toErar :SITE n I = _ -_ 20a G 6T ST 5� _ �'°° 16TH ST Y ."ns 100 6M sr .� g alp„x oPSE LA a Sim `"O ri EIS l - 1 1Sa•1 ST. N H N 1T pO �f •GI ` YrT� isf `1 I S 19T Sir Ierer $ Us Y I.A4GALRFS .-�1 � - a17N 8 PKWY a Trot �R4a 1AALX 1 - s Ev a SE TT BAKER BE 0= rt -' '"I SW 23R0 - S Z3RD p ST L--_--- 1 .� _ e "�s - --- ' 162NO< ST �' ---.r s 3EY0 [r R NTON 'Z �`` - , ,S:.z�l+ WE 164TH = - n ST '< �,lOSJD I 11100 - _ T ,��l, '� R r t teM-st4 ply sE 16sr. g TRRCK iN(/ a 1 R'C S� 'a EI66rN �Ar!,i sr �I ..r� , ST ° ! NCTIO 1 29TH 6T r s K N W 6r TE1674=i ; 25 j 30 R _ I_ _ S W 30TH _ _ -t T �! E ar 1 29 rr N se N z� _ n! $Y 33Rp •9r N 1 16e� _n tt E 8 •i I •^$�169TN IL •_i SE 169rN Nl`F?i i Sr .� i lsJ s l"7w i RM - _' SE- .1^'N Sf 170rN, < Si g o' ,''' ` e1 SY iH S'r - -' S 172KC ST SE! 1 Y0 ST SE ?:: ST 1OB00 ' ____ 634 'if tr 1 i CC �. t 3�) 91 si 1 " _ �^n Si,S II' TM i zE_t7JiD sr u g IT 8 rn_ Sr 1 57 - r v. '.:+39 ` nl r!a °?. L S SE 17SST' iN I£ y ' SE 1761 ST ST II SAkUN DR I/ RI LLA sti A 11ST ST k a Sr 1E - REFERENCE: THE THOMAS GUIDE, KING COUNTY, WASHINGTON, PAGES 655 AND 656, 1995 EDITION. TERRA VICINITY MAP FIRE STATION #14 ASSOCIATES RENTON, WASHINGTON Geotechnical Consultants Proj. No. 2802 Date '3/95 Figure 1 i • S rr rMKTY LM re+ce APPROXIMATE SCALE I i I 0 --- (macaw) B-1 B-2 APRON i L I (WIC.) LEGEND: B-3 L 1 �O I APPROXIMATE BORING LOCATION Q B-8 FISTATON BLILDGR mo W I —ern 1"Imo AMA B-5 i —� ---y (Am(•Li 1 $ I B-4— j III , II B6 L— UL 1.1.1J111.1 ��-- j at fi`KKNO sp ces B 10 (AwmLT) j 111_I iallII_LU1 c UNo AY6NUC S.W. REFERENCE SITE PLAN PROVIDED BY MCADOO,MALCOM&YOUEL,ARCHTECTS,DRAWING No.1, TERRA EXPLORATION LOCATION PLAN DATED 313/95,AND CONCEPTUAL SCHEMATIC SITE PLAN PROVIDED BY DEPARTMENT FIRE STATION#14 OF COMMUNITY SERVICES,JAMES PAXTON,AIA,DATED 2/16/95. ASSOCIATES RENTCK wASWNGTON 77 Geotechnical Consultants Proj.No.2802 Date 3/95 Figure 2 MAJOR DIVISIONS LETTER GRAPH TYPICAL DESCRIPTION T- SYMBOL SYMBOL GRAVELS Clean GW a; CD.•� Well-graded gravels, gravel-sand mixtures, little Gravels •.Q•q• or no fines. 0 U) to (less than .. . . .. Poorly-graded gravels, gravel-sand mixtures, little w n3 ai More than o GP • •• • •• 5/ fines) or no fines. O =•7 50% of coarse '• ' ' ' 04 U) a) GM is GM ' • Silty gravels, gravel-sand-silt mixtures, non- p > larger than No. Gravels �t plastic fines. Z a 4 sieve. with fines GC Clayey gravels, gravel-sand-clay mixtures, plastic Q o • • fines. c�7 o N SANDS Clean Well-graded sands, gravelly sands, little or Sands SW no fines. o > : (A coa z (less than >r <> > >< More than Poorfygraded sands or gravelly sands, little Q m 50% of coarse 5% fines) SP r: ? or no fines. O fraction is smaller than SM << Silty sands, sand silt mixtures, non plastic fines. No. 4 sieve. Sands with fines SC Clayey sands, sand-clay mixtures, plastic fines. N SILTS AND CLAYS ML Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silts with slight plasticity. 0 R O � CL Inorganic clays of low to medium plasticity, gravelly m a Liquid limit is less than 50% clays, sandy clays, silty clays, lean clays. E pw o N QL Organic silts and organic clays of low plasticity. z LO c z Inorganic silts, micaceous or diatomaceous fine L SILTS AND CLAYS MH sandy or silty soils, elastic. C7 c CO w v� z o Liquid limit is greater than 50% CH Inorganic clays of high plasticity, fat clays. E OH i Organic clays of medium to high plasticity, v' f r , organic silts. HIGHLY ORGANIC SOILS PT .. Peat and other highly organic soils. ,. ., . DEFINITION OF TERMS AND SYMBOLS J Standard Penetration 2" OUTSIDE DIAMETER SPLIT w Density Resistance in Blows/Foot I SPOON SAMPLER � Very loose 0-4 2.4" INSIDE DIAMETER RING SAMPLER Loose 410 OR SHELBY TUBE SAMPLER a Medium dense 10-30 P SAMPLER PUSHED Dense 30-50 * SAMPLE NOT RECOVERED r¢ Very dense >50 Q WATER LEVEL (DATE) WATER OBSERVATION STANDPIPE Standard Penetration C TORVANE READINGS, tsf > Density Resistance in Blows/Foot q u PENETROMETER READING, tsf Very soft 0 2 W MOISTURE, percent of dry weight Soft 2-4 pcf DRY DENSITY, pounds per cubic foot Medium stiff 48 LL LIQUID LIMIT, percent Stiff 8-16 U) Very stiff 16-32 PI PLASTIC INDEX Hard >32 N STANDARD PENETRATION, blows per foot SOIL CLASSIFICATION SYSTEM TERRA Fire Station #14 ' • ASSOCIATES Renton, Washington Geotechnical Consultants Proj. No. T-2802 Date 3/95 Figure 3 Boring No. B-1 Logged by: DRK Date: 3/1/95 Approximate Elev. 19 a) Graph/ Depth 0- (N) Water USCS Soil Description Consistency E Blows/ Content (ft.) 13 foot N FILL: Greenish gray silty SAND with gravel, moist. S Medium Dense 18 13.2 5 (Fill becomes loose below 6 feet) A A A A A A e A A A A A A A A A A A A A I Black PEAT,wet. 4 AAAAAAA 10 AAAAAAA1 AAAAAAA AAAAAAA1 AAAAAAA A A AA A 1%A 0 (Becomes brown PEAT Soft 'A A FPT�A A AA at 13.5 feet) to Stiff 11 154.6 A A e 'AAAAAAA AAAAAAA1 15 AAAAAAA A A A A A ft A e AAAAAAA AAAAAAAt AAAAAAA AAAAAAAe (Gray fat clay below 18 feet) 2 AAAAAAA 1 53.9 24.8 Black medium poorly graded —20 SAND, water-bearing. - Rp Medium Dense (Becomes silty below 23 feet) 21 24.6 ...... —25 see* 444499 Black sandy GRAVEL, water-bearing. Very Dense (Becomes gray below 28 feet) 80 7.9 T , V Boring terminated at 30 feet. &'A Groundwater at 6 feet. Drilled with bentonite slurry to stabilize the hole. Note: Upper 3 feet of loose organic spoils were dozed to provide stable access to the rig. BORING LOG TERRA FIRE STATION #14 RENTON, WASHINGTON ASSOCIATES Geotechnical Consultants Figure Proj. No. T-2802 Date 3/95 4 Boring No. B-2 Logged by: DRK Approximate Elev. 19 Date: 3/1/95 • Graph/ Depth CL (N) Water 46 E Blows/ Content USCS Soil Description Consistency CIO foot N FILL: Greenish gray silty SAND with gravel, moist. Medium Dense S M = 21 12.2 5 r FILL Gray silty gravelly SAND, SM water bearing. Loose = 7 20.9 10 A A A A A h A Brown and black fibrous peat A A A A A A A I with lens of fat clay,wet. A A AA-"h AA Stiff I 11 126.4 t-�2T I - i AAAAAAA - 15 AAAAAAII 1 k A A A A 41 25.1 Black fine to medium SAND, wet. -20 Dense 27 25.3 - 25 Gray silty sandy GRAVEL, = 94/11' 14.4 wet. • 30 GM Very Dense - T 88/11- 18.1 Boring terminated at 34.5 feet. Groundwater encountered at 6 feet. Drilled with bentonite slurry to stabilize the hole. Note: Upper 3 to 4 feet of loose wet organic spoils were dozed to provide stable areas to the rig. L BORING LOG TERM FIRE STATION #14 ASSOCIATESRENTON, WASHINGTON • Geotechnical Consultants Proj. No. T-2802 I Date 3/95T Figure 5 Boring No. B-3 Logged by: DRK Date: 2/27/95 Approximate Elev. 23 . . a)• Graph/ Depth n. (N) Water USCS Soil Description Consistency E Blows/ Content (ft.) a foot N s7 >: : .£..„5, FILL: Brown coarse SAND °•��:�.•�"� with trace silt and gravel, SP moist to wet. Dense 32 10.2 M Mottled silty sand at 4 feet FILL: Blue gray silty coarse 5 SAND with gravel,wet. w a (Block of wood at 5 feet) SM Loose T 1 8 15.3 10 nCHBluish gray organic CLAY, Medium Stiff wet. T 1 7 67.4 n A A A n A A n Brown to black fibrous PEAT, 230.0 nA nnAnAhn wet. 15 " ""I Medium Stiff n kE-13 An nnAAnA nnAnAAn 133.1 """^""1 35 23.3 Black coarse SAND, 128.4 :.` SP water-bearing. Dense Brown fat organic CLAY,wet. 20 I I I I I I 1 1 1 I I I I I I Stiff 11 OH II 1 I I I I I I IIIII 1111 T SSS ••• 1 47 23.4 IIIIII Black coarse SAND, 4 '*> water-bearing g 25 SP Dense { I • 11 34.6 �1 CL Gray sandy CLAY,wet.CH Stiff a L. (Continued on next page) BORING LOG TERRA FIRE STATION #14 •' ASSOCIATES RENTON, WASHINGTON , .. Geotechnical Consultants Proj. No. T-2802 Date 3/95 Figure 6 - ' Boring No. B-3 (Continued) Logged by: DRK Date: 2/27/95 -3 Graph/ Depth Q- (N) Water ep USCS Soil Description Consistency E Blows/ Content (ft.) a foot M G CH • • . • • Gray silty sandy GRAVEL, • • • • •0 water-bearing. T • • • • • 1 45 10.6 • GP . Dense • . . . . 35 ' :«°{ .`< >< ' Gray to black gravelly coarse I 65 16.6 SAND to coarse SAND with gravel,water-bearing. 40 {tiyi. Y � T 76 14.7 Very Dense 'tv' , `'; 45 :: 92 25.1 50 43 t BORING LOG OggTERRA FIRE STATION #14 ASSOCIATES RENTON, WASHINGTON Geotechnical Consultants Proj. No. T-2802 Date 3/95 Figure 6a a Boring No. B-4 Logged by: DRK r- Date: 2/28/95 Approximate Elev. 22 a) -. Graph/ Depth � Water Content USCS Soil Description Consistency glows a foot/ (%) FILL: Brown fine to medium SAND, moist. r. Very Dense 63 12.1 >rLSP „at'' :•:..::.., . .>; 5 .. ... ```"';0.0Gray gravelly SAND. Loose >•.<::: :s ':_:<•� •• Medium Dense <� 10 in A A A A A A A Brown peat with pieces of 13* A A^^A^^ wood,wet. AAAAAAA A A PT n I Medium Stiff 15 AA An AAAAAAA AAA n A n A n A A A = 19 167.5 Ann . ;;•.:;h<' Black medium SAND with 20 :...., ell... §:� oc layer of fat clay,wet.casional 8 to 12 inch :w'z'•;:<x? 61.4 fat clay .:M; ?`SP Dense I 49 26.3 <"NM11. .� 25 ML CL Lean clay/silt layer at 28 feet Stiff 10 29.2 27.8 "`''•`''""3` (No clay/silt layers below 30 :: . . 30 feet) Very Dense >`�����•;��' Black medium sand. 60 12.9 Boring terminated at 34 feet. Groundwater encountered at 7 feet. Drilled with bentonite slurry to stabilize the hole. *Dames and Moore sampler. (NR)-No sample recovery. L BORING LOG TERRA FIRE STATION #14 RENTON, WASHINGTON tj 909 ASSOCIATES Geotechnical Consultants Proj. No. T-2802 I Date 3/95 Figure 7 J Boring No. B-5 Logged by: DRK Date: 2/27/95 Approximate Elev. 22.5 Graph/ Depth CI" (N) Water USCS Soil Description Consistency E Blows Content (ft ) a (ft) N .......... ' FILL: Gray medium to coarse SAND,wet. < SP�k` , Medium Dense 5 Gray silty SAND with some peat,water-bearing. n ` ^ 10 A 4 18.9 nn AAA AA Loose/Soft A A A to Medium Stiff SM APT n <:AAAA AAAAA AAAA e 15 nnAAn 7 36.6 ` AAAAA AAAAAA )AAAAAA )J^^AAAAAA 4AAAAAA Black clean medium SAND, ,, water-bearing. Y Sp Loose 20 6 31.0 IT Boring terminated at 21.5 feet. Groundwater seepage at 1 foot. Groundwater encountered at 7 feet. BORING LOG TERRA FIRE STATION #14 t ASSOCIATES RENTON, WASHINGTON Ogg Geotechnical Consultants proj. No. T-2802 1 Date 3/95 Figure 8 r-s Boring No. B-6 Logged by: DRK Date: 2/27/95 Approximate Elev. 22 W ., Graph/ Depth Q' (N) Water USCS Soil Description Consistency E Blows Content (ft.) a (ft) (%) FILL: Gray medium to coarse :A.ky SAND with occasional gravel, a Fr >. wet. •c I.M. 9009.3 Dense "4K SP h .. ����;::>�:?G• (Large cobbles at 5 feet and 5 `ti: %•¢ wood fragments at 7 feet) v\vf :•y. Gray sandy SILT with thin layers of silty sand and 21 19.4 ML occasional gravel, moist. Very Stiff A A IT A A 0 10 ^A^^A A^ Brown PEAT with fragments AAAAAAAe of wood and occasional """"AAA A layers of lean clay. AnAnAA y y ^A A A A A A Medium Stiff ^ A 11 188.4 A A PT A A t0 AAAAAA Stiff AAAAAAA AAAAAA AAAAAAA 15 AAAAAAAO 7 69.7 AAAAAAA Boring terminated at 16.5 feet. No groundwater encountered. @ Blow counts may not be representative. Large gravel at the tip. >r L L BORING LOG TERRA FIRE STATION #14 ,`; ..'• ASSOCIATES RENTON, WASHINGTON Geotechnical Consultants FProj. No. T-2802 I Date 3/95 Agure 9 M Boring No. B-7 Logged by: DRK Date: 2/28/95 Approximate Elev. 21 a) Graph/ Dept h 0- (N) Water USCS Soil Description Consistency E Blows/ Content Cn foot N Tr FILL: Greenish gray silty SAND with occasional large gravel, moist to wet. SM Medium Dense 5 11 17.7 ............ AAAAAA1 AAAAAAA iAAAAAA1 Brown fibrous PEAT with A A h A A 4 A I organic fat clay changing to 10 A1%AAftA 11 84.5 brown fibrous PEAT with lens A A A A A A A A A A h A A I of fat clay, moist. AAAAAAA 15 AAAAAA? A AA Soft AA(PT]A I to AAAAAAA Stiff AAAAAA1 —15 4 AAAAAAA 232.5 A AAAAAAA ft A 11A I A A A A A A A AAAAAAA e AAAAAAAAAAAA A A AAAAAA Black medium SAND,water- 20 62 20.7 . SP . bearing. Very Dense .......... Gray SILT/lean CLAY,wet. ML —25 CL Stiff - 9 39.0 ............ Gray silty SAND followed by .s SM medium to coarse gravel, GP Dense 30 wet. 41 13.0 T Boring terminated at 31.5 feet Groundwater at 8 feet. Drilled with bentonite slurry to stabilize the hole. BORING LOG TERM FIRE STATION #14 ................................... ................................. ............... OU ASSOCIATES RENTON, WASHINGTON I - Geotechnical Consultants Proj. No. T-2802 I Date 3/95 Figure 10 Boring No. B-8 Logged by: DRK Date: 2/27/95 Approximate Elev. 20 a) Graph/ Depth CL (N) Water USCS Soil Description Consistency E Blows/ Content 0 foot N U) FILL: Greenish brown silty SAND with gravel, moist. X 1: Dense S M 36 24.5 5 Gray sandy CLAY with thick A layers of brown peat,wet. 9 29.4 AA A A A 1 — 10 A A e Medium Stiff CL A PT e - A A A A P 7 281.2 AAAAA V AAAA I AAAAA 15 AAAAAAAAAAA AAAAAA1 AAhAAAAI Black medium SAND,with 28 23.1 occasional layers of clay/ silt,water bearing. —20 (Clay/silt layer at 21.5 feet) ihM 23 22.8 Medium Dense XXXX.I.............. 25 W. 14 12.8 (Continued on next page) BORING LOG TERRA FIRE STATION #14 RENTON, WASHINGTON Egg ASSOCIATES Geotechnical Consultants Proj. No. T-2802 I Date 3/95 1 Figure 11 _ Boring No. B-8 (Continued) Logged by: DRK Date: 2/27/95 _a) Graph/ Depth a (N) Water USCS Soil Description Consistency E Blows/ Content - (ft.) a foot (%) SP ' Black medium SAND, 47 14.0 v}.yvv{{k.. ♦. water-bearing. 35 (Becomes coarser with depth) �rky C Sv T (Some charcoal at 39 feet) > .....`a 40 • SP'f, : •"' (Becomes coarse sand/gravel Dense : below 42 feet) to Very Dense >z <` 45 50 yv Boring terminated at 51.5 feet. Groundwater encountered at 14 feet. Drilled with bentonite slurry to stabilize the hole. a MW a BORING LOG TERRA ARE STATION #14 9•� �� '• • �' ASSOCIATES RENTON, WASHINGTON , .. Geotechnical Consultants Proj. No. T-2802 I Date 3/95 Figure 11a xf s Boring No. B-9 Logged by: DRK Date: 2/28/95 Approximate Elev. 23 a) -- Graph/ Depth E (N) Water USCS Soil Description Consistency Blows/ Content (ft ) a foot N FILL(Spoils): Brown silty Very Loose SAND with considerable SM organics, wet. to Medium Dense 25 11.6 FILL: Brown medium SAND, moist to wet. 5 Medium Dense w k...... FILL: Greenish gray silty Loose 11 15.4 SM SAND with gravel,wet. to Medium Dense ' 10 n A A A A A"" Brown PEAT,wet. nn AAA nnAnnnn A A A A A A AAAAAAn 12 147.3 """""" Stiff ^" PT h" to A n 15 AAAAAAA Very Stiff nnAAAA AAAAAAA """""A (Brown fat CLAY at 17.5 feet) A n A n A A A n A n A A A 22 79.9 ` ' Black fine SAND with 20 .: occasional 3 to 4 inch layers < ;,• :.� >.I.'`^:� Y of silt/clay, water-bearing. {{ . 62 SP Very Dense 25 30 SM Gray silty gravelly SAND, Medium Dense T 26 GM water bearing. Boring terminated at 3L5 eet. Groundwater at 7 feet. Drilled with bentonite slurry to stabilize the hole. Note: Upper 3 feet of loose organic spoils were dozed to provide stable access to the rig. BORING LOG r TERRA FIRE STATION #14 ASSOCIATES RENTON, WASHINGTON Non Geotechnical Consultants Fproj. No. T-2802 Date 3/95 Figure 12 Boring No. B-10 Logged by: DRK Date: 2/28/95 Approximate Elev. 21 a) Graph/ CL (N) Water USCS Soil Description Consistency Depth E Blows Content N Greenish gray silty SAND with gravel. X X %4 21 23.4 (Thin layer of organic silty Medium Dense sand at 3.5 feet) 1: -X (Becomes brown silty sand at 7.5 feet) A A A A A A A Brown to black fibrous peat, Stiff 10 22.5 6AAAARAP moist. AAAAAAA AAAAAAAAAAAAA 10 A AAAAAA 0 AAAAAAA AAAAAAO AAAAAhA ANAAAAP AjtjE h A A e 12 121.9 AAhAAAA AAAAAA e AAAAAAA AAAAAAe 15 AAAAAhA AAAAAA AAAAAA A 0 AAAAAA1 AAAAAhA A A A A A A I AAAAAAA 14 25.3 SP Black medium SAND,water-bearing..Loose to Medium Densel Boring terminated at 19 feet. Groundwater at 7 feet. BORING LOG TERRA FIRE STATION #14 ASSOCIATES RENTON, WASHINGTON Geotechnical Consultants Proj. No. T-2802 I Date 3/95 Figure 13 SIEVE ANALYSIS HYDROMETER ANALYSIS WK81=6 *I xv,I .• •. Ott.t.�t.����7t�t■�����t��.■.t�tt��/■■■■.t�t�t� �tt.t.�tt■t�tti■l\i\tit■��\�t�tttt■tom t■■t■tl•tt■fit■■■■t■�ttttlt� �t�t�t��t�t■■.��t■�� ��t��.■.t.ttt■�..■■■.t.tt�tt� �t��t�t�ttt■t■■t■�tt�. . ■t�t��tt�ttt��...�t�tt��.....t■■■ttt■■tttt■ �tt.�t�t�t�t■■t■�t����tt■tttt.tt��ttt�ttt�ttttt■t t■■.�t��t■■■■.�tt.t�■� INN! IMME �t�■t�t�t��■■t�t��t��ttt�.ttt��t��ttt�.■.�t�ttt..t■■■■.�t�tttt� , •� Ott.�t�t�tt��■.�tt��tttt►.�tttt.■ttt�ttt�ttttt�■■.�tt.�t■■■■■■�tt.t�. , �ttt■�t�t.t��■.�t���■tw.�t� ttt�ttt�ttttt�■■.�tt.ttt�■t■■■■.�t�t�. ■tttt.tt. t�■■t��■t.�ttt■■���: � ■■.��tt�■t ■.� tt� � - ■tt�ttttit.t�tt■t�t■■t■t■ttt■���t\�.tt■t�t�.■ttit.t���/■■■■t■t■t�t� �t��t�t.��■.�tt����tttt►�tttt■tt��w■.t.t��/■■■■.t.t�t� �t�t�t.t�t.��■.�tt�t■tit.�ttt��i�t�tttttIN �■■■■.t■t�tttt� , �ttt■Ott.t�tt��tt.�tt���.tttt�.tt����t�ttttt�.■.tt■tt.t■ttt� ■■■■.tt■tt.ttttt� ., MENEM • �ttt■tt■ttt■t�ttt■t■■t■t.ttt■t■��t�1l�t�t�.■t■�ttt■ttt�/■■■■t■t■t�t� �ttt■t.tt.���■.t■tit.��t�'■�t�t�■■t■t■t��t■■■■.t■ttt■t� ����t.t��■.t.�t.��tt��ll�t�ttttt.■■mm■��l■■■ WOMEN , ��t■ttt■trot■t■■t■t.ttt■t■���:��tttt■tom■■.t■tt.�t■■■■.t■tit' • • �t�t.t��t�t■■.�t�����1.1•�tttt�■■.tt■�t�t■■■■.t.t�t� . �• ���t�tt.��■.t■tit■���tt�t�t�■■t■t.t��t ■■■.t.t�� � ,, ��t.t�tt■tit■■t■�ttt■t.���■l�tt��■■.t.t��■■■■■.t■t>•ttt� ., Ott.t.t�tt■t�tt1■.t■ttt■t■���■l�tttt■MEMNO■■.t. =15■■i■■t■t■ttt■tttttt■■■.mtt. � t.Ott■ttt■t■■.t■fit■���■l\t��■■.t.tt■ • �tt.t.tt.t�ttt■�■.t.tt�t■ ��■��t�tttt■�■�■.tt■tt.�t■■■■.t■tt.tt�t .. OWNER ���W�� WOMEN omm�MEMM�m • �t��tt��■.t■ttt■t■t.tttt.�tttttttttt■tt►�,.�■■.tt■ttt■tt■t�t■■ IMMUNE ����t�ttt■�■.�t���tttt�.t�tttt■.ttt�tt�. >_■■.�t��t=■■■.�tt.tt� �tt■��tt��■ ��t.�ttttt..��ttt■.•�■■.t.t�ttttt■■t ■■■t■�tt�ttttt� ., ' t�t�tt.�tt.t�tt� ■�it■tt��■��t�tt■ttt�tttt��;��■.t.t��t■■■■■■t.■t.� t�t.tt�■■itt.t■� ■. • • • > Description Moisture r- Content Mzzi Cn z Cn SAND with trace silt SAN1 with some silt j " ww�w■■■■w.■■��wl■.iwwwl■■w■����..�.—:::��ww�w■■�■■.■.w1w..■■.■■■■■.-■■■ww■■ ��■ww■■��■�■■�■.wrw�-w��.w�■■■w■■ww■��■ww�w■.�.■■w■-■.■■■■� �-.■�i :. ■wow■■�■.�■■ww►�■w■w��www�■■w�w��w�w��w.■w■.�www�■■■■■■�i—wiww■■w JIM 90 . �w.�ww�wwlwl■.emu—���ww■ww■wwt:1 ■wiw/www■■i■.■■■■���_ • �ww�w.w■wwlwl■.mow►■mum IM w■ ��� ■ ■��_— ..■.�-.�..�...1M...■�"—�C.ii.�C:::�.........:....■mow■■■ '' w�■�■■■■■■■■w.■�■w�w�►��■■w■�■�■�.w�w■www■■w■■�■■ww■■�■■■■■■�■— ww■w • MEN MEIM in mom so MEW MES ■www wwlNo ME= so /■. no Nam soIMM an ..� ..w....�.._■- —.�.�..���.w■...IM .... .ME . �.-..�... .. w-. ■�—■■■�■■.■■■■.■.■■w. w,��■�■.■�■■-■■.■■■■-■w■ �.■—■ ■�■■■wwr■�ww■w ■. -w■i.■■..■w■■ww�-i�w���w■�ww■�.w.w■.�■■■w.■■. ■■■.-■■w■■.w • ME IN ME on ON ON ON EOWE ON no M! �C:CC�C::C��w�-��C�EM ME:pC�::CC:-CCC �■■■C■.��mom CCC�.�`CE�:::�Cw—w-�'::Em SM ON WE mom w■■■ —w.w■w..■■uww.w■�w�www■■��w�ww►�.■.w■���■■■■■■.w,.■■�� ' M BE . . r— Description . . .-. c32.5 Sandy SIEVE ANALYSIS �H VA 9 • . loan ■m 101=110moul MOM �.■.��..�.... ��.�. �... ■■ Cam■■■■■■.MOM.■.. aine NO WE momm� Boni ME 1101110010m • ■■■■�■■ '�����iiiiii���■����■�iii■1010ii�siiiiii■m■���i■ WE 101101001111 mmm 101000110 NO o�■�i■u��iii��i�������ii=i��oiiiiii��s • MI=IN 1■ .CCILU,69��om NINE .. NAIN NO C1010no 1mmWW .:: •.- ®cam � • � ' • . ® . . • •- ®� Ln z SAND with trace silt • � � Silty SAND with gravel SIEVE ANALYSIS � • � _SIZE OF OPENING IN INCHES . �• •• 1011001001 IMIMIMMMMI COME 11101 MEN �momm� MEN OEM AMMEMME Nowsmasm mom MEN mMM1MM1MmM1 ■■■ 1MMMMM1OEM Mmnmm�= Boom • 1010101001110101 MIU�� miummommon noel Man �IMMEME JIM Cam:=:C:MEN :Cm� •, . CnSAND with some gravel and silt APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING Fire Station#14 Renton,Washington We performed our field exploration between February 27 and March 3, 1995. Subsurface conditions on the site were explored by drilling ten test borings using a truck-mounted B-61 drill rig operated by T- Geoboring and Development, Inc. of Puyallup, Washington. A bulldozer was used to move the rig and clear access to the boring locations. The test borings were drilled at the approximate locations shown on Figure 2. The location of the " boring was determined by measurements and pacing from known points, property comers, and site a features shown on the Proposed Soil Boring Relocation Plan prepared by James Paxton and dated February 16, 1995. _- The field exploration was monitored continuously by a geotechnical engineer from our firm who classified the soils encountered, maintained a log of the borings, obtained representative soil samples, and observed pertinent site features. All samples were visually classified in accordance with the Unified Soil Classification System described on Figure 3. The Boring Logs are attached as Figures 4 through 13. The soil classifications shown on the boring logs represent our interpretations of the field logs and the results of visual examinations and laboratory tests performed on samples obtained from the borings. t.. Representative soil samples collected from the borings were placed in closed containers and taken to our laboratory for further examination and testing. Moisture content determinations were performed on all samples. Grain size analysis tests were performed on seven samples. We conducted a consolidation test on one sample. The results of our laboratory testing are shown on Figures 14 through 17 and the boring logs. r L t i AA 7 Project No.T-2802